PAMPA
MUNICIPALIDAD DISTRITAL DE NIEPOS
RUC: 20603047681
UNIDAD EJECUTORA
PROVIAS - MTC
MINISTERIO DE TRANSPORTES Y COMUNICACIONES
I.- GENERALIDADES
OBRA:
DISTRITO : NIEPOS
PROVINCIA : SAN MIGUEL
REGION : CAJAMARCA
Comentarios relevantes :
9. Conclusiones : Ninguna
OS GENERALES DE LA OBRA
Ninguna
Ninguna
(con IGV), 19.30%
(con IGV), 19.30%
Avance Físico
EJECUCION PRESUPUESTAL - 2018
E-4 INFORME MENSUAL DE VALORIZACIONES
(PARA CONTRATOS CUYO PRESUPUESTO BASE NO CONTIENE I.G.V.)
TOTAL 3,786,916.88 #REF! 0.00 0.00 0.00 #REF! 0.00 #REF! #REF!
SALDO POR
VALORIZAR #REF! #REF!
SALDO POR
AMORTIZAR 0.00
SALDO MCO.
PPTAL 2007
CALENDARIO DE COMPROMISOS
EJECUCION MENSUAL: Abril 2018
#REF!
0.00
APROBADO POR :
DIRECTOR DE ADMINISTRACION :
VALORIZACION N° 02
OBRA : SALDO DE OBRA "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIOÓ N PRIMARIA EN LOS CENTROS POBLADOS DE CHAQUIL, C
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
INSPECTOR : INGº CARLOS A. GOMEZ NECIOSUP - MUNICIPALIDAD DISTRITAL DE LA ESPERANZA CORRESPONDIENTE AL MES
Page 14
VALORIZACION N° 02
OBRA : SALDO DE OBRA "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIOÓ N PRIMARIA EN LOS CENTROS POBLADOS DE CHAQUIL, C
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
INSPECTOR : INGº CARLOS A. GOMEZ NECIOSUP - MUNICIPALIDAD DISTRITAL DE LA ESPERANZA CORRESPONDIENTE AL MES
Page 15
VALORIZACION N° 02
OBRA : SALDO DE OBRA "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIOÓ N PRIMARIA EN LOS CENTROS POBLADOS DE CHAQUIL, C
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
INSPECTOR : INGº CARLOS A. GOMEZ NECIOSUP - MUNICIPALIDAD DISTRITAL DE LA ESPERANZA CORRESPONDIENTE AL MES
Page 16
VALORIZACION N° 02
N LOS CENTROS POBLADOS DE CHAQUIL, CHUMBIOCSHA Y MARCOPAMPA, DISTRITO DE LA ESPERANZA, SANTA CRUZ - CAJAMARCA"- LOCALIDAD DE CHAQUI
Page 17
VALORIZACION N° 02
N LOS CENTROS POBLADOS DE CHAQUIL, CHUMBIOCSHA Y MARCOPAMPA, DISTRITO DE LA ESPERANZA, SANTA CRUZ - CAJAMARCA"- LOCALIDAD DE CHAQUI
0.00
#REF! 264.87 16,342.48 #REF! #REF! #REF! #REF!
0.00
#REF! 0.00 #REF! #REF! #REF! #REF!
#REF! 0.00 #REF! #REF! #REF! #REF!
#REF! 0.00 #REF! #REF! #REF! #REF!
#REF! 0.00 #REF! #REF! #REF! #REF!
0.00
#REF! 0.00 #REF! #REF! #REF! #REF!
0.00
#REF! 0.00 #REF! #REF! #REF! #REF!
#REF! 0.00 #REF! #REF! #REF! #REF!
0.00
#REF! 0.00 #REF! #REF! #REF! #REF!
#REF! 0.00 #REF! #REF! #REF! #REF!
#REF! 0.00 #REF! #REF! #REF! #REF!
0.00
#REF! 0.00 #REF! #REF! #REF! #REF!
#REF! 0.00 #REF! #REF! #REF! #REF!
0.00
#REF! 0.00 #REF! #REF! #REF! #REF!
Page 18
VALORIZACION N° 02
N LOS CENTROS POBLADOS DE CHAQUIL, CHUMBIOCSHA Y MARCOPAMPA, DISTRITO DE LA ESPERANZA, SANTA CRUZ - CAJAMARCA"- LOCALIDAD DE CHAQUI
Page 19
VALORIZACION N° 02
Valoriz. S/. %
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Page 20
VALORIZACION N° 02
Valoriz. S/. %
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Page 21
VALORIZACION N° 02
Valoriz. S/. %
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
Page 22
#REF!
OBRA 0
PROPIETARIO : MINISTERIO DE EDUCACIOÓ N
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
SUPERVISOR 0
PRESUPUESTO BASE ANTER
PARTIDA DESCRIPCIÓN
Unid. Metrado P. U. S/. Presup. Metrado
5.00 Instalaciones Eléctricas
5.01 Salida para Alumbrado, Tomacorrientes, Fuerza y Señales Debiles
05.01.01 CONEXION A RED EXISTENTE Und 2.00 65.44 130.88
05.01.02 SALIDA DE TECHO (CENTRO DE LUZ) Pto 83.00 73.53 6,102.99 68.00
05.01.03 SALIDA PARA BRAQUETE (PARED) Pto 4.00 68.02 272.08 4.00
05.01.04 INTERRUPTOR DE 01 GOLPE Pto 14.00 12.49 174.86 8.00
05.01.05 INTERRUPTOR DE 02 GOLPES Pto 6.00 15.71 94.26 4.00
05.01.06 INTERRUPTOR DE CONMUTACION O DE TRES VIAS Pto 2.00 17.14 34.28 0
05.01.07 SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA PARA LAMPARA DE EMERGENCIA Pto 8.00 85.26 682.08 8
05.01.08 SALIDA TOMACORRIENTE MONOFASICA DOBLE CON PUESTA A TIERRA DE 15 a 0.40m Pto 40.00 91.70 3,668.00 40.00
05.01.09 SALIDA TOMACORRIENTE MONOFASICA DOBLE CON PUESTA A TIERRA DE 15 EN PISO Und 8.00 87.25 698 8.00
05.01.10 POZO PUESTA A TIERRA-2004 P-1 ( R<15 Ohms) Und 2.00 660.98 1,321.96 2.00
5.02 Salida para comunicaciones y Señales
05.02.01 SALIDA PARA TIMBRE Pto 1.00 84.34 84.34 2.00
05.02.02 SALIDA PARA INTERNET Pto 25.00 235.97 5899.25 40.00
05.02.03 SALIDA DETELEFONO y/o INTERCOMUNICADORES Pto 1.00 76.70 76.7 2.00
5.03 Canalización y/o Tuberías
05.03.01 EXCAVACION DE ZANJAS PARA REDES EXT. ELECT. m3 69.79 24.86 1734.98 30.00
05.03.02 RELLENO MANUAL CON MATERIAL PROPIO (REDES EXT.ELEC). m3 69.79 20.72 1446.05 30.00
05.03.03 TUBERIA PVC-P 40mm m 136.85 18.57 2541.30 80.00
05.03.04 TUBERIA PVC-P 25mm m 126.55 12.23 1547.71 80.00
05.03.05 TUBERIA PVC-P 20mm m 56.61 9.77 553.08 56.61
5.04 Cajas
05.04.01 CAJA DE PASE 100X55X50 Und 13.00 70.50 916.5 8.00
5.05 Tableros y cuchillas (Llaves)
#REF!
OBRA 0
PROPIETARIO : MINISTERIO DE EDUCACIOÓ N
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
SUPERVISOR 0
PRESUPUESTO BASE ANTER
PARTIDA DESCRIPCIÓN
Unid. Metrado P. U. S/. Presup. Metrado
05.05.01 TABLERO GENERAL 1-2x100A;1-2x50A;6-2x32A,2-2X20A Und 1.00 1144.62 1144.62 1.00
05.05.02 TAB. AUT. 1-2x32A;1-2x25A;3-2x16A,1-1DF30mA Und 1.00 499.06 499.06 1.00
05.05.03 TAB. AUT. 1-2x32A;1-2x25A;2-2x16A,1-1DF30mA Und 4.00 465.24 1860.96 4.00
05.05.04 TAB. AUT. 1-2x50A; 2-2x20A,2-1DF-2X25-30mA Und 1.00 568.33 568.33 1.00
05.05.05 TAB. AUT. 1-2x25A;1-2x20A;1-2x16A Und 1.00 342.16 342.16 1.00
05.05.06 TAB. AUT. 1-2x32A; 1-2x25A;2-2x16A Und 1.00 344.14 344.14 1.00
05.05.07 TAB.DE CONTROL MANDO DE BOMBA Und 1.00 509.64 509.64 1.00
05.05.08 TAB. AUT. 1x32A; 3-2x16A Und 1.00 334.58 334.58 1.00
5.06 Conexiones a Red Externa y Medidores
05.06.01 ALIM. CONDUCTOR N2XH (2-1x10+1X10(T)) mm2 m 93.81 16.63 1560.06 60.00
05.06.02 ALIM. CONDUCTOR N2XH (2-1x6+1X6(T)) mm2 m 144.56 11.72 1694.24 100.00
05.06.03 ALIM. CONDUCTORN2XH (1-4+1X4(N)+1X4(T)) mm2 m 94.10 9.37 881.717 60.00
05.06.04 CABLE COBRE DESNUDO 1x16mm2, y 20mm PVC-P m 10.00 12.97 129.7 10.00
5.07 Artefactos
05.07.01 ARTEF.FLUORESCENTE 2/36W (SIM.BE JOSFEL) P/ADOSAR Und 55.00 102.36 5629.8 30.00
05.07.02 ARTEF.FLUORESCENTE 2/18W (SIM.BE JOSFEL) P/ADOSAR Und 48.00 97.55 4682.4 30.00
05.07.03 ART.T/PLASTICO CUADRADO C/LAMP. FLUORESC. CIRC. 32W Und 4.00 72.26 289.04 2.00
05.07.04 BRAQUET REFLECTOR C/2 LAMPARAS AHORADORAS DE 18 W Und 3.00 107.22 321.66 1.00
05.07.05 LAMPARA DE EMERGENCIA OPALUX 2 FAROS 35 W/GIRO 180º-BAT. 6V- 4 AMP-220V Und 8.00 89.11 712.88 4.00
05.07.06 ARTEFACTO REFLECTRO AEREO 400W Und 8.00 366.52 2932.16 0.00
05.07.07 BUZONETA Und 3.00 186.11 558.33 0.00
05.07.08 POSTES DE FE° DE 80 mm x 4.0 m Und 4.00 276.68 1106.72 3.00
05.07.09 CAMPANILLA DE TIMBRE DE 2" CON TRANF 220/12V Und 1.00 64.05 64.05 0.00
COSTO DIRECTO TOTAL 54,145.55
GASTOS GENERALES 8.00% 4,331.64
#REF!
OBRA 0
PROPIETARIO : MINISTERIO DE EDUCACIOÓ N
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
SUPERVISOR 0
PRESUPUESTO BASE ANTER
PARTIDA DESCRIPCIÓN
Unid. Metrado P. U. S/. Presup. Metrado
UTILIDAD 7.00% 3,790.19
SUB TOTAL 62,267.38
#REF!
: SALDO DE OBRA "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIOÓ N PRIMARIA EN LOS CENTROS POBLADOS DE
OBRA CHAQUIL, CHUMBIOCSHA Y MARCOPAMPA, DISTRITO DE LA ESPERANZA, SANTA CRUZ - CAJAMARCA"- LOCALIDAD DE
CHAQUIL
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
INSPECTOR : INGº CARLOS A. GOMEZ NECIOSUP - MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
ACTUAL
PARTIDA DESCRIPCIÓN
Unid. Metrado
001 ESTRUCTURAS
01 TRABAJOS PRELIMINARES
01.01 LIMPIEZA DE TERRENO MANUAL m2 1,126.00
01.02 TRAZO Y REPLANTEO m2 1,279.00
01.03 CARTEL DE IDENTIFICACION DE LA OBRA DE 5.40M X 3.60M. Unid. 1.00
01.04 MOVILIZACION DE EQUIPO Y HERRAMIENTAS est. 1.00
01.05 ALMACEN PARA LA OBRA est. 1.00
02 MOVIMIENTO DE TIERRAS
02.01 CONFORMACION DE TERRAPLEN m3 2,790.63
02.02 CORTE DE TERRENO MANUAL PARA LOSA DEPORTIVA m3 144.00
02.03 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS m3 70.35
02.04 EXCAVACION MANUAL PARA ZAPATAS m3 104.41
02.05 EXCAVACION MANUAL PARA VEREDAS + SARDINEL m3 22.74
02.06 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 91.35
02.07 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQUETE m3 300.17
02.08 NIVELACION INTERIOR APISONADO MANUAL m2 0.00
02.09 AFIRMADO E=4" PARA PISOS INTERIORES Y EXTERIORES m2 625.45
02.10 EXCAVACION MANUAL P/CUNETAS m3 24.20
03 OBRAS DE CONCRETO SIMPLE
03.01 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO HORMIGON m2 86.75
03.03 CONCRETO CEM-HOR 1:8 + 25% P.M. (PARA SOBRECIMIENTOS Y MURO) m3 0.00
03.05 DADO DE CONCRETO F'C=175 KG/CM2 P/PROTECCION TUB. EVACUACION AGUAS DE LLUVIA m3 0.00
: SALDO DE OBRA "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIOÓ N PRIMARIA EN LOS CENTROS POBLADOS DE
OBRA CHAQUIL, CHUMBIOCSHA Y MARCOPAMPA, DISTRITO DE LA ESPERANZA, SANTA CRUZ - CAJAMARCA"- LOCALIDAD DE
CHAQUIL
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
INSPECTOR : INGº CARLOS A. GOMEZ NECIOSUP - MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
ACTUAL
PARTIDA DESCRIPCIÓN
Unid. Metrado
04.01.03 ACERO FY=4200 KG/CM2, GRADO 60 kg 1,714.00
04.02 ZAPATAS
04.02.01 CONCRETO F'C= 210 KG/CM2. EN ZAPATAS m3 12.36
04.02.02 ACERO FY=4200 KG/CM2, GRADO 60 kg 1,116.00
04.03 COLUMNAS
04.03.01 CONCRETO F'C= 210 KG/CM2. P/COLUMNAS m3 0.00
04.03.02 ENCOFRADO Y DESENCOFRADO P/COLUMNAS m2 0.00
04.03.03 ACERO FY=4200 KG/CM2, GRADO 60 kg 3,020.32
04.04 VIGAS
04.04.01 CONCRETO F'C= 210 KG/CM2. PARA VIGAS m3 0.00
04.04.02 ENCOFRADO Y DESENCOFRADO P/VIGAS m2 0.00
04.04.03 ACERO FY=4200 KG/CM2 EN VIGAS kg 0.00
04.05 LOSAS ALIGERADAS
04.05.01 CONCRETO F'C= 210 KG/CM2. P/LOSAS ALIGERADAS m3 0.00
04.05.02 ENCOFRADO Y DESENCOFRADO P/LOSAS ALIGERADAS m2 0.00
04.05.03 ACERO FY=4200 KG/CM2, GRADO 60 kg 0.00
04.05.04 LADRILLO HUECO DE ARCILLA 15X30X30 CM PARA TECHO ALIGERADO und 0.00
: SALDO DE OBRA "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIOÓ N PRIMARIA EN LOS CENTROS POBLADOS DE
OBRA CHAQUIL, CHUMBIOCSHA Y MARCOPAMPA, DISTRITO DE LA ESPERANZA, SANTA CRUZ - CAJAMARCA"- LOCALIDAD DE
CHAQUIL
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
INSPECTOR : INGº CARLOS A. GOMEZ NECIOSUP - MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
ACTUAL
PARTIDA DESCRIPCIÓN
Unid. Metrado
10 CONTRAZOCALOS
: SALDO DE OBRA "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIOÓ N PRIMARIA EN LOS CENTROS POBLADOS DE
OBRA CHAQUIL, CHUMBIOCSHA Y MARCOPAMPA, DISTRITO DE LA ESPERANZA, SANTA CRUZ - CAJAMARCA"- LOCALIDAD DE
CHAQUIL
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
INSPECTOR : INGº CARLOS A. GOMEZ NECIOSUP - MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
ACTUAL
PARTIDA DESCRIPCIÓN
Unid. Metrado
18.01 MITIGACION DE IMPACTO AMBIENTAL glb
003 CISTERNA Y TANQUE ELEVADO
19 TRABAJOS PRELIMINARES
19.01 LIMPIEZA DE TERRENO MANUAL m2
19.02 TRAZO Y REPLANTEO m2
20 MOVIMIENTO DE TIERRAS
20.01 EXCAVACION PARA ZAPATAS DE 1.00 MT A 1.40 MT DE PROFUNDIDAD m3
20.02 RELLENO CON MATERIAL PROPIO m3
20.03 ACARREO DE MATERIAL EXCEDENTE P/ELIMINACION D PROM=50M m3
20.04 REFINE Y NIVELACION EN TERRENO NORMAL m2
21 OBRAS DE CONCRETO SIMPLE
21.01 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2
22 OBRAS DE CONCRETO ARMADO
22.01 ZAPATAS
22.01.01 CONCRETO F'C= 210 KG/CM2. EN ZAPATAS m3
22.01.02 ACERO EN ZAPATAS kg
22.02 TANQUE ELEVADO
22.02.01 CONCRETO F'C= 210 KG/CM2. PARA TANQUE ELEVADO m3
22.02.02 ENCOFRADO Y DESENCOFRADO EN TANQUE ELEVADO m2
22.02.03 ACERO FY= 4200 KG/CM2, GRADO 60 kg
22.03 CISTERNA
22.03.01 CONCRETO F'C= 210 KG/CM2. PARA CISTERNA m3
22.03.02 ENCOFRADO Y DESENCOFRADO EN CISTERNA m2
22.03.03 ACERO FY= 4200 KG/CM2, GRADO 60 kg
22.04 COLUMNAS
22.04.01 CONCRETO F'C= 210 KG/CM2. EN COLUMNAS m3
22.04.02 ENCOFRADO Y DESENCOFRADO P/COLUMNAS m2
22.04.03 ACERO FY= 4200 KG/CM2, GRADO 60 kg
22.05 VIGAS
22.05.01 CONCRETO F'C= 210 KG/CM2. PARA VIGAS m3
22.05.02 ENCOFRADO Y DESENCOFRADO P/VIGAS m2
22.05.03 ACERO FY= 4200 KG/CM2, GRADO 60 kg
22.06 LOSA MACIZA
22.06.01 CONCRETO F'C=210 KG/CM2 PARA LOSAS MACIZAS m3
22.06.02 ENCOFRADO Y DESENCOFRADO EN LOSA MACIZA m2
22.06.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS MACIZAS kg
22.07 ALBANÑ ILERIA
22.07.01 MURO DE LADRILLO KK DE ARCILLA DE SOGA MEZCLA 1:4 m2
22.08 REVOQUES ENLUCIDOS Y MOLDURAS
METRADOS EJECUTADOS VALORIZACION N° 01 - JUNIO DEL 2016
: SALDO DE OBRA "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIOÓ N PRIMARIA EN LOS CENTROS POBLADOS DE
OBRA CHAQUIL, CHUMBIOCSHA Y MARCOPAMPA, DISTRITO DE LA ESPERANZA, SANTA CRUZ - CAJAMARCA"- LOCALIDAD DE
CHAQUIL
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
INSPECTOR : INGº CARLOS A. GOMEZ NECIOSUP - MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
ACTUAL
PARTIDA DESCRIPCIÓN
Unid. Metrado
22.08.01 TARRAJEO EN COLUMNAS - ARISTAS m2
22.08.02 TARRAJEO EN VIGAS - ARISTAS m2
TARRAJEO EN MUROS INTERIORES Y EXTERIORES 1:5 x 1.5 CM. (INC. COLUMNAS Y VIGA
22.08.03 PERIMETRAL) m2
: SALDO DE OBRA "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIOÓ N PRIMARIA EN LOS CENTROS POBLADOS DE
OBRA CHAQUIL, CHUMBIOCSHA Y MARCOPAMPA, DISTRITO DE LA ESPERANZA, SANTA CRUZ - CAJAMARCA"- LOCALIDAD DE
CHAQUIL
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
INSPECTOR : INGº CARLOS A. GOMEZ NECIOSUP - MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
ACTUAL
PARTIDA DESCRIPCIÓN
Unid. Metrado
: SALDO DE OBRA "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIOÓ N PRIMARIA EN LOS CENTROS POBLADOS DE
OBRA CHAQUIL, CHUMBIOCSHA Y MARCOPAMPA, DISTRITO DE LA ESPERANZA, SANTA CRUZ - CAJAMARCA"- LOCALIDAD DE
CHAQUIL
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
INSPECTOR : INGº CARLOS A. GOMEZ NECIOSUP - MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
ACTUAL
PARTIDA DESCRIPCIÓN
Unid. Metrado
38.03 SALIDA DE DESAGUE EN PVC DE 4" pto
38.04 SALIDAS DE PVC PARA VENTILACIÓN DE 2" pto
METRADOS EJECUTADOS VALORIZACION N° 01 - JUNIO DEL 2016
: SALDO DE OBRA "MEJORAMIENTO DE LOS SERVICIOS DE EDUCACIOÓ N PRIMARIA EN LOS CENTROS POBLADOS DE
OBRA CHAQUIL, CHUMBIOCSHA Y MARCOPAMPA, DISTRITO DE LA ESPERANZA, SANTA CRUZ - CAJAMARCA"- LOCALIDAD DE
CHAQUIL
PROPIETARIO : MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
INSPECTOR : INGº CARLOS A. GOMEZ NECIOSUP - MUNICIPALIDAD DISTRITAL DE LA ESPERANZA
ACTUAL
PARTIDA DESCRIPCIÓN
Unid. Metrado
38.05 REGISTRO DE BRONCE 4" und
38.06 REGISTRO DE BRONCE 2", PROVISION Y COLOCACION und
38.07 SOMBRERO VENTILACION PVC DE 2" pza
38.08 SUMIDERO DE 2" pza
38.09 CAJA DE REGISTRO DE DESAGUE 12" X 12" TAPA F°G° pza
38.10 ACCESORIOS DE DESAGUE glb
39 APARATOS Y ACCESORIOS SANITARIOS
39.01 INODORO TANQUE BAJO BLANCO und
39.02 LAVATORIO SONNET 19X10 BLANCO COMERCIAL (SIN COLOCACION) pza
39.03 VALVULA COMPUERTA DE BRONCE DE 1/2" und
39.04 PAPELERA DE LOSA Y BARRA PLASTICA, COLOR BLANCO und
39.05 COLOCACION DE APARATOS SANITARIOS pza
39.06 LAVADERO CORRIDO DE CONCRETO und
39.07 URINARIOS CORRIDO DE CONCRETO und
40 SISTEMA DE AGUAS DE LLUVIAS
40.01 CANALETA DE FIERRO GALVANIZADO P/EVAC. DE AGUAS DE LLUVIA m
40.02 MONTAJE PARA DRENAJE PLUVIAL CON TUBERIA PVC 4" m
006 TANQUE SEPTICO Y PERCOLADOR
41.01 LIMPIEZA DE TERRENO MANUAL m2
41.02 TRAZO Y REPLANTEO m2
41.03 EXCAVACION MANUAL DE ZANJAS m3
41.04 ELIMINACION DE MATERIAL EXCEDENTE DIST. 30M m3
41.05 NIVELACION INTERIOR APISONADO MANUAL m2
41.06 SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2
41.07 CONCRETO F'C=175 KG/CM2 PARA MUROS REFORZADOS m3
41.08 ACERO EN MUROS REFORZADOS GRADO 60 kg
41.09 ENCOFRADO Y DESENCOF MUROS REFORZADOS m2
41.10 TARRAJEO CON IMPERMEABILIZANTES m2
41.11 TARRAJEO EN EXTERIORES (MORTERO 1:5) m2
41.12 ACCESORIOS DE DESAGUE glb
42 POZO PERCOLADOR
42.01 LIMPIEZA DE TERRENO MANUAL m2
42.02 TRAZO Y REPLANTEO m2
42.03 EXCAVACION MANUAL PARA CIMIENTOS - ZAPATAS m3
42.04 ACARREO DE MATERIAL EXCEDENTE P/ELIMINACION D PROM=50M m3
42.05 CONCRETO F'C=175 KG/CM2 PARA MUROS REFORZADOS m3
42.06 ACERO EN MUROS REFORZADOS GRADO 60 kg
42.07 ENCOFRADO Y DESENCOF MUROS REFORZADOS m2
42.08 MUROS DE LADRILLO KK DE ARCILLA DE CABEZA C/M 1:4 X 1.5CM. m2
42.09 ACCESORIOS DE DESAGUE glb
VALORIZACION N° 01 - NOVIEMBRE DEL 2016
OBRA
"MEJORAMIENTO DE LA TROCHA CARROZABLE DEL TRAMO DE NIEPOS - LA PAMPA - LA TIENDA Y EL ALTO, DISTRITO DE
NIEPOS -SAN MIGUEL-CAJAMARCA”
PROPIETARIO #REF!
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. JORGE ALFONSO JULIAN CASTRO
SUPERVISOR : ING. HERNANDO SANTIAGO TAPIA GAYOSO RRESPONDIENTE AL MES
METRADOS EJECUTADOS
PARTIDA DESCRIPCIÓN
Unid. Metrado Valoriz.S/. %
01 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD
1.01 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES
01.01.01 CONSTRUCCIONES PROVISIONALES
01.01.01.01 HABILITACIÓN DE PATIO DE MÁQUINAS M3 100.00 599.00 100.00%
01.01.01.02 CARTEL DE IDENTIFICACIÓN DE OBRA DE 3.60x2.40m UND 1.00 942.77 100.00%
01.01.02 MOVILIZACIÓN DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS
01.01.02.01 MOVILIZACIÓN DE CAMPAMENTO, MAQUINARIA Y HERRAMIENTAS GLB 0.50 21,766.81 50.00%
01.01.03 TRABAJOS PRELIMINARES
01.01.03.01 DESBROCE Y LIMPIEZA DE TERRENO HA 0.93 1,997.81 70.00%
01.01.03.02 TRAZO, REPLANTEO Y GEOREFERENCIACION KM 2.54 1,310.67 80.00%
01.01.03.03 TRAZO Y REPLANTEO PRELIMINAR DE OBRAS DE ARTE M2 0.00 0.00%
1.02 SEGURIDAD Y SALUD
01.02.01 EQUIPO DE PROTECCION INDIVIDUAL KIT 20.00 2,762.80 100.00%
01.02.02 EQUIPO DE PROTECCION COLECTIVA KIT 1.00 6,769.26 100.00%
01.02.03 SEÑALIZACIÓN TEMPORAL DE SEGURIDAD EST 0.50 1,244.55 50.00%
1.03 MOVIMIENTO DE TIERRAS
01.03.01 CORTE DE MATERIAL SUELTO CON MAQUINARIA. M3 14,252.53 93,354.05 90.00%
01.03.02 RELLENO CON MATERIAL PROPIO SELECIONADO M3 22,359.29 119,622.22 90.00%
01.03.03 PERFILADO Y COMPACTADO DE SUB RASANTE CON MATERIAL PROPIO REUSABLE M2 12,855.86 25,968.84 90.00%
01.03.04 ELIMINACIÓN DE MATERIAL EXCEDENTE Dprom. = 3 km M3 5,224.60 49,894.92 90.00%
1.04 PAVIMENTO
02.01.01.02 RELLENO CON MATERIAL PROPIO COMP. DE ENTRADA Y SALIDA DE ALCANTARILLA. M3 0.00 0.00%
02.01.01.03 RELLENO DE MATERIAL DE PRESTAMO, COMPACTADO PARA ASIENTO DE TMC M3 0.00 0.00%
02.01.01.04 ELIMINACION DE MATERIAL EXCEDENTE M3 0.00 0.00%
VALORIZACION N° 01 - NOVIEMBRE DEL 2016
OBRA
"MEJORAMIENTO DE LA TROCHA CARROZABLE DEL TRAMO DE NIEPOS - LA PAMPA - LA TIENDA Y EL ALTO, DISTRITO DE
NIEPOS -SAN MIGUEL-CAJAMARCA”
PROPIETARIO #REF!
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. JORGE ALFONSO JULIAN CASTRO
SUPERVISOR : ING. HERNANDO SANTIAGO TAPIA GAYOSO RRESPONDIENTE AL MES
METRADOS EJECUTADOS
PARTIDA DESCRIPCIÓN
Unid. Metrado Valoriz.S/. %
02.01.02 OBRAS DE CONCRETO SIMPLE
02.01.02.01 MAMPOSTERIA DE PIEDRA F'c = 175 kg/cm2 + 25 % PM (MAX. 6") PARA M2 0.00 0.00%
EMBOQUILLADO Y ALIVIADERO
CONCRETO SIMPLE F'c = 175 kg/cm2 + 25 % PM (MAX. 4") PARA ESTRUCTURAS DE
02.01.02.02 ENTRADA M3 0.00 0.00%
Y SALIDA DE ALCANTARILLA
02.01.02.03 ENCOFRADO Y DESENCOFRADO NORMAL CON MADERA TORNILLO M2 0.00 0.00%
02.01.03 ALCANTARILLAS TMC
02.01.03.01 ALCANTARILLA METÁLICA CIRCULAR TMC Ø = 36" M 0.00 0.00%
02.01.04 REBOQUES Y ENLUCIDOS
02.01.04.01 TARRAJEO DE ESTRUCTURAS DE ENTRADA Y SALIDA DE ALCANTARILLAS M2 0.00 0.00%
02.01.05 PINTURA
02.01.05.01 PINTURA REFLECTIVA PARA ALCANTARILLAS M2 0.00 0.00%
2.02 BADENES
02.02.01 MOVIMIENTO DE TIERRAS
02.02.01.01 EXCAVACIÓN DE ZANJAS C/MAQ. EN TERRENO SEMI ROCOSO PARA ESTRUCTURAS DE M3 0.00 0.00%
BADENES
02.02.01.02 RELLENO CON MATERIAL PROPIO SELECIONADO M3 0.00 0.00%
02.02.01.03 RELLENO CON MATERIAL GRANULAR Y COMPACTADO P/ BADEN M2 0.00 0.00%
02.02.01.04 ELIMINACION DE MATERIAL EXCEDENTE Dprom. = 3 km M3 0.00 0.00%
02.02.02 OBRAS DE CONCRETO SIMPLE
02.02.02.01 MAMPOSTERIA DE PIEDRA C/ F'c = 175 kg/cm2 PARA EMBOQUILLADO DE ENTRADA Y M2 0.00 0.00%
SALIDA
02.02.02.02 CONCRETO SIMPLE F'c = 175 kg/cm2 P/LOSA BADEN M3 0.00 0.00%
02.02.03 VARIOS
02.02.03.01 SELLADO DE JUNTAS TRANSVERSALES DE BADENES ML 0.00 0.00%
02.02.03.02 DESVIO DE CAUSE P/CONSTRUCCION BADEN GLB 0.00 0.00%
3 CUNETAS
3.01 TRAZO Y REPLANTEO CUNETAS KM 0.00 0.00%
3.02 CONFORMACIÓN DE CUNETAS LONGITUDINALES EN MATERIAL SUELTO S/REVESTIR M 0.00 0.00%
4 SEÑALIZACION
4.01 SEÑALES PREVENTIVAS UND 0.00 0.00%
4.02 SEÑALES INFORMATIVAS UND 0.00 0.00%
4.03 SEÑALES REGLAMENTARIAS UND 0.00 0.00%
4.04 POSTES KILOMETRICOS UND 0.00 0.00%
5 IMPACTO AMBIENTAL
5.01 REVEGETACIÓN HA 0.00 0.00%
6 FLETE
6.01 FLETE RURAL GLB 0.50 9,661.01 50.00%
CERTIFICADO DE PAGO - VALORIZACION DE OBRA
Ubicación : Niepos - La Pampa - La Tienda - El Alto - Distrito de Niepos - Provincia de San Miguel - Región Cajamarca
Tipo de Proceso : LICITACION PUBLICA N° 003-2017-MDN/CS
Contratista : CONSORCIO VIAL LA PAMPA
Monto del Contrato(S/.) : 4,468,561.92 con IGV
Monto del Contrato (S/.) : 3,786,916.88 con IGV
Factor de Relacion : 1.00000
Plazo de Ejecucion : 150 dias calendarios
Residente de Obra : ING. CESAR AUGUSTO TIPARRA DE LOS SANTOS
Supervisor de Obra : ING. MANUEL ENRIQUE GONZALES URIARTE
Inicio Contractual : 4/25/2018
Termino de Obra Contractual : 9/21/2018
Mes Valorizado : DEL 25 AL 30 DE ABRIL DEL 2018
A: VALORIZACION CONTRACTUAL
VALORIZACION DE OBRA N° 01 3,786,916.88
C: REAJUSTES
REINTEGRO
TOTAL (D)
B: DEDUCCION
DEDUCCION QUE NO CORRESPONDE POR ADELANTO DIRECTO
TOTAL (E)
CIP 45582
CIP 39191
730,936.09
730,936.09
131,568.50
862,504.59
862,504.59
VALORIZACION DE AVANCE DE OBRA N° 01 - MES DE ABRIL DEL 2018
MEJORAMIENTO DE LA TROCHA CARROZABLE DEL TRAMO DE NIEPOS-LA PAMPA-LA TIENDA Y EL ALTO, DISTRITO DE NIEPOS-SAN MIGUEL-CAJAMARCA
PRESUPUESTO DE OBRA ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/. METRADO PARCIAL S/. % METRADO PARCIAL S/. % METRADO PARCIAL S/. % METRADO PARCIAL S/. %
01 OBRAS PROVISIONALES
01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA glb 1.00 56,998.29 56,998.29 0.00 0.00% 0.45 25,694.13 45.08% 0.45 25694.13 45.08% 0.55 31304.16 54.92%
01.02 CAMPAMENTO PROVISIONAL DE OBRA m2 80.00 156.68 12,534.40 0.00 0.00% 80.00 12,534.40 100.00% 80.00 12534.40 100.00% 0.00 0.00 0.00%
01.03 CARTEL DE IDENTIFICACION DE LA OBRA DE 4.80m x 2.40m und 1.00 1,854.43 1,854.43 0.00 0.00% 1.00 1,854.43 100.00% 1.00 1854.43 100.00% 0.00 0.00 0.00%
02 OBRAS PRELIMINARES
02.01 TRAZO Y REPLANTEO km 10.61 1,340.01 14,217.51 0.00 0.00% 7.00 9,380.07 65.98% 7.00 9380.07 65.98% 3.61 4837.44 34.02%
02.02 DESBROCE Y LIMPIEZA ha 5.92 3.10 18.35 0.00 0.00% 3.45 10.70 58.31% 3.45 10.70 58.31% 2.47 7.65 41.69%
03 EXPLANACIONES
03.01 CORTE DE MATERIAL SUELTO CON MAQUINARIA m3 28,437.08 5.81 165,219.43 0.00 0.00% 9,550.91 55,490.79 33.59% 9550.91 55490.79 33.59% 18886.17 109728.64 66.41%
03.02 CORTE ROCA SUELTA (PERF. Y DISP.) CON MAQUINARIA m3 1,340.13 17.31 23,197.65 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1340.13 23197.65 100.00%
03.03 RELLENO CON MATERIAL PROPIO m3 2,065.07 7.66 15,818.44 0.00 0.00% 993.35 7,609.06 48.10% 993.35 7609.06 48.10% 1071.72 8209.38 51.90%
03.04 MEJORAMIENTO DE SUELO A NIVEL DE SUBRASANTE (OVER E=0.40M) m3 1,117.60 94.87 106,026.71 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1117.60 106026.71 100.00%
03.05 RELLENO CON MATERIAL PROPIO TRANSPORTADO m3 29.73 8.88 264.00 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 29.73 264.00 100.00%
04 PAVIMENTOS
04.01 PERFILADO Y COMPACTADO DE SUB-RASANTE EN ZONAS DE CORTE m2 49,374.62 3.63 179,229.87 0.00 0.00% 16,642.66 60,412.86 33.71% 16642.66 60412.86 33.71% 32731.96 118817.01 66.29%
04.02 AFIRMADO E=0.20M m2 11,631.80 68.38 795,382.48 0.00 0.00% 3,321.31 227,111.18 28.55% 3321.31 227111.18 28.55% 8310.49 568271.30 71.45%
05 TRANSPORTE
05.01 TRANSPORTE DE MATERIAL EXCEDENTE D>1 km m3k 15,361.87 2.85 43,781.33 0.00 0.00% 5,464.38 15,573.48 35.57% 5464.38 15573.48 35.57% 9897.49 28207.85 64.43%
05.02 TRANSPORTE DE MATERIAL EXCEDENTE D<1 km m3k 23,956.33 6.92 165,777.80 0.00 0.00% 12,302.97 85,136.55 51.36% 12302.97 85136.55 51.36% 11653.36 80641.25 48.64%
05.03 TRANSPORTE DE MATERIAL EXCEDENTE DE CORTE PARA RELLENO D<1 km m3k 3.95 5.82 22.99 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.95 22.99 100.00%
05.04 TRANSPORTE DE MAT. GRANULAR HASTA 1 km m3k 11,631.80 6.08 70,721.34 0.00 0.00% 3,321.31 20,193.56 28.55% 3321.31 20193.56 28.55% 8310.49 50527.78 71.45%
05.05 TRANSPORTE DE MAT. GRANULAR > 1 km m3k 30,737.54 2.85 87,601.99 0.00 0.00% 13,219.21 37,674.75 43.01% 13219.21 37674.75 43.01% 17518.33 49927.24 56.99%
05.06 FLETE TERRESTRE glb 1.00 42,618.70 42,618.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 42618.70 100.00%
06 ALCANTARILLAS TIPO TMC 40" - 15 UND
06.01 TRAZO Y REPLANTEO DE OBRAS DE ARTE m2 195.92 3.72 728.82 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 195.92 728.82 100.00%
06.02 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 518.89 30.57 15,862.47 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 518.89 15862.47 100.00%
06.03 BASE GRANULAR E=0.10M m3 14.18 42.11 597.12 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 14.18 597.12 100.00%
06.04 RELLENO CON MATERIAL PROPIO m3 332.11 7.66 2,543.96 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 332.11 2543.96 100.00%
06.05 ELIMINACION DE MATERIAL EXCEDENTE m3 3,502.20 17.92 62,759.42 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3502.20 62759.42 100.00%
06.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2 276.03 53.66 14,811.77 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 276.03 14811.77 100.00%
06.07 ACERO fy=4,200 kg/cm2 kg 753.82 4.81 3,625.87 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 753.82 3625.87 100.00%
06.08 CONCRETO f´c = 210 kg/cm2 m3 36.15 565.40 20,439.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 36.15 20439.21 100.00%
06.09 MAMPOSTERIA DE PIEDRA m3 13.59 208.58 2,834.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 13.59 2834.60 100.00%
06.10 ALCANTARILLA TMC Ø=40" m 86.25 475.88 41,044.65 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 86.25 41044.65 100.00%
06.11 PINTURA EN SARDINELES m 54.00 25.41 1,372.14 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 54.00 1372.14 100.00%
07 ALCANTARILLAS TIPO TMC 24" - 18 UND
07.01 TRAZO Y REPLANTEO DE OBRAS DE ARTE m2 182.61 3.72 679.31 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 182.61 679.31 100.00%
07.02 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 463.72 30.57 14,175.92 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 463.72 14175.92 100.00%
07.03 BASE GRANULAR E=0.10M m3 11.34 42.11 477.53 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.34 477.53 100.00%
07.04 RELLENO CON MATERIAL PROPIO m3 11.97 7.66 91.69 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.97 91.69 100.00%
07.05 ELIMINACION DE MATERIAL EXCEDENTE m3 4,860.39 17.92 87,098.19 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4860.39 87098.19 100.00%
07.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2 349.64 53.66 18,761.68 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 349.64 18761.68 100.00%
07.07 ACERO fy=4,200 kg/cm2 kg 954.84 4.81 4,592.78 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 954.84 4592.78 100.00%
07.08 CONCRETO f´c = 210 kg/cm2 m3 47.47 565.40 26,839.54 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 47.47 26839.54 100.00%
07.09 MAMPOSTERIA DE PIEDRA m3 17.21 208.58 3,589.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 17.21 3589.66 100.00%
07.10 ALCANTARILLA TMC Ø=24" m 109.25 405.53 44,304.15 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 109.25 44304.15 100.00%
07.11 PINTURA EN SARDINELES m 45.60 25.41 1,158.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 45.60 1158.70 100.00%
08 BADENES
08.01 TRAZO Y REPLANTEO DE OBRAS DE ARTE m2 848.40 3.72 3,156.05 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 848.40 3156.05 100.00%
08.02 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 283.37 30.57 8,662.62 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 283.37 8662.62 100.00%
08.03 BASE GRANULAR E=0.10M m3 69.55 42.11 2,928.75 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 69.55 2928.75 100.00%
08.04 ELIMINACION DE MATERIAL EXCEDENTE m3 340.05 17.92 6,093.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 340.05 6093.70 100.00%
08.05 CONCRETO f'c=175 kg/cm2 + 30%PM m3 283.37 508.55 144,107.81 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 283.37 144107.81 100.00%
VALORIZACION DE AVANCE DE OBRA N° 01 - MES DE ABRIL DEL 2018
MEJORAMIENTO DE LA TROCHA CARROZABLE DEL TRAMO DE NIEPOS-LA PAMPA-LA TIENDA Y EL ALTO, DISTRITO DE NIEPOS-SAN MIGUEL-CAJAMARCA
PRESUPUESTO DE OBRA ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/. METRADO PARCIAL S/. % METRADO PARCIAL S/. % METRADO PARCIAL S/. % METRADO PARCIAL S/. %
08.06 ENCOFRADO Y DESENCOFRADO PARA ESTRUCTURAS m2 135.24 53.66 7,256.98 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 135.24 7256.98 100.00%
08.07 JUNTA ASFALTICA E=1", PARA BADENES m 217.00 9.74 2,113.58 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 217.00 2113.58 100.00%
08.08 EMBOQUILLADO DE PIEDRA E=0.20M m2 396.75 98.72 39,167.16 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 396.75 39167.16 100.00%
09 PONTON L= 8.50 M
09.01 TRABAJOS PRELIMINARES
09.01.01 DESBROCE Y LIMPIEZA ha 0.07 4,661.41 326.30 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.07 326.30 100.00%
09.01.02 TRAZO Y REPLANTEO DE OBRAS DE ARTE m2 660.00 3.72 2,455.20 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 660.00 2455.20 100.00%
09.01.03 CORTE DE MATERIAL SUELTO CON MAQUINARIA m3 646.94 5.06 3,273.52 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 646.94 3273.52 100.00%
09.01.04 CORTE DE MATERIAL SUELTO CON MAQUINARIA BAJO AGUA m3 469.84 7.35 3,453.32 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 469.84 3453.32 100.00%
09.01.05 RELLENO CON MATERIAL PROPIO m3 489.50 7.66 3,749.57 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 489.50 3749.57 100.00%
09.01.06 ELIMINACION DE MATERIAL EXCEDENTE m3 850.64 26.29 22,363.33 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 850.64 22363.33 100.00%
09.02 ESTRIBOS 0.00 0.00 0.00 0.00 0.00% 0.00 0.00
09.02.01 SOLADO PARA ESTRIBOS Y ALETAS E=16'' MEZCLA 1:12 C:H m2 155.00 52.94 8,205.70 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 155.00 8205.70 100.00%
09.02.02 ENCOFRADO Y DESENCOFRADO PARA ZAPATAS - BAJ AGUA m2 117.98 45.18 5,330.34 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 117.98 5330.34 100.00%
09.02.03 ENCOFRADO Y DESENCOFRADO EN PANTALLA m2 420.31 82.19 34,545.28 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 420.31 34545.28 100.00%
09.02.04 CONCRETO f'c=175 kg/cm2 PARA SUB ZAPATA m3 35.40 466.07 16,498.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 35.40 16498.88 100.00%
09.02.05 CONCRETO F'c=280 kg/cm2, ESTRIBOS m3 115.00 610.79 70,240.85 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 115.00 70240.85 100.00%
09.02.06 CONCRETO F'c=210 kg/cm2, ALETAS - ESTRIBOS m3 235.09 565.40 132,919.89 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 235.09 132919.89 100.00%
09.02.07 ACERO DE REFUERZO fy=4200 Kg/cm2 EN ESTRIBOS kg 6,578.22 4.81 31,641.24 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6578.22 31641.24 100.00%
09.02.08 ACERO DE REFUERZO fy=4200 Kg/cm2 EN ALETAS DE ESTRIBOS kg 9,583.92 4.81 46,098.66 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9583.92 46098.66 100.00%
09.03 LOSA DE PUENTE
09.03.01 FALSO PUENTE m2 80.00 1,077.02 86,161.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 80.00 86161.60 100.00%
09.03.02 ENCOFRADO Y DESENCOFRADO DE LOSA m2 75.05 73.54 5,519.18 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 75.05 5519.18 100.00%
09.03.03 CONCRETO F'c=280 kg/cm2, LOSA m3 49.78 610.79 30,405.13 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 49.78 30405.13 100.00%
09.03.04 ACERO fy=4,200 kg/cm2 kg 2,779.29 4.81 13,368.38 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 2779.29 13368.38 100.00%
09.03.05 APOYO DE NEOPRENE SHORE 70. DE 0.50X0.2X0.05 und 6.00 2,984.10 17,904.60 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 6.00 17904.60 100.00%
09.03.06 BARANDA DE TUBO F° G° 2'' m 22.00 189.04 4,158.88 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 22.00 4158.88 100.00%
09.03.07 TUBERIA DE DRENAJE PVC SAL 3'' m 9.60 13.84 132.86 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 9.60 132.86 100.00%
09.03.08 ACABADO DE VEREDA m2 11.52 31.78 366.11 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.52 366.11 100.00%
10 CUNETAS SIN REVESTIR
10.01 CONTRUCCION DE CUNETAS DE TIERRA EN MATERIAL NO CLASIFICADO m 10,420.00 5.37 55,955.40 0.00 0.00% 2,000.00 10,740.00 19.19% 2000.00 10740.00 19.19% 8420.00 45215.40 80.81%
11 SEÑALIZACION
11.01 SEÑALES PREVENTIVAS 60X60 cm und 84.00 929.33 78,063.72 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 84.00 78063.72 100.00%
11.02 SEÑALES INFORMATIVAS 1.40x0.50 M und 5.00 781.59 3,907.95 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 3907.95 100.00%
11.03 SEÑALES REGLAMENTARIAS und 8.00 787.06 6,296.48 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 8.00 6296.48 100.00%
11.04 POSTES KILOMETRICOS und 11.00 172.89 1,901.79 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 11.00 1901.79 100.00%
12 SEGURIDAD Y SALUD
12.01 ELABORACION, IMP, Y ADM. PLAN DE SEGURIDAD Y SALUD glb 1.00 4,200.00 4,200.00 0.00 0.00% 0.20 840.00 20.00% 0.20 840.00 20.00% 0.80 3360.00 80.00%
12.02 EQUIPO DE PROTECCION COLECTIVA und 70.00 270.00 18,900.00 0.00 0.00% 10.00 2,700.00 14.29% 10.00 2700.00 14.29% 60.00 16200.00 85.71%
12.03 EQUIPO DE PROTECCION INDIVIDUAL und 10.00 93.45 934.50 0.00 0.00% 2.00 186.90 20.00% 2.00 186.90 20.00% 8.00 747.60 80.00%
12.04 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 5,500.00 5,500.00 0.00 0.00% 0.20 1,100.00 20.00% 0.20 1100.00 20.00% 0.80 4400.00 80.00%
12.05 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 7,500.00 7,500.00 0.00 0.00% 0.20 1,500.00 20.00% 0.20 1500.00 20.00% 0.80 6000.00 80.00%
12.06 RECURSOS ANTE EMERGENCIA EN SEGURIDAD Y SALUD glb 1.00 3,800.00 3,800.00 0.00 0.00% 0.20 760.00 20.00% 0.20 760.00 20.00% 0.80 3040.00 80.00%
13 IMPACTO AMBIENTAL
13.01 ACONDICIONAMIENTO DE BOTADEROS m3 22,000.00 2.61 57,420.00 0.00 0.00% 16,450.00 42,934.50 74.77% 16450.00 42934.50 74.77% 5550.00 14485.50 25.23%
13.02 RESTAURACION DE CAMPAMENTOS Y PATIOS DE MAQUINA ha 0.81 15,108.90 12,238.21 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.81 12238.21 100.00%
13.03 RESTAURACION DE CANTERAS ha 0.96 7,748.55 7,438.61 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 0.96 7438.61 100.00%
13.04 EDUCACIÓN AMBIENTAL, BOLETINES CHARLAS mes 5.00 7,372.18 36,860.90 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 5.00 36860.90 100.00%
13.05 PROGRAMA DE SEÑALIZACION AMBIENTAL und 7.00 864.81 6,053.67 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 7.00 6053.67 100.00%
Costo Directo 3,209,251.59 0.00 619,437.36 619,437.36 2,589,814.23
Gastos Generales 10% 320,925.16 0.00 61,943.74 61,943.74 258,981.42
Utilidad 08% 256,740.13 0.00 49,554.99 49,554.99 207,185.14
============
VALORIZACION DE AVANCE DE OBRA N° 01 - MES DE ABRIL DEL 2018
MEJORAMIENTO DE LA TROCHA CARROZABLE DEL TRAMO DE NIEPOS-LA PAMPA-LA TIENDA Y EL ALTO, DISTRITO DE NIEPOS-SAN MIGUEL-CAJAMARCA
PRESUPUESTO DE OBRA ACUMULADO ANTERIOR MES ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/. METRADO PARCIAL S/. % METRADO PARCIAL S/. % METRADO PARCIAL S/. % METRADO PARCIAL S/. %
Sub Total 3,786,916.88 0.00 730,936.09 730,936.09 3,055,980.79
IGV 18% 681,645.04 0.00 131,568.50 131,568.50 550,076.54
============
Presupuesto Total 4,468,561.92 0.00 0.00% 862,504.59 19.30% 862,504.59 19.30% 3,606,057.33 80.70%
CALCULO DEL REAJUSTE
"MEJORAMIENTO DE LA TROCHA CARROZABLE DEL TRAMO DE NIEPOS - LA PAMPA - LA TIENDA Y EL ALTO, DISTRITO DE NIEPOS -SAN MIGUEL-
OBRA CAJAMARCA”
FÓRMULA POLINÓMICA
K = 0.050*(Ir / Io) + 0.053*(Mr / Mo) + 0.059*(Ar / Ao) + 0.063*(Cr / Co) + 0.148*(Mr / Mo) + 0.263*(Ar / Ao) + 0.364*(Mr / Mo)
Código Ind. Base Mar-18 Apr-18 May-18 Jun-18
Símbolo Elemento Representativo Coef. % Incid.
N° Nov-17 Índice K Índice K Índice K Índice K
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.050 100.00% 441.61 446.14 0.051
M MADERA NACIONAL PARA ENCOF. Y CARPINT. 43 0.053 100.00% 722.52 726.59 0.053
A ACERO DE CONTRUCCION CORRUGADO 03 0.059 100.00% 464.75 506.47 0.064
C CEMENTO PORTLAND TIPO I 21 0.063 100.00% 465.71 476.04 0.064
M MANO DE OBRA INC. LEYES SOCIALES 47 0.148 100.00% 580.90 582.52 0.148
A AGREGADP GRUESO 05 0.263 100.00% 449.82 449.53 0.263
M MAQUINARIA Y EQUIPO NACIONAL 48 0.364 100.00% 363.07 365.55 0.366
COEFICIENTE DE REAJUSTE K= 1.000 K= 1.010 K= 0.000 K= 0.000 K= 0.000
CALCULO DEL REAJUSTE (REINTEGRO)
OBRA "MEJORAMIENTO DE LA TROCHA CARROZABLE DEL TRAMO DE NIEPOS - LA PAMPA - LA TIENDA Y EL ALTO, DISTRITO DE NIEPOS
-SAN MIGUEL-CAJAMARCA”
CALCULO DE RAJUSTES
N° DESCRIPCION VALORIZACIONES S/. K-1 REAJUSTE DEL MES
01 SUB TOTAL S/. 730,936.09 0.0102 S/. 7,480.95
SUB TOTAL S/. 7,480.95
IGV 18% S/. 1,346.57
TOTAL S/. 8,827.52
K = 0.340*(Jr / Jo) + 0.125*(MQr / MQo) + 0.090*(Ar / Ao) + 0.086*(Cr / Co) + 0.068*(Mr / Mo) + 0.067*(AGr / AGo)+0.053*(Hr / Ho)+0.171*(GGU
K = 0.423*(Jr / Jo) + 0.088*(Mr / Mo) + 0.076*(Tr / To) + 0.064*(Br / Bo) + 0.061*(Ar / Ao) + 0.060*(Cr / Co)+0.057*(DCr / DCo)+0.171*(GGUr /
TRATO PRINCIPAL
DE DIOS, DISTRITO DE PULAN, PROVINCIA DE SANTA CRUZ-CAJAMARCA
DCr / DCo)+0.171*(GGUr / GGUo)
Feb-15 Mar-15
Especilidad K Especilidad
Estructura 0 Estructura
Arquitectura 0 Arquitectura
I. Sanitarias 0 I. Sanitarias
I. Electricas 0 I. Electricas
1 Oct-14 3.32%
2 Dec-14 10.10%
3 Jan-15 15.90%
4 Feb-15 15.80%
5 Mar-15 17.70%
6 Apr-15 18.55%
7 May-15 18.63%
Formula VALORIZACION -3
Polinomica N° Periodo
01 ESTRUCTURAS
01 Octubre 2014
02 Noviembre 2014
03 Diciembre 2014
04 Enero 2015
05 Febrero 2015
06 Marzo 2015
07 Abril 2015
02 ARQUITECTURA
01 Octubre 2014
02 Noviembre 2014
03 Diciembre 2014
04 Enero 2015
05 Febrero 2015
06 Marzo 2015
07 Abril 2015
03 INSTALACIONES SANITARIAS
01 Octubre 2014
02 Noviembre 2014
03 Diciembre 2014
04 Enero 2015
05 Febrero 2015
06 Marzo 2015
07 Abril 2015
04 INSTALACIONES ELECTRICAS
01 Octubre 2014
02 Noviembre 2014
03 Diciembre 2014
04 Enero 2015
05 Febrero 2015
06 Marzo 2015
07 Abril 2015
Nov-14 Dec-14
K Especilidad K
1.014 Estructura 0
1.005 Arquitectura 0
0 I. Sanitarias 0
0 I. Electricas 0
Mar-15 Apr-15
K Especilidad K
0 Estructura 0
0 Arquitectura 0
0 I. Sanitarias 0
0 I. Electricas 0
ACUMULADO
% EJECUTADO REPROGRAMADO EJECUTADO REPROGRAMADO
Reajuste
Monto S/. (Kr-1) Pagado Rp
R = V x (Kr - 1)
ONES ELECTRICAS
0.00 0.000 0.00 0.00
0.00 0.000 0.00 0.00
0.00 0.000 0.00 0.00
0.00 0.000 0.00 0.00
May-15
Especilidad K
Estructura 0
Arquitectura 0
I. Sanitarias 0
I. Electricas 0
ACUMULADO ESTADO
EJECUTADO
145,941.52 ADELANTADO
#REF! ADELANTADO
0.00 -
0.00 -
0.00 -
0.00 -
0.00 -
Regularización
Rr
= R - Rp
1,156.94
0.00
#REF!
0.00
0.00
0.00
#REF!
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,156.94
#REF!
#REF!
CRONOGRAMA VALORIZADO DE OBRA
MEJORAMIENTO DEL CAMINO VECINAL PUENTE TECHIN - CRUCE CHIRIMOYO - DISTRITO DE QUEROCOTILLO - CUTERVO -
PRESUPUESTO DE OBRA TIEMPO DE EJE
ITEM DESCRIPCION UND METRADO PRECIO S/. PARCIAL S/. 25/04-30/04 01/05-31/05 01/06-30/06
01 CAMINO VECINAL
01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60m x 7.20m und 4.00 1,988.73 7,954.92 3,977.46
01.02 CAMPAMENTO PROVISIONAL DE OBRA m2 600.00 214.95 128,970.00 128,970.00
01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y MAQUINARIA GLB 1.00 39,048.77 39,048.77 39,048.77
02 TRABAJOS PRELIMINARES
02.01 LIMPIEZA Y DESFORESTACION MANUAL ha 16.81 986.52 16,586.31 8,293.16 8,293.16
02.02 TRAZO Y REPLANTEO PRELIMINAR km 30.00 411.41 12,342.30 6,171.15 6,171.15
REPOSICION DE CERCOS PERIMETRICO C/POSTES DE MADERA Y ALAMB
02.03 ml 2,329.38 7.91 18,425.40
PUAS
03 EXPLANACIONES
03.01 CORTE DE MATERIAL SUELTO CON MAQUINARIA m3 250,466.22 4.76 1,192,219.21 397,406.40 397,406.40 198,703.20
03.02 CORTE ROCA SUELTA (PERF. Y DISP.) CON MAQUINARIA m3 13,050.87 7.64 99,708.61 99,708.61
03.03 CORTE ROCA FIJA (PERF. Y DISP.) RENDIMIENTO=320 M3/DIA m3 4,532.42 18.53 83,985.74
03.04 CONFORMACION DE TERRAPLENES RENDIMIENTO=1,030 M3/DIA m3 8,811.50 3.90 34,364.84
03.05 PERFILADO Y COMPACTADO DE SUB-RASANTE m2 156,363.78 1.12 175,127.44
03.06 RELLENO CON MATERIAL PROPIO m3 0.00 0.00 0.00
03.07 MEJORAMIENTO DE SUELO A NIVEL DE SUBRASANTE (OVER E=0.40M) m3 0.00 0.00 0.00
03.08 RELLENO CON MATERIAL PROPIO TRANSPORTADO m3 0.00 0.00
04 TRANSPORTE PAGADO
TRANSPORTE DE MATERIAL ELIMINADO A BOTADERO DISTANCIA HASTA 1
04.01 m3k 224,625.54 3.82 858,069.57
km, R=293.20 M3KM
TRANSPORTE DE MATERIAL ELIMINADO A BOTADERO DISTANCIA > 1 km,
04.02 m3k 124,720.89 2.12 264,408.28
R=712.04 M3KM
TRANSPORTE DE MATERIAL PROPIO PARA RELLENO DISTANCIA HASTA 1
04.03 m3k 2,547.70 3.72 9,477.44
km, R=304.90 M3KM
05 PAVIMENTOS
05.01 EXTRACCION Y APILAMIENTO RENDIMIENTO=575 M3/DIA m3 56,865.12 3.69 209,832.29
05.02 CARGIO DE MATERIAL AFIRMADO, RENDIMIENTO=792 M3/DIA m3 62,551.63 1.34 83,819.18
05.03 COLOCACION DE CAPA DE RODADURA m3 51,587.60 8.05 415,280.17 83,056.03 62,292.03 62,292.03
05.04 RELLENO CON MATERIAL TIPO OVER (e=0.30m) CON EQUIPO m3 7,740.80 69.93 541,314.48 54,131.45 81,197.17 81,197.17
06 TRANSPORTE PAGADO
TRANSPORTE DE MATERIAL DE CANTERA DISTANCIA HASTA 1 KM, R=350.60
06.01 m3k 43,303.97 3.38 146,367.40 73,183.70 73,183.70
M3KM
06.02 TRANSPORTE DE MATERIAL DE CANTERA DISTANCIA > 1 KM, R=1000 M3KM m3k 163,804.56 1.72 281,743.85 140,871.93 140,871.93
07 SEÑALIZACION
07.01 SEÑALES INFORMATIVAS - PANEL m2 13.09 732.75 9,591.70 1,438.76 2,397.93
07.02 FABRICACION DE SEÑALES PREVENTIVAS RENDIMIENTO=30 UND/DIA und 108.50 480.19 52,100.62
07.03 FABRICACION DE SEÑALES REGLAMENTARIAS RENDIMIENTO=25 UND/DIA und 10.00 528.31 5,283.10
3,977.46 7,954.92
128,970.00
39,048.77
16,586.31
12,342.30
198,703.20 1,192,219.21
99,708.61
0.00
0.00 0.00
0.00
281,743.85
211,191.90
6,778.62
06.02 TRANSPORTE DE MATERIAL DE CANTERA DISTANCIA > 1 KM, R=1000 M3KM m3k 316,444.92 1.72 544,285.26 0.00 0.00 0.00
22,704.22 86,730.12 31,595.02 120,692.99 2,797.53 10,686.57 66,603.93 254,427.01 134,181.21 512,572.22
11,648.44 24,694.68 11,339.50 24,039.75 3,440.96 7,294.84 69,749.51 147,868.96 97,770.34 207,273.11
90.32 335.99 415.44 1,545.44 73.47 273.31 556.66 2,070.78 1,339.39 4,982.54
"MEJORAMIENTO DE LA TROCHA CARROZABLE DEL TRAMO DE NIEPOS - LA PAMPA - LA TIENDA Y EL ALTO, DISTRITO DE NIEPOS - SAN MIGUEL -
CAJAMARCA”
GASTOS
ITEM DESCRIPCION COSTO DIRECTO S/. UTILIDADES S/. SUB TOTAL S/. IGV (18%) TOTAL S/. ESTADO
GENERALES S/.
MES 6
ACUMULADO SALDO
Err:509
619,437.36 2,589,814.23
61,943.74 258,981.42
49,554.99 207,185.14
730,936.09 3,055,980.78
131,568.50 550,076.54
862,504.59 3,606,057.33
19.30% 80.70%
VALORIZACIÓN N° 01 - MES DE ABRIL DEL 2018
OBRA "MEJORAMIENTO DE TROCHA CARROZABLE DEL TRAMO DE NIEPOS - LA PAMPA - LA TIENDA Y EL ALTO, DISTRITO DE NIEPOS -SAN MIGUEL-CAJAMARCA”
1,000,000
700,000
500,000
400,000
300,000
Column C
200,000 EJECUTADO
100,000
Mar-18; 0.00
0 Mar-18; S/. 0.00S/. 0.00 S/. 0.00
Mar-18 abr-2018 may-2018 jun-2018 jul-2018 ago-2018 set-2018
PLAZO DE EJECUCION (150 DIAS CALENDARIOS)
200,000 EJECUTADO
100,000
Mar-18; 0.00
0 Mar-18; S/. 0.00S/. 0.00 S/. 0.00
Mar-18 abr-2018 may-2018 jun-2018 jul-2018 ago-2018 set-2018
PLAZO DE EJECUCION (150 DIAS CALENDARIOS)
CUTADO
S/. 890,678.49
Column C
ACUMULADO
EJECUTADO
EJECUTADO
go-2018 set-2018
EJECUTADO
go-2018 set-2018
862,504.59 Err:509
VALORIZACIÓN N° 01 - ABRIL DEL 2018
OBRA "MEJORAMIENTO DE TROCHA CARROZABLE DEL TRAMO DE NIEPOS - LA PAMPA - LA TIENDA Y EL ALTO, DISTRITO DE NIEPOS -SAN MIGUEL-CAJAMARCA”
100%
90%
80%
70%
60%
50%
40%
30%
20% Column E
EJECUTADO
10%
Mar-18; 0.00%
0% Mar-18; 0.00%
Mar-18 abr-2018 may-2018 jun-2018 jul-2018 ago-2018 set-2018
Mar-18; 0.00%
0% Mar-18; 0.00%
Mar-18 abr-2018 may-2018 jun-2018 jul-2018 ago-2018 set-2018
olumn E
ECUTADO
set-2018
ECUTADO
set-2018
ALORIZADOS EJECUTADOS
PORCENTAJES
PARCIAL ACUMUL.
% %
0.00% 0.00%
Err:509 Err:509
Err:509
CALENDARIO REPROGRAMADO VALORIZADO DE OBRA
OBRA
: MEJORAMIENTO DE LA 0FERTA DE LOS SERVICIOS EDUCATIVOS DE LA IEP 10680 CP SAN JUAN DE DIOS, DISTRITO DE PULAN,
PROVINCIA DE SANTA CRUZ - CAJAMARCA
PROPIETARIO : MUNICIPALIDAD DE SANTA CRUZ
CONTRATISTA : SECURGRAMA SRL
RESIDENTE : ING. HERNANDO SANTIAGO TAPIA GAYOSO
SUPERVISORA 0
SUPERVISOR : ING. PABLO LASERNA MAYRA
CORRESPONDIENTE AL MES : MAYO 2015 FECHA DE PRESENTACIÓN : 05 DE JUNIO DEL 2015
VALORIZ. N°01 VALORIZ. N°02 VALORIZ. N°03 VALORIZ. N°04 VALORIZ. N°05 VALORIZ. N°06 VALORIZ. N°07
DESCRIPCION PRESUPUESTO
8 al 15 Oct 9 al 31 Dic 1 al 31 Ene 1 al 28 Feb 1 al 31 Marz 1 al 30 Abr 1 al 29 May
ARQUITECTURA 530,790.30 0.00 21,329.26 22,640.30 72,931.95 73,875.69 202,784.04 137,229.07
ESTRUCTURAS 1,047,243.43 61,948.23 167,127.67 265,937.20 212,976.17 239,154.10 100,100.06 0.00
INSTALACIONES SANITARIAS 36,229.96 0.00 0.00 3,987.41 4,215.40 4,180.60 17,831.86 6,014.69
INSTALACIONES ELECTRICAS 54,145.55 0.00 0.00 4,114.82 4,690.30 13,055.72 25,410.40 6,874.31
COSTO DIRECTO 1,668,409.24 61,948.23 188,456.93 296,679.73 294,813.82 330,266.11 346,126.36 150,118.07
G.G(8)% 133,472.74 4,955.86 15,076.55 23,734.38 23,585.11 26,421.29 27,690.11 12,009.45
UTILIDAD(7)% 116,788.647 4,336.376 13,191.985 20,767.581 20,636.967 23,118.628 24,228.845 10,508.26
EQUIPAMIENTO 227,126.17 0.00 0.00 0.00 0.00 0.00 227,126.17 0
SUB TOTAL 2,145,796.80 71,240.46 216,725.47 341,181.69 339,035.89 379,806.03 625,171.48 172,635.78
IGV ( 18%) 386,243.42 12,823.28 39,010.58 61,412.70 61,026.46 68,365.08 112,530.87 31,074.44
TOTAL 2,532,040.22 84,063.75 255,736.05 402,594.39 400,062.35 448,171.11 737,702.35 203,710.22
AVANCE PROGRAMADO 3.32% 10.10% 15.90% 15.80% 17.70% 29.13% 8.05%
AVANCE PROGRAMADO ACUMULADO 3.32% 13.42% 29.32% 45.12% 62.82% 91.95% 100.00%
AVANCE EJECUTADO #REF! 8.64% 20.27% 12.29% 10.65% 22.75%
AVANCE EJECUTADO ACUMULADO #REF! 15.44% 35.71% 48.00% 58.65% 81.40%
VALORIZ. N°08
1 al 29 May
137,229.07
0.00
6,014.69
6,874.31
150,118.07
12,009.45
10,508.26
0
172,635.78
31,074.44
203,710.22
8.05%
108.05%