01 OBRAS PROVISIONALES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40X3.60 M. und 1.00
01.02 CASETA DE ALMACEN Y GUARDIANIA m2 25.00
01.03 CERCO PROVISIONAL DE ESTERAS m 158.00
02 TRABAJOS PRELIMINARES
02.01 TRAZO NIVELES Y REPLANTEO m2 1,636.02
02.02 LIMPIEZA DEL TERRENO EN FORMA MANUAL m2 1,636.02
02.03 MOVILIZACION Y DESMOVILIZACION DE HERRAMIENTAS Y EQUIPO GLB 1.00
03 MOVIMIENTO DE TIERRAS
03.01 MOVIMIENTO DE TIERRAS - NIVELACION DE TERRENO
03.01.01 CORTE Y EXCAVACION EN TERRENO SUELTO C/MAQUINARIA m3 1,028.80
03.01.02 RELLENO CON MATERIAL DE PRESTAMO C/MAQUINARIA m3 280.04
03.01.03 NIVELACION Y COMPACTACION DE TERRENO NATURAL C/MAQUINARIA m2 1,636.02
03.01.04 ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO m3 1,286.00
3.02 MOVIMIENTO DE TIERRAS PARA ESTRUCTURAS
03.02.01 EXCAVACION DE ZANJAS EN TERRENO SUELTO m3 1,591.17
03.02.02 RELLENO CON MATERIAL PROPIO C/EQUIPO LIVIANO m3 114.18
03.02.03 RELLENO CON MATERIAL PRESTAMO C/EQUIPO LIVIANO m3 1,319.20
03.02.04 TERRAPLEN PARA VEREDAS Y FALSO PISO E=0.15CM m2 1,050.50
03.02.05 ACARREO DE MATERIAL EXCEDENTE D=30 M. m3 1,772.40
03.02.06 ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO m3 1,772.40
04 OBRAS DE CONCRETO SIMPLE
04.01 SOLADO DE 4" MEZCLA 1:12 CEMENTO-HORMIGON m2 324.70
04.02 CONCRETO F'C=100 KG/CM2 + 30% PG P/CIMIENTOS CORRIDOS m3 186.30
04.03 SOBRECIMIENTO: CONCRETO 1:8 + 25% P.M. m3 22.63
04.04 SOBRECIMIENTO: ENCOFRADO Y DESENCOFRADO NORMAL m2 301.71
04.05 GRADAS: CONCRETO F'C=140 KG/CM2 m3 1.10
04.06 GRADAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 6.50
04.07 FALSO PISO DE E=4" CONCRETO 1:10 m2 49.30
05 OBRAS DE CONCRETO ARMADO
05.01 ZAPATAS
05.01.01 ZAPATAS: CONCRETO F'C= 210 KG/CM2 m3 49.30
05.01.02 ZAPATAS: ACERO F'Y=4200 KG/CM2 GRADO 60 kg 1,061.52
05.02 SOBRECIMIENTOS REFORZADOS
05.02.01 SOBRECIMIENTOS REFORZADOS: CONCRETO F'C= 210 KG/CM2 C/CEMENTO TIPO V m3 11.94
05.02.02 SOBRECIMIENTOS REFORZADOS: ENCOFRADO Y DESENCOFRADO NORMAL m2 139.60
05.02.03 SOBRECIMIENTOS REFORZADOS: ACERO F'Y=4200 KG/CM2 kg #VALUE!
05.03 VIGAS DE CIMENTACION
05.03.01 VIGAS DE CIMENTACION: CONCRETO F'C= 210 KG/CM2 C/CEMENTO TIPO V m3 2.10
05.03.02 VIGA DE CIMENTACION: ENCOFRADO Y DESENCOFRADO NORMAL m2 4.30
05.03.03 VIGA DE CIMENTACION: ACERO F'Y=4200 KG/CM2 kg 288.53
05.04 COLUMNAS
05.04.01 COLUMNAS: CONCRETO F'C=210 KG/CM2 m3 49.50
05.04.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 640.70
05.04.03 COLUMNAS: ACERO F'Y=4200 KG/CM2 kg 7,044.88
05.05 VIGAS
05.05.01 VIGAS: CONCRETO F'C=210 KG/CM2 m3
05.05.02 VIGAS: ENCOFRADO CARAVISTA m2
05.05.03 VIGAS: ACERO F'Y=4200 KG/CM2 kg 7,320.13
05.06 LOSA ALIGERADA
05.06.01 LOSA ALIGERADA: CONCRETO F'C=210 KG/CM2 m3
05.06.02 LOSA ALIGERADA: ENCOFRADO Y DESENCOFRADO NORMAL m2
05.06.03 LOSA ALIGERADA: ACERO F'Y=4200 KG/CM2 GRADO 60 kg 1,660.18
05.06.04 LOSA ALIGERADA: LADRILLO HUECO DE ARCILLA 15X30X30 CM. und
05.07 LOSA MACIZA
05.07.01 LOSA MACIZA: CONCRETO F'C=210 KG/CM2 m3
05.07.02 LOSA MACIZA: ENCOFRADO CARAVISTA m2
05.07.03 LOSA MACIZA: ACERO F'Y=4200 KG/CM2 kg 1,681.68
05.08 MURO DE CONTENCION
05.08.01 MURO DE CONT. : CONCRETO F'C=210 KG/CM2 m3
05.08.02 MURO DE CONT. : ENCOFRADO CARAVISTA m2
05.08.03 MURO DE CONT. : ACERO F'Y=4200 KG/CM2 kg 16,312.04
05.08 RAMPA DE CONCRETO
05.08.01 RAMPA : CONCRETO F'C=210 KG/CM2 m3
05.08.02 RAMPA : ENCOFRADO CARAVISTA m2
PLANILLA DE METRADOS
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
01.00.00 OBRAS PROVISIONALES
02.02.00 LIMPIEZA DEL TERRENO EN FORMA MANUAL 1.00 1,636.02 - - 1,636.02 1,636.02
03.01.01 CORTE Y EXCAVACION EN TERRENO SUELTO C/MAQUINARIA AREA DISTANCIA 1,028.80 1,028.80
CORTE 1-1 1.00 41.75
CORTE 2-2 1.00 24.64 16.96 562.99
CORTE 3-3 1.00 25.02 18.76 465.81
OBRAS EXTERIORES
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
PLANILLA DE METRADOS ESTRUCTURAS
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
CIMENTACION DE RAMPA
Z -RAMPA 8.00 0.70 0.70 1.40 5.49
CIMENTACION PLACA 7.00 2.30 0.47 1.00 7.57
1.00 0.95 0.47 1.00 0.45
OTROS
Z-RAMPA 5.00 0.70 0.70 1.40 3.43
SARDINEL S-01 1.00 2.93 0.50 0.70 1.03
1.00 21.09 0.50 0.70 7.38
1.00 2.45 0.45 0.65 0.72
1.00 2.80 0.45 0.65 0.82
LADO DERECHO 1.00 18.00 0.45 0.65 5.27
PLACA DE INGRESO 2.00 1.80 0.80 1.40 4.03
CIMENTACION PLACA 1.00 1.68 0.47 1.00 0.79
2.00 2.33 0.47 1.00 2.19
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
Z-5' 1 2.85 1.5 1.75 7.48
Z-6 1 1.73 0.95 1.75 2.88
Z-7 1 0.95 0.7 1.75 1.16
PLANILLA DE METRADOS ESTRUCTURAS
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
Z-7' 2 0.95 0.7 1.75 2.33
Z-8 1 0.7 0.7 1.75 0.86
Z-8' 1 0.7 0.7 1.75 0.86
Z-9 1 1.1 1.1 1.75 2.12
Z-9' 2 0.7 0.7 1.75 1.72
Cimientos Corridos
EJE 1-1 ; l=1.65+0.93 1 2.58 0.5 1.15 1.48
EJE 2-2; L=0.88+1.65+.88 1 3.41 0.55 1.15 2.16
EJE 5-5; L=1.38+1.4+1.08 1 3.86 0.55 1.15 2.44
EJE 7-7; L=2 1 2 0.55 1.15 1.27
EJE 8-8; L=1.96+0.95 1 2.91 0.5 1.15 1.67
EJE 6 a B' 1 2.2 0.5 1.15 1.27
EJE A-A; L=3.04+3.46 1 6.5 0.55 1.15 4.11
EJE B-B 1 1.26 0.5 1.15 0.72
EJE B'-B' 1 1.07 0.5 1.15 0.62
EJE C-C 1 0.81 0.5 1.15 0.47
EJE C''-C'' 1 1.79 0.5 1.15 1.03
EJE D-D = 0.47*2+2.46+3.45 1 6.85 0.55 1.15 4.33
EJE D'-D' 1 2.15 0.5 1.15 1.24
Viga de Cimentacion
EJE 3-3 1 5.6 0.5 1.15 3.22
ZAPATAS
EXCAVACION O.E 1 8.92
Area intima 1 1 22.78
area intima 2 1 25.27
Talleres 1 15.79
SUM 1 50.52
Zona Administrativa 1 15.07
138.33
altura de excavacion 1.75
altura ocupada por concreto 0.6
% cimiento corrido sobre zapata 30%
volumen de relleno con material propio = 64
PLANILLA DE METRADOS ESTRUCTURAS
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
cimientos corridos
EXCAVACION O.E 1 100
Area intima 1 1 29
area intima 2 1 24
Talleres 1 16
SUM 1 23
Zona Administrativa 1 42
232.52
altura de excavacion 1.15
altura ocupada por concreto 0.9
volumen de relleno con material propio = 51
MUROS DE CONTENCIÓN
MURO M-01 1.00 1.30 27.00 35.10
1.00 30.50 27.00 823.50
1.00 2.20 27.00 59.40
MURO M-02 Izquierda 1.00 4.07 10.80 43.96
Centro Derecha 1.00 3.84 10.80 41.47
Centro Derecha 1.00 9.39 10.80 101.41
Derecha 1.00 4.60 10.80 49.68
MURO M-03 1.00 6.00 5.50 33.00
MURO M-04 1.00 4.62 28.50 131.67
AREA INTIMA 1
AREA 1 1.00 11.82 11.82
AREA 2 1.00 11.82 11.82
AREA 3 1.00 11.82 11.82
AREA 4 1.00 11.82 11.82
AREA 5 1.00 2.93 2.93
AREA 6 1.00 2.88 2.88
AREA 7 1.00 2.93 2.93
AREA 8 1.00 2.88 2.88
PLANILLA DE METRADOS ESTRUCTURAS
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
AREA INTIMA 2
AREA 9 1.00 8.77 8.77
AREA 10 1.00 8.77 8.77
AREA 11 1.00 8.77 8.77
AREA 12 1.00 8.77 8.77
AREA 13 1.00 2.91 2.91
AREA 14 1.00 2.91 2.91
AREA 15 1.00 2.91 2.91
AREA 16 1.00 2.91 2.91
TALLERES
AREA 17 1.00 35.08 35.08
AREA 18 1.00 2.19 2.19
AREA 19 1.00 2.19 2.19
ZONA ADMINISTRATIVA
AREA 26 1.00 115.14 115.14
AREA 27 1.00 2.01 2.01
AREA 28 1.00 2.01 2.01
SOLADO EN ZAPATAS
Obras Exteriores
Z -RAMPA 8.00 0.70 0.70 3.92
Z-RAMPA 5.00 0.70 0.70 2.45
Columnas de cerco
c-3 50.00 0.55 0.55 15.13
c-9 1.00 0.55 0.55 0.30
c-8 8.00 0.55 0.55 2.42
c-8' 3.00 0.55 0.55 0.91
Area intima 1
Z-1 12.00 0.95 0.95 10.83
Z-2 2.00 1.15 0.95 2.19
area intima 2
Z-1 16.00 0.95 0.95 14.44
Talleres 1.00
Z-10 5.00 1.05 1.10 5.78
Z-10' 1.00 1.05 1.10 1.16
Z-11 2.00 0.95 1.10 2.09
SUM
PLANILLA DE METRADOS ESTRUCTURAS
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
Z-3 2.00 1.90 1.35 5.13
Z-3' 1.00 1.90 1.35 2.57
Z-3'' 1.00 1.71 0.66 1.13
1.00 1.35 0.70 0.95
Z-4 2.00 1.10 1.10 2.42
Z-4' 2.00 1.35 1.10 2.97
Z-5 1.00 1.75 1.50 2.63
Z-5' 1.00 2.85 1.50 4.28
Z-6 1.00 1.73 0.95 1.64
Z-7 1.00 0.95 0.70 0.67
Z-7' 2.00 0.95 0.70 1.33
Z-8 1.00 0.70 0.70 0.49
Z-8' 1.00 0.70 0.70 0.49
Z-9 1.00 1.10 1.10 1.21
Z-9' 2.00 0.70 0.70 0.98
Zona Administrativa
Z-4 4.00 1.10 1.10 4.84
Z-7 8.00 0.95 0.70 5.32
Z-8 4.00 0.70 0.70 1.96
Z-9' 2.00 0.70 0.70 0.98
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
Eje F y G 2.00 3.10 0.55 0.45 1.53
AREA TALLERES - PLANO ES-04
Cimientos Corridos
EJE 1-1 L=3.54*2+2.51 = 1.00 9.59 0.50 0.80 3.84
EJE 1'-1' 1.00 1.88 0.50 0.80 0.75
EJE 2-2 1.00 6.01 0.50 0.80 2.40
EJE A y D 2.00 3.70 0.50 0.80 2.96
EJE B y C 2.00 2.50 0.50 0.80 2.00
EJE B' 1.00 2.00 0.50 0.80 0.80
SALON DE USOS MULTIPLES - PLANO ES-05
Cimientos Corridos
EJE 1-1 ; l=6.10-.75 1 5.35 0.5 0.8 2.14
EJE 2-2; L=7.2-.5 1 6.7 0.55 0.8 2.95
EJE 5-5; L=7.88-.5 1 7.38 0.55 0.8 3.25
EJE 7-7; L=3-.3 1 2 0.55 0.8 0.88
EJE 8-8; L=5.5-.5 1 5 0.5 0.8 2.00
EJE 6 a B' 1 3.72 0.5 0.8 1.49
EJE A-A; L=0.81+8.88-.7 1 8.99 0.55 0.8 3.96
EJE A-B 1 1.35 0.5 0.8 0.54
EJE B'-B' , l=0.89+1.75 1 2.64 0.5 0.8 1.06
EJE C'-C' 1 3.1 0.5 0.8 1.24
EJE C''-C'' 1 1.79 0.5 0.8 0.72
EJE D-D = 11.82-.7*2-.15 1 10.27 0.55 0.8 4.52
EJE D'-D' 1 3.1 0.5 0.8 1.24
ZONA ADMINISTRATIVA- PLANO ES-07
Cimientos Corridos
Eje 2-2 = 3.67+3.68+2.45 1 9.8 0.5 0.8 3.92
EJE 3-3 = 2.18+7.33 1 9.51 0.5 0.8 3.80
EJE 5-5 = 2.18 + 2.68 1 4.86 0.5 0.8 1.94
EJE 6-6 1 1.98 0.5 0.8 0.79
EJE 7-7 = 3.45+2.10+1.28 1 6.83 0.5 0.8 2.73
EJE 8-8 = 3.45+2.45+3.45 1 9.35 0.5 0.8 3.74
EJE A-A =11.40-.3*3 1 10.5 0.5 0.8 4.20
EJE B-B 1 2.72 0.5 0.8 1.09
EJE B'-B' 1 5.47 0.5 0.8 2.19
EJE C-C = 2.22+2.55 1 4.77 0.5 0.8 1.91
EJE D-D = 2.44+2.55 1 4.99 0.5 0.8 2.00
EJE E-E 1 2.93 0.5 0.8 1.17
EJE F-F = 11.40-.3*4 1 10.2 0.5 0.8 4.08
EJE C'-C' = 1.70 1 1.7 0.5 0.8 0.68
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
Cimientos Corridos
Eje 1-1 L=1.36+0.5+1.11+1.09+0.5+1.36+1.36+0.5+1.11+1.09+0.5+1.36 1.00 11.84 0.15 0.45 0.80
Eje 2-2 L=2.76+2.77+2.76+2.77 1.00 11.06 0.15 0.45 0.75
Eje 1'-1' L=0.5+1.1+1.1+0.5+0.5+1.1+1.1+0.5 1.00 6.40 0.15 0.80 0.77
Eje A y L 2.00 3.10 0.15 0.45 0.42
Eje A' y L' 2.00 1.00 0.15 0.45 0.14
Eje B y K 2.00 1.40 0.15 0.45 0.19
Eje B' y J' 4.00 1.45 0.15 0.45 0.39
Eje H y E 2.00 1.40 0.15 0.45 0.19
Eje H' y E' 2.00 1.00 0.15 0.45 0.14
Eje F y G 2.00 3.10 0.15 0.45 0.42
AREA TALLERES - PLANO ES-04
Cimientos Corridos
EJE 1-1 L=3.54*2+2.51 = 1.00 9.59 0.15 0.45 0.65
EJE 2-2 L=2.11+1.79+2.09 1.00 5.99 0.15 0.45 0.40
EJE A y D 2.00 3.70 0.15 0.45 0.50
EJE B y C 2.00 1.84 0.15 0.45 0.25
EJE B' 1.00 2.00 0.15 0.45 0.14
SALON DE USOS MULTIPLES - PLANO ES-05
Cimientos Corridos
EJE 1-1 ; 1 2.33 0.15 0.45 0.16
EJE 7-7; L=2 1 1.2 0.15 0.45 0.08
EJE 8-8; L=2.76+0.49 1 3.25 0.15 0.45 0.22
EJE 6 a B', L=3.76+.66 1 4.42 0.15 0.45 0.30
EJE B-B, L=1.75+.89 1 2.64 0.15 0.45 0.18
EJE B''-B'' 1 2.1 0.15 0.45 0.14
EJE C-C 1 1.25 0.15 0.45 0.08
EJE C''-C'' 1 0.8 0.15 0.45 0.05
EJE E-E 1 3.1 0.15 0.45 0.21
ZONA ADMINISTRATIVA- PLANO ES-07
Cimientos Corridos
Eje 2-2 = 3.67+3.68 1 7.35 0.15 0.45 0.50
EJE 3-3 =1.23+0.93+2.53 1 4.69 0.15 0.45 0.32
EJE 5-5 = 2.4+2.4 1 4.8 0.15 0.45 0.32
EJE 6-6 1 1.65 0.15 0.45 0.11
EJE 7-7 1 2.52 0.15 0.45 0.17
EJE 8-8 = 1.32+2.45+1.33 1 5.1 0.15 0.45 0.34
EJE A-A = 4.17+1.15+1.15+1.33+2.7 1 10.5 0.15 0.45 0.71
EJE B-B 1 2.59 0.15 0.45 0.17
EJE B'-B' 1 0.7 0.15 0.45 0.05
EJE C-C = 1.05+2.55 1 4.16 0.15 0.45 0.28
EJE D-D =2.55+2.44 1 4.99 0.15 0.45 0.34
EJE E-E 1 2.78 0.15 0.45 0.19
EJE F-F =2.59+1.44+1.15+1.15+4.18 1 10.51 0.15 0.45 0.71
EJE C'-C' = 1.65+0.84 1 2.49 0.15 0.45 0.17
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
Eje E' 2.00 1.45 2.00 0.45 2.61
Eje F 1.00 1.60 2.00 0.45 1.44
Eje F' 1.00 1.00 2.00 0.45 0.90
Eje G 1.00 3.30 2.00 0.45 2.97
AREA INTIMA - PLANO ES -03
Eje 1-1 L=1.36+0.5+1.11+1.09+0.5+1.36+1.36+0.5+1.11+1.09+0.5+1.36 1.00 11.84 2.00 0.45 10.66
Eje 2-2 L=2.76+2.77+2.76+2.77 1.00 11.06 2.00 0.45 9.95
Eje 1'-1' L=0.5+1.1+1.1+0.5+0.5+1.1+1.1+0.5 1.00 6.40 2.00 0.80 10.24
Eje A y L 2.00 3.10 2.00 0.45 5.58
Eje A' y L' 2.00 1.00 2.00 0.45 1.80
Eje B y K 2.00 1.40 2.00 0.45 2.52
Eje B' y J' 4.00 1.45 2.00 0.45 5.22
Eje H y E 2.00 1.40 2.00 0.45 2.52
Eje H' y E' 2.00 1.00 2.00 0.45 1.80
Eje F y G 2.00 3.10 2.00 0.45 5.58
AREA TALLERES - PLANO ES-04
EJE 1-1 L=3.54*2+2.51 = 1.00 9.59 2.00 0.45 8.63
EJE 2-2 L=2.11+1.79+2.09 1.00 5.99 2.00 0.45 5.39
EJE A y D 2.00 3.70 2.00 0.45 6.66
EJE B y C 2.00 1.84 2.00 0.45 3.31
EJE B' 1.00 2.00 2.00 0.45 1.80
SALON DE USOS MULTIPLES - PLANO ES-05
EJE 1-1 ; 1 2.33 2.00 0.45 2.10
EJE 7-7; L=2 1 1.2 2.00 0.45 1.08
EJE 8-8; L=2.76+0.49 1 3.25 2.00 0.45 2.93
EJE 6 a B', L=3.76+.66 1 4.42 2.00 0.45 3.98
EJE B-B, L=1.75+.89 1 2.64 2.00 0.45 2.38
EJE B''-B'' 1 2.1 2.00 0.45 1.89
EJE C-C 1 1.25 2.00 0.45 1.13
EJE C''-C'' 1 0.8 2.00 0.45 0.72
EJE E-E 1 3.1 2.00 0.45 2.79
ZONA ADMINISTRATIVA- PLANO ES-07
Cimientos Corridos
Eje 2-2 = 3.67+3.68 1 7.35 2.00 0.45 6.62
EJE 3-3 =1.23+0.93+2.53 1 4.69 2.00 0.45 4.22
EJE 5-5 = 2.4+2.4 1 4.8 2.00 0.45 4.32
EJE 6-6 1 1.65 2.00 0.45 1.49
EJE 7-7 1 2.52 2.00 0.45 2.27
EJE 8-8 = 1.32+2.45+1.33 1 5.1 2.00 0.45 4.59
EJE A-A = 4.17+1.15+1.15+1.33+2.7 1 10.5 2.00 0.45 9.45
EJE B-B 1 2.59 2.00 0.45 2.33
EJE B'-B' 1 0.7 2.00 0.45 0.63
EJE C-C = 1.05+2.55 1 4.16 2.00 0.45 3.74
EJE D-D =2.55+2.44 1 4.99 2.00 0.45 4.49
EJE E-E 1 2.78 2.00 0.45 2.50
EJE F-F =2.59+1.44+1.15+1.15+4.18 1 10.51 2.00 0.45 9.46
EJE C'-C' = 1.65+0.84 1 2.49 2.00 0.45 2.24
AREA INTIMA 2
AREA 13 1.00 2.91 2.91
AREA 14 1.00 2.91 2.91
AREA 15 1.00 2.91 2.91
AREA 16 1.00 2.91 2.91
PLANILLA DE METRADOS ESTRUCTURAS
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
TALLERES
AREA 18 1.00 2.19 2.19
AREA 19 1.00 2.19 2.19
ZONA ADMINISTRATIVA
AREA 27 1.00 2.01 2.01
AREA 28 1.00 2.01 2.01
05.01.00 ZAPATAS
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
05.01.02 ZAPATAS: ACERO F'Y=4200 KG/CM2 GRADO 60 1,011.00
OBRAS EXTERIORES 1.00 77.22
AREA INTIMA I 1.00 147.11
AREA INTIMA II 1.00 161.57
TALLERES 1.00 104.74
SUM 1.00 374.70
AMB. ADMINISTRATIVO 1.00 145.63
05.02.01 VIGAS DE CIMENTACION: CONCRETO F'C= 210 KG/CM2 C/CEMENTO TIPO V 2.10
SALON DE USOS MULTIPLES
VC-01 - EJE 3 1.00 7.20 0.30 0.95 2.05
05.03.01 SOBRECIMIENTOS REFORZADOS: CONCRETO F'C= 210 KG/CM2 C/CEMENTO TIPO V 11.94
CERCO PERIMETRICO -sobrcimientos
PARTE POSTERIOR - CC5 1.00 10.75 0.15 1.15 1.85
LATERAL DERECHA CC-5 1.00 1.56 0.15 1.50 0.35
1.00 0.55 0.15 1.50 0.12
1.00 1.27 0.15 1.50 0.29 26.18
1.00 1.85 0.15 1.50 0.42
1.00 14.03 0.15 1.50 3.16
1.00 6.92 0.15 1.50 1.56
LATERAL IZQUIERDA CC-5 1.00 4.10 0.15 1.50 0.92
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
05.04.03 MUROS DE CONT.; ACERO F'Y=4200 KG/CM2 16,312.04
05.05.00 COLUMNAS
OBRAS EXTERIORES
C-3
PARTE POSTERIOR 15.00 0.25 0.15 3.95 2.22
LATERAL DERECHA 17.00 0.25 0.15 4.30 2.74
LATERAL IZQUIERDA 3.00 0.25 0.15 4.65 0.52
ANCLA EN CORONA MURO 3.00 0.25 0.15 3.20 0.36
FRONTAL 12.00 0.25 0.15 3.90 1.76
C-8
LATERAL IZQUIERDA 5.00 0.25 0.25 4.20 1.31 37.00
INTERIOR - ANCLA EN ZAPATA 13.00 0.25 0.25 4.00 3.25
INTERIOR - ANCLA EN MURO 19.00 0.25 0.25 6.00 7.13
C-8'
LATERAL IZQUIERDA 3.00 0.29 0.25 4.20 0.91
AREA INTIMA 1
C-1 12.00 0.25 0.25 3.70 2.78
C-2 2.00 0.45 0.20 4.60 0.83
C-3 12.00 0.15 0.25 3.80 1.71
AREA INTIMA 2
C-1 16.00 0.25 0.25 3.70 3.70
C-3 12.00 0.15 0.25 3.80 1.71
TALLERES
C-7 2.00 0.30 0.25 4.50 0.68
C-8 4.00 0.30 0.38 3.80 1.71
2.00 0.30 0.38 4.50 1.01
SALON DE USOS MULTIPLES
C-1 6.00 0.25 0.25 5.10 1.91
C-1' 2.00 0.25 0.34 5.10 0.87
C-3 2.00 0.25 0.15 4.80 0.36
C-4 1.00 0.15 0.35 4.80 0.25
C-4' 1.00 0.30 0.23 4.80 0.33
C-5 5.00 0.30 0.30 5.75 2.59
C-6 1.00 3.14 0.30 5.75 0.41
C-6' 2.00 3.14 0.25 3.60 0.18
AREA ADMINISTRATIVA
C-3 13.00 0.25 0.15 4.20 2.05
C-5 - PERIMETRO 12.00 0.30 0.30 3.80 4.10
C-5 - INTERIOR 4.00 0.30 0.30 5.40 1.94
C-6' 2.00 3.14 0.25 3.75 0.18
OBRAS EXTERIORES
C-3 PERIMETRO
PARTE POSTERIOR 15.00 0.50 3.95 29.63
LATERAL DERECHA 17.00 0.50 4.30 36.55
LATERAL IZQUIERDA 3.00 0.80 4.65 11.16
ANCLA EN CORONA MURO 3.00 0.80 3.20 7.68
FRONTAL 12.00 0.50 3.90 23.40
C-8
LATERAL IZQUIERDA 5.00 1.00 4.20 21.00
INTERIOR - ANCLA EN ZAPATA 13.00 0.73 4.00 37.96
INTERIOR - ANCLA EN MURO 19.00 0.80 6.00 91.20
C-8'
LATERAL IZQUIERDA 3.00 1.10 4.20 13.86
PLANILLA DE METRADOS ESTRUCTURAS
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
AREA INTIMA 1 PERIMETRO
C-1 12.00 0.75 3.70 33.30
C-2 2.00 1.20 4.60 11.04
C-3 12.00 0.65 3.80 29.64
TALLERES PERIMETRO
C-7 2.00 0.95 4.50 8.55
C-8 4.00 1.45 3.80 22.04
2.00 1.45 4.50 13.05
05.06.00 VIGAS
OBRAS EXTERIORES
V - B (Cerco Perimetrico) 1.00 87.75 0.15 0.15 1.97
AREA INTIMA 1
V-1 4.00 4.60 0.25 0.30 1.38
4.00 5.10 0.25 0.30 1.53
2.00 4.60 0.25 0.30 0.69
V-2 4.00 5.10 0.25 0.30 1.53
V-3 1.00 4.60 0.20 0.35 0.32
V-A 2.00 4.60 0.25 0.25 0.58
VCH-1 4.00 1.15 0.15 0.20 0.14
2.00 1.70 0.15 0.20 0.10
4.00 1.15 0.15 0.20 0.14
2.00 1.70 0.15 0.20 0.10
V-B 4.00 4.60 0.15 0.20 0.55
4.00 5.10 0.15 0.20 0.61
2.00 4.60 0.15 0.20 0.28
4.00 5.10 0.15 0.20 0.61
AREA INTIMA 2
V-1 4.00 4.60 0.25 0.30 1.38
4.00 5.10 0.25 0.30 1.53
V-A 2.00 4.60 0.25 0.25 0.58
VCH-1 4.00 1.15 0.15 0.20 0.14
2.00 1.70 0.15 0.20 0.10
V-B 4.00 4.60 0.15 0.20 0.55
4.00 5.10 0.15 0.20 0.61
PLANILLA DE METRADOS ESTRUCTURAS
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
TALLERES
VP-8 4.00 4.60 0.25 0.40 1.84
VP-9 8.00 4.00 0.25 0.35 2.80
V-6 1.00 4.60 0.50 0.20 0.46
V-B 6.00 4.60 0.15 0.20 0.83
AREA ADMINISTRATIVA
OBRAS EXTERIORES
V - B (Cerco Perimetrico) 1.00 87.75 0.30 26.33
AREA INTIMA 1
V-1 4.00 4.60 0.45 8.28
4.00 5.10 0.45 9.18
2.00 4.60 0.45 4.14
V-2 4.00 5.10 0.45 9.18
V-3 1.00 4.60 0.50 2.30
V-A 2.00 4.60 0.35 3.22
VCH-1 4.00 1.15 0.15 0.69
2.00 1.70 0.15 0.51
4.00 1.15 0.15 0.69
2.00 1.70 0.15 0.51
V-B 4.00 4.60 0.35 6.44
4.00 5.10 0.35 7.14
2.00 4.60 0.35 3.22
4.00 5.10 0.35 7.14
AREA INTIMA 2
V-1 4.00 4.60 0.45 8.28
4.00 5.10 0.45 9.18
V-A 2.00 4.60 0.35 3.22
VCH-1 4.00 1.15 0.15 0.69
2.00 1.70 0.15 0.51
V-B 4.00 4.60 0.35 6.44
4.00 5.10 0.35 7.14
TALLERES
VP-8 4.00 4.60 0.65 11.96
VP-9 8.00 4.00 0.55 17.60
V-6 1.00 4.60 0.50 2.30
V-B 6.00 4.60 0.35 9.66
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
1.00 7.00 0.70 4.90
VP-4 2.00 10.40 0.35 7.28
2.00 10.40 0.40 8.32
V-4 1.00 10.40 0.60 6.24
AREA ADMINISTRATIVA
AREA ADMINISTRATIVA
1.00 26.15 25.35 0.125 82.86
CANT MEDIDAS
ITEM PARCIAL TOTAL
VECES LARGO (L) ANCHO (B) ALTO (H)
05.10.00 SARDINELES
UNID.
UND
M2
ML
M2
M2
GLB
M3
M3
M2
M3
M3
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
M3
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
M3
M2
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
M3
M3
M2
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
M3
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
M3
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
M2
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
M3
M2
m2
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
M3
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
KG
M3
M2
KG
M3
M2
KG
M3
M2
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
KG
M3
M2
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
KG
M3
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
M2
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
KG
M3
M2
KG
UND
M3
M2
PLANILLA DE METRADOS ESTRUCTURAS
UNID.
KG
M3
M2
KG
M3
M2
KG
RESUMEN DE METRADO DE ACERO
Proyecto CENTRO ASISTENCIAL INTEGRAL PARA EL ADULTO MAYOR 7.66667 Hoja Nº :.................
Propietario MUNICIPALIDAD POVINCIAL JORGE BASADRE GROHMANN Plano Nº :...........................................................
Fecha JUNIO DEL 2005 Hecho por :...........................................................
Revisado :...........................................................
OBRAS EXTERIORES
1/2" 13 5 0.6 39
ACERO EN ZAPATAS
ACERO EN ZAPATAS
ACERO EN ZAPATAS
1/2" 5 7 1 35
1/2" 1 7 1 7
1/2" 2 6 1 12
Proyecto CENTRO ASISTENCIAL INTEGRAL PARA EL ADULTO MAYOR 7.66667 Hoja Nº :.................
Propietario MUNICIPALIDAD POVINCIAL JORGE BASADRE GROHMANN Plano Nº :...........................................................
Fecha JUNIO DEL 2005 Hecho por :...........................................................
Revisado :...........................................................
ACERO EN ZAPATAS
1/2" 2 12 1.25 30
Z-4 1/2" 2 8 1 16
1/2" 2 8 1 16
Z-5'
Z-5' 1/2" 1 10 2.3 23
1 10 0.5 5
1/2" 1 16 1.4 22.4
1 16 0.75 12
1/2" 1 5 0.6 3
1/2" 1 5 0.6 3
1/2" 2 5 0.7 7
Proyecto CENTRO ASISTENCIAL INTEGRAL PARA EL ADULTO MAYOR 7.66667 Hoja Nº :.................
Propietario MUNICIPALIDAD POVINCIAL JORGE BASADRE GROHMANN Plano Nº :...........................................................
Fecha JUNIO DEL 2005 Hecho por :...........................................................
Revisado :...........................................................
ACERO EN ZAPATAS
Z-4 1/2" 4 1 8 32
Z-4
1/2" 4 1 8 32
Proyecto CENTRO ASISTENCIAL INTEGRAL PARA EL ADULTO MAYOR 7.66667 Hoja Nº :.................
Propietario MUNICIPALIDAD POVINCIAL JORGE BASADRE GROHMANN Plano Nº :...........................................................
Fecha JUNIO DEL 2005 Hecho por :...........................................................
Revisado :...........................................................
Proyecto CENTRO ASISTENCIAL INTEGRAL PARA EL ADULTO MAYOR 7.66667 Hoja Nº :.................
Propietario MUNICIPALIDAD POVINCIAL JORGE BASADRE GROHMANN Plano Nº :...........................................................
Fecha JUNIO DEL 2005 Hecho por :...........................................................
Revisado :...........................................................
VC-01
As corr positivo
L = 8.3 + 0.35*2 (anclaje)+0.8 (empalme) = 9.80 As corrido 3/4" 1 4 9.8 39.2
As Negativo corrido
3/4" 1 4 9.8 39.2
As INTERMEDIO
1/2" 1 4 9.8 39.2
Calculo de estribos:
1@0.05 (1est;5cm)+ 6@0.15 (6est;90cm) + 4@0.25 (4est;120cm) ; a ambos extremos = 22 estribos en 4.30 m
EJE 3 => LUZ DE 5.6M = 22 + 1.3/0.35 = 25 ESTRIBOS
Longitud del Estribo = (0.24 + 1.18 + 0.1)x2 = 3.0 m 3/8" 1 44 2.45 107.8
Longitudes x f
Nro.de Nro.de Longitud
Partida Nro. Descripción Diseño del Fierro f elementos piezas por
iguales elementos x pieza 1/4"/3/4" 3/8" 1/2" 5/8"
05.03.03 COLUMNAS
ACERO ESTRUCTURAL
OBRAS EXTERIORES
C-3
C-3
PARTE POSTERIOR de fondo de cimentacion a viga = 0.25+0.5+3.95+0.15+0.25 = 5.1 3/8" 15 4 5.1 306
Estribos = 1@0.05, r@0.20 =3.85/0.2=19 + 2 = 21 est 1/4" 15 21 0.7 220.5
LATERAL DERECHA = 0.25+0.5+4.3+0.15+0.25 = 5.45 3/8" 17 4 5.45 370.6
Estribos = 1@0.05, r@0.20 =4.30/0.2=22 + 2 = 24 est 1/4" 17 24 0.7 285.6
LATERAL IZQUIERDA = 0.25+0.5+4.65+0.15+0.25 = 5.80 3/8" 3 4 5.8 69.6
Estribos = 1@0.05, r@0.20 =4.55/0.2=23 + 2 = 25 est 1/4" 3 25 0.7 52.5
ANCLA EN CORONA MURO = 3.0 3/8" 3 4 3 36
Estribos = 1@0.05, r@0.20 =2.9/0.2=15 + 2 = 17 est 1/4" 3 17 0.7 35.7
FRONTAL = 0.25+0.5+3.9+0.15+0.25 = 5.05 3/8" 12 4 5.05 242.4
Estribos = 1@0.05, r@0.20 =3.8/0.2=19 + 2 = 21 est 1/4" 12 21 0.7 176.4
Longitud del Estribo = 0.20 x 2 + 0.10 x 2 + 0.05 x 2 = 0.70 ml
C-8
LATERAL IZQUIERDA de fondo de cimentacion a viga = 0.25+0.5+4.20+0.15+0.25 = 5.35 1/2" 5 4 5.35 107
Estribos = 1@0.05, r@0.20 =4.1/0.2=21 + 2 = 23 est 1/4" 5 23 0.95 109.25
C-3
METRADOS
Proyecto CENTRO ASISTENCIAL INTEGRAL PARA EL ADULTO MAYOR 7.66667 Hoja Nº :.................
Propietario MUNICIPALIDAD POVINCIAL JORGE BASADRE GROHMANN Plano Nº :...........................................................
Fecha JUNIO DEL 2005 Hecho por :...........................................................
Revisado :...........................................................
LATERAL IZQUIERDA de fondo de cimentacion a viga = 0.25+0.5+4.20+0.15+0.25 = 5.35 1/2" 3 4 5.35 64.2
Estribos = 1@0.05, r@0.20 =4.1/0.2=21 + 2 = 23 est 1/4" 3 23 1.05 72.45
Longitud del Estribo 2 = 0.20 x 2 + 0.24 x 2 + 0.07 x 2 = 1.05 ml
OBRAS EXTERIORES
Vb
.15
Vb
LONGITUD TOTAL DE LA VIGA: 3/8" 1 4 87.75 351
= 2.90+5.50+35.80+9.90+4.90+10.95+9.55+3.90+4.35 = 87.75 1/4" 1 440 0.55 242
Estribos = 1@0.05, r@0.20 =87.75/0.2=438 + 2 = 440 est
. C-2
. 0.25 1/2" 2 4 5.75 46.00 45.72 5
C-3
. 0.25 - 12 4 4.25 204.00 114.24 23
0.25 0.78
C-3
. 0.25 3/8" 12 4 4.25 204.00 114.24 23
0.25 0.78
0.25 1.05
. C-8
. 0.25 5/8" 6 4 5.75 138.00 214.18 15
VA-01
. 4.05 1/2" 8 3 4.05 98.00 97.41 11
. 4.05 1/2" 8 2 4.05 65.00 64.61 7
V- 2
. 5.10 1/2" 1 3 5.10 16.00 15.90 2
. 5.10 1/2" 1 2 5.10 11.00 10.93 1
. 5.10 3/8" 1 2 5.10 11.00 6.16 1
VCH-01
. 4.90 3/8" 16 4 4.90 314.00 175.84 35
. 4.90
. 0.65 1/4" 16 34 0.65 353.60 87.69 -
TOTAL DE FIERROCORRUGADO
DIAMETRO : Ø 1/2" = 41 VAR
DIAMETRO : Ø 3/8" = 43 VAR
DIAMETRO : Ø 1/4" = 246.75 KG
VA-01
. 4.05 1/2" 8 3 4.05 98.00 97.41 11
. 4.05 1/2" 8 2 4.05 65.00 64.61 7
VCH-01
. 4.90 3/8" 18 4 4.90 353.00 197.68 39
. 4.90
. 0.65 1/4" 18 34 0.65 397.80 98.65 -
TOTAL DE FIERROCORRUGADO
DIAMETRO : Ø 1/2" = 48 VAR
DIAMETRO : Ø 3/8" = 49 VAR
DIAMETRO : Ø 1/4" = 285.25 KG
PLANILLA DE METRADO DE ACERO
Obra : CENTRO ASISTENCIAL PARA EL ADULTO MAYOR: TALLERES
ITEM LONGITUDES POR DIAMETRO PESO
Nro ELEM. Nro PIEZAS LONGITUD 1/4¨ 3/8¨ 1/2¨ 5/8¨ 3/4¨ 1¨ (KG) VAR
DESCRIPCION DIAMETRO
IGUALES x ELEM. POR PIEZA 0.25 0.56 0.99 1.55 2.24 3.97
ACERO EN VIGAS
VP-8
. 4.40 5/8" 4 5 4.40 88.00 136.58 10
. 4.40 1/2" 4 2 4.40 36.00 35.78 4
V-6
. 5.00 1/2" 1 6 5.00 30.00 29.82 3
. 5.00
V-b
. 6.00 3/8" 6 4 6.00 144.00 80.64 16
. 6.00
. 0.65 1/4" 6 70 0.65 273.00 67.70 -
TOTAL DE FIERROCORRUGADO
DIAMETRO : Ø 5/8" = 20 VAR
DIAMETRO : Ø 1/2" = 29 VAR
DIAMETRO : Ø 3/8" = 51 VAR
DIAMETRO : Ø 1/4" = 140.36 KG
0.25 0.75
C-5
. 0.25 5/8" 7 4 6.20 174.00 270.05 19
C'-6
. 0.25 1/2" 2 6 4.25 51.00 50.69 6
0.25 0.85
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
P-2
. 0.45 3/4" 4 6 5.40 130.00 290.55 14
5/8" 4 2 5.40 44.00 68.29 5
. 4.60 1/2" 4 2 5.40 44.00 43.74 5
. C'-1
. 0.25 1/2" 2 4 5.10 41.00 40.75 5
C-4
. 0.25 3/8" 1 6 5.10 31.00 17.36 3
. 4.60
1/4" 1 33 0.6 19.80 4.91 -
0.25 0.60 0.60
1/4" 1 33 0.6 19.80 4.91 -
. C'-4
. 0.25
3/8" 1 7 5.10 36.00 20.16 4
. 4.60
TOTAL DE ACEROS
DIAMETRO : Ø 3/4" = 22 VAR
DIAMETRO : Ø 5/8" = 31 VAR
DIAMETRO : Ø 1/2" = 32 VAR
DIAMETRO : Ø 3/8" = 145 VAR
DIAMETRO : Ø 1/4" = 106.07 KG
Obra : CENTRO ASISTENCIAL PARA EL ADULTO MAYOR: S.U.M
ITEM LONGITUDES POR DIAMETRO PESO
Nro ELEM. Nro PIEZAS LONGITUD 1/4¨ 3/8¨ 1/2¨ 5/8¨ 3/4¨ 1¨ (KG) VAR
DESCRIPCION DIAMETRO
IGUALES x ELEM. POR PIEZA 0.25 0.56 0.99 1.55 2.24 3.97
ACERO EN VIGAS
VP-1 3/4" 2 6 5.40 65.00 145.28 7
. 5.95
5/8" 2 2 1.20 5.00 7.76 1
ACERO EN VIGAS
VP-4
. 12.0 5/8" 2 6 12.00 144.00 223.49 16
1/2" 2 2 12.00 48.00 47.71 5
V- 4
. 12.00 5/8" 1 4 12.00 48.00 74.50 5
1/2" 1 4 12.00 48.00 47.71 5
VP- 5
. 3.50 5/8" 4 4 3.50 56.00 86.91 6
V-B
. 12.0 3/8" 4 4 12.00 192.00 107.52 21
TOTAL DE ACEROS
DIAMETRO : Ø 3/4" = 29 VAR
DIAMETRO : Ø 5/8" = 41 VAR
DIAMETRO : Ø 1/2" = 20 VAR
DIAMETRO : Ø 3/8" = 158 VAR
DIAMETRO : Ø 1/4" = 90 KG
C'-6
. 0.25 1/2" 2 6 4.25 51.00 50.69 6
0.25 0.85
TOTAL DE FIERROCORRUGADO
DIAMETRO : Ø 1/2" = 6 VAR
DIAMETRO : Ø 3/8" = 95 VAR
DIAMETRO : Ø 1/4" = 10.54 KG
Obra : CENTRO ASISTENCIAL PARA EL ADULTO MAYOR: ADMINISTRATIVOS
ITEM LONGITUDES POR DIAMETRO PESO
Nro ELEM. Nro PIEZAS LONGITUD 1/4¨ 3/8¨ 1/2¨ 5/8¨ 3/4¨ 1¨ (KG) VAR
DESCRIPCION DIAMETRO
IGUALES x ELEM. POR PIEZA 0.25 0.56 0.99 1.55 2.24 3.97
ACERO EN VIGAS
VP-6
. 13.75 5/8" 2 4 13.75 110.00 170.72 12
. 13.75 1/2" 2 2 13.75 55.00 54.67 6
TOTAL DE FIERROCORRUGADO
DIAMETRO : Ø 1/2" = 13 VAR
DIAMETRO : Ø 3/8" = 37 VAR
DIAMETRO : Ø 1/4" = 72.90 KG
TOTAL DE FIERROCORRUGADO
DIAMETRO : Ø 3/8" = 53 VAR
DIAMETRO : Ø 1/4" = 75.20 KG
TOTAL DE FIERROCORRUGADO
DIAMETRO : Ø 1/2" = 17 VAR
DIAMETRO : Ø 3/8" = 4 VAR
DIAMETRO : Ø 1/4" = 33.33 KG
Obra : CENTRO ASISTENCIAL PARA EL ADULTO MAYOR: S.U.M
ITEM LONGITUDES POR DIAMETRO PESO
DESCRIPCION DIAMETRO Nro ELEM. Nro PIEZAS LONGITUD 1/4¨ 3/8¨ 1/2¨ 5/8¨ 3/4¨ 1¨ (KG) VAR
IGUALES x ELEM. POR PIEZA 0.25 0.56 0.99 1.55 2.24 3.97
TOTAL DE ACEROS
DIAMETRO : Ø 3/8" = 2 VAR
DIAMETRO : Ø 1/2" = 60 VAR
DIAMETRO : Ø 1/4" = 116.86 KG
TOTAL DE ACEROS
DIAMETRO : Ø 3/8" = 8 VAR
TOTAL DE FIERROCORRUGADO
DIAMETRO : Ø 1/2" = 89 VAR
DIAMETRO : Ø 3/8" = 152 VAR
Obra : CENTRO ASISTENCIAL PARA EL ADULTO MAYOR: MC-01
ITEM LONGITUDES POR DIAMETRO PESO
Nro ELEM. Nro PIEZAS LONGITUD 1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1'' (KG) VAR
DESCRIPCION DIAMETRO
IGUALES x ELEM. POR PIEZA 0.25 0.56 0.99 1.55 2.24 3.97
ACERO EN MUROS DE CONTENCION
. 0.35
5/8" 1 160 7.70 1232.00 1,912.06 137
. 0.25
1/2" 1 213 5.00 1065.00 1,058.61 118
. 0.25
. 34.00
TOTAL DE FIERROCORRUGADO
DIAMETRO : Ø 5/8" = 197 VAR
DIAMETRO : Ø 1/2" = 701 VAR
DIAMETRO : Ø 3/8" = 166 VAR
. 0.35
. 22.00
. 0.15
1/2" 1 110 4.50 495.00 492.03 55
. 0.35
. 22.00
TOTAL DE FIERROCORRUGADO
DIAMETRO : Ø 1/2" = 293 VAR
DIAMETRO : Ø 3/8" = 49 VAR
Obra : CENTRO ASISTENCIAL PARA EL ADULTO MAYOR: MC-03
ITEM LONGITUDES POR DIAMETRO PESO
Nro ELEM. Nro PIEZAS LONGITUD 1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1'' (KG) VAR
DESCRIPCION DIAMETRO
IGUALES x ELEM. POR PIEZA 0.25 0.56 0.99 1.55 2.24 3.97
ACERO EN MUROS DE CONTENCION
. 0.05
1/2" 1 32 3.25 104.00 103.38 12
. 0.20
. 6.50
. 0.05
3/8" 1 16 3.25 52.00 29.12 6
. 0.20
. 6.50
TOTAL DE FIERROCORRUGADO
DIAMETRO : Ø 1/2" = 12 VAR 2.125
DIAMETRO : Ø 3/8" = 20 VAR
4.34
. 0.10
1/2" 1 32 7.20 231.00 229.61 26
. 0.35
. 4.70
TOTAL DE FIERROCORRUGADO
DIAMETRO : Ø 5/8" = 28 VAR
DIAMETRO : Ø 1/2" = 234 VAR
DIAMETRO : Ø 3/8" = 23 VAR 280
Obra : CENTRO ASISTENCIAL PARA EL ADULTO MAYOR: RAMPA
ITEM LONGITUDES POR DIAMETRO PESO
Nro ELEM. Nro PIEZAS LONGITUD 1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1'' (KG) VAR
DESCRIPCION DIAMETRO
IGUALES x ELEM. POR PIEZA 0.25 0.56 0.99 1.55 2.24 3.97
ACERO EN PLACA DE 7 CMS
. 0.25
. 50.00
ACERO EN RAMPA
TOTAL DE FIERROCORRUGADO
DIAMETRO : Ø 1/2" = 62 VAR
DIAMETRO : Ø 3/8" = 190 VAR
Nro ELEM. Nro PIEZAS LONGITUD 1/4'' 3/8'' 1/2'' 5/8'' 3/4'' 1'' (KG) VAR
DESCRIPCION DIAMETRO
IGUALES x ELEM. POR PIEZA 0.25 0.56 0.99 1.55 2.24 3.97
SARDINEL S-01
. 0.20
. 30.00
TOTAL DE FIERROCORRUGADO
DIAMETRO : Ø 3/8" = 38 VAR