Documentos de Académico
Documentos de Profesional
Documentos de Cultura
GIS Technology
ABB Power Grids High Voltage – Impulsado La Transformación Energética
OSCAR QUINTERO| Sales Specialist GIS & GCB
Tamaño Total de Mercado Estimado para 2016
NEU
2013 3’465 MUSD 300
6 1
8
2 7
5
1 Compaca y Modular Fiablemente Probada 4 No environmental constrains 7 Substation security and aesthetics
2 Requiere de poco Espacio 5 Reduce tiempos de 8 Advanced features for digital substation
3 Bajos costos de Impacto Ambiental y de Cilco de 6 Altos Estandares de Calidad y Seguridad
Vida
nSeccioandor
n Interruptor nSeccionador de Tierra
n Trans. Corriente nBarrajes
n Trans. Tensión
n Seccioandor
n Seccionador de Tierra
DTB
n Interruptor
LTB n Transformador de Corriente
n Interruptor
Funcionalidad
Servicio y Mantenimiento
Características
§ Largos Intervalos de Mantenimiento
§ Equipo fiable aislado en Gas
§ Subestación más compacta
Beneficios
§ No hay interrupciones en subestaciones
de alta mar
§ Ahorro de costos por reducción de
espacio
Product ENK ELK-04 C / ELK-04 ELK-14 C / ELK-14 ELK-3 C / ELK-3 ELK-4 ELK-5
Rated voltage [kV] 72.5 145 / 170 245 / 253 / 300 420 / 550 800 1200
Rated power frequency withstand voltage [kV] 140 275 / 325 460 650 / 740 960 1100
Rated lightning impulse withstand voltage [kV] 325 650 / 750 1050 1425 / 1675 2100 2400
Rated normal current [A] 2500 3150 / 4000 3150 / 4000 5000 / 6300 5000 / 6300 5000 / 8000
§ CO2 or N2
§ O2
Business case
• Provide reliable electrical infrastructure for largest
power station in terms of produced power
• 20 generating units with 14 GW capacity
• 10 generating units at 60 Hz Brazil
• 10 generating units at 50 Hz Paraguay
• ABB solution
• 550 kV GIS installation in 1½- and double breaker
arrangement with 54 bays, 63 kA
• Transmission systems
• 765 kV AC, 60 Hz
• 600 kV DC
• Second largest 550 kV GIS substation
• Customer benefits
• Reliable electricity supply to Paraguay and Brazil
with approx. 95 Mio MWh/year
• GIS inside powerhouse building
§ Resistencia de suelo
Telecomunicações
80.00%
Terraplanagem
GIS
AIS
0 5 10 15 20 25 30
Fundação/Terraplanagem/Base Civil Linha Curta 550 kV
Engenharia Aprovação dos Desenhos
Fabricação dos Equipamentos Transporte
Entrega no campo Montagem
Comissionamento
1,3 5 6
8
7
2,3 4
9
Gas Insulated Switchgear,
three-phase
4,2 m
Air Insulated Switchgear
Configuration 1, 2
Double busbar 1,3
2,3
Busbar disconnectors 3 8
with earthing switch
Circuit breaker 4 6
Current transformer 5 7
Line disconnector 7
5 Gas Insulated Switchgear,
with earthing switch 4 single phase
Voltage transformer 6 9
© ABB Group
August 30, 2017 | Slide 51
Servicios