Id Modo de Nombre de tarea Duración Comienzo Fin Predecesoras
2018 2019 2020 2021
tarea tri 4 tri 1 tri 2 tri 3 tri 4 tri 1 tri 2 tri 3 tri 4 tri 1 tri 2 tri 3 1 PROYECTO 4 380 días lun 06/05/19vie 16/10/20 PROYECTO 4 380 días 2 INICIO 0 mss lun 06/05/19lun 06/05/19 INICIO 3 A 6 mss lun 06/05/19vie 18/10/19 2 A 6 mss 4 B 4 mss lun 06/05/19vie 23/08/19 2 B 4 mss 5 C 3 mss lun 06/05/19vie 26/07/19 2 C 3 mss 6 D 1 ms lun 21/10/19vie 15/11/19 3 D 1 ms 7 E 5 mss lun 21/10/19vie 06/03/20 4,3 E 5 mss 8 F 4 mss lun 09/03/20vie 26/06/20 7 F 4 mss 9 G 2 mss lun 09/03/20vie 01/05/20 5,7 G 2 mss 10 H 3 mss lun 29/07/19vie 18/10/19 5 H 3 mss 11 I 1 ms lun 04/05/20vie 29/05/20 9 I 1 ms 12 J 2 mss lun 01/06/20vie 24/07/20 11,10 J 2 mss 13 K 7 mss lun 21/10/19vie 01/05/20 10 K 7 mss 14 L 5 mss lun 04/05/20vie 18/09/20 13,6,9 L 5 mss 15 M 4 mss lun 21/10/19vie 07/02/20 10 M 4 mss 16 N 1 ms lun 21/09/20vie 16/10/20 12,14,15 N 1 ms 17 FIN 0 mss vie 16/10/20 vie 16/10/20 16 FIN
Tarea Resumen inactivo Tareas externas
División Tarea manual Hito externo
Hito solo duración Fecha límite
Proyecto: PROBLEMA 4 Resumen Informe de resumen manual Tareas críticas Fecha: vie 03/05/19 Resumen del proyecto Resumen manual División crítica