: “AMPLIACION Y MEJORAMIENTO DE AGUA POTABLE E INSTALACION DEL SISTEMA DE ALCANTARILLADO Y PLANTA DE Fecha de Inicio Contractual
OBRA TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE
ANTABAMBA - APURIMAC”
Plazo de Ejecucion Contractual en (D.C.)
ENTIDAD :MUNICIPALIDAD DISTRITAL DE JUAN ESPINOZA MEDRANO
UBICACION :DISTRITO DE JUAN ESPINOZA - ANTABAMBA - APURIMAC Suspension de Plazo
LOCALIDAD : VITO
EJECUTA : CONSORCIO SAN MARTIN Fecha de Termino Contractual
FECHA : JULIO - 2018
01 SISTEMA DE AGUA POTABLE 713,486.13 51,541.11 140,338.91 59,395.28 150.00 0.00 40,616.65 102,608.89
02 SISTEMA DE ALCANTARILLADO 1,122,076.05 142,876.68 92,514.58 246,396.55 76,667.19 0.00 208,997.54 224,540.67
03 PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES 425,118.56 48,609.25 38,399.89 54,301.86 23,048.02 0.00 23,744.15 11,943.48
04 CAPACITACION Y MITAGACION AMBIENTAL 33,010.50 4,943.05 6,348.18 4,996.15 4,214.10 0.00 6,344.31 1,579.01
05 FLETE TERRESTRE 77,907.87 34,928.63 27,267.75 7,790.79 3,895.39 0.00 805.06 805.06
Costo Directo 2,371,599.11 282,898.72 304,869.31 372,880.63 107,974.70 0.00 280,507.72 341,477.10
GASTOS GENERALES (10.00%) 237,159.91 28,289.87 30,486.93 37,288.06 10,797.47 0.00 28,050.77 34,147.71
UTILIDAD (5.00%) 118,579.96 14,144.94 15,243.47 18,644.03 5,398.74 0.00 14,025.39 17,073.86
SUB-TOTAL ### 325,333.53 350,599.71 428,812.72 124,170.91 0.00 ### 392,698.67
I.G.V (18%) 490,921.02 58,560.04 63,107.95 77,186.29 22,350.76 0.00 58,065.10 70,685.76
TOTAL MONTO CONTRATADO S/. ### 383,893.57 413,707.66 505,999.01 146,521.67 0.00 ### 463,384.43
CURVA "S"
120.00%
100.00% 100.00%
86.96%96.43%
80.00%
71.29%
60.00%
56.89%
45.06%
40.00% 40.51%45.06%
24.78%
20.00%
11.93%
0.00%
1 2 3 4 5 6 7 8 9 10
RESUMEN DEL
EPROGRAMADO POR LA SUSPENSION DE PLAZO N° 01
14-Nov-18
240
18-Feb-19 al 31-Mar-19
22-Aug-19
01.03.04.01 ACCESORIOS LINEA DE CONDUCCION 788.53 S/. 0.00 S/. 473.12 S/. 315.41 S/. 0.00
01.03.05 PRUEBA HIDRAULICA S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.03.05.01 PRUEBA HIDRAULICA EN LINEA DE CONDUCCION 4,081.20 S/. 0.00 S/. 3,146.40 S/. 934.80 S/. 0.00
01.04 CAMARA DE ROMPE PRESION (03 UND) S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
CALENDARIO DE AVANCE DE OBRA VALORIZADO REPROGRAMADO POR LA SUSPENSION DE PLAZO N° 01 : SISTEMA DE AGUA PO
01.06.11.01 LIMPIEZA Y DESBROCE DE TERRENO 135.63 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 135.63
01.06.11.02 TRAZO Y REPLANTEO 219.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 219.00
01.06.11.03 EXCAVACION MANUAL EN MATERIAL GRAVOSO 779.64 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 779.64
01.06.11.04 ELIMINACION DE MATERIAL EXCEDENTE 974.45 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 974.45
CALENDARIO DE AVANCE DE OBRA VALORIZADO REPROGRAMADO POR LA SUSPENSION DE PLAZO N° 01 : SISTEMA DE AGUA PO
A DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
A DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
A DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
S/. 0.00
A DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
A DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
A DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
A DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
MADO POR LA SUSPENSION DE PLAZO N° 01 : SISTEMA DE AGUA POTABLE
A DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
A DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
A DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
A DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
A DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
OBRA : “AMPLIACION Y MEJORAMIENTO DE AGUA POTABLE E INSTALACION DEL SISTEMA DE ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESP
01.03.02 SUMINISTRO E INSTALACION TUBERIAS PVC UF NTP ISO 4435 S-25 Ø 200 23,670.15
MM, E=3.9MM S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.04 PRUEBA HIDRAULICA S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.04.01 DOBLE PRUEBA HIDRAULICA DE TUBERIAS PVC UF (D=160MM, 200MM) 16,878.24 S/. 799.43 S/. 1,589.73 S/. 1,801.07 S/. 650.29 S/. 5,838.29
CALENDARIO DE AVANCE DE OBRA VALORIZADO REPROGRAMADO POR LA SUSPENSION DE PLAZO N° 01: SISTEMA DE ALCA
OBRA : “AMPLIACION Y MEJORAMIENTO DE AGUA POTABLE E INSTALACION DEL SISTEMA DE ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESP
OBRA : “AMPLIACION Y MEJORAMIENTO DE AGUA POTABLE E INSTALACION DEL SISTEMA DE ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESP
01.05.02.06 DADOS DE CONCRETO P/EMPALME A BUZONES 13,073.52 S/. 625.86 S/. 556.32 S/. 2,746.83 S/. 1,321.26 S/. 5,823.40
1.06 CONEXION DOMICILIARIA (290 UND) S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.06.01 OBRAS PRELIMINARES S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.06.01.01 PROTECCION DE OBRA C/CINTA PLASTICA P/SEÑALIZACION DE PELIGRO 3,148.82 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.06.01.02 TRAZO, NIVELACION Y REPLANTEO DE ZANJAS 3,639.21 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.06.02 MOVIMIENTO DE TIERRAS S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.06.02.01 EXCAVACION DE ZANJAS P/CONEXIONES DOMICILIARIAS DESAGUE 78,746.31 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.06.02.02 REFINE, NIVELACION Y CONFORMACION DE ZANJAS 2,619.72 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.06.02.03 CAMA DE APOYO E=0.10M PARA TUBERIAS 32,146.36 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
OBRA : “AMPLIACION Y MEJORAMIENTO DE AGUA POTABLE E INSTALACION DEL SISTEMA DE ALCANTARILLADO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESP
DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA - APURIMAC”
S/. 0.00
S/. 6,199.43 S/. 0.00
AMADO POR LA SUSPENSION DE PLAZO N° 01: SISTEMA DE ALCANTARILLADO
DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA - APURIMAC”
S/. 0.00
S/. 0.00
S/. 0.00
AMADO POR LA SUSPENSION DE PLAZO N° 01: SISTEMA DE ALCANTARILLADO
DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA - APURIMAC”
S/. 0.00
S/. 0.00
DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA - APURIMAC”
#REF!
### ### ### S/. 0.00
22,454.07 12,580.25 428.03 -
11,227.03 6,290.13 214.02 -
258,221.77 144,672.91 4,922.36 -
46,479.92 26,041.12 886.02 -
304,701.69 170,714.03 5,808.38 -
20.01% 11.21% 0.38% 0.00%
88.41% 99.62% 100.00% 100.00%
CALENDARIO DE AVANCE DE OBRA VALORIZADO REPROGRAMADO POR LA SUSPENSION DE PLAZO N° 01: PLANTA DE TRATAMIENTO
01.01.03 CORTE EN MATERIAL GRAVOSO CON MAQUINARIA . 19,320.00 S/. 19,320.00 S/. 0.00 S/. 0.00 S/. 0.00
1.02 MOVIMIENTO DE TIERRA PTAR S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.02.01 TRAZO Y REPLANTEO 2,733.10 S/. 2,733.10 S/. 0.00 S/. 0.00 S/. 0.00
01.02.02 CORTE EN MATERIAL GRAVOSO CON MAQUINARIA . 9,395.04 S/. 9,395.04 S/. 0.00 S/. 0.00 S/. 0.00
01.02.03 RELLENO CON MATERIAL EXCEDENTE DE CORTE 5,882.11 S/. 5,882.11 S/. 0.00 S/. 0.00 S/. 0.00
1.03 CAMARA DE REJAS (01 UND) S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.03.01 LIMPIEZA Y DESBROCE DE TERRENO 7.75 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.03.02 TRAZO Y REPLANTEO 28.00 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.03.03 EXCAVACION MANUAL EN MATERIAL GRAVOSO 192.37 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.03.04 ELIMINACION DE MAT.EXCED. CARGUIO MANUAL Dmax = 50m 212.74 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.03.05 SOLADO DE CONCRETO 4" MEZCLA 1:12 C-H 207.74 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.03.06 CONCRETO F'C=210KG/CM2 939.96 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.03.07 ENCOFRADO Y DESENCOFRADO 990.46 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
CALENDARIO DE AVANCE DE OBRA VALORIZADO REPROGRAMADO POR LA SUSPENSION DE PLAZO N° 01: PLANTA DE TRATAMIENTO
01.06.21 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC 1,078.66 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
1.07 BUZONETAS EN LECHO DE SECADO (02UND) S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.07.01 CONCRETO F'C=210KG/CM 2 2,048.35 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.07.02 ENCOFRADO Y DESENCOFRADO 1,444.64 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.07.03 ACERO DE REFUERZO FY=4200 KG/CM2 378.61 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.07.04 TARRAJEO CON IMPERMEABILIZANTE 765.36 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
1.08 TUBERIAS Y ACCESORIOS DE EMPALME S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.08.01 TRAZO, NIVELACION Y REPLANTEO 1,271.82 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.08.02 EXCAVACION DE ZANJAS H=1.35 - 2.00MTS 35,980.78 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
CALENDARIO DE AVANCE DE OBRA VALORIZADO REPROGRAMADO POR LA SUSPENSION DE PLAZO N° 01: PLANTA DE TRATAMIENTO
01.08.07 SUMINISTRO E INSTALACION TUBERIA PVC UF NTP ISO 4435 S-25 Ø200MM 929.50
S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.08.08 SUMINISTRO E INSTALACION TUBERIA PVC UF NTP ISO 4435 S-25 Ø315MM 2,184.84
S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
1.09 CAMARA DE CLORACION S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.09.01 LIMPIEZA DE TERRENO MANUAL 8.21 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.09.02 TRAZO, NIVELACION Y REPLANTEO 29.68 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.09.03 EXCAVACION DE ZANJA PARA ESTRUCTURA 401.38 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
CALENDARIO DE AVANCE DE OBRA VALORIZADO REPROGRAMADO POR LA SUSPENSION DE PLAZO N° 01: PLANTA DE TRATAMIENTO
1.1 CERCO PERIMETRICO EN PLANTA DE TRATAMIENTO S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.10.01 TRAZO, NIVELACION Y REPLANTEO 527.71 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.10.02 EXCAVACION DE ZANJA PARA ESTRUCTURA H<1.50 31.12 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.10.03 ELIMINACION DE MAT.EXCED. CARGUIO MANUAL Dmax = 50m 22.89 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.10.04 CONCRETO CILOPEO 1.8% + 25% P.M. 19.66 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.10.05 CONCRETO F'C=210KG/CM2 EN COLUMNAS 211.90 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.10.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS 233.49 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.10.07 ACERO DE REFUERZO FY=4200 KG/CM2 234.47 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.10.08 ROLLIZO DE EUCALIPTO DE 4" X 2.50M 1,256.64 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.10.09 SUMINISTRO Y COLOCACION DE ALAMBRE DE PUAS 16,086.14 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
CALENDARIO DE AVANCE DE OBRA VALORIZADO REPROGRAMADO POR LA SUSPENSION DE PLAZO N° 01: PLANTA DE TRATAMIENTO
1.11 ARBORIZACION EN PLANTA DE TRATAMIENTO S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.11.01 TRAZO, NIVELACION Y REPLANTEO 98.70 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.11.02 EXCAVACION DE HOYOS PARA ARBOLES 51.24 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
01.11.03 SEMBRADO DE PINO 1,119.30 S/. 0.00 S/. 0.00 S/. 0.00 S/. 0.00
COSTO DIRECTO S/. 425,118.56 ### ### ### ### S/. 0.00 ###
GASTOS GENERALES (10%) S/. 42,511.86 4,860.93 3,839.99 5,430.19 2,304.80 - 2,374.42
UTILIDAD (5%) S/. 21,255.93 2,430.46 1,919.99 2,715.09 1,152.40 - 1,187.21
SUBTOTAL S/. 488,886.35 55,900.64 44,159.87 62,447.14 26,505.22 - 27,305.78
IGV (18.00%) S/. 87,999.54 10,062.12 7,948.78 11,240.49 4,770.94 - 4,915.04
PRESUPUESTO TOTAL S/. 576,885.89 65,962.76 52,108.65 73,687.63 31,276.16 - 32,220.82
PORCENTAJE MENSUAL 11.43% 9.03% 12.77% 5.42% 0.00% 5.59%
PORCENTAJE ACUMULADO 11.43% 20.47% 33.24% 38.66% 38.66% 44.25%
O POR LA SUSPENSION DE PLAZO N° 01: PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
DO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 7.75 S/. 0.00
S/. 28.00 S/. 0.00
S/. 192.37 S/. 0.00
S/. 212.74 S/. 0.00
S/. 207.74 S/. 0.00
S/. 939.96 S/. 0.00
S/. 990.46 S/. 0.00
O POR LA SUSPENSION DE PLAZO N° 01: PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
DO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
DO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
DO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
DO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
DO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
S/. 8,673.00
S/. 929.50
S/. 2,184.84
S/. 1,889.69
S/. 0.00
S/. 8.21 S/. 0.00
S/. 29.68 S/. 0.00
S/. 133.79 S/. 267.59 S/. 0.00
O POR LA SUSPENSION DE PLAZO N° 01: PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES
DO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
DO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE ANTABAMBA -
S/. 0.00
S/. 98.70 S/. 0.00
S/. 51.24 S/. 0.00
S/. 559.65 S/. 559.65
DO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
S/. 0.00
DO POR LA SUSPENSION DE PLAZO N° 01: CAPACITACION Y MITIGACION AMBIENTAL
DO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE
DO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE
COSTO DIRECTO S/. 77,907.87 ### ### S/. 7,790.79 S/. 3,895.39 S/. 0.00 S/. 805.06 S/. 805.06
GASTOS GENERALES (10%) S/. 7,790.79 3,492.86 2,726.78 779.08 389.54 - 80.51 80.51
UTILIDAD (5%) S/. 3,895.39 1,746.43 1,363.39 389.54 194.77 - 40.25 40.25
SUBTOTAL S/. 89,594.05 40,167.92 31,357.92 8,959.41 4,479.70 - 925.82 925.82
IGV (18.00%) S/. 16,126.93 7,230.23 5,644.43 1,612.69 806.35 - 166.65 166.65
PRESUPUESTO TOTAL ### 47,398.15 37,002.35 10,572.10 5,286.05 - 1,092.47 1,092.47
PORCENTAJE MENSUAL 44.83% 35.00% 10.00% 5.00% 0.00% 1.03% 1.03%
PORCENTAJE ACUMULADO 44.83% 79.83% 89.83% 94.83% 94.83% 95.87% 96.90%
ROGRAMADO POR LA SUSPENSION DE PLAZO N° 01: FLETE TERRESTRE
DO Y PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES DE LA COMUNIDAD DE VITO DISTRITO DE JUAN ESPINOZA MEDRANO PROVINCIA DE