01 JORNAL
DEL EMPLEADO EVENTUAL
CARGO UNID. CANT. P.UNT.
ENFERMERO hh 8.0000 85.00
OPERARIO hh 40,633.0145 13.34
OFICIAL hh 9,003.3897 12.76
PEON hh 45,857.2704 11.26
TOTAL
MATERIALES DE CONSTRUCCION
02 DESCRIPCION UNIDAD CANTIDAD P.U.
ACEITE PARA MOTOR SAE-30 gal 2.7210 13.00
LUBRICANTE PARA TUBERIA TIPO MAZZA gal 1.6984 25.00
ALAMBRE NEGRO RECOCIDO # 16 kg 1,785.0455 5.00
ALAMBRE NEGRO RECOCIDO # 8 kg 1,149.0900 5.00
CLAVOS PARA MADERA CON CABEZA DE 1 1/2 " kg 6.0920 5.00
CLAVOS PARA MADERA CON CABEZA DE 2 1/2" kg 6.2500 5.50
CLAVOS PARA MADERA CON CABEZA DE 2" kg 3.9029 5.00
CLAVOS PARA MADERA CON CABEZA DE 3" kg 1,207.7930 5.50
CLAVOS PARA CEMENTO DE ACERO CON CABEZA DE 3/4" kg 0.1000 2.00
PERNO HEXAGONAL DE 3/4" X 3 1/2" pza 9.0000 0.80
SOPORTE TIPO ABRAZADERA PARA TUBO 4"-6" u 79.0000 15.00
CLAVOS PARA CALAMINA kg 5.0000 7.00
PERNOS DE FIERRO CON CABEZA CROMADA 1/4" X 3" pza 4,629.0300 1.00
PERNOS 1/4" X 2" pza 5,753.7000 1.50
MUEBLE DE MELAMINE P/COMPUTADORA u 15.0000 150.00
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 35,806.6785 4.50
ARENA FINA m3 131.9192 120.00
TIERRA NEGRA ORGANICA m3 1.0500 45.00
PIEDRA CHANCADA DE 1/2" m3 592.4818 120.00
PIEDRA CHANCADA DE 3/4" m3 3.9520 120.00
PIEDRA GRANDE DE 8" m3 72.1562 85.00
RESUMEN PRESUPUESTO ANALÍTICO - COSTO DIRECT
TOTAL
TOTAL
O ANALÍTICO
S/. 1,173,960.53
SUB TOTAL
680.00
542,044.41
114,883.25
516,352.86
1,173,960.53
S/. 2,186,369.80
TOTAL
35.37
42.46
8,925.23
5,745.45
30.46
34.38
19.51
6,642.86
0.20
7.20
1,185.00
35.00
4,629.03
8,630.55
2,250.00
161,130.05
15,830.30
47.25
71,097.82
474.24
6,133.28
O - COSTO DIRECTO
O ANALÍTICO
S/. 1,173,960.53
39,011.84
53,018.95
29,258.88
131.25
450.00
3.65
900.00
250.00
1,094.56
6,254.78
2,420.00
4,500.00
900.00
240.00
90.00
1,797.60
25.00
44.00
120.00
3,600.00
O - COSTO DIRECTO
O ANALÍTICO
S/. 1,173,960.53
160.00
450.00
85.00
604.80
302.40
48.00
36.00
30.00
150.00
395.00
395.00
4.50
614.25
4,940.00
16,000.00
65,784.73
70,889.63
2,719.05
196.11
244,474.04
25.00
120.00
1,440.00
405.00
2,100.00
130.69
1.50
334,067.20
2,406.31
3.20
255.00
O - COSTO DIRECTO
O ANALÍTICO
S/. 1,173,960.53
1,404.94
9,600.00
150.00
30.00
5.00
16.00
48.00
28.00
230.00
210.00
1,826.51
1,336.38
130,046.00
57.60
3.08
20.00
450.00
500.00
150.00
92,884.05
1,290.00
6,575.01
408.24
2,303.28
77,282.36
O - COSTO DIRECTO
O ANALÍTICO
S/. 1,173,960.53
137.43
1,511.30
10.99
709.44
3.75
4.80
8.00
2,400.00
1,170.00
1,200.00
60.00
918.75
43.18
30.00
40.00
2,630.25
1,883.28
935.46
19,109.09
627.48
1,003.96
50,326.52
6,290.49
52,500.00
4,532.25
61.25
226.21
16,500.30
300.00
2.00
6,300.00
O - COSTO DIRECTO
O ANALÍTICO
S/. 1,173,960.53
52,741.19
600.00
595.20
144.00
44.80
2,550.00
10,290.00
1,050.00
3,507.00
6,306.30
1,134.00
161,103.60
850.50
1,960.00
5,544.00
66,652.50
95,008.67
12.24
21.12
76.41
400.00
160.00
750.00
96.20
342.27
O - COSTO DIRECTO
O ANALÍTICO
S/. 1,173,960.53
1,575.00
34,295.47
9,639.00
540.00
240.00
7,430.72
450.00
38.50
484.40
240.00
1,443.05
2,409.36
2,333.79
718.09
15.75
60.27
644.63
1,786.14
7,944.00
195.98
88.00
128.00
310.00
1,303.50
475.02
2,768.22
814.80
99.00
18.90
15.75
15.75
O - COSTO DIRECTO
O ANALÍTICO
S/. 1,173,960.53
2.63
180.00
84.00
116.40
120.00
1,250.93
531.00
2,988.38
5,796.00
160.00
76.61
3.60
2,186,369.80
S/. 24,555.00
SUB TOTAL
360.00
3,750.00
150.00
700.00
1,500.00
660.00
1,120.00
O - COSTO DIRECTO
O ANALÍTICO
S/. 1,173,960.53
780.00
375.00
105.00
175.00
200.00
75.00
750.00
100.00
150.00
3,150.00
2,925.00
1,000.00
1,150.00
1,500.00
480.00
720.00
600.00
480.00
480.00
520.00
600.00
24,555.00
S/. 119,102.39
SUB TOTAL
547.68
250.00
4,376.62
5,036.68
3,139.36
1,375.00
O - COSTO DIRECTO
O ANALÍTICO
S/. 1,173,960.53
3,150.00
960.00
6,848.27
20,401.36
1,660.80
2.00
1,966.86
62.50
0.57
107.50
10.75
5,272.69
4,857.66
24,935.00
23,288.51
2,022.11
816.48
6,592.21
672.45
360.00
389.33
119,102.39
S/. 3,503,987.72
RESUMEN PRESUPUESTO ANALÍTICO - GASTOS GENERALE
GASTOS GENERALES
OBRA LLAMAHUIRE
RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO
01 JORNAL
DEL EMPLEADO EVENTUAL
% DE PARTICIPACION
CARGO N° DE PERSONAS MESES COSTO
COORDINADOR DE PROYECTO 0.20 9.00 8,000.00
RESIDENTE DE PROYECTOS DE INVERSION 1.00 9.00 7,500.00
ESPECIALISTA EN SEGURIDAD 0.50 9.00 3,150.00
ASISTENTE TECNICO DE OBRA 1.00 9.00 4,000.00
AUXILIAR ADMINISTRATIVO I / SECRETARIA 0.20 8.00 1,800.00
TOPOGRAFO 1.00 3.00 2,200.00
MAESTRO DE OBRA 1.00 9.00 2,200.00
ALMACENERO 1.00 9.00 1,800.00
OPERADOR DE EQUIPO LIVIANO 1.00 7.00 1,800.00
COCINERA 1.00 6.00 1,200.00
TOTAL
05 VACACIONES TRUNCAS
DEL EMPLEADO EVENTUAL
% DE PARTICIPACION
CARGO N° DE PERSONAS MESES COSTO
COORDINADOR DE PROYECTO 0.20 9.00 666.67
RESIDENTE DE PROYECTOS DE INVERSION 1.00 9.00 625.00
ESPECIALISTA EN SEGURIDAD 0.50 9.00 262.50
ASISTENTE TECNICO DE OBRA 1.00 9.00 333.33
AUXILIAR ADMINISTRATIVO I / SECRETARIA 0.20 8.00 150.00
TOPOGRAFO 1.00 3.00 183.33
MAESTRO DE OBRA 1.00 9.00 183.33
ALMACENERO 1.00 9.00 150.00
OPERADOR DE EQUIPO LIVIANO 1.00 7.00 150.00
COCINERA 1.00 6.00 100.00
TOTAL
RESUMEN PRESUPUESTO ANALÍTICO - GASTOS GENERALE
% DE PARTICIPACION
CARGO N° DE PERSONAS MESES COSTO
COORDINADOR DE PROYECTO 0.20 9.00 666.67
RESIDENTE DE PROYECTOS DE INVERSION 1.00 9.00 625.00
ESPECIALISTA EN SEGURIDAD 0.50 9.00 262.50
ASISTENTE TECNICO DE OBRA 1.00 9.00 333.33
AUXILIAR ADMINISTRATIVO I / SECRETARIA 0.20 8.00 150.00
TOPOGRAFO 1.00 3.00 183.33
MAESTRO DE OBRA 1.00 9.00 183.33
ALMACENERO 1.00 9.00 150.00
OPERADOR DE EQUIPO LIVIANO 1.00 7.00 150.00
COCINERA 1.00 6.00 100.00
TOTAL
ESSALUD (9%)
DEL EMPLEADO EVENTUAL
% DE PARTICIPACION
CARGO N° DE PERSONAS MESES COSTO
RESUMEN PRESUPUESTO ANALÍTICO - GASTOS GENERALE
BIENES DE CONSUMO
04 ADQUISICION DE BIENES
05 OTROS
MATERIALES DE ESCRITORIO
01 MATERIALES DE ESCRITORIO
ANALÍTICO
213,801.25
SUB TOTAL
14,400.00
67,500.00
14,175.00
36,000.00
2,880.00
6,600.00
19,800.00
16,200.00
12,600.00
7,200.00
197,355.00
SUB TOTAL
1,200.00
5,625.00
1,181.25
3,000.00
240.00
550.00
1,650.00
1,350.00
1,050.00
600.00
16,446.25
GASTOS GENERALES
15,846.25
SUB TOTAL
1,200.00
5,625.00
1,181.25
3,000.00
240.00
550.00
1,650.00
1,350.00
1,050.00
600.00
15,846.25
S/. 16,446.25
SUB TOTAL
1,200.00
5,625.00
1,181.25
3,000.00
240.00
550.00
1,650.00
1,350.00
1,050.00
600.00
16,446.25
S/. 4,991.47
SUB TOTAL
149.99
749.97
GASTOS GENERALES
S/. 2,590.28
SUB TOTAL
GASTOS GENERALES
SUB TOTAL
81.00
379.69
79.73
202.50
16.20
37.13
111.38
91.13
70.88
40.50
1,110.12
S/. 7,050.00
SUB TOTAL
150.00
100.00
120.00
2,000.00
200.00
350.00
GASTOS GENERALES
SUB TOTAL
9,800.00
2,880.00
12,680.00
S/. 9,512.50
SUB TOTAL
1.50
6.00
0.00
5.00
2.00
16.00
30.50
SUB TOTAL
50.00
50.00
SUB TOTAL
7,000.00
1,000.00
1,200.00
9,200.00
SUB TOTAL
9.00
40.00
3.00
GASTOS GENERALES
S/. 22,661.48
SUB TOTAL
20,880.00
49.36
600.00
382.12
120.00
630.00
22,661.48
GASTOS GENERALES
S/. 1,910.50
SUB TOTAL
20.00
2.00
1.00
3.00
6.00
20.00
10.00
100.00
15.00
11.00
13.00
20.00
24.00
20.00
10.00
10.50
78.00
36.00
120.00
9.00
15.00
8.00
8.00
6.00
10.00
3.00
48.00
20.00
4.00
100.00
1,080.00
80.00
1,910.50
S/. 1,240.50
GASTOS GENERALES
SUB TOTAL
560.00
680.50
1,240.50
S/. 308,730.48
RESUMEN PRESUPUESTO ANALITICO - SUPERVISION
FTE.FTO : CANON Y SOBRECANON, REGALIAS, RENTA DE ADUANAS Y PARTICIP
UNIDAD GEST. : MUNICIPALIDAD DISTRITAL DE CHALLHUAHUACHO
FUNCION : 015 EDUCACION
PROGRAMA : 033 EDUCACION
SUB-PROGRAMA : 0127 INFRAESTRUCTURA EDUCATIVA
PROYECTO : “MEJORAMIENTO DE LOS SERVICIOS DE EDUCACION PRIMARIA EN L
DE KUCHUHUACHO Y 50773 DE LLAMAHUIRE DIST. CHALLHUAHUACH
-APURIMAC
GASTOS DE SUPERVISION
OBRA LLAMAHUIRE
RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO
01 JORNAL
DEL EMPLEADO EVENTUAL
05 VACACIONES TRUNCAS
DEL EMPLEADO EVENTUAL
COMBUSTIBLE Y LUBRICANTES
MATERIALES DE ESCRITORIO
1 MATERIALES DE ESCRITORIO
ALÍTICO
S/. 102,475.00
SUB TOTAL
13,500.00
67,500.00
6,075.00
15,400.00
102,475.00
SUB TOTAL
1,687.50
5,625.00
506.25
1,283.33
9,102.08
S/. 8,539.58
SUB TOTAL
1,125.00
5,625.00
506.25
1,283.33
8,539.58
SUPERVISION
ENTA DE ADUANAS Y PARTICIPACIONES
S/. 8,539.58
SUB TOTAL
1,125.00
5,625.00
506.25
1,283.33
8,539.58
SUPERVISION
ENTA DE ADUANAS Y PARTICIPACIONES
S/. 1,858.26
SUB TOTAL
149.99
749.97
374.99
583.31
1,858.26
S/. 9,991.31
SUB TOTAL
1,316.25
6,581.25
592.31
1,501.50
9,991.31
S/. 1,190.00
SUB TOTAL
1,140.00
50.00
1,250.00
1190.00
S/. 2,920.04
SUB TOTAL
SUPERVISION
ENTA DE ADUANAS Y PARTICIPACIONES
S/. 13,282.12
SUB TOTAL
12,600.00
300.00
382.12
13,282.12
S/. 1,235.42
SUB TOTAL
0.00
27.00
1.00
0.00
8.00
0.70
3.50
3.50
32.00
10.00
15.00
6.00
24.00
6.00
3.50
52.00
4.50
3.00
5.00
72.00
4.75
7.50
8.00
720.00
218.47
1,235.42
SUPERVISION
ENTA DE ADUANAS Y PARTICIPACIONES
S/. ###
RESUMEN PRESUPUESTO ANALITICO - LIQUIDACION DE OBRA
GASTOS DE LIQUIDACION
OBRA LLAMAHUIRE
RETRIBUCIONES COMPLEMENTARIAS-CONTRATOS A PLAZO FIJO
01 JORNAL
DEL EMPLEADO EVENTUAL
11,931.36
CARGO N° DE PERSONAS MESES COSTO SUB TOTAL
ING.LIQUIDADOR DE OBRA 1.00 1.00 6,500.00 6,500.00
LIQUIDADOR FINANCIERO 1.00 1.00 5,000.00 5,000.00
AUXILIAR ADMINISTRATIVO I / SECRETARIA 0.10 1.00 1,590.00 159.00
TOPOGRAFO 0.10 0.75 2,331.42 174.86
OPERADOR MAQ. LIVIANA 0.10 0.50 1,950.00 97.50
TOTAL 11,931.36
05 VACACIONES TRUNCAS
DEL EMPLEADO EVENTUAL
03 REPUESTOS
01 OTROS SERVICIOS
1 MATERIALES DE ESCRITORIO
01 JORNAL
02 VACACIONES TRUNCAS
DEL EMPLEADO EVENTUAL
COMBUSTIBLE Y LUBRICANTES
MATERIALES DE ESCRITORIO
NALÍTICO
CO
S/. 16,850.00
S/. 1,404.17
S/. 18,254.17
8,125.00 8,125.00
3,033.33 3,033.33
4,333.33 866.67
4,875.00 4,875.00
2,708.33 1,354.17
18,254.17
S/. 1,404.17
S/. 10,740.00
7,500.00 6,000.00
3,500.00 1,750.00
1,200.00 240.00
4,000.00 2,000.00
1,500.00 750.00
10,740.00
S/. 560.00
S/. 2,841.00
S/. 1,221.45
3.50 0.00
8.00 16.00
10.00 0.00
0.25 0.75
6.00 6.00
0.20 1.20
0.50 3.00
3.50 10.50
2.00 12.00
26.00 78.00
4.50 9.00
3.00 6.00
5.00 5.00
18.00 54.00
4.75 4.75
1.55 1.55
2.00 4.00
321.50 964.50
1,221.45
XPEDIENTE TECNICO
S/. 0.00
S/. 35,020.78
RESUMEN PRESUPUESTO ANALITICO - AVALUACION DE EXP.
GASTOS DE EVALUACION
OBRA LLAMAHUIRE
01 JORNAL
02 VACACIONES TRUNCAS
COMBUSTIBLE Y LUBRICANTES
DESCRIPCION UND CANTIDAD P.U.
PETROLEO DIESEL 2 GLN 20.00 15.00
TOTAL
01 OTROS SERVICIOS
DESCRIPCIÓN UND. CANTIDAD P.U.
ALQUILER DE CAMIONETA DIA 0.50 174.50
TOTAL
MATERIALES DE ESCRITORIO
01 MATERIALES DE ESCRITORIO PARA FORMULADOR
ANALÍTICO
S/. 8,750.00
SUB TOTAL
7,500.00
125.00
375.00
750.00
8,750.00
SUB TOTAL
625.00
10.42
31.25
62.50
729.17
S/. 729.17
SUB TOTAL
625.00
10.42
31.25
62.50
729.17
S/. 416.67
SUB TOTAL
312.50
10.42
31.25
62.50
416.67
S/. 100.00
SUB TOTAL
83.33
4.17
4.17
8.33
100.00
S/. 1,443.75
SUB TOTAL
731.25
12.19
36.56
73.13
853.13
SUB TOTAL
506.25
8.44
25.31
50.63
590.63
S/. 410.00
SUB TOTAL
350.00
60.00
410.00
S/. 300.00
SUB TOTAL
300.00
300.00
S/. 87.25
SUB TOTAL
87.25
87.25
S/. 176.45
SUB TOTAL
4.50
0.50
2.00
0.70
3.50
3.50
80.00
0.25
6.00
0.50
3.50
6.50
3.00
18.00
2.00
30.00
12.00
176.45
S/. 12,003.28
HOJA RESUMEN
PRESUPUESTO BASE
Código Descripción
A COSTO DIRECTO
B COSTO DIRECTO
C GASTOS GENERALES Err:509
D GASTOS DE SUPERVISION Err:509
E GASTOS DE LIQUIDACION DE OBRA Err:509
F ELB. EXP. TECNICO Err:509
G PRESUPUESTO TOTAL
NTA DE ADUANAS Y PARTICIPACIONES
Parcial (S/.)
Err:509
Err:509
308,730.48
### 150,031.31
16,514.26
Err:509
###
Err:509