1.01 POSTE DE CONCRETO ARMADO CENTRIFUGADO 13/300/180/375 + PERILLA und 11.00 S/1,260.00
1.02 POSTE DE CONCRETO ARMADO CENTRIFUGADO 13/400/180/375 + PERILLA und 36.00 S/1,560.00
2.01 CONDUCTOR DE COBRE DESNUDO CABLEADO TEMPLE DURO 35mm2, 7HIL m 195.00 S/12.00
2.02 CONDUCTOR DE ALEAC. ALUM. 6201-T81(AAAC) CABL. 50mm2, 7HIL m 4293.45 S/2.60
2.03 CONDUCTOR ALUMINIO 1350H(AAC) 6 mm², TEMPLE BLANDO SOLIDO m 202.50 S/1.20
2.04 CABLE UNIP.ES N2XSY 18/30 kV DE 50 mm2. UNIPOLAR m 2630.00 S/54.00
2.05 CABLE NYY - 1 kV DE 1 x 25mm² m 40.00 S/10.00
2.06 CABLE NYY - 1 kV DE 1 x 35mm² m 10.00 S/15.00
2.07 CABLE NYY - 1 kV DE 1 x 50mm² m 30.00 S/21.00
2.08 CABLE NYY - 1 kV DE 1 x 95mm² m 40.00 S/42.00
2.09 CABLE NYY - 1 kV DE 3 - 1 x 35mm² m 40.00 S/45.00
2.1 CABLE NYY - 1 kV DE 3 - 1 x 70mm² m 10.00 S/85.00
2.11 CABLE NYY - 1 kV DE 3 - 1 x 95mm² m 30.00 S/105.00
2.12 CABLE NYY - 1 kV DE 3 - 1 x 150mm² m 40.00 S/165.00
2.13 CONDUCTOR TIP THW 90 de 10-1x4 mm2, para medidor de SP m 120.00 S/185.00
2.14 CONDUCTOR TIPO THW 90 de 8-1x10 mm2, para medidor de AP m 120.00 S/28.00
3 SUMINISTRO DE AISLADORES
3.01 AISLADOR DE POLIMERICO TIPO PIN 36KV, Lf 920mm und 135.00 S/185.00
AISLAD. POLIMERICO P' SUSPENSION 36KV, CON HERRAJES DE FºGº, Lf 900
3.02 und 66.00 S/85.00
mm
4 SUMINISTRO DE MATERIAL ELECTRICO ACCESORIO RED PRIMARIA
4.01 PERNO DOBLE ARMADO, INC. 4 TUERCAS DE A°G°, DE 3/4"Øx20" und 181.00 S/10.00
4.02 GRAPA DE ANCLAJE TP. PISTOLA ALUM. P.COND. 50 mm2 3 PERN und 66.00 S/15.00
4.03 PERNO OJO AºGº DE 5/8"ØX10" CON TUERCA, ARANDELA Y CONTRATUE und 63.00 S/8.00
4.04 TUERCAS OJO DE A°G° DE 16mm(5/8")Ø und 3.00 S/7.00
4.05 CINTA PLANA DE ARMAR DE AL.Gdo.1345,ESP.1.3mm ANCHO, 4.5Kg. m 66.00 S/1.20
4.06 ARANDELA CUADRADA PLANA. A°G° 2 1/4"x21/4"x3/16",HUECO 11/16" und 260.00 S/1.00
4.07 ARANDELA CUADRADA CURV. A°G° 2 1/4"x21/4"x3/16",HUECO 11/16" und 404.00 S/1.00
4.08 VARILLA DE ARMAR SIMPLE DE AL-AL PARA COND. DE 50mm2 und 33.00 S/11.00
4.09 CINTA AISLANTE VINILICAS PVC, ALTA PERFORM. 19mmx20mx0.18mm rll 30.50 S/7.00
4.1 CINTA AISLANTE DE GOMA EPR AUTOFUNDENTE DE 19mm9.2mScotch23 rll 30.50 S/42.00
4.11 FLEJE DE ACERO INOXIDABLE (CINTA BAND IT), DE 3/4"x30m m 140.00 S/5.20
4.12 HEBILLA DE ACERO INOXIDABLE P' FLEJE 3/4" und 224.00 S/1.70
4.13 CONECTOR DE DERIV. CUÑA, TIPO AMPAC Al/Cu DE 50-35/50-35 mm2 und 66.00 S/9.50
4.14 CONECTOR DE DERIV. CUÑA, TIPO AMPAC Al/Al DE 50-50/50-50 mm2 und 6.00 S/10.20
4.15 CONECTOR DE DERIV. CUÑA, TIPO AMPAC Al/Cu DE 50-50/50-50 mm2 und 36.00 S/10.20
4.16 TERMINAL DE COMPRESION 25 mm2 und 8.00 S/0.80
4.17 TERMINAL DE COMPRESION 35 mm2 und 28.00 S/1.10
4.18 TERMINAL DE COMPRESION 50 mm2 und 70.00 S/3.00
4.19 TERMINAL DE COMPRESION 70 mm2 und 6.00 S/3.80
4.2 TERMINAL DE COMPRESION 95 mm2 und 26.00 S/4.90
4.21 TERMINAL DE COMPRESION 150 mm2 und 24.00 S/6.10
4.22 Perfil "U" de Fº Gº de 76 x 76,2 x 6 mm espesor x 2,40 m long. und 6.00 S/110.00
4.23 Perfil "U" de Fº Gº de 102 x 76,2 x 9,5 mm espesor x 2,80 m long. und 12.00 S/140.00
4.24 EXTENSOR F°G° PARA CUT OUT TIPO "T" und 2.00 S/165.00
PERNO MAQUINADO DE A°Gº, 16mm Ø x 254mm., CON TUERCA Y
4.25 und 84.00 S/11.00
CONTRATUERCA
PERNO MAQUINADO DE A°Gº, 16mm Ø x 152mm., CON TUERCA Y
4.26 und 4.00 S/9.90
CONTRATUERCA
4.27 PLATINAS PARA MEDIA LOSA und 6.00 S/28.00
4.28 GRAPAS TIPO "C" PARA SUJETAR EL TRANSFORMADOR und 52.00 S/20.00
4.29 CINTA SEÑALIZADORA 22,9 KV COLOR ROJO m 462.00 S/0.50
KIT TERMINACION UNIPOLAR P' CABLE SECO DE 3-1x50mm2, 18/30 KV
4.3 (MONT. EXT.). Kit 30.00 S/780.00
4.31 TUBO DE A° G° PARA BAJADA DE CABLE SUBTERRANEO 102mm(4")Ø, 3,2m und 25.00 S/225.00
5.03 PERNO ANGULAR OJO CON GUARDACABO, A°G° 5/8"øx10" CON TUERCA. pza 17.00 S/1.40
6.02 CONDUCTOR DE COBRE DURO PROTEGIDO TIPO CPI DE 35 MM2, 7 HILOS m 165.00 S/14.20
8.06 TABLERO TD3 FIBRA-VIDRIO, 3Ø 380/220V (TRAFO 160 kVA), RESINA PRFV und 7.00 S/12,500.00
8.07 TABLERO TD3 FIBRA-VIDRIO, 3Ø 380/220V (TRAFO 100 kVA), RESINA PRFV und 1.00 S/8,900.00
8.08 TABLERO TD3 FIBRA-VIDRIO, 3Ø 380/220V (TRAFO 50 kVA), RESINA PRFV und 2.00 S/7,000.00
1.01 POSTE CONCRETO ARMADO CENTRIFUGADO DE 11/300/150/315 + PERILLA und 8.00 S/547.57
1.02 POSTE CONCRETO ARMADO CENTRIFUGADO DE 8/200/150/270 + PERILLA und 72.00 S/320.00
1.03 POSTE CONCRETO ARMADO CENTRIFUGADO DE 8/300/150/270 + PERILLA und 69.00 S/345.00
2.03 CABLE AUTOP. ALTIPO CAAI,C/ PORT.AL-AL FORR. 3x50 + 1x16 +NA35mm2 m 3,330.00 S/18.00
2.04 CONDUCTOR AUTOPORTANTE DE COBRE CAI 3x16 + 1x16 mm2 m 236.00 S/8.00
2.05 CABLE NYY - 1 kV DE 3 x 1 x 35mm² m 26.00 S/44.00
2.06 CABLE NYY - 1 kV DE 1 x 25mm² m 26.00 S/10.00
3 SUMINISTRO DE MATERIAL ELECTRICO ACCESORIO RED SECUNDARIA
3.01 GRAPA DE SUSPENSION - PARA PORT. DE AL. 25-35 mm2 pza 75.00 S/6.00
PERNO GANCHO SUSP.(ARANDELA FIJA Y MOV. TUERCA Y
3.02 pza 75.00 S/8.13
CONTRATUERCA),16mmx203mm Long.
PERNO OJO (ARANDELA FIJA Y MOV. TUERCA Y
3.03 pza 86.00 S/8.20
CONTRATUERCA),16mmx203mm Long.
PERNO OJO (ARANDELA FIJA Y MOV. TUERCA Y
3.04 pza 10.00 S/9.88
CONTRATUERCA),16mmx305mm Long.
3.05 TUERCA OJO A°G° 16mm(5/8")Ø pza 36.00 S/7.25
3.06 CORREA PLASTICA DE AMARRE ANTIUVE 363x5mm pza 755.00 S/0.20
3.07 MORDAZA CONICA TERMINAL P/CABLE FORR. PORTANT. AL. 25-50mm2 pza 135.00 S/8.56
3.08 CAPUCHON TERMOCONTRACTIL, SELLADOR PUNTA DE CABLE 16-70mm2. pza 594.00 S/3.34
3.09 CONECTOR DERIVACION CUÑA PARA AL o AL, 16/16mm² und 36.00 S/10.20
3.1 CONECTOR DERIVACION CUÑA PARA AL o AL, 25/25mm² und 4.00 S/11.10
3.11 CONECTOR DERIVACION CUÑA PARA AL o AL, 35/35mm² und 32.00 S/13.00
3.12 CONECTOR DERIVACION CUÑA PARA AL o AL, 50/50mm² und 65.00 S/14.10
3.13 CONECTOR DERIVACION CUÑA PARA AL o Cu, 50/35mm² und 29.00 S/13.20
3.14 CONECTOR DERIVACION CUÑA PARA AL o Cu, 35/35mm² und 15.00 S/12.50
3.15 CONECTOR DERIVACION CUÑA PARA AL o Cu, 25/35mm² und 2.00 S/11.10
3.16 CONECTOR DERIVACION CUÑA PARA AL o CU, 2.5/16mm² und 157.00 S/9.90
3.17 CONECTOR DERIVACION CUÑA PARA AL o CU, 2.5/25mm² und 157.00 S/9.90
3.18 CONECTOR DERIVACION CUÑA, AL - CU, 16-50 mm2 und 328.00 S/14.10
3.19 CONECTOR DERIVACION CUÑA, AL - CU, 16-35 mm2 und 136.00 S/12.20
3.2 CONECTOR DERIVACION CUÑA, AL - CU, 16-25 mm2 und 9.00 S/11.00
3.21 CONECTOR DERIVACION CUÑA, AL - AL, 6-50 mm2 und 31.00 S/8.90
3.22 CONECTOR DERIVACION CUÑA, AL - AL, 6-35 mm2 und 34.00 S/8.30
3.23 CONECTOR DERIVACION CUÑA, AL - AL, 6-25 mm2 und 4.00 S/7.90
3.24 MANTA ABIERTA TERMOCONTRAIBLE CRSM - 34/10-1200mm und 65.00 S/138.50
3.25 FLEJE DE ACERO INOXIDABLE (CINTA BAND IT), DE 19mmx30m m 198.00 S/5.30
3.26 HEBILLA DE ACERO INOXIDABLE P' FLEJE 19mm und 253.00 S/1.80
CAJAS DERIVACION POLIMERICA, INCLUYE BORNE S/GEL (6 SALIDAS)
3.27 und 78.00 S/168.00
380/220V.
CAJAS DERIVACION POLIMERICA, INCLUYE BORNE S/GEL (9 SALIDAS)
3.28 380/220V. und 41.00 S/150.00
4.06 VARILLA ANCLAJE CON OJAL GUARDACABO A°G° 16mmø x 2,40m., TU und 45.00 S/38.00
4.07 BLOQUE DE CONCRETO ARMADO DE 0,40 x 0,40 x 0,15m und 45.00 S/26.00
4.08 ALAMBRE N°10 DE F°G° m 23.00 S/2.50
4.09 ARANDELA CUADRADA DE A°G° 102x102x6mm, HUECO 21mmø und 45.00 S/6.20
4.1 ARANDELA CUADRADA CURV. A°G° 57x57x5mm,HUECO 18mmø und 90.00 S/1.10
4.11 JUEGO DE CONTRAPUNTA A°G° DE 51mmØx1,00m x 6mm esp. und 45.00 S/30.00
5 SUMINISTRO DE EQUIPOS DE ALUMBRADO PUBLICO Y ACCESORIOS.
5.01 CORDON PORTATIL DE COBRE (NLT) 2x2,5 mm2 m 863.00 S/4.50
5.02 PASTORAL PARAB' AºGº PP/1,78/1,76/38,1/15° und 157.00 S/98.00
LUMINARIA PARA LÁMPARA VAPOR SODIO ALTA PRESIÓN 70 W, INC. EQUIP.
5.03 und 157.00 S/290.00
(DE UN SOLO CUERPO)
LÁMPARA DE VAPOR DE SODIO DE ALTA PRESION. DE 70 W,E27 TUBULAR,
5.04 und 157.00 S/49.00
220 V
7.16 Medidor Monof. de Energía Activa, Tipo Electronico 220V, 10-40A, 60Hz, und 500.00 S/36.00
Clase 1
PRESUPUESTO INSTALACION - RED SECUNDARIA
UNIDA METRADO
ITEM DESCRIPCIÓN P.U.
D
B RED SECUNDARIA
2 INSTALACION DE POSTES DE CONCRETO
2.01 Excavación de Hoyos para poste de concreto 8m und 140.00 S/24.00
2.02 Excavación de Hoyos para poste de concreto 11m und 8.00 S/35.00
2.03 Distribución de postes de concreto o madera, de almacén a punto de izaje und 148.00 S/30.00
2.04 Izaje de postes de concreto de 8 m con camión grua und 140.00 S/215.00
2.05 Izaje de postes de concreto de 11 m con camión grua und 8.00 S/260.00
3 MONTAJE DE RETENIDAS
3.01 Excavación de hoyo para retenida inclinada o vertical und 45.00 S/50.00
3.02 Instalación de retenida vertical und 45.00 S/40.00
3.03 Relleno y compactación de retenida inclinada y vertical und 45.00 S/20.00
4 MONTAJE DE ARMADOS
4.01 Montaje de Estructuras de: ALINEAMIENTO - ANGULO<5°-Tipo (A) und 72.00 S/35.00
4.02 Montaje de Estructuras de: FIN DE LINEA - TIPO (F) und 30.00 S/50.00
4.03 Montaje de Estructuras de: ANCLAJE VANO FLOJO -Tipo (VF) und 12.00 S/50.00
4.04 Montaje de Estructuras de: ANCLAJE DERIVACION VANO FLOJO Tipo (DVF) und 4.00 S/75.00
4.05 Montaje de Estructuras de: DERIVACION 180° -Tipo (DR) und 33.00 S/80.00
4.11 Montaje de Estructuras de: FIN DE CIRCUITO -Tipo (FC) und 4.00 S/50.00
4.15 Montaje de Estructuras en: S.A.B. und 9.00 S/65.00
4.16 Montaje de Caja de derivación de 6 y 9 salidas. und 118.00 S/60.00
Montaje y conexionado de caja de medicion y proteccion. inc. montaje de
4.17 und 500.00 S/68.00
Interruptor termomagnetico y medidor electro
5 MONTAJE DE CONDUCTORES
MONTAJE DE CONDUCTOR DE AL. FORRADO TIPO AUTOPORTANTE
5.01 m 285.00 S/2.00
1x16+NA25 mm2
MONTAJE DE CONDUCTOR DE AL. FORRADO TIPO AUTOPORTANTE
5.02 m 287.00 S/2.60
3x35+16+NA25 mm2
MONTAJE DE CONDUCTOR DE AL. FORRADO TIPO AUTOPORTANTE
5.05 m 3330.00 S/3.50
3x50+16+NA35 mm2
6 MONTAJE DE PUESTA A TIERRA.
6.01 Excavación de hoyo para puesta a tierra und 20.00 S/80.00
6.02 Instalación de puesta a tierra tipo PAT-1 und 20.00 S/35.00
6.03 Relleno y compactación para puesta tierra und 20.00 S/110.00
7 MONTAJE DE EQUIPOS DE ALUMBRADO PUBLICO Y ACCESORIOS.
7.01 MONTAJE DE LUMINARIA Y LÁMPARA (Iincluye conductor y accesorios) und 157.00 S/38.00
7.02 MONTAJE DE PASTORAL A°.G°. - EN POSTE DE B.T. y M.T. und 157.00 S/22.00
8 CONEXIONES DOMICILIARIAS
8.01 MONTAJE Y CONEXIONADO DE ACOMETIDA SIMPLE 1ø- (01) USUARIO CORTA und 493.00 S/28.00
MONTAJE Y CONEXIONADO DE ACOMETIDA SIMPLE 1ø- (01) USUARIO
8.02 und 295.00 S/55.00
LARGA
9 SEÑALIZACION DE POSTES EN BAJA TENSION
9.01 Señalización de estructuras und 148.00 S/21.00
10 PRUEBAS Y PUESTA EN SERVICIO
10.01 PRUEBAS Y PUESTA EN SERVICIO R.S. Glb. 0.50 S/10,000.00
PRESUPUESTO DE RED DE DISTRIBUCION - AGUA POTABLE - 1ERA ETAPA
ITEM DESCRIPCION UNIDAD METRADO P.UNITARIO
02 SEÑALIZACION DE TRANSITO
02.02 SEÑALIZACION NOCTURNA día 40.00 100.00
03 TRABAJOS PRELIMINARES
03.01 TRAZO Y REPLANTEOS INICIALES DEL PROYECTO m 8,880.00 1.40
04 MOVIMIENTO DE TIERRAS
04.01 EXCAVACION DE ZANJAS C/EQ.T.ARENA HASTA 1.50MPP m 8,880.00 18.00
04.02 REFINE DE ZANJA Y NIVELACION DE TUBOS m 8,880.00 1.20
04.03 RELLENO COMP. ZANJA T. ARENOSO HASTA 1.50MPP m 8,880.00 17.00
04.04 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM m3 100.00 12.00
05 SUMINISTRO E INSTALACION DE TUBERIA PVC ISO 4422
05.01 TUBERIA PVC AGUA C-7.5 UF DN 110MM INC. ANILLOS m 6,526.00 25.00
05.02 TUBERIA PVC AGUA C-7.5 UF DN 160MM INC. ANILLOS m 2,354.00 32.00
05.03 EMPALME DE LINEA DE ADUCCION DE RESERVORIO und 1.00 230.00
05.04 INSTALACION TUBERIA PVC UF DN (110) m 6,526.00 4.00
05.05 INSTALACION TUBERIA PVC UF DN (160) m 2,354.00 4.00
05.06 PRUEBA HIDRAULICA + DESINF.TUB. DN 110MM m 6,526.00 1.00
05.07 PRUEBA HIDRAULICA + DESINF.TUB. DN 160MM m 6,526.00 1.20
06 SUMINISTRO E INSTALACION DE ACCESORIOS
06.02 CRUZ PVC P/TUB.PVC C-7.5 UF DN110 INC. ANILLOS P/INYECCION und 24.00 203.00
06.03 CODO PVC 90°- P/TUB.PVC C-7.5 UF DN110 INYECTADO INC. ANILLOS und 1.00 282.76
06.04 TEE PVC P/TUB.PVC C-7.5 UF DN110 P/INYECCION INC. ANILLOS und 18.00 80.00
06.05 TEE PVC P/TUB.PVC C-7.5 UF DN160 P/INYECCION INC. ANILLOS und 7.00 221.00
06.06 TEE PVC C-7.5 UF DN110X90 P/INYECCION und 42.00 115.00
06.07 REDUCCION PVC C-7.5 UF DN110X90 und 20.00 75.20
06.08 TAPON PVC P/TUB.PVC C-7.5 UF DN110 INYECTADO INC. ANILLOS und 8.00 207.01
06.09 TAPON PVC P/TUB.PVC C-7.5 UF DN160 INYECTADO INC. ANILLOS und 8.00 207.01
06.10 VALVULA COMP. P/TUB.PVC C-7.5 UF DN110 und 16.00 626.00
06.11 HIDRANTE TIPO POSTE HFD CUERPO SECO 2 BOCAS DN110 ENTRADA UF INC. und 6.00 1,500.00
06.12 ANILLOS
INSTALACION DE ACCESORIOS PVC DN (110) und 65.00 19.11
06.13 INSTALACION DE ACCESORIOS PVC DN (160) und 114.00 25.00
06.14 INSTALACION DE VALVULA PVC DN 110 MM und 16.00 80.86
06.15 INSTALACION DE GRIFO CONTRA INCENDIO und 4.00 111.11
07 OBRAS DE CONCRETO SIMPLE
07.01 DADOS CONCRETO F'C=140KG/CM2+ANCLAJE P/ACC.DN(63-90) und 65.00 66.00
07.02 DADOS CONCRETO F'C=140KG/CM2+ANCLAJE P/ACC.DN(110-160) und 76.00 67.00
08 CONEXIONES DOMICILIARIAS AGUA POTABLE
08.01 EXCAVACION ZANJA 0.60*0.80 MPP m 4,798.00 8.00
08.02 REFINE Y NIVELACION DE TUBOS CONEXON AGUA m 4,798.00 2.00
08.03 SUM. E INSTAL. TUBO PVC De(20-32)mm m 4,798.00 2.73
08.04 RELLENO COMP. ZANJA 0.60*0.80 MPP m 4,798.00 7.00
08.05 SUMINISTRO ABRAZADERA PVC DN (110x20)mm und 792.00 19.50
08.06 SUMINISTRO ABRAZADERA PVC DN (160x20)mm und 4.00 21.11
08.07 SUM.E INSTAL. ACCESORIOS DE MEDICION (20x32)mm und 500.00 13.28
08.08 SUMINISTRO CAJA REGISTRO DE AGUA und 500.00 78.00
08.09 INSTALACION CAJA REGISTRO AGUA und 500.00 34.00
08.10 PRUEBA HIDRAULICA AGUA und 500.00 2.00
08.11 DESINFECCION DE LA CONEXION AGUA und 500.00 14.00
09 SUMINISTRO E INSTALACION DE MICROMEDIDORES
09.01 MEDIDOR CHORRO UNICO 15MM+ACOPLE PARA 19CM und 500.00 85.00
09.02 INSTALACION DE MEDIDOR Y ACCESORIOS und 500.00 45.00
09.03 DADOS PARA ANCLAJE DE MICROMEDIDOR 0.20x0.20x0.10M und 500.00 6.00
PRESUPUESTO DE RED DE DISTRIBUCION - AGUA RESIDUAL
ITEM DESCRIPCION UNIDAD METRADO P.UNITARIO
01 SEÑALIZACION
01.03 SEÑALIZACION NOCTURNA día 40.00 89.60
02 TRABAJOS PRELIMINARES
02.01 TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO m 8,091.99 2.00
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION /MAQ T. ARENOSO HASTA 1.80MPP m 1,261.78 13.58
16 CIELORRASOS
16.01 CIELORRASO INC.VIGAS EMPOTRADAS C/MORTERO 1:5x1.5 CM m2 234.27 18.00
17 PISOS Y PAVIMENTOS
17.01 FALSO PISO DE 4" DE CONCRETO 1:8 (F'c=140 KG/CM2) m2 123.20 19.80
17.02 CONTRAPISO C/MORTERO 1:4 + ACABADO CON PASTA 1:2 x1.5CM m2 123.20 18.00
17.04 VEREDA RIGIDA DE CONCRETO F'c= 140 KG/CM2 E=10 CM PASTA 1:2 m2 128.00 32.40
18 CONTRAZOCALOS
18.01 CONTRAZOCALOS DE CEMENTO PULIDO CON MORTERO 1:5 DE e=2cm m 101.71 16.20
HASTA h=10cm
19 CARPINTERIA METALICA
19.01 PUERTA METALICA DE 1.50 M. x 2.10 M. und 1.00 900.00
19.02 VENTANA DE FIERRO C/PERFIL "L" 1"x1/8"FIJA+REF."T" DE 1" m2 16.00 162.00
19.03 ESCALERA TIPO MARINERO DE TUBO F.GDO ø 1 1/2" und 6.00 188.55
19.04 PASAMANOS METALICO EN ESCALERA INC.PINTURA m 27.00 45.00
19.05 BARANDA DE TUBO Fo Gdo PASAMANO 1 1/2"-PARANTE 1"x1M ALT. m 20.00 135.00
19.06 MARCO Y TAPA PLANCHA LAC 1/4" C/MECANISMO DE SEG. S/DISEÑO und 2.00 270.00
19.07 VENTILACION CON TUBERIA DE ACERO SEGUN DISEÑO DE 8" und 6.00 1,200.00
19.08 SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO (8"-10") und 6.00 36.00
19.09 SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO (4"-6") und 6.00 27.00
20 PINTURA
20.01 PINTADO DE MURO INTERIOR C/LATEX VINILICO (VINILATEX O SIMILAR) m2 40.55 15.00
20.02 PINTADO DE MURO EXTERIOR C/LATEX VINILICO (VINILATEX O SIMILAR) m2 31.63 18.00
20.03 PINTADO DE CIELO RASO C/LATEX VINILICO (VINILATEX O SIMILAR) m2 18.43 23.00
21 VARIOS
21.01 PRUEBA HIDRAULICA DE RESERVORIOS m3 750.00 6.00
21.02 DESINFECCION CON EMPLEO DE CISTERNA+EQUIP DE BOMBEO P/LLENADO m3 750.00 6.00
21.03 WATER STOP DE NEOPRENE DE 6" PROVISION Y COLOCACION DE JUNTA m 30.00 23.80
23.21 ABRAZADERA DE PLATINA CON PERNOS DE ANCLAJE PARA TUB.DN250MM und 10.00 117.39
25.03 SALIDA DE TOMACORRIENTE C/AWG TW 2.5MM(14)+DPVC SEL 16MM(5/8) pto 3.00 80.79
01.02.02 CONCRETO F´C=280 KG/CM2, CANALETAS DE BUZONES, CAMARAS, CAJAS M3 5.00 414.00
01.02.09 CONCRETO F'C=280 KG/CM2 PARA MUROS REFORZADOS hasta 1.50 m M3 414.00
PRIMER ANILLO 6.08
01.02.10 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS hasta 1.50 m M2 32.00
40.51
01.02.11 CONCRETO F'C=280 KG/CM2 PARA MUROS REFORZADOS M3 24.91 414.00
01.02.12 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS M2 166.07 35.00
01.02.13 ACERO ESTRUCTURAL P/MURO REFORZADO KG 1,436.36 4.00
01.02.14 CONCRETO F'C= 280 KG/CM2, PARA LOSA DE BUZON, CAMARA M3 3.01 414.00
01.02.15 ENCOFRADO Y DESENCOFRADO NORMAL P/LOSA MACIZA M2 3.77 30.00
01.02.16 ACERO ESTRUCTURAL P/LOSA MACIZA KG 118.40 4.00
01.02.17 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO M2 16.62 22.50
01.02.18 TARRAJEO CON IMPERMEABILIZANTE DEMURO EN CAMARAS M2 96.08 22.50
PROVISION Y COLOCADO DE JUNTA CON WATER STOP DE NEOPREN
01.02.19 e=0.15M. M 57.81 34.00
01.03.02 CONCRETO F´C=280 KG/CM2, CANALETAS DE BUZONES, CAMARAS, CAJAS M3 1.56 414.00
01.03.08 CONCRETO F'C=280 KG/CM2 PARA MUROS REFORZADOS hasta 1.50 m M3 414.00
PRIMER ANILLO 2.17
01.03.09 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS hasta 1.50 m M2 25.20
21.67
01.03.10 CONCRETO F'C=280 KG/CM2 PARA MUROS REFORZADOS M3 5.79 414.00
01.03.11 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS M2 57.92 25.20
01.03.12 ACERO ESTRUCTURAL P/MURO REFORZADO KG 722.12 4.00
01.03.13 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO M2 3.46 22.50
01.03.14 TARRAJEO CON IMPERMEABILIZANTE DEMURO EN CAMARAS M2 36.35 22.50
01.03.15 PROVISION Y COLOCADO DE JUNTA CON WATER STOP DE NEOPREN M 23.56 18.00
e=0.15M.
01.04.00 CAJA DE VALVULAS
01.04.01 CONCRETO F´C=100 KG/CM2 SOLADO P/SELLADO DE CAISSON CAJA M3 1.25 198.00
01.04.02 CONCRETO F'C=280 KG/CM2 PARA MUROS REFORZADOS M3 7.50 414.00
01.04.03 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS M2 75.04 3,425.20
01.04.04 ACERO ESTRUCTURAL P/MURO REFORZADO KG 411.32 4.00
01.04.05 TARRAJEO CON IMPERMEABILIZANTE DE MUROS M2 35.28 22.50
01.05.00 CAMARA ROMPE PRESION
01.05.01 CONCRETO F´C=245 KG/CM2, CANALETAS DE BUZONES, CAMARAS, CAJAS M3 0.27 387.00
02.01.04 INSTALACIÓN DE TABLEROS DE ARRANQUE SUAVE PARA BOMBAS DE 25 HP. Eqp 2.00 239.58
02.01.05 INSTALACIÓN DE TABLERO ALTERNADO PARA 02 ELECTROBOMBAS DE 18.6 Eqp 1.00 359.37
KW DE LA CAMARA HUMEDA. COMPONENTES SCHNEIDER.
02.02. MONTAJE DE CONEXIONES ELECTRICAS SUBTERRANEAS
INSTALACION DE CAJAS DE PASE DE CONCRETO ARMADO 245KG/CM2 DE
0.6x0.6x0.80 M. Und 4.000 89.84
02.02.01
02.02.02 INSTALACIÓN DE DUCTOS DE CONCRETO de 0.25 x 0.25 x 1.0 M. Und 20.000 11.98
02.02.03 EXCAVACIÓN DE ZANJA DE 0.6 x 0.8 x 20 METROS. m3 9.600 17.97
02.02.04 RELLENO CAMA ARENA FINA. m3 1.800 11.98
INSTALACIÓN DE CONDUCTOR ELÉCTRICO PARA ALIMENTACIÓN DE
TABLEROS.( DE MURETE DE SE A TG) INCLUYE EXCAV, RELLENO Y ELIMINAC, m 30.000 11.98
INSTAL TUBO Y CABLEADO
02.02.05
INSTALACIÓN DE CONDUCTOR ELÉCTRICO PARA ALIMENTACIÓN DE BOMBAS
3-1x70 + 1x50 MM2. INC INSTA DE KITS 3M. m 60.000 5.99
02.02.06
INSTALACIÓN DE CONDUCTOR ELÉCTRICO PARA ALIMENTACIÓN DE RADAR.
m 60.000 1.80
02.02.07
02.02.08 RELLENO LATERAL C/ARENA FINA m3 5.200 9.58
02.02.09 RELLENO SUPERIOR C/ARENA FINA m3 2.800 9.58
02.02.10 RELLENO CON MATERIAL PROPIO m3 1.200 9.58
PUESTA A TIERRA EN TABLEROS CON EQUIPOS ELECTRONICOS Y MOTRICES
05 OHMS (VARILLA DE COBRE) A TODO COSTO Und 2.000 765.00
02.02.11
02.02.12 MEGHADO Y PROTOCOLO DE PUESTAS A TIERRA Und 2.000 135.00
02.03. MONTAJE DE INSTALACIONES ELECTRICAS DE INTERIORES
02.03.01 SALIDA p/CENTRO LUZ DE CASETAS pto 9.00 31.5
02.03.02 LAMPARAS Y LUMINARIAS AHORRADORAS pto 9.00 31.5
02.03.03 SALIDA p/TOMACORRIENTE BIPOLAR DOBLE c/PUESTA A TIERRA pto 8.00 31.5
02.03.04 SALIDA p/INTERRUPTOR BIPOLAR DOBLE pto 1.00 31.5
02.03.05 SALIDA p/INTERRUPTOR SIMPLE pto 5.00 31.5
INSTALACIÓN DE TABLERO PRINCIPAL METALICO 3 CIRCUITOS/TERMOM CON
DIFERENCIAL Und 1.00 135.00
02.03.06
PRESUPUESTO MEJORAMIENTO - POZO TUBULAR
UNIDA METRADO
ITEM DESCRIPCION P.UNITARIO
D
01 PERFORACION DE POZO
01.01 ANTEPOZO D1 = 1.00, 5.00 PP m3 4.00 56.00
01.02 PREPARACIÓN DE ACCESO, TRANSPORTE E INSTALACIÓN DE MAQUINARIA DE glb 1.00 56,000.00
PERFORACIÓN, HERRAMIENTAS.
01.03 PERFORACIÓN CON DIÁMETROS DE 21'' DE 0 A 31.20M. m 31.20 2,000.00
01.04 ENTUBADO CON TUBERÍA DE 21'' DE Æ POR ¼ DE 0 A 36M Y RECUPERACIÓN m 31.20 882.00
DE 0 A 31.20M.
01.05 PERFORACIÓN CON DIÁMETRO DE 18'' DE 31.20 A 75M. m 43.80 675.00
01.06 ENTUBADO Y RECUPERACION DE TUBERIA HERRAMIENTA DE 18’’ DE 0 A m 64.40 342.00
64.40m.
01.07 SUMINISTRO E INSTALACIÓN DE TUBERÍA CIEGA DE ACERO B.C. DEFINITIVA m 53.40 612.00
DE 15'' DE DIÁMETRO POR ¼ DE ESPESOR.
01.08 SUMINISTRO E INSTALACIÓN DE FILTROS DE ACERO INOXIDABLE DE 15'' DE m 21.60 2,134.00
DIÁMETRO CON ABERTURA DE 1.5ML. TIPO PUENTE TRAPEZOIDAL.
01.09 SUMINISTRO E INSTALACIÓN DE GRAVA REDONDEADA SELECCIONADA m3 22.00 341.40
REFERENCIAL DE ¼'' A 3/8'', LIMPIA SIN RESTOS ORGÁNICOS.
01.10 PRUEBAS DE VERTICALIDAD Y ALINEAMIENTO DEL POZO. und 2.00 1,437.48
01.11 PROVISIÓN Y APLICACIÓN DE TRIPOLIFOSFATO DE SODIO. kg 100.00 21.56
01.12 DESARROLLO DE POZO POR EL SISTEMA DE PISTONEO MECÁNICO. h 48.00 225.00
01.13 TRANSPORTE E INSTALACIÓN DEL EQUIPO DE BOMBEO glb 1.00 4,192.65
01.14 PRUEBA DE RENDIMIENTO POR BOMBEO AFORO. h 72.00 216.00
01.15 ANÁLISIS FÍSICO-QUÍMICO Y BACTERIOLÓGICO DEL AGUA. und 2.00 539.06
01.16 DESMONTAJE DEL EQUIPO DE BOMBEO Y TRANSPORTE. glb 1.00 3,593.70
01.17 CONSTRUCCIÓN DE SELLO SANITARIO DE CONCRETO ARMADO SEGÚN glb 1.00 898.43
DISEÑO Y TAPA METÁLICA.
01.18 LIMPIEZA, NIVELACIÓN Y ELIMINACIÓN DE DESMONTE PRODUCTO DE LA glb 1.00 1,497.38
PERFORACIÓN
2 ELECTRIFICACION DE POZO TUBULAR
2.01 SUMINISTRO DEMATERIALES und 1.00 88,906.00
2.02 MONTAJE ELECTROMECANICO glb 1.00 56,000.00
PREUPUESTO EQUIPAMIENTO - POZO TUBULAR
UNIDA METRADO
ITEM DESCRIPCION P.UNITARIO
D
01 OBRAS PROVISIONALES
01.05 TRASLADO MAQ/EQUIP. MATERIALES Y HERRAMIENTAS A OBRA vje 1.00 7,890.00
02 SEÑALIZACION DE TRANSITO
02.02 SEÑALIZACION NOCTURNA día 60.00 46.71
03 SUMINISTRO E INSTALACION DE ELECTROBOMBA, ARBOL DE SALIDA,
INSTRUMENTACION Y QUIPO DE CLORACION
03.01 ELECTROBOMBA SUMEGIBLE 65 HP
03.01.01 SUMINISTRO DE ELECTROBOMBA SUMERGIBLE DE 65.0 HP, 380 VOLTIOS, 60 und 1.00 85,674.00
HZ.
03.01.02 CABLE PARA BOMBA SUMERGIBLE 2/0 INC. EMPALMES Y SENSOR DE m 80.00 101.82
ELECTRODOS
03.01.04 MONTAJE DE EQUIPO DE BOMBEO und 1.00 6,218.00
03.02 COLUMNA Y ARBOL DE SALIDA
03.02.01 TUBO DE ACERO SCHEDULE 40 DE 6"Ø X 3.0 MTS. ROSCADO EN AMBOS pza 25.00 890.00
EXTREMOS. ROSCA PARALELA CON 8 HILOS/PULG.
03.02.02 UNIÓN SCHEDULE 40 ROSCADA DE 6" CON 8 HILOS/PULG. pza 25.00 280.00
03.02.03 CODO DE 6"Ø X 90º BRIDADO pza 1.00 382.96
03.02.04 CODO DE 6"Ø X 45º BRIDADO pza 2.00 384.95
03.02.05 UNION FLEXIBLE DRESSER FE. MAXIRAM DE 6"Ø 250 LBS pza 1.00 260.82
03.02.06 VÁLVULA CHECK SWING DE 6"Ø BRIDADA KTZ 125 PSI pza 1.00 1,350.00
03.02.07 VÁLVULA COMPUERTA OS&Y DE FE. 6"Ø BRIDADA 125PSI pza 1.00 1,440.00
03.02.08 TEE DE 6"Ø X 4"Ø FE pza 3.00 131.03
03.02.09 TEE de 4"Ø x 4"Ø Fe pza 1.00 48.28
03.02.10 CODO DE 4"Ø X 90º BRIDADO pza 2.00 243.76
03.02.11 UNION FLEXIBLE DRESSER FE. MAXIRAM DE 4"Ø 250 LBS pza 1.00 162.84
03.02.12 VÁLVULA COMPUERTA OS&Y DE FE. 4"Ø BRIDADA 125PSI pza 2.00 720.00
03.02.13 PERNOS ZINCADO DE 5/8" X 3 " pza 130.00 1.98
03.02.14 PERNOS ZINCADO DE 5/8" X 2 1/2" pza 90.00 2.25
03.02.15 EMPAQUETADURA DE JEBE ENLONADO 1/4" m 4.00 160.91
03.02.16 BRIDAS DE FE. DE 6"Ø pza 20.00 84.50
03.02.17 BRIDAS DE FE. DE 4"Ø pza 15.00 52.50
03.02.18 VÁLVULA DE AIRE DE 1"Ø pza 1.00 1,437.48
03.02.19 LLAVE ESFERICA DE 1" pza 2.00 59.90
03.02.20 TUBO FE. GALV. DE 1"Ø X 6.0 MTS pza 3.00 112.10
03.02.21 CODO DE FE. GALV. DE 1" X 90º pza 5.00 2.73
03.02.22 MONTAJE DE COLUMNA Y ARBOL DE SALIDA DE ELECTROBOMBA und 1.00 5,800.00
SUMERGIBLE
03.03 INSTRUMENTACION
03.03.01 MACROMEDIDOR DE 6"Ø pza 1.00 22,000.00
03.03.02 TRANSMISOR DE PRESION pza 1.00 4,950.00
03.03.03 MONTAJE Y PROGRAMACION DE EQUIPOS und 1.00 623.15
03.04 EQUIPO DE CLORACION
03.04.01 SISTEMA DE CLORACION PARA OPERACION AL VACIO CON DISPOS. DE glb 1.00 4,860.00
CAMBIO AUTOMATICO
03.04.02 CILINDRO DE ACERO ALEADO, C/ TRATAMIENTO TERMICO SIN COSTURA, und 2.00 2,790.00
PARA 68 kg. CLORO GAS INCLUYE CARGA
03.04.03 ELECTROBOMBA TIPO BOOSTER, CENTRIFUGA HORIZONTAL DE 2.0 HP, und 1.00 4,072.86
TRIFASICA, 220V / 60HZ
03.04.04 BALANZA TIPO PLATAFORMA CON MECANICA und 1.00 1,042.17
03.04.05 ACCESORIOS DE INSTALACION STANDAR glb 1.00 2,210.13
03.04.06 COMPARADOR COLORIMETRICO PORTATIL, REACTIVO DPD EN POLVO. und 1.00 395.31
03.04.07 MATERIALES PARA INSTALACIÓN EQUIPO CLORACIÓN glb 1.00 1,197.90
03.04.08 MONTAJE EQUIPO CLORACION Y ACCESORIOS und 1.00 2,581.01
03.04.09 PRUEBAS DE OPERACION Y PRUEBAS DE OPERATIVIDAD DE SERVICIO DE und 1.00 310.56
ELECTROBOMBA SUMERGIBLE
04 SUMINISTRO E INSTALACION DE TABLERO ELECTRICO
04.01 SUMINISTRO DE TABLERO ELECTRICO DE 65 HP 380 VOLTIOS, 60 HZ und 1.00 46,578.00
04.02 TRASLADO DE TABLERO ELECTRICO NUEVO A INSTALACIONES DEL POZO und 1.00 242.28
04.03 MONTAJE DE TABLERO ELECTRICO NUEVO 65 HP und 1.00 1,323.90
04.04 PRUEBAS DE OPERACION Y PRUEBAS DE OPERATIVIDAD DE SERVICIO und 1.00 818.72
05 AUTOMATIZACION DE EQUIPOS ELECTROMECANICOS
05.01 SUMINISTRO DE EQUIPOS DE AUTOMATIZACION PARA POZO und 1.00 67,000.00
05.02 INSTALACION DE EQUIPOS DE AUTOMATIZACION Y PRUEBAS und 1.00 7,890.00
PRESUPUESTO CASETA - POZO TUBULAR
UNIDA METRADO
ITEM DESCRIPCION P.UNITARIO
D
01 OBRAS PRELIMINARES
01.01 TRAZO Y REPLANTEO km 60.00 0.55
02 MOVIMIENTO DE TIERRAS
02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 7.63 10.80
02.02 EXCAVACION DE ZANJAS PARA ESTRUCTURAS m3 9.57 10.80
02.03 RELLENO DE ZANJAS CON MATERIAL PROPIO m3 3.61 11.70
02.05 ELIMINACION MATERIAL EXCEDENTE m3 17.67 10.80
03 CONCRETO SIMPLE
03.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=2" m2 8.32 32.40
03.02 CONCRETO 1:10+25% PM PARA CIMIENTOS CORRIDOS m3 5.72 189.00
03.03 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS m3 2.88 225.00
03.04 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO m2 23.00 19.80
03.05 FASLO PISO E=10CM m2 52.39 19.80
03.06 CONCRETO f'c=175 kg/cm2 PARA ANCLAJES Y/O DADOS m3 0.38 315.00
03.07 ENCOFRADO Y DESENCOFRADO PARA ANCLAJES Y/O DADOS DE ACCESORIOS m2 3.00 19.80
04 CONCRETO ARMADO
04.01 ZAPATAS
04.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 4.16 351.00
04.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 121.39 3.42
04.02 VIGA DE CIMENTACION
04.02.01 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 3.23 351.00
04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 25.88 22.50
04.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS CIMENTACION kg 636.85 3.42
04.03 COLUMNAS
04.03.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 1.33 351.00
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 17.28 22.50
04.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 257.44 3.42
04.04 VIGAS
04.04.01 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 4.07 351.00
04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 18.02 22.50
04.04.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 653.65 3.42
04.05 LOSAS ALIGERADAS
04.05.01 CONCRETO f'c=210 kg/cm2 PARA LOSAS ALIGERADAS m3 4.96 351.00
04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 59.48 22.50
04.05.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS kg 400.16 3.42
04.05.04 LADRILLO DE ARCILLA HUECO 15X30X30 cm PROVEIDO Y COLOCADO und 472.08 2.34
05 MAMPOSTERIA
05.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 77.90 42.30
06 TARRAJEOS Y VESTIDURAS
06.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 86.13 18.00
06.02 TARRAJEO EN EXTERIORES m2 79.65 18.00
06.03 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 22.18 18.00
06.04 VESTIDURA DE DERRAMES EN PUERTAS m 0.63 13.50
06.05 CIELO RASO INCLUYE VIGAS EMPOTRADAS CON MORTERO 1:4 X 1.5 cm m2 59.48 21.00
06.06 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 0.95 18.00
07 PISOS Y CONTRAPISOS
07.01 PISO CE CEMENTO FROTACHADO m2 52.88 27.00
08 PINTURAS
08.01 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 86.13 6.75
08.02 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS m2 79.65 6.75
09 CARPINTERIA METALICA
09.01 PORTON METALICO 2.60x2.50 M und 1.00 5,000.00
09.02 TAPA METALICA TECHO D=1.70M E=1/16" und 1.00 495.00
10 INSTALACIONES ELECTRICAS
10.01 PUNTO DE LUZ pto 6.00 72.00
10.02 TOMACORRIENTES pto 2.00 72.00
10.03 TABLERO DE DISTRIBUCION, CON TRES LLAVES TERMICAS und 1.00 568.00
PRESUPUESTO LINEA DE IMPULSION - AGUA POTABLE
ITEM DESCRIPCION UNIDAD METRADO P.UNITARIO
01 SEÑALIZACION
01.05 SEÑALIZACION NOCTURNA día 10.00 150.00
02 TRABAJOS PRELIMINARES
02.01 TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO m 44.05 0.55
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION /MAQ. T. ARENOSO HASTA 2.00MPP m 44.05 17.10
03.02 REFINE Y NIVELACION DE TUBOS OBRA m 44.05 5.00
03.03 RELLENO COMP. ZANJA C/EQUIPO T. ARENOSO HASTA 2.00MPP m 44.05 18.87
03.04 ENTIBADO Y DESENTIBADO DE ZANJA m2 20.00 27.00
03.05 ELIMINACIÓN DE DESMONTE C/C T.N.P/TUB DN 200MM m 10.00 10.80
04 SUMINISTRO E INSTALACION DE TUBERÍA PVC
04.01 TUBERIA PVC DN200MM INC. ANILLOS. m 498.00 117.00
04.02 INSTALACION TUBERIA PVC DN200MM. m 498.00 15.81
04.03 PRUEBA HIDR/DESINF DE TUBERIA PVC DN200MM. m 498.00 2.26
04.04 EMPALME A TUBERIA INCLUYE ACCESORIOS DIVERSOS und 1.00 24,567.00
05 SUMINISTRO E INSTALACION DE ACCESORIOS PVC
05.01 CODO PVC 90° P/TUB.PVC C-7.5 DN200 INYECTADO INC. ANILLOS und 4.00 552.35
05.02 REDUCCION PVC DN200x150MM INC.ANILLOS und 1.00 126.86
05.03 TEE PVC DN200x150 MM INC.ANILLOS und 1.00 751.39
05.04 INSTALACION DE ACCESORIOS PVC DN (200-250)mm. und 4.00 102.35
06 ESTACION DE CONTROL EN CAPTACION DE AGUA POTABLE
06.01 CAJA DE CA. F'c=210 KG/CM2 DE 2.50x2.00x2.00 M und 1.00 4,775.75
06.02 VALVULA COMP HFD BB DN200 INC.ACCESORIOS und 2.00 3,431.98
06.03 VALVULA REGULADORA DE CAUDAL Y PRESION DN 200 MM BB INC. und 1.00 20,535.56
ACCESORIOS
06.04 ACOPLAMIENTOS HFD DN200 INC.ACCESORIOS und 1.00 3,042.67
06.05 INSTALACION DE ACOPLAMIENTOS Y CESORIOS BRIDADOS HFD DN (200-350) und 4.00 89.56
COSTO DIRECTO
GASTOS GENERALES 5%
UTILIDAD 7%
SUB TOTAL
IGV
TOTAL
VALORIZACION QUINCENAL
SEMANA 2
J V S D L M M J V S D
1 2 3 4 5 6 7 8 9 10 11
PARCIAL
156,276.02 674 674 674 674 674 674 674 674 674
113,883.98 633 633 633 633 633 633 633 633 633
56,185.05
31,674.96
146,245.10 1,016 1,016 1,016 1,016 1,016 1,016
255,404.37
275,050.86
1,227,906.45
28,855.32
207,167.24
57,975.00
9,349.68
19,828.76
4,065.75
34,033.60
113,400.00
56,000.00
3,200.00
33,750.00
8,775.00
PARCIAL
S/13,860.00
S/56,160.00
S/2,736.00
S/589.50
S/4,000.00
S/1,320.00
S/6,210.00
S/7,260.00
S/7,476.00
S/28,800.00
S/1,611.00
S/105.00
S/2,340.00
S/11,162.97
S/243.00
S/142,020.00
S/400.00
S/150.00
S/630.00
S/1,680.00
S/1,800.00
S/850.00
S/3,150.00
S/6,600.00
S/22,200.00
S/3,360.00
S/24,975.00
S/5,610.00
S/1,810.00
S/990.00
S/504.00
S/21.00
S/79.20
S/260.00
S/404.00
S/363.00
S/213.50
S/1,281.00
S/728.00
S/380.80
S/627.00
S/61.20
S/367.20
S/6.40
S/30.80
S/210.00
S/22.80
S/127.40
S/146.40
S/660.00
S/1,680.00
S/330.00
S/924.00
S/39.60
S/168.00
S/1,040.00
S/231.00
S/23,400.00
S/5,625.00
S/700.00
S/4,488.00
S/629.00
S/23.80
S/795.60
S/969.00
S/88.40
S/40.80
S/748.00
S/731.00
S/28.05
S/299.20
S/1,040.00
S/10,754.10
S/2,343.00
S/1,776.00
S/2,200.00
S/1,540.00
S/440.00
S/1,653.00
S/1,375.00
S/1,696.00
S/8,640.00
S/144.00
S/36.00
S/273.00
S/96.00
S/98,240.00
S/59,400.00
S/15,000.00
S/58,000.00
S/22,400.00
S/87,500.00
S/8,900.00
S/14,000.00
S/2,300.00
S/7,300.00
S/3,100.00
S/230.00
S/4,500.00
S/65.00
S/156.00
S/12.00
S/550.00
S/420.00
TOTAL
S/3,300.00
S/11,880.00
S/2,115.00
S/2,350.00
S/12,600.00
S/3,400.00
S/3,450.00
S/8,544.00
S/8,316.00
S/8,316.00
S/195.00
S/5,152.14
S/11,046.00
S/675.00
S/330.00
S/450.00
S/850.00
S/1,020.00
S/680.00
S/4,400.00
S/1,925.00
S/6,050.00
S/912.00
S/3,800.00
S/1,500.00
S/10,200.00
S/650.00
S/50.00
S/420.00
S/2,160.00
S/25,000.00
TOTAL
S/4,380.56
S/23,040.00
S/23,805.00
S/792.30
S/3,157.00
S/59,940.00
S/1,888.00
S/1,144.00
S/260.00
S/450.00
S/609.75
S/705.20
S/98.80
S/261.00
S/151.00
S/1,155.60
S/1,983.96
S/367.20
S/44.40
S/416.00
S/916.50
S/382.80
S/187.50
S/22.20
S/1,554.30
S/1,554.30
S/4,624.80
S/1,659.20
S/99.00
S/275.90
S/282.20
S/31.60
S/9,002.50
S/1,049.40
S/455.40
S/13,104.00
S/6,150.00
S/270.00
S/1,350.00
S/360.00
S/1,644.16
S/1,708.20
S/1,710.00
S/1,170.00
S/57.50
S/279.00
S/99.00
S/1,350.00
S/3,883.50
S/15,386.00
S/45,530.00
S/7,693.00
S/6,060.40
S/6,060.40
S/360.00
S/448.00
S/165.00
S/171.00
S/3,014.66
S/110.00
S/170.00
S/760.00
S/924.00
S/580.00
S/500.00
S/59,050.00
S/18.60
S/18,500.00
S/1,062.00
S/6,100.00
S/1,100.00
S/1,400.00
S/1,008.00
S/400.00
S/350.00
S/885.75
S/56.00
S/266.00
S/17,000.00
S/18,000.00
TOTAL
S/3,360.00
S/280.00
S/4,440.00
S/30,100.00
S/2,080.00
S/2,250.00
S/1,800.00
S/900.00
S/2,520.00
S/1,500.00
S/600.00
S/300.00
S/2,640.00
S/200.00
S/585.00
S/7,080.00
S/34,000.00
S/570.00
S/746.20
S/11,655.00
S/1,600.00
S/700.00
S/2,200.00
S/5,966.00
S/3,454.00
S/13,804.00
S/16,225.00
S/3,108.00
S/5,000.00
PARCIAL
4,000.00
12,432.00
159,840.00
10,656.00
150,960.00
1,200.00
163,150.00
75,328.00
230.00
26,104.00
9,416.00
6,526.00
7,831.20
4,872.00
282.76
1,440.00
1,547.00
4,830.00
1,504.03
1,656.08
1,656.08
10,016.00
9,000.00
1,242.36
2,850.00
1,293.73
444.45
4,290.00
5,092.00
38,384.00
9,596.00
13,091.58
33,586.00
15,443.33
84.44
6,641.69
39,000.00
17,000.00
1,000.00
7,000.00
42,500.00
22,500.00
3,000.00
PARCIAL
3,584.12
16,183.98
17,134.97
51,531.18
51,511.72
25,194.46
9,710.39
11,356.02
36,927.88
39,437.71
24,097.55
60,710.83
17,251.20
221,738.86
4,245.33
8,116.80
12,437.20
113.15
48,551.94
24,275.97
133,368.00
25,006.50
83,355.00
9,891.46
55,570.00
40,000.00
18,000.00
4,000.00
90,000.00
PARCIAL
1,575.00
3,000.00
700.00
300.00
2,000.00
14,400.00
180.00
5,994.00
4,000.00
9,180.00
17,514.79
90,348.80
2,601.90
216,097.92
149,324.80
32,908.80
208.96
11,603.20
11,603.20
11,603.20
11,916.80
11,916.80
11,440.80
11,440.80
11,440.80
11,440.80
11,440.80
21,440.00
21,440.00
21,440.00
21,440.00
51,667.20
22,608.72
75,138.56
26,582.40
12,994.02
76,963.20
26,920.80
24,425.28
14,302.52
1,998.00
2,060.10
1,754.08
1,792.80
1,215.27
1,841.52
7,250.40
4,224.42
3,176.48
13,197.60
2,218.14
4,216.86
2,439.36
2,217.60
4,147.20
1,647.70
900.00
2,592.00
1,131.30
1,215.00
2,700.00
540.00
7,200.00
216.00
162.00
608.25
569.34
423.89
4,500.00
4,500.00
714.07
4,896.00
587.57
16,688.00
3,700.00
652.86
521.81
1,467.00
791.57
89.84
242.45
47.92
431.24
3,342.14
68,900.00
4,312.44
319.07
2,567.70
169.45
14,000.00
16,800.00
1,412.56
2,971.75
2,780.09
1,305.71
7,290.00
521.81
1,250.61
1,672.27
898.43
161.72
215.62
60.61
27,000.00
2,265.23
395.79
503.12
979.88
970.30
1,173.94
539.06
1,435.83
314.65
849.07
1,059.90
169.45
38,080.00
3,917.13
1,390.04
652.86
179.69
395.79
215.62
181.84
862.49
862.49
4,640.66
113.80
4,312.44
888.00
3,398.92
1,188.70
85.59
227.30
233.55
242.36
256.64
16.17
6.23
135.84
1,796.90
PARCIAL
224.85
449.70
722.63
95.04
154.09
290.86
503.55
939.38
10,273.50
5,562.43
703.30
1,421.28
1,021.68
940.41
285.75
3,465.60
1,884.85
6,654.96
5,109.28
1,455.44
1,684.80
2,477.76
1,077.09
1,232.01
11,918.03
6,480.25
1,455.44
1,077.09
981.02
945.00
4,309.20
2,645.06
1,870.94
95.04
11.03
264.06
123.55
1,431.00
165.73
130.41
248.98
403.29
225.92
1,474.20
656.16
217.80
284.31
501.51
112.27
396.63
370.06
364.31
207.90
466.83
1,238.97
1,257.30
198.00
136.08
142.02
51.84
253.44
181.98
318.47
388.40
3,931.20
490.77
53.26
342.02
95.04
237.60
24.91
121.50
45.00
162.00
32.40
31.50
47.70
27.00
32.40
63.00
108.00
189.00
162.00
58.50
27.00
40.50
PARCIAL
5,857.40
290.52
290.52
232.47
22.55
936.00
142.99
357.48
21.45
446.85
329.06
2,070.00
368.46
4,500.18
3,018.16
2,516.70
911.39
763.32
2,516.70
1,296.19
10,313.23
5,812.61
5,745.44
1,246.14
113.10
473.60
373.95
2,161.80
1,965.38
97.02
645.84
405.72
436.80
897.43
487.49
495.88
897.43
545.98
2,397.06
1,459.60
2,888.48
77.93
817.91
424.12
247.10
3,106.66
257,027.01
1,645.28
793.80
104.49
321.42
171.76
689.01
598.21
590.40
114.83
37.39
170.32
25.43
237.38
5,400.00
154.64
PARCIAL
140.00
311.85
5,457.38
1,247.40
7,144.20
4,776.03
45,000.00
17,085.60
6,615.00
3,640.00
28,875.00
600.00
PARCIAL
23.54
76.87
76.87
30.95
12.86
104.63
150.61
2292.30
306.18
526.50
85.70
443.52
242.75
295.76
703.76
421.90
251.36
1154.34
642.80
891.10
519.90
510.12
901.58
2323.12
1280.99
1324.73
472.64
131.76
58.05
791.17
315.00
297.00
117.00
36.00
437.53
496.77
220.08
126.00
126.00
126.00
155.30
600.00
75.30
189.00
108.00
63.00
31.50
94.50
31.50
108.00
16.20
22.50
122.45
57.35
145.18
45.00
PARCIAL
1960.00
479.16
479.16
828.00
119.79
179.69
479.16
287.50
359.37
119.79
239.58
239.58
359.37
299.48
527.08
311.45
239.58
479.16
479.16
359.37
359.37
179.69
838.53
670.82
359.37
239.58
359.37
179.69
179.69
143.75
89.84
718.74
1500.00
479.16
359.37
359.37
239.58
172.50
21.56
359.37
359.37
107.81
49.83
26.83
11.50
1530.00
270.00
283.50
283.50
252.00
31.50
157.50
135.00
PARCIAL
224.00
56,000.00
62,400.00
27,518.40
29,565.00
22,024.80
32,680.80
46,094.40
7,510.83
2,874.96
2,156.22
10,800.00
4,192.65
15,552.00
1,078.11
3,593.70
898.43
1,497.38
88,906.00
56,000.00
PARCIAL
7,890.00
2,802.37
85,674.00
8,145.72
6,218.00
22,250.00
7,000.00
382.96
769.89
260.82
1,350.00
1,440.00
393.08
48.28
487.52
162.84
1,440.00
256.95
202.68
643.66
1,690.00
787.56
1,437.48
119.79
336.30
13.66
5,800.00
22,000.00
4,950.00
623.15
4,860.00
5,580.00
4,072.86
1,042.17
2,210.13
395.31
1,197.90
2,581.01
310.56
46,578.00
242.28
1,323.90
818.72
67,000.00
7,890.00
PARCIAL
32.94
82.40
103.36
42.24
190.84
269.57
1,081.08
648.00
455.40
1,037.32
119.70
59.40
1,460.16
415.15
1,133.73
582.30
2,178.03
466.83
388.80
880.44
1,428.57
405.45
2,235.48
1,740.96
1,338.30
1,368.55
1,104.67
3,295.17
1,550.34
1,433.70
399.24
8.51
1,249.08
17.10
1,427.76
581.38
537.64
5,000.00
495.00
432.00
144.00
568.00
PARCIAL
471,952.59
1,500.00
24.18
753.26
220.25
831.09
540.00
108.00
58,266.00
7,874.52
1,127.49
24,567.00
2,209.41
126.86
751.39
409.39
4,775.75
6,863.97
20,535.56
3,042.67
358.22
260.47
271.62
22,696.08
395.31
2,041.10
74.55
147.51
49.28
7,155.00
6,097.31
21,800.00
1,557.27
37,800.00
3,023.50
395.31
51.61
115.43
28.29
89.46
295.02
49.28
248.11
PARCIAL
806.43
19.48
606.71
38.32
415.12
162.00
2,128.80
155.56
83.30
219.68
539.06
105.65
1,546.73
133.35
149.45
167.39
PARCIAL
3,000.00
5,828.70
2,098.33
66,447.18
8,640.00
86,890.50
9,654.50
400.00
34,545.00
3,450.00
975.91
89.03
140.88
263.43
43.21
754.68
944.01
983.70
S/190,593.79
AGOSTO
SEMANA 3 SEMANA 4
L M M J V S D L M M J
12 13 14 15 16 17 18 19 20 21 22
674 674 674 674 674 674 674 674 674 674
633 633 633 633 633 633 633 633 633 633
299 299 299 299
1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016
169 169 169 169 169 169 169 169 169 169
178 178 178 178 178 178 178 178 178 178
537 537 537 537 537 537 537 537 537 537
537 537 537 537 537 537 537 537 537 537
262 262 262 262 262 262 262 262 262 262
101 101 101 101 101 101 101 101 101 101
118 118 118 118 118 118 118 118 118 118
385 385 385 385 385 385 385 385 385 385
411 411 411 411 411 411 411 411 411 411
251 251 251 251 251 251 251 251 251 251
632 632 632 632 632 632 632 632 632 632
180 180 180 180 180 180 180 180 180 180
5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347
1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133
315
800 800 800 800 800 800 800 800 800 800
8,311 8,311 8,311 8,311 8,311 8,311 8,311 8,311 8,311 8,311
S/22,106.48 S/21,791.48 S/21,791.48 S/21,791.48 S/21,791.48 S/21,791.48 S/21,973.67 S/21,973.67 S/21,973.67 S/21,973.67
S/1,105.32 S/1,089.57 S/1,089.57 S/1,089.57 S/1,089.57 S/1,089.57 S/1,098.68 S/1,098.68 S/1,098.68 S/1,098.68
S/1,547.45 S/1,525.40 S/1,525.40 S/1,525.40 S/1,525.40 S/1,525.40 S/1,538.16 S/1,538.16 S/1,538.16 S/1,538.16
S/24,759.26 S/24,406.46 S/24,406.46 S/24,406.46 S/24,406.46 S/24,406.46 S/24,610.51 S/24,610.51 S/24,610.51 S/24,610.51
S/4,456.67 S/4,393.16 S/4,393.16 S/4,393.16 S/4,393.16 S/4,393.16 S/4,429.89 S/4,429.89 S/4,429.89 S/4,429.89
S/29,215.92 S/28,799.62 S/28,799.62 S/28,799.62 S/28,799.62 S/28,799.62 S/29,040.40 S/29,040.40 S/29,040.40 S/29,040.40
S/414,397.60
MANA 4 SEMANA 5 SEMANA 6
V S D L M M J V S D L M
23 24 25 26 27 28 29 30 31 1 2 3
674 674 674 674 674 674 674 674 674 674
633 633 633 633 633 633 633 633 633 633
299 299 299 299 299 299 299 299 299 299
1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016
178 178 178 178 178 178 178 178 178 178
537 537 537 537 537 537 537 537 537 537
537 537 537 537 537 537 537 537 537 537
262 262 262 262 262 262 262 262 262 262
101 101 101 101 101 101 101 101 101 101
118 118 118 118 118 118 118 118 118 118
385 385 385 385 385 385 385 385 385 385
411 411 411 411 411 411 411 411 411 411
251 251 251 251 251 251 251 251 251 251
632 632 632 632 632 632 632 632 632 632
180 180 180 180 180 180 180 180 180 180
5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347
1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133
315
8,311 8,311 8,311 8,311 8,311 8,311 8,311 8,311 8,311 8,311
325 325 325 325 325 325 325 325
16 16 16 16 16 16 16 16
16 16 16 16 16 16 16 16
13 13 13 13 13 13 13 13
1 1 1 1 1 1 1 1
52 52 52 52 52 52 52 52
8 8 8 8 8 8 8 8
20 20 20 20 20 20 20 20
1 1 1 1 1 1 1 1
25 25 25 25 25 25 25 25
S/21,973.67 S/21,973.67 S/23,022.09 S/23,022.09 S/23,022.09 S/23,022.09 S/23,022.09 S/23,022.09 S/25,419.67 S/25,104.67
S/1,098.68 S/1,098.68 S/1,151.10 S/1,151.10 S/1,151.10 S/1,151.10 S/1,151.10 S/1,151.10 S/1,270.98 S/1,255.23
S/1,538.16 S/1,538.16 S/1,611.55 S/1,611.55 S/1,611.55 S/1,611.55 S/1,611.55 S/1,611.55 S/1,779.38 S/1,757.33
S/24,610.51 S/24,610.51 S/25,784.74 S/25,784.74 S/25,784.74 S/25,784.74 S/25,784.74 S/25,784.74 S/28,470.03 S/28,117.23
S/4,429.89 S/4,429.89 S/4,641.25 S/4,641.25 S/4,641.25 S/4,641.25 S/4,641.25 S/4,641.25 S/5,124.61 S/5,061.10
S/29,040.40 S/29,040.40 S/30,425.99 S/30,425.99 S/30,425.99 S/30,425.99 S/30,425.99 S/30,425.99 S/33,594.64 S/33,178.33
S/414,397.60
SETIEMBRE
SEMANA 6 SEMANA 7
M J V S D L M M J V S D
4 5 6 7 8 9 10 11 12 13 14 15
674 674 674 674 674 674 674 674 674 674
633 633 633 633 633 633 633 633 633 633
299 299 299 299 299 299 299 299 299 299
1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016
137 137 137 137 137 137 137 137 137 137
987 987 987 987 987 987 987 987 987 987
276 276 276 276 276 276 276 276 276 276
13,860
56,160
2,736
590
4,000
1,320
6,210
7,260
7,476
28,800
1,611
105
69 69 69 69 69 69
248 248 248 248 248 248
44 44 44 44 44 44
49 49 49 49 49 49
178 178 178 178 178 178 178 178 178 178
537 537 537 537 537 537 537 537 537 537
537 537 537 537 537 537 537 537 537 537
262 262 262 262 262 262 262 262 262 262
101 101 101 101 101 101 101 101 101 101
118 118 118 118 118 118 118 118 118 118
385 385 385 385 385 385 385 385 385 385
411 411 411 411 411 411 411 411 411 411
251 251 251 251 251 251 251 251 251 251
632 632 632 632 632 632 632 632 632 632
180 180 180 180 180 180 180 180 180 180
5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347
1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133
100 100 100 100 100 100 100 100 100 100
300
2,000
17,515
90,349
520 520 520 520 520
8,311 8,311 8,311 8,311 8,311 8,311
104 104
325 325 325 325 325 325 325 325 325 325
16 16 16 16 16 16 16 16 16 16
16 16 16 16 16 16 16 16 16 16
13 13 13 13 13 13 13 13 13 13
1 1 1 1 1 1 1 1 1 1
52 52 52 52 52 52 52 52 52 52
8 8 8 8 8 8 8 8 8 8
20 20 20 20 20 20 20 20 20 20
1 1 1 1 1 1 1 1 1 1
25 25 25 25 25 25 25 25 25 25
S/26,013.67 S/26,013.67 S/26,534.05 S/26,534.05 S/173,651.99 S/26,009.70 S/16,999.24 S/108,527.66 S/16,283.34 S/16,283.34
S/1,300.68 S/1,300.68 S/1,326.70 S/1,326.70 S/8,682.60 S/1,300.48 S/849.96 S/5,426.38 S/814.17 S/814.17
S/1,820.96 S/1,820.96 S/1,857.38 S/1,857.38 S/12,155.64 S/1,820.68 S/1,189.95 S/7,596.94 S/1,139.83 S/1,139.83
S/29,135.31 S/29,135.31 S/29,718.14 S/29,718.14 S/194,490.22 S/29,130.86 S/19,039.15 S/121,550.98 S/18,237.34 S/18,237.34
S/5,244.36 S/5,244.36 S/5,349.26 S/5,349.26 S/35,008.24 S/5,243.55 S/3,427.05 S/21,879.18 S/3,282.72 S/3,282.72
S/34,379.67 S/34,379.67 S/35,067.40 S/35,067.40 S/229,498.46 S/34,374.41 S/22,466.19 S/143,430.15 S/21,520.06 S/21,520.06
S/678,476.45
SETIEMBRE
SEMANA 8 SEMANA 9
L M M J V S D L M M J
16 17 18 19 20 21 22 23 24 25 26
674 674 674 674 674 674 674 674 674 674
633 633 633 633 633 633 633 633 633 633
299 299 299 299 299 299 299 299 299 299
137 137 137 137 137 137 137 137 137 137
987 987 987 987 987 987 987 987 987 987
276 276 276 276 276 276 276 276 276 276
2,340
11,163
243
142,020
400
150
630
1,680
1,800
850
3,150
6,600
22,200
3,360
24,975
5,610
0
1,810
990
504
21
79
260
404
363
214
1,281
728
381
627
61
367
6
31
210
23
127
146
660
1,680
330
924
40
168
1,040
231
23,400
5,625
700
4,488
629
24
796
969
88
41
748
731
28
299
1,040
10,754
2,343
1,776
2,200
1,540
440
1,653
1,375
1,696
69 69 69 69 69 69 69 69 69 69
248 248 248 248 248 248 248 248 248 248
44 44 44 44 44 44 44 44 44 44
49 49 49 49 49 49 49 49 49 49
263 263 263 263 263 263 263 263 263 263
71 71 71 71 71 71 71 71 71 71
72 72 72 72 72 72 72 72 72 72
178 178 178 178 178 178 178 178 178 178
173 173 173 173 173 173 173 173 173 173
173 173 173 173 173 173 173 173 173 173
8 8 8 8 8 8 8 8 8 8
215 215 215 215 215 215 215 215 215 215
460 460 460 460 460 460 460 460 460 460
28 28 28 28 28 28 28 28 28 28
14 14 14 14 14 14 14 14 14 14
19 19 19 19 19 19 19 19 19 19
71 71 71 71
85 85 85 85
57 57 57 57
367 367 367 367
160 160 160 160
504 504 504 504
76 76 76 76
169 169 169 169 169 169 169 169 169 169
178 178 178 178 178 178 178 178 178 178
537 537 537 537 537 537 537 537 537 537
537 537 537 537 537 537 537 537 537 537
262 262 262 262 262 262 262 262 262 262
101 101 101 101 101 101 101 101 101 101
118 118 118 118 118 118 118 118 118 118
385 385 385 385 385 385 385 385 385 385
411 411 411 411 411 411 411 411 411 411
251 251 251 251 251 251 251 251 251 251
632 632 632 632 632 632 632 632 632 632
180 180 180 180 180 180 180 180 180 180
5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347
1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133
100 100 100 100 100 100 100 100 100 100
1,828 1,828 1,828 1,828 1,828 1,828 1,828 1,828 1,828 1,828
27 27 27 27 27 27 27 27 27 27
173 173 173 173 173 173 173 173 173 173
31 31 31 31 31 31 31 31 31 31
375 375 375 375 375 375 375 375 375 375
252 252 252 252 252 252 252 252 252 252
210 210 210 210 210 210 210 210 210 210
76 76 76 76 76 76 76 76 76 76
64 64 64 64 64 64 64 64 64 64
210 210 210 210 210 210 210 210 210 210
108 108 108 108 108 108 108 108 108 108
859 859 859 859 859 859 859 859 859 859
484 484 484 484 484 484 484 484 484 484
479 479 479 479 479 479 479 479 479 479
104 104 104 104 104 104 104 104 104 104
9 9 9 9 9 9 9 9 9 9
39 39 39 39 39 39 39 39 39 39
31 31 31 31 31 31 31 31 31 31
180 180 180 180 180 180 180 180 180 180
164 164 164 164 164 164 164 164 164 164
224
S/844,517.17
MANA 9 SEMANA 10 SEMANA
V S D L M M J V S D L M
27 28 29 30 1 2 3 4 5 6 7 8
674 674 674 674 674 674 674 674 674 674
633 633 633 633 633 633 633 633 633 633
299 299 299 299 299 299 299 299 299 299
1,016 1,016
137 137 137 137 137 137 137 137 137 137
987 987 987 987 987 987 987 987 987 987
276 276 276 276 276 276 276 276 276 276
8,640
144
36
273
96
69 69 69 69 69 69 69 69 69 69
248 248 248 248 248 248 248 248 248 248
44 44 44 44 44 44 44 44 44 44
49 49 49 49 49 49 49 49 49 49
263 263 263 263 263 263 263 263 263 263
71 71 71 71 71 71 71 71 71 71
72 72 72 72 72 72 72 72 72 72
178 178 178 178 178 178 178 178 178 178
173 173 173 173 173 173 173 173 173 173
173 173 173 173 173 173 173 173 173 173
8 8 8 8 8 8 8 8 8 8
215 215 215 215 215 215 215 215 215 215
460 460 460 460 460 460 460 460 460 460
28 28 28 28 28 28 28 28 28 28
14 14 14 14 14 14 14 14 14 14
19 19 19 19 19 19 19 19 19 19
71 71 71 71 71 71 71 71
85 85 85 85 85 85 85 85
57 57 57 57 57 57 57 57
367 367 367 367 367 367 367 367
160 160 160 160 160 160 160 160
504 504 504 504 504 504 504 504
76 76 76 76 76 76 76 76
169 169 169 169 169 169 169 169 169 169
178 178 178 178 178 178 178 178 178 178
537 537 537 537 537 537 537 537 537 537
537 537 537 537 537 537 537 537 537 537
262 262 262 262 262 262 262 262 262 262
101 101 101 101 101 101 101 101 101 101
118 118 118 118 118 118 118 118 118 118
385 385 385 385 385 385 385 385 385 385
411 411 411 411 411 411 411 411 411 411
251 251 251 251 251 251 251 251 251 251
632 632 632 632 632 632 632 632 632 632
180 180 180 180 180 180 180 180 180 180
5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347
1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133
315
100 100
149,325
1,828 1,828 1,828 1,828 1,828 1,828 1,828 1,828
1,907 1,907
27 27
173 173
31 31
375 375
252 252
210 210
76 76
64 64
210 210
108 108
859 859
484 484
479 479
104 104
9 9
39 39
31 31
180 180
164 164
8 8 8 8 8 8 8 8
54 54 54 54 54 54 54 54
34 34 34 34 34 34 34 34
36 36 36 36 36 36 36 36
75 75 75 75 75 75 75 75
41 41 41 41 41 41 41 41
41 41 41 41 41 41 41 41
75 75 75 75 75 75 75 75
45 45 45 45 45 45 45 45
S/746,635.18
OCTUBRE
SEMANA 11 SEMANA 12
M J V S D L M M J V S
9 10 11 12 13 14 15 16 17 18 19
674 674 674 674 674 674 674 674 674 674
633 633 633 633 633 633 633 633 633 633
299 299 299 299 299 299 299 299 299 299
1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016
137 137 137 137 137 137 137 137 137 137
987 987 987 987 987 987 987 987 987 987
276 276 276 276 276 276 276 276 276 276
230
4,500
65
156
12
69 69 69 69 69 69 69 69 69 69
248 248 248 248 248 248 248 248 248 248
44 44 44 44 44 44 44 44 44 44
49 49 49 49 49 49 49 49 49 49
263 263 263 263 263 263 263 263 263 263
71 71 71 71 71 71 71 71 71 71
72 72 72 72 72 72 72 72 72 72
178 178 178 178 178 178 178 178 178 178
173 173 173 173 173 173 173 173 173 173
173 173 173 173 173 173 173 173 173 173
8 8 8 8
215 215 215 215
460 460 460 460
28 28 28 28
14 14 14 14
19 19 19 19
90 90 90 90 90 90
169 169 169 169 169 169 169 169 169 169
178 178 178 178 178 178 178 178 178 178
537 537 537 537 537 537 537 537 537 537
537 537 537 537 537 537 537 537 537 537
262 262 262 262 262 262 262 262 262 262
101 101 101 101 101 101 101 101 101 101
118 118 118 118 118 118 118 118 118 118
385 385 385 385 385 385 385 385 385 385
411 411 411 411 411 411 411 411 411 411
251 251 251 251 251 251 251 251 251 251
632 632 632 632 632 632 632 632 632 632
180 180 180 180 180 180 180 180 180 180
5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347 5,347
1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133 1,133
11,603
54 54 54 54
34 34 34 34
36 36 36 36
75 75 75 75
41 41 41 41
41 41 41 41
75 75 75 75
45 45 45 45
21 21 21 21 21 21
259 259 259 259 259 259
21,419 21,419 21,419 21,419 21,419 21,419
137 137 137 137 137 137
66 66 66 66 66 66
5,200 5,200 5,200 5,200
47 47 47 47 47 47
S/24,532.87 S/24,532.87 S/24,532.87 S/36,136.07 S/56,185.84 S/53,511.00 S/53,511.00 S/53,511.00 S/53,511.00 S/65,114.20
S/1,226.64 S/1,226.64 S/1,226.64 S/1,806.80 S/2,809.29 S/2,675.55 S/2,675.55 S/2,675.55 S/2,675.55 S/3,255.71
S/1,717.30 S/1,717.30 S/1,717.30 S/2,529.53 S/3,933.01 S/3,745.77 S/3,745.77 S/3,745.77 S/3,745.77 S/4,557.99
S/27,476.82 S/27,476.82 S/27,476.82 S/40,472.40 S/62,928.15 S/59,932.33 S/59,932.33 S/59,932.33 S/59,932.33 S/72,927.91
S/4,945.83 S/4,945.83 S/4,945.83 S/7,285.03 S/11,327.07 S/10,787.82 S/10,787.82 S/10,787.82 S/10,787.82 S/13,127.02
S/32,422.65 S/32,422.65 S/32,422.65 S/47,757.44 S/74,255.21 S/70,720.14 S/70,720.14 S/70,720.14 S/70,720.14 S/86,054.93
S/746,635.18
SEMANA 13 SEMANA 14
D L M M J V S D L M M
20 21 22 23 24 25 26 27 28 29 30
59,400
15,000
58,000
22,400
87,500
8,900
14,000
2,300
7,300
3,100
69 69 69 69 69 69 69 69 69
248 248 248 248 248 248 248 248 248
44 44 44 44 44 44 44 44 44
49 49 49 49 49 49 49 49 49
42 42 42 42 42 42 42 42 42
11,603
1,907 1,907 1,907 1,907 1,907 1,907
9 9 9
27 27 27
14 14 14
57 57 57
50 50 50
49 49 49
10 10 10
3 3 3
14 14 14
2 2 2
20 20 20
47 47 47 47 47 47 47 47 47
42 42 42
1 1 1
21 21 21
6 6 6
23 23 23
15 15 15
3 3 3
61 61 61
4 4 4
21 21 21
11 11 11
85 85 85
10 10 10
7 7 7
8 8 8
84 84 84
11 11 11
1 1 1
3 3 3
1 1 1
2 2 2
8 8 8
1 1 1
7 7 7
S/431,437.04 S/55,297.04 S/55,409.46 S/55,553.99 S/55,553.99 S/68,869.44 S/35,566.36 S/35,251.36 S/35,059.31
S/21,571.85 S/2,764.85 S/2,770.47 S/2,777.70 S/2,777.70 S/3,443.47 S/1,778.32 S/1,762.57 S/1,752.97
S/30,200.59 S/3,870.79 S/3,878.66 S/3,888.78 S/3,888.78 S/4,820.86 S/2,489.65 S/2,467.60 S/2,454.15
S/483,209.48 S/61,932.68 S/62,058.60 S/62,220.47 S/62,220.47 S/77,133.77 S/39,834.32 S/39,481.52 S/39,266.43
S/86,977.71 S/11,147.88 S/11,170.55 S/11,199.68 S/11,199.68 S/13,884.08 S/7,170.18 S/7,106.67 S/7,067.96
S/570,187.19 S/73,080.57 S/73,229.15 S/73,420.15 S/73,420.15 S/91,017.85 S/47,004.50 S/46,588.20 S/46,334.39
S/1,438,831.91
SEMANA 14 SEMANA 15
J V S D L M M J V
31 1 2 3 4 5 6 7 8
49 49 49
42 42 42 42 42 42 42 42
4,381
23,040
23,805
0
792
3,157
59,940
1,888
1,144
260
70 70 70 70 70
6 6 6 6 6
93 93 93 93 93
62 62 62 62 62
4 4 4 4 4
18 18 18 18 18
20 20 20 20 20
62 62 62 62 62
19 19 19 19 19
21 21 21 21 21
21 21 21 21 21
128 128 128 128 128
115 115 115 115 115
16 16 16 16 16
37 37 37 37 37
17 17 17 17 17
6 6 6 6 6
90 90 90 90 90 90 90 90
1,712 1,712
927 927 927 927 927
117 117 117 117 117
237 237 237 237 237
170 170 170 170 170
8 8 8 8 8 8 8 8
1 1 1 1 1 1 1 1
22 22 22 22 22 22 22 22
10 10 10 10 10 10 10 10
27 27 27 27 27 27 27 27
14 14 14 14 14 14 14 14
57 57 57 57 57 57 57 57
50 50 50 50 50 50 50 50
49 49 49 49 49 49 49 49
10 10 10 10 10 10 10 10
3 3 3 3 3 3 3 3
14 14 14 14 14 14 14 14
2 2 2 2 2 2 2 2
20 20 20 20 20 20 20 20
47 47 47 47 47 47 47 47
85,674
1 1 1 1 1 1 1 1
21 21 21 21 21 21 21 21
6 6 6 6 6 6 6 6
23 23 23 23 23 23 23 23
15 15 15 15 15 15 15 15
3 3 3 3 3 3 3 3
61 61 61 61 61 61 61 61
4 4 4 4 4 4 4 4
21 21 21 21 21 21 21 21
11 11 11 11 11 11 11 11
85 85 85 85 85 85 85 85
10 10 10 10 10 10 10 10
7 7 7 7 7 7 7 7
8 8 8 8 8 8 8 8
84 84 84 84 84 84 84 84
11 11 11 11 11 11 11 11
1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
8 8 8 8 8 8 8 8
1 1 1 1 1 1 1 1
7 7 7 7 7 7 7 7
S/35,059.31 S/35,059.31 S/45,738.11 S/250,273.78 S/44,779.29 S/44,779.29 S/44,779.29 S/44,779.29
S/1,752.97 S/1,752.97 S/2,286.91 S/12,513.69 S/2,238.96 S/2,238.96 S/2,238.96 S/2,238.96
S/2,454.15 S/2,454.15 S/3,201.67 S/17,519.16 S/3,134.55 S/3,134.55 S/3,134.55 S/3,134.55
S/39,266.43 S/39,266.43 S/51,226.69 S/280,306.64 S/50,152.80 S/50,152.80 S/50,152.80 S/50,152.80
S/7,067.96 S/7,067.96 S/9,220.80 S/50,455.19 S/9,027.50 S/9,027.50 S/9,027.50 S/9,027.50
S/46,334.39 S/46,334.39 S/60,447.49 S/330,761.83 S/59,180.31 S/59,180.31 S/59,180.31 S/59,180.31
S/1,178,323.54
NOVIEMBRE
SEMANA 16
S D L M M J V S D
9 10 11 12 13 14 15 16 17
42 42 42 42 42 42 42
610
705
99
261
151
1,156
1,984
367
44
416
917
383
188
22
1,554
1,554
4,625
1,659
99
276
282
32
9,003
1,049
455
13,104
6,150
70 70 70 70 70 70 70
6 6 6 6 6 6 6
93 93 93 93 93 93 93
62 62 62 62 62 62 62
4 4 4 4 4 4 4
18 18 18 18 18 18 18
20 20 20 20 20 20 20
62 62 62 62 62 62 62
19 19 19 19 19 19 19
21 21 21 21 21 21 21
21 21 21 21 21 21 21
128 128 128 128 128 128 128
115 115 115 115 115 115 115
16 16 16 16 16 16 16
37 37 37 37 37 37 37
17 17 17 17 17 17 17
6 6 6 6 6 6 6
715
849
90 90 90 90 90 90 90
3,573
51,667
8
1
22
10
239
28
22
41
67 67 67 67 67 67
38 38 38 38 38 38
246 246 246 246 246 246
27
14
57
50
49
10
3
14
2
20
450
13
12 12 12 12 12 12
26 26 26 26 26 26
455 455 455 455 455 455
7,682
50 50 50 50 50 50
83 83 83 83 83 83
47 47 47 47 47 47 47
1 1 1 1 1 1 1
21 21 21 21 21 21 21
6 6 6 6 6 6 6
23 23 23 23 23 23 23
15 15 15 15 15 15 15
3 3 3 3 3 3 3
61 61 61 61 61 61 61
4 4 4 4 4 4 4
21 21 21 21 21 21 21
11 11 11 11 11 11 11
85 85 85 85 85 85 85
10 10 10 10 10 10 10
7 7 7 7 7 7 7
8 8 8 8 8 8 8
84 84 84 84 84 84 84
11 11 11 11 11 11 11
1 1 1 1 1 1 1
3 3 3 3 3 3 3
1 1 1 1 1 1 1
2 2 2 2 2 2 2
8 8 8 8 8 8 8
1 1 1 1 1 1 1
7 7 7 7 7 7 7
S/59,200.16 S/98,596.66 S/55,900.86 S/55,900.86 S/55,900.86 S/55,900.86 S/114,508.77
S/2,960.01 S/4,929.83 S/2,795.04 S/2,795.04 S/2,795.04 S/2,795.04 S/5,725.44
S/4,144.01 S/6,901.77 S/3,913.06 S/3,913.06 S/3,913.06 S/3,913.06 S/8,015.61
S/66,304.18 S/110,428.26 S/62,608.97 S/62,608.97 S/62,608.97 S/62,608.97 S/128,249.83
S/11,934.75 S/19,877.09 S/11,269.61 S/11,269.61 S/11,269.61 S/11,269.61 S/23,084.97
S/78,238.94 S/130,305.34 S/73,878.58 S/73,878.58 S/73,878.58 S/73,878.58 S/151,334.79
S/1,178,323.54
BRE
SEMANA 17 SE
L M M J V S D L M
18 19 20 21 22 23 24 25 26
42 42 42 42 42 42 42 42
360
1,644
1,708
1,710
1,170
58
279
99
1,350
3,884
15,386
45,530
7,693
6,060
6,060
360
448
165
171
3,015
110
170
760
924
580
500
59,050
19
18,500
1,062
6,100
1,100
1,400
1,008
400
350
886
56
266
17,000
18,000
70 70 70 70 70 70 70 70
6 6 6 6 6 6 6 6
93 93 93 93 93 93 93 93
105 105
63 63
25 25
13 13
110 110
8 8
24 24
295 295
1,417 1,417
67 67 67 67 67 67 67 67
29 29 29 29 29 29 29 29
92 92 92 92 92 92 92 92
249 249
144 144
575 575
676 676
62 62 62 62 62 62 62 62
4 4 4 4 4 4 4 4
18 18 18 18 18 18 18 18
20 20 20 20 20 20 20 20
62 62 62 62 62 62 62 62
19 19 19 19 19 19 19 19
21 21 21 21 21 21 21 21
21 21 21 21 21 21 21 21
128 128 128 128 128 128 128 128
115 115 115 115 115 115 115 115
16 16 16 16 16 16 16 16
37 37 37 37 37 37 37 37
17 17 17 17 17 17 17 17
6 6 6 6 6 6 6 6
715
848.6666667
90 90 90 90 90 90 90 90
4,885
2,384 2,384
243 243 243 243 243 243
562 562 562
496
180 180
993 993 993 993 993 993
84 84 84 84 84 84
19 19 19 19 19 19
397
62 62 62 62 62 62
61 61 61 61 61 61
35 35 35 35 35 35
467
12 12 12 12 12 12
26 26 26 26 26 26
455 455 455 455 455 455
104 104 104 104 104 104 104 104
1,191 1,191
417 417 417 417 417 417 417 417
50 50 50 50 50 50 50 50
83 83 83 83 83 83 83 83
4,939 4,939
3,111 3,111
47 47 47 47 47 47 47 47
33
14 14
17 17
7 7
32 32
42 42 42 42 42 42 42 42
1 1 1 1 1 1 1 1
21 21 21 21 21 21 21 21
6 6 6 6 6 6 6 6
23 23 23 23 23 23 23 23
15 15 15 15 15 15 15 15
3 3 3 3 3 3 3 3
61 61 61 61 61 61 61 61
4 4 4 4 4 4 4 4
21 21 21 21 21 21 21 21
11 11 11 11 11 11 11 11
85 85 85 85 85 85 85 85
10 10 10 10 10 10 10 10
7 7 7 7 7 7 7 7
8 8 8 8 8 8 8 8
84 84 84 84 84 84 84 84
11 11 11 11 11 11 11 11
1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3
1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2
8 8 8 8 8 8 8 8
1 1 1 1 1 1 1 1
7 7 7 7 7 7 7 7
81 81
2 2
61 61
4 4
42 42
16 16
213 213
16 16
8 8
22 22
54 54
11 11
155 155
13 13
15 15
17 17
S/66,251.89 S/52,794.17 S/52,794.17 S/53,355.77 S/53,355.77 S/82,365.30 S/262,941.54 S/56,050.56
S/3,312.59 S/2,639.71 S/2,639.71 S/2,667.79 S/2,667.79 S/4,118.26 S/13,147.08 S/2,802.53
S/4,637.63 S/3,695.59 S/3,695.59 S/3,734.90 S/3,734.90 S/5,765.57 S/18,405.91 S/3,923.54
S/74,202.11 S/59,129.47 S/59,129.47 S/59,758.46 S/59,758.46 S/92,249.13 S/294,494.52 S/62,776.62
S/13,356.38 S/10,643.31 S/10,643.31 S/10,756.52 S/10,756.52 S/16,604.84 S/53,009.01 S/11,299.79
S/87,558.49 S/69,772.78 S/69,772.78 S/70,514.99 S/70,514.99 S/108,853.98 S/347,503.54 S/74,076.42
S/1,383,178.34
SEMANA 18 SEMANA 19
M J V S D L M M
27 28 29 30 1 2 3 4
42 42 42 42
8 8 8
70 70 70
70 70 70 70 70 70 70
6 6 6 6 6 6 6
93 93 93 93 93 93 93
13 13 13 13 13 13 13
24 24 24
31 31 31
67 67 67 67 67 67 67
29 29 29 29 29 29 29
92 92 92 92 92 92 92
62 62 62 62 62 62 62
4 4 4 4 4 4 4
18 18 18 18 18 18 18
20 20 20 20 20 20 20
62 62 62 62 62 62 62
19 19 19 19 19 19 19
21 21 21 21 21 21 21
21 21 21 21 21 21 21
128 128 128 128 128 128 128
115 115 115 115 115 115 115
16 16 16 16 16 16 16
37 37 37 37 37 37 37
17 17 17 17 17 17 17
6 6 6 6 6 6 6
90 90
412 412
292 292 292
422 422
265 265 265
496 496 496 496
180 180 180 180
1,232
540 540 540
121 121 121
90 90 90
82 82 82
21 21 21
104 104 104 104
1,191 1,191 1,191 1,191
796 796 796
7,500 7,500 7,500
2,848 2,848 2,848
1,103 1,103 1,103
50 50 50 50
83 83 83 83
47 47 47 47 47 47 47
58 58 58
123 123 123
22 22 22
67 67 67
143 143 143
17 17 17
14 14 14 14
17 17 17 17
7 7 7 7
32 32 32 32
270
180 180 180
108 108 108
76 76 76
173 173 173
20 20 20
10 10 10
42 42 42 42 42 42 42
1 1 1 1 1 1 1
21 21 21 21 21 21 21
6 6 6 6 6 6 6
23 23 23 23 23 23 23
15 15 15 15 15 15 15
3 3 3 3 3 3 3
61 61 61 61 61 61 61
4 4 4 4 4 4 4
21 21 21 21 21 21 21
11 11 11 11 11 11 11
85 85 85 85 85 85 85
10 10 10 10 10 10 10
7 7 7 7 7 7 7
8 8 8 8 8 8 8
84 84 84 84 84 84 84
11 11 11 11 11 11 11
1 1 1 1 1 1 1
3 3 3 3 3 3 3
1 1 1 1 1 1 1
2 2 2 2 2 2 2
8 8 8 8 8 8 8
1 1 1 1 1 1 1
7 7 7 7 7 7 7
81 81 81 81 81 81 81
2 2 2 2 2 2 2
61 61 61 61 61 61 61
4 4 4 4 4 4 4
42 42 42 42 42 42 42
16 16 16 16 16 16 16
22 22 22 22 22 22 22
54 54 54 54 54 54 54
11 11 11 11 11 11 11
155 155 155 155 155 155 155
13 13 13 13 13 13 13
15 15 15 15 15 15 15
17 17 17 17 17 17 17
S/56,050.56 S/56,050.56 S/55,960.95 S/84,113.76 S/59,924.19 S/60,489.08 S/60,489.08
S/2,802.53 S/2,802.53 S/2,798.05 S/4,205.69 S/2,996.21 S/3,024.45 S/3,024.45
S/3,923.54 S/3,923.54 S/3,917.27 S/5,887.96 S/4,194.69 S/4,234.24 S/4,234.24
S/62,776.62 S/62,776.62 S/62,676.27 S/94,207.42 S/67,115.09 S/67,747.77 S/67,747.77
S/11,299.79 S/11,299.79 S/11,281.73 S/16,957.33 S/12,080.72 S/12,194.60 S/12,194.60
S/74,076.42 S/74,076.42 S/73,958.00 S/111,164.75 S/79,195.81 S/79,942.37 S/79,942.37
SEMANA 19 SEMANA 20
J V S D L M M J
5 6 7 8 9 10 11 12
93 93 93 93 93 93 93
13 13 13 13 13 13 13
24 24 24 24 24 24 24
31 31 31 31 31 31 31
67 67 67 67 67 67 67
29 29 29 29 29 29 29
92 92 92 92 92 92 92
100 100
62 62 62 62 62 62 62
4 4 4 4 4 4 4
18 18 18 18 18 18 18
20 20 20 20 20 20 20
62 62 62 62 62 62 62
19 19 19 19 19 19 19
21 21 21 21 21 21 21
21 21 21 21 21 21 21
128 128 128 128 128 128 128
115 115 115 115 115 115 115
16 16 16 16 16 16 16
37 37 37 37 37 37 37
17 17 17 17 17 17 17
6 6 6 6 6 6 6
715
848.6666667
3,696 3,696 3,696 3,696 3,696 3,696 3,696
71 71 71 71 71 71 71
135 135 135 135 135 135 135
207 207 207 207 207 207 207
1,998
3,625
422 422 422 422 422 422
265 265 265 265 265 265 265
92 92 92 92
21 21 21 21 21 21 21
796 796 796
7,500 7,500 7,500
2,848 2,848 2,848
1,103 1,103 1,103
47 47 47 47 47 47 47
270 270 270 270 270 270 270
58 58 58 58 58 58 58
123 123 123 123 123 123 123
22 22 22 22 22 22 22
67 67 67 67 67 67 67
143 143 143 143 143 143 143
17 17 17 17 17 17 17
10 10 10
1,460
138 138 138
1,134
194 194 194
726 726 726
1 1 1
21 21 21
6 6 6
23 23 23
15 15 15
3 3 3
61 61 61
4 4 4
21 21 21
11 11 11
85 85 85
10 10 10
7 7 7
8 8 8
84 84 84
11 11 11
1 1 1
3 3 3
1 1 1
2 2 2
8 8 8
1 1 1
7 7 7
81
61
4
42
16
213
16
8
22
54
11
155
13
15
17
70 70 70 70
2,215 2,215 2,215 2,215
288 288 288 288
3 3 3 3
5 5 5 5
9 9 9 9
1 1 1 1
25 25 25 25
31 31 31 31
33 33 33 33
S/927,516.32
DICIEMBRE
NA 20 SEMANA 21
V S D L M M J V
13 14 15 16 17 18 19 20
93 93 93 93 93 93 93
13 13 13 13 13 13 13
24 24 24 24 24 24 24
31 31 31 31 31 31 31
67 67
29 29
92 92
62 62 62 62 62 62 62
4 4 4 4 4 4 4
18 18 18 18 18 18 18
20 20 20 20 20 20 20
62 62 62 62 62 62 62
19 19 19 19 19 19 19
21 21 21 21 21 21 21
21 21 21 21 21 21 21
128 128 128 128 128 128 128
115 115 115 115 115 115 115
16 16 16 16 16 16 16
37 37 37 37 37 37 37
17 17 17 17 17 17 17
6 6 6 6 6 6 6
3,696 3,696 3,696 3,696 3,696 3,696 3,696
71 71 71 71 71 71 71
135 135 135 135 135 135 135
207 207 207 207 207 207 207
1,793
243 243
307 307
3,625
422 422
265 265
92 92 92 92 92 92 92
945
4,309
105 105
17 17
11 11
12 12
4 4
21 21
182
318
388
3,931
491
2,406 2,406 2,406 2,406 2,406 2,406 2,406
4,939 4,939
3,111 3,111
47 47 47 47 47 47 47
270 270 270 270 270 270 270
58 58 58 58 58 58 58
123 123 123 123 123 123 123
22 22 22 22 22 22 22
67 67 67 67 67 67 67
143 143 143 143 143 143 143
17 17 17 17 17 17 17
135 135
745 745
446 446
456 456
368 368
549 549
100 100 100 100 100 100 100
70 70 70 70 70 70 70
2,215 2,215 2,215 2,215 2,215 2,215 2,215
288 288 288 288 288 288 288
3 3 3 3 3 3 3
5 5 5 5 5 5 5
9 9 9 9 9 9 9
1 1 1 1 1 1 1
25 25 25 25 25 25 25
31 31 31 31 31 31 31
33 33 33 33 33 33 33
S/
CRONOGR
SEMANA 22
S D L M M J V S D
21 22 23 24 25 26 27 28 29
1,016
93 93 93 93 93 93 93
105
63
25
13
110
8
24
295
1,417
24 24 24 24 24 24 24
31 31 31 31 31 31 31
249
144
575
676
62 62 62 62 62 62 62
4 4 4 4 4 4 4
18 18 18 18 18 18 18
20 20 20 20 20 20 20
62 62 62 62 62 62 62
19 19 19 19 19 19 19
21 21 21 21 21 21 21
21 21 21 21 21 21 21
128 128 128 128 128 128 128
115 115 115 115 115 115 115
16 16 16 16 16 16 16
37 37 37 37 37 37 37
17 17 17 17 17 17 17
6 6 6 6 6 6 6
715
848.6666667
3,696
71
135
207
6 6 6 6 6 6
2,697 2,697 2,697 2,697 2,697 2,697
1,349 1,349 1,349 1,349 1,349 1,349
92 92 92 92 92 92 92
238
25
122
45
162
32
32
48
27
32
63
108
2,406
600
24
13 13 13 13 13 13
13 13 13 13 13 13
5 5 5 5 5 5
2 2 2 2 2 2
17 17 17 17 17 17
25 25 25 25 25 25
47
270
310
226
58
123
22
67
143
17
2,588
13
74
45
3,722
438
1,429
135
745
1,741
446
456
368
70 70 70 70 70 70 70
2,215 2,215 2,215 2,215 2,215 2,215 2,215
288 288 288 288 288 288 288
3 3 3 3 3 3 3
5 5 5 5 5 5 5
9 9 9 9 9 9 9
1 1 1 1 1 1 1
25 25 25 25 25 25 25
31 31 31 31 31 31 31
33 33 33 33 33 33 33
S/743,408.08
CRONOGRAMA DE OBRA - VALORIZADO
SEMANA 23 SE
L M M J V S D L M
30 31 1 2 3 4 5 6 7
62 62 62 62 62 62 62 62
4 4 4 4 4 4 4 4
18 18 18 18 18 18 18 18
20 20 20 20 20 20 20 20
62 62 62 62 62 62 62 62
19 19 19 19 19 19 19 19
21 21 21 21 21 21 21 21
21 21 21 21 21 21 21 21
128 128 128 128 128 128 128 128
115 115 115 115 115 115 115 115
16 16 16 16 16 16 16 16
37 37 37 37 37 37 37 37
17 17 17 17 17 17 17 17
6 6 6 6 6 6 6 6
715
848.6666667
582 582
145 145
198 198
509 509
234 234
1 1
101 101
591 591
258 258
15 15
106 106
644 644
341 341
45 45
6 6 6 6 6 6 6 6
2,697 2,697 2,697 2,697 2,697 2,697 2,697 2,697
1,349 1,349 1,349 1,349 1,349 1,349 1,349 1,349
92 92 92 92 92 92
50 50
144 144
63 63
68 68
150 150
30 30
400 400
12 12
9 9
25 25 25 25 25 25 25 25
24 24 24 24 24 24 24 24
18 18 18 18 18 18 18 18
30 30 30 30 30 30 30 30
88 88 88 88 88 88
14 14 14 14 14 14
74 74
40 40
5,000
495
0
432
144
568
100 100 100 100 100 100 100 100
70 70 70 70 70 70 70 70
2,215 2,215 2,215 2,215 2,215 2,215 2,215 2,215
288 288 288 288 288 288 288 288
3 3 3 3 3 3 3 3
5 5 5 5 5 5 5 5
9 9 9 9 9 9 9 9
1 1 1 1 1 1 1 1
25 25 25 25 25 25 25 25
31 31 31 31 31 31 31 31
33 33 33 33 33 33 33 33
S/594,749.91
ENERO 2020
SEMANA 24 SEMANA 25
M J V S D L M M
8 9 10 11 12 13 14 15
62 62 62 62 62 62 62
4 4 4 4 4 4 4
18 18 18 18 18 18 18
20 20 20 20 20 20 20
62 62 62 62 62 62 62
19 19 19 19 19 19 19
21 21 21 21 21 21 21
21 21 21 21 21 21 21
128 128 128 128 128 128 128
115 115 115 115 115 115 115
16 16 16 16 16 16 16
37 37 37 37 37 37 37
17 17 17 17 17 17 17
6 6 6 6 6 6 6
6 6 6 6
2,697 2,697 2,697 2,697
1,349 1,349 1,349 1,349
25 25 25 25 25 25 25
24 24 24 24 24 24 24
18 18 18 18 18 18 18
30 30 30 30 30 30 30
22 22 22
61 61 61
33 33 33
4 4 4
10 10 10
2 2 2
18 18 18
13 13 13
22 22 22
52 52 52
70 70 70
37 37 37
7 7 7
9 9 9
3 3 3
1,125 1,125 1,125
94 94 94
16 16 16
21 21 21
41 41 41
40 40 40
49 49 49
22 22 22
60 60 60
13 13 13
35 35 35
44 44 44
7 7 7
0 0
1,587 1,587 1,587
163 163 163
58 58 58
27 27 27
7 7 7
16 16 16
9 9 9
8 8 8
36 36 36
36 36 36
9 9 9
10 10 10
10 10 10
11 11 11
1 1 1
6 6 6
75 75 75
74 74 74 74
40 40 40 40
70 70 70 70
2,215 2,215 2,215 2,215
288 288 288 288
3 3 3 3
5 5 5 5
9 9 9 9
1 1 1 1
25 25 25 25
31 31 31 31
33 33 33 33
S/594,749.91
ENERO 2020
SEMANA 25 SEMANA 26
J V S D L M M J
16 17 18 19 20 21 22 23
62 62 62 62 62 62 62
4 4 4 4 4 4 4
18 18 18 18 18 18 18
20 20 20 20 20 20 20
62 62 62 62 62 62 62
19 19 19 19 19 19 19
21 21 21 21 21 21 21
21 21 21 21 21 21 21
128 128 128 128 128 128 128
115 115 115 115 115 115 115
16 16 16 16 16 16 16
37 37 37 37 37 37 37
17 17 17 17 17 17 17
6 6 6 6 6 6 6
715
848.6666667
25 25 25 25 25 25 25
24 24 24 24 24 24 24
18 18 18 18 18 18 18
30 30 30 30 30 30 30
22 22 22 22 22 22 22
61 61 61 61 61 61 61
33 33 33 33 33 33 33
4 4 4 4 4 4 4
10 10 10 10 10 10 10
2 2 2 2 2 2 2
18 18 18 18 18 18 18
13 13 13 13 13 13 13
22 22 22 22 22 22 22
52 52 52 52 52 52 52
70 70 70 70 70 70 70
37 37 37 37 37 37 37
7 7 7 7 7 7 7
9 9 9 9 9 9 9
3 3 3 3 3 3 3
1,125 1,125 1,125 1,125 1,125 1,125 1,125
94 94 94 94 94 94 94
16 16 16 16 16 16 16
21 21 21 21 21 21 21
41 41 41 41 41 41 41
40 40 40 40 40 40 40
49 49 49 49 49 49 49
22 22 22 22 22 22 22
60 60 60 60 60 60 60
13 13 13 13 13 13 13
35 35 35 35 35 35 35
44 44 44 44 44 44 44
7 7 7 7 7 7 7
0 0 0 0 0 0
1,587 1,587 1,587 1,587 1,587 1,587 1,587
163 163 163 163 163 163 163
58 58 58 58 58 58 58
27 27 27 27 27 27 27
7 7 7 7 7 7 7
16 16 16 16 16 16 16
9 9 9 9 9 9 9
8 8 8 8 8 8 8
36 36 36 36 36 36 36
36 36 36 36 36 36 36
9 9 9 9 9 9 9
10 10 10 10 10 10 10
10 10 10 10 10 10 10
11 11 11 11 11 11 11
1 1 1 1 1 1 1
6 6 6 6 6 6 6
75 75 75 75 75 75 75
156 156 156 156
99 99 99
422
84
385
S/628,250.26
ANA 26 SEMANA 27
V S D L M M J V
24 25 26 27 28 29 30 31
1,016 1,016
159.3846154 159.3846154
2049.230769 2049.230769
136.6153846 136.6153846 136.6153846 137 136.6153846 136.6153846 136.6153846
1935.384615 1935.384615 1935.384615 1935 1935.384615 1935.384615 1935.384615
100 100 100 100 100
62 62 62 62 62 62 62
4 4 4 4 4 4 4
18 18 18 18 18 18 18
20 20 20 20 20 20 20
62 62 62 62 62 62 62
19 19 19 19 19 19 19
21 21 21 21 21 21 21
21 21 21 21 21 21 21
128 128 128 128 128 128 128
115 115 115 115 115 115 115
16 16 16 16 16 16 16
37 37 37 37 37 37 37
17 17 17 17 17 17 17
6 6 6 6 6 6 6
25 25
24 24
18 18
188 188
188 188
30 30
204 204
24 24
22 22 22 22 22 22 22
61 61 61 61 61 61 61
33 33 33 33 33 33 33
4 4 4 4 4 4 4
10 10 10 10 10 10 10
2 2 2 2 2 2 2
18 18 18 18 18 18 18
13 13 13 13 13 13 13
22 22 22 22 22 22 22
52 52 52 52 52 52 52
70 70 70 70 70 70 70
37 37 37 37 37 37 37
7 7 7 7 7 7 7
9 9 9 9 9 9 9
3 3 3 3 3 3 3
1,125 1,125 1,125 1,125 1,125 1,125 1,125
94 94 94 94 94 94 94
16 16 16 16 16 16 16
21 21 21 21 21 21 21
41 41 41 41 41 41 41
40 40 40 40 40 40 40
49 49 49 49 49 49 49
22 22 22 22 22 22 22
60 60 60 60 60 60 60
13 13 13 13 13 13 13
35 35 35 35 35 35 35
44 44 44 44 44 44 44
7 7 7 7 7 7 7
0 0 0 0 0 0
1,587 1,587 1,587 1,587 1,587 1,587 1,587
163 163 163 163 163 163 163
58 58 58 58 58 58 58
27 27 27 27 27 27 27
7 7 7 7 7 7 7
16 16 16 16 16 16 16
9 9 9 9 9 9 9
8 8 8 8 8 8 8
36 36 36 36 36 36 36
36 36 36 36 36 36 36
9 9 9 9 9 9 9
10 10 10 10 10 10 10
10 10 10 10 10 10 10
11 11 11 11 11 11 11
1 1 1 1 1 1 1
6 6 6 6 6 6 6
75 75 75 75 75 75 75
156 156 156 156 156 156 156
342
95
84 84
385 385
643
87 87 87 87 87
85 85 85 85 85
150 150 150 150 150
S/35,591.06 S/36,233.85 S/31,031.97 S/30,594.90 S/30,594.90 S/30,594.90 S/30,594.90
S/1,779.55 S/1,811.69 S/1,551.60 S/1,529.75 S/1,529.75 S/1,529.75 S/1,529.75
S/2,491.37 S/2,536.37 S/2,172.24 S/2,141.64 S/2,141.64 S/2,141.64 S/2,141.64
S/39,861.98 S/40,581.92 S/34,755.80 S/34,266.29 S/34,266.29 S/34,266.29 S/34,266.29
S/7,175.16 S/7,304.74 S/6,256.04 S/6,167.93 S/6,167.93 S/6,167.93 S/6,167.93
S/47,037.14 S/47,886.66 S/41,011.85 S/40,434.22 S/40,434.22 S/40,434.22 S/40,434.22
S/628,250.26
SEMANA 28
S D L M M J V S D
1 2 3 4 5 6 7 8 9
2091.666667
965.7435897
2.948717949
334.6666667
120.7179487
62
4
18
20
62
19
21
21
128
115
16
37
17
6
22 22 22 22 22 22 22
61 61 61 61 61 61 61
33 33 33 33 33 33 33
4 4 4 4 4 4 4
10 10 10 10 10 10 10
2 2 2 2 2 2 2
18 18 18 18 18 18 18
13 13 13 13 13 13 13
22 22 22 22 22 22 22
52 52 52 52 52 52 52
70 70 70 70 70 70 70
37 37 37 37 37 37 37
7 7 7 7 7 7 7
9 9 9 9 9 9 9
3 3 3 3 3 3 3
1,125 1,125 1,125 1,125 1,125 1,125 1,125
94 94 94 94 94 94 94
16 16 16 16 16 16 16
21 21 21 21 21 21 21
41 41 41 41 41 41 41
40 40 40 40 40 40 40
49 49 49 49 49 49 49
22 22 22 22 22 22 22
60 60 60 60 60 60 60
13 13 13 13 13 13 13
35 35 35 35 35 35 35
44 44 44 44 44 44 44
7 7 7 7 7 7 7
0 0 0 0 0 0
1,587 1,587 1,587 1,587 1,587 1,587 1,587
163 163 163 163 163 163 163
58 58 58 58 58 58 58
27 27 27 27 27 27 27
7 7 7 7 7 7 7
16 16 16 16 16 16 16
9 9 9 9 9 9 9
8 8 8 8 8 8 8
36 36 36 36 36 36 36
36 36 36 36 36 36 36
9 9 9 9 9 9 9
10 10 10 10 10 10 10
10 10 10 10 10 10 10
11 11 11 11 11 11 11
1 1 1 1 1 1 1
6
6 6 6 6 6 6 6
75 75 75 75 75 75 75
156
891
87
85
150
791
S/31,486.00 S/26,462.80 S/26,462.80 S/26,462.80 S/26,462.80 S/26,462.80 S/27,260.19
S/1,574.30 S/1,323.14 S/1,323.14 S/1,323.14 S/1,323.14 S/1,323.14 S/1,363.01
S/2,204.02 S/1,852.40 S/1,852.40 S/1,852.40 S/1,852.40 S/1,852.40 S/1,908.21
S/35,264.32 S/29,638.33 S/29,638.33 S/29,638.33 S/29,638.33 S/29,638.33 S/30,531.42
S/6,347.58 S/5,334.90 S/5,334.90 S/5,334.90 S/5,334.90 S/5,334.90 S/5,495.66
S/41,611.90 S/34,973.23 S/34,973.23 S/34,973.23 S/34,973.23 S/34,973.23 S/36,027.07
S/375,353.83
FEBRERO 2019
SEMANA 29 SE
L M M J V S D L M
10 11 12 13 14 15 16 17 18
20 20 20 20 20 20
6 6 6 6 6 6
21 21
21 21
21 21
26 26
100 100
13 13
32 32
18 18
11 11
5 5
16 16
5 5
18 18
3 3
4 4
20 20
10 10
24 24
8 8
S/15,492.42 S/15,492.42 S/15,492.42 S/15,492.42 S/15,492.42 S/15,492.42 S/15,738.71 S/15,738.71
S/774.62 S/774.62 S/774.62 S/774.62 S/774.62 S/774.62 S/786.94 S/786.94
S/1,084.47 S/1,084.47 S/1,084.47 S/1,084.47 S/1,084.47 S/1,084.47 S/1,101.71 S/1,101.71
S/17,351.51 S/17,351.51 S/17,351.51 S/17,351.51 S/17,351.51 S/17,351.51 S/17,627.36 S/17,627.36
S/3,123.27 S/3,123.27 S/3,123.27 S/3,123.27 S/3,123.27 S/3,123.27 S/3,172.92 S/3,172.92
S/20,474.78 S/20,474.78 S/20,474.78 S/20,474.78 S/20,474.78 S/20,474.78 S/20,800.29 S/20,800.29
5,353.83
SEMANA 30 SEMANA 31
M J V S D L M M
19 20 21 22 23 24 25 26
21 21 21 21
21 21 21 21
21 21 21 21
26 26 26 26
100 100 100 100
13 13 13 13
32 32 32 32
18 18 18 18
11 11 11 11
5 5 5 5
16 16 16 16
5 5 5 5
18 18 18 18
3 3 3 3
4 4 4 4
20 20 20 20
10 10 10 10
24 24 24 24
8 8 8 8
27 27 27
27 27 27
46 46 46
7 7 7
0 0 0
10 10 10
27 27 27
16 16 16
0 0 0
20 20 20
7 7 7
13 13 13
13 13 13
0 0 0
20 20 20
17 17 17
0 0 0
29 29 29
17 17 17
13 13 13
27 27 27
27 27 27
20 20 20
20 20 20
0 0 0
10 10 10
47 47 47
37 37 37
20 20 20
13 13 13
20 20 20
10 10 10
10 10 10
8 8 8
S/15,738.71 S/15,738.71 S/15,738.71 S/15,738.71 S/14,222.98 S/14,222.98 S/14,222.98
S/786.94 S/786.94 S/786.94 S/786.94 S/711.15 S/711.15 S/711.15
S/1,101.71 S/1,101.71 S/1,101.71 S/1,101.71 S/995.61 S/995.61 S/995.61
S/17,627.36 S/17,627.36 S/17,627.36 S/17,627.36 S/15,929.74 S/15,929.74 S/15,929.74
S/3,172.92 S/3,172.92 S/3,172.92 S/3,172.92 S/2,867.35 S/2,867.35 S/2,867.35
S/20,800.29 S/20,800.29 S/20,800.29 S/20,800.29 S/18,797.10 S/18,797.10 S/18,797.10
S/233,550.16
SEMANA 31 SEMANA 32
J V S D L M M J
27 28 29 1 2 3 4 5
27 27 27 27 27 27 27
27 27 27 27 27 27 27
46 46 46 46 46 46 46
7 7 7 7 7 7 7
0 0 0 0 0 0 0
10 10 10 10 10 10 10
27 27 27 27 27 27 27
16 16 16 16 16 16 16
0 0 0 0 0 0 0
20 20 20 20 20 20 20
7 7 7 7 7 7 7
13 13 13 13 13 13 13
13 13 13 13 13 13 13
0 0 0 0 0 0 0
20 20 20 20 20 20 20
17 17 17 17 17 17 17
0 0 0 0 0 0 0
29 29 29 29 29 29 29
17 17 17 17 17 17 17
13 13 13 13 13 13 13
27 27 27 27 27 27 27
27 27 27 27 27 27 27
20 20 20 20 20 20 20
20 20 20 20 20 20 20
0 0 0 0 0 0 0
10 10 10 10 10 10 10
47 47 47 47 47 47 47
37 37 37 37 37 37 37
20 20 20 20 20 20 20
13 13 13 13 13 13 13
20 20 20 20 20 20 20
10 10 10 10 10 10 10
10 10 10 10 10 10 10
8 8 8 8 8 8 8
S/13,205.50 S/13,205.50 S/13,205.50 S/13,205.50 S/13,205.50 S/13,205.50 S/13,205.50
S/660.27 S/660.27 S/660.27 S/660.27 S/660.27 S/660.27 S/660.27
S/924.38 S/924.38 S/924.38 S/924.38 S/924.38 S/924.38 S/924.38
S/14,790.16 S/14,790.16 S/14,790.16 S/14,790.16 S/14,790.16 S/14,790.16 S/14,790.16
S/2,662.23 S/2,662.23 S/2,662.23 S/2,662.23 S/2,662.23 S/2,662.23 S/2,662.23
S/17,452.39 S/17,452.39 S/17,452.39 S/17,452.39 S/17,452.39 S/17,452.39 S/17,452.39
S
MARZO 2020
ANA 32 SEMANA 33
V S D L M M J V
6 7 8 9 10 11 12 13
27 27 27 27 27 27 27
27 27 27 27 27 27 27
46 46 46 46 46 46 46
7 7 7 7 7 7 7
0 0 0 0 0 0 0
10 10 10 10 10 10 10
27 27 27 27 27 27 27
16 16 16 16 16 16 16
0 0 0 0 0 0 0
20 20 20 20 20 20 20
7 7 7 7 7 7 7
13 13 13 13 13 13 13
13 13 13 13 13 13 13
0 0 0 0 0 0 0
20 20 20 20 20 20 20
17 17 17 17 17 17 17
0 0 0 0 0 0 0
29 29 29 29 29 29 29
17 17 17 17 17 17 17
13 13 13 13 13 13 13
27 27 27 27 27 27 27
27 27 27 27 27 27 27
20 20 20 20 20 20 20
20 20 20 20 20 20 20
0 0 0 0 0 0 0
10 10 10 10 10 10 10
47 47 47 47 47 47 47
37 37 37 37 37 37 37
20 20 20 20 20 20 20
13 13 13 13 13 13 13
20 20 20 20 20 20 20
10 10 10 10 10 10 10
10 10 10 10 10 10 10
8 8 8 8 8 8 8
7 7 7 7 7
60 60 60 60 60
40 40 40 40 40
30 30 30 30 30
0 0 0 0 0
30 30 30 30 30
20 20 20 20 20
14 14 14 14 14
2 2 2 2 2
30 30 30 30 30
30 30 30 30 30
9 9 9 9 9
4 4 4 4 4
2 2 2 2 2
1 1 1 1 1
23 23 23 23 23
0 0 0 0 0
24 24 24 24 24
24 24 24 24 24
21 21 21 21 21
3 3 3 3 3
13 13 13 13 13
11 11 11 11 11
S/13,205.50 S/13,205.50 S/15,943.65 S/15,943.65 S/15,943.65 S/15,943.65 S/15,943.65
S/660.27 S/660.27 S/797.18 S/797.18 S/797.18 S/797.18 S/797.18
S/924.38 S/924.38 S/1,116.06 S/1,116.06 S/1,116.06 S/1,116.06 S/1,116.06
S/14,790.16 S/14,790.16 S/17,856.89 S/17,856.89 S/17,856.89 S/17,856.89 S/17,856.89
S/2,662.23 S/2,662.23 S/3,214.24 S/3,214.24 S/3,214.24 S/3,214.24 S/3,214.24
S/17,452.39 S/17,452.39 S/21,071.13 S/21,071.13 S/21,071.13 S/21,071.13 S/21,071.13
S/231,141.13
MARZO 2020
SEMANA 34
S D L M M J V S D L
14 15 16 17 18 19 20 21 22 23
1,852
347
1,158
137
772
556
250
56
1,250
109
27
27
46
10
27
16
0
20
13
13
20
17
0
29
17
13
27
27
20
20
10
47
37
20
13
20
10
10
7 7 7 7 7 7 7
60 60 60 60 60 60 60
40 40 40 40 40 40 40
30 30 30 30 30 30 30
0 0 0 0 0 0 0
30 30 30 30 30 30 30
20 20 20 20 20 20 20
14 14 14 14 14 14 14
2 2 2 2 2 2 2
30 30 30 30 30 30 30
30 30 30 30 30 30 30
9 9 9 9 9 9 9
4 4 4 4 4 4 4
2 2 2 2 2 2 2
1 1 1 1 1 1 1
23 23 23 23 23 23 23
0 0 0 0 0 0 0
24 24 24 24 24 24 24
24 24 24 24 24 24 24
21 21 21 21 21 21 21
3 3 3 3 3 3 3
13 13 13 13 13 13 13
11 11 11 11 11 11 11
S/15,943.65 S/9,075.49 S/9,075.49 S/9,075.49 S/9,075.49 S/9,075.49 S/9,075.49 S/4,226.55
S/797.18 S/453.77 S/453.77 S/453.77 S/453.77 S/453.77 S/453.77 S/211.33
S/1,116.06 S/635.28 S/635.28 S/635.28 S/635.28 S/635.28 S/635.28 S/295.86
S/17,856.89 S/10,164.55 S/10,164.55 S/10,164.55 S/10,164.55 S/10,164.55 S/10,164.55 S/4,733.74
S/3,214.24 S/1,829.62 S/1,829.62 S/1,829.62 S/1,829.62 S/1,829.62 S/1,829.62 S/852.07
S/21,071.13 S/11,994.17 S/11,994.17 S/11,994.17 S/11,994.17 S/11,994.17 S/11,994.17 S/5,585.81
S/114,281.69
SEMANA 35 SEMANA 36
M M J V S D L M M J V
24 25 26 27 28 29 30 31 1 2 3
674 674 674 674 674 674 674 674 674 674
299
587 587 587 587 587 587 587 587 587 587
137 137 137 137 137 137 137 137 137 137
987 987 987 987 987 987 987 987 987 987
276 276 276 276 276 276 276 276 276 276
195 195 195 195 195 195 195 195 195 195
367 367 367 367 367 367 367 367 367 367
75 75 75 75 75 75 75 75 75 75
630 630 630 630 630 630 630 630 630 630
S/4,226.55 S/3,927.69 S/3,927.69 S/3,927.69 S/3,927.69 S/3,927.69 S/3,927.69 S/3,927.69 S/3,927.69 S/3,927.69
S/211.33 S/196.38 S/196.38 S/196.38 S/196.38 S/196.38 S/196.38 S/196.38 S/196.38 S/196.38
S/295.86 S/274.94 S/274.94 S/274.94 S/274.94 S/274.94 S/274.94 S/274.94 S/274.94 S/274.94
S/4,733.74 S/4,399.02 S/4,399.02 S/4,399.02 S/4,399.02 S/4,399.02 S/4,399.02 S/4,399.02 S/4,399.02 S/4,399.02
S/852.07 S/791.82 S/791.82 S/791.82 S/791.82 S/791.82 S/791.82 S/791.82 S/791.82 S/791.82
S/5,585.81 S/5,190.84 S/5,190.84 S/5,190.84 S/5,190.84 S/5,190.84 S/5,190.84 S/5,190.84 S/5,190.84 S/5,190.84
,281.69
ABRIL 2020
SEMANA 37 SEMANA 38
S D L M M J V S D L M M
4 5 6 7 8 9 10 11 12 13 14 15
674 674 674 674 674 674 674 674 674 674
587 587 587 587 587 587 587 587 587 587
1,016 1,016 1,016
350,000
137 137 137 137 137 137 137 137 137 137
987 987 987 987 987 987 987 987 987 987
276 276 276 276 276 276 276 276 276 276
195 195 195 195 195 195 195 195 195 195
367 367 367 367 367 367 367 367 367 367
75 75 75 75 75 75 75 75 75 75
630 630 630 630 630 630 630 630 630 630
S/3,927.69 S/9,248.62 S/9,248.62 S/9,248.62 S/9,248.62 S/9,248.62 S/9,248.62 S/360,264.21 S/10,264.21 S/10,264.21
S/196.38 S/462.43 S/462.43 S/462.43 S/462.43 S/462.43 S/462.43 S/18,013.21 S/513.21 S/513.21
S/274.94 S/647.40 S/647.40 S/647.40 S/647.40 S/647.40 S/647.40 S/25,218.49 S/718.49 S/718.49
S/4,399.02 S/10,358.45 S/10,358.45 S/10,358.45 S/10,358.45 S/10,358.45 S/10,358.45 S/403,495.91 S/11,495.91 S/11,495.91
S/791.82 S/1,864.52 S/1,864.52 S/1,864.52 S/1,864.52 S/1,864.52 S/1,864.52 S/72,629.26 S/2,069.26 S/2,069.26
S/5,190.84 S/12,222.97 S/12,222.97 S/12,222.97 S/12,222.97 S/12,222.97 S/12,222.97 S/476,125.18 S/13,565.18 S/13,565.18
S/597,356.73
ABRIL 2020
SEMANA 38 SEMANA 39
J V S D L M M J V S D L
16 17 18 19 20 21 22 23 24 25 26 27
674 674 674 674 674 674 674 674 674 674
587 587 587 587 587 587 587 587 587 587
1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016
5,321 5,321 5,321 5,321 5,321 5,321 5,321 5,321 5,321 5,321
7,640 7,640 7,640 7,640 7,640 7,640 7,640
29,264
367 367 367 367 367 367 367 367 367 367
75 75 75 75 75 75 75 75 75 75
630 630 630 630 630 630 630 630 630 630
3,780
1,556 1,556 1,556 1,556 1,556 1,556 1,556
320
938 938 938 938 938 938 938
S/481,098.31
SEMANA 40 SEMANA 41
M M J V S D L M M J V
28 29 30 1 2 3 4 5 6 7 8
587 587 587 587 587 587 587 587 587 587
5,321 5,321 5,321 5,321 5,321 5,321 5,321 5,321 5,321 5,321
7,640 7,640 7,640 7,640 7,640 7,640 7,640 7,640 7,640 7,640
29,264 29,264 29,264 29,264 29,264 29,264 29,264 29,264 29,264 29,264
367 367 367 367 367 367 367 367 367 367
75 75 75 75 75 75 75 75 75 75
630 630 630 630 630 630 630 630 630 630
3,780 3,780 3,780 3,780 3,780 3,780 3,780 3,780 3,780 3,780
1,556 1,556 1,556 1,556 1,556 1,556 1,556 1,556 1,556 1,556
320 320 320 320 320 320 320 320 320
938 938 938 938 938 938 938 938 938 938
244 244 244 244 244 244 244 244 244 244
S/52,178.26 S/52,178.26 S/52,178.26 S/52,178.26 S/52,178.26 S/50,915.68 S/50,915.68 S/50,915.68 S/50,915.68 S/50,595.68
S/2,608.91 S/2,608.91 S/2,608.91 S/2,608.91 S/2,608.91 S/2,545.78 S/2,545.78 S/2,545.78 S/2,545.78 S/2,529.78
S/3,652.48 S/3,652.48 S/3,652.48 S/3,652.48 S/3,652.48 S/3,564.10 S/3,564.10 S/3,564.10 S/3,564.10 S/3,541.70
S/58,439.65 S/58,439.65 S/58,439.65 S/58,439.65 S/58,439.65 S/57,025.56 S/57,025.56 S/57,025.56 S/57,025.56 S/56,667.16
S/10,519.14 S/10,519.14 S/10,519.14 S/10,519.14 S/10,519.14 S/10,264.60 S/10,264.60 S/10,264.60 S/10,264.60 S/10,200.09
S/68,958.79 S/68,958.79 S/68,958.79 S/68,958.79 S/68,958.79 S/67,290.16 S/67,290.16 S/67,290.16 S/67,290.16 S/66,867.25
S/873,484.21
MAYO 2020
SEMANA 42 SEMANA 43
S D L M M J V S D L M M
9 10 11 12 13 14 15 16 17 18 19 20
587 587 587 587 587 587 587 587 587 587
1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016 1,016
5,321 5,321 5,321 5,321 5,321 5,321 5,321 5,321 5,321 5,321
7,640 7,640 7,640 7,640 7,640 7,640 7,640 7,640 7,640 7,640
29,264 29,264 29,264 29,264 29,264 29,264 29,264 29,264 29,264 29,264
195
367
75
630
3,780 3,780 3,780 3,780 3,780 3,780 3,780 3,780 3,780 3,780
1,556 1,556 1,556 1,556 1,556 1,556 1,556 1,556 1,556 1,556
938 938 938 938 938 938 938 938 938 938
244 244 244 244 244 244 244 244 244 244
S/50,595.68 S/50,343.74 S/50,343.74 S/50,343.74 S/50,343.74 S/50,343.74 S/50,343.74 S/50,343.74 S/50,343.74 S/50,343.74
S/2,529.78 S/2,517.19 S/2,517.19 S/2,517.19 S/2,517.19 S/2,517.19 S/2,517.19 S/2,517.19 S/2,517.19 S/2,517.19
S/3,541.70 S/3,524.06 S/3,524.06 S/3,524.06 S/3,524.06 S/3,524.06 S/3,524.06 S/3,524.06 S/3,524.06 S/3,524.06
S/56,667.16 S/56,384.99 S/56,384.99 S/56,384.99 S/56,384.99 S/56,384.99 S/56,384.99 S/56,384.99 S/56,384.99 S/56,384.99
S/10,200.09 S/10,149.30 S/10,149.30 S/10,149.30 S/10,149.30 S/10,149.30 S/10,149.30 S/10,149.30 S/10,149.30 S/10,149.30
S/66,867.25 S/66,534.29 S/66,534.29 S/66,534.29 S/66,534.29 S/66,534.29 S/66,534.29 S/66,534.29 S/66,534.29 S/66,534.29
S/873,484.21
SEMANA 43 SEMANA 44
J V S D L M M J V S D
21 22 23 24 25 26 27 28 29 30 31
S/860,294.51
0
10,241,706.34
512,085.32
716,919.44
11,470,711.10
2,064,728.00
13,535,439.10
13,535,439.10
Proyecto : HABILITACIÓN URBANA VALLE REQUE
Propietario : CONSTRUCTORA VALLE REQUE S.A.C.
Departamento : LAMBAYEQUE
Provincia : CHICLAYO
Etapa : 1ERA - ETAPA - HABILITACION URBANA
Documento : CRONOGRAMA DE OBRA VALORIZADO
. % DE AVANZE
PRESUPUESTO PISTAS - VEREDAS Y PARQUES - 1ERA ETAPA AGOSTO AGOSTO
% TOTAL
ITEM DESCRIPCIÓN UNIDAD METRADO P.UNITARIO PARCIAL 15 DIAS 31 DIAS 15 DIAS 31 DIAS
A PAVIMENTACION
01 OBRAS PRELIMINARES
01.01 TRAZO Y REPLANTEO INICIAL DEL PROYECTO m2 78,138.01 2.00 156,276.02 93,765.61 60.00%
02 MOVIMIENTO DE TIERRAS
02.01 CORTE MASIVO A MAQUINA EN TERRENO m3 16,269.14 7.00 113,883.98 68,330.39 60.00%
02.02 RELLENO COMPACTADO CON MATERIAL PROPIO m3 3,745.67 15.00 56,185.05 22,474.02 40.00%
02.03 EXCAVACION P/OBRAS DE PAVIMENTACION m3 7,918.74 4.00 31,674.96 4,751.24 15.00%
02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 14,624.51 10.00 146,245.10 73,122.55 50.00%
03 PAVIMENTACION
03.01 SUB BASE CON AFIRMADO COMPACTADO E=0.20M m3 6,548.83 39.00 255,404.37 0.00 0.00%
03.02 BASE DE AFIRMADO COMPACTADO E=0.20M m3 6,548.83 42.00 275,050.86 0.00 0.00%
03.03 CARPETA ASFALTICA EN FRIO 2'' (inc. Imprimación) m2 27,286.81 45.00 1,227,906.45 0.00 0.00%
05 VEREDAS
05.01 SUB BASE CON AFIRMADO E=0.10 m3 739.88 39.00 28,855.32 0.00 0.00%
05.02 VEREDA DE CONCRETO F´c=140 kg/cm2, E= 0.10 m m2 7,398.83 28.00 207,167.24 0.00 0.00%
05.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2 2,319.00 25.00 57,975.00 0.00 0.00%
05.04 JUNTA EN VEREDAS DE 1/2" m 3,116.56 3.00 9,349.68 0.00 0.00%
06 RAMPA PARA VEREDAS
06.01 RAMPA PARA MINUSVALIDOS DE CONCRETO f´c=175 Kg./cm2 m2 708.17 28.00 19,828.76 0.00 0.00%
06.02 ENCOFRADO Y DESENCOFRADO m2 162.63 25.00 4,065.75 0.00 0.00%
07 SARDINEL
07.01 SARDINELES DE CONCRETO DE f'c=175 kg/cm2 m 1,063.55 32.00 34,033.60 0.00 0.00%
08 PARQUES Y AREAS VERDES
08.01 ADOQUIN EN PARQUE m2 2,100.00 54.00 113,400.00 0.00 0.00%
8.02 LOSA DE FUTBOLL H=0.20 / INCLUYE ENCOFRADO m2 700.00 80.00 56,000.00 0.00 0.00%
8.03 CONFITILLO ALRREDEDOR DE LOSA H=0.05 m2 400.00 8.00 3,200.00 0.00 0.00%
8.04 GRASS NATURAL m2 5,625.00 6.00 33,750.00 0.00 0.00%
09 SEÑALIZACION Y SEGURIDAD VIAL
09.01 PINTURA ZONAL, DE SIMBOLOS Y LETRAS m2 351.00 25.00 8,775.00 0.00 0.00%
PRESUPUESTO SUMINISTRO - RED PRIMARIA - 1ERA ETAPA AGOSTO AGOSTO
% TOTAL
ITEM DESCRIPCIÓN UNIDAD METRADO P.UNITARIO PARCIAL 15 DIAS 31 DIAS 15 DIAS 31 DIAS
RED PRIMARIA
1 SUMINISTRO DE POSTES + ACCESORIOS DE CONCRETO RED PRIMARIA
1.01 POSTE DE CONCRETO ARMADO CENTRIFUGADO 13/300/180/375 + PERILLA und 11.00 S/1,260.00 S/13,860.00
1.02 POSTE DE CONCRETO ARMADO CENTRIFUGADO 13/400/180/375 + PERILLA und 36.00 S/1,560.00 S/56,160.00
1.03 MEDIA PALOMILLA DE CONCRETO ARMADO 1.50/100 und 18.00 S/152.00 S/2,736.00
1.04 MEDIA PALOMILLA DE CONCRETO ARMADO 2.20/100 und 3.00 S/196.50 S/589.50
1.05 MEDIA LOSA DE CONCRETO ARMADO 1.30/750 und 16.00 S/250.00 S/4,000.00
1.06 MEDIA LOSA DE CONCRETO ARMADO 1.10/750 und 6.00 S/220.00 S/1,320.00
1.07 MENSULA DE CONCRETO ARMADO VIBRADO DE M/1.00/300 und 69.00 S/90.00 S/6,210.00
1.08 MENSULA DE CONCRETO ARMADO VIBRADO DE M/1.50/300 und 66.00 S/110.00 S/7,260.00
1.09 DUCTO DE CONCRETO DE 4 VIAS; 1 m DE LONG; DE 90mmØ DE VIA und 178.00 S/42.00 S/7,476.00
1.10 BUZON DE C.A. 1,00X1,00X1,20 m und 24.00 S/1,200.00 S/28,800.00
1.11 LADRILLO TIPO KING KONG und 1790.00 S/0.90 S/1,611.00
1.12 CRUCETA DE MADERA 1.2M und 1.00 S/105.00 S/105.00
2 SUMINISTRO DE CONDUCTORES RED PRIMARIA
2.01 CONDUCTOR DE COBRE DESNUDO CABLEADO TEMPLE DURO 35mm2, 7HIL m 195.00 S/12.00 S/2,340.00
2.02 CONDUCTOR DE ALEAC. ALUM. 6201-T81(AAAC) CABL. 50mm2, 7HIL m 4293.45 S/2.60 S/11,162.97
2.03 CONDUCTOR ALUMINIO 1350H(AAC) 6 mm², TEMPLE BLANDO SOLIDO m 202.50 S/1.20 S/243.00
2.04 CABLE UNIP.ES N2XSY 18/30 kV DE 50 mm2. UNIPOLAR m 2630.00 S/54.00 S/142,020.00
2.05 CABLE NYY - 1 kV DE 1 x 25mm² m 40.00 S/10.00 S/400.00
2.06 CABLE NYY - 1 kV DE 1 x 35mm² m 10.00 S/15.00 S/150.00
2.07 CABLE NYY - 1 kV DE 1 x 50mm² m 30.00 S/21.00 S/630.00
2.08 CABLE NYY - 1 kV DE 1 x 95mm² m 40.00 S/42.00 S/1,680.00
2.09 CABLE NYY - 1 kV DE 3 - 1 x 35mm² m 40.00 S/45.00 S/1,800.00
2.1 CABLE NYY - 1 kV DE 3 - 1 x 70mm² m 10.00 S/85.00 S/850.00
2.11 CABLE NYY - 1 kV DE 3 - 1 x 95mm² m 30.00 S/105.00 S/3,150.00
2.12 CABLE NYY - 1 kV DE 3 - 1 x 150mm² m 40.00 S/165.00 S/6,600.00
2.13 CONDUCTOR TIP THW 90 de 10-1x4 mm2, para medidor de SP m 120.00 S/185.00 S/22,200.00
2.14 CONDUCTOR TIPO THW 90 de 8-1x10 mm2, para medidor de AP m 120.00 S/28.00 S/3,360.00
3 SUMINISTRO DE AISLADORES
3.01 AISLADOR DE POLIMERICO TIPO PIN 36KV, Lf 920mm und 135.00 S/185.00 S/24,975.00
3.02 AISLAD. POLIMERICO P' SUSPENSION 36KV, CON HERRAJES DE FºGº, Lf 900 mm und 66.00 S/85.00 S/5,610.00
4.25 PERNO MAQUINADO DE A°Gº, 16mm Ø x 254mm., CON TUERCA Y CONTRATUERCA und 84.00 S/11.00 S/924.00
4.26 PERNO MAQUINADO DE A°Gº, 16mm Ø x 152mm., CON TUERCA Y CONTRATUERCA und 4.00 S/9.90 S/39.60
4.31 TUBO DE A° G° PARA BAJADA DE CABLE SUBTERRANEO 102mm(4")Ø, 3,2m und 25.00 S/225.00 S/5,625.00
4.32 CURVA DE PVC-SAP Ø 102mm (4"). und 25.00 S/28.00 S/700.00
5 SUMINISTRO DE RETENIDAS RED PRIMARIA
5.01 AISLAD. POLIMERICO P' SUSPENSION 36KV, CON HERRAJES DE FºGº, Lf 900 mm und 34.00 S/132.00 S/4,488.00
5.02 GUARDACABLE A°G° 2mm (1/16")x 2400mm, CON PERNO Y SEGURO pza 17.00 S/37.00 S/629.00
5.03 PERNO ANGULAR OJO CON GUARDACABO, A°G° 5/8"øx10" CON TUERCA. pza 17.00 S/1.40 S/23.80
5.04 CABLE A°G° 3/8"ø, 7 HILOS, ALTA RESISTENCIA. m 221.00 S/3.60 S/795.60
5.05 AMARRE O MORDAZAS PREFORMADAS DE A°G° PARA CABLE DE 3/8"ø. und 102.00 S/9.50 S/969.00
5.06 ARANDELA CUADRADA DE A°G° 4"x4"x1/4", HUECO 13/16"ø und 17.00 S/5.20 S/88.40
5.07 ARANDELA CUADRADA CURV. A°G° 2 1/4"x21/4"x3/16",HUECO 11/16" und 34.00 S/1.20 S/40.80
5.08 VARILLA ANCLAJE CON OJAL GUARDACABO A°G° 5/8"ø x 2.40m., TU und 17.00 S/44.00 S/748.00
5.09 BLOQUE DE CONCRETO ARMADO 0.50x0.50x0.20m und 17.00 S/43.00 S/731.00
5.1 ALAMBRE GALVANIZADO N° 14 PARA AMARRE m 25.50 S/1.10 S/28.05
5.11 GRILLETE DE ACERO DE 70KN und 34.00 S/8.80 S/299.20
5.12 JUEGO DE CONTRAPUNTA A°G° DE 2"Øx1.20m x 1/4"esp. und 13.00 S/80.00 S/1,040.00
6 SUMINISTRO DE PUESTA A TIERRA. RED PRIMARIA
6.01 CONDUCTOR COBRE DESNUDO, CABL., TEMPLE BLANDO, 35mm2, 7HI m 853.50 S/12.60 S/10,754.10
6.02 CONDUCTOR DE COBRE DURO PROTEGIDO TIPO CPI DE 35 MM2, 7 HILOS m 165.00 S/14.20 S/2,343.00
6.03 PLANCHA DOBLADA DE COBRE TIPO "J" und 222.00 S/8.00 S/1,776.00
6.04 VARILLA DE COPPERWELD 16mm Ø(5/8")Øx2.40m und 55.00 S/40.00 S/2,200.00
6.05 CAJA DE CONCRETO ARMADO P/PUESTA ATIERRA CON LOGO und 55.00 S/28.00 S/1,540.00
6.06 CONECTOR DE BRONCE VARILLA 16 mm Ø(5/8"Ø)- CAB(35mm2) und 55.00 S/8.00 S/440.00
6.07 CONECTOR DE DERIVACION CUÑA TIPO UDC 35/35mm2 und 174.00 S/9.50 S/1,653.00
6.08 ACCESORIOS ANTIRROBO und 55.00 S/25.00 S/1,375.00
6.09 BENTONITA (SACO 30 Kg) Bls 53.00 S/32.00 S/1,696.00
7 SUMINISTRO Y MONTAJE DE PARARRAYOS Y CUT OUT
SECCIONADOR POLIMERICO TIPO CUT-OUT 36KV,170KVBIL,100A,10KA, línea fuga
7.01 mín = 900 mm und 24.00 S/360.00 S/8,640.00
8.01 TRAFO 3Ø. BT1000 msnm (22.9)±2x2.5%/0,40-0,23 kV 160 KVA linea fuga mín und 4.00 S/24,560.00 S/98,240.00
bushing ≥ 900 mm
TRAFO 3Ø. BT1000 msnm (22.9)±2x2.5%/0,40-0,23 kV 125 KVA linea fuga mín
8.02 bushing ≥ 900 mm und 3.00 S/19,800.00 S/59,400.00
TRAFO 3Ø. BT1000 msnm (22.9)±2x2.5%/0,40-0,23 kV 100 KVA linea fuga mín
8.03 bushing ≥ 900 mm und 1.00 S/15,000.00 S/15,000.00
8.06 TABLERO TD3 FIBRA-VIDRIO, 3Ø 380/220V (TRAFO 160 kVA), RESINA PRFV und 7.00 S/12,500.00 S/87,500.00
8.07 TABLERO TD3 FIBRA-VIDRIO, 3Ø 380/220V (TRAFO 100 kVA), RESINA PRFV und 1.00 S/8,900.00 S/8,900.00
8.08 TABLERO TD3 FIBRA-VIDRIO, 3Ø 380/220V (TRAFO 50 kVA), RESINA PRFV und 2.00 S/7,000.00 S/14,000.00
8.09 CAJAS PORTAMEDIDOR (SERV. PARTICULAR Y AP) und 10.00 S/230.00 S/2,300.00
8.1 MEDIDOR ELECTRONICO 3Ø MULTIFUNCION DE 4 HILOS, 380/220 V, 60 Hz, (S.P.) und 10.00 S/730.00 S/7,300.00
8.11 MEDIDOR ELECTRONICO 3Ø DE 4 HILOS, 60 Hz, (A.P.) und 10.00 S/310.00 S/3,100.00
9 SUMINISTRO DE SISTEMA DE MEDICION
9.01 CAJA PORTAMEDIDOR TRIF. TIPO LTM DE 245X200X525mm und 1.00 S/230.00 S/230.00
9.02 MEDIDOR ELECTRÓNICO A1800 CON PUERTO RS 485, 220v, 5A, 4 HILOS und 1.00 S/4,500.00 S/4,500.00
9.03 TUBO F°G° 25.4mmǾx6.4m und 1.00 S/65.00 S/65.00
9.04 CORDON PORTATIL DE CU NPT 4x4 + 4 X 2.5mm2 m 12.00 S/13.00 S/156.00
9.05 CURVA PVC SAP DE 25.4mm(1")Ǿ X 90° m 4.00 S/3.00 S/12.00
10 SUMINISTRO DE EQUIPOS DE PROTECCION DE BT
10.01 INTERRUP. TERM. TRIF.CAJA MOLD. 100 A - 690V,REG. 0.4-1.0 und 2.00 S/275.00 S/550.00
10.02 CAJA METALICA TIPO F1M 670X320X200mm und 2.00 S/210.00 S/420.00
PRESUPUESTO INSTALACION - RED PRIMARIA AGOSTO AGOSTO
% TOTAL
ITEM DESCRIPCIÓN UNIDAD METRADO P.U. TOTAL 15 DIAS 31 DIAS 15 DIAS 31 DIAS
A RED PRIMARIA
2 MONTAJE DE POSTES + ACCESORIOS DE CONCRETO
2.01 IZAJE DE POSTES DE C.A.C. DE 13/300kg/180/375mm und 11.00 S/300.00 S/3,300.00
2.02 IZAJE DE POSTES DE C.A.C. DE 13/400kg/180/375mm und 36.00 S/330.00 S/11,880.00
2.03 EXCAVACIÓN DE HOYOS PARA POSTES DE 13 M. und 47.00 S/45.00 S/2,115.00
DISTRIBUCIÓN DE POSTES DE CONCRETO, DE ALMACÉN A PUNTO DE IZAJE CON
2.04 CAMIÓN GRÚA und 47.00 S/50.00 S/2,350.00
8.01 Montaje de: Tablero de Distribución , 3ø. 380/220 V, Instal.exterior (inc. abraza) und 10.00 S/380.00 S/3,800.00
8.03 MONTAJE DE TRANSFORMADOR 3Ø, (22,9)±2x2.5%/0,40-0,23 kV. und 12.00 S/850.00 S/10,200.00
8.04 MONTAJE DE TRAFOMIX 3Ø. 22,9/0,220 KV und 1.00 S/650.00 S/650.00
9 MONTAJE DE EQUIPOS DE MEDICION
9.01 MONTAJE DE CAJA LTM und 1.00 S/50.00 S/50.00
9.02 CONSTRUCCION DE MURETE PARA CAJA LTM und 1.00 S/420.00 S/420.00
10 SEÑALIZACION DE POSTES.
10.01 SEÑALIZACIÓN DE POSTES. und 54.00 S/40.00 S/2,160.00
11 PRUEBAS Y PUESTA EN SERVICIO
11.1 PRUEBAS Y PUESTA EN SERVICIO R.P. Glb. 1.00 S/25,000.00 S/25,000.00
PRESUPUESTO SUMINISTRO - RED SECUNDARIA AGOSTO AGOSTO
% TOTAL
ITEM DESCRIPCIÓN UNIDAD METRADO P.U. TOTAL 15 DIAS 31 DIAS 15 DIAS 31 DIAS
A RED SECUNDARIA
1 SUMINISTRO DE POSTES + ACCESORIOS DE CONCRETO RED SECUNDARIA
1.01 POSTE CONCRETO ARMADO CENTRIFUGADO DE 11/300/150/315 + PERILLA und 8.00 S/547.57 S/4,380.56
1.02 POSTE CONCRETO ARMADO CENTRIFUGADO DE 8/200/150/270 + PERILLA und 72.00 S/320.00 S/23,040.00
1.03 POSTE CONCRETO ARMADO CENTRIFUGADO DE 8/300/150/270 + PERILLA und 69.00 S/345.00 S/23,805.00
2 SUMINISTRO DE CONDUCTORES RED SECUNDARIA
2.01 CABLE AUTOP. AL. TIPO CAAI, C/PORT. AL-AL FORR. 1x16+NA25mm2 m 285.00 S/2.78 S/792.30
2.02 CABLE AUTOP. ALTIPO CAAI,C/ PORT.AL-AL FORR. 3x35 + 1x16 +NA25mm2 m 287.00 S/11.00 S/3,157.00
2.03 CABLE AUTOP. ALTIPO CAAI,C/ PORT.AL-AL FORR. 3x50 + 1x16 +NA35mm2 m 3,330.00 S/18.00 S/59,940.00
2.04 CONDUCTOR AUTOPORTANTE DE COBRE CAI 3x16 + 1x16 mm2 m 236.00 S/8.00 S/1,888.00
2.05 CABLE NYY - 1 kV DE 3 x 1 x 35mm² m 26.00 S/44.00 S/1,144.00
2.06 CABLE NYY - 1 kV DE 1 x 25mm² m 26.00 S/10.00 S/260.00
3 SUMINISTRO DE MATERIAL ELECTRICO ACCESORIO RED SECUNDARIA
3.01 GRAPA DE SUSPENSION - PARA PORT. DE AL. 25-35 mm2 pza 75.00 S/6.00 S/450.00
PERNO GANCHO SUSP.(ARANDELA FIJA Y MOV. TUERCA Y
3.02 CONTRATUERCA),16mmx203mm Long. pza 75.00 S/8.13 S/609.75
3.03 PERNO OJO (ARANDELA FIJA Y MOV. TUERCA Y CONTRATUERCA),16mmx203mm pza 86.00 S/8.20 S/705.20
Long.
3.04 PERNO OJO (ARANDELA FIJA Y MOV. TUERCA Y CONTRATUERCA),16mmx305mm pza 10.00 S/9.88 S/98.80
Long.
3.05 TUERCA OJO A°G° 16mm(5/8")Ø pza 36.00 S/7.25 S/261.00
3.06 CORREA PLASTICA DE AMARRE ANTIUVE 363x5mm pza 755.00 S/0.20 S/151.00
3.07 MORDAZA CONICA TERMINAL P/CABLE FORR. PORTANT. AL. 25-50mm2 pza 135.00 S/8.56 S/1,155.60
3.08 CAPUCHON TERMOCONTRACTIL, SELLADOR PUNTA DE CABLE 16-70mm2. pza 594.00 S/3.34 S/1,983.96
3.09 CONECTOR DERIVACION CUÑA PARA AL o AL, 16/16mm² und 36.00 S/10.20 S/367.20
3.1 CONECTOR DERIVACION CUÑA PARA AL o AL, 25/25mm² und 4.00 S/11.10 S/44.40
3.11 CONECTOR DERIVACION CUÑA PARA AL o AL, 35/35mm² und 32.00 S/13.00 S/416.00
3.12 CONECTOR DERIVACION CUÑA PARA AL o AL, 50/50mm² und 65.00 S/14.10 S/916.50
3.13 CONECTOR DERIVACION CUÑA PARA AL o Cu, 50/35mm² und 29.00 S/13.20 S/382.80
3.14 CONECTOR DERIVACION CUÑA PARA AL o Cu, 35/35mm² und 15.00 S/12.50 S/187.50
3.15 CONECTOR DERIVACION CUÑA PARA AL o Cu, 25/35mm² und 2.00 S/11.10 S/22.20
3.16 CONECTOR DERIVACION CUÑA PARA AL o CU, 2.5/16mm² und 157.00 S/9.90 S/1,554.30
3.17 CONECTOR DERIVACION CUÑA PARA AL o CU, 2.5/25mm² und 157.00 S/9.90 S/1,554.30
3.18 CONECTOR DERIVACION CUÑA, AL - CU, 16-50 mm2 und 328.00 S/14.10 S/4,624.80
3.19 CONECTOR DERIVACION CUÑA, AL - CU, 16-35 mm2 und 136.00 S/12.20 S/1,659.20
3.2 CONECTOR DERIVACION CUÑA, AL - CU, 16-25 mm2 und 9.00 S/11.00 S/99.00
3.21 CONECTOR DERIVACION CUÑA, AL - AL, 6-50 mm2 und 31.00 S/8.90 S/275.90
3.22 CONECTOR DERIVACION CUÑA, AL - AL, 6-35 mm2 und 34.00 S/8.30 S/282.20
3.23 CONECTOR DERIVACION CUÑA, AL - AL, 6-25 mm2 und 4.00 S/7.90 S/31.60
3.24 MANTA ABIERTA TERMOCONTRAIBLE CRSM - 34/10-1200mm und 65.00 S/138.50 S/9,002.50
3.25 FLEJE DE ACERO INOXIDABLE (CINTA BAND IT), DE 19mmx30m m 198.00 S/5.30 S/1,049.40
3.26 HEBILLA DE ACERO INOXIDABLE P' FLEJE 19mm und 253.00 S/1.80 S/455.40
3.27 CAJAS DERIVACION POLIMERICA, INCLUYE BORNE S/GEL (6 SALIDAS) 380/220V. und 78.00 S/168.00 S/13,104.00
3.28 CAJAS DERIVACION POLIMERICA, INCLUYE BORNE S/GEL (9 SALIDAS) 380/220V. und 41.00 S/150.00 S/6,150.00
4.03 PERNO ANGULAR OJO CON GUARDACABO, A°G° 16mmøx203mm CON TUERCA. pza 45.00 S/8.00 S/360.00
4.04 CABLE A°G° 10mmø, 7 HILOS, SIMENS MARTIN. m 448.00 S/3.67 S/1,644.16
4.05 AMARRE O MORDAZAS PREFORMADAS DE A°G° PARA CABLE DE 10mmø. und 180.00 S/9.49 S/1,708.20
4.06 VARILLA ANCLAJE CON OJAL GUARDACABO A°G° 16mmø x 2,40m., TU und 45.00 S/38.00 S/1,710.00
4.07 BLOQUE DE CONCRETO ARMADO DE 0,40 x 0,40 x 0,15m und 45.00 S/26.00 S/1,170.00
4.08 ALAMBRE N°10 DE F°G° m 23.00 S/2.50 S/57.50
4.09 ARANDELA CUADRADA DE A°G° 102x102x6mm, HUECO 21mmø und 45.00 S/6.20 S/279.00
4.1 ARANDELA CUADRADA CURV. A°G° 57x57x5mm,HUECO 18mmø und 90.00 S/1.10 S/99.00
4.11 JUEGO DE CONTRAPUNTA A°G° DE 51mmØx1,00m x 6mm esp. und 45.00 S/30.00 S/1,350.00
5 SUMINISTRO DE EQUIPOS DE ALUMBRADO PUBLICO Y ACCESORIOS.
5.01 CORDON PORTATIL DE COBRE (NLT) 2x2,5 mm2 m 863.00 S/4.50 S/3,883.50
5.02 PASTORAL PARAB' AºGº PP/1,78/1,76/38,1/15° und 157.00 S/98.00 S/15,386.00
5.03 LUMINARIA PARA LÁMPARA VAPOR SODIO ALTA PRESIÓN 70 W, INC. EQUIP.(DE UN und 157.00 S/290.00 S/45,530.00
SOLO CUERPO)
5.04 LÁMPARA DE VAPOR DE SODIO DE ALTA PRESION. DE 70 W,E27 TUBULAR, 220 V und 157.00 S/49.00 S/7,693.00
7.16 Medidor Monof. de Energía Activa, Tipo Electronico 220V, 10-40A, 60Hz, Clase 1 und 500.00 S/36.00 S/18,000.00
B RED SECUNDARIA
2 INSTALACION DE POSTES DE CONCRETO
2.01 Excavación de Hoyos para poste de concreto 8m und 140.00 S/24.00 S/3,360.00
2.02 Excavación de Hoyos para poste de concreto 11m und 8.00 S/35.00 S/280.00
2.03 Distribución de postes de concreto o madera, de almacén a punto de izaje und 148.00 S/30.00 S/4,440.00
2.04 Izaje de postes de concreto de 8 m con camión grua und 140.00 S/215.00 S/30,100.00
2.05 Izaje de postes de concreto de 11 m con camión grua und 8.00 S/260.00 S/2,080.00
3 MONTAJE DE RETENIDAS
3.01 Excavación de hoyo para retenida inclinada o vertical und 45.00 S/50.00 S/2,250.00
3.02 Instalación de retenida vertical und 45.00 S/40.00 S/1,800.00
3.03 Relleno y compactación de retenida inclinada y vertical und 45.00 S/20.00 S/900.00
4 MONTAJE DE ARMADOS
4.01 Montaje de Estructuras de: ALINEAMIENTO - ANGULO<5°-Tipo (A) und 72.00 S/35.00 S/2,520.00
4.02 Montaje de Estructuras de: FIN DE LINEA - TIPO (F) und 30.00 S/50.00 S/1,500.00
4.03 Montaje de Estructuras de: ANCLAJE VANO FLOJO -Tipo (VF) und 12.00 S/50.00 S/600.00
4.04 Montaje de Estructuras de: ANCLAJE DERIVACION VANO FLOJO Tipo (DVF) und 4.00 S/75.00 S/300.00
4.05 Montaje de Estructuras de: DERIVACION 180° -Tipo (DR) und 33.00 S/80.00 S/2,640.00
4.11 Montaje de Estructuras de: FIN DE CIRCUITO -Tipo (FC) und 4.00 S/50.00 S/200.00
4.15 Montaje de Estructuras en: S.A.B. und 9.00 S/65.00 S/585.00
4.16 Montaje de Caja de derivación de 6 y 9 salidas. und 118.00 S/60.00 S/7,080.00
4.17 Montaje y conexionado de caja de medicion y proteccion. inc. montaje de und 500.00 S/68.00 S/34,000.00
Interruptor termomagnetico y medidor electro
5 MONTAJE DE CONDUCTORES
MONTAJE DE CONDUCTOR DE AL. FORRADO TIPO AUTOPORTANTE 1x16+NA25
5.01 mm2 m 285.00 S/2.00 S/570.00
03.06 RELLENO Y COMP. ZANJA T. ARENOSO HASTA 1.00MPP m 1,261.78 9.00 11,356.02
03.07 RELLENO Y COMP. ZANJA T. ARENOSO HASTA 1.20MPP m 3,357.08 11.00 36,927.88
03.08 RELLENO Y COMP. ZANJA T. ARENOSO HASTA 1.50MPP m 3,033.67 13.00 39,437.71
03.09 RELLENO Y COMP. ZANJA T. ARENOSO HASTA 2.00MPP m 1,154.65 20.87 24,097.55
03.10 ENTIBADO Y DESENTIBADO DE ZANJA m2 1,214.22 50.00 60,710.83
03.11 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM m3 1,437.60 12.00 17,251.20
04 BUZON/CAJAS DE INSPECCION
04.01 BUZON Di=1.20m x 2.50 und 110.00 3,500.00 385,000.00
04.02 BUZON Di=1.20m x 3.50 und 17.00 4,800.00 81,600.00
05 SUMINISTRO TUBOS COLECTOR
05.01 SUMINISTRO TUBO PVC S20 UF DN200mm m 7,391.30 30.00 221,738.86
05.02 SUMINISTRO TUBO PVC S20 UF DN250mm m 121.30 35.00 4,245.33
05.03 SUMINISTRO TUBO PVC S20 UF DN315mm m 213.60 38.00 8,116.80
05.04 SUMINISTRO TUBO PVC S20 UF DN355mm m 365.80 34.00 12,437.20
06 INSTALACION DE TUBOS COLECTOR/EMISOR
06.01 EMPALME A BUZON Y/O RED EXISTENTE und 1.00 113.15 113.15
06.02 INSTALACION TUBO PVC UF DN 200 MM m 8,091.99 6.00 48,551.94
06.03 PRUEBA HIDRAULICA TUBO PVC DN 200 MM m 8,091.99 3.00 24,275.97
07 CONEXIONES DOMICILIARIAS DESAGUE
07.01 SUMINISTRO TUBO PVC S20 UF DN160mm m 5,557.00 24.00 133,368.00
07.02 INSTALACION TUBO PVC S20 DN 160 MM m 5,557.00 4.50 25,006.50
07.03 EXCAVACION DE ZANJA T.NORMAL CONEX.DESAGUE m 5,557.00 15.00 83,355.00
07.04 REFINE Y NIVELACION DE ZANJA CONEXION m 5,557.00 1.78 9,891.46
07.05 RELLENO Y COMP.DE ZANJA CONEXION m 5,557.00 10.00 55,570.00
07.06 EMPALME A COLECTOR PVC DN 200 MM und 500.00 80.00 40,000.00
07.07 INSTALACION CAJA DE REGISTRO/TARRAJEO und 500.00 36.00 18,000.00
07.08 PRUEBA HIDRAULICA CONEX.DOMICILIARIA DESAGUE und 500.00 8.00 4,000.00
07.09 SUMINISTRO CAJA DE REGISTRO DESAGUE und 500.00 180.00 90,000.00
PRESUPUESTO - RESERVORIO 1,200 M3 AGOSTO AGOSTO
% TOTAL
ITEM DESCRIPCIÓN UNIDAD METRADO P.UNITARIO PARCIAL 15 DIAS 31 DIAS 15 DIAS 31 DIAS
01 OBRAS PROVISIONALES
01.03 BAÑOS PORTATIL mes 5.00 315.00 1,575.00
02 SEÑALIZACION E ILUMINACION DE OBRA
02.02 ILUMINACION NOCTURNA NOCTURNA día 30.00 100.00 3,000.00
03 TRABAJOS PRELIMINARES
03.01 TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO m 350.00 2.00 700.00
03.03 PRUEBA COMPACTACION SUELOS (PROCTOR MODIFICADO DENSIDAD DE und
CAMPO) 2.00 150.00 300.00
03.04 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRENSION) und 10.00 200.00 2,000.00
04 MOVIMIENTO DE TIERRAS
04.01 EXCAVACION C/EQUIPO EN TERRENO NORMAL m3 800.00 18.00 14,400.00
04.02 REFINE Y NIVELACION Y APISONADO EN TERRENO NORMAL m2 60.00 3.00 180.00
04.03 RELLENO CON MATERIAL DE PRESTAMO PARA MEJORAMIENTO DE TERRENO m3
PARA CIMENTACION 250.00 23.98 5,994.00
04.04 ENTIBADO Y DESENTIBADO DE ZANJA m2 100.00 40.00 4,000.00
04.05 ELIMINACION MATERIAL EXEDENTE C/EQUIPO HASTA 5KM m3 850.00 10.80 9,180.00
05 CONCRETO SIMPLE
05.01 CONCRETO 1:8+25% P.M. PARA SOLADOS Y/O SUB BASES m3 75.41 232.26 17,514.79
06 LOSA DE CIMENTACION
06.01 CONCRETO EN LOSA CIMENTACION f'c=210 kg/cm2 m3 237.76 380.00 90,348.80
06.02 ENCOFRADO Y DEDESENCOFRADO LOSA DE CIMENTACION m2 74.34 35.00 2,601.90
06.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSA DE FONDO DE PISO kg 54,024.48 4.00 216,097.92
07 VIGAS DE CIMENTACION
07.01 CONCRETO EN VIGAS DE CIMENTACION F'C=210 KG/CM2 m3 392.96 380.00 149,324.80
07.02 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION m2 1,096.96 30.00 32,908.80
07.03 ACERO DE REFUERZO fy=4200 kg/cm2 EN VIGAS DE CIMENTACION kg 52.24 4.00 208.96
08 FUSTE CILINDRICO
08.01 CONCRETO F'C=210 KG/CM2 MUROS REFORZADOS CIRCULARES HASTA 5.00 M m3
ALTURA 31.36 370.00 11,603.20
08.02 CONCRETO F'C=210 KG/CM2 MUROS REFORZADOS CIRCULARES HASTA 10.00 M m3
ALTURA 31.36 370.00 11,603.20
08.03 CONCRETO F'C=210 KG/CM2 MUROS REFORZADOS CIRCULARES HASTA 15.00 M m3
ALTURA 31.36 370.00 11,603.20
08.04 CONCRETO F'C=210 KG/CM2 MUROS REFORZADOS CIRCULARES HASTA 20.00 M m3
ALTURA 31.36 380.00 11,916.80
08.05 CONCRETO F'C=210 KG/CM2 MUROS REFORZADOS CIRCULARES HASTA 30.00 M m3
ALTURA 31.36 380.00 11,916.80
08.06 ENCOFRADO Y DESENCOFRADO CARAVISTA P/MUROS CIRCULARES HASTA 5.00M m2
DE ALTURA 254.24 45.00 11,440.80
08.07 ENCOFRADO Y DESENCOFRADO CARAVISTA P/MUROS CIRCULARES HASTA m2
10.00M DE ALTURA 254.24 45.00 11,440.80
08.08 ENCOFRADO Y DESENCOFRADO CARAVISTA P/MUROS CIRCULARES HASTA m2
15.00M DE ALTURA 254.24 45.00 11,440.80
08.09 ENCOFRADO Y DESENCOFRADO CARAVISTA P/MUROS CIRCULARES HASTA m2
20.00M DE ALTURA 254.24 45.00 11,440.80
08.10 ENCOFRADO Y DESENCOFRADO CARAVISTA P/MUROS CIRCULARES HASTA m2
30.00M DE ALTURA 254.24 45.00 11,440.80
08.11 ACERO Fy=4200KG/CM2 (ALTURA HASTA 10M) kg 4,288.00 5.00 21,440.00
08.12 ACERO Fy=4200KG/CM2 (ALTURA HASTA 15M) kg 4,288.00 5.00 21,440.00
08.13 ACERO Fy=4200KG/CM2 (ALTURA HASTA 20M) kg 4,288.00 5.00 21,440.00
08.14 ACERO Fy=4200KG/CM2 (ALTURA HASTA 30M) kg 4,288.00 5.00 21,440.00
09 VIGA ANULAR Y FONDO DE CUBA
09.01 CONCRETO F'c= 210 KG/CM2 (20-30 M ALTURA) m3 143.52 360.00 51,667.20
09.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGAS (20-30 M ALTURA) m2
837.36 27.00 22,608.72
09.03 ACERO Fy=4200 KG/CM2 (20-30 M ALTURA) kg 18,784.64 4.00 75,138.56
10 MURO Y VIGA SUPERIOR DE CUBA
10.11 CONCRETO F'c=210 KG/CM2 VIGAS (25-30 ALTURA) m3 73.84 360.00 26,582.40
10.12 ENCOFRADO Y DESENCOFRADO CARAVISTA EN VIGAS (25-30M ALTURA) m2
481.26 27.00 12,994.02
10.13 ACERO Fy=4200 KG/CM2 (25-30M ALTURA) kg 19,240.80 4.00 76,963.20
11 CUPULA DE RESERVORIO
11.01 CONCRETO F'c=210 KG/CM2 PARA CUPULA ESFERICA m3 74.78 360.00 26,920.80
11.02 ENCOFRADO Y DESENCOFRADO PARA CUPULA ESFERICA m2 904.64 27.00 24,425.28
11.03 ACERO ESTRUCTURAL TRABAJADO PARA CUPULA ESFERICA kg 3,575.63 4.00 14,302.52
12 LINTERNA DE RESERVORIO
12.01 CONCRETO F'C=210 KG/CM2 MURO REFORZADO CIRCULAR LINTERNA HASTA m3
30.00 M ALTURA 5.55 360.00 1,998.00
12.02 ENCOFRADO Y DESENCOFRADO CARAVISTA P/MURO CILINDRICO m2 76.30 27.00 2,060.10
12.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 TRABAJADO PARA MUROS kg 438.52 4.00 1,754.08
13 VIGA PUENTE RESERVORIO
13.01 CONCRETO F'C=210 KG/CM2 P/VIGA PUENTE RE HASTA 30.00 M ALTURA m3
4.98 360.00 1,792.80
13.02 ENCOFRADO Y DESENCOFRADO CARAVISTA P/VIGAS CIRCULARES m2 45.01 27.00 1,215.27
13.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 TRABAJADO PARA VIGAS Y DINTELES kg 460.38 4.00 1,841.52
14 ESCALERA HELICOIDAL RESERVORIO
14.01 CONCRETO F'c=210 KG/CM2 PARA ESCALERAS m3 20.14 360.00 7,250.40
14.02 ENCOFRADO Y DESENCOFRADO CARAVISTA PARA ESCALERAS m2 156.46 27.00 4,224.42
14.03 ACERO ESTRUCTURAL Fy=4200 KG/CM2 TRABAJADO PARA ESCALERAS kg 794.12 4.00 3,176.48
15 REVOQUES ENLUCIDOS Y MOLDURAS
15.01 TARRAJEO CON IMPERMEABILIZANTE MURO INTERIOR CUBA E=1.5CM m2 586.56 22.50 13,197.60
15.02 REVESTIMIENTO GRADAS C/MORTERO 1:4 x2.0CM+PULIDO 1:2x1.0CM m
123.23 18.00 2,218.14
16 CIELORRASOS
16.01 CIELORRASO INC.VIGAS EMPOTRADAS C/MORTERO 1:5x1.5 CM m2 234.27 18.00 4,216.86
17 PISOS Y PAVIMENTOS
17.01 FALSO PISO DE 4" DE CONCRETO 1:8 (F'c=140 KG/CM2) m2 123.20 19.80 2,439.36
17.02 CONTRAPISO C/MORTERO 1:4 + ACABADO CON PASTA 1:2 x1.5CM m2 123.20 18.00 2,217.60
17.04 VEREDA RIGIDA DE CONCRETO F'c= 140 KG/CM2 E=10 CM PASTA 1:2 m2 128.00 32.40 4,147.20
18 CONTRAZOCALOS
18.01 CONTRAZOCALOS DE CEMENTO PULIDO CON MORTERO 1:5 DE e=2cm HASTA m
h=10cm 101.71 16.20 1,647.70
19 CARPINTERIA METALICA
19.01 PUERTA METALICA DE 1.50 M. x 2.10 M. und 1.00 900.00 900.00
19.02 VENTANA DE FIERRO C/PERFIL "L" 1"x1/8"FIJA+REF."T" DE 1" m2 16.00 162.00 2,592.00
19.03 ESCALERA TIPO MARINERO DE TUBO F.GDO ø 1 1/2" und 6.00 188.55 1,131.30
19.04 PASAMANOS METALICO EN ESCALERA INC.PINTURA m 27.00 45.00 1,215.00
19.05 BARANDA DE TUBO Fo Gdo PASAMANO 1 1/2"-PARANTE 1"x1M ALT. m 20.00 135.00 2,700.00
19.06 MARCO Y TAPA PLANCHA LAC 1/4" C/MECANISMO DE SEG. S/DISEÑO und 2.00 270.00 540.00
19.07 VENTILACION CON TUBERIA DE ACERO SEGUN DISEÑO DE 8" und 6.00 1,200.00 7,200.00
19.08 SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO (8"-10") und 6.00 36.00 216.00
19.09 SOPORTE METALICO T/ABRAZADERA P/TUB. DE DIAMETRO (4"-6") und 6.00 27.00 162.00
20 PINTURA
20.01 PINTADO DE MURO INTERIOR C/LATEX VINILICO (VINILATEX O SIMILAR) m2
40.55 15.00 608.25
20.02 PINTADO DE MURO EXTERIOR C/LATEX VINILICO (VINILATEX O SIMILAR) m2
31.63 18.00 569.34
20.03 PINTADO DE CIELO RASO C/LATEX VINILICO (VINILATEX O SIMILAR) m2 18.43 23.00 423.89
21 VARIOS
21.01 PRUEBA HIDRAULICA DE RESERVORIOS m3 750.00 6.00 4,500.00
21.02 DESINFECCION CON EMPLEO DE CISTERNA+EQUIP DE BOMBEO P/LLENADO m3
750.00 6.00 4,500.00
21.03 WATER STOP DE NEOPRENE DE 6" PROVISION Y COLOCACION DE JUNTA m
30.00 23.80 714.07
21.04 JUNTA DE DILATACION EN CONSTRUCCION CON TECNOPOR E=1" m2 680.00 7.20 4,896.00
21.05 PROVISION Y COLOCADO DE SELLO IGAS NEGRO gal 50.00 11.75 587.57
22 LINEA DE CONDUCCION A RESERVORIO-SISTEMA BYPASS
22.01 TUBERIA HD BB DN200MM m 56.00 298.00 16,688.00
22.02 CODO HFD BRIDADO DN200MMx90º und 5.00 740.00 3,700.00
22.03 CODO HFD BRIDADO DN200MMx45º und 1.00 652.86 652.86
22.04 REDUCCION HFD BB DN(250-200)MM INC.EMPAQUETADURAS Y PERNOS und
1.00 521.81 521.81
22.05 UNION DESMONTAJE AUTOPORTANTE BB DN200MM und 3.00 489.00 1,467.00
22.06 BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DE 8"(200M) und 8.00 98.95 791.57
22.07 BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DE 8"(200MM) und 1.00 89.84 89.84
22.08 EMPAQUETADURA DE JEBE ENLONADO DE 8"(200MM) und 16.00 15.15 242.45
22.09 PERNO DE ACERO INC.TUERCA P/UNIR BRIDAS DE 8"(200MM.) und 16.00 2.99 47.92
22.10 ABRAZADERA DE PLATINA CON PERNOS DE ANCLAJE PARA TUB.DN200MM und
8.00 53.91 431.24
22.11 NIPLE H.DUCTIL BB DN200x0.40M und 6.00 557.02 3,342.14
22.12 VALVULA DE ALTITUD (15-35)M INC.DISPOSITIVOS DE CONTROL DE NIVEL Y jgo
SEÑALIZACIONES 1.00 68,900.00 68,900.00
22.13 VALVULA MARIPOSA BB DN200MM und 1.00 4,312.44 4,312.44
22.14 DADOS CONCRETO F'C=140 KG/CM2+ENCOFR.-ANCLAJE ACCES. DN200mm und 4.00 79.77 319.07
22.15 INSTALACION DE ACCESORIOS PVC DN (200-250)mm. und 50.00 51.35 2,567.70
22.16 INSTALACION DE VALVULAS BRIDADAS DN(200-250) und 2.00 84.73 169.45
23 LINEA DE REBOSE-ADUCCION
23.01 TUBERIA HD BB DN200MM INC.PERNOS Y EMPAQUETADURAS m 56.00 250.00 14,000.00
23.02 TUBERIA HD BB DN250MM INC.PERNOS Y EMPAQUETADURAS m 48.00 350.00 16,800.00
23.03 CODO HFD BRIDADO DN250MMx45º und 2.00 706.28 1,412.56
23.04 CODO HFD 90° BRIDADO DN250MMx90° und 4.00 742.94 2,971.75
23.05 CODO HFD BRIDADO DN200MMx90º und 4.00 695.02 2,780.09
23.06 CODO HFD BRIDADO DN200MMx45º und 2.00 652.86 1,305.71
23.07 UNION DESMONTAJE AUTOPORTANTE BB DN250MM und 18.00 405.00 7,290.00
23.08 REDUCCION HFD BB DN(250-200)MM INC.EMPAQUETADURAS Y PERNOS und
1.00 521.81 521.81
23.09 TEE FFD BRIDADO DN250x200mm und 1.00 1,250.61 1,250.61
23.10 TEE FFD BRIDADO DN250x250mm und 1.00 1,672.27 1,672.27
23.11 CANASTILLA DE BRONCE BRIDADA DE 10" und 1.00 898.43 898.43
23.12 PERNO DE ACERO INC.TUERCA P/UNIR BRIDAS DE 10"(250MM.) und 54.00 2.99 161.72
23.13 PERNO DE ACERO INC.TUERCA P/UNIR BRIDAS DE 8"(200MM.) und 72.00 2.99 215.62
23.14 EMPAQUETADURA DE JEBE ENLONADO DE 8"(200MM) und 4.00 15.15 60.61
23.15 NIPLE FFD DN200x40cm BB pza 6.00 4,500.00 27,000.00
23.16 VALVULA COMP FFD BB DN250 und 1.00 2,265.23 2,265.23
23.17 BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DE 8"(200M) und 4.00 98.95 395.79
23.18 BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DE 10"(250MM) und 2.00 251.56 503.12
23.19 BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DE 10"(250MM) und 4.00 244.97 979.88
23.20 ABRAZADERA DE PLATINA CON PERNOS DE ANCLAJE PARA TUB.DN200MM und
18.00 53.91 970.30
23.21 ABRAZADERA DE PLATINA CON PERNOS DE ANCLAJE PARA TUB.DN250MM und
10.00 117.39 1,173.94
23.22 ARTEZA DE REBOSE DE CONCRETO ARMADO und 1.00 539.06 539.06
23.23 DADOS CONCRETO F'C=140 KG/CM2+ENCOFR.-ANCLAJE ACCES. DN200mm und 18.00 79.77 1,435.83
23.24 INSTALACION DE MEDIDOR ELECTROMAGNETICO DN250MM INC.ACCESORIOS und
1.00 314.65 314.65
23.25 INSTALACION TUBERIA H.DUCTIL K-7 BB DN (200-250)MM. m 80.00 10.61 849.07
23.26 INSTALACION DE ACCESORIOS BRIDADOS HFD DN (200-250) und 20.00 53.00 1,059.90
23.27 INSTALACION DE VALVULAS BRIDADAS DN(200-250) und 2.00 84.73 169.45
24 LINEA DE LIMPIA
24.01 TUBERIA HD BB DN200MM INC.PERNOS Y EMPAQUETADURAS m 112.00 340.00 38,080.00
24.02 TEE HFD BRIDADO DN200x200mm und 3.00 1,305.71 3,917.13
24.03 CODO FFD BRIDADO DN200MMx90º und 2.00 695.02 1,390.04
24.04 CODO FFD BRIDADO DN200MMx45º und 1.00 652.86 652.86
24.05 BRIDA DE ACERO PARA SOLDAR-ROMPE AGUA DE 8"(200MM) und 2.00 89.84 179.69
24.06 BRIDA DE ACERO PARA SOLDAR Y EMPERNAR DE 8"(200M) und 4.00 98.95 395.79
24.07 PERNO DE ACERO INC.TUERCA P/UNIR BRIDAS DE 8"(200MM.) und 72.00 2.99 215.62
24.08 EMPAQUETADURA DE JEBE ENLONADO DE 8"(200MM) und 12.00 15.15 181.84
24.09 UNION DESMONTAJE AUTOPORTANTE BB DN200MM und 2.00 431.24 862.49
24.10 ABRAZADERA DE PLATINA CON PERNOS DE ANCLAJE PARA TUB.DN200MM und
16.00 53.91 862.49
24.11 NIPLE FFD BB DN200x1.00M und 4.00 1,160.17 4,640.66
24.12 TRAMPA PVC SAP DN200MM und 1.00 113.80 113.80
24.13 VALVULA MARIPOSA BB DN200MM und 1.00 4,312.44 4,312.44
24.14 DADOS DE ANCLAJE P/ACCES.DN(200-250)mm und 7.00 126.86 888.00
24.15 INSTALACION DE ACCESORIOS FFD BB DN (200-250) MM und 12.00 283.24 3,398.92
24.16 INSTALACION TUBERIA H.DUCTIL K-7 BB DN (200-250)MM. m 112.00 10.61 1,188.70
24.17 INSTALACION DE VALVULAS COMP. H. DUCTIL BB DN(200-250)MM und 1.00 85.59 85.59
25 INSTALACIONES ELECTRICAS
25.01 TABLERO ELECT. GAB.METALICO P/DISTRIBUCION DE 3 CIRCUITOS und 1.00 227.30 227.30
25.02 SALIDA DE PARED C/CABLE AWG TW 2.5MM(14)+DPVC SEL 16MM(5/8) pto
3.00 77.85 233.55
25.03 SALIDA DE TOMACORRIENTE C/AWG TW 2.5MM(14)+DPVC SEL 16MM(5/8) pto 3.00 80.79 242.36
25.04 PROVISION DE TUBERIA PVC SAP DE 19 MM.(3/4") m 104.00 2.47 256.64
25.05 CAJA DE FIERRO GALVANIZADO 200x200x30 MM.INC. TAPA und 3.00 5.39 16.17
25.06 PLACA INTERRUPTOR DE BAKELITA DE 1GOLPE-SWITCH und 2.00 3.11 6.23
25.07 FLUORESCENTE 2 X 40 W INCLUYENDO EQUIPO Y PANTALLA und 2.00 67.92 135.84
25.08 INSTALACION ELECTRICA EN ILUMINACION SEGUN DISEÑO glb 1.00 1,796.90 1,796.90
CERCO Y CASETA DE RESERVORIO AGOSTO AGOSTO
% TOTAL
ITEM DESCRIPCION UNIDAD METRADO P.UNITARIO PARCIAL 15 DIAS 31 DIAS 15 DIAS 31 DIAS
01.02.02 CONCRETO F´C=280 KG/CM2, CANALETAS DE BUZONES, CAMARAS, CAJAS M3 5.00 414.00 2,070.00
01.02.03 CONCRETO F´C=280 KG/CM2, PARA MURO DE CHOQUE M3 0.89 414.00 368.46
01.02.04 CONCRETO F'C=280 KG/CM2 PARA LOSA DE FONDO M3 10.87 414.00 4,500.18
01.02.05 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS DE FONDO-PISO KG 754.54 4.00 3,018.16
01.02.06 CONCRETO F'C=280 KG/CM2 P/ZAPATA TIPO CAISSON M3 6.08 414.00 2,516.70
01.02.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA ZAPATAS TIPO CAISSON M2 40.51 22.50 911.39
01.02.08 ACERO ESTRUCTURAL TRABAJADO P/ZAPATAS DE CAISSON KG 190.83 4.00 763.32
01.02.09 CONCRETO F'C=280 KG/CM2 PARA MUROS REFORZADOS hasta 1.50 m PRIMER M3 6.08 414.00 2,516.70
ANILLO
01.02.10 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS hasta 1.50 m M2 40.51 32.00 1,296.19
01.02.11 CONCRETO F'C=280 KG/CM2 PARA MUROS REFORZADOS M3 24.91 414.00 10,313.23
01.02.12 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS M2 166.07 35.00 5,812.61
01.02.13 ACERO ESTRUCTURAL P/MURO REFORZADO KG 1,436.36 4.00 5,745.44
01.02.14 CONCRETO F'C= 280 KG/CM2, PARA LOSA DE BUZON, CAMARA M3 3.01 414.00 1,246.14
01.02.15 ENCOFRADO Y DESENCOFRADO NORMAL P/LOSA MACIZA M2 3.77 30.00 113.10
01.02.16 ACERO ESTRUCTURAL P/LOSA MACIZA KG 118.40 4.00 473.60
01.02.17 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO M2 16.62 22.50 373.95
01.02.18 TARRAJEO CON IMPERMEABILIZANTE DEMURO EN CAMARAS M2 96.08 22.50 2,161.80
01.02.19 PROVISION Y COLOCADO DE JUNTA CON WATER STOP DE NEOPREN e=0.15M. M 57.81 34.00 1,965.38
01.03.00 CAMARA DE REJAS
01.03.01 CONCRETO F´C=100 KG/CM2 SOLADO P/SELLADO DE CAISSON CAJA M3 0.49 198.00 97.02
01.03.02 CONCRETO F´C=280 KG/CM2, CANALETAS DE BUZONES, CAMARAS, CAJAS M3 1.56 414.00 645.84
01.03.03 CONCRETO F'C=280 KG/CM2 PARA LOSA DE FONDO M3 0.98 414.00 405.72
01.03.04 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS DE FONDO-PISO KG 109.20 4.00 436.80
01.03.05 CONCRETO F'C=280 KG/CM2 P/ZAPATA TIPO CAISSON M3 2.17 414.00 897.43
01.03.06 ENCOFRADO Y DESENCOFRADO NORMAL PARA ZAPATAS TIPO CAISSON M2 21.67 22.50 487.49
01.03.07 ACERO ESTRUCTURAL TRABAJADO P/ZAPATAS DE CAISSON KG 123.97 4.00 495.88
CONCRETO F'C=280 KG/CM2 PARA MUROS REFORZADOS hasta 1.50 m PRIMER
01.03.08 ANILLO M3 2.17 414.00 897.43
01.03.09 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS hasta 1.50 m M2 21.67 25.20 545.98
01.03.10 CONCRETO F'C=280 KG/CM2 PARA MUROS REFORZADOS M3 5.79 414.00 2,397.06
01.03.11 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS M2 57.92 25.20 1,459.60
01.03.12 ACERO ESTRUCTURAL P/MURO REFORZADO KG 722.12 4.00 2,888.48
01.03.13 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO M2 3.46 22.50 77.93
01.03.14 TARRAJEO CON IMPERMEABILIZANTE DEMURO EN CAMARAS M2 36.35 22.50 817.91
01.03.15 PROVISION Y COLOCADO DE JUNTA CON WATER STOP DE NEOPREN e=0.15M. M 23.56 18.00 424.12
01.04.00 CAJA DE VALVULAS
01.04.01 CONCRETO F´C=100 KG/CM2 SOLADO P/SELLADO DE CAISSON CAJA M3 1.25 198.00 247.10
01.04.02 CONCRETO F'C=280 KG/CM2 PARA MUROS REFORZADOS M3 7.50 414.00 3,106.66
01.04.03 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS M2 75.04 3,425.20 257,027.01
01.04.04 ACERO ESTRUCTURAL P/MURO REFORZADO KG 411.32 4.00 1,645.28
01.04.05 TARRAJEO CON IMPERMEABILIZANTE DE MUROS M2 35.28 22.50 793.80
01.05.00 CAMARA ROMPE PRESION
01.05.01 CONCRETO F´C=245 KG/CM2, CANALETAS DE BUZONES, CAMARAS, CAJAS M3 0.27 387.00 104.49
01.05.02 CONCRETO F'C=245 KG/CM2 PARA LOSA DE FONDO M3 0.83 387.00 321.42
01.05.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS DE FONDO-PISO KG 42.94 4.00 171.76
01.05.04 CONCRETO F'C=245 KG/CM2 PARA MUROS REFORZADOS M3 1.78 387.00 689.01
01.05.05 ENCOFRADO Y DESENCOFRADO PARA MUROS REFORZADOS M2 23.74 25.20 598.21
01.05.06 ACERO ESTRUCTURAL P/MURO REFORZADO KG 147.60 4.00 590.40
01.05.07 CONCRETO F'C= 245 KG/CM2, PARA LOSA MACIZA DE CAMARA M3 0.30 387.00 114.83
01.05.08 ENCOFRADO Y DESENCOFRADO NORMAL P/LOSA MACIZA M2 1.48 25.20 37.39
01.05.09 ACERO ESTRUCTURAL P/LOSA MACIZA KG 42.58 4.00 170.32
01.05.10 TARRAJEO CON IMPERMEABILIZANTE DE LOSA DE FONDO-PISO M2 1.13 22.50 25.43
01.05.11 TARRAJEO CON IMPERMEABILIZANTE DEMURO EN CAMARAS M2 10.55 22.50 237.38
01.06.00 VARIOS
01.06.02 BOMBEO DE AGUAS SUBTERRANEAS H 360.00 15.00 5,400.00
01.06.03 INSTALACION DE TUBERIAS UF 315 mm-S 20 M 19.86 7.79 154.64
PRESUPUESTO CERCO - CAMARA DE BOMBEO AGOSTO AGOSTO
% TOTAL
ITEM DESCRIPCION UNIDAD METRADO P.UNITARIO PARCIAL 15 DIAS 31 DIAS 15 DIAS 31 DIAS
1 OBRAS PROVISIONALES
1.01 Trazo, Niveles y Replanteo M2 42.88 0.55 23.54
2 MOVIMIENTO DE TIERRAS
2.01 EXCAVACIONES ZAPATAS M3 7.12 10.80 76.87
2.02 EXCAVACION DE ZANJAS M3 7.12 10.80 76.87
2.03 EXCAVACION PARA FALSO PISO M3 2.87 10.80 30.95
3 RELLENOS
3.01 RELLENO Y APISONADO CON MATERIAL PROPIO M3 1.10 11.70 12.86
3.02 RELLENO CON AFIRMADO M2 3.88 27.00 104.63
4 ELIMINACIÓN DE MATERIAL EXCEDENTE
4.01 ELIMINACIÓN DE MATERIAL EXCEDENTE D=>5KM M3 13.95 10.80 150.61
ESTRUCTURAS
5 OBRAS DE CONCRETO SIMPLE
5.01 CIMIENTOS CORRIDOS - CONCRETO 1:10 + 30% P.G. M3 10.19 225.00 2292.30
5.02 VEREDA - CONCRETO 140 KG/CM2 e=4" M3 9.45 32.40 306.18
6 OBRAS DE CONCRETO ARMADO
6.01 ZAPATAS
6.01.01 CONCRETO F'C= 210 KG/CM2 -ZAPATAS M3 1.50 351.00 526.50
6.01.02 ACERO ESTRUCTURAL FY= 4200 KG/CM2 KG 25.06 3.42 85.70
6.02 SOBRECIMIENTO
6.02.01 CONCRETO F'C = 210 KG/CM2 PARA SOBRECIMIENTO M3 1.26 351.00 443.52
6.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN SOBRECIMIENTO M2 12.26 19.80 242.75
COLUMNAS
04.01. Encofrado y Desencofrado en Columnas m2 14.94 19.80 295.76
04.02. Acero de Refuerzo en Columnas Fy=4200 Kg/ cm2 kg 175.94 4.00 703.76
04.03. Concreto en Columnas F'c= 175 Kg/cm2 m3 1.34 315.00 421.90
VIGAS
04.04. Encofrado y Desencofrado en Vigas m2 12.70 19.80 251.36
04.05. Acero de Refuerzo en Vigas Fy=4200 Kg/ cm2 kg 288.59 4.00 1154.34
04.06. Concreto en Vigas F'c= 175 Kg/cm2 m3 2.04 315.00 642.80
LOSAS ALIGERADAS
04.07. Concreto en losa aligerada (fc=175 kg/cm2) m3 2.83 315.00 891.10
04.08. Encofrado y desencofrado de losa aligerada m2 26.26 19.80 519.90
04.09. Ladrillo hueco de 15x.30x.30 pza. 218.00 2.34 510.12
04.10. Acero refuerzo fy 4200 kg/cm2 kg. 225.40 4.00 901.58
ARQUITECTURA
7 MUROS Y TABIQUES DE ALBAÑILERIA
7.01 MURO LADRILLO K.K. DE ARCILLA 18 HCOS. AMARRE DE SOGA M2 54.92 42.30 2323.12
8 REVOQUES Y REVESTIMIENTOS
8.01 TARRAJEO EN INTERIORES M2 71.17 18.00 1280.99
8.02 TARRAJEO EN EXTERIORES M2 73.60 18.00 1324.73
8.04 TARRAJEO DE CIELORASO M2 26.26 18.00 472.64
8.05 VESTIDURA DE DERRAMES ML 9.15 14.40 131.76
8.06 BRUÑAS EXTERIORES ML 21.50 2.70 58.05
9 FALSO PISO
9.01 FALSO PISO DE 4" DE CONCRETO 1:10 + ACABADO PULIDO M2 29.30 27.00 791.17
10 CARPINTERIA DE MADERA
10.01 PUERTA MADERA CASETA DE CONTROL UND 1.00 315.00 315.00
10.02 PUERTA DE MADERA SSHH UND 1.00 297.00 297.00
11 VIDRIOS , CRISTALES Y SIMILARES
13.01 VENTANA PARA CASETA DE CONTROL UND 1.00 117.00 117.00
13.02 VENTANA SSHH UND 1.00 36.00 36.00
14 PINTURA 0.00
14.02 PINTURA LATEX 2 MANOS EN MUROS INTERIORES M2 64.82 6.75 437.53
14.03 PINTURA LATEX 2 MANOS EN MUROS EXTERIORES M2 73.60 6.75 496.77
14.04 PINTURA LATEX EN CIELO RASO 2 MANOS M2 32.61 6.75 220.08
15 INSTALACIONES ELECTRICAS
15.01 Salida de Centro de Luz Pto. 4.00 31.50 126.00
15.02 Salida para Tomacorriente Pto. 4.00 31.50 126.00
15.03 Salida para Interruptor Pto. 4.00 31.50 126.00
15.04 Tableros y/o Cuchillas - 12 POLOS - CUARTO DE CONTROL Und. 1.00 155.30 155.30
15.05 Tableros y/o Cuchillas - GRUPO ELECTROGENO - SIN LLAVES Und. 1.00 600.00 600.00
15.06 PUNTO ELECTRICO PARA LUMINARIA EXTERNA - SIN LAMPARA Und. 2.00 37.65 75.30
16 INSTALACIONES SANITARIAS APARATOS Y ACCESORIOS SANITARIOS
16.01 Inodoro de Losa Blanca Und. 1.00 189.00 189.00
16.02 Lavatorio de Losa Blanca Und. 1.00 108.00 108.00
17 SISTEMA DE AGUA, DESAGUE Y VENTILACION
Incluye Griferia e Instalacion
17.01 Salida de Desague PVC 2'' Pto. 2.00 31.50 63.00
17.02 Salida de Desague PVC 4'' Pto. 1.00 31.50 31.50
17.03 Salida de agua fria Pto. 3.00 31.50 94.50
17.04 Ventilacion de 2'' Und. 1.00 31.50 31.50
17.05 Caja de Registro 12''x24'' Und. 1.00 108.00 108.00
17.06 Sumidero de Bronce de 2'' Und. 1.00 16.20 16.20
17.07 Registro Cromado de 4'' Und. 1.00 22.50 22.50
18 REDES DE DISTRIBUCION
18.01 Tuberia PVC 4'' ml. 9.07 13.50 122.45
18.02 Tuberia PVC 2'' ml. 5.31 10.80 57.35
18.03 Tuberia PVC de 1/2'' ml. 11.87 12.23 145.18
18.04 Valvula de compuerta de 1/2'' Und. 1.00 45.00 45.00
MONTAJE EQUIPAMIENTO DE CAMARA DE BOMBEO AGOSTO AGOSTO
% TOTAL
ITEM DESCRIPCION UNIDAD METRADO P.UNITARIO PARCIAL 15 DIAS 31 DIAS 15 DIAS 31 DIAS
02.01.03 INSTALACIÓN DE GRUPO ELÉCTROGENO DE 50 KVA TRIFASICO EN 440/380/220 V. Eqp 1.00 1,500.00 1500.00
INSTALACION CON TECLE INTERIOR Y POLINES.
02.01.04 INSTALACIÓN DE TABLEROS DE ARRANQUE SUAVE PARA BOMBAS DE 25 HP. Eqp 2.00 239.58 479.16
02.01.05 INSTALACIÓN DE TABLERO ALTERNADO PARA 02 ELECTROBOMBAS DE 18.6 KW DE Eqp 1.00 359.37 359.37
LA CAMARA HUMEDA. COMPONENTES SCHNEIDER.
02.02. MONTAJE DE CONEXIONES ELECTRICAS SUBTERRANEAS
INSTALACION DE CAJAS DE PASE DE CONCRETO ARMADO 245KG/CM2 DE
0.6x0.6x0.80 M. Und 4.000 89.84 359.37
02.02.01
02.02.02 INSTALACIÓN DE DUCTOS DE CONCRETO de 0.25 x 0.25 x 1.0 M. Und 20.000 11.98 239.58
02.02.03 EXCAVACIÓN DE ZANJA DE 0.6 x 0.8 x 20 METROS. m3 9.600 17.97 172.50
02.02.04 RELLENO CAMA ARENA FINA. m3 1.800 11.98 21.56
INSTALACIÓN DE CONDUCTOR ELÉCTRICO PARA ALIMENTACIÓN DE TABLEROS.( DE
MURETE DE SE A TG) INCLUYE EXCAV, RELLENO Y ELIMINAC, INSTAL TUBO Y m 30.000 11.98 359.37
CABLEADO
02.02.05
INSTALACIÓN DE CONDUCTOR ELÉCTRICO PARA ALIMENTACIÓN DE BOMBAS 3-
1x70 + 1x50 MM2. INC INSTA DE KITS 3M. m 60.000 5.99 359.37
02.02.06
INSTALACIÓN DE CONDUCTOR ELÉCTRICO PARA ALIMENTACIÓN DE RADAR.
m 60.000 1.80 107.81
02.02.07
02.02.08 RELLENO LATERAL C/ARENA FINA m3 5.200 9.58 49.83
02.02.09 RELLENO SUPERIOR C/ARENA FINA m3 2.800 9.58 26.83
02.02.10 RELLENO CON MATERIAL PROPIO m3 1.200 9.58 11.50
PUESTA A TIERRA EN TABLEROS CON EQUIPOS ELECTRONICOS Y MOTRICES 05
OHMS (VARILLA DE COBRE) A TODO COSTO Und 2.000 765.00 1530.00
02.02.11
02.02.12 MEGHADO Y PROTOCOLO DE PUESTAS A TIERRA Und 2.000 135.00 270.00
02.03. MONTAJE DE INSTALACIONES ELECTRICAS DE INTERIORES
02.03.01 SALIDA p/CENTRO LUZ DE CASETAS pto 9.00 31.5 283.50
02.03.02 LAMPARAS Y LUMINARIAS AHORRADORAS pto 9.00 31.5 283.50
02.03.03 SALIDA p/TOMACORRIENTE BIPOLAR DOBLE c/PUESTA A TIERRA pto 8.00 31.5 252.00
02.03.04 SALIDA p/INTERRUPTOR BIPOLAR DOBLE pto 1.00 31.5 31.50
02.03.05 SALIDA p/INTERRUPTOR SIMPLE pto 5.00 31.5 157.50
INSTALACIÓN DE TABLERO PRINCIPAL METALICO 3 CIRCUITOS/TERMOM CON
DIFERENCIAL Und 1.00 135.00 135.00
02.03.06
PRESUPUESTO MEJORAMIENTO - POZO TUBULAR AGOSTO AGOSTO
% TOTAL
ITEM DESCRIPCION UNIDAD METRADO P.UNITARIO PARCIAL 15 DIAS 31 DIAS 15 DIAS 31 DIAS
01 PERFORACION DE POZO
01.01 ANTEPOZO D1 = 1.00, 5.00 PP m3 4.00 56.00 224.00
01.02 PREPARACIÓN DE ACCESO, TRANSPORTE E INSTALACIÓN DE MAQUINARIA DE glb
PERFORACIÓN, HERRAMIENTAS. 1.00 56,000.00 56,000.00
01.03 PERFORACIÓN CON DIÁMETROS DE 21'' DE 0 A 31.20M. m 31.20 2,000.00 62,400.00
01.04 ENTUBADO CON TUBERÍA DE 21'' DE Æ POR ¼ DE 0 A 36M Y RECUPERACIÓN DE 0 m
A 31.20M. 31.20 882.00 27,518.40
01.05 PERFORACIÓN CON DIÁMETRO DE 18'' DE 31.20 A 75M. m 43.80 675.00 29,565.00
01.06 ENTUBADO Y RECUPERACION DE TUBERIA HERRAMIENTA DE 18’’ DE 0 A 64.40m. m
64.40 342.00 22,024.80
01.07 SUMINISTRO E INSTALACIÓN DE TUBERÍA CIEGA DE ACERO B.C. DEFINITIVA DE 15'' m
DE DIÁMETRO POR ¼ DE ESPESOR. 53.40 612.00 32,680.80
01.08 SUMINISTRO E INSTALACIÓN DE FILTROS DE ACERO INOXIDABLE DE 15'' DE m
DIÁMETRO CON ABERTURA DE 1.5ML. TIPO PUENTE TRAPEZOIDAL. 21.60 2,134.00 46,094.40
01.09 SUMINISTRO E INSTALACIÓN DE GRAVA REDONDEADA SELECCIONADA m3
REFERENCIAL DE ¼'' A 3/8'', LIMPIA SIN RESTOS ORGÁNICOS. 22.00 341.40 7,510.83
01.10 PRUEBAS DE VERTICALIDAD Y ALINEAMIENTO DEL POZO. und 2.00 1,437.48 2,874.96
01.11 PROVISIÓN Y APLICACIÓN DE TRIPOLIFOSFATO DE SODIO. kg 100.00 21.56 2,156.22
01.12 DESARROLLO DE POZO POR EL SISTEMA DE PISTONEO MECÁNICO. h 48.00 225.00 10,800.00
01.13 TRANSPORTE E INSTALACIÓN DEL EQUIPO DE BOMBEO glb 1.00 4,192.65 4,192.65
01.14 PRUEBA DE RENDIMIENTO POR BOMBEO AFORO. h 72.00 216.00 15,552.00
01.15 ANÁLISIS FÍSICO-QUÍMICO Y BACTERIOLÓGICO DEL AGUA. und 2.00 539.06 1,078.11
01.16 DESMONTAJE DEL EQUIPO DE BOMBEO Y TRANSPORTE. glb 1.00 3,593.70 3,593.70
01.17 CONSTRUCCIÓN DE SELLO SANITARIO DE CONCRETO ARMADO SEGÚN DISEÑO Y glb
TAPA METÁLICA. 1.00 898.43 898.43
01.18 LIMPIEZA, NIVELACIÓN Y ELIMINACIÓN DE DESMONTE PRODUCTO DE LA glb
PERFORACIÓN 1.00 1,497.38 1,497.38
2 ELECTRIFICACION DE POZO TUBULAR
2.01 SUMINISTRO DEMATERIALES und 1.00 88,906.00 88,906.00
2.02 MONTAJE ELECTROMECANICO glb 1.00 56,000.00 56,000.00
PREUPUESTO EQUIPAMIENTO - POZO TUBULAR AGOSTO AGOSTO
% TOTAL
ITEM DESCRIPCION UNIDAD METRADO P.UNITARIO PARCIAL 15 DIAS 31 DIAS 15 DIAS 31 DIAS
01 OBRAS PROVISIONALES
01.05 TRASLADO MAQ/EQUIP. MATERIALES Y HERRAMIENTAS A OBRA vje 1.00 7,890.00 7,890.00
02 SEÑALIZACION DE TRANSITO
02.02 SEÑALIZACION NOCTURNA día 60.00 46.71 2,802.37
03 SUMINISTRO E INSTALACION DE ELECTROBOMBA, ARBOL DE SALIDA,
INSTRUMENTACION Y QUIPO DE CLORACION
03.01 ELECTROBOMBA SUMEGIBLE 65 HP
03.01.01 SUMINISTRO DE ELECTROBOMBA SUMERGIBLE DE 65.0 HP, 380 VOLTIOS, 60 HZ. und
1.00 85,674.00 85,674.00
03.01.02 CABLE PARA BOMBA SUMERGIBLE 2/0 INC. EMPALMES Y SENSOR DE ELECTRODOS m
80.00 101.82 8,145.72
03.01.04 MONTAJE DE EQUIPO DE BOMBEO und 1.00 6,218.00 6,218.00
03.02 COLUMNA Y ARBOL DE SALIDA
03.02.01 TUBO DE ACERO SCHEDULE 40 DE 6"Ø X 3.0 MTS. ROSCADO EN AMBOS pza
EXTREMOS. ROSCA PARALELA CON 8 HILOS/PULG. 25.00 890.00 22,250.00
03.02.02 UNIÓN SCHEDULE 40 ROSCADA DE 6" CON 8 HILOS/PULG. pza 25.00 280.00 7,000.00
03.02.03 CODO DE 6"Ø X 90º BRIDADO pza 1.00 382.96 382.96
03.02.04 CODO DE 6"Ø X 45º BRIDADO pza 2.00 384.95 769.89
03.02.05 UNION FLEXIBLE DRESSER FE. MAXIRAM DE 6"Ø 250 LBS pza 1.00 260.82 260.82
03.02.06 VÁLVULA CHECK SWING DE 6"Ø BRIDADA KTZ 125 PSI pza 1.00 1,350.00 1,350.00
03.02.07 VÁLVULA COMPUERTA OS&Y DE FE. 6"Ø BRIDADA 125PSI pza 1.00 1,440.00 1,440.00
03.02.08 TEE DE 6"Ø X 4"Ø FE pza 3.00 131.03 393.08
03.02.09 TEE de 4"Ø x 4"Ø Fe pza 1.00 48.28 48.28
03.02.10 CODO DE 4"Ø X 90º BRIDADO pza 2.00 243.76 487.52
03.02.11 UNION FLEXIBLE DRESSER FE. MAXIRAM DE 4"Ø 250 LBS pza 1.00 162.84 162.84
03.02.12 VÁLVULA COMPUERTA OS&Y DE FE. 4"Ø BRIDADA 125PSI pza 2.00 720.00 1,440.00
03.02.13 PERNOS ZINCADO DE 5/8" X 3 " pza 130.00 1.98 256.95
03.02.14 PERNOS ZINCADO DE 5/8" X 2 1/2" pza 90.00 2.25 202.68
03.02.15 EMPAQUETADURA DE JEBE ENLONADO 1/4" m 4.00 160.91 643.66
03.02.16 BRIDAS DE FE. DE 6"Ø pza 20.00 84.50 1,690.00
03.02.17 BRIDAS DE FE. DE 4"Ø pza 15.00 52.50 787.56
03.02.18 VÁLVULA DE AIRE DE 1"Ø pza 1.00 1,437.48 1,437.48
03.02.19 LLAVE ESFERICA DE 1" pza 2.00 59.90 119.79
03.02.20 TUBO FE. GALV. DE 1"Ø X 6.0 MTS pza 3.00 112.10 336.30
03.02.21 CODO DE FE. GALV. DE 1" X 90º pza 5.00 2.73 13.66
03.02.22 MONTAJE DE COLUMNA Y ARBOL DE SALIDA DE ELECTROBOMBA SUMERGIBLE und 1.00 5,800.00 5,800.00
03.03 INSTRUMENTACION
03.03.01 MACROMEDIDOR DE 6"Ø pza 1.00 22,000.00 22,000.00
03.03.02 TRANSMISOR DE PRESION pza 1.00 4,950.00 4,950.00
03.03.03 MONTAJE Y PROGRAMACION DE EQUIPOS und 1.00 623.15 623.15
03.04 EQUIPO DE CLORACION
03.04.01 SISTEMA DE CLORACION PARA OPERACION AL VACIO CON DISPOS. DE CAMBIO glb
AUTOMATICO 1.00 4,860.00 4,860.00
03.04.02 CILINDRO DE ACERO ALEADO, C/ TRATAMIENTO TERMICO SIN COSTURA, PARA 68 und
kg. CLORO GAS INCLUYE CARGA 2.00 2,790.00 5,580.00
03.04.03 ELECTROBOMBA TIPO BOOSTER, CENTRIFUGA HORIZONTAL DE 2.0 HP, TRIFASICA, und
220V / 60HZ 1.00 4,072.86 4,072.86
03.04.04 BALANZA TIPO PLATAFORMA CON MECANICA und 1.00 1,042.17 1,042.17
03.04.05 ACCESORIOS DE INSTALACION STANDAR glb 1.00 2,210.13 2,210.13
03.04.06 COMPARADOR COLORIMETRICO PORTATIL, REACTIVO DPD EN POLVO. und 1.00 395.31 395.31
03.04.07 MATERIALES PARA INSTALACIÓN EQUIPO CLORACIÓN glb 1.00 1,197.90 1,197.90
03.04.08 MONTAJE EQUIPO CLORACION Y ACCESORIOS und 1.00 2,581.01 2,581.01
03.04.09 PRUEBAS DE OPERACION Y PRUEBAS DE OPERATIVIDAD DE SERVICIO DE und
ELECTROBOMBA SUMERGIBLE 1.00 310.56 310.56
04 SUMINISTRO E INSTALACION DE TABLERO ELECTRICO
04.01 SUMINISTRO DE TABLERO ELECTRICO DE 65 HP 380 VOLTIOS, 60 HZ und 1.00 46,578.00 46,578.00
04.02 TRASLADO DE TABLERO ELECTRICO NUEVO A INSTALACIONES DEL POZO und 1.00 242.28 242.28
04.03 MONTAJE DE TABLERO ELECTRICO NUEVO 65 HP und 1.00 1,323.90 1,323.90
04.04 PRUEBAS DE OPERACION Y PRUEBAS DE OPERATIVIDAD DE SERVICIO und 1.00 818.72 818.72
05 AUTOMATIZACION DE EQUIPOS ELECTROMECANICOS
05.01 SUMINISTRO DE EQUIPOS DE AUTOMATIZACION PARA POZO und 1.00 67,000.00 67,000.00
05.02 INSTALACION DE EQUIPOS DE AUTOMATIZACION Y PRUEBAS und 1.00 7,890.00 7,890.00
PRESUPUESTO CASETA - POZO TUBULAR AGOSTO AGOSTO
% TOTAL
ITEM DESCRIPCION UNIDAD METRADO P.UNITARIO PARCIAL 15 DIAS 31 DIAS 15 DIAS 31 DIAS
01 OBRAS PRELIMINARES
01.01 TRAZO Y REPLANTEO km 60.00 0.55 32.94
02 MOVIMIENTO DE TIERRAS
02.01 EXCAVACION DE ZANJAS PARA CIMIENTOS m3 7.63 10.80 82.40
02.02 EXCAVACION DE ZANJAS PARA ESTRUCTURAS m3 9.57 10.80 103.36
02.03 RELLENO DE ZANJAS CON MATERIAL PROPIO m3 3.61 11.70 42.24
02.05 ELIMINACION MATERIAL EXCEDENTE m3 17.67 10.80 190.84
03 CONCRETO SIMPLE
03.01 SOLADOS CONCRETO f'c=100 kg/cm2 h=2" m2 8.32 32.40 269.57
03.02 CONCRETO 1:10+25% PM PARA CIMIENTOS CORRIDOS m3 5.72 189.00 1,081.08
03.03 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS m3 2.88 225.00 648.00
03.04 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO m2 23.00 19.80 455.40
03.05 FASLO PISO E=10CM m2 52.39 19.80 1,037.32
03.06 CONCRETO f'c=175 kg/cm2 PARA ANCLAJES Y/O DADOS m3 0.38 315.00 119.70
03.07 ENCOFRADO Y DESENCOFRADO PARA ANCLAJES Y/O DADOS DE ACCESORIOS m2
3.00 19.80 59.40
04 CONCRETO ARMADO
04.01 ZAPATAS
04.01.01 CONCRETO f'c=210 kg/cm2 PARA ZAPATAS m3 4.16 351.00 1,460.16
04.01.02 ACERO ESTRUCTURAL TRABAJADO PARA ZAPATAS kg 121.39 3.42 415.15
04.02 VIGA DE CIMENTACION
04.02.01 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 3.23 351.00 1,133.73
04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 25.88 22.50 582.30
04.02.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS CIMENTACION kg 636.85 3.42 2,178.03
04.03 COLUMNAS
04.03.01 CONCRETO f'c=210 kg/cm2 PARA COLUMNAS m3 1.33 351.00 466.83
04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 17.28 22.50 388.80
04.03.03 ACERO ESTRUCTURAL TRABAJADO PARA COLUMNAS kg 257.44 3.42 880.44
04.04 VIGAS
04.04.01 CONCRETO EN VIGAS f'c=210 kg/cm2 m3 4.07 351.00 1,428.57
04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 18.02 22.50 405.45
04.04.03 ACERO ESTRUCTURAL TRABAJADO PARA VIGAS kg 653.65 3.42 2,235.48
04.05 LOSAS ALIGERADAS
04.05.01 CONCRETO f'c=210 kg/cm2 PARA LOSAS ALIGERADAS m3 4.96 351.00 1,740.96
04.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS m2 59.48 22.50 1,338.30
04.05.03 ACERO ESTRUCTURAL TRABAJADO PARA LOSAS ALIGERADAS kg 400.16 3.42 1,368.55
04.05.04 LADRILLO DE ARCILLA HUECO 15X30X30 cm PROVEIDO Y COLOCADO und 472.08 2.34 1,104.67
05 MAMPOSTERIA
05.01 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-ARENA m2 77.90 42.30 3,295.17
06 TARRAJEOS Y VESTIDURAS
06.01 TARRAJEO EN INTERIORES ACABADO CON CEMENTO-ARENA m2 86.13 18.00 1,550.34
06.02 TARRAJEO EN EXTERIORES m2 79.65 18.00 1,433.70
06.03 TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-ARENA m2 22.18 18.00 399.24
06.04 VESTIDURA DE DERRAMES EN PUERTAS m 0.63 13.50 8.51
06.05 CIELO RASO INCLUYE VIGAS EMPOTRADAS CON MORTERO 1:4 X 1.5 cm m2 59.48 21.00 1,249.08
06.06 TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA m2 0.95 18.00 17.10
07 PISOS Y CONTRAPISOS
07.01 PISO CE CEMENTO FROTACHADO m2 52.88 27.00 1,427.76
08 PINTURAS
08.01 PINTURA LATEX EN MUROS INTERIORES 2 MANOS m2 86.13 6.75 581.38
08.02 PINTURA LATEX EN MUROS EXTERIORES 2 MANOS m2 79.65 6.75 537.64
09 CARPINTERIA METALICA
09.01 PORTON METALICO 2.60x2.50 M und 1.00 5,000.00 5,000.00
09.02 TAPA METALICA TECHO D=1.70M E=1/16" und 1.00 495.00 495.00
10 INSTALACIONES ELECTRICAS
10.01 PUNTO DE LUZ pto 6.00 72.00 432.00
10.02 TOMACORRIENTES pto 2.00 72.00 144.00
10.03 TABLERO DE DISTRIBUCION, CON TRES LLAVES TERMICAS und 1.00 568.00 568.00
PRESUPUESTO LINEA DE IMPULSION - AGUA POTABLE AGOSTO AGOSTO
% TOTAL
ITEM DESCRIPCION UNIDAD METRADO P.UNITARIO PARCIAL 15 DIAS 31 DIAS 15 DIAS 31 DIAS
01 SEÑALIZACION
01.05 SEÑALIZACION NOCTURNA día 10.00 150.00 1,500.00
02 TRABAJOS PRELIMINARES
02.01 TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO m 44.05 0.55 24.18
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION /MAQ. T. ARENOSO HASTA 2.00MPP m 44.05 17.10 753.26
03.02 REFINE Y NIVELACION DE TUBOS OBRA m 44.05 5.00 220.25
03.03 RELLENO COMP. ZANJA C/EQUIPO T. ARENOSO HASTA 2.00MPP m 44.05 18.87 831.09
03.04 ENTIBADO Y DESENTIBADO DE ZANJA m2 20.00 27.00 540.00
03.05 ELIMINACIÓN DE DESMONTE C/C T.N.P/TUB DN 200MM m 10.00 10.80 108.00
04 SUMINISTRO E INSTALACION DE TUBERÍA PVC
04.01 TUBERIA PVC DN200MM INC. ANILLOS. m 498.00 117.00 58,266.00
04.02 INSTALACION TUBERIA PVC DN200MM. m 498.00 15.81 7,874.52
04.03 PRUEBA HIDR/DESINF DE TUBERIA PVC DN200MM. m 498.00 2.26 1,127.49
04.04 EMPALME A TUBERIA INCLUYE ACCESORIOS DIVERSOS und 1.00 24,567.00 24,567.00
05 SUMINISTRO E INSTALACION DE ACCESORIOS PVC
05.01 CODO PVC 90° P/TUB.PVC C-7.5 DN200 INYECTADO INC. ANILLOS und 4.00 552.35 2,209.41
05.02 REDUCCION PVC DN200x150MM INC.ANILLOS und 1.00 126.86 126.86
05.03 TEE PVC DN200x150 MM INC.ANILLOS und 1.00 751.39 751.39
05.04 INSTALACION DE ACCESORIOS PVC DN (200-250)mm. und 4.00 102.35 409.39
06 ESTACION DE CONTROL EN CAPTACION DE AGUA POTABLE
06.01 CAJA DE CA. F'c=210 KG/CM2 DE 2.50x2.00x2.00 M und 1.00 4,775.75 4,775.75
06.02 VALVULA COMP HFD BB DN200 INC.ACCESORIOS und 2.00 3,431.98 6,863.97
06.03 VALVULA REGULADORA DE CAUDAL Y PRESION DN 200 MM BB INC. ACCESORIOS und
1.00 20,535.56 20,535.56
06.04 ACOPLAMIENTOS HFD DN200 INC.ACCESORIOS und 1.00 3,042.67 3,042.67
06.05 INSTALACION DE ACOPLAMIENTOS Y CESORIOS BRIDADOS HFD DN (200-350) und 4.00 89.56 358.22
06.06 INSTALACION DE VALVULAS BB HFD DN (200-250) und 2.00 130.24 260.47
06.07 INSTALACION DE VALVULAS SOST PRES Y LIMIT CAUD HFD DN (200-300) BB und 1.00 271.62 271.62
06.08 MEDIDOR ULTRA SONIDO DE UN CANAL und 1.00 22,696.08 22,696.08
06.09 MANOMETRO (0-300)PSI INCLUYE ACCESORIOS und 2.00 197.65 395.31
06.10 VALVULA DE AIRE H.D. DOBLE EFECTO DN50MM und 1.00 2,041.10 2,041.10
06.11 INSTALACION DE VALVULAS DE AIRE DN(50-100)MM und 1.00 74.55 74.55
06.12 INSTALACION DE MEDIDOR ULTRASONIDO CON UN CANAL INCLUYE und 1.00 147.51 147.51
06.13 INSTALACION DE MANOMETROS und 2.00 24.64 49.28
07 ESTACION DE MICROSECTORES
07.01 CAJA DE CA. F'c=210 KG/CM2 DE 1.50x2.50x2.00 M und 2.00 3,577.50 7,155.00
07.02 VALVULA MARIPOSA BB DN150 PN10 und 2.00 3,048.66 6,097.31
07.03 VALVULA REGULADORA MODELO 7PM DN150 PN10 BB und 2.00 10,900.00 21,800.00
07.04 VALVULA DE AIRE DOBLE FUNCION DN 1" und 2.00 778.64 1,557.27
07.05 MEDIDOR DN150 CON PULSO PARA LECTURA REMOTA (ULTRASONIDO DOS und
CANALES) 2.00 18,900.00 37,800.00
07.06 ACOPLAMIENTO DN150 und 2.00 1,511.75 3,023.50
07.07 MANOMETRO (0-300)PSI INCLUYE ACCESORIOS und 2.00 197.65 395.31
07.08 INSTALACION DE VALVULA MARIPOSA DN150 BB und 2.00 25.80 51.61
07.09 INSTALACION DE VALVULA REGULADORA DN150 und 2.00 57.71 115.43
07.10 INSTALACION DE ACOPLAMIENTOS DN150 und 2.00 14.15 28.29
07.11 INSTALACION VALVULA DE AIRE DOBLE FUNCION DE 1" INC. ACCESORIOS und 2.00 44.73 89.46
07.12 INSTALACION DE MEDIDOR ULTRASONIDO DOS CANALES und 2.00 147.51 295.02
07.13 INSTALACION DE MANOMETROS und 2.00 24.64 49.28
08 OBRAS DE CONCRETO
08.01 DADOS DE CONCRETO F'c=140 KG/CM2 P/AACESORIOS DN(200-250) und 3.00 82.70 248.11
PRESUPUESTO LINEA DE ADUCCION - AGUA POTABLE AGOSTO AGOSTO
% TOTAL
ITEM DESCRIPCION UNIDAD METRADO P.UNITARIO PARCIAL 15 DIAS 31 DIAS 15 DIAS 31 DIAS
01 SEÑALIZACION
01.03 SEÑALIZACION NOCTURNA día 10.00 80.64 806.43
02 TRABAJOS PRELIMINARES
02.01 TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO m 35.48 0.55 19.48
03 MOVIMIENTO DE TIERRAS
03.01 EXCAVACION DE ZANJAS C/EQ.T.ARENA HASTA 1.50MPP m 35.48 17.10 606.71
03.02 REFINE DE ZANJA Y NIVELACION DE TUBOS m 35.48 1.08 38.32
03.03 RELLENO COMP. ZANJA T. ARENOSO HASTA 1.50MPP m 35.48 11.70 415.12
03.04 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM m3 15.00 10.80 162.00
04 SUMINITRO E INSTALACION DE TUBERIA PVC ISO 4422
04.01 TUBERIA PVC AGUA C-7.5 UF DN160 INC.ANILLOS m 35.48 60.00 2,128.80
04.02 INSTALACION TUBERIA PVC UF DN (160) m 35.48 4.38 155.56
04.03 PRUEBA HIDR.+DESINF.DE TUBERIA DN160 A ZANJA TAPADA m 35.48 2.35 83.30
05 SUMINISTRO E INSTALACION DE ACCESORIOS
05.01 CODO PVC 90° P/TUB.PVC C-7.5 DN160 INYECTADO INC. ANILLOS und 1.00 219.68 219.68
05.02 TEE PVC DN160x110 MM INC.ANILLOS und 1.00 539.06 539.06
05.03 REDUCCION PVC DN160x110MM INC.ANILLOS und 1.00 105.65 105.65
05.04 VALVULA COMP. HFD UF DN160 INC.ANILLOS und 2.00 773.36 1,546.73
05.05 INSTALACION DE VALVULA COMP. DN(160)MM und 2.00 66.68 133.35
05.06 INSTALACION DE ACCESORIOS PVC DN (160)mm. und 4.00 37.36 149.45
06 OBRAS DE CONCRETO SIMPLE
06.01 DADOS DE ANCLAJE P/ACCES.DN(160)mm und 2.00 83.70 167.39
LINEA IMPULSION AGUA RESIDUAL AGOSTO AGOSTO
% TOTAL
ITEM DESCRIPCION UNIDAD METRADO P.UNITARIO PARCIAL 15 DIAS 31 DIAS 15 DIAS 31 DIAS
02 SEÑALIZACION
02.03 SEÑALIZACION NOCTURNA día 30.00 100.00 3,000.00
03 TRABAJOS PRELIMINARES
03.01 TRAZOS Y REPLANTEOS INICIALES DEL PROYECTO m 1,942.90 3.00 5,828.70
04 MOVIMIENTO DE TIERRAS
04.01 REFINE Y NIVELACION DE TUBOS EN OBRA m 1,942.90 1.08 2,098.33
04.02 EXCAVACION C/EQUIP. T. ARENA HASTA 3.00MPP m3 3,885.80 17.10 66,447.18
04.03 ELIMINACION MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM m3 800.00 10.80 8,640.00
05 INSTALACION DE TUBOS IMPULSION
05.01 INSTALACION TUBO PVC UF DN 250 MM m 1,930.90 45.00 86,890.50
05.02 PRUEBA HIDR/DE TUBERIA PVC C-10 UF DN250MM. m 1,930.90 5.00 9,654.50
05.03 EMPALME A BUZON Y/O RED EXISTENTE und 1.00 400.00 400.00
05.04 SUMINISTRO E INSTALACION DE ACCESORIOS PVC INYECTADOS glb 1.00 34,545.00 34,545.00
06 BUZON ROMPE PRESION
06.01 BUZON Di=1.20m x 3.50 MPP und 1.00 3,450.00 3,450.00
07 SUMINISTRO TUBOS COLECTOR
07.01 SUMINISTRO TUBO PVC S20 UF DN250mm m 12.00 81.33 975.91
08 PAVIMENTACION
08.01 PREPARACION DE LA SUB-RASANTE m2 21.86 4.07 89.03
08.02 SUB BASE E=0.10 M. (HORMIGON) m2 21.86 6.44 140.88
08.03 BASE CON AFIRMADO e=0.20m m2 21.86 12.05 263.43
08.04 BARRIDO Y LIMPIEZA P/CARPETA ASFALTICA m2 21.86 1.98 43.21
08.05 IMPRIMACION ASFALTICA m2 21.86 34.52 754.68
08.06 CARPETA ASFALTICA EMULSIFICADO m2 21.86 43.18 944.01
08.07 SLURRY SEAL, e=10 mm m2 21.86 45.00 983.70
CONTROL DE AVANCE
PROYECTADO
VALORIZACION QUINCENAL Fecha
MONTO S/.
CONTROL DE AVANCE
PROYECTADO REAL
% %
% DE EJECUCIÓN % DE
ACUMULAD MONTO S/. ACUMULAD
PROGRAMADA EJECUCIÓN
O O
1.41% 1.41% 346,845.74 2.56% 2.56%
3.06% 4.47%
5.01% 9.48%
120.00%
6.24% 15.72%
100.00%
5.52% 21.24%
80.00%
10.63% 31.87%
60.00%
8.71% 40.58% 40.00%
10.22% 50.79% 20.00%
6.85% 57.65% 0.00%
5.49% 63.14%
4.39% 67.53%
4.64% 72.17%
2.77% 74.95%
1.73% 76.67%
1.71% 78.38%
0.84% 79.23%
4.41% 83.64%
3.55% 87.19%
6.45% 93.65%
6.36% 100.00%
13,535,439.10
CURVA "S"
120.00%
100.00%
80.00%
60.00%
40.00%
20.00%
0.00%
PROYECTADO REAL