CRONOGRAMA VALORIZADO DE EJECUCIÓ

ITEM DESCRIPCION UND

A ESTRUCTURAS
01 OBRAS PROVISIONALES
01.01 CONSTRUCCION PROVISIONAL DE CAMPAMENTO GLB
01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und
02 TRABAJOS PRELIMINARES
02.01 TRAZO Y REPLANTEO m2
02.02 LIMPIEZA DE TERRENO MANUAL m2
03 SEGURIDAD Y SALUD EN OBRA
03.01 EQUIPOS DE PROTECCIÓN INDIVIDUAL und
03.02 EQUIPOS DE PROTECCIÓN COLECTIVA GLB
03.03 SEÑALIZACION TEMPORAL DE SEGURIDAD GLB
03.04 CAPACITACIÓN EN SEGURIDAD Y SALUD GLB
04 MOVIMIENTO DE TIERRAS
04.01 MODULO 01: COCINA, COMEDOR, DEPOSITO
04.01.01 EXCAVACION DE ZANJA PARA ZAPATAS EN TERRENO NORMAL m3
04.01.02 EXCAVACION DE ZANJA PARA CIMIENTOS CORRIDO EN TERRENO NORMAL m3
04.01.03 RELLENO CON MATERIAL PROPIO m3
04.01.04 AFIRMADO DE 4" EXTENDIDO Y COMPACTADO m2
04.01.05 ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA m3
04.02 VEREDAS
04.02.01 CORTE A NIVEL DE SUBRASANTE PARA CONFORMACION DE VEREDAS m3
04.02.02 NIVELACION Y COMPACTACION DE SUB RAZANTE C/EQUIPO m2
04.02.03 AFIRMADO DE 4" EXTENDIDO Y COMPACTADO m2
04.02.04 ELIMINACION MATERIAL EXCEDENTE CON TRANSPORTE m3
05 CONCRETO SIMPLE
05.01 MODULO 01: COCINA, COMEDOR, DEPOSITO
05.01.01 SOLADO PARA ZAPATAS E=6", CON MEZCLA 1:12 m2
05.01.02 CIMIENTOS CORRIDOS MEZCLA 1:10 + 30% P.G m3
05.01.03 FALSO PISO DE 4" DE CONCRETO 1:8 m2
05.02 VEREDAS
05.02.01 CONCRETO PARA VEREDAS f´c=140kg/cm2 m2
05.02.02 ENCOFRADO Y DESENCOFRADO DE VEREDAS m2
06 CONCRETO ARMADO
06.01 MODULO 01: COCINA, COMEDOR, DEPOSITO
06.01.01 ZAPATAS
06.01.01.01 CONCRETO F'C= 210 KG/CM2. EN ZAPATAS m3
06.01.01.02 ACERO DE REFUERZO FY=4200 KG/CM2 kg
CRONOGRAMA VALORIZADO DE EJECUCIÓ

ITEM DESCRIPCION UND

06.01.02 VIGA DE CIMENTACION


06.01.02.01 CONCRETO F'C= 210 KG/CM2. EN VIGA DE CIMENTACION m3
06.01.02.02 ACERO DE REFUERZO FY=4200 KG/CM2 kg
06.01.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGA DE CIMENTACIÓN m2
06.01.03 SOBRECIMIENTO ARMADO
06.01.03.01 CONCRETO F'C=175 KG/CM2 PARA SOBRECIMIENTOS REFORZADOS m3
06.01.03.02 ACERO DE REFUERZO FY=4200 KG/CM2 kg
06.01.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2
06.01.04 COLUMNAS
06.01.04.01 CONCRETO F'C=210 KG/CM2. PARA COLUMNAS m3
06.01.04.02 CONCRETO F'C=175 KG/CM2 PARA COLUMNAS m3
06.01.04.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg
06.01.04.04 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2
06.01.05 VIGAS
06.01.05.01 CONCRETO F'C=210 KG/CM2. PARA VIGAS m3
06.01.05.02 CONCRETO F'C=175 KG/CM2. PARA VIGAS m3
06.01.05.03 ACERO DE REFUERZO FY=4200 KG/CM2 kg
06.01.05.04 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2
07 ESTRUCTURA DE MADERA
07.01 MODULO 01: COCINA, COMEDOR, DEPOSITO
07.01.01 TIJERAL DE MADERA L=10.10 M, S= 32% und
07.01.02 FIJACION DE TIJERAL A VIGA DE CºAº und
07.01.03 VIGA DE REFUERZO DE 4"X4" m
07.01.04 FIJACION DE VIGA DE REFUERZO A VIGA DE CºAº und
07.01.05 FIJACION DE VIGA REFUERZO A TIJERAL und
08 JUNTAS
08.01 MODULO 01: COCINA, COMEDOR, DEPOSITO
08.01.01 JUNTA DE CONSTRUCCION CON TEKNOPORT ML
B ARQUITECTURA
01 ALBAÑILERIA
01.01 MODULO 01: COCINA, COMEDOR, DEPOSITO
01.01.01 MURO DE LADRILLO KK DE ARCILLA - CABEZA 9X13X24 CM. 1:5 X 1.5 CM m2
01.01.02 MURO DE LADRILLO KK DE ARCILLA - SOGA 9X13X24 CM. 1:5 X 1.5 CM m2
02 REVOQUES ENLUCIDOS Y MOLDURAS
02.01 MODULO 01: COCINA, COMEDOR, DEPOSITO
02.01.01 TARRAJEO INTERIOR Y EXTERIOR C/MORTERO 1:5 X1.5 CM.(INC.COLUMNAS Y VIGAS) m2
02.01.02 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANOS. m
CRONOGRAMA VALORIZADO DE EJECUCIÓ

ITEM DESCRIPCION UND

02.01.03 EJECUCION DE BRUÑA EN MUROS m


03 PISOS
03.01 MODULO 01: COCINA, COMEDOR, DEPOSITO
03.01.01 CONTRAPISO DE 35 MM m2
03.01.02 PISO DE CEMENTO PULIDO COLOREADO Y BRUÑADO m2
04 ZOCALOS Y CONTRAZOCALOS
04.01 MODULO 01: COCINA, COMEDOR, DEPOSITO
04.01.01 CONTRAZOCALO DE CEMENTO C/MORTERO 1:5, DE E=1.5 CM, H = 10 CM m
04.01.02 CONTRAZOCALO DE CEMENTO C/MORTERO 1:5, DE E=2.00 CM, H = 20 CM m
05 CARPINTERIA DE MADERA
05.01 MODULO 01: COCINA, COMEDOR, DEPOSITO
05.01.01 PUERTA DE MADERA TABLEROS REBAJADOS DE 4 .5 MM DE CEDRO m2
05.01.02 VENTANA DE MADERA CON HOJAS DE CEDRO m2
05.01.03 PUERTA CONTRAPLACADA DE 35 MM TRIPLAY m2
06 CERRAJERIA
06.01 MODULO 01: COCINA, COMEDOR, DEPOSITO
06.01.01 BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" pza
06.01.02 CERRADURA FORTE DE 2 GOLPES pza
07 COBERTURA
07.01 MODULO 01: COCINA, COMEDOR, DEPOSITO
07.01.01 SUMINISTRO Y COLOCACION DE ETERNIT GRIS GRAN ONDA m2
07.01.02 CORREAS DE MADERA DE 3"X2" m
08 FALSO TECHO
08.01 MODULO 01: COCINA, COMEDOR, DEPOSITO
08.01.01 FALSO TECHO m2
09 VIDRIOS, CRISTALES Y SIMILARES
MODULO 01: COCINA, COMEDOR, DEPOSITO
09.01
09.01.01 VIDRIO SEMIDOBLE. INCOLORO CRUDO p2
10 PINTURA
10.01 MODULO 01: COCINA, COMEDOR, DEPOSITO
10.01.01 PINTURA VINILICA EN CIELORRASO Y ALERO 2 MANOS m2
10.01.02 PINTURA VINILICA EN INTERIOR Y EXTERIOR 2 MANOS m2
10.01.03 PINTURA EN PUERTAS C/BARNIZ 2 MANOS m2
10.01.04 PINTURA EN VENTANAS C/BARNIZ 2 MANOS m2
10.01.05 PINTURA ESMALTE EN CONTRAZOCALOS (02 MANOS) + 02 MANOS DE CAPA BASE m2
11 CONTROL DE CALIDAD
11.01 DISEÑO DE MEZCLAS und
CRONOGRAMA VALORIZADO DE EJECUCIÓ

ITEM DESCRIPCION UND

11.02 PRUEBA DE CALIDAD DEL CONCRETO (PRUEBA A LA COMPRESION) und


11.03 PRUEBA PROCTOR STANDARD und
11.04 PRUEBA COMPACTACION DENSIDAD CAMPO und
C INSTALACIONES ELECTRICAS
01 MODULO 01: COCINA, COMEDOR, DEPOSITO
01.01 TABLEROS DISTRIBUCION CAJA METALICA CON 4 CIRCUITOS pza
01.02 CAJA DE PASE DE 100 X 150 MM pto
01.03 SALIDA DE TECHO C/CABLE AWG TW 2.5MM(14)+D PVC SAP 19MM(3/4) pto
01.04 SALIDA TOMACORRIENTE C/AWG TW 4MM(12)+D PVC SEL 19MM(3/4) pto
01.05 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A pza
01.06 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 20A pza
01.07 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 15A pza
01.08 FLUORESCENTE RECTO ISPE 2 X 30 W INCLUYENDO EQUIPO Y PANTALL und
01.09 FLUORESCENTE CIRCULAR 32 W. und
D INSTALACIONES SANITARIAS
01 RED EXTERIOR
01.01 SISTEMA DE DESAGUE
01.01.01 RED DE DERIVACION PVC SAL PARA DESAGUE DE 4" m
01.01.02 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza
01.02 SISTEMA DE AGUA FRIA
01.02.01 TUBERIA PVC SAP CLASE 10 D=3/4" ROSCADA m
01.03 DRENAJE PLUVIAL
01.03.01 CANALALETA DE Fº GALVANIZADO D=3" m
01.03.02 TUBERIA DE DESAGUE DE PVC SAL 3" m
02 RED INTERIOR
02.01 SISTEMA DE DESAGUE
02.01.01 SALIDA DE PVC SAL PARA DESAGUE DE 2'' pto
02.01.02 SALIDA DE PVC SAL PARA VENTILACION DE 2" pto
02.01.03 SUMIDERO DE BRONCE 2", PROVISION Y COLOCACION und
02.01.04 REGISTRO DE BRONCE CROMADO 2" und
02.02 SALIDA DE AGUA FRIA
02.02.01 VALVULA DE COMPUERTA 3/4" und
02.02.02 TUBERIA PVC SAP CLASE 10 D=3/4" ROSCADA m
02.02.03 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto
03 APARATOS Y ACCESORIOS SANITARIOS
03.01 LAVADERO DE COCINA DE ACERO INOXIDABLE C/ESCURRIDOR pza
CRONOGRAMA VALORIZADO DE EJECUCIÓ

ITEM DESCRIPCION UND

COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
0.01 SUB TOTAL
IGV (18.00 %)
PRESUPUESTO TOTAL PARA CONTRATO

GASTOS DE SUPERVISION DE OBRA


GASTOS DE ELABORACIÓN DE EXP. TECNICO
PRESUPUESTO TOTAL DE INVERSIÓN

AVANCE MENSUAL
AVANCE MENSUAL ACUMULADO
EJECUCIÓN DE OBRA

MES 01 (30 DIAS) MES 02 (30 DIAS)


METRADO PRECIO (S/.) PARCIAL (S/.)
PARCIAL % PARCIAL %

76,934.10 39,514.05 51.36% 37,420.05 48.64%


1,863.75 1,863.75 100.00% 0.00 0.00%
1.00 1,200.00 1,200.00 1,200.00 0.00
1.00 663.75 663.75 663.75 0.00
309.06 309.06 100.00% 0.00 0.00%
143.08 1.45 207.47 207.47 0.00
143.08 0.71 101.59 101.59 0.00
10,912.36 10,912.36 100.00% 0.00 0.00%
20.00 334.00 6,680.00 6,680.00 0.00
1.00 1,792.80 1,792.80 1,792.80 0.00
1.00 1,189.56 1,189.56 1,189.56 0.00
1.00 1,250.00 1,250.00 1,250.00 0.00
7,778.90 1,663.73 21.39% 6,115.17 78.61%
5,359.27 1,663.73 31.04% 3,695.54 68.96%
21.06 47.63 1,003.09 1,003.09 0.00
36.99 17.86 660.64 660.64 0.00
21.32 23.15 493.56 0.00 493.56
82.08 9.35 767.45 0.00 767.45
44.81 54.33 2,434.53 0.00 2,434.53
2,419.63 0.00 0.00% 2,419.63 100.00%
12.50 56.06 700.75 0.00 700.75
52.07 8.01 417.08 0.00 417.08
52.07 9.35 486.85 0.00 486.85
15.00 54.33 814.95 0.00 814.95
7,047.05 2,399.85 34.05% 4,647.20 65.95%
4,352.05 2,399.85 55.14% 1,952.20 44.86%
13.00 44.07 572.91 572.91 0.00
12.33 148.17 1,826.94 1,826.94 0.00
53.15 36.73 1,952.20 0.00 1,952.20
2,695.00 0.00 0.00% 2,695.00 100.00%
52.07 37.32 1,943.25 0.00 1,943.25
15.50 48.50 751.75 0.00 751.75
42,957.13 22,365.30 52.06% 20,591.83 47.94%
42,957.13 22,365.30 52.06% 20,591.83 47.94%
4,435.91 4,435.91 100.00% 0.00 0.00%
5.50 505.86 2,782.23 2,782.23 0.00
223.47 7.40 1,653.68 1,653.68 0.00
EJECUCIÓN DE OBRA

MES 01 (30 DIAS) MES 02 (30 DIAS)


METRADO PRECIO (S/.) PARCIAL (S/.)
PARCIAL % PARCIAL %
9,452.55 9,452.55 100.00% 0.00 0.00%
5.86 446.36 2,615.67 2,615.67 0.00
619.56 7.40 4,584.74 4,584.74 0.00
46.90 48.02 2,252.14 2,252.14 0.00
7,241.66 7,040.41 97.22% 201.25 2.78%
3.96 406.56 1,609.98 1,408.73 201.25
524.15 7.40 3,878.71 3,878.71 0.00
40.90 42.86 1,752.97 1,752.97 0.00
12,666.60 1,436.43 11.34% 11,230.17 88.66%
4.97 447.19 2,222.53 0.00 2,222.53
0.58 426.85 247.57 0.00 247.57
931.74 7.40 6,894.88 1,436.43 5,458.45
78.61 42.00 3,301.62 0.00 3,301.62
9,160.41 0.00 0.00% 9,160.41 100.00%
4.54 446.36 2,026.47 0.00 2,026.47
0.46 428.58 197.15 0.00 197.15
688.21 7.40 5,092.75 0.00 5,092.75
36.30 50.80 1,844.04 0.00 1,844.04
5,974.41 0.00 0.00% 5,974.41 100.00%
5,974.41 0.00 0.00% 5,974.41 100.00%
2.00 1,900.61 3,801.22 0.00 3,801.22
4.00 148.40 593.60 0.00 593.60
26.10 31.73 828.15 0.00 828.15
8.00 75.53 604.24 0.00 604.24
4.00 36.80 147.20 0.00 147.20
91.44 0.00 0.00% 91.44 100.00%
91.44 0.00 0.00% 91.44 100.00%
19.25 4.75 91.44 0.00 91.44
74,560.73 1,478.44 1.98% 73,082.29 98.02%
7,862.01 1,228.44 15.63% 6,633.57 84.37%
7,862.01 1,228.44 15.63% 6,633.57 84.37%
47.44 137.60 6,527.74 1,019.96 5,507.78
14.85 89.85 1,334.27 208.48 1,125.79
8,805.69 0.00 0.00% 8,805.69 100.00%
8,805.69 0.00 0.00% 8,805.69 100.00%
255.35 30.50 7,788.18 0.00 7,788.18
56.35 11.99 675.64 0.00 675.64
EJECUCIÓN DE OBRA

MES 01 (30 DIAS) MES 02 (30 DIAS)


METRADO PRECIO (S/.) PARCIAL (S/.)
PARCIAL % PARCIAL %
74.32 4.60 341.87 0.00 341.87
4,776.47 0.00 0.00% 4,776.47 100.00%
4,776.47 0.00 0.00% 4,776.47 100.00%
82.07 23.13 1,898.28 0.00 1,898.28
82.07 35.07 2,878.19 0.00 2,878.19
2,301.51 0.00 0.00% 2,301.51 100.00%
2,301.51 0.00 0.00% 2,301.51 100.00%
52.20 24.83 1,296.13 0.00 1,296.13
37.50 26.81 1,005.38 0.00 1,005.38
6,456.28 0.00 0.00% 6,456.28 100.00%
6,456.28 0.00 0.00% 6,456.28 100.00%
6.63 311.43 2,064.78 0.00 2,064.78
24.19 154.25 3,731.31 0.00 3,731.31
2.39 276.23 660.19 0.00 660.19
606.03 0.00 0.00% 606.03 100.00%
606.03 0.00 0.00% 606.03 100.00%
12.00 23.50 282.00 0.00 282.00
3.00 108.01 324.03 0.00 324.03
17,983.00 0.00 0.00% 17,983.00 100.00%
17,983.00 0.00 0.00% 17,983.00 100.00%
140.00 91.70 12,838.00 0.00 12,838.00
196.00 26.25 5,145.00 0.00 5,145.00
17,610.19 0.00 0.00% 17,610.19 100.00%
17,610.19 0.00 0.00% 17,610.19 100.00%
96.32 182.83 17,610.19 0.00 17,610.19
1,620.07 0.00 0.00% 1,620.07 100.00%
1,620.07 0.00 0.00% 1,620.07 100.00%
233.44 6.94 1,620.07 0.00 1,620.07
5,143.08 0.00 0.00% 5,143.08 100.00%
5,143.08 0.00 0.00% 5,143.08 100.00%
96.32 11.93 1,149.10 0.00 1,149.10
251.08 12.62 3,168.63 0.00 3,168.63
18.02 15.91 286.70 0.00 286.70
24.19 13.57 328.26 0.00 328.26
12.72 16.54 210.39 0.00 210.39
1,396.40 250.00 17.90% 1,146.40 82.10%
2.00 200.00 400.00 250.00 150.00
EJECUCIÓN DE OBRA

MES 01 (30 DIAS) MES 02 (30 DIAS)


METRADO PRECIO (S/.) PARCIAL (S/.)
PARCIAL % PARCIAL %
4.00 11.60 46.40 0.00 46.40
1.00 250.00 250.00 0.00 250.00
2.00 350.00 700.00 0.00 700.00
4,237.36 0.00 0.00% 4,237.36 100.00%
4,237.36 0.00 0.00% 4,237.36 100.00%
1.00 158.50 158.50 0.00 158.50
1.00 68.45 68.45 0.00 68.45
13.00 104.92 1,363.96 0.00 1,363.96
12.00 118.94 1,427.28 0.00 1,427.28
4.00 61.63 246.52 0.00 246.52
2.00 76.63 153.26 0.00 153.26
1.00 61.63 61.63 0.00 61.63
4.00 73.86 295.44 0.00 295.44
8.00 57.79 462.32 0.00 462.32
5,454.59 0.00 0.00% 5,454.59 100.00%
4,150.96 0.00 0.00% 4,150.96 100.00%
1,054.29 0.00 0.00% 1,054.29 100.00%
17.00 25.77 438.09 0.00 438.09
2.00 308.10 616.20 0.00 616.20
191.77 0.00 0.00% 191.77 100.00%
47.35 4.05 191.77 0.00 191.77
2,904.90 0.00 0.00% 2,904.90 100.00%
32.00 46.11 1,475.52 0.00 1,475.52
27.00 52.94 1,429.38 0.00 1,429.38
837.81 0.00 0.00% 837.81 100.00%
536.90 0.00 0.00% 536.90 100.00%
3.00 107.37 322.11 0.00 322.11
1.00 96.00 96.00 0.00 96.00
1.00 90.76 90.76 0.00 90.76
1.00 28.03 28.03 0.00 28.03
300.91 0.00 0.00% 300.91 100.00%
1.00 78.30 78.30 0.00 78.30
35.47 4.05 143.65 0.00 143.65
2.00 39.48 78.96 0.00 78.96
465.82 0.00 0.00% 465.82 100.00%
1.00 465.82 465.82 0.00 465.82
EJECUCIÓN DE OBRA

MES 01 (30 DIAS) MES 02 (30 DIAS)


METRADO PRECIO (S/.) PARCIAL (S/.)
PARCIAL % PARCIAL %
161,186.78 40,992.49 25.43% 120,194.29 74.57%
24.57% 39,609.81 10,073.44 29,536.37
10.00% 16,118.68 4,099.25 12,019.43
216,915.27 55,165.18 161,750.09
39,044.75 9,929.73 29,115.02
255,960.02 65,094.91 25.43% 190,865.11 74.57%

10.25% 16,520.00 4,201.31 12,318.69


6.51% 10,500.00 2,670.33 7,829.67
282,980.02 71,966.55 211,013.47

25.43% 74.57%
25.43% 100.00%
1 2 3 4
39514.05 37420.05
1863.75
1200.00
663.75
309.06
207.47
101.59
10912.36
6680.00
1792.80
1189.56
1250.00
1663.73 6115.17
1663.73 3695.54
1003.09
660.64
493.56
767.45
2434.53
2419.63
700.75
417.08
486.85
814.95
2399.85 4647.20
2399.85 1952.20
572.91
1826.94
1952.20
2695.00
1943.25
751.75
22365.30 20591.83
22365.30 20591.83
4435.91
2782.23
1653.68
9452.55
2615.67
4584.74
2252.14
7040.41 201.25
1408.73 201.25
3878.71
1752.97
1436.43 11230.17
2222.53
247.57
1436.43 5458.45
3301.62
9160.41
2026.47
197.15
5092.75
1844.04
5974.41
5974.41
3801.22
593.60
828.15
604.24
147.20
91.44
91.44
91.44
1478.44 73082.29
1228.44 6633.57
1228.44 6633.57
1019.96 5507.78
208.48 1125.79
8805.69
8805.69
7788.18
675.64
341.87
4776.47
4776.47
1898.28
2878.19
2301.51
2301.51
1296.13
1005.38
6456.28
6456.28
2064.78
3731.31
660.19
606.03
606.03
282.00
324.03
17983.00
17983.00
12838.00
5145.00
17610.19
17610.19
17610.19
1620.07
1620.07
1620.07
5143.08
5143.08
1149.10
3168.63
286.70
328.26
210.39
250.00 1146.40
250.00 150.00
46.40
250.00
700.00
4237.36
4237.36
158.50
68.45
1363.96
1427.28
246.52
153.26
61.63
295.44
462.32
5454.59
4150.96
1054.29
438.09
616.20
191.77
191.77
2904.90
1475.52
1429.38
837.81
536.90
322.11
96.00
90.76
28.03
300.91
78.30
143.65
78.96
465.82
465.82
I. ESTUDIO DEFINITIVO
1.1 Expediente Técnico Documento 1

II. COMPONENTES DE PROYECTO

2.1 COMPONENTE N° 01. ADECUADA CALZADA PARA LA TRANSITABILIDAD VEHICULAR


Acción 01.01 -A : Construcción de Pavimento de
2.1.1 Ml 228.04
rodadura con Concreto Simple, f'c=210 kg/cm2.
2.1.2 Acción 01.02 : Construcción de Alcantarilla M2 188.97
Acción 01.03 : Renovacion de Redes de Conexiones
2.1.3 Ml 141.3
Domiciliarias de agua
Acción 01.04 : Renovacion de Redes de Conexiones
2.1.4 Ml 378.44
Domiciliarias de desague
2.1.5 Acción 01.05 : Mitigación de Impacto Ambiental Informe 1
2.2 COMPONENTE N° 02 . ADECUADAS VIAS PARA EL TRANSITO PEATONAL
Acción 02.01: Veredas con losas de concreto f'c=175 kg/cm2
2.2.1 Ml 894
E=0.15m
2.2.1 Acción 02.02: Rampas Ml 7.2
2.3 COMPONENTE N° 03. ADECUADO CONOCIMIENTO EN TEMAS VIALES
2.3.1 Acción 3.1 : Capacitación a los beneficiarios Informe 1
COSTO DIRECTO
30,000.00 0
33,000.00 0
Costos S/.
VIAVILIDAD EXP. TÉCNICO
488,917.13 Err:509

154,076.07 Err:509 Err:509 Err:509

184,165.27 Err:509

12,938.33 Err:509

132,737.46 Err:509

5,000.00 Err:509
97,224.89 Err:509

97,224.89 Err:509

0 Err:509
3,000.00 0.00
3,000.00 Err:509
589,321.34 Err:509 161,186.78