Está en la página 1de 25

UNIDAD DE

INSUMOS (MANO DE OBRA - MATERIALES - EQUIPOS+HERREAMIENTAS) TRABAJO

TRABAJOS PROVISIONALES 69.33


MOVILIZACION Y DESMOVILIZACION 8
MOVILIZACION Y DESMOVILIZACION 8
CASETA DE OFICINA, ALMACEN Y GUARDIANIA 37.33
CAPATAZ 9.33
OPERARIO 9.33
PEON 18.67
CLAVOS PARA MADERA C/C 3" 0
HORMIGON 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
CALAMINA GALVANIZADA 1.83mx0.83mx3mm 0
MADERA TORNILLO 0
TRIPLAY LUPUNA 4 x 8 x 4 mm 0
CARTEL DE OBRA 6.0 0x 4.00 24
OPERARIO 8
PEON 16
CLAVOS PARA MADERA C/C 3" 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
MADERA TORNILLO 0
ROLLISOS L=6.00m D=4" 0
GIGANTOGRAFIA 0
TRABAJOS PRELIMINARES 2723.13
TRAZO Y REPLANTEO PRELIMINAR 36.32
CAPATAZ 7.23
PEON 14.6
TOPOGRAFO 7.23
YESO BOLSA 28 kg 0.00
ESTACAS DE MADERA 0.00
PINTURA ESMALTE SINTÉTICO 0
ESTACION TOTAL 7.23
TRAZO Y REPLANTEO DURANTE LA EJECUCION 2612.62
CAPATAZ 316.68
PEON 950.03
TOPOGRAFO 633.37
YESO BOLSA 28 kg 0
ESTACAS DE MADERA 0.00
PINTURA ESMALTE SINTÉTICO 0
NIVEL 316.68
MIRAS 79.17
ESTACION TOTAL 316.68
DEMOLICIONES 31.83
OPERARIO 16
PEON 7.92
MARTILLO NEUMATICO DE 24 kg 3.97
COMPRESORA NEUMATICA 125-175 PCM 76 HP 3.97
ELIMINACION DE DEMOLICIONES 26.77
PEON 10.7
CARGADOR SOBRE LLANTAS DE 100-115 HP 2-2.25 yd3 5.35
CAMION VOLQUETE DE 15 m3 10.70
LIMPIEZA DEL TERRENO MANUAL 15.60
PEON 15.6
SEGURIDAD Y SALUD EN EL TRABAJO 3258
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SAL 240
ELABORACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO 240
EQUIPOS DE PROTECCION INDIVIDUAL 2880
GUANTES DE JEBE 640
GUANTES DE CUERO 640
CHALECOS 320
LENTES DE SEGURIDAD 320
ZAPATO DE SEGURIDAD 320
CASCO DE SEGURIDAD 320.00
RESPIRADORES 320.00
SEÑALIZACION TEMPORAL DE SEGURIDAD 120
PEON 120
CINTA SEÑALIZADORA AMARILLA 0
CONO DE SEGURIDAD ANARANJADO H=30cm 0
TRANQUERA DE MADERA 0
LETRERO DE DESVIO 0.00
CAPACITACION EN SEGURIDAD Y SALUD 16
CAPACITACION EN SEGURIDAD 16
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE 2
BOTIQUIN DE PRIMEROS AUXILIOS 0
EXTINTOR DE POLVO QUIMICO SECO DE 12 LITROS 0
CAMILLA DE SEGURIDAD Y SALUD 2
PAVIMENTO RIGIDO 738.33
MOVIMIENTO DE TIERRAS 170.55
CORTE DE TERRENO EN PAVIMENTO 33.08
CAPATAZ 6.62
PEON 13.22
TOPOGRAFO 6.62
TRACTOR DE ORUGAS DE 140 - 160HP 6.62
PERFILADO Y COMPACTACION SUB-RASANTES DE PAVIMENTO RIGIDO 114
CAPATAZ 9.15
OFICIAL 9.15
PEON 50.1
MOTOBOMBA DE 3"-4" (7-10HP) 13.65
RODILLO LISO VIBRATORIO AUTOPROPULSADO 1.8 ton 9.15
MOTONIVELADORA 125 HP 9.15
CAMION CISTERNA 4x2 (AGUA) 122 HP 2 000gl 13.65
ELIMINACION DE MATERIAL EXCEDENTE DIST. MAX. 5Km EN PAVIMENTOS 23.47
PEON 9.38
CARGADOR SOBRE LLANTAS DE 100-115 HP 2-2.25 yd3 4.7
CAMION VOLQUETE DE 15 m3 9.38
BASE GRANULAR 80
BASE GRANULAR E=0.20m 80
CAPATAZ 9.08
PEON 41.83
AFIRMADO 0
MOTOBOMBA DE 3"-4" (7-10HP) 5.47
RODILLO LISO VIBRATORIO AUTOPROPULSADO 1.8 ton 9.08
MOTONIVELADORA 130 - 135 HP 9.08
CAMION CISTERNA 4x2 (AGUA) 122 HP 2 000gl 5.47
OBRAS DE CONCRETO ARMADO 487.78
ENCOFRADO Y DESENCOFRADO PARA LOSA DE PAVIMENTO 44.05
CAPATAZ 14.68
OPERARIO 14.68
OFICIAL 14.68
ALAMBRE NEGRO N° 8 0
ALAMBRE NEGRO N° 16 0
CLAVOS PARA MADERA C/C 3" 0
MADERA TORNILLO 0
CONCRETO f'c=210 kg/cm2 366.92
OPERARIO 45.87
OFICIAL 45.87
PEON 229.32
PIEDRA CHANCADA 1/2" 0
ARENA GRUESA 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
AGUA 0
VIBRADOR DE CONCRETO 4 HP 1.35" 22.93
MEZCLADORA DE CONCRETO TROMPO 8 HP 9P3 22.93
CURADO DE LOSA DE CONCRETO EN PAVIMENTO RIGIDO 25.48
PEON 25.48
ARENA GRUESA 0
AGUA 0
JUNTAS ASFALTICAS DE CONSTRUCCION Y DILATACION 46.27
CAPATAZ 6.62
OFICIAL 13.2
PEON 26.43
ASFALTO LIQUIDO RC-250 0
ARENA GRUESA 0
ACERO LISO PARA JUNTAS 5.08
OFICIAL 5.08
ACERO LISO EN VARILLAS DE 3/4" 0
VEREDAS DE CONCRETO 348.08
MOVIMIENTO DE TIERRAS 149.45
PERFILADO Y COMPACTADO DE LA SUB-RASANTE EN VEREDAS 78
CAPATAZ 15.6
PEON 31.2
AGUA 0
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP 31.2
CONFORMACION Y COMPACTACION DE BASE GRANULAR EN VEREDAS E=0.10m 37.43
CAPATAZ 3.75
OFICIAL 3.75
PEON 18.72
RODILLO LISO VIBRATORIO AUTOPROPULSADO 1.8 ton 3.75
MOTONIVELADORA 125 HP 3.75
CAMION CISTERNA 4x2 (AGUA) 122 HP 2 000gl 3.75
AFIRMADO PARA BASE E= 10cm EN VEREDAS 34
CAPATAZ 6.23
PEON 19.65
AFIRMADO 0
MOTOBOMBA DE 3"-4" (7-10HP) 0.93
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP 6.23
CAMION CISTERNA 4x2 (AGUA) 122 HP 2 000gl 0.93
OBRAS DE CONCRETO SIMPLE 198.63
ENCOFRADO Y DESENCOFRADO PARA VEREDAS 19.92
CAPATAZ 6.63
OFICIAL 6.63
PEON 6.63
ALAMBRE NEGRO N° 8 0
ALAMBRE NEGRO N° 16 0
CLAVOS PARA MADERA C/C 3" 0
MADERA TORNILLO 0
CONCRETO f'c=175 kg/cm2 EN VEREDAS 123.93
CAPATAZ 8
OPERARIO 8
OFICIAL 12
PEON 63.97
PIEDRA CHANCADA 1/2" 0
ARENA GRUESA 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
AGUA 0
VIBRADOR DE CONCRETO 4 HP 1.35" 15.98
MEZCLADORA DE CONCRETO TROMPO 8 HP 9P3 15.98
CURADO DEL CONCRETO EN VEREDAS 27.3
PEON 27.3
ARENA GRUESA 0
AGUA 0
BRUÑADO EN VEREDAS DE CONCRETO 6
OPERARIO 3.98
PEON 1.98
REGLA DE ALUMINIO 0.02
ACABADO SUPERFICIAL Y LATERAL DE VEREDA 12.2
CAPATAZ 3.9
PEON 7.8
ARENA FINA 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
AGUA 0
REGLA DE ALUMINIO 0.48
JUNTAS ASFALTICAS EN VEREDAS E= 1" 9.28
CAPATAZ 1.33
OFICIAL 2.65
PEON 5.3
ASFALTO LIQUIDO RC-250 0
ARENA GRUESA 0
SARDINELES DE CONCRETO 90.4
OBRAS DE CONCRETO SIMPLE 90.4
ENCOFRADO Y DESENCOFRADO PARA SARDINELES PERALTADOS 23.7
CAPATAZ 7.9
OPERARIO 7.9
OFICIAL 7.9
ALAMBRE NEGRO N° 8 0
ALAMBRE NEGRO N° 16 0
CLAVOS PARA MADERA C/C 3" 0
MADERA TORNILLO 0
CONCRETO f'c=175 kg/cm2 EN SARDINEL PERALTADO 59.7
CAPATAZ 4.27
OPERARIO 4.27
PEON 34.12
PIEDRA CHANCADA 1/2" 0
ARENA GRUESA 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
AGUA 0
VIBRADOR DE CONCRETO 4 HP 1.35" 8.53
MEZCLADORA DE CONCRETO TROMPO 8 HP 9P3 8.53
CURADO DEL CONCRETO EN SARDINEL PERALTADO 5.47
PEON 5.47
ARENA GRUESA 0
AGUA 0
JUNTAS ASFALTICAS EN SARDINELES PERALTADOS 1.55
CAPATAZ 0.22
OPERARIO 0.45
PEON 0.88
ASFALTO LIQUIDO RC-250 0
ARENA GRUESA 0
CANAL DE DRENAJE 169.42
OBRAS DE CONCRETO SIMPLE 169.42
ENCOFRADO Y DESENCOFRADO PARA CANAL DE DRENAJE 45.5
CAPATAZ 15.17
OPERARIO 15.17
OFICIAL 15.17
ALAMBRE NEGRO N° 8 0
ALAMBRE NEGRO N° 16 0
CLAVOS PARA MADERA C/C 3" 0
MADERA TORNILLO 0
CONCRETO PARA CANAL DE DRENAJE f'c=175 kg/cm2 81.28
OPERARIO 5.6
OFICIAL 8.4
PEON 44.85
PIEDRA CHANCADA 1/2" 0
ARENA GRUESA 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
AGUA 0
VIBRADOR DE CONCRETO 4 HP 1.35" 11.22
MEZCLADORA DE CONCRETO TROMPO 8 HP 9P3 11.22
CURADO DEL CONCRETO EN CANAL DE DRENAJE 21.97
PEON 21.97
ARENA GRUESA 0
AGUA 0
ACERO DE REFUERZO PARA CANAL DE DRENAJE fy=4,200 kg/cm2 7.33
OFICIAL 7.33
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 0
JUNTAS ASFALTICAS DE CONSTRUCCION Y DILATACION 13.35
CAPATAZ 1.92
OFICIAL 3.82
PEON 7.63
ASFALTO LIQUIDO RC-250 0
ARENA GRUESA 0
CONEXIONES DE AGUA Y DESAGUE 347.92
RED MATRIZ 215.57
CONEXION DE AGUA 1 1/2" 90
OPERARIO 20
OFICIAL 20
PEON 40
TUBERIA PVC SAP C-10 Ø 1 1/2" 0
PIEDRA CHANCADA 1/2" 0
ARENA FINA 0
ARENA GRUESA 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
PEGAMENTO PARA PVC 1/4 GLN 0
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP 5
BALDE PRUEBA-TAPÓN-ABRAZ. Y ACCESORIOS 5
CONEXION DE DESAGUE 8" 125.57
OPERARIO 29.55
OFICIAL 29.55
PEON 59.1
TUBERIA PVC SAL 8" PARA DESAGUE 0
PIEDRA CHANCADA 1/2" 0
ARENA GRUESA 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
TUBERIA CACHIMBA UPVC DE 8" PARA DESAGUE 0
PEGAMENTO PARA PVC 1/4 GLN 0
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP 7.38
DOMICILIARIAS 132.35
CONEXION DE AGUA 1/2" 68.47
OPERARIO 15.03
OFICIAL 15.03
PEON 30.07
TUBERIA PVC SAP A-10 DE 1/2" 0
CODO PVC SAP Ø 1/2"x90° 0
UNION PVC-SAP PARA AGUA 1/2" 0
PIEDRA CHANCADA 1/2" 0
ARENA FINA 0
ARENA GRUESA 0
MARCO Y TAPA DE FIERRO GALVANIZADO PARA MEDIDOR 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
NIPLE RT TUERCA EMPAQUE 1/2" 0
PEGAMENTO PARA PVC 1/4 GLN 0
CINTA TEFLON 0
LLAVE DE PASO RT NIPLE TUERCA EMPAQUE 1/2" 0
CAJA DE CONCRETO PARA MEDIDOR 0
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP 4.52
BALDE PRUEBA-TAPÓN-ABRAZ. Y ACCESORIOS 3.83
CONEXION DE DESAGUE 6" 63.88
OPERARIO 15.03
OFICIAL 15.03
PEON 30.07
TUBERIA PVC SAL 6" PARA DESAGUE 0
PIEDRA CHANCADA 1/2" 0
ARENA GRUESA 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
CAJA DE CONCRETO PREFABRICADO 0.30x0.60 h=0.60 C/TAPA 0
PEGAMENTO PARA PVC 1/4 GLN 0
MADERA TORNILLO 0
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP 3.75
SEÑALIZACION 368.62
SEÑALIZACION VERTICAL 15
SEÑALIZACION VERTICAL PREVENTIVA 15
OPERARIO 6
OFICIAL 3
PEON 6
CEMENTO PORTLAND TIPO I (42.5 kg) 0
SEÑAL VERTICAL PREVENTIVA 0
AGUA 0
SEÑALIZACION HORIZONTAL 353.62
PINTURA LINEAL EN SARDINEL 148.2
OPERARIO 7.8
PEON 15.6
PINTURA DE TRAFICO 51.48
THINNER 42.12
XILOL 31.2
PINTURA DE PAVIMENTOS (LINEA DISCONTINUA) 75.4
OPERARIO 5.2
PEON 15.6
PINTURA DE TRAFICO 8.58
THINNER 7.02
XILOL 39
PINTURA DE PAVIMENTOS (BORDES) 130
OPERARIO 5.2
PEON 15.6
PINTURA DE TRAFICO 17.17
THINNER 14.03
XILOL 78
VARIOS 80.2
NIVELACION DE TAPAS DE BUZONES EXISTENTES 33.4
CAPATAZ 6.67
OFICIAL 6.67
PEON 20.02
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 0
PIEDRA CHANCADA 1/2" 0
ARENA GRUESA 0
CEMENTO PORTLAND TIPO I (42.5 kg) 0
TAPA DE CONCRETO REFORZADO PARA BUZON 0
MOTOBOMBA DE 3"-4" (7-10HP) 0.02
CAMION CISTERNA 4x2 (AGUA) 122 HP 2 000gl 0.02
LIMPIEZA FINAL DE OBRA 46.8
PEON 46.8
FLETE TERRESTRE 47.73
FLETE TERRESTRE 24
FLETE TERRESTRE 24
TRANSPORTE DE AGREGADOS 23.73
CAMION VOLQUETE DE 15 m3 23.73
UNIDADES DE FACTOR DEL CATEGORÍA DE MANO DE OBRA Y EQUIPOS
ASIGNACIÓN RECURSO

CAPATAZ
OPERARIO
1 1.00 OFICIAL
PEON
0.58 9.33 TOPOGRAFO
0.58 9.33 ESTACION TOTAL
1.17 18.67 MOTOBOMBA DE 3"-4" (7-10HP)
8.75 8.75 RODILLO LISO VIBRATORIO AUTOPROPULSADO 1.8 ton
2.91 2.91 COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP
6.48 6.48 MARTILLO NEUMATICO DE 24 kg
24.5 24.50 COMPRESORA NEUMATICA 125-175 PCM, 76 HP
46.83 46.83 CARGADOR SOBRE LLANTAS DE 100-115 HP 2-2.25 yd3
31.19 31.19 BALDE PRUEBA-TAPÓN-ABRAZ. Y ACCESORIOS
TRACTOR DE ORUGAS DE 140 - 160HP
1 8.00 MOTONIVELADORA 130 - 135 HP
2 16.00 MOTONIVELADORA 125 HP
1.5 1.50 CAMION VOLQUETE DE 15 m3
3.65 3.65 CAMION CISTERNA 4x2 (AGUA) 122 HP 2,000gl
129.17 129.17 VIBRADOR DE CONCRETO 4 HP 1.35"
3 3.00 MEZCLADORA DE CONCRETO TROMPO 8 HP 9P3
1 1.00

0.45 7.23
0.91 14.60
0.45 7.23
20.48 20.48
30.71 30.71
13.65 13.65
0.45 7.23

0.68 316.68
2.05 950.03
1.37 633.37
20.48 20.48
58.01 58.01
13.65 13.65
0.68 0.68
0.17 0.17
0.68 316.68

1 16.00
0.5 7.92
0.25 0.25
0.25 0.25
1.34 10.70
0.67 5.35
1.34 10.70

1.95 15.60

1 1.00

40 40.00
40 40.00
20 20.00
20 20.00
20 20.00
20 20.00
20 20.00

5 120.00
5 5.00
5 5.00
12 12.00
6 6.00

1 1.00

1 1.00
1 1.00
0.13 0.13

0.41 6.62
0.83 13.22
0.41 6.62
0.41 6.62

0.57 9.15
0.57 9.15
3.13 50.10
0.85 13.65
0.57 9.15
0.57 9.15
0.85 0.85

1.17 9.38
0.59 4.70
1.17 9.38
0.57 9.08
2.62 41.83
170.63 170.63
0.34 5.47
0.57 9.08
0.57 9.08
0.34 0.34

0.92 14.68
0.92 14.68
0.92 14.68
38.66 38.66
11.89 11.89
49.56 49.56
242.84 242.84

1.91 45.87
1.91 45.87
9.55 229.32
84.85 84.85
61.92 61.92
1115.64 1,115.64
24.08 24.08
0.96 22.93
0.96 22.93

0.46 25.48
5.46 5.46
5.46 5.46

0.41 6.62
0.83 13.20
1.65 26.43
74.34 74.34
4.46 4.46

0.64 5.08
150.97 150.97

0.97 15.60
1.95 31.20
3.51 3.51
1.95 31.20
0.23 3.75
0.23 3.75
1.17 18.72
0.23 3.75
0.23 3.75
0.23 0.23

0.78 6.23
2.46 19.65
35.1 35.10
0.12 0.93
0.78 6.23
0.12 0.12

0.28 6.63
0.28 6.63
0.28 6.63
1.94 1.94
0.6 0.60
2.49 2.49
12.2 12.20

0.33 8.00
0.33 8.00
0.5 12.00
2.67 63.97
10.99 10.99
10.79 10.79
169.92 169.92
4.1 4.10
0.67 15.98
0.67 15.98

0.49 27.30
1.95 1.95
1.95 1.95

0.5 3.98
0.25 1.98
0

0.49 3.90
0.98 7.80
1.95 1.95
5.86 5.86
13.66 13.66
0.06 0.06

0.17 1.33
0.33 2.65
0.66 5.30
7.46 7.46
0.45 0.45

0.99 7.90
0.99 7.90
0.99 7.90
62.39 62.39
19.2 19.20
79.99 79.99
391.95 391.95

0.27 4.27
0.27 4.27
2.13 34.12
8.79 8.79
8.63 8.63
135.92 135.92
3.28 3.28
0.53 8.53
0.53 8.53

0.1 5.47
0.39 0.39
0.39 0.39

0.03 0.22
0.06 0.45
0.11 0.88
1.49 1.49
0.09 0.09

0.95 15.17
0.95 15.17
0.95 15.17
106.47 106.47
32.76 32.76
136.5 136.50
668.85 668.85
0.35 5.60
0.53 8.40
2.8 44.85
17.34 17.34
17.03 17.03
268.01 268.01
6.46 6.46
0.7 11.22
0.7 11.22

0.39 21.97
3.14 3.14
3.14 3.14

0.92 7.33
2061.61 2,061.61

0.24 1.92
0.48 3.82
0.95 7.63
10.73 10.73
0.64 0.64

1.25 20.00
1.25 20.00
2.5 40.00
975 975.00
17.55 17.55
0.39 0.39
11.7 11.70
97.5 97.50
3.51 3.51
0.31 5.00
0.31 5.00

1.85 29.55
1.85 29.55
3.69 59.10
1170 1,170.00
17.55 17.55
13.65 13.65
128.7 128.70
195 195.00
23.4 23.40
0.46 7.38
0.94 15.03
0.94 15.03
1.88 30.07
155 155.00
62 62.00
31 31.00
2.79 2.79
0.06 0.06
1.86 1.86
31 31.00
15.5 15.50
31 31.00
0.56 0.56
4.96 4.96
31 31.00
31 31.00
0.28 4.52
0.24 3.83

0.94 15.03
0.94 15.03
1.88 30.07
186 186.00
2.79 2.79
2.17 2.17
20.46 20.46
31 31.00
3.72 3.72
37.57 37.57
0.23 3.75

0.25 6.00
0.13 3.00
0.25 6.00
0.6 0.60
2 2.00
0.02 0.02

0.98 7.80
1.95 15.60
6.44 6.44
5.27 5.27
3.9 3.90
0.65 5.20
1.95 15.60
1.07 1.07
0.88 0.88
4.88 4.88

0.65 5.20
1.95 15.60
2.15 2.15
1.76 1.76
9.75 9.75

0.83 6.67
0.83 6.67
2.5 20.02
30 30.00
0.55 0.55
0.5 0.50
7.5 7.50
5 5.00
0
0

1.95 46.80

1 1.00

0.99 23.73
TRABAJOS PROVISIONALES 69.33
MOVILIZACION Y DESMOVILIZACION 8
MOVILIZACION Y DESMOVILIZACION 8 100%
CASETA DE OFICINA, ALMACEN Y GUARDIANIA 37.33
CAPATAZ 9.33 58%
OPERARIO 9.33 58%
PEON 18.67 117%
CLAVOS PARA MADERA C/C 3" 0 875%
HORMIGON 0 291%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 648%
CALAMINA GALVANIZADA 1.83mx0.83mx3mm 0 2450%
MADERA TORNILLO 0 4683%
TRIPLAY LUPUNA 4 x 8 x 4 mm 0 3119%
CARTEL DE OBRA 6.0 0x 4.00 24
OPERARIO 8 100%
PEON 16 200%
CLAVOS PARA MADERA C/C 3" 0 150%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 365%
MADERA TORNILLO 0 12917%
ROLLISOS L=6.00m D=4" 0 300%
GIGANTOGRAFIA 0 100%
TRABAJOS PRELIMINARES 2,723.13
TRAZO Y REPLANTEO PRELIMINAR 36.32
CAPATAZ 7.23 45%
PEON 14.6 91%
TOPOGRAFO 7.23 45%
YESO BOLSA 28 kg 0 2048%
ESTACAS DE MADERA 0 3071%
PINTURA ESMALTE SINTÉTICO 0 1365%
ESTACION TOTAL 7.23 45%
TRAZO Y REPLANTEO DURANTE LA EJECUCION 2,612.62
CAPATAZ 316.68 68%
PEON 950.03 205%
TOPOGRAFO 633.37 137%
YESO BOLSA 28 kg 0 2048%
ESTACAS DE MADERA 0 5801%
PINTURA ESMALTE SINTÉTICO 0 1365%
NIVEL 316.68 68%
MIRAS 79.17 17%
ESTACION TOTAL 316.68 68%
DEMOLICIONES 31.83
OPERARIO 16 100%
PEON 7.92 50%
MARTILLO NEUMATICO DE 24 kg 3.97 25%
COMPRESORA NEUMATICA 125-175 PCM 76 HP 3.97 25%
ELIMINACION DE DEMOLICIONES 26.77
PEON 10.7 134%
CARGADOR SOBRE LLANTAS DE 100-115 HP 2-2.25 yd3 5.35 67%
CAMION VOLQUETE DE 15 m3 10.7 134%
LIMPIEZA DEL TERRENO MANUAL 15.6
PEON 15.6 195%
SEGURIDAD Y SALUD EN EL TRABAJO 3,258
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE 240
SEGURIDAD Y SALUD EN EL TRABAJO

ELABORACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO 240 100%

EQUIPOS DE PROTECCION INDIVIDUAL 2,880


GUANTES DE JEBE 640 4000%
GUANTES DE CUERO 640 4000%
CHALECOS 320 2000%
LENTES DE SEGURIDAD 320 2000%
ZAPATO DE SEGURIDAD 320 2000%
CASCO DE SEGURIDAD 320 2000%
RESPIRADORES 320 2000%
SEÑALIZACION TEMPORAL DE SEGURIDAD 120
PEON 120 500%
CINTA SEÑALIZADORA AMARILLA 0 500%
CONO DE SEGURIDAD ANARANJADO H=30cm 0 500%
TRANQUERA DE MADERA 0 1200%
LETRERO DE DESVIO 0 600%
CAPACITACION EN SEGURIDAD Y SALUD 16
CAPACITACION EN SEGURIDAD 16 100%
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y 2
SALUD DURANTE EL TRABAJO
BOTIQUIN DE PRIMEROS AUXILIOS 0 100%
EXTINTOR DE POLVO QUIMICO SECO DE 12 LITROS 0 100%
CAMILLA DE SEGURIDAD Y SALUD 2 13%
PAVIMENTO RIGIDO 738.33
MOVIMIENTO DE TIERRAS 170.55
CORTE DE TERRENO EN PAVIMENTO 33.08
CAPATAZ 6.62 41%
PEON 13.22 83%
TOPOGRAFO 6.62 41%
TRACTOR DE ORUGAS DE 140 - 160HP 6.62 41%

PERFILADO Y COMPACTACION SUB-RASANTES DE PAVIMENTO RIGIDO 114

CAPATAZ 9.15 57%


OFICIAL 9.15 57%
PEON 50.1 313%
MOTOBOMBA DE 3"-4" (7-10HP) 13.65 85%
RODILLO LISO VIBRATORIO AUTOPROPULSADO 1.8 ton 9.15 57%
MOTONIVELADORA 125 HP 9.15 57%
CAMION CISTERNA 4x2 (AGUA) 122 HP 2 000gl 13.65 85%

ELIMINACION DE MATERIAL EXCEDENTE DIST. MAX. 5Km EN PAVIMENTOS 23.47

PEON 9.38 117%


CARGADOR SOBRE LLANTAS DE 100-115 HP 2-2.25 yd3 4.7 59%
CAMION VOLQUETE DE 15 m3 9.38 117%
BASE GRANULAR 80
BASE GRANULAR E=0.20m 80
CAPATAZ 9.08 57%
PEON 41.83 262%
AFIRMADO 0 17063%
MOTOBOMBA DE 3"-4" (7-10HP) 5.47 34%
RODILLO LISO VIBRATORIO AUTOPROPULSADO 1.8 ton 9.08 57%
MOTONIVELADORA 130 - 135 HP 9.08 57%
CAMION CISTERNA 4x2 (AGUA) 122 HP 2 000gl 5.47 34%
OBRAS DE CONCRETO ARMADO 487.78
ENCOFRADO Y DESENCOFRADO PARA LOSA DE PAVIMENTO 44.05
CAPATAZ 14.68 92%
OPERARIO 14.68 92%
OFICIAL 14.68 92%
ALAMBRE NEGRO N° 8 0 3866%
ALAMBRE NEGRO N° 16 0 1189%
CLAVOS PARA MADERA C/C 3" 0 4956%
MADERA TORNILLO 0 24284%
CONCRETO f'c=210 kg/cm2 366.92
OPERARIO 45.87 191%
OFICIAL 45.87 191%
PEON 229.32 955%
PIEDRA CHANCADA 1/2" 0 8485%
ARENA GRUESA 0 6192%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 111564%
AGUA 0 2408%
VIBRADOR DE CONCRETO 4 HP 1.35" 22.93 96%
MEZCLADORA DE CONCRETO TROMPO 8 HP 9P3 22.93 96%
CURADO DE LOSA DE CONCRETO EN PAVIMENTO RIGIDO 25.48
PEON 25.48 46%
ARENA GRUESA 0 546%
AGUA 0 546%
JUNTAS ASFALTICAS DE CONSTRUCCION Y DILATACION 46.27
CAPATAZ 6.62 41%
OFICIAL 13.2 83%
PEON 26.43 165%
ASFALTO LIQUIDO RC-250 0 7434%
ARENA GRUESA 0 446%
ACERO LISO PARA JUNTAS 5.08
OFICIAL 5.08 64%
ACERO LISO EN VARILLAS DE 3/4" 0 15097%
VEREDAS DE CONCRETO 348.08
MOVIMIENTO DE TIERRAS 149.45
PERFILADO Y COMPACTADO DE LA SUB-RASANTE EN VEREDAS 78
CAPATAZ 15.6 97%
PEON 31.2 195%
AGUA 0 351%
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP 31.2 195%
CONFORMACION Y COMPACTACION DE BASE GRANULAR EN VEREDAS 37.43
E=0.10m
CAPATAZ 3.75 23%
OFICIAL 3.75 23%
PEON 18.72 117%
RODILLO LISO VIBRATORIO AUTOPROPULSADO 1.8 ton 3.75 23%
MOTONIVELADORA 125 HP 3.75 23%
CAMION CISTERNA 4x2 (AGUA) 122 HP 2 000gl 3.75 23%
AFIRMADO PARA BASE E= 10cm EN VEREDAS 34
CAPATAZ 6.23 78%
PEON 19.65 246%
AFIRMADO 0 3510%
MOTOBOMBA DE 3"-4" (7-10HP) 0.93 12%
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP 6.23 78%
CAMION CISTERNA 4x2 (AGUA) 122 HP 2 000gl 0.93 12%
OBRAS DE CONCRETO SIMPLE 198.63
ENCOFRADO Y DESENCOFRADO PARA VEREDAS 19.92
CAPATAZ 6.63 28%
OFICIAL 6.63 28%
PEON 6.63 28%
ALAMBRE NEGRO N° 8 0 194%
ALAMBRE NEGRO N° 16 0 60%
CLAVOS PARA MADERA C/C 3" 0 249%
MADERA TORNILLO 0 1220%
CONCRETO f'c=175 kg/cm2 EN VEREDAS 123.93
CAPATAZ 8 33%
OPERARIO 8 33%
OFICIAL 12 50%
PEON 63.97 267%
PIEDRA CHANCADA 1/2" 0 1099%
ARENA GRUESA 0 1079%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 16992%
AGUA 0 410%
VIBRADOR DE CONCRETO 4 HP 1.35" 15.98 67%
MEZCLADORA DE CONCRETO TROMPO 8 HP 9P3 15.98 67%
CURADO DEL CONCRETO EN VEREDAS 27.3
PEON 27.3 49%
ARENA GRUESA 0 195%
AGUA 0 195%
BRUÑADO EN VEREDAS DE CONCRETO 6
OPERARIO 3.98 50%
PEON 1.98 25%
REGLA DE ALUMINIO 0.02 0%
ACABADO SUPERFICIAL Y LATERAL DE VEREDA 12.2
CAPATAZ 3.9 49%
PEON 7.8 98%
ARENA FINA 0 195%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 586%
AGUA 0 1366%
REGLA DE ALUMINIO 0.48 6%
JUNTAS ASFALTICAS EN VEREDAS E= 1" 9.28
CAPATAZ 1.33 17%
OFICIAL 2.65 33%
PEON 5.3 66%
ASFALTO LIQUIDO RC-250 0 746%
ARENA GRUESA 0 45%
SARDINELES DE CONCRETO 90.4
OBRAS DE CONCRETO SIMPLE 90.4

ENCOFRADO Y DESENCOFRADO PARA SARDINELES PERALTADOS 23.7

CAPATAZ 7.9 99%


OPERARIO 7.9 99%
OFICIAL 7.9 99%
ALAMBRE NEGRO N° 8 0 6239%
ALAMBRE NEGRO N° 16 0 1920%
CLAVOS PARA MADERA C/C 3" 0 7999%
MADERA TORNILLO 0 39195%
CONCRETO f'c=175 kg/cm2 EN SARDINEL PERALTADO 59.7
CAPATAZ 4.27 27%
OPERARIO 4.27 27%
PEON 34.12 213%
PIEDRA CHANCADA 1/2" 0 879%
ARENA GRUESA 0 863%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 13592%
AGUA 0 328%
VIBRADOR DE CONCRETO 4 HP 1.35" 8.53 53%
MEZCLADORA DE CONCRETO TROMPO 8 HP 9P3 8.53 53%
CURADO DEL CONCRETO EN SARDINEL PERALTADO 5.47
PEON 5.47 10%
ARENA GRUESA 0 39%
AGUA 0 39%
JUNTAS ASFALTICAS EN SARDINELES PERALTADOS 1.55
CAPATAZ 0.22 3%
OPERARIO 0.45 6%
PEON 0.88 11%
ASFALTO LIQUIDO RC-250 0 149%
ARENA GRUESA 0 9%
CANAL DE DRENAJE 169.42
OBRAS DE CONCRETO SIMPLE 169.42
ENCOFRADO Y DESENCOFRADO PARA CANAL DE DRENAJE 45.5
CAPATAZ 15.17 95%
OPERARIO 15.17 95%
OFICIAL 15.17 95%
ALAMBRE NEGRO N° 8 0 10647%
ALAMBRE NEGRO N° 16 0 3276%
CLAVOS PARA MADERA C/C 3" 0 13650%
MADERA TORNILLO 0 66885%
CONCRETO PARA CANAL DE DRENAJE f'c=175 kg/cm2 81.28
OPERARIO 5.6 35%
OFICIAL 8.4 53%
PEON 44.85 280%
PIEDRA CHANCADA 1/2" 0 1734%
ARENA GRUESA 0 1703%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 26801%
AGUA 0 646%
VIBRADOR DE CONCRETO 4 HP 1.35" 11.22 70%
MEZCLADORA DE CONCRETO TROMPO 8 HP 9P3 11.22 70%
CURADO DEL CONCRETO EN CANAL DE DRENAJE 21.97
PEON 21.97 39%
ARENA GRUESA 0 314%
AGUA 0 314%

ACERO DE REFUERZO PARA CANAL DE DRENAJE fy=4,200 kg/cm2 7.33

OFICIAL 7.33 92%


ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 0 206161%
JUNTAS ASFALTICAS DE CONSTRUCCION Y DILATACION 13.35
CAPATAZ 1.92 24%
OFICIAL 3.82 48%
PEON 7.63 95%
ASFALTO LIQUIDO RC-250 0 1073%
ARENA GRUESA 0 64%
CONEXIONES DE AGUA Y DESAGUE 347.92
RED MATRIZ 215.57
CONEXION DE AGUA 1 1/2" 90
OPERARIO 20 125%
OFICIAL 20 125%
PEON 40 250%
TUBERIA PVC SAP C-10 Ø 1 1/2" 0 97500%
PIEDRA CHANCADA 1/2" 0 1755%
ARENA FINA 0 39%
ARENA GRUESA 0 1170%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 9750%
PEGAMENTO PARA PVC 1/4 GLN 0 351%
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP 5 31%
BALDE PRUEBA-TAPÓN-ABRAZ. Y ACCESORIOS 5 31%
CONEXION DE DESAGUE 8" 125.57
OPERARIO 29.55 185%
OFICIAL 29.55 185%
PEON 59.1 369%
TUBERIA PVC SAL 8" PARA DESAGUE 0 117000%
PIEDRA CHANCADA 1/2" 0 1755%
ARENA GRUESA 0 1365%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 12870%
TUBERIA CACHIMBA UPVC DE 8" PARA DESAGUE 0 19500%
PEGAMENTO PARA PVC 1/4 GLN 0 2340%
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP 7.38 46%
DOMICILIARIAS 132.35
CONEXION DE AGUA 1/2" 68.47
OPERARIO 15.03 94%
OFICIAL 15.03 94%
PEON 30.07 188%
TUBERIA PVC SAP A-10 DE 1/2" 0 15500%
CODO PVC SAP Ø 1/2"x90° 0 6200%
UNION PVC-SAP PARA AGUA 1/2" 0 3100%
PIEDRA CHANCADA 1/2" 0 279%
ARENA FINA 0 6%
ARENA GRUESA 0 186%
MARCO Y TAPA DE FIERRO GALVANIZADO PARA MEDIDOR 0 3100%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 1550%
NIPLE RT TUERCA EMPAQUE 1/2" 0 3100%
PEGAMENTO PARA PVC 1/4 GLN 0 56%
CINTA TEFLON 0 496%
LLAVE DE PASO RT NIPLE TUERCA EMPAQUE 1/2" 0 3100%
CAJA DE CONCRETO PARA MEDIDOR 0 3100%
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP 4.52 28%
BALDE PRUEBA-TAPÓN-ABRAZ. Y ACCESORIOS 3.83 24%
CONEXION DE DESAGUE 6" 63.88
OPERARIO 15.03 94%
OFICIAL 15.03 94%
PEON 30.07 188%
TUBERIA PVC SAL 6" PARA DESAGUE 0 18600%
PIEDRA CHANCADA 1/2" 0 279%
ARENA GRUESA 0 217%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 2046%
CAJA DE CONCRETO PREFABRICADO 0.30x0.60 h=0.60 C/TAPA 0 3100%
PEGAMENTO PARA PVC 1/4 GLN 0 372%
MADERA TORNILLO 0 3757%
COMPACTADOR VIBRATORIO TIPO PLANCHA 4 HP 3.75 23%
SEÑALIZACION 368.62
SEÑALIZACION VERTICAL 15
SEÑALIZACION VERTICAL PREVENTIVA 15
OPERARIO 6 25%
OFICIAL 3 13%
PEON 6 25%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 60%
SEÑAL VERTICAL PREVENTIVA 0 200%
AGUA 0 2%
SEÑALIZACION HORIZONTAL 353.62
PINTURA LINEAL EN SARDINEL 148.2
OPERARIO 7.8 98%
PEON 15.6 195%
PINTURA DE TRAFICO 51.48 644%
THINNER 42.12 527%
XILOL 31.2 390%
PINTURA DE PAVIMENTOS (LINEA DISCONTINUA) 75.4
OPERARIO 5.2 65%
PEON 15.6 195%
PINTURA DE TRAFICO 8.58 107%
THINNER 7.02 88%
XILOL 39 488%
PINTURA DE PAVIMENTOS (BORDES) 130
OPERARIO 5.2 65%
PEON 15.6 195%
PINTURA DE TRAFICO 17.17 215%
THINNER 14.03 176%
XILOL 78 975%
VARIOS 80.2
NIVELACION DE TAPAS DE BUZONES EXISTENTES 33.4
CAPATAZ 6.67 83%
OFICIAL 6.67 83%
PEON 20.02 250%
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 0 3000%
PIEDRA CHANCADA 1/2" 0 55%
ARENA GRUESA 0 50%
CEMENTO PORTLAND TIPO I (42.5 kg) 0 750%
TAPA DE CONCRETO REFORZADO PARA BUZON 0 500%
MOTOBOMBA DE 3"-4" (7-10HP) 0.02 0%
CAMION CISTERNA 4x2 (AGUA) 122 HP 2 000gl 0.02 0%
LIMPIEZA FINAL DE OBRA 46.8
PEON 46.8 195%
FLETE TERRESTRE 47.73
FLETE TERRESTRE 24
FLETE TERRESTRE 24 100%
TRANSPORTE DE AGREGADOS 23.73
CAMION VOLQUETE DE 15 m3 23.73 99%