600 Obras de Arte - Tingo
600 Obras de Arte - Tingo
DESCARGA
CUNETAS CUNETA TIPO
ITEM PARTIDAS UND MUROS ALCANT. TOTAL
CANALES REC BADEN
601.C
LONGITUD ANCHO ALTURA VOLUMEN
ELEMENTO PARTIDA
(m) (m) (m) (m 3) (m 3)
TOTAL 210.10
610.D
LONGITUD ANCHO ALTURA VOLUMEN
ELEMENTO N° VECES PARTIDA
(m) (m) (m) (m 3) (m 3)
CUNETÓN 85.25
Losa Fondo 110.00 1.40 0.225 1.00 34.65
Pared Lateral Izquierda 110.00 0.20 1.000 1.00 22.00
Pared Lateral Derecha 110.00 0.20 1.300 1.00 28.60
TOTAL 108.80
610.H
LONGITUD ANCHO ALTURA VOLUMEN
ELEMENTO N° VECES PARTIDA
(m) (m) (m) (m 3) (m 3)
CUNETÓN 11.55
Solado 110.00 1.40 0.075 1.00 11.55
TOTAL 12.00
612.A
LONGITUD ANCHO ALTURA VOLUMEN
ELEMENTO N° VECES PARTIDA
(m) (m) (m) (m 3) (m 2)
CUNETÓN 557.05
Losa Fondo 110.00 0.225 2.00 49.50
1.40 0.225 2.00 0.63
Pared Lateral Izquierda 110.00 1.000 2.00 220.00
0.20 1.000 2.00 0.40
Pared Lateral Derecha 110.00 1.300 2.00 286.00
0.20 1.300 2.00 0.52
TOTAL 581.35
LONGITUD 615
ELEMENTO LONGITUD EMPALME
TOTAL CANTIDAD N° DE VECES PARTIDA
CODIGO Ø (Kg/m) (m) (m) (m) (Kg)
CUNETÓN 4,585.67
Losa Fondo
A1 3/8" 0.56 9.00 - 9.00 12.00 13.00 786.24
B1 3/8" 0.56 4.15 - 4.15 39.00 13.00 1,178.27
B4 3/8" 0.56 1.56 - 1.56 35.00 13.00 397.49
Pared Lateral Izquierda
A2 3/8" 0.56 9.00 - 9.00 10.00 13.00 655.20
B2 3/8" 0.56 1.38 - 1.38 35.00 13.00 351.62
Pared Lateral Derecha
A3 3/8" 0.56 9.00 - 9.00 12.00 13.00 786.24
B3 3/8" 0.56 1.69 - 1.69 35.00 13.00 430.61
TOTAL 4,780.37
624.A
LONGITUD
ELEMENTO CANTIDAD N° VECES PARTIDA
(m) (m)
-
-
TOTAL -
640.A
LONGITUD ANCHO
ELEMENTO N° VECES PARTIDA
(m) (m) (m 2)
TOTAL 64.80
1006.J
LONGITUD
ELEMENTO CANTIDAD N° VECES PARTIDA
(m) (m)
TOTAL 18.20
695.A
TOTAL 24.00
OBRAS DE ARTE
ESTUDIO DEFINITIVO DEL PROYECTO DE MEJORAMIENTO DE LA CARRETERA
SATIPO - MAZAMARI - DESVIO PANGOA - PUERTO OCOPA
CONCRETO
CLASE D ENCOFRADO Y GAVIÓN ROLLIZOS
PROGRESIVA LONGITUD ANCHO ESPESOR ANCHO ESPESOR LONGITUD CANTIDAD MADERA
(F'C = 210 DESENCOFRADO TIPO CAJA Ø= 0.45 m.
KG/CM2)
OBSERVACIONES
OBRAS DE ARTE
ESTUDIO DEFINITIVO PARA LA CONSTRUCCION DEL PUENTE EL TINGO Y ACCESOS
TOTAL 41.50
CONSORCIO
OBRAS DE ARTE Y
ESTUDIO DEFINITIVO PARA LA
TOTAL - - - 1.00