Facultad de Minas, Universidad In this article, we first present a description of the mining planning
Nacional de Colombia, Medellín, process from a classical point of view and its relationship with the
Colombia. current mining planning processes based on optimization in its different
stages. Next, we will approach the open-pit mining planning processes
from a decision-based approach under uncertainty. Finally, it has a
critical analysis of the articles classifying them into five categories:
Geological modeling; Mining planning; Financial evaluation; Decisions
under uncertainty and optimization models.
Gomes Sand is a quarry operation that produces sand and aggregates for
the construction industry. The quarry is experiencing inconsistencies in
fragmentation and poor well conditions as a result of poor drilling and
blasting practices. This is due to excessive downtime in the loading,
transport and crushing processes. A comparative evaluation exercise of
the blasting practices was carried out to evaluate the effect of the
inconsistency in the mining cycle. After the changes in the blasting
practices, the downtime was reduced, the utilization of the crushing
plant was improved by 4.9%. Improved blasting practices and further
Universidad de petroria fragmentation reduced the number of loads lost each month due to jaw
crusher blockages from 9.2% to 3.9% of the plant's performance. The
change in blasting practices also improved well conditions.
Drilling and blasting are fundamental operations in the mining cycle and
the important component of mining costs. In principle, the
fragmentation of the rock can be managed by two options: increase or
reduce the specific consumption of explosives or modify the drilling
pattern. The choice of one or the other type of control depends on the
relationship between the unit costs of drilling and explosives, and the
technical or unforeseeable constraints for different reasons. Then it is
necessary to identify the link between the design of the production and
Universidad Nacional de Colombia some factors that affect the subsequent processing of the product. This
article analyzes the theoretical bases in order to evaluate the main ones.
In particular, a method developed through the analysis of results in a
large number of limestone open-pit quarries in Italy is described and
commented on. The first experimental results in Brazil were obtained by
applying this method in the Experimental Mine of the Responsible
Mining Research Center of the University of São Paulo. The experimental
methods and the results will be analyzed and discussed in the second
part of this document.
Author Keywords Index Keywords Métodos de enseñanza
drilling
drilling
Drill, blast
Tipo de universidad Tipo de estudio Motivos de exclusión
No responde la pregunta de
investigación
Esta realacionado a la minería de no
metálica.
Motivos de inclusión