CALCULO DEL COEFICIENTE DE REAJUSTE "K"

OBRA "MEJORAMIENTO DEL SERVICIO DE EDUCACIÓN PRIMARIA EN LA I.E. N 36157 DEL DISTRITO DE ANDABAMBA - ACOBAMBA - HUANCAVELICA"
CONTRATISTA CONSORCIO ANDABAMBA
SUPERVISION ING. FREDY HUACCACHI HUAMAN
RESIDENTE ING. DANTE MOISES MENDOZA PEREZ
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANDABAMBA
DEPARTAMENTO HUANCAVELICA

FORMULA 01: AREA ADMINISTRATIVA - PEDAGODICA

K = 0.377*(MHr/MHo) + 0.265*(MBCTr/MBCTo) + 0.201*(Mr/Mo)+0.077*(IAr/IAo) + 0.080*(AAFr/AAFo)

Porcentaje Base Dec-14 Jan-15 Feb-15 Mar-15


SIMB DESCRIPCION I.U. Coef
% Set - 14 "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"

MH MANO DE OBRA INC. LEYES SOCIALES 47 100.00% 0.377 523.70 523.70 0.377 523.15 0.377 523.15 0.377 523.15 0.377
MBCT MADERA NACIONAL PARA ENCOFRADO Y CARP. 43 100.00% 0.265 789.51 797.43 0.268 794.10 0.267 795.15 0.267 797.10 0.268
M MAQUINARIA Y EQUIPO IMPORTADO 49 100.00% 0.201 255.29 264.41 0.208 268.53 0.211 275.86 0.217 277.02 0.218
IA INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 100.00% 0.077 403.02 404.87 0.077 405.56 0.077 406.79 0.078 409.90 0.078
AAF ACERO DE CONSTRUCCION CORRUGADO 03 100.00% 0.080 481.01 501.62 0.083 509.07 0.085 517.67 0.086 515.52 0.086

COEFICIENTE DE REAJUSTE "K" 1.000 Ka = 1.014 Ka = 1.017 Ka = 1.025 Ka = 1.026


CALCULO DEL COEFICIENTE DE REAJUSTE "K"
OBRA "MEJORAMIENTO DEL SERVICIO DE EDUCACIÓN PRIMARIA EN LA I.E. N 36157 DEL DISTRITO DE ANDABAMBA - ACOBAMBA - HUANCAVELICA"
CONTRATISTA CONSORCIO ANDABAMBA
SUPERVISION ING. FREDY HUACCACHI HUAMAN
RESIDENTE ING. DANTE MOISES MENDOZA PEREZ
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANDABAMBA
DEPARTAMENTO HUANCAVELICA

FORMULA 02: AREA DE COCINA Y COMEDOR

K = 0.383*(MHr/Mho) + 0.164*(Cr/Co) + 0.151*(ACr/ACo) + 0.252*(BMAAr/BMAAo) + 0.050*(IAMTr/IAMRo)

Porcentaje Base Dec-14 Jan-15 Feb-15 Mar-15


SIMB DESCRIPCION I.U. Coef
% Set - 14 "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"

MH MANO DE OBRA INC. LEYES SOCIALES 47 100.00% 0.383 523.70 523.70 0.383 523.15 0.383 523.15 0.383 523.15 0.383
C CEMENTO PORTALND TIPO I 21 100.00% 0.164 366.81 375.64 0.168 389.65 0.174 389.65 0.174 389.65 0.174
AC ACERO DE CONSTRUCCION CORRUGADO 03 100.00% 0.151 481.01 501.62 0.157 509.07 0.160 517.67 0.163 515.52 0.162
BMAA BLOQUE Y LADRILLO 17 100.00% 0.252 749.21 754.77 0.254 749.32 0.252 748.77 0.252 750.04 0.252
IAMT INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 100.00% 0.050 403.02 404.87 0.050 405.56 0.050 406.79 0.050 409.90 0.051

COEFICIENTE DE REAJUSTE "K" 1.000 Ka = 1.013 Ka = 1.019 Ka = 1.022 Ka = 1.022


CALCULO DEL COEFICIENTE DE REAJUSTE "K"
OBRA "MEJORAMIENTO DEL SERVICIO DE EDUCACIÓN PRIMARIA EN LA I.E. N 36157 DEL DISTRITO DE ANDABAMBA - ACOBAMBA - HUANCAVELICA"
CONTRATISTA CONSORCIO ANDABAMBA
SUPERVISION ING. FREDY HUACCACHI HUAMAN
RESIDENTE ING. DANTE MOISES MENDOZA PEREZ
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANDABAMBA
DEPARTAMENTO HUANCAVELICA

FORMULA 03: TANQUE ELEVADO Y CISTERNA

K = 0.398*(Mr/Mo) + 0.292*(ABDIr/ABDIo) + 0.169*(CADPr/CADPo) + 0.083*(MAHr/MAHo) + 0.058*(Mr/Mo)

Porcentaje Base Dec-14 Jan-15 Feb-15 Mar-15


SIMB DESCRIPCION I.U. Coef
% Set - 14 "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"

MH MANO DE OBRA INC. LEYES SOCIALES 47 100.00% 0.398 523.70 523.70 0.398 523.15 0.398 523.15 0.398 523.15 0.398
C ACERO DE CONSTRUCCION CORRUGADO 03 100.00% 0.292 481.01 501.62 0.305 509.07 0.309 517.67 0.314 515.52 0.313
AC CEMENTO PORTLAND TIPO I 21 100.00% 0.169 366.81 375.64 0.173 389.65 0.180 389.65 0.180 389.65 0.180
BMAA MAQUINARIA Y EQUIPO NACIONAL 48 100.00% 0.083 341.35 346.68 0.084 348.43 0.085 350.89 0.085 352.93 0.086
IAMT MADERA NACIONAL PARA ENCOF. Y CARPINT. 43 100.00% 0.058 789.51 797.43 0.059 794.10 0.058 795.15 0.058 797.10 0.059

COEFICIENTE DE REAJUSTE "K" 1.000 Ka = 1.018 Ka = 1.029 Ka = 1.035 Ka = 1.034


CALCULO DEL COEFICIENTE DE REAJUSTE "K"
OBRA "MEJORAMIENTO DEL SERVICIO DE EDUCACIÓN PRIMARIA EN LA I.E. N 36157 DEL DISTRITO DE ANDABAMBA - ACOBAMBA - HUANCAVELICA"
CONTRATISTA CONSORCIO ANDABAMBA
SUPERVISION ING. FREDY HUACCACHI HUAMAN
RESIDENTE ING. DANTE MOISES MENDOZA PEREZ
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANDABAMBA
DEPARTAMENTO HUANCAVELICA

FORMULA 04: OBRAS EXTERIORES

K = 0.332*(Mr/Mo) + 0.255*(CMAr/CMAo) + 0.129*(AGr/AGo) + 0.207*(Ir/Io) + 0.077*(MHr/MHo)

Porcentaje Base Dec-14 Jan-15 Feb-15 Mar-15


SIMB DESCRIPCION I.U. Coef
% Set - 14 "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"

M MANO DE OBRA INC. LEYES SOCIALES 47 100.00% 0.332 523.70 523.70 0.332 523.15 0.332 523.15 0.332 523.15 0.332
CMA MADERA NACIONAL PARA ENCOF. Y CARPINT. 21 100.00% 0.255 366.81 375.64 0.261 389.65 0.271 389.65 0.271 389.65 0.271
AG AGREGADO GRUESO 05 100.00% 0.129 392.69 398.58 0.131 396.59 0.130 398.02 0.131 400.70 0.132
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 100.00% 0.207 403.02 404.87 0.208 405.56 0.208 406.79 0.209 409.90 0.211
MH MAQUINARIA Y EQUIPO IMPORTADO 49 100.00% 0.077 255.29 264.41 0.080 268.53 0.081 275.86 0.083 277.02 0.084

COEFICIENTE DE REAJUSTE "K" 1.000 Ka = 1.012 Ka = 1.022 Ka = 1.025 Ka = 1.028


CALCULO DEL COEFICIENTE DE REAJUSTE "K"
OBRA "MEJORAMIENTO DEL SERVICIO DE EDUCACIÓN PRIMARIA EN LA I.E. N 36157 DEL DISTRITO DE ANDABAMBA - ACOBAMBA - HUANCAVELICA"
CONTRATISTA CONSORCIO ANDABAMBA
SUPERVISION ING. FREDY HUACCACHI HUAMAN
RESIDENTE ING. DANTE MOISES MENDOZA PEREZ
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANDABAMBA
DEPARTAMENTO HUANCAVELICA

FORMULA 05: CERCO PERIMETRICO

K = 0.456*(Mr/Mo) + 0.203*(ACr/ACo) + 0.163*(BAr/BAo) + 0.084*(MIr/MIo) + 0.094*(MGHr/MGHo)

Porcentaje Base Dec-14 Jan-15 Feb-15 Mar-15


SIMB DESCRIPCION I.U. Coef
% Set - 14 "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"

M MANO DE OBRA INC. LEYES SOCIALES 47 100.00% 0.456 523.70 523.70 0.456 523.15 0.456 523.15 0.456 523.15 0.456
AC ACERO DE CONSTRUCCION CORRUGADO 03 100.00% 0.203 481.01 501.62 0.212 509.07 0.215 517.67 0.218 515.52 0.218
BA BLOQUE Y LADRILLO 17 100.00% 0.163 749.21 754.77 0.164 749.32 0.163 748.77 0.163 750.04 0.163
MI MADERA NACIONAL PARA ENCOF. Y CARPINT. 43 100.00% 0.084 789.51 797.43 0.085 794.10 0.084 795.15 0.085 797.10 0.085
MGH MAQUINARIA Y EQUIPO IMPORTADO 49 100.00% 0.094 255.29 264.41 0.097 268.53 0.099 275.86 0.102 277.02 0.102

COEFICIENTE DE REAJUSTE "K" 1.000 Ka = 1.014 Ka = 1.017 Ka = 1.023 Ka = 1.023


CALCULO DEL COEFICIENTE DE REAJUSTE "K"
OBRA "MEJORAMIENTO DEL SERVICIO DE EDUCACIÓN PRIMARIA EN LA I.E. N 36157 DEL DISTRITO DE ANDABAMBA - ACOBAMBA - HUANCAVELICA"
CONTRATISTA CONSORCIO ANDABAMBA
SUPERVISION ING. FREDY HUACCACHI HUAMAN
RESIDENTE ING. DANTE MOISES MENDOZA PEREZ
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANDABAMBA
DEPARTAMENTO HUANCAVELICA

FORMULA 06: EQUIPAMIENTO - CAPACITACION

K = 1.000*(Ir/Io)

Porcentaje Base Dec-14 Jan-15 Feb-15 Mar-15


SIMB DESCRIPCION I.U. Coef
% Set - 14 "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"

I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 100.00% 1.000 403.02 404.87 1.005 405.56 1.006 406.79 1.009 409.90 1.017

COEFICIENTE DE REAJUSTE "K" 1.000 Ka = 1.005 Ka = 1.006 Ka = 1.009 Ka = 1.017


CALCULO DEL COEFICIENTE DE REAJUSTE "K"
OBRA "MEJORAMIENTO DEL SERVICIO DE EDUCACIÓN PRIMARIA EN LA I.E. N 36157 DEL DISTRITO DE ANDABAMBA - ACOBAMBA - HUANCAVELICA"
CONTRATISTA CONSORCIO ANDABAMBA
SUPERVISION ING. FREDY HUACCACHI HUAMAN
RESIDENTE ING. DANTE MOISES MENDOZA PEREZ
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANDABAMBA
DEPARTAMENTO HUANCAVELICA

FORMULA 07: RAMPAS Y MUROS DE CONTENCION

K = 0.696*(MHr/MHo) + 0.147*(AAr/AAo) + 0.081*(CIGDr/CIGDo) + 0.076*(AMMMr/AMMMo)

Porcentaje Base Dec-14 Jan-15 Feb-15 Mar-15


SIMB DESCRIPCION I.U. Coef
% Set - 14 "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"

MH MANO DE OBRA INC. LEYES SOCIALES 47 100.00% 0.696 523.7 523.70 0.696 523.15 0.695 523.15 0.695 523.15 0.695
AA ACERO DE CONSTRUCCION CORRUGADO 03 100.00% 0.147 481.01 501.62 0.153 509.07 0.156 517.67 0.158 515.52 0.158
CIGD CEMENTO PORTLAND TIPO I 21 100.00% 0.081 366.81 375.64 0.083 389.65 0.086 389.65 0.086 389.65 0.086
AMMM GAGREGADO GRUESO 05 100.00% 0.076 392.69 398.58 0.077 396.59 0.077 398.02 0.077 400.70 0.078

COEFICIENTE DE REAJUSTE "K" 1.000 Ka = 1.009 Ka = 1.014 Ka = 1.017 Ka = 1.016


CALCULO DEL COEFICIENTE DE REAJUSTE "K"
OBRA "MEJORAMIENTO DEL SERVICIO DE EDUCACIÓN PRIMARIA EN LA I.E. N 36157 DEL DISTRITO DE ANDABAMBA - ACOBAMBA - HUANCAVELICA"
CONTRATISTA CONSORCIO ANDABAMBA
SUPERVISION ING. FREDY HUACCACHI HUAMAN
RESIDENTE ING. DANTE MOISES MENDOZA PEREZ
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANDABAMBA
DEPARTAMENTO HUANCAVELICA

FORMULA 08: EQUIPAMIENTO - CAPACITACION

K = 1.000*(Fr/Fo)

Porcentaje Base Dec-14 Jan-15 Feb-15 Mar-15


SIMB DESCRIPCION I.U. Coef
% Set - 14 "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"

F FLETE TERRESTRE 32 100.00% 1.000 468.49 468.56 1.000 468.56 1.000 468.56 1.000 469.08 1.001

COEFICIENTE DE REAJUSTE "K" 1.000 Ka = 1.000 Ka = 1.000 Ka = 1.000 Ka = 1.001


K"

Apr-15 May-15 Jun-15 Jul-15 Aug-15


"Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"
523.15 0.377 523.15 0.377 544.59 0.392 544.59 0.392 544.59 0.392
796.28 0.267 802.02 0.269 810.32 0.272 808.03 0.271 815.46 0.274
279.73 0.220 282.51 0.222 283.41 0.223 285.08 0.224 290.4 0.229
411.5 0.079 413.82 0.079 415.20 0.079 417.07 0.080 418.64 0.080
505.2 0.084 497.61 0.083 496.56 0.083 458.09 0.076 462.12 0.077

Ka = 1.027 Ka = 1.030 Ka = 1.049 Ka = 1.044 Ka = 1.051


K"

Apr-15 May-15 Jun-15 Jul-15 Aug-15


"Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"
523.15 0.383 523.15 0.383 544.59 0.398 544.59 0.398 544.59 0.398
389.65 0.174 389.65 0.174 389.65 0.174 389.65 0.174 389.65 0.174
505.20 0.159 497.61 0.156 496.56 0.156 458.09 0.144 462.12 0.145
748.26 0.252 748.58 0.252 745.27 0.251 745.53 0.251 742.52 0.250
411.50 0.051 413.82 0.051 415.20 0.052 417.07 0.052 418.64 0.052

Ka = 1.018 Ka = 1.016 Ka = 1.031 Ka = 1.019 Ka = 1.019


K"

Apr-15 May-15 Jun-15 Jul-15 Aug-15


"Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"
523.15 0.398 523.15 0.398 544.59 0.414 544.59 0.414 544.59 0.414
505.20 0.307 497.61 0.302 496.56 0.301 458.09 0.278 462.12 0.281
389.65 0.180 389.65 0.180 389.65 0.180 389.65 0.180 389.65 0.180
354.51 0.086 355.41 0.086 356.20 0.087 415.57 0.101 359.33 0.087
796.28 0.058 802.02 0.059 810.32 0.060 808.03 0.059 815.46 0.060

Ka = 1.028 Ka = 1.025 Ka = 1.041 Ka = 1.032 Ka = 1.021


K"

Apr-15 May-15 Jun-15 Jul-15 Aug-15


"Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"
523.15 0.332 523.15 0.332 544.59 0.345 544.59 0.345 544.59 0.345
389.65 0.271 389.65 0.271 389.65 0.271 389.65 0.271 389.65 0.271
401.16 0.132 398.48 0.131 401.55 0.132 402.57 0.132 403.33 0.132
411.50 0.211 413.82 0.213 415.20 0.213 417.07 0.214 418.64 0.215
279.73 0.084 282.51 0.085 283.41 0.085 285.08 0.086 290.40 0.088

Ka = 1.030 Ka = 1.031 Ka = 1.047 Ka = 1.049 Ka = 1.051


K"

Apr-15 May-15 Jun-15 Jul-15 Aug-15


"Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"
523.15 0.456 523.15 0.456 544.59 0.474 544.59 0.474 544.59 0.474
505.20 0.213 797.61 0.337 496.56 0.210 458.09 0.193 462.12 0.195
748.26 0.163 748.58 0.163 745.27 0.162 745.53 0.162 742.52 0.162
796.28 0.085 802.02 0.085 810.32 0.086 808.03 0.086 815.46 0.087
279.73 0.103 282.51 0.104 283.41 0.104 285.08 0.105 290.40 0.107

Ka = 1.019 Ka = 1.144 Ka = 1.036 Ka = 1.021 Ka = 1.024


K"

Apr-15 May-15 Jun-15 Jul-15 Aug-15


"Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"
411.50 1.021 413.82 1.027 415.20 1.030 417.07 1.035 418.64 1.039

Ka = 1.021 Ka = 1.027 Ka = 1.030 Ka = 1.035 Ka = 1.039


K"

Apr-15 May-15 Jun-15 Jul-15 Aug-15


"Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"
523.15 0.695 523.15 0.695 544.59 0.724 544.59 0.724 544.59 0.724
505.20 0.154 797.61 0.244 496.56 0.152 458.09 0.140 462.12 0.141
389.65 0.086 389.65 0.086 389.65 0.086 389.65 0.086 389.65 0.086
401.16 0.078 398.48 0.077 401.55 0.078 402.57 0.078 403.33 0.078

Ka = 1.013 Ka = 1.102 Ka = 1.039 Ka = 1.028 Ka = 1.029


K"

Apr-15 May-15 Jun-15 Jul-15 Aug-15


"Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"
469.08 1.001 469.08 1.001 466.15 0.995 466.15 0.995 466.15 0.995

Ka = 1.001 Ka = 1.001 Ka = 0.995 Ka = 0.995 Ka = 0.995


CALCULO DEL COEFICIENTE DE REAJUSTE "K"
OBRA "MEJORAMIENTO DEL SERVICIO DE EDUCACIÓN PRIMARIA EN LA I.E. N 36157 DEL DISTRITO DE ANDABAMBA - ACOBAMBA - HUANCAVELICA"
CONTRATISTA CONSORCIO ANDABAMBA
SUPERVISION ING. FREDY HUACCACHI HUAMAN
RESIDENTE ING. DANTE MOISES MENDOZA PEREZ
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANDABAMBA
DEPARTAMENTO HUANCAVELICA

K = 0.350*(Mr/Mo) + 0.106*(CBr/Cbo) + 0.075*(APTr/APTo) + 0.054*(AALr/AALo) + 0.169*(FMr/Fmo) + 0.113*(Mr/Mo) + 0.133*(Ir/Io)

Porcentaje Base Dec-14 Jan-15 Feb-15 Mar-15


SIMB DESCRIPCION I.U. Coef
% Set - 14 "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"

M MANO DE OBRA INC. LEYES SOCIALES 47 100.00% 0.350 523.70 523.70 0.350 523.15 0.350 523.15 0.350 523.15 0.350
CB CEMENTO PORTLAND TIPO I 21 100.00% 0.106 366.81 375.64 0.109 389.65 0.113 389.65 0.113 389.65 0.113
APT ACERO DE CONSTRUCION CORRUGADO 03 100.00% 0.075 481.01 501.62 0.078 509.07 0.079 517.67 0.081 515.52 0.080
AAL AGREGADO GRUESO 05 100.00% 0.054 392.69 398.58 0.055 396.59 0.055 398.02 0.055 400.70 0.055
FM FLETE TERRESTRE 32 100.00% 0.169 468.49 468.56 0.169 468.56 0.169 468.56 0.169 469.08 0.169
M MAQUINARIA Y EQUIPO IMPORTADO 49 100.00% 0.113 255.29 264.41 0.117 268.53 0.119 275.86 0.122 277.02 0.123
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 100.00% 0.133 403.02 404.87 0.134 405.56 0.134 406.79 0.134 409.90 0.135

COEFICIENTE DE REAJUSTE "K" 1.000 Ka = 1.011 Ka = 1.018 Ka = 1.023 Ka = 1.025


COEFICIENTE DE REAJUSTE "K"

Apr-15 May-15 Jun-15 Jul-15 Aug-15


"Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r" "Kr" "r"

523.15 0.350 523.15 0.350 544.59 0.364 544.59 0.364 544.59 0.364
389.65 0.113 389.65 0.113 389.65 0.113 389.65 0.113 389.65 0.113
505.20 0.079 497.61 0.078 496.56 0.077 458.09 0.071 462.12 0.072
401.16 0.055 398.48 0.055 401.55 0.055 402.57 0.055 403.33 0.055
469.08 0.169 469.08 0.169 466.15 0.168 466.15 0.168 466.15 0.168
279.73 0.124 282.51 0.125 283.41 0.125 285.08 0.126 290.40 0.129
411.50 0.136 413.82 0.137 415.20 0.137 417.07 0.138 418.64 0.138

Ka = 1.025 Ka = 1.025 Ka = 1.040 Ka = 1.035 Ka = 1.039


CALCULO DEL REINTEGRO
OBRA "MEJORAMIENTO DEL SERVICIO DE EDUCACIÓN PRIMARIA EN LA I.E. N 36157 DEL DISTRITO DE ANDABAMBA - ACOBAMBA - HUANCAVELICA"
CONTRATISTA CONSORCIO ANDABAMBA
SUPERVISION ING. FREDY HUACCACHI HUAMAN
RESIDENTE ING. DANTE MOISES MENDOZA PEREZ
ENTIDAD MUNICIPALIDAD DISTRITAL DE ANDABAMBA
DEPARTAMENTO HUANCAVELICA

K = 0.350*(Mr/Mo) + 0.106*(CBr/Cbo) + 0.075*(APTr/APTo) + 0.054*(AALr/AALo) + 0.169*(FMr/Fmo) + 0.113*(Mr/Mo) + 0.133*(Ir/Io)

VALORIZACION AVANCE MENSUAL (S/.) REINTEGRO


PROGRAMADO REAL K-1 PROGRAMADO REAL
N° PERIODO
PARCIAL ACUMUL. REAL ACUMUL. PARCIAL ACUMUL. REAL ACUMUL.
01 Dec-14 499,754.01 499,754.01 482,111.11 482,111.11 0.011 5,621.12 5,621.12 5,422.67 5,422.67
02 Jan-15 245,641.05 745,395.06 189,835.94 671,947.05 0.018 4,389.14 10,010.26 3,392.01 8,814.68
03 Feb-15 278,289.40 1,023,684.46 173,722.83 845,669.88 0.023 6,416.26 16,426.52 4,005.37 12,820.05
04 Mar-15 137,236.03 1,160,920.49 117,418.92 963,088.81 0.025 3,405.75 19,832.27 2,913.96 15,734.01
05 Apr-15 43,826.66 1,204,747.15 46,083.83 1,009,172.64 0.025 1,095.60 20,927.87 1,152.02 16,886.03
06 May-15 169,111.81 1,373,858.97 106,675.25 1,115,847.89 0.025 4,302.64 25,230.51 2,714.10 19,600.13
07 Jun-15 141,523.76 1,515,382.73 104,782.81 1,220,630.70 0.040 5,636.42 30,866.93 4,173.15 23,773.28
08 Jul-15 106,540.77 1,621,923.50 216,271.96 1,436,902.66 0.035 3,763.55 34,630.48 7,639.80 31,413.08
09 Aug-15 135,597.79 1,757,521.29 320,618.63 1,757,521.29 0.039 5,278.92 39,909.40 12,481.93 43,895.01
TOTAL 1,757,521.29 1,757,521.29 39,909.40 43,895.01
ANTERIOR
REINTEGRO ACTUAL
HUANCAVELICA"

REINTEGRO DEDUCCION REINTEGRO


BRUTO NETO
AUTORIZADO EFECTIVO MATER. AUTORIZADO

5,422.67 0.00 0.00 5,422.67


3,392.01 0.00 0.00 3,392.01
4,005.37 0.00 0.00 4,005.37
2,913.96 0.00 0.00 2,913.96
1,152.02 0.00 0.00 1,152.02
2,714.10 0.00 0.00 2,714.10
4,173.15 0.00 0.00 4,173.15
7,639.80 0.00 0.00 7,639.80
5,278.92 0.00 0.00 5,278.92
36,692.00 0.00 0.00 36,692.00
0.00
36,692.00
MONTO DEL CONTRATO VIGENTE
OBRA : "MEJORAMIENTO DEL SERVICIO DE EDUCACIÓN PRIMARIA EN LA I.E. N 36157 DEL
DISTRITO DE ANDABAMBA - ACOBAMBA - HUANCAVELICA"
PORCESO DE SELECCIÓN :
CONTRATO N° :
CONTRATISTA : CONSORCIO ANDABAMBA

TOTAL
N° DESCRIPCION MONTO SIN IGV IGV
INC. IGV

01 Contrato principal sin IGV 1,757,521.29 316,353.83 2,073,875.12


02 Adicional N° 01 0.00 0.00 0.00
03 Deductivo N° 01 0.00 0.00 0.00
04 Reintegro del Contrato Principal 36,692.00 6,604.56 43,296.56
05 Reintegro del Adicional N° 01 0.00 0.00 0.00
06 Reintegro Compensacion Tiempo de Servicio 0.00 0.00 0.00
07 Reintegro Compensacion Vacacional 0.00 0.00 0.00
08 Intereses Art. 255 D.S. 0.84-2004-PCM 0.00 0.00 0.00
09 Mayores Gastos Generales 0.00 0.00 0.00
MONTO TOTAL (S/.) 1,757,521.29 316,353.83 2,073,875.12
REINTEGRO A FAVOR DEL CONTRATISTA 36,692.00 6,604.56 43,296.56
MONTO TOTAL AL FINALIZAR LA LIQUIDACION 2,117,171.68
LIQUIDACION FINAL DE OBRA

OBRA: "MEJORAMIENTO DE LAS CALLES EN LA LOCALIDAD DE ANDABAMBA, DISTRITO DE ANDABAMBA - ACOBAMBA -

CONTR.: CONTRATO N°001-2017-LP/MDA


CONTRA.: CONSORCIO ACUARIO RUC N°20541417851
MONTO 3,030,930.71
MONTO SIN2,568,585.35

Costo Final de Obra


N° CONCEPTO (S/.)

01 MONTO VALORIZADO 2,568,585.35


Valorizacion sin reajustes 2,238,207.70
Valorización por Adicional - Deductivo Vinculante 207,660.09
Valorización por Adicional de Obra 41,618.83
Valorizacion por Mayores Mestrados 81,098.73

02 REAJUSTES DE LA VALORIZACION 0.00


Por Obra principal 0.00
Por Adicional 0.00
Retencion por retraso de la Obra 0.00
Obra Principal 0.00
Obra Adicional 0.00
Reintegros y Otros 0.00

03 MONTO BRUTO VALORIZ. REAJUSTADO (01+02) 2,568,585.35

04 DEDUCCION DEL REAJUSTE 0.00


Por Adelanto Directo 0.00
Por Adelanto de Materiales 0.00

05 MONTO NETO VALORIZ. REAJUSTADO (03+04) 2,568,585.35

06 AMORTIZACIONES DE ADELANTOS 770,575.60


Adelanto Directo 256,858.53
Adelanto de Materiales 513,717.07

07 OTROS 0.00
Mayores Gastos Generales Ampl. Plazo 0.00
Interes por Moras en pagos 0.00
Otros Conceptos 0.00

08 MONTO NETO FACTURABLE SIN I.G.V. (01+06+07) 3,339,160.95

09 MONTO RETENIDO 0.00


Varios 0.00

10 MULTA Y OBLIGACIONES VARIAS 0.00


Multa por Retraso en la entrega de Obra 0.00
Otros 0.00

11 MONTO LIQUIDO A PAGAR (05+09+10) 2,568,585.35

12 IMPUESTO GENERAL A LAS VENTAS (I.G.V.) 462,345.36


Del Monto Neto 462,345.36
Del Monto Reajuste 0.00
Por Adelantos Otorgados 0.00

13 MONTO A COMPROMETER (11+12) 3,030,930.71

14 MONTO A CANCELAR FACTURABLE (11+12) 3,030,930.71

COSTO FINAL DE LA OBRA (05+07+12) 3,030,930.71


OBRA

ITO DE ANDABAMBA - ACOBAMBA - HUANCAVELICA"

Montos Pagados Saldo a Pagar


(S/.) (S/.)

2,568,546.58 38.77
2,238,207.70 0.00
207,660.09 0.00
41,580.06 38.77
81,098.73 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

2,568,546.58 38.77

0.00 0.00
0.00 0.00
0.00 0.00

2,568,546.58 38.77

770,575.60 0.00
256,858.53 0.00
513,717.07 0.00

0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00

3,339,122.18 38.77

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00
0.00 0.00

2,568,546.58 38.77

462,338.38 6.98
462,338.38 6.98
0.00 0.00
0.00 0.00

3,030,884.96 45.75

3,030,884.96 45.75

3,030,884.96 45.75