9/11/2017
INGENIEROS CONSULTORES S.A
Project: Checked by: Date:
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES - LA ATARJEA B.P
Client: Element:
SEDAPAL TANQUE AIREADOR DE LODOS
J.M.T.C
Date:
A
9/11/2017
INGENIEROS CONSULTORES S.A
Project: Checked by: Date:
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES - LA ATARJEA B.P
Client: Element:
SEDAPAL TANQUE AIREADOR DE LODOS
J.M.T.C
Date:
A
9/11/2017
INGENIEROS CONSULTORES S.A
Project: Checked by: Date:
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES - LA ATARJEA B.P
Client: Element:
SEDAPAL TANQUE AIREADOR DE LODOS
ℎ_𝑖/𝐻_𝐿 =0.5−0.09375(𝐷/𝐻_𝐿 )
ℎ_𝑖/𝐻_𝐿 =0.375
J.M.T.C
Date:
A
9/11/2017
INGENIEROS CONSULTORES S.A
Project: Checked by: Date:
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES - LA ATARJEA B.P
Client: Element:
SEDAPAL TANQUE AIREADOR DE LODOS
�_𝑖≤�_𝑆→𝐶_𝑖=𝑆_𝐷𝑆
�_𝑖>�_𝑆→𝐶_𝑖=𝑆_𝐷1/�_𝑖 ≤𝑆_𝐷𝑆
�_𝑆=𝑆_𝐷1/𝑆_𝐷𝑆 ≤𝑆_𝐷𝑆
J.M.T.C
Date:
A
9/11/2017
INGENIEROS CONSULTORES S.A
Project: Checked by: Date:
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES - LA ATARJEA B.P
Client: Element:
SEDAPAL TANQUE AIREADOR DE LODOS
Ref. Calculations
�_𝑐>1.6∕�_𝑆 →𝐶_𝑐=6 (0.4𝑆_𝐷𝑆)/(�_𝑐^2 )=(2.4𝑆_𝐷𝑆)/(�_𝑐^2 ) Output
�_𝑣≤�_𝑠→𝐶_𝑡=𝑆_𝐷𝑆
�_𝑣>�_𝑠→𝐶_𝑡=𝑆_𝐷1/�_𝑣
J.M.T.C
Date:
A
9/11/2017
INGENIEROS CONSULTORES S.A
Project: Checked by: Date:
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES - LA ATARJEA B.P
Client: Element:
SEDAPAL TANQUE AIREADOR DE LODOS
J.M.T.C
Date:
A
9/11/2017
INGENIEROS CONSULTORES S.A
Project: Checked by: Date:
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES - LA ATARJEA B.P
Client: Element:
SEDAPAL TANQUE AIREADOR DE LODOS
Distribución de la Fuerza
ACI.350.3-06 �_𝑤𝑦=�_𝑤𝑦/𝜋𝑟
�_𝑖𝑦= 〖 2� 〗 _𝑖𝑦/𝜋𝑟 �_𝑐𝑦=(16�_𝑐𝑦)/9𝜋𝑟
𝑐𝑜𝑠� 𝑐𝑜𝑠�
�_𝑣𝑦=ü_𝑣 𝑞_ℎ𝑦
(R5.3.3)
y gL ph
m t/m 3
t/m2
5.20
4.60 1.00 0.00
4.09 1.00 0.51
3.58 1.00 1.02
3.07 1.00 1.53
2.56 1.00 2.04
2.04 1.00 2.56
8 de 15
Project N°: Rev.
JMTC CALCULATION SHEET Made by:
001
J.M.T.C
Date:
A
9/11/2017
INGENIEROS CONSULTORES S.A
Project: Checked by: Date:
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES - LA ATARJEA B.P
Client: Element:
SEDAPAL TANQUE AIREADOR DE LODOS
as
20
30
40
FACTOR DE ZONA
ZONA Z
1 0.1
2 0.25
3 0.35
4 0.45
FACTOR DE IMPORTANCIA
USO Z
I 1
II 1.25
III 1.5
Tipo de estructura Ri Rc
FACTOR DE IMPORTANCIA
SUELO
ZONA
S0 S1 S2 S3
4 0.80 1.00 1.05 1.10
3 0.80 1.00 1.15 1.20
2 0.80 1.00 1.20 1.40
1 0.80 1.00 1.60 2.00
SUELO
PERIODO
S0 S1 S2 S3
TP 0.30 0.40 0.60 1.00
TL 3.00 2.50 2.00 1.60
11 de 15
8/31/2017
INGENIEROS CONSULTORES S.A
Project: Checked by: Date:
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES - LA ATARJEA
Client: Element:
SEDAPAL TANQUE AIREADOR DE LODOS
E.030 (2.5) El factor de amplificación sísmica "C" está definido por las siguientes expresiones:
𝐶=1+7.5 �/�_�
�<0.2�_�
�<�_� 𝐶=2.5
𝐶=2.5(�_�/�)
�_�<�<�_𝐿
𝐶=2.5((�_�.�_𝐿)/�^2 )
�>�_𝐿
1.20
2 S
a
/
1.00 g
T
p
T
0.80 L
Sa/g
0.60
0.40
Donde:
0.20 2 SDS : S DS = 1.1250
Aceleración espectral de diseño para
periodos cortos
0.00 SD1 = Aceleración espectral de diseño para S D1 = 0.4500
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
periodos cortos
Periodo T
p
T
0.80 L
12 de 15
Sa/g
0.60
8/31/2017
INGENIEROS CONSULTORES S.A
Project: 0.20 2 Checked by: Date:
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES - LA ATARJEA
Client: Element:
SEDAPAL TANQUE AIREADOR DE LODOS
0.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
Ref. Calculations Output
Periodo T
C T (s) Sa/g
1.00 0.00 0.4500
1.38 0.02 0.6188
1.75 0.04 0.7875
2.13 0.06 0.9563
2.50 0.08 1.1250
2.50 0.10 1.1250
2.50 0.12 1.1250
2.50 0.14 1.1250
2.50 0.16 1.1250
2.50 0.18 1.1250
2.50 0.20 1.1250
2.50 0.25 1.1250
2.50 0.30 1.1250
2.50 0.35 1.1250
2.50 0.40 1.1250
2.22 0.45 1.0000
2.00 0.50 0.9000
1.82 0.55 0.8182
1.67 0.60 0.7500
1.54 0.65 0.6923
1.43 0.70 0.6429
1.33 0.75 0.6000
1.25 0.80 0.5625
1.18 0.85 0.5294
1.11 0.90 0.5000
1.05 0.95 0.4737
1.00 1.00 0.4500
0.91 1.10 0.4091
0.83 1.20 0.3750
0.77 1.30 0.3462
0.71 1.40 0.3214
0.67 1.50 0.3000
0.63 1.60 0.2813
0.59 1.70 0.2647
0.56 1.80 0.2500
0.53 1.90 0.2368
0.50 2.00 0.2250
0.45 2.20 0.2045
0.42 2.40 0.1875
0.37 2.60 0.1664
0.32 2.80 0.1435
0.28 3.00 0.1250
0.16 4.00 0.0703
0.10 5.00 0.0450
0.07 6.00 0.0313
0.05 7.00 0.0230
0.04 8.00 0.0176
0.03 9.00 0.0139
0.03 10.00 0.0113
13 de 15
8/31/2017
INGENIEROS CONSULTORES S.A
Project: Checked by: Date:
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES - LA ATARJEA
Client: Element:
SEDAPAL TANQUE AIREADOR DE LODOS
0.30
2.50 0.18 0.5625
2.50 0.20 0.5625
2.50 0.25 0.5625 0.20
2.50 0.30 0.5625
2.50 0.35 0.5625
0.10
2.50 0.40 0.5625
2.22 0.45 0.5000 SDS 0.5625
2.00 0.50 0.4500 0.00 1; 0.0000 SD1 0.2250
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
1.82 0.55 0.4091
1.67 0.60 0.3750 Periodo T
1.54 0.65 0.3462
1.43 0.70 0.3214
1.33 0.75 0.3000
1.25 0.80 0.2813
1.18 0.85 0.2647 Donde:
1.11 0.90 0.2500 SDS : Aceleración espectral de diseño para
1.05 0.95 0.2368 periodos cortos
1.00 1.00 0.2250 SD1 = Aceleración espectral de diseño
0.91 1.10 0.2045 correspondiente a T=1.0 seg.
0.83 1.20 0.1875
0.77 1.30 0.1731
0.71 1.40 0.1607
0.67 1.50 0.1500
0.63 1.60 0.1406
0.59 1.70 0.1324
0.56 1.80 0.1250
0.53 1.90 0.1184
0.50 2.00 0.1125
0.45 2.20 0.1023
0.42 2.40 0.0938
0.37 2.60 0.2496
0.32 2.80 0.2152
0.28 3.00 0.1875
0.16 4.00 0.1055
0.10 5.00 0.0675
0.07 6.00 0.0469
0.05 7.00 0.0344
0.04 8.00 0.0264
0.03 9.00 0.0208
0.03 10.00 0.0169
14 de 15
8/31/2017
INGENIEROS CONSULTORES S.A
Project: Checked by: Date:
PLANTA DE TRATAMIENTO DE AGUAS RESIDUALES - LA ATARJEA
Client: Element:
SEDAPAL TANQUE AIREADOR DE LODOS
FACTOR DE IMPORTANCIA
TIPO USO I
Tanques que deben permanecer en servicio para propósitos de emergencias después de un evento
II 1.25
sísmico ó tanques que hacen pare del sistema de líneas vitales
Tipo de estructura Ri Rc
Superficial Enterrado
Tanques no anclados
1.50 2.00 1.00
confinadoso sin confinar
FACTOR DE SUELO
SUELO
ZONA
S0 S1 S2 S3
4 0.80 1.00 1.05 1.10
3 0.80 1.00 1.15 1.20
2 0.80 1.00 1.20 1.40
1 0.80 1.00 1.60 2.00
SUELO
PERIODO
S0 S1 S2 S3
TP 0.30 0.40 0.60 1.00
TL 3.00 2.50 2.00 1.60
Tp Sa/g
0.40 0.0000
0.40 1.1250
TL Sa/g
2.50 0.0000
2.50 0.1875
Tp Sa/g
0.40 0.0000
0.40 0.5625
TL Sa/g
2.50 0.0000
2.50 0.0938