Descripción.

grout 8" Concreto (m3)


Elemento ubicación Num largo Anch.

Calzadura

corte 1 130.93 1.00 81.83 1.60


corte 1 130.93 1.00 81.83 1.60

corte 2 82.19 1.00 51.37 1.60


corte 2 82.19 1.00 51.37 1.60

corte 2 19.89 1.00 12.43 1.60


corte 2 19.89 1.00 12.43 1.60

corte 3 38.14 1.00 23.84 1.60


corte 3 38.14 1.00 23.84 1.60

Sub total 542.30 Sub total

Desperdicio

Sub total + Desperdicio


TOTALES. Total Concreto (m3).

Concreto 100 Kg/cm2

1. EL CONCRETO DE LAS CALZADURAS TENDRA


UNA RESISTENCIA MINIMA f'c=100 kg/cm2, CON UN
30% DE PIEDRA GRANDE (8" MAXIMO). DURANTE
EL VACIADO SE DEBERA VIBRAR LA MEZCLA CON
VIBRADORES MECANICOS, PARA LOGRAR UN
LLENADO DE LA ZONA VACIOS.EXCAVADA SIN
DEJAR ESPACIOS

LOS VEINTE CENTIMETROS SUPERIORES DE CADA


VACIADO SE LLENARAN CON GROUT EXPANSIVO.
Concreto (m3) Excavacion (m3) Encofrado (m2)
Altura Sub total. Num largo Anch. Altura Sub total. Num Largo Anch. Altura Sub total.

3.40 445.16 1.00 81.83 1.60 3.40 445.16 1.00 81.83 3.40 278.22
6.80 890.31 1.00 81.83 1.60 6.80 890.31 1.00 81.83 6.80 556.44

2.95 242.47 1.00 51.37 1.60 2.95 242.47 1.00 51.37 2.95 151.54
5.90 484.93 1.00 51.37 1.60 5.90 484.93 1.00 51.37 5.90 303.08

2.95 58.67 1.00 12.43 1.60 2.95 58.67 1.00 12.43 2.95 36.67
5.90 117.34 1.00 12.43 1.60 5.90 117.34 1.00 12.43 5.90 73.34

2.45 93.45 1.00 23.84 1.60 2.45 93.45 1.00 23.84 2.45 58.41
4.90 186.91 1.00 23.84 1.60 4.90 186.91 1.00 23.84 4.90 116.82

2,519.23 Sub total 2,519.23 Sub total 1,574.52

- Desperdicio - Desperdicio -

+ Desperdicio 2,519.23 Sub total + Desperdicio 2,519.23 Sub total + Desperdicio 1,574.52
creto (m3). 2,519.30 Total excavacion (m3). 2,519.30 Total Encofrado (m2). 1,574.60
RESUMEN DE METRADOS

MEJORAMIENTO DEL SERVICIO DE READAPTACION SOCIAL EN EL E.P CHINCHA" CODIG


PROYECTO:
(COMPONENTE I-SEGUNDA ETAPA)
ENTIDAD: OFICINA DE INFRAESTRUCTURA PENITENCIARIA - INPE
LUGAR: DEP. ICA - PROV. ICA - DIST. CHINCHA
FECHA: AGOSTO, 2017

TIPO: EDIFICACION
ZONA UI-DEVIDA
SPRINT: SPRINT 03
MODULO: AREA DE VISITA
CODIGO: E25

ITEM DESCRIPCION
OE.2
ESTRUCTURAS
OE.2.1
MOVIMIENTO DE TIERRAS
OE.2.1.2
EXCAVACIONES
OE.2.1.2.1 EXCAVACION MANUAL EN TERRENO NATURALHASTA h=1.00 m
OE.2.1.2.2 EXCAVACION ZANJA P/CIMIENTO C/EQUIPO TERRENO NATURAL, HASTAh=1.50m
OE.2.1.2.3 EXCAVACION ZANJA P/CIMIENTO C/EQUIPO TERRENO NATURAL, HASTAh=2.00m
OE.2.1.4
RELLENOS
OE.2.1.4.1 RELLENO COMPACTADO C/MATERIAL PROPIO SELECCIONADO C/EQUIPO LIVIANO
OE.2.1.4.2 ACARREO DE MATERIAL PROPIO SELECCIONADO PARA RELLENO
OE.2.1.4.3 RELLENO COMPACTADO C/EQUIPO. MATERIAL DE PRESTAMO CON EQUIPO LIVIANO
OE.2.1.5 NIVELACIÓN INTERIOR Y APISONADO
OE.2.1.5.1 NIVELACION Y COMPACTACION DE FONDO DE CIMENTACIÓN
OE.2.1.5.2 NIVELACIÓN INTERIOR Y COMPACTADO P/ FALSO PISO
OE.2.1.6 ELIMINACIÓN DE MATERIAL EXCEDENTE
OE.2.1.6.1 ACARREO INTERNO MAT. PROCED. DE EXCAV. MASIVA
OE.2.1.6.2 ACARREO INTERNO MAT. PROCED. DE EXCAV. DE ZANJAS
OE.2.1.6.3 ELIMINACION DE MATERIAL EXCEDENTE D<IO KM
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.3 SOLADOS
OE.2.2.3.1 SOLADO, CONCRETO f'c= 100 kg/cm2 (Cemento Tipo V)
OE.2.2.10 LOSA DE CONCRETO
OE.2.2.10.1 LOSA DE CONCRETO CONCRETO PREMEZCLADO FC=175 Kg/cm2 H=0.15m
OE.2.2.10.2 LOSA DE CONCRETO, ENCOFRADO Y DESENCOFRADO (NORMAL)
OE.2.3 OBRAS DE CONCRETO ARMADO
OE.2.3.2 ZAPATAS
OE.2.3.2.1 ZAPATA, CONCRETO PREMEZCLADO FC=210 Kg/cm2 (CEMENTO TIPO V)
OE.2.3.2.2 ZAPATA, ENCOFRADO Y DESENCOFRADO (NORMAL)
OE.2.3.2.3 ZAPATA, ACERO DE REFUERZO f'y=4200 kg/cm2
OE.2.3.3 VIGAS DE CIMENTACION
OE.2.3.3.1 VIGA DE CIMENTACION, CONCRETO PREMEZCLADO FC=210 Kg/cm2 (CEMENTO TIPO V)
OE.2.3.3.2 VIGA DE CIMENTACION, ENCOFRADO Y DESENCOFRADO (NORMAL)
OE.2.3.3.3 VIGA DE CIMENTACION, ACERO DE REFUERZO f'y=4200 kg/cm2
OE.2.3.7 COLUMNAS
OE.2.3.7.1 CONCRETO
OE.2.3.7.1.2 COLUMNAS, CONCRETO FC=210 Kg/cm2 (CEMENTO TIPO I)
OE.2.3.7.2.2 ENCOFRADO Y DESENCOFRADO
OE.2.3.7.2.1 COLUMNAS, ENCOFRADO Y DESENCOFRADO (NORMAL)
OE.2.3.7.2.2 COLUMNAS, ENCOFRADO Y DESENCOFRADO (CARAVISTA)
OE.2.3.7.3 ACERO
OE.2.3.7.3.1 COLUMNA, ACERO DE REFUERZO f'y=4200 kg/cm2
OE.2.4 ESTRUCTURAS METALICAS
OE.2.4.2 VIGAS METALICAS
OE.2.4.2.1 ARMADO Y MONTAJE DE VIGA
OE.2.4.4 TIJERALES Y RETICULADOS
OE.2.4.4.8 APOYO PARA TIJERAL TIPO 7
OE.2.4.4.9 APOYO PARA TIJERAL TIPO 8
OE.2.4.5 CORREAS
OE.2.4.5.1 ARMADO Y MONTAJE DE CORREA
OE.2.4.6 COBERTURAS
OE.2.4.6.3 COBERTURA DE PANEL METALICO CURVO opaco e=0.50mm
OE.2.4.7 ELEMENTOS PARA AGUAS PLUVIALES
OE..2.4.7.1 CANALETA
OE.2.6 VARIOS
OE.2.6.1 JUNTAS
OE.2.6.1.5 JUNTA DE DILATACION HORIZONTAL e=25mm
OE.2.6.5 MESA DE CONCRETO
OE.2.6.5.1 MESA DE CONCRETO CON 4 ASIENTOS (MTC-05)
OE.2.6.6 CURADO DE CONCRETO
S

EL E.P CHINCHA" CODIGO SNIP N°231778

UND. METRADO P.U. (S/.) PARCIAL

m3 9.90 0.00
m3 0.00
m3 21.95 0.00

m3 16.64 0.00
m3 16.64 0.00
m3 59.36 0.00

m2 26.68 0.00
m2 75.67 0.00

m3 0.00
m3 23.10 0.00
m3 23.10 0.00

m2 26.68 0.00

m3 75.67 0.00
m2 5.21 0.00

m3 7.84 0.00
m2 22.40 0.00
kg 304.19 0.00

m3 3.80 0.00
m2 30.40 0.00
kg 522.74 0.00

m3 3.92 0.00

m2 0.00
m2 39.21 0.00

kg 694.04 0.00

kg 1,145.72 0.00

und 4.00 0.00


und 4.00 0.00

und 14.00 0.00

m2 156.57 0.00

m 17.00 0.00

m 6.45 0.00

und 20.00 0.00


m2 171.60 0.00
PLANILLA DE METRADOS SUSTENTO DE ARQUITECTURA

MEJORAMIENTO DEL SERVICIO DE READAPTACION SOCIAL EN EL E.P CHINCHA"


PROYECTO:
(COMPONENTE I-SEGUNDA ETAPA)
ENTIDAD: OFICINA DE INFRAESTRUCTURA PENITENCIARIA - INPE
LUGAR: DEP. ICA - PROV. ICA - DIST. CHINCHA
FECHA: AGOSTO, 2017

TIPO: EDIFICACION
ZONA: UI-DEVIDA
MODULO: AREA DE VISITAS

DIMENSIONES
ITEM DESCRIPCION N° VECES
LARGO

OE.2 ESTRUCTURA
OE.2.1.2 EXCAVACIONES
OE.2.1.2.1 EXCAVACION MANUAL EN TERRENO NATURAL HASTA h=1.00 m
CIMIENTOS
EJE 1-1, 2-2, 3-3 Y 4-4 4 4.1
EJE A-A, B-B, C-C Y D-D 4.00 1.40

OE.2.1.2.2 EXCAVACION SANJA P/CIMIENTO C/QUIPO TERRENO NATURAL, HASTA h=1.50 m


ZAPATA
Z1 8 1.4

OE.2.1.4 RELLENOS
OE.2.1.4.1 RELLENO COMPACTADO C/MATERIAL PROPIO SELECCIONADO C/QUIPO LIVIANO
EXCAVACION MANUAL EN TERRENO NATURAL HASTA h=1.00 m
EXCAVACION SANJA P/CIMIENTO C/QUIPO TERRENO NATURAL, HASTA h=1.50 m

DESMINUCION POR SOLADO


EJE 1-1, 2-2, 3-3 Y 4-4 -4 4.1
EJE A-A, B-B, C-C Y D-D -4.00 1.40
Z1 -8 1.4

DISMINUCION POR VIGAS CIMENTADAS


EJE 1-1, 2-2, 3-3 Y 4-4 -4.00 5.15
EJE A-A, B-B, C-C Y D-D -4 2.45

DISMINUCION POR ZAPATAS


Z1 -8 1.4

DISMINUCION COLUMNAS
C1 -8 area

OE.2.1.4.2 ACARREO DE MATERIAL PROPIO SELECCIONADO PARA RELLENO


IDEM DE RELLENO COMPACTADO C/MATERIAL PROPIO SELECCIONADO C/QUIPO 1 16.64

OE.2.1.4.3 RELLENO COMPACTADO C/ MATERIAL PRESTAMO C/ EQUIPO LIVIANO


CON AREA DE AMBIENTE
area de visitas 1 18.78
disminucion de columnas -8
OE.2.1.5 NIVELACIÓN INTERIOR Y APISONADO
OE.2.1.5.1 NIVELACION Y COMPACTACION DE FONDO DE CIMENTACIÓN
CIMIENTOS
EJE 1-1, 2-2, 3-3 Y 4-4 4 4.1
EJE A-A, B-B, C-C Y D-D 4.00 1.40
ZAPATAS
Z1 8.00 1.40

OE.2.1.5.2 NIVELACION INTERIOR Y COMPACTADO P/FALSO PISO


area de visitas 1
disminucion columnas -8

OE.2.1.6 ELIMINACION DE MATERIAL EXCEDENTE


OE.2.1.6.2 ACARREO INTERNO MAT. PROCED. DE EXCAV. DE ZANJAS vol.
EXCAVACION DE ZANJA C/EQUIPO TERRENO NATURAL 1 31.85
RELLENO COMPACTADO C/MATERIAL DE PRESTAMO C/EQUIPO LIVIANO -1 16.64

OE.2.1.6.3 ELIMINACION DE MATERIAL EXCEDENTE D<10 KM


idem acarreo interno

OE.2 ESTRUCTURA
OE.2.2 OBRAS DE CONCRETO SIMPLE
OE.2.2.3 SOLADOS
OE.2.2.3.1 SOLADO, CONCRETO f'c= 100 kg/cm2 (Cemento Tipo V)
EJE 1-1, 2-2, 3-3 Y 4-4 4.00 4.10
EJE A-A, B-B, C-C Y D-D 4.00 1.40
Z1 8.00 1.40

OE.2.2.10 LOSA DE CONCRETO


OE.2.2.10.1 LOSA DE CONCRETO CONCRETO PREMEZCLADO FC=175 Kg/cm2 H=0.15m
area de visitas 1.00
disminucion columnas -8.00

OE.2.2.10.2 LOSA DE CONCRETO, ENCOFRADO Y DESENCOFRADO (NORMAL)


area de visitas 1.00
1.00
RQUITECTURA

N EL E.P CHINCHA" CODIGO SNIP N°231778


A ETAPA)

DIMENSIONES
PARCIAL Total Und
ANCHO ALTO

9.9 m3

0.5 0.9 7.38


0.50 0.90 2.52

21.952 m3

1.4 1.4 21.952

16.6 m3
9.9
21.95

0.5 0.1 -0.82


0.50 0.10 -0.28
1.4 0.1 -1.568

0.25 0.50 -2.575


0.25 0.50 -1.225

1.4 0.5 -7.84

0.13 0.9 -0.936

16.64 m3
16.64

59.25816 m3
15.86 0.2 59.57016
0.13 0.3 -0.312
26.68 m2

0.5 8.2
0.50 2.8

1.40 15.68

75.64 m2
76.68 76.68
0.13 -1.04

f 23.101 m3
1.3 41.405
1.1 -18.304

23.1 m3

26.68 m2
0.50 8.20
0.50 2.80
1.40 15.68

75.64 m2
76.68 76.68
0.13 -1.04

5.21 m2
15.86 0.15 2.38
18.88 0.15 2.83
PLANILLA DE SUSTENTO DE METRAD

PROYECTO: MEJORAMIENTO DEL SERVICIO DE READAPTACION SOCIAL EN EL E.P CHINCHA" CODIGO SNIP N°2
ENTIDAD: OFICINA DE INFRAESTRUCTURA PENITENCIARIA - INPE
LUGAR: DEP. ICA - PROV. ICA - DIST. CHINCHA
FECHA: AGOSTO, 2017

TIPO: EDIFICACION
ZONA: UI-DEVIDA
MODULO: AREA DE VISITAS

Partida Elemento Concreto FC=210 Kg/cm2 (m3) Encofrado (m2)


N° Descripción. Num largo Anch. Altura Sub total. Num Largo

OE.2.3 OBRAS DE CONCRETO ARMADO


OE.2.3.2 ZAPATAS

Z1 8.00 1.40 1.40 0.50 7.84 8.00 5.60

Sub total Sub total 7.84 Sub total

Desperdicio - Desperdicio

Sub total + Desperdicio 7.84 Sub total + Desperdicio


TOTALES. Total Concreto (m3). 7.90 Total Encofrado (m2).

Partida Elemento Concreto FC=210 Kg/cm2 (m3) Encofrado (m2)


N° Descripción. Num largo Anch. Altura Sub total. Num Largo

OE.2.3.3 VIGAS DE CIMENTACION


OE.2.3.3.1 VIGA DE CIMENTACION, CONCRETO PREMEZCLADO FC=210 Kg/cm2 (CEMENTO TIPO V)

EJE 1-1,2-2,3-3 Y 4-4 4.00 5.15 0.25 0.50 2.58 4.00 5.15
1 TRAMO DE VIGA

EJE A-A, B-B,C-C Y D-D 4.00 2.45 0.25 0.50 1.23 8.00 2.45
1 TRAMO DE VIGA

Sub total Sub total 3.80 Sub total

Desperdicio - Desperdicio
Sub total + Desperdicio 3.80 Sub total + Desperdicio
TOTALES. Total Concreto (m3). 3.80 Total Encofrado (m2).

Partida Elemento Concreto FC=175 Kg/cm2 (m3) Encofrado (m2)


N° Descripción. Num largo Anch. Altura Sub total. Num Largo

OE.2.3.7 SOBRECIMIENTOS REFORZADOS


OE.2.3.7.1 CONCRETO
OE.2.3.7.1.2 COLUMNAS, CONCRETO FC=210 Kg/cm2 (CEMENTO TIPO I)
PERIM
C1 8.00 AREA 0.13 3.90 4.06 16.00 3.90

mesa de concreto

Sub total Sub total 4.06 Sub total

Desperdicio Desperdicio

Sub total + Desperdicio Sub total + Desperdicio


TOTALES. Total Concreto (m3). 4.06 Total Encofrado (m2).
E SUSTENTO DE METRADOS DE ESTRUCTURAS

NCHA" CODIGO SNIP N°231778 (COMPONENTE I-SEGUNDA ETAPA)

0.30 0.40 0.56 0.99 1.55


Encofrado (m2) Acero (ml.)
Anch. Altura Sub total. Tipo Num Cant. Long. Ø 1/4 8mm 3/8 1/2 5/8

0.50 22.40 8.00 7.00 1.75 5/8 - - - - 98.00


8.00 7.00 1.75 5/8 - - - - 98.00

al 22.40 sub total en ml. - - - - 196.00


% de Desperdicios por Ø
- Desperdicios en ml. - - - - -
Peso por ml. 0.250 0.395 0.560 0.994 1.552
tal + Desperdicio 22.40 sub total en Kg. - - - - 304.19
Encofrado (m2). 22.40 Total Acero (Kg). 304.20 38.51

0.30 0.40 0.56 0.99 1.55


Encofrado (m2) Acero (ml.)
Anch. Altura Sub total. Tipo Num Cant. Long. Ø 1/4 8mm 3/8 1/2 5/8

acero longitudinal
1.00 20.60 4.00 6.00 6.32 5/8 - - - - 151.68
estribos - - - - -
4.00 30.00 1.48 3/8 - - 177.60 - -
acero longitudinal superior - - - - -
1.00 19.60 4.00 6.00 3.62 5/8 - - - - 86.88
estribos - - - - -
4.00 16.00 1.48 3/8 - - 94.72 - -

al 40.20 sub total en ml. - - 272.32 - 238.56


% de Desperdicios por Ø
- Desperdicios en ml. - - - - -
Peso por ml. 0.250 0.395 0.560 0.994 1.552
tal + Desperdicio 40.20 sub total en Kg. - - 152.50 - 370.25
Encofrado (m2). 40.20 Total Acero (Kg). 522.80 137.58

Encofrado (m2) Acero (ml.)


Anch. Altura Sub total. Tipo Num Cant. Long. Ø 1/4 8mm 3/8 1/2 5/8

PERIM -
acero longitudinal
1.26 78.62 8.00 8.00 5.28 5/8 - - - - 337.92
- estribo - - - - -
8.00 29.00 1.31 3/8 - - 303.92 - -
- - - - - -
- - - - -
- - - - -
- - - - -
al 78.62 sub total en ml. - - 303.92 - 337.92
% de Desperdicios por Ø
- Desperdicios en ml. - - - - -
Peso por ml. 0.250 0.395 0.560 0.994 1.552
tal + Desperdicio 78.62 sub total en Kg. - - 170.20 - 524.45
Encofrado (m2). 78.70 Total Acero (Kg). 694.70 171.28
2.24 3.97

3/4 1

- -
- -

- -

-
2.235 3.973
- -
38.51

2.24 3.97

3/4 1

- -
- -
- -
- -
- -
- -
- -

- -

-
2.235 3.973
- -
137.58

3/4 1

- -
- -
- -
- -
- -
- -
- -
- -

-
2.235 3.973
- -
171.28
PLANILLA DE METRADOS SUSTENTO

PROYECTO: MEJORAMIENTO DEL SERVICIO DE READAPTACION SOCIAL EN EL E.P CHINCHA" CODIGO SNI
ENTIDAD: OFICINA DE INFRAESTRUCTURA PENITENCIARIA - INPE
LUGAR: DEP. ICA - PROV. ICA - DIST. CHINCHA
FECHA: AGOSTO, 2017

TIPO: EDIFICACION
ZONA: UI-DEVIDA
MODULO: AREA DE VISITAS

ITEM DESCRIPCION und

OE.2.4 ESTRUCTURAS METALICAS


OE.2.4.2 VIGAS METALICAS
OE.2.4.2.1 ARMADO Y MONTAJE DE VIGAS kg
Techo metalico L=8.50
viga rectangular (250 x 150 x 1/4") de 9.21 m

OE.2.4.4 TIJERALES Y RETICULADOS und


OE.2.4.4.8 APOYO PARA TIJERAL TIPO 7
mastil mayor (0.1*0.1)
ramal 3 (0.1*0.1)
ramal 4 (0.1*0.1)
placa base PL -400mm x 400mm x 1/2"
uniones PL-420 mm x420mm x 35mm
pernos de anclaje con tuerca y contratuerca ꬾ1/2"x0.52cm

OE.2.4.4.9 APOYO PARA TIJERAL TIPO 8


apoyo fijo
mastil menor (0.1*0.1)
ramal (0.1*0.1)
ramal (0.1*0.1)
placa base PL- 400mm x400mmx1/2"
uniones pl-420mmx420mmx35mm
pernos de anclaje con tuerca y contratuerca ꬾ 1/2"x0.52cm

OE.2.4.5 CORREAS und


OE.2.4.5.1 ARMADO Y MONTAJE DE CORREAS
Tubo lac rectangular 100x50x1/8" de 8.50m
OE.2.4.6 COBERTURAS
OE.2.4.6.3 COBERTURA DE PANEL METALICO CURVO opaco e=0.50mm m2

O.E.2.4.7 ELEMENTOS PARA AGUAS PLUVIALES


O.E.2.4.7.1 A CANALETAS m
METRADOS SUSTENTO DE ESTRUCTURAS

CHINCHA" CODIGO SNIP N°231778 (COMPONENTE I-SEGUNDA ETAPA)

N° de
cantidad largo diametro kg/ml parcial
elementos

2.00 9.21 2.00 31.10 572.86

2.00

4.00
4.00 1.43
4.00 1.44
4.00 2.21
4.00
4.00
32.00

4.00
4.00 0.60
4.00 0.48
4.00 1.09
4.00
4.00
32.00

7.00
2.00 14.00
2.00 AREA= 78.29 156.58

1.00 8.50 2.00 17.00


total

1,145.72

4.00

4.00

14.00
156.58

17.00
PLANILLA DE METRADOS SUSTENTO DE ESTRUC

PROYECTO:
ENTIDAD:
LUGAR:
FECHA:

TIPO:
ZONA:
MODULO:

ITEM

OE.2.6
OE.2.6.1
OE.2.6.1.5

O.E.2.6.5
O.E.2.6.5.1

OE.2.6.6
PLANILLA DE METRADOS SUSTENTO DE ESTRUCTURAS

MEJORAMIENTO DEL SERVICIO DE READAPTACION SOCIAL EN EL E.P CHINCHA" CODIGO SNIP N


OFICINA DE INFRAESTRUCTURA PENITENCIARIA - INPE
DEP. ICA - PROV. ICA - DIST. CHINCHA
AGOSTO, 2017

EDIFICACION
UI-DEVIDA
AREA DE VISITAS

DESCRIPCION

VARIOS
JUNTAS
JUNTA DE DILATACION HORIZONTAL e=25mm
J2 (Area de visitas)

MESA DE CONCRETO
MESA DE CONCRETO CON 4 ASIENTOS (MTC-05)
PATIO

CURADO DE CONCRETO
FALSO PISO ,CONCRETO fc=140 kg/cm2 (cemento portland tipo V)
Zapatas

VIGAS DE CIMENTACION
COLUMNAS ,CONCRETO f´c=210 kg/cm2 (cemento portland tipo I)
NTO DE ESTRUCTURAS

CHINCHA" CODIGO SNIP N°231778 (COMPONENTE I-SEGUNDA ETAPA)

LADRILLO
N° VECES PARCIAL Total Und
AREA FACTOR ALTO

6.45 m
2.00 1.40 2.80
1.00 3.65 3.65

20.00 und

1.00 20.00 20.00

171.60 m2
m2 75.67 75.67
m3 7.84 0.50 3.92
m2 22.40 22.40
m2 30.40 30.40
m2 39.21 39.21