Cauce Principal

Sección 30 Tramo Superior Sección 29 Tramo Superior


Estación Elevación Estación Elevación
33.53 27.43 33.53 27.28
36.58 24.38 36.27 24.23
60.96 23.77 58.22 23.62
64.01 21.34 61.26 21.18
70.10 21.64 67.36 21.49
73.15 24.08 70.41 23.93
106.68 24.69 100.58 24.54
109.73 27.74 103.33 27.58

Downstream Reach Lengths Downstream Reach Lengths


LOB Channel ROB LOB Channel ROB
137.2 152.4 167.6 137.2 152.4 167.6

Manning`s Values Manning`s Values


LOB Channel ROB LOB Channel ROB
0.05 0.032 0.04 0.05 0.032 0.04

Main Channel Bank Stations Main Channel Bank Stations


Left Bank Right Bank Left Bank Right Bank
60.96 73.15 58.22 70.41

Sección 27 Tramo Inferior Sección 26 Tramo Inferior


Estación Elevación Estación Elevación
33.53 27.25 33.53 27.10
36.82 24.20 37.48 24.05
63.15 23.59 69.08 23.44
66.81 21.15 73.47 21.00
74.13 21.46 82.25 21.31
77.79 23.90 86.64 23.74
114.00 24.51 130.09 24.35
117.29 27.55 134.04 27.40

Downstream Reach Lengths Downstream Reach Lengths


LOB Channel ROB LOB Channel ROB
150 150 150 150 150 150

Manning`s Values Manning`s Values


LOB Channel ROB LOB Channel ROB
0.05 0.032 0.04 0.05 0.032 0.04

Main Channel Bank Stations Main Channel Bank Stations


Left Bank Right Bank Left Bank Right Bank
63.15 77.79 69.08 86.64

Tributario
Sección 4 Sección 3
Estación Elevación Estación Elevación
64.01 27.43 64.01 27.25
67.06 24.99 67.06 24.81
79.25 24.38 79.25 24.20
80.77 21.34 80.77 21.15
82.30 21.64 82.30 21.46
83.82 24.69 83.82 24.51
91.44 25.30 91.44 25.12
94.49 27.74 94.49 27.55

Downstream Reach Lengths Downstream Reach Lengths


LOB Channel ROB LOB Channel ROB
150 150 150 150 150 150

Manning`s Values Manning`s Values


LOB Channel ROB LOB Channel ROB
0.046 0.038 0.046 0.046 0.038 0.046

Main Channel Bank Stations Main Channel Bank Stations


Left Bank Right Bank Left Bank Right Bank
79.25 83.82 79.25 83.82

Caudales [m3/s]
Periodo de Retorno [Años]
Nombre Rio 10 50 100
Tributario 15 38 95
Tramo Superior 40 100 205
Sección 28 Tramo Superior
Estación Elevación
33.53 27.16
35.72 24.11
53.28 23.50
56.33 21.06
62.42 21.37
65.47 23.80
89.61 24.41
91.81 27.46

Downstream Reach Lengths


LOB Channel ROB
0 0 0

Manning`s Values
LOB Channel ROB
0.05 0.032 0.04

Main Channel Bank Stations


Left Bank Right Bank
53.28 65.47

Sección 25 Tramo Inferior Sección 24 Tramo Inferior


Estación Elevación Estación Elevación
33.53 27.01 33.53 26.94
37.48 23.96 37.48 23.90
69.08 23.35 69.08 23.29
73.47 20.91 73.47 20.85
82.25 21.21 82.25 21.15
86.64 23.65 86.64 23.59
130.09 24.26 130.09 24.20
134.04 27.31 134.04 27.25

Downstream Reach Lengths Downstream Reach Lengths


LOB Channel ROB LOB Channel ROB
150 150 150 0 0 0

Manning`s Values Manning`s Values


LOB Channel ROB LOB Channel ROB
0.05 0.032 0.04 0.05 0.032 0.04

Main Channel Bank Stations Main Channel Bank Stations


Left Bank Right Bank Left Bank Right Bank
69.08 86.64 69.08 86.64

Sección 2
Estación Elevación
64.01 27.16
67.06 24.72
79.25 24.11
80.77 21.06
82.30 21.37
83.82 24.41
91.44 25.02
94.49 27.46

Downstream Reach Lengths


LOB Channel ROB
0 0 0

Manning`s Values
LOB Channel ROB
0.046 0.038 0.046

Main Channel Bank Stations


Left Bank Right Bank
79.25 83.82