Load Station P V2 V3

Unique
Story Column Case/Comb
Name o m tonf tonf tonf
Carga
Story1 C43 110 0 -64.0561 -1.244 0.9195
muerta
Carga
Story1 C43 110 1.075 -63.4111 -1.244 0.9195
muerta
Carga
Story1 C43 110 2.15 -62.7661 -1.244 0.9195
muerta
Carga
Story1 C44 115 0 -60.332 -1.1524 -0.9128
muerta

Story1 C44 115 Carga 1.075 -59.687 -1.1524 -0.9128


muerta
Carga
Story1 C44 115 2.15 -59.042 -1.1524 -0.9128
muerta
Carga
Story1 C45 120 0 -73.6999 -1.477 2.6916
muerta
Carga
Story1 C45 120 muerta 1.075 -73.0549 -1.477 2.6916

Carga
Story1 C45 120 2.15 -72.4099 -1.477 2.6916
muerta
T M2 M3

tonf-m tonf-m tonf-m

0.0142 0.8294 -0.9409

0.0142 -0.1591 0.3964

0.0142 -1.1476 1.7337

0.0142 -0.6533 -0.7901

0.0142 0.3279 0.4487

0.0142 1.3091 1.6875

0.0142 2.2634 -1.0012

0.0142 -0.6301 0.5866

0.0142 -3.5236 2.1744


Load Station P V2 V3
Unique
Story Column Case/Comb
Name o m tonf tonf tonf
Story1 C43 110 Live 0 -31.9559 -0.271 0.3373
Story1 C43 110 Live 1.075 -31.9559 -0.271 0.3373
Story1 C43 110 Live 2.15 -31.9559 -0.271 0.3373
Story1 C44 115 Live 0 -30.3689 -0.232 -0.3752
Story1 C44 115 Live 1.075 -30.3689 -0.232 -0.3752
Story1 C44 115 Live 2.15 -30.3689 -0.232 -0.3752
Story1 C45 120 Live 0 -34.4342 -0.3744 1.0005
Story1 C45 120 Live 1.075 -34.4342 -0.3744 1.0005
Story1 C45 120 Live 2.15 -34.4342 -0.3744 1.0005
T M2 M3

tonf-m tonf-m tonf-m


0.004 0.3047 -0.1699
0.004 -0.058 0.1214
0.004 -0.4206 0.4127
0.004 -0.2719 -0.117
0.004 0.1314 0.1323
0.004 0.5348 0.3817
0.004 0.8413 -0.2179
0.004 -0.2342 0.1845
0.004 -1.3097 0.587
Load Station P V2 V3
Unique
Story Column Case/Comb
Name o m tonf tonf tonf
Story1 C43 110 SXD Max 0 19.689 11.536 5.2616
Story1 C43 110 SXD Max 1.075 19.689 11.536 5.2616
Story1 C43 110 SXD Max 2.15 19.689 11.536 5.2616
Story1 C44 115 SXD Max 0 13.2556 8.1887 5.4955
Story1 C44 115 SXD Max 1.075 13.2556 8.1887 5.4955
Story1 C44 115 SXD Max 2.15 13.2556 8.1887 5.4955
Story1 C45 120 SXD Max 0 17.5534 5.9298 5.237
Story1 C45 120 SXD Max 1.075 17.5534 5.9298 5.237
Story1 C45 120 SXD Max 2.15 17.5534 5.9298 5.237
T M2 M3

tonf-m tonf-m tonf-m


0.3883 7.0247 16.4096
0.3883 1.3716 4.0136
0.3883 4.2896 8.3976
0.3883 7.2143 11.7556
0.3883 1.3092 2.9571
0.3883 4.6026 5.8547
0.3883 7.0052 8.6936
0.3883 1.3775 2.3233
0.3883 4.2555 4.0603
Load Station P V2 V3
Unique
Story Column Case/Comb
Name o m tonf tonf tonf
Story1 C43 110 SYD Max 0 8.5811 5.1552 7.2019
Story1 C43 110 SYD Max 1.075 8.5811 5.1552 7.2019
Story1 C43 110 SYD Max 2.15 8.5811 5.1552 7.2019
Story1 C44 115 SYD Max 0 14.4004 3.7946 7.5713
Story1 C44 115 SYD Max 1.075 14.4004 3.7946 7.5713
Story1 C44 115 SYD Max 2.15 14.4004 3.7946 7.5713
Story1 C45 120 SYD Max 0 13.1672 2.9936 7.2681
Story1 C45 120 SYD Max 1.075 13.1672 2.9936 7.2681
Story1 C45 120 SYD Max 2.15 13.1672 2.9936 7.2681
T M2 M3

tonf-m tonf-m tonf-m


0.1884 9.6755 7.3368
0.1884 1.936 1.7986
0.1884 5.8104 3.7504
0.1884 9.9744 5.4722
0.1884 1.8381 1.3969
0.1884 6.3056 2.6902
0.1884 9.7291 4.421
0.1884 1.9185 1.206
0.1884 5.899 2.0189
DISEÑO DE VIGA DE CIMENTACION EJE B-B
COLUMNA 3-B: COLUMNA 4-B: COLUMNA 5-B:
b= 0.50 m b= 0.50 m b= 0.50 m
h= 0.50 m h= 0.50 m h= 0.50 m

PD= 64.0561 Tn PD= 60.332 Tn PD= 73.6999 Tn


PL= 31.9559 Tn PL= 30.3689 Tn PL= 34.4342 Tn
Dirección Longitudinal.- Dirección Transversal.- Dirección Longitudinal.- Dirección Transversal.- Dirección Longitudinal.-
MD= 0.83 Tn-m MD= -0.94 Tn-m MD= -0.65 Tn-m MD= -0.79 Tn-m MD= 2.26 Tn-m
ML= 0.30 Tn-m ML= -0.17 Tn-m ML= -0.27 Tn-m ML= -0.12 Tn-m ML= 0.84 Tn-m
MS= 9.68 Tn-m MS= 16.41 Tn-m MS= 9.97 Tn-m MS= 11.76 Tn-m MS= 9.73 Tn-m
Ps= -8.58 Tn Ps= -19.69 Tn Ps= -14.40 Tn Ps= -13.26 Tn Ps= -13.17 Tn

Distancia entre columnas= 2.85 m Distancia entre colu 4.47

Datos.-
Gt= 1.60 Kg/cm2
K30= 3280.00 Tn/m3
f'c= 280.00 Kg/cm2
s/c= 200.00 Kg/m2
NPT= 0.15 m
NFZ= -1.30 m

Solución.-
1.-Esfuerzo Neto del Suelo.-
�_𝑛= 12.90 Tn/m2 Sin Sismo
�_𝑛𝑠= 17.70 Tn/m2 Con Sismo

2.-Dimensionamiento en Planta - Cargas de Servicio.-


A.- Cargas de Gravedad.-
P1= 96.012 Tn P2= 90.7009 Tn P3= 108.134 Tn
ML1= 1.13 Tn-m ML2= -0.93 Tn-m ML3= 3.10 Tn-m
MT1= -1.11 Tn-m MT2= -0.91 Tn-m MT3= -1.22 Tn-m
L= 3.35 m L= 4.97 m
R= 294.847 Tn
XR= 4.09 m
Lt= 8.686 m L= 8.80 m
�_𝑛= 12.90 Tn/m2 B= 2.80 m 2.597
Az= 22.85635659 m2
B= 2.5973 m

Verificación de Esfuerzos en el suelo.-


R= 294.847 Tn
e= -0.057
ML= -16.777723 Tn-m
MT= -3.24 Tn-m

�_1= 11.9662 + -0.4643 + -0.2815 = 11.22 Tn/m2 12.7


�_2= 11.9662 - -0.4643 + -0.2815 = 12.15 Tn/m2
�_3= 11.9662 + -0.4643 - -0.2815 = 11.78 Tn/m2
�_4= 11.9662 - -0.4643 - -0.2815 = 12.71 Tn/m2

B.- Cargas de Gravedad + Sismo Longitudinal Horario


P1= 89.14712 Tn P2= 79.18058 Tn P3= 97.6003 Tn
ML1= 8.87 Tn-m ML2= 7.05 Tn-m ML3= 10.89 Tn-m
MT1= -1.11 Tn-m MT2= -0.91 Tn-m MT3= -1.22 Tn-m
L= 3.35 m L= 4.97 m
R= 265.92804 Tn
XR= 4.15 m
L= 8.80 m
�_𝑛𝑠= 17.70 Tn/m2 B= 2.80 m

Verificación de Esfuerzos en el suelo.-


R= 265.92804 Tn
e= 0.00 m
ML= 0.5052058 Tn-m
MT= -3.24 Tn-m

�_1= 10.7925 + 0.0140 + -0.2815 = 10.53 Tn/m2 11.09


�_2= 10.7925 - 0.0140 + -0.2815 = 10.50 Tn/m2
�_3= 10.7925 + 0.0140 - -0.2815 = 11.09 Tn/m2
�_4= 10.7925 - 0.0140 - -0.2815 = 11.06 Tn/m2

C.- Cargas de Gravedad + Sismo Longitudinal AntiHorario


P1= 102.87688 Tn P2= 102.22122 Tn P3= 118.668 Tn
ML1= -6.61 Tn-m ML2= -8.90 Tn-m ML3= -4.68 Tn-m
MT1= -1.11 Tn-m MT2= -0.91 Tn-m MT3= -1.22 Tn-m
L= 3.35 m L= 4.97 m
R= 323.76596 Tn
XR= 4.04 m
L= 8.80 m
�_𝑛𝑠= 17.70 Tn/m2 B= 2.80 m
Verificación de Esfuerzos en el suelo.-
R= 323.76596 Tn
e= -0.105 m
ML= -34.0606518 Tn-m
MT= -3.24 Tn-m

�_1= 13.1399 + -0.9425 + -0.2815 = 11.92 Tn/m2 14.36


�_2= 13.1399 - -0.9425 + -0.2815 = 13.80 Tn/m2
�_3= 13.1399 + -0.9425 - -0.2815 = 12.48 Tn/m2
�_4= 13.1399 - -0.9425 - -0.2815 = 14.36 Tn/m2

D.- Cargas de Gravedad + Sismo Transversal Horario.-


P1= 80.2608 Tn P2= 80.09642 Tn P3= 94.0914 Tn
ML1= 1.13 Tn-m ML2= -0.93 Tn-m ML3= 3.10 Tn-m
MT1= 12.02 Tn-m MT2= 8.50 Tn-m MT3= 5.74 Tn-m
L= 3.35 m L= 4.97 m
R= 254.4486 Tn
XR= 4.14 m
L= 8.80 m
�_𝑛𝑠= 17.70 Tn/m2 B= 2.80 m

Verificación de Esfuerzos en el suelo.-


R= 254.4486 Tn
e= -0.01 m
ML= -1.4848014 Tn-m
MT= 26.25 Tn-m

�_1= 10.3266 + -0.0411 + 2.2829 = 12.57 Tn/m2 12.65


�_2= 10.3266 - -0.0411 + 2.2829 = 12.65 Tn/m2
�_3= 10.3266 + -0.0411 - 2.2829 = 8.00 Tn/m2
�_4=
10.3266 - -0.0411 - 2.2829 = 8.08 Tn/m2

E.- Cargas de Gravedad + Sismo Transversal AntiHorario.-


P1= 111.7632 Tn P2= 101.30538 Tn P3= 122.177 Tn
ML1= 1.13 Tn-m ML2= -0.93 Tn-m ML3= 3.10 Tn-m
MT1= -14.24 Tn-m MT2= -10.31 Tn-m MT3= -8.17 Tn-m
L= 3.35 m L= 4.97 m
R= 335.2454 Tn
XR= 4.05 m
L= 8.80 m
�_𝑛𝑠= 17.70 Tn/m2 B= 2.80 m

Verificación de Esfuerzos en el suelo.-


R= 335.2454 Tn
e= -0.10 m
ML= -32.0706446 Tn-m
MT= -32.72 Tn-m

�_1= 13.6057 + -0.8874 + -2.8459 = 9.87 Tn/m2 17.34


�_2= 13.6057 - -0.8874 + -2.8459 = 11.65 Tn/m2
�_3= 13.6057 + -0.8874 - -2.8459 = 15.56 Tn/m2
�_4= 13.6057 - -0.8874 - -2.8459 = 17.34 Tn/m2

3.- Esfuerzos Ultimos en el Suelo.-


A.- Cargas de Gravedad.-
P1= 144.00357 Tn P2= 136.09193 Tn P3= 161.718 Tn
ML1= 1.68 Tn-m ML2= -1.38 Tn-m ML3= 4.60 Tn-m
MT1= -1.61 Tn-m MT2= -1.31 Tn-m MT3= -1.77 Tn-m
L= 3.35 m L= 4.97 m
R= 441.8135 Tn
XR= 4.09 m
L= 8.80 m
B= 2.80 m

Cálculo de esfuerzos últimos en el suelo.-


R= 441.8135 Tn
e= -0.06
ML= -27.2230295 Tn-m
MT= -4.68 Tn-m

�_1= 17.9307 + -0.7533 + -0.4073 = 16.77 Tn/m2 19.09


�_2= 17.9307 - -0.7533 + -0.4073 = 18.28 Tn/m2
�_3= 17.9307 + -0.7533 - -0.4073 = 17.58 Tn/m2
�_4= 17.9307 - -0.7533 - -0.4073 = 19.09 Tn/m2
B.- Cargas de Gravedad + Sismo Longitudinal Horario
P1= 111.4339 Tn P2= 98.975725 Tn P3= 122 Tn
ML1= 11.09 Tn-m ML2= 8.82 Tn-m ML3= 13.61 Tn-m
MT1= -1.39 Tn-m MT2= -1.13 Tn-m MT3= -1.52 Tn-m
L= 3.35 m L= 4.97 m
R= 332.41005 Tn
XR= 4.15 m
L= 8.80 m
B= 2.80 m

Cálculo de esfuerzos últimos en el suelo.-


R= 332.41005 Tn
e= 0.00 m
ML= 0.63150725 Tn-m
MT= -4.05 Tn-m

�_1= 13.4907 + 0.0175 + -0.3519 = 13.16 Tn/m2 13.86


�_2= 13.4907 - 0.0175 + -0.3519 = 13.12 Tn/m2
�_3= 13.4907 + 0.0175 - -0.3519 = 13.86 Tn/m2
�_4= 13.4907 - 0.0175 - -0.3519 = 13.83 Tn/m2

C.- Cargas de Gravedad + Sismo Longitudinal AntiHorario


P1= 128.5961 Tn P2= 127.776525 Tn P3= 148.335 Tn
ML1= -8.26 Tn-m ML2= -11.13 Tn-m ML3= -5.85 Tn-m
MT1= -1.39 Tn-m MT2= -1.13 Tn-m MT3= -1.52 Tn-m
L= 3.35 m L= 4.97 m
R= 404.70745 Tn
XR= 4.04 m
L= 8.80 m
B= 2.80 m

Cálculo de esfuerzos últimos en el suelo.-


R= 404.70745 Tn
e= -0.11 m
ML= -42.5758148 Tn-m
MT= -4.05 Tn-m
�_1= 16.4248 + -1.1781 + -0.3519 = 14.89 Tn/m2 17.95
�_2= 16.4248 - -1.1781 + -0.3519 = 17.25 Tn/m2
�_3= 16.4248 + -1.1781 - -0.3519 = 15.60 Tn/m2
�_4= 16.4248 - -1.1781 - -0.3519 = 17.95 Tn/m2

D.- Cargas de Gravedad + Sismo Transversal Horario.-


P1= 100.326 Tn P2= 100.120525 Tn P3= 117.614 Tn
ML1= 1.42 Tn-m ML2= -1.16 Tn-m ML3= 3.88 Tn-m
MT1= 15.02 Tn-m MT2= 10.62 Tn-m MT3= 7.17 Tn-m
L= 3.35 m L= 4.97 m
R= 318.06075 Tn
XR= 4.14 m
L= 8.80 m
B= 2.80 m

Cálculo de esfuerzos últimos en el suelo.-


R= 318.06075 Tn
e= -0.01 m
ML= -1.85600175 Tn-m
MT= 32.81 Tn-m

�_1=
12.9083 + -0.0514 + 2.8536 = 15.71 Tn/m2 15.81
�_2=
12.9083 - -0.0514 + 2.8536 = 15.81 Tn/m2
�_3=
12.9083 + -0.0514 - 2.8536 = 10.00 Tn/m2
�_4=
12.9083 - -0.0514 - 2.8536 = 10.11 Tn/m2

E.- Cargas de Gravedad + Sismo Transversal AntiHorario.-


P1= 139.704 Tn P2= 126.631725 Tn P3= 152.721 Tn
ML1= 1.42 Tn-m ML2= -1.16 Tn-m ML3= 3.88 Tn-m
MT1= -17.80 Tn-m MT2= -12.89 Tn-m MT3= -10.22 Tn-m
L= 3.35 m L= 4.97 m
R= 419.05675 Tn
XR= 4.05 m

L= 8.80 m
B= 2.80 m

Cálculo de esfuerzos últimos en el suelo.-

R= 419.05675 Tn
e= -0.10 m
ML= -40.0883058 Tn-m
MT= -40.91 Tn-m

�_1=
17.0072 + -1.1093 + -3.5574 = 12.34 Tn/m2 21.67
�_2=
17.0072 - -1.1093 + -3.5574 = 14.56 Tn/m2
�_3=
17.0072 + -1.1093 - -3.5574 = 19.46 Tn/m2
�_4=
17.0072 - -1.1093 - -3.5574 = 21.67 Tn/m2 MAS CRITICO

Esfuerzos Ultimos en el Suelo.- Cargas de Gravedad + Sismo Transversal AntiHorario.-


Pu1= 139.704 Tn Pu2= 126.631725 Tn P3= 152.721 Tn
MuL1= 1.418 Tn-m MuL2= -1.1565 Tn-m ML3= 3.88088 Tn-m
MuT1= -17.798 Tn-m MuT2= -12.889475 Tn-m MT3= -10.217 Tn-m
L= 3.350 m L= 4.97 m
R= 419.057 Tn
XR= 4.054 m
L= 8.80 m
B= 2.80 m
Cálculo de esfuerzos últimos en el suelo.-
R= 419.057 Tn
e= -0.096 m
ML= -40.088 Tn-m
MT= -40.905 Tn-m
G1= 17.0072 + -1.1093 + -3.5574 = 12.34 Tn/m2
G2= 17.0072 - -1.1093 + -3.5574 = 14.56 Tn/m2
G3= 17.0072 + -1.1093 - -3.5574 = 19.46 Tn/m2
G4= 17.0072 - -1.1093 - -3.5574 = 21.67 Tn/m2 MAS CRITICO

Esfuerzo Último de Diseño, Gud= 21.67 Tn/m2

Combinación de Diseño = 1.25D + 1.25L - 1STH

4. Altura de la Zapata.- con la condicion de rigidez para luces intermedias 0.55


𝐿�≤1.75∜(4𝐸𝐼/(𝐾_𝑐 𝑏))
A.- Por Rigidez.-
Lm= 4.16 m
L= 8.80 m
B= 2.80 m L < Lm 0.750
n= 3.143
s= 0.772727273 4.16 33.191 0.550
Ks= 2534.55 Tn/m3
Ec= 2509980.08 Tn/m2 2.80
con la condicion de rigidez para luces en voladizos
𝐿�≤0.88∜(4𝐸𝐼/(𝐾_𝑐 𝑏))

B.- Por Longitud de Desarrollo.- λL = 1.1351 < 1.75


Ld= 42.01 cm CIMENTACION RIGIDA
hz= 52.83 cm L < Lm
hz= 0.55 m
elegimos 0.23 16.690
hz= 0.750 m 0.23
�_𝒖 ≤
∅�_�
�_𝒖 ≤
∅�_�
Pu1= 139.70 Pu2= 126.63 Pu3= 152.72

0.25 3.35 4.97 0.23

ơ= 21.67 Tn/m2
wu= 60.69 tn/m
8.80

Carga última por metro lineal

wu= 60.68674594 tn/m


Pu1= = 139.70 tn
Pu2= = 126.63 tn
Pu3= = 152.72 tn

Esfuerzos cortantes y momentos flectores V2=59.50 V4=179.29 V6=13.96


1= 15.17
2= 59.500
3= 143.81
4= 179.29
5= 122.34
6= 13.96
V1=15.17 V3=143.81 V5=122.34

1= 1.90 M1- As min


2= 27.26 M1+ As min
3= 143.11 M2-
4= 121.69 M2+
5= 1.90 M3- As min

corte longitudinal corte transversal


d= 66.73 wu= 21.6738
x= 0.83473 cm Vu= 24.38
Vu= 179.29 Tn Vu= 138.79 Tn fiVc= 33.79 ok
fiVc= 140.85 Tn
�_𝒖 ≤ ∅�_� (OK)

D.- Verificación por Fuerza Cortante por Punzonamiento.-

Columna Exterior.- Columna Interior.- Columna Interior.-

s= 50.00 cm s= 50 cm s= 50.00 cm
t= 50.00 cm t= 50 cm t= 50.00 cm
dL= 66.73 cm dL= 66.73 cm dL= 66.73 cm
dT= 64.82 cm dT= 64.82 cm dT= 64.82 cm
m= 116.73 cm m= 116.73 cm m= 116.73 cm
n= 114.82 cm n= 114.82 cm n= 114.82 cm
b0= 463.10 cm b0= 463.10 cm b0= 463.10 cm
A0= 13402.9386 cm2 A0= 13402.9386 cm2 A0= 13403 cm2
Pu= 139.704 Tn Pu= 126.631725 Tn Pu= 152.721 Tn
�_𝒖= 21.67 Tn/m2 �_𝒖= 21.67 Tn/m2 �_𝒖= 21.67 Tn/m2
Vup= 110.65 Tn Vup= 97.58 Tn Vup= 123.67 Tn
βc = 1 βc = 1 βc = 1
ΦVcp1= 602.6983259 Tn ΦVcp1= 602.6983259 Tn ΦVcp1= 602.698 Tn
ΦVcp2= 406.7289316 Tn ΦVcp2= 406.7289316 Tn ΦVcp2= 406.729 Tn
ΦVc= 406.7289316 Tn ΦVc= 406.7289316 Tn ΦVc= 406.729 Tn

5. Diseño del Refuerzo.-

Acero Mínimo.-
b= 280.00 cm
d= 66.73 cm
As,min= 33.63192 cm2
barras de 5/8" 1.99 cm2
S= 16.57 cm
Usar 1 Φ 5/8" @ 0.15

Apoyo Izquierdo,Derecho
Usar 1 Φ 5/8" @ 0.15

Momentos positivos.- Momentos negativos.-


Mu= 121.69 Tn-m Mu= 143.11 Tn-m
b= 280.00 cm b= 280.00 cm
d= 66.73 cm d= 66.73 cm
a= 6.673 cm a= 6.673 cm
As= 50.78 cm2 As= 59.72 cm2
a= 4.27 cm a= 5.02 cm
As= 49.84 cm2 As= 58.95 cm2
a= 4.19 cm a= 4.95 cm
As= 49.81 cm2 As'' = 16.17 As= 58.92 cm2 As'' = 25.29
a= 4.19 cm a= 4.95 cm
S= 22.33 cm S= 22.03 cm
Usar 1 Φ 1/2" @ 0.20 Usar 1 Φ 5/8" @ 0.20

Refuerzo Transversal.-
Bajo Columna Extrema.- Bajo Columna Interior.- Bajo Columna Interior.-
Lv= 1.15 m Lv= 1.15 m Lv= 1.15 m
b= 98.62 cm b= 114.82 cm b= 114.82 cm
Gud= 21.67 Tn/m2 Gud= 21.67 Tn/m2 Gud= 21.67 Tn/m2
Wu= 21.37 Tn/m Wu= 24.89 Tn/m Wu= 24.89 Tn/m
Mu= 14.13 Tn-m Mu= 16.46 Tn-m Mu= 16.46 Tn-m
d= 64.82 cm d= 64.82 cm d= 64.82 cm
a= 6.482 cm a= 6.482 cm a= 6.482 cm
As= 6.41 cm2 As= 7.46 cm2 As= 7.46 cm2
a= 1.53 cm a= 1.53 cm a= 1.53 cm
As= 5.84 cm2 As= 6.80 cm2 As= 6.80 cm2
a= 1.39 cm a= 1.39 cm a= 1.39 cm
As= 5.83 cm2 As= 6.79 cm2 As= 6.79 cm2
a= 1.39 cm a= 1.39 cm a= 1.39 cm
As= 5.83 cm2 As= 6.79 cm2 As= 6.79 cm2
a= 1.39 cm a= 1.39 cm a= 1.39 cm
As,min= 11.51 cm2 As,min= 13.40 cm2 As,min= 13.40 cm2
Φ 3/4" 2.85 cm2 Φ 3/4" 2.85 cm2 Φ 3/4" 2.85 cm2
Nro barras 5.00 Nro barras 5.00 Nro barra 5.00
Usar 5 Φ 3/4" Usar 5 Φ 3/4" Usar 5 Φ 3/4"

Acero mínimo
b= 100 cm
d= 64.82 cm
As = 11.6676 cm2
Barras de 3/4" 2.85 cm2
Espaciamiento 24.4
Usar 1 Φ 3/4" @ 0.225 m
Dirección Transversal.-
MD= -1.00 Tn-m
ML= -0.22 Tn-m
MS= 8.69 Tn-m
Ps= -17.55 Tn