topo 3.64 19.54 71.

15
operario 1,072.79 19.54 20,962.41
oficial 1,843.68 16.14 29,756.99
peon 8,245.40 14.51 119,640.81
capataz 194.80 20.08 3,911.67

Alambre Negro N°16 730.40 4.70 3,432.87


Clavo para madera 3" 48.67 4.70 228.76
Acero de Refuerzo fy=4200 10,842.77 4.70 50,961.03
Piedra Mediana 18.36 59.00 1,083.24
Pedra Chancada 1/2 101.31 75.00 7,597.98
Material Clasificado para base 517.00 48.00 24,816.00
arena gruesa 71.51 68.00 4,862.71
cemento portaland tipo ip 1,708.82 23.00 39,302.95
yeso de 28 kg 19.08 17.00 324.36
laca desmoldeadora 72.76 39.90 2,903.06
elastomeras z flex 30.08 70.74 2,127.69
lijar para madera 93.60 1.50 140.40
gasolina de 84 oct 197.35 14.50 2,861.59
hormigon 48.96 65.00 3,182.40
tecnopor 4x8x1 5.68 27.12 153.91
madera Tornillo 2,645.76 5.09 13,466.92
Triplay de 4x8x19mm 81.12 122.89 9,968.82
Petroleo diesel b5 2,125.46 14.50 30,819.16
pintura esmalte 0.24 60.00 14.31
mascara respirador contra polvo 25.00 35.00 875.00
casco tipo jokey de color 25.00 30.00 750.00
guante de cuero 25.00 25.00 625.00
zapatos de seguridad c/punta de acero 25.00 85.00 2,125.00
protector de oidos 25.00 5.00 125.00
Lentes de seguridad negro3m 3.75 27.00 101.25
lentes de seguridad antiempañante 25.00 15.00 375.00
botas de jebe con punta reforzada 11.25 55.00 618.75
guante de jebe 3.75 2.50 9.38
pantalon denim 25.00 60.00 1,500.00
camisa manga larga denim 25.00 50.00 1,250.00
cortavientos c/revestimiento polar 25.00 15.00 375.00

Herramientas Manuales 5,209.11


camion cisterna 4x2 agua 122hp 2000gl 54.34 102.67 5,578.59
camion volquete 15m3 272.84 124.74 34,034.54
estacion total incluye accesorios 0.46 120.00 55.33
compactador Vibra tipo plancha 4 hp 1,049.76 15.00 15,746.43
cargador S/llantas 125hp 2.5 a 3.5m3 136.27 215.99 29,432.63
retroexcavador S/llantas 58 HP 1 yd3 8.14 138.57 1,127.75
Excavadora sobre orugas 2.4m3 54.13 392.06 21,223.74
Vibrador de concreto 4hp 1.35" 97.99 15.00 1,469.92
mezcladora concreto tambor 18hp 97.99 15.00 1,469.92
Nivel topografico 0.46 35.00 16.14
topo -11.10 19.19 -212.91
operario -421.94 19.19 -8,097.12
oficial -96.59 15.91 -1,536.82
peon -816.91 14.31 -11,689.93
capataz -24.32 19.70 -479.08

alambre negro 16 -36.09 4.70 -169.64


clavos para madera 3" -0.56 4.70 -2.65
acero de refuerzo fy=4200 grado 60 -748.72 4.00 -2,994.87
Piedra mediana -6.90 59.00 -407.10
piedra chancada de 3/4 -15.91 75.00 -1,192.95
piedra grande mayor d=0.50m -344.16 120.00 -41,299.20
geotextil AMOCO 4550 -6.60 3.80 -25.08
colchon reno 5x2x0.30 -3.00 322.30 -966.90
gavion torsionado (zing+alum) 5x1x0.50 -3.00 350.00 -1,050.00
gavion torsionado (g) 5x1.50x1 -3.00 380.00 -1,140.00
yeso de 28kg -71.10 17.00 -1,208.70
laca desmoldeadora -0.84 39.90 -33.59
geodren vial 65mm h=0.50m, inc/tuberia drenante d=65mm -82.31 40.96 -3,371.40
geodren vial 100mm h=0.50m, inc/tuberia drenante d=100 -20.70 53.62 -1,109.93
pegamento pesado para pvc -0.96 45.00 -43.38
silla pvc DN 100mm x 65mm -3.37 15.00 -50.61
Lijar para madera -1.08 1.50 -1.62
Madera tornillo -30.61 5.09 -155.82
triplay de 4x8x19mm -0.94 122.89 -115.34
Petroleo diesel B5 -4,334.05 14.50 -62,843.77
Pintura esmalte -0.73 60.00 -43.61

herramienta manuales -627.12


Camion cisterna 4x2 agua 122hp 2000gln -76.65 102.67 -7,870.06
camion Volquete 15m3 -105.46 124.74 -13,155.12
Estacion Total incluye accesorios -1.41 120.00 -168.62
Cargador S/llantas 125HP 2.5 a 3.5m3 -106.85 215.99 -23,077.95
Excavadora sobre orugas 2.40m3 -62.99 392.06 -24,696.72
Nivel topografico incluye accesorios -1.41 35.00 -49.18
174,343.02

206,977.53

115,364.11
-7,518.79
489,165.87

-22,015.87

-118,226.16

-69,644.77
-8.02
-209,894.82