OBRA :
UBICACIÓN :
CONTRATISTA :
HECHO POR: REVISADO POR:
05.00.00 ZAPATAS
05.01.00 ACERO EN ZAPATAS F`Y=4 200 Kg/cm2
05.01.01 DESCRIPCION Ø LONG. PIEZAS ELEM. 1/4" 3/8" 1/2" 5/8" 3/4"
Z-1 Kg 1/2" 1.20 25 28 0.99 1.55
COLUMNAS
05.03.00 COLUMNAS - CONCRETO F`C=210 Kg/cm2
05.03.01 PRIMER NIVEL
OFICINAS
C-1 M3 12 0.25 0.25 3.10 2.33
COLUMNAS - ENCOFRADO Y DESENCOFRADO
05.03.02 PRIMER NIVEL
OFICINAS
C-1 M2 12 1.00 3.10 37.20
COLUMNAS - ACERO F`Y=4 200 Kg/cm2
05.03.03 DESCRIPCION Ø LONG. PIEZAS ELEM. 1/4" 3/8" 1/2" 5/8" 3/4"
PRIMER NIVEL
OFICINAS
C-1 Kg 1/2" 4.29 4.00 12.00 0.99
ESTRIBOS Kg 3/8" 1.20 25.00 12.00 0.56
VIGAS
05.04.00 VIGAS - CONCRETO F`C=210 Kg/cm2
05.04.01 1er NIVEL
OFICINAS
eje 1,2,3,4 (A-B) m3 4 3.40 0.20 0.20 0.54
eje 1,2,3,4 (B-C) m3 4 2.90 0.20 0.20 0.46
eje A,B,C (1,2) m3 3 2.95 0.20 0.30 0.53
eje A,B,C (2,3) m3 3 4.65 0.20 0.30 0.84
eje A,B,C (3,4) m3 3 4.60 0.20 0.30 0.83
COBERTURA
05.05.01 PRIMER NIVEL
PARCIAL TOTAL
108.6
108.6
0
0
0
0
0
0
0
24.17 30.22
10.91 13.63
8.22 10.28
6.30
1.30
7.10
2.30
1.50
831.60
1"
831.60
8.64
2.56
37.20
405.10
1"
203.86
201.24
3.20
32.04
291.48
1"
44.86
79.30
167.33 11.6
11.95
51.97
94.64
141.12
165.46
ARQUITECTURA
OBRA :
UBICACIÓN :
CONTRATISTA :
HECHO POR: REVISADO POR: FECHA:
DESCUENTOS O DISMINUCIONES
PUERTAS 322.09
P-1 m2 5 4.65 5.05 117.41
P-2 m2 4 4.65 3.85 71.61
P-3 m2 7 1.00 2.20 15.40
P-4 m2 7 0.90 2.00 12.60
P-5 m2 3 0.70 2.00 4.20
VENTANAS
V-1 m2 8 4.65 1.00 37.20
V-2 m2 4 4.65 2.00 37.20
V-3 m2 1 2.80 3.20 8.96
V-4 m2 1 3.20 5.47 17.50
DESCUENTOS O DISMINUCIONES
PUERTAS 323.89
P-1 m2 5 4.65 5.05 117.41
P-2 m2 4 4.65 3.85 71.61
P-3 m2 7 1.00 2.20 15.40
VENTANAS
V-1 m2 8 4.65 1.00 37.20
V-2 m2 6 4.65 2.00 55.80
V-3 m2 1 2.80 3.20 8.96
V-4 m2 1 3.20 5.47 17.50
PUERTAS
P1 ml 5 4.65 5.05 97.00
P2 ml 4 4.65 3.85 68.00
P3 ml 7 1.00 2.20 44.80
P4 ml 7 0.90 2.00 40.60
P5 ml 20 0.70 2.00 108.00
09.00.00 CIELORRASO
09.02.00 CIELORRASO CON MESCLA DE CEMENTO - ARENA 1216.38
14.00.00 CERRAJERIA
14.01.00 BISAGRAS
16.01.01 BISAGRAS CAPUCHINAS ALUMINIZADAS PESADAS DE 4"X4" 136.00
MERCADO
und 136 136
14.02.00 CERRADURAS
14.02.01 CERRADURA TIPO FORTE DE 2 GOLPES 34.00
MERCADO
und 34 34
15.00.00 VIDRIOS CRISTALES Y SIMILARES
15.01.00 VIDRIOS DE 6mm CON ACCESORIOS 1424.59
VENTANAS
V1 p2 1 4.65 1.00 11.30
V2 p2 6 4.65 2.00 59.80
V3 p2 2 2.80 3.20 17.60
V4 p2 3 3.20 5.47 30.14
V5 EN TIJERALES TECHO p2 11 1.00 4.82 31.64
16.00.00 PINTURAS
16.02.00 PINTURA LATEX MAS EMPASTADO EN MUROS INTERIORES 2 MANOS 2912.74
1 er NIVEL
MERCADO 3234.83
EJE 1 (A-B)(B-C)(C-D)(D-E)(E-F)(F-G)(G-H)(H-I) m2 8 4.65 5.05 187.86
EJE 7 (A-B)(B-C)(C-D)(D-E)(E-F)(F-G)(G-H)(H-I) m2 8 4.65 5.05 187.86
EJE A,I (1-2)(2-3)(3-4)(4-5) m2 8 4.65 5.05 187.86
EJE A,B,H,I (5-6) m2 4 4.75 5.05 95.95
EJE A,B,H,I (6-7) m2 4 2.05 5.05 41.41
EJE C,D,E,F,G,(5'-7) m2 5 3.45 5.05 87.11
EJE 2,3,4 (H-I) m2 3 4.65 5.05 70.45
EJE C,D,E,F,G,(3-4) m2 9 4.65 1.50 62.78
EJE H (1-2)(2-3)(3-4) m2 3 4.65 5.05 70.45
OTRAS DIVISIONES a media altura m2 2 77.57 1.50 232.71
OTRAS DIVISIONES m2 1 29.57 5.05 149.33
2do NIVEL
EJE 1 (A-B)(B-C)(C-D)(D-E)(E-F)(F-G)(G-H)(H-I) m2 8 4.65 3.30 122.76
EJE 7 (A-B)(B-C)(C-D)(D-E)(E-F)(F-G)(G-H)(H-I) m2 8 4.65 3.30 122.76
EJE A,I (1-2)(2-3)(3-4)(4-5) m2 8 4.65 3.30 122.76
EJE A,B,H,I (5-6) m2 4 4.75 3.30 62.70
EJE A,B,H,I (6-7) m2 4 2.05 3.30 27.06
EJE 2,3,4 (H-I) m2 6 4.65 3.30 92.07
EJE H (1-2)(2-3)(3-4) m2 3 4.65 3.30 46.04
OTRAS DIVISIONES a media altura m2 2 202.18 1.50 606.54
OTRAS DIVISIONES m2 1 6.20 3.30 20.46
3er NIVEL
exteriores m2 1 33.65 3.30 111.05
diviciones m2 2 79.83 3.30 526.88
DESCUENTOS O DISMINUCIONES
PUERTAS 322.09
P-1 m2 5 4.65 5.05 117.41
P-2 m2 4 4.65 3.85 71.61
P-3 m2 7 1.00 2.20 15.40
P-4 m2 7 0.90 2.00 12.60
P-5 m2 3 0.70 2.00 4.20
VENTANAS
V-1 m2 8 4.65 1.00 37.20
V-2 m2 4 4.65 2.00 37.20
V-3 m2 1 2.80 3.20 8.96
V-4 m2 1 3.20 5.47 17.50
DESCUENTOS O DISMINUCIONES
PUERTAS 323.89
P-1 m2 5 4.65 5.05 117.41
P-2 m2 4 4.65 3.85 71.61
P-3 m2 7 1.00 2.20 15.40
VENTANAS
V-1 m2 8 4.65 1.00 37.20
V-2 m2 6 4.65 2.00 55.80
V-3 m2 1 2.80 3.20 8.96
V-4 m2 1 3.20 5.47 17.50
PINTURA EN PUERTAS DE MADERA 32.20
PUERTAS
P3 m2 7 1.00 2.20 15.40
P4 m2 7 0.90 2.00 12.60
P5 m2 3 0.70 2.00 4.20
CARPINTERIA METALICA
puertas de estructura metalica und 9 9.00 9.00
18.03.00 ACCESORIOS
18.03.02 SUMIDERO DE 2" 59.00
MERCADO PZA 59 59.00
20.04.00 TABLEROS
20.04.01 TABLERO DE DISTRIBUCION TG+TD-01 3.00
MERCADO und 3 3.00
TOM INTER
52 15
49 6
28 13
129 34