Está en la página 1de 27

PLANILLA DE HIERRO DE ESTRIBO E1 (fy= 4200 kg/cm2)

Espc. Dimensiones Longitud (m) Peso (kg)


Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
V-01 E 20 14 -
18.00 18.00 252.00 2.466 621.43 Ver Despiece
V-02 E 20 14 -
18.00 18.00 252.00 2.466 621.43 Ver Despiece
V-03 E 14 18 -
15.00 15.00 270.00 1.208 326.16 Ver Despiece
V-03a E 14 8 -
15.00 15.00 120.00 1.208 144.96 Ver Despiece
VIGA CABEZAL

V-04 G 12 112 2 (0.82) 2 (1.70) 2 (0.10)


150 5.24 586.88 0.888 521.15
V-05 G 12 56 2 (1.30) 2 (0.60) 2 (0.10)
150 4.00 224.00 0.888 198.91
V-06 G 12 56 2 (0.72) 2 (1.70) 2 (0.10)
150 5.04 282.24 0.888 250.63
V-07 C 12 22 200
0.15 1.05 0.15 1.35 29.70 0.888 26.37
V-08 C 12 12 200
0.15 2.15 0.15 2.45 29.40 0.888 26.11
V-09 C 12 22 200
0.15 1.05 0.15 1.35 29.70 0.888 26.37
V-10 C 12 6 200
0.15 4.30 0.15 4.60 27.60 0.888 24.51
E-01 L 14 104 250
1.90 0.20 2.10 218.40 1.208 263.83
ESPALDAR
E-02 E 14 12 200
15.00 15.00 180.00 1.208 217.44 Ver Despiece
L-01 F 14 20 250
0.20 2.75 1.05 4.00 80.00 1.208 96.64
LATERALES
MUROS

L-02 C 14 20 200
0.20 1.30 0.20 1.70 34.00 1.208 41.07
L-03 C 14 36 250
0.20 3.25 0.20 3.65 131.40 1.208 158.73
L-04 C 18 68 200
0.20 2.85 0.20 3.25 221.00 1.998 441.56
TOTAL ESTRIBO E1 4,007.31 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE ESTRIBO E1 (f'c= 350 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
1 13.400 1.800 1.400 33.77 33.77
VIGA CABEZAL 1 8.800 0.044 1.100 0.43 0.43 Desnivel
1 4.400 0.044 1.100 0.21 0.21 Desnivel
ESPALDAR 2 6.400 1.150 0.300 2.21 4.42 B= Altura Promedio
2 1.400 1.050 0.300 0.44 0.88
MUROS LATERALES
2 2.000 3.450 0.300 2.07 4.14 B= Altura Promedio
TOTAL ESTRIBO E1 43.84 m³

PLANILLA DE HORMIGON DE LIMPIEZA ESTRIBO E1 (f'c= 140 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
VIGA CABEZAL 1 14.40 2.40 0.10 3.46 3.46
MUROS LATERALES 2 2.00 1.30 0.10 0.26 0.52
TOTAL ESTRIBO E1 3.98 m³

RESUMEN DE MATERIALES DE ESTRIBO E1


RUBRO TOTAL
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 3.98 m³
HORMIGON f´c= 350 kg/cm2= 35MPa 43.84 m³
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 4007.31 kg

PLANILLA DE HIERRO DE ESTRIBO E2 (fy= 4200 kg/cm2)


Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
V-01 E 20 14 -
18.00 18.00 252.00 2.466 621.43 Ver Despiece
V-02 E 20 14 -
18.00 18.00 252.00 2.466 621.43 Ver Despiece
V-03 E 14 18 -
15.00 15.00 270.00 1.208 326.16 Ver Despiece
V-03a E 14 8 -
15.00 15.00 120.00 1.208 144.96 Ver Despiece
VIGA CABEZAL

V-04 G 12 112 2 (0.82) 2 (1.70) 2 (0.10)


150 5.24 586.88 0.888 521.15
V-05 G 12 56 2 (1.30) 2 (0.60) 2 (0.10)
150 4.00 224.00 0.888 198.91
V-06 G 12 56 2 (0.72) 2 (1.70) 2 (0.10)
150 5.04 282.24 0.888 250.63
V-07 C 12 22 200
0.15 1.05 0.15 1.35 29.70 0.888 26.37
V-08 C 12 12 200
0.15 2.15 0.15 2.45 29.40 0.888 26.11
V-09 C 12 22 200
0.15 1.05 0.15 1.35 29.70 0.888 26.37
V-10 C 12 6 200
0.15 4.30 0.15 4.60 27.60 0.888 24.51
E-01 L 14 78 250
1.90 0.20 2.10 163.80 1.208 197.87
PEATONAL LATERALES ESPALDAR

E-02 E 14 12 200
15.00 15.00 180.00 1.208 217.44 Ver Despiece
E-02a C 14 12 200
0.20 1.60 0.20 2.00 24.00 1.208 28.99 Ver Despiece
E-03 L 14 28 250
2.20 0.20 2.40 67.20 1.208 81.18 Ver Despiece
L-01 F 14 20 250
0.20 2.75 1.05 4.00 80.00 1.208 96.64
MUROS

L-02 C 14 20 200
0.20 1.30 0.20 1.70 34.00 1.208 41.07
L-03 C 14 32 250
0.20 2.25 0.20 2.65 84.80 1.208 102.44
L-04 C 18 68 200
0.20 2.20 0.20 2.60 176.80 1.998 353.25
LR-01 C 14 13 150
0.10 1.95 0.40 2.45 31.85 1.208 38.47
LR-02 C 14 13 150
0.10 1.95 0.20 2.25 29.25 1.208 35.33
LOSA

LR-03 C 8 9 200
0.10 1.60 0.10 1.80 16.20 0.395 6.40
LR-04 C 8 9 200
0.10 1.60 0.10 1.80 16.20 0.395 6.40
TOTAL ESTRIBO E2 3,993.52 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE ESTRIBO E2 (f'c= 350 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
1 13.200 1.800 1.400 33.26 33.26
VIGA CABEZAL 1 8.800 0.044 1.100 0.43 0.43
1 4.400 0.044 1.100 0.21 0.21
2 5.100 1.150 0.300 1.76 3.52 B= Altura Promedio
ESPALDAR
2 1.500 1.750 0.300 0.79 1.58
2 1.400 1.050 0.300 0.44 0.88
MUROS LATERALES
2 2.000 3.450 0.300 2.07 4.14 B= Altura Promedio
LOSA PEATONAL 1 2.000 1.600 0.200 0.64 0.64 B= Ancho Promedio
TOTAL ESTRIBO E2 44.66 m³

PLANILLA DE HORMIGON DE LIMPIEZA ESTRIBO E2 (f'c= 140 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
VIGA CABEZAL 1 14.20 2.40 0.10 3.41 3.41
MUROS LATERALES 2 2.00 1.30 0.10 0.26 0.52
TOTAL ESTRIBO E2 3.93 m³

RESUMEN DE MATERIALES DE ESTRIBO E2


RUBRO TOTAL
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 3.93 m³ 7.904 324.6
HORMIGON f´c= 350 kg/cm2= 35MPa 44.66 m³ 88.504 403.825346241 492.329
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 3993.52 kg 8000.828 58648.7664 66649.594

MATERIALES DE ESTRIBO E1
MATERIALES ESPECIFICACION
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa
HORMIGON PARA ESTRIBO f´c= 350 kg/cm2= 35MPa
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa

RUBRO CANTIDAD
AISLADORES SISMICOS 6 Unidades
PLANILLA DE ACERO A-36 PARA APOYOS PROVISIONALES Y OBRA FALSA (fy= 2500 kg/cm 2)
DIMENSIONES (mm) Peso Unitario Peso Total
Lugar ELEMENTO CANTIDAD (Kg/U) (Kg) Observaciones
A B ESPESOR LONGITUD AREA
4.00 2000 350 20 109.90 439.60 ALAS
VIGA I 2.00 2000 860 12 162.02 324.05 ALMA
12.00 860 150 12 12.15 145.82 RIGIDIZADORES
OBRA FALSA
PLACA DE ANCLAJE 2.00 1100 350 20 60.45 120.89 300
L 75x75x4 6.00 1050 584 4.81 28.88 284
PLACA SOBRE VIGAS 1.00 2000 1500 4 94.20 94.20 584
PLACA 1 24.00 300 300 16 11.30 271.30
APOYOS PLACA 2 24.00 250 300 12 7.07 169.56
PROVISIONALES
ESTRIBO PLACA 3 24.00 226 300 12 6.39 153.28
ARRIOSTRAMIENTO 10.00 1900 1800 26.85 268.47 2C(200x50x3) 600
PLACA 1 48.00 300 400 16 15.07 723.46 300
PLACA 2 48.00 250 400 12 9.42 452.16 900
APOYOS
PROVISIONALES PLACA 3 48.00 226 400 12 8.52 408.75 1800
PILAS
ARRIOSTRAMIENTO 20.00 1900 1800 26.85 536.94 2C(200x50x3)
ARRIOSTRAMIENTO 12.00 1050 1800 14.84 178.04 2C(200x50x3)
PLACA 1 24.00 300 600 16 22.61 542.59
APOYOS PLACA 2 24.00 250 600 12 14.13 339.12
PROVISIONALES
PLACA 3 24.00 226 600 12 12.77 306.56
PILA
PROVISIONAL ARRIOSTRAMIENTO 10.00 1900 1800 26.85 268.47 2C(200x50x3)
ARRIOSTRAMIENTO 6.00 1050 1800 14.84 89.02 2C(200x50x3)
TOTAL 5,861.16 kg

RESUMEN DE MATERIALES DE RAMPA PEATONAL DERECHA


RUBRO TOTAL
APOYOS DE NEOPRENO 300x300x10 84 u
PERNOS DE EXPANSION DE ∅20mm 20 u
ACERO ESTRUCTURAL fy= 2500 kg/cm2= 250MPa 5861.16 kg
PLANILLA DE HIERRO DE PILA P1 (fy= 4200 kg/cm 2)
Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
V-01 L 25 - 17 16.00 16.00 272.00 3.853 1048.02 Ver Despiece
V-02 I 14 - 18 13.50 13.50 243.00 1.208 293.54 Ver Despiece
V-02a I 14 - 8 13.50 13.50 108.00 1.208 130.46 Ver Despiece
V-03 L 20 - 17 15.00 15.00 255.00 2.466 628.83 Ver Despiece
VIGA CABEZAL

V-04 O 12 150 64 2 (1.00) 2 (1.80) 2 (0.10) 5.80 371.20 0.888 329.63


V-05 O 12 150 128 2 (1.00) 2 (1.80) 2 (0.10) 5.80 742.40 0.888 659.25
V-06 O 12 150 64 2 (1.60) 2 (0.60) 2 (0.10) 4.60 294.40 0.888 261.43
V-07 C 12 200 22 0.15 1.60 0.15 1.90 41.80 0.888 37.12
V-08 C 12 200 18 0.15 2.15 0.15 2.45 44.10 0.888 39.16
V-09 C 12 200 22 0.15 1.60 0.15 1.90 41.80 0.888 37.12
V-10 C 12 200 9 0.15 4.30 0.15 4.60 41.40 0.888 36.76
C-01 L 28 - 72 5.25 0.50 5.75 414.00 4.833 2000.86 2 Columnas
COLUMNA
C-02 O 18 100 41 10.40 1.00 2 (0.30) 12.00 492.00 1.998 983.02 2 Columnas
Z-01 L 20 150 48 13.50 13.50 648.00 2.466 1597.97 Ver Despiece
Z-02 L 22 150 48 14.00 14.00 672.00 2.984 2005.25 Ver Despiece
Z-03 C 22 150 74 0.90 6.90 0.90 8.70 643.80 2.984 1921.10
ZAPATA

Z-04 C 25 150 74 0.90 6.90 0.90 8.70 643.80 3.853 2480.56


Z-05 C 16 - 16 1.10 6.80 1.10 9.00 144.00 1.578 227.23
Z-05a C 16 - 16 0.60 10.80 0.60 12.00 192.00 1.578 302.98
Z-06 E 18 200 80 2 (1.10) 2 (1.90) 2 (0.25) 6.50 520.00 1.998 1038.96
Z-07 F 18 450 240 1.90 0.20 0.20 2.30 552.00 1.998 1102.90
TOTAL PILA P1 17,162.14 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla
de corte de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE PILA P1 (f'c= 350 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
1 12.600 1.900 1.700 40.70 40.70
VIGA CABEZAL 1 8.800 0.044 1.700 0.66 0.66
1 4.400 0.044 1.700 0.33 0.33
COLUMNAS 2 Diametro= 1.500 1.800 3.18 6.36
ZAPATA 1 11.000 7.000 2.000 154.00 154.00
TOTAL PILA P1 202.05 m³

PLANILLA DE HORMIGON DE LIMPIEZA PILA P1 (f'c= 140 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
REPLANTILLO 1 12.00 8.00 0.10 9.60 9.60
TOTAL PILA P1 9.60 m³

RESUMEN DE MATERIALES DE PILA P1


RUBRO TOTAL
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 9.60 m³
HORMIGON f´c= 350 kg/cm2= 35MPa 202.05 m³
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 17162.14 kg

PLANILLA DE HIERRO DE PILA P2 (fy= 4200 kg/cm 2)


Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
V-01 L 25 - 17 16.00 16.00 272.00 3.853 1048.02 Ver Despiece
V-02 I 14 - 18 13.50 13.50 243.00 1.208 293.54 Ver Despiece
V-02a I 14 - 8 13.50 13.50 108.00 1.208 130.46 Ver Despiece
V-03 L 20 - 17 15.00 15.00 255.00 2.466 628.83 Ver Despiece
VIGA CABEZAL

V-04 O 12 150 64 2 (1.00) 2 (1.80) 2 (0.10) 5.80 371.20 0.888 329.63


V-05 O 12 150 128 2 (1.00) 2 (1.80) 2 (0.10) 5.80 742.40 0.888 659.25
V-06 O 12 150 64 2 (1.60) 2 (0.60) 2 (0.10) 4.60 294.40 0.888 261.43
V-07 C 12 200 22 0.15 1.60 0.15 1.90 41.80 0.888 37.12
V-08 C 12 200 18 0.15 2.15 0.15 2.45 44.10 0.888 39.16
V-09 C 12 200 22 0.15 1.60 0.15 1.90 41.80 0.888 37.12
V-10 C 12 200 9 0.15 4.30 0.15 4.60 41.40 0.888 36.76
C-01 L 28 - 72 5.75 0.50 6.25 450.00 4.833 2174.85 2 Columnas
COLUMNA
C-02 O 18 100 45 10.40 1.00 2 (0.30) 12.00 540.00 1.998 1078.92 2 Columnas
Z-01 L 20 150 48 13.50 13.50 648.00 2.466 1597.97 Ver Despiece
Z-02 L 22 150 48 14.00 14.00 672.00 2.984 2005.25 Ver Despiece
Z-03 C 22 150 74 0.90 6.90 0.90 8.70 643.80 2.984 1921.10
ZAPATA

Z-04 C 25 150 74 0.90 6.90 0.90 8.70 643.80 3.853 2480.56


Z-05 C 16 - 16 1.10 7.40 1.10 9.60 153.60 1.578 242.38
Z-05a C 16 - 16 0.60 10.80 0.60 12.00 192.00 1.578 302.98
Z-06 E 18 200 80 2 (1.10) 2 (1.90) 2 (0.25) 6.50 520.00 1.998 1038.96
Z-07 F 18 450 288 1.90 0.20 0.20 2.30 662.40 1.998 1323.48
TOTAL PILA P2 17,667.76 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla
de corte de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE PILA P2 (f'c= 350 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
1 12.600 1.900 1.700 40.70 40.70
VIGA CABEZAL 1 8.800 0.044 1.700 0.66 0.66
1 4.400 0.044 1.700 0.33 0.33
COLUMNAS 2 Diametro= 1.50 2.30 4.06 8.13
ZAPATA 1 11.00 7.60 2.00 167.20 167.20
TOTAL PILA P2 217.01 m³

PLANILLA DE HORMIGON DE LIMPIEZA PILA P2 (f'c= 140 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
REPLANTILLO 1 12.00 8.60 0.10 10.32 10.32
TOTAL PILA P2 10.32 m³

RESUMEN DE MATERIALES DE PILA P2


RUBRO TOTAL
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 10.32 m³ 19.92 m³ 457.2
HORMIGON f´c= 350 kg/cm2= 35MPa 217.01 m³ 419.06 m³
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 17667.76 kg 34829.89 m³ 105907.944 140737.84 m³
PLANILLA DE HIERRO DE PILOTE DE ESTRIBO E1 Ø1200mm L=41450mm. (fy= 4200 kg/cm 2)
Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. (mm) Cant.
a b c Unidad Total Unitario Total
PE1-01 I 25 - 24 12.00 12.00 288.00 3.853 1109.66
PE1-01a I 25 - 24 12.00 12.00 288.00 3.853 1109.66
PE1-01b I 25 - 24 12.00 12.00 288.00 3.853 1109.66

ESTRIBO 1
PILOTE PE1-01c I 25 - 24 12.00 12.00 288.00 3.853 1109.66
PE1-01d I 25 - 24 3.00 3.00 72.00 3.853 277.42
PE1-02 O 18 80 60.2 10.40 1.00 2 (0.30) 12.00 722.40 1.998 1443.36
PE1-02a O 18 150 58 10.40 1.00 2 (0.30) 12.00 696.00 1.998 1390.61
TOTAL 1 PILOTE 7,550.04
TOTAL 4 PILOTES 30,200.14

NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá
efectuar su planilla de corte de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE ACERO A-36 DE PILOTE DE ESTRIBO E1 Ø1200mm L=41450mm. (fy= 2500 kg/cm 2)

Espesor Diámetro Externo Diámetro Interno Longitud Volumen (kg)


Lugar
(m) (m) (m) (m) Parcial Total
CAMISA 0.02 1.24 1.20 6.00 3610.44 3610.44
TOTAL 1 PILOTE 3,610.44
TOTAL 4 PILOTES 14,441.78

PLANILLA DE HORMIGON DE PILOTE DE ESTRIBO E1 Ø1200mm L=41450mm. (f'c= 350 kg/cm 2)


Volumen (m3)
Lugar Cant. Diámetro Longitud
(u) (m) (m) Parcial Total
PILOTE 1 1.20 41.45 46.88 51.57
TOTAL 1 PILOTE 51.57
NOTA: se aumento un 10% de desperdicio TOTAL 4 PILOTES 206.27

RESUMEN DE MATERIALES PILOTES DE ESTRIBO E1 - L=41450mm


RUBRO 1 PILOTE Ø1200 TOTAL (4 PILOTES)
PREBARRENADO DE PILOTE 41.45 ml 165.80 ml
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 7550.04 kg 30200.14 kg
ACERO A-36 fy= 2500 kg/cm2= 250 Mpa 3610.44 kg 14441.78 kg
HORMIGON f´c= 350 kg/cm2= 35MPa 51.57 m³ 206.27 m³

PLANILLA DE HIERRO DE PILOTE DE PILA P1 Ø1400mm L=38000mm. (fy= 4200 kg/cm 2)


Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant.
(mm) a b c Unidad Total Unitario Total
PP1-01 I 25 - 32 12.00 12.00 384.00 3.853 1479.55
PP1-01a I 25 - 32 12.00 12.00 384.00 3.853 1479.55
PP1-01b I 25 - 32 12.00 12.00 384.00 3.853 1479.55
PILOTE
PILA 1

PP1-01c I 25 - 32 9.55 9.55 305.60 3.853 1177.48


PP1-02 O 18 80 72.6 10.40 1.00 2 (0.30) 12.00 871.20 1.998 1740.66
PP1-02a O 18 150 60.5 10.40 1.00 2 (0.30) 12.00 726.00 1.998 1450.55
TOTAL 1 PILOTE 8,807.34
TOTAL 6 PILOTES 52,844.03

NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá
efectuar su planilla de corte de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE ACERO A-36 DE PILOTE DE PILA P1 Ø1400mm L=38000mm. (fy= 2500 kg/cm 2)

Espesor Diámetro Externo Diámetro Interno Longitud Volumen (kg)


Lugar
(m) (m) (m) (m) Parcial Total
CAMISA 0.02 1.44 1.40 6.00 4202.32 4202.32
TOTAL 1 PILOTE 4,202.32
TOTAL 6 PILOTES 25,213.92

PLANILLA DE HORMIGON DE PILOTE DE PILA P1 Ø1400mm L=38000mm. (f'c= 350 kg/cm 2)


Volumen (m3)
Lugar Cant. Diámetro Longitud
(u) (m) (m) Parcial Total
PILOTE 1 1.40 38.00 58.50 64.35
TOTAL 1 PILOTE 64.35
NOTA: se aumento un 10% de desperdicio TOTAL 6 PILOTES 386.08

RESUMEN DE MATERIALES PILOTES DE PILA P1 - L=38000mm


RUBRO 1 PILOTE Ø1400 TOTAL (6 PILOTES)
PREBARRENADO DE PILOTE 38.00 ml 228.00 ml
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 8807.34 kg 52844.03 kg
ACERO A-36 fy= 2500 kg/cm2= 250 Mpa 4202.32 kg 25213.92 kg
HORMIGON f´c= 350 kg/cm2= 35MPa 64.35 m³ 386.08 m³

PLANILLA DE HIERRO DE PILOTE DE PILA P2 Ø1400mm L=38200mm. (fy= 4200 kg/cm 2)


Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant.
(mm)
Espc.
Lugar Mc Tipo Ø mm. (mm) Cant.
a b c Unidad Total Unitario Total
PP2-01 I 25 - 32 12.00 12.00 384.00 3.853 1479.55
PP2-01a I 25 - 32 12.00 12.00 384.00 3.853 1479.55
PP2-01b I 25 - 32 12.00 12.00 384.00 3.853 1479.55

PILOTE
PILA 2
PP2-01c I 25 - 32 9.75 9.75 312.00 3.853 1202.14
PP2-02 O 18 80 72.6 10.40 1.00 2 (0.30) 12.00 871.20 1.998 1740.66
PP2-02a O 18 150 61 10.40 1.00 2 (0.30) 12.00 732.00 1.998 1462.54
TOTAL 1 PILOTE 8,843.99 774.19 m³
TOTAL 6 PILOTES 53,063.91

NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá
efectuar su planilla de corte de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE ACERO A-36 DE PILOTE DE PILA P2 Ø1400mm L=38200mm. (fy= 2500 kg/cm 2)
Espesor Diámetro Externo Diámetro Interno Longitud Volumen (kg)
Lugar
(m) (m) (m) (m) Parcial Total
CAMISA 0.02 1.44 1.40 6.00 4202.32 4202.32
TOTAL 1 PILOTE 4,202.32
TOTAL 6 PILOTES 25,213.92

PLANILLA DE HORMIGON DE PILOTE DE PILA P2 Ø1400mm L=38200mm. (f'c= 350 kg/cm 2)

Cant. Diámetro Longitud Volumen (m3)


Lugar
(u) (m) (m) Parcial Total
PILOTE 1 1.40 38.20 58.80 64.68
TOTAL 1 PILOTE 64.68
NOTA: se aumento un 10% de desperdicio TOTAL 6 PILOTES 388.11

RESUMEN DE MATERIALES PILOTES DE PILA P2 - L=38200mm


RUBRO 1 PILOTE Ø1400 TOTAL (6 PILOTES)
PREBARRENADO DE PILOTE 38.20 ml 229.20 ml
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 8843.99 kg 53063.91 kg
ACERO A-36 fy= 2500 kg/cm2= 250 Mpa 4202.32 kg 25213.92 kg
HORMIGON f´c= 350 kg/cm2= 35MPa 64.68 m³ 388.11 m³

PLANILLA DE HIERRO DE PILOTE DE ESTRIBO E2 Ø1200mm L=39700mm. (fy= 4200 kg/cm 2)


Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant.
(mm) a b c Unidad Total Unitario Total
PE2-01 I 25 - 24 12.00 12.00 288.00 3.853 1109.66
PE2-01a I 25 - 24 12.00 12.00 288.00 3.853 1109.66
ESTRIBO 2

PE2-01b I 25 - 24 12.00 12.00 288.00 3.853 1109.66


PILOTE

PE2-01c I 25 - 24 11.25 11.25 270.00 3.853 1040.31


PE2-02 O 18 80 60.2 10.40 1.00 2 (0.30) 12.00 722.40 1.998 1443.36
PE2-02a O 18 150 54.2 10.40 1.00 2 (0.30) 12.00 650.40 1.998 1299.50
TOTAL 1 PILOTE 7,112.16
TOTAL 4 PILOTES 28,448.63

NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá
efectuar su planilla de corte de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE ACERO A-36 DE PILOTE DE ESTRIBO E2 Ø1200mm L=39700mm. (fy= 2500 kg/cm 2)

Espesor Diámetro Externo Diámetro Interno Longitud Volumen (kg)


Lugar
(m) (m) (m) (m) Parcial Total
CAMISA 0.02 1.24 1.20 6.00 3610.44 3610.44
TOTAL 1 PILOTE 3,610.44
TOTAL 4 PILOTES 14,441.78

PLANILLA DE HORMIGON DE PILOTE DE ESTRIBO E2 Ø1200mm L=39700mm. (f'c= 350 kg/cm 2)


Volumen (m3)
Lugar Cant. Diámetro Longitud
(u) (m) (m) Parcial Total
PILOTE 1 1.20 39.70 44.90 49.39
TOTAL 1 PILOTE 49.39
NOTA: se aumento un 10% de desperdicio TOTAL 4 PILOTES 197.56

RESUMEN DE MATERIALES PILOTES DE ESTRIBO E2 - L=39700mm


RUBRO 1 PILOTE Ø1200 TOTAL (4 PILOTES)
PREBARRENADO DE PILOTE 39.70 ml 158.80 ml
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 7112.16 kg 28448.63 kg
ACERO A-36 fy= 2500 kg/cm2= 250 Mpa 3610.44 kg 14441.78 kg
HORMIGON f´c= 350 kg/cm2= 35MPa 49.39 m³ 197.56 m³
PLANILLA DE HIERRO DE VIGA POSTENSADA (fy= 4200 kg/cm2)
Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
V1-01 E 32 - 5 29.55 29.55 147.75 6.313 932.75 Ver Despiece
V1-01a E 10 - 6 27.00 27.00 162.00 0.617 99.95 Ver Despiece
V1-01b I 10 - 2 10.00 10.00 20.00 0.617 12.34
V1-01c I 10 - 2 2.00 2.00 4.00 0.617 2.47
V1-02 E 32 - 4 12.00 12.00 48.00 6.313 303.02
TRAMO 1

V1-03 I 32 - 6 30.00 30.00 180.00 6.313 1136.34 Ver Despiece


V1-04 G 10 Variable 131 2 (0.40) 2 (1.45) 2 (0.08) 3.85 504.35 0.617 311.18 b= Altura Promedio
V1-04a G 12 100 21 2 (0.40) 2 (1.75) 2 (0.08) 4.45 93.45 0.888 82.98 b= Altura Promedio
V1-05 G 10 Variable 131 2 (0.40) 2 (0.35) 2 (0.08) 1.65 216.15 0.617 133.36
V1-05a G 12 100 21 2 (0.40) 2 (0.35) 2 (0.08) 1.65 34.65 0.888 30.77
V1-06 G 12 Variable 65 2 (0.40) 2 (0.60) 2 (0.08) 2.15 139.75 0.888 124.10
Separador I 32 - 13 0.45 0.45 5.85 6.313 36.93
V2-01 E 32 - 5 30.00 30.00 150.00 6.313 946.95 Ver Despiece
V2-01a E 10 - 6 27.00 27.00 162.00 0.617 99.95 Ver Despiece
V2-01b I 10 - 2 10.00 10.00 20.00 0.617 12.34
V2-01c I 10 - 2 2.00 2.00 4.00 0.617 2.47
V2-02 E 32 - 4 12.00 12.00 48.00 6.313 303.02
V2-03 E 32 - 6 30.00 30.00 180.00 6.313 1136.34 Ver Despiece
TRAMO 2

V2-03a E 32 - 4 30.00 30.00 120.00 6.313 757.56 Ver Despiece CANTIDAD M M2 M3


V2-03b I 32 - 8 12.00 12.00 96.00 6.313 606.05
V2-04 G 10 Variable 130 2 (0.40) 2 (1.45) 2 (0.08) 3.85 500.50 0.617 308.81 b= Altura Promedio
V2-04a G 12 100 21 2 (0.40) 2 (1.75) 2 (0.08) 4.45 93.45 0.888 82.98 b= Altura Promedio
V2-05 G 10 Variable 130 2 (0.40) 2 (0.35) 2 (0.08) 1.65 214.50 0.617 132.35
V2-05a G 12 100 21 2 (0.40) 2 (0.35) 2 (0.08) 1.65 34.65 0.888 30.77
V2-06 G 12 Variable 65 2 (0.40) 2 (0.60) 2 (0.08) 2.15 139.75 0.888 124.10
Separador I 32 - 76 0.45 0.45 34.20 6.313 215.90
SUBTOTAL 2 TRAMOS 7,965.80 Kg 2 1 0.2 0.4
TOTAL 4 TRAMOS (1 VIGA) 15,931.59 Kg 2 1.75 0.2 0.7
TOTAL 6 VIGAS 95,589.56 Kg #REF!
PLANILLA DE HIERRO DE REFUERZO EN LOSA Y VIGAS POSTENSADAS (fy= 4200 kg/cm 2)
Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
R-01 I 25 150 79 12.00 12.00 948.00 3,853 3652.64
REFUERZO
R-01a E 25 - 12 110.40 110.40 1324.80 3.853 5104.45 Ver Despiece
TOTAL 8,757.10 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de
corte de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.
CANTIDAD M M2 M3
PLANILLA DE HORMIGON DE VIGAS POSTENSADAS (f'c= 500 kg/cm2) PLANILLA DE HORMIGON DE JUNTA DE VIGAS POSTENSADAS (f'c= 500 kg/cm 2) 1 0.5 31.5 15.75
Volumen (m3) Volumen (m3) 2 1 0.2 0.4
Lugar CANTIDAD Observaciones Lugar CANTIDAD Observaciones
Total Total 2 1.75 0.2 0.7
TRAMO 1 1 18.00 TRAMO 1-2 1 1.80 16.85
TRAMO 2 1 17.80 TRAMO 2-3 1 1.45
TRAMO 3 1 17.80 TRAMO 3-4 1 1.80
TRAMO 4 1 18.00
TOTAL 1 VIGA 71.60 m³ TOTAL 1 VIGA 5.05 m³
TOTAL 6 VIGA 429.60 m³ TOTAL 6 VIGA 30.30 m³

RESUMEN DE MATERIALES
RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 104346.66 kg
HORMIGON f´c= 500 kg/cm2= 50MPa 459.90 m³

MATERIALES
HORMIGON f´c= 500 kg/cm2= 50MPa
ACERO DE POSTENSADO (fsu=18990 kg/cm2)
PLANILLA DE ACERO DE POSTENSADO (fsu=18990 kg/cm2)
Cantidad Torones Peso Uni. Peso Total
Postensado Ø mm. Longitud
Ducto 1 Ducto Total (kg/m) (kg)
Superior 12.7 1 12 12 101 0.777 941.72
Inferior 12.7 4 24 96 101 0.777 7533.79
TOTAL (1 VIGA) 8,475.52 kg
TOTAL 6 VIGA 50,853.10 kg
PLANILLA DE HIERRO DE DIAFRAGMA DE ESTRIBOS (fy= 4200 kg/cm 2)
Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
DIAFRGMA DE-01 E 22 - 7 14.00 14.00 98.00 2.984 292.43 Ver Despiece
ESTRIBO DE-02 E 22 - 6 14.00 14.00 84.00 2.984 250.66 Ver Despiece
DE-03 C 22 - 35 0.40 1.40 0.40 2.20 77.00 2.984 229.77
DE-04 G 12 150 50 2 (0.45) 2 (0.65) 2 (0.08) 2.35 117.50 0.888 104.34
DE-05 G 12 150 100 2 (0.31) 2 (1.31) 2 (0.08) 3.39 339.00 0.888 301.03
TOTAL 1 ESTRIBO 1,178.23 Kg 2 1.75 0.2 0.7
TOTAL 2 ESTRIBOS 2,356.46 Kg #REF!
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE DIAFRAGMA DE ESTRIBOS (f'c= 350 kg/cm 2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
DIAFRAGMA ESTRIBO 5 1.50 1.25 0.60 1.13 5.63
RECUBRIMIENTO 2 0.10 1.25 0.60 0.08 0.15
TOTAL 1 ESTRIBO 5.78 Kg
NOTA: El hormigon de junta de vigas fue considerado en la lamina de vigas postensadas. TOTAL 2 ESTRIBOS 11.55 Kg

RESUMEN DE MATERIALES DE DIAFRAGMAS DE ESTRIBOS


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 2356.46 kg
HORMIGON f´c= 350 kg/cm2= 35MPa 11.55 m³

PLANILLA DE HIERRO DE DIAFRAGMA DE PILAS (fy= 4200 kg/cm2)


Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
DP-01 E 28 - 9 14.00 14.00 126.00 4.833 608.96 Ver Despiece
DP-02 E 22 - 10 14.00 14.00 140.00 2.984 417.76 MATERIALES
DIAFRGMA PILA

DP-03 E 14 - 4 13.00 13.00 52.00 1.208 62.82 Ver Despiece HORMIGON f´c= 500 kg/cm2= 50MPa
DP-04 E 28 - 7 14.00 14.00 98.00 4.833 473.63 Ver Despiece ACERO DE POSTENSADO (fsu=18990 kg/cm2)
DP-05 C 28 - 10 0.50 1.40 0.50 2.40 24.00 4.833 115.99 PLANILLA DE ACERO DE POSTENSADO (fsu=18990 kg/cm2)
DP-06 G 12 150 100 2 (0.54) 2 (1.91) 2 (0.08) 5.05 505.00 0.888 448.44 Postensado Ø mm. Cantidad Torones Longitud Peso Uni. Peso Total
Ducto (kg/m) (kg)
DP-07 G 12 150 50 2 (0.85) 2 (0.65) 2 (0.08) 3.15 157.50 0.888 139.86
TOTAL 1 PILA 2,267.46 Kg
TOTAL 2 PILAS 4,534.92 Kg Superior 12.7 2 6 12 101 0.777 941.72
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte Inferior 12.7 4 24 96 101 0.777 7533.79
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización. TOTAL (1 VIGA) 8,475.52 kg
TOTAL 6 VIGA 50,853.10 kg
PLANILLA DE HORMIGON DE DIAFRAGMA DE PILAS (f'c= 350 kg/cm2)
DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
DIAFRAGMA PILA 5 1.50 1.85 1.00 2.78 13.88
RECUBRIMIENTO 2 0.10 1.85 1.00 0.19 0.37
TOTAL 1 PILA 14.25 Kg
NOTA: El hormigon de junta de vigas fue considerado en la lamina de vigas postensadas. TOTAL 2 PILAS 28.49 Kg

RESUMEN DE MATERIALES DE DIAFRAGMAS DE PILAS


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 4534.92 kg
HORMIGON f´c= 350 kg/cm2= 35MPa 28.49 m³

PLANILLA DE HIERRO DE DIAFRAGMA CENTRAL (fy= 4200 kg/cm2)


Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
DC-01 E 22 - 9 14.00 14.00 126.00 2.984 375.98 Ver Despiece
DIAFRGMA CENTRAL

DC-02 E 22 - 6 14.00 14.00 84.00 2.984 250.66


DC-03 E 14 - 4 13.00 13.00 52.00 1.208 62.82 Ver Despiece
DC-04 E 22 - 7 14.00 14.00 98.00 2.984 292.43 Ver Despiece
DC-05 C 22 - 10 0.40 1.40 0.40 2.20 22.00 2.984 65.65 Ver Despiece
DC-08 G 12 150 50 2 (0.85) 2 (0.65) 2 (0.08) 3.15 157.50 0.888 139.86
DC-09 G 12 150 100 2 (0.53) 2 (1.32) 2 (0.08) 3.85 385.00 0.888 341.88
TOTAL 1,529.28 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE DIAFRAGMA CENTRAL (f'c= 350 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
DIAFRAGMA CENTRAL 5 1.50 1.25 1.00 1.88 9.38
RECUBRIMIENTO 2 0.10 1.25 1.00 0.13 0.25
TOTAL 9.63 Kg

RESUMEN DE MATERIALES DE DIAFRAGMA CENTRAL


RUBRO TOTAL DIAFRAGMAS LOSA ACCESOS RAMPAS MUROS VIGAS
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 1529.28 kg 8420.65 kg 41070.2914 3990.7695 10578.3772 16138.24225 104346.6564 184544.99 kg
HORMIGON f´c= 350 kg/cm2= 35MPa 9.63 m³ 49.67 kg 335 52.17725 436.84 kg
REPLNTILLO 14.2535 14.35 43.16 71.7635
PLANILLA DE HIERRO PARA LOSA DE TABLERO, BORDILLOS Y ACERAS (fy= 4200 kg/cm2)
PLANILLA DE HIERRO DE ACERAS Y COLUMNAS (f'y= 4200 Kg/cm2)
Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total Dimensiones (m) Longitud (m) Peso (kg)
Lugar Mc Tipo Φ mm Espac. (mm) Cant. Observación
L-01 E 14 150 667 15.00 15.00 10005.00 1.208 12086.04 Ver Despiece a b c d e unidad total unitario total
TABLERO
LOSA DE
L-02 E 14 150 667 15.00 15.00 10005.00 1.208 12086.04 Ver Despiece 700 A 12 300 244 0.40 0.34 0.74 0.34 0.20 2.02 492.88 0,888 437.68

ACERA
LOSA
L-03 E 10 200 66 105.55 105.55 6966.30 0.617 4298.21 Ver Despiece 701 E 10 - 5 79.55 79.55 397.75 0.617 245.41
L-04 E 12 150 88 105.55 105.55 9288.40 0.888 8248.10 Ver Despiece 700 A 12 300 38 0.40 0.34 0.74 0.34 0.20 2.02 76.76 0.888 68.16

ACE

LOS

ACC
ESO
RA

A
B-01 E 10 - 6 105.55 105.55 633.30 0.617 390.75 Ver Despiece
BORDILLOS
B-02 B 12 300 668 0.25 2 (0.30) 2 (0.20) 1.25 835.00 0.888 741.48
A-01 A 12 300 668 2 (0.30) 2 (0.30) 1.40 2.60 1736.80 0.888 1542.28
ACERAS A-02 E 10 - 20 105.55 105.55 2111.00 0.617 1302.49 Ver Despiece
A-03 E 12 - 4 105.55 105.55 422.20 0.888 374.91 Ver Despiece
TOTAL 41,070.29 Kg 2 1 0.2 0.4
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON PARA LOSA DE TABLERO, BORDILLOS Y ACERAS (f'c= 350 kg/cm2)
DIMENSIONES (m) Volumen (m3) CANTIDAD M M2 M3
Lugar CANTIDAD Observaciones
ANCHO ESPESOR LONGITUD Parcial Total 1 0.5 31.5 15.75
LOSA DE TABLERO 1 13.20 0.20 100.00 264.00 264.00 2 1 0.2 0.4
CHAFLAN 6 0.50 0.05 100.00 2.50 15.00
2 1.50 0.20 100.00 30.00 60.00 #REF!
ACERAS
2 0.60 0.10 100.00 6.00 -12.00 DUCTO
BORDILLOS 2 0.20 0.20 100.00 4.00 8.00
TOTAL 335.00 m³

RESUMEN DE MATERIALES DE LOSA DE TABLERO, BORDILLOS Y ACERAS


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 41070.29 kg
HORMIGON f´c= 350 kg/cm2= 35MPa 335.00 m³
PLANILLA DE HIERRO PARA LOSAS DE ACCESO (fy= 4200 kg/cm2)
PLANILLA DE HIERRO DE ACERAS Y COLUMNAS (f'y= 4200 Kg/cm2)
Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total Lugar Mc Tipo Φ mm Espac. (mm) Cant. Dimensiones (m) Longitud (m) Peso (kg) Observación
LA1-01 E 12 250-350 23 15.00 15.00 345.00 0.888 306.36 Ver Despiece TOTAL 1 CUERPO = #REF! kg
LA1-02 E 12 250-350 23 15.00 15.00 345.00 0.888 306.36 Ver Despiece TOTAL 2 CUERPOS = #REF! kg
LA1-03
LOSA DE ACCESO 1

C 12 200 65 0.20 6.55 0.20 6.95 451.75 0.888 401.15 Ancho Promedio
LA1-04 C 20 200 65 0.20 6.55 0.20 6.95 451.75 2.466 1114.02 Ancho Promedio CANTIDAD M M2 M3
LA1-05 E 12 - 2 15.00 15.00 30.00 0.888 26.64 Ver Despiece 1 0.5 31 15.5
LA1-06 D 12 200 65 0.35 0.25 0.25 0.85 55.25 0.888 49.06
LA1-07 D 12 200 65 0.35 0.25 0.25 0.85 55.25 0.888 49.06
LA1-08 E 12 - 2 15.00 15.00 30.00 0.888 26.64 Ver Despiece
LA1-09 L 12 200 65 0.90 0.60 1.50 97.50 0.888 86.58
LA2-01 E 12 250-300 23 10.50 10.50 241.50 0.888 214.45 Ver Despiece TOTAL 1 CUERPO = 0.00 kg
LA2-02 E 12 250-300 23 10.50 10.50 241.50 0.888 214.45 Ver Despiece TOTAL 2 CUERPOS = 0.00 kg
LA2-03
LOSA DE ACCESO 2

C 12 200 48 0.20 5.95 0.20 6.35 304.80 0.888 270.66 Ancho Promedio
LA2-04 C 20 200 48 0.20 5.95 0.20 6.35 304.80 2.466 751.64 Ancho Promedio CANTIDAD M M2 M3
LA2-05 E 12 - 2 10.50 10.50 21.00 0.888 18.65 Ver Despiece 1 0.5 31 15.5
LA2-06 D 12 200 48 0.35 0.25 0.25 0.85 40.80 0.888 36.23
LA2-07 D 12 200 48 0.35 0.25 0.25 0.85 40.80 0.888 36.23
LA2-08 E 12 - 2 10.50 10.50 21.00 0.888 18.65 Ver Despiece
LA2-09 L 12 200 48 0.90 0.60 1.50 72.00 0.888 63.94
TOTAL 3,990.77 Kg 2 1 0.2 0.4
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de
corte de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON PARA LOSAS DE ACCESO (f'c= 350 kg/cm2)


DIMENSIONES (m) Volumen (m3) CANTIDAD M M2 M3
Lugar CANTIDAD Observaciones
ANCHO ESPESOR LONGITUD Parcial Total 1 0.5 31.5 15.75
1 12.70 0.35 6.65 29.56 29.56 LOSA 2 1.75 0.2 0.7
LOSA DE ACCERO 1
2 0.05 12.70 0.64 1.27 APOYOS DE LOSA
1 9.60 0.35 6.05 20.33 20.33 LOSA
LOSA DE ACCERO 2
2 0.05 10.20 0.51 1.02 APOYOS DE LOSA
TOTAL 52.18 m³

PLANILLA DE HORMIGON DE LIMPIEZA PARA LOSAS DE ACCESO (f'c= 140 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
ANCHO ESPESOR LONGITUD Parcial Total
LOSA DE ACCESO 1 1 12.70 0.10 6.65 8.45 8.45
LOSA DE ACCESO 2 1 9.60 0.10 6.05 5.81 5.81
TOTAL 14.25 m³

RESUMEN DE MATERIALES DE LOSAS DE ACCESO


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 3990.77 kg
HORMIGON f´c= 350 kg/cm2= 35MPa 52.18 m³
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 14.25 m³
PLANILLA DE HIERRO DE MUROS DE CONFINAMIENTO 1 Y 2 DE ESTRIBO E2 (fy= 4200 kg/cm2)
Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
M1-01 C 16 300 40 0.20 3.30 0.70 4.20 168.00 1.578 265.10 b= Altura Promedio
M1-01a L 16 300 40 0.70 2.30 3.00 120.00 1.578 189.36
M1-02 C 12 150 80 0.20 3.30 0.70 4.20 336.00 0.888 298.37 b= Altura Promedio
M1-03 E 12 200 18 13.00 13.00 234.00 0.888 207.79 Ver Despiece
CONFINAMIENTO 1

M1-04 E 12 200 18 13.00 13.00 234.00 0.888 207.79 Ver Despiece


M1-05 C 16 150 80 0.25 2.10 0.25 2.60 208.00 1.578 328.22
MURO DE

M1-06 C 16 150 80 0.25 2.10 0.25 2.60 208.00 1.578 328.22


M1-07 G 10 200 11 13.00 13.00 143.00 0.617 88.23 Ver Despiece
M1-08 G 10 200 11 13.00 13.00 143.00 0.617 88.23 Ver Despiece
LR1-01 C 14 150 47 0.40 1.70 0.10 2.20 103.40 1.208 124.91 Ver Despiece
LR1-02 C 14 150 47 0.20 1.70 0.10 2.00 94.00 1.208 113.55 Ver Despiece
LR1-03 E 8 200 8 7.00 7.00 56.00 0.395 22.12 Ver Despiece
LR1-04 E 8 200 8 7.00 7.00 56.00 0.395 22.12 Ver Despiece
M2-01 C 14 400 30 0.15 2.10 0.50 2.75 82.50 1.208 99.66 b= Altura Promedio
M2-01a L 14 400 30 0.50 1.50 2.00 60.00 1.208 72.48 b= Altura Promedio
CONFINAMIENTO 2

M2-02 C 10 200 60 0.15 2.10 0.50 2.75 165.00 0.617 101.81 b= Altura Promedio
M2-03 E 10 150 17 13.00 13.00 221.00 0.617 136.36 Ver Despiece
MURO DE

M2-04 E 10 150 17 13.00 13.00 221.00 0.617 136.36 Ver Despiece


M2-05 C 16 150 80 0.20 1.40 0.20 1.80 144.00 1.578 227.23
M2-06 C 16 150 80 0.20 1.40 0.20 1.80 144.00 1.578 227.23
M2-07 G 10 250 7 13.00 13.00 91.00 0.617 56.15 Ver Despiece
M2-08 G 10 250 7 13.00 13.00 91.00 0.617 56.15 Ver Despiece
TOTAL 3,397.44 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE MUROS DE CONFINAMIENTO DE ESTRIBO E2 (f'c= 280 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
Pantalla 1.00 12.00 3.05 0.30 10.98 10.98 b= Altura Promedio
MURO 1 Zapata 1.00 12.00 2.20 0.35 9.24 9.24
Losa 1.00 7.05 1.50 0.20 2.12 2.12
Pantalla 1.00 12.00 1.90 0.25 5.70 5.70 b= Altura Promedio
MURO 2
Zapata 1.00 12.00 1.50 0.30 5.40 5.40
TOTAL 33.44 m³

PLANILLA DE HORMIGON DE LIMPIEZA (f'c= 140 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
REPLANTILLO 1 12.00 3.00 0.10 3.60 3.60 Muro 1
REPLANTILLO 1 12.00 2.30 0.10 2.76 2.76 Muro 2
TOTAL 6.36 m³

RESUMEN DE MATERIALES DE MUROS DE CONFINAMIENTO 1 Y 2 DE ESTRIBO E2


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 3397.44 kg
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 6.36 m³
HORMIGON f´c= 280 kg/cm2= 28MPa 33.44 m³

PLANILLA DE HIERRO DE MUROS DE CONFINAMIENTO 3 Y 4 DE ESTRIBO E2 (fy= 4200 kg/cm2)


Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
M3-01 C 12 400 30 0.10 1.90 0.30 2.30 69.00 0.888 61.27 b= Altura Promedio
M3-01a L 12 400 30 0.30 1.00 1.30 39.00 0.888 34.63
CONFINAMIENTO 3

M3-02 C 8 200 60 0.10 1.90 0.30 2.30 138.00 0.395 54.51 b= Altura Promedio
M3-03 E 10 200 8 13.00 13.00 104.00 0.617 64.17 Ver Despiece
MURO DE

M3-04 E 10 200 8 13.00 13.00 104.00 0.617 64.17 Ver Despiece


M3-05 C 14 150 80 0.15 1.00 0.15 1.30 104.00 1.208 125.63
M3-06 C 14 150 80 0.15 1.00 0.15 1.30 104.00 1.208 125.63
M3-07 G 8 200 7 13.00 13.00 91.00 0.395 35.95 Ver Despiece
M3-08 G 8 200 7 13.00 13.00 91.00 0.395 35.95 Ver Despiece
M4-01 C 10 400 35 0.05 0.95 0.25 1.25 43.75 0.617 26.99 b= Altura Promedio
M4-01a L 10 400 35 0.25 0.70 0.95 33.25 0.617 20.52
CONFINAMIENTO 4

M4-02 C 8 200 70 0.05 0.95 0.25 1.25 87.50 0.395 34.56 b= Altura Promedio
M4-03 E 8 150 7 15.00 15.00 105.00 0.395 41.48 Ver Despiece
MURO DE

M4-04 E 8 150 7 15.00 15.00 105.00 0.395 41.48 Ver Despiece


M4-05 C 10 150 93 0.05 0.75 0.05 0.85 79.05 0.617 48.77
M4-06 C 10 150 93 0.05 0.75 0.05 0.85 79.05 0.617 48.77
M4-07 G 8 250 4 15.00 15.00 60.00 0.395 23.70 Ver Despiece
M4-08 G 8 250 4 15.00 15.00 60.00 0.395 23.70 Ver Despiece
TOTAL 911.87 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE MUROS DE CONFINAMIENTO DE ESTRIBO E2 (f'c= 280 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
Pantalla 1.00 12.00 1.25 0.20 3.00 3.00 b= Altura Promedio
MURO 3
Zapata 1.00 12.00 1.10 0.25 3.30 3.30
Pantalla 1.00 14.00 0.90 0.15 1.89 1.89 b= Altura Promedio
MURO 4
Zapata 1.00 14.00 0.85 0.15 1.79 1.79
TOTAL 9.98 m³

PLANILLA DE HORMIGON DE LIMPIEZA (f'c= 140 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
REPLANTILLO 1 14.00 1.90 0.10 2.66 2.66 Muro 3
REPLANTILLO 1 14.00 1.65 0.10 2.31 2.31 Muro 4
TOTAL 4.97 m³

RESUMEN DE MATERIALES DE MUROS DE CONFINAMIENTO 3 Y 4 DE ESTRIBO E2


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 911.87 kg
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 4.97 m³
HORMIGON f´c= 280 kg/cm2= 28MPa 9.98 m³

PLANILLA DE HIERRO DE MUROS DE CONFINAMIENTO 5 Y 6 DE ESTRIBO E2 (fy= 4200 kg/cm2)


Espc. Dimensiones Longitud (m) Peso (kg) MATERIALES
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total HORMIGON f´c= 500 kg/cm2= 50MPa
M5-01 C 16 300 40 0.20 3.30 0.70 4.20 168.00 1.578 265.10 b= Altura Promedio ACERO DE POSTENSADO (fsu=18990 kg/cm2)
M5-01a L 16 300 40 0.70 2.30 3.00 120.00 1.578 189.36
CONFINAMIENTO 5

M5-02 C 12 150 80 0.20 3.30 0.70 4.20 336.00 0.888 298.37 b= Altura Promedio PLANILLA DE ACERO DE POSTENSADO (fsu=18990 kg/cm2)
M5-03 E 12 200 18 13.00 13.00 234.00 0.888 207.79 Ver Despiece Postensado Ø mm. Cantidad Torones Longitud Peso Uni. Peso Total
MURO DE

Ducto (kg/m) (kg)


M5-04 E 12 200 18 13.00 13.00 234.00 0.888 207.79 Ver Despiece
M5-05 C 16 150 80 0.25 2.10 0.25 2.60 208.00 1.578 328.22
M5-06 C 16 150 80 0.25 2.10 0.25 2.60 208.00 1.578 328.22 Superior 12.7 2 6 12 101 0.777 941.72
M5-07 G 10 200 11 13.00 13.00 143.00 0.617 88.23 Ver Despiece Inferior 12.7 4 24 96 101 0.777 7533.79
M5-08 G 10 200 11 13.00 13.00 143.00 0.617 88.23 Ver Despiece TOTAL (1 VIGA) 8,475.52 kg
M6-01 C 14 400 30 0.15 2.10 0.50 2.75 82.50 1.208 99.66 b= Altura Promedio TOTAL 6 VIGA 50,853.10 kg
M6-01a L 14 400 30 0.50 1.50 2.00 60.00 1.208 72.48 b= Altura Promedio
CONFINAMIENTO 6

M6-02 C 10 200 60 0.15 2.10 0.50 2.75 165.00 0.617 101.81 b= Altura Promedio
M6-03 E 10 150 17 13.00 13.00 221.00 0.617 136.36 Ver Despiece
MURO DE

M6-04 E 10 150 17 13.00 13.00 221.00 0.617 136.36 Ver Despiece


M6-05 C 16 150 80 0.20 1.40 0.20 1.80 144.00 1.578 227.23
M6-06 C 16 150 80 0.20 1.40 0.20 1.80 144.00 1.578 227.23
M6-07 G 10 250 7 13.00 13.00 91.00 0.617 56.15 Ver Despiece
M6-08 G 10 250 7 13.00 13.00 91.00 0.617 56.15 Ver Despiece
TOTAL 3,114.74 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE MUROS DE CONFINAMIENTO DE ESTRIBO E2 (f'c= 280 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
Lugar CANTIDAD Observaciones
A B C Parcial Total
Pantalla 1.00 12.00 3.05 0.30 10.98 10.98 b= Altura Promedio
MURO 5
Zapata 1.00 12.00 2.20 0.35 9.24 9.24
Pantalla 1.00 12.00 1.90 0.25 5.70 5.70 b= Altura Promedio
MURO 6
Zapata 1.00 12.00 1.50 0.30 5.40 5.40
TOTAL 31.32 m³

PLANILLA DE HORMIGON DE LIMPIEZA (f'c= 140 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
REPLANTILLO 1 12.00 3.00 0.10 3.60 3.60 Muro 5
REPLANTILLO 1 12.00 2.30 0.10 2.76 2.76 Muro 6
TOTAL 6.36 m³

RESUMEN DE MATERIALES DE MUROS DE CONFINAMIENTO 5 Y 6 DE ESTRIBO E2


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 3114.74 kg
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 6.36 m³
HORMIGON f´c= 280 kg/cm2= 28MPa 31.32 m³

PLANILLA DE HIERRO DE MUROS DE CONFINAMIENTO 7 Y 8 DE ESTRIBO E2 (fy= 4200 kg/cm2)


Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
M7-01 C 12 400 30 0.10 1.90 0.30 2.30 69.00 0.888 61.27 b= Altura Promedio
M7-01a L 12 400 30 0.30 1.00 1.30 39.00 0.888 34.63
CONFINAMIENTO 7

M7-02 C 8 200 60 0.10 1.90 0.30 2.30 138.00 0.395 54.51 b= Altura Promedio
M7-03 E 10 200 8 13.00 13.00 104.00 0.617 64.17 Ver Despiece
MURO DE

M7-04 E 10 200 8 13.00 13.00 104.00 0.617 64.17 Ver Despiece


M7-05 C 14 150 80 0.15 1.00 0.15 1.30 104.00 1.208 125.63
M7-06 C 14 150 80 0.15 1.00 0.15 1.30 104.00 1.208 125.63
M7-07 G 8 200 7 13.00 13.00 91.00 0.395 35.95 Ver Despiece
M7-08 G 8 200 7 13.00 13.00 91.00 0.395 35.95 Ver Despiece
M8-01 C 10 400 30 0.05 0.95 0.25 1.25 37.50 0.617 23.14 b= Altura Promedio
M8-01a L 10 400 30 0.25 0.70 0.95 28.50 0.617 17.58
CONFINAMIENTO 8

M8-02 C 8 200 60 0.05 0.95 0.25 1.25 75.00 0.395 29.63 b= Altura Promedio
M8-03 E 8 150 7 15.00 15.00 105.00 0.395 41.48 Ver Despiece
MURO DE

M8-04 E 8 150 7 15.00 15.00 105.00 0.395 41.48 Ver Despiece


M8-05 C 10 150 80 0.05 0.75 0.05 0.85 68.00 0.617 41.96
M8-06 C 10 150 80 0.05 0.75 0.05 0.85 68.00 0.617 41.96
M8-07 G 8 250 4 15.00 15.00 60.00 0.395 23.70 Ver Despiece
M8-08 G 8 250 4 15.00 15.00 60.00 0.395 23.70 Ver Despiece
TOTAL 886.51 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE MUROS DE CONFINAMIENTO DE ESTRIBO E2 (f'c= 280 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
Pantalla 1.00 12.00 1.25 0.20 3.00 3.00 b= Altura Promedio
MURO 7
Zapata 1.00 12.00 1.10 0.25 3.30 3.30
Pantalla 1.00 12.00 0.90 0.15 1.62 1.62 b= Altura Promedio
MURO 8
Zapata 1.00 12.00 0.85 0.15 1.53 1.53
TOTAL 9.45 m³

PLANILLA DE HORMIGON DE LIMPIEZA (f'c= 140 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
REPLANTILLO 1 12.00 1.90 0.10 2.28 2.28 Muro 7
REPLANTILLO 1 12.00 1.65 0.10 1.98 1.98 Muro 8
TOTAL 4.26 m³

RESUMEN DE MATERIALES DE MUROS DE CONFINAMIENTO 7 Y 8 DE ESTRIBO E2


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 886.51 kg
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 4.26 m³
HORMIGON f´c= 280 kg/cm2= 28MPa 9.45 m³

ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 8310.57 kg


HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 21.95 m³
HORMIGON f´c= 280 kg/cm2= 28MPa 84.18 m³
PLANILLA DE HIERRO DE MUROS DE CONFINAMIENTO 1 Y 2 DE ESTRIBO E1 (fy= 4200 kg/cm2)
Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
M1-01 C 16 300 40 0.20 3.10 0.70 4.00 160.00 1.578 252.48 b= Altura Promedio
CONFINAMIENTO 1 M1-01a L 16 300 40 0.70 2.00 2.70 108.00 1.578 170.42
M1-02 C 12 150 80 0.20 3.10 0.70 4.00 320.00 0.888 284.16 b= Altura Promedio
M1-03 E 12 200 18 13.00 13.00 234.00 0.888 207.79 Ver Despiece
MURO DE

M1-04 E 12 200 18 13.00 13.00 234.00 0.888 207.79 Ver Despiece


M1-05 C 16 150 80 0.25 2.00 0.25 2.50 200.00 1.578 315.60
M1-06 C 16 150 80 0.25 2.00 0.25 2.50 200.00 1.578 315.60
M1-07 G 10 200 11 13.00 13.00 143.00 0.617 88.23 Ver Despiece
M1-08 G 10 200 11 13.00 13.00 143.00 0.617 88.23 Ver Despiece
M2-01 C 14 400 30 0.15 2.20 0.50 2.85 85.50 1.208 103.28 b= Altura Promedio
M2-01a L 14 400 30 0.50 1.50 2.00 60.00 1.208 72.48 b= Altura Promedio
CONFINAMIENTO 2

M2-02 C 10 200 60 0.15 2.20 0.50 2.85 171.00 0.617 105.51 b= Altura Promedio
M2-03 E 10 150 17 13.00 13.00 221.00 0.617 136.36 Ver Despiece
MURO DE

M2-04 E 10 150 17 13.00 13.00 221.00 0.617 136.36 Ver Despiece


M2-05 C 16 150 80 0.20 1.40 0.20 1.80 144.00 1.578 227.23
M2-06 C 16 150 80 0.20 1.40 0.20 1.80 144.00 1.578 227.23
M2-07 G 10 250 7 13.00 13.00 91.00 0.617 56.15 Ver Despiece
M2-08 G 10 250 7 13.00 13.00 91.00 0.617 56.15 Ver Despiece
TOTAL 3,051.05 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE MUROS DE CONFINAMIENTO DE ESTRIBO E1 (f'c= 280 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
Pantalla 1.00 12.00 3.33 0.30 11.99 11.99 b= Altura Promedio
MURO 1
Zapata 1.00 12.00 2.10 0.35 8.82 8.82
Pantalla 1.00 12.00 2.00 0.25 6.00 6.00 b= Altura Promedio
MURO 2
Zapata 1.00 12.00 1.50 0.30 5.40 5.40
TOTAL 32.21 m³

PLANILLA DE HORMIGON DE LIMPIEZA (f'c= 140 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
REPLANTILLO 1 12.00 2.90 0.10 3.48 3.48 Muro 1
REPLANTILLO 1 12.00 2.30 0.10 2.76 2.76 Muro 2
TOTAL 6.24 m³

RESUMEN DE MATERIALES DE MUROS DE CONFINAMIENTO 1 Y 2 DE ESTRIBO E1


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 3051.05 kg
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 6.24 m³
HORMIGON f´c= 280 kg/cm2= 28MPa 32.21 m³

PLANILLA DE HIERRO DE MUROS DE CONFINAMIENTO 3 Y 4 DE ESTRIBO E1 (fy= 4200 kg/cm2)


Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
M3-01 C 12 400 30 0.10 1.45 0.30 1.85 55.50 0.888 49.28 b= Altura Promedio
M3-01a L 12 400 30 0.30 1.00 1.30 39.00 0.888 34.63
M3-02
CONFINAMIENTO 3

C 8 200 60 0.10 1.45 0.30 1.85 111.00 0.395 43.85 b= Altura Promedio
M3-03 E 10 200 8 13.00 13.00 104.00 0.617 64.17 Ver Despiece
MURO DE

M3-04 E 10 200 8 13.00 13.00 104.00 0.617 64.17 Ver Despiece


M3-05 C 14 150 80 0.15 1.00 0.15 1.30 104.00 1.208 125.63
M3-06 C 14 150 80 0.15 1.00 0.15 1.30 104.00 1.208 125.63
M3-07 G 8 200 7 13.00 13.00 91.00 0.395 35.95 Ver Despiece
M3-08 G 8 200 7 13.00 13.00 91.00 0.395 35.95 Ver Despiece
M4-01 C 10 400 30 0.05 1.10 0.25 1.40 42.00 0.617 25.91 b= Altura Promedio
M4-01a L 10 400 30 0.25 0.70 0.95 28.50 0.617 17.58
CONFINAMIENTO 4

M4-02 C 8 200 60 0.05 1.10 0.25 1.40 84.00 0.395 33.18 b= Altura Promedio
M4-03 E 8 150 7 15.00 15.00 105.00 0.395 41.48 Ver Despiece
MURO DE

M4-04 E 8 150 7 15.00 15.00 105.00 0.395 41.48 Ver Despiece


M4-05 C 10 150 80 0.05 0.80 0.05 0.90 72.00 0.617 44.42
M4-06 C 10 150 80 0.05 0.80 0.05 0.90 72.00 0.617 44.42
M4-07 G 8 250 4 15.00 15.00 60.00 0.395 23.70 Ver Despiece
M4-08 G 8 250 4 15.00 15.00 60.00 0.395 23.70 Ver Despiece
TOTAL 875.13 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE MUROS DE CONFINAMIENTO DE ESTRIBO E1 (f'c= 280 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
Pantalla 1.00 12.00 1.28 0.20 3.07 3.07 b= Altura Promedio
MURO 3
Zapata 1.00 12.00 1.10 0.25 3.30 3.30
Pantalla 1.00 14.00 1.03 0.15 2.16 2.16 b= Altura Promedio
MURO 4
Zapata 1.00 14.00 0.90 0.15 1.89 1.89
TOTAL 10.43 m³

PLANILLA DE HORMIGON DE LIMPIEZA (f'c= 140 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
REPLANTILLO 1 14.00 1.90 0.10 2.66 2.66 Muro 3
REPLANTILLO 1 14.00 1.70 0.10 2.38 2.38 Muro 4
TOTAL 5.04 m³

RESUMEN DE MATERIALES DE MUROS DE CONFINAMIENTO 3 Y 4 DE ESTRIBO E1


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 875.13 kg
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 5.04 m³
HORMIGON f´c= 280 kg/cm2= 28MPa 10.43 m³

PLANILLA DE HIERRO DE MUROS DE CONFINAMIENTO 5 Y 6 DE ESTRIBO E1 (fy= 4200 kg/cm2)


Espc. Dimensiones Longitud (m) Peso (kg) MATERIALES
Lugar Mc Tipo Ø mm. (mm) Cant. Observaciones
a b c Unidad Total Unitario Total HORMIGON f´c= 500 kg/cm2= 50MPa
M5-01 C 16 300 40 0.20 3.10 0.70 4.00 160.00 1.578 252.48 b= Altura Promedio ACERO DE POSTENSADO (fsu=18990 kg/cm2)
M5-01a L 16 300 40 0.70 2.00 2.70 108.00 1.578 170.42
CONFINAMIENTO 5

M5-02 C 12 150 80 0.20 3.10 0.70 4.00 320.00 0.888 284.16 b= Altura Promedio PLANILLA DE ACERO DE POSTENSADO (fsu=18990 kg/cm2)
M5-03 E 12 200 18 13.00 13.00 234.00 0.888 207.79 Ver Despiece Postensado Ø mm. Cantidad Torones Longitud Peso Uni. Peso Total
MURO DE

Ducto (kg/m) (kg)


M5-04 E 12 200 18 13.00 13.00 234.00 0.888 207.79 Ver Despiece
M5-05 C 16 150 80 0.25 2.00 0.25 2.50 200.00 1.578 315.60
M5-06 C 16 150 80 0.25 2.00 0.25 2.50 200.00 1.578 315.60 Superior 12.7 2 6 12 101 0.777 941.72
M5-07 G 10 200 11 13.00 13.00 143.00 0.617 88.23 Ver Despiece Inferior 12.7 4 24 96 101 0.777 7533.79
M5-08 G 10 200 11 13.00 13.00 143.00 0.617 88.23 Ver Despiece TOTAL (1 VIGA) 8,475.52 kg
M6-01 C 14 400 30 0.15 2.20 0.50 2.85 85.50 1.208 103.28 b= Altura Promedio TOTAL 6 VIGA 50,853.10 kg
M6-01a L 14 400 30 0.50 1.50 2.00 60.00 1.208 72.48 b= Altura Promedio
CONFINAMIENTO 6

M6-02 C 10 200 60 0.15 2.20 0.50 2.85 171.00 0.617 105.51 b= Altura Promedio
M6-03 E 10 150 17 13.00 13.00 221.00 0.617 136.36 Ver Despiece
MURO DE

M6-04 E 10 150 17 13.00 13.00 221.00 0.617 136.36 Ver Despiece


M6-05 C 16 150 80 0.20 1.40 0.20 1.80 144.00 1.578 227.23
M6-06 C 16 150 80 0.20 1.40 0.20 1.80 144.00 1.578 227.23
M6-07 G 10 250 7 13.00 13.00 91.00 0.617 56.15 Ver Despiece
M6-08 G 10 250 7 13.00 13.00 91.00 0.617 56.15 Ver Despiece
TOTAL 3,051.05 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE MUROS DE CONFINAMIENTO DE ESTRIBO E1 (f'c= 280 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
Pantalla 1.00 12.00 3.33 0.30 11.99 11.99 b= Altura Promedio
MURO 5
Zapata 1.00 12.00 2.10 0.35 8.82 8.82
Pantalla 1.00 12.00 2.00 0.25 6.00 6.00 b= Altura Promedio
MURO 6
Zapata 1.00 12.00 1.50 0.30 5.40 5.40
TOTAL 32.21 m³

PLANILLA DE HORMIGON DE LIMPIEZA (f'c= 140 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
REPLANTILLO 1 12.00 2.90 0.10 3.48 3.48 Muro 5
REPLANTILLO 1 12.00 2.30 0.10 2.76 2.76 Muro 6
TOTAL 6.24 m³

RESUMEN DE MATERIALES DE MUROS DE CONFINAMIENTO 5 Y 6 DE ESTRIBO E1


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 3051.05 kg
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 6.24 m³
HORMIGON f´c= 280 kg/cm2= 28MPa 32.21 m³

PLANILLA DE HIERRO DE MUROS DE CONFINAMIENTO 7 Y 8 DE ESTRIBO E1 (fy= 4200 kg/cm2)


Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. Cant. Observaciones
(mm) a b c Unidad Total Unitario Total
M7-01 C 12 400 30 0.10 1.45 0.30 1.85 55.50 0.888 49.28 b= Altura Promedio
M7-01a L 12 400 30 0.30 1.00 1.30 39.00 0.888 34.63
CONFINAMIENTO 7

M7-02 C 8 200 60 0.10 1.45 0.30 1.85 111.00 0.395 43.85 b= Altura Promedio
M7-03 E 10 200 8 13.00 13.00 104.00 0.617 64.17 Ver Despiece
MURO DE

M7-04 E 10 200 8 13.00 13.00 104.00 0.617 64.17 Ver Despiece


M7-05 C 14 150 80 0.15 1.00 0.15 1.30 104.00 1.208 125.63
M7-06 C 14 150 80 0.15 1.00 0.15 1.30 104.00 1.208 125.63
M7-07 G 8 200 7 13.00 13.00 91.00 0.395 35.95 Ver Despiece
M7-08 G 8 200 7 13.00 13.00 91.00 0.395 35.95 Ver Despiece
M8-01 C 10 400 26 0.05 1.10 0.25 1.40 36.40 0.617 22.46 b= Altura Promedio
M8-01a L 10 400 25 0.25 0.70 0.95 23.75 0.617 14.65
CONFINAMIENTO 8

M8-02 C 8 200 51 0.05 1.10 0.25 1.40 71.40 0.395 28.20 b= Altura Promedio
M8-03 E 8 150 7 15.00 15.00 105.00 0.395 41.48 Ver Despiece
MURO DE

M8-04 E 8 150 7 15.00 15.00 105.00 0.395 41.48 Ver Despiece


M8-05 C 10 150 68 0.05 0.80 0.05 0.90 61.20 0.617 37.76
M8-06 C 10 150 68 0.05 0.80 0.05 0.90 61.20 0.617 37.76
M8-07 G 8 250 4 15.00 15.00 60.00 0.395 23.70 Ver Despiece
M8-08 G 8 250 4 15.00 15.00 60.00 0.395 23.70 Ver Despiece
TOTAL 850.44 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE MUROS DE CONFINAMIENTO DE ESTRIBO E1 (f'c= 280 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
Pantalla 1.00 12.00 1.28 0.20 3.07 3.07 b= Altura Promedio
MURO 7
Zapata 1.00 12.00 1.10 0.25 3.30 3.30
Pantalla 1.00 10.25 1.03 0.15 1.58 1.58 b= Altura Promedio
MURO 8
Zapata 1.00 10.25 0.90 0.15 1.38 1.38
TOTAL 9.34 m³

PLANILLA DE HORMIGON DE LIMPIEZA (f'c= 140 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
REPLANTILLO 1 10.25 1.90 0.10 1.95 1.95 Muro 7
REPLANTILLO 1 10.25 1.70 0.10 1.74 1.74 Muro 8
TOTAL 3.69 m³

RESUMEN DE MATERIALES DE MUROS DE CONFINAMIENTO 7 Y 8 DE ESTRIBO E1


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 850.44 kg
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 3.69 m³
HORMIGON f´c= 280 kg/cm2= 28MPa 9.34 m³

ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 7827.67 kg


HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 21.21 m³
HORMIGON f´c= 280 kg/cm2= 28MPa 84.18 m³
PLANILLA DE HIERRO DE RAMPA PEATONAL DERECHA (fy= 4200 kg/cm2)
Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. (mm) Cant. Observaciones
a b c Unidad Total Unitario Total
MRP-01 C 14 150 127 0.20 4.50 0.70 5.40 685.80 1.208 828.45 b= Altura Promedio
MRP-02 C 14 150 127 0.20 4.50 0.70 5.40 685.80 1.208 828.45 b= Altura Promedio
MRP-03 E 10 150 14 21.00 21.00 294.00 0.617 181.40 Ver Despiece
PANTALLA

MRP-03a E 10 150 9 19.00 19.00 171.00 0.617 105.51 Ver Despiece


MRP-03b E 10 150 11 11.00 11.00 121.00 0.617 74.66 Ver Despiece
MRP-04 E 10 200 14 21.00 21.00 294.00 0.617 181.40 Ver Despiece
MRP-04a E 10 200 9 19.00 19.00 171.00 0.617 105.51 Ver Despiece
MRP-04b E 10 200 11 11.00 11.00 121.00 0.617 74.66 Ver Despiece
MRP-05 C 14 150 127 0.25 2.40 0.25 2.90 368.30 1.208 444.91
MRP-06
ZAPATA

C 14 150 127 0.25 2.40 0.25 2.90 368.30 1.208 444.91


MRP-07 E 10 200 13 21.00 21.00 273.00 0.617 168.44 Ver Despiece
MRP-08 E 10 200 13 21.00 21.00 273.00 0.617 168.44 Ver Despiece
LR1-01 C 14 150 10 0.10 1.70 0.40 2.20 22.00 1.208 26.58 b= Altura Promedio
LR1-02 C 14 150 10 0.10 1.70 0.20 2.00 20.00 1.208 24.16 b= Altura Promedio
LRD1-01 E 8 200 8 12.00 12.00 96.00 0.395 37.92 b= Altura Promedio
LRD1-02 E 8 200 8 12.00 12.00 96.00 0.395 37.92 Ver Despiece
LR2-01 C 14 150 53 0.10 1.70 0.40 2.20 116.60 1.208 140.85 Ver Despiece
LR2-02 C 14 150 53 0.10 1.70 0.20 2.00 106.00 1.208 128.05
LR3-01 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68
LOSA DE RAMPA PEATONAL

LR3-02 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68


LRD2-01 E 8 200 8 21.00 21.00 168.00 0.395 66.36 Ver Despiece
LRD2-02 E 8 200 8 21.00 21.00 168.00 0.395 66.36 Ver Despiece
LR4-01 C 14 150 107 0.10 1.70 0.40 2.20 235.40 1.208 284.36
LR4-02 C 14 150 107 0.10 1.70 0.20 2.00 214.00 1.208 258.51
LR5-01 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68
LR5-02 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68
LRD3-01 E 8 200 8 7.45 7.45 59.60 0.395 23.54
LRD3-02 E 8 200 8 7.45 7.45 59.60 0.395 23.54
LR6-01 C 14 150 29 0.10 3.25 0.10 3.45 100.05 1.208 120.86
LR6-02 C 14 150 29 0.10 3.25 0.10 3.45 100.05 1.208 120.86
LR7-01 C 14 150 10 0.10 2.90 0.40 3.40 34.00 1.208 41.07
LR7-02 C 14 150 10 0.10 2.90 0.20 3.20 32.00 1.208 38.66 Ver Despiece
Varilla de VA-01 C 12 - 64 0.15 0.08 0.15 0.38 24.32 0.888 21.60
anclaje
TOTAL 5,234.62 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE RAMPA PEATONAL DERECHA (f'c= 280 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
1.00 1.50 2.10 0.30 0.95 0.95
1.00 5.80 3.45 0.30 6.00 6.00 b= Altura Promedio
Pantalla 1.00 2.20 5.15 0.30 3.40 3.40
MURO 1
1.00 8.00 4.83 0.30 11.59 11.59 b= Altura Promedio
1.00 1.50 3.50 0.30 1.58 1.58
Zapata 1.00 19.00 2.50 0.35 16.63 16.63
Losa 1 1.00 1.50 1.50 0.20 0.45 0.45
Losa 2 1.00 1.50 8.00 0.20 2.40 2.40
Losa 3 1.00 1.50 3.30 0.20 0.99 0.99
MURO 2 Losa 4 1.00 1.50 16.00 0.20 4.80 4.80
Losa 5 1.00 1.50 3.30 0.20 0.99 0.99
Losa 6 1.00 1.50 4.30 0.20 1.29 1.29
Losa 7 1.00 1.50 1.70 0.20 0.51 0.51
TOTAL 51.57 m³

PLANILLA DE HORMIGON DE LIMPIEZA (f'c= 140 kg/cm 2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
REPLANTILLO 1 20.00 3.50 0.10 7.00 7.00
TOTAL 7.00 m³

PLANILLA DE ACERO A-36 PARA PASAMANOS (fy= 2500 kg/cm2)

Espesor Diámetro Externo Diámetro Interno Longitud Peso Peso Total


Lugar (Kg/m) (Kg) Observaciones
(mm) (mm) (mm) (m)
TUBO 3" 3.00 76.20 70.20 52.10 5.42 282.16 PASAMANOS
TUBO 2½" 3.00 63.50 57.50 30.40 4.48 136.07 POSTE
TUBO 2" 2.00 50.80 46.80 104.20 2.41 250.81
SUBTOTAL 669.03 kg
DIMENSIONES (mm) Peso Unitario Peso Total
Lugar CANTIDAD Observaciones
A B C (Kg/U) (Kg)
PLACA 32.00 100 100 4 0.31 10.05
SUBTOTAL 10.05 kg
TOTAL 679.08 kg

RESUMEN DE MATERIALES DE RAMPA PEATONAL DERECHA


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 5234.62 kg
HORMIGON f´c= 280 kg/cm2= 28MPa 51.57 m³
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 7.00 m³
ACERO ESTRUCTURAL fy= 2500 kg/cm2= 250MPa 679.08 kg

PLANILLA DE HIERRO DE RAMPA PEATONAL IZQUIERDA (fy= 4200 kg/cm2)


Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. (mm) Cant. Observaciones
a b c Unidad Total Unitario Total
MRP-01 C 14 150 133 0.20 4.30 0.70 5.20 691.60 1.208 835.45 b= Altura Promedio
MRP-02 C 14 150 133 0.20 4.30 0.70 5.20 691.60 1.208 835.45 b= Altura Promedio
MRP-03 E 10 150 18 21.00 21.00 378.00 0.617 233.23 Ver Despiece
PANTALLA

MRP-03a E 10 150 9 20.00 20.00 180.00 0.617 111.06 Ver Despiece


PANTALLA
MRP-03b E 10 150 7 5.00 5.00 35.00 0.617 21.60 a= Ancho Promedio
MRP-04 E 10 200 18 21.00 21.00 378.00 0.617 233.23 Ver Despiece
MRP-04a E 10 200 9 20.00 20.00 180.00 0.617 111.06 Ver Despiece
MRP-04b E 10 200 7 5.00 5.00 35.00 0.617 21.60 a= Ancho Promedio
MRP-05 C 14 150 133 0.25 2.40 0.25 2.90 385.70 1.208 465.93
ZAPATA MRP-06 C 14 150 133 0.25 2.40 0.25 2.90 385.70 1.208 465.93
MRP-07 E 10 200 13 21.00 21.00 273.00 0.617 168.44 Ver Despiece
MRP-08 E 10 200 13 21.00 21.00 273.00 0.617 168.44 Ver Despiece
LR1-01 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68 b= Altura Promedio
LR1-02 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68 b= Altura Promedio
LRD1-01 C 8 200 8 0.10 1.45 0.10 1.65 13.20 0.395 5.21 b= Altura Promedio
LRD1-02 C 8 200 8 0.10 1.45 0.10 1.65 13.20 0.395 5.21 Ver Despiece
LOSA DE RAMPA PEATONAL

LR2-01 C 14 150 114 0.10 1.70 0.40 2.20 250.80 1.208 302.97 Ver Despiece
LR2-02 C 14 150 114 0.10 1.70 0.20 2.00 228.00 1.208 275.42
LR3-01 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68
LR3-02 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68
LRD2-01 E 8 200 8 21.00 21.00 168.00 0.395 66.36 Ver Despiece
LRD2-02 E 8 200 8 21.00 21.00 168.00 0.395 66.36 Ver Despiece
LR4-01 C 14 150 124 0.10 1.70 0.40 2.20 272.80 1.208 329.54
LR4-02 C 14 150 124 0.10 1.70 0.20 2.00 248.00 1.208 299.58
LRD3-01 E 8 200 8 21.00 21.00 168.00 0.395 66.36
LRD3-02 E 8 200 8 21.00 21.00 168.00 0.395 66.36
Varilla de VA-01 C 12 - 66 0.15 0.08 0.15 0.38 25.08 0.888 22.27
anclaje
TOTAL 5,343.76 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE RAMPA PEATONAL IZQUIERDA (f'c= 280 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
1.00 1.50 4.05 0.30 1.82 1.82
Pantalla 1.00 17.00 4.48 0.30 22.85 22.85 b= Altura Promedio
MURO 1
1.00 1.50 2.70 0.30 1.22 1.22
Zapata 1.00 20.00 2.50 0.35 17.50 17.50
Losa 1 1.00 1.50 3.30 0.20 0.99 0.99
Losa 2 1.00 1.50 17.00 0.20 5.10 5.10
MURO 2
Losa 3 1.00 1.50 3.30 0.20 0.99 0.99
Losa 4 1.00 1.50 18.50 0.20 5.55 5.55
TOTAL 56.02 m³

PLANILLA DE HORMIGON DE LIMPIEZA (f'c= 140 kg/cm 2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
REPLANTILLO 1 21.00 3.50 0.10 7.35 7.35
TOTAL 7.35 m³

PLANILLA DE ACERO A-36 PARA PASAMANOS (fy= 2500 kg/cm2)

Espesor Diámetro Externo Diámetro Interno Longitud Peso Peso Total


Lugar Observaciones
(mm) (mm) (mm) (m) (Kg/m) (Kg)
TUBO 3" 3.00 76.20 70.20 56.35 5.42 305.17 PASAMANOS
TUBO 2½" 3.00 63.50 57.50 31.35 4.48 140.32 POSTE
TUBO 2" 2.00 50.80 46.80 112.70 2.41 271.26
SUBTOTAL 716.76 kg
DIMENSIONES (mm) Peso Unitario Peso Total
Lugar CANTIDAD Observaciones
A B C (Kg/U) (Kg)
PLACA 33.00 100 100 4 0.31 10.36
SUBTOTAL 10.36 kg
TOTAL 727.12 kg

RESUMEN DE MATERIALES DE RAMPA PEATONAL IZQUIERDA


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 5343.76 kg 10578.38 kg
HORMIGON f´c= 280 kg/cm2= 28MPa 56.02 m³ 107.58 kg 168.360375 275.94 kg
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 7.35 m³ 14.35 kg
ACERO ESTRUCTURAL fy= 2500 kg/cm2= 250MPa 727.12 kg 1406.21 kg
PLANILLA DE HIERRO DE RAMPA PEATONAL DERECHA (fy= 4200 kg/cm2)
Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. (mm) Cant. Observaciones
a b c Unidad Total Unitario Total
MRP-01 C 14 150 127 0.20 4.50 0.70 5.40 685.80 1.208 828.45 b= Altura Promedio
MRP-02 C 14 150 127 0.20 4.50 0.70 5.40 685.80 1.208 828.45 b= Altura Promedio
MRP-03 E 10 150 14 21.00 21.00 294.00 0.617 181.40 Ver Despiece
PANTALLA

MRP-03a E 10 150 9 19.00 19.00 171.00 0.617 105.51 Ver Despiece


MRP-03b E 10 150 11 11.00 11.00 121.00 0.617 74.66 Ver Despiece
MRP-04 E 10 200 14 21.00 21.00 294.00 0.617 181.40 Ver Despiece
MRP-04a E 10 200 9 19.00 19.00 171.00 0.617 105.51 Ver Despiece
MRP-04b E 10 200 11 11.00 11.00 121.00 0.617 74.66 Ver Despiece
MRP-05 C 14 150 127 0.25 2.40 0.25 2.90 368.30 1.208 444.91
MRP-06
ZAPATA

C 14 150 127 0.25 2.40 0.25 2.90 368.30 1.208 444.91


MRP-07 E 10 200 13 21.00 21.00 273.00 0.617 168.44 Ver Despiece
MRP-08 E 10 200 13 21.00 21.00 273.00 0.617 168.44 Ver Despiece
LR1-01 C 14 150 10 0.10 1.70 0.40 2.20 22.00 1.208 26.58 b= Altura Promedio
LR1-02 C 14 150 10 0.10 1.70 0.20 2.00 20.00 1.208 24.16 b= Altura Promedio
LRD1-01 E 8 200 8 12.00 12.00 96.00 0.395 37.92 b= Altura Promedio
LRD1-02 E 8 200 8 12.00 12.00 96.00 0.395 37.92 Ver Despiece
LR2-01 C 14 150 53 0.10 1.70 0.40 2.20 116.60 1.208 140.85 Ver Despiece
LR2-02 C 14 150 53 0.10 1.70 0.20 2.00 106.00 1.208 128.05
LR3-01 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68
LOSA DE RAMPA PEATONAL

LR3-02 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68


LRD2-01 E 8 200 8 21.00 21.00 168.00 0.395 66.36 Ver Despiece
LRD2-02 E 8 200 8 21.00 21.00 168.00 0.395 66.36 Ver Despiece
LR4-01 C 14 150 107 0.10 1.70 0.40 2.20 235.40 1.208 284.36
LR4-02 C 14 150 107 0.10 1.70 0.20 2.00 214.00 1.208 258.51
LR5-01 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68
LR5-02 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68
LRD3-01 E 8 200 8 7.45 7.45 59.60 0.395 23.54
LRD3-02 E 8 200 8 7.45 7.45 59.60 0.395 23.54
LR6-01 C 14 150 29 0.10 3.25 0.10 3.45 100.05 1.208 120.86
LR6-02 C 14 150 29 0.10 3.25 0.10 3.45 100.05 1.208 120.86
LR7-01 C 14 150 10 0.10 2.90 0.40 3.40 34.00 1.208 41.07
LR7-02 C 14 150 10 0.10 2.90 0.20 3.20 32.00 1.208 38.66 Ver Despiece
Varilla de VA-01 C 12 - 64 0.15 0.08 0.15 0.38 24.32 0.888 21.60
anclaje
TOTAL 5,234.62 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE RAMPA PEATONAL DERECHA (f'c= 280 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
1.00 1.50 2.10 0.30 0.95 0.95
1.00 5.80 3.45 0.30 6.00 6.00 b= Altura Promedio
Pantalla 1.00 2.20 5.15 0.30 3.40 3.40
MURO 1
1.00 8.00 4.83 0.30 11.59 11.59 b= Altura Promedio
1.00 1.50 3.50 0.30 1.58 1.58
Zapata 1.00 19.00 2.50 0.35 16.63 16.63
Losa 1 1.00 1.50 1.50 0.20 0.45 0.45
Losa 2 1.00 1.50 8.00 0.20 2.40 2.40
Losa 3 1.00 1.50 3.30 0.20 0.99 0.99
MURO 2 Losa 4 1.00 1.50 16.00 0.20 4.80 4.80
Losa 5 1.00 1.50 3.30 0.20 0.99 0.99
Losa 6 1.00 1.50 4.30 0.20 1.29 1.29
Losa 7 1.00 1.50 1.70 0.20 0.51 0.51
TOTAL 51.57 m³

PLANILLA DE HORMIGON DE LIMPIEZA (f'c= 140 kg/cm 2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
REPLANTILLO 1 20.00 3.50 0.10 7.00 7.00
TOTAL 7.00 m³

PLANILLA DE ACERO A-36 PARA PASAMANOS (fy= 2500 kg/cm2)

Espesor Diámetro Externo Diámetro Interno Longitud Peso Peso Total


Lugar (Kg/m) (Kg) Observaciones
(mm) (mm) (mm) (m)
TUBO 3" 3.00 76.20 70.20 52.10 5.42 282.16 PASAMANOS
TUBO 2½" 3.00 63.50 57.50 30.40 4.48 136.07 POSTE
TUBO 2" 2.00 50.80 46.80 104.20 2.41 250.81
SUBTOTAL 669.03 kg
DIMENSIONES (mm) Peso Unitario Peso Total
Lugar CANTIDAD Observaciones
A B C (Kg/U) (Kg)
PLACA 32.00 100 100 4 0.31 10.05
SUBTOTAL 10.05 kg
TOTAL 679.08 kg

RESUMEN DE MATERIALES DE RAMPA PEATONAL DERECHA


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 5234.62 kg
HORMIGON f´c= 280 kg/cm2= 28MPa 51.57 m³
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 7.00 m³
ACERO ESTRUCTURAL fy= 2500 kg/cm2= 250MPa 679.08 kg

PLANILLA DE HIERRO DE RAMPA PEATONAL IZQUIERDA (fy= 4200 kg/cm2)


Espc. Dimensiones Longitud (m) Peso (kg)
Lugar Mc Tipo Ø mm. (mm) Cant. Observaciones
a b c Unidad Total Unitario Total
MRP-01 C 14 150 133 0.20 4.30 0.70 5.20 691.60 1.208 835.45 b= Altura Promedio
MRP-02 C 14 150 133 0.20 4.30 0.70 5.20 691.60 1.208 835.45 b= Altura Promedio
MRP-03 E 10 150 18 21.00 21.00 378.00 0.617 233.23 Ver Despiece
PANTALLA

MRP-03a E 10 150 9 20.00 20.00 180.00 0.617 111.06 Ver Despiece


PANTALLA
MRP-03b E 10 150 7 5.00 5.00 35.00 0.617 21.60 a= Ancho Promedio
MRP-04 E 10 200 18 21.00 21.00 378.00 0.617 233.23 Ver Despiece
MRP-04a E 10 200 9 20.00 20.00 180.00 0.617 111.06 Ver Despiece
MRP-04b E 10 200 7 5.00 5.00 35.00 0.617 21.60 a= Ancho Promedio
MRP-05 C 14 150 133 0.25 2.40 0.25 2.90 385.70 1.208 465.93
ZAPATA MRP-06 C 14 150 133 0.25 2.40 0.25 2.90 385.70 1.208 465.93
MRP-07 E 10 200 13 21.00 21.00 273.00 0.617 168.44 Ver Despiece
MRP-08 E 10 200 13 21.00 21.00 273.00 0.617 168.44 Ver Despiece
LR1-01 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68 b= Altura Promedio
LR1-02 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68 b= Altura Promedio
LRD1-01 C 8 200 8 0.10 1.45 0.10 1.65 13.20 0.395 5.21 b= Altura Promedio
LRD1-02 C 8 200 8 0.10 1.45 0.10 1.65 13.20 0.395 5.21 Ver Despiece
LOSA DE RAMPA PEATONAL

LR2-01 C 14 150 114 0.10 1.70 0.40 2.20 250.80 1.208 302.97 Ver Despiece
LR2-02 C 14 150 114 0.10 1.70 0.20 2.00 228.00 1.208 275.42
LR3-01 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68
LR3-02 C 14 150 10 0.10 3.25 0.10 3.45 34.50 1.208 41.68
LRD2-01 E 8 200 8 21.00 21.00 168.00 0.395 66.36 Ver Despiece
LRD2-02 E 8 200 8 21.00 21.00 168.00 0.395 66.36 Ver Despiece
LR4-01 C 14 150 124 0.10 1.70 0.40 2.20 272.80 1.208 329.54
LR4-02 C 14 150 124 0.10 1.70 0.20 2.00 248.00 1.208 299.58
LRD3-01 E 8 200 8 21.00 21.00 168.00 0.395 66.36
LRD3-02 E 8 200 8 21.00 21.00 168.00 0.395 66.36
Varilla de VA-01 C 12 - 66 0.15 0.08 0.15 0.38 25.08 0.888 22.27
anclaje
TOTAL 5,343.76 Kg
NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte
de hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE RAMPA PEATONAL IZQUIERDA (f'c= 280 kg/cm2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
1.00 1.50 4.05 0.30 1.82 1.82
Pantalla 1.00 17.00 4.48 0.30 22.85 22.85 b= Altura Promedio
MURO 1
1.00 1.50 2.70 0.30 1.22 1.22
Zapata 1.00 20.00 2.50 0.35 17.50 17.50
Losa 1 1.00 1.50 3.30 0.20 0.99 0.99
Losa 2 1.00 1.50 17.00 0.20 5.10 5.10
MURO 2
Losa 3 1.00 1.50 3.30 0.20 0.99 0.99
Losa 4 1.00 1.50 18.50 0.20 5.55 5.55
TOTAL 56.02 m³

PLANILLA DE HORMIGON DE LIMPIEZA (f'c= 140 kg/cm 2)


DIMENSIONES (m) Volumen (m3)
Lugar CANTIDAD Observaciones
A B C Parcial Total
REPLANTILLO 1 21.00 3.50 0.10 7.35 7.35
TOTAL 7.35 m³

PLANILLA DE ACERO A-36 PARA PASAMANOS (fy= 2500 kg/cm2)

Espesor Diámetro Externo Diámetro Interno Longitud Peso Peso Total


Lugar Observaciones
(mm) (mm) (mm) (m) (Kg/m) (Kg)
TUBO 3" 3.00 76.20 70.20 56.35 5.42 305.17 PASAMANOS
TUBO 2½" 3.00 63.50 57.50 31.35 4.48 140.32 POSTE
TUBO 2" 2.00 50.80 46.80 112.70 2.41 271.26
SUBTOTAL 716.76 kg
DIMENSIONES (mm) Peso Unitario Peso Total
Lugar CANTIDAD Observaciones
A B C (Kg/U) (Kg)
PLACA 33.00 100 100 4 0.31 10.36
SUBTOTAL 10.36 kg
TOTAL 727.12 kg

RESUMEN DE MATERIALES DE RAMPA PEATONAL IZQUIERDA


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 5343.76 kg 10578.38 kg
HORMIGON f´c= 280 kg/cm2= 28MPa 56.02 m³ 107.58 kg 168.360375 275.94 kg
HORMIGON DE LIMPIEZA f´c= 140 kg/cm2= 14MPa 7.35 m³ 14.35 kg
ACERO ESTRUCTURAL fy= 2500 kg/cm2= 250MPa 727.12 kg 1406.21 kg
PLANILLA DE HIERRO DE ACERAS Y BARRERAS (fy= 4200 kg/cm 2)
Espc. Dimensiones
Lugar Mc Tipo Ø mm. Cant.
(mm) a b c
A-01 E 10 - 6 137.10
ACERA
A-02 F 12 300 368 2 (0.40) 2 (0.40) 0.90

P-01 C 12 - 4 0.20 1.40 0.20


POSTE
P-02 G 10 150 9 2 (0.20) 2 (0.20) 2 (0.06)

NOTA : La planilla de hierro fue elaborada por el diseñador para determinar cantidades de hierro a nivel de presupuesto.
hierro para armado de los elementos en obra, previa aprobación de la Fiscalización.

PLANILLA DE HORMIGON DE DE ACERAS Y BARRERAS (f'c= 350 kg/cm 2


DIMENSIONES (m)
Lugar CANTIDAD
A B C
ACERA 1.00 129.60 1.00 0.25
POSTES 64.00 1.04 0.25 0.25

PLANILLA DE ACERO A-36 PARA BARRERAS (fy= 2500 kg/cm 2)

Lugar CANTIDAD Espesor Diámetro Externo Diámetro Interno Longitud


(mm) (mm) (mm) (m)
TUBO 3" 18 3.00 76.20 70.20 12.00
TUBO 3" 4 3.00 76.20 70.20 9.13

RESUMEN DE MATER
RUBRO
ACERO EN BARRAS fy= 4200 k
HORMIGON f´c= 350 kg/
ACERO ESTRUCTURAL fy= 2500
Y BARRERAS (fy= 4200 kg/cm 2)
Longitud (m) Peso (kg)
Observaciones
Unidad Total Unitario Total
137.10 822.60 0,617 507544.20 b= Altura Promedio
2.50 920.00 0,888 816960.00 b= Altura Promedio
SUBTOTAL 1,324.50 kg
1.80 7.20 0,888 6393.60
0.92 8.28 0,617 5108.76
SUBTOTAL 1 POSTE 11.50 kg
TOTAL 64 POSTES 736.15 kg 55
TOTAL 2,060.66 Kg 54
de hierro a nivel de presupuesto. El contratista deberá efectuar su planilla de corte de 10
64

ERAS Y BARRERAS (f'c= 350 kg/cm 2)


) Volumen (m3)
Observaciones
C Parcial Total
0.25 32.40 32.40
0.25 0.07 4.16
TOTAL 36.56 m³

A BARRERAS (fy= 2500 kg/cm2)

Longitud Peso Peso Total Observaciones


(m) (Kg/m) (Kg)
12.00 5.42 1169.78
9.13 5.42 197.67
TOTAL 1,367.46 kg

RESUMEN DE MATERIALES DE ACERAS Y BARRERAS


RUBRO TOTAL
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa 2060.66 kg
HORMIGON f´c= 350 kg/cm2= 35MPa 36.56 m³
ACERO ESTRUCTURAL fy= 2500 kg/cm2= 250MPa 1367.46 kg
PLANILLA DE BARRERAS
Peso Cantidad Peso Total
Rubros (Kg/U) (U) por Rubro (Kg)
Placa de Acero (Placa 2) 0.31 32.00 10.05
TOTAL 10.05

Peso Cantidad Peso Total


Rubros (Kg/m) (m) por Rubro (Kg)
Tubo Galvanizado ∅3" 5.42 52.10 282.16
Tubo Galvanizado ∅2½" 4.48 52.10 233.20
Tubo Galvanizado ∅2" 2.41 104.20 250.81
TOTAL 766.16

RESUMEN DE MATERIALES DE RAMPA PEATONAL DERECHA


RUBRO
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa
HORMIGON f´c= 280 kg/cm2= 28MPa

LONGITUD(m) 100
CALCULO

Observaciones RUBROS

PLACA DE ACERO (PLACA 2)


Kg
TUBO GALVANIZADO 3"

Observaciones TUBO GALVANIZADO 90

TUBO GALVANIZADO 50
TUBO GALVANIZADO 38

Kg

E RAMPA PEATONAL DERECHA


TOTAL
0.00 kg
0.00 m³ 576
ESPESOR(mm) ó AREA (mm)
Nº ELEMENTOS LONGITUD(mm)
32 4 10000

1 25000 689.89

1 350 570.20

3 25000 306.62
3 350 #REF!
PLACAS ACERO placa 10000
Espesor 1 3
Dmayor1 76.2
Dmenor1 70.2
Espesor 2 3
TUBO GALVANIZADO Dmayor2 63.5
Dmenor2 57.5
Espesor 1' 2
Dmayor1' 50.8
Dmenor1' 46.8
TUBO CUADRADO A1(mm2)
GALVANIZADO
A2(mm2)
PERNOS A1(mm2) 314.16
Dmayor 33.5
TUERCAS
Dmenor 20
PLANILLA DE BARRERAS

Peso Cantidad Peso Total


Rubros (Kg/U) (U) por Rubro (Kg)

Placa de Acero (Pilastra) 14.78 204.00 3015.22


Placa de Acero (Placa 1) 5.89 102.00 600.53
Placa de Acero (Placa 2) 2.34 204.00 476.42
Pernos de Placa 1 Inc Tuercas 1.85 408.00 753.80
Pernos de Placa 2 Inc Tuercas 0.28 408.00 115.55
Peso Cantidad Peso Total
Rubros (Kg/m) (m) por Rubro (Kg)
Tubo Galvanizado ∅100 7.18 200.00 1435.30
Tubo Galvanizado ∅90 3.48 11.20 38.95
Tubo Galvanizado ∅50 4.34 600.00 2604.25
Tubo Galvanizado ∅38 1.78 33.60 59.66

LONGITUD(m) 100
CALCULO

Observaciones RUBROS

PLACA DE ACERO (PILASTRA)


PLACA DE ACERO (PLACA 1)
PLACA DE ACERO (PLACA 2)

TUBO GALVANIZADO 100

Observaciones
TUBO GALVANIZADO 90
TUBO GALVANIZADO 50
Junta de dilatación L=350mm TUBO GALVANIZADO 38
PERNOS PLACA 2
Junta de dilatación L=350mm PERNOS PLACA 1

TUERCAS

576
ESPESOR(mm) ó
LONGITUD(mm) AREA (mm)
Lugar Mc
Nº ELEMENTOS
204 10 188287
102 10 75000 400
204 10 29750 401
402

TRAMO 1
1 25000 914 403

1 350 443
3 25000 553 404
3 350 226 405
60 71.5 314 405a
60 727.5 314 406

TRAMO 2
407
432 12 567
A1(mm2)PLACA 1 75000 408
A2(mm2)PLACA 2 29750
A3(mm2) PILASTRA 188286.5
PLACAS ACERO

A4(mm2)
Espesor 1 3
Dmayor1 100
Dmenor1 94
Espesor 2 3 PLANILLA DE HORMIGON D
Dmayor2 50 Lugar
TUBO GALVANIZADO Dmenor2 44
Espesor 1' 2 TRAMO 1
Dmayor1' 90 TRAMO 2
Dmenor1' 86 TRAMO 3
Espesor 2' 2 TRAMO 4
Dmayor2' 38
Dmenor2' 34
TUBO CUADRADO A1(mm2)
GALVANIZADO A2(mm2)
PERNOS A1(mm2) 314.16
Dmayor 33.5
TUERCAS
Dmenor 20

PLANILLA DE ACERO DE
Ducto Ø mm.
1 12.7
PLANILLA DE HIERRO DE VIGA POSTENSADA (fy= 4200 kg/cm2)

Espc. Dimensiones Longitud (m) Peso (kg)


Tipo Ø mm. Cant.
(mm)
a b c Unidad Total Unitario Total
I 32 - 5 29.15 29.15 145.75 6.313 920.12
I 32 - 5 12.00 12.00 60.00 6.313 378.78
I 32 - 6 29.00 29.00 174.00 6.313 1098.46
E 10 Variable 152 2 (0.40) 2 (1.30) 2 (0.10) 3.60 547.20 0.617 337.62

G 10 Variable 152 0.40 2 (1.50) 2 (0.18) 3.76 571.52 0.617 352.63


I 32 - 5 30.00 30.00 150.00 6.313 946.95
I 32 - 5 30.00 30.00 150.00 6.313 946.95
I 32 - 6 30.00 30.00 180.00 6.313 1136.34

E 10 Variable 151 2 (0.40) 2 (1.30) 2 (0.10) 3.60 543.60 0.617 335.40

G 10 Variable 151 0.40 2 (1.50) 2 (0.18) 3.76 567.76 0.617 350.31


SUBTOTAL 2 TRAMOS 6,803.56
TOTAL 4 TRAMOS (1 VIGA) 13,607.12

TOTAL 6 VIGAS 81,642.73

PLANILLA DE HORMIGON DE VIGAS POSTENSADAS (f'c= 500 kg/cm 2) PLANILLA DE HORMIGON DE JUNTA DE VIGAS POSTENSADAS (f'c= 350 k
CANTIDAD Volumen (m3) Observaciones Lugar CANTIDAD Volumen (m3)
Total Total
1 16.90 TRAMO 1-2 1 0.65
1 16.70 TRAMO 2-3 1 0.36
1 16.70 TRAMO 3-4 1 0.65
1 16.90
TOTAL 1 VIGA 67.20 m³ TOTAL 1 VIGA 1.66
TOTAL 6 VIGA 403.20 m³ TOTAL 6 VIGA 9.96

RESUMEN DE MATERIALES
RUBRO
ACERO EN BARRAS fy= 4200 kg/cm2= 420 Mpa
HORMIGON f´c= 500 kg/cm2= 50MPa
HORMIGON f´c= 350 kg/cm2= 35MPa

PLANILLA DE ACERO DE POSTENSADO (fsu=18982.88 kg/cm 2)


18982.88
Cant. Longitud Peso Uni. Peso Total (kg)
(kg/m)
24 101 0.777 1883.45
TOTAL 4 DUCTOS (1 VIGA) 7,533.79 kg
TOTAL 6 VIGA 45,202.75 kg
Peso (kg)
Observaciones
Total
920.12 Ver Despiece
378.78
1098.46 Ver Despiece
337.62 b= Altura Promedio

352.63 b= Altura Promedio


946.95 Ver Despiece
946.95 Ver Despiece
1136.34 Ver Despiece

335.40 b= Altura Promedio

350.31 b= Altura Promedio


6,803.56 Kg
13,607.12 Kg

81,642.73 Kg

DE VIGAS POSTENSADAS (f'c= 350 kg/cm 2)


Volumen (m3) Observaciones
Total
0.65
0.36
0.65

1.66 m³
9.96 m³

DE MATERIALES
TOTAL
/cm2= 420 Mpa 81642.73 kg
m2= 50MPa 403.20 m³
m2= 35MPa 9.96 m³

También podría gustarte