2.1 MOVIMIENTO DE TIERRAS
2.1.1 EXCAVACIONES
2.1.1.1 EXCAVACIONES MASIVAS
2.1.1.1 EXCAVACION MASIVA DE CISTERNA
Vista en Planta
2.1.1.2 EXCAVACION MASIVA DE PISCINA
2.1.1.2 EXCAVACIONES SIMPLES
2.1.1.2.1 EXCAVACION MANUAL DE CISTERNA
TIPO PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial CANTIDAD Subtotal Unidad
3
Z1 0.95 1 1 0.95 21 19.95 m
3
Z2 0.95 1.5 2 2.85 1 2.85 m
Z1
Z2
2.1.1.2.3 EXCAVACION MANUAL CIMIENTO CORRIDO
EJE 1-1 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 1.8 0.684 m
T2 0.95 0.4 2.05 0.779 m3
VISTA EN PLANTA
VISTA EN CORTE
EJE 2-2 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 1.75 0.665 m
T2 0.95 0.4 1.575 0.5985 m3
T3 0.95 0.4 1 0.38 m3
EJE 3-3 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 1.75 0.665 m
T2 0.95 0.4 1.2 0.456 m3
T3 0.95 0.4 0.8 0.304 m3
EJE 4-4 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 0.3176 0.120688 m
EJE 5-5 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 1.75 0.665 m
T2 0.95 0.4 2 0.76 m3
EJE 6-6 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 1.75 0.665 m
T2 0.95 0.4 1.075 0.4085 m3
EJE 7-7 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 0.2625 0.09975 m
T2 0.95 0.4 0.7375 0.28025 m3
EJE 8-8 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
T1 0.7 0.4 6 1.68 m3
EJE A-A PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.5 2.1 0.9975 m
T2 0.7 0.4 1.4 0.392 m3
T3 0.95 0.5 1.16 0.551 m3
T4 0.95 0.5 1.44 0.684 m3
T5 0.95 0.5 3.25 1.54375 m3
T6 0.95 0.5 1.25 0.59375 m3
T7 0.7 0.4 2.3 0.644 m3
EJE B-B PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 1.25 0.475 m
T2 0.95 1.553 1.47535 m3
3
T3 0.95 0.5 0.5695 0.2705125 m
T4 0.95 0.5 3.2466 1.542135 m3
T5 0.95 0.5 1.2534 0.595365 m3
EJE C-C PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.5 2.1 0.9975 m
T2 0.95 0.5 1.25 0.59375 m3
T3 0.7 0.4 1.31 0.3668 m3
T4 0.95 0.5 1.44 0.684 m3
T5 0.95 0.5 2.622 1.24545 m3
T6 0.95 0.5 1.378 0.65455 m3
T7 0.7 0.4 2.3 0.644 m3
2.1.2 RELLENOS
2.1.2.1 RELLENO CON MATERIAL PROPIO
EJE 2-2 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 2.875 0 0.92 m
T2 0.8 0.4 2.475 0.1312 0.68704 m3
T3 0.8 0.4 0.6 0.03125 0.167 m3
EJE 3-3 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 2.7305 0.06875 0.81876 m
T2 0.8 0.4 1.45 0.0625 0.414 m3
T3 0.8 0.4 1.425 0.06875 0.401 m3
EJE 4-4 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 0.942 0.0875 0.23144 m
EJE 5-5 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 2.875 0.1 0.84 m
T2 0.8 0.4 3.125 0.1 0.92 m3
EJE 6-6 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 2.875 0 0.92 m
T2 0.8 0.4 3.125 0.1 0.92 m3
EJE 7-7 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 3.375 0.2375 0.89 m
EJE 8-8 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 6 0.17 1.784 m