Está en la página 1de 10

2.

ESTRUCTURAS
2.1 MOVIMIENTO DE TIERRAS
2.1.1 EXCAVACIONES
2.1.1.1 EXCAVACIONES MASIVAS
2.1.1.1 EXCAVACION MASIVA DE CISTERNA

PROFUNDIDAD (m) ANCHO (m) LARGO (m) Subtotal


2 1.5 2 6 m3
Vista en Corte

Vista en Planta
2.1.1.2 EXCAVACION MASIVA DE PISCINA
2.1.1.2 EXCAVACIONES SIMPLES
2.1.1.2.1 EXCAVACION MANUAL DE CISTERNA

PROFUNDIDAD (m) ANCHO (m) LARGO (m) Subtotal


0.15 0.8 2 0.24 m3

2.1.1.2.2 EXCAVACION MANUAL DE ZAPATAS

TIPO PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial CANTIDAD Subtotal Unidad
3
Z1 0.95 1 1 0.95 21 19.95 m
3
Z2 0.95 1.5 2 2.85 1 2.85 m

Z1

Z2
2.1.1.2.3 EXCAVACION MANUAL CIMIENTO CORRIDO

EJE 1-1 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 1.8 0.684 m
T2 0.95 0.4 2.05 0.779 m3

VISTA EN PLANTA

VISTA EN CORTE

EJE 2-2 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 1.75 0.665 m
T2 0.95 0.4 1.575 0.5985 m3
T3 0.95 0.4 1 0.38 m3

EJE 3-3 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 1.75 0.665 m
T2 0.95 0.4 1.2 0.456 m3
T3 0.95 0.4 0.8 0.304 m3

EJE 4-4 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 0.3176 0.120688 m

EJE 5-5 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 1.75 0.665 m
T2 0.95 0.4 2 0.76 m3
EJE 6-6 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 1.75 0.665 m
T2 0.95 0.4 1.075 0.4085 m3

EJE 7-7 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 0.2625 0.09975 m
T2 0.95 0.4 0.7375 0.28025 m3

EJE 8-8 PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
T1 0.7 0.4 6 1.68 m3

EJE A-A PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.5 2.1 0.9975 m
T2 0.7 0.4 1.4 0.392 m3
T3 0.95 0.5 1.16 0.551 m3
T4 0.95 0.5 1.44 0.684 m3
T5 0.95 0.5 3.25 1.54375 m3
T6 0.95 0.5 1.25 0.59375 m3
T7 0.7 0.4 2.3 0.644 m3

EJE B-B PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.4 1.25 0.475 m
T2 0.95 1.553 1.47535 m3
3
T3 0.95 0.5 0.5695 0.2705125 m
T4 0.95 0.5 3.2466 1.542135 m3
T5 0.95 0.5 1.2534 0.595365 m3

EJE C-C PROFUNDIDAD (m) ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.95 0.5 2.1 0.9975 m
T2 0.95 0.5 1.25 0.59375 m3
T3 0.7 0.4 1.31 0.3668 m3
T4 0.95 0.5 1.44 0.684 m3
T5 0.95 0.5 2.622 1.24545 m3
T6 0.95 0.5 1.378 0.65455 m3
T7 0.7 0.4 2.3 0.644 m3
2.1.2 RELLENOS
2.1.2.1 RELLENO CON MATERIAL PROPIO

EJE 1-1 ALTURA ANCHO (m) LARGO (m) Parcial Unidad


3
T1 0.15 0.25 2.425 0.091 m
T2 0.15 0.25 2.675 0.100 m3

EJE 2-2 ALTURA ANCHO (m) LARGO (m) Parcial Unidad


3
T1 0.15 0.25 2.425 0.091 m
T2 0.15 0.25 0.4 0.015 m3
T3 0.15 0.4 1.175 0.071 m3
T4 0.15 0.25 0.375 0.014 m3
T5 0.15 0.25 0.6 0.023 m3
T6 0.15 0.25 0.4 0.015 m3

EJE 3-3 ALTURA ANCHO (m) LARGO (m) Parcial Unidad


3
T1 0.15 0.25 0.7 0.026 m
T2 0.15 0.4 0.8 0.048 m3
T3 0.15 0.25 1 0.038 m3
T4 0.15 0.4 1.3 0.078 m3
T5 0.15 0.25 1.175 0.044 m3

EJE 4-4 ALTURA ANCHO (m) LARGO (m) Parcial Unidad


3
T1 0.15 0.25 0.6926 0.026 m
EJE 5-5 ALTURA ANCHO (m) LARGO (m) Parcial Unidad
3
T1 0.15 0.4 1 0.060 m
T2 0.15 0.25 1.5 0.056 m3
T3 0.15 0.4 2.875 0.173 m3

EJE 6-6 ALTURA ANCHO (m) LARGO (m) Parcial Unidad


3
T1 0.15 0.25 2.5 0.094 m
T2 0.15 0.4 1.075 0.065 m3

EJE 7-7 ALTURA ANCHO (m) LARGO (m) Parcial Unidad


3
T1 0.15 0.4 1.26 0.076 m
T2 0.15 0.25 1.615 0.061 m3

EJE A-A ALTURA ANCHO (m) LARGO (m) Parcial Unidad


3
T1 0.15 0.35 2.825 0.148 m
T2 0.15 0.35 1.75 0.092 m3
T3 0.15 0.35 4.45 0.234 m3
T4 0.15 0.35 3.85 0.202 m3
T5 0.15 0.35 2.125 0.112 m3

EJE B-B ALTURA ANCHO (m) LARGO (m) Parcial Unidad


3
T1 0.15 0.25 2 0.075 m
T2 0.15 1.46 0.219 m3
T3 0.15 0.25 1.3195 0.049 m3
T4 0.15 0.5 3.85 0.289 m3
T5 0.15 0.25 2.125 0.080 m3

EJE C-C ALTURA ANCHO (m) LARGO (m) Parcial Unidad


3
T1 0.15 0.35 2.7 0.142 m
T2 0.15 0.35 2.05 0.108 m3
T3 0.15 0.35 2.041 0.107 m3
T4 0.15 0.35 3.2 0.168 m3
T5 0.15 0.35 1.85 0.097 m3
AREA ALTURA PARCIAL Unidad
3
A1 13.19 0.15 1.979 m
A2 4.015 0.15 0.602 m3
A3 5.4 0.15 0.810 m3
A4 2.6 0.15 0.390 m3
A5 3.41 0.15 0.512 m3
A6 14 0.15 2.100 m3
A7 9.81 0.15 1.472 m3
A8 23.04 0.15 3.456 m3
A9 6.857 0.15 1.029 m3

2.1.3 ELIMINACION DE MATERIAL EXCEDENTE


2.2 OBRAS DE CONCRETO SIMPLE
2.2.1 CIMIENTO CORRIDO
EJE 1-1 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 6 0.3 1.68 m

EJE 2-2 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 2.875 0 0.92 m
T2 0.8 0.4 2.475 0.1312 0.68704 m3
T3 0.8 0.4 0.6 0.03125 0.167 m3

EJE 3-3 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 2.7305 0.06875 0.81876 m
T2 0.8 0.4 1.45 0.0625 0.414 m3
T3 0.8 0.4 1.425 0.06875 0.401 m3

EJE 4-4 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 0.942 0.0875 0.23144 m

EJE 5-5 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 2.875 0.1 0.84 m
T2 0.8 0.4 3.125 0.1 0.92 m3
EJE 6-6 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 2.875 0 0.92 m
T2 0.8 0.4 3.125 0.1 0.92 m3

EJE 7-7 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 3.375 0.2375 0.89 m

EJE 8-8 ALTURA ANCHO (m) LARGO (m) AREA DE ELEMENTO PARCIAL Unidad
3
T1 0.8 0.4 6 0.17 1.784 m