Simb. I.U. Oct. 2016 Nov. 2016 Dic. 2016 Ene. 2017 Feb. 2017 Mar. 2017 Abr. 2017
J 47 258.94 258.94 258.94 258.94 258.94 258.94 258.94
F 3 195.39 198.14 198.13 187.08 195.33 194.41 191.42
B 17 290.2 267.01 285.96 285.9 283.9 275.1 267.24
C 21 264.25 269.09 271.41 277.51 287.2 287.2 294.36
M 43 314.33 314.95 320.14 320.88 321.15 322.08 321.02
E 48 281.97 285.38 289.69 298.92 313.56 312.43 305.93
T 72 234.57 236.82 238.25 234.43 240.93 238.03 236.95
G 39 261.61 261.69 263.31 263.65 264.18 265.79 267.36
0.151 𝐹_𝑟/𝐹_0 +0.074 𝐿_𝑟/𝐿_0 +0.061 𝐶_𝑟/𝐶_0 +0.088 𝑀_𝑟/𝑀_0 +0.056 𝐸_𝑟/𝐸_0 +0.057 𝑇_𝑟/𝑇_0 +0.226 〖���〗 _𝑟/ 〖���〗 _0
AVANCES PROGRAMADOS
C) PARAMETROS ASUMIDOS
SOLUCIÓN
La fecha referencial para los indices unificados los asumiremos con el mes de octubre del 2016
0.151 𝐹_𝑟/𝐹_0 +0.074 𝐿_𝑟/𝐿_0 +0.061 𝐶_𝑟/𝐶_0 +0.088 𝑀_𝑟/𝑀_0 +0.056 𝐸_𝑟/𝐸_0 +0.057 𝑇_𝑟/𝑇_0 +0.226 〖���〗 _𝑟/ 〖���〗 _0
I.U.
% DE PRESUP. VAL. 1 (DIC.-2016) VAL. 2 (ENE.-2017) VAL. 3 (FEB.-2017)
CODIGO I.U COEFICIEN
SIMBOLO
/ 〖���〗 _0
A) SE TIENE LOS SIGUIENTES DATOS
a) Datos Generales
- Procesos : COSTOS UNITARIOS
- Contrato de Obra : N° XXXXX -2016-MTC/XX
- Obra : XXXXXXXXXXXXXXXXXX
- Contratista : XXXXXXXXXXXXXXXXXX
- Monto del Valor Referencial S/300,000.00
- Monto del Contrato con I.G.V. : S/270,000.00
- Monto del Contrato sin I.G.V. : S/228,813.56
- Factor de relacion: 0.90
- Fecha del Valor REFERENCIAL : Oct-16
- Area Geografica : 02
- Plazo de Ejecucion :
Simb. I.U. Oct. 2016 Nov. 2016 Dic. 2016 Ene. 2017 Feb. 2017 Mar. 2017
J 47 258.94 258.94 258.94 258.94 258.94 258.94
F 3 195.39 198.14 198.13 187.08 195.33 194.41
B 17 290.2 267.01 285.96 285.9 283.9 275.1
C 21 264.25 269.09 271.41 277.51 287.2 287.2
M 43 314.33 314.95 320.14 320.88 321.15 322.08
E 48 281.97 285.38 289.69 298.92 313.56 312.43
T 72 234.57 236.82 238.25 234.43 240.93 238.03
G 39 261.61 261.69 263.31 263.65 264.18 265.79
0.151 𝐹_𝑟/𝐹_0 +0.074 𝐿_𝑟/𝐿_0 +0.061 𝐶_𝑟/𝐶_0 +0.088 𝑀_𝑟/𝑀_0 +0.056 𝐸_𝑟/𝐸_0 +0.057 𝑇_𝑟/𝑇_0 +0.226 〖���〗 _𝑟/ 〖���〗 _0
PROGRAMADO EJECUTADO
235000.00 235,000.00
SOLUCIÓN
I.U OCT.-
VAL. (sin incid. RELACION 2016 NOV.-2016 MAX. SOLICIT. OTORGAR
ELEMENTO I.G.V.)
F 3 ACERO DE CONSTRUCCION CORRUGADO 228,813.56 0.1510 0.90 195.39 198.14 31,533.42 0.00 0.00
B 17 BLOQUE Y LADRILLO 228,813.56 0.0740 0.90 290.20 267.01 14,021.23 0.00 0.00
C 21 CEMENTO PORTLAND TIPO I 228,813.56 0.0610 0.90 264.25 269.09 12,791.95 10,000.00 10,000.00
T 72 TUBERIA DE PVC PARA AGUA 228,813.56 0.0570 0.90 234.57 236.82 11,850.73 0.00 0.00
10,000.00
AMORTIZACION POR ADELANTO DE MATERIALES DEL MES DE DICIEMBRE - 2016
Imo
ADEL.MAT. MET. MAT. P. UNIT. FACTOR DE Ima AMORT.
SIMBOLO
I.U OCT.-
DIC.-2016 UTILZADO MATERIAL REALCION NOV.-2017 ADEL.MAT.
ELEMENTO 2016
F 3 ACERO DE CONSTRUCCION CORRUGADO 0.00 0.00 0.00 0.90 198.14 195.39 0.00
B 17 BLOQUE Y LADRILLO 0.00 0.00 0.00 0.90 267.01 290.20 0.00
C 21 CEMENTO PORTLAND TIPO I 10,000.00 200.00 15.00 0.90 269.09 264.25 2,749.45
T 72 TUBERIA DE PVC PARA AGUA 0.00 0.00 0.00 0.90 236.82 234.57 0.00
2,749.45
CALCULO DE DEDUCTIVOS POR MATERIALES MES DE DICIEMBRE DEL 2016
I.U
incid. ON 2016 DIC.-2016 OCT.-2016 DEDUCTIV.
ELEMENTO
F 3 ACERO DE CONSTRUCCION CORRUGADO 0.1510 34,000.00 0.00 0.00 0.00 0.00
B 17 BLOQUE Y LADRILLO 0.0740 34,000.00 0.00 0.00 0.00 0.00
C 21 CEMENTO PORTLAND TIPO I 0.0610 34,000.00 264.25 264.25 264.25 0.00
T 72 TUBERIA DE PVC PARA AGUA 0.0570 34,000.00 0.00 0.00 0.00 0.00
0.00
MONT.
SAL. B. POR Coef. De FACTOR DE Imo OCT.- Ima MONTO MONTO A
SIMBOLO
SALD.AMORT.
I.U VAL. (sin MAX.
incid. RELACION 2016 ENE.-2016 MES ANT. SOLICIT. OTORGAR
ELEMENTO I.G.V.) SOLICIT.
F 3 ACERO DE CONSTRUCCION CORRUGADO 228,813.56 0.1510 0.90 195.39 187.08 0.00 29,773.25 0.00 0.00
B 17 BLOQUE Y LADRILLO 228,813.56 0.0740 0.90 290.20 285.90 0.00 15,013.18 0.00 0.00
C 21 CEMENTO PORTLAND TIPO I 228,813.56 0.0610 0.90 264.25 277.51 7,250.55 5,577.84 10,000.00 5,577.84
T 72 TUBERIA DE PVC PARA AGUA 228,813.56 0.0570 0.90 234.57 234.43 0.00 11,731.13 0.00 0.00
Imo
ADEL.MAT. MET. MAT. P. UNIT. FACTOR DE Ima AMORT.
SIMBOLO
I.U OCT.-
ENE.-2017 UTILZADO MATERIAL REALCION DIC.-2017 ADEL.MAT.
ELEMENTO 2016
F 3 ACERO DE CONSTRUCCION CORRUGADO 0.00 0.00 0.00 0.90 198.13 195.39 0.00
B 17 BLOQUE Y LADRILLO 0.00 0.00 0.00 0.90 285.96 290.20 0.00
C 21 CEMENTO PORTLAND TIPO I 12,828.39 200.00 15.00 0.90 271.41 264.25 2,773.16
T 72 TUBERIA DE PVC PARA AGUA 0.00 0.00 0.00 0.90 238.25 234.57 0.00
2,773.16
I.U
incid. ON ENE.-2017 ENE.-2016 OCT.-2016 DEDUCTIV.
ELEMENTO
F 3 ACERO DE CONSTRUCCION CORRUGADO 0.1510 59,000.00 187.08 187.08 195.39 0.00
B 17 BLOQUE Y LADRILLO 0.0740 59,000.00 285.90 285.90 290.20 0.00
C 21 CEMENTO PORTLAND TIPO I 0.0610 59,000.00 277.51 277.51 264.25 0.00
T 72 TUBERIA DE PVC PARA AGUA 0.0570 59,000.00 234.43 234.43 234.57 0.00
0.00
Imo
ADEL.MAT. MET. MAT. P. UNIT. FACTOR DE Ima AMORT.
SIMBOLO
F 3 ACERO DE CONSTRUCCION CORRUGADO 0.00 0.00 0.00 0.90 187.08 195.39 0.00
B 17 BLOQUE Y LADRILLO 0.00 0.00 0.00 0.90 285.90 290.20 0.00
C 21 CEMENTO PORTLAND TIPO I 10,055.23 150.00 15.00 0.90 277.51 264.25 2,126.61
T 72 TUBERIA DE PVC PARA AGUA 0.00 0.00 0.00 0.90 234.43 234.57 0.00
2,126.61
CALCULO DE DEDUCTIVOS POR MATERIALES DEL MES DE FEBRERO
Imo
ADEL.MAT. MET. MAT. P. UNIT. FACTOR DE Ima AMORT.
SIMBOLO
I.U OCT.-
ENE.-2017 UTILZADO MATERIAL REALCION FEB.-2017 ADEL.MAT.
ELEMENTO 2016
F 3 ACERO DE CONSTRUCCION CORRUGADO 0.00 0.00 0.00 0.90 195.33 195.39 0.00
B 17 BLOQUE Y LADRILLO 0.00 0.00 0.00 0.90 283.90 290.20 0.00
C 21 CEMENTO PORTLAND TIPO I 7,928.61 300.00 15.00 0.90 287.20 264.25 4,401.74
T 72 TUBERIA DE PVC PARA AGUA 0.00 0.00 0.00 0.90 240.93 234.57 0.00
4,401.74
VAL. 1 (DIC.-2016) VAL. 2 (ENE.-2017) VAL. 3 (FEB.-2017) VAL. 4 (MAR.-2017) VAL. 5 (ABR.-2017)
0.00
0.00
12,828.39
0.00
12,828.39
A) SE TIENE LOS SIGUIENTES DATOS
a) Datos Generales
- Procesos : COSTOS UNITARIOS
- Contrato de Obra : N° XXXXX -2016-MTC/XX
- Obra : XXXXXXXXXXXXXXXXXX
- Contratista : XXXXXXXXXXXXXXXXXX
- Monto del Valor Referencial S/300,000.00
- Monto del Contrato con I.G.V. : S/270,000.00
- Monto del Contrato sin I.G.V. : S/228,813.56
- Fecha del Valor REFERENCIAL : Oct-16
- Area Geografica : 02
- Plazo de Ejecucion :
Simb. I.U. Oct. 2016 Nov. 2016 Dic. 2016 Ene. 2017 Feb. 2017 Mar. 2017
J 47 258.94 258.94 258.94 258.94 258.94 258.94
F 3 195.39 198.14 198.13 187.08 195.33 194.41
B 17 290.2 267.01 285.96 285.9 283.9 275.1
C 21 264.25 269.09 271.41 277.51 287.2 287.2
M 43 314.33 314.95 320.14 320.88 321.15 322.08
E 48 281.97 285.38 289.69 298.92 313.56 312.43
T 72 234.57 236.82 238.25 234.43 240.93 238.03
G 39 261.61 261.69 263.31 263.65 264.18 265.79
_𝑟/𝐽_0 +0.151 𝐹_𝑟/𝐹_0 +0.074 𝐿_𝑟/𝐿_0 +0.061 𝐶_𝑟/𝐶_0 +0.088 𝑀_𝑟/𝑀_0 +0.056 𝐸_𝑟/𝐸_0 +0.057 𝑇_𝑟/𝑇_0 +0.226 〖���〗 _𝑟/ 〖���
PROGRAMADO EJECUTADO
235000.00 235,000.00
J MANO DE OBRA 47 0.2870 100.00% 258.94 258.94 0.287 258.94 0.287 258.94
F ACERO DE CONSTRUCCION C 3 0.1510 100.00% 195.39 198.14 0.153 198.13 0.153 187.08
B BLOQUE Y LADRILLO 17 0.0740 100.00% 290.2 267.01 0.068 285.96 0.073 285.90
C CEMENTO PORTLAND TIPO I 21 0.0610 100.00% 264.25 269.09 0.062 271.41 0.063 277.51
M MADERA NACIONAL PARA ENCO 43 0.0880 100.00% 314.33 314.95 0.088 320.14 0.090 320.88
E MAQUINARIA Y EQUIPO NACI 48 0.0560 100.00% 281.97 285.38 0.057 289.69 0.058 298.92
T TUBERIA DE PVC PARA AGUA 72 0.0570 100.00% 234.57 236.82 0.058 238.25 0.058 234.43
G INDICE GENERAL DE PRECIOS 39 0.2260 100.00% 261.61 261.69 0.226 263.31 0.227 263.65
0.999 1.008
VALORES DE K:
MES 5
38,000.00
235,000.00
11,000.00
235,000.00
0.01
507.72
1,928.66
146.97
1,780.31
295.32
1,928.66
148.35
MONTO MONTO
Imo MAXIMO MAXIMO
Ima Ima
OCT.-
DIC.-2016 ENE.-2017 VAL. N° VAL. N°
2016
01 02