1.

00 TRABAJOS PRELIMINARES
1.01 LIMPIEZA DEL TERRENO (m2)
29.33 m2
DESCRIP. # VECES ANCHO LARGO ALTURA PARCIAL UNIDAD
AREA TOTAL DEL TERRENO 1 4.19 7.00 29.33 m2
TOTAL 29.33 m2

1.02 TRAZO Y REPLANTEO DEL TERRENO (m2)


29.33 m2
DESCRIP. # VECES ANCHO LARGO ALTURA PARCIAL UNIDAD
AREA TOTAL DEL TERRENO 1 4.19 7.00 29.33 m2
TOTAL 29.33 m2

2.00 MOVIMIENTO DE TIERRAS


2.01 EXCAVACIONES DE CIMIENTOS CORRIDOS (m3)
4.57 m3
DESCRIP. # VECES ANCHO LARGO ALTURA PARCIAL UNIDAD
EJE A-A TRAMO 1-2 1 0.60 1.10 1.15 0.76 m3
EJE A-A TRAMO 2-3 1 0.60 1.10 1.15 0.76 m3
EJE B-B TRAMO 1-2 1 0.60 1.10 1.15 0.76 m3
EJE B-B TRAMO 2-3 1 0.60 1.10 1.15 0.76 m3
EJE 1-1 TRAMO A-B 1 0.45 0.99 1.15 0.51 m3
EJE 2-2 TRAMO A-B 1 0.45 0.99 1.15 0.51 m3
EJE 3-3 TRAMO A-B 1 0.45 0.99 1.15 0.51 m3
TOTAL 4.57 m3

2.02 EXCAVACIONES DE ZAPATAS (m3)


19.20 m3
DESCRIP. # VECES ANCHO LARGO ALTURA PARCIAL UNIDAD
ZAPATA 01 6 1.60 1.60 1.25 19.20 m3
TOTAL 19.20 m3

2.04 ELIMINACION DE MATERIAL EXEDENTE (m3) 23.37 m3


tierra suelta E=25%
volumen excabado - volumen de rrelleno
DESCRIP. Volumen(m3) Coef. # VECES PARC. (m3)
VOLUMEN EXCAVADO 23.77 1.25 1 29.72
VOLUMEN RELLENADO 7.06 0.90 1 6.35
TOTAL (m3) 23.37
2.05 RELLENO CON MATERIAL DE AFIRMADO EN CIMIENTOS CORRIDOS (m3)
6.85 m3
DESCRIP. # VECES AREA LARGO PARCIAL UNIDAD
EJE A-A TRAMO 1-2 1 0.93 1.10 1.02 m3
EJE A-A TRAMO 2-3 1 0.93 1.10 1.02 m3
EJE B-B TRAMO 1-2 1 0.93 1.10 1.02 m3
EJE B-B TRAMO 2-3 1 0.93 1.10 1.02 m3
EJE 1-1 TRAMO A-B 1 0.93 0.99 0.92 m3
EJE 2-2 TRAMO A-B 1 0.93 0.99 0.92 m3
EJE 3-3 TRAMO A-B 1 0.93 0.99 0.92 m3
TOTAL 6.85 m3

2.06 RELLENO CON MATERIAL DE AFIRMADO EN ZAPATAS (m3)


0.20 m3
DESCRIP. # VECES AREA ALTURA PARCIAL UNIDAD
ZAPATA 01 6 2.07 0.65 8.06 m3
TOTAL 0.20 m3

TOTAL DE RELLENO CON MATERIAL PROPIO 7.06 m3


3.00 CONCRETO SIMPLE

3.01 CIMIENTOS CORRIDOS (CONCRETO CICLOPEO) (m3)


1.99 m3
DESCRIP. # VECES ANCHO LARGO ALTURA PARCIAL UNIDAD
EJE A-A TRAMO 1-2 1 0.60 1.10 0.50 0.33 m3
EJE A-A TRAMO 2-3 1 0.60 1.10 0.50 0.33 m3
EJE B-B TRAMO 1-2 1 0.60 1.10 0.50 0.33 m3
EJE B-B TRAMO 2-3 1 0.60 1.10 0.50 0.33 m3
EJE 1-1 TRAMO A-B 1 0.45 0.99 0.50 0.22 m3
EJE 2-2 TRAMO A-B 1 0.45 0.99 0.50 0.22 m3
EJE 3-3 TRAMO A-B 1 0.45 0.99 0.50 0.22 m3
TOTAL 1.99 m3

TOTAL DE CONCRETO SIMPLE EN CIMIENTOS CORRIDOS 1.99 m3

3.02 FALSOS PISOS (m2) 25.55 m2


DESCRIP. # VECES ANCHO LARGO PARCIAL UNIDAD
AREA DE HABITACION CLCULO EN AUTOCAD 25.55 m2
TOTAL DE AREA DE FALSOS PISOS CLCULO EN AUTOCAD 25.55 m2

TOTAL DE FALSOS PISOS 25.55 m2

3.03 SOLADOS EN ZAPATAS (m2)


15.36 m2
DESCRIP. # VECES ANCHO LARGO ALTURA PARCIAL UNIDAD
ZAPATA 01 6 1.60 1.60 0.10 15.36 m2
TOTAL 15.36 m2

TOTAL DE SOLADOS EN ZAPATAS 15.36 m2

3.05 SOBRECIMIENTOS (CONCRETO CICLOPEO) (m3)


2.04 m3
DESCRIP. # VECES ANCHO LARGO ALTURA PARCIAL UNIDAD
EJE A-A TRAMO 1-2 1 0.15 2.90 0.50 0.22 m3
EJE A-A TRAMO 2-3 1 0.15 2.90 0.50 0.22 m3
EJE B-B TRAMO 1-2 1 0.15 2.90 0.50 0.22 m3
EJE B-B TRAMO 2-3 1 0.15 2.90 0.50 0.22 m3
EJE 1-1 TRAMO A-B 1 0.15 3.60 0.50 0.27 m3
EJE 2-2 TRAMO A-B 1 0.25 3.60 0.50 0.45 m3
EJE 3-3 TRAMO A-B 1 0.25 3.60 0.50 0.45 m3
TOTAL 2.04 m3

TOTAL DE CONCRETO CICLOPEO EN SOBRECIMIENTOS 2.04 m3


3.06 ENCOFRADOS Y DESENCOFRADOS EN SOBRECIMIENTOS (m2)
22.40 m2
DESCRIP. # VECES ANCHO LARGO ALTURA PARCIAL UNIDAD
EJE A-A TRAMO 1-2 2 2.90 0.50 2.90 m2
EJE A-A TRAMO 2-3 2 2.90 0.50 2.90 m2
EJE B-B TRAMO 1-2 2 2.90 0.50 2.90 m2
EJE B-B TRAMO 2-3 2 2.90 0.50 2.90 m2
EJE 1-1 TRAMO A-B 2 3.60 0.50 3.60 m2
EJE 2-2 TRAMO A-B 2 3.60 0.50 3.60 m2
EJE 3-3 TRAMO A-B 2 3.60 0.50 3.60 m2
TOTAL 22.40 m2

TOTAL DE ENCOFRADOS Y DESENCOFRADOS EN SOBRECIMIENTOS 22.40 m2

TOTAL DE CONCRETO CICLOPEO 4.03 m3


4.00 CONCRETO ARMADO
4.01 ZAPATAS
4.01.01 CONCRETO (m3)
DESCRIP. # VECES ANCHO LARGO ALTURA
ZAPATA 01 6 1.60 1.60 0.50
TOTAL

TOTAL DE CONCRETO EN EN ZAPATAS 1.45 m3

4.01.02 ACERO (Kg)

FACTORES DE CONVERSION Y DATOS DE ANCLAJES, TRASLAPES Y ESTRIBOS

DIMETRO 3/4" 1/2" 3/8" 1"


FACTOR DE COMVERSION 2.235 0.994 0.56 3.973

PERIMETROS INTERNOS # DE VARILLAS DE ACERO EN ZAPATA


ZAPATAS (HORIZONTALES)
ANCHO LARGO
ZAPATA 1 1.60 1.60 9

DESCRIPCION CROQUIS
# DE VECES DE
ZAPATA # VECES ACERO
(HORIZ. Y
VERT.)
1/2" 9

Z-1 (Hor. Y Vert.) 2

1/2" 9

TOTAL (Kg)

TOTAL DE ACERO EN ZAPATAS 18.29

4.02 COLUMNAS
4.02.01 CONCRETO ((m3)
PRIMER NIVEL
DESCRIPCION CROQUIS CANTIDAD DE # VECES
COLUMNA

COLUMNA 1 6

TOTAL

4.02.02 ENCOFRADO Y DESENCOFRADO (m2)


PRIMER NIVEL
Descrip. Croquis CANTIDAD DE #VECES
COLUMNAS
C1 - 1 Nivel 6
(1)

TOTAL

TOTAL DE ENCOFRADO Y DESENCOFRADO EN COLUMAS (PRIMER NIVEL)

4.02.03 ACERO LONGITUDINAL EN COLUMNAS (Kg)


PRIMER NIVEL
CANTIDAD DE #VECES DE
Descrip. Croquis COLUMNAS ACERO

C1 3/4" 6 6

TOTAL

ACERO DE ESTRIBOS EN COLUMNAS (Kg)


PRIMER NIVEL
Descrip. Croquis CANTIDAD DE #VECES DE
COLUMNAS ACERO

C1 3/8" 6 32

TOTAL

4.03 VIGAS DE CIMENTACIN


4.03.01 CONCRETO (m3)

DESCRIP. # VECES ANCHO LARGO ALTURA PARCIAL


EJE A-A TRAMO 1-2 1 0.30 2.90 0.40 0.35
EJE A-A TRAMO 2-3 1 0.30 2.90 0.40 0.35
EJE B-B TRAMO 1-2 1 0.30 2.90 0.40 0.35
EJE B-B TRAMO 2-3 1 0.30 2.90 0.40 0.35
EJE 1-1 TRAMO A-B 1 0.30 3.60 0.40 0.43
EJE 2-2 TRAMO A-B 1 0.30 3.60 0.40 0.43
EJE 3-3 TRAMO A-B 1 0.30 3.60 0.40 0.43
TOTAL 22.40

4.03.02 ENCOFRADO Y DESENCOFRADO (m2)

DESCRIP. # VECES ANCHO LARGO ALTURA PARCIAL


EJE A-A TRAMO 1-2 2 2.90 0.40 2.32
EJE A-A TRAMO 2-3 2 2.90 0.40 2.32
EJE B-B TRAMO 1-2 2 2.90 0.40 2.32
EJE B-B TRAMO 2-3 2 2.90 0.40 2.32
EJE 1-1 TRAMO A-B 2 3.60 0.40 2.88
EJE 2-2 TRAMO A-B 2 3.60 0.40 2.88
EJE 3-3 TRAMO A-B 2 3.60 0.40 2.88
TOTAL 17.92

22.40
ACERO LONGITUDINAL EN VIGAS DE CIMENTACION (Kg)

CANTIDAD DE #VECES DE
Descrip. Croquis COLUMNAS ACERO

C1 5/8" 4 4

TOTAL
ACERO DE ESTRIBOS EN VIGAS DE CIMENTACION (Kg)
PRIMER NIVEL
CANTIDAD DE #VECES DE
Descrip. Croquis vigas de ACERO
cimentacion

C1 1/4" 4 149

TOTAL
1.45 m3
PARCIAL UNIDAD
7.68 m3
1.45 m3

1 3/8" 5/8" 6 mm 8 mm 12 mm
7.907 1.552 0.22 0.395 0.888

# DE VARILLAS DE ACERO EN ZAPATA


(VERTICALES)

18.29 kg

LONGITUD ANCHO ALTO F.C (m-Kg) PARCIAL (Kg)


0.85 0.994 15.2082

0.65 0.994 11.6298

18.29

Kg

2.412 m3
LARGO ANCHO ALTO F.C (m-Kg) PARCIAL (m3)

0.3 0.4 3.35 2.412

2.412

2.83 m2
PERIMETRO ANCHO ALTO F.C (m-kg) Parcial (m2)
1.6 3.35 32.16

2.828

2.828 m2

347.5872 Kg
PERIMETRO ANCHO LONGITUD F.C (m-kg) Parcial (kg)

4.32 2.235 347.5872

347.5872

173.26 Kg
LONGITUD ANCHO ALTO F.C (m-kg) Parcial (kg)

0.85 2.85 0.56 91.392

173.264
UNIDAD
m3
m3
m3
m3
m3
m3
m3
m3

UNIDAD

m3
m3

m3
m3
m3

m3
m3
m3

PERIMETRO ANCHO LONGITUD F.C (m-kg) Parcial (kg)

22.4 1.552 556.2368

556.2368
126.65 Kg

LONGITUD ANCHO largo F.C (m-kg) Parcial (kg)

0.85 2.85 0.25 126.65

126.65
losas
concreto

descripcion ancho altura largo parcial (m3)

losa del piso


del primer
piso 3.9 0.1 7 2.73
losa de techo 3.6 0.05 2.9 0.522
losa de techo 3.6 0.05 2.9 0.522
losa de techo 3.6 0.05 1.2 0.216
total 3.99 m3

VIGAS
concreto
descripcion ancho altura largo cantidad parcial (m3)
viga VS 0.4 0.2 3.6 3 0.864
viga VS
(voladiso) 0.3 0.2 3.6 1 0.216
viga VP 0.3 0.35 2.9 4 1.218
viga VP
(voladiso) 0.3 0.35 1.5 2 0.315
total 2.613

acero
descripcion detalle cantidad #veces longitud f.c (m-kg)
longitud de 5/8" 4 3 4.14 1.552
barilla 1/2" 2 3 4.14 0.994
vigas VS
longitud de
los estribos 3/8" 32 3 1.24 0.56
longitud de 3/4" 4 2 8.45 2.235
la barilla 5/8" 2 2 8.45 1.552
vigas VS
longitud de
los estribos 3/8" 80 2 1.38 0.56
total

tarrajeos
descripcion #veces longitud altura parcial m2

tarrajeos en
las caras
laterales 2 7.35 3.15 46.305
tarrajeos en
las caras 1 3.6 1.2 4.32
frontales 1 2.45 1.2 2.94
total 53.565
longitud estribo:
0.34(2)+0.14(2)+0.04+0.12(2)=1.24

parcial (kg) recubrimiento


77.10336 0.025
24.69096

66.6624
151.086
52.4576

123.648
495.64832
DESCRIPCION UNIDADES METRADO
1.00 TRABAJOS PRELIMINARES
1.01 LIMPIEZA DEL TERRENO (m2) m2 29.33
1.02 TRAZO Y REPLANTEO DEL TERRENO (m m2 29.33
2.00 MOVIMIENTO DE TIERRAS
2.01 EXCAVACIONES m3 23.77
2.02 RELLENOS m3 7.06
2.03 ELIMINACION DE MATERIAL EXCEDENTE m3 23.37
2.04 0 m3 0.00
2.05 0 m3 0.00
3.00 CONCRETO SIMPLE
3.01 CONCRETO m3 4.028
3.02 SOLADO m2 15.360
4.00 ENCOFRADOS Y DESENCOFRADOS m2 0.000
5.00 CONCRETO ARMADO
5.01 CONCRETO m3 Err:509
5.02 ACERO kg 4280.453
6.00 LADRILLO DE TECHO ALIGERADO UNIDADES 0.00
6.01 LADRILLO PARA MUROS UNIDADES 0.000