CUADRO DE LIQUIDACION
PENDIENTE DE
SUB TOTAL IGV FACTURA ABONADO(S/.) F. GARANTIA (S/.) SALDO POR ABONAR (S/.)
FACTURACION (S/.)
S/. 96,291.38 S/. 17,332.45 S/. 113,623.83 S/. 9,629.14 S/. 103,994.69
S/. 79,933.96 S/. 14,388.11 S/. 94,322.07 S/. 8,507.40 S/. 85,814.68
S/. 80,770.93 S/. 14,538.77 S/. 95,309.70 S/. 8,245.09 S/. 87,064.60
S/. 121,862.47 S/. 21,935.25 S/. 143,797.72 S/. 12,396.25 S/. 131,401.47
S/. 89,177.49 S/. 16,051.95 S/. 105,229.44 S/. 9,330.67 S/. 95,898.78
S/. 91,993.34 S/. 16,558.80 S/. 108,552.15 S/. 4,669.67 S/. 103,882.48
S/. 91,946.70 S/. 16,550.41 S/. 108,497.11 S/. 4,667.34 S/. 103,829.77
S/. 91,901.16 S/. 16,542.21 S/. 108,443.37 S/. 4,665.06 S/. 103,778.31
S/. 92,000.64 S/. 16,560.11 S/. 108,560.75 S/. 4,670.03 S/. 103,890.72
S/. 68,599.67 S/. 12,347.94 S/. 80,947.61 S/. 7,197.66 S/. 73,749.95
S/. 64,956.39 S/. 11,692.15 S/. 76,648.54 S/. 3,517.82 S/. 73,130.72
S/. 90,043.57 S/. 16,207.84 S/. 106,251.41 S/. 4,610.48 S/. 101,640.93
S/. 90,258.17 S/. 16,246.47 S/. 106,504.65 S/. 4,623.59 S/. 101,881.05
S/. 40,414.08 S/. 7,274.54 S/. 47,688.62 S/. 2,020.70 S/. 45,667.91
S/. 8,067.99 S/. 1,452.24 S/. 9,520.22 S/. 403.40 S/. 9,116.82
S/. 1,198,217.96 S/. 215,679.23 S/. 1,413,897.19 S/. - S/. - S/. 89,154.29 S/. 1,324,742.90
VALORIZACION No. 01 al 19.01.2017 CD IGV TOTAL
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD : SUMA ALZADA
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 0.00 96,291.38 7.84% 96,291.38 7.84% 1,131,755.43 92.16%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 903.20 30,257.20 7.72% 903.20 30,257.20 7.72% 10,794.74 361,623.65 92.28%
01.02.02.05 COLUMNAS - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 25.65 897.75 5.46% 25.65 897.75 5.46% 443.77 15,531.99 94.54%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 32.23 1,386.04 13.41% 32.23 1,386.04 13.41% 208.16 8,950.73 86.59%
01.02.02.06 VIGAS - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 679.74 24,470.64 7.75% 679.74 24,470.64 7.75% 8,093.41 291,362.76 92.25%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 23.84 95.37 7.69% 23.84 95.37 7.69% 286.12 1,144.50 92.31%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 442.40 1,769.62 7.69% 442.40 1,769.62 7.69% 5,308.85 21,235.38 92.31%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 5.74 22.96 7.69% 5.74 22.96 7.69% 68.88 275.52 92.31%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 414.68 10,781.68 6.88% 414.68 10,781.68 6.88% 5,615.87 146,012.73 93.12%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 615.53 21,543.66 8.74% 615.53 21,543.66 8.74% 6,423.45 224,820.64 91.26%
01.02.02.08 ESCALERA - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 1.66 66.46 7.69% 1.66 66.46 7.69% 19.94 797.54 92.31%
ESCUADRAS Y PLATAFORMAS - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 5.00 2,520.00 7.69% 5.00 2,520.00 7.69% 60.00 30,240.00 92.31%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.08 556.92 7.69% 0.08 556.92 7.69% 0.92 6,683.08 92.31%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 2.31 1,923.08 7.69% 2.31 1,923.08 7.69% 27.69 23,076.92 92.31%
SANCIONES
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 0.00 96,291.38 96,291.38 1,131,755.43
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD : SUMA ALZADA
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 96,291.38 85,073.96 6.93% 181,365.35 14.77% 1,046,681.47 85.23%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 903.20 30,257.20 897.15 30,054.53 7.67% 1,800.35 60,311.73 15.39% 9,897.59 331,569.13 84.61%
01.02.02.05 COLUMNAS - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 25.65 897.75 27.46 960.93 5.85% 53.11 1,858.68 11.31% 416.32 14,571.06 88.69%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 32.23 1,386.04 21.50 924.29 8.94% 53.73 2,310.33 22.35% 186.66 8,026.44 77.65%
01.02.02.06 VIGAS - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 679.74 24,470.64 636.59 22,917.27 7.26% 1,316.33 47,387.91 15.00% 7,456.82 268,445.49 85.00%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 23.84 95.37 23.84 95.37 7.69% 47.69 190.75 15.38% 262.28 1,049.12 84.62%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 442.40 1,769.62 442.40 1,769.62 7.69% 884.81 3,539.23 15.38% 4,866.44 19,465.77 84.62%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 5.74 22.96 5.74 22.96 7.69% 11.48 45.92 15.38% 63.14 252.56 84.62%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 414.68 10,781.68 460.18 11,964.68 7.63% 874.86 22,746.36 14.51% 5,155.69 134,048.05 85.49%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 615.53 21,543.66 451.64 15,807.40 6.42% 1,067.17 37,351.06 15.16% 5,971.81 209,013.24 84.84%
01.02.02.08 ESCALERA - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 1.66 66.46 - 0.00% 1.66 66.46 7.69% 19.94 797.54 92.31%
ESCUADRAS Y PLATAFORMAS - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 5.00 2,520.00 - - 0.00% 5.00 2,520.00 7.69% 60.00 30,240.00 92.31%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.08 556.92 0.08 556.92 7.69% 0.15 1,113.85 15.38% 0.85 6,126.15 84.62%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 2.31 1,923.08 - 0.00% 2.31 1,923.08 7.69% 27.69 23,076.92 92.31%
SANCIONES
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 96,291.38 79,933.96 176,225.35 1,046,681.47
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD : SUMA ALZADA
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 181,365.35 82,450.93 6.71% 263,816.28 21.48% 964,230.54 78.52%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 1,800.35 60,311.73 874.72 29,303.16 7.48% 2,675.07 89,614.89 22.87% 9,022.86 302,265.96 77.13%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 53.11 1,858.68 26.76 936.73 5.70% 79.87 2,795.41 17.01% 389.55 13,634.33 82.99%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 53.73 2,310.33 20.95 900.97 8.72% 74.68 3,211.29 31.07% 165.71 7,125.48 68.93%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 1,316.33 47,387.91 620.68 22,344.34 7.07% 1,937.01 69,732.25 22.08% 6,836.14 246,101.15 77.92%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 47.69 190.75 23.84 95.37 7.69% 71.53 286.12 23.08% 238.44 953.75 76.92%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 884.81 3,539.23 442.40 1,769.62 7.69% 1,327.21 5,308.85 23.08% 4,424.04 17,696.15 76.92%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 11.48 45.92 5.74 22.96 7.69% 17.22 68.88 23.08% 57.40 229.60 76.92%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 874.86 22,746.36 448.68 11,665.56 7.44% 1,323.54 34,411.92 21.95% 4,707.02 122,382.48 78.05%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 1,067.17 37,351.06 440.35 15,412.22 6.26% 1,507.52 52,763.28 21.42% 5,531.46 193,601.02 78.58%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 1.66 66.46 - 0.00% 1.66 66.46 7.69% 19.94 797.54 92.31%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 5.00 2,520.00 - 0.00% 5.00 2,520.00 7.69% 60.00 30,240.00 92.31%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.15 1,113.85 - 0.00% 0.15 1,113.85 15.38% 0.85 6,126.15 84.62%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 2.31 1,923.08 - 0.00% 2.31 1,923.08 7.69% 27.69 23,076.92 92.31%
SANCIONES
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 181,365.35 80,770.93 262,136.28 964,230.54
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD : SUMA ALZADA
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 263,816.28 123,962.47 10.09% 387,778.75 31.58% 840,268.07 68.42%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 2,675.07 89,614.89 1,323.30 44,330.42 11.31% 3,998.37 133,945.31 34.18% 7,699.57 257,935.54 65.82%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 79.87 2,795.41 40.49 1,417.11 8.63% 120.36 4,212.51 25.64% 349.06 12,217.22 74.36%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 74.68 3,211.29 31.70 1,363.00 13.19% 106.38 4,574.30 44.25% 134.01 5,762.47 55.75%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 1,937.01 69,732.25 938.97 33,802.98 10.70% 2,875.98 103,535.23 32.78% 5,897.17 212,298.17 67.22%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 71.53 286.12 238.44 953.75 76.92% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 1,327.21 5,308.85 225.45 901.80 3.92% 1,552.66 6,210.64 27.00% 4,198.59 16,794.36 73.00%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 17.22 68.88 57.40 229.60 76.92% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 1,323.54 34,411.92 678.77 17,647.90 11.26% 2,002.30 52,059.83 33.20% 4,028.25 104,734.58 66.80%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 1,507.52 52,763.28 666.17 23,315.92 9.46% 2,173.69 76,079.19 30.88% 4,865.29 170,285.11 69.12%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 1.66 66.46 - 0.00% 1.66 66.46 7.69% 19.94 797.54 92.31%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 5.00 2,520.00 - 0.00% 5.00 2,520.00 7.69% 60.00 30,240.00 92.31%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.15 1,113.85 - 0.00% 0.15 1,113.85 15.38% 0.85 6,126.15 84.62%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 2.31 1,923.08 - 0.00% 2.31 1,923.08 7.69% 27.69 23,076.92 92.31%
SANCIONES
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 256,996.28 121,862.47 378,858.75 840,268.07
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
100%
P-2 / HALL COMUN
100% 30% 70% 0% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-5 / DEPOSITO
100% 30% 70% 70% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-5 / BAO SERVICIO
100% 30% 50% 50% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-2 / COCINA BATIENTE
100% 30% 50% 50% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-8 / COCINA VAIVEN
100% 30% 70% 0% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-1 / BAO VISITAS
100% 30% 70% 0% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-7 / DORM. 1
100% 30% 70% 70% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-1 / WC IZQUIERDA
100% 30% 0% 70% 0% 30% 0% 0% 0% 0% 0% 0% 0%
P-1 / WC DERECHA
100% 30% 70% 0% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-1 / BAO 1
100% 30% 70% 70% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-7 / DORM. 2
100% 30% 70% 70% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-1 / BAO 2
P-7 / DORM. 3 100% 30% 70% 70% 50% 30% 0% 0% 0% 0% 0% 0% 0%
DEPARTAMENTOS
1501 1601
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 82,995.71
MODALIDAD : SUMA ALZADA
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 387,778.75 93,306.66 7.60% 481,085.40 39.17% 746,961.41 60.83%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 3,998.37 133,945.31 1,054.15 35,314.07 9.01% 5,052.52 169,259.38 43.19% 6,645.42 222,621.47 56.81%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 120.36 4,212.51 32.25 1,128.88 6.87% 152.61 5,341.39 32.51% 316.81 11,088.34 67.49%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 106.38 4,574.30 25.25 1,085.78 10.50% 131.63 5,660.08 54.76% 108.76 4,676.69 45.24%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 2,875.98 103,535.23 690.70 24,865.24 7.87% 3,566.68 128,400.47 40.65% 5,206.47 187,432.93 59.35%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 1,552.66 6,210.64 438.00 1,752.00 7.62% 1,990.66 7,962.64 34.61% 3,760.59 15,042.36 65.39%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 2,002.30 52,059.83 483.19 12,562.91 8.01% 2,485.49 64,622.74 41.21% 3,545.06 92,171.67 58.79%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 2,173.69 76,079.19 474.22 16,597.77 6.74% 2,647.91 92,676.96 37.62% 4,391.07 153,687.34 62.38%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 1.66 66.46 - 0.00% 1.66 66.46 7.69% 19.94 797.54 92.31%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 5.00 2,520.00 - 0.00% 5.00 2,520.00 7.69% 60.00 30,240.00 92.31%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.15 1,113.85 - 0.00% 0.15 1,113.85 15.38% 0.85 6,126.15 84.62%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 2.31 1,923.08 - 0.00% 2.31 1,923.08 7.69% 27.69 23,076.92 92.31%
SANCIONES
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 378,858.75 89,177.49 468,036.24 746,961.41
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 475,462.02
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 686,720.80
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 481,085.40 93,393.34 7.61% 574,478.75 46.78% 653,568.07 53.22%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 5,052.52 169,259.38 845.24 28,315.47 7.23% 5,897.76 197,574.85 50.42% 5,800.18 194,306.00 49.58%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 152.61 5,341.39 25.86 905.16 5.51% 178.47 6,246.55 38.02% 290.95 10,183.18 61.98%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 131.63 5,660.08 20.25 870.60 8.42% 151.88 6,530.68 63.18% 88.51 3,806.09 36.82%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 3,566.68 128,400.47 661.44 23,812.01 7.54% 4,228.12 152,212.48 48.19% 4,545.03 163,620.92 51.81%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 1,990.66 7,962.64 514.27 2,057.07 8.94% 2,504.93 10,019.71 43.55% 3,246.32 12,985.29 56.45%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 2,485.49 64,622.74 495.49 12,882.70 8.22% 2,980.98 77,505.44 49.43% 3,049.58 79,288.97 50.57%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 2,647.91 92,676.96 486.29 17,020.26 6.91% 3,134.21 109,697.23 44.53% 3,904.77 136,667.07 55.47%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 1.66 66.46 2.49 99.69 11.54% 4.15 166.15 19.23% 17.45 697.85 80.77%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 5.00 2,520.00 7.50 3,780.00 11.54% 12.50 6,300.00 19.23% 52.50 26,460.00 80.77%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.15 1,113.85 0.11 765.77 10.58% 0.26 1,879.62 25.96% 0.74 5,360.38 74.04%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 2.31 1,923.08 3.46 2,884.62 11.54% 5.77 4,807.69 19.23% 24.23 20,192.31 80.77%
SANCIONES
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 468,036.24 91,993.34 560,029.58 653,568.07
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 475,462.02
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 686,720.80
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 481,085.40 93,346.70 7.60% 667,825.45 54.38% 560,221.37 45.62%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 5,897.76 169,259.38 1,034.58 34,658.50 8.84% 6,932.34 232,233.35 59.26% 4,765.60 159,647.50 40.74%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 178.47 5,341.39 76.41 2,674.48 16.28% 254.89 8,921.03 54.30% 214.53 7,508.71 45.70%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 151.88 5,660.08 10.66 458.54 4.44% 162.54 6,989.22 67.62% 77.85 3,347.55 32.38%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 4,228.12 128,400.47 - 0.00% 4,228.12 152,212.48 48.19% 4,545.03 163,620.92 51.81%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 2,504.93 7,962.64 979.00 3,916.01 17.02% 3,483.93 13,935.72 60.58% 2,267.32 9,069.28 39.42%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 2,980.98 64,622.74 672.15 17,475.79 11.15% 3,653.12 94,981.23 60.58% 2,377.43 61,813.18 39.42%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 3,134.21 92,676.96 760.95 26,633.30 10.81% 3,895.16 136,330.53 55.34% 3,143.82 110,033.77 44.66%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 4.15 66.46 2.49 99.69 11.54% 6.65 265.85 30.77% 14.95 598.15 69.23%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 12.50 2,520.00 7.50 3,780.00 11.54% 20.00 10,080.00 30.77% 45.00 22,680.00 69.23%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.26 1,113.85 0.11 765.77 10.58% 0.37 2,645.38 36.54% 0.63 4,594.62 63.46%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 5.77 1,923.08 3.46 2,884.62 11.54% 9.23 7,692.31 30.77% 20.77 17,307.69 69.23%
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 647,141.91
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 515,040.91
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 667,825.45 93,301.16 7.60% 761,126.61 61.98% 466,920.21 38.02%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 6,932.34 232,233.35 535.43 17,937.06 4.58% 7,467.77 250,170.41 63.84% 4,230.16 141,710.45 36.16%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 254.89 8,921.03 20.23 708.02 4.31% 275.12 9,629.05 58.61% 194.31 6,800.69 41.39%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 162.54 6,989.22 8.65 371.95 3.60% 171.19 7,361.17 71.21% 69.20 2,975.60 28.79%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 4,228.12 152,212.48 1,307.31 47,063.30 14.90% 5,535.44 199,275.79 63.10% 3,237.71 116,557.61 36.90%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 3,483.93 13,935.72 276.50 1,106.01 4.81% 3,760.43 15,041.73 65.38% 1,990.82 7,963.27 34.62%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 3,653.12 94,981.23 289.93 7,538.19 4.81% 3,943.05 102,519.42 65.38% 2,087.50 54,274.99 34.62%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 3,895.16 136,330.53 315.62 11,046.55 4.48% 4,210.77 147,377.08 59.82% 2,828.21 98,987.22 40.18%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 6.65 265.85 2.49 99.69 11.54% 9.14 365.54 42.31% 12.46 498.46 57.69%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 20.00 10,080.00 7.50 3,780.00 11.54% 27.50 13,860.00 42.31% 37.50 18,900.00 57.69%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.37 2,645.38 0.11 765.77 10.58% 0.47 3,411.15 47.12% 0.53 3,828.85 52.88%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 9.23 7,692.31 3.46 2,884.62 11.54% 12.69 10,576.92 42.31% 17.31 14,423.08 57.69%
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 732,912.99
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 429,269.82
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 761,126.61 93,400.64 7.61% 854,527.24 69.58% 373,519.57 30.42%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 7,467.77 250,170.41 843.35 28,252.25 7.21% 8,311.12 278,422.66 71.05% 3,386.81 113,458.20 28.95%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 275.12 9,629.05 - - 0.00% 275.12 9,629.05 58.61% 194.31 6,800.69 41.39%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 171.19 7,361.17 15.57 669.51 6.48% 186.76 8,030.68 77.69% 53.63 2,306.09 22.31%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 5,535.44 199,275.79 644.28 23,194.09 7.34% 6,179.72 222,469.88 70.44% 2,593.43 93,363.52 29.56%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 3,760.43 15,041.73 442.40 1,769.62 7.69% 4,202.84 16,811.35 73.08% 1,548.41 6,193.65 26.92%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 3,943.05 102,519.42 579.86 15,076.39 9.62% 4,522.92 117,595.81 75.00% 1,507.64 39,198.60 25.00%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 4,210.77 147,377.08 504.99 17,674.48 7.17% 4,715.76 165,051.56 66.99% 2,323.22 81,312.74 33.01%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 9.14 365.54 2.49 99.69 11.54% 11.63 465.23 53.85% 9.97 398.77 46.15%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DESTENS ml 65.00 504.00 32,760.00 27.50 13,860.00 7.50 3,780.00 11.54% 35.00 17,640.00 53.85% 30.00 15,120.00 46.15%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.47 3,411.15 - - 0.00% 0.47 3,411.15 47.12% 0.53 3,828.85 52.88%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 12.69 10,576.92 3.46 2,884.62 11.54% 16.15 13,461.54 53.85% 13.85 11,538.46 46.15%
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 819,549.32
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 342,633.49
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 854,527.24 143,953.21 11.72% 998,480.45 81.31% 229,566.36 18.69%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 8,311.12 278,422.66 1,383.85 46,359.10 11.83% 9,694.98 324,781.76 82.88% 2,002.96 67,099.09 17.12%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 275.12 9,629.05 81.02 2,835.79 17.26% 356.14 12,464.83 75.87% 113.28 3,964.90 24.13%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 186.76 8,030.68 20.76 892.68 8.64% 207.52 8,923.36 86.33% 32.87 1,413.41 13.67%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 6,179.72 222,469.88 982.73 35,378.30 11.20% 7,162.45 257,848.18 81.64% 1,610.70 57,985.22 18.36%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 4,202.84 16,811.35 442.40 1,769.62 7.69% 4,645.24 18,580.96 80.77% 1,106.01 4,424.04 19.23%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 4,522.92 117,595.81 463.89 12,061.11 7.69% 4,986.80 129,656.91 82.69% 1,043.75 27,137.49 17.31%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 4,715.76 165,051.56 1,060.76 37,126.54 15.07% 5,776.52 202,178.10 82.06% 1,262.46 44,186.20 17.94%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 11.63 465.23 2.49 99.69 11.54% 14.12 564.92 65.38% 7.48 299.08 34.62%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DESTENS ml 65.00 504.00 32,760.00 35.00 17,640.00 7.50 3,780.00 11.54% 42.50 21,420.00 65.38% 22.50 11,340.00 34.62%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.47 3,411.15 0.11 765.77 10.58% 0.58 4,176.92 57.69% 0.42 3,063.08 42.31%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 16.15 13,461.54 3.46 2,884.62 11.54% 19.62 16,346.15 65.38% 10.38 8,653.85 34.62%
11478.3181214513
Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 882,018.91
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 280,163.90
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 924,526.91 70,356.39 5.73% 994,883.31 81.01% 233,163.51 18.99%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 8,943.64 299,611.84 527.09 17,657.66 4.51% 9,470.73 317,269.50 80.96% 2,227.20 74,611.35 19.04%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 275.12 9,629.05 80.92 2,832.07 17.24% 356.03 12,461.12 75.84% 113.39 3,968.62 24.16%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 195.41 8,402.63 10.38 446.34 4.32% 205.79 8,848.97 85.61% 34.60 1,487.80 14.39%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 6,743.46 242,764.70 402.68 14,496.31 4.59% 7,146.14 257,261.01 81.45% 1,627.01 58,572.39 18.55%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 4,534.64 18,138.56 331.80 1,327.21 5.77% 4,866.44 19,465.77 84.62% 884.81 3,539.23 15.38%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 4,754.86 123,626.36 347.92 9,045.83 5.77% 5,102.78 132,672.19 84.62% 927.78 24,122.22 15.38%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 5,094.50 178,307.42 378.74 13,255.86 5.38% 5,473.24 191,563.28 77.76% 1,565.74 54,801.02 22.24%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 14.12 564.92 3.74 149.54 17.31% 17.86 714.46 82.69% 3.74 149.54 17.31%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DESTENS ml 65.00 504.00 32,760.00 42.50 21,420.00 11.25 5,670.00 17.31% 53.75 27,090.00 82.69% 11.25 5,670.00 17.31%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.58 4,176.92 0.16 1,148.65 15.87% 0.74 5,325.58 73.56% 0.26 1,914.42 26.44%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 19.62 16,346.15 5.19 4,326.92 17.31% 24.81 20,673.08 82.69% 5.19 4,326.92 17.31%
11658.1754159945
Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 941,080.19
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 221,102.62
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 994,883.31 92,209.57 7.51% 1,087,092.88 88.52% 140,953.94 11.48%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 9,470.73 317,269.50 843.35 28,252.25 7.21% 10,314.08 345,521.75 88.17% 1,383.85 46,359.10 11.83%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 356.03 12,461.12 32.37 1,132.83 6.89% 388.40 13,593.95 82.74% 81.02 2,835.79 17.26%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 205.79 8,848.97 13.84 595.12 5.76% 219.63 9,444.09 91.36% 20.76 892.68 8.64%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 7,146.14 257,261.01 644.28 23,194.09 7.34% 7,790.42 280,455.10 88.80% 982.73 35,378.30 11.20%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 4,866.44 19,465.77 442.40 1,769.62 7.69% 5,308.85 21,235.38 92.31% 442.40 1,769.62 7.69%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 5,102.78 132,672.19 463.89 12,061.11 7.69% 5,566.67 144,733.30 92.31% 463.89 12,061.11 7.69%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 5,473.24 191,563.28 504.99 17,674.48 7.17% 5,978.22 209,237.76 84.93% 1,060.76 37,126.54 15.07%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 17.86 714.46 2.49 99.69 11.54% 20.35 814.15 94.23% 1.25 49.85 5.77%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DESTENS ml 65.00 504.00 32,760.00 53.75 27,090.00 7.50 3,780.00 11.54% 61.25 30,870.00 94.23% 3.75 1,890.00 5.77%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.74 5,325.58 0.11 765.77 10.58% 0.84 6,091.35 84.13% 0.16 1,148.65 15.87%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 24.81 20,673.08 3.46 2,884.62 11.54% 28.27 23,557.69 94.23% 1.73 1,442.31 5.77%
7047.6969347017
Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 1,025,759.68
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 136,423.13
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 1,087,092.88 92,471.87 7.53% 1,179,564.74 96.05% 48,482.07 3.95%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 10,314.08 345,521.75 978.48 32,778.96 8.36% 11,292.56 378,300.71 96.53% 405.38 13,580.14 3.47%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 388.40 13,593.95 56.69 1,984.31 12.08% 445.09 15,578.26 94.82% 24.33 851.48 5.18%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 219.63 9,444.09 17.30 743.90 7.20% 236.93 10,187.99 98.56% 3.46 148.78 1.44%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 7,790.42 280,455.10 644.28 23,194.09 7.34% 8,434.70 303,649.19 96.14% 338.45 12,184.21 3.86%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 5,308.85 21,235.38 442.40 1,769.62 7.69% 5,751.25 23,005.00 100.00% - - 0.00%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 5,566.67 144,733.30 463.89 12,061.11 7.69% 6,030.55 156,794.41 100.00% - - 0.00%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 5,978.22 209,237.76 504.99 17,674.48 7.17% 6,483.21 226,912.24 92.10% 555.77 19,452.06 7.90%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 20.35 814.15 0.62 24.92 2.88% 20.98 839.08 97.12% 0.62 24.92 2.88%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DESTENS ml 65.00 504.00 32,760.00 61.25 30,870.00 1.88 945.00 2.88% 63.13 31,815.00 97.12% 1.88 945.00 2.88%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.84 6,091.35 0.08 574.33 7.93% 0.92 6,665.67 92.07% 0.08 574.33 7.93%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 28.27 23,557.69 0.87 721.15 2.88% 29.13 24,278.85 97.12% 0.87 721.15 2.88%
-
2424.1035270929
Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 1,115,966.15
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 46,216.67
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 1,179,564.74 40,414.08 3.29% 1,219,978.83 99.34% 8,067.99 0.66%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 11,292.56 378,300.71 405.38 13,580.14 3.47% 11,697.94 391,880.85 100.00% - - 0.00%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 445.09 15,578.26 24.33 851.48 5.18% 469.42 16,429.74 100.00% - - 0.00%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 236.93 10,187.99 3.46 148.78 1.44% 240.39 10,336.77 100.00% - - 0.00%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 8,434.70 303,649.19 338.45 12,184.21 3.86% 8,773.15 315,833.40 100.00% - - 0.00%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 5,751.25 23,005.00 - - 0.00% 5,751.25 23,005.00 100.00% - - 0.00%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 6,030.55 156,794.41 - - 0.00% 6,030.55 156,794.41 100.00% - - 0.00%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 6,483.21 226,912.24 333.46 11,671.23 4.74% 6,816.67 238,583.48 96.84% 222.31 7,780.82 3.16%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 20.98 839.08 0.62 24.92 2.88% 21.60 864.00 100.00% - - 0.00%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DESTENS ml 65.00 504.00 32,760.00 63.13 31,815.00 1.88 945.00 2.88% 65.00 32,760.00 100.00% - - 0.00%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.92 6,665.67 0.04 287.16 3.97% 0.96 6,952.84 96.03% 0.04 287.16 3.97%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 29.13 24,278.85 0.87 721.15 2.88% 30.00 25,000.00 100.00% - - 0.00%
-
403.3993306251
Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 1,154,401.99
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 7,780.82
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 1,219,978.83 8,067.99 0.66% 1,228,046.82 100.00% 0.00 0.00%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 11,697.94 391,880.85 - 0.00% 11,697.94 391,880.85 100.00% - - 0.00%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 469.42 16,429.74 - 0.00% 469.42 16,429.74 100.00% - - 0.00%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 240.39 10,336.77 - 0.00% 240.39 10,336.77 100.00% - - 0.00%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 8,773.15 315,833.40 - 0.00% 8,773.15 315,833.40 100.00% - - 0.00%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 5,751.25 23,005.00 - 0.00% 5,751.25 23,005.00 100.00% - - 0.00%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 6,030.55 156,794.41 - 0.00% 6,030.55 156,794.41 100.00% - - 0.00%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 6,816.67 238,583.48 222.31 7,780.82 3.16% 7,038.98 246,364.30 100.00% - - 0.00%
01.02.02.08 ESCALERA - - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 21.60 864.00 - - 0.00% 21.60 864.00 100.00% - - 0.00%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DESTENS ml 65.00 504.00 32,760.00 65.00 32,760.00 - - 0.00% 65.00 32,760.00 100.00% - - 0.00%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.96 6,952.84 0.04 287.16 3.97% 1.00 7,240.00 100.00% - - 0.00%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 30.00 25,000.00 - 0.00% 30.00 25,000.00 100.00% - - 0.00%
-
0
Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA
PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.
275.11562
195.41
costo por piso
metrado un piso 566.41 462.04 14,482.54 11,494.57 6,030.55 8,837.24 884.81 42,758.17
p.u 35.00 43.00 33.50 36.00 26.00 35.00 4.00
FECHA FACTURACION
8-Apr 22-Apr 6-May 20-May 3-Jun 17-Jun 1-Jul 15-Jul
SALDO VAL. N 06 VAL. N07 VAL. N 08 VAL. N 09 VAL. N 10 VAL. N 11 VAL. N 12 VAL. N 13
746,961.41 93,370.18 - - - - - -
653,591.24 93,370.18
560,221.06 93,370.18
466,850.88 93,370.18
373,480.71 93,370.18
280,110.53 93,370.18
186,740.35 93,370.18
93,370.18 93,370.18
FECHA PAGO
15-Apr 29-Apr 13-May 27-May 10-Jun 24-Jun 8-Jul 22-Jul
PISO PISO 16 PISO 18 PISO 20 PISO 22 PISO 24 PISO 26 PISO 28 PISO 29
SALDO VAL. N 06 VAL. N07 VAL. N 08 VAL. N 09 VAL. N 10 VAL. N 11 VAL. N 12 VAL. N 13
746,961.41 93,370.18 - - - - - -
653,591.24 93,370.18
560,221.06 93,370.18
466,850.88 93,370.18
373,480.71 93,370.18
280,110.53 93,370.18
186,740.35 93,370.18
93,370.18 93,370.18
Val . 13 (15.07.17)
MATERIALES
PREVENCIONISTA (19.06.17-01.07.17)
DESCCUENTO POR DAOS A TERCEROS S/. 8,379.69 S/. 0.00 S/. -4,000.00 S/. -2,166.00 S/. -2,213.69
EQUIPOS DE PROTECCION PERSONAL S/. -
S/. -2,213.69