PROYECTO: "TORRE FORUM ETAPA II

TRABAJOS: ENCOFRADO Y DESENCOFRADO


CONTRATISTA: JCC CONSTRUCTORA SAC

CUADRO DE LIQUIDACION

VALORIZACIONES MONTO AMORTIZACION DESCUENTOS AMONESTACIONES

1. PRESUPUESTO CONTRACTUAL Y ADENDAS

Valorizacion 1 S/. 96,291.38 S/. - S/. - S/. -


Valorizacion 2 S/. 85,073.96 S/. - S/. -5,140.00 S/. -
Valorizacion 3 S/. 82,450.93 S/. - S/. -1,680.00 S/. -
Valorizacion 4 S/. 123,962.47 S/. - S/. -2,100.00 S/. -
Valorizacion 5 S/. 93,306.66 S/. - S/. -4,129.16 S/. -
Valorizacion 6 S/. 93,393.34 S/. - S/. -1,400.00 S/. -
Valorizacion 7 S/. 93,346.70 S/. - S/. -1,400.00 S/. -
Valorizacion 8 S/. 93,301.16 S/. - S/. -1,400.00 S/. -
Valorizacion 9 S/. 93,400.64 S/. - S/. -1,400.00 S/. -
Valorizacion 10 S/. 69,999.67 S/. - S/. -1,400.00 S/. -
Valorizacion 11 S/. 70,356.39 S/. - S/. -5,400.00 S/. -
Valorizacion 12 S/. 92,209.57 S/. - S/. -2,166.00 S/. -
Valorizacion 13 S/. 92,471.87 S/. - S/. -2,213.69 S/. -
Valorizacion 14 S/. 40,414.08 S/. - S/. - S/. -
Valorizacion 15 S/. 8,067.99 S/. - S/. - S/. -

TOTAL S/. 1,228,046.82 S/. - S/. -29,828.86 S/. -

LIQUIDACION ECONOMICA GACSAC:


RESUMEN VALORIZACIONES INC. IGV
PRESUPUESTO CONTRACTUAL S/. 1,449,095.24
DESCUENTOS S/. -35,198.05
SALDO POR EJECUTAR S/. -
PAGO DE LIQUIDACIONES OBREROS ATC S/. -
PRESUPUESTO FINAL S/. 1,413,897.19
TOTAL FACTURADO S/. -1,413,897.19
SALDO POR FACTURAR S/. -
FACTURAS PENDIENTES DE PAGO S/. -
FONDO DE GARANTIA A RETENER S/. 89,154.29
TOTAL POR DESEMBOLSAR S/. 89,154.29
O DE LIQUIDACION

PENDIENTE DE
SUB TOTAL IGV FACTURA ABONADO(S/.) F. GARANTIA (S/.) SALDO POR ABONAR (S/.)
FACTURACION (S/.)

S/. 96,291.38 S/. 17,332.45 S/. 113,623.83 S/. 9,629.14 S/. 103,994.69
S/. 79,933.96 S/. 14,388.11 S/. 94,322.07 S/. 8,507.40 S/. 85,814.68
S/. 80,770.93 S/. 14,538.77 S/. 95,309.70 S/. 8,245.09 S/. 87,064.60
S/. 121,862.47 S/. 21,935.25 S/. 143,797.72 S/. 12,396.25 S/. 131,401.47
S/. 89,177.49 S/. 16,051.95 S/. 105,229.44 S/. 9,330.67 S/. 95,898.78
S/. 91,993.34 S/. 16,558.80 S/. 108,552.15 S/. 4,669.67 S/. 103,882.48
S/. 91,946.70 S/. 16,550.41 S/. 108,497.11 S/. 4,667.34 S/. 103,829.77
S/. 91,901.16 S/. 16,542.21 S/. 108,443.37 S/. 4,665.06 S/. 103,778.31
S/. 92,000.64 S/. 16,560.11 S/. 108,560.75 S/. 4,670.03 S/. 103,890.72
S/. 68,599.67 S/. 12,347.94 S/. 80,947.61 S/. 7,197.66 S/. 73,749.95
S/. 64,956.39 S/. 11,692.15 S/. 76,648.54 S/. 3,517.82 S/. 73,130.72
S/. 90,043.57 S/. 16,207.84 S/. 106,251.41 S/. 4,610.48 S/. 101,640.93
S/. 90,258.17 S/. 16,246.47 S/. 106,504.65 S/. 4,623.59 S/. 101,881.05
S/. 40,414.08 S/. 7,274.54 S/. 47,688.62 S/. 2,020.70 S/. 45,667.91
S/. 8,067.99 S/. 1,452.24 S/. 9,520.22 S/. 403.40 S/. 9,116.82

S/. 1,198,217.96 S/. 215,679.23 S/. 1,413,897.19 S/. - S/. - S/. 89,154.29 S/. 1,324,742.90
VALORIZACION No. 01 al 19.01.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD : SUMA ALZADA
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 0.00 96,291.38 7.84% 96,291.38 7.84% 1,131,755.43 92.16%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 903.20 30,257.20 7.72% 903.20 30,257.20 7.72% 10,794.74 361,623.65 92.28%
01.02.02.05 COLUMNAS - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 25.65 897.75 5.46% 25.65 897.75 5.46% 443.77 15,531.99 94.54%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 32.23 1,386.04 13.41% 32.23 1,386.04 13.41% 208.16 8,950.73 86.59%
01.02.02.06 VIGAS - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 679.74 24,470.64 7.75% 679.74 24,470.64 7.75% 8,093.41 291,362.76 92.25%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 23.84 95.37 7.69% 23.84 95.37 7.69% 286.12 1,144.50 92.31%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 442.40 1,769.62 7.69% 442.40 1,769.62 7.69% 5,308.85 21,235.38 92.31%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 5.74 22.96 7.69% 5.74 22.96 7.69% 68.88 275.52 92.31%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 414.68 10,781.68 6.88% 414.68 10,781.68 6.88% 5,615.87 146,012.73 93.12%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 615.53 21,543.66 8.74% 615.53 21,543.66 8.74% 6,423.45 224,820.64 91.26%
01.02.02.08 ESCALERA - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 1.66 66.46 7.69% 1.66 66.46 7.69% 19.94 797.54 92.31%
ESCUADRAS Y PLATAFORMAS - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 5.00 2,520.00 7.69% 5.00 2,520.00 7.69% 60.00 30,240.00 92.31%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.08 556.92 7.69% 0.08 556.92 7.69% 0.92 6,683.08 92.31%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 2.31 1,923.08 7.69% 2.31 1,923.08 7.69% 27.69 23,076.92 92.31%

Costo Directo 1,228,046.82 0.00 96,291.38 96,291.38 1,131,755.43


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 0.00 96,291.38 96,291.38 1,131,755.43

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 0.00 0.00 0.00 0.00
Descuento por materiales 0.00 0.00 0.00 0.00 0.00
Descuento por EPPS 0.00 0.00 0.00 0.00
SUBTOTAL 1,228,046.82 0.00 96,291.38 96,291.38 1,131,755.43

SANCIONES
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 0.00 96,291.38 96,291.38 1,131,755.43

IGV 18.00% 221,048.43 0.00 17,332.45 17,332.45 203,715.98


Total Factura S/. 1,449,095.24 0.00 113,623.83 113,623.83 1,335,471.41

Retencin de Fondo de Garanta


10.00% 122,804.68 0.00 9,629.14 9,629.14 113,175.54
Total a Pagar S/. 1,326,290.56 0.00 103,994.69 103,994.69 1,222,295.87

Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 01 al 19.01.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2
VALORIZACION 3
VALORIZACION 4

ACUMULADO 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


VALORIZACION No. 02 al 02.02.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD : SUMA ALZADA
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 96,291.38 85,073.96 6.93% 181,365.35 14.77% 1,046,681.47 85.23%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 903.20 30,257.20 897.15 30,054.53 7.67% 1,800.35 60,311.73 15.39% 9,897.59 331,569.13 84.61%
01.02.02.05 COLUMNAS - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 25.65 897.75 27.46 960.93 5.85% 53.11 1,858.68 11.31% 416.32 14,571.06 88.69%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 32.23 1,386.04 21.50 924.29 8.94% 53.73 2,310.33 22.35% 186.66 8,026.44 77.65%
01.02.02.06 VIGAS - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 679.74 24,470.64 636.59 22,917.27 7.26% 1,316.33 47,387.91 15.00% 7,456.82 268,445.49 85.00%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 23.84 95.37 23.84 95.37 7.69% 47.69 190.75 15.38% 262.28 1,049.12 84.62%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 442.40 1,769.62 442.40 1,769.62 7.69% 884.81 3,539.23 15.38% 4,866.44 19,465.77 84.62%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 5.74 22.96 5.74 22.96 7.69% 11.48 45.92 15.38% 63.14 252.56 84.62%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 414.68 10,781.68 460.18 11,964.68 7.63% 874.86 22,746.36 14.51% 5,155.69 134,048.05 85.49%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 615.53 21,543.66 451.64 15,807.40 6.42% 1,067.17 37,351.06 15.16% 5,971.81 209,013.24 84.84%
01.02.02.08 ESCALERA - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 1.66 66.46 - 0.00% 1.66 66.46 7.69% 19.94 797.54 92.31%
ESCUADRAS Y PLATAFORMAS - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 5.00 2,520.00 - - 0.00% 5.00 2,520.00 7.69% 60.00 30,240.00 92.31%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.08 556.92 0.08 556.92 7.69% 0.15 1,113.85 15.38% 0.85 6,126.15 84.62%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 2.31 1,923.08 - 0.00% 2.31 1,923.08 7.69% 27.69 23,076.92 92.31%

Costo Directo 1,228,046.82 96,291.38 85,073.96 181,365.35 1,046,681.47


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 96,291.38 85,073.96 181,365.35 1,046,681.47

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 0.00 -2,800.00 -2,800.00 0.00
Descuento por materiales 0.00 0.00 -2,340.00 -2,340.00 0.00
Descuento por EPPS 0.00 0.00 0.00 0.00
SUBTOTAL 1,228,046.82 96,291.38 79,933.96 176,225.35 1,046,681.47

SANCIONES
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 96,291.38 79,933.96 176,225.35 1,046,681.47

IGV 18.00% 221,048.43 17,332.45 14,388.11 31,720.56 188,402.66


Total Factura S/. 1,449,095.24 113,623.83 94,322.07 207,945.91 1,235,084.13

Retencin de Fondo de Garanta


10.00% 122,804.68 9,629.14 8,507.40 18,136.53 104,668.15
Total a Pagar S/. 1,326,290.56 103,994.69 85,814.68 189,809.37 1,130,415.99

Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 02 al 02.02.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2 85,073.96 - -5,140.00 - 79,933.96 14,388.11 94,322.07 8,507.40
VALORIZACION 3
VALORIZACION 4

ACUMULADO 181,365.35 - -5,140.00 - 176,225.35 31,720.56 207,945.91 18,136.53

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


VALORIZACION No. 03 al 18.02.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD : SUMA ALZADA
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 181,365.35 82,450.93 6.71% 263,816.28 21.48% 964,230.54 78.52%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 1,800.35 60,311.73 874.72 29,303.16 7.48% 2,675.07 89,614.89 22.87% 9,022.86 302,265.96 77.13%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 53.11 1,858.68 26.76 936.73 5.70% 79.87 2,795.41 17.01% 389.55 13,634.33 82.99%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 53.73 2,310.33 20.95 900.97 8.72% 74.68 3,211.29 31.07% 165.71 7,125.48 68.93%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 1,316.33 47,387.91 620.68 22,344.34 7.07% 1,937.01 69,732.25 22.08% 6,836.14 246,101.15 77.92%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 47.69 190.75 23.84 95.37 7.69% 71.53 286.12 23.08% 238.44 953.75 76.92%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 884.81 3,539.23 442.40 1,769.62 7.69% 1,327.21 5,308.85 23.08% 4,424.04 17,696.15 76.92%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 11.48 45.92 5.74 22.96 7.69% 17.22 68.88 23.08% 57.40 229.60 76.92%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 874.86 22,746.36 448.68 11,665.56 7.44% 1,323.54 34,411.92 21.95% 4,707.02 122,382.48 78.05%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 1,067.17 37,351.06 440.35 15,412.22 6.26% 1,507.52 52,763.28 21.42% 5,531.46 193,601.02 78.58%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 1.66 66.46 - 0.00% 1.66 66.46 7.69% 19.94 797.54 92.31%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 5.00 2,520.00 - 0.00% 5.00 2,520.00 7.69% 60.00 30,240.00 92.31%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.15 1,113.85 - 0.00% 0.15 1,113.85 15.38% 0.85 6,126.15 84.62%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 2.31 1,923.08 - 0.00% 2.31 1,923.08 7.69% 27.69 23,076.92 92.31%

Costo Directo 1,228,046.82 181,365.35 82,450.93 263,816.28 964,230.54


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 181,365.35 82,450.93 263,816.28 964,230.54

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 0.00 -1,400.00 -1,400.00 0.00
Descuento por materiales 0.00 0.00 -280.00 -280.00 0.00
Descuento por EPPS 0.00 0.00 0.00 0.00
SUBTOTAL 1,228,046.82 181,365.35 80,770.93 262,136.28 964,230.54

SANCIONES
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 181,365.35 80,770.93 262,136.28 964,230.54

IGV 18.00% 221,048.43 32,645.76 14,538.77 47,184.53 173,561.50


Total Factura S/. 1,449,095.24 214,011.11 95,309.70 309,320.81 1,137,792.04

Retencin de Fondo de Garanta


10.00% 122,804.68 18,136.53 8,245.09 26,381.63 96,423.05
Total a Pagar S/. 1,326,290.56 195,874.57 87,064.60 282,939.18 1,041,368.98

Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 03 al 18.02.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2 85,073.96 - -5,140.00 - 79,933.96 14,388.11 94,322.07 8,507.40
VALORIZACION 3 82,450.93 - -1,680.00 - 80,770.93 14,538.77 95,309.70 8,245.09

ACUMULADO 263,816.28 - -6,820.00 - 256,996.28 46,259.33 303,255.61 26,381.63

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


VALORIZACION No. 04 al 11.03.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD : SUMA ALZADA
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 263,816.28 123,962.47 10.09% 387,778.75 31.58% 840,268.07 68.42%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 2,675.07 89,614.89 1,323.30 44,330.42 11.31% 3,998.37 133,945.31 34.18% 7,699.57 257,935.54 65.82%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 79.87 2,795.41 40.49 1,417.11 8.63% 120.36 4,212.51 25.64% 349.06 12,217.22 74.36%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 74.68 3,211.29 31.70 1,363.00 13.19% 106.38 4,574.30 44.25% 134.01 5,762.47 55.75%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 1,937.01 69,732.25 938.97 33,802.98 10.70% 2,875.98 103,535.23 32.78% 5,897.17 212,298.17 67.22%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 71.53 286.12 238.44 953.75 76.92% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 1,327.21 5,308.85 225.45 901.80 3.92% 1,552.66 6,210.64 27.00% 4,198.59 16,794.36 73.00%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 17.22 68.88 57.40 229.60 76.92% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 1,323.54 34,411.92 678.77 17,647.90 11.26% 2,002.30 52,059.83 33.20% 4,028.25 104,734.58 66.80%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 1,507.52 52,763.28 666.17 23,315.92 9.46% 2,173.69 76,079.19 30.88% 4,865.29 170,285.11 69.12%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 1.66 66.46 - 0.00% 1.66 66.46 7.69% 19.94 797.54 92.31%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 5.00 2,520.00 - 0.00% 5.00 2,520.00 7.69% 60.00 30,240.00 92.31%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.15 1,113.85 - 0.00% 0.15 1,113.85 15.38% 0.85 6,126.15 84.62%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 2.31 1,923.08 - 0.00% 2.31 1,923.08 7.69% 27.69 23,076.92 92.31%

Costo Directo 1,228,046.82 263,816.28 123,962.47 387,778.75 840,268.07


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 263,816.28 123,962.47 387,778.75 840,268.07

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 -6,820.00 -2,100.00 -8,920.00 0.00
Descuento por materiales 0.00 0.00 0.00 0.00 0.00
Descuento por EPPS 0.00 0.00 0.00 0.00
SUBTOTAL 1,228,046.82 256,996.28 121,862.47 378,858.75 840,268.07

SANCIONES
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 256,996.28 121,862.47 378,858.75 840,268.07

IGV 18.00% 221,048.43 46,259.33 21,935.25 68,194.57 151,248.25


Total Factura S/. 1,449,095.24 303,255.61 143,797.72 447,053.32 991,516.32

Retencin de Fondo de Garanta


10.00% 122,804.68 26,381.63 12,396.25 38,777.87 84,026.81
Total a Pagar S/. 1,326,290.56 276,873.98 131,401.47 408,275.45 907,489.51

Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 04 al 11.03.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2 85,073.96 - -5,140.00 - 79,933.96 14,388.11 94,322.07 8,507.40
VALORIZACION 3 82,450.93 - -1,680.00 - 80,770.93 14,538.77 95,309.70 8,245.09
VALORIZACION 4 123,962.47 - -2,100.00 - 121,862.47 21,935.25 143,797.72 12,396.25

ACUMULADO 387,778.75 - -8,920.00 - 378,858.75 68,194.57 447,053.32 38,777.87

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


PORTA MARINA - CONTROL AVANCE DE PUERTAS
25% = EN TALLER EN TALLER PEDIDO, FALTA LLEGAR
30% = EN OBRA, SIN INSTALAR MATERIAL EN OBRA DEFINIDO FALTA HABILITAR
50% = MARCO INSTALADO, SIN ACABADO EN PROCESO INSTALACION NO APLICA / NO TIENE
70% = MARCO Y PUERTA INSTALADO, SIN ACABADO PENDIENTE REMATES TERMINADO

DESCRIPCION ACABADOS DEPARTAMENTOS


201 301 401 501 601 701 801 901 1001 1101 1201 1301 1401

100%
P-2 / HALL COMUN
100% 30% 70% 0% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-5 / DEPOSITO
100% 30% 70% 70% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-5 / BAO SERVICIO
100% 30% 50% 50% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-2 / COCINA BATIENTE
100% 30% 50% 50% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-8 / COCINA VAIVEN
100% 30% 70% 0% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-1 / BAO VISITAS
100% 30% 70% 0% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-7 / DORM. 1
100% 30% 70% 70% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-1 / WC IZQUIERDA
100% 30% 0% 70% 0% 30% 0% 0% 0% 0% 0% 0% 0%
P-1 / WC DERECHA
100% 30% 70% 0% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-1 / BAO 1
100% 30% 70% 70% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-7 / DORM. 2
100% 30% 70% 70% 50% 30% 0% 0% 0% 0% 0% 0% 0%
P-1 / BAO 2
P-7 / DORM. 3 100% 30% 70% 70% 50% 30% 0% 0% 0% 0% 0% 0% 0%

100% 30% 70% 70% 50% 30% 0% 0% 0% 0% 0% 0% 0%


P-1 / BAO 3

No tienen jambas ni chapas instaladas


NTROL AVANCE DE PUERTAS

DEPARTAMENTOS
1501 1601

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

0%

No tienen jambas ni chapas instaladas


VALORIZACION No. 05 al 25.03.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 82,995.71
MODALIDAD : SUMA ALZADA
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 387,778.75 93,306.66 7.60% 481,085.40 39.17% 746,961.41 60.83%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 3,998.37 133,945.31 1,054.15 35,314.07 9.01% 5,052.52 169,259.38 43.19% 6,645.42 222,621.47 56.81%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 120.36 4,212.51 32.25 1,128.88 6.87% 152.61 5,341.39 32.51% 316.81 11,088.34 67.49%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 106.38 4,574.30 25.25 1,085.78 10.50% 131.63 5,660.08 54.76% 108.76 4,676.69 45.24%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 2,875.98 103,535.23 690.70 24,865.24 7.87% 3,566.68 128,400.47 40.65% 5,206.47 187,432.93 59.35%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 1,552.66 6,210.64 438.00 1,752.00 7.62% 1,990.66 7,962.64 34.61% 3,760.59 15,042.36 65.39%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 2,002.30 52,059.83 483.19 12,562.91 8.01% 2,485.49 64,622.74 41.21% 3,545.06 92,171.67 58.79%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 2,173.69 76,079.19 474.22 16,597.77 6.74% 2,647.91 92,676.96 37.62% 4,391.07 153,687.34 62.38%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 1.66 66.46 - 0.00% 1.66 66.46 7.69% 19.94 797.54 92.31%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 5.00 2,520.00 - 0.00% 5.00 2,520.00 7.69% 60.00 30,240.00 92.31%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.15 1,113.85 - 0.00% 0.15 1,113.85 15.38% 0.85 6,126.15 84.62%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 2.31 1,923.08 - 0.00% 2.31 1,923.08 7.69% 27.69 23,076.92 92.31%

Costo Directo 1,228,046.82 387,778.75 93,306.66 481,085.40 746,961.41


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 387,778.75 93,306.66 481,085.40 746,961.41

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 -8,920.00 -1,400.00 -10,320.00 0.00
Descuento por materiales 0.00 0.00 -2,729.16 -2,729.16 0.00
Descuento por EPPS 0.00 0.00 0.00 0.00
SUBTOTAL 1,228,046.82 378,858.75 89,177.49 468,036.24 746,961.41

SANCIONES
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 378,858.75 89,177.49 468,036.24 746,961.41

IGV 18.00% 221,048.43 68,194.57 16,051.95 84,246.52 134,453.05


Total Factura S/. 1,449,095.24 447,053.32 105,229.44 552,282.76 881,414.47

Retencin de Fondo de Garanta


10.00% 122,804.68 38,777.87 9,330.67 48,108.54 74,696.14
Total a Pagar S/. 1,326,290.56 408,275.45 95,898.78 504,174.22 806,718.32

Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 05 al 25.03.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2 85,073.96 - -5,140.00 - 79,933.96 14,388.11 94,322.07 8,507.40
VALORIZACION 3 82,450.93 - -1,680.00 - 80,770.93 14,538.77 95,309.70 8,245.09
VALORIZACION 4 123,962.47 - -2,100.00 - 121,862.47 21,935.25 143,797.72 12,396.25
VALORIZACION 5 93,306.66 - -4,129.16 - 89,177.49 16,051.95 105,229.44 9,330.67

ACUMULADO 481,085.40 - -13,049.16 - 468,036.24 84,246.52 552,282.76 48,108.54

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


VALORIZACION No. 06 al 07.04.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 475,462.02
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 686,720.80
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 481,085.40 93,393.34 7.61% 574,478.75 46.78% 653,568.07 53.22%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 5,052.52 169,259.38 845.24 28,315.47 7.23% 5,897.76 197,574.85 50.42% 5,800.18 194,306.00 49.58%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 152.61 5,341.39 25.86 905.16 5.51% 178.47 6,246.55 38.02% 290.95 10,183.18 61.98%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 131.63 5,660.08 20.25 870.60 8.42% 151.88 6,530.68 63.18% 88.51 3,806.09 36.82%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 3,566.68 128,400.47 661.44 23,812.01 7.54% 4,228.12 152,212.48 48.19% 4,545.03 163,620.92 51.81%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 1,990.66 7,962.64 514.27 2,057.07 8.94% 2,504.93 10,019.71 43.55% 3,246.32 12,985.29 56.45%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 2,485.49 64,622.74 495.49 12,882.70 8.22% 2,980.98 77,505.44 49.43% 3,049.58 79,288.97 50.57%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 2,647.91 92,676.96 486.29 17,020.26 6.91% 3,134.21 109,697.23 44.53% 3,904.77 136,667.07 55.47%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 1.66 66.46 2.49 99.69 11.54% 4.15 166.15 19.23% 17.45 697.85 80.77%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 5.00 2,520.00 7.50 3,780.00 11.54% 12.50 6,300.00 19.23% 52.50 26,460.00 80.77%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.15 1,113.85 0.11 765.77 10.58% 0.26 1,879.62 25.96% 0.74 5,360.38 74.04%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 2.31 1,923.08 3.46 2,884.62 11.54% 5.77 4,807.69 19.23% 24.23 20,192.31 80.77%

Costo Directo 1,228,046.82 481,085.40 93,393.34 574,478.75 653,568.07


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 481,085.40 93,393.34 574,478.75 653,568.07

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 -10,320.00 -1,400.00 -11,720.00 0.00
Descuento por materiales 0.00 -2,729.16 0.00 -2,729.16 0.00
Descuento por EPPS 0.00 0.00 0.00 0.00
SUBTOTAL 1,228,046.82 468,036.24 91,993.34 560,029.58 653,568.07

SANCIONES
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 468,036.24 91,993.34 560,029.58 653,568.07

IGV 18.00% 221,048.43 84,246.52 16,558.80 100,805.33 117,642.25


Total Factura S/. 1,449,095.24 552,282.76 108,552.15 660,834.91 771,210.32

Retencin de Fondo de Garanta


5.00% 122,804.68 48,108.54 4,669.67 52,778.21 70,026.47
Total a Pagar S/. 1,326,290.56 504,174.22 103,882.48 608,056.70 701,183.85

Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 06 al 07.04.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2 85,073.96 - -5,140.00 - 79,933.96 14,388.11 94,322.07 8,507.40
VALORIZACION 3 82,450.93 - -1,680.00 - 80,770.93 14,538.77 95,309.70 8,245.09
VALORIZACION 4 123,962.47 - -2,100.00 - 121,862.47 21,935.25 143,797.72 12,396.25
VALORIZACION 5 93,306.66 - -4,129.16 - 89,177.49 16,051.95 105,229.44 9,330.67
VALORIZACION 6 93,393.34 - -1,400.00 - 91,993.34 16,558.80 108,552.15 4,669.67

ACUMULADO 574,478.75 - -14,449.16 - 560,029.58 100,805.33 660,834.91 52,778.21

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


VALORIZACION No. 07 al 21.04.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 475,462.02
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 686,720.80
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 481,085.40 93,346.70 7.60% 667,825.45 54.38% 560,221.37 45.62%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 5,897.76 169,259.38 1,034.58 34,658.50 8.84% 6,932.34 232,233.35 59.26% 4,765.60 159,647.50 40.74%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 178.47 5,341.39 76.41 2,674.48 16.28% 254.89 8,921.03 54.30% 214.53 7,508.71 45.70%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 151.88 5,660.08 10.66 458.54 4.44% 162.54 6,989.22 67.62% 77.85 3,347.55 32.38%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 4,228.12 128,400.47 - 0.00% 4,228.12 152,212.48 48.19% 4,545.03 163,620.92 51.81%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 2,504.93 7,962.64 979.00 3,916.01 17.02% 3,483.93 13,935.72 60.58% 2,267.32 9,069.28 39.42%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 2,980.98 64,622.74 672.15 17,475.79 11.15% 3,653.12 94,981.23 60.58% 2,377.43 61,813.18 39.42%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 3,134.21 92,676.96 760.95 26,633.30 10.81% 3,895.16 136,330.53 55.34% 3,143.82 110,033.77 44.66%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 4.15 66.46 2.49 99.69 11.54% 6.65 265.85 30.77% 14.95 598.15 69.23%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 12.50 2,520.00 7.50 3,780.00 11.54% 20.00 10,080.00 30.77% 45.00 22,680.00 69.23%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.26 1,113.85 0.11 765.77 10.58% 0.37 2,645.38 36.54% 0.63 4,594.62 63.46%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 5.77 1,923.08 3.46 2,884.62 11.54% 9.23 7,692.31 30.77% 20.77 17,307.69 69.23%

Costo Directo 1,228,046.82 481,085.40 93,346.70 667,825.45 560,221.37


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 481,085.40 93,346.70 667,825.45 560,221.37

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 -11,720.00 -1,400.00 -13,120.00 0.00
Descuento por materiales 0.00 -2,729.16 0.00 -2,729.16 0.00
Descuento por EPPS 0.00 0.00 0.00 0.00
SUBTOTAL 1,228,046.82 560,029.58 91,946.70 651,976.29 560,221.37
0.00
SANCIONES 0.00
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 560,029.58 91,946.70 651,976.29 560,221.37
0.00
IGV 18.00% 221,048.43 100,805.33 16,550.41 117,355.73 100,839.85
Total Factura S/. 1,449,095.24 660,834.91 108,497.11 769,332.02 661,061.21
0.00
Retencin de Fondo de Garanta
5.00% 122,804.68 52,778.21 4,667.34 57,445.54 65,359.14
Total a Pagar S/. 1,326,290.56 608,056.70 103,829.77 711,886.47 595,702.07

Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 07 al 21.04.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2 85,073.96 - -5,140.00 - 79,933.96 14,388.11 94,322.07 8,507.40
VALORIZACION 3 82,450.93 - -1,680.00 - 80,770.93 14,538.77 95,309.70 8,245.09
VALORIZACION 4 123,962.47 - -2,100.00 - 121,862.47 21,935.25 143,797.72 12,396.25
VALORIZACION 5 93,306.66 - -4,129.16 - 89,177.49 16,051.95 105,229.44 9,330.67
VALORIZACION 6 93,393.34 - -1,400.00 - 91,993.34 16,558.80 108,552.15 4,669.67
VALORIZACION 7 93,346.70 - -1,400.00 - 91,946.70 16,550.41 108,497.11 4,667.34

ACUMULADO 667,825.45 - -15,849.16 - 651,976.29 117,355.73 769,332.02 57,445.54

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


VALORIZACION No. 08 al 05.05.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 647,141.91
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 515,040.91
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 667,825.45 93,301.16 7.60% 761,126.61 61.98% 466,920.21 38.02%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 6,932.34 232,233.35 535.43 17,937.06 4.58% 7,467.77 250,170.41 63.84% 4,230.16 141,710.45 36.16%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 254.89 8,921.03 20.23 708.02 4.31% 275.12 9,629.05 58.61% 194.31 6,800.69 41.39%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 162.54 6,989.22 8.65 371.95 3.60% 171.19 7,361.17 71.21% 69.20 2,975.60 28.79%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 4,228.12 152,212.48 1,307.31 47,063.30 14.90% 5,535.44 199,275.79 63.10% 3,237.71 116,557.61 36.90%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 3,483.93 13,935.72 276.50 1,106.01 4.81% 3,760.43 15,041.73 65.38% 1,990.82 7,963.27 34.62%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 3,653.12 94,981.23 289.93 7,538.19 4.81% 3,943.05 102,519.42 65.38% 2,087.50 54,274.99 34.62%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 3,895.16 136,330.53 315.62 11,046.55 4.48% 4,210.77 147,377.08 59.82% 2,828.21 98,987.22 40.18%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 6.65 265.85 2.49 99.69 11.54% 9.14 365.54 42.31% 12.46 498.46 57.69%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DEST ml 65.00 504.00 32,760.00 20.00 10,080.00 7.50 3,780.00 11.54% 27.50 13,860.00 42.31% 37.50 18,900.00 57.69%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.37 2,645.38 0.11 765.77 10.58% 0.47 3,411.15 47.12% 0.53 3,828.85 52.88%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 9.23 7,692.31 3.46 2,884.62 11.54% 12.69 10,576.92 42.31% 17.31 14,423.08 57.69%

Costo Directo 1,228,046.82 667,825.45 93,301.16 761,126.61 466,920.21


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 667,825.45 93,301.16 761,126.61 466,920.21

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 -13,120.00 -1,400.00 -14,520.00 0.00
Descuento por materiales 0.00 -2,729.16 0.00 -2,729.16 0.00
Descuento por EPPS 0.00 0.00 0.00 0.00
SUBTOTAL 1,228,046.82 651,976.29 91,901.16 743,877.44 466,920.21
0.00
SANCIONES 0.00
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 651,976.29 91,901.16 743,877.44 466,920.21
0.00
IGV 18.00% 221,048.43 117,355.73 16,542.21 133,897.94 84,045.64
Total Factura S/. 1,449,095.24 769,332.02 108,443.37 877,775.38 550,965.85
0.00
Retencin de Fondo de Garanta
5.00% 122,804.68 57,445.54 4,665.06 62,110.60 60,694.08
Total a Pagar S/. 1,326,290.56 711,886.47 103,778.31 815,664.78 490,271.77

Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 08 al 05.05.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2 85,073.96 - -5,140.00 - 79,933.96 14,388.11 94,322.07 8,507.40
VALORIZACION 3 82,450.93 - -1,680.00 - 80,770.93 14,538.77 95,309.70 8,245.09
VALORIZACION 4 123,962.47 - -2,100.00 - 121,862.47 21,935.25 143,797.72 12,396.25
VALORIZACION 5 93,306.66 - -4,129.16 - 89,177.49 16,051.95 105,229.44 9,330.67
VALORIZACION 6 93,393.34 - -1,400.00 - 91,993.34 16,558.80 108,552.15 4,669.67
VALORIZACION 7 93,346.70 - -1,400.00 - 91,946.70 16,550.41 108,497.11 4,667.34
VALORIZACION 8 93,301.16 - -1,400.00 - 91,901.16 16,542.21 108,443.37 4,665.06

ACUMULADO 761,126.61 - -17,249.16 - 743,877.44 133,897.94 877,775.38 62,110.60

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


VALORIZACION No. 09 al 19.05.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 732,912.99
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 429,269.82
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 761,126.61 93,400.64 7.61% 854,527.24 69.58% 373,519.57 30.42%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 7,467.77 250,170.41 843.35 28,252.25 7.21% 8,311.12 278,422.66 71.05% 3,386.81 113,458.20 28.95%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 275.12 9,629.05 - - 0.00% 275.12 9,629.05 58.61% 194.31 6,800.69 41.39%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 171.19 7,361.17 15.57 669.51 6.48% 186.76 8,030.68 77.69% 53.63 2,306.09 22.31%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 5,535.44 199,275.79 644.28 23,194.09 7.34% 6,179.72 222,469.88 70.44% 2,593.43 93,363.52 29.56%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 3,760.43 15,041.73 442.40 1,769.62 7.69% 4,202.84 16,811.35 73.08% 1,548.41 6,193.65 26.92%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 3,943.05 102,519.42 579.86 15,076.39 9.62% 4,522.92 117,595.81 75.00% 1,507.64 39,198.60 25.00%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 4,210.77 147,377.08 504.99 17,674.48 7.17% 4,715.76 165,051.56 66.99% 2,323.22 81,312.74 33.01%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 9.14 365.54 2.49 99.69 11.54% 11.63 465.23 53.85% 9.97 398.77 46.15%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DESTENS ml 65.00 504.00 32,760.00 27.50 13,860.00 7.50 3,780.00 11.54% 35.00 17,640.00 53.85% 30.00 15,120.00 46.15%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.47 3,411.15 - - 0.00% 0.47 3,411.15 47.12% 0.53 3,828.85 52.88%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 12.69 10,576.92 3.46 2,884.62 11.54% 16.15 13,461.54 53.85% 13.85 11,538.46 46.15%

Costo Directo 1,228,046.82 761,126.61 93,400.64 854,527.24 373,519.57


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 761,126.61 93,400.64 854,527.24 373,519.57

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 -14,520.00 -1,400.00 -15,920.00 0.00
Descuento por materiales 0.00 -2,729.16 0.00 -2,729.16 0.00
Descuento por EPPS 0.00 0.00 0.00 0.00
SUBTOTAL 1,228,046.82 743,877.44 92,000.64 835,878.08 373,519.57
0.00
SANCIONES 0.00
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 743,877.44 92,000.64 835,878.08 373,519.57
0.00
IGV 18.00% 221,048.43 133,897.94 16,560.11 150,458.05 67,233.52
Total Factura S/. 1,449,095.24 877,775.38 108,560.75 986,336.14 440,753.09
0.00
Retencin de Fondo de Garanta
5.00% 122,804.68 62,110.60 4,670.03 66,780.63 56,024.05
Total a Pagar S/. 1,326,290.56 815,664.78 103,890.72 919,555.50 384,729.04

Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 09 al 19.05.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2 85,073.96 - -5,140.00 - 79,933.96 14,388.11 94,322.07 8,507.40
VALORIZACION 3 82,450.93 - -1,680.00 - 80,770.93 14,538.77 95,309.70 8,245.09
VALORIZACION 4 123,962.47 - -2,100.00 - 121,862.47 21,935.25 143,797.72 12,396.25
VALORIZACION 5 93,306.66 - -4,129.16 - 89,177.49 16,051.95 105,229.44 9,330.67
VALORIZACION 6 93,393.34 - -1,400.00 - 91,993.34 16,558.80 108,552.15 4,669.67
VALORIZACION 7 93,346.70 - -1,400.00 - 91,946.70 16,550.41 108,497.11 4,667.34
VALORIZACION 8 93,301.16 - -1,400.00 - 91,901.16 16,542.21 108,443.37 4,665.06
VALORIZACION 9 93,400.64 - -1,400.00 - 92,000.64 16,560.11 108,560.75 4,670.03

ACUMULADO 854,527.24 - -18,649.16 - 835,878.08 150,458.05 986,336.14 66,780.63

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


VALORIZACION No. 10 al 01.06.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 819,549.32
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 342,633.49
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 854,527.24 143,953.21 11.72% 998,480.45 81.31% 229,566.36 18.69%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 8,311.12 278,422.66 1,383.85 46,359.10 11.83% 9,694.98 324,781.76 82.88% 2,002.96 67,099.09 17.12%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 275.12 9,629.05 81.02 2,835.79 17.26% 356.14 12,464.83 75.87% 113.28 3,964.90 24.13%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 186.76 8,030.68 20.76 892.68 8.64% 207.52 8,923.36 86.33% 32.87 1,413.41 13.67%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 6,179.72 222,469.88 982.73 35,378.30 11.20% 7,162.45 257,848.18 81.64% 1,610.70 57,985.22 18.36%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 4,202.84 16,811.35 442.40 1,769.62 7.69% 4,645.24 18,580.96 80.77% 1,106.01 4,424.04 19.23%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 4,522.92 117,595.81 463.89 12,061.11 7.69% 4,986.80 129,656.91 82.69% 1,043.75 27,137.49 17.31%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 4,715.76 165,051.56 1,060.76 37,126.54 15.07% 5,776.52 202,178.10 82.06% 1,262.46 44,186.20 17.94%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 11.63 465.23 2.49 99.69 11.54% 14.12 564.92 65.38% 7.48 299.08 34.62%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DESTENS ml 65.00 504.00 32,760.00 35.00 17,640.00 7.50 3,780.00 11.54% 42.50 21,420.00 65.38% 22.50 11,340.00 34.62%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.47 3,411.15 0.11 765.77 10.58% 0.58 4,176.92 57.69% 0.42 3,063.08 42.31%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 16.15 13,461.54 3.46 2,884.62 11.54% 19.62 16,346.15 65.38% 10.38 8,653.85 34.62%

Costo Directo 1,228,046.82 854,527.24 143,953.21 998,480.45 229,566.36


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 854,527.24 143,953.21 998,480.45 229,566.36

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 -15,920.00 -1,400.00 -17,320.00 0.00
Descuento por materiales 0.00 -2,729.16 0.00 -2,729.16 0.00
Descuento por EPPS 0.00 0.00 0.00 0.00
SUBTOTAL 1,228,046.82 835,878.08 142,553.21 978,431.29 229,566.36
0.00
SANCIONES 0.00
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 835,878.08 142,553.21 978,431.29 229,566.36
0.00
IGV 18.00% 221,048.43 150,458.05 25,659.58 176,117.63 41,321.95
Total Factura S/. 1,449,095.24 986,336.14 168,212.79 1,154,548.92 270,888.31
0.00
Retencin de Fondo de Garanta
5.00% 122,804.68 66,780.63 7,197.66 73,978.29 48,826.39
Total a Pagar S/. 1,326,290.56 919,555.50 161,015.12 1,080,570.63 222,061.92

11478.3181214513
Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 10 al 01.06.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2 85,073.96 - -5,140.00 - 79,933.96 14,388.11 94,322.07 8,507.40
VALORIZACION 3 82,450.93 - -1,680.00 - 80,770.93 14,538.77 95,309.70 8,245.09
VALORIZACION 4 123,962.47 - -2,100.00 - 121,862.47 21,935.25 143,797.72 12,396.25
VALORIZACION 5 93,306.66 - -4,129.16 - 89,177.49 16,051.95 105,229.44 9,330.67
VALORIZACION 6 93,393.34 - -1,400.00 - 91,993.34 16,558.80 108,552.15 4,669.67
VALORIZACION 7 93,346.70 - -1,400.00 - 91,946.70 16,550.41 108,497.11 4,667.34
VALORIZACION 8 93,301.16 - -1,400.00 - 91,901.16 16,542.21 108,443.37 4,665.06
VALORIZACION 9 93,400.64 - -1,400.00 - 92,000.64 16,560.11 108,560.75 4,670.03
VALORIZACION 10 143,953.21 - -1,400.00 - 142,553.21 25,659.58 168,212.79 7,197.66

ACUMULADO 998,480.45 - -20,049.16 - 978,431.29 176,117.63 1,154,548.92 73,978.29

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


VALORIZACION No. 11 al 15.06.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 882,018.91
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 280,163.90
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 924,526.91 70,356.39 5.73% 994,883.31 81.01% 233,163.51 18.99%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 8,943.64 299,611.84 527.09 17,657.66 4.51% 9,470.73 317,269.50 80.96% 2,227.20 74,611.35 19.04%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 275.12 9,629.05 80.92 2,832.07 17.24% 356.03 12,461.12 75.84% 113.39 3,968.62 24.16%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 195.41 8,402.63 10.38 446.34 4.32% 205.79 8,848.97 85.61% 34.60 1,487.80 14.39%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 6,743.46 242,764.70 402.68 14,496.31 4.59% 7,146.14 257,261.01 81.45% 1,627.01 58,572.39 18.55%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 4,534.64 18,138.56 331.80 1,327.21 5.77% 4,866.44 19,465.77 84.62% 884.81 3,539.23 15.38%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 4,754.86 123,626.36 347.92 9,045.83 5.77% 5,102.78 132,672.19 84.62% 927.78 24,122.22 15.38%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 5,094.50 178,307.42 378.74 13,255.86 5.38% 5,473.24 191,563.28 77.76% 1,565.74 54,801.02 22.24%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 14.12 564.92 3.74 149.54 17.31% 17.86 714.46 82.69% 3.74 149.54 17.31%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DESTENS ml 65.00 504.00 32,760.00 42.50 21,420.00 11.25 5,670.00 17.31% 53.75 27,090.00 82.69% 11.25 5,670.00 17.31%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.58 4,176.92 0.16 1,148.65 15.87% 0.74 5,325.58 73.56% 0.26 1,914.42 26.44%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 19.62 16,346.15 5.19 4,326.92 17.31% 24.81 20,673.08 82.69% 5.19 4,326.92 17.31%

Costo Directo 1,228,046.82 924,526.91 70,356.39 994,883.31 233,163.51


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 924,526.91 70,356.39 994,883.31 233,163.51

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 -17,320.00 -1,400.00 -18,720.00 0.00
Descuento por materiales 0.00 -2,729.16 -4,000.00 -6,729.16 0.00
Descuento por EPPS 0.00 0.00 0.00 0.00
SUBTOTAL 1,228,046.82 978,431.29 64,956.39 969,434.14 233,163.51
0.00
SANCIONES 0.00
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 978,431.29 64,956.39 969,434.14 233,163.51
0.00
IGV 18.00% 221,048.43 176,117.63 11,692.15 174,498.15 41,969.43
Total Factura S/. 1,449,095.24 1,154,548.92 76,648.54 1,143,932.29 275,132.94
0.00
Retencin de Fondo de Garanta
5.00% 122,804.68 73,978.29 3,517.82 77,496.11 45,308.57
Total a Pagar S/. 1,326,290.56 1,080,570.63 73,130.72 1,066,436.18 229,824.37

11658.1754159945
Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 11 al 15.06.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2 85,073.96 - -5,140.00 - 79,933.96 14,388.11 94,322.07 8,507.40
VALORIZACION 3 82,450.93 - -1,680.00 - 80,770.93 14,538.77 95,309.70 8,245.09
VALORIZACION 4 123,962.47 - -2,100.00 - 121,862.47 21,935.25 143,797.72 12,396.25
VALORIZACION 5 93,306.66 - -4,129.16 - 89,177.49 16,051.95 105,229.44 9,330.67
VALORIZACION 6 93,393.34 - -1,400.00 - 91,993.34 16,558.80 108,552.15 4,669.67
VALORIZACION 7 93,346.70 - -1,400.00 - 91,946.70 16,550.41 108,497.11 4,667.34
VALORIZACION 8 93,301.16 - -1,400.00 - 91,901.16 16,542.21 108,443.37 4,665.06
VALORIZACION 9 93,400.64 - -1,400.00 - 92,000.64 16,560.11 108,560.75 4,670.03
VALORIZACION 10 69,999.67 - -1,400.00 - 68,599.67 12,347.94 80,947.61 7,197.66
VALORIZACION 11 70,356.39 - -5,400.00 - 64,956.39 11,692.15 76,648.54 3,517.82

ACUMULADO 994,883.31 - -25,449.16 - 969,434.14 174,498.15 1,143,932.29 77,496.11

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


VALORIZACION No. 12 al 30.06.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 941,080.19
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 221,102.62
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 994,883.31 92,209.57 7.51% 1,087,092.88 88.52% 140,953.94 11.48%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 9,470.73 317,269.50 843.35 28,252.25 7.21% 10,314.08 345,521.75 88.17% 1,383.85 46,359.10 11.83%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 356.03 12,461.12 32.37 1,132.83 6.89% 388.40 13,593.95 82.74% 81.02 2,835.79 17.26%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 205.79 8,848.97 13.84 595.12 5.76% 219.63 9,444.09 91.36% 20.76 892.68 8.64%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 7,146.14 257,261.01 644.28 23,194.09 7.34% 7,790.42 280,455.10 88.80% 982.73 35,378.30 11.20%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 4,866.44 19,465.77 442.40 1,769.62 7.69% 5,308.85 21,235.38 92.31% 442.40 1,769.62 7.69%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 5,102.78 132,672.19 463.89 12,061.11 7.69% 5,566.67 144,733.30 92.31% 463.89 12,061.11 7.69%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 5,473.24 191,563.28 504.99 17,674.48 7.17% 5,978.22 209,237.76 84.93% 1,060.76 37,126.54 15.07%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 17.86 714.46 2.49 99.69 11.54% 20.35 814.15 94.23% 1.25 49.85 5.77%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DESTENS ml 65.00 504.00 32,760.00 53.75 27,090.00 7.50 3,780.00 11.54% 61.25 30,870.00 94.23% 3.75 1,890.00 5.77%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.74 5,325.58 0.11 765.77 10.58% 0.84 6,091.35 84.13% 0.16 1,148.65 15.87%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 24.81 20,673.08 3.46 2,884.62 11.54% 28.27 23,557.69 94.23% 1.73 1,442.31 5.77%

Costo Directo 1,228,046.82 994,883.31 92,209.57 1,087,092.88 140,953.94


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 994,883.31 92,209.57 1,087,092.88 140,953.94

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 -18,720.00 0.00 -18,720.00 0.00
Descuento por materiales 0.00 -6,729.16 0.00 -6,729.16 0.00
Descuento por Daos a terceros 0.00 0.00 -2,166.00 -2,166.00
SUBTOTAL 1,228,046.82 969,434.14 90,043.57 1,059,477.71 140,953.94
0.00
SANCIONES 0.00
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 969,434.14 90,043.57 1,059,477.71 140,953.94
0.00
IGV 18.00% 221,048.43 174,498.15 16,207.84 190,705.99 25,371.71
Total Factura S/. 1,449,095.24 1,143,932.29 106,251.41 1,250,183.70 166,325.65
0.00
Retencin de Fondo de Garanta
5.00% 122,804.68 77,496.11 4,610.48 82,106.59 40,698.09
Total a Pagar S/. 1,326,290.56 1,066,436.18 101,640.93 1,168,077.11 125,627.56

7047.6969347017
Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 12 al 30.06.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2 85,073.96 - -5,140.00 - 79,933.96 14,388.11 94,322.07 8,507.40
VALORIZACION 3 82,450.93 - -1,680.00 - 80,770.93 14,538.77 95,309.70 8,245.09
VALORIZACION 4 123,962.47 - -2,100.00 - 121,862.47 21,935.25 143,797.72 12,396.25
VALORIZACION 5 93,306.66 - -4,129.16 - 89,177.49 16,051.95 105,229.44 9,330.67
VALORIZACION 6 93,393.34 - -1,400.00 - 91,993.34 16,558.80 108,552.15 4,669.67
VALORIZACION 7 93,346.70 - -1,400.00 - 91,946.70 16,550.41 108,497.11 4,667.34
VALORIZACION 8 93,301.16 - -1,400.00 - 91,901.16 16,542.21 108,443.37 4,665.06
VALORIZACION 9 93,400.64 - -1,400.00 - 92,000.64 16,560.11 108,560.75 4,670.03
VALORIZACION 10 69,999.67 - -1,400.00 - 68,599.67 12,347.94 80,947.61 7,197.66
VALORIZACION 11 70,356.39 -5,400.00 - 64,956.39 11,692.15 76,648.54 3,517.82
VALORIZACION 12 92,209.57 - -2,166.00 - 90,043.57 16,207.84 106,251.41 4,610.48

ACUMULADO 1,087,092.88 - -27,615.16 - 1,059,477.71 190,705.99 1,250,183.70 82,106.59

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


VALORIZACION No. 13 al 15.07.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 1,025,759.68
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 136,423.13
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 1,087,092.88 92,471.87 7.53% 1,179,564.74 96.05% 48,482.07 3.95%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 10,314.08 345,521.75 978.48 32,778.96 8.36% 11,292.56 378,300.71 96.53% 405.38 13,580.14 3.47%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 388.40 13,593.95 56.69 1,984.31 12.08% 445.09 15,578.26 94.82% 24.33 851.48 5.18%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 219.63 9,444.09 17.30 743.90 7.20% 236.93 10,187.99 98.56% 3.46 148.78 1.44%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 7,790.42 280,455.10 644.28 23,194.09 7.34% 8,434.70 303,649.19 96.14% 338.45 12,184.21 3.86%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 5,308.85 21,235.38 442.40 1,769.62 7.69% 5,751.25 23,005.00 100.00% - - 0.00%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 5,566.67 144,733.30 463.89 12,061.11 7.69% 6,030.55 156,794.41 100.00% - - 0.00%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 5,978.22 209,237.76 504.99 17,674.48 7.17% 6,483.21 226,912.24 92.10% 555.77 19,452.06 7.90%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 20.35 814.15 0.62 24.92 2.88% 20.98 839.08 97.12% 0.62 24.92 2.88%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DESTENS ml 65.00 504.00 32,760.00 61.25 30,870.00 1.88 945.00 2.88% 63.13 31,815.00 97.12% 1.88 945.00 2.88%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.84 6,091.35 0.08 574.33 7.93% 0.92 6,665.67 92.07% 0.08 574.33 7.93%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 28.27 23,557.69 0.87 721.15 2.88% 29.13 24,278.85 97.12% 0.87 721.15 2.88%
-

Costo Directo 1,228,046.82 1,087,092.88 92,471.87 1,179,564.74 48,482.07


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 1,087,092.88 92,471.87 1,179,564.74 48,482.07

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 -18,720.00 0.00 -18,720.00 0.00
Descuento por materiales 0.00 -6,729.16 0.00 -6,729.16 0.00
Descuento por Daos a terceros 0.00 -2,166.00 -2,213.69 -4,379.69
SUBTOTAL 1,228,046.82 1,059,477.71 90,258.17 1,149,735.89 48,482.07
0.00
SANCIONES 0.00
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 1,059,477.71 90,258.17 1,149,735.89 48,482.07
0.00
IGV 18.00% 221,048.43 190,705.99 16,246.47 206,952.46 8,726.77
Total Factura S/. 1,449,095.24 1,250,183.70 106,504.65 1,356,688.35 57,208.84
0.00
Retencin de Fondo de Garanta
5.00% 122,804.68 82,106.59 4,623.59 86,730.18 36,074.50
Total a Pagar S/. 1,326,290.56 1,168,077.11 101,881.05 1,269,958.16 21,134.35

2424.1035270929
Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 13 al 15.07.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2 85,073.96 - -5,140.00 - 79,933.96 14,388.11 94,322.07 8,507.40
VALORIZACION 3 82,450.93 - -1,680.00 - 80,770.93 14,538.77 95,309.70 8,245.09
VALORIZACION 4 123,962.47 - -2,100.00 - 121,862.47 21,935.25 143,797.72 12,396.25
VALORIZACION 5 93,306.66 - -4,129.16 - 89,177.49 16,051.95 105,229.44 9,330.67
VALORIZACION 6 93,393.34 - -1,400.00 - 91,993.34 16,558.80 108,552.15 4,669.67
VALORIZACION 7 93,346.70 - -1,400.00 - 91,946.70 16,550.41 108,497.11 4,667.34
VALORIZACION 8 93,301.16 - -1,400.00 - 91,901.16 16,542.21 108,443.37 4,665.06
VALORIZACION 9 93,400.64 - -1,400.00 - 92,000.64 16,560.11 108,560.75 4,670.03
VALORIZACION 10 69,999.67 - -1,400.00 - 68,599.67 12,347.94 80,947.61 7,197.66
VALORIZACION 11 70,356.39 -5,400.00 - 64,956.39 11,692.15 76,648.54 3,517.82
VALORIZACION 12 92,209.57 - -2,166.00 - 90,043.57 16,207.84 106,251.41 4,610.48
VALORIZACION 13 92,471.87 - -2,213.69 - 90,258.17 16,246.47 106,504.65 4,623.59

ACUMULADO 1,179,564.74 - -29,828.86 - 1,149,735.89 206,952.46 1,356,688.35 86,730.18

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


VALORIZACION No. 14 al 25.07.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 1,115,966.15
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 46,216.67
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 1,179,564.74 40,414.08 3.29% 1,219,978.83 99.34% 8,067.99 0.66%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 11,292.56 378,300.71 405.38 13,580.14 3.47% 11,697.94 391,880.85 100.00% - - 0.00%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 445.09 15,578.26 24.33 851.48 5.18% 469.42 16,429.74 100.00% - - 0.00%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 236.93 10,187.99 3.46 148.78 1.44% 240.39 10,336.77 100.00% - - 0.00%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 8,434.70 303,649.19 338.45 12,184.21 3.86% 8,773.15 315,833.40 100.00% - - 0.00%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 5,751.25 23,005.00 - - 0.00% 5,751.25 23,005.00 100.00% - - 0.00%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 6,030.55 156,794.41 - - 0.00% 6,030.55 156,794.41 100.00% - - 0.00%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 6,483.21 226,912.24 333.46 11,671.23 4.74% 6,816.67 238,583.48 96.84% 222.31 7,780.82 3.16%
01.02.02.08 ESCALERA - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 20.98 839.08 0.62 24.92 2.88% 21.60 864.00 100.00% - - 0.00%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DESTENS ml 65.00 504.00 32,760.00 63.13 31,815.00 1.88 945.00 2.88% 65.00 32,760.00 100.00% - - 0.00%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.92 6,665.67 0.04 287.16 3.97% 0.96 6,952.84 96.03% 0.04 287.16 3.97%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 29.13 24,278.85 0.87 721.15 2.88% 30.00 25,000.00 100.00% - - 0.00%
-

Costo Directo 1,228,046.82 1,179,564.74 40,414.08 1,219,978.83 8,067.99


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 1,179,564.74 40,414.08 1,219,978.83 8,067.99

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 -18,720.00 0.00 -18,720.00 0.00
Descuento por materiales 0.00 -6,729.16 0.00 -6,729.16 0.00
Descuento por Daos a terceros 0.00 -4,379.69 0.00 -4,379.69
SUBTOTAL 1,228,046.82 1,149,735.89 40,414.08 1,190,149.97 8,067.99
0.00
SANCIONES 0.00
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 1,149,735.89 40,414.08 1,190,149.97 8,067.99
0.00
IGV 18.00% 221,048.43 206,952.46 7,274.54 214,227.00 1,452.24
Total Factura S/. 1,449,095.24 1,356,688.35 47,688.62 1,404,376.97 9,520.22
0.00
Retencin de Fondo de Garanta
5.00% 122,804.68 86,730.18 2,020.70 88,750.89 34,053.79
Total a Pagar S/. 1,326,290.56 1,269,958.16 45,667.91 1,315,626.08 -24,533.57

403.3993306251
Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 14 al 25.07.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2 85,073.96 - -5,140.00 - 79,933.96 14,388.11 94,322.07 8,507.40
VALORIZACION 3 82,450.93 - -1,680.00 - 80,770.93 14,538.77 95,309.70 8,245.09
VALORIZACION 4 123,962.47 - -2,100.00 - 121,862.47 21,935.25 143,797.72 12,396.25
VALORIZACION 5 93,306.66 - -4,129.16 - 89,177.49 16,051.95 105,229.44 9,330.67
VALORIZACION 6 93,393.34 - -1,400.00 - 91,993.34 16,558.80 108,552.15 4,669.67
VALORIZACION 7 93,346.70 - -1,400.00 - 91,946.70 16,550.41 108,497.11 4,667.34
VALORIZACION 8 93,301.16 - -1,400.00 - 91,901.16 16,542.21 108,443.37 4,665.06
VALORIZACION 9 93,400.64 - -1,400.00 - 92,000.64 16,560.11 108,560.75 4,670.03
VALORIZACION 10 69,999.67 - -1,400.00 - 68,599.67 12,347.94 80,947.61 7,197.66
VALORIZACION 11 70,356.39 -5,400.00 - 64,956.39 11,692.15 76,648.54 3,517.82
VALORIZACION 12 92,209.57 - -2,166.00 - 90,043.57 16,207.84 106,251.41 4,610.48
VALORIZACION 13 92,471.87 - -2,213.69 - 90,258.17 16,246.47 106,504.65 4,623.59
VALORIZACION 14 40,414.08 - - - 40,414.08 7,274.54 47,688.62 2,020.70

ACUMULADO 1,219,978.83 - -29,828.86 - 1,190,149.97 214,227.00 1,404,376.97 88,750.89

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


VALORIZACION No. 15 al 18.08.2017 CD IGV TOTAL

PROPIETARIO : C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA : TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA : JCC GG , UTILIDAD Y VARIOS S/. 0.00
RUBRO: ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00 1,154,401.99
SUBCONTRATO : ENCOFRADO FONDO DE GARANTIA 10 % S/. 122,804.68 S/. 0.00 S/. 122,804.68 1,162,182.82
MODALIDAD : SUMA ALZADA 7,780.82
MONEDA : NUEVOS SOLES S/.
PRESUPUESTO ACUMULADO ANTERIOR PERIODO ACTUAL ACUMULADO ACTUAL SALDO POR VALORIZAR
P.UNIT. TOTAL MONTO MONTO MONTO MONTO
CODIGO DESCRIPCION UNID CANT CANT CANT % CANT % CANT %
S/. S/. S/. S/. S/. 0
1,228,046.82 1,219,978.83 8,067.99 0.66% 1,228,046.82 100.00% 0.00 0.00%
01.02.02 CONCRETO ARMADO
01.02.02.03 PLACAS
01.02.02.03.05 ENCOFRADO Y DESENCOFRADO DE PLACAS m2 11,697.94 33.50 391,880.85 11,697.94 391,880.85 - 0.00% 11,697.94 391,880.85 100.00% - - 0.00%
01.02.02.05 COLUMNAS - - -
01.02.02.05.05 ENCOFRADO Y DESENCOFRADO DE COLUMNAS m2 469.42 35.00 16,429.74 469.42 16,429.74 - 0.00% 469.42 16,429.74 100.00% - - 0.00%
01.02.02.05.06 ENCOFRADO Y DESENCOFRADO PARA COLUMNA CIRCULAR m2 240.39 43.00 10,336.77 240.39 10,336.77 - 0.00% 240.39 10,336.77 100.00% - - 0.00%
01.02.02.06 VIGAS - - -
01.02.02.06.03 ENCOFRADO Y DESENCOFRADO DE VIGAS m2 8,773.15 36.00 315,833.40 8,773.15 315,833.40 - 0.00% 8,773.15 315,833.40 100.00% - - 0.00%
01.02.02.07 LOSAS ALIGERADAS Y MACIZAS - - -
01.02.02.07.03 COLOCACION PRELOSA DE 20 cm (420 Kg/Cm2) m2 309.97 4.00 1,239.87 309.97 1,239.87 - 0.00% 309.97 1,239.87 100.00% - - 0.00%
01.02.02.07.04 COLOCACION PRELOSA DE 20 cm (350 Kg/Cm2) m2 5,751.25 4.00 23,005.00 5,751.25 23,005.00 - 0.00% 5,751.25 23,005.00 100.00% - - 0.00%
01.02.02.07.06 COLOCACION PRELOSA DE 27.5 cm, (420 Kg/cm2) m2 74.62 4.00 298.48 74.62 298.48 - 0.00% 74.62 298.48 100.00% - - 0.00%
01.02.02.07.08 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA m2 6,030.55 26.00 156,794.41 6,030.55 156,794.41 - 0.00% 6,030.55 156,794.41 100.00% - - 0.00%
01.02.02.07.09 ENCOFRADO Y DESENCOFRADO LOSA MACIZA m2 7,038.98 35.00 246,364.30 6,816.67 238,583.48 222.31 7,780.82 3.16% 7,038.98 246,364.30 100.00% - - 0.00%
01.02.02.08 ESCALERA - - - - - - -
01.02.02.08.03 ENCOFRADO Y DESENCOFRADO DE ESCALERA m2 21.60 40.00 864.00 21.60 864.00 - - 0.00% 21.60 864.00 100.00% - - 0.00%
ESCUADRAS Y PLATAFORMAS - - -
01.02.02.09.01 PLATAFORMAS INSTALACION Y DESINSTALACION DE MALLAS ANTICAIDAS, TENSADO Y DESTENS ml 65.00 504.00 32,760.00 65.00 32,760.00 - - 0.00% 65.00 32,760.00 100.00% - - 0.00%
01.02.02.09.02 ARMADO Y COLOCACION DE CAJUELAS PARA HALFEN glb 1.00 7,240.00 7,240.00 0.96 6,952.84 0.04 287.16 3.97% 1.00 7,240.00 100.00% - - 0.00%
01.02.02.09.03 INSTALACION DE PLATAFORMAS PARA ELEVADOR DE CARGA und 30.00 833.33 25,000.00 30.00 25,000.00 - 0.00% 30.00 25,000.00 100.00% - - 0.00%
-

Costo Directo 1,228,046.82 1,219,978.83 8,067.99 1,228,046.82 0.00


Gastos Generales 0.00% 0.00 0.00 0.00 0.00 0.00
Valorizacin Bruta 1,228,046.82 1,219,978.83 8,067.99 1,228,046.82 0.00

Amortizacin del adelanto en efectivo 0.00% 0.00 0.00 0.00 0.00


Descuento por alquiler de grua (Descargas de Acero y Encofrado) 0.00 0.00 0.00 0.00 0.00
Descuento por mano de obra 0.00 -18,720.00 0.00 -18,720.00 0.00
Descuento por materiales 0.00 -6,729.16 0.00 -6,729.16 0.00
Descuento por Daos a terceros 0.00 -4,379.69 0.00 -4,379.69
SUBTOTAL 1,228,046.82 1,190,149.97 8,067.99 1,198,217.96 0.00
0.00
SANCIONES 0.00
Por temas de Calidad 0.00 0.00 0.00 0.00
Por temas de Seguridad 0.00 0.00 0.00 0.00
SUB TOTAL 1,228,046.82 1,190,149.97 8,067.99 1,198,217.96 0.00
0.00
IGV 18.00% 221,048.43 214,227.00 1,452.24 215,679.23 0.00
Total Factura S/. 1,449,095.24 1,404,376.97 9,520.22 1,413,897.19 0.00
0.00
Retencin de Fondo de Garanta
5.00% 122,804.68 88,750.89 403.40 89,154.29 0.00
Total a Pagar S/. 1,326,290.56 1,315,626.08 9,116.82 1,324,742.90 0.00

0
Vo. Bo. OFICINA TECNICA Vo. Bo. RESIDENTE OBRA

ORIGINAL : ADMINISTRACION / CONTABILIDAD


COPIAS : OFICINA TECNICA
SUBCONTRATISTA

NOTA : ADMINISTRACION DEBERA CHEQUEAR ALMACEN/PLANILLAS/ADELANTOS EN EFECTIVO/ETC. PARA DESCUENTOS AL SUBCONTRATISTA

AQU TERMINA LA PRESENTACION DE LA VALORIZACION A APROBAR


C&J CONSTRUCTORES y CONTRATISTAS SAC.

VALORIZACION No. 15 al 18.08.2017 CD IGV TOTAL

PROPIETARIO :C Y J CONSTRUCTORES Y CONTRATISTAS PRESUPUESTO S/. 1,228,046.82 S/. 221,048.43 S/. 1,449,095.24
OBRA :TORRE FORUM ETAPA II COSTO DIRECTO S/. 1,228,046.82
CONTRATISTA :JCC GG Y UTILIDAD S/. 0.00
RUBRO:ENCOFRADO ADELANTO S/. 0.00 S/. 0.00 S/. 0.00
SUBCONTRATO :ENCOFRADO FONDO DE GARANTIA 10% S/. 122,804.68 S/. 0.00 S/. 122,804.68
MODALIDAD :SUMA ALZADA
MONEDA :NUEVOS SOLES S/.

VALORIZACION CD AMORTIZACION DESCUENTOS SANCIONES SUBTOTAL IGV FACTURA FONDO GARANTIA


CONCEPTO
S/. S/. S/. S/. S/. S/. S/. S/.
VALORIZACION 1 96,291.38 - - - 96,291.38 17,332.45 113,623.83 9,629.14
VALORIZACION 2 85,073.96 - -5,140.00 - 79,933.96 14,388.11 94,322.07 8,507.40
VALORIZACION 3 82,450.93 - -1,680.00 - 80,770.93 14,538.77 95,309.70 8,245.09
VALORIZACION 4 123,962.47 - -2,100.00 - 121,862.47 21,935.25 143,797.72 12,396.25
VALORIZACION 5 93,306.66 - -4,129.16 - 89,177.49 16,051.95 105,229.44 9,330.67
VALORIZACION 6 93,393.34 - -1,400.00 - 91,993.34 16,558.80 108,552.15 4,669.67
VALORIZACION 7 93,346.70 - -1,400.00 - 91,946.70 16,550.41 108,497.11 4,667.34
VALORIZACION 8 93,301.16 - -1,400.00 - 91,901.16 16,542.21 108,443.37 4,665.06
VALORIZACION 9 93,400.64 - -1,400.00 - 92,000.64 16,560.11 108,560.75 4,670.03
VALORIZACION 10 69,999.67 - -1,400.00 - 68,599.67 12,347.94 80,947.61 7,197.66
VALORIZACION 11 70,356.39 -5,400.00 - 64,956.39 11,692.15 76,648.54 3,517.82
VALORIZACION 12 92,209.57 - -2,166.00 - 90,043.57 16,207.84 106,251.41 4,610.48
VALORIZACION 13 92,471.87 - -2,213.69 - 90,258.17 16,246.47 106,504.65 4,623.59
VALORIZACION 14 40,414.08 - - - 40,414.08 7,274.54 47,688.62 2,020.70
VALORIZACION 15 8,067.99 - - - 8,067.99 1,452.24 9,520.22 403.40

ACUMULADO 1,228,046.82 - -29,828.86 - 1,198,217.96 215,679.23 1,413,897.19 89,154.29

FORMATO PARA CRUZAR INFORMACION CON CONTABILIDAD Y ESTADOS DE CUENTAS.


Columnas Columna circular Placas Vigas Losa Aligerada Losa Maciza Prelosa
PISO 4 16.18 10.75 432.31 327.47 231.94 245.69 221.20
PISO 5 16.18 10.75 432.31 327.47 231.94 245.69 221.20
PISO 6 16.18 10.75 432.31 327.47 231.94 245.69 221.20
PISO 7 16.18 10.75 432.31 327.47 231.94 245.69 221.20
PISO 8 16.18 10.75 432.31 327.47 231.94 245.69 221.20
PISO 9 16.18 10.75 432.31 327.47 231.94 245.69 221.20
PISO 10 16.18 10.75 432.31 327.47 231.94 245.69 221.20
PISO 11 16.18 10.75 432.31 327.47 231.94 245.69 221.20
PISO 12 16.18 10.75 432.31 327.47 231.94 245.69 221.20
PISO 13 16.18 10.75 432.31 327.47 231.94 245.69 221.20
PISO 14 16.18 10.75 432.31 327.47 231.94 245.69 221.20
PISO 15 16.18 10.75 432.31 327.47 231.94 245.69 221.20
PISO 16 16.18 10.75 432.31 319.29 231.94 252.49 221.20
PISO 17 16.18 10.75 452.22 320.12 231.94 252.49 221.20
PISO 18 16.18 6.92 430.02 322.14 231.94 252.49 221.20
PISO 19 16.18 6.92 430.02 322.14 231.94 252.49 221.20
PISO 20 16.18 6.92 430.02 322.14 231.94 252.49 221.20
PISO 21 16.18 6.92 421.68 322.14 231.94 252.49 221.20
PISO 22 16.18 6.92 421.68 322.14 231.94 252.49 221.20
PISO 23 16.18 6.92 421.68 322.14 231.94 252.49 221.20
PISO 24 16.18 6.92 421.68 322.14 231.94 252.49 221.20
PISO 25 16.18 6.92 421.68 322.14 231.94 252.49 221.20
PISO 26 16.18 6.92 421.68 322.14 231.94 252.49 221.20
PISO 27 16.18 6.92 421.68 322.14 231.94 252.49 221.20
PISO 28 16.18 6.92 421.68 322.14 231.94 252.49 221.20
PISO 29 16.18 6.92 421.68 322.14 231.94 252.49 221.20
PISO 30 + AZOTEA 48.66 6.92 540.50 338.45 0.00 555.77 0.00

Acumulado 469.42 240.39 11,697.94 8,773.15 6,030.55 7,038.98 5,751.25


Valorizado val 12 388.40 219.63 10,314.08 7,790.42 5,566.67 5,978.22 5,308.85

Valorizacion 13 81.02 20.76 1,383.85 982.73 463.89 1,060.76 442.40

275.11562
195.41
costo por piso
metrado un piso 566.41 462.04 14,482.54 11,494.57 6,030.55 8,837.24 884.81 42,758.17
p.u 35.00 43.00 33.50 36.00 26.00 35.00 4.00
FECHA FACTURACION
8-Apr 22-Apr 6-May 20-May 3-Jun 17-Jun 1-Jul 15-Jul
SALDO VAL. N 06 VAL. N07 VAL. N 08 VAL. N 09 VAL. N 10 VAL. N 11 VAL. N 12 VAL. N 13
746,961.41 93,370.18 - - - - - -
653,591.24 93,370.18
560,221.06 93,370.18
466,850.88 93,370.18
373,480.71 93,370.18
280,110.53 93,370.18
186,740.35 93,370.18
93,370.18 93,370.18

FECHA PAGO
15-Apr 29-Apr 13-May 27-May 10-Jun 24-Jun 8-Jul 22-Jul
PISO PISO 16 PISO 18 PISO 20 PISO 22 PISO 24 PISO 26 PISO 28 PISO 29
SALDO VAL. N 06 VAL. N07 VAL. N 08 VAL. N 09 VAL. N 10 VAL. N 11 VAL. N 12 VAL. N 13
746,961.41 93,370.18 - - - - - -
653,591.24 93,370.18
560,221.06 93,370.18
466,850.88 93,370.18
373,480.71 93,370.18
280,110.53 93,370.18
186,740.35 93,370.18
93,370.18 93,370.18
Val . 13 (15.07.17)

30.06.17 Monto a descontar saldo Val 11 val 12 val 13

MATERIALES
PREVENCIONISTA (19.06.17-01.07.17)
DESCCUENTO POR DAOS A TERCEROS S/. 8,379.69 S/. 0.00 S/. -4,000.00 S/. -2,166.00 S/. -2,213.69
EQUIPOS DE PROTECCION PERSONAL S/. -

S/. -2,213.69