PRESUPUESTO

UNIDAD
ITEM DESCRIPCION
01.00.00 TRABAJO PRELIMINAR
01.01.01 LIMPIEZA DE TERRENO
01.02.00 LIMPIEZA DE TERRENO MANUAL M2
02.00.00 TRAZO, NIVELES Y REPLANTEO
02.01.00 NIVELACION, TRAZO Y REPLANTEO PRELIMINAR M2
02.02.00 NIVELACION, TRAZO Y REPLANTEO DURANTE EL TRABAJO M2
02.00.00 MOVIMIENTO DE TIERRAS
02.01.00 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL H1.50 M M3
02.02.00 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL H>1.50 M M3
02.03.00 ACARREO de material excedente
02.04.00 ELIMINACION DE ATERIAL EXCEDENTE C/EQUIPO HASTA 5KM
03.00.00 OBRAS DE CONCRETO SIMPLE
03.01.00 SOLADOS Y SUBZAPATAS
03.01.01 SOLADOS DE CONCRETO F'C=100 KG/CM2 ESPESOR =10 CM
03.01.02 SUB ZAPATA CONCRETO F'C=100 KG/CM2 50% DE PIEDRA GRANDE
03.02.00 CIMIENTO Y SOBRECIMIENTO
03.02.01 CIMIENTO CORRIDO C:H=1.8+30% DE PIEDRA GRANDE M3
03.02.02 CONCRETO FC140KG/CM2 PARA SOBFRECIMIENTOS M3
03.02.03 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO M2
03.03.00 FALSO PISO
03.03.01 FALSO PISO MEZCLA C:H1: 8 e=4. M2
04.00.00 OBRAS DE CONCRETO ARMADO
04.01.00 ZAPATAS:
04.01.01 ZAPATAS: CONCRETO F'C=210 KG/CM2 KG
TO
METRADO PRECIO S/.
UNITARIO PARCIAL
S/.

155.82

155.82
155.82

17.35
126.58
187.11
187.11

5.56
40.50

12.35
3.75
30.00

85.85

650.54
PLANILLA METRADOS

PROYECTO MEJORAMIENTO DE LA INFRAESTRUCTURA EDUCATIVA DE LA I.E. PILLONE, DISTRITO DE UB

ITEM DESCRIPCION UND.

01.00.00 LIMPIEZA DE TERRENO


01.01.00 LIMPIEZA DE TERRENO MANUAL M2

02.00.00 TRAZO, NIVELES Y REPLANTEO


02.01.00 NIVELACION, TRAZO Y REPLANTEO PRELIMINAR M2
02.02.00 NIVELACION, TRAZO Y REPLANTEO DURANTE EL TRABAJO M2

03.00.00 MOVIMIENTO DE TIERRAS


03.01.00 EXCAVACION MANULA DE ZANJAS EN TERRENO NORMAL H1.50 M M3
AULA 01, 02, 03
EJE 1 DESDE EL EJE C HASTA EL EJE F
EJE 3 DESDE EL EJE C HASTA EL EJE F
EJE F DESDE EL EJE 1 HASTA EL EJE 3
EJE E DESDE EL EJE 1 HASTA EL EJE 3
EJE D DESDE EL EJE 1 HASTA EL EJE 3
EJE C DESDE EL EJE 1 HASTA EL EJE 3
AULA 04
EJE 1 DESDEEL EJE B HASTA EL EJE A
EJE 3 DESDEEL EJE B HASTA EL EJE A
EJE B DESDEEL EJE 1 HASTA EL EJE 3
EJE B DESDEEL EJE B HASTA EL EJE A

03.02.00 EXCAVACION MANUAL DE ZANJAS EN TERRENO NORMAL H>1.50 M


AULA 1,2,3 UNIDAD
Z1 M3
Z2 M3
Z3 M3
Z4 M3
Z5 M3
Z6

AULA 4 UNIDAD
Z3 M3
Z4 M3

03.03.00 ACARREO DE MATERIAL EXCEDENTE Dprom=30m


MATERIAL TOTAL DE ESPONJAMIENTO MAS 30%

03.04.00 ELIMINACION DE MATERIAL EXCEDENTE C/EQUIPO HASTA 5KM


METRADO TOTAL DE EXCAVACIN MAS 30%

04.00.00 OBRAS DE CONCRETO SIMPLE


04.01.00 SOLADOS Y SUBZAPATAS
04.01.01 SOLADOS DE CONCRETO F'C=100 KG/CM2 ESPESOR =10 CM UNIDAD
AULA 1,2,3
Z1 M3
Z2 M3
Z3 M3
Z4 M3
Z5 M3
Z6 M3
AULA 4
Z3 M3
Z4 M3
04.01.02 SUB ZAPATA CONCRETO F'C=100 KG/CM2 50% DE PIEDRA GRANDE
AULA 1,2,3
Z1 M3
Z2 M3
Z3 M3
Z4 M3
Z5 M3
Z6 M3
AULA 4
Z3 M3
Z4 M3
04.02.00 CIMIENTO Y SOBRECIMIENTO
04.02.01 CIMIENTO CORRIDO C:H=1.8+30% DE PIEDRA GRANDE M3
AULA 01, 02, 03
EJE 1 DESDE EL EJE C HASTA EL EJE F M3
EJE 3 DESDE EL EJE C HASTA EL EJE F M3
EJE F DESDE EL EJE 1 HASTA EL EJE 3 M3
EJE E DESDE EL EJE 1 HASTA EL EJE 3 M3
EJE D DESDE EL EJE 1 HASTA EL EJE 3 M3
EJE C DESDE EL EJE 1 HASTA EL EJE 3 M3
AULA 04
EJE 1 DESDEEL EJE B HASTA EL EJE A M3
EJE 3 DESDEEL EJE B HASTA EL EJE A M3
EJE B DESDEEL EJE 1 HASTA EL EJE 3 M3
EJE B DESDEEL EJE 1 HASTA EL EJE 3 M3

04.02.02 CONCRETO FC140KG/CM2 PARA SOBRECIMIENTOS

AULAS01,02,03
EJE 1 DESDE EL EJE C HASTA EL EJE F M3
EJE 3 DESDE EL EJE C HASTA EL EJE F M3

EJE F DESDE EL EJE 1 HASTA EL EJE 3 M3


EJE E DESDE EL EJE 1 HASTA EL EJE 3 M3
EJE D DESDE EL EJE 1 HASTA EL EJE 3 M3
EJE C DESDE EL EJE 1 HASTA EL EJE 3 M3
AULA 04
EJE 1 DESDEEL EJE B HASTA EL EJE A M3
EJE 3 DESDEEL EJE B HASTA EL EJE A M3
EJE B DESDEEL EJE 1 HASTA EL EJE 3 M3

EJE B DESDEEL EJE 1 HASTA EL EJE 3 M3

04.02.03 SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO M2


AULA 01, 02, 03
EJE 1 DESDE EL EJE C HASTA EL EJE F
EJE 3 DESDE EL EJE C HASTA EL EJE F M2

EJE F DESDE EL EJE 1 HASTA EL EJE 3 M2


EJE E DESDE EL EJE 1 HASTA EL EJE 3 M2
EJE D DESDE EL EJE 1 HASTA EL EJE 3 M2
EJE C DESDE EL EJE 1 HASTA EL EJE 3 M2
AULA 04
EJE 1 DESDEEL EJE B HASTA EL EJE A M2
EJE 3 DESDEEL EJE B HASTA EL EJE A M2
EJE B DESDEEL EJE 1 HASTA EL EJE 3 M2

EJE A DESDEEL EJE 1 HASTA EL EJE 3 M2


04.03.00 FALSO PISO
04.03.01 FALSO PISO MEZCLA C:H1: 8 e=4. M2
AULA 1
AREA DE PUERTA
AULA 2
AREA DE PUERTA
AULA 3
AREA DE PUERTA
AULA 4
AREA DE PUERTA
04.00.00 OBRAS DE CONCRETO ARMADO
04.01.00 ZAPATAS:
04.01.01 ZAPATAS: CONCRETO F'C=210 KG/CM2
AULA 1,2,3
Z1 M3
Z2 M3
Z3 M3
Z4 M3
Z5 M3
Z6 M3
AULA 4
Z3 M3
Z4 M3
04.01.02 ZAPATAS: ACERO FY=4200 KG/CM2 GRADO 60
04.02.00 VIGAS DE CIMENTACION
04.02.01 VIGAS DE CIMENTACION: CONCRETO F'C=210 KG/CM M3
AULA 1,2,3
EJE 1 M3
EJE 3 M3
EJE C-F M3

AULA 4
EJE 1 M3
EJE 3 M3
EJE A-B M3
04.02.02 VIGAS DE CIMENTACION: ENCOFRADO Y DESENCOFRADO
AULA 1,2,3 (CARA EXT)
EJE 1 M3
EJE 3 M3
EJE C M3
EJE F M3
AULA 1,2,3 (CARA INT)
EJE 1 M3
EJE 3 M3
EJE C M3
EJE D M3
EJE E M3
EJE F M3

AULA 4 (CARA EXT)


EJE 1 M3
EJE 3 M3
EJE A M3
EJE B M3
AULA 4 (CARA INT)
EJE 1 M3
EJE 3 M3
EJE A M3
EJE B M3

04.02.03 VIGAS DE CIMENTACION: ACERO FY=4200 KG/CM2 GRADO 60


TRADOS

PILLONE, DISTRITO DE UBINAS, PROVINCIA SANCHEZ CERRO, MOQUEGUA

MEDIDAS
CANT PARCIAL TOTAL
LARGO(L) ANCHO(A) ALTURA(H)

21.2 7.35 155.82 155.82

LARGO(L) ANCHO(A) ALTURA(H) PARCIAL


21.2 7.35 155.82
21.2 7.35 155.82

LARGO(L) ANCHO(A) ALTURA(H) 17.35

5.95 0.5 1.1 3.2725


5.2 0.5 1.1 2.86
2.6 0.5 1.1 1.43
2.65 0.5 1.1 1.4575
2.65 0.5 1.1 1.4575
2.6 0.5 1.1 1.43

2.35 0.5 1.1 1.2925


2.35 0.5 1.1 1.2925
2.6 0.5 1.1 1.43
2.6 0.5 1.1 1.43

CANTIDAD LARGO(L) ANCHO(A) ALTURA(H) PARCIAL 126.58


2 2.15 1.8 2.5 19.35
2 2.35 1.75 2.5 20.56
4 1.15 1.15 2.5 13.23
2 1.65 1.8 2.5 14.85
1 2.45 1.8 2.5 11.03
1 2.5 1.8 2.5 11.25

CANTIDAD LARGO(L) ANCHO(A) ALTURA(H) PARCIAL


2 1.15 1.15 2.5 6.61
4 1.65 1.8 2.5 29.7

143.93 187.11

MAS 30% DE ESPONJAMIENTO 43.18


MAS 30% DE ESPONJAMIENTO 43.18

CANTIDAD LARGO(L) ANCHO(A) ALTURA(H) PARCIAL 5.06

2 2.15 1.8 0.1 0.77


2 2.35 1.75 0.1 0.82
4 1.15 1.15 0.1 0.53
2 1.65 1.8 0.1 0.59
1 2.45 1.8 0.1 0.44
1 2.5 1.8 0.1 0.45

2 1.15 1.15 0.1 0.26


4 1.65 1.8 0.1 1.19
CANTIDAD LARGO(L) ANCHO(A) ALTURA(H) PARCIAL 40.50

2 2.15 1.8 0.8 6.19


2 2.35 1.75 0.8 6.58
4 1.15 1.15 0.8 4.23
2 1.65 1.8 0.8 4.75
1 2.45 1.8 0.8 3.53
1 2.5 1.8 0.8 3.60

2 1.15 1.15 0.8 2.12


4 1.65 1.8 0.8 9.50

CANTIDAD LARGO(L) ANCHO(A) ALTURA(H) PARCIAL 12.35

8.27 0.24 1.98 0.24


8.12 0.24 1.95
4.9 0.24 1.18
4.9 0.24 1.18
4.9 0.24 1.18
4.9 0.24 1.18

2.99 0.24 0.72


2.99 0.24 0.72
4.6 0.24 1.10
4.9 0.24 1.18

CANT LARGO(L) ANCHO(A) ALTO(H) 3.75

8.27 0.25 0.3 0.62


4.82 0.25 0.3 0.36 OJO LO TOMAMOS ASI POR L
3.30 0.25 0.2 0.17 OJO LO TOMAMOS ASI POR L
4.90 0.25 0.3 0.37
4.90 0.25 0.3 0.37
4.90 0.25 0.3 0.37
4.90 0.25 0.3 0.37

2.99 0.25 0.3 0.22


2.99 0.25 0.3 0.22
3.50 0.25 0.3 0.26 OJO LO TOMAMOS ASI POR L
1.10 0.25 0.2 0.06 OJO LO TOMAMOS ASI POR L
4.90 0.25 0.3 0.37

CANT LARGO(L) ANCHO(A) ALTO(H) 30.00

2 8.27 0.3 4.96


2 4.82 0.3 2.89
2 3.30 0.2 1.32
2 4.90 0.3 2.94
2 4.90 0.3 2.94
2 4.90 0.3 2.94
2 4.90 0.3 2.94

2 2.99 0.3 1.79


2 2.99 0.3 1.79
2 3.50 0.3 2.10
2 1.10 0.2 0.44
2 4.90 0.3 2.94

CANT LARGO(L) ANCHO(A) ALTO(H) 85.85


5.45 3.9 21.26
1.1 0.25 0.28
5.45 3.9 21.26
1.1 0.25 0.28
5.45 4 21.80
1.1 0.25 0.28
5.45 3.75 20.44
1.1 0.25 0.28

CANTIDAD LARGO(L) ANCHO(A) ALTURA(H) PARCIAL 25.32

2 2.15 1.8 0.5 3.87


2 2.35 1.75 0.5 4.1125
4 1.15 1.15 0.5 2.645
2 1.65 1.8 0.5 2.97
1 2.45 1.8 0.5 2.205
1 2.5 1.8 0.5 2.25

2 1.15 1.15 0.5 1.3225


4 1.65 1.8 0.5 5.94
650.54

CANTIDAD LARGO(L) ANCHO(A) ALTURA(H) PARCIAL 14.03


12.8 0.3 0.7 2.688
12.8 0.3 0.7 2.688
4 5.45 0.3 0.7 4.578

4.25 0.3 0.7 0.8925


4.25 0.3 0.7 0.8925
2 5.45 0.3 0.7 2.289

CANTIDAD LARGO(L) ANCHO(A) ALTURA(H) PARCIAL 92.82


1 12.8 0.7 8.96
1 12.8 0.7 8.96
1 5.95 0.7 4.165
1 5.95 0.7 4.165

1 11.8 0.7 8.26


1 11.8 0.7 8.26
1 5.45 0.7 3.815
2 5.45 0.7 7.63
2 5.45 0.7 7.63
1 5.45 0.7 3.815

1 4.25 0.7 2.975


1 4.25 0.7 2.975
1 5.95 0.7 4.165
1 5.95 0.7 4.165

1 3.75 0.7 2.625


1 3.75 0.7 2.625
1 5.45 0.7 3.815
1 5.45 0.7 3.815
AREA DE CC1 (0,9*0,5)- AREA DE LA VIGA DE CIMENTACION(0,3*0,7))

OJO LO TOMAMOS ASI POR LO Q NO HAY PUERTA


OJO LO TOMAMOS ASI POR LO Q HAY PUERTA
OJO LO TOMAMOS ASI POR LO Q NO HAY PUERTA
OJO LO TOMAMOS ASI POR LO Q HAY PUERTA
Longitud N de piezas N de
ITEM Descripcion del Elemento Unitaria por elementos
(ml) elemento iguales

04.01.02 ZAPATAS: ACERO FY=4200 KG/CM2 GRADO 60


AULA 01,02,03

ACERO LONGITUDINAL Y TRANSVERSAL (Z-1)


ACERO LONGITUDINAL 1.6 10 2
ACERO TRANSVERSAL 1.95 8 2

ACERO LONGITUDINAL Y TRANSVERSAL (Z-2)


ACERO LONGITUDINAL 1.55 11 2
ACERO TRANSVERSAL 2.15 8 2

ACERO LONGITUDINAL Y TRANSVERSAL (Z-3)


ACERO LONGITUDINAL 1 5 4
ACERO TRANSVERSAL 1 5 4

ACERO LONGITUDINAL Y TRANSVERSAL (Z-4)


ACERO LONGITUDINAL 1.65 8 2
ACERO TRANSVERSAL 1.5 8 2

ACERO LONGITUDINAL Y TRANSVERSAL (Z-5)


ACERO LONGITUDINAL 1.65 12 1
ACERO TRANSVERSAL 2.3 8 1

ACERO LONGITUDINAL Y TRANSVERSAL (Z-6)


ACERO LONGITUDINAL 1.65 12 1
ACERO TRANSVERSAL 2.35 8 1

AULA 04

ACERO LONGITUDINAL Y TRANSVERSAL (Z-3)


ACERO LONGITUDINAL 1 5 2
ACERO TRANSVERSAL 1 5 2

ACERO LONGITUDINAL Y TRANSVERSAL (Z-4)


ACERO LONGITUDINAL 1.65 8 4
ACERO TRANSVERSAL 1.5 8 4

SUMATORIA TOTAL DE METRADOS


SUMATORIA TOTAL DE METRADOS
ACERO DE REFUERZO Longitud Metrado
Diametro
1/4 3/8 1/2 5/8 3/4 Parcial Parcial
" 0.25 0.56 0.99 1.55 2.24 (m) (kg)

5/8 49.6 32 49.6


5/8 48.36 31.2 48.36

5/8 52.855 34.1 52.86


5/8 53.32 34.4 53.32

5/8 31 20 31
5/8 31 20 31

5/8 40.92 26.4 40.92


5/8 37.2 24 37.2

5/8 30.69 19.8 30.69


5/8 28.52 18.4 28.52

5/8 30.69 19.8 30.69


5/8 29.14 18.8 29.14

5/8 15.5 10 15.5


5/8 15.5 10 15.5

5/8 81.84 52.8 81.84


5/8 74.4 48 74.4

650.54 650.54
650.54 650.54
METRADO
FINAL
Longitud N de piezas
ITEM Descripcion del Elemento Unitaria por
(ml) elemento

04.01.02 ZAPATAS: ACERO FY=4200 KG/CM2 GRADO 60


AULA 01,02,03
EJE 1 Y EJE 3
ACERO LONGITUDINAL Y TRANSVERSAL
ACERO LONGITUDINAL 12.8 8
12.8 4
ACERO TRANSVERSAL 1.98 74

EJE C,D,E,F
ACERO LONGITUDINAL Y TRANSVERSAL
ACERO LONGITUDINAL 5.95 8
5.95 4
ACERO TRANSVERSAL 1.98 8

ACERO LONGITUDINAL Y TRANSVERSAL (Z-3)


ACERO LONGITUDINAL 1 5
ACERO TRANSVERSAL 1 5

ACERO LONGITUDINAL Y TRANSVERSAL (Z-4)


ACERO LONGITUDINAL 1.65 8
ACERO TRANSVERSAL 1.5 8

ACERO LONGITUDINAL Y TRANSVERSAL (Z-5)


ACERO LONGITUDINAL 1.65 12
ACERO TRANSVERSAL 2.3 8

ACERO LONGITUDINAL Y TRANSVERSAL (Z-6)


ACERO LONGITUDINAL 1.65 12
ACERO TRANSVERSAL 2.35 8

AULA 04

ACERO LONGITUDINAL Y TRANSVERSAL (Z-3)


ACERO LONGITUDINAL 1 5
ACERO TRANSVERSAL 1 5

ACERO LONGITUDINAL Y TRANSVERSAL (Z-4)


ACERO LONGITUDINAL 1.65 8
ACERO TRANSVERSAL 1.5 8

SUMATORIA TOTAL DE METRADOS


ACERO DE REFUERZO Longitud
N de Diametro
elementos 1/4 3/8 1/2 5/8 3/4 Parcial
iguales " 0.25 0.56 0.99 1.55 2.24 (m)

2 3/4 458.752 204.8


2 1/2 101.376 102.4
2 3/8 164.1024 293.04

4 3/4 426.496 190.4


4 1/2 94.248 95.2
2 3/8 49.104 31.68

4 5/8 31 20
4 5/8 31 20

2 5/8 40.92 26.4


2 5/8 37.2 24

1 5/8 30.69 19.8


1 5/8 28.52 18.4

1 5/8 30.69 19.8


1 5/8 29.14 18.8

2 5/8 15.5 10
2 5/8 15.5 10
4 5/8 81.84 52.8
4 5/8 74.4 48

650.54
Metrado METRADO
Parcial FINAL
(kg)

458.752
101.376
164.1024

426.50
94.25
49.104

31
31

40.92
37.2

30.69
28.52

30.69
29.14

15.5
15.5
81.84
74.4

650.54