METRADO DE EXPLANACIONES

TIPO DE SUELO PROYECTO :


MATERIAL SUELTO 1
ROCA SUELTA 2
ROCA FIJA 3

LONGITUD TOTAL : 05+830 KM. M3. LONG. M3. LONG. M3.


Totales de Movimiento de Tierras (m3.) 1,043.36 #VALUE! 0.00 0.00 0.00
CORTE
PROG. AREA DE AREA DE Tipo MATERIAL SUELTO ROCA SUELTA ROCA FIJA
METROS CORTE RELLENO Suelo

#VALUE!
0 2.714 0.076 1 0.00 0
10 5.765 0.000 1 38.54 10
20 7.876 0.000 1 68.21 10
30 10.054 0.000 1 89.65 10
40 9.643 0.000 1 98.49 10
50 5.985 0.000 1 78.14 10
60 2.595 0.000 1 42.90 10
70 4.035 0.000 1 33.15 10
80 6.130 0.000 1 50.83 10
90 7.863 0.000 1 69.97 10
100 8.920 0.000 1 83.92 10
110 10.462 0.000 1 96.91 10
120 4.817 0.996 1 76.40 10
130 1.937 0.000 1 33.77 10
140 3.672 0.000 1 28.05 10
150 1.636 7.757 1 26.54 10
160 0.000 5.770 1 8.18 10
170 6.250 2.706 1 31.25 10
180 0.154 2.608 1 32.02 10
190 4.570 0.306 1 23.62 10
200 2.000 0.150 1 32.85 10
1,043.36

CUADRO DE METRADO DE EXPLANACIONES

DESCRIPCION EJECUTADO (M3) SALDO (M3)


ROCA FIJA
MAT SUELTO 1,043.36

DESCRIPCION EJECUTADO (M3) SALDO (M3)


MAT PROPIO 202.56
MAT DE PREST
CIONES

LONG. M3.
0.00 202.56

ROCA FIJA VOLUMEN


RELLENO

0.38

4.98
4.98

38.79
67.64
42.38
26.57
14.57
2.28
202.56