PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

01.00.00 CERCO PERIMTRICO


01.01.00 CERCO PERIMETRICO CON MURO METALICO
01.02.00 OBRAS DE CONCRETO ARMADO
01.02.01 SOBRECIMIENTO ARMADO
01.03.02.01 CONCRETO EN SOBRECIMIENTO REFORZADO F'C=175KG/CM2
progresiva 0+000 al 0+03966

01.03.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS


progresiva 0+000 al 0+03966

01.03.02.03 ACERO EN SOBRECIMIENTO REFORZADO FY=4200KG/CM2, GRADO 60


progresiva 0+000 al 0+03966

Acero longitudinal de dmetro 3/8"

Acero transversal de dmetro 3/8"

01.03.03 COLUMNAS
01.03.03.01 CONCRETO EN COLUMNAS F'C=210KG/CM2

C-1
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

01.03.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS

C-1

01.03.03.03 ACERO EN COLUMNAS FY=4200 KG/CM2 - GRADO 60


C-1

Acero longitudinal de dimetro 1/2"


Acero transversal de dimetro 1/4"

01.03.04 VIGAS
01.03.04.01 CONCRETO EN VIGAS F'C=210KG/CM2

Numero de Paos

01.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

Numero de Paos

01.03.04.03 ACERO EN VIGAS FY=4200KG/CM2 GRADO 60

Numero de Paos
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

Acero longitudinal de dmetro 1/2"

Acero transversal de dmetro 1/4"

01.02.00 CERCO PERIMETRICO CON MURO DE ALBAILERIA


01.01.00 MOVIMIENTOS DE TIERRAS
01.01.01 EXCAVACIN DE ZANJAS P/CIMIENTOS INCLUYE VIGAS DE CIMENTACIN
progresiva 0+03966 hasta 0+12558

progresiva 0+000 hasta 0+03896


progresiva 0+000 hasta 0+010
progresiva 0+010 hasta 0+020
progresiva 0+020 hasta 0+030
progresiva 0+030 hasta 0+03896

01.01.02 EXCAVACION PARA ZAPATAS


progresiva 0+000 hasta 0+03896
Excavacin para zapata

01.01.03 RELLENO Y COMPACTADO CON DE ZANJAS CON MATERIAL PROPIO C/EQ


progresiva 0+03966 hasta 0+12558
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

rea de la seccin a rellenar

progresiva 0+000 hasta 0+03896


progresiva 0+000 hasta 0+010
progresiva 0+010 hasta 0+020
progresiva 0+020 hasta 0+030
progresiva 0+030 hasta 0+03896

01.01.04 ELIMINACIN DE MATERIAL EXCEDENTE C/MAQUINARIA DIST.=5 KM

01.02.01 OBRAS DE CONCRETO SIMPLE


01.02.02.01 SOLADO EN CERCO
progresiva 0+03966 hasta 0+12558
progresiva 0+000 hasta 0+0389

01.03.00 OBRAS DE CONCRETO ARMADO


01.02.02 CIMIENTO CORRIDO
01.02.02.01 CONCRETO CIMIENTO CORRIDO MEZCLA 1:10+25% P.G. 6" MAX
progresiva 0+03966 hasta 0+12558
progresiva 0+000 hasta 0+010
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

progresiva 0+020 hasta 0+030


progresiva 0+010 hasta 0+020
progresiva 0+030 hasta 0+03896

01.03.01 ZAPATAS
01.03.01.01 CONCRETO EN ZAPATAS F'C =210 KG/CM2

Z-1

01.03.01.02 ACERO EN ZAPATAS FY=4200KG/CM2 - GRADO 60


Acero en zapata tipo Z-1

Acero en lado corto (con acero de dimetro 1/2")

Acero en lado largo (con acero de dimetro 1/2")

01.03.02 SOBRECIMIENTO ARMADO


01.03.02.01 CONCRETO EN SOBRECIMIENTO REFORZADO F'C=175KG/CM2
progresiva 0+03966 hasta 0+12558

progresiva 0+000 hasta 0+010

progresiva 0+020 hasta 0+030

progresiva 0+010 hasta 0+020


PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

progresiva 0+030 hasta 0+03896

01.03.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS


progresiva 0+03966 hasta 0+12558
progresiva 0+000 hasta 0+010
progresiva 0+020 hasta 0+030
progresiva 0+010 hasta 0+020
progresiva 0+030 hasta 0+03896

01.03.02.03 ACERO EN SOBRECIMIENTO REFORZADO FY=4200KG/CM2, GRADO 60


progresiva 0+03966 hasta 0+12558

Acero longitudinal de dmetro 3/8"

Acero transversal de dmetro 3/8"

progresiva 0+000 hasta 0+03896

Acero longitudinal de dmetro 3/8"

Acero transversal de dmetro 3/8"

01.03.03 COLUMNAS
01.03.03.01 CONCRETO EN COLUMNAS F'C=210KG/CM2
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

C-1 en progresiva 0+03966 hasta 0+12558

C-1 en progresiva 0+000 hasta 0+03896

01.03.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS

C-1 en progresiva 0+03966 hasta 0+12558

C-1 en progresiva 0+000 hasta 0+03896

01.03.03.03 ACERO EN COLUMNAS FY=4200 KG/CM2 - GRADO 60

C-1 en progresiva 0+03966 hasta 0+12558

Acero longitudinal de dimetro 1/2"

Acero transversal de dimetro 1/4"

C-1 en progresiva 0+000 hasta 0+03896

progresiva 0+000 hasta 0+010

Acero longitudinal de dimetro 1/2"

Acero transversal de dimetro 1/4"

progresiva 0+010 hasta 0+020


PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

Acero longitudinal de dimetro 1/2"

Acero transversal de dimetro 1/4"

progresiva 0+020 hasta 0+030

Acero longitudinal de dimetro 1/2"

Acero transversal de dimetro 1/4"

progresiva 0+030 hasta 0+03896

Acero longitudinal de dimetro 1/2"

Acero transversal de dimetro 1/4"

01.03.04 VIGAS
01.03.04.01 CONCRETO EN VIGAS F'C=210KG/CM2

V-1 en progresiva 0+03966 hasta 0+12558


Por paos L=3.00m

V-1 en progresiva 0+000 hasta 0+03896


Por paos L=3.00m
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

01.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS


V-1 en progresiva 0+03966 hasta 0+12558
Por paos L=3.00m

V-1 en progresiva 0+000 hasta 0+03896


Por paos L=3.00m

01.03.04.03 ACERO EN VIGAS FY=4200KG/CM2 GRADO 60

V-1 en progresiva 0+03966 hasta 0+12558


Por paos L=3.00m

Acero longitudinal de dmetro 1/2"

Acero transversal de dmetro 1/4"

V-1 en progresiva 0+000 hasta 0+03896


ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

Acero longitudinal de dmetro 1/2"

Acero transversal de dmetro 1/4"

02.00.00 MURO DE CONTENCION


02.01.00 MOVIMIENTOS DE TIERRAS
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

01.01.01 EXCAVACIN MASIVA CON MAQUINARIA


P.K.=0+000.00

P.K.=0+002.50

P.K.=0+005.00

P.K.=0+007.50

P.K.=0+010.00

P.K.=0+012.50

P.K.=0+015.00

P.K.=0+017.50

P.K.=0+020.00

P.K.=0+022.50

P.K.=0+025.00

P.K.=0+027.50

P.K.=0+030.00

P.K.=0+032.50

P.K.=0+035.00

P.K.=0+037.50

P.K.=0+040.00

P.K.=0+042.50
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

P.K.=0+045.00

P.K.=0+047.50

P.K.=0+050.00

P.K.=0+050.50

P.K.=0+055.00

P.K.=0+057.50

P.K.=0+060.00

P.K.=0+062.50

P.K.=0+065.00

P.K.=0+067.50

P.K.=0+070.00

P.K.=0+072.50

P.K.=0+075.00

P.K.=0+077.50

P.K.=0+082.50

P.K.=0+085.00

P.K.=0+087.50

P.K.=0+090.00

P.K.=0+092.50
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

P.K.=0+095.00

P.K.=0+097.50

P.K.=0+100.00

P.K.=0+102.50

P.K.=0+105.00

P.K.=0+107.50

P.K.=0+110.00

P.K.=0+112.50

P.K.=0+115.00

P.K.=0+117.50

P.K.=0+120.00

P.K.=0+122.50

P.K.=0+125.00

P.K.=0+127.50

P.K.=0+130.00

P.K.=0+132.50

P.K.=0+135.00

P.K.=0+137.50

P.K.=0+140.00
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

P.K.=0+142.50

P.K.=0+145.00

P.K.=0+147.50

P.K.=0+150.00

02.01.02 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO C/EQUIPO


P.K.=0+000.00

P.K.=0+002.50

P.K.=0+005.00

P.K.=0+007.50

P.K.=0+010.00

P.K.=0+012.50

P.K.=0+015.00

P.K.=0+017.50

P.K.=0+020.00

P.K.=0+022.50

P.K.=0+025.00

P.K.=0+027.50

P.K.=0+030.00
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

P.K.=0+032.50

P.K.=0+035.00

P.K.=0+037.50

P.K.=0+040.00

P.K.=0+042.50

P.K.=0+045.00

P.K.=0+047.50

P.K.=0+050.00

P.K.=0+050.50

P.K.=0+055.00

P.K.=0+057.50

P.K.=0+060.00

P.K.=0+062.50

P.K.=0+065.00

P.K.=0+067.50

P.K.=0+070.00

P.K.=0+072.50

P.K.=0+075.00

P.K.=0+077.50
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

P.K.=0+082.50

P.K.=0+085.00

P.K.=0+087.50

P.K.=0+090.00

P.K.=0+092.50

P.K.=0+095.00

P.K.=0+097.50

P.K.=0+100.00

P.K.=0+102.50

P.K.=0+105.00

P.K.=0+107.50

P.K.=0+110.00

P.K.=0+112.50

P.K.=0+115.00

P.K.=0+117.50

P.K.=0+120.00

P.K.=0+122.50

P.K.=0+125.00

P.K.=0+127.50
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

P.K.=0+130.00

P.K.=0+132.50

P.K.=0+135.00

P.K.=0+137.50

P.K.=0+140.00

P.K.=0+142.50

P.K.=0+145.00

P.K.=0+147.50

P.K.=0+150.00

02.01.04 ELIMINACIN DE MATERIAL EXCEDENTE C/MAQUINARIA DIST.=5 KM

02.02.00 OBRAS DE CONCRETO SIMPLE


02.02.01 SOLADOS
02.02.01.01 SOLADO E=4" EN MURO DE CONTENCION F'C=140 KG/CM2
Concreto en el muro tipo-1
Concreto en el muro tipo-2
Concreto en el muro tipo-3
Concreto en el muro tipo-4
Concreto en el muro tipo-5
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

02.03.00 OBRAS DE CONCRETO ARMADO


02.03.01 ZAPATAS
02.03.01.01 CONCRETO EN ZAPATAS F'C =210 KG/CM2
Concreto en el muro tipo-1
Concreto en el muro tipo-2
Concreto en el muro tipo-3
Concreto en el muro tipo-4

02.03.01.02 ACERO EN ZAPATAS FY=4200KG/CM2 - GRADO 60


Acero en Zapata Muro Tipo - 01
Acero superior

Acero longitudinal de dmetro 1/2"

Acero transversal de dmetro 1/2"

Acero inferior

Acero longitudinal de dmetro 5/8"

Acero transversal de dmetro 3/4"

Acero en Zapata Muro Tipo - 02


Acero superior
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

Acero longitudinal de dmetro 1/2"


Acero transversal de dmetro 1/2"

Acero inferior

Acero longitudinal de dmetro 5/8"


Acero transversal de dmetro 3/4"

Acero en Zapata Muro Tipo - 03


Acero superior

Acero longitudinal de dmetro 1/2"


Acero transversal de dmetro 1/2"

Acero inferior

Acero longitudinal de dmetro 5/8"


Acero transversal de dmetro 3/4"

Acero en Zapata Muro Tipo - 04


Acero superior

Acero longitudinal de dmetro 1/2"


Acero transversal de dmetro 1/2"
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

Acero inferior

Acero longitudinal de dmetro 5/8"

Acero transversal de dmetro 3/4"

02.03.02 MURO DE CONCRETO ARMADO


02.03.02.01 CONCRETO EN MURO F'C=210 KG/CM2

Concreto en el muro tipo-1

Concreto en el muro tipo-2

Concreto en el muro tipo-3

Concreto en el muro tipo-4

02.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO

Concreto en el muro tipo-1


lateral
frontal
PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

Concreto en el muro tipo-2


lateral
frontal

Concreto en el muro tipo-3

Concreto en el muro tipo-4

02.03.02.03 ACERO EN MURO FY=4200KG/CM2 GRADO 60


Acero en el muro tipo - 01
Acero interior

Acero longitudinal de dimetro 3/8"

Acero transversal de dimetro 1/2"


Bastn de 3/8"

Acero exterior

Acero longitudinal de dimetro 1/2"

Acero transversal de dimetro 1/2"

Acero en el muro tipo - 02


PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

Acero interior

Acero longitudinal de dimetro 3/8"

Acero transversal de dimetro 1/2"

Bastn de 3/8"

Acero exterior

Acero longitudinal de dimetro 1/2"


Acero transversal de dimetro 1/2"

Acero en el muro tipo - 03

Acero interior

Acero longitudinal de dimetro 3/8"

Acero transversal de dimetro 1/2"

Bastn de 3/8"

Acero exterior

Acero longitudinal de dimetro 1/2"

Acero transversal de dimetro 1/2"


PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

Acero en el muro tipo - 04

Acero interior

Acero longitudinal de dimetro 3/8"

Acero transversal de dimetro 1/2"

Bastn de 3/8"

Acero exterior

Acero longitudinal de dimetro 1/2"

Acero transversal de dimetro 1/2"

02.03.02 CONTRAFUERTE
02.03.02.01 CONCRETO EN CONTRAFUERTE F'C=210 KG/CM2

Concreto en contrafuerte (muro tipo-1)

Concreto en contrafuerte (muro tipo-2)

Concreto en contrafuerte (muro tipo-3)


PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

Concreto en contrafuerte (muro tipo-4)

02.03.02.01 ENCOFRADO Y DESENCOFRADO NORMAL EN CONTRAFUERTE

Encofrado y desencofrado en contrafuerte (muro tipo-1)

Encofrado y desencofrado en contrafuerte (muro tipo-2)

Encofrado y desencofrado en contrafuerte (muro tipo-3)

Encofrado y desencofrado en contrafuerte (muro tipo-4)


PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

02.03.02.01 ACERO EN CONTRAFUERTE FY=4200KG/CM2 GRADO 60

Acero en el muro tipo - 01 (contrafuerte)

Acero en Estribo

Acero horizontal 3/8"

Acero vertical 3/8"

Acero en Arista de contrafuerte

Acero longitudinal de dimetro 5/8"

Acero longitudinal de dimetro 1/2"

Acero en baston 3/8"

Acero en el muro tipo - 02 (contrafuerte)

Acero en Estribo

Acero horizontal 3/8"

Acero vertical 3/8"

Acero en Arista de contrafuerte

Acero longitudinal de dimetro 5/8"


PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

Acero longitudinal de dimetro 1/2"


Acero en baston 3/8"

Acero en el muro tipo - 03 (contrafuerte)

Acero en Estribo

Acero horizontal 3/8"


Acero vertical 3/8"

Acero en Arista de contrafuerte

Acero longitudinal de dimetro 5/8"

Acero longitudinal de dimetro 1/2"


Acero en baston 3/8"

Acero en el muro tipo - 04 (contrafuerte)

Acero en Estribo h=3m

Acero horizontal 3/8"

Acero vertical 3/8"

Acero en Arista de contrafuerte


PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

Acero longitudinal de dimetro 5/8"


Acero longitudinal de dimetro 1/2"

Acero en baston 3/8"

Acero en Estribo h=5m

Acero horizontal 3/8"


Acero vertical 3/8"

Acero en Arista de contrafuerte

Acero longitudinal de dimetro 5/8"

Acero longitudinal de dimetro 1/2"


Acero en baston 3/8"

Acero en Estribo h=7m

Acero horizontal 3/8"

Acero vertical 3/8"

Acero en Arista de contrafuerte

Acero longitudinal de dimetro 5/8"


PL

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIPAMIEN


PBLICA INTEGRADA DE HUANCACHACA, DISTRIT

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

Acero longitudinal de dimetro 1/2"


Acero en baston 3/8"

02.03.00 OBRAS DE CONCRETO CICLOPEO


02.03.01 ZAPATAS
02.03.01.01 CONCRETO EN ZAPATAS
Concreto en el muro tipo-5

02.03.01 CONCRETO EN MURO


02.03.01.01 CONCRETO EN MURO

Concreto en el muro tipo-5

02.03.01.01 CONCRETO EN DENTELLON

Concreto en el muro tipo-5

02.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO

Encofrado longitudinal en muro tipo - 5


PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

TRICO CON MURO METALICO


CRETO ARMADO
O ARMADO
BRECIMIENTO REFORZADO F'C=175KG/CM2 M3

39.66 0.15

SENCOFRADO DE SOBRECIMIENTOS M2

39.66

CIMIENTO REFORZADO FY=4200KG/CM2, GRADO 60 KG

dmetro 3/8" 146.00

1.15

LUMNAS F'C=210KG/CM2 M3

0.20 0.15
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

SENCOFRADO EN COLUMNAS M2
Permetro

0.70

NAS FY=4200 KG/CM2 - GRADO 60 KG

dimetro 1/2" 3.40


dimetro 1/4" 0.74

AS F'C=210KG/CM2 M3

2.80 0.20

SENCOFRADO NORMAL EN VIGAS M2

2.80 0.50

FY=4200KG/CM2 GRADO 60 KG
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

dmetro 1/2" 3.86

0.78

TRICO CON MURO DE ALBAILERIA


E TIERRAS
ANJAS P/CIMIENTOS INCLUYE VIGAS DE CIMENTACIN (MANUAL) M3
hasta 0+12558
85.92 0.60

asta 0+03896 AREA


10.00 9.90
10.00 15.98
10.00 10.75
8.96 19.66

M3
asta 0+03896
0.60 0.60

ACTADO CON DE ZANJAS CON MATERIAL PROPIO C/EQUIPO LIVIANO M3


hasta 0+12558 rea
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

85.92 0.14

asta 0+03896 AREA


10.00 0.14
10.00 0.14
10.00 0.14
8.96 0.14

ATERIAL EXCEDENTE C/MAQUINARIA DIST.=5 KM M3

CRETO SIMPLE
M2
hasta 0+12558 85.92 0.60
38.90 0.60

CRETO ARMADO

NTO CORRIDO MEZCLA 1:10+25% P.G. 6" MAX M3


hasta 0+12558 85.92 0.60
10.00 0.60
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

10.00 0.60
10.00 0.60
asta 0+03896 8.96 0.60

PATAS F'C =210 KG/CM2 M3

0.60 0.60

S FY=4200KG/CM2 - GRADO 60 KG

con acero de dimetro 1/2") 0.45

con acero de dimetro 1/2") 0.45

O ARMADO
BRECIMIENTO REFORZADO F'C=175KG/CM2 M3
hasta 0+12558 3.00 0.15

3.00 0.60

3.00 0.60

3.00 0.60
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

asta 0+03896 3.00 0.60

SENCOFRADO DE SOBRECIMIENTOS M2
hasta 0+12558 3.00
3.00
3.00
3.00
3.00

CIMIENTO REFORZADO FY=4200KG/CM2, GRADO 60 KG


hasta 0+12558

dmetro 3/8" 1.76

4.00

asta 0+03896

dmetro 3/8" 10.35

2.02

LUMNAS F'C=210KG/CM2 M3
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

+03966 hasta 0+12558 0.20 0.15

+000 hasta 0+03896 0.25 0.25

SENCOFRADO EN COLUMNAS M2

Permetro

+03966 hasta 0+12558 0.50

+000 hasta 0+03896 1.00

NAS FY=4200 KG/CM2 - GRADO 60 KG

0+03966 hasta 0+12558

dimetro 1/2" 4.70

dimetro 1/4" 0.72

0+000 hasta 0+03896

dimetro 1/2" 4.70

dimetro 1/4" 1.16


PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

dimetro 1/2" 5.90

dimetro 1/4" 1.16

dimetro 1/2" 4.70

dimetro 1/4" 1.16

dimetro 1/2" 5.90

dimetro 1/4" 1.16

AS F'C=210KG/CM2 M3

+03966 hasta 0+12558


3.00 0.15

+000 hasta 0+03896


3.00 0.25
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

SENCOFRADO NORMAL EN VIGAS M2


+03966 hasta 0+12558
3.00 0.50

+000 hasta 0+03896


3.00 0.65

FY=4200KG/CM2 GRADO 60 KG

+03966 hasta 0+12558

dmetro 1/2" 4.00

0.84

+000 hasta 0+03896


SENCOFRADO NORMAL EN VIGAS

dmetro 1/2" 4.00

1.04

NTENCION
E TIERRAS
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

VA CON MAQUINARIA M3 Area


41.47

39.75

35.78

32.02

32.32

33.17

64.9

56.98

43.12

43.73

44.87

45.31

44.39

44.32

44.8

45.27

45.21

60.93
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

65.7

44.18

43.44

42.98

43.1

43.19

42.12

42.39

42.32

42.14

42.02

41.93

42.08

41.95

43.44

44.07

43.44

43.17

43.74
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

44.82

45.87

45.09

45.47

47.59

23.4

9.55

4.35

3.55

3.59

3.74

4.32

4.5

5.5

4.7

5.22

4.24

4.07

5.08
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

8.83

8.38

8.16

8.33

ACTADO DE ZANJAS CON MATERIAL PROPIO C/EQUIPO LIVIANO M3 Area


19.25

14.05

9.96

9.31

8.86

8.64

9.68

41.88

44.3

47.29

47.95

46.46
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

45.78

45.52

44.46

43.86

29.41

17.95

16.95

17.89

18.56

16.53

19.06

24.91

29.45

30.15

30.5

31.21

32.78

33.85

28.18
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

23.6

23.83

26.78

29.66

32.64

36.58

40.6

38.19

39.46

42.13

18.96

4.72

3.84

5.23

6.17

6.48

4.35

3.51

2.95
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

3.62

2.93

4.16

4.15

3.78

3.31

3.32

3.6

3.34

ATERIAL EXCEDENTE C/MAQUINARIA DIST.=5 KM M3

CRETO SIMPLE

MURO DE CONTENCION F'C=140 KG/CM2 M3


17.62 4.70
70.62 5.70
17.46 6.10
6.00 4.70
40.88 2.20
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

CRETO ARMADO

PATAS F'C =210 KG/CM2 M3


17.62 4.70
70.62 5.70
17.46 6.10
6.00 4.70

S FY=4200KG/CM2 - GRADO 60 KG

de dmetro 1/2" 5.42

de dmetro 1/2" 18.34

de dmetro 5/8" 5.42

de dmetro 3/4" 18.34


PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

de dmetro 1/2" 6.42


de dmetro 1/2" 71.34

de dmetro 5/8" 6.42


de dmetro 3/4" 71.34

de dmetro 1/2" 6.82


de dmetro 1/2" 18.18

de dmetro 5/8" 6.82


de dmetro 3/4" 18.18

de dmetro 1/2" 5.42


de dmetro 1/2" 6.72
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

de dmetro 5/8" 5.42

de dmetro 3/4" 6.72

RETO ARMADO
RO F'C=210 KG/CM2 M3
rea
17.62 2.10

70.62 2.80

17.46 3.15

0.15 29.11

SENCOFRADO NORMAL EN MURO M2


rea

2.10
63.00
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

2.80
72.00

81.00

115.00

FY=4200KG/CM2 GRADO 60 KG

de dimetro 3/8" 8.16

de dimetro 1/2" 18.12


3.60

de dimetro 1/2" 8.16

de dimetro 1/2" 18.12


PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

de dimetro 3/8" 9.10

de dimetro 1/2" 71.62

3.91

de dimetro 1/2" 9.10


de dimetro 1/2" 71.62

de dimetro 3/8" 10.10

de dimetro 1/2" 18.46

4.15

de dimetro 1/2" 10.10

de dimetro 1/2" 18.46


PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

de dimetro 3/8" 6.30

de dimetro 1/2" 6.50

3.91

de dimetro 1/2" 6.30

de dimetro 1/2" 6.50

NTRAFUERTE F'C=210 KG/CM2 M3


rea

erte (muro tipo-1) 0.30 10.50

erte (muro tipo-2) 0.30 13.94

erte (muro tipo-3) 0.30 16.43


PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

erte (muro tipo-4) 0.30 10.50


0.30 7.50

0.30 4.50

SENCOFRADO NORMAL EN CONTRAFUERTE M2


rea

frado en contrafuerte (muro tipo-1) 10.50

1.14

frado en contrafuerte (muro tipo-2) 13.94

1.31

frado en contrafuerte (muro tipo-3) 16.43

1.46

frado en contrafuerte (muro tipo-4) 2.29

1.75
1.27
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

AFUERTE FY=4200KG/CM2 GRADO 60 KG

po - 01 (contrafuerte)

110.00

87.00

de dimetro 5/8" 8.63

de dimetro 1/2" 8.63

4.32

po - 02 (contrafuerte)

193.00

171.00

de dimetro 5/8" 9.88


PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

de dimetro 1/2" 9.88


4.94

po - 03 (contrafuerte)

228.00
184.14

de dimetro 5/8" 10.80

de dimetro 1/2" 10.80


5.40

po - 04 (contrafuerte)

55.32

57.25
PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

de dimetro 5/8" 5.54


de dimetro 1/2" 5.54

2.77

83.52
72.27

de dimetro 5/8" 7.10

de dimetro 1/2" 7.10


3.55

129.33

94.50

de dimetro 5/8" 8.73


PLANILLA DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN EDUCATIVA


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES YAROWILCA

RAS EXTERIORES

MEDIDAS

UND LARGO ANCHO

de dimetro 1/2" 8.73


4.37

CRETO CICLOPEO

M3
40.88 2.20

M3

40.88

M3

40.88

SENCOFRADO NORMAL EN MURO M2

al en muro tipo - 5
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

0.60 1.00 3.57

0.60 2.00 47.59

factor

0.58 3.00 254.04

0.58 146.00 97.38

3.00 13.00 1.17


ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

3.00 13.00 27.30

factor

1.02 13.60 47.16


0.25 286.00 52.91

0.15 11.00 0.92

11.00 15.40

factor
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

1.02 44.00 173.24

0.25 242.00 47.19

0.80 41.24

99.00
159.80
107.50
176.15

0.50 16.00 2.88

rea
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

0.14 1.00 12.03

1.40
1.40
1.40
1.25

569.09

1.00 51.55
1.00 23.34

0.80 1.00 41.24


0.80 1.00 4.80
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

0.80 1.00 4.80


1.00 1.00 6.00
1.00 1.00 5.38

0.50 16.00 2.88

factor

1.02 80.00 36.72

1.02 80.00 36.72

0.60 26.00 7.02

0.60 3.00 3.24

1.50 3.00 8.10

0.60 3.00 3.24


ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

1.50 3.00 8.10

0.60 52.00 93.60


0.60 6.00 10.80
1.50 6.00 27.00
0.60 6.00 10.80
1.50 6.00 27.00

factor

0.58 312.00 318.49

0.58 78.00 180.96

0.58 12.00 72.04

0.58 144.00 168.71


ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

3.30 35.00 3.47

3.30 16.00 3.30

3.30 35.00 57.75

3.30 16.00 52.80

factor

1.02 140.00 671.16

0.25 910.00 163.80

factor

1.02 12.00 57.53

0.25 75.00 21.75


ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

1.02 12.00 72.22

0.25 96.00 27.84

1.02 12.00 57.53

0.25 75.00 21.75

1.02 12.00 72.22

0.25 75.00 21.75

0.20 26.00 2.34

0.20 12.00 1.80


ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

26.00 39.00

12.00 23.40

factor

1.02 140.00 571.20

0.25 546.00 114.66

factor

1.02 64.00 261.12

0.25 252.00 65.52


ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

Area VOL.
41.47

39.75 101.53
35.78 94.41
32.02 84.75
32.32 80.43
33.17 81.86
64.9 122.59
56.98 152.35
43.12 125.13
43.73 108.56
44.87 110.75
45.31 112.73
44.39 112.13
44.32 110.89
44.8 111.40
45.27 112.59
45.21 113.10
60.93 132.68
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

65.7 158.29
44.18 137.35
43.44 109.53
42.98 108.03
43.1 107.60
43.19 107.86
42.12 106.64
42.39 105.64
42.32 105.89
42.14 105.58
42.02 105.20
41.93 104.94
42.08 105.01
41.95 105.04
43.44 106.74
44.07 109.39
43.44 109.39
43.17 108.26
43.74 108.64
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

44.82 110.70
45.87 113.36
45.09 113.70
45.47 113.20
47.59 116.33
23.4 88.74
9.55 41.19
4.35 17.38
3.55 9.88
3.59 8.93
3.74 9.16
4.32 10.08
4.5 11.03
5.5 12.50
4.7 12.75
5.22 12.40
4.24 11.83
4.07 10.39
5.08 11.44
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

8.83 17.39
8.38 21.51
8.16 20.68
8.33 20.61

Area VOL.
19.25

14.05 41.63
9.96 30.01
9.31 24.09
8.86 22.71
8.64 21.88
8 20.80
9.68 22.10
41.88 64.45
44.3 107.73
47.29 114.49
47.95 119.05
46.46 118.01
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

45.78 115.30
45.52 114.13
44.46 112.48
43.86 110.40
29.41 91.59
17.95 59.20
16.95 43.63
17.89 43.55
18.56 45.56
16.53 43.86
19.06 44.49
24.91 54.96
29.45 67.95
30.15 74.50
30.5 75.81
31.21 77.14
32.78 79.99
33.85 83.29
28.18 77.54
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

23.6 64.73
23.83 59.29
26.78 63.26
29.66 70.55
32.64 77.88
36.58 86.53
40.6 96.48
38.19 98.49
39.46 97.06
42.13 101.99
18.96 76.36
4.72 29.60
3.84 10.70
5.23 11.34
6.17 14.25
6.48 15.81
4.35 13.54
3.51 9.83
2.95 8.08
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

3.62 8.21
2.93 8.19
4.16 8.86
4.15 10.39
3.78 9.91
3.31 8.86
3.32 8.29
3.6 8.65
3.34 8.68

1689.91

0.10 1.00 8.28


0.10 1.00 40.25
0.10 1.00 10.65
0.10 1.00 2.82
0.10 1.00 8.99
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

0.50 1.00 41.41


0.50 1.00 201.27
0.50 1.00 53.25
0.50 1.00 14.10

Factor

1.60 99.00 858.53

2.26 28.00 1160.56

1.60 99.00 858.53

2.26 28.00 1160.56

Factor
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

1.60 393.00 4036.90


2.26 30.00 4836.85

1.60 393.00 4036.90


2.26 30.00 4836.85

Factor

1.60 98.00 1069.38


2.26 32.00 1314.78

1.60 98.00 1069.38


2.26 32.00 1314.78

Factor

1.60 34.00 294.85


2.26 25.00 379.68
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

1.60 34.00 294.85

2.26 25.00 379.68

rea
2.10 1.00 37.00

2.80 1.00 197.74

3.15 1.00 55.00

29.11 1.00 4.37

rea

2.10 4.00 8.40


63.00 4.00 252.00
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

2.80 4.00 11.20


72.00 4.00 288.00

81.00 4.00 324.00

115.00 2.00 230.00

1.00 89.00 726.24

1.60 36.00 1043.71


1.60 89.00 512.64

1.60 89.00 1161.98

1.60 36.00 1043.71


ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

1.00 357.00 3248.70

1.60 41.00 4698.27

1.60 357.00 2233.39

1.60 357.00 5197.92


1.60 41.00 4698.27

1.00 84.00 848.40

1.60 46.00 1358.66

1.60 84.00 557.76

1.60 84.00 1357.44

1.60 46.00 1358.66


ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

1.00 36.00 226.80

1.60 26.00 270.40

1.60 36.00 225.22

1.60 36.00 362.88

1.60 26.00 270.40

rea

10.50 6.00 18.90

13.94 25.00 104.55

16.43 6.00 29.57


ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

10.50 1.00 3.15


7.50 1.00 2.25

4.50 1.00 1.35

rea

10.50 12.00 126.00

1.14 6.00 6.84

13.94 50.00 697.00

1.31 25.00 32.75

16.43 16.00 262.88

1.46 6.00 8.76

2.29 1.00 2.29

1.75 1.00 1.75


1.27 1.00 1.27
ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

1.00 6.00 660.00

1.60 6.00 835.20

1.60 12.00 165.70

1.60 12.00 165.70

1.60 18.00 124.27

1.00 25.00 4825.00

1.60 25.00 6840.00

1.60 50.00 790.40


ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

1.60 50.00 790.40


1.60 75.00 592.80

1.00 6.00 1368.00


1.60 6.00 1767.74

1.60 12.00 207.36

1.60 12.00 207.36


1.60 18.00 155.52

1.00 1.00 55.32

1.60 1.00 91.60


ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

1.60 2.00 17.73


1.60 1.00 8.86

1.60 1.00 4.43

1.00 1.00 83.52


1.60 1.00 115.63

1.60 2.00 22.72

1.60 1.00 11.36


1.60 1.00 5.68

1.00 1.00 129.33

1.60 1.00 151.20

1.60 2.00 27.94


ETRADOS

EDUCATIVA
S YAROWILCA - HUNUCO.

N SUB TOTAL
DE
ALTO VECES LONG. AREA VOL. KG.

1.60 1.00 13.97


1.60 1.00 6.98

0.55 1.00 49.46

AREA
2.51 1.00 102.61

AREA
0.18 7.00 51.51

AREA
2.51 16.00 40.16
2.95 8.00 23.60
3.08 8.00 24.64
TOTAL

3.57

47.59

351.42

1.17
TOTAL

27.30

100.07

0.92

15.40

220.43
TOTAL

583.70

2.88

17.48
TOTAL

569.09

74.89

46.04
TOTAL

2.88

73.44

29.70
TOTAL

169.20

740.20

3.47
TOTAL

110.55

1187.54
TOTAL

4.14
TOTAL

62.40

1012.50
TOTAL

4897.98
TOTAL
TOTAL
TOTAL

3208.06
TOTAL
TOTAL
TOTAL

1689.91

62.01
TOTAL

310.03

27903.03
TOTAL
TOTAL

294.10

260.40
TOTAL

31401.45
TOTAL
TOTAL

158.42
TOTAL

1139.54
TOTAL

20241.72
TOTAL
TOTAL
TOTAL

49.46

102.61

51.51

88.40
METRADO DE ACERO

PROYECTO : CONSTRUCCIN Y AMPLIACIN " CENTRO DE SALUD CARLOS S

OBRA : MODULO I

FECHA : ENERO DEL 2011 HECHO POR : REVISADO PO

MEDIDAS LONGI
DESCRIPCION DISEO DE FIERRO CANT.
N DE LONG.x 0.25
PIEZAS PIEZAS
1/4''
0.3

#REF! ACERO EN ZAPATAS FY=4200 KG/CM2 - GRADO 60


Z-3 (1.80x2.00)
Longitudinal 1.65 1/2'' 11.00 13.00 1.65

Transversal 1.85 1/2'' 11.00 12.00 1.85

Z-4 (2.00x2.20 )
Longitudinal 1.85 1/2'' 10.00 12.00 1.85

Transversal 2.05 1/2'' 10.00 15.00 2.05

Z-5 (2.20x2.20 )
Longitudinal 2.05 1/2'' 3.00 15.00 2.05

Transversal 2.05 1/2'' 3.00 15.00 2.05

Z-6 (1.60x1.80 )
Longitudinal 1.45 1/2'' 2.00 12.00 1.45

Transversal 1.65 1/2'' 2.00 11.00 1.65

Z-7 (1.00x1.00 )
Longitudinal 0.85 1/2'' 5.00 7.00 0.85

Transversal 0.85 1/2'' 5.00 7.00 0.85

Z-8 (1.25x1.25 )
Longitudinal 1.10 1/2'' 2.00 8.00 1.1

Transversal 1.10 1/2'' 2.00 8.00 1.1

#REF! ACERO EN COLUMNAS FY= 4200 KG/CM2 - GRADO 60


PRIMER NIVEL
C-3 (0.25 x 0.40)
Longitudinal 6.25 5/8'' 12.00 2.00 6.25
3/4'' 12.00 4.00 6.25
0.17
Estribos 3/8'' 12.00 36.00 1.15
0.32
C-9 (0.25 x 0.40)
Longitudinal 5/8'' 12.00 3.00 6.25
6.25 3/4'' 12.00 4.00 6.25

Estribos 0.17 3/8'' 12.00 36.00 1.15

0.32
C-4 (0.25 x 0.25)
Longitudinal 1/2'' 3.00 6.00 5.85
0.17 5.85
Estribos 3/8'' 3.00 30.00 0.85
0.17
Ca - 2 ( 0.13 x 0.25 )
Longuitudinal 1/2'' 13.00 4.00 3.60
0.09 3.6

Estribos 0.21 3/8'' 13.00 21.00 1.30

Ca - 6 ( 0.10 x 0.13 )
Longuitudinal 1/2'' 56.00 2.00 3.60
3.6
0.15
Estribos 3/8'' 56.00 21.00 0.15

SEGUNDO NIVEL
C-3 (0.25 x 0.40)
Longitudinal 3.40 5/8'' 12.00 2.00 3.40
3/4'' 12.00 4.00 3.40
0.17
Estribos 3/8'' 12.00 21.00 1.15
0.32
C-9 (0.25 x 0.40)
Longitudinal 3.40 5/8'' 12.00 3.00 3.40
3/4'' 12.00 4.00 3.40

Estribos 0.17 3/8'' 12.00 21.00 1.15

0.32
Ca - 2 ( 0.13 x 0.25 )
Longuitudinal 1/2'' 10.00 4.00 3.60
0.09 3.6

Estribos 0.21 3/8'' 10.00 21.00 1.30

Ca - 6 ( 0.10 x 0.13 )
Longuitudinal 1/2'' 35.00 2.00 3.60
3.6
0.15
Estribos 3/8'' 35.00 21.00 0.15
#REF! ACERO EN VIGAS FY= 4200 KG/CM2 - GRADO 60
PRIMER NIVEL
Portico 4-4, 6-6, 7-7, 9-9, 11-11 y 13-13
Ref. Longitudinal ( - ) 17.85 3/4'' 6.00 2.00 17.85

Baston ( - ) 1.55 5/8'' 6.00 5.00 1.55

Baston ( - ) 3.75 5/8'' 6.00 2.00 3.75

Baston ( - ) 1.30 5/8'' 6.00 5.00 1.30

Ref. Longitudinal ( + ) 17.20 3/4'' 6.00 2.00 17.20

Baston (+ ) 2.90 5/8'' 6.00 5.00 2.90

Baston (+ ) 3.40 5/8'' 6.00 5.00 3.40

Baston (+ ) 3.30 5/8'' 6.00 5.00 3.30

Estribos 3/8'' 6.00 100.00 1.55


0.52

Estribos 0.12 3/8'' 6.00 6.00 0.75


0.17
0.17
Portico A-A, D-D, F-F y G-G
Ref. Longitudinal ( - ) 19.05 5/8'' 4.00 2.00 19.05

Baston ( - ) 1.2 5/8'' 4.00 1.00 1.20

Baston ( - ) 2.55 5/8'' 4.00 1.00 2.55

Baston ( - ) 2.65 5/8'' 4.00 3.00 2.65

Baston ( - ) 1.20 5/8'' 4.00 1.00 1.20

Ref. Longitudinal ( + ) 19.05 5/8'' 4.00 2.00 19.05

Baston ( + ) 2.30 5/8'' 4.00 1.00 2.30

Baston ( + ) 1.80 3/8'' 4.00 3.00 1.80

Baston ( + ) 2.40 5/8'' 4.00 1.00 2.40

Estribos 0.52 3/8'' 4.00 120.00 1.55

0.17
SEGUNDO NIVEL
Portico 4-4, 6-6, 7-7, 9-9, 11-11 y 13-13
Ref. Longitudinal ( - ) 17.85 3/4'' 6.00 2.00 17.85
Baston ( - ) 1.55 5/8'' 6.00 5.00 1.55

Baston ( - ) 3.75 5/8'' 6.00 2.00 3.75

Baston ( - ) 1.30 5/8'' 6.00 5.00 1.30

Ref. Longitudinal ( + ) 17.20 3/4'' 6.00 2.00 17.20

Baston (+ ) 2.90 5/8'' 6.00 5.00 2.90

Baston (+ ) 3.40 5/8'' 6.00 5.00 3.40

Baston (+ ) 3.30 5/8'' 6.00 5.00 3.30

Estribos 3/8'' 6.00 100.00 1.55


0.52

Estribos 0.12 3/8'' 6.00 6.00 0.75


0.17
0.17
Portico A-A, D-D, F-F y G-G
Ref. Longitudinal ( - ) 19.05 5/8'' 4.00 2.00 19.05

Baston ( - ) 1.2 5/8'' 4.00 1.00 1.20

Baston ( - ) 2.55 5/8'' 4.00 1.00 2.55

Baston ( - ) 2.65 5/8'' 4.00 3.00 2.65

Baston ( - ) 1.20 5/8'' 4.00 1.00 1.20

Ref. Longitudinal ( + ) 19.05 5/8'' 4.00 2.00 19.05

Baston ( + ) 2.30 5/8'' 4.00 1.00 2.30

Baston ( + ) 1.80 5/8'' 4.00 3.00 1.80

Baston ( + ) 2.40 5/8'' 4.00 1.00 2.40

Estribos 0.52 3/8'' 4.00 120.00 1.55

0.17

#REF! ACERO EN LOSAS ALIGERADAS Y=4200 KG/CM2 - GRADO 60


PRIMER NIVEL
Baston ( - ) 0.85 5/8'' 2.00 20.00 0.85

Baston ( - ) 2.55 5/8'' 4.00 20.00 2.55

Ref. Longitudinal ( + ) 18.60 5/8'' 1.00 20.00 18.60


Baston ( - ) 0.85 5/8'' 1.00 16.00 0.85

Baston ( - ) 2.55 5/8'' 5.00 16.00 2.55

Ref. Longitudinal ( + ) 20.25 5/8'' 1.00 16.00 18.60

SEGUNDO NIVEL
Baston ( - ) 0.85 5/8'' 2.00 46.00 0.85

Baston ( - ) 2.55 5/8'' 4.00 46.00 2.55

Ref. Longitudinal ( + ) 18.60 5/8'' 1.00 46.00 18.60

#REF! ACERO EN CISTERNA FY=4200 KG/CM2 - GRADO 60

Refuerzo 1/4'' 3.00 2.00 1.00 6.00

Estribos 1/4'' 3.00 2.00 0.70 4.20

#REF! ACERO EN ESCALERAS FY=4200 KG/CM2 - GRADO


PRIMER NIVEL
Primer Tramo
Longitudinal 6.11 1/2'' 1.00 10.00 6.11

2.50
Longitudinal 1/2'' 1.00 10.00 2.50

Longitudinal 2.50 1/2'' 1.00 10.00 2.50

Longitudinal 2.90 1/2'' 1.00 10.00 2.90


2.60
Longitudinal 1/2'' 1.00 10.00 2.60

Transversal 1.50 1/2'' 1.00 58.00 1.50

Segundo Tramo
Longitudinal 1/2'' 1.00 10.00 6.90
6.90

Longitudinal 1/2'' 1.00 10.00 6.80

Longitudinal 6.80 1/2'' 1.00 10.00 2.90


2.90

Longitudinal 1/2'' 1.00 10.00 2.88


2.88

Transversal 1.50 1/2'' 1.00 57.00 1.50


SEGUNDO NIVEL
Tercer y Cuarto Tramo
Longitudinal 1/2'' 2.00 10.00 6.87
6.90

Longitudinal 1/2'' 2.00 10.00 6.82

Longitudinal 6.80 1/2'' 2.00 10.00 2.89


2.90

Longitudinal 1/2'' 2.00 10.00 2.88


2.88

Transversal 1.50 1/2'' 2.00 57.00 1.50


O

UD CARLOS SHOWING FERRARI "

REVISADO POR:

LONGITUDES x (m)
PARCIAL TOTAL
0.58 1.02 1.60 2.26 (KG) (KG)
3/8'' 1/2'' 5/8'' 3/4''
0.4 0.5 0.6 0.75

Err:502 1,387.15
Err:502
235.95 240.67
Err:502
244.20 249.08

Err:502
222.00 226.44
Err:502
307.50 313.65

Err:502
92.25 94.10
Err:502
92.25 94.10

Err:502
34.80 35.50
Err:502
36.30 37.03
Err:502
Err:502
29.75 30.35
Err:502
29.75 30.35
Err:502
Err:502
17.60 17.95
Err:502
17.60 17.95
Err:502

Err:502 5,620.86

Err:502
150.00 240.00
300.00 678.00
Err:502
496.80 288.14
Err:502
Err:502
225.00 360.00
300.00 678.00

496.80 288.14

Err:502
Err:502
105.30 107.41
Err:502
76.50 44.37
Err:502
Err:502
187.20 190.94
Err:502
Err:502
354.90 205.84
Err:502
Err:502
403.20 411.26
Err:502
Err:502
176.40 102.31

Err:502
Err:502
81.60 130.56
163.20 368.83
Err:502
289.80 168.08
Err:502
Err:502
122.40 195.84
163.20 368.83

289.80 168.08

Err:502
Err:502
144.00 146.88
Err:502
Err:502
273.00 158.34
Err:502
Err:502
252.00 257.04
Err:502
Err:502
110.25 63.95

Err:502
Err:502 6461.20
Err:502
Err:502
214.20 484.09
Err:502
46.50 74.40
Err:502
45.00 72.00
Err:502
39.00 62.40
Err:502
206.40 466.46
Err:502
87.00 139.20
Err:502
102.00 163.20
Err:502
99.00 158.40

930.00 539.40
Err:502
Err:502
27.00 15.66

Err:502
Err:502
152.40 243.84
Err:502
4.80 7.68

10.20 16.32

31.80 50.88
Err:502
4.80 7.68

152.40 243.84
Err:502
9.20 14.72
Err:502
21.60 12.53
Err:502
9.60 15.36

Err:502
744.00 431.52
Err:502
Err:502

Err:502
Err:502
214.20 484.09
Err:502
46.50 74.40
Err:502
45.00 72.00
Err:502
39.00 62.40
Err:502
206.40 466.46
Err:502
87.00 139.20
Err:502
102.00 163.20
Err:502
99.00 158.40

930.00 539.40
Err:502
Err:502
27.00 15.66

Err:502
Err:502
152.40 243.84
Err:502
4.80 7.68

10.20 16.32

31.80 50.88
Err:502
4.80 7.68

152.40 243.84
Err:502
9.20 14.72
Err:502
21.60 34.56
Err:502
9.60 15.36

Err:502
744.00 431.52
Err:502
Err:502

Err:502

Err:502 4045.12

34.00 54.40
Err:502
204.00 326.40
Err:502
372.00 595.20
Err:502
13.60 21.76
Err:502
204.00 326.40
Err:502
297.60 476.16
Err:502

78.20 125.12
Err:502
469.20 750.72
Err:502
855.60 1368.96
Err:502
Err:502

Err:502 2.55
Err:502
1.50
Err:502
Err:502
1.05
Err:502
Err:502
Err:502
Err:502

Err:502 1115.47
Err:502

61.10 62.32
Err:502
25.00 25.50
Err:502
25.00 25.50
Err:502
29.00 29.58
Err:502
26.00 26.52
Err:502
87.00 88.74

Err:502
69.00 70.38
Err:502
68.00 69.36

29.00 29.58
Err:502

28.80 29.38

85.50 87.21
Err:502
Err:502
137.40 140.15
Err:502
136.40 139.13

57.80 58.96

Err:502
57.60 58.75
Err:502
171.00 174.42
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

01.00.00 CERCO PERIMTRICO


01.01.00 MUROS Y TABIQUES DE ALBAILERIA
01.01.01 MURO DE LADRILLO KING-KONG REX DE CABEZA 18 HUECOS
Muro en ingreso principal

01.01.02 MURO DE LADRILLO KING-KONG REX DE SOGA 18 HUECOS


Muro en progresiva 0+000 hasta 0+027.40
Muro en progresiva 0+027.40 hasta 0+064.61
Muro en progresiva 0+064.61 hasta 0+115.12
Muro en progresiva 0+064.61 hasta 0+115.12
Muro en progresiva 0+064.61 hasta 0+115.12
Muro en progresiva 0+115.12 hasta 0+159.43
Muro en progresiva 0+159.43 hasta 0+181.37
Muro en progresiva 0+159.43 hasta 0+181.37
Muro en progresiva 0+181.37 hasta 0+197.12
Muro en progresiva 0+181.37 hasta 0+197.12
Muro en progresiva 0+197.12 hasta 0+210.25
Muro en progresiva 0+210.25 hasta 0+229.19
Muro en progresiva 0+210.25 hasta 0+229.19
Muro en progresiva 0+229.19 hasta 0+247.51
Muro en progresiva 0+229.19 hasta 0+247.51

1 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

Muro en progresiva 0+247.51 hasta 0+288.83


Muro en progresiva 0+288.83 hasta 0+321.79
Muro en progresiva 0+288.83 hasta 0+321.79
Muro en progresiva 0+321.79 hasta 0+329.77

01.02.00 REVOQUES ENLUCIDOS Y MOLDURAS


01.02.01 TARRAJEO DE MUROS INTERIORES
Muro en ingreso principal

01.02.02 TARRAJEO DE MUROS EXTERIORES


Muro en ingreso principal

01.02.03 TARRAJEO DE SUPERFICIES EN COLUMNAS

C-1

C-2

En muro armado

01.02.04 TARRAJEO DE SUPERFICIES EN VIGAS


Tarrajeo en progresiva 0+000 hasta 0+027.40
Tarrajeo en progresiva 0+027.40 hasta 0+064.61

2 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

Tarrajeo en progresiva 0+064.61 hasta 0+115.12


Tarrajeo en progresiva 0+064.61 hasta 0+115.12
Tarrajeo en progresiva 0+064.61 hasta 0+115.12
Tarrajeo en progresiva 0+115.12 hasta 0+159.43
Tarrajeo en progresiva 0+159.43 hasta 0+181.37
Tarrajeo en progresiva 0+159.43 hasta 0+181.37
Tarrajeo en progresiva 0+181.37 hasta 0+197.12
Tarrajeo en progresiva 0+181.37 hasta 0+197.12
Tarrajeo en progresiva 0+197.12 hasta 0+210.25
Tarrajeo en progresiva 0+210.25 hasta 0+229.19
Tarrajeo en progresiva 0+210.25 hasta 0+229.19
Tarrajeo en progresiva 0+229.19 hasta 0+247.51
Tarrajeo en progresiva 0+229.19 hasta 0+247.51
Tarrajeo en progresiva 0+247.51 hasta 0+288.83
Tarrajeo en progresiva 0+288.83 hasta 0+321.79
Tarrajeo en progresiva 0+288.83 hasta 0+321.79
Tarrajeo en progresiva 0+321.79 hasta 0+329.77
Tarrajeo en ingreso principal

01.02.05 VESTIDURA DE ARISTAS EN COLUMNAS

C-1

3 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

C-2

En muro armado

01.02.06 VESTIDURA DE ARISTAS EN VIGAS


Vestidura en progresiva 0+000 hasta 0+027.40
Vestidura en progresiva 0+027.40 hasta 0+064.61
Vestidura en progresiva 0+064.61 hasta 0+115.12
Vestidura en progresiva 0+064.61 hasta 0+115.12
Vestidura en progresiva 0+064.61 hasta 0+115.12
Vestidura en progresiva 0+115.12 hasta 0+159.43
Vestidura en progresiva 0+159.43 hasta 0+181.37
Vestidura en progresiva 0+159.43 hasta 0+181.37
Vestidura en progresiva 0+181.37 hasta 0+197.12
Vestidura en progresiva 0+181.37 hasta 0+197.12
Vestidura en progresiva 0+197.12 hasta 0+210.25
Vestidura en progresiva 0+210.25 hasta 0+229.19
Vestidura en progresiva 0+210.25 hasta 0+229.19
Vestidura en progresiva 0+229.19 hasta 0+247.51
Vestidura en progresiva 0+229.19 hasta 0+247.51
Vestidura en progresiva 0+247.51 hasta 0+288.83
Vestidura en progresiva 0+288.83 hasta 0+321.79

4 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

Vestidura en progresiva 0+288.83 hasta 0+321.79


Vestidura en progresiva 0+321.79 hasta 0+329.77
Vestidura en ingreso principal

01.03.00 CIELORRASOS
01.03.01 CIELORASO CON MEZCLAS CEMENTO ARENA

Tarrajeo en losa

Tarrajeo en volado

01.04.00 ZOCALOS
01.04.01 ZCALOS DE CEMENTO FROTACHADO H=0.60M.
Zcalo en progresiva 0+000 hasta 0+027.40
Zcalo en progresiva 0+027.40 hasta 0+064.61
Zcalo en progresiva 0+064.61 hasta 0+115.12
Zcalo en progresiva 0+064.61 hasta 0+115.12
Zcalo en progresiva 0+064.61 hasta 0+115.12
Zcalo en progresiva 0+115.12 hasta 0+159.43
Zcalo en progresiva 0+159.43 hasta 0+181.37
Zcalo en progresiva 0+159.43 hasta 0+181.37
Zcalo en progresiva 0+181.37 hasta 0+197.12
VestiduraZcalo

5 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

Zcalo en progresiva 0+197.12 hasta 0+210.25


Zcalo en progresiva 0+210.25 hasta 0+229.19
Zcalo en progresiva 0+210.25 hasta 0+229.19
Zcalo en progresiva 0+229.19 hasta 0+247.51
Zcalo en progresiva 0+229.19 hasta 0+247.51
Zcalo en progresiva 0+247.51 hasta 0+288.83
Zcalo en progresiva 0+288.83 hasta 0+321.79
Zcalo en progresiva 0+288.83 hasta 0+321.79
Zcalo en progresiva 0+321.79 hasta 0+329.77

01.05.00 CARPINTERIA METALICA


01.05.01 REJAS METLICAS
01.05.01.01 REJA METALICA SEGUN DISEO
Reja metlica en el ingreso principal
Reja metlica en el ingreso secundario

01.05.01.02 COLOCACIN DE REJA METLICA

01.05.02 CERRAJERIA
01.05.02.01 CERRADURAS DE 3 GOLPES PARA REJA

6 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

01.06.00 PINTURA EN INTERIORES Y EXTERIORES


01.06.01 PINTURA EN INTERIORES
01.06.01.01 PINTURA LATEX EN MUROS INTERIORES

01.06.01.02 PINTURA LATEX EN INTERIORES COLUMNA Y VIGA

01.06.01.03 PINTURA LATEX EN INTERIORES ZOCALOS

01.06.02 PINTURA EN EXTERIORES


01.06.02.01 PINTURA LATEX EN MUROS EXTERIORES

01.06.02.02 PINTURA LATEX EN EXTERIORES COLUMNA Y VIGA

01.06.02.03 PINTURA LATEX EN CIELO RASO

01.06.02.04 PINTURA LATEX EN EXTERIORES ZOCALOS

02.00.00 MURO DE CONCRETO ARMADO


02.01.00 OTROS
02.01.01 JUNTA DE DILATACION

Lnea transversal corte 2-2

Lnea transversal corte 3-3

Lnea transversal corte 4-4

7 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

Lnea transversal corte 5-5


Lnea transversal corte 6-6

Lnea transversal corte 7-7

Lnea transversal corte 8-8

Lnea transversal corte 9-9

Lnea transversal corte 10-10

02.01.02 TUBERIA 3" PARA DRENAJE EN MURO

Tubera corte 2-2

Tubera corte 3-3

Tubera corte 4-4


Tubera corte 5-5

Tubera corte 6-6

Tubera corte 7-7

Tubera corte 8-8

Tubera corte 9-9

Tubera corte 10-10

03.00.00 RESERVORIO DE 5M3

8 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

03.01.00 REVOQUES ENLUCIDOS Y MOLDURAS


03.01.01 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE

Tarrajeo en muro interior

Tarrajeo en losa de fondo

03.01.02 TARRAJEO DE MUROS EXTERIORES

03.02.00 PINTURA EN INTERIORES Y EXTERIORES


03.02.01 PINTURA EN EXTERIORES
03.02.01.01 PINTURA LATEX EN MUROS EXTERIORES

03.03.00 OTROS
03.03.01 TAPA DE FIERRO GALVANIZADO

03.03.02 COLOCACIN TAPA DE FIERRO GALVANIZADO

03.03.03 TAPA DE CONCRETO ARMADO

03.03.04 ESCALERA TIPO GATO

04.00.00 CAPTACIN
04.01.00 REVOQUES ENLUCIDOS Y MOLDURAS

9 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

04.01.01 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE


Tarrajeo en muro interior

Tarrajeo en losa de fondo

04.01.02 TARRAJEO DE MUROS EXTERIORES

04.02.00 PINTURA EN INTERIORES Y EXTERIORES


04.02.01 PINTURA EN EXTERIORES
04.02.01.01 PINTURA LATEX EN MUROS EXTERIORES

04.03.00 OTROS
04.03.01 TAPA DE FIERRO GALVANIZADO

04.03.02 COLOCACIN TAPA DE FIERRO GALVANIZADO

05.00.00 CAJAS DE REUNIN Y EMBOQUILLADO DE SALIDA


05.01.00 REVOQUES ENLUCIDOS Y MOLDURAS
05.01.01 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE

Tarrajeo en muro interior

Tarrajeo en losa de fondo

10 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

05.01.02 TARRAJEO DE MUROS EXTERIORES

05.02.00 PINTURA EN INTERIORES Y EXTERIORES


05.02.01 PINTURA EN EXTERIORES
05.02.01.01 PINTURA LATEX EN MUROS EXTERIORES

05.03.00 OTROS
05.03.01 TAPA DE FIERRO GALVANIZADO

05.03.02 COLOCACIN TAPA DE FIERRO GALVANIZADO

06.00.00 LOSA MULTIDEPORTIVA Y TRIBUNA


06.01.00 PINTURA
06.01.01 PINTURA EN LINEAS DE FULBITO COLOR BLANCO

Lnea en el contorno
Lnea de rea

Lnea de medio campo

Lnea de medio campo

11 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

06.01.02 PINTURA EN LINEAS DE VOLEY COLOR AMARILLO


Lnea en el contorno

Lnea de medio campo

06.01.03 PINTURAEN LINEAS DE BASQUET COLOR VERDE

Lnea 01
Lnea 02

Lnea 03

Lnea 04

06.02.00 OTROS
06.02.01 EQUIPAMIENTO DEPORTIVO PARA FULBITO Y BASQUET

06.02.02 EQUIPAMIENTO DEPORTIVO PARA VOLEY

06.02.03 JUNTA DE CONTRACCIN

Lnea transversal

Lnea longitudinal

06.02.04 JUNTA DE DILATACION

Lnea transversal

12 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

Lnea longitudinal

06.02.05 CURADO DE CONCRETO

06.02.06 BARANDA METLICA

07.00.00 PATIO DE FORMACIN Y LOSA DE DISTRIBUCIN


07.01.00 OTROS
07.01.01 JUNTA DE CONTRACCIN

Lnea transversal losa 01

Lnea longitudinal losa 01

Lnea transversal losa 02


Lnea longitudinal losa 02

Lnea transversal losa 03

Lnea longitudinal losa 03

Lnea transversal losa 04

Lnea longitudinal losa 04


Lnea transversal losa 06

Lnea longitudinal losa 06

13 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

07.01.02 JUNTA DE DILATACION


Lnea transversal

Lnea longitudinal

07.01.03 CURADO DE CONCRETO


rea de losa 01
rea de losa 02
rea de losa 03
rea de losa 04
rea de losa 05
rea de losa 06

07.01.04 BARANDA METLICA

07.01.05 BANCAS TPICAS

08.00.00 ESTRADO Y ESCALERAS


08.01.00 OTROS
08.01.01 JUNTA DE CONTRACCIN

Lnea transversal losa 01

Lnea longitudinal losa 01

14 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

08.01.02 MASTIL PARA PABELLON NACIONAL

09.00.00 RAMPAS Y VEREDAS


09.01.00 OTROS
09.01.01 JUNTA DE CONTRACCIN
Lnea transversal losa 01

Lnea longitudinal losa 01

Lnea transversal losa 02

Lnea longitudinal losa 02

Lnea transversal losa 03


Lnea longitudinal losa 03

Lnea transversal losa 04

Lnea longitudinal losa 04

Lnea transversal losa 05

Lnea transversal losa 06


Lnea transversal losa 07

Lnea transversal losa 08

Lnea transversal losa 09

15 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

09.01.02 JUNTA DE DILATACION

Lnea transversal 01

Lnea transversal 02

Lnea transversal 03

Lnea transversal 04

09.01.03 BARANDA METLICA

10.00.00 CUNETAS DE DRENAJE


10.01.00 OTROS
10.01.01 JUNTA DE RELLENO ASFLTICO

Lnea transversal losa 01

10.01.02 REJILLA METLICA PARA CUNETA

Lnea transversal 01

11.00.00 SARDINEL
11.01.00 OTROS

16 De 201
PLANIL

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


ESTUDIANTIL DE ANDAS CHICO, DISTRITO DE YAR

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

11.01.01 JUNTA DE DILATACION


Lnea transversal losa 01

11.01.02 HABILITACION DE TERRENO PARA AREAS VERDES

reas verdes

11.01.03 HABILITACION Y COLOCACION DE GRAVILLA EN PISO

rea de juego

11.01.04 JUEGOS PARA NIOS

17 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

UES DE ALBAILERIA
O KING-KONG REX DE CABEZA 18 HUECOS M2
9.05

O KING-KONG REX DE SOGA 18 HUECOS M2


0+000 hasta 0+027.40 3.00
0+027.40 hasta 0+064.61 3.00
0+064.61 hasta 0+115.12 3.00
0+064.61 hasta 0+115.12 3.20
0+064.61 hasta 0+115.12 3.06
0+115.12 hasta 0+159.43 3.00
0+159.43 hasta 0+181.37 2.65
0+159.43 hasta 0+181.37 3.00
0+181.37 hasta 0+197.12 3.00
0+181.37 hasta 0+197.12 2.30
0+197.12 hasta 0+210.25 2.95
0+210.25 hasta 0+229.19 3.00
0+210.25 hasta 0+229.19 2.60
0+229.19 hasta 0+247.51 2.80
0+229.19 hasta 0+247.51 3.00

18 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

0+247.51 hasta 0+288.83 3.00


0+288.83 hasta 0+321.79 3.00
0+288.83 hasta 0+321.79 2.26
0+321.79 hasta 0+329.77 2.35

UCIDOS Y MOLDURAS
ROS INTERIORES M2
9.05

ROS EXTERIORES
9.05

ERFICIES EN COLUMNAS M2 Permetro

0.68

1.34

3.90 0.20

ERFICIES EN VIGAS M2
a 0+000 hasta 0+027.40 3.00 0.25
a 0+027.40 hasta 0+064.61 3.00 0.25

19 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

a 0+064.61 hasta 0+115.12 3.00 0.25


a 0+064.61 hasta 0+115.12 3.20 0.25
a 0+064.61 hasta 0+115.12 3.06 0.25
a 0+115.12 hasta 0+159.43 3.00 0.25
a 0+159.43 hasta 0+181.37 2.65 0.25
a 0+159.43 hasta 0+181.37 3.00 0.25
a 0+181.37 hasta 0+197.12 3.00 0.25
a 0+181.37 hasta 0+197.12 2.30 0.25
a 0+197.12 hasta 0+210.25 2.95 0.25
a 0+210.25 hasta 0+229.19 3.00 0.25
a 0+210.25 hasta 0+229.19 2.60 0.25
a 0+229.19 hasta 0+247.51 2.80 0.25
a 0+229.19 hasta 0+247.51 3.00 0.25
a 0+247.51 hasta 0+288.83 3.00 0.25
a 0+288.83 hasta 0+321.79 3.00 0.25
a 0+288.83 hasta 0+321.79 2.26 0.25
a 0+321.79 hasta 0+329.77 2.35 0.25
13.35 0.25

STAS EN COLUMNAS ML

20 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

STAS EN VIGAS ML
iva 0+000 hasta 0+027.40 3.00
iva 0+027.40 hasta 0+064.61 3.00
iva 0+064.61 hasta 0+115.12 3.00
iva 0+064.61 hasta 0+115.12 3.20
iva 0+064.61 hasta 0+115.12 3.06
iva 0+115.12 hasta 0+159.43 3.00
iva 0+159.43 hasta 0+181.37 2.65
iva 0+159.43 hasta 0+181.37 3.00
iva 0+181.37 hasta 0+197.12 3.00
iva 0+181.37 hasta 0+197.12 2.30
iva 0+197.12 hasta 0+210.25 2.95
iva 0+210.25 hasta 0+229.19 3.00
iva 0+210.25 hasta 0+229.19 2.60
iva 0+229.19 hasta 0+247.51 2.80
iva 0+229.19 hasta 0+247.51 3.00
iva 0+247.51 hasta 0+288.83 3.00
iva 0+288.83 hasta 0+321.79 3.00

21 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

iva 0+288.83 hasta 0+321.79 2.26


iva 0+321.79 hasta 0+329.77 2.35
13.35

MEZCLAS CEMENTO ARENA M2

4.95 1.25

4.95 0.15

ENTO FROTACHADO H=0.60M. M2


0+000 hasta 0+027.40 3.00
0+027.40 hasta 0+064.61 3.00
0+064.61 hasta 0+115.12 3.00
0+064.61 hasta 0+115.12 3.20
0+064.61 hasta 0+115.12 3.06
0+115.12 hasta 0+159.43 3.00
0+159.43 hasta 0+181.37 2.65
0+159.43 hasta 0+181.37 3.00
0+181.37 hasta 0+197.12 3.00
2.30

22 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

0+197.12 hasta 0+210.25 2.95


0+210.25 hasta 0+229.19 3.00
0+210.25 hasta 0+229.19 2.60
0+229.19 hasta 0+247.51 2.80
0+229.19 hasta 0+247.51 3.00
0+247.51 hasta 0+288.83 3.00
0+288.83 hasta 0+321.79 3.00
0+288.83 hasta 0+321.79 2.26
0+321.79 hasta 0+329.77 2.35

EGUN DISEO M2
ngreso principal 4.85
ngreso secundario 3.00

REJA METLICA UND

3 GOLPES PARA REJA UND

23 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

ERIORES Y EXTERIORES

N MUROS INTERIORES M2

N INTERIORES COLUMNA Y VIGA M2

N INTERIORES ZOCALOS M2

N MUROS EXTERIORES M2

N EXTERIORES COLUMNA Y VIGA M2

N CIELO RASO M2

N EXTERIORES ZOCALOS M2

NCRETO ARMADO

ML

2.55

3.20

4.55

24 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

6.30
3.45

2.10

3.20

3.20

2.50

A DRENAJE EN MURO ML

0.20

0.25

0.35
0.55

0.30

0.20

0.25

0.25

0.20

25 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

UCIDOS Y MOLDURAS
ROS INTERIORES CON IMPERMEABILIZANTE M2

1.90

1.90 1.90

ROS EXTERIORES M2 2.30

ERIORES Y EXTERIORES

N MUROS EXTERIORES M2

ALVANIZADO M2 0.40 0.40

A DE FIERRO GALVANIZADO UND

UND

ML

UCIDOS Y MOLDURAS

26 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

ROS INTERIORES CON IMPERMEABILIZANTE M2


1.10

1.20 1.20

ROS EXTERIORES M2 1.50

ERIORES Y EXTERIORES

N MUROS EXTERIORES M2

ALVANIZADO M2 1.20 1.20

A DE FIERRO GALVANIZADO UND

UNIN Y EMBOQUILLADO DE SALIDA


UCIDOS Y MOLDURAS
ROS INTERIORES CON IMPERMEABILIZANTE M2

1.10

1.20 1.20

27 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

ROS EXTERIORES M2 1.50

ERIORES Y EXTERIORES

N MUROS EXTERIORES M2

ALVANIZADO M2 1.20 1.20

A DE FIERRO GALVANIZADO UND

EPORTIVA Y TRIBUNA

S DE FULBITO COLOR BLANCO ML

26.00 14.00
13.90

13.90

17.00

28 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

S DE VOLEY COLOR AMARILLO ML


18.00 9.00

9.00

S DE BASQUET COLOR VERDE ML

22.95
11.35

3.60

5.95

PORTIVO PARA FULBITO Y BASQUET UND

PORTIVO PARA VOLEY UND

ML

19.65

30.60

ML

19.65

29 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

30.60

M2 30.60 19.65

ML 28.35

MACIN Y LOSA DE DISTRIBUCIN

ML

7.60

7.60

8.25
5.35

3.50

4.70

9.30

8.90
17.75

15.45

30 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

ML
20.25

18.55

M2
16.40
43.44
51.87
56.67
37.63
272.48

ML 19.00

UND

SCALERAS

ML

2.60

8.25

31 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

ELLON NACIONAL UND

ML
0.70

7.90

1.10

2.70

2.45
4.45

1.60

11.00

2.00

1.20
1.50

1.75

1.60

32 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

ML

1.00

1.40

2.75

1.90

ML 95.40

DRENAJE

O ASFLTICO ML

1.50

A PARA CUNETA ML

348.80

33 De 201
PLANILLA DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE LOPEZ ALBUJ
TUDIANTIL DE ANDAS CHICO, DISTRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

MEDIDAS

UND LARGO ANCHO

ML
1.50

TERRENO PARA AREAS VERDES M2

OLOCACION DE GRAVILLA EN PISO M2

JGO

34 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

22.63
2.50 1.00 22.63

710.23
2.50 8.00 60.00
2.50 9.00 67.50
2.50 9.00 67.50
2.50 2.00 16.00
2.50 3.00 22.95
2.50 13.00 97.50
2.50 4.00 26.50
2.50 3.00 22.50
2.50 3.00 22.50
2.50 2.00 11.50
2.50 4.00 29.50
2.50 3.00 22.50
2.50 3.00 19.50
2.50 3.00 21.00
2.50 3.00 22.50

35 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

2.50 12.00 90.00


2.50 9.00 67.50
2.50 1.00 5.65
2.50 3.00 17.63

22.63
2.50 1.00 22.63

22.63
2.50 1.00 22.63

402.31

3.30 135.00 302.94

3.30 1.00 0.97

6.00 2.00 98.40

237.95
0.20 8.00 19.20
0.20 9.00 21.60

36 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

0.20 9.00 21.60


0.20 2.00 5.12
0.20 3.00 7.34
0.20 13.00 31.20
0.20 4.00 8.48
0.20 3.00 7.20
0.20 3.00 7.20
0.20 2.00 3.68
0.20 4.00 9.44
0.20 3.00 7.20
0.20 3.00 6.24
0.20 3.00 6.72
0.20 3.00 7.20
0.20 12.00 28.80
0.20 9.00 21.60
0.20 1.00 1.81
0.20 3.00 5.64
0.20 1.00 10.68

1843.20

3.30 135.00 1782.00

37 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

3.30 1.00 13.20

6.00 2.00 48.00

1189.76
8.00 96.00
9.00 108.00
9.00 108.00
2.00 25.60
3.00 36.72
13.00 156.00
4.00 42.40
3.00 36.00
3.00 36.00
2.00 18.40
4.00 47.20
3.00 36.00
3.00 31.20
3.00 33.60
3.00 36.00
12.00 144.00
9.00 108.00

38 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

1.00 9.04
3.00 28.20
1.00 53.40

3.66

0.20 2.00 2.48

0.80 2.00 1.19

340.91
0.60 16.00 28.80
0.60 18.00 32.40
0.60 18.00 32.40
0.60 4.00 7.68
0.60 6.00 11.02
0.60 26.00 46.80
0.60 8.00 12.72
0.60 6.00 10.80
0.60 6.00 10.80
0.60 4.00 5.52

39 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

0.60 8.00 14.16


0.60 6.00 10.80
0.60 6.00 9.36
0.60 6.00 10.08
0.60 6.00 10.80
0.60 24.00 43.20
0.60 18.00 32.40
0.60 2.00 2.71
0.60 6.00 8.46

26.58
3.50 1.00 16.98
3.20 1.00 9.60

2.00 2.00

2.00 2.00

40 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

22.63 22.63

320.13 320.13

340.91 340.91

22.63 22.63

320.13 320.13

3.66 3.66

340.91 340.91

109.30

2.00 5.10

2.00 6.40

3.00 13.65

41 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

6.00 37.80
1.00 3.45

5.00 10.50

3.00 9.60

4.00 12.80

4.00 10.00

40.60

3.00 0.60

3.00 0.75

12.00 4.20
28.00 15.40

7.00 2.10

5.00 1.00

26.00 6.50

21.00 5.25

24.00 4.80

42 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

18.05

1.90 4.00 14.44

1.00 3.61

1.50 4.00 13.80 13.80

13.80 13.80

3.00 0.48 0.48

3.00 3.00

1.00

1.60 1.00 1.60 1.60

43 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

5.84
1.00 4.00 4.40

1.00 1.44

1.05 4.00 6.30 6.30

6.30 6.30

1.00 1.44 1.44

1.00 1.00

28.64

1.30 16.00 22.88

4.00 5.76

44 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

1.30 16.00 31.20 31.20

31.20 31.20

4.00 5.76 5.76

4.00 4.00

138.70

1.00 80.00
2.00 27.80

1.00 13.90

1.00 17.00

45 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

72.00
1.00 54.00

2.00 18.00

99.60

2.00 45.90
2.00 22.70

2.00 7.20

4.00 23.80

2.00 2.00

1.00 1.00

240.30

6.00 117.90

4.00 122.40

50.25

1.00 19.65

46 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

1.00 30.60

1.00 601.29 601.29

1.00 28.35 28.35

451.80

3.00 22.80

3.00 22.80

2.00 16.50
4.00 21.40

2.00 7.00

1.00 4.70

5.00 46.50

5.00 44.50
8.00 142.00

8.00 123.60

47 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

38.80
1.00 20.25

1.00 18.55

478.50
16.40 1.00 16.40
43.44 1.00 43.44
51.87 1.00 51.87
56.67 1.00 56.67
37.63 1.00 37.63
272.48 1.00 272.48

1.00 19.00 19.00

3.00 3.00

21.25

5.00 13.00

1.00 8.25

48 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

3.00 3.00

983.25
10.00 7.00

2.00 15.80

5.00 5.50

2.00 5.40

5.00 12.25
2.00 8.90

15.00 24.00

2.00 22.00

86.00 172.00

128.00 153.60
146.00 219.00

44.00 77.00

163.00 260.80

49 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

17.90

2.00 2.00

2.00 2.80

2.00 5.50

4.00 7.60

1.00 95.40 95.40

135.00

90.00 135.00

348.80

1.00 348.80

50 De 201
DOS

E LOPEZ ALBUJAR A LA POBLACION

N SUB TOTAL
DE TOTAL
ALTO VECES LONG. AREA VOL. KG.

45.00
30.00 45.00

1329.27

1329.27

113.26

113.26

1.00 1.00

51 De 201
RESUMEN DE METRADOS

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIP


PBLICA INTEGRADA DE HUANCACHACA, DI
YAROWILCA - HUNUCO.

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

01.00.00 CERCO PERIMTRICO


Err:509 Err:509
Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

0 Acero longitudinal de dmetro 1/2"


000 Acero transversal de dmetro 1/4"
000 000
01.02.02 CIMIENTO CORRIDO
01.02.02.01 CONCRETO CIMIENTO CORRIDO MEZCLA 1:10+25% P.G. 6" MAX

Err:509 Err:509
01.03.01 ZAPATAS
01.03.01.01 CONCRETO EN ZAPATAS F'C =210 KG/CM2

01.03.01.02 ACERO EN ZAPATAS FY=4200KG/CM2 - GRADO 60


01.03.02 SOBRECIMIENTO ARMADO
RESUMEN DE METRADOS

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIP


PBLICA INTEGRADA DE HUANCACHACA, DI
YAROWILCA - HUNUCO.

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

01.03.02.01 CONCRETO EN SOBRECIMIENTO REFORZADO F'C=175KG/CM2


01.03.02.02 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS

01.03.02.03 ACERO EN SOBRECIMIENTO REFORZADO FY=4200KG/CM2, GRADO


01.03.03 COLUMNAS
01.03.03.01 CONCRETO EN COLUMNAS F'C=210KG/CM2

01.03.03.02 ENCOFRADO Y DESENCOFRADO EN COLUMNAS

01.03.03.03 ACERO EN COLUMNAS FY=4200 KG/CM2 - GRADO 60


01.03.04 VIGAS
01.03.04.01 CONCRETO EN VIGAS F'C=210KG/CM2

01.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

01.03.04.03 ACERO EN VIGAS FY=4200KG/CM2 GRADO 60


Err:509 Err:509
Err:509 Err:509

Err:509 Err:509

Err:509 Err:509
Err:509 Err:509
Err:509 Err:509

Err:509 Err:509
RESUMEN DE METRADOS

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIP


PBLICA INTEGRADA DE HUANCACHACA, DI
YAROWILCA - HUNUCO.

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

Err:509 Err:509

02.00.00 MURO DE CONTENCION


02.01.00 MOVIMIENTOS DE TIERRAS
Err:509 Err:509

01.01.01 EXCAVACIN MASIVA CON MAQUINARIA

02.01.02 RELLENO Y COMPACTADO DE ZANJAS CON MATERIAL PROPIO C/E

Err:509 Err:509

02.01.04 ELIMINACIN DE MATERIAL EXCEDENTE C/MAQUINARIA DIST.=5 KM

02.02.00 OBRAS DE CONCRETO SIMPLE


02.02.01 SOLADOS
02.02.01.01 SOLADO E=4" EN MURO DE CONTENCION F'C=140 KG/CM2

02.03.00 OBRAS DE CONCRETO ARMADO


02.03.01 ZAPATAS
02.03.01.01 CONCRETO EN ZAPATAS F'C =210 KG/CM2

02.03.01.02 ACERO EN ZAPATAS FY=4200KG/CM2 - GRADO 60


RESUMEN DE METRADOS

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIP


PBLICA INTEGRADA DE HUANCACHACA, DI
YAROWILCA - HUNUCO.

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

02.03.02 MURO DE CONCRETO ARMADO


02.03.02.01 CONCRETO EN MURO F'C=210 KG/CM2

02.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO

02.03.02.03 ACERO EN MURO FY=4200KG/CM2 GRADO 60


02.03.02 CONTRAFUERTE
02.03.02.01 CONCRETO EN CONTRAFUERTE F'C=210 KG/CM2
02.03.02.01 ENCOFRADO Y DESENCOFRADO NORMAL EN CONTRAFUERTE

02.03.02.01 ACERO EN CONTRAFUERTE FY=4200KG/CM2 GRADO 60


02.03.00 OBRAS DE CONCRETO CICLOPEO
02.03.01 ZAPATAS
02.03.01.01 CONCRETO EN ZAPATAS
02.03.01 CONCRETO EN MURO
02.03.01.01 CONCRETO EN MURO
02.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN MURO
RESUMEN DE METRADOS

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIP


PBLICA INTEGRADA DE HUANCACHACA, DI
YAROWILCA - HUNUCO.

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION
RESUMEN DE METRADOS

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIP


PBLICA INTEGRADA DE HUANCACHACA, DI
YAROWILCA - HUNUCO.

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION

Err:509
Err:509
Err:509

Err:509
Err:509
RESUMEN DE METRADOS

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIP


PBLICA INTEGRADA DE HUANCACHACA, DI
YAROWILCA - HUNUCO.

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION
RESUMEN DE METRADOS

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIP


PBLICA INTEGRADA DE HUANCACHACA, DI
YAROWILCA - HUNUCO.

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION
RESUMEN DE METRADOS

PROYECTO : CREACIN DE INFRAESTRUCTURA Y EQUIP


PBLICA INTEGRADA DE HUANCACHACA, DI
YAROWILCA - HUNUCO.

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ESTRUCTURAS

N DESCRIPCION
RESUMEN DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES
ROWILCA - HUNUCO.

RAS EXTERIORES

TOTAL
UND

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

al de dmetro 1/2"
al de dmetro 1/4"
0 0.00

NTO CORRIDO MEZCLA 1:10+25% P.G. 6" MAX M3 46.04

PATAS F'C =210 KG/CM2 M3 2.88

S FY=4200KG/CM2 - GRADO 60 KG 73.44


O ARMADO
RESUMEN DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES
ROWILCA - HUNUCO.

RAS EXTERIORES

TOTAL
UND

BRECIMIENTO REFORZADO F'C=175KG/CM2 M3 29.70


SENCOFRADO DE SOBRECIMIENTOS M2 169.20

CIMIENTO REFORZADO FY=4200KG/CM2, GRADO 60 KG 740.20

LUMNAS F'C=210KG/CM2 M3 3.47

SENCOFRADO EN COLUMNAS M2 110.55

NAS FY=4200 KG/CM2 - GRADO 60 KG 1187.54

AS F'C=210KG/CM2 M3 4.14

SENCOFRADO NORMAL EN VIGAS M2 62.40

FY=4200KG/CM2 GRADO 60 KG 1012.50

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509

Err:509 Err:509
RESUMEN DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES
ROWILCA - HUNUCO.

RAS EXTERIORES

TOTAL
UND

Err:509 Err:509

NTENCION
E TIERRAS
Err:509 Err:509

VA CON MAQUINARIA M3 4897.98

ACTADO DE ZANJAS CON MATERIAL PROPIO C/EQUIPO LIVIANO M3 3208.06

Err:509 Err:509

ATERIAL EXCEDENTE C/MAQUINARIA DIST.=5 KM M3 1689.91

CRETO SIMPLE

MURO DE CONTENCION F'C=140 KG/CM2 M3 62.01

CRETO ARMADO

PATAS F'C =210 KG/CM2 M3 310.03

S FY=4200KG/CM2 - GRADO 60 KG 27903.03


RESUMEN DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES
ROWILCA - HUNUCO.

RAS EXTERIORES

TOTAL
UND

RETO ARMADO
RO F'C=210 KG/CM2 M3 294.10

SENCOFRADO NORMAL EN MURO M2 260.40

FY=4200KG/CM2 GRADO 60 KG 31401.45

NTRAFUERTE F'C=210 KG/CM2 M3 158.42


SENCOFRADO NORMAL EN CONTRAFUERTE M2 1139.54

AFUERTE FY=4200KG/CM2 GRADO 60 KG 20241.72


CRETO CICLOPEO

M3 49.46

M3 102.61
SENCOFRADO NORMAL EN MURO M2 88.40
RESUMEN DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES
ROWILCA - HUNUCO.

RAS EXTERIORES

TOTAL
UND
RESUMEN DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES
ROWILCA - HUNUCO.

RAS EXTERIORES

TOTAL
UND
RESUMEN DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES
ROWILCA - HUNUCO.

RAS EXTERIORES

TOTAL
UND
RESUMEN DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES
ROWILCA - HUNUCO.

RAS EXTERIORES

TOTAL
UND
RESUMEN DE METRADOS

REACIN DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA INSTITUCIN


BLICA INTEGRADA DE HUANCACHACA, DISTRITO DE APARICIO POMARES
ROWILCA - HUNUCO.

RAS EXTERIORES

TOTAL
UND
RESUMEN DE METRADOS

PROYECTO : MEJORAMIENTO DE LOS SERVICIOS QUE PRESTA


LOPEZ ALBUJAR A LA POBLACION ESTUDIANTIL D
DISTRITO DE YARUMAYO HUANUCO

SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

01.00.00 CERCO PERIMTRICO


01.01.00 MUROS Y TABIQUES DE ALBAILERIA
01.01.01 MURO DE LADRILLO KING-KONG REX DE CABEZA 18 HUECOS

01.01.02 MURO DE LADRILLO KING-KONG REX DE SOGA 18 HUECOS


01.02.00 REVOQUES ENLUCIDOS Y MOLDURAS
01.02.01 TARRAJEO DE MUROS INTERIORES

01.02.02 TARRAJEO DE MUROS EXTERIORES

01.02.03 TARRAJEO DE SUPERFICIES EN COLUMNAS


01.02.04 TARRAJEO DE SUPERFICIES EN VIGAS
01.02.05 VESTIDURA DE ARISTAS EN COLUMNAS
01.02.06 VESTIDURA DE ARISTAS EN VIGAS

01.03.00 CIELORRASOS
01.03.01 CIELORASO CON MEZCLAS CEMENTO ARENA

01.04.00 ZOCALOS
01.04.01 ZCALOS DE CEMENTO FROTACHADO H=0.60M.

01.05.00 CARPINTERIA METALICA


01.05.01 REJAS METLICAS

1 De 201
SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

01.05.01.01 REJA METALICA SEGUN DISEO

01.05.01.02 COLOCACIN DE REJA METLICA


01.05.02 CERRAJERIA
01.05.02.01 CERRADURAS DE 3 GOLPES PARA REJA

01.06.00 PINTURA EN INTERIORES Y EXTERIORES


01.06.01 PINTURA EN INTERIORES
01.06.01.01 PINTURA LATEX EN MUROS INTERIORES

01.06.01.02 PINTURA LATEX EN INTERIORES COLUMNA Y VIGA

01.06.01.03 PINTURA LATEX EN INTERIORES ZOCALOS

01.06.02 PINTURA EN EXTERIORES


01.06.02.01 PINTURA LATEX EN MUROS EXTERIORES

01.06.02.02 PINTURA LATEX EN EXTERIORES COLUMNA Y VIGA

01.06.02.03 PINTURA LATEX EN CIELO RASO

01.06.02.04 PINTURA LATEX EN EXTERIORES ZOCALOS

02.00.00 MURO DE CONCRETO ARMADO


02.01.00 OTROS
02.01.01 JUNTA DE DILATACION

02.01.02 TUBERIA 3" PARA DRENAJE EN MURO

03.00.00 RESERVORIO DE 5M3


03.01.00 REVOQUES ENLUCIDOS Y MOLDURAS

2 De 201
SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

03.01.01 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE

03.01.02 TARRAJEO DE MUROS EXTERIORES

03.02.00 PINTURA EN INTERIORES Y EXTERIORES


03.02.01 PINTURA EN EXTERIORES
03.02.01.01 PINTURA LATEX EN MUROS EXTERIORES

03.03.00 OTROS
03.03.01 TAPA DE FIERRO GALVANIZADO

03.03.02 COLOCACIN TAPA DE FIERRO GALVANIZADO

03.03.03 TAPA DE CONCRETO ARMADO

03.03.04 ESCALERA TIPO GATO

04.00.00 CAPTACIN
04.01.00 REVOQUES ENLUCIDOS Y MOLDURAS
04.01.01 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE

04.01.02 TARRAJEO DE MUROS EXTERIORES

04.02.00 PINTURA EN INTERIORES Y EXTERIORES


04.02.01 PINTURA EN EXTERIORES
04.02.01.01 PINTURA LATEX EN MUROS EXTERIORES

04.03.00 OTROS
04.03.01 TAPA DE FIERRO GALVANIZADO

04.03.02 COLOCACIN TAPA DE FIERRO GALVANIZADO

3 De 201
SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

05.00.00 CAJAS DE REUNIN Y EMBOQUILLADO DE SALIDA


05.01.00 REVOQUES ENLUCIDOS Y MOLDURAS
05.01.01 TARRAJEO DE MUROS INTERIORES CON IMPERMEABILIZANTE

05.01.02 TARRAJEO DE MUROS EXTERIORES

05.02.00 PINTURA EN INTERIORES Y EXTERIORES


05.02.01 PINTURA EN EXTERIORES
05.02.01.01 PINTURA LATEX EN MUROS EXTERIORES

05.03.00 OTROS
05.03.01 TAPA DE FIERRO GALVANIZADO

05.03.02 COLOCACIN TAPA DE FIERRO GALVANIZADO

06.00.00 LOSA MULTIDEPORTIVA Y TRIBUNA


06.01.00 PINTURA
06.01.01 PINTURA EN LINEAS DE FULBITO COLOR BLANCO

06.01.02 PINTURA EN LINEAS DE VOLEY COLOR AMARILLO


06.01.03 PINTURAEN LINEAS DE BASQUET COLOR VERDE

06.02.00 OTROS
06.02.01 EQUIPAMIENTO DEPORTIVO PARA FULBITO Y BASQUET

06.02.02 EQUIPAMIENTO DEPORTIVO PARA VOLEY

06.02.03 JUNTA DE CONTRACCIN

4 De 201
SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

06.02.04 JUNTA DE DILATACION

06.02.05 CURADO DE CONCRETO

06.02.06 BARANDA METLICA

07.00.00 PATIO DE FORMACIN Y LOSA DE DISTRIBUCIN


07.01.00 OTROS
07.01.01 JUNTA DE CONTRACCIN

07.01.02 JUNTA DE DILATACION

07.01.03 CURADO DE CONCRETO

07.01.04 BARANDA METLICA

07.01.05 BANCAS TPICAS

08.00.00 ESTRADO Y ESCALERAS


08.01.00 OTROS
08.01.01 JUNTA DE CONTRACCIN

08.01.02 MASTIL PARA PABELLON NACIONAL

09.00.00 RAMPAS Y VEREDAS


09.01.00 OTROS
09.01.01 JUNTA DE CONTRACCIN

09.01.02 JUNTA DE DILATACION

09.01.03 BARANDA METLICA

10.00.00 CUNETAS DE DRENAJE

5 De 201
SUB PRESUPUESTO : OBRAS EXTERIORES

FECHA :

ESPECIALIDAD : ARQUITECTUTRA

N DESCRIPCION

10.01.00 OTROS
10.01.01 JUNTA DE RELLENO ASFLTICO

10.01.02 REJILLA METLICA PARA CUNETA

11.00.00 SARDINEL
11.01.00 OTROS
11.01.01 JUNTA DE DILATACION

11.01.02 HABILITACION DE TERRENO PARA AREAS VERDES

11.01.03 HABILITACION Y COLOCACION DE GRAVILLA EN PISO

11.01.04 JUEGOS PARA NIOS

6 De 201
RESUMEN DE METRADOS

EJORAMIENTO DE LOS SERVICIOS QUE PRESTA LA I.E. N 32132 ENRIQUE


PEZ ALBUJAR A LA POBLACION ESTUDIANTIL DE ANDAS CHICO,
TRITO DE YARUMAYO HUANUCO

RAS EXTERIORES

UITECTUTRA

DESCRIPCION UND TOTAL

UES DE ALBAILERIA
O KING-KONG REX DE CABEZA 18 HUECOS M2 22.63

O KING-KONG REX DE SOGA 18 HUECOS M2 710.23


UCIDOS Y MOLDURAS
ROS INTERIORES M2 22.63

ROS EXTERIORES 22.63

ERFICIES EN COLUMNAS M2 402.31


ERFICIES EN VIGAS M2 237.95
STAS EN COLUMNAS ML 1843.20
STAS EN VIGAS ML 1189.76

MEZCLAS CEMENTO ARENA M2 3.66

ENTO FROTACHADO H=0.60M. M2 340.91

7 De 201
RAS EXTERIORES

UITECTUTRA

DESCRIPCION UND TOTAL

EGUN DISEO M2 26.58

REJA METLICA UND 2.00

3 GOLPES PARA REJA UND 2.00

ERIORES Y EXTERIORES

N MUROS INTERIORES M2 22.63

N INTERIORES COLUMNA Y VIGA M2 320.13

N INTERIORES ZOCALOS M2 340.91

N MUROS EXTERIORES M2 22.63

N EXTERIORES COLUMNA Y VIGA M2 320.13

N CIELO RASO M2 3.66

N EXTERIORES ZOCALOS M2 340.91

NCRETO ARMADO

ML 109.30

A DRENAJE EN MURO ML 40.60

UCIDOS Y MOLDURAS

8 De 201
RAS EXTERIORES

UITECTUTRA

DESCRIPCION UND TOTAL

ROS INTERIORES CON IMPERMEABILIZANTE M2 18.05

ROS EXTERIORES M2 13.80

ERIORES Y EXTERIORES

N MUROS EXTERIORES M2 13.80

ALVANIZADO M2 0.48

A DE FIERRO GALVANIZADO UND 3.00

UND 1.00

ML 1.60

UCIDOS Y MOLDURAS
ROS INTERIORES CON IMPERMEABILIZANTE M2 5.84

ROS EXTERIORES M2 6.30

ERIORES Y EXTERIORES

N MUROS EXTERIORES M2 6.30

ALVANIZADO M2 1.44

A DE FIERRO GALVANIZADO UND 1.00

9 De 201
RAS EXTERIORES

UITECTUTRA

DESCRIPCION UND TOTAL

UNIN Y EMBOQUILLADO DE SALIDA


UCIDOS Y MOLDURAS
ROS INTERIORES CON IMPERMEABILIZANTE M2 28.64

ROS EXTERIORES M2 31.20

ERIORES Y EXTERIORES

N MUROS EXTERIORES M2 31.20

ALVANIZADO M2 5.76

A DE FIERRO GALVANIZADO UND 4.00

EPORTIVA Y TRIBUNA

S DE FULBITO COLOR BLANCO ML 138.70

S DE VOLEY COLOR AMARILLO ML 72.00


S DE BASQUET COLOR VERDE ML 99.60

PORTIVO PARA FULBITO Y BASQUET UND 2.00

PORTIVO PARA VOLEY UND 1.00

ML 240.30

10 De 201
RAS EXTERIORES

UITECTUTRA

DESCRIPCION UND TOTAL

ML 50.25

M2 601.29

ML 28.35

MACIN Y LOSA DE DISTRIBUCIN

ML 451.80

ML 38.80

M2 478.50

ML 19.00

UND 3.00

SCALERAS

ML 21.25

ELLON NACIONAL UND 3.00

ML 983.25

ML 17.90

ML 95.40

DRENAJE

11 De 201
RAS EXTERIORES

UITECTUTRA

DESCRIPCION UND TOTAL

O ASFLTICO ML 135.00

A PARA CUNETA ML 348.80

ML 45.00

TERRENO PARA AREAS VERDES M2 1329.27

OLOCACION DE GRAVILLA EN PISO M2 113.26

JGO 1.00

12 De 201

También podría gustarte