Documentos de Académico
Documentos de Profesional
Documentos de Cultura
$ 15,820,768,272
PRECIO CON IVA
$2,600,841,600
$ -
$ 17,136,000
$ -
$ -
$1,923,096,120
$ 244,342,224
$2,192,465,646
$ 475,109,880
$2,345,231,732
$2,345,231,732
$ 12,143,454,934
}
{
HYJHUBBUUJJYYYUJYUYUUJJKKK, MMMMMV
PETROLEO DIESEL
HORAS
CONSUMO COMBUSTIBLE CANTIDAD LITROS/HORA TRABAJADAS LITROS/DIA LITROS/MES
5,054,400 $ 1,415,232,000
1,036,800 $ 290,304,000
194,400 $ 54,432,000
324,000 $ 90,720,000
1,555,200 $ 435,456,000
1,166,400 $ 326,592,000
518,400 $ 145,152,000
518,400 $ 145,152,000
51,840 $ 14,515,200
10,419,840 $ 2,917,555,200
Costo de compra Vida util
Equipos auxiliares Valor /Ao Valor/Mes
(CLP) (aos)
Camin aljibe $ 120,000,000 9 $ 13,333,333 $ 1,111,111
Camin pluma $ 120,000,000 9 $ 13,333,333 $ 1,111,111
Retroexcavadora $ 180,000,000 9 $ 20,000,000 $ 1,666,667
Camin surtidor $ 120,000,000 9 $ 13,333,333 $ 1,111,111
Bulldocer $ 250,000,000 9 $ 27,777,778 $ 2,314,815
Rodillo Compactador $ 150,000,000 9 $ 16,666,667 $ 1,388,889
Motoniveladora $ 150,000,000 9 $ 16,666,667 $ 1,388,889
Cantidad Valorcon
total/Mes
IVA
2 $ 2,222,222
1 $ 1,111,111
1 $ 1,666,667
1 $ 1,111,111
1 $ 2,314,815
1 $ 1,388,889
1 $ 1,388,889
$ 11,203,704
Carpeta Cantidad 44 (Unidad) Suministro
Producto
para : pozas (US$/m)
$ 31,801,342,285
MOVIMIENTO DE TIERRA Y COMPACTACIN ( EMPRESA CONTRATISTA
Talud
Material de baja ley de la 106785 4698540
mina y de pilas agotadas.
Precio instalacin carpetas/
( EMPRESA CONTRATISTA 1)
( EMPRESA CONTRATISTA 2)
Precio Precio total para la
Precio (US$/Ton (CLP/Ton de construccin de
de talud) talud) taludes /Ao