Nombre Duracin

PAVIMENTACION FLEXIBLE Y RIGIDO 240 das


OBRAS PROVISIONALES 240 das
CARTEL DE OBRA INCLUIDO INSTALACION 7 das
MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTA 7 das
ALMACEN,OFICINAS, GUARDANIA 240 das
OBRAS PRELIMINARES 210 das
TRAZO Y REPLANTEO CON TOPOGRAFO 210 das
MOVIMIENTO DE TIERRAS 181 das
EXCAVACION HASTA SUBRASANTE MAT SUELTO C/TRACTOR140-160 HP 100 das
EXCAVACION MANUAL DE ZANJA PARA SARDINELES, CUNETAS Y BADENES 20 das
CONFORMACION Y COMPACTACION SUBRASANTE C/MOTONIV. 125 HP 100 das
SUB BASE GRANULAR E=0.20 M C/EQUIPO 135 das
BASE GRANULAR E=0.20 M C/EQUIPO 94 das
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO 180 das
OBRAS DE CONCRETO 139 das
PAVIMENTO RIGIDO 46 das
CONCRETO FC=210 KG/CM2 EN PAVIMENTO RIGIDO (CEMENTO TIPO I) 45 das
ACERO ESTRUCTURAL TRABAJADO PARA PAVIMENTO RIGIDO (DOWELLS) 45 das
ENCOFRADO Y DESENCOFRADO NORMAL EN PAVIMENTO RIGIDO 45 das
SARDINEL EXPUESTOS 101 das
CONCRETO FC=175 KG/CM2 EN SARDINEL, CEMENTO TIPO I 100 das
ENCOFRADO Y DESENCOFRADO DE SARDINEL 100 das
SARDINEL DE CONFINAMIENTO 6 das
CONCRETO FC=175 KG/CM2 EN SARDINEL, CEMENTO TIPO I 5 das
ENCOFRADO Y DESENCOFRADO DE SARDINEL 5 das
CUNETAS DE CONCRETO 45 das
CONCRETO FC=175 KG/CM2 EN CUNETAS, CEMENTO TIPO I 45 das
ENCOFRADO Y DESENCOFRADO EN CUNETAS 45 das
BADEN DE CONCRETO 15 das
CONCRETO FC=210 KG/CM2 EN BADEN (CEMENTO TIPO I) 15 das
ENCOFRADO Y DESENCOFRADO NORMAL EN BADEN 15 das
JUNTAS 5 das
JUNTAS ASFALTICAS 5 das
PAVIMENTO FLEXIBLE 20 das
IMPRIMACION ASFALTICA 15 das
CARPETA ASFALTICA EN CALIENTE DE 2" 15 das
SEALIZACION 4 das
PINTADO DE SARDINELES 4 das
PINTADO DE PAVIMENTOS (SIMBOLO Y LETRAS) 4 das
PINTADO DE PAVIMENTOS (LINEAS CONTINUA) 4 das
VARIOS 236 das
RECONEXION DE PUNTOS DE AGUA 20 das
RECONEXION DE INSTALACION DE PUNTOS DE DESAGUE 20 das
NIVELACION DE TAPAS DE BUZONES 10 das
LIMPIEZA FINAL DE LA OBRA 3 das
VEREDAS 219 das
OBRAS PRELIMINARES 120 das
TRAZO Y REPLANTEO CON TOPOGRAFO 120 das
MOVIMIENTO DE TIERRAS 190 das
CORTE A NIVEL DE SUBRASANTE EN MATERIAL COMUN-MANUAL 50 das
EXCAVACION MANUAL DE ZANJA PARA SARDINELES 120 das
RELLENO COMPACTADO CON MATERIAL PROPIO 30 das
CONFORMACION Y COMPACTACION SUBRASANTE PARA VEREDAS 110 das
BASE GRANULAR PARA VEREDAS DE 0.10 M. 120 das
ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO 100 das
OBRAS DE CONCRETO 205 das
VEREDAS Y MARTILLOS DE CONCRETO 151.25 das
CONCRETO F'C=175 KG/CM2 PARA VEREDAS 140 das
ENCOFRADO Y DESENCOFRADO DE VEREDA 140 das
JUNTAS 10 das
JUNTAS ASFALTICAS 10 das
SARDINEL PERALTADO (AREA VERDE) 151 das
CONCRETO FC=175 KG/CM2 EN SARDINEL, CEMENTO TIPO I 150 das
ENCOFRADO Y DESENCOFRADO DE SARDINEL 150 das
ACERO ESTRUCTURAL TRABAJADO PARA SARDINEL 150 das
VARIOS 8 das
LIMPIEZA FINAL DE LA OBRA 3 das
EXTRACCION Y COLOCACION DE BLOQUES DE GRAMA 5 das
Comienzo Fin Predecesoras N Dias
10/10/13 08:00 a.m. 06/06/14 06:00 p.m. 240 Dias
10/10/13 08:00 a.m. 06/06/14 07:00 p.m. #VALUE!
10/10/13 08:00 a.m. 16/10/13 07:00 p.m. #VALUE!
10/10/13 08:00 a.m. 16/10/13 07:00 p.m. 3CC #VALUE!
10/10/13 09:00 a.m. 06/06/14 07:00 p.m. 3CC #VALUE!
10/10/13 09:00 a.m. 07/05/14 07:00 p.m. #VALUE!
10/10/13 09:00 a.m. 07/05/14 07:00 p.m. 3CC #VALUE!
25/10/13 09:00 a.m. 23/04/14 07:00 p.m. #VALUE!
25/10/13 09:00 a.m. 01/02/14 05:00 p.m. 7CC+15d #VALUE!
15/11/13 09:00 a.m. 04/12/13 07:00 p.m. #VALUE!
09/11/13 08:00 a.m. 16/02/14 05:00 p.m. 9CC+15d #VALUE!
16/11/13 08:00 a.m. 30/03/14 05:00 p.m. 11CC+7d #VALUE!
15/01/14 09:00 a.m. 18/04/14 07:00 p.m. 12CC+60d #VALUE!
26/10/13 08:00 a.m. 23/04/14 07:00 p.m. 9CC+1d #VALUE!
16/12/13 09:00 a.m. 03/05/14 05:00 p.m. #VALUE!
17/02/14 09:00 a.m. 03/04/14 07:00 p.m. #VALUE!
18/02/14 09:00 a.m. 03/04/14 07:00 p.m. 19CC+1d #VALUE!
18/02/14 09:00 a.m. 03/04/14 07:00 p.m. 19CC+1d #VALUE!
17/02/14 09:00 a.m. 02/04/14 07:00 p.m. 7CC+130d #VALUE!
16/12/13 09:00 a.m. 26/03/14 07:00 p.m. #VALUE!
17/12/13 09:00 a.m. 26/03/14 07:00 p.m. 22CC+1d #VALUE!
16/12/13 09:00 a.m. 25/03/14 07:00 p.m. 12CC+30d #VALUE!
19/04/14 08:00 a.m. 24/04/14 07:00 p.m. #VALUE!
20/04/14 08:00 a.m. 24/04/14 07:00 p.m. 25CC+1d #VALUE!
19/04/14 08:00 a.m. 23/04/14 07:00 p.m. 13 #VALUE!
16/03/14 10:00 a.m. 30/04/14 11:00 a.m. #VALUE!
16/03/14 10:00 a.m. 30/04/14 11:00 a.m. 28CC #VALUE!
16/03/14 10:00 a.m. 30/04/14 11:00 a.m. 13CC+19d,59,58 #VALUE!
19/04/14 08:00 a.m. 03/05/14 05:00 p.m. #VALUE!
19/04/14 08:00 a.m. 03/05/14 05:00 p.m. 31CC #VALUE!
19/04/14 08:00 a.m. 03/05/14 05:00 p.m. 13 #VALUE!
04/04/14 09:00 a.m. 08/04/14 07:00 p.m. #VALUE!
04/04/14 09:00 a.m. 08/04/14 07:00 p.m. 17 #VALUE!
07/05/14 09:00 a.m. 26/05/14 07:00 p.m. #VALUE!
07/05/14 09:00 a.m. 21/05/14 07:00 p.m. 13FC+18d,27 #VALUE!
12/05/14 09:00 a.m. 26/05/14 07:00 p.m. 35CC+5d #VALUE!
27/05/14 09:00 a.m. 30/05/14 07:00 p.m. #VALUE!
27/05/14 09:00 a.m. 30/05/14 07:00 p.m. 36 #VALUE!
27/05/14 09:00 a.m. 30/05/14 07:00 p.m. 36 #VALUE!
27/05/14 09:00 a.m. 30/05/14 07:00 p.m. 36 #VALUE!
10/10/13 08:00 a.m. 02/06/14 07:00 p.m. #VALUE!
24/12/13 09:00 a.m. 12/01/14 05:00 p.m. 9CC+60d #VALUE!
24/12/13 09:00 a.m. 12/01/14 05:00 p.m. 9CC+60d #VALUE!
25/01/14 08:00 a.m. 03/02/14 07:00 p.m. #VALUE!
31/05/14 08:00 a.m. 02/06/14 07:00 p.m. 38 #VALUE!
10/10/13 08:00 a.m. 16/05/14 07:00 p.m. #VALUE!
10/10/13 08:00 a.m. 06/02/14 07:00 p.m. #VALUE!
10/10/13 08:00 a.m. 06/02/14 07:00 p.m. 7CC #VALUE!
10/10/13 08:00 a.m. 17/04/14 07:00 p.m. #VALUE!
10/10/13 08:00 a.m. 28/11/13 07:00 p.m. 48CC #VALUE!
10/10/13 08:00 a.m. 06/02/14 07:00 p.m. 50CC #VALUE!
12/10/13 08:00 a.m. 01/12/13 10:00 a.m. 50CC+30d #VALUE!
13/10/13 08:00 a.m. 30/01/14 07:00 p.m. 50CC+1d #VALUE!
17/10/13 08:00 a.m. 13/02/14 07:00 p.m. 53CC+7d #VALUE!
08/01/14 09:00 a.m. 17/04/14 07:00 p.m. 50CC+90d #VALUE!
16/10/13 08:00 a.m. 08/05/14 07:00 p.m. #VALUE!
16/10/13 08:00 a.m. 16/03/14 10:00 a.m. #VALUE!
16/10/13 08:00 a.m. 04/03/14 07:00 p.m. 59CC+1d #VALUE!
16/10/13 08:00 a.m. 16/03/14 10:00 a.m. 54CC+20d #VALUE!
05/03/14 09:00 a.m. 14/03/14 07:00 p.m. #VALUE!
05/03/14 09:00 a.m. 14/03/14 07:00 p.m. 58 #VALUE!
09/12/13 09:00 a.m. 08/05/14 07:00 p.m. #VALUE!
10/12/13 09:00 a.m. 08/05/14 07:00 p.m. 64CC+1d #VALUE!
09/12/13 09:00 a.m. 07/05/14 07:00 p.m. 48CC+60d #VALUE!
10/12/13 09:00 a.m. 08/05/14 07:00 p.m. 64CC+1d #VALUE!
09/05/14 09:00 a.m. 16/05/14 07:00 p.m. #VALUE!
14/05/14 09:00 a.m. 16/05/14 07:00 p.m. 68 #VALUE!
09/05/14 09:00 a.m. 13/05/14 07:00 p.m. 63,58 #VALUE!