OBRAS PROVISIONALES 240 das CARTEL DE OBRA INCLUIDO INSTALACION 7 das MOVILIZACION Y DESMOVILIZACION DE EQUIPO Y HERRAMIENTA 7 das ALMACEN,OFICINAS, GUARDANIA 240 das OBRAS PRELIMINARES 210 das TRAZO Y REPLANTEO CON TOPOGRAFO 210 das MOVIMIENTO DE TIERRAS 181 das EXCAVACION HASTA SUBRASANTE MAT SUELTO C/TRACTOR140-160 HP 100 das EXCAVACION MANUAL DE ZANJA PARA SARDINELES, CUNETAS Y BADENES 20 das CONFORMACION Y COMPACTACION SUBRASANTE C/MOTONIV. 125 HP 100 das SUB BASE GRANULAR E=0.20 M C/EQUIPO 135 das BASE GRANULAR E=0.20 M C/EQUIPO 94 das ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO 180 das OBRAS DE CONCRETO 139 das PAVIMENTO RIGIDO 46 das CONCRETO FC=210 KG/CM2 EN PAVIMENTO RIGIDO (CEMENTO TIPO I) 45 das ACERO ESTRUCTURAL TRABAJADO PARA PAVIMENTO RIGIDO (DOWELLS) 45 das ENCOFRADO Y DESENCOFRADO NORMAL EN PAVIMENTO RIGIDO 45 das SARDINEL EXPUESTOS 101 das CONCRETO FC=175 KG/CM2 EN SARDINEL, CEMENTO TIPO I 100 das ENCOFRADO Y DESENCOFRADO DE SARDINEL 100 das SARDINEL DE CONFINAMIENTO 6 das CONCRETO FC=175 KG/CM2 EN SARDINEL, CEMENTO TIPO I 5 das ENCOFRADO Y DESENCOFRADO DE SARDINEL 5 das CUNETAS DE CONCRETO 45 das CONCRETO FC=175 KG/CM2 EN CUNETAS, CEMENTO TIPO I 45 das ENCOFRADO Y DESENCOFRADO EN CUNETAS 45 das BADEN DE CONCRETO 15 das CONCRETO FC=210 KG/CM2 EN BADEN (CEMENTO TIPO I) 15 das ENCOFRADO Y DESENCOFRADO NORMAL EN BADEN 15 das JUNTAS 5 das JUNTAS ASFALTICAS 5 das PAVIMENTO FLEXIBLE 20 das IMPRIMACION ASFALTICA 15 das CARPETA ASFALTICA EN CALIENTE DE 2" 15 das SEALIZACION 4 das PINTADO DE SARDINELES 4 das PINTADO DE PAVIMENTOS (SIMBOLO Y LETRAS) 4 das PINTADO DE PAVIMENTOS (LINEAS CONTINUA) 4 das VARIOS 236 das RECONEXION DE PUNTOS DE AGUA 20 das RECONEXION DE INSTALACION DE PUNTOS DE DESAGUE 20 das NIVELACION DE TAPAS DE BUZONES 10 das LIMPIEZA FINAL DE LA OBRA 3 das VEREDAS 219 das OBRAS PRELIMINARES 120 das TRAZO Y REPLANTEO CON TOPOGRAFO 120 das MOVIMIENTO DE TIERRAS 190 das CORTE A NIVEL DE SUBRASANTE EN MATERIAL COMUN-MANUAL 50 das EXCAVACION MANUAL DE ZANJA PARA SARDINELES 120 das RELLENO COMPACTADO CON MATERIAL PROPIO 30 das CONFORMACION Y COMPACTACION SUBRASANTE PARA VEREDAS 110 das BASE GRANULAR PARA VEREDAS DE 0.10 M. 120 das ELIMINACION DE MATERIAL EXCEDENTE CON EQUIPO 100 das OBRAS DE CONCRETO 205 das VEREDAS Y MARTILLOS DE CONCRETO 151.25 das CONCRETO F'C=175 KG/CM2 PARA VEREDAS 140 das ENCOFRADO Y DESENCOFRADO DE VEREDA 140 das JUNTAS 10 das JUNTAS ASFALTICAS 10 das SARDINEL PERALTADO (AREA VERDE) 151 das CONCRETO FC=175 KG/CM2 EN SARDINEL, CEMENTO TIPO I 150 das ENCOFRADO Y DESENCOFRADO DE SARDINEL 150 das ACERO ESTRUCTURAL TRABAJADO PARA SARDINEL 150 das VARIOS 8 das LIMPIEZA FINAL DE LA OBRA 3 das EXTRACCION Y COLOCACION DE BLOQUES DE GRAMA 5 das Comienzo Fin Predecesoras N Dias 10/10/13 08:00 a.m. 06/06/14 06:00 p.m. 240 Dias 10/10/13 08:00 a.m. 06/06/14 07:00 p.m. #VALUE! 10/10/13 08:00 a.m. 16/10/13 07:00 p.m. #VALUE! 10/10/13 08:00 a.m. 16/10/13 07:00 p.m. 3CC #VALUE! 10/10/13 09:00 a.m. 06/06/14 07:00 p.m. 3CC #VALUE! 10/10/13 09:00 a.m. 07/05/14 07:00 p.m. #VALUE! 10/10/13 09:00 a.m. 07/05/14 07:00 p.m. 3CC #VALUE! 25/10/13 09:00 a.m. 23/04/14 07:00 p.m. #VALUE! 25/10/13 09:00 a.m. 01/02/14 05:00 p.m. 7CC+15d #VALUE! 15/11/13 09:00 a.m. 04/12/13 07:00 p.m. #VALUE! 09/11/13 08:00 a.m. 16/02/14 05:00 p.m. 9CC+15d #VALUE! 16/11/13 08:00 a.m. 30/03/14 05:00 p.m. 11CC+7d #VALUE! 15/01/14 09:00 a.m. 18/04/14 07:00 p.m. 12CC+60d #VALUE! 26/10/13 08:00 a.m. 23/04/14 07:00 p.m. 9CC+1d #VALUE! 16/12/13 09:00 a.m. 03/05/14 05:00 p.m. #VALUE! 17/02/14 09:00 a.m. 03/04/14 07:00 p.m. #VALUE! 18/02/14 09:00 a.m. 03/04/14 07:00 p.m. 19CC+1d #VALUE! 18/02/14 09:00 a.m. 03/04/14 07:00 p.m. 19CC+1d #VALUE! 17/02/14 09:00 a.m. 02/04/14 07:00 p.m. 7CC+130d #VALUE! 16/12/13 09:00 a.m. 26/03/14 07:00 p.m. #VALUE! 17/12/13 09:00 a.m. 26/03/14 07:00 p.m. 22CC+1d #VALUE! 16/12/13 09:00 a.m. 25/03/14 07:00 p.m. 12CC+30d #VALUE! 19/04/14 08:00 a.m. 24/04/14 07:00 p.m. #VALUE! 20/04/14 08:00 a.m. 24/04/14 07:00 p.m. 25CC+1d #VALUE! 19/04/14 08:00 a.m. 23/04/14 07:00 p.m. 13 #VALUE! 16/03/14 10:00 a.m. 30/04/14 11:00 a.m. #VALUE! 16/03/14 10:00 a.m. 30/04/14 11:00 a.m. 28CC #VALUE! 16/03/14 10:00 a.m. 30/04/14 11:00 a.m. 13CC+19d,59,58 #VALUE! 19/04/14 08:00 a.m. 03/05/14 05:00 p.m. #VALUE! 19/04/14 08:00 a.m. 03/05/14 05:00 p.m. 31CC #VALUE! 19/04/14 08:00 a.m. 03/05/14 05:00 p.m. 13 #VALUE! 04/04/14 09:00 a.m. 08/04/14 07:00 p.m. #VALUE! 04/04/14 09:00 a.m. 08/04/14 07:00 p.m. 17 #VALUE! 07/05/14 09:00 a.m. 26/05/14 07:00 p.m. #VALUE! 07/05/14 09:00 a.m. 21/05/14 07:00 p.m. 13FC+18d,27 #VALUE! 12/05/14 09:00 a.m. 26/05/14 07:00 p.m. 35CC+5d #VALUE! 27/05/14 09:00 a.m. 30/05/14 07:00 p.m. #VALUE! 27/05/14 09:00 a.m. 30/05/14 07:00 p.m. 36 #VALUE! 27/05/14 09:00 a.m. 30/05/14 07:00 p.m. 36 #VALUE! 27/05/14 09:00 a.m. 30/05/14 07:00 p.m. 36 #VALUE! 10/10/13 08:00 a.m. 02/06/14 07:00 p.m. #VALUE! 24/12/13 09:00 a.m. 12/01/14 05:00 p.m. 9CC+60d #VALUE! 24/12/13 09:00 a.m. 12/01/14 05:00 p.m. 9CC+60d #VALUE! 25/01/14 08:00 a.m. 03/02/14 07:00 p.m. #VALUE! 31/05/14 08:00 a.m. 02/06/14 07:00 p.m. 38 #VALUE! 10/10/13 08:00 a.m. 16/05/14 07:00 p.m. #VALUE! 10/10/13 08:00 a.m. 06/02/14 07:00 p.m. #VALUE! 10/10/13 08:00 a.m. 06/02/14 07:00 p.m. 7CC #VALUE! 10/10/13 08:00 a.m. 17/04/14 07:00 p.m. #VALUE! 10/10/13 08:00 a.m. 28/11/13 07:00 p.m. 48CC #VALUE! 10/10/13 08:00 a.m. 06/02/14 07:00 p.m. 50CC #VALUE! 12/10/13 08:00 a.m. 01/12/13 10:00 a.m. 50CC+30d #VALUE! 13/10/13 08:00 a.m. 30/01/14 07:00 p.m. 50CC+1d #VALUE! 17/10/13 08:00 a.m. 13/02/14 07:00 p.m. 53CC+7d #VALUE! 08/01/14 09:00 a.m. 17/04/14 07:00 p.m. 50CC+90d #VALUE! 16/10/13 08:00 a.m. 08/05/14 07:00 p.m. #VALUE! 16/10/13 08:00 a.m. 16/03/14 10:00 a.m. #VALUE! 16/10/13 08:00 a.m. 04/03/14 07:00 p.m. 59CC+1d #VALUE! 16/10/13 08:00 a.m. 16/03/14 10:00 a.m. 54CC+20d #VALUE! 05/03/14 09:00 a.m. 14/03/14 07:00 p.m. #VALUE! 05/03/14 09:00 a.m. 14/03/14 07:00 p.m. 58 #VALUE! 09/12/13 09:00 a.m. 08/05/14 07:00 p.m. #VALUE! 10/12/13 09:00 a.m. 08/05/14 07:00 p.m. 64CC+1d #VALUE! 09/12/13 09:00 a.m. 07/05/14 07:00 p.m. 48CC+60d #VALUE! 10/12/13 09:00 a.m. 08/05/14 07:00 p.m. 64CC+1d #VALUE! 09/05/14 09:00 a.m. 16/05/14 07:00 p.m. #VALUE! 14/05/14 09:00 a.m. 16/05/14 07:00 p.m. 68 #VALUE! 09/05/14 09:00 a.m. 13/05/14 07:00 p.m. 63,58 #VALUE!