Está en la página 1de 8

2017

Autor: aceliss

SEXTO TRABAJO ESCALONADO


DE ANASTECIMIENTO DE AGUA Y
ALCANTARILLADO

ALUMNO: CELIS SERAFIN,


YUNNIOR GERMAN
CONTENIDO
1 PERIODO DE DISEO DE CADA COMPONENTE DEL SISTEMA.......................................
1.1 COSTO DEL PROYECTO.....................................................................................................................
1.2 HORIZONTE DEL PROYECTO.......................................................................................................
1.2.1 POBLACIN DE DISEO......................................................................................................
1.3 PERIODO DE DISEO DE CADA ELEMENTO................................................................................
2 ESTRUCTURAS...............................................................................................................................
METODO DE LAURIA....................................................................................................................
3 BIBLIOGRAFA.........................................................................................................
1 PERIODO DE DISEO DE CADA COMPONENTE DEL
SISTEMA
El periodo de diseo es el tiempo de duracin de todos los elementos que componen el
Proyecto. Existen diversos factores que determinan el periodo ptimo de diseo
mencionndose algunos:

La vida til de las estructuras, que est en funcin de la resistencia fsica del material que
lo constituye y el desgaste que sufren estas.

El estudio de factibilidad, que depende primordialmente del aspecto econmico.

El crecimiento poblacional, que es un factor muy importante porque incluye posibles


cambios en el desarrollo industrial y comercial de la comunidad ya que pueden variar los
ndices econmicos.

La tasa de inters, que es un factor muy importante por cuanto si la tasa de inters es
bajo se puede pensar en periodos largos.

El crecimiento de la poblacin y la tasa de inters tienen cierta relacin; as a menor relacin


de crecimiento menor tasa de inters, esto implica un menor funcionamiento en los
primeros aos.

l proporcionarle desage a una poblacin, es un servicio cuyo costo debe ser retribuido por
los beneficiarios, siendo estos muy elevados si se toma periodos muy largos para
poblaciones con desarrollos muy violentos esta podra causar una gran quiebra
administrativa.

Esto nos indica que de acuerdo a las tendencias de aumento de la poblacin es conveniente
elegir periodos ptimos de diseo ms largo para crecimientos lentos y viceversa.

Generalmente los sistemas se disean y se constituyen para satisfacer la poblacin mayor


que la actual.

La poblacin de la zona es de crecimiento moderado pues tiene una tasa de crecimiento de


2.30 por ciento, por ende con muchas posibilidades de desarrollo pero con un rea
urbana no definida y con una poblacin mucho menor de 10,000 habitantes, por lo tanto
se asume un periodo de diseo de 20 aos.

Para el desarrollo del Periodo de Diseo segn el libro de Simn Arrocha, se tiene que tener
varios factores determinantes tales como:

Durabilidad o vida til de las instalaciones o componentes del sistema.


Facilidades de construccin y posibilidades de ampliacin o sustitucin.
Tendencia de crecimiento de la poblacin.
Posibilidad de financiamiento y la tasa de inters.

Si se menciona estos factores en el expediente

De esto tambin podemos decir que es sumamente importante lo que es los costos de
operacin y mantenimiento de cada componente del sistema, tambin se requiere la
tendencia poblacional para determinar el periodo de diseo con la ecuacin de Lauria.
Pero en el Presupuesto no presentan los costos de operacin y mantenimiento bajo lo cual no
se puede realizar el proceso de Lauria. Por ende posemos afirmas, en el expediente del
proyecto no se determin el periodo de diseo de los elementos de una manera ptima
como nos ense en la clase o como menciona en el libro de Simon Arrocha, teniendo en
consideracin varios factores.

Para el Periodo de diseo tendremos en cuenta los costos ya que estos influyen en el periodo de
diseo por ende incluimos la informacin tal como est en el expediente, siendo uno de los
factores:

RESUMEN DE PRESUPUESTO
1.1 C
MEJORAMIENTO , AMPLIACION DEL SISTEMA DE AGUA POTABLE Y ALCANTARILLADO DEL DISTRITO DE
os
PROYECTO
MARGOS, PROVINCIA DE HUANUCO - HUANUCO to
CODIGO SNIP 52039
UBICACIN REGION:HUANUCO - PROVINCIA:HUANUCO - DISTRITO:MARGOS
PLAZO DE
240 DIAS CALENDARIOS
EJECUCION

GENERALES SISTEMA DE AGUA SISTEMA DE ALCANTARILLADO TOTAL

04 RED COLECTORA
DESCRIPCION 02 AGUA POTABLE: 04 PLANTA DE
01 OBRAS Y 03 AGUA POTABLE: DE ALCANTARILLADO,
LINEA DE TRATAMIENTO DE
TRABAJOS ESTRUCTURAS EMISOR Y
ADUCCION Y RED AGUAS
PRELIMINARES HIDRAULICAS CONEXIONES
DE DISTRIBUCION RESIDUALES
DOMICILIARIAS

Costo Directo S/. 67,682.07 S/. 837,594.90 S/. 141,415.97 S/. 1,210,821.52 S/. 925,457.09 S/. 3,182,971.55

Gastos Generales S/. 5,414.57 S/. 67,007.59 S/. 11,313.28 S/. 96,865.72 S/. 74,036.57 S/. 254,637.73

Utilidad S/. 3,384.10 S/. 41,879.75 S/. 7,070.80 S/. 60,541.08 S/. 46,272.82 S/. 159,148.55

SUB TOTAL-1 S/. 76,480.74 S/. 946,482.24 S/. 159,800.05 S/. 1,368,228.32 S/. 1,045,766.48 S/. 3,596,757.83

IGV (19%) S/. 14,531.34 S/. 179,831.63 S/. 30,362.01 S/. 259,963.38 S/. 198,695.64 S/. 683,384.00

SUB TOTAL-2 S/. 91,012.08 S/. 1,126,313.87 S/. 190,162.06 S/. 1,628,191.70 S/. 1,244,462.12 S/. 4,280,141.83

Supervisin S/. 4,138.09 S/. 59,856.79 S/. 130,612.22 S/. 194,607.10

SUB TOTAL-3 S/. 95,150.17 S/. 1,376,332.72 S/. 3,003,266.04 S/. 4,474,748.93

Expediente Tcnico S/. 40,000.00 S/. 40,000.00

TOTAL
PRESUPUESTO S/. 4,514,748.93 S/. 4,514,748.93

SON: Cuatro Millones Quinientos Catorce Mil Setecientos Cuarenta y Ocho con 93/100 Nuevos Soles

del proyecto.

1.2 HORIZONTE DEL PROYECTO


En la evaluacin de campo se han registrado lotes. Considerando una estimacin de 5
habitantes por lote tendramos 3180 habitantes. Por tanto, consideramos este valor como
dato base de la poblacin, la misma que nos servir para el dimensionamiento de las
estructuras hidrulicas a construir.

La determinacin de la poblacin futura est basada en las normas establecidas para zonas
rurales como es nuestro caso. El periodo a proyectar es de 20 aos y la tasa de
crecimiento promedio es de 2.3% anual.

Los clculos se muestran en los cuadros de diseo de cada estructura.


1.2.1 POBLACIN DE DISEO
Se determin la poblacin y la densidad poblacional para el periodo de diseo adoptado
donde se determin la tasa de crecimiento y la densidad poblacional.

Tasa de crecimiento = 2.3%

Densidad poblacional = 5hab/lote

1.3 PERIODO DE DISEO DE CADA ELEMENTO.

ESTRUCTURAS 2.1.1.1.1 CARACTERSTICAS PERIODO (Aos)


Colectores principales y Ampliacin inconveniente y costosa 40-50
emisores de descarga
Tuberas secundarias Bajos costos de sustitucin 15-20

PARA EL SISTEMA DE AGUA POTABLE

DESCRIPCION DE POBLACION PERIODO DE POBLACION DE


| N LOTES
ESTRUCTURA ACTUAL DISEO (AOS) DISEO

TOTAL RESERVORIO 100 M3 636 3180 20 5011

PARA EL SISTEMA DE AGUA POTABLE

POBLACION PERIODO DE DISEO POBLACION DE


DESCRIPCION DE ESTRUCTURA N LOTES
ACTUAL (AOS) DISEO
ZONA DE
PLANT. DE TRAT. CON TANQUE
DESCARGA 591 2960 20 4664
IMHOFF
N1
ZONA DE
PLANT. DE TRAT. CON TANQUE
DESCARGA 22 110 10 138
SEPTICO (01)
N2
ZONA DE
PLANT. DE TRAT. CON TANQUE
DESCARGA 22 110 10 138
SEPTICO (02)
N3
ZONA DE
PLANT. DE TRAT. CON TANQUE I.E. JESUS DE
DESCARGA 01 10
SEPTICO (03) NAZARETH
N4
TOTAL 636 3180

COMO PODEMOS OBSERVAR NO HAY LA TASA DE INTERES DE LOS ELEMENTOS EN


EL EXPEDIENTE, ESO NOS DIFICULTA PARA DETERMINAR EL PERIODO DE DISEO
POR EL METODO DE LAURIA, DEL METODO PODEMOS DECIR QUE SE UNA LA
SIGUIENTE ECUACIN PERO PRIMERO PARTE DE LA GRAFICA PROPORCIONADA
EN LA CLASE

METODO DE LAURIA

1.12 0.85
2.6(1a) 0.3 ( 1a ) Xo
Xi= +
r r
DONDE:

a = fraccin de propio llamado factor escalar de economa

r = tasa de inters

Xo = intercepto de la demanda con eje de abscisa (periodo transcurrido para demanda =

0)
Xi = periodo de dselo econmico

CONSIDERACIONES DEL MTODO

Xo = 0, cuando el proyecto es nuevo

Xo 0, cuando el proyecto es una rehabilitacin o mejoramiento, como es el caso del

proyecto en anlisis.

0.3 ( 1a ) Xo0.85 Representa el periodo de recupero de la inversin


r
que se gener en el proyecto.
3 BIBLIOGRAFA

- Diapositivas de clase de abastecimiento de agua y alcantarillado de la


FIC-UNHEVAL-2015

- Ambiental, D. G. (2011). Reglamento de la Calidad del Agua para. (E. p.


Salud, Ed.) Lima Per, Lima: Imprenta: J.B. GRAFIC E.I.R.L. Obtenido de
http:/ www.digesa,minsa.gob.pe

- El Programa de Agua y Saneamiento (PAS), e. c. (---). Pequeos Sistemas


de abatecimiento de aguas para multiples localidades-Un nuevo reto.
BRAZIL: El Grupo Temtico sobre Agua y Saneamiento Rural del Banco
Mundial.

- Ing. Clifton Paucar y Montenegro. (2011). Propuesta Normativa para los


Concretos Usados. LIma: BOLETN INFORMATIVO ASOCEM 2011.

- OBRAS DESANEAMIENTO (0S 020, O. 0. (2014). REGLAMENTA NACIONAL


DE EDIFICAIONES. LIMA.

- Diapositivas de la clase de hidrologa general FIC-UNHEVAL-2015