01 EQUIPAM. POZO
01 EQUIPAMIENTO DE POZO 1,270.00
03.01 CONCRETO CIMIENTO CORRIDO 1:10 + 30% P.M M3 3.19 124.47 397.06
03.03 CONCRETO SOBRECIMIENTO 1:8 + 25% P.M. (A M3 0.64 185.28 118.58
03.04 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENT M2 8.51 27.00 229.77
03.05 FALSO PISO, E = 2" (MEZCLA 1:10 CEMENTO M2 7.08 10.73 75.97
04 OBRAS DE CONCRETO ARMADO 909.51
01.01 SUM INSTAL TUBERIA PVC SAP CLASE 10, 2" ML 51.65 9.73 502.55
02 PRUEBAS HIDRAULICAS 64.05
04 RESERVORIO ELEVADO 06 M3
01 TRABAJOS PRELIMINARES 35.88
04 RESERVORIO ELEVADO 06 M3
04.10ACERO FY=4200 KG/CM2 EN VIGAS 29,700.22
04.10 ACERO FY=4200 KG/CM2 EN VIGAS KG 751.88 5.23 3,932.33
04.11 CONCRETO EN RESERVORIO F'C=210 KG/CM2 M3 5.14 343.37 1,764.92
04.12 ENCOFRADO Y DESENCOFRADO EN RESERVORIO M2 49.69 66.71 3,314.82
04.13 ACERO EN RESERVORIO FY=4200KG/CM2 KG 314.99 5.10 1,606.45
05 REVOQUES Y ENLUCIDOS 4,698.94
06 RED DE DISTRIBUCION
01 RED DE DISTRIBUCION 91,740.30
06 RED DE DISTRIBUCION
02.09SUMINISTRO Y COLOC.REDUCCION 11/4" A 1" 1,217.68
02.09 SUMINISTRO Y COLOC.REDUCCION 11/4" A 1" UN 1.00 11.65 11.65
02.10 SUMINISTRO Y COLOCACION REDUCC. 11/4" A UN 1.00 10.85 10.85
02.11 SUMINISTRO Y COLOC.REDUCCION PVC 11/4" A UN 4.00 11.65 46.60
02.12 SUMINIS.Y COLOCAC.REDUCCION PVC SAP C-10 UN 3.00 14.45 43.35
02.13 SUMINISTRO Y COLOCACION REDUCCION PVC 1" UN 6.00 9.45 56.70
02.14 SUMINISTRO Y COLOCACION REDUCCION PVC 3/ UN 14.00 9.25 129.50
02.15 SUMINISTRO Y COLOCACION TEE PVC SAP C-10 UN 4.00 4.57 18.28
02.16 SUMINISTRO Y COLOCACION TEE PVC SAP C-10 UN 5.00 4.48 22.40
02.17 SUMINISTRO Y COLOCACION TEE PVC C-10 1" UN 7.00 14.65 102.55
02.18 SUMINISTRO Y COLOCACION TEE PVC 3/4" UN 36.00 12.09 435.24
02.19 SUMINIS.Y COLOCAC.TAPON HEMBRA PVC 3/4" UN 3.00 3.07 9.21
03 PASE AEREO (18.00ML) 6,408.08
08 VALVULAS DE PURGA(05)
01 TRABAJOS PRELIMINARES 9.68
10 CARTEL DE OBRA
01 OBRAS PROVISIONALES 1,455.54
11 PLACA RECORDATORIA
01 PLACA RECORDATORIA 662.73
11 PLACA RECORDATORIA
01.05MUROS, ACERO FY=4200 KG/CM2 662.73
01.05 MUROS, ACERO FY=4200 KG/CM2 KG 8.66 5.25 45.47
TOTAL DEL PRESUPUESTO 11 S/. 662.73
12 FLETES
01.01FLETE TERRESTRE 14,943.23
01.01 FLETE TERRESTRE GLB 1.00 4,355.85 4,355.85
01.02 FLETE EN ZONA RURAL (NO AFECTO A IGV) GLB 1.00 10,587.38 10,587.38
TOTAL DEL PRESUPUESTO 12 S/. 14,943.23
13 IMPACTO AMBIENTAL
01 CONTROL AMBIENTAL 3,628.20
01.02 RECOJO Y DISPOSIC. RESTOS CONCRETO Y BLS GLB 1.00 900.00 900.00
01.03 RECOJO Y DISPOSICIN DE MATERIAL SOBRANT GLB 1.00 300.00 300.00
01.04 LETRINA PARA TRABAJADORES UND 1.00 2,000.00 2,000.00
01.05 LETREROS DE SEALIZACIN EST 1.00 428.20 428.20
TOTAL DEL PRESUPUESTO 13 S/. 3,628.20
14 SEGURIDAD Y SALUD
01 ELABORAC.E IMPLEMENT. PLAN SEGURIDAD Y S 4,635.00
15 CONTROL DE CALIDAD
01 ROTURA DE PROBETAS 540.00
16 APORTE COMUNAL
01.01EXCAVACION MANUAL DE ZANJAS/ML, (0.80X0. 11,739.33
01.01 EXCAVACION MANUAL DE ZANJAS/ML, (0.80X0. ML 2,202.50 5.33 11,739.33
TOTAL DEL PRESUPUESTO 16 S/. 11,739.33
18 MODULO DE INDUMENTARIA
01 IMPLEMENTOS DE SEGURIDAD 1,015.00
20 MODULO DE CAPACITACION
01.01MODULO DE CAPACITACION 1,441.20
01.01 MODULO DE CAPACITACION GLB 1.00 1,441.20 1,441.20
TOTAL DEL PRESUPUESTO 20 S/. 1,441.20