Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Liquidacion Economica
Liquidacion Economica
7.- OTROS - - -
Mayores Gastso Generales (amp. Plazo) - - -
Intereses por mora en pagos - - -
Otros conceptos -
7.- OTROS -
Mayores Gastso Generales (amp. Plazo) -
Intereses por mora en pagos -
Otros conceptos
SUB TOTAL S/. 1,496,072.31 S/. 88,856.78 S/. 250,945.00 S/. 325,494.20 S/. 269,537.17 S/. 57,898.30 S/. 145,790.88 S/. 15,728.74 S/. 341,821.24 S/. 1,496,072.31
IGV (18.00%) S/. 269,293.02 S/. 15,994.22 S/. 45,170.10 S/. 58,588.96 S/. 48,516.69 S/. 10,421.69 S/. 26,242.36 S/. 2,831.17 S/. 61,527.82 S/. 269,293.02
TOTAL PRESUPUESTO S/. 1,765,365.33 S/. 104,851.00 S/. 296,115.10 S/. 384,083.16 S/. 318,053.86 S/. 68,319.99 S/. 172,033.24 S/. 18,559.91 S/. 403,349.06 S/. 1,765,365.33
OBRA : REHABILITACION DEL CAMINO VECINAL RANRAHIRCA - ARHUAY CONTRATISTA : CONSORCIO VIAL YUNGAY
PROPIETARIO : Provias Descentralizado SUPERVISOR : CONSORCIO CENTRO SUR
DEPARTAMENTO #REF! PLAZO EJECUCIN 135 DIAS
109,397.11 108,440.42
YUNGAY
TRO SUR
Reajuste
Acumulado Reajuste Reconocid Estado de
Retencin
Real Reconocido o la obra
3,774.64 3,774.64 Acumulado
3,774.64 - atrasada
16,803.70 8,730.40 12,505.04 4,298.66 adelantada
37,928.27 26,042.35 38,547.39 -4,917.78 adelantada
57,329.56 22,085.18 60,632.57 -2,683.89 atrasada
61,838.68 3,961.69 64,594.26 547.43 atrasada
73,881.01 9,080.26 73,674.52 2,962.07 adelantada
75,365.80 - 73,674.52 1,484.79 adelantada
108,440.42 35,722.59 109,397.11 -2,647.97 atrasada
109,397.11 -956.69
OBRA 0.00
PROPIETARIO REHABILITACION DEL CAMINO VECINAL RANRAHIRCA - ARHUAY
DEPARTAMENTO ANCASH
VALOR CONTR. 1,528,893.47 sin I.G.V.
VALOR CONTR. 1,804,094.29 con I.G.V.
FRMULA POLINMICA N 01
K = 0.152*(Mr/Mo) + 0.093*(CAMr/CAMo) + 0.225*(Mr/Mo) + 0.300*(Mr/Mo) + 0.230*(Ir/Io)
M 47 MANO DE OBRS INCL. LEYES SOCIALES 0.152 0.152 100.000% 498.10 0.152 523.70 0.16
M 49 MAQUINARIA Y EQUIPO IMPORTADO 0.300 0.300 100.000% 249.75 0.300 264.41 0.318
I 39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 0.230 0.230 100.000% 397.88 0.230 404.87 0.234
COEFICIENTE DE REAJUSTE K1 1.000 1.036
CONTRATISTA : CONSORCIO VIAL YUNGAY
SUPERVISOR : CONSORCIO CENTRO SUR
PLAZO EJECUCIN 135 DIAN CALENDARIO
FECHA DE INICIO 17-dic-14
FECHA DE TRMINO 27-jun-15
523.15 0.16 523.15 0.16 523.15 0.16 523.15 0.16 523.15 0.16 544.59 0.166 544.59 0.166
268.53 0.323 275.86 0.331 277.02 0.333 279.73 0.336 282.51 0.339 283.41 0.34 285.08 0.342
405.56 0.234 406.79 0.235 409.90 0.237 411.50 0.238 413.82 0.239 415.20 0.24 417.07 0.241
1.044 1.055 1.061 1.066 1.070 1.080 1.082