Cinta Transportadora
Entorchamiento de la Cinta
i
TEF
Fi
TEF/100
1
571
0.09459459
5.71
2
811
0.22972973
8.11
3
979
0.36486486
9.79
4
1128
0.5
11.28
5
1341
0.63513514
13.41
6
1551
0.77027027
15.51
7
1820
0.90540541
18.2
Fi %
9.45945946
22.972973
36.4864865
50
63.5135135
77.027027
90.5405405
Desalineacin de la Cinta
TEF
Fi
TEF/100
451
0.08333333
4.51
576
0.20238095
5.76
671
0.32142857
6.71
805
0.44047619
8.05
1130
0.55952381
11.3
1213
0.67857143
12.13
1411
0.79761905
14.11
1531
0.91666667
15.31
Fi %
8.33333333
20.2380952
32.1428571
44.047619
55.952381
67.8571429
79.7619048
91.6666667
i
1
2
3
4
5
6
7
8
Segn http://reliabilityanalyticstoolkit.appspot.com/weibull_analysis_solution
CONFIABILIDAD
Equipo
Modo de Falla con Muy
Crtico
Alta Criticidad
Cinta
Entorchamiento
1325.55
2.71
Transportado
Desalineacin
1110.26
2.4
ra
Desajuste del Acople
1330.18
5.28
Unidad
Rod. del Motor Daados
1458.25
6.16
Motriz
Rod. Tambor Motriz Da.
1258.16
4.99
5
Guinche Recalentamiento de Motor 1224.08
Elec. Tnsor Rod. del Motor Daados
1314.5
5.36
Unidad Motriz
Desajuste
i
1
2
3
4
5
6
i
1
2
3
4
5
6
i
1
2
3
4
5
6
7
del Acople
TEF
921
1026
1191
1281
1360
1599
ll_analysis_solution
CONFIABILIDAD
Fi %
10.9375
26.5625
42.1875
57.8125
73.4375
89.0625
Fi %
9.45945946
22.972973
36.4864865
50
63.5135135
77.027027
90.5405405
i
1
2
3
4
5
6
Fi %
10.9375
26.5625
42.1875
57.8125
73.4375
89.0625
Fi %
10.9375
26.5625
42.1875
57.8125
73.4375
89.0625
i
740
3535
4205
4050
3220
2733
3560
3800
1800
2276
3010
924
TEF
1
2
3
4
5
6
7
8
9
10
11
12
740
924
1800
2276
2733
3010
3220
3535
3560
3800
4050
4205
Fi
0.05645161
0.13709677
0.21774194
0.2983871
0.37903226
0.45967742
0.54032258
0.62096774
0.7016129
0.78225806
0.86290323
0.94354839
TEF/100
7.4
9.24
18
22.76
27.33
30.1
32.2
35.35
35.6
38
40.5
42.05
Segn http://reliabilityanalyticstoolkit.appspot.com/weibull_analysis_solution
CONFIABILIDAD
Reliability
Probability DeTasa de Falla
R(t)
f(t)
h(t)
200 0.99500777 4.6979E-005 4.7215E-005
35
43
72
20
64
i
1
2
3
4
5
TPR
18
20
35
40
43
M'(t)
5.64516129
13.7096774
21.7741935
29.8387097
37.9032258
46
54
18
75
40
83
123
6
7
8
9
10
11
12
46
54
64
72
75
83
123
45.9677419
54.0322581
62.0967742
70.1612903
78.2258065
86.2903226
94.3548387
50
a
M(t)
0.04347826 0.99852997
TPPR Data
56.0833333
t
200
y2
90
ll_analysis_solution
ra R=0,95
m
23
a
0.04347826
TEF
740
3535
4205
4050
3220
2733
3560
3800
1800
2276
3010
924
TFS
35
43
72
20
64
46
54
18
75
40
83
123
TO
705
3492
4133
4030
3156
2687
3506
3782
1725
2236
2927
801
COSTO PREVENTIVO
TO
TO/200h Costo Preventivo
33180
165.9
46452000
2765
13.825
3871000
705
3.525
987000
4133
20.665
5786200
280000
COSTO CORRECTIVO
Costo Correctivo
11400000
Costo Prom. Reparar
Penalizacin por Reparar
150000
800000
950000
33180
8760
3.78767123
Costo Prev.
48.1982756 32.9325625
13495517.2 9221117.49
Diferencia
-2095517.16 2178882.51