Está en la página 1de 49

FACTORES DE CONVERSION DE MONC

Regin
Sierra

Urbano
0.60

Rural
0.41

Nombre del Proyecto


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SAN

NOTA:

LLENAR LAS CELDAS MARCADAS Y LOS RECUADROS CON LETRA Y/O FUENTES DE COLOR ROJO

N EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUNIN

NTES DE COLOR ROJO

MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUNIN
POBLACION DIRECTAMENTE AFECTADA
POBLADORES

CANTIDAD

DISTRIBUCION

121
78
322
76

0.2027
0.1307
0.5394
0.1273

20.27%
13.07%
53.94%
12.73%

597

1.0000

100.00%

NIOS
JOVENES
ADULTOS
MAYORES
TOTAL

Fuente: datos de encuesta del Proyectista - 2007.

AOS
2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021
10

1.10%

1.10%

1.10%

1.10%

1.10%

1.10%

1.10%

1.10%

1.10%

1.10%

1.10%

121

122

124

125

126

128

129

131

132

134

135

78

79

80

81

81

82

83

84

85

86

87

322

326

329

333

336

340

344

348

351

355

359

76

77

78

79

79

80

81

82

83

84

85

597

604

611

618

622

630

637

645

651

659

666

PROMEDIO

631

POBLACION BENEFICIARIA INDIRECTA

Tipo de
Poblacin

Nmero de
habitantes

Poblacin Total

597

Poblacin Directamente Afectada

554

Beneficiarios indirectos

43

PROYECCION DE POBLACION BENEFICIARIA INDIRECTAMENTE


TASA DE CRECIMIENTO r=1,2%
AOS
POBLACION
Tasa de crecim.poblac.
Poblacin Indirecta
TOTAL

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021
10

1.20%

1.20%

1.20%

1.20%

1.20%

1.20%

1.20%

1.20%

1.20%

1.20%

1.20%

43

44

44

45

45

46

46

47

47

48

48

43

44

44

45

45

46

46

47

47

48

48

PROYECCION DE POBLACION BENEFICIARIA TOTAL


TASA DE CRECIMIENTO r=1.2%
AOS
POBLACION
Tasa de crecim.poblac.
Poblacin Total
TOTAL

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

10

1.20%

1.20%

1.20%

1.20%

1.20%

1.20%

1.20%

1.20%

1.20%

1.20%

1.20%

597

604

611

619

626

634

641

649

657

665

673

597

604

611

619

626

634

641

649

657

665

673

Promedio

638

FORMATO 3
ANLISIS GENERAL DE LA OFERTA
DEL PRODUCTO O SERVICIO

a)

Situacin Actual del Proyecto


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA,
DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUNIN
CARACTERISTICAS DE LA OFERTA SIN PROYECTO

NOMBRE

1
2

PARTIDAS

MEJORAMIENTO DEL
MURO DE CONTENCION

MURO DE
CONTENCION
ARMADO

MEJORAMIENTO DEL
MURO DE CONTENCION

DADOS DE
CONCRETO

Unidad
(ml)
0.00

0.00

Cantidad
1.00

1.00

CARACTERISTICAS DE LA INFRAESTRUCTURA
factor
subtot
Superficie
Estado
(m)
(m)
fsico
0.00

0.00

0.00

b)

0.00

INEXISTENTE

0.00

MURO DE
CONTENCION

DETERIORADO

Condicion

MALO

0.00

Situacin con Proyecto - Alternativa 01


CARACTERISTICAS DE LA OFERTA CON PROYECTO - ALTERNATIVA 1

ITEM

1
2

NOMBRE

TRAMOS

Longitud
(m2)

Cantidad

CARACTERISTICAS DE LA INFRAESTRUCTURA
factor
subtot
Estado
Superficie
(m)
(m)
fsico

Condicin

MEJORAMIENTO DEL
MURO DE CONTENCION

MURO DE
CONTENCION
ARMADO

104.67

1.00

1.00

104.67

CONCRETO ARMADO

Bueno

Adecuado

MEJORAMIENTO DEL
MURO DE CONTENCION

DADOS DE
CONCRETO

260.46

1.00

1.00

260.46

CONCRETO SIMPLE

Bueno

Adecuado

3
365.13

c)

Situacin con Proyecto - Alternativa 02


CARACTERISTICAS DE LA OFERTA CON PROYECTO - ALTERNATIVA 2

Lado

1
2
3

NOMBRE

TRAMOS

MEJORAMIENTO DEL
MURO DE CONTENCION

MURO DE
CONTENCION
ARMADO

MEJORAMIENTO DEL
MURO DE CONTENCION

DADOS DE
CONCRETO

Cantidad

CARACTERISTICAS DE LA VIA PEATONAL


factor
subtot
Superficie
Estado
(m)
(m)
peatonal
fsico

360.73

1.00

1.00

360.73

CONCRETO ARMADO

Bueno

Adecuado

0.00

1.00

1.00

0.00

CONCRETO SIMPLE

Bueno

Adecuado

Longitud
(m2)

360.73

Basureros

FORMATO 4
BALANCE OFERTA - DEMANDA

MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO


JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUNIN
Las caractersitcas tcnicas del Proyecto estn de acuerdo con la demanda proyectada

CUADRO DE BALANCE OFERTA DEMANDA

Caractersticas

Und.

Demanda
Actual

Oferta
Actual

Brecha

MURO DE CONTENCION ARMADO


DADOS DE CONCRETO
CAPACITACIONES
MITIGACION AMBIENTAL

ML
ML
UND
GLB

104.67
260.46
3.00
1.00

0.00
0.00
0.00
0.00

-104.67
-260.46
-3.00
-1.00

ML
UND

365.13
4.00

MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA,
DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUNIN
CUADRO RESUMEN DE PRESUPUESTOS ETAPA PRE-OPERATIVA

ETAPA PRE-OPERATIVA
CONCEPTO

ALTERNATIVA N 1

ALTERNATIVA N 2

PRECIOS PRIVADOS

FR

PRECIOS SOCIALES

PRECIOS PRIVADOS

FR

PRECIOS SOCIALES

EXPEDIENTE TECNICO 4.% CD

S/. 19,535.01

0.91

S/. 17,776.86

S/. 35,055.52

0.91

S/. 31,900.52

OBRAS CIVILES (PRESUPUESTO)

S/. 488,375.33

MONC

S/. 74,191.62

0.60

S/. 44,514.97

S/. 124,840.46

0.6

S/. 74,904.28

MOC

S/. 73,863.40

0.91

S/. 67,215.69

S/. 164,862.32

0.91

S/. 150,024.71

INSUMOS RESTANTES

S/. 340,320.31

0.84

S/. 285,869.06

S/. 586,685.10

0.84

S/. 492,815.48

COSTO DIRECTO

S/. 488,375.33

S/. 397,599.73

S/. 876,387.88

GASTOS GENERALES (10% CD)

S/. 48,837.53

0.85

S/. 41,511.90

S/. 87,638.79

0.85

S/. 74,492.97

UTILIDAD (10% CD)

S/. 48,837.53

0.85

S/. 41,511.90

S/. 87,638.79

0.85

S/. 74,492.97

VALOR REFERENCIAL

S/. 605,585.41

S/. 498,400.39

S/. 1,086,720.97

GASTOS DE SUPERVISION (4% CD)

S/. 19,535.01

S/. 17,776.86

S/. 35,055.52

MONTO TOTAL

S/. 625,120.42

S/. 516,177.26

S/. 1,121,776.49

S/. 930,531.45

S/. 625,120.42

S/. 516,177.26

S/. 1,121,776.49

S/. 930,531.45

TOTAL

S/. 876,387.88

0.91

S/. 717,744.47

S/. 898,630.93
0.91

S/. 31,900.52

PRESUPUESTO DE OPERACIN Y MANTENIMIENTO ORDINARIO


ETAPA OPERATIVA - ALTERNATIVA N01
(EN NUEVOS SOLES)

ITEM

DESCRIPCION

Und

METRADO

COSTO UNIT.

SUB
TOTAL

1.00

OPERACIN

1.01

Pago de Personal Obrero

h/h

0.00

15.00

0.00
0.00

1.02

Pago de Personal Tecnico

h/h

0.00

30.00

0.00

2.00

MANTENIMIENTO

2.01

Limpieza de lecho

ml

365.18

23.29

8,505.04

Costo Directo

8,505.04
8,505.04

Gastos Generales 10%

850.50

Valor Referencial

9,355.55

PRESUPUESTO DE OPERACIN Y MANTENIMIENTO ORDINARIO


ETAPA OPERATIVA - ALTERNATIVA N02
(EN NUEVOS SOLES)

PARTIDA

DESCRIPCION

Und

METRADO

COSTO UNIT.

SUB
TOTAL

1.00

OPERACIN

0.00

1.01

Pago de Personal Obrero

h/h

0.00

12.00

0.00

1.02

Pago de Personal Tecnico

h/h

0.00

30.00

0.00

2.00

MANTENIMIENTO

2.01

Limpieza de lecho

ml

365.18

23.29

8,505.04

Costo Directo
Gastos Generales 10%
Valor Referencial

8,505.04
8,505.04
850.50
9,355.55

MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN


SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUNIN
CUADROS RESUMEN DE MANTENIMIENTOS - ETAPA OPERATIVA
MANTENIMIENTO ORDINARIO
ETAPA OPERATIVA
CONCEPTO

COSTO

ALTERNATIVA N 1
PRECIOS PRIVADOS

ALTERNATIVA N 2

FR

PRECIOS SOCIALES

PRECIOS PRIVADOS

S/. 8,505.04

FR

PRECIOS SOCIALES

S/. 8,505.04

MONC (6.%)

S/. 510.30

0.6

S/. 306.18

S/. 510.30

0.6

S/. 306.18

MOC (91%)

S/. 6,123.63

0.91

S/. 5,572.50

S/. 6,123.63

0.91

S/. 5,572.50

INSUMOS (11%)

S/. 935.55

0.84

S/. 785.87

S/. 935.55

0.84

S/. 785.87

EQUIPOS Y HERRAM. (11%)

S/. 935.55

0.84

S/. 785.87

S/. 935.55

0.84

S/. 785.87

S/. 7,450.42

S/. 8,505.04

S/. 722.93

S/. 850.50

S/. 8,173.35

S/. 9,355.55

COSTO DIRECTO
GASTOS GENERALES (10%)

VALOR REFERENCIAL

S/. 8,505.04
S/. 850.50

S/. 0.85

S/. 9,355.55

S/. 7,450.42
S/. 0.85

S/. 722.93

S/. 8,173.35

CUADROS RESUMEN DE MANTENIMIENTOS - ETAPA OPERATIVA


MANTENIMIENTO EXTRAORDINARIO
ETAPA OPERATIVA
ALTERNATIVA N 1

CONCEPTO

PRECIOS PRIVADOS

ALTERNATIVA N 2

FR

PRECIOS SOCIALES

PRECIOS PRIVADOS

FR

PRECIOS SOCIALES

S/. 2,270.75

COSTO

S/. 5,710.00

MONC (66.28%)

S/. 3,784.59

0.6

S/. 2,270.75

S/. 3,784.59

0.6

S/. 246.10

0.91

S/. 223.95

S/. 246.10

0.91

S/. 223.95

S/. 1,197.39

0.84

S/. 1,005.81

S/. 1,197.39

0.84

S/. 1,005.81

S/. 481.92

0.84

S/. 404.82

S/. 481.92

0.84

S/. 404.82

S/. 3,905.33

S/. 5,710.00

S/. 485.35

S/. 571.00

S/. 4,390.68

S/. 6,281.00

MOC (4.31%)
INSUMOS (20.97%)
EQUIPOS Y HERRAM. (8.44%)

COSTO DIRECTO
GASTOS GENERALES (10%)

VALOR REFERENCIAL

S/. 5,710.00

S/. 5,710.00
S/. 571.00

S/. 6,281.00

6826.88
7750.88

S/. 0.85

S/. 3,905.33
S/. 0.85

S/. 485.35

S/. 4,390.68

PRESUPUESTO POR IMPACTO AMBIENTAL


ALTERNATIVAS N 01 y N 02
(EN NUEVOS SOLES)

ITEM
07.00.00
07.01.00
07.02.00

DESCRIPCION

Und

MITIGACION AMBIENTAL

METRADO

COSTO UNIT.

SUB
TOTAL

GBL

Charlas de contaminacion ambiental

GBL

2.00

1,250.00

2,500.00

Charlas de seguridad (Defensa Civil)

GBL

2.00

1,326.23

2,652.46

Costo Directo
Gastos Generales 10%
Valor Referencial

19500

5,152.46
515.25
5,667.71

Item

Descripcin
1
1.02
1.02.01
1.03
1.03.05
1.06
1.06.01
2
2.1

Und.

Metrado

Precio S/.

Parcial S/.

MURO DE CONTENCION

Total S/.
53,380.71

TRABAJOS PRELIMINARES

323.40

LIMPIEZA DE TERRENO MANUAL

490

0.66

323.4

MOVIMIENTO DE TIERRAS

51,557.31

ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA

m3

1,984.50

25.98

51,557.31

m2

750

1,500.00

glb

2452.45

2452.45

VARIOS

1,500.00

LIMPIEZA GENERAL DE OBRA

2452.45

MITIGACION AMBIENTAL
CAPACITACION EN MEDIDAS DE CONTINGENCIAS MEDIO AMBIE
TOTAL DE COSTO DIRECTO
GASTOS GENERALES

55,833.16

7%

3,908.32

UTILIDADES

5%

2,791.66

SUPERVISION

3%

1,674.99

EXPEDIENTE TECNICO

3%

1,674.99
----------------

SUB TOTAL
IMPUESTO (IGV)

65,883.13
18%

11,858.96
================

TOTAL DE PRESUPUESTO

77,742.09

Hoja de trabajo N 01

ALTERNATIVA I

Descripcion

1
2
3
4
5
6

Costo Directo
S/.

61,047.40
5,526.00
22,891.30
168,899.96
211,467.68
7,500.00

OBRAS PROVICIONALES
SEGURIDAD Y SALUD
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CONCRETO ARMADO
CAPACITACIONES

TOTALES

477,332.34

Total (PP) Costo Directo


S/.
S/.
61,047.40
5,526.00
22,891.30
168,899.96
211,467.68
7,500.00
477,332.34

61,047.40
5,526.00
22,891.30
168,899.96
211,467.68
7,500.00
0

477,332.34

469,832.34

ALTERNATIVA II

Descripcion

1
2
3
4

OBRAS PROVICIONALES
SEGURIDAD Y SALUD
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE

Costo Directo
S/.

61,047.40
5,526.00
22,891.30
19,920.80

Total (PP)
S/.
61,047.40
5,526.00
22,891.30
19,920.80

PS

51,735.08
4,683.05
19,399.41
16,882.03

5 CONCRETO ARMADO
6 CAPACITACIONES

747,955.41
7,500.00

TOTALES

864,840.91

747,955.41
7,500.00
0
864,840.91

628,533.96
6,302.52
0

727,536.06

* El tortal es producto del costo de alquiler por el N de h-m que se usaran anualmente.
El costo por alquiler ser constante durante los 5 aos de horizonte de evaluacin, as mismo los costos de operacin y mantenimiento estarn
incluidos en el costo de alquiler de maquinarias
884876.69
20,035.78

PS

S/.
51,735.08
4,683.05
19,399.41
143,135.56
179,209.90
6,302.52
0

404,465.52

655044
-177,711.66

32500
536447.39

KM DE VIA PROYECTADA
0
150

1
155

2
159

3
164

4
169

5
175

592,230.46

MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA,
DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUNIN
PRESUPUESTO ETAPA PREOPERATIVA
ALTERNATIVA I
Presupuesta en la Etapa Pre Operativa (en nuevos soles).
CONCEPTO

CANT.

UNIDAD

1.- Etapa Pre Operativa


1.1 Intangible

EXPEDIENTE TECNICO

UND
UND

SUPERVISION
1.2.- Inversion

OBRAS PROVICIONALES
SEGURIDAD Y SALUD
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CONCRETO ARMADO

GBL
GBL
GBL
GBL
GBL
SUB TOTAL

COSTO
UNITARIO

SUB TOTAL /AO


(PP)

(PS)

19,535.01
19535.0132
0
469,832.34
61,047.40
5,526.00
22,891.30
168,899.96
211,467.68

19,535.01
19,535.01
469,832.34
61,047.40
5,526.00
22,891.30
168,899.96
211,467.68

17,759.10
17,759.10
398,163.00

489,367.35

489,367.35

415,922.10

51,735.08
4,683.05
19,399.41
143,135.56
179,209.90

PRESUPUESTO ETAPA PREOPERATIVA


ALTERNATIVA 2

CONCEPTO
1.- Etapa Pre Operativa
1.1 Intangible

Presupuesta en la Etapa Pre Operativa (en nuevos soles).


CANT.
UNIDAD
COSTO
MEDIDA
UNITARIO
SUB TOTAL /AO
PP

EXPEDIENTE TECNICO

UND
UND

SUPERVISION
1.2.- Inversion

OBRAS PROVICIONALES
SEGURIDAD Y SALUD
MOVIMIENTO DE TIERRAS
CONCRETO SIMPLE
CONCRETO ARMADO
CAPACITACIONES
TOTAL ANUALMENTE

GBL

PS
31,868.65
31,868.65
-

35,055.52
35055.5152
0
864,840.91
61,047.40
5,526.00
22,891.30
19,920.80
747,955.41
7,500.00

35,055.52
35,055.52
864,840.91
61,047.40
5,526.00
22,891.30
19,920.80
747,955.41
7,500.00

726,757.07
51,300.34
4,643.70
19,236.39
16,740.17
628,533.96
6,302.52

899,896.43

899,896.43

758,625.72

FORMATO 5-1A
COSTOS INCREMENTALES A PRECIOS PRIVADOS (S/)
MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA
ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUNIN

NOMBRE DEL PROYECTO

ALTERNATIVA 1
CONCEPTO
1. COSTOS CON PROYECTO
Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Implementacin
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)

1
9,355.55

2
9,355.55

3
9,355.55

4
9,355.55

A O S
5
15,636.55

6
9,355.55

7
8
9,355.55 9,355.55

9
9,355.55

10
9,355.55

9,355.55
0.00
0.00

9,355.55

0.00

9,355.55
0.00
0.00

0.00

9,355.55
0.00
0.00

9,355.55
6,281.00
0.00

9,355.55
0.00
0.00

9,355.55 9,355.55
0.00
0.00
0.00
0.00

9,355.55
0.00
0.00

9,355.55
0.00
0.00

0.00
625,120.42

0.00
9,355.55

0.00
9,355.55

0.00
9,355.55

0.00
9,355.55

0.00
15,636.55

0.00
9,355.55

0.00
0.00
9,355.55 9,355.55

0.00
9,355.55

0.00
9,355.55

0
625,120.42
625,120.42
0.00

OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 5-1B
COSTOS INCREMENTALES A PRECIOS SOCIALES (S/)

NOMBRE DEL PROYECTO

MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA


ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUNIN
ALTERNATIVA 1

CONCEPTO

1
8,173.35

2
8,173.35

3
8,173.35

4
8,173.35

A O S
5
12,564.02

6
7
8
9
10
1. COSTOS CON PROYECTO
8,173.35 8,173.35 8,173.35 8,173.35
8,173.35
Costos de Inversin
* Inversin en Activos Fijos (Obras civiles) 516,177.26
* Implementacin
0.00
Costos de Operacin y Mantenimiento
* Mantenimiento ordinario
8,173.35 8,173.35 8,173.35 8,173.35 8,173.35
8,173.35 8,173.35 8,173.35 8,173.35
8,173.35
* Mantenimiento extraordinario
0.00
0.00
0.00
4,390.68
0.00
0.00
0.00
0.00
0.00
2. COSTOS SIN PROYECTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL COSTOS INCREMENTALES (1 - 2)
516,177.26 8,173.35 8,173.35 8,173.35 8,173.35 12,564.02 8,173.35 8,173.35 8,173.35 8,173.35
8,173.35
OBSERVACIONES
Intangibles
: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
Inversin en Activos Fijos
: Obras civiles, maquinarias y equipo, terrenos, entre otros.
NOTA

0
516,177.26

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 5-2A

COSTOS INCREMENTALES A PRECIOS PRIVADOS (S/)


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE
LA OROYA, PROVINCIA DE YAULI - JUNIN

NOMBRE DEL PROYECTO

ALTERNATIVA 2
CONCEPTO

0
1,121,776.49

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Alquiler para Equipamiento

1
9,355.55

2
9,355.55

3
9,355.55

4
9,355.55

A O S
5
15,636.55

6
9,355.55

7
9,355.55

8
9,355.55

9
9,355.55

10
9,355.55

9,355.55
0.00

9,355.55
0.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
0.00

9,355.55
0.00

9,355.55
0.00

0.00

0.00

0.00
9,355.55

0.00
9,355.55

1,121,776.49
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario

2. COSTOS SIN PROYECTO


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL COSTOS INCREMENTALES (1 - 2)
1,121,776.49
9,355.55
9,355.55
9,355.55
9,355.55
15,636.55
9,355.55
9,355.55
9,355.55
OBSERVACIONES
Intangibles
: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
Inversin en Activos Fijos
: Obras civiles, maquinarias y equipo, terrenos, entre otros.
NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 5-2B
COSTOS INCREMENTALES A PRECIOS SOCIALES (S/)
MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA
OROYA, PROVINCIA DE YAULI - JUNIN

NOMBRE DEL PROYECTO

ALTERNATIVA 2
CONCEPTO

0
930,531.45

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Alquiler para Equipamiento
Costos de Operacin y Mantenimiento
* Mantenimiento ordinario
* Mantenimiento extraordinario

1
8,173.35

2
8,173.35

3
8,173.35

4
8,173.35

A O S
5
12,564.02

6
8,173.35

7
8,173.35

8
8,173.35

9
8,173.35

10
8,173.35

8,173.35
0.00

8,173.35
0.00

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
0.00

8,173.35
0.00

8,173.35
0.00

0.00

0.00

0.00
8,173.35

0.00
8,173.35

930,531.45
0.00

2. COSTOS SIN PROYECTO


0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL COSTOS INCREMENTALES (1 - 2)
930,531.45
8,173.35
8,173.35
8,173.35
8,173.35
12,564.02
8,173.35
8,173.35
8,173.35
OBSERVACIONES
Intangibles
: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
Inversin en Activos Fijos
: Obras civiles, maquinarias y equipo, terrenos, entre otros.
NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-1A

COSTO EFECTIVIDAD A PRECIOS PRIVADOS (S/)


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE
LA OROYA, PROVINCIA DE YAULI - JUNIN

NOMBRE DEL PROYECTO

ALTERNATIVA 1
CONCEPTO
1. COSTOS CON PROYECTO
Costos de Inversin
* Intangibles (Expediente tcnico)
* Inversin en Activos Fijos (Obras civiles)
* Implementacin
* Impacto ambiental
Costos de Operacin y Mantenimiento
* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
699,202.14
Factor FAC ( VACT 10% )
VALOR ANUAL EQUIV.
VAE
113,791.93

1
9,355.55

2
9,355.55

3
15,636.55

4
9,355.55

A O S
5
9,355.55

6
15,636.55

7
9,355.55

8
9,355.55

9
15,636.55

10
9,355.55

0.00

9,355.55
0.00
0.00

9,355.55
0.00
0.00

9,355.55
6,281.00
0.00

9,355.55
0.00
0.00

9,355.55
0.00
0.00

9,355.55
6,281.00
0.00

9,355.55
0.00
0.00

9,355.55
0.00
0.00

9,355.55
6,281.00
0.00

9,355.55
0.00
0.00

0.00
630,788.13
1.000

0.00
9,355.55
0.909

0.00
9,355.55
0.826

0.00
15,636.55
0.751

0.00
9,355.55
0.683

0.00
9,355.55
0.621

0.00
15,636.55
0.564

0.00
9,355.55
0.513

0.00
9,355.55
0.467

0.00
15,636.55
0.424

0.00
9,355.55
0.386

630,788.13
0.163

8,505.04
0.163

7,731.86
0.163

11,747.97
0.163

6,389.96
0.163

5,809.06
0.163

8,826.42
0.163

4,800.87
0.163

4,364.43
0.163

6,631.42
0.163

3,606.97
0.163

102,657.86

1,384.16

1,258.32

1,911.93

1,039.94

945.40

1,436.46

781.32

710.29

1,079.23

587.02

0
630,788.13
19,535.01
605,585.41
0.00
5,667.71

OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-1B

COSTO EFECTIVIDAD A PRECIOS SOCIALES (S/)


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE
LA OROYA, PROVINCIA DE YAULI - JUNIN

NOMBRE DEL PROYECTO

ALTERNATIVA 1
CONCEPTO
1. COSTOS CON PROYECTO
Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Implementacin

0
516,177.26

1
8,173.35

2
8,173.35

3
8,173.35

4
8,173.35

A O S
5
12,564.02

6
8,173.35

7
8,173.35

8
8,173.35

10
8,173.35

8,173.35
0.00
0.00

8,173.35
0.00
0.00

0.00
8,173.35
0.424

0.00
8,173.35
0.386

3,466.30
0.163

3,151.18
0.163

564.12

512.84

516,177.26
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
8,173.35
8,173.35
8,173.35
8,173.35
8,173.35
8,173.35
8,173.35
8,173.35
* Mantenimiento extraordinario
0.00
0.00
0.00
0.00
4,390.68
0.00
0.00
0.00
2. COSTOS SIN PROYECTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL COSTOS INCREMENTALES (1 - 2)
516,177.26
8,173.35
8,173.35
8,173.35
8,173.35
12,564.02
8,173.35
8,173.35
8,173.35
Factor de Actualizacin FAC ( 10 % )
1.000
0.909
0.826
0.751
0.683
0.621
0.564
0.513
0.467
VALOR ACTUAL NETO
VACT
569,125.19
516,177.26
7,430.31
6,754.83
6,140.76
5,582.50
7,801.27
4,613.64
4,194.22
3,812.93
Factor FAC ( VACT 10% )
0.163
0.163
0.163
0.163
0.163
0.163
0.163
0.163
0.163
VALOR ANUAL EQUIV.
VAE
92,622.50
84,005.47
1,209.25
1,099.32
999.38
908.53
1,269.62
750.85
682.59
620.54
OBSERVACIONES
Intangibles
: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
Inversin en Activos Fijos
: Obras civiles, maquinarias y equipo, terrenos, entre otros.
NOTA

9
8,173.35

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-2A

COSTO EFECTIVIDAD A PRECIOS PRIVADOS (S/)


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE
LA OROYA, PROVINCIA DE YAULI - JUNIN

NOMBRE DEL PROYECTO

ALTERNATIVA 2
CONCEPTO
1. COSTOS CON PROYECTO
* Intangibles (Expediente tcnico)
* Inversin en Activos Fijos (Obras civiles)
* Alquiler para Equipamiento
* Impacto ambiental
Costos de Operacin y Mantenimiento
* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 11 % )
VALOR ACTUAL NETO
VACT
1,186,268.64
Factor FAC ( VACT 11% )
VALOR ANUAL EQUIV.
VAE
212,365.73
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

1
9,355.55

2
9,355.55

3
9,355.55

4
9,355.55

A O S
5
15,636.55

6
9,355.55

7
9,355.55

8
9,355.55

9
9,355.55

10
9,355.55

9,355.55
0.00

9,355.55
0.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
0.00

9,355.55
0.00

9,355.55
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
1,127,444.19
1.000

0.00
9,355.55
0.901

0.00
9,355.55
0.812

0.00
9,355.55
0.731

0.00
9,355.55
0.659

0.00
15,636.55
0.593

0.00
9,355.55
0.535

0.00
9,355.55
0.482

0.00
9,355.55
0.434

0.00
9,355.55
0.391

0.00
9,355.55
0.352

1,127,444.19
0.179

8,428.42
0.179

7,593.17
0.179

6,840.69
0.179

6,162.79
0.179

9,279.53
0.179

5,001.86
0.179

4,506.18
0.179

4,059.62
0.179

3,657.31
0.179

3,294.88
0.179

201,834.99

1,508.86

1,359.33

1,224.62

1,103.26

1,661.22

895.43

806.70

726.75

654.73

589.85

0
1,127,444.19
35,055.52
1,086,720.97
0.00
5,667.71

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA
: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.
Se considera el valor residual total de la inversin inicial al 10 ao (mtodo de depreciacin lin
=
0.00%

FORMATO 6-2B

COSTO EFECTIVIDAD A PRECIOS SOCIALES (S/)


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE
LA OROYA, PROVINCIA DE YAULI - JUNIN

NOMBRE DEL PROYECTO

ALTERNATIVA 2
CONCEPTO

0
930,531.45

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Alquiler para Equipamiento

1
8,173.35

2
8,173.35

3
8,173.35

4
8,173.35

A O S
5
12,564.02

6
8,173.35

7
8,173.35

8
8,173.35

10
8,173.35

8,173.35
0.00
0.00

8,173.35
0.00
0.00

0.00
8,173.35
0.424

0.00
8,173.35
0.386

3,466.30
0.179

3,151.18
0.179

620.54

564.12

930,531.45
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
8,173.35
8,173.35
8,173.35
8,173.35
8,173.35
8,173.35
8,173.35
8,173.35
* Mantenimiento extraordinario
0.00
0.00
0.00
0.00
4,390.68
0.00
0.00
0.00
2. COSTOS SIN PROYECTO
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
TOTAL COSTOS INCREMENTALES (1 - 2)
930,531.45
8,173.35
8,173.35
8,173.35
8,173.35
12,564.02
8,173.35
8,173.35
8,173.35
Factor de Actualizacin FAC ( 10 % )
1.000
0.909
0.826
0.751
0.683
0.621
0.564
0.513
0.467
VALOR ACTUAL NETO
VACT
983,479.38
930,531.45
7,430.31
6,754.83
6,140.76
5,582.50
7,801.27
4,613.64
4,194.22
3,812.93
Factor FAC ( VACT 10% )
0.179
0.179
0.179
0.179
0.179
0.179
0.179
0.179
0.179
VALOR ANUAL EQUIV.
VAE
176,062.41
166,583.68
1,330.17
1,209.25
1,099.32
999.38
1,396.58
825.93
750.85
682.59
OBSERVACIONES
Intangibles
: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
Inversin en Activos Fijos
: Obras civiles, maquinarias y equipo, terrenos, entre otros.
NOTA

9
8,173.35

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

RAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUNIN
METODOLOGIA COSTO - EFECTIVIDAD
CALCULO DE RATIOS COSTO - EFECTIVIDAD (C/E)
ALTERNATIVA 1
DESCRIPCION

SIMBOLO

ALTERNATIVA 2

A Precios

A Precios

A Precios

Privados

Sociales

Privados

Sociales

VACT

699,202.14

569,125.19

1,186,268.64

983,479.38

VALOR ANUAL EQUIVALENTE

VAE

113,791.93

92,622.50

212,365.73

176,062.41

METROS DE INFRAESTRUCTURA CONSTRUIDA (ML)

MCP

365.13

365.13

365.13

365.13

PA

597

597

597

597

VALOR ACTUAL DE LOS COSTOS TOTALES

NUMERO PROMEDIO DE HABITANTES

A Precios

RATIO METROS LINEALES DE INFRAESTRUCTURA CONSTRUIDA :


ALTERNATIVA 1
COSTO EFECTIVIDAD

ALTERNATIVA 2

A Precios

A Precios

A Precios

A Precios

Privados

Sociales

Privados

Sociales

1,914.94

1,558.69

3,248.89

2,693.50

VACT
CE =

------------

Escoge

MCP

RATIO NUMERO DE POBLACION POR AO :


ALTERNATIVA 1
COSTO EFECTIVIDAD

ALTERNATIVA 2

A Precios

A Precios

A Precios

A Precios

Privados

Sociales

Privados

Sociales

190.61

155.15

355.72

294.91

VAE
CE =

-----------PA

RATIO NUMERO DE POBLACION :


ALTERNATIVA 1

ALTERNATIVA 2

Alternativa 1

COSTO EFECTIVIDAD

A Precios

A Precios

A Precios

A Precios

Privados

Sociales

Privados

Sociales

1,171.19

953.31

1,987.05

1,647.37

VACT
CE =

-----------PA

FORMATO 6-1C

ANALISIS DE SENSIBILIDAD A PRECIOS PRIVADOS (S/)


NOMBRE DEL PROYECTO

MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA,
PROVINCIA DE YAULI - JUNIN

SENSIBILIDAD

+20% de Inversin
ALTERNATIVA 1

CONCEPTO

1
9,355.55

2
9,355.55

3
15,636.55

4
9,355.55

A O S
5
9,355.55

6
15,636.55

7
9,355.55

8
9,355.55

9
15,636.55

10
9,355.55

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
750,144.51
1.0000

0.00
9,355.55
0.9009

0.00
9,355.55
0.8116

0.00
15,636.55
0.7312

0.00
9,355.55
0.6587

0.00
9,355.55
0.5935

0.00
15,636.55
0.5346

0.00
9,355.55
0.4817

0.00
9,355.55
0.4339

0.00
15,636.55
0.3909

0.00
9,355.55
0.3522

750,144.51
0.1627

8,428.42
0.1627

7,593.17
0.1627

11,433.31
0.1627

6,162.79
0.1627

5,552.06
0.1627

8,359.94
0.1627

4,506.18
0.1627

4,059.62
0.1627

6,112.71
0.1627

3,294.88
0.1627

122,082.56

1,371.69

1,235.75

1,860.72

1,002.97

903.57

1,360.54

733.36

660.68

994.82

536.23

0
750,144.51

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Implementacin

750,144.51
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
815,647.58
Factor FAC ( VACT 10% )
VALOR ANUAL EQUIV.
VAE
132,742.89
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-1C

ANALISIS DE SENSIBILIDAD A PRECIOS SOCIALES (S/)


NOMBRE DEL PROYECTO

MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA,
PROVINCIA DE YAULI - JUNIN

SENSIBILIDAD

+20% de Inversin

ALTERNATIVA 1
CONCEPTO

1
8,173.35

2
8,173.35

3
12,564.02

4
8,173.35

A O S
5
8,173.35

6
12,564.02

7
8,173.35

8
8,173.35

9
12,564.02

10
8,173.35

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
619,412.71
1.0000

0.00
8,173.35
0.9091

0.00
8,173.35
0.8264

0.00
12,564.02
0.7513

0.00
8,173.35
0.6830

0.00
8,173.35
0.6209

0.00
12,564.02
0.5645

0.00
8,173.35
0.5132

0.00
8,173.35
0.4665

0.00
12,564.02
0.4241

0.00
8,173.35
0.3855

619,412.71
0.1627

7,430.31
0.1627

6,754.83
0.1627

9,439.54
0.1627

5,582.50
0.1627

5,075.00
0.1627

7,092.06
0.1627

4,194.22
0.1627

3,812.93
0.1627

5,328.37
0.1627

3,151.18
0.1627

100,806.57

1,209.25

1,099.32

1,536.24

908.53

825.93

1,154.20

682.59

620.54

867.17

512.84

0
619,412.71

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Implementacin

619,412.71
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
677,273.66
Factor FAC ( VACT 10% )
VALOR ANUAL EQUIV.
VAE
110,223.17
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-1C
ANALISIS DE SENSIBILIDAD A PRECIOS PRIVADOS (S/)
MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAULI -

NOMBRE DEL PROYECTO


SENSIBILIDAD

+10% de Inversin

ALTERNATIVA 1
CONCEPTO

1
9,355.55

2
9,355.55

3
15,636.55

4
9,355.55

A O S
5
9,355.55

6
15,636.55

7
9,355.55

8
9,355.55

9
15,636.55

10
9,355.55

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
687,632.46
1.0000

0.00
9,355.55
0.9091

0.00
9,355.55
0.8264

0.00
15,636.55
0.7513

0.00
9,355.55
0.6830

0.00
9,355.55
0.6209

0.00
15,636.55
0.5645

0.00
9,355.55
0.5132

0.00
9,355.55
0.4665

0.00
15,636.55
0.4241

0.00
9,355.55
0.3855

687,632.46
0.1627

8,505.04
0.1627

7,731.86
0.1627

11,747.97
0.1627

6,389.96
0.1627

5,809.06
0.1627

8,826.42
0.1627

4,800.87
0.1627

4,364.43
0.1627

6,631.42
0.1627

3,606.97
0.1627

111,909.02

1,384.16

1,258.32

1,911.93

1,039.94

945.40

1,436.46

781.32

710.29

1,079.23

587.02

0
687,632.46

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Implementacin

687,632.46
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
756,046.47
Factor FAC ( VACT 10% )
VALOR ANUAL EQUIV.
VAE
123,043.08
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-1C
ANALISIS DE SENSIBILIDAD A PRECIOS SOCIALES (S/)
NOMBRE DEL PROYECTO

MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA,
PROVINCIA DE YAULI - JUNIN

SENSIBILIDAD

+10% de Inversin
ALTERNATIVA 1

CONCEPTO

1
8,173.35

2
8,173.35

3
12,564.02

4
8,173.35

A O S
5
8,173.35

6
12,564.02

7
8,173.35

8
8,173.35

9
12,564.02

10
8,173.35

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
567,794.98
1.0000

0.00
8,173.35
0.9091

0.00
8,173.35
0.8264

0.00
12,564.02
0.7513

0.00
8,173.35
0.6830

0.00
8,173.35
0.6209

0.00
12,564.02
0.5645

0.00
8,173.35
0.5132

0.00
8,173.35
0.4665

0.00
12,564.02
0.4241

0.00
8,173.35
0.3855

567,794.98
0.1627

7,430.31
0.1627

6,754.83
0.1627

9,439.54
0.1627

5,582.50
0.1627

5,075.00
0.1627

7,092.06
0.1627

4,194.22
0.1627

3,812.93
0.1627

5,328.37
0.1627

3,151.18
0.1627

92,406.02

1,209.25

1,099.32

1,536.24

908.53

825.93

1,154.20

682.59

620.54

867.17

512.84

0
567,794.98

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Implementacin

567,794.98
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
625,655.93
Factor FAC ( VACT 10% )
VALOR ANUAL EQUIV.
VAE
101,822.62
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-1C
ANALISIS DE SENSIBILIDAD A PRECIOS PRIVADOS (S/)

NOMBRE DEL PROYECTO


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUN
SENSIBILIDAD
-10% de Inversin

ALTERNATIVA 1
CONCEPTO

1
9,355.55

2
9,355.55

3
15,636.55

4
9,355.55

A O S
5
9,355.55

6
15,636.55

7
9,355.55

8
9,355.55

9
15,636.55

10
9,355.55

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
562,608.38
1.0000

0.00
9,355.55
0.9091

0.00
9,355.55
0.8264

0.00
15,636.55
0.7513

0.00
9,355.55
0.6830

0.00
9,355.55
0.6209

0.00
15,636.55
0.5645

0.00
9,355.55
0.5132

0.00
9,355.55
0.4665

0.00
15,636.55
0.4241

0.00
9,355.55
0.3855

562,608.38
0.1627

8,505.04
0.1627

7,731.86
0.1627

11,747.97
0.1627

6,389.96
0.1627

5,809.06
0.1627

8,826.42
0.1627

4,800.87
0.1627

4,364.43
0.1627

6,631.42
0.1627

3,606.97
0.1627

91,561.92

1,384.16

1,258.32

1,911.93

1,039.94

945.40

1,436.46

781.32

710.29

1,079.23

587.02

0
562,608.38

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Implementacin

562,608.38
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
631,022.39
Factor FAC ( VACT 11% )
VALOR ANUAL EQUIV.
VAE
102,695.99
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-1C
ANALISIS DE SENSIBILIDAD A PRECIOS SOCIALES (S/)

NOMBRE DEL PROYECTO


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUN
SENSIBILIDAD
-10% de Inversin

ALTERNATIVA 1
CONCEPTO

1
8,173.35

2
8,173.35

3
12,564.02

4
8,173.35

A O S
5
8,173.35

6
12,564.02

7
8,173.35

8
8,173.35

9
12,564.02

10
8,173.35

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
464,559.53
1.0000

0.00
8,173.35
0.9091

0.00
8,173.35
0.8264

0.00
12,564.02
0.7513

0.00
8,173.35
0.6830

0.00
8,173.35
0.6209

0.00
12,564.02
0.5645

0.00
8,173.35
0.5132

0.00
8,173.35
0.4665

0.00
12,564.02
0.4241

0.00
8,173.35
0.3855

464,559.53
0.1627

7,430.31
0.1627

6,754.83
0.1627

9,439.54
0.1627

5,582.50
0.1627

5,075.00
0.1627

7,092.06
0.1627

4,194.22
0.1627

3,812.93
0.1627

5,328.37
0.1627

3,151.18
0.1627

75,604.92

1,209.25

1,099.32

1,536.24

908.53

825.93

1,154.20

682.59

620.54

867.17

512.84

0
464,559.53

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Implementacin

464,559.53
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
522,420.48
Factor FAC ( VACT 10% )
VALOR ANUAL EQUIV.
VAE
85,021.53
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-1C
ANALISIS DE SENSIBILIDAD A PRECIOS PRIVADOS (S/)

NOMBRE DEL PROYECTO


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YA
SENSIBILIDAD
-20% de Inversin

ALTERNATIVA 1
CONCEPTO

1
9,355.55

2
9,355.55

3
15,636.55

4
9,355.55

A O S
5
9,355.55

6
15,636.55

7
9,355.55

8
9,355.55

9
15,636.55

10
9,355.55

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
500,096.34
1.0000

0.00
9,355.55
0.9091

0.00
9,355.55
0.8264

0.00
15,636.55
0.7513

0.00
9,355.55
0.6830

0.00
9,355.55
0.6209

0.00
15,636.55
0.5645

0.00
9,355.55
0.5132

0.00
9,355.55
0.4665

0.00
15,636.55
0.4241

0.00
9,355.55
0.3855

500,096.34
0.1627

8,505.04
0.1627

7,731.86
0.1627

11,747.97
0.1627

6,389.96
0.1627

5,809.06
0.1627

8,826.42
0.1627

4,800.87
0.1627

4,364.43
0.1627

6,631.42
0.1627

3,606.97
0.1627

81,388.38

1,384.16

1,258.32

1,911.93

1,039.94

945.40

1,436.46

781.32

710.29

1,079.23

587.02

0
500,096.34

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Implementacin

500,096.34
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
568,510.35
Factor FAC ( VACT 10% )
VALOR ANUAL EQUIV.
VAE
92,522.44
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-1C
ANALISIS DE SENSIBILIDAD A PRECIOS SOCIALES (S/)

NOMBRE DEL PROYECTO


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YA
SENSIBILIDAD
-20% de Inversin

ALTERNATIVA 1
CONCEPTO

1
8,173.35

2
8,173.35

3
12,564.02

4
8,173.35

A O S
5
8,173.35

6
12,564.02

7
8,173.35

8
8,173.35

9
12,564.02

10
8,173.35

0.00

8,173.35
0.00
0.00

8,173.35
0.00
0.00

8,173.35
4,390.68
0.00

8,173.35
0.00
0.00

8,173.35
0.00
0.00

8,173.35
4,390.68
0.00

8,173.35
0.00
0.00

8,173.35
0.00
0.00

8,173.35
4,390.68
0.00

8,173.35
0.00
0.00

0.00
412,941.81
1.0000

0.00
8,173.35
0.9091

0.00
8,173.35
0.8264

0.00
12,564.02
0.7513

0.00
8,173.35
0.6830

0.00
8,173.35
0.6209

0.00
12,564.02
0.5645

0.00
8,173.35
0.5132

0.00
8,173.35
0.4665

0.00
12,564.02
0.4241

0.00
8,173.35
0.3855

412,941.81
0.1627

7,430.31
0.1627

6,754.83
0.1627

9,439.54
0.1627

5,582.50
0.1627

5,075.00
0.1627

7,092.06
0.1627

4,194.22
0.1627

3,812.93
0.1627

5,328.37
0.1627

3,151.18
0.1627

67,204.38

1,209.25

1,099.32

1,536.24

908.53

825.93

1,154.20

682.59

620.54

867.17

512.84

0
412,941.81

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Implementacin
Costos de Operacin y Mantenimiento
* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
470,802.75
Factor FAC ( VACT 10% )
VALOR ANUAL EQUIV.
VAE
76,620.98

412,941.81
0.00

OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-2C
ANALISIS DE SENSIBILIDAD A PRECIOS PRIVADOS (S/)

MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE L

NOMBRE DEL PROYECTO


SENSIBILIDAD

+20% de Inversin

ALTERNATIVA 2
CONCEPTO

1
9,355.55

2
9,355.55

3
15,636.55

4
9,355.55

A O S
5
9,355.55

6
15,636.55

7
9,355.55

8
9,355.55

9
15,636.55

10
9,355.55

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
1,346,131.78
1.0000

0.00
9,355.55
0.9091

0.00
9,355.55
0.8264

0.00
15,636.55
0.7513

0.00
9,355.55
0.6830

0.00
9,355.55
0.6209

0.00
15,636.55
0.5645

0.00
9,355.55
0.5132

0.00
9,355.55
0.4665

0.00
15,636.55
0.4241

0.00
9,355.55
0.3855

1,346,131.78
0.1627

8,505.04
0.1627

7,731.86
0.1627

11,747.97
0.1627

6,389.96
0.1627

5,809.06
0.1627

8,826.42
0.1627

4,800.87
0.1627

4,364.43
0.1627

6,631.42
0.1627

3,606.97
0.1627

219,076.75

1,384.16

1,258.32

1,911.93

1,039.94

945.40

1,436.46

781.32

710.29

1,079.23

587.02

0
1,346,131.78

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Alquiler para Equipamiento

1,346,131.78
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
1,414,545.79
Factor FAC ( VACT 10% )
VALOR ANUAL EQUIV.
VAE
230,210.81
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-2C
ANALISIS DE SENSIBILIDAD A PRECIOS SOCIALES (S/)

MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE L

NOMBRE DEL PROYECTO


SENSIBILIDAD

+20% de Inversin

ALTERNATIVA 2
CONCEPTO

1
8,173.35

2
8,173.35

3
12,564.02

4
8,173.35

A O S
5
8,173.35

6
12,564.02

7
8,173.35

8
8,173.35

9
12,564.02

10
8,173.35

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
1,116,637.74
1.0000

0.00
8,173.35
0.9091

0.00
8,173.35
0.8264

0.00
12,564.02
0.7513

0.00
8,173.35
0.6830

0.00
8,173.35
0.6209

0.00
12,564.02
0.5645

0.00
8,173.35
0.5132

0.00
8,173.35
0.4665

0.00
12,564.02
0.4241

0.00
8,173.35
0.3855

1,116,637.74
0.1627

7,430.31
0.1627

6,754.83
0.1627

9,439.54
0.1627

5,582.50
0.1627

5,075.00
0.1627

7,092.06
0.1627

4,194.22
0.1627

3,812.93
0.1627

5,328.37
0.1627

3,151.18
0.1627

181,727.65

1,209.25

1,099.32

1,536.24

908.53

825.93

1,154.20

682.59

620.54

867.17

512.84

0
1,116,637.74

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Alquiler para Equipamiento

1,116,637.74
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
1,174,498.69
Factor FAC ( VACT 10% )
VALOR ANUAL EQUIV.
VAE
191,144.25
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-2C
ANALISIS DE SENSIBILIDAD A PRECIOS PRIVADOS (S/)
NOMBRE DEL PROYECTO
MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUNIN
SENSIBILIDAD
+10% de Inversin

ALTERNATIVA 2
CONCEPTO

0
1,233,954.14

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Alquiler para Equipamiento

1
9,355.55

2
9,355.55

3
15,636.55

4
9,355.55

A O S
5
9,355.55

6
15,636.55

7
9,355.55

8
9,355.55

9
15,636.55

10
9,355.55

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
9,355.55
0.9091

0.00
9,355.55
0.8264

0.00
15,636.55
0.7513

0.00
9,355.55
0.6830

0.00
9,355.55
0.6209

0.00
15,636.55
0.5645

0.00
9,355.55
0.5132

0.00
9,355.55
0.4665

0.00
15,636.55
0.4241

0.00
9,355.55
0.3855

8,505.04
0.1627

7,731.86
0.1627

11,747.97
0.1627

6,389.96
0.1627

5,809.06
0.1627

8,826.42
0.1627

4,800.87
0.1627

4,364.43
0.1627

6,631.42
0.1627

3,606.97
0.1627

1,384.16

1,258.32

1,911.93

1,039.94

945.40

1,436.46

781.32

710.29

1,079.23

587.02

1,233,954.14
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
0.00
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
0.00
TOTAL COSTOS INCREMENTALES (1 - 2)
1,233,954.14
1.0000
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
1,302,368.14 1,233,954.14
Factor FAC ( VACT 10% )
0.1627
VALOR ANUAL EQUIV.
VAE
211,954.42
200,820.35
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-2C
ANALISIS DE SENSIBILIDAD A PRECIOS SOCIALES (S/)
NOMBRE DEL PROYECTO
MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUNIN
SENSIBILIDAD
+10% de Inversin

ALTERNATIVA 2
CONCEPTO

0
1,023,584.59

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Alquiler para Equipamiento

1
8,173.35

2
8,173.35

3
12,564.02

4
8,173.35

A O S
5
8,173.35

6
12,564.02

7
8,173.35

8
8,173.35

9
12,564.02

10
8,173.35

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
8,173.35
0.9091

0.00
8,173.35
0.8264

0.00
12,564.02
0.7513

0.00
8,173.35
0.6830

0.00
8,173.35
0.6209

0.00
12,564.02
0.5645

0.00
8,173.35
0.5132

0.00
8,173.35
0.4665

0.00
12,564.02
0.4241

0.00
8,173.35
0.3855

7,430.31
0.1627

6,754.83
0.1627

9,439.54
0.1627

5,582.50
0.1627

5,075.00
0.1627

7,092.06
0.1627

4,194.22
0.1627

3,812.93
0.1627

5,328.37
0.1627

3,151.18
0.1627

1,209.25

1,099.32

1,536.24

908.53

825.93

1,154.20

682.59

620.54

867.17

512.84

1,023,584.59
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
0.00
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
0.00
TOTAL COSTOS INCREMENTALES (1 - 2)
1,023,584.59
1.0000
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
1,081,445.54 1,023,584.59
Factor FAC ( VACT 10% )
0.1627
VALOR ANUAL EQUIV.
VAE
176,000.28
166,583.68
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-2C
ANALISIS DE SENSIBILIDAD A PRECIOS PRIVADOS (S/)

NOMBRE DEL PROYECTO


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUNIN
SENSIBILIDAD
-10% de Inversin

ALTERNATIVA 2
CONCEPTO

0
1,009,598.84

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Alquiler para Equipamiento

1
9,355.55

2
9,355.55

3
15,636.55

4
9,355.55

A O S
5
9,355.55

6
15,636.55

7
9,355.55

8
9,355.55

9
15,636.55

10
9,355.55

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
9,355.55
0.9091

0.00
9,355.55
0.8264

0.00
15,636.55
0.7513

0.00
9,355.55
0.6830

0.00
9,355.55
0.6209

0.00
15,636.55
0.5645

0.00
9,355.55
0.5132

0.00
9,355.55
0.4665

0.00
15,636.55
0.4241

0.00
9,355.55
0.3855

8,505.04
0.1627

7,731.86
0.1627

11,747.97
0.1627

6,389.96
0.1627

5,809.06
0.1627

8,826.42
0.1627

4,800.87
0.1627

4,364.43
0.1627

6,631.42
0.1627

3,606.97
0.1627

1,384.16

1,258.32

1,911.93

1,039.94

945.40

1,436.46

781.32

710.29

1,079.23

587.02

1,009,598.84
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
0.00
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
0.00
TOTAL COSTOS INCREMENTALES (1 - 2)
1,009,598.84
1.0000
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
1,078,012.85 1,009,598.84
Factor FAC ( VACT 10% )
0.1627
VALOR ANUAL EQUIV.
VAE
175,441.63
164,307.56
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-2C
ANALISIS DE SENSIBILIDAD A PRECIOS SOCIALES (S/)

NOMBRE DEL PROYECTO


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAULI - JUNIN
SENSIBILIDAD
-10% de Inversin

ALTERNATIVA 2
CONCEPTO

1
8,173.35

2
8,173.35

3
12,564.02

4
8,173.35

A O S
5
8,173.35

6
12,564.02

7
8,173.35

8
8,173.35

9
12,564.02

10
8,173.35

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
837,478.30
1.0000

0.00
8,173.35
0.9091

0.00
8,173.35
0.8264

0.00
12,564.02
0.7513

0.00
8,173.35
0.6830

0.00
8,173.35
0.6209

0.00
12,564.02
0.5645

0.00
8,173.35
0.5132

0.00
8,173.35
0.4665

0.00
12,564.02
0.4241

0.00
8,173.35
0.3855

837,478.30
0.1627

7,430.31
0.1627

6,754.83
0.1627

9,439.54
0.1627

5,582.50
0.1627

5,075.00
0.1627

7,092.06
0.1627

4,194.22
0.1627

3,812.93
0.1627

5,328.37
0.1627

3,151.18
0.1627

136,295.74

1,209.25

1,099.32

1,536.24

908.53

825.93

1,154.20

682.59

620.54

867.17

512.84

0
837,478.30

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Alquiler para Equipamiento

837,478.30
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
895,339.25
Factor FAC ( VACT 10% )
VALOR ANUAL EQUIV.
VAE
145,712.34
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-2C
ANALISIS DE SENSIBILIDAD A PRECIOS PRIVADOS (S/)

NOMBRE DEL PROYECTO


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAUL
SENSIBILIDAD
-20% de Inversin

ALTERNATIVA 2
CONCEPTO

1
9,355.55

2
9,355.55

3
15,636.55

4
9,355.55

A O S
5
9,355.55

6
15,636.55

7
9,355.55

8
9,355.55

9
15,636.55

10
9,355.55

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

9,355.55
0.00

9,355.55
6,281.00

9,355.55
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
897,421.19
1.0000

0.00
9,355.55
0.9091

0.00
9,355.55
0.8264

0.00
15,636.55
0.7513

0.00
9,355.55
0.6830

0.00
9,355.55
0.6209

0.00
15,636.55
0.5645

0.00
9,355.55
0.5132

0.00
9,355.55
0.4665

0.00
15,636.55
0.4241

0.00
9,355.55
0.3855

897,421.19
0.1627

8,505.04
0.1627

7,731.86
0.1627

11,747.97
0.1627

6,389.96
0.1627

5,809.06
0.1627

8,826.42
0.1627

4,800.87
0.1627

4,364.43
0.1627

6,631.42
0.1627

3,606.97
0.1627

146,051.17

1,384.16

1,258.32

1,911.93

1,039.94

945.40

1,436.46

781.32

710.29

1,079.23

587.02

0
897,421.19

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Alquiler para Equipamiento

897,421.19
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
965,835.20
Factor FAC ( VACT 10% )
VALOR ANUAL EQUIV.
VAE
157,185.23
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 6-2C
ANALISIS DE SENSIBILIDAD A PRECIOS SOCIALES (S/)

NOMBRE DEL PROYECTO


MEJORAMIENTO DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA DE YAUL
SENSIBILIDAD
-20% de Inversin

ALTERNATIVA 2
CONCEPTO

1
8,173.35

2
8,173.35

3
12,564.02

4
8,173.35

A O S
5
8,173.35

6
12,564.02

7
8,173.35

8
8,173.35

9
12,564.02

10
8,173.35

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

8,173.35
0.00

8,173.35
4,390.68

8,173.35
0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00
744,425.16
1.0000

0.00
8,173.35
0.9091

0.00
8,173.35
0.8264

0.00
12,564.02
0.7513

0.00
8,173.35
0.6830

0.00
8,173.35
0.6209

0.00
12,564.02
0.5645

0.00
8,173.35
0.5132

0.00
8,173.35
0.4665

0.00
12,564.02
0.4241

0.00
8,173.35
0.3855

744,425.16
0.1627

7,430.31
0.1627

6,754.83
0.1627

9,439.54
0.1627

5,582.50
0.1627

5,075.00
0.1627

7,092.06
0.1627

4,194.22
0.1627

3,812.93
0.1627

5,328.37
0.1627

3,151.18
0.1627

121,151.77

1,209.25

1,099.32

1,536.24

908.53

825.93

1,154.20

682.59

620.54

867.17

512.84

0
744,425.16

1. COSTOS CON PROYECTO


Costos de Inversin
* Inversin en Activos Fijos (Obras civiles)
* Alquiler para Equipamiento

744,425.16
0.00

Costos de Operacin y Mantenimiento


* Mantenimiento ordinario
* Mantenimiento extraordinario
2. COSTOS SIN PROYECTO
Costos de Operacin y Mantenimiento
* Operacin y Mantenimiento ordinario
TOTAL COSTOS INCREMENTALES (1 - 2)
Factor de Actualizacin FAC ( 10 % )
VALOR ACTUAL NETO
VACT
802,286.11
Factor FAC ( VACT 10% )
VALOR ANUAL EQUIV.
VAE
130,568.37
OBSERVACIONES
Intangibles
Inversin en Activos Fijos

: Saneamiento de tierras, estudios complementarios de ingeniera, expedientes tcnicos, franquicias, permisos, entre otros.
: Obras civiles, maquinarias y equipo, terrenos, entre otros.

NOTA

: Se debern programar las reposiciones que sean necesarias en el horizonte del proyecto.

FORMATO 8
ANALISIS DE SENSIBILIDAD

MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROVINCIA

RESULTADO ANALISIS DE SENSIBILIDAD C/E = INVERSION / INF. CONST.


Costo

Variacin en el
Costo de
Inversin

Efectividad

-20%
-10%

ALTERNATIVA 1

ALTERNATIVA 2

A Precios

A Precios

A Precios

Privados

Sociales

Privados

Sociales

Inv/Inf.

952.279

788.614

1617.814

1343.863

Inv/Inf.

1056.989

875.076

1805.717

1499.731

0%

Inv/Inf.

1171.193

953.309

1987.050

1647.369

10%

Inv/Inf.

1266.410

1048.000

2181.521

1811.467

20%

Inv/Inf.

1366.244

1134.462

2369.423

1967.334

COST O/EFECT IV IDAD

A Precios

ANALISIS DE SENSIBILIDAD
PRECIOS PRIVADOS
2500.000
2000.000
1500.000
1000.000
500.000
0.000
-20%

-10%

0%

10%

20%

% INCREMENTO DE INVERSION

COSTO/EFECTIVIDAD

ALTERNATIVA 1

ALTERNATIVA 2

ANALISIS DE SENSIBILIDAD
PRECIOS SOCIALES

3500.000
3000.000
2500.000
2000.000
1500.000
1000.000
500.000
0.000
-20%

-10%

0%

10%

20%

1000.000
500.000
0.000
-20%

-10%

0%

10%

% INCREMENTO DE INVERSION
ALTERNATIVA 2

ALTERNATIVA 1

20%

O DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PROV

RESUMEN DE INDICADORES A PRECIOS PRIVADOS


INDICADOR
Inversin por rea de infraestructura construida
Inversin por habitante

ALTERNATIVA 1

ALTERNATIVA 2

1,914.94

3,248.89

190.61

355.72

RESUMEN DE INDICADORES A PRECIOS SOCIALES


INDICADOR
Inversin por rea de infraest.peatonal
Inversin por habitante

TOTAL DEL PROYECTO


VACT social (S/.)
Poblacin beneficiada
CE por poblacin
Sensibilidad de CE
Sostenible

ALTERNATIVA 1

ALTERNATIVA 2

1,558.69

2,693.50

155.15

294.91

ALTERNATIVA 1

ALTERNATIVA 2

569,125.19

983,479.38

1,025.00

1,025.00

953.31

1,647.37

Hasta 20%

Hasta 20%

Si

SI

DEL MURO DE CONTENCION DE LA DEFENSA RIBEREA EN EN PUEBLO JOVEN SANTA ANITA, DISTRITO DE LA OROYA, PRO

PRESUPUESTOS ALTERNATIVAS - ETAPA PRE-OPERATIVA


(EN NUEVOS SOLES)
ALTERNATIVA 1
CONCEPTO

ALTERNATIVA 2

A Precios

A Precios

A Precios

A Precios

Privados

Sociales

Privados

Sociales

Elaboracin del Expediente Tcnico

19,535.01

17,776.86

35,055.52

31,900.52

Obras Civiles Proyectadas

605,585.41

498,400.39

1,086,720.97

898,630.93

Sub Total

625,120.42

516,177.26

1,121,776.49

930,531.45

625,120.42

516,177.26

1,121,776.49

930,531.45

TOTAL

PRESUPUESTO ALTERNATIVA SELECCIONADA


(EN NUEVOS SOLES)

ALTERNATIVA 1
CONCEPTO

A Precios

A Precios

Privados

Sociales

Elaboracin del Expediente Tcnico

19,535.01

17,776.86

Obras Civiles Proyectadas

605,585.41

498,400.39

625,120.42

516,177.26

TOTAL

FORMATO 9
ANLISIS DE SOSTENIBILIDAD DEL PROYECTO
(Alternativa 1)

1.-

DEFINIR CLARAMENTE LA INSTITUCION ENCARGADA DE LA OPERACIN Y MANTENIMIENTO DEL PROYECTO


La Municipalidad Provincial de Yauli la Oroya sera el encargado de llevar a cabo los trabajos de Operacin y mantenimiento ordinario del Proyecto
Mejoramiento del Muro de Contencion de la Defensa Riberea en el Pueblo Joven Santa Anita, Distrito de la Oroya, Provinvia de Yauli - Junin .

2.-

ANALIZAR LA CAPACIDAD TECNICA Y LOGISTICA DE LOS ENCARGADOS DE LA OPERACIN Y MANTENIMIENTO


La Municipalidad Provincial de Yauli la Oroya, cuenta con la Gerencia de Desarrollo Urbano, posee la capacidad tcnica y logstica para la
Construcciony el Mejoramiento del Muro de Contencion de la Defensa Riberea en el Pueblo Joven Santa Anita, Distrito de la Oroya, Provinvia de
Yauli - Junin.

3.-

FUENTES DE FINANCIAMIENTO

COSTOS Y FUENTES
Inversin
Mantenimiento Ordinario
Mantenimiento Extraordinario
TOTAL:

2008
625,120.42
9,355.55
0.00
634,475.97

2009

2010

9,355.55
0.00
9,355.55

9,355.55
6,281.00
15,636.55

AOS
2011
9,355.55
0.00
9,355.55

2012

HASTA EL AO 2018

9,355.55
0.00
9,355.55

SE REPITE LA SECUENCIA

Nota: La Operacin y Mantenimiento del Proyecto estaran a cargo del Centro de Asistencia al Adulto Mayor

PARTICIPACIN DE LOS BENEFICIARIOS DIRECTOS DEL PROYECTO


4.-

Los beneficiarios podrn participar con la mano de obra no calificada en la Ejecucion o el mantenimiento del Proyecto.

Informe de compatibilidad para FORMATOS LOCAL ADULTO MAYOR.xls


Ejecutar el 21/05/2009 12:44
Las siguientes caractersticas de este libro no son compatibles con versiones
anteriores de Excel. Estas caractersticas podran perderse o degradarse si
guarda el libro con un formato de archivo anterior.
Prdida menor de fidelidad

Algunas frmulas de este libro estn vinculadas a otros libros que estn
cerrados. Cuando estas frmulas se vuelven a calcular en versiones anteriores
de Excel sin abrir los libros vinculados, los caracteres que exceden el lmite de
255 caracteres no se pueden devolver.

N de apariciones

27

'DESAG. O Y M'!D13
'COSTOS INCRE 1'!F61
'COSTO EFECT 2'!H40
'SENSIB 1 +20%'!C26
'SENSIB 1 +20%'!C72
'SENSIB 1 +10%'!C26
'SENSIB 1 +10%'!H40
'SENSIB 1 +10%'!C72
'SENSIB 1 +10%'!C89
'SENSIB 1 -10%'!C26
'SENSIB 1 -10%'!C72
'SENSIB 1 -10%'!C89
'SENSIB 1 -20%'!C26
'SENSIB 1 -20%'!C71
'SENSIB 1 -20%'!C88
'SENSIB 2 +20%'!C25
'SENSIB 2 +20%'!C71
'SENSIB 2 +20%'!C88
'SENSIB 2 +10%'!C26
'SENSIB 2 +10%'!C72
'SENSIB 2 +10%'!C89
'SENSIB 2 -10%'!C26
'SENSIB 2 -10%'!C72
'SENSIB 2 -10%'!C89
'SENSIB 2 -20%'!C26
'SENSIB 2 -20%'!C72
'SENSIB 2 -20%'!C89

MARCO LOGICO

OBJETIVOS
FIN:

PROPSITO :

Segurdad de la poblacin, sus viviendas e


infraestructura para un desarrollo
sostenido

Proteccion fisica de la poblacin,


viviendas e infraestructura de la margen
derecha del rio Yauli en el pueblo joven
Santa Anita

1.Obras de proteccion fsica.

COMPONENTE
S:

ACCIONES:

2.Trabajos de Mitigacin Ambiental.

1.Construccin de Muro de contencin de


concreto armado inclinado de 2.50 m de
alto y de 104.67 metros de longitud con
una zapata de 1.60 mt x 1 mt.
2.Capacitaciones sobre mitigacin
ambiental y seguridad a la poblacin.

MARCO LOGICO

INDICADORES

FUENTES DE
VERIFICACIN

SUPUESTOS

Al 2021 el PP.JJ. Santa Anita Aplicacn de


desarrollando sostenibilidad en un encuestas
ambiente de seguridad fsica.
Que apartir del 2015 la poblacion
del pueblo joven no tendr riesgos
y vivirn tranquilos.
Trabajar en forma coordinada con
todas las instituciones existentes.
Termino de las construcciones de
las viviendas

Verificacin en situ

Una Comunidad y distrito


ms unidos, crecimiento de
la Poblacin.
Participacin activa de La Poblacin cuenta con
presupuesto
mayores recursos
participativo.
econmicos para la
atencin de otras
necesidades.

Se incrementa la poblacion e
inversion en la zona. Aumento del
valor de sus predios

En Situ. Informacin
No ocurrencias de crisis
estadsticas INEI
macroeconmica. Bien
informacin en el rea inmueble con acabados de
de rentas en la
calidad
Municipalidad

1.Apartir de 2015 se contara con 1. Verificacion en el lugar 1.


Disponibilidad
de
una obra de prevencion
muro .
profesionales para llevar a
concreto atmado inclinado de 2.40
cabo
el
proyecto
de
de alto
y de 490 metros de
manera eficaz y eficiente.
longitud.
1. Apartir de 2015 la poblacin 2.Diagnstico.
tendr comocimientos de tipos de
obras de proteccin, lugares y los
riesgos a que se exponen.
Insfraestructuraconstruidaconunainversin Valorizacion de Obra y
deS/.625,120.41apreciosdemercado,en la revisin del
365.13metroslineales
cuaderno de obra

* Capacitaciones sobre mitigacin


ambiental a la poblacin a S/.
5,667.71 nuevos soles

Liquidacin fsica y
fnanciera de la
ejecucin del proyecto.

2. Evitar la migracin por


falta de seguridad.

Desembolsooportunode
recursosparalaejecucindela
obra
Interesdelapoblacinen
participarenlostalleresde
capacitacin

MEDIO FISICO NATURAL


1.- Suelo
2.- Agua
3.- Erosion Hdrica
MEDIO BIOLOGICO
1.- Vegetacin
MEDIO SOCIAL
1.- Proteccin
2.- Trabajo

-1
-1

1
1

1
1
1

1
1

3
1

1
1

NACIONAL

REGIONAL

LOCAL

LARGA

MEDIA

CORTA

PERMANENTE

NEUTRO

NEGATIVO

VARIABLE DE INCIDENCIA

POSITIVO

De todo ello se puede deducir el siguiente cuadro


EFECTO
TEMPORABILIDAD ESPACIALES
TRANSITORIA

-1
-1
-1
FUERTE

MODERADO

LEVE
MAGNITUD