NUMEROS GENERADORES

OBRA:

PLANTA DE BOMBEO

PLANO:

CARCAMO DE BOMBEO 1
UBICACIN:
CLAVE
1005 01

CONCEPTO

FFCHA:

NOGALES, EDO. DE SONORA

CALCULO:

LOCALIZARON
EJE

TRAMO

A- B

1-2

TIPO

LARGO

ANCHO

18.82

16.35

ALTO

PZAS

OBSERVACIONES

307.71 M2
TOTAL:

A110A

RESULTADO

LIMPIEZA Y TRAZO EN EL AREA DE TRABAJO.

EXCAVACION CON MAQUINA PARA ZANJAS, EN


MATERIAL "B", EN SECO, CON AFLOJE Y
EXTRACCION DEL MATERIAL, AMACICE Y
LIMPIEZA
DE
PLANTILLA
Y
TALUDES,
REMOCIN, CARGA A CAMION O A UN LADO DE
LA ZANJA, INCLUYENDO ACARREO A 10 M. DEL
EJE DE LA MISMA Y CONSERVACIN

V = h (A1 + A2)/2

A1 = 129.53

A2 = 68.45

7.07

699.86 M3

TOTAL:
S/C

RELLENO EN ESTRUCTURAS

S/C

COMPACTADO AL 90% PROCTOR, CON


MATERIAL PRODUCTO DE EXCAVACION
(vol. Excavado)

V = h (A1 + A2)/2

307.71 M2

699.86 M3

A1 = 129.53

A2 = 68.45

7.07

699.86 M3

(vol. plantilla de crcamo de bombeo)

7.60

5.13

0.05

-1.95 M3

(vol. de estructura)

7.60

5.13

5.76

-224.57 M3
473.34 M3

4030 00

FABRICACION Y COLADO
VIBRADO Y CURADO.

DE

CONCRETO

4030 01

PLANTILLA DE CONCRETO F'C=100 KG/CM2


VIBRADO Y CURADO, AGREGADO MXIMO DE
3/4" DE 5 CM DE ESPESOR
7.87

5.13

0.05

2.02 M3
TOTAL:

4030 05

2.02 M3

FABRICACION Y COLADO DE CONCRETO


F'C=250
KG/CM2
VIBRADO
Y CURADO,
AGREGADO MX. DE 3/4"
a) EN CIMENTACIONES.
A

1-2

7.87

5.13

0.30

12.11 M3

1-2

5.00

5.13

0.30

3.85 M3

N2

5.13

0.25

0.75

0.96 M3

N1

2.50

0.20

0.23

0.12 M3

N1

2.50

0.20

0.23

0.12 M3

N1

2.50

0.20

0.23

0.12 M3

N1

2.50

0.20

0.23

0.12 M3

b) EN TRABES.

Pgina 1 de 9

NUMEROS GENERADORES
OBRA:

PLANTA DE BOMBEO

PLANO:

CARCAMO DE BOMBEO 1
UBICACIN:
CLAVE

CONCEPTO

FFCHA:

NOGALES, EDO. DE SONORA

CALCULO:

LOCALIZARON
EJE

TRAMO

LARGO

ANCHO

ALTO

N1

TIPO

2.50

0.20

0.23

PZAS

RESULTADO

OBSERVACIONES

0.12 M3

Lim. De Agua

5.13

0.15

3.42

2.63 M3

Huecos para llenar carcamo

0.85

0.30

0.15

-0.04 M3

4 Complementos de las rejillas

0.90

0.66

0.15

Losa completa de 20 cm.

4.34

4.53

0.20

3.93 M3

0.85

0.85

0.20

-0.14 M3

c) EN LOSAS.

(registro hombre)

4.00

0.36 M3

d) EN MUROS.
A

1-2

6.52

5.13

0.30

10.03 M3

1-2

6.52

5.13

0.30

10.03 M3

A- B

6.52

7.60

0.30

14.87 M3

A- B

6.52

7.60

0.30

14.87 M3
TOTAL:

4080 00

CIMBRA DE MADERA PARA ACABADOS NO


APARENTES EN.

4080 01

a) EN CIMENTACIONES.
1

A- B

7.87

0.35

2.00

5.51 M2

1-2

5.13

0.45

2.00

4.62 M2

TOTAL:
4080 03

10.13 M2

b) TRABES
Nervadura 2

5.13

Nervadura 2

5.13

0.25
0.40

1.28 M2
2.05 M2

Nervadura 2

5.13

0.60

3.08 M2

Nervadura 1

2.80

0.25

4.00

2.80 M2

Nervadura 1

2.80

0.13

4.00

1.46 M2

Nervadura 1

2.80

0.05

16.00

2.24 M2

TOTAL:
4080 04

74.06 M3

12.91 M2

c) LOSAS CON ALTURA DE OBRA FALSA HASTA


3.60 M.
Losa

7.87

Losa

Costados

7.87

Losa

Costados

5.13

5.13

40.37 M2
0.20

2.00

3.15 M2

0.20

2.00

2.05 M2

Lim. De Agua

5.13

0.15

0.77 M2

Lim. De Agua

5.13

1.48

7.59 M2

Lim. De Agua

5.13

1.32

6.77 M2
TOTAL:

53.93 M2

Pgina 2 de 9

NUMEROS GENERADORES
OBRA:

PLANTA DE BOMBEO

PLANO:

CARCAMO DE BOMBEO 1
UBICACIN:
CLAVE
4080 05

CONCEPTO

FFCHA:

NOGALES, EDO. DE SONORA

CALCULO:

LOCALIZARON
EJE

TRAMO

TIPO

LARGO

1,2

A- B

Ext.

1,2

A- B

Int.

A,B

1-2

A,B

1-2

ANCHO

ALTO

PZAS

7.87

6.52

2.00

102.62 M2

7.27

5.72

2.00

83.17 M2

Ext.

6.52

4.54

2.00

59.20 M2

Int.

5.92

4.54

2.00

53.75 M2

Lim. De Agua

5.13

0.15

0.77 M2

Lim. De Agua

5.13

1.97

10.11 M2

Lim. De Agua

5.13

1.82

9.34 M2
TOTAL:

4080 07

RESULTADO

OBSERVACIONES

d) EN MUROS HASTA 3.00 M DE ALTURA.

318.96 M2

BONIFICACION EN CIMBRA PARA ACABADO


APARENTE.
b) TRABES
Nervadura 2

5.13

Nervadura 2

5.13

0.25
0.55

1.28 M2
2.82 M2

Nervadura 2

5.13

0.60

3.08 M2

Nervadura 1

2.80

0.25

4.00

2.80 M2

Nervadura 1

2.80

0.13

4.00

1.46 M2

Nervadura 1

2.80

0.05

16.00

2.24 M2

Losa

7.87

c) LOSAS CON ALTURA DE OBRA FALSA HASTA


3.60 M.
5.13

40.37 M2

Losa

Costados

7.87

0.20

2.00

3.15 M2

Losa

Costados

5.13

0.20

2.00

2.05 M2

Lim. De Agua

5.13

0.15

0.77 M2

Lim. De Agua

5.13

1.48

7.59 M2

Lim. De Agua

5.13

1.32

6.77 M2

d) EN MUROS HASTA 3.00 M DE ALTURA.


1,2

A- B

Ext.

7.87

6.17

2.00

97.12 M2

1,2

A- B

Int.

7.27

5.72

2.00

83.17 M2

A,B

1-2

Ext.

6.52

4.54

2.00

59.20 M2

1-2

Int.

5.92

4.54

2.00

53.75 M2

A,B

Lim. De Agua

5.13

0.15

0.77 M2

Lim. De Agua

5.13

1.97

10.11 M2

Lim. De Agua

5.13

1.82

9.34 M2
TOTAL:

4090 01

387.84 M2

SUMINISTRO Y COLOCACION DE ACERO DE


REFUERZO

Pgina 3 de 9

NUMEROS GENERADORES
OBRA:

PLANTA DE BOMBEO

PLANO:

CARCAMO DE BOMBEO 1
UBICACIN:
CLAVE

CONCEPTO

CALCULO:

LOCALIZARON
EJE

1). TRABE DE 25x60 cm DE CONCRETO


REFORZADO f'c=250 kg/cm2, ARMADA CON 6 var.
No. 5 Y ESTRIBOS No.3 A CADA 20 cm.

FFCHA:

NOGALES, EDO. DE SONORA

TRAMO

TIPO

LARGO

ANCHO

ALTO

PZAS

RESULTADO

OBSERVACIONES

159.95 KG

a). Acero fy=4,200 kg/cm 2 3/8"


No. Estr. = 1.00 m / 0.20 m/est = 6.00 estribos
=Long. x No. Estr. x 0.557 kg/m = 6.02 kg/m
r

= 62.61 kg
b). Acero fy=4,200 kg/cm 2 5/8"
No. Vars. x 1.560 kg/m = 9.36 kg/m

= 97.34 kg
2). LOSA DE CIMENTACION DE 45 cm PROMEDIO
DE CONCRETO REFORZADO f'c=250 kg/cm2,
ARMADA CON var. No. 5 @ 15 Y var. No. 6 @ 15.

2,162.04 KG

a). Acero fy=4,200 kg/cm 2 5/8"


No. vars. = 1.00 m / 0.15 m = 8.00 vars
=Long. x No. vars. x 1.560 kg/m = 12.48 kg/m
r

= 885.24 kg
b). Acero fy=4,200 kg/cm 2 3/4"
No. vars. = 1.00 m / 0.15 m = 8.00 vars
=Long. x No. vars. x 2.250 kg/m = 18.00 kg/m

= 1,276.80 kg
3). LOSA SUPERIOR DE 15 cm DE CONCRETO
REFORZADO f'c=250 kg/cm2, ARMADO CON var.
No. 4 @ 20.

229.06 KG

a). Acero fy=4,200 kg/cm 2 1/2"


No. vars. = 1.00 m / 0.20 m = 6.00 vars
=Long. x No. vars. x 0.996 kg/m = 5.98 kg/m
r

= 119.20 kg
b). Acero fy=4,200 kg/cm 2 1/2"
No. vars. = 8.20 m / 0.30 m = 22.00 vars
=Long. x No. vars. x 0.996 kg/m = 31.77 kg/m

= 63.54 kg

Pgina 4 de 9

NUMEROS GENERADORES
OBRA:

PLANTA DE BOMBEO

PLANO:

CARCAMO DE BOMBEO 1
UBICACIN:
CLAVE

CONCEPTO

FFCHA:

NOGALES, EDO. DE SONORA

CALCULO:

LOCALIZARON
EJE

TRAMO

TIPO

LARGO

ANCHO

ALTO

PZAS

RESULTADO

OBSERVACIONES

c). Acero fy=4,200 kg/cm2 1/2"


No. vars. = 5.73 m / 0.40 m = 15.00 vars
=Long. x No. vars. x 0.996 kg/m = 23.16 kg/m
r

= 46.32 kg
4). LOSA DE 15 cm DE CONCRETO REFORZADO
f'c=200 kg/cm2, ARMADO CON var. No. 4 @ 15

158.87 KG

a). Acero fy=4,200 kg/cm 2 1/2"


No. vars. = 1.00 m / 0.15 m = 8.00 vars
=Long. x No. vars. x 0.996 kg/m = 7.97 kg/m
r

= 158.87 kg
5). MURO DE 30 cm PROMEDIO DE CONCRETO
REFORZADO f'c=250 kg/cm2, ARMADO CON var.
No. 5 @ 15, No. 6 @ 15 Y 8 @ 15.

6,505.68 KG

a). Acero fy=4,200 kg/cm 2 5/8"


No. vars. = 7.11 m / 0.30 m = 25.00 vars
=Long. x No. vars. x 1.560 kg/m = 1072.50 kg/m
r

= 1,072.50 kg
b). Acero fy=4,200 kg/cm 2 5/8"
No. vars. = 7.11 m / 0.30 m = 25.00 vars
=Long. x No. vars. x 1.560 kg/m = 1008.54 kg/m

= 1,008.54 kg
c). Acero fy=4,200 kg/cm2 5/8"
No. vars. = 2.70 m / 0.30 m = 10.00 vars
=Long. x No. vars. x 1.560 kg/m = 56.94 kg/m

= 227.76 kg
d). Acero fy=4,200 kg/cm 2 5/8"
No. vars. = 2.70 m / 0.30 m = 10.00 vars
=Long. x No. vars. x 1.560 kg/m = 50.70 kg/m

= 202.80 kg
e). Acero fy=4,200 kg/cm 2 3/4"
No. vars. = 8.20 m / 0.30 m = 28.00 vars
=Long. x No. vars. x 2.250 kg/m = 472.50 kg/m

= 1,890.00 kg

Pgina 5 de 9

NUMEROS GENERADORES
OBRA:

PLANTA DE BOMBEO

PLANO:

CARCAMO DE BOMBEO 1
UBICACIN:
CLAVE

CONCEPTO

FFCHA:

NOGALES, EDO. DE SONORA

CALCULO:

LOCALIZARON
EJE

TRAMO

TIPO

LARGO

ANCHO

ALTO

PZAS

RESULTADO

OBSERVACIONES

f). Acero fy=4,200 kg/cm2 5/8"


No. vars. = 5.73 m / 0.30 m = 20.00 vars
=Long. x No. vars. x 1.560 kg/m = 234.00 kg/m
r

= 936.00 kg
g). Acero fy=4,200 kg/cm2 3/4"
No. vars. = 8.20 m / 0.30 m = 28.00 vars
=Long. x No. vars. x 2.250 kg/m = 195.30 kg/m

= 781.20 kg
h). Acero fy=4,200 kg/cm 2 5/8"
No. vars. = 5.73 m / 0.30 m = 20.00 vars
=Long. x No. vars. x 1.560 kg/m = 96.72 kg/m

= 386.88 kg
6). MURO DE 15 cm DE CONCRETO REFORZADO
f'c=200 kg/cm2, ARMADO CON var. No. 4 @ 15

139.74 KG

a). Acero fy=4,200 kg/cm 2 1/2"


No. vars. = 1.00 m / 0.15 m = 8.00 vars
=Long. x No. vars. x 0.996 kg/m = 7.97 kg/m
= 139.74 kg

TOTAL:
4140 01

SUMINISTRO
Y
COLOCACION
IMPERMEABILIZANTE INTEGRAL.

9,355.34 KG

DE
1,383.00 KG

concreto f'c = 250 kg/cm2 =


Cemento :

74.06

m3

0.467

ton.

2 kg por cada bulto de cemento =

1,383.00

34,586.02 kg

691.72

bultos de 50 kg

kg
TOTAL:

4140 06

1,383.00 KG

SUMINISTRO Y COLOCACION DE BANDA DE


P.V.C., SIN OJILLOS DE 9".
24.80

3.00
TOTAL:

74.40 M
74.40 M

Pgina 6 de 9

NUMEROS GENERADORES
OBRA:

PLANTA DE BOMBEO

PLANO:

CARCAMO DE BOMBEO 1
UBICACIN:
CLAVE

CONCEPTO

FFCHA:

NOGALES, EDO. DE SONORA

CALCULO:

LOCALIZARON
EJE

TRAMO

TIPO

LARGO

ANCHO

ALTO

PZAS

RESULTADO

OBSERVACIONES

Pgina 7 de 9

Proyecto Ejecutivo del Crcamo de Bombeo


y Emisor de Aguas Residuales
para Nogales, Sonora.

No. de contrato: CONTA08-019


Tarea II

COMISIN DE COOPERACIN ECOLGICA FRONTERIZA


ORGANISMO OPERADOR MUNICIPAL DE AGUA POTABLE, ALCANTARILLADO Y SANEAMIENTO
PRESUPUESTO BASE
CARCAMO 1 "CAMPO DE BISBOL"
(OBRA CIVIL)

LOCALIDAD: NOGALES
MUNICIPIO: NOGALES
CLAVE

CONCEPTO

UNIDAD

CANTIDAD

P.U. ($)

IMPORTE ($)

1.TERRACERIAS
(NORMA CNA)
1005 01

LIMPIEZA Y TRAZO EN EL AREA DE TRABAJO.

307.71

$7.16

$2,203.20

TOTAL TERRACERIAS =

$2,203.20

2. EXCAVACIONES
A110A

EXCAVACION CON MAQUINA PARA ZANJAS, EN MATERIAL "B", EN


SECO, CON AFLOJE Y EXTRACCION DEL MATERIAL, AMACICE Y
LIMPIEZA DE PLANTILLA Y TALUDES, REMOCIN, CARGA A
CAMION O A UN LADO DE LA ZANJA, INCLUYENDO ACARREO A 10
M. DEL EJE DE LA MISMA Y CONSERVACIN DE LA EXCAVACION
HASTA LA INSTALACION SATISFACTORIA DE LA TUBERIA.
EXCAVACION DE 0.0 A 8.0 MTS. DE PROFUNDIDAD.

699.86

$21.50

$15,046.99

TOTAL EXCAVACIONES =

$15,046.99

3. RELLENOS EN ZANJAS
A131D

RELLENO APISONADO Y COMPACTADO CON EQUIPO MECNICO


CON MATERIAL "A" Y/O "B", EN ZANJAS, CON AGUA EN CAPAS DE
30 CM. DE ESPESOR AL 85% DE LA PRUEBA PROCTOR. INCLUYE,
MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCIN.

473.34

$58.70

$27,785.06

TOTAL RELLENOS =

$27,785.06

27. ALBAILERIA Y ESTRUCTURAS


D030A

FABRICACION Y COLADO DE CONCRETO SIMPLE, INCLUYE


OBTENCION DE ARENAS, GRAVAS, CRIBADO, ACARREO 1ER. KM.
ETC. FABRICACION, ACARREO Y COLOCACION DEL CONCRETO
DE F'c= 100 KG/CM2 T.M.A 3/4", MANO DE OBRA, EQUIPO,
HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCIN.

2.02

$1,480.10

$2,989.80

D030E

FABRICACION Y COLADO DE CONCRETO SIMPLE VIBRADO Y


CURADO CON MEMBRANA, INCLUYE OBTENCION DE ARENAS,
GRAVAS, CRIBADO, ACARREO 1ER. KM. FABRICACION, ACARREO
Y COLOCACION DEL CONCRETO DE F'c= 250 KG/CM2 TM.A. DE
3/4", MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO
NECESARIO PARA SU CORRECTA EJECUCIN.

74.06

$1,919.44

$142,153.73

D0801

CIMBRA DE MADERA PARA ACABADOS NO APARENTES EN


CIMENTACIONES, INCLUYE: FLETES Y MANIOBRAS LOCALES DEL
MATERIAL,
FABRICACIN,
CIMBRADO,
DESCIMBRADO,
TERMINADO DEL REA COLADA, MATERIALES, MANO DE OBRA,
EQUIPO, HERRAMIENTA Y TODO LO NECESARIO PARA SU
CORRECTA EJECUCIN.

10.13

$202.55

$2,051.83

D0803

CIMBRA DE MADERA PARA ACABADOS NO APARENTES EN


TRABES Y COLUMNAS, CON ALTURA DE OBRA FALSA DE 3.00
MTS., INCLUYE FLETES Y MANIOBRAS LOCALES DEL MATERIAL,
FABRICACION, CIMBRADO,
DESCIMBRADO, TERMINADO DEL
REA COLADA, MATERIALES, MANO DE OBRA, EQUIPO,
HERRAMIENTA Y TODO LO NECESARIO PARA SU CORRECTA
EJECUCIN.

12.91

$224.55

$2,898.94

Seccin 13:
Presupuesto Base

Proyecto Ejecutivo del Crcamo de Bombeo


y Emisor de Aguas Residuales
para Nogales, Sonora.

No. de contrato: CONTA08-019


Tarea II

COMISIN DE COOPERACIN ECOLGICA FRONTERIZA


ORGANISMO OPERADOR MUNICIPAL DE AGUA POTABLE, ALCANTARILLADO Y SANEAMIENTO
PRESUPUESTO BASE
CARCAMO 1 "CAMPO DE BISBOL"
(OBRA CIVIL)

LOCALIDAD: NOGALES
MUNICIPIO: NOGALES
CLAVE

CONCEPTO

UNIDAD

CANTIDAD

P.U. ($)

IMPORTE ($)

D0804

CIMBRA DE MADERA PARA ACABADOS NO APARENTES EN LOSAS,


CON ALTURA DE OBRA FALSA DE 3.60 MTS., INCLUYE FLETES Y
MANIOBRAS LOCALES DEL MATERIAL, FABRICACION, CIMBRADO,
DESCIMBRADO, TERMINADO DEL REA COLADA, MATERIALES,
MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO LO NECESARIO
PARA SU CORRECTA EJECUCIN.

53.93

$191.91

$10,349.71

D0805

CIMBRA DE MADERA PARA ACABADOS NO APARENTES EN


MUROS, CON ALTURA DE OBRA DE HASTA 3.00 MTS., INCLUYE
FLETES Y MANIOBRAS LOCALES DEL MATERIAL, FABRICACION,
CIMBRADO, DESCIMBRADO, TERMINADO DEL REA COLADA,
MATERIALES, MANO DE OBRA, EQUIPO, HERRAMIENTA Y TODO
LO NECESARIO PARA SU CORRECTA EJECUCIN.

318.96

$205.84

$65,654.73

4140 06

SUMINISTRO Y COLOCACIN DE BANDA DE PVC, SIN OJILLOS EN


JUNTA DE CONSTRUCCIN DE 9".

74.40

$139.05

$10,345.32

D090B

SUMINISTRO Y COLOCACIN DE ACERO DE REFUERZO DE F=


4200 Kg./cm, INCLUYE SUMINISTRO DE BODEGA DE LA
COMPAA,
DESPERDICIOS,
ALAMBRE
DE
AMARRE,
HABILITACIN Y COLOCACIN.

KG

9299.80

$23.95

$222,730.21

ESC01

SUMINISTRO, FABRICACIN E INSTALACIN DE ESCALERA


MARINA DE PERFL TUBULAR DE 2"X2" CAL. 14,CON ESCALONES
A CADA 30 CM INCLUYE, MANO DE OBRA, EQUIPO,
HERRAMIENTA, MATERIALES Y TODO LO NECESARIO PARA SU
CORRECTA Y COMPLETA EJECUCIN.

KG

88.50

$55.85

$4,942.73

(NORMA CNA)
4080 07

BONIFICACION EN CIMBRA POR ACABADO

387.84

49.03

$19,015.80

4140 01

SUM. Y COLOC. DE IMPERMEABILIZANTE INTEGRAL

KG

1383.00

$17.03

$23,552.49

TOTAL ALBAILERIA Y ESTRUCTURAS =

$506,685.29

SUBTOTAL DE PRESUPUESTO =
IVA =
TOTAL DE PRESUPUESTO =

$551,720.54
$82,758.08
$634,478.62

Seccin 13:
Presupuesto Base