Documentos de Académico
Documentos de Profesional
Documentos de Cultura
3 PRES Carcamo 1 Obra Civil
3 PRES Carcamo 1 Obra Civil
OBRA:
PLANTA DE BOMBEO
PLANO:
CARCAMO DE BOMBEO 1
UBICACIN:
CLAVE
1005 01
CONCEPTO
FFCHA:
CALCULO:
LOCALIZARON
EJE
TRAMO
A- B
1-2
TIPO
LARGO
ANCHO
18.82
16.35
ALTO
PZAS
OBSERVACIONES
307.71 M2
TOTAL:
A110A
RESULTADO
V = h (A1 + A2)/2
A1 = 129.53
A2 = 68.45
7.07
699.86 M3
TOTAL:
S/C
RELLENO EN ESTRUCTURAS
S/C
V = h (A1 + A2)/2
307.71 M2
699.86 M3
A1 = 129.53
A2 = 68.45
7.07
699.86 M3
7.60
5.13
0.05
-1.95 M3
(vol. de estructura)
7.60
5.13
5.76
-224.57 M3
473.34 M3
4030 00
FABRICACION Y COLADO
VIBRADO Y CURADO.
DE
CONCRETO
4030 01
5.13
0.05
2.02 M3
TOTAL:
4030 05
2.02 M3
1-2
7.87
5.13
0.30
12.11 M3
1-2
5.00
5.13
0.30
3.85 M3
N2
5.13
0.25
0.75
0.96 M3
N1
2.50
0.20
0.23
0.12 M3
N1
2.50
0.20
0.23
0.12 M3
N1
2.50
0.20
0.23
0.12 M3
N1
2.50
0.20
0.23
0.12 M3
b) EN TRABES.
Pgina 1 de 9
NUMEROS GENERADORES
OBRA:
PLANTA DE BOMBEO
PLANO:
CARCAMO DE BOMBEO 1
UBICACIN:
CLAVE
CONCEPTO
FFCHA:
CALCULO:
LOCALIZARON
EJE
TRAMO
LARGO
ANCHO
ALTO
N1
TIPO
2.50
0.20
0.23
PZAS
RESULTADO
OBSERVACIONES
0.12 M3
Lim. De Agua
5.13
0.15
3.42
2.63 M3
0.85
0.30
0.15
-0.04 M3
0.90
0.66
0.15
4.34
4.53
0.20
3.93 M3
0.85
0.85
0.20
-0.14 M3
c) EN LOSAS.
(registro hombre)
4.00
0.36 M3
d) EN MUROS.
A
1-2
6.52
5.13
0.30
10.03 M3
1-2
6.52
5.13
0.30
10.03 M3
A- B
6.52
7.60
0.30
14.87 M3
A- B
6.52
7.60
0.30
14.87 M3
TOTAL:
4080 00
4080 01
a) EN CIMENTACIONES.
1
A- B
7.87
0.35
2.00
5.51 M2
1-2
5.13
0.45
2.00
4.62 M2
TOTAL:
4080 03
10.13 M2
b) TRABES
Nervadura 2
5.13
Nervadura 2
5.13
0.25
0.40
1.28 M2
2.05 M2
Nervadura 2
5.13
0.60
3.08 M2
Nervadura 1
2.80
0.25
4.00
2.80 M2
Nervadura 1
2.80
0.13
4.00
1.46 M2
Nervadura 1
2.80
0.05
16.00
2.24 M2
TOTAL:
4080 04
74.06 M3
12.91 M2
7.87
Losa
Costados
7.87
Losa
Costados
5.13
5.13
40.37 M2
0.20
2.00
3.15 M2
0.20
2.00
2.05 M2
Lim. De Agua
5.13
0.15
0.77 M2
Lim. De Agua
5.13
1.48
7.59 M2
Lim. De Agua
5.13
1.32
6.77 M2
TOTAL:
53.93 M2
Pgina 2 de 9
NUMEROS GENERADORES
OBRA:
PLANTA DE BOMBEO
PLANO:
CARCAMO DE BOMBEO 1
UBICACIN:
CLAVE
4080 05
CONCEPTO
FFCHA:
CALCULO:
LOCALIZARON
EJE
TRAMO
TIPO
LARGO
1,2
A- B
Ext.
1,2
A- B
Int.
A,B
1-2
A,B
1-2
ANCHO
ALTO
PZAS
7.87
6.52
2.00
102.62 M2
7.27
5.72
2.00
83.17 M2
Ext.
6.52
4.54
2.00
59.20 M2
Int.
5.92
4.54
2.00
53.75 M2
Lim. De Agua
5.13
0.15
0.77 M2
Lim. De Agua
5.13
1.97
10.11 M2
Lim. De Agua
5.13
1.82
9.34 M2
TOTAL:
4080 07
RESULTADO
OBSERVACIONES
318.96 M2
5.13
Nervadura 2
5.13
0.25
0.55
1.28 M2
2.82 M2
Nervadura 2
5.13
0.60
3.08 M2
Nervadura 1
2.80
0.25
4.00
2.80 M2
Nervadura 1
2.80
0.13
4.00
1.46 M2
Nervadura 1
2.80
0.05
16.00
2.24 M2
Losa
7.87
40.37 M2
Losa
Costados
7.87
0.20
2.00
3.15 M2
Losa
Costados
5.13
0.20
2.00
2.05 M2
Lim. De Agua
5.13
0.15
0.77 M2
Lim. De Agua
5.13
1.48
7.59 M2
Lim. De Agua
5.13
1.32
6.77 M2
A- B
Ext.
7.87
6.17
2.00
97.12 M2
1,2
A- B
Int.
7.27
5.72
2.00
83.17 M2
A,B
1-2
Ext.
6.52
4.54
2.00
59.20 M2
1-2
Int.
5.92
4.54
2.00
53.75 M2
A,B
Lim. De Agua
5.13
0.15
0.77 M2
Lim. De Agua
5.13
1.97
10.11 M2
Lim. De Agua
5.13
1.82
9.34 M2
TOTAL:
4090 01
387.84 M2
Pgina 3 de 9
NUMEROS GENERADORES
OBRA:
PLANTA DE BOMBEO
PLANO:
CARCAMO DE BOMBEO 1
UBICACIN:
CLAVE
CONCEPTO
CALCULO:
LOCALIZARON
EJE
FFCHA:
TRAMO
TIPO
LARGO
ANCHO
ALTO
PZAS
RESULTADO
OBSERVACIONES
159.95 KG
= 62.61 kg
b). Acero fy=4,200 kg/cm 2 5/8"
No. Vars. x 1.560 kg/m = 9.36 kg/m
= 97.34 kg
2). LOSA DE CIMENTACION DE 45 cm PROMEDIO
DE CONCRETO REFORZADO f'c=250 kg/cm2,
ARMADA CON var. No. 5 @ 15 Y var. No. 6 @ 15.
2,162.04 KG
= 885.24 kg
b). Acero fy=4,200 kg/cm 2 3/4"
No. vars. = 1.00 m / 0.15 m = 8.00 vars
=Long. x No. vars. x 2.250 kg/m = 18.00 kg/m
= 1,276.80 kg
3). LOSA SUPERIOR DE 15 cm DE CONCRETO
REFORZADO f'c=250 kg/cm2, ARMADO CON var.
No. 4 @ 20.
229.06 KG
= 119.20 kg
b). Acero fy=4,200 kg/cm 2 1/2"
No. vars. = 8.20 m / 0.30 m = 22.00 vars
=Long. x No. vars. x 0.996 kg/m = 31.77 kg/m
= 63.54 kg
Pgina 4 de 9
NUMEROS GENERADORES
OBRA:
PLANTA DE BOMBEO
PLANO:
CARCAMO DE BOMBEO 1
UBICACIN:
CLAVE
CONCEPTO
FFCHA:
CALCULO:
LOCALIZARON
EJE
TRAMO
TIPO
LARGO
ANCHO
ALTO
PZAS
RESULTADO
OBSERVACIONES
= 46.32 kg
4). LOSA DE 15 cm DE CONCRETO REFORZADO
f'c=200 kg/cm2, ARMADO CON var. No. 4 @ 15
158.87 KG
= 158.87 kg
5). MURO DE 30 cm PROMEDIO DE CONCRETO
REFORZADO f'c=250 kg/cm2, ARMADO CON var.
No. 5 @ 15, No. 6 @ 15 Y 8 @ 15.
6,505.68 KG
= 1,072.50 kg
b). Acero fy=4,200 kg/cm 2 5/8"
No. vars. = 7.11 m / 0.30 m = 25.00 vars
=Long. x No. vars. x 1.560 kg/m = 1008.54 kg/m
= 1,008.54 kg
c). Acero fy=4,200 kg/cm2 5/8"
No. vars. = 2.70 m / 0.30 m = 10.00 vars
=Long. x No. vars. x 1.560 kg/m = 56.94 kg/m
= 227.76 kg
d). Acero fy=4,200 kg/cm 2 5/8"
No. vars. = 2.70 m / 0.30 m = 10.00 vars
=Long. x No. vars. x 1.560 kg/m = 50.70 kg/m
= 202.80 kg
e). Acero fy=4,200 kg/cm 2 3/4"
No. vars. = 8.20 m / 0.30 m = 28.00 vars
=Long. x No. vars. x 2.250 kg/m = 472.50 kg/m
= 1,890.00 kg
Pgina 5 de 9
NUMEROS GENERADORES
OBRA:
PLANTA DE BOMBEO
PLANO:
CARCAMO DE BOMBEO 1
UBICACIN:
CLAVE
CONCEPTO
FFCHA:
CALCULO:
LOCALIZARON
EJE
TRAMO
TIPO
LARGO
ANCHO
ALTO
PZAS
RESULTADO
OBSERVACIONES
= 936.00 kg
g). Acero fy=4,200 kg/cm2 3/4"
No. vars. = 8.20 m / 0.30 m = 28.00 vars
=Long. x No. vars. x 2.250 kg/m = 195.30 kg/m
= 781.20 kg
h). Acero fy=4,200 kg/cm 2 5/8"
No. vars. = 5.73 m / 0.30 m = 20.00 vars
=Long. x No. vars. x 1.560 kg/m = 96.72 kg/m
= 386.88 kg
6). MURO DE 15 cm DE CONCRETO REFORZADO
f'c=200 kg/cm2, ARMADO CON var. No. 4 @ 15
139.74 KG
TOTAL:
4140 01
SUMINISTRO
Y
COLOCACION
IMPERMEABILIZANTE INTEGRAL.
9,355.34 KG
DE
1,383.00 KG
74.06
m3
0.467
ton.
1,383.00
34,586.02 kg
691.72
bultos de 50 kg
kg
TOTAL:
4140 06
1,383.00 KG
3.00
TOTAL:
74.40 M
74.40 M
Pgina 6 de 9
NUMEROS GENERADORES
OBRA:
PLANTA DE BOMBEO
PLANO:
CARCAMO DE BOMBEO 1
UBICACIN:
CLAVE
CONCEPTO
FFCHA:
CALCULO:
LOCALIZARON
EJE
TRAMO
TIPO
LARGO
ANCHO
ALTO
PZAS
RESULTADO
OBSERVACIONES
Pgina 7 de 9
LOCALIDAD: NOGALES
MUNICIPIO: NOGALES
CLAVE
CONCEPTO
UNIDAD
CANTIDAD
P.U. ($)
IMPORTE ($)
1.TERRACERIAS
(NORMA CNA)
1005 01
307.71
$7.16
$2,203.20
TOTAL TERRACERIAS =
$2,203.20
2. EXCAVACIONES
A110A
699.86
$21.50
$15,046.99
TOTAL EXCAVACIONES =
$15,046.99
3. RELLENOS EN ZANJAS
A131D
473.34
$58.70
$27,785.06
TOTAL RELLENOS =
$27,785.06
2.02
$1,480.10
$2,989.80
D030E
74.06
$1,919.44
$142,153.73
D0801
10.13
$202.55
$2,051.83
D0803
12.91
$224.55
$2,898.94
Seccin 13:
Presupuesto Base
LOCALIDAD: NOGALES
MUNICIPIO: NOGALES
CLAVE
CONCEPTO
UNIDAD
CANTIDAD
P.U. ($)
IMPORTE ($)
D0804
53.93
$191.91
$10,349.71
D0805
318.96
$205.84
$65,654.73
4140 06
74.40
$139.05
$10,345.32
D090B
KG
9299.80
$23.95
$222,730.21
ESC01
KG
88.50
$55.85
$4,942.73
(NORMA CNA)
4080 07
387.84
49.03
$19,015.80
4140 01
KG
1383.00
$17.03
$23,552.49
$506,685.29
SUBTOTAL DE PRESUPUESTO =
IVA =
TOTAL DE PRESUPUESTO =
$551,720.54
$82,758.08
$634,478.62
Seccin 13:
Presupuesto Base