PRESUPUESTO ANALITICO

"MEJORAMIENTO DE LOS SERVICIOS DEL PUESTO DE SALUD DEL PP.JJ TUPAC AMARU - SECTOR 1 - CHAUPIMARCA - PASCO - PASCO"
GOBIERNO REGIONAL PASCO
ADMINISTRACIN DIRECTA
60 DAS CALENDARIOS
PASCO
PASCO
PRESUPUESTO ANALITICO COSTO DIRECTO

UNIDAD

DETALLE POR ESPECIFICA

CANTIDAD

Item

Especifica 1

Especifica 2

PARTIDAS ESPECIFICAS

Sub Generica 2

Sub Generica 1

Generica

Tipo Trans

OBRA:
ENTE EJECUTOR:
MODALIDAD:
TIEMPO DE EJECUCIN:
REGIN:
PROVINCIA:

COSTO DE CONST. POR ADMIN. DIRECTA - PERSONAL


OPERARIO
OFICIAL
PEN
COSTO DE CONST. POR ADMIN. DIRECTA - BIENES
ACERO
FIERRO LISO DE 1/2" x 6m. AREQUIPA
ACERO 1/4"
ACERO 3/8"
ACERO
1/2"
PLANCHA
ESTRIADA DE 4'x8'x1/8"
TUB. FIERRO NEGRO DE 3/4" x 6.4m
TUBO RECTANGULAR DE FIERRO DE 1" x 2" X 6.40 m.
TUBO RECTANGULAR DE FIERRO DE 2" x 2" X 6.40 m.
TUBO RECTANGULAR DE FIERRO DE 1/2" x 2" X 6.40 m.
TUBO RECTANGULAR DE FIERRO DE 4" x 2" X 6.40 m.

AGREGADOS
ARENA FINA
PIEDRA GRANDE DE 8"
PIEDRA MEDIANA (MAX. 4")
ARENA GRUESA
LAJA DE PIEDRA
MATERIAL AFIRMADO

hh
hh
hh

var
var
var
var
pln
und
var
var
var
var

m3
m3
m3
m3
m3
m3

1,853.04
975.42
3,512.19

1.20
30.00
345.00
125.00
0.77
0.02
174.41
1.50
21.30
4.80

24.60
12.37
45.66
1.28
5.49
29.35

CANTO RODADO
HORMIGON SELECCIONADO (PUESTO EN OBRA)
TIERRA DE CHACRA O VEGETAL
HUMUS
MATERIAL RELLENO
GRASS SELECTO

m3
m3
m3
m3
m3
sac

4.28
184.82
113.19
112.15
152.44
0.78

FERRETERIA
CLAVOS PARA MADERA C/C 3"
CLAVOS CON CABEZA DE 2 1/2"
ALAMBRE NEGRO N16
ALAMBRE NEGRO N8
CLAVOS PARA CALAMINA
LADRILLO K.K. DE ARCILLA 9X14X24 CM
CEMENTO PORTLAND TIPO I (42.5KG)
CERRADURA DOS GOLPES C/CADENA SEGURIDAD
BISAGRA DE FIERO DE 6", CON EJE DE 5/8"
CERRADURAS DE 03 GOLPES (FORTE)
MECHA NARANJA
FULMINANTE O DETONANTE
DINAMITA SEMEXA 65 7/8 X 7 CARTUCHO
YESO EN BOLSAS DE 25 KG.
SOLDADURA CELLOCORD 1/8"
LIJA
TELA ARPILLERA H = 2.2M
REGLA DE ALUMINIO P/ACABADOS
THINER
PINTURA LATEX
PINTURA ESMALTE
BASE IMPRIMANTE
CALAMINA GALVANIZADA DE 1.83m x 0.83 m.
TUBERIA PVC SAL 4"
CINTA SEALIZADORA AMARILLA
SACOS VACIOS

kg
kg
kg
kg
kg
und
BOL
und
und
und
m
und
und
BOL
kg
und
m
und
gln
gln
gln
kg
pln
und
ML
und

121.95
13.60
133.91
188.92
1.50
2,002.26
1,530.58
2.01
9.00
2.00
142.12
568.48
568.48
6.21
101.83
37.84
136.00
31.92
0.91
11.19
25.27
55.97
24.90
34.20
250.00
29.00

MADERA
LISTONES DE MADERA TORNILLO 2"x2"x 10'
LISTONES DE MADERA TORNILLO 2"x2"x 8'
LISTONES DE MADERA TORNILLO 2"x2"x14'

und
und
und

28.50
5.00
5.00

LISTONES DE MADERA TORNILLO 2"x3"x 11'


MADERA ROLLIZO DE EUCALIPTO DE 4" X 3.50 M
MADERA ROLLIZO DE EUCALIPTO DE 4" X 5.00 M
TRIPLAY DE 4'x8'x 4 mm
TRIPLAY DE 4'x8'x 18 mm
MADERA TORNILLO INC.CORTE P/ENCOFRADO
ASERRIN DE MADERA

und
und
und
pln
pln
p2
sac

VESTUARIOS, ACCESORIOS Y PRENDAS DIVERSAS


PROTECTORES (CASCOS COLOR BLANCO DE BUENA CALIDAD
und
3M)
PROTECTORES
(CASCOS COLOR VERDE INCLUYE ACCESORIOS DE PROTECCIN)
und
PROTECTORES (CASCOS COLOR AZUL INCLUYE ACCESORIOS DE PROTECCIN)
und
PROTECTORES (CASCOS COLOR NARANJA INCLUYE ACCESORIOS DE PROTECCIN)
und
MAMELUCO SEGN DISEO
und
BOTAS DE JEBE TALLA 38 - 41
par
GUANTES DE CUERO CON REFUERZO
und
LENTES DE SEGURIDAD
Und
CHALECOS DE SEGURIDAD DRILL COLOR NARANJA
und

COSTO DE CONST. POR ADMIN. DIRECTA - SERVICIOS


HERRAMIENTAS MANUALES
LLANTA PARA BUGGI (INCLUIDO CMARA)
CARRETILLA BUGGIE REFORZADO
PALA CUCHARA TRAMONTINA
Y/O SIMILAR
PICO
(INCLUYE MANGO MARCA TRAMONTINA)
SERRUCHO GRANDE
WINCHA DE FIBRA DE VIDRIO DE 50M STANLEY
WINCHA METLICA DE 5M STANLEY
REGLA DE ALUMINIO DE 3M
BROCHA DE 4"
TUMI Y/ODE
SIMILAR
BROCHA
2"
TUMI Y/O SIMILAR
RODILLO
SOGA DE NYLON DE 3/4"
BARRETAS DE 1 ACERADA
COMBA DE 8 LBS
ARCO SIERRA
MARTILLO
CIZALLA GRANDE

%MO
und
und
und
und
und
und
und
pza
und
und
und
ml
und
und
und
und
und

5.10
78.20
2.00
20.10
82.68
2,185.75
37.73

2.00
6.00
4.00
15.00
15.00
20.00
30.00
20.00
25.00

6.00
4.00
8.00
8.00
2.00
1.00
2.00
4.00
4.00
4.00
5.00
20.00
4.00
5.00
2.00
2.00
1.00

ALICATES
PARCHE PARA LLANTA DE BUGGI
INFLADOR MEDIANO
MANGUERA
ALQUILER DE EQUIPOS Y MAQUINARIA
ESTACION TOTAL
EQUIPO DE PINTURA
ACROW METLICO
MEZCLADORA DE CONCRETO DE 9 -11P3
CAMION VOLQUETE 10 M3.
EQUIPO DE SOLDAR

und
und
und
ml

1.00
1.00
1.00
100.00

DIA
hm
HE
hm
hm
hm

3.58
10.41
181.02
102.25
3.58
79.05
7.35
247.26
45.48
45.48
45.48
14.71
1.19

MAQUINA ROLADORA
hm
COMPACTADOR VIBR. TIPO PLANCHA 7 HP
hm
COMPRESORA NEUMATICA 87 HP 250-330 PCM
hm
MARTILLO NEUMATICO DE 29 Kg.
hm
BARRENOS
hm
VIBRADOR DE CONCRETO 4 HP 2.40"
hm
CARGADOR FRONTAL CAT-930
hm
COSTO DE CONST. POR ADMIN. DIRECTA - OTROS
ENERGIA ELECTRICA PARA LA OBRA
est
IMPRESION BANNER
m2
FLETE TRANSPORTE DE MATERIALES Y MOVILIZACION DE EUIPOS Y HERRAMIENTAS
GLB
AGUA Y DESAGUE PARA LA OBRA
GLB
PLANTONES FORESTALES
und
CHARLAS AMBIENTAL
GLB
POLO CON LOGOS AMBIENTALES
und
LETRERO DE UBICACION
und
LETRERO AMBIENTALES
und
AGUARRAZ
galon
TANQUE DE AGUA 1000LT
und
ADITIVO ACELERANTE
galon
TROZADORA PARA CORTE METALICO
und
MEZCLADORA DE CONCRETO TIPO TOLBA
GLB
PRUEBA DE RESISTENCIA DEL CONCRETO
GLB
SEMILLA DE FLORES: PENSAMIENTO CALENDULA, PRIMAVERA, ILUSION kg

1.00
8.64
1.00
1.00
29.00
1.00
40.00
1.00
1.00
31.20
1.00
10.00
1.00
1.00
1.00
24.00

CODIGO
ESPECIFICA DE GASTOS

COSTO
DIRECTO

6
6
6
6

2
2
2
2

2
2
2
2

Especifica 2

2
2
2
2

Item

Especifica 1

Sub Generica 2

Sub Generica 1

Generica

Tipo Trans

2
2
2
2

COSTO
DIRECTO

ESPECIFICA DE GASTOS
3
4
5
6

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL


COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS
COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - OTROS
TOTAL

83,008.44
137,830.94
19,000.19
19,592.78
259,432.35

SCO - PASCO"

83,008.44
73,908.45
9,099.99
INCID.

P.U

SUB TOTAL

PARCIAL
83,008.44

15.22
13.23
11.93

28,203.21
12,904.79
41,900.44

28,203.21
12,904.79
41,900.44
137,830.94
35,099.25

1
1
1
1
1
1
1
1
1
1

33.40
6.00
14.00
25.00
260.00
45.40
130.00
213.00
90.00
377.60

40.08
180.00
4,830.00
3,125.00
200.67
0.81
22,673.72
319.50
1,917.00
1,812.48

1
1
1
1
1
1

95.00
60.00
60.00
85.00
50.00
50.00

2,337.11
742.46
2,739.68
109.10
274.25
1,467.70

6.00
14.00
25.00

40.08
245.18
6,476.88
4,151.54
200.67
0.81
22,673.72
319.50
1,917.00
1,812.48

31,078.96
2,337.12
742.46
2,739.68
109.10
274.25
1,467.70

del expediente
10,873.60

1
1
1
1
1
1

60.00
60.00
23.60
47.20
23.60
640.00

256.50
11,089.25
2,671.35
5,293.66
3,597.54
500.35

5.00
5.00
5.00
5.00
7.65
1.00
20.00
65.00
15.00
66.00
2.50
4.00
4.25
8.00
14.50
1.50
6.00
85.00
17.00
30.00
28.00
5.30
24.00
16.00
1.50
1.20

609.73
68.00
669.53
944.61
11.48
2,002.26
30,611.60
130.65
135.00
132.00
355.30
2,273.92
2,416.04
49.68
1,476.46
56.76
816.00
2,713.12
15.55
335.81
707.64
296.63
597.60
547.22
375.00
34.80

18.00
14.00
23.40

513.00
70.00
117.00

256.50
11,089.25
2,671.35
5,293.66
3,597.54
500.35
48,382.38

5,045.26

609.73
68.00
669.53
944.61
11.48
2,002.26
30,611.60
130.65
135.00
132.00
355.30
2,273.92
2,416.04
49.68
1,476.46
56.76
816.00
2,713.12
15.55
335.81
707.64
296.63
597.60
547.22
375.00
34.80

20,740.35
1
1
1

513.00
70.00
117.00

1
1
1
1
1
1
1

27.25
6.00
8.00
26.00
94.00
4.95
8.00

138.98
469.20
16.00
522.60
7,772.30
10,819.44
301.84

1
1
1
1
1
1
1
1
1

35.00
8.00
8.00
8.00
53.00
20.00
8.00
15.00
21.00

70.00
48.00
32.00
120.00
795.00
400.00
240.00
300.00
525.00

138.98
469.20
16.00
522.60
7,772.30
10,819.44
301.84
2,530.00

19,000.19
2,546.00
33.00
148.00
25.50
33.00
20.00
62.00
6.50
45.00
19.00
10.00
12.00
3.50
64.00
46.00
12.00
23.00
48.00

198.00
592.00
204.00
264.00
40.00
62.00
13.00
180.00
76.00
40.00
60.00
70.00
256.00
230.00
24.00
46.00
48.00

2,564.24

12.00
1.00
30.00
1.00

12.00
1.00
30.00
100.00

120.00
10.00
10.00
30.00
150.00
10.00
10.00
12.50
115.00
10.50
10.50
12.00
160.00

429.60
104.10
1,810.22
3,067.39
536.28
790.48
73.49
3,090.78
5,230.02
477.52
477.52
176.54
190.24

1,670.00
16.00
6,490.00
2,900.00
23.60
746.14
18.30
150.00
174.00
15.00
500.00
85.00
1,000.00
1,500.00
750.00
35.00

1,670.00
138.24
6,490.00
2,900.00
684.40
746.14
732.00
150.00
174.00
468.00
500.00
850.00
1,000.00
1,500.00
750.00
840.00

85.00

468
868

16,454.19

16,559.84
1,021.49
104.10
1,810.22
3,067.39
50.05
790.48
73.49
3,090.78
5,230.02
477.52
477.52
176.54
190.24

6,185.06

19,592.78

19,592.78

6,490.00

1,770.00
138.24
2,360.00
2,950.00
684.40
452.80
732.00
150.00
174.00
868.00

4,340.00
840.00

31.20

400.05

259,757.59
325.24

PRESUPUESTO ANALITICO
MEJORAMIENTO DE LOS SERVICIOS DEL PUESTO DE SALUD DEL PP.JJ TUPAC AMARU - SECTOR 1 - CHAUPIMARCA - PASCO - PASCO
GOBIERNO REGIONAL PASCO
ADMINISTRACIN DIRECTA
60 DAS CALENDARIOS
PASCO
PASCO
PRESUPUESTO ANALITICO GASTOS GENERALES

UNIDAD

DETALLE POR ESPECIFICA

CANTIDAD

Item

Especifica 1

Especifica 2

PARTIDAS ESPECIFICAS

Sub Generica 2

Sub Generica 1

Generica

Tipo Trans

OBRA:
ENTE EJECUTOR:
MODALIDAD:
TIEMPO DE EJECUCIN:
REGIN:
PROVINCIA:

COSTO DE CONST. POR ADMIN. DIRECTA - PERSONAL


PERSONAL TECNICO - PERSONAL ADMINISTRATIVO
SERVICIO DE INGENIERO RESIDENTE
SERVICIO DE ASISTENTE ADMINISTRATIVO
PERSONAL TECNICO DE OBRA
MAESTRO DE OBRA
VIGILANTE
ALMACENERO DE OBRA
COSTO DE CONST. POR ADMIN. DIRECTA - BIENES
UTILES DE ESCRITORIO
ARCHIVADORES TAMAO OFICIO
PAPEL BOND A-4 DE 75 GRAMOS
CUADERNO DE ACTA 50 HOJAS
CUADERNO DE OBRA 100 HOJAS + LEGALIZADA
LAPICEROS PILOT TINTA SECA (AZUL, NEGRO ROJO)
CUADERNO A-4 100 HOJAS CUADRICULADO
FOLDER MANILA TAMAO A-4
GOMA EN BARRA UHU
PAPEL CARBON COLO AZUL
GRAPAS 26/6 RAPID CAJA 5000 STAPLES
TONER KONICA MINOLTA TN414
ESCRITORIOS PEQUEOS

MES
MES

2
2

MES
MES
MES

2
2
2

UND
MILLAR
UND
UND
UND
DOCENA
DOCENA
UND
DOCENA
UND
UND
UND

6.0000
5.0000
1.0000
2.0000
12.0000
12.0000
2.0000
2.0000
2.0000
1.0000
1.0000
2.0000

CODIGO
ESPECIFICA DE GASTOS

COSTO
DIRECTO

6
6

2
2

2
2

Especifica 2

2
2

Item

Especifica 1

Sub Generica 2

Sub Generica 1

Generica

Tipo Trans

2
2

COSTO
DIRECTO

ESPECIFICA DE GASTOS
3
4

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL


COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES
TOTAL

27,200.00
1,225.00
28,425.00

CO - PASCO

83,008.44
73,908.45
9,099.99
INCID.

P.U

SUB TOTAL

PARCIAL
27,200.00

5,800.00
2,000.00

11,600.00
4,000.00

28,203.21
12,904.79

3,000.00
1,400.00
1,400.00

6,000.00
2,800.00
2,800.00

41,900.44
1,225.00
1,225.00

1
1
1
1
1
1
1
1
1
1
1
1

5.50
30.00
6.00
40.00
4.00
2.50
5.00
3.00
4.00
5.00
349.00
250.00

33.00
150.00
6.00
80.00
48.00
30.00
10.00
6.00
8.00
5.00
349.00
500.00

12
40.08
245.18
6,476.88
4,151.54
200.67
0.81
22,673.72
319.50
1,917.00
1,812.48
330.00

toner konica minolta tn414

330

25,975.76 monto de expediente


#REF!

PRESUPUESTO ANALITICO
MEJORAMIENTO DE LOS SERVICIOS DEL PUESTO DE SALUD DEL PP.JJ TUPAC AMARU - SECTOR 1 - CHAUPIMARCA - PASCO - PASCO
GOBIERNO REGIONAL PASCO
ADMINISTRACIN DIRECTA
60 DAS CALENDARIOS
PASCO
PASCO
PRESUPUESTO ANALITICO SUPERVISION

6
6

CANTIDAD

COSTO DE CONST. POR ADMIN. DIRECTA - PERSONAL


PERSONAL TECNICO - PERSONAL ADMINISTRATIVO
SERVICIO DE MONITOR DE SUPERVISION
COSTO DE CONST. POR ADMIN. DIRECTA - SERVICIO
ENSAYOS
Prueba de resistencia del concreto

MES

GLB

1.0000

2
2

2
2

COSTO
DIRECTO

ESPECIFICA DE GASTOS
Item

Especifica 1

2
2

Especifica 2

CODIGO
Sub Generica 2

Generica

Sub Generica 1

Tipo Trans

2
2

UNIDAD

DETALLE POR ESPECIFICA


Item

Especifica 1

Especifica 2

PARTIDAS ESPECIFICAS

Sub Generica 2

Sub Generica 1

Generica

Tipo Trans

OBRA:
ENTE EJECUTOR:
MODALIDAD:
TIEMPO DE EJECUCIN:
REGIN:
PROVINCIA:

3
4

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL


COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES
TOTAL

11,600.00
1,387.88
12,987.88

CO - PASCO

83,008.44
73,908.45
9,099.99
INCID.

P.U

SUB TOTAL

PARCIAL
11,600.00

5,800.00

11,600.00

28,203.21
1,387.88
1,387.88

1,387.88

12

1,387.88

40.08

PRUEBA DE RESISTENCIA DEL CONCRETO

12,987.88 expedinete tecnico