"MEJORAMIENTO DE LOS SERVICIOS DEL PUESTO DE SALUD DEL PP.JJ TUPAC AMARU - SECTOR 1 - CHAUPIMARCA - PASCO - PASCO"
GOBIERNO REGIONAL PASCO
ADMINISTRACIN DIRECTA
60 DAS CALENDARIOS
PASCO
PASCO
PRESUPUESTO ANALITICO COSTO DIRECTO
UNIDAD
CANTIDAD
Item
Especifica 1
Especifica 2
PARTIDAS ESPECIFICAS
Sub Generica 2
Sub Generica 1
Generica
Tipo Trans
OBRA:
ENTE EJECUTOR:
MODALIDAD:
TIEMPO DE EJECUCIN:
REGIN:
PROVINCIA:
AGREGADOS
ARENA FINA
PIEDRA GRANDE DE 8"
PIEDRA MEDIANA (MAX. 4")
ARENA GRUESA
LAJA DE PIEDRA
MATERIAL AFIRMADO
hh
hh
hh
var
var
var
var
pln
und
var
var
var
var
m3
m3
m3
m3
m3
m3
1,853.04
975.42
3,512.19
1.20
30.00
345.00
125.00
0.77
0.02
174.41
1.50
21.30
4.80
24.60
12.37
45.66
1.28
5.49
29.35
CANTO RODADO
HORMIGON SELECCIONADO (PUESTO EN OBRA)
TIERRA DE CHACRA O VEGETAL
HUMUS
MATERIAL RELLENO
GRASS SELECTO
m3
m3
m3
m3
m3
sac
4.28
184.82
113.19
112.15
152.44
0.78
FERRETERIA
CLAVOS PARA MADERA C/C 3"
CLAVOS CON CABEZA DE 2 1/2"
ALAMBRE NEGRO N16
ALAMBRE NEGRO N8
CLAVOS PARA CALAMINA
LADRILLO K.K. DE ARCILLA 9X14X24 CM
CEMENTO PORTLAND TIPO I (42.5KG)
CERRADURA DOS GOLPES C/CADENA SEGURIDAD
BISAGRA DE FIERO DE 6", CON EJE DE 5/8"
CERRADURAS DE 03 GOLPES (FORTE)
MECHA NARANJA
FULMINANTE O DETONANTE
DINAMITA SEMEXA 65 7/8 X 7 CARTUCHO
YESO EN BOLSAS DE 25 KG.
SOLDADURA CELLOCORD 1/8"
LIJA
TELA ARPILLERA H = 2.2M
REGLA DE ALUMINIO P/ACABADOS
THINER
PINTURA LATEX
PINTURA ESMALTE
BASE IMPRIMANTE
CALAMINA GALVANIZADA DE 1.83m x 0.83 m.
TUBERIA PVC SAL 4"
CINTA SEALIZADORA AMARILLA
SACOS VACIOS
kg
kg
kg
kg
kg
und
BOL
und
und
und
m
und
und
BOL
kg
und
m
und
gln
gln
gln
kg
pln
und
ML
und
121.95
13.60
133.91
188.92
1.50
2,002.26
1,530.58
2.01
9.00
2.00
142.12
568.48
568.48
6.21
101.83
37.84
136.00
31.92
0.91
11.19
25.27
55.97
24.90
34.20
250.00
29.00
MADERA
LISTONES DE MADERA TORNILLO 2"x2"x 10'
LISTONES DE MADERA TORNILLO 2"x2"x 8'
LISTONES DE MADERA TORNILLO 2"x2"x14'
und
und
und
28.50
5.00
5.00
und
und
und
pln
pln
p2
sac
%MO
und
und
und
und
und
und
und
pza
und
und
und
ml
und
und
und
und
und
5.10
78.20
2.00
20.10
82.68
2,185.75
37.73
2.00
6.00
4.00
15.00
15.00
20.00
30.00
20.00
25.00
6.00
4.00
8.00
8.00
2.00
1.00
2.00
4.00
4.00
4.00
5.00
20.00
4.00
5.00
2.00
2.00
1.00
ALICATES
PARCHE PARA LLANTA DE BUGGI
INFLADOR MEDIANO
MANGUERA
ALQUILER DE EQUIPOS Y MAQUINARIA
ESTACION TOTAL
EQUIPO DE PINTURA
ACROW METLICO
MEZCLADORA DE CONCRETO DE 9 -11P3
CAMION VOLQUETE 10 M3.
EQUIPO DE SOLDAR
und
und
und
ml
1.00
1.00
1.00
100.00
DIA
hm
HE
hm
hm
hm
3.58
10.41
181.02
102.25
3.58
79.05
7.35
247.26
45.48
45.48
45.48
14.71
1.19
MAQUINA ROLADORA
hm
COMPACTADOR VIBR. TIPO PLANCHA 7 HP
hm
COMPRESORA NEUMATICA 87 HP 250-330 PCM
hm
MARTILLO NEUMATICO DE 29 Kg.
hm
BARRENOS
hm
VIBRADOR DE CONCRETO 4 HP 2.40"
hm
CARGADOR FRONTAL CAT-930
hm
COSTO DE CONST. POR ADMIN. DIRECTA - OTROS
ENERGIA ELECTRICA PARA LA OBRA
est
IMPRESION BANNER
m2
FLETE TRANSPORTE DE MATERIALES Y MOVILIZACION DE EUIPOS Y HERRAMIENTAS
GLB
AGUA Y DESAGUE PARA LA OBRA
GLB
PLANTONES FORESTALES
und
CHARLAS AMBIENTAL
GLB
POLO CON LOGOS AMBIENTALES
und
LETRERO DE UBICACION
und
LETRERO AMBIENTALES
und
AGUARRAZ
galon
TANQUE DE AGUA 1000LT
und
ADITIVO ACELERANTE
galon
TROZADORA PARA CORTE METALICO
und
MEZCLADORA DE CONCRETO TIPO TOLBA
GLB
PRUEBA DE RESISTENCIA DEL CONCRETO
GLB
SEMILLA DE FLORES: PENSAMIENTO CALENDULA, PRIMAVERA, ILUSION kg
1.00
8.64
1.00
1.00
29.00
1.00
40.00
1.00
1.00
31.20
1.00
10.00
1.00
1.00
1.00
24.00
CODIGO
ESPECIFICA DE GASTOS
COSTO
DIRECTO
6
6
6
6
2
2
2
2
2
2
2
2
Especifica 2
2
2
2
2
Item
Especifica 1
Sub Generica 2
Sub Generica 1
Generica
Tipo Trans
2
2
2
2
COSTO
DIRECTO
ESPECIFICA DE GASTOS
3
4
5
6
83,008.44
137,830.94
19,000.19
19,592.78
259,432.35
SCO - PASCO"
83,008.44
73,908.45
9,099.99
INCID.
P.U
SUB TOTAL
PARCIAL
83,008.44
15.22
13.23
11.93
28,203.21
12,904.79
41,900.44
28,203.21
12,904.79
41,900.44
137,830.94
35,099.25
1
1
1
1
1
1
1
1
1
1
33.40
6.00
14.00
25.00
260.00
45.40
130.00
213.00
90.00
377.60
40.08
180.00
4,830.00
3,125.00
200.67
0.81
22,673.72
319.50
1,917.00
1,812.48
1
1
1
1
1
1
95.00
60.00
60.00
85.00
50.00
50.00
2,337.11
742.46
2,739.68
109.10
274.25
1,467.70
6.00
14.00
25.00
40.08
245.18
6,476.88
4,151.54
200.67
0.81
22,673.72
319.50
1,917.00
1,812.48
31,078.96
2,337.12
742.46
2,739.68
109.10
274.25
1,467.70
del expediente
10,873.60
1
1
1
1
1
1
60.00
60.00
23.60
47.20
23.60
640.00
256.50
11,089.25
2,671.35
5,293.66
3,597.54
500.35
5.00
5.00
5.00
5.00
7.65
1.00
20.00
65.00
15.00
66.00
2.50
4.00
4.25
8.00
14.50
1.50
6.00
85.00
17.00
30.00
28.00
5.30
24.00
16.00
1.50
1.20
609.73
68.00
669.53
944.61
11.48
2,002.26
30,611.60
130.65
135.00
132.00
355.30
2,273.92
2,416.04
49.68
1,476.46
56.76
816.00
2,713.12
15.55
335.81
707.64
296.63
597.60
547.22
375.00
34.80
18.00
14.00
23.40
513.00
70.00
117.00
256.50
11,089.25
2,671.35
5,293.66
3,597.54
500.35
48,382.38
5,045.26
609.73
68.00
669.53
944.61
11.48
2,002.26
30,611.60
130.65
135.00
132.00
355.30
2,273.92
2,416.04
49.68
1,476.46
56.76
816.00
2,713.12
15.55
335.81
707.64
296.63
597.60
547.22
375.00
34.80
20,740.35
1
1
1
513.00
70.00
117.00
1
1
1
1
1
1
1
27.25
6.00
8.00
26.00
94.00
4.95
8.00
138.98
469.20
16.00
522.60
7,772.30
10,819.44
301.84
1
1
1
1
1
1
1
1
1
35.00
8.00
8.00
8.00
53.00
20.00
8.00
15.00
21.00
70.00
48.00
32.00
120.00
795.00
400.00
240.00
300.00
525.00
138.98
469.20
16.00
522.60
7,772.30
10,819.44
301.84
2,530.00
19,000.19
2,546.00
33.00
148.00
25.50
33.00
20.00
62.00
6.50
45.00
19.00
10.00
12.00
3.50
64.00
46.00
12.00
23.00
48.00
198.00
592.00
204.00
264.00
40.00
62.00
13.00
180.00
76.00
40.00
60.00
70.00
256.00
230.00
24.00
46.00
48.00
2,564.24
12.00
1.00
30.00
1.00
12.00
1.00
30.00
100.00
120.00
10.00
10.00
30.00
150.00
10.00
10.00
12.50
115.00
10.50
10.50
12.00
160.00
429.60
104.10
1,810.22
3,067.39
536.28
790.48
73.49
3,090.78
5,230.02
477.52
477.52
176.54
190.24
1,670.00
16.00
6,490.00
2,900.00
23.60
746.14
18.30
150.00
174.00
15.00
500.00
85.00
1,000.00
1,500.00
750.00
35.00
1,670.00
138.24
6,490.00
2,900.00
684.40
746.14
732.00
150.00
174.00
468.00
500.00
850.00
1,000.00
1,500.00
750.00
840.00
85.00
468
868
16,454.19
16,559.84
1,021.49
104.10
1,810.22
3,067.39
50.05
790.48
73.49
3,090.78
5,230.02
477.52
477.52
176.54
190.24
6,185.06
19,592.78
19,592.78
6,490.00
1,770.00
138.24
2,360.00
2,950.00
684.40
452.80
732.00
150.00
174.00
868.00
4,340.00
840.00
31.20
400.05
259,757.59
325.24
PRESUPUESTO ANALITICO
MEJORAMIENTO DE LOS SERVICIOS DEL PUESTO DE SALUD DEL PP.JJ TUPAC AMARU - SECTOR 1 - CHAUPIMARCA - PASCO - PASCO
GOBIERNO REGIONAL PASCO
ADMINISTRACIN DIRECTA
60 DAS CALENDARIOS
PASCO
PASCO
PRESUPUESTO ANALITICO GASTOS GENERALES
UNIDAD
CANTIDAD
Item
Especifica 1
Especifica 2
PARTIDAS ESPECIFICAS
Sub Generica 2
Sub Generica 1
Generica
Tipo Trans
OBRA:
ENTE EJECUTOR:
MODALIDAD:
TIEMPO DE EJECUCIN:
REGIN:
PROVINCIA:
MES
MES
2
2
MES
MES
MES
2
2
2
UND
MILLAR
UND
UND
UND
DOCENA
DOCENA
UND
DOCENA
UND
UND
UND
6.0000
5.0000
1.0000
2.0000
12.0000
12.0000
2.0000
2.0000
2.0000
1.0000
1.0000
2.0000
CODIGO
ESPECIFICA DE GASTOS
COSTO
DIRECTO
6
6
2
2
2
2
Especifica 2
2
2
Item
Especifica 1
Sub Generica 2
Sub Generica 1
Generica
Tipo Trans
2
2
COSTO
DIRECTO
ESPECIFICA DE GASTOS
3
4
27,200.00
1,225.00
28,425.00
CO - PASCO
83,008.44
73,908.45
9,099.99
INCID.
P.U
SUB TOTAL
PARCIAL
27,200.00
5,800.00
2,000.00
11,600.00
4,000.00
28,203.21
12,904.79
3,000.00
1,400.00
1,400.00
6,000.00
2,800.00
2,800.00
41,900.44
1,225.00
1,225.00
1
1
1
1
1
1
1
1
1
1
1
1
5.50
30.00
6.00
40.00
4.00
2.50
5.00
3.00
4.00
5.00
349.00
250.00
33.00
150.00
6.00
80.00
48.00
30.00
10.00
6.00
8.00
5.00
349.00
500.00
12
40.08
245.18
6,476.88
4,151.54
200.67
0.81
22,673.72
319.50
1,917.00
1,812.48
330.00
330
PRESUPUESTO ANALITICO
MEJORAMIENTO DE LOS SERVICIOS DEL PUESTO DE SALUD DEL PP.JJ TUPAC AMARU - SECTOR 1 - CHAUPIMARCA - PASCO - PASCO
GOBIERNO REGIONAL PASCO
ADMINISTRACIN DIRECTA
60 DAS CALENDARIOS
PASCO
PASCO
PRESUPUESTO ANALITICO SUPERVISION
6
6
CANTIDAD
MES
GLB
1.0000
2
2
2
2
COSTO
DIRECTO
ESPECIFICA DE GASTOS
Item
Especifica 1
2
2
Especifica 2
CODIGO
Sub Generica 2
Generica
Sub Generica 1
Tipo Trans
2
2
UNIDAD
Especifica 1
Especifica 2
PARTIDAS ESPECIFICAS
Sub Generica 2
Sub Generica 1
Generica
Tipo Trans
OBRA:
ENTE EJECUTOR:
MODALIDAD:
TIEMPO DE EJECUCIN:
REGIN:
PROVINCIA:
3
4
11,600.00
1,387.88
12,987.88
CO - PASCO
83,008.44
73,908.45
9,099.99
INCID.
P.U
SUB TOTAL
PARCIAL
11,600.00
5,800.00
11,600.00
28,203.21
1,387.88
1,387.88
1,387.88
12
1,387.88
40.08