Está en la página 1de 17

RESUMEN

DESCRIPCION
C.D
G.GENERALES (14.22%)
G. GESTION (2.08%)
G. SUPERVICION(7.89%)
G. LIQUIDACION(1.35%)
G. SEGUIMIENTO Y MONITOREO(0.78%)
G. EXPEDIENTE(0.00%)
TOTAL

PARTIDAS
NUEVAS
83,050.39
12,281.41
1,796.44
6,814.37
1,165.96
673.66
0.00
105,782.23

MAYORES
METRADOS
37,569.71
15,073.50
2,204.84
8,363.57
1,431.03
826.82
0.00
65,469.47

DEDUCTIVOS
82,225.97
11,692.53
1,710.30
6,487.63
1,110.05
641.36
0.00
103,867.84

S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.
S/.

TOTAL ADICIONAL
38,394.13
15,662.38
2,290.98
8,690.31
1,486.94
859.12
0.00
67,383.86

TOTAL
PRESUPUESTO

840,492.84
907,876.70

PRESUPUESTO
ANALITICO
GENERAL

PROYECTO: "MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA IEI LUQUINA CHICO DEL DISTRITO
SNIP: 245780
CODIGO

DESCRIPCION

2.6

ADQUISICION DE ACTIVOS NO FINANCIEROS

2.6.2

CONSTRUCCION DE EDIFICIOS Y ESTRUCTURAS

2.6.2 2

EDIFICIOS O UNIDADES NO RESIDENCIALES

2.6.2 2.2

INSTALACIONES EDUCATIVAS

2.6.2 2.2 3

C.D

GASTOS GENERALES

790,765.93

86,010.59

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL

273,816.53

71,865.00

2.6.2 2.2 4

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES

487,962.41

5,505.59

2.6.2 2.2 5

COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS

28,986.99

8,640.00

64,790.00

0.00

ADQUISICION DE VEHICULOS, MAQUINARIAS Y OTROS

2.6.3
2.6.3 2

ADQUISICION DE MAQUINARIAS, EQUIPO Y MOBILIARIO

2.6.3 2.1

PARA OFICINA

2.6.3 2.1 1

MAQUINAS Y EQUIPOS

2.6.3 2.1 2

MOBILIARIO

2.6.3 2.2

PARA INSTALACIONES EDUCATIVAS

2.6.3.2.3

ADQUISICION DE EQUIPOS INFORMATICOS Y DE COMUNICACIONES

2.6.3.2.3.1

EQUIPOS COMPUTACIONALES Y PERIFERICOS

INVERSIONES INTANGIBLES

2.6.7
2.6.7 1

INVERSIONES INTANGIBLES

2.6.7 1.5

FORMACION Y CAPACITACION

64,790.00

4,550.00
4,550.00

0.00

2.6.7 1.5 1

GASTOS POR LA CONTRATACION DEL PERSONAL

2.6.7 1.5 2

GASTOS POR LA COMPRA DE BIENES

2.6.7 1.5 3

GASTOS POR LA CONTRACION DE SERVICIOS

OTROS GASTOS DE ACTIVOS NO FINANCIEROS

2.6.8
2.6.8 1

OTROS GASTOS DE ACTIVOS NO FINANCIEROS

2.6.8 1.3

ELABORACION DE EXPEDIENTES TECNICOS

2.6.8 1.3 1

ELABORACION DE EXPEDIENTES TECNICOS

2.6.8 1.4

OTROS GASTOS DIVERSOS DE ACTIVOS NO FINANCIEROS

2.6.8 1.4 1

GASTO POR LA CONTRATACION DE PERSONAL

2.6.8 1.4 2

GASTO POR LA COMPRA DE BIENES

2.6.8 1.4 3

GASTO POR LA CONTRATACION DE SERVICIOS

TOTAL S/.

0.00

0.00

860,105.93

86,010.59

LA IEI LUQUINA CHICO DEL DISTRITO DE CHUCUITO, PROVINCIA DE PUNO - REGION PUNO"

GASTOS DE
SUPERVISION

GASTOS DE EXP.
TECNICO

0.00

0.00

GASTOS DE
LIQUIDACION

GASTOS DE SEG.
MONITOREO

0.00

0.00

TOTAL

876,776.52

345,681.53
493,468.00
37,626.99

0.00

0.00

0.00

0.00

64,790.00

64,790.00

0.00

0.00

0.00

0.00

0.00

43,005.30

11,500.00

10,500.00

6,100.00

11,500.00

71,105.30
11,500.00

31,166.50

8,224.33

4,724.34

44,115.17

3,845.00

1,116.91

943.00

5,904.91

7,993.80

1,158.76

432.66

9,585.22

10,500.00

6,100.00

1,017,221.82

43,005.30

11,500.00

Precios y cantidades de recursos requeridos


Obra

PROYECTO: "MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA IEI LUQUINA CHICO DEL DISTRITO DE CHUCUITO, PROVINCIA DE PUNO - REGION PUNO"

Fecha

20/04/2015 10:00:26 AM

Cdigo

Recurso

0147000032

TOPOGRAFO

hh

65.4700

14.00

916.59

0147000038
0147010002

CAPACITACION A PROFESORES Y PADRES DE FAMILIA


OPERARIO

glb
hh

1.0000
9,279.4500

4,550.00
11.56

4,550.00
107,270.48

0147010003

OFICIAL

hh

5,044.3600

9.67

48,778.99

0147010004

PEON

hh

13,877.7300

8.42

116,850.47

Unidad

Cantidad

Precio S/.

Parcial S/.

MANO DE OBRA

278,366.53
MATERIALES
0201020019

SOMBRERO DE VENTILACION DE 2"

pza

15.0000

8.00

0201020029

TEE SANITARIA PVC DES. SAL 2"

pza

2.0000

2.50

5.00

0202000010
0202000015

ALAMBRE NEGRO # 16

kg
kg

851.2300
517.0900

4.80
4.80

4,085.91
2,482.02

0202000024

REJA METALICA T-1 (segun su diseo)

1.0000

1,500.00

1,500.00

0202000025
0202000026
0202000027
0202000028
0202010000
0202010002
0202010003
0202010005
0202010007
0202020001
0202020007
0202020026
0202020028
0202050017
0202050018
0202170001
0202200101
0202510100
0202810003
0202940063
0203020003
0204000000
0204010003
0205000003
0205000009
0205000032
0205000039
0205010004
0205020015
0205360012
0207010000
0207010001
0207020016
0207040005
0207060010
0210020067
0210020068
0210020069
0210020070
0210020071
0210020073
0210040098
0210060026
0210100062
0210140078
0210230001
0210230003
0210270001
0210270004
0210280006
0210330002
0210410026
0211700052
0212000047
0212000049
0212010005
0212020025
0212020026
0212030038
0212090004
0212090049
0212090109
0212090110
0212100103
0212400085
0212950005

REJA METALICA T-3 (segun su diseo)

u
u
u
u
kg
kg
kg
kg
kg
kg
kg
u
u
u
u
kg
u
u
u
u
kg
m3
m3
m3
m3
m3
u
m3
m2
m3
m
m
m
m
m
pza
pza
pza
pza
pza
jgo
pza
pza
u
u
u
u
u
u
m
pza
u
u
pza
u
u
u
u
pza
u
u
pza
pza
u
u
m

2.0000
2.0000
2.0000
3.0000
5.7800
168.6300
2.0800
242.5400
17.4100
17.5200
6.2300
1.0000
1.0000
46.0000
46.0000
49.4700
92.0000
1,598.0000
1.0000
2.0000
11,873.8600
67.3600
2.0000
43.8200
52.4500
212.2100
22.0000
124.5900
254.4400
43.5200
819.1900
330.0000
6.0000
26.0000
604.1600
2.0000
2.0000
4.0000
8.0000
13.0000
1.0000
3.0000
1.0000
4.0000
3.0000
1.0000
4.0000
5.0000
2.0000
48.0900
14.0000
3.0000
1.0000
2.0000
1.0000
16.5000
6.0000
4.0000
9.3800
47.0000
25.0000
9.0000
1.0000
1.0000
4.0000
339.0700

150.00
70.00
200.00
200.00
4.80
4.80
4.80
4.80
4.80
8.00
1.00
1,800.00
400.00
10.00
15.00
8.00
15.00
3.30
250.00
180.00
3.20
80.00
35.00
110.00
80.00
80.00
35.00
80.00
35.00
90.00
2.00
2.80
35.00
5.50
1.10
250.00
180.00
50.00
80.00
60.00
560.00
160.00
120.00
15.00
25.00
10.00
14.00
5.00
8.00
25.00
10.00
35.00
800.00
45.00
240.00
8.00
50.00
60.00
6.00
2.50
2.50
15.00
5.00
600.00
60.00
2.50

300.00
140.00
400.00
600.00
27.73
809.43
9.96
1,164.18
83.58
140.20
6.23
1,800.00
400.00
460.00
690.00
395.76
1,380.00
5,273.40
250.00
360.00
37,996.33
5,389.15
70.00
4,819.67
4,196.18
16,977.17
770.00
9,967.23
8,905.43
3,916.76
1,638.38
924.00
210.00
143.00
664.57
500.00
360.00
200.00
640.00
780.00
560.00
480.00
120.00
60.00
75.00
10.00
56.00
25.00
16.00
1,202.25
140.00
105.00
800.00
90.00
240.00
132.00
300.00
240.00
56.28
117.50
62.50
135.00
5.00
600.00
240.00
847.68

ALAMBRE NEGRO # 8

REJA METALICA T-2 (segun su diseo)


REJA METALICA T-4 (segun su diseo)
REJA METALICA CIRCULAR D=1.40 M
CLAVOS PARA MADERA CON CABEZA DE 1 1/2 "
CLAVOS PARA MADERA CON CABEZA DE 2 1/2"
CLAVOS PARA MADERA CON CABEZA DE 2"
CLAVOS PARA MADERA CON CABEZA DE 3"
CLAVOS PARA MADERA CON CABEZA DE 4"
CLAVO DE ACERO PARA CEMENTO 1 1/2"
CLAVOS PARA CEMENTO DE ACERO CON CABEZA DE 3/4"
PUERTA METALICA ( segun su diseo)
PUERTA METALICA P-2 (segun su diseo)
PLATINA DE 2" X 6" X 3/16"
PLATINA DE 6" X 8" X 3/16"
CLAVOS PARA CALAMINA
PERNO HEXAGONAL DE ANCLAJE DE 5/8" X 10"
PERNOS DE 3/8" X 4" PARA CARTELAS
GIGANTOGRAFIA
ASTA BANDERA
ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60
ARENA FINA
TIERRA DE CULTIVO o NEGRA
PIEDRA CHANCADA DE 1/2"
PIEDRA GRANDE DE 8"
PIEDRA MEDIANA
CAJA DE CONCRETO PREFABRICADO PARA CAJA DE REGISTRO- DESAGUE
ARENA GRUESA
BALDOSA ACUSTICA 2'X2', E=12mm (Inc. carril de fijacion y accesorios)
GRAVA SELECCIONADA
CABLE TW # 14 AWG 2.5 mm2
CABLE TW # 12 AWG - 4 mm2
CONDUCTOR DE COBRE DESNUDO 16MM2
CABLE DE CONEXION GPT # 10
ALAMBRE DE CU. 4 mm2 TW
INODORO ONE PIECE (INC. ACCESORIOS E INSTALACION)
INODORO TANQUE BAJO TIPO BABY (INC. ACCESORIOS)
FLOURESCENTE CIRCULAR 1x32W C/EQUIPO Y PANTALLA
FLOURESCENTE RECTANGULAR DE 2x40W C/EQUIPO Y PANTALLA TIPO REJILLA
BRAQUET DE PARED TIPO GLOBO D=20CM, CON LAMPARA AHORRADORA DE 1x20W
ACCESORIOS Y MATERIALES PARA PUESTA A TIERRA
LAVATORIO DE PARED TIPO OVALIN BLANCO (INC. ACCESORIOS)
DUCHA (INC. ACCESORIOS)_x000D_
PAPELERA DE LOSA Y BARRA PLASTICA (INC. INSTALACION)
CAJA DE CONCRETO PARA GRIFO DE RIEGO
REGISTRO DE BRONCE DE 2"
REGISTRO DE BRONCE DE 4"
SUMIDERO CROMADO DE 2"
SUMIDERO CROMADO DE 4"
REJILLA DE PLATINA 1"X1/8"
NICHO PARA VALVULAS
GRIFO DE RIEGO DE 1/2"
PARARRAYOS TIPO PDC CON TODO INC/ACCES.
TABLERO GABINETE METAL BARRA BRONCE 12 POLOS
TABLERO DE DISTRIBUCION EMPOTRABLE (24POLO RIEL DIN)
TOMACORRIENTE DOBLE PLANO BAKELITA
INTERRUPTOR TERMOMAGNETICO DE 2 X 20A X 240V
INTERRUPTOR TERMOMAGNETICO DE 2 X 30A X 240V
INTERRUPTOR SIMPLE
CAJA RECTANGULAR GALV. 4" X 2 1/8"
CAJA OCTOGONAL GALVANIZADA LIVIANA 4" X 2 1/8 "
CAJA PARA VALVULAS CON TAPA FG
CAJA DE PASE DE FIERRO GALNIZADO 100X100X55
PLACA RECORDATORIA DE MARMOL INC/INSTALACION
INTERRUPTOR TERMOMAGNETICO BIPOLAR 2X63A
TUBERIA EMPOTRADO PVC SAP NTP 399.006 DE 50MM

120.00

Precios y cantidades de recursos requeridos


Obra

PROYECTO: "MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA IEI LUQUINA CHICO DEL DISTRITO DE CHUCUITO, PROVINCIA DE PUNO - REGION PUNO"

Fecha

20/04/2015 10:00:26 AM

Cdigo

Recurso

0213000006

ASFALTO RC-250

0217160007
0217600006

LADRILLO K.K. MECANIZADO 10X14X24CM

0218090002
0218100002

Unidad

Cantidad

Precio S/.

Parcial S/.

gal

120.9500

18.00

2,177.15

CUMBRERA CALAMINON ALUZINC TIPO T E=0.60MM

u
m

42,403.4000
37.7000

1.60
40.00

67,845.44
1,507.80

CABLE NHX-90.6.0MM2 ALIMENTADOR

301.2300

2.80

843.46

CABLE CU DESNUDO CABLEADO 1X16 MM2 ESTA A TIERRA

31.5000

3.50

110.25

0219020009

CABLE NYY 3-1X16 + 1x16mm2 + 1x16mm2

72.0000

6.50

468.00

0221000001
0221020007

CEMENTO PORTLAND TIPO IP (42.5 kg)


ELEMENTOS DECORATIVOS COM PLANCHA METALICA EN PUERTA (SEGUN DISEO)

bls
glb

3,350.1100
1.0000

24.00
2,000.00

80,402.69
2,000.00

0224000030

CERAMICA CELIMA DE 20CM X 30CM.

m2

35.8700

35.00

1,255.38

0224000031

CERAMICA CELIMA ANTIDESLIZANTE DE 30CM X 30CM.

m2

14.1800

35.00

496.13

0224000034

CERAMICO DE 20CM X 30CM.

m2

36.7000

33.00

1,211.02

0224000035
0226050010

CERAMICA ANTIDESLIZANTE DE 30CM X 30CM.

m2
u

25.7300
43.6800

35.00
1.50

900.38
65.52

0226060001

MANIJA DE BRONCE PARA PUERTA

9.0000

10.00

90.00

0226070055
0226160017
0226510039
0227030000
0229040001
0229040007
0229060005
0229120063
0229150010
0229160001
0229180005
0229200010
0229350003
0229500003
0229550094
0229980034
0229980035
0230010001
0230100001
0230150014
0230320007
0230320008
0230320009
0230340001
0230460015
0230460032
0230460038
0230460048
0230480032
0230510080
0230750110
0230810052
0231520001
0231700002
0231700003
0232000000
0232970003
0238000003
0239010069
0239020024
0239020034
0239020075
0239050000
0239060019
0239070000
0239140013
0239490067
0239500097
0239500098
0239500099
0239500100
0239900101
0239900103
0241050002
0241070001
0241070002
0243040000
02431100000003
02431100000006
0243110007
0243110008
0243130026
0243130027
0243130028
0243130029
0243130030

CERRADURA EXTERIOR DE DOS GOLPES

10.0000
64.0000
5.0000
2.0000
31.0000
0.4800
27.2800
31.6100
19.7900
40.0000
33.4400
2.9300
111.4600
105.0000
1.0000
12.0000
1.0000
58.7400
2.0000
14.2500
3.0000
1.0000
3.0000
1.0000
24.0100
10.6100
0.0500
2.8500
0.9000
60.2000
1.0000
312.9800
1.0000
46.8000
9.6000
6.0000
1.0000
427.2000
1.0000
20.3800
14.8600
15.1600
71.6900
100.0000
2.0000
4.0000
5.0000
11.6000
1.0000
1.0000
1.0000
8.7100
1.0000
2,101.5500
119.0000
119.0000
1,745.1800
76.4200
478.8300
94.0000
164.5000
3.0000
15.0000
2.0000
1.0000
1.0000

80.00
12.00
50.00
30.00
3.50
32.00
10.00
15.00
15.00
4.50
5.50
18.00
105.00
15.00
20.00
2,800.00
700.00
2.00
350.00
20.00
130.00
250.00
250.00
2,000.00
22.00
15.00
90.00
95.00
2.00
12.00
600.00
60.00
85.00
0.50
1.00
800.00
2,000.00
80.00
200.00
2.50
2.00
2.00
3.00
3.00
45.00
95.00
15.00
3.20
250.00
280.00
70.00
100.00
250.00
5.10
8.50
3.50
4.20
20.00
6.67
40.00
50.00
1,200.00
110.00
100.00
450.00
300.00

800.00
768.00
250.00
60.00
108.51
15.36
272.82
474.08
296.83
180.00
183.94
52.69
11,703.04
1,575.00
20.00
33,600.00
700.00
117.49
700.00
285.04
390.00
250.00
750.00
2,000.00
528.29
159.08
4.50
271.02
1.80
722.40
600.00
18,778.80
85.00
23.40
9.60
4,800.00
2,000.00
34,176.22
200.00
50.95
29.72
30.31
215.06
300.00
90.00
380.00
75.00
37.12
250.00
280.00
70.00
871.38
250.00
10,717.91
1,011.46
416.48
7,329.76
1,528.40
3,193.80
3,760.00
8,225.00
3,600.00
1,650.00
200.00
450.00
300.00

TARUGO

BISAGRA CAPUCHINA 4"


CERRADURA TIPO BOLA
CONECTOR ANDERSON 5/8"
CINTA AISLANTE
CINTA AUTOVULCANIZANTE
YESO DE 28 Kg
TECKNOPORT E= 1"
OCRE ROJO
CARBON VEGETAL
FRAGUA PARA CERAMICO
THINNER
CESPED SINTETICO
SOLDADURA CELLOCORD 1/8"
SOLDADURA CELLOCORD
EQUIPO DE COMPUTO
IMPRESORA MULTIFUNCIONAL
RODOPLAST PARA BORDE DE MAYOLICAS
VARILLA DE COBRE DE D=5/8" X 2.40 m
PASTA MURAL
LAVATORIO ONE PIECE COLOR BLANCO_x000D_
LAVADERO DE COCINA DE ACERO INOXIDABLE, 2 POZAS C/ESCURRIDERA
LAVADERO DE COCINA DE ACERO INOXIDABLE, 1 POZAS C/ESCURRIDERA
MITIGACION AMBIENTAL
PEGAMENTO PARA LOSETAS Y CERAMICAS
SILICONA
PEGAMENTO P/TUBO PVC
PEGAMENTO PARA PVC
CINTA TEFLON
JEBE GRUESO
ACOMETIDA DOMICILIARIA MONOFASICA 220V.
CALAMINON ALUZINC TIPO T E=0.60MM
CAJA DE REGISTRO DE CONCRETO SIMPLE PARA DESAGUE TIPO ESAL
CURVAS PVC-SEL 20 mm
CURVAS PVC-SEL 50 mm
FLETE
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
HORMIGON
ENERGIA ELECTRICA PARA LA CONSTRUCCION
LIJA PARA CONCRETO
LIJAR PARA FIERRO
LIJA PARA MADERA
AGUA
SAL INDUSTRIAL
GUANO VACUNO
BUZON ELECTRICO PRE FABRICADO SEGUN DETALLES
CAJA DE VALVULA CON TAPA DE FG
REGLA DE MADERA
ACCESORIOS - CONEXION DE INSTALACIONES ELECTRICAS
MEDIDOR ELECTRICO
MEDIDOR DE AGUA
DIVISION BAO ALUMINIO Y MELAMINE
PRUEBA ELECTRICAS (AISLAMIENTO Y CONTINUIDAD)
MADERA MACHIHEMBRADA AGUANO
CONTRAZOCALO DE MADERA AGUANO 4" X 3/4"
RODON DE MADERA AGUANO 3/4" X 3/4"
MADERA TORNILLO
MADERA AGUANO 2" X 3" X 10'
MADERA AGUANO 2" X 3" X 10'
MADERA AGUANO 2" X 4" X 10'
MADERA AGUANO 2" X 6" X 10'
MESAS CIRCULARES
SILLAS PERSONALES PARA NIOS
SILLA PARA ADULTO
ESCRITORIO
PIZARRA ACRILICA

u
u
u
pza
u
rll
rll
bls
m2
kg
kg
kg
gal
m2
kg
kg
u
u
m
u
gal
pza
pza
pza
m2
bls
u
gal
gal
pza
m
u
m2
pza
u
u
glb
glb
m3
glb
hja
u
u
m3
kg
m3
u
u
p2
u
u
u
m2
glb
p2
m
m
p2
pza
m
pza
pza
u
u
u
u
u

Precios y cantidades de recursos requeridos


Obra

PROYECTO: "MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA IEI LUQUINA CHICO DEL DISTRITO DE CHUCUITO, PROVINCIA DE PUNO - REGION PUNO"

Fecha

20/04/2015 10:00:26 AM

Cdigo

Recurso

Unidad

0243130031

ESTANTES

5.0000

950.00

4,750.00

0243130032
0243130033

MESAS Y SILLAS PARA TRABAJO GRUPAL


MUEBLE PARA COMPUTADORA

u
u

1.0000
12.0000

2,000.00
450.00

2,000.00
5,400.00

0243130034

ESCRITORIO Y SILLA

1.0000

1,200.00

1,200.00

0243130035

SILLA TAPIZADAS

4.0000

160.00

640.00

0243130036

BOTIQUIN BASICO

1.0000

100.00

100.00

0243130037
0243130038

ARMARIOS

u
u

1.0000
1.0000

500.00
500.00

500.00
500.00

0243130039

UTENSILLOS (OLLAS, PLATOS, TASAS, CUCHARONES)

jgo

1.0000

4,000.00

4,000.00

0243130040

MESA

jgo

1.0000

2,000.00

2,000.00

0243130041

SILLA

jgo

15.0000

110.00

1,650.00

0243130042
0243130043

ESTANTERIAS Y DESPENSA PARA VIVERES

u
u

1.0000
3.0000

950.00
200.00

950.00
600.00

0243140000

MADERA CORRIENTE PARA ENCOFRADO

p2

7,104.8900

3.20

22,735.66

0243160000
02431700010001
02436000010002
0244030024
0246030073
0246030074
0250010007
0253000002
0254010014
0254030000
0254060000
0254080000
0254110014
0254160001
0254450003
0254610004
0254610051
0256220032
0256900011
0262110071
0265140102
0265700010
0265700052
0271090016
0272000081
0272060010
0272060044
0272060045
0272070000
0272080011
0272080012
0272080013
0272130012
0272130016
0272140001
0272140003
0272140019
0272180010
0272190009
0272190011
0272300018
0272300025
0272300026
0272320003
0272730004
0273010007
0273010026
0273010029
0273010032
0273010033
0273010034
0273110002
0273110006
0273110052
0273110054
0273110056
0273110057
0273110058
0273110059
0273110060
0273130021
0273130022
0273130023
0273130024
0273160002
0273160007

MADERA CORRIENTE PARA ESTACAS

p2
m2
pza
m2
m2
u
pza
gal
gal
gal
gal
gal
u
gal
gal
gal
gal
m2
pl
u
u
u
u
u
m
u
pza
u
u
pza
u
u
m
m
u
u
u
pza
u
u
pza
u
u
u
m
pza
m
m
m
m
m
pza
pza
pza
pza
pza
u
u
pza
pza
u
u
u
u
pza
pza

63.1700
36.4000
2.0000
8.6400
120.0000
8.0000
11.0000
35.3300
2.8900
102.9000
1.1900
4.2200
80.0000
267.5300
1.9700
1.6500
0.1300
54.0500
27.3900
6.0000
18.0000
43.6800
523.3200
50.0000
78.4400
51.9000
19.0000
5.0000
22.2800
18.0000
5.0000
7.0000
3.0600
22.0500
15.0000
5.0000
9.0000
17.0000
5.0000
6.0000
18.0000
24.0000
7.0000
8.0000
17.8500
9.0000
47.2700
132.2500
4.2000
18.9000
102.9300
9.0000
1.0000
6.3000
5.1000
2.0000
3.1500
9.0000
8.1900
8.1900
19.0000
5.0000
19.0000
2.0000
15.0000
22.0000

2.50
250.00
25.00
25.00
8.00
760.00
30.00
15.00
55.00
48.00
45.00
45.00
10.00
25.00
80.00
35.00
38.00
110.00
26.00
580.00
2.00
2.00
0.45
25.00
4.50
2.00
2.50
3.50
2.50
2.00
3.50
4.00
10.00
25.00
2.50
4.50
3.50
35.00
6.50
8.50
8.00
25.00
3.50
4.50
6.00
12.00
4.00
7.00
6.50
3.80
4.50
2.00
6.00
2.00
4.50
6.00
2.00
4.50
3.50
3.50
2.50
3.50
4.00
6.00
3.00
4.50

9,100.00
50.00
216.00
960.00
6,080.00
330.00
529.91
158.79
4,939.11
53.50
189.90
800.00
6,688.38
157.84
57.63
4.99
5,945.50
712.14
3,480.00
36.00
87.36
235.50
1,250.00
352.97
103.80
47.50
17.50
55.69
36.00
17.50
28.00
30.60
551.25
37.50
22.50
31.50
595.00
32.50
51.00
144.00
600.00
24.50
36.00
107.10
108.00
189.08
925.74
27.30
71.82
463.19
18.00
6.00
12.60
22.95
12.00
6.30
40.50
28.67
28.67
47.50
17.50
76.00
12.00
45.00
99.00

COCINA

KITS DE MATERIAL EDUCATIVO

PUERTA DE MADERA AGUANO TABLERO REBAJADO 1 1/4"


ROLLIZO DE EUCALIPTO DE 6" X 5.50 m
TRIPLAY DE 8 mm
MALLA RASCHELL INC/ACCES.
TIJERAL METALICO PARA SOSTENER MALLA RASCHELL S/DETALLE C/TODO
TAPA CON MARCO FIERRO FUNDIDO DE DESAGUE 10" X 20"
PETROLEO
PINTURA ESMALTE
PINTURA LATEX
PINTURA ANTICORROSIVA
BARNIZ MARINO
FLORES PLANTONES
IMPRIMANTE
PINTURA TRANSITO
SELLADOR DE MADERA
PINTURA SELLADOR PARA MADERA
PLANCHA DE FIERRO 1/8" PARA CARTELAS
CALAMINA GALVANIZADA DE 1.83 X 0.83 X 0.25mm
POSTE DE ARMADURA METALICA CON ANGULOS DE 1 1/2" - 1" SEGUN DETTALE C/TODO
NIPLE DE PVC DE 1/2" X 2"
TIRAFON 4"
TIRAFON PARA SUJECION CALAMINON TIPO T
ABRAZADERA DE PLATINA 1"X1/8"
TUBERIA PVC SAP PRESION PARA AGUA C-10 R. 1/2"
CODO PVC SAP PARA AGUA CON ROSCA DE 1/2" X 90
CODO PVC SAP 1/2" X 90
CODO PVC SAP 3/4" X 90
TEE PVC SAP PARA AGUA CON ROSCA DE 1/2"
TEE PVC SAP 1/2"
TEE PVC SAP 1/2"
TEE PVC SAP 3/4"
TUBERIA PVC SAL PARA DESAGUE DE 6"
TUBERIA PVC SAL PRESION P/AGUA DIAM 3"
CODO PVC SAL DE 2" X 90
CODO PVC SAL DE 4" X 90
CODO PVC SAL DE VENTILACION DE 4"
UNION UNIVERSAL PVC SAP 3/4"
TRAMPA S PVC SAL DE 2"
TRAMPA S PVC SAL DE 4"
UNION UNIVERSAL DE PVC PARA AGUA CALIENTE 1/2"
UNION UNIVERSAL PVC SAP 1/2"
REDUCCION PVC SAP DE 3/4" A 1/2
YEE PVC SAL CON REDUCCION 4" - 2"
TUBERIA CRIBADA 3"
TUBERIA PVC SAL 2" X 3 m
TUBERIA PVC SAL 2"
TUBERIA PVC SAL 4"
TUBERIA PVC SAP C-7.5 DE 4"
TUBERIA PVC SAP DE 1/2"
TUBERIA PVC SAP DE 3/4"
CODO PVC SAL 2" X 90
CODO PVC SAL 6" X 90
CODO PVC SAL 2" X 45
CODO PVC SAL 4" X 45
CODO PVC SAL 6" X 45
CODO PVC SAL 2" X 45
CODO PVC SAL 4" X 90
CODO PVC SAL 3"x45
CODO PVC SAL 3"x90
TEE PVC SAL 2" X 2"
TEE PVC SAL 4" X 2"
TEE PVC SAL 4" X 4"
TEE PVC SAL 6" X 6"
YEE PVC SAL DE 2" X 2"
YEE PVC SAL DE 4" X 4"

Cantidad

Precio S/.

Parcial S/.

157.90

Precios y cantidades de recursos requeridos


Obra

PROYECTO: "MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA IEI LUQUINA CHICO DEL DISTRITO DE CHUCUITO, PROVINCIA DE PUNO - REGION PUNO"

Fecha

20/04/2015 10:00:26 AM

Cdigo

Recurso

0273160058

YEE PVC SAL SP DE 4" X 4"

4.0000

4.50

18.00

0273160059
0273170018

YEE PVC SAL SP DE 2" X 2"

u
pza

7.0000
1.0000

3.00
5.00

21.00
5.00

0274010026

TUBERIA PVC SEL P/INST. ELECTRICAS DE 3/4"

654.0000

1.50

981.00

0274010032

TUBERIA PVC-SEL 20mm x 3m

81.8900

3.00

245.68

0274010033

TUBERIA PVC-SEL 50mm x 3m

17.2800

18.00

311.04

0274020027
0277000002

CURVA PVC SEL 3/4"

pza
u

241.0000
9.0000

0.50
65.00

120.50
585.00

0277030018

VALVULA TIPO CHECK DE 3/4"

0277110001

VALVULA DE GLOBO DE BRONCE DE 1/2"

0279000054
0279110005

Unidad

UNION PVC SAL 4"-2"

VALVULA COMPUERTA DE BRONCE DE 1/2"

Cantidad

Precio S/.

Parcial S/.

1.0000

35.00

35.00

pza

4.0000

25.00

100.00

VIDRIO TRANSPARENTE INCOLORO e=4MM

p2

31.6700

6.80

215.34

VIDRIO SISTEMA MODUGLAS INC. ACCESORIOS E INSTALACION

m2

98.0300

45.00

4,411.35
552,752.41

EQUIPOS
0337010001
0337010025
0337020043
0337040032
0337520087
0337530017
0337540001
0348010011
0348040027
0348090002
0348210004
0348890003
0349010034
0349030003
0349040009
0349180024

HERRAMIENTAS MANUALES

0349520011
0349880016

%MO
u
hm
u
u
ovl
hm
hm
hm
est
hm
hm
hm
hm
hm
hm

0.15
9.8000
103.2100
9.0500
14.3600
36.7500
365.8000
8.0100
803.0300
96.0000
38.3400
4.4500
213.5100
8.0100
19.0500

3
2.50
20.00
8.00
10.00
5.00
15.00
130.00
3.00
20.00
15.00
5.00
10.00
150.00
20.00

7,969.10
0.44
24.50
2,064.23
72.41
143.62
183.75
5,486.99
1,041.04
2,409.07
1,920.00
575.14
22.23
2,135.10
1,201.21
380.96

VIBRADOR DE CONCRETO DE 1.5"

hm

264.9500

10.00

2,649.51

NIVEL TOPGRAFICO

hm

75.0900

10.00

750.92

BROCHA DE 4"
BALDE PRUEBA TAPON ABRAZADERA Y ACCESORIOS
REGLA METALICA DE ALUMINIO
HOJAS DE SIERRA
CORDEL # 36
MIRAS Y JALONES
MEZCLADORA DE CONCRETO DE 9 -11p3
CAMION VOLQUETE 6 X 4 330 HP 10 m3
ANDAMIO METAL TABLAS ALQUILER
SOLDADORA
ESTACION TOTAL
COMPRESORA DE AIRE PARA EL PINTADO
COMPACTADOR VIBRATORIO TIPO PLANCHA 5.8 HP
CARGADOR SOBRE LLANTAS 125 HP 2.5 yd3
WINCHE DE DOS BALDES DE 350 kg MOTOR ELECTRICO 3.6 HP

28,986.99

PROYECTO: "MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA IEI LUQUINA CHICO DEL DISTRITO DE CHUCUITO, PROVINCIA DE PUNO - REGION
PUNO"

PRESUPUESTO ANALITICO GASTOS GENERALES


DESCRIPCION

UND

CANT.

COSTO

COEF. PART.

P. PARC.

TOTAL

2.6.2 2.2 3 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL

71,865.00

RETRIBUCIONES Y COMPLEMENTOS
PERSONAL PROFESIONAL Y AUXILIAR
Ing. Residente I
Asistente Administrativo

54,000.00
Mes
Mes

6.00
6.00

4,500.00
2,000.00

1.00
1.00

27,000.00
12,000.00

Mes

6.00

2,500.00

1.00

15,000.00

OBLIGACIONES DEL EMPLEADOR


Leyes Sociales

Gbl

1.00

5,265.00

5,265.00

GASTOS VARIABLES Y ADICIONALES


Vacaciones Truncas
Compensacin por Tiempo de Servicios

Gbl
Gbl

1.00
1.00

4,500.00
4,500.00

4,500.00
4,500.00

ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES


Escolaridad, Aguinaldos y Gratificaciones

Gbl

1.00

3,600.00

3,600.00

PERSONAL TECNICO
Maestro de Obra

5,265.00

9,000.00

3,600.00

2.6.2 2.2 4 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES


A) VESTUARIO
CASCOS DE SEG. PARA PROFESIONALES ,TECNICOS, AUXILIARES
ZAPATOS DE SEGURIDAD PROFESIONAL, TECNICOS, AUXILIAR

5,505.59
940.00
UND
UND

4.00
4.00

35.00
200.00

140.00
800.00

UND
MILL
PQT
UND
UND
UND
UND
UND
UND
UND

3.00
6.00
1.00
3.00
3.00
1.00
6.00
5.00
5.00
5.00

25.00
25.00
20.00
5.00
3.50
10.00
1.20
0.40
2.50
2.06

75.00
150.00
20.00
15.00
10.50
10.00
7.20
2.00
12.50
10.29

UND
PQT
GLB

2.00
0.50
1.00

220.00
50.00
690.10

440.00
25.00
690.10

GLB

1.00

400.00

400.00

UND

2.00

8.00

16.00

GLN

180.00

14.90

2,682.00

B) MATERIALES DE ESCRITORIO
CUADERNO DE OBRA DE 50 FOLIOS AUTOCOPIABLE
PAPEL BOND A-4 COLOR BLANCO 75 GR.
PAPEL CARBON
ARCHIVADOR DE PALANCA GRANDE
ARCHIVADOR DE PALANCA 1/2 OFICIO - LOMO ANCHO
PORTAMINAS
REPUESTOS PARA PORTAMINAS
LAPICEROS TINTA SECA
LAPICEROS TINTA LIQUIDA
RESALTADOR

312.49

BIENES DE CONSUMO
TONER PARA IMPRESORA LASER
DVD EN BLANCO X 100 UND
IMPREVISTOS VARIOS

1,155.10

MEDICAMENTOS
MEDICAMENTOS Y BOTIQUIN DE PRIMEROS AUXILIOS

400.00

EQUIPAMIENTO Y BIENES DURADEROS


FLEXOMETRO DE 5 MTS

16.00

COMBUSTIBLE
COMBUSTIBLE PARA CAMIONETA

2,682.00

2.6.2 2.2 5 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS


OTROS SERVICIOS DE TERCEROS
Alquiler de camioneta
Dias
Legalizacin de Cuaderno de Obra
Und
Otros SERVICIOS
glb

8,640.00
8,640.00
40.00
6.00
1.00

TOTAL GASTOS GENERALES S/.


COSTO DIRECTO DE LA OBRA
PORCENTAJE DE GASTOS GENERALES

160.00
40.00
2,000.00

6,400.00
240.00
2,000.00
86,010.59

PROYECTO: "MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA IEI LUQUINA CHICO DEL DISTRITO DE CHUCUITO, PROVINCIA DE PUNO - REGION
PUNO"

PRESUPUESTO ANALITICO GASTOS DE SUPERVISION


DESCRIPCION

UND

CANT.

COSTO

COEF. PART.

P. PARC.

TOTAL

2.6.8 1.4 1 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL

31,166.50

RETRIBUCIONES Y COMPLEMENTOS
PERSONAL PROFESIONAL Y AUXILIAR
Ing. Supervisor I
OBLIGACIONES DEL EMPLEADOR
Leyes Sociales

27,000.00
Mes

6.00

4,500.00

1.00

27,000.00

Gbl

0.50

2,633.00

1,316.50

GASTOS VARIABLES Y ADICIONALES


Vacaciones Truncas
Compensacin por Tiempo de Servicios

Gbl
Gbl

0.50
0.50

2,250.00
2,250.00

1,125.00
1,125.00

ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES


Escolaridad, Aguinaldos y Gratificaciones

Gbl

0.50

1,200.00

600.00

1,316.50

2,250.00

600.00

2.6.8 1.4 2 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES


COMBUSTIBLE Y LUBRICANTES
Petroleo
BIENES DE CONSUMO
Vestuario de Seguridad
Zapatos de seguridad
Implementos de Oficina
Toner para Impresoras
Papel Bond A-4
Gastos imprevistos

3,845.00
745.00

Gln

50.00

14.90

745.00

Und

1.00

280.00

280.00

Und
Mill.
Glb

1.00
4.00
1.00

220.00
25.00
2,500.00

220.00
100.00
2,500.00

3,100.00

2.6.8 1.4 3 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS

7,993.80

ALQUILER DE BIENES
Alquiler de camioneta

Dias

30.00

160.00

4,800.00

OTROS SERVICIOS DE TERCEROS


Evaluador de Proyecto

Glb

1.00

3,193.80

3,193.80

TOTAL GASTOS DE SUPERVISION S/.


COSTO DIRECTO DE LA OBRA
PORCENTAJE DE GASTOS DE SUPERVISION

4,800.00

1.00

3,193.80
43,005.30

PROYECTO: "MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA IEI LUQUINA CHICO DEL DISTRITO
PUNO"

PRESUPUESTO ANALITICO GASTOS ELABORACION DE EXPEDIEN


DESCRIPCION

UND

CANT.

COSTO

2.6.8 1.4 1 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL


RETRIBUCIONES Y COMPLEMENTOS
PERSONAL PROFESIONAL Y AUXILIAR

Jefe de proyecto
Especialista en arquitectura
Especialista en estructuras

Mes
Mes
Mes

1.00
1.00
1.00

4,000.00
3,500.00
3,500.00

OBLIGACIONES DEL EMPLEADOR


Leyes Sociales

Gbl

0.50

731.00

GASTOS VARIABLES Y ADICIONALES


Vacaciones Truncas
Compensacin por Tiempo de Servicios

Gbl
Gbl

0.50
0.50

625.00
625.00

ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES


Escolaridad, Aguinaldos y Gratificaciones

Gbl

0.50

1,200.00

2.6.8 1.4 2 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES


COMBUSTIBLE Y LUBRICANTES
Petroleo

Gln

50.00

14.90

Implementos de Oficina
Toner para Impresoras
Papel Bond A-4
Fotocopias y Otros

Und
Mill.
Mes

2.00
4.00
1.00

220.00
25.00
100.00

2.6.8 1.4 3 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS


OTROS SERVICIOS DE TERCEROS
Otros Servicios

Glb

1.00

1,024.50

TOTAL GASTOS DE EXPEDIENTE TECN


COSTO DIRECTO DE LA OBRA
PORCENTAJE DE GASTOS DE EXPEDIENTE TECNICO

AL EN LA IEI LUQUINA CHICO DEL DISTRITO DE CHUCUITO, PROVINCIA DE PUNO - REGION


PUNO"

ASTOS ELABORACION DE EXPEDIENTE TECNICO


COEF. PART.

P. PARC.

TOTAL
9,090.50
7,500.00

1.00
0.50
0.50

4,000.00
1,750.00
1,750.00
365.50
365.50
625.00
312.50
312.50
600.00
600.00
1,385.00
745.00
745.00
640.00
440.00
100.00
100.00

1,024.50
1,024.50
1,024.50
TOTAL GASTOS DE EXPEDIENTE TECNICO S/.

11,500.00

PROYECTO: "MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA IEI LUQUINA CHICO DEL DISTRITO DE CHUCUITO, PROVINCIA DE PUNO - REGION
PUNO"

PRESUPUESTO ANALITICO GASTOS DE LIQUIDACION


DESCRIPCION

UND

CANT.

COSTO

COEF. PART.

P. PARC.

TOTAL

2.6.8 1.4 1 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL

8,224.33

RETRIBUCIONES Y COMPLEMENTOS
PERSONAL PROFESIONAL Y AUXILIAR

7,000.00

Liquidador Tcnico de Obra


Liquidador Financiero de Obra

Mes

1.00

4,000.00

1.00

4,000.00

Mes

1.00

3,000.00

1.00

3,000.00

OBLIGACIONES DEL EMPLEADOR


Leyes Sociales

Gbl

0.50

682.00

341.00

GASTOS VARIABLES Y ADICIONALES


Vacaciones Truncas
Compensacin por Tiempo de Servicios

Gbl
Gbl

0.50
0.50

583.33
583.33

291.67
291.67

ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES


Escolaridad, Aguinaldos y Gratificaciones

Gbl

0.50

600.00

300.00

341.00

583.33

300.00

2.6.8 1.4 2 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES


COMBUSTIBLE Y LUBRICANTES
Petroleo

1,116.91
745.00

Gln

50.00

14.90

745.00
371.91

Implementos de Oficina
Toner para Impresoras
Papel Bond A-4
Fotocopias y Otros

Und
Mill.
Mes

1.00
4.00
1.00

220.00
28.50
37.91

220.00
114.00
37.91

2.6.8 1.4 3 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS


OTROS SERVICIOS DE TERCEROS
Otros Servicios

1,158.76
1,158.76

Glb

1.00

1,158.76

TOTAL GASTOS DE LIQUIDACION S/.


COSTO DIRECTO DE LA OBRA
PORCENTAJE DE GASTOS DE LIQUIDACION

1,158.76
10,500.00

PROYECTO: "MEJORAMIENTO DEL SERVICIO DE EDUCACION INICIAL EN LA IEI LUQUINA CHICO DEL DISTRITO
PUNO"

PRESUPUESTO ANALITICO GASTOS DE GESTION SEGUIMIENTO Y


DESCRIPCION

UND

CANT.

COSTO

2.6.8 1.4 1 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - PERSONAL


RETRIBUCIONES Y COMPLEMENTOS
PERSONAL PROFESIONAL Y AUXILIAR

Responsable del Monitoreo

Mes

1.00

3,500.00

OBLIGACIONES DEL EMPLEADOR


Leyes Sociales

Gbl

1.00

341.00

GASTOS VARIABLES Y ADICIONALES


Vacaciones Truncas
Compensacin por Tiempo de Servicios

Gbl
Gbl

1.00
1.00

291.67
291.67

ESCOLARIDAD, AGUINALDOS Y GRATIFICACIONES


Escolaridad, Aguinaldos y Gratificaciones

Gbl

1.00

300.00

Gln

50.00

14.90

Mill.
Mes

4.00
1.00

24.50
100.00

2.6.8 1.4 2 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - BIENES


COMBUSTIBLE Y LUBRICANTES
Petroleo
Implementos de Oficina
Papel Bond A-4
Fotocopias y Otros

2.6.8 1.4 3 COSTO DE CONSTRUCCION POR ADMINISTRACION DIRECTA - SERVICIOS


OTROS SERVICIOS DE TERCEROS
Otros Servicios

Glb

1.00

432.66

TOTAL GASTOS DE LIQUIDACION S/.


COSTO DIRECTO DE LA OBRA
PORCENTAJE DE GASTOS DE GESTION SEGUIMIENTO Y MONITOREO

AL EN LA IEI LUQUINA CHICO DEL DISTRITO DE CHUCUITO, PROVINCIA DE PUNO - REGION


PUNO"

ASTOS DE GESTION SEGUIMIENTO Y MONITOREO


COEF. PART.

P. PARC.

TOTAL
4,724.34
3,500.00

1.00

3,500.00
341.00
341.00
583.34
291.67
291.67
300.00
300.00
943.00
745.00
745.00
198.00
98.00
100.00

432.66
432.66
432.66
TOTAL GASTOS DE LIQUIDACION S/.

6,100.00