Presupuesto
Presupuesto
Cliente
Lugar
0202005
MEJORAMIENTO DE VIAS CON PISTAS, VEREDAS Y OVALO DE LA AV. 9 DE ENERO DEL AAHH TUPAC AMARU DISTRITO DE
CHAUPIMARCA, PROVINCIA DE PASCO - PASCO.
Costo al
HONORABLE MUNICIPALIDAD PROVINCIAL DE PASCO
10/06/2014
PASCO - PASCO - CHAUPIMARCA
Item
Descripcin
01
OVALO
01.01
Und.
Metrado
Precio S/.
Parcial S/.
343,624.83
TRABAJOS PRELIMINARES
3,534.15
01.01.01
m2
937.44
1.47
1,378.04
01.01.02
m2
937.44
2.30
2,156.11
01.02
CONCRETO SIMPLE
6,445.96
01.02.01
m2
207.80
28.11
5,841.26
01.02.02
m2
207.80
2.00
415.60
01.02.03
LIMPIEZA DE LOSA
m2
207.80
0.91
01.03
01.03.01
SARDINELES
189.10
16,038.62
MOVIMIENTO DE TIERRAS
5,046.22
01.03.01.01
m3
446.75
9.31
4,159.24
01.03.01.02
m3
19.03
36.06
686.22
m2
72.74
2.76
01.03.01.03
01.03.02
CONCRETO SIMPLE
200.76
10,992.40
01.03.02.01
m3
19.03
316.65
6,025.85
01.03.02.02
m2
99.79
42.27
4,218.12
01.03.02.03
CURADO DE SARDINELES
m2
99.79
1.10
109.77
m2
99.79
6.40
01.03.02.04
01.04
01.04.01
VEREDAS DE CONCRETO
638.66
31,915.90
MOVIMIENTO DE TIERRAS
21,367.92
01.04.01.01
m3
338.90
36.06
12,220.73
01.04.01.02
m2
338.90
5.36
1,816.50
01.04.01.03
m2
338.90
13.62
4,615.82
01.04.01.04
m3
87.86
18.04
1,584.99
01.04.01.05
m3
87.86
12.86
1,129.88
01.04.02
CONCRETO SIMPLE
10,547.98
01.04.02.01
m2
55.63
54.95
3,056.87
01.04.02.02
m2
32.29
39.53
1,276.42
01.04.02.03
m2
370.84
10.27
3,808.53
01.04.02.04
m2
370.84
1.92
712.01
01.04.02.05
JUNTAS DE DILATACION
319.65
5.30
1,694.15
01.05
VARIOS
101,904.90
01.05.01
und
4.00
15,691.20
62,764.80
01.05.02
pza
1.00
2,770.21
2,770.21
01.05.03
und
3.00
2,935.36
8,806.08
01.05.04
m2
1.00
20,679.35
20,679.35
und
9.00
764.94
01.05.05
01.06
MUROS DE CONTENCION
6,884.46
17,036.54
01.06.01
m3
9.69
36.76
356.20
01.06.02
01.06.03
m3
3.87
59.16
228.95
m2
16.82
2.98
01.06.04
50.12
m3
11.62
13.79
160.24
01.06.05
m3
11.61
351.56
4,081.61
01.06.06
m3
19.53
218.20
4,261.45
01.06.07
m2
127.96
40.49
5,181.10
01.06.08
kg
395.37
4.24
1,676.37
01.06.09
m2
85.41
7.10
606.41
01.06.10
25.20
6.66
167.83
01.06.11
m2
127.96
1.10
140.76
01.06.12
JUNTAS ASFALTICAS
19.92
6.30
125.50
2,234.90
11,174.50
11,174.50
01.07
01.07.01
RESALTO DE CONCRETO
RESALTO DE CONCRETO (REDUCTOR DE VELOCIDAD)
01.08
BARANDAS METALICAS
und
5.00
15,215.99
01.08.01
26.90
132.85
3,573.67
01.08.02
79.95
145.62
11,642.32
01.09
01.09.01
INVERNADERO
55,367.70
MOVIMIENTO DE TIERRAS
912.58
01.09.01.01
m3
17.12
36.76
629.33
01.09.01.02
m3
20.54
13.79
283.25
m3
13.66
341.63
4,666.67
01.09.02.02
ENCOFRADO Y DESENCOFRADO
m2
50.60
36.71
1,857.53
01.09.02.03
kg
456.49
4.24
01.09.02
01.09.02.01
01.09.03
CONCRETO ARMADO
8,459.72
ESTRUCTURA METALICA
1,935.52
10,225.74
01.09.03.01
und
1.00
8,403.60
8,403.60
01.09.03.02
glb
1.00
1,822.14
1,822.14
01.09.04
01.09.04.01
01.09.05
01.09.05.01
01.09.06
01.09.06.01
01.09.07
01.09.07.01
01.10
REVOQUES
TARRAJEO CEMENTO ARENA 1:4
594.45
m2
27.83
21.36
VIDRIOS
VIDRIO TEMPLADO 8 MM REFLEJANTE
m2
107.04
298.13
m2
27.83
8.52
glb
1.00
3,026.26
PINTURAS
PINTURA EN ZOCALOS
31,911.84
237.11
VARIOS
TRANSPORTE DE MATERIALES NO COMERCIALES A OBRA (LIMA PASCO)
594.45
31,911.84
237.11
3,026.26
PISOS
3,026.26
16,988.47
01.10.01
m2
231.42
44.08
10,200.99
01.10.02
CONTRAPISO DE 25 MM
m2
224.40
16.87
3,785.63
01.10.03
m2
220.40
13.62
3,001.85
01.11
SEALIZACION
55,930.97
01.11.01
SEALIZACION REGULADORA
und
23.00
289.95
6,668.85
01.11.02
SEALIZACION INFORMATIVA
und
16.00
200.75
3,212.00
01.11.03
SEALIZACION PREVENTIVA
und
19.00
262.90
4,995.10
01.11.04
und
18.00
720.98
12,977.64
m2
1,998.39
14.05
28,077.38
01.11.05
01.12
12,071.13
01.12.01
m3
68.29
36.06
2,462.54
01.12.02
m2
341.45
10.77
3,677.42
01.12.03
m2
341.45
8.97
3,062.81
01.12.04
und
44.00
65.19
2,868.36
02
02.01
PAVIMENTO DE CONCRETO
1,579,052.02
OBRAS PROVISIONALES
190,355.37
02.01.01
mes
7.00
750.00
5,250.00
02.01.02
und
1.00
1,501.49
1,501.49
02.01.03
DISEO DE MEZCLAS
und
1.00
350.00
350.00
02.01.04
ROTURA DE PROBETAS
und
250.00
25.00
6,250.00
02.01.05
est
1.00
42,400.00
42,400.00
02.01.06
glb
1.00
126,203.88
126,203.88
BAOS QUIMICOS
mes
7.00
1,200.00
02.01.07
02.02
TRABAJOS PRELIMINARES
8,400.00
56,884.45
02.02.01
m2
10,176.52
1.10
11,194.17
02.02.02
m2
10,176.52
1.47
14,959.48
02.02.03
02.02.04
m2
und
10,176.52
28.00
2.30
261.60
23,406.00
7,324.80
02.03
02.03.01
MOVIMIENTO DE TIERRAS
EXCAVACION DE TERRENO NATURAL A NIVEL DE SUB RASANTE CON
MAQUINARIA
360,748.30
m3
4,006.24
7.43
29,766.36
74,823.00
02.03.02
m3
416.47
179.66
02.03.03
m2
10,176.52
3.39
34,498.40
02.03.04
m2
10,176.52
13.63
138,705.97
02.03.05
und
16.00
320.00
5,120.00
02.03.06
und
16.00
210.00
3,360.00
m3
5,791.18
12.86
02.03.07
02.04
OBRAS DE CONCRETO
02.04.01
m3
02.04.02
02.04.03
ACERO EN JUNTAS
02.04.04
02.05
02.05.01
02.05.02
02.06
02.06.01
02.06.02
02.07
02.07.01
03
03.01
74,474.57
879,711.72
2,035.30
348.53
709,363.11
m2
1,505.94
39.41
59,349.10
kg
10,428.60
4.74
49,431.56
m2
10,176.52
6.05
61,567.95
m2
10,176.52
2.16
LIMPIEZA DE LOSA
m2
10,176.52
1.10
33,175.45
SELLADO DE JUNTAS
21,981.28
11,194.17
43,069.83
JUNTAS TRANSVERSALES
2,795.28
5.72
15,989.00
JUNTAS LONGITUDINALES
4,734.41
5.72
27,080.83
1.00
15,106.90
VARIOS
MANTENIMIENTO DE REDES DE AGUA Y DESAGUE
15,106.90
glb
VEREDAS DE CONCRETO
15,106.90
867,216.57
TRABAJOS PRELIMINARES
30,632.45
03.01.01
m2
6,218.16
1.10
03.01.02
m2
6,218.16
1.47
9,140.70
03.01.03
m2
6,218.16
2.30
14,301.77
DISEO DE MEZCLAS
und
1.00
350.00
03.01.04
03.02
MOVIMIENTO DE TIERRAS
6,839.98
350.00
297,540.64
03.02.01
m2
1,088.18
27.84
30,294.93
03.02.02
m3
1,712.16
43.28
74,102.28
03.02.03
m3
649.18
57.29
37,191.52
03.02.04
m2
6,491.82
16.75
108,737.99
03.02.05
m3
2,225.81
12.86
28,623.92
03.02.06
und
338.00
55.00
03.03
OBRAS DE CONCRETO
18,590.00
421,407.78
03.03.01
m2
6,218.16
54.95
341,687.89
03.03.02
m3
31.80
283.04
9,000.67
03.03.03
m2
273.66
39.53
10,817.78
03.03.04
m2
59.65
35.06
2,091.33
03.03.05
m2
6,218.16
8.10
50,367.10
03.03.06
ACABADO DE RAMPAS
m2
273.66
14.92
4,083.01
03.03.07
und
16.00
210.00
3,360.00
03.04
GRADAS
8,558.36
03.04.01
m3
20.72
316.65
6,560.99
03.04.02
m2
49.33
40.49
1,997.37
03.05
20,271.21
03.05.01
m2
6,218.16
2.16
13,431.23
03.05.02
LIMPIEZA DE VEREDAS
m2
6,218.16
1.10
6,839.98
03.06
03.06.01
SELLADO DE JUNTAS
JUNTAS DE DILATACION
1,824.37
5.30
9,669.16
9,669.16
03.07
VARIOS
442.13
132.85
58,736.97
12.00
1,700.00
20,400.00
79,136.97
03.07.01
03.07.02
und
04
04.01
583,337.35
6,731.22
04.01.01
04.01.02
04.02
m2
2,619.15
1.10
m2
2,619.15
1.47
MOVIMIENTO DE TIERRAS
2,881.07
3,850.15
133,356.47
04.02.01
m3
141.43
36.06
5,099.97
04.02.02
m3
565.73
179.66
101,639.05
04.02.03
m3
940.52
12.86
12,095.09
04.02.04
m3
166.35
87.30
14,522.36
04.03
58,358.50
04.03.01
m3
140.86
316.65
44,603.32
04.03.02
m2
726.25
18.94
13,755.18
04.04
04.04.01
368,967.31
185,245.55
04.04.01.01
m3
247.18
337.18
83,344.15
04.04.01.02
m2
1,667.69
42.27
70,493.26
04.04.01.03
kg
7,407.58
4.24
31,408.14
04.04.02
MUROS DE CONTENCION
183,721.76
04.04.02.01
m3
237.94
351.56
83,650.19
04.04.02.02
m2
1,028.09
42.94
44,146.18
kg
13,189.95
4.24
55,925.39
m2
1,279.54
10.31
04.04.02.03
04.05
04.05.01
04.06
REVOQUES
SOLAQUEO DE MUROS DE CONCRETO
13,192.06
VARIOS
13,192.06
2,731.79
04.06.01
m2
67.81
9.52
04.06.02
SELLADO DE JUNTAS
182.82
3.44
628.90
04.06.03
218.82
6.66
1,457.34
05
05.01
05.01.01
05.01.01.01
05.01.01.02
05.01.02
77,502.78
CUNETAS
23,077.77
TRABAJOS PRELIMINARES
2,382.39
m2
927.00
1.10
1,019.70
m2
927.00
1.47
1,362.69
MOVIMIENTO DE TIERRAS
4,401.76
05.01.02.01
m3
74.16
43.28
05.01.02.02
m3
92.70
12.86
05.01.03
05.01.03.01
05.01.04
05.01.04.01
05.02
05.02.01
05.02.01.01
05.02.01.02
05.02.02
645.55
1,192.12
14,732.14
m3
46.97
313.65
412.00
3.79
SELLADO DE JUNTAS
SELLADO DE JUNTAS
3,209.64
14,732.14
1,561.48
SUMIDEROS
1,561.48
15,316.66
TRABAJOS PRELIMINARES
43.43
m2
16.90
1.10
m2
16.90
1.47
MOVIMIENTO DE TIERRAS
18.59
24.84
1,655.38
05.02.02.01
m3
27.89
43.28
05.02.02.02
m3
34.86
12.86
448.30
05.02.03
05.02.03.01
m3
12.97
318.63
13,617.85
4,132.63
05.02.03.02
m2
139.15
32.80
4,564.12
05.02.03.03
kg
873.60
4.24
3,704.06
05.02.03.04
und
11.00
110.64
05.03
05.03.01
05.03.01.01
05.03.02
1,207.08
1,217.04
28,196.78
372.77
m3
12.06
30.91
CONCRETO ARMADO
372.77
27,824.01
05.03.02.01
m3
23.44
343.59
8,053.75
05.03.02.02
m2
158.96
40.49
6,436.29
05.03.02.03
kg
866.39
4.24
3,673.49
05.03.02.04
05.04
05.04.01
05.04.01.01
05.04.02
48.00
201.26
10,911.57
TRABAJOS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO PRELIMINAR DE ZANJAS
9,660.48
72.89
m2
50.27
1.45
MOVIMIENTO DE TIERRAS
72.89
5,046.33
05.04.02.01
m3
60.33
23.36
1,409.31
05.04.02.02
62.84
2.80
175.95
05.04.02.03
62.84
15.20
955.17
m3
55.43
41.03
2,274.29
m3
18.01
12.86
231.61
05.04.02.04
05.04.02.05
05.04.03
4,727.21
05.04.03.01
05.04.03.02
und
05.04.04
05.04.04.01
05.04.05
05.04.05.01
06
06.01
62.84
70.57
4,434.62
9.00
32.51
292.59
62.84
2.85
PRUEBAS HIDRAULICAS
PRUEBA HIDRAULICA DE TUBERIAS PVC-UF
179.09
m
CAJAS DE REGISTRO
BUZON CIEGO H : 1.10 m
179.09
886.05
und
1.00
886.05
JARDINERIA
886.05
19,728.68
TRABAJOS PRELIMINARES
1,870.33
06.01.01
m2
367.45
1.10
404.20
06.01.02
m2
367.45
1.69
620.99
06.01.03
m2
367.45
2.30
845.14
m2
367.45
5.36
1,969.53
m2
367.45
5.08
1,866.65
10.77
3,957.44
06.02
06.02.01
06.02.02
06.03
MOVIMIENTO DE TIERRAS
3,836.18
TRABAJOS DE JARDINERIA
9,985.74
06.03.01
m2
367.45
06.03.02
m2
367.45
7.89
2,899.18
06.03.03
und
48.00
65.19
3,129.12
06.04
VARIOS
4,036.43
06.04.01
m2
3,130.95
1.08
06.04.02
glb
1.00
655.00
07
07.01
07.01.01
07.02
07.02.01
IMPACTO AMBIENTAL
07.03
07.03.01
SEALIZACION AMBIENTAL
SEALIZACION CON MENSAJES DE EDUCACION AMBIENTAL
07.04
MANEJO DE RESIDUOS
07.04.01
07.05
07.05.01
07.06
33,878.40
m3
5,791.18
5.85
und
1.00
1,000.00
1,000.00
und
5.00
50.00
250.00
250.00
33,878.40
1,000.00
720.00
und
12.00
60.00
655.00
43,667.38
3,381.43
720.00
3,000.00
glb
1.00
3,000.00
338.98
3,000.00
2,280.00
07.06.01
BOTIQUIN DE SEGURIDAD
und
1.00
07.06.02
EXTINTOR DE SEGURIDAD
und
4.00
120.00
480.00
07.06.03
glb
1.00
1,800.00
1,800.00
07.07
2,200.00
07.07.01
und
2.00
600.00
07.07.02
EXPOSICIONES ABIERTAS
glb
1.00
1,000.00
COSTO DIRECTO
338.98
1,200.00
1,000.00
3,514,129.61
456,836.85
UTILIDADES (10%)
351,412.96
....................................................
SUBTOTAL
4,322,379.42
IGV (18%)
778,028.30
..................................................
PRESUPUESTO TOTAL
5,100,407.72
Fecha :
24/07/2016 03:29:01 PM
01
01.01
01.01.01
01.01.01.01
01.01.02
01.01.02.01
01.01.03
01.01.03.01
01.01.03.01.01
01.01.03.01.02
01.01.03.02
01.01.03.03
01.01.03.03.01
01.01.03.03.02
01.02
01.02.01
01.02.02
01.02.03
01.02.03.01
01.02.04
01.02.05
01.02.06
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06
01.03.07
01.04
01.04.01
01.04.02
01.04.03
01.04.04
01.05
01.05.01
01.05.02
01.06
01.06.01
01.06.02
01.07
01.07.01
01.07.01.01
01.07.01.02
01.07.01.03
01.07.01.04
01.07.01.05
01.08
01.08.01
01.08.02
01.08.03
01.08.04
01.08.05
01.09
01.09.01
02
02.01.
02.01.01
02.01.02
02.01.03
02.01.04
02.02.
02.02.01
02.02.01.01
02.02.01.02
02.02.02.
02.02.02.01.
02.02.02.01.01
02.02.02.01.01.01
02.02.02.01.01.02
02.02.02.01.01.03
02.02.02.01.02
02.02.02.01.02.01
02.02.02.01.02.02
02.02.02.01.02.03
02.02.02.01.02.04
02.02.02.02
02.02.02.02.01
02.02.02.02.01.01
02.02.02.02.01.02
02.02.02.02.01.03
02.02.02.02.01.04
02.02.02.02.01.05
02.02.02.02.02
02.02.02.02.02.01
02.02.02.02.02.02
02.02.02.02.02.03
02.02.02.02.02.04
02.02.02.02.02.05
02.02.02.03
02.02.02.03.01
02.02.02.03.02
02.02.02.03.03
02.02.02.04
02.02.02.04.01
02.02.02.04.01.01
02.02.02.04.01.02
02.02.02.04.02
02.02.02.04.02.01
02.02.02.04.02.02
02.02.02.04.03
02.02.02.04.03.01
02.02.02.04.03.02
02.02.03.
02.02.03.01
02.02.03.01.01
02.02.03.01.02
02.02.03.01.03
02.02.03.04
02.02.03.04.01
02.02.03.04.01.01
02.02.03.04.01.02
02.02.03.04.01.03
02.02.03.04.01.04
02.02.03.04.02
02.02.03.04.02.01
02.02.03.04.02.02
02.02.03.04.02.03
02.02.03.04.02.04
02.02.03.04.02.05
02.02.03.04.03
02.02.03.04.03.01
02.02.03.04.04
02.02.03.04.04.01
02.02.03.04.05
02.02.03.04.05.01
02.02.03.05
02.02.03.05.01
02.02.03.05.01.01
02.02.03.05.01.02
02.02.03.05.02
02.02.03.05.02.01
02.02.03.05.02.02
02.02.03.05.02.03
02.02.03.05.03
02.02.03.05.03.01
02.02.03.05.03.02
02.02.03.05.03.03
02.02.03.05.04
02.02.03.05.04.01
02.02.03.05.04.02
02.02.03.05.04.03
02.02.03.05.05
02.02.03.05.05.01
02.02.03.05.05.02
02.02.03.05.06
02.02.03.05.06.01
02.02.03.05.06.02
02.02.03.05.06.03
02.02.03.05.07
02.02.03.05.07.01
02.02.03.05.08
02.02.03.05.08.01
02.02.03.05.09
02.02.03.05.09.01
02.03.
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.02.03
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.03.07
03.02.06
03.03
03.03.01
03.03.01.01
03.03.01.02
03.03.01.03
03.03.02
03.03.02.01
03.03.02.02
03.03.02.03
03.03.03
03.03.03.01
03.03.03.02
03.03.04
03.03.04.01
03.03.04.02
03.03.05
03.03.05.01
03.04
03.04.01
03.04.02
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.03
04.03.01
04.03.02
04.04
04.04.01
04.04.01.01
04.04.01.02
04.04.01.03
04.04.02
04.04.02.01
04.04.02.02
04.04.02.03
04.05
04.05.01
04.06
04.06.01
04.06.02
04.06.03
05
05.01
05.01.01
05.01.01.01
05.01.01.02
05.01.02
05.01.02.01
05.01.02.02
05.01.03
05.01.03.01
05.01.04
05.01.04.01
05.02
05.02.01
05.02.01.01
05.02.01.02
05.02.02
05.02.02.01
05.02.02.02
05.02.03
05.02.03.01
05.02.03.02
05.02.03.03
05.02.03.04
05.03
05.03.01
05.03.01.01
05.03.02
05.03.02.01
05.03.02.02
05.03.02.03
05.03.02.04
05.04
05.04.01
05.04.01.01
05.04.02
05.04.02.01
05.04.02.02
05.04.02.03
05.04.02.04
05.04.02.05
05.04.03
05.04.03.01
05.04.03.02
05.04.04
05.04.04.01
05.04.05
05.04.05.01
06
06.01
06.01.01
06.01.02
06.01.03
06.02
06.02.01
06.02.02
06.03
06.03.01
06.03.02
06.03.03
06.04
06.04.01
06.04.02
07
07.01
07.01.01
07.02
07.02.01
07.03
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.06.02
07.06.03
07.07
07.07.01
07.07.02
PAVIMENTO DE CONCRETO
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION
CARTEL DE IDENTIFICACION DE OBRA DE 4.80 X 3.60M
CONTRUCCIONES PROVISIONALES
ALQUILER DE CAMPAMENTO PROVISIONAL (OFICINA Y ALMACEN)
GASTO DE OPERACIONES
AGUA PARA LA CONSTRUCCION
OBTENCION DEL SERVICIO
ALMACENAMIENTO Y DISTRIBUCION
DESAGUE PARA LA CONSTRUCCION
ENERGIA ELECTRICA PROVISIONAL
CONEXIN E INSTALACION
CONSUMO Y MANTENIMIENTO
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
MANTENIMIENTO DE TRANSITO
SEALIZACION DE OBRA DURANTE LA EJECUCION
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION
NIVELACION DE BUZONES EN GENERAL
MOVIMIENTO DE TIERRAS
EXCAVACION DE TERRENO NATURAL A NIVEL DE SUB RASANTE CON MAQUINARIA
CORTE EN TERRENO ROCOSO
ESCARIFICADO Y COMPACTADO DE SUB RASANTE
RELLENO Y PREPARACION PARA SUB BASE E=0.20M
PRUEBA COMPACTACION DE SUELOS (PROCTOR MODIFICADO)
PRUEBA DE DENSIDAD DE CAMPO
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA d = 6km
OBRAS DE CONCRETO
PAVIMENTO DE CONCRETO DE 8" FC=210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE PAVIMENTOS
ACERO EN JUNTAS
ACABADO INTEGRAL DE PAVIMENTO
CURADO Y LIMPIEZA DE LOSA
CURADO CON ADITIVO QUIMICO
LIMPIEZA DE LOSA
SELLADO DE JUNTAS
JUNTAS TRANSVERSALES
JUNTAS LONGITUDINALES
SEGURIDAD Y SALUD EN OBRA
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
EQUIPOS DE PROTECCION INDIVIDUAL
EQUIPOS DE PROTECCION COLECTIVA
SEALIZACION TEMPORAL DE SEGURIDAD
CAPACITACION EN SEGURIDAD Y SALUD
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO
SEALIZACION
SEALIZACION REGULADORA
SEALIZACION INFORMATIVA
SEALIZACION PREVENTIVA
SEALIZACION INFORMATIVA DE CALLES
PINTURA DE TRAFICO PARA SEALIZACION
VARIOS
MOVIMIENTO DE TIERRAS
DEMOLICION DE VEREDAS E=4"
EXCAVACION MANUAL EN TERRENO COMPACTO
RELLENO CON MATERIAL PROPIO SELECCIONADO
COMPACTACION DE SUELO PARA VEREDAS E=4"
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA d>1km
PRUEBA DE DENSIDAD DE CAMPO
MEJORAMIENTO DE CAJAS DE REGISTRO DE AGUA Y DESAGUE A NIVEL
OBRAS DE CONCRETO
VEREDAS DE CONCRETO
CONCRETO fc = 175 kg/cm2 C/MEZCL.
ENCOFRADO Y DESENCOFRADO DE VEREDAS
ACABADO DE VEREDAS BRUADO
RAMPAS DE CONCRETO
RAMPA DE CONCRETO F'C 175 KG/CM2
ENCOFRADO Y DESENCOFRADO DE RAMPAS
ACABADO DE RAMPAS
GRADAS DE CONCRETO
GRADAS DE CONCRETO f'c=175 kg/cm2
ENCOFRADO Y DESENCOFRADO CARAVISTA
CURADO Y LIMPIEZA DE VEREDAS
CURADO CON ADITIVO QUIMICO
LIMPIEZA DE VEREDAS
SELLADO DE JUNTAS
JUNTAS DE DILATACION
VARIOS
BARANDA METALICA FN D=2" x 2.5 MM h=0.60 m SEGUN DISEO
REUBICACION DE POSTES DE CONCRETO DE ALUMBRADO
SARDINELES Y MUROS DE CONTENCION
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO COMPACTO A MANO
CORTE EN TERRENO ROCOSO
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA d>1km
RELLENO COMPACTADO CON MATERIAL DE DRENAJE
OBRAS DE CONCRETO SIMPLE
CONCRETO f'c=175 kg/cm2 EN SARDINEL SUMERGIDO
SOLADO e=3" MEZCLA C: H 1 :12
OBRAS DE CONCRETO ARMADO
MURO SARDINEL ARMADO
CONCRETO f'c=210 kg/cm2 EN MURO SARDINEL
ENCOFRADO Y DESENCOFRADO DE MURO SARDINEL
ACERO fy=4200 Kg/cm2 GRADO 60 MURO SARDINEL.
MUROS DE CONTENCION
CONCRETO EN MUROS DE CONTENCION F'C 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE MUROS DE CONTENCION
ACERO fy=4200 Kg/cm2 GRADO 60 MUROS DE CONTENCION
REVOQUES
SOLAQUEO DE MUROS DE CONCRETO
VARIOS
JUNTA DE MURO CON TECKNOPOR e=1"
SELLADO DE JUNTAS
DRENES DE PVC =1.5" PARA MUROS
CUNETAS, SISTEMA DE DRENAJE PLUVIAL
CUNETAS
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO COMPACTO
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA d = 6km
OBRAS DE CONCRETO SIMPLE
CUNETAS DE CONCRETO f'c=175 kg/cm2
SELLADO DE JUNTAS
SELLADO DE JUNTAS
SUMIDEROS
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO COMPACTO
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA d = 6km
OBRAS DE CONCRETO ARMADO
SUMIDERO DE CONCRETO f'c=175 kg/cm2
ENCOFRADO Y DESENCOFRADO DE SUMIDEROS
ACERO fy=4200 Kg/cm2 GRADO 60
REJILLA DE FIERRO 1/2" (0.30 DE ANCHO)
ALCANTARILLA DE DRENAJE PLUVIAL
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA
CONCRETO ARMADO
CONCRETO f'c=210 kg/cm2 EN ALCANTARILLA
ENCOFRADO Y DESENCOFRADO CARAVISTA
ACERO DE REFUERZO fy=4,200 kg/cm2
REJILLA METALICA PARA ALCANTARILLA T 2
RED DE DESAGUE PLUVIAL
TRABAJOS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO PRELIMINAR DE ZANJAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA CON EQUIPO (TERRENO DURO)
REFINE Y NIVEL DE ZANJA P/TUBERIAS
PREPARACION DE CAMAS DE APOYO P/TUB. CON MATERIAL DE PRESTAMO
RELLENO Y COMPACTACION DE ZANJA (PRESTAMO Y PROPIO SELECCIONADO)
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA d = 6 km
SUMINISTRO E INSTALACION DE TUBERIA
TENDIDO DE TUBERIA UPVC U/F S-25 D=315 mm
CONEXION DE TUBERIA 315MM A DRENAJE DE CONCRETO
PRUEBAS HIDRAULICAS
PRUEBA HIDRAULICA DE TUBERIAS PVC-UF
CAJAS DE REGISTRO
BUZON CIEGO H : 1.10 m
JARDINERIA
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION
MOVIMIENTO DE TIERRAS
REFINE Y NIVELACION MANUAL CON MATERIAL PROPIO P/JARDINERIA
CONFORMACION CON TIERRA DE CHACRA e=0.10m
TRABAJOS DE JARDINERIA
MEJORAMIENTO DE SUELO PARA JARDINERIA
SEMBRADO DE GRASS AMERICANO
1579052
190355.37
und
1 1501.49
mes
750
5250
m2 10176.5
est
1
1.1
42400
11194.17
42400
m2 10176.5
m2 10176.5
und
28
1.47
2.3
261.6
14959.48
23406
7324.8
360748.3
29766.36
74823
34498.4
138705.97
5120
3360
74474.57
879711.72
709363.11
59349.1
49431.56
61567.95
33175.45
21981.28
11194.17
43069.83
15989
27080.83
m3
m3
m2
m2
und
und
m3
4006.24
416.47
10176.5
10176.5
16
16
5791.18
7.43
179.66
3.39
13.63
320
210
12.86
m3
2035.3
m2 1505.94
kg 10428.6
m2 10176.5
348.53
39.41
4.74
6.05
m2 10176.5
m2 10176.5
2.16
1.1
m
m
2795.28
4734.41
5.72
5.72
und
23
und
16
und
19
und
18
m2 1998.39
289.95
200.75
262.9
720.98
14.05
1501.49
55930.97
6668.85
3212
4995.1
12977.64
28077.38
15106.9
glb
m2
m2
1 15106.9
937.44
937.44
1.47
2.3
m3
m3
m2
446.75
19.03
72.74
9.31
36.06
2.76
m3
m2
m2
m2
19.03
99.79
99.79
99.79
316.65
42.27
1.1
6.4
m3
m2
m2
m3
m3
338.9
338.9
338.9
87.86
87.86
36.06
5.36
13.62
18.04
12.86
m2
m2
m2
m2
m
und
55.63
32.29
370.84
370.84
319.65
5
54.95
39.53
10.27
1.92
5.3
2234.9
15106.9
343624.83
3534.15
1378.04
2156.11
6445.96
16038.62
5046.22
4159.24
686.22
200.76
10992.4
6025.85
4218.12
109.77
638.66
31915.9
21367.92
12220.73
1816.5
4615.82
1584.99
1129.88
10547.98
3056.87
1276.42
3808.53
712.01
1694.15
11174.5
01.05
01.05.02
01.05.03
01.05.04
01.05.05
06.01
m3
m2
68.29
341.45
36.06
10.77
2462.54
3677.42
06.01.02
06.01.03
06.02.01
06.02.02
341.45
44
8.97
65.19
12071.13
3062.81
2868.36
06.03
9.69
36.76
356.2
06.03.02
06.04
m3
06.03.01
06.03.03
17036.54
TRABAJOS PRELIMINARES
06.01.01
06.02
m2
und
VARIOS
01.05.01
06.04.01
06.04.02
m3
m2
m3
3.87
16.82
11.62
59.16
2.98
13.79
228.95
50.12
160.24
m3
m2
kg
m3
m2
11.61
127.96
395.37
19.53
127.96
351.56
40.49
4.24
218.2
1.1
4081.61
5181.1
1676.37
4261.45
140.76
25.2
6.66
167.83
19.92
6.3
125.5
m2
85.41
7.1
m3
m3
17.12
20.54
36.76
13.79
m3
m2
kg
13.66
50.6
456.49
341.63
36.71
4.24
606.41
55367.7
912.58
629.33
283.25
8459.72
4666.67
1857.53
1935.52
m2
27.83
21.36
m2
107.04
298.13
m2
27.83
8.52
10225.74
8403.6
1822.14
16988.47
10200.99
3785.63
3001.85
594.45
594.45
31911.84
31911.84
237.11
237.11
m
m
26.9
79.95
132.85
145.62
15215.99
3573.67
11642.32
m2
m2
m2
207.8
207.8
207.8
28.11
2
0.91
und
glb
m2
m2
m2
1 8403.6
1 1822.14
231.42
224.4
220.4
m2 6218.16
m2 6218.16
m2 6218.16
44.08
16.87
13.62
5841.26
415.6
189.1
867216.57
30632.45
1.1
6839.98
1.47
9140.7
2.3 14301.77
01.09.07
01.09.07.
VARIOS
TRANSPORTE DE MATERIALES NO COMERCIALES A OBRA (LIMA PASCO)
02.01.03
DISEO DE MEZCLAS
02.01.04
ROTURA DE PROBETAS
02.01.06
02.01.07
BAOS QUIMICOS
03.01.04
DISEO DE MEZCLAS
1088.18
1712.16
649.18
6491.82
2225.81
16
338
297540.64
27.84 30294.93
43.28 74102.28
57.29 37191.52
16.75 108737.99
12.86 28623.92
210
3360
55
18590
421407.78
m2 6218.16
m2
273.66
m2 6218.16
54.95 341687.89
39.53 10817.78
8.1
50367.1
m2
m3
m3
m2
m3
und
und
m3
m2
m2
31.8
59.65
273.66
283.04
35.06
14.92
m3
m2
20.72
49.33
316.65
40.49
m2 6218.16
m2 6218.16
2.16
1.1
1824.37
5.3
442.13
12
132.85
1700
m2 2619.15
m2 2619.15
1.1
1.47
m
und
m3
m3
m3
m3
141.43
565.73
940.52
166.35
36.06
179.66
12.86
87.3
m3
m2
140.86
726.25
316.65
18.94
m3
247.18
m2 1667.69
kg 7407.58
337.18
42.27
4.24
m3
237.94
m2 1028.09
kg
13190
351.56
42.94
4.24
m2 1279.54
10.31
m2
m
m
67.81
182.82
218.82
9.52
3.44
6.66
9000.67
2091.33
4083.01
8558.36
6560.99
1997.37
20271.21
13431.23
6839.98
9669.16
9669.16
79136.97
58736.97
20400
583337.35
6731.22
2881.07
3850.15
133356.47
5099.97
101639.05
12095.09
14522.36
58358.5
44603.32
13755.18
368967.31
185245.55
83344.15
70493.26
31408.14
183721.76
83650.19
44146.18
55925.39
13192.06
13192.06
2731.79
645.55
628.9
1457.34
77502.78
23077.77
m2
m2
927
927
1.1
1.47
m3
m3
74.16
92.7
43.28
12.86
m3
46.97
313.65
412
3.79
m2
m2
16.9
16.9
1.1
1.47
m3
m3
27.89
34.86
43.28
12.86
m3
m2
kg
und
12.97
139.15
873.6
11
318.63
32.8
4.24
110.64
m3
12.06
30.91
m3
m2
kg
m
23.44
158.96
866.39
48
343.59
40.49
4.24
201.26
m2
50.27
1.45
m3
m
m
m3
m3
60.33
62.84
62.84
55.43
18.01
23.36
2.8
15.2
41.03
12.86
m
und
62.84
9
70.57
32.51
62.84
2.85
und
886.05
m2
m2
m2
367.45
367.45
367.45
1.1
1.69
2.3
m2
m2
367.45
367.45
5.36
5.08
m2
m2
367.45
367.45
10.77
7.89
2382.39
1019.7
1362.69
4401.76
3209.64
1192.12
14732.14
14732.14
1561.48
1561.48
15316.66
43.43
18.59
24.84
1655.38
1207.08
448.3
13617.85
4132.63
4564.12
3704.06
1217.04
28196.78
372.77
372.77
27824.01
8053.75
6436.29
3673.49
9660.48
10911.57
72.89
72.89
5046.33
1409.31
175.95
955.17
2274.29
231.61
4727.21
4434.62
292.59
179.09
179.09
886.05
886.05
19728.68
1870.33
404.2
620.99
845.14
3836.18
1969.53
1866.65
9985.74
3957.44
2899.18
und
48
65.19
m2 3130.95
glb
1
1.08
655
m3 5791.18
5.85
und
1000
und
50
und
12
60
glb
3000
und
und
glb
1
4
1
338.98
120
1800
und
glb
2
1
600
1000
3129.12
4036.43
3381.43
655
43667.38
33878.4
33878.4
1000
1000
250
250
720
720
3000
3000
2280
338.98
480
1800
2200
1200
1000
TITULOS
PARTIDAS
101,904.90
und
4.00
15,691.20
62,764.80
pza
1.00
2,770.21
2,770.21
und
3.00
2,935.36
8,806.08
m2
1.00
20,679.35
20,679.35
und
9.00
764.94
6,884.46
m2
367.45
1.10
404.20
m2
367.45
1.69
620.99
m2
367.45
2.30
1,870.33
845.14
3,836.18
m2
367.45
5.36
1,969.53
m2
367.45
5.08
1,866.65
m2
367.45
10.77
3,957.44
m2
367.45
7.89
2,899.18
und
48.00
65.19
3,129.12
m2
3,130.95
1.08
3,381.43
glb
1.00
655.00
655.00
9,985.74
4,036.43
3,026.26
glb
1.00
3,026.26
3,026.26
und
1.00
350.00
350.00
und
250.00
25.00
6,250.00
glb
1.00
126,203.88
126,203.88
mes
7.00
1,200.00
8,400.00
und
1.00
350.00
350.00
ITEM
01
01.01
01.01.01
01.01.01.01
01.01.02
01.01.02.01
01.01.03
01.01.03.01
01.01.03.01.01
01.01.03.01.02
01.01.03.01.03
01.01.03.03
01.01.03.03.01
01.01.03.03.02
01.02
01.02.01
01.02.02
01.02.03
01.02.03.01
01.02.04
01.02.05
01.02.06
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06
01.03.07
01.04
01.04.01
01.04.02
01.04.02.01
01.04.02.02
01.04.03
01.04.03.01
01.04.03.02
01.04.04
01.05
01.05.01
01.05.02
01.06
01.06.01
01.06.02
01.07
01.07.01
01.07.01.01
01.07.01.02
01.07.01.03
01.07.01.04
01.07.01.05
01.08
01.08.01
01.08.02
01.08.03
01.08.04
01.08.05
01.09
01.09.01
02
02.01.
02.01.01
02.01.02
02.01.03
02.01.04
02.02.
02.02.01
02.02.01.01
02.02.01.02
02.02.02.
02.02.02.01.
02.02.02.01.01
02.02.02.01.01.01
02.02.02.01.01.02
02.02.02.01.01.03
02.02.02.01.02
02.02.02.01.02.01
02.02.02.01.02.02
02.02.02.01.02.02.01
02.02.02.01.02.02.02
02.02.02.01.02.03
02.02.02.01.02.04
02.02.02.02
02.02.02.02.01
02.02.02.02.01.01
02.02.02.02.01.02
02.02.02.02.01.03
02.02.02.02.01.04
02.02.02.02.01.05
02.02.02.02.02
02.02.02.02.02.01
02.02.02.02.02.02
02.02.02.02.02.02.01
02.02.02.02.02.02.02
02.02.02.02.02.03
02.02.02.02.02.04
02.02.02.02.02.05
02.02.02.03
02.02.02.03.01
02.02.02.03.02
02.02.02.03.03
02.02.02.04
02.02.02.04.01
02.02.02.04.01.01
02.02.02.04.01.02
02.02.02.04.02
02.02.02.04.02.01
02.02.02.04.02.02
02.02.02.04.02.02.01
02.02.02.04.02.02.02
02.02.02.04.02.03
02.02.02.04.02.03.01
02.02.02.04.02.03.02
02.02.02.04.03
02.02.02.04.03.01
02.02.02.04.03.02
02.02.03.
02.02.03.01
02.02.03.01.01
02.02.03.01.02
02.02.03.01.02.01
02.02.03.01.02.02
02.02.03.01.03
02.02.03.01.03.01
02.02.03.01.03.02
02.02.03.02
02.02.03.02.01
02.02.03.02.01.01
02.02.03.02.01.02
02.02.03.02.01.03
02.02.03.02.01.04
02.02.03.02.02
02.02.03.02.02.01
02.02.03.02.02.02
02.02.03.02.02.02.01
02.02.03.02.02.02.02
02.02.03.02.02.03
02.02.03.02.02.03.01
02.02.03.02.02.03.02
02.02.03.02.02.04
02.02.03.02.02.05
02.02.03.02.03
02.02.03.02.03.01
02.02.03.02.04
02.02.03.02.04.01
02.02.03.02.05
02.02.03.02.05.01
02.02.03.03
02.02.03.03.01
02.02.03.03.01.01
02.02.03.03.01.02
02.02.03.03.02
02.02.03.03.02.01
02.02.03.03.02.02
02.02.03.03.02.02.01
02.02.03.03.02.02.02
02.02.03.03.02.03
02.02.03.03.02.03.01
02.02.03.03.02.03.02
02.02.03.03.03
02.02.03.03.03.01
02.02.03.03.03.02
02.02.03.03.03.02.01
02.02.03.03.03.02.02
02.02.03.03.03.03
02.02.03.03.03.03.01
02.02.03.03.03.03.02
02.02.03.03.04
02.02.03.03.04.01
02.02.03.03.04.02
02.02.03.03.04.02.01
02.02.03.03.04.02.02
02.02.03.03.04.03
02.02.03.03.04.03.01
02.02.03.03.04.03.02
02.02.03.03.05
02.02.03.03.05.01
02.02.03.03.05.02
02.02.03.03.06
02.02.03.03.06.01
02.02.03.03.06.02
02.02.03.03.06.03
02.02.03.03.07
02.02.03.03.07.01
02.02.03.03.08
02.02.03.03.08.01
02.02.03.03.09
02.02.03.03.09.01
02.03.
02.03.01
02.03.01.01
02.03.01.02
02.03.02
02.03.02.01
02.03.02.02
02.03.02.03
03
03.01
03.01.01
03.01.02
03.01.03
03.02
03.02.01
03.02.02
03.02.03
03.02.04
03.02.05
03.03.07
03.02.06
03.03
03.03.01
03.03.01.01
03.03.01.02
03.03.01.02.01
03.03.01.02.02
03.03.01.03
03.03.02
03.03.02.01
03.03.02.02
03.03.02.02.01
03.03.02.02.02
03.03.02.03
03.03.03
03.03.03.01
03.03.03.02
03.03.03.02.01
03.03.03.02.02
03.03.04
03.03.04.01
03.03.04.02
03.03.05
03.03.05.01
03.04
03.04.01
03.04.02
04
04.01
04.01.01
04.01.02
04.02
04.02.01
04.02.02
04.02.03
04.02.04
04.03
04.03.01
04.03.02
04.04
04.04.01
04.04.01.01
04.04.01.02
04.04.01.02.01
04.04.01.02.02
04.04.01.03
04.04.01.03.01
04.04.01.03.02
04.04.02
04.04.02.01
04.04.02.02
04.04.02.02.01
04.04.02.02.02
04.04.02.03
04.04.02.03.01
04.04.02.03.01
04.05
04.05.01
04.06
04.06.01
04.06.02
04.06.03
05
05.01
05.01.01
05.01.01.01
05.01.01.02
05.01.02
05.01.02.01
05.01.02.02
05.01.03
05.01.03.01
05.01.04
05.01.04.01
05.02
05.02.01
05.02.01.01
05.02.01.02
05.02.02
05.02.02.01
05.02.02.02
05.02.03
05.02.03.01
05.02.03.02
05.02.03.02.01
05.02.03.02.02
05.02.03.03
05.02.03.03.01
05.02.03.03.02
05.02.03.04
05.03
05.03.01
05.03.01.01
05.03.02
05.03.02.01
05.03.02.02
05.03.02.02.01
05.03.02.02.02
05.03.02.03
05.03.02.03.01
05.03.02.03.02
05.03.02.04
05.04
05.04.01
05.04.01.01
05.04.02
05.04.02.01
05.04.02.02
05.04.02.03
05.04.02.04
05.04.02.05
05.04.03
05.04.03.01
05.04.03.02
05.04.04
05.04.04.01
05.04.05
05.04.05.01
06
06.01
06.01.01
06.01.02
06.01.03
06.02
06.02.01
06.02.02
06.03
06.03.01
06.03.02
06.03.03
06.04
06.04.01
06.04.02
07
07.01
07.01.01
07.02
07.02.01
07.03
07.03.01
07.04
07.04.01
07.05
07.05.01
07.06
07.06.01
07.06.02
07.06.03
07.07
07.07.01
07.07.02
PARTIDAS
PAVIMENTO DE CONCRETO
OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION
CARTEL DE IDENTIFICACION DE OBRA DE 4.80 X 3.60M
CONTRUCCIONES PROVISIONALES
ALQUILER DE CAMPAMENTO PROVISIONAL (OFICINA Y ALMACEN)
GASTO DE OPERACIONES
AGUA PARA LA CONSTRUCCION
OBTENCION DEL SERVICIO
ALMACENAMIENTO Y DISTRIBUCION
DESAGUE PARA LA CONSTRUCCION
ENERGIA ELECTRICA PROVISIONAL
CONEXIN E INSTALACION
CONSUMO Y MANTENIMIENTO
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS
MANTENIMIENTO DE TRANSITO
SEALIZACION DE OBRA DURANTE LA EJECUCION
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION
NIVELACION DE BUZONES EN GENERAL
MOVIMIENTO DE TIERRAS
EXCAVACION DE TERRENO NATURAL A NIVEL DE SUB RASANTE CON MAQUINARIA
CORTE EN TERRENO ROCOSO
ESCARIFICADO Y COMPACTADO DE SUB RASANTE
RELLENO Y PREPARACION PARA SUB BASE E=0.20M
PRUEBA COMPACTACION DE SUELOS (PROCTOR MODIFICADO)
PRUEBA DE DENSIDAD DE CAMPO
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA d = 6km
OBRAS DE CONCRETO
CONCRETO F'C=210 KG/CM2 EN PAVIMENTO
ENCOFRADO Y DESENCOFRADO DE PAVIMENTOS
ENCOFRADO
DESENCOFRADO
ACERO EN JUNTAS
HABILITACION DE ACERO
COLOCAION DE ACERO
ACABADO INTEGRAL DE PAVIMENTO
CURADO Y LIMPIEZA DE LOSA
CURADO CON ADITIVO QUIMICO
LIMPIEZA DE LOSA
SELLADO DE JUNTAS
JUNTAS TRANSVERSALES
UND
und
mes
glb
glb
glb
glb
glb
m2
est
glb
m2
m2
und
m3
m3
m2
m2
und
und
m3
m3
m2
m2
m2
kg
kg
kg
m2
m2
m2
m
JUNTAS LONGITUDINALES
SEGURIDAD Y SALUD EN OBRA
ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO
EQUIPOS DE PROTECCION INDIVIDUAL
EQUIPOS DE PROTECCION COLECTIVA
SEALIZACION TEMPORAL DE SEGURIDAD
CAPACITACION EN SEGURIDAD Y SALUD
RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO
SEALIZACION
SEALIZACION REGULADORA
SEALIZACION INFORMATIVA
SEALIZACION PREVENTIVA
SEALIZACION INFORMATIVA DE CALLES
PINTURA DE TRAFICO PARA SEALIZACION
VARIOS
MANTENIMIENTO DE REDES DE AGUA Y DESAGUE
OVALO
TRABAJOS PRELIMINARES
LIMPIENZA DEL TERRENO
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION
TRANSPORTE DE MATERIALES NO COMERCIALES A OBRA LIMA - PASCO
ESTRUCTURAS
MOVIMIENTO DE TIERRAS
NIVELACION DE TERRENO
EXACAVACIONES SIMPLES
OBRAS DE CONCRETO SIMPLE
SARDINELES
MOVIMIENTO DE TIERRAS
CONFORMACION DE TERRAPLEN SIN MATERIAL
CORTE EN TERRENO COMPACTO A MANO
COMPACTACION DE SUELO PARA SARDINELES
CONCRETO SIMPLE EN SARDINEL
SARDINEL DE CONCRETO f'c=175 kg/cm2
ENCOFRADO Y DESENCOFRADO DE SARDINELES CARAVISTA
ENCOFRADO
DESENCOFRADO
CURADO DE SARDINELES
ACABADO SOLAQUEADO DE SARDINELES
VEREDAS DE CONCRETO
MOVIMIENTO DE TIERRAS
CORTE A NIVEL DE SUBRASANTE MANUAL
NIVELACION Y COMPACTADO DE SUB-RASANTE
AFIRMADO PARA VEREDAS
ACARREO DE MATERIAL EXCEDENTE D= 30 M
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA d>1km
CONCRETO SIMPLE EN VEREDAS
CONCRETO fc = 175 kg/cm2 C/MEZCL. VEREDAS
ENCOFRADO Y DESENCOFRADO DE VEREDAS
ENCOFRADO
DESENCOFRADO
ACABADO DE VEREDAS CON OCRE Y BRUADO
TENDIDO DE ARROCERA Y CURADO DE VEREDA
glb
glb
glb
glb
glb
und
und
und
und
m2
glb
m2
m2
m2
glb
m2
m3
m3
m3
m2
m3
m2
m2
m2
m2
m2
m3
m2
m2
m3
m3
m2
m2
m2
m2
m2
m2
JUNTAS DE DILATACION
RESALTO VERTICAL DE CONCRETO
CORTE Y RETIRO DE PAVIMENTO EXISTENTE
EXCAVACION SEGN DISEO
CONCRETO F'C=175 KG/CM2 PARA RESALTO
JARDINERIA
MOVIMIENTO DE TIERRAS
CORTE EN TERRENO COMPACTO A MANO
MEJORAMIENTO DE SUELO PARA JARDINERIA
CONCRETO PARA JARDINERIA CIRCULAR
CONCRETO F'C=175 KG/CM2 PARA JARDINERIA
ENCOFRADO Y DESENCOFRADO
ENCOFRADO
DESENCOFRADO
ACERO GRADO=60 Fy=4200 KG/CM2
HABILITACION DE ACERO
COLOCAION DE ACERO
TRATAMIENTO PAISAJISTICO (JARDINERIA)
SEMBRADO DE GRASS AMERICANO
PLANTACION DE ESPECIES ORNAMENTALES
OBRAS DE CONCRETO ARMADO
PARADERO DE CONCRETO ARMADO SEGN DISEO
CONCRETO F'C=210 KG/CM2
ENCOFRADO Y DESENCOFRADO
ENCOFRADO
DESENCOFRADO
ACERO GRADO=60 Fy=4200 KG/CM2
HABILITACION DE ACERO
COLOCAION DE ACERO
MUROS DE CONTENCION
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA EN TERRENO NORMAL
RELLENO COMPACTADO CON MATERIAL PROPIO
COMPACTACION DE SUELO PARA MUROS
ELIMINACION DE MATERIAL EXCEDENTE
CONCRETO ARMADO EN MUROS DE CONTENCION
CONCRETO EN MUROS DE CONTENCION F'C 210 KG/CM2
ENCOFRADO Y DESENCOFRADO CARAVISTA
ENCOFRADO
DESENCOFRADO
ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60
HABILITACION DE ACERO
COLOCAION DE ACERO
CONCRETO CICLOPEO F'C 175 KG/CM2
CURADO DE MUROS DE CONTENCION
DRENAJE DE MUROS
DRENES DE PVC =1.5" PARA MUROS
JUNTAS EN MUROS
JUNTAS ASFALTICAS
PINTADO DE MURO DE CONTENCION
PINTURA ESMALTE ACRILICO EN SUPERFICIE DE MUROS 2 MANOS
INVERNADERO
MOVIMIENTO DE TIERRAS
m
m3
m3
m3
m3
m2
m3
m2
m2
m2
kg
kg
kg
m2
und
m3
m2
m2
m2
kg
kg
kg
m3
m3
m2
m3
m3
m2
m2
m2
kg
kg
kg
m3
m2
m
m
m2
m3
m3
m3
m2
m2
m2
kg
kg
kg
m3
m2
m2
m2
kg
kg
kg
m3
m2
m2
m2
kg
kg
kg
und
glb
m2
m2
m2
m2
m2
m2
m
m
m2
m2
m2
m2
m2
m2
m2
m3
m3
m2
m3
und
und
m2
m2
m2
m2
m2
m3
m2
m2
m2
m2
m3
m2
m2
m2
m2
m2
m
m
und
m2
m2
m3
m3
m3
m3
m3
m2
m3
m2
m2
m2
kg
kg
COLOCAION DE ACERO
MUROS DE CONTENCION
CONCRETO EN MUROS DE CONTENCION F'C 210 KG/CM2
ENCOFRADO Y DESENCOFRADO DE MUROS DE CONTENCION
ENCOFRADO
DESENCOFRADO
ACERO fy=4200 Kg/cm2 GRADO 60 MUROS DE CONTENCION
HABILITACION DE ACERO
COLOCAION DE ACERO
REVOQUES
SOLAQUEO DE MUROS DE CONCRETO
VARIOS
JUNTA DE MURO CON TECKNOPOR e=1"
SELLADO DE JUNTAS
DRENES DE PVC =1.5" PARA MUROS
CUNETAS, SISTEMA DE DRENAJE PLUVIAL
CUNETAS
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO COMPACTO
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA d = 6km
OBRAS DE CONCRETO SIMPLE
CUNETAS DE CONCRETO f'c=175 kg/cm2
SELLADO DE JUNTAS
SELLADO DE JUNTAS
SUMIDEROS
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO COMPACTO
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA d = 6km
OBRAS DE CONCRETO ARMADO
SUMIDERO DE CONCRETO f'c=175 kg/cm2
ENCOFRADO Y DESENCOFRADO DE SUMIDEROS
ENCOFRADO
DESENCOFRADO
ACERO fy=4200 Kg/cm2 GRADO 60
HABILITACION DE ACERO
COLOCAION DE ACERO
REJILLA DE FIERRO 1/2" (0.30 DE ANCHO)
ALCANTARILLA DE DRENAJE PLUVIAL
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA
CONCRETO ARMADO
CONCRETO f'c=210 kg/cm2 EN ALCANTARILLA
ENCOFRADO Y DESENCOFRADO CARAVISTA
ENCOFRADO
DESENCOFRADO
ACERO DE REFUERZO fy=4,200 kg/cm2
HABILITACION DE ACERO
kg
m3
m2
m2
m2
kg
kg
kg
m2
m2
m
m
m2
m2
m3
m3
m3
m
m2
m2
m3
m3
m3
m2
m2
m2
kg
kg
kg
und
m3
m3
m2
m2
m2
kg
kg
COLOCAION DE ACERO
REJILLA METALICA PARA ALCANTARILLA T 2
RED DE DESAGUE PLUVIAL
TRABAJOS PRELIMINARES
TRAZO, NIVELES Y REPLANTEO PRELIMINAR DE ZANJAS
MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJA CON EQUIPO (TERRENO DURO)
REFINE Y NIVEL DE ZANJA P/TUBERIAS
PREPARACION DE CAMAS DE APOYO P/TUB. CON MATERIAL DE PRESTAMO
RELLENO Y COMPACTACION DE ZANJA (PRESTAMO Y PROPIO SELECCIONADO)
ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA d = 6 km
SUMINISTRO E INSTALACION DE TUBERIA
TENDIDO DE TUBERIA UPVC U/F S-25 D=315 mm
CONEXION DE TUBERIA 315MM A DRENAJE DE CONCRETO
PRUEBAS HIDRAULICAS
PRUEBA HIDRAULICA DE TUBERIAS PVC-UF
CAJAS DE REGISTRO
BUZON CIEGO H : 1.10 m
JARDINERIA
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO PRELIMINAR
TRAZO Y CONTROL DE NIVELES DURANTE LA CONSTRUCCION
MOVIMIENTO DE TIERRAS
REFINE Y NIVELACION MANUAL CON MATERIAL PROPIO P/JARDINERIA
CONFORMACION CON TIERRA DE CHACRA e=0.10m
TRABAJOS DE JARDINERIA
MEJORAMIENTO DE SUELO PARA JARDINERIA
SEMBRADO DE GRASS AMERICANO
PLANTACION DE ESPECIES ORNAMENTALES
VARIOS
LIMPIEZA FINAL DE OBRA
PLACA RECORDATORIA INCLUIDO PEDESTAL
IMPACTO AMBIENTAL
DEPOSITOS DE MATERIAL EXCEDENTE
ACONDICIONAMIENTO DEL DEPOSITO DE MATERIAL EXCEDENTE
MONITOREO DE PLAN DE MANEJO AMBIENTAL
SEGUIMIENTO EN LA FASE DE CONSTRUCCION
SEALIZACION AMBIENTAL
SEALIZACION CON MENSAJES DE EDUCACION AMBIENTAL
MANEJO DE RESIDUOS
CONTENEDORES DE RESIDUOS SOLIDOS EN LA FASE DE CONSTRUCCION
MANEJO DE MATERIAL PARTICULADO EN EL AIRE
CONTROL DE POLVO
PLAN DE CONTINGENCIA EN SEGURIDAD
BOTIQUIN DE SEGURIDAD
EXTINTOR DE SEGURIDAD
EQUIPO DE PRIMEROS AUXILIOS
EDUCACION Y PARTICIPACION CIUDADANA
JORNADAS DE CAPACITACION AL PERSONAL DE OBRA
EXPOSICIONES ABIERTAS
kg
m
m2
m3
m
m
m3
m3
m
und
m
und
m2
m2
m2
m2
m2
m2
m2
und
m2
glb
m3
und
und
und
glb
und
und
glb
und
glb
1.00
7.00
2.00
3.00
1.00
MARTILLO NEUMATICO DE
25 KG
COMPRESORA NEUMATICA
DE 76 HP
MIRAS Y JALONES
TEODOLITO + MIRA
Peon
Oficial
RENDIMIEN
TO
UNITARIO
TP
Operario
METRADO
1.00
1.00
1.00
1.00
1.00
10,176.52
1.00
10
10
100.00
10.00
10,176.52
10,176.52
28.00
10
110
60
500.00
350.00
4.00
1.00
1.00
1.00
4,006.24
416.47
10,176.52
10,176.52
16.00
16.00
5,791.18
25
30
20
30
28
30
30
329.00
6.60
1,080.00
1,500.00
1.00
1.00
298.00
1.00
1.00
1.00
2.00
2,035.30
1,505.94
1,505.94
1,505.94
10,428.60
10,428.60
10,428.60
10,176.52
90
89
16.00
18.00
89
1.00
0.50
1.00
2.00
3.00
5.00
2.00
1.00
3.00
6.00
1.00
2.00
4.00
1.00
2.00
2.00
10.00
1.00
250.00
1.00
1.00
90
30.00
1.00
10,176.52
10,176.52
90
5
100.00
500.00
2,795.28
15
100.00
1.00
5.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
4,734.41
15
100.00
1.00
2.00
23.00
16.00
19.00
18.00
1,998.39
12
8
10
18
20
2.00
2.00
2.00
1.00
30.00
1.00
0.05
0.02
0.02
0.25
2.00
1.13
1.00
60
1.00
25.00
25.00
937.44
937.44
937.44
1.00
2
4
3
500.00
350.00
1.00
1.00
1.00
446.75
19.03
72.74
2
7
2
450.00
3.00
200.00
19.03
99.79
99.79
99.79
99.79
99.79
2
10
12.00
10.00
2.00
1.00
7
3
100.00
35.00
1.00
338.90
338.90
338.90
87.86
87.86
12
4
3
15
2
3.00
100.00
120.00
6.00
298.00
55.63
32.29
32.29
32.29
370.84
370.84
4
4
60.00
9.00
2.00
1.00
4
4
140.00
800.00
2.00
1.00
1.00
1.00
1.00
1.00
1.50
1.32
2.00
0.50
2.00
3.00
0.25
937.44
1,545.00
1.00
1.00
1.00
4.00
1.00
4.00
8.00
1.00
0.50
1.00
1.00
1.00
1.00
1.00
4.00
4.00
1.00
2.00
8.00
4.00
1.00
1.00
1.00
1.00
319.65
100.00
1.00
2.00
68.29
341.45
20
7
3.00
40.00
1.00
1.00
1.00
0.95
1.89
1.89
1.89
0.85
0.85
0.85
341.45
44.00
10
5
40.00
10.00
1.00
2.00
1.00
9.69
3.87
16.82
11.62
4
2
2
2
3.00
18.00
200.00
240.00
1.00
1.00
1.00
1.00
8.00
4.00
2.00
11.61
127.96
127.96
127.96
395.37
395.37
395.37
19.53
127.96
4
7
12.00
10.00
2.00
1.00
1.00
1.00
250.00
1.00
1.00
2
7
18.00
100.00
25.20
40.00
19.92
100.00
1.00
3.00
85.41
30.00
1.00
2.00
7.20
3.00
3.60
514.00
396.94
396.94
396.94
4,440.91
4,440.91
4,440.91
1.00
10.00
10.00
1.00
1.00
17.12
20.54
6
2
3.00
240.00
13.66
50.60
50.60
50.60
456.49
456.49
456.49
4
5
16.00
12.00
3.00
1.00
2.00
1.00
250.00
1.00
1.00
1.00
1.00
10
3
0.10
1.00
1.50
5.00
0.50
231.42
224.40
220.40
10
10
7
20.00
120.00
35.00
1.00
4.00
27.83
14.00
1.00
0.50
107.04
8.00
1.00
2.00
27.83
30.00
1.00
0.50
26.90
79.95
9
13
3.00
1.00
0.60
0.20
0.60
0.10
207.80
207.80
207.80
3
3
2
90.00
100.00
600.00
4.00
1.00
6,218.16
6,218.16
6,218.16
15
5
50
100.00
500.00
350.00
1.00
1.00
2.00
10.00
22.69
17.52
17.52
17.52
196.01
196.01
196.01
56.38
43.54
43.54
43.54
487.11
487.11
487.11
1.00
1.00
1.00
1.00
1.00
10.00
1.00
6.00
0.50
6.00
1.00
5.00
1.00
2.00
3.00
1.00
1.00
1.00
1.00
1,088.18
1,712.16
649.18
6,491.82
2,225.81
16.00
338.00
15
11
30
30
9
20
20
80.00
2.50
8.00
90.00
298.00
2.00
1.00
6,218.16
273.66
273.66
273.66
6,218.16
30
30
60.00
9.00
2.00
1.00
30
30.00
1.00
31.80
59.65
59.65
59.65
273.66
15
15
15.00
11.00
1.00
1.00
15
15.00
1.00
20.72
49.33
49.33
49.33
10
10
12.00
10.00
2.00
1.00
6,218.16
6,218.16
30
7
100.00
500.00
1,824.37
100.00
1.00
442.13
12.00
25
30
3.00
0.60
2,619.15
2,619.15
6
10
100.00
500.00
1.00
141.43
565.73
940.52
166.35
15
35
4
7
3.00
6.60
298.00
10.00
140.86
726.25
12
6
12.00
150.00
247.18
1,667.69
1,667.69
1,667.69
7,407.58
7,407.58
30
60
45
1.00
2.00
1.00
2.00
4.00
2.00
1.00
1.00
8.00
1.00
1.00
10.00
1.00
1.00
8.00
1.00
2.00
1.00
2.00
1.00
5.00
2.00
0.60
1.00
2.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
1.00
1.00
2.00
8.00
7.00
12.00
10.00
2.00
1.00
2.00
1.00
8.00
250.00
1.00
1.00
1.00
1.00
1.00
7,407.58
237.94
1,028.09
1,028.09
1,028.09
13,189.95
13,189.95
13,189.95
30
38
12.00
11.00
2.00
1.00
1.00
38
250.00
1.00
1.00
1,279.54
30
25.00
1.00
67.81
182.82
218.82
25
5
30
40.00
250.00
40.00
1.00
927.00
927.00
4
3
100.00
500.00
74.16
92.70
25
3
2.50
298.00
46.97
10
12.00
412.00
250.00
16.90
16.90
2
7
100.00
500.00
27.89
34.86
20
3
2.50
298.00
12.97
139.15
139.15
139.15
873.60
873.60
873.60
11.00
10
10
12.00
12.00
1.50
1.00
1.50
1.00
10
250.00
1.00
1.00
3.00
1.00
12.06
3.00
23.44
158.96
158.96
158.96
866.39
866.39
5
6
12.00
10.00
1.00
1.00
1.00
1.00
250.00
1.00
1.00
1.00
0.50
2.00
1.00
1.00
2.00
1.00
2.00
10.00
1.00
1.00
1.00
2.00
1.00
8.00
1.00
3.00
1.00
2.00
1.00
1.00
1.00
2.00
7.50
1.00
0.86
10.00
1.00
1.00
1.00
1.00
866.39
48.00
2.00
0.50
50.27
500.00
1.00
60.33
62.84
62.84
55.43
18.01
10
5
5
5
2
50.00
60.00
35.00
14.00
298.00
62.84
9.00
7
7
180.00
4.00
1.00
62.84
100.00
1.00
1.00
1.00
1.80
1.00
1.00
367.45
367.45
367.45
3
2
5
100.00
500.00
350.00
1.00
1.00
1.00
3.00
3.00
367.45
367.45
15
5
20.00
200.00
367.45
367.45
48.00
7
8
5
40.00
50.00
10.00
3,130.95
1.00
10
2
100.00
1.00
5,791.18
152
350.00
1.00
150
1.00
5.00
1.00
12.00
1.00
1.00
100
1.00
1.00
4.00
1.00
5
5
5
1.00
1.00
1.00
2.00
1.00
59
58.88
1.00
1.00
0.50
3.00
0.50
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
2.00
2.00
5.00
1.00
2.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
1.00
4.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
1.00
3.00
1.00
1.00
0.50
COMPACTADORA
VIBRATORIA TIPO PLANCHA
DE 7HP
CAMION PLATAFORMA
PARA TRANSPORTE
CIZALLA P/CORTE DE
FIERRO
MEZACLADORA DE
CONCRETO DE 9 - 11 P3
VIBRADOR DE CONCRETO
DE 4HP DE 1.25"
CAMION VOLQUETE DE 12
m3
CARGADOR S/LLANTAS DE
125 - 155 HP
BARRENO
0.03
0.03
1.00
1.00
0.50
1.00
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
0.50
3.00
1.00
1.00
0.50
1.00
1.00
0.50
3.00
1.00
1.00
0.50
1.00
1.00
1.00
1.00
1.00
3.00
1.00
1.00
0.33
1.00
1.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
0.50
1.00
1.00
0.50
1.00
1.00
3.00
1.00
1.00
1.50
1.50
3.00
0.50
1.00
1.00
0.50
1.00
1.00
1.00
3.00
1.00
RETROEXCAVADORA DE
CASE 580C
ANDAMIO METALICO
COMPRESOR DE AIRE
Tu (Das)
f'm
fm
t
Tp (Dias)
0.03
0.05
1.00
0.40
0.30
0.10
0.30
0.30
1.00
N. Rend.