The SERVIU inside their politics or force for the construction are the
Technical Specifications that basically are the alternatives of materials that can
utilize the contractors to devise the social dwellings.
To part of these alternatives that the SERVIU specifies; the market offers
other alternatives of materials that comply equal function specifically for the
construction of structure and exterior covering.
In this work they were analyzed and they bought in base to different costquality alternatives of materials found in the market, as is the case of the Covintec;
System RBS, that met similar characteristics to them established by the SERVIU in
their technical specifications (Metalcon and wood), being able thus that way to elect
new materials that would be able to innovate these specifications, that did not alter
the budget established by the SERVR7 for the social dwelling.
In the present investigation obtained as a result that of the materials them
offered by the market, the most adequate one in base to its characteristics of costquality is the Covintec, which perfectly could be utilized for the elaboration of the
social dwellings.
DEDICATORIA
A mis padres por todo el esfuerzo y el apoyo que me dieron durante todos estos aos para
poder lograr culminar con esta etapa de mi vida, los amo mucho.
A mi polola Marcela, quien ha sido un pilar fundamental para poder lograr esto, Te amo
mucho.
En especial a una personita que me estuvo dando todas la fuerzas y animndome, aunque
no siempre fue personalmente sino que a la distancia, para poder terminar mi carrera. A
mi hija Javierita te amo mucho.
Y bueno, tambin a mis hermanas...
NDICE
DESCRIPCIN
PGINA
INTRODUCCIN
OBJETIVOS
A.- GENERALES
B.- ESPECIFICOS
CAPITULO I: GENERALIDADES
2.1.1.2.- Excavaciones.
2.1.1.3.- Cimientos.
2.1.1.5.- Sobrecimientos.
10
10
10
11
11
a) Albailera de ladrillo.
11
b) Albailera de bloques.
12
c) Sobretabique madera.
12
13
13
13
13
14
a) Tabiquera de madera.
14
b) Tabiquera metlica.
14
14
a) En madera.
14
b) Metlica.
15
15
a) Zinc-alum ondulado.
15
15
2.1.1.10.- Hojalatera.
16
17
17
17
18
18
2.1.2.1.1.-Tabiques.
18
18
18
19
19
20
20
20
21
2.1.2.6.- Cielos.
22
22
22
22
2.1.2.7.1.- Marcos.
23
2.1.2.7.2.- Puertas.
23
2.1.2.7.3.- Ventanas.
23
2.1.2.8.- Vidrios.
24
2.1.2.9.- Quincallera
24
24
25
26
26
26
2.1.3.1.2.- Grifera.
26
26
26
27
28
28
29
29
2.1.4.1.- Cierros
29
29
30
30
31
31
31
3.1.1.1.- Qu es el Ferrocemento?
31
32
33
3.1.2.1.- Qu el Metalcon?
33
34
35
35
37
38
3.1.4.1.- Qu es el Covintec?
38
39
40
40
41
42
42
42
43
43
3.2.2.- StucoVolcan
44
3.2.2.1.- Qu es el StucoVolcan?
44
45
3.2.3.- PanelVolcan
45
3.2.3.1.- Qu es el PanelVolvan?
45
46
47
47
48
49
49
50
52
52
54
4.2.1- Transporte
54
4.2.2.- Confeccin
55
4.2.3.- Calidad
56
57
57
58
Construccin.
5.2.1.- Sistema constructivo Madera.
58
58
59
60
60
61
62
62
63
64
64
65
66
66
67
68
CONCLUSIONES
69
ANEXOS
72
72
76
105
BIBLIOGRAFIA
106
INTRODUCCIN
Desde siempre, la vivienda ha ocupado un lugar esencial dentro de las necesidades del
ser humano, protegindolo, entre otros, contra los agentes climticos, y asumiendo una
especial relevancia al generar en sus miembros sentimientos de satisfaccin y pertenencia
respecto a ella.
As surge la necesidad de realizar un anlisis de costos para una vivienda social tipo, a
fin de mostrar las variaciones de costo entre una vivienda social con materiales ya utilizados y
una con materiales innovadores o que recin se encuentran en nuestro mercado.
OBJETIVOS
A.- GENERALES
Comparar en base a costo las distintas alternativas que presenta el SERVIU, en las
Especificaciones Tcnicas del programa de viviendas sociales.
B.- ESPECIFICOS
Comparar entre los materiales presentes en las especificaciones tcnicas del SERVIU y
los que el mercado ofrece como otras alternativas para la construccin de estructura y
revestimiento exterior, en base al costo y calidad de cada uno de ellos, en un muro tipo.
Realizar un cuadro comparativo entre los distintos tipos de estructuras en base a las
caractersticas que estos presentan, para reflejar cual o cules poseen ms ventajas y de
esa manera poder elegir aquellos que puedan innovar en las especificaciones tcnicas
para la construccin de estructura y revestimiento exterior de una vivienda social.
CAPITULO I: GENERALIDADES
El problema habitacional que hoy nos atae provoca gran preocupacin tanto en
organismos de Gobierno como en la poblacin. Tiene sus orgenes hacia fines del siglo pasado
y uno de sus hitos importantes lo constituye la creacin de los Consejos habitacionales para
Obreros. La Ley 1838 de 1906; algunos aseguran que es una de las primeras leyes dictadas en
Amrica en el campo de la problemtica habitacional.
Debido al crecimiento flujo migratorio del campo a las ciudades, comenz a hacerse
crtico el dficit habitacional, apareciendo las primeras poblaciones callampas. Para
solucionar esto se cre la junta central de la habitacin popular, cuya principal funcin
consista en entregar viviendas higinicas a los pobladores de escasos recursos.
Las primeras leyes dictadas para este efecto fueron la ley 4.931 y el decreto con Fuerza
de Ley N 33 en el ao 1931.
10
Este esquema no fue capaz de coordinar el papel correspondiente a cada una de ellas,
por lo que se les permiti a cada una ejercer las funciones de las dems, excepto la COU. Se
crearon entonces programas independientes entre ellas comprometiendo inversiones
imprevistas para el presupuesto anual del ministerio de la vivienda y Urbanismo.
11
Para que la vivienda responda a sus funciones debe cumplir con un mnimo de
requisitos materiales y de acceso a redes de servicios bsicos e infraestructuras de
equipamiento comunitario. A nivel social, el parque habitacional debe permitir a cada familia
satisfacer estas necesidades, en condiciones mnimas y, no menos importante, con autonoma
residencial, lo que implica que cada hogar requiere una vivienda independiente, por lo que
debern existir en cantidad suficiente para que todos los hogares puedan acceder a una casa.
Sin embargo, este desafo que se plantea a nivel nacional es muy difcil de cumplir,
ms an cuando se trata de comunas en que el valor del suelo sobrepasa cualquier posibilidad
de compra por parte del Estado. Son, en este sentido, necesarias las alianzas con los
municipios y el sector privado, nica manera de iniciar un camino de anlisis de posibles
soluciones habitacionales concretas. As mismo, al contemplar soluciones habitacionales que
presenten condiciones mnimas, cabe cuestionarse, a que se alude: a privilegiar la cantidad
por sobre la calidad?, Reflejando ello en algunos experiencias de construccin de viviendas de
poco metraje; a privilegiar la calidad de la construccin? , O brindar soluciones
habitacionales que no incorporan equipamiento comunitario?.
12
viviendas revela la existencia de una brecha, no superada hasta ese momento, entre la
produccin de soluciones habitacionales y el aumento anual de las necesidades por
crecimiento de la poblacin y deterioro del parque existente. La produccin anual era de
32000 soluciones, alcanzando a 42000 si se considera el aporte del sector privado. A la vez se
estim que para detener la expansin del dficit deberan proveerse alrededor de 100.000
soluciones anuales a partir de los aos noventa.
Luego de varios aos de esfuerzo en esta rea, y en relacin a los resultados logrados,
si bien se pudo concluir que se avanz en la reduccin del dficit heredado, se ampli la
capacidad de produccin del sector construccin y se mejor los mecanismos para dar
alojamiento a los ms pobres, la cantidad de familias sin casa que existen demandan an
mayores recursos.
13
Por otro lado, no se puede dejar de mencionar que la produccin de viviendas cada vez
se dificulta ms por el agotamiento del suelo urbano disponible, lo que provoca el
encarecimiento de las soluciones habitacionales y torna urgente encarar el problema de la
infraestructura urbana, que demandan inversiones de gran envergadura, y de nuevas
tecnologas en la construccin habitacional.
14
Los materiales que a continuacin se indican son los mnimos, exigidos por SERVIU X
Regin, los que debern ser de primera calidad.
Antes de iniciar los trabajos, se har el replanteo general de la obra, fijando estacas en
los ejes y esquinas de sitios y lneas de edificacin. La materializacin de los puntos de
referencia para la definicin planimtrica y altimtrica del loteo, y posteriores rellenos y
movimientos de tierra que resulten necesarios; le definicin de nivele definitivos se efectuar
conforme a lo consignado en el proyecto de pavimentacin y aguas lluvias. Los movimientos
de tierra, rellenos y perfilado al interior de manzanas no podrn quedar bajo el nivel de la
solera y s con pendiente adecuada para el escurrimiento superficial de aguas lluvias.
15
2.1.1.2.- EXCAVACIONES:
2.1.1.3.- CIMIENTOS:
2.1.1.5.- SOBRECIMIENTOS:
16
Hasta 0,60 m.: Contener el relleno interior con albailera de 0,15 m mnimo espesor,
con fundacin de 0,20 m de profundidad y relleno exterior de 0,30 m de alto por 1 m
de ancho (horizontal, con talud al trmino de l de 1:1,5 (V:H).
Para el caso que se consulte radier de hormign, este tendr un espesor mnimo de 0,07
m., adems de una cama de ripio de 0,08 m., sin fino, instalada sobre base de material
estabilizado compactado mecnicamente.
Los radieres sern afinados a grano perdido y debidamente curados para evitar fisuras
y desgaste prematuro.
17
e) Albailera de ladrillo.
La distancia entre pilares armados dentro de un muro ser de mximo 3,30 m., a ejes.
Los muros y tabiques de albailera debern consultar morteros de pega en proporcin 1:4 (
325 Kg./c/m3 ).
18
f) Albailera de bloques.
( 325
Kg/c/m3 ).
La distancia mxima entre pilares armados dentro de un muro ser de mximo 3,30 m.,
a ejes.
g) Sobretabique madera.
19
c) Tabiquera de madera de pino IPV o madera nativa roja sin impregnar (excepto
tepa y coige )
d) Tabiquera de metal
20
c) Tabiquera de madera.
d) Tabiquera metlica.
c) En madera.
Estructura en base a cerchas de madera de pino insigne IPV, con piezas de un espesor
mnimo de 35 mm o tijerales de madera nativa o madera de pino insigne IPV con piezas de un
espesor mnimo de 45 mm.
21
d) Metlica.
c) Zinc-alum ondulado.
22
2.1.1.10.- HOJALATERA
La hojalatera debe ser metlica, se aceptar zinc-alum de 0,35 mm. Soldado en fro o
fe galv. de 0,40 mm. de espesor.
b)
PVC.
23
a)
b)
PVC de = 75 mm.
Para cualquier solucin de alero, los tapacanes sern en madera roja nativa (excepto
tepa y coige) o madera IPV cepilladas y se conformarn con piezas de 20mm. mn x 100 mm.
mx, fijados a canes, de tal modo que el distanciamiento de apoyo no exceda los 60 cm.
24
2.1.2.1.1.-Tabiques
En todos los casos los espesores de los elementos soportantes verticales debern
cumplir con la condicin de un F-15 resistencia al fuego segn la O.G.U.C.
25
Los frontones podrn ser revestidos con traslapo de madera nativa roja u otra madera
impregnada vaco y presin de 16x100 o 120 mm cepillada o con plancha de fibrocemento de
4 mm de espesor o cualquiera de las alternativas dadas para revestimientos de muros y
tabiques, debiendo cumplir con la condicin de un F-15 resistencia al fuego requerida segn
O.G.U.C.
26
En todo caso los espesores de los elementos soportantes verticales debern cumplir con
la condicin de un F-15, para los cuales el oferente debe considerar la combinacin de
materiales y aumentar si as se requiere, ya que los que se mencionan a continuacin son
mnimos referenciales.
Se considera como zona hmeda todo el interior del bao y la cocina (muros, cielo y
piso) y la estructura de estos tabiques. En caso de estar integrado el sector cocina al estar
comedor, debe definirse claramente la zona hmeda en la planta de arquitectura.
27
a) Sobre radier de hormign este deber terminarse con palmetas vinlicas tipo
Flexit clsico o similar de 33x33 cm de 1,6 mm de espesor mnimo o capa de
mortero con tierra de color incorporado, de 1 cm., encerado. Debe cuidarse una
prolija limpieza de la superficie antes de ejecutar las terminaciones de piso.
b) Baldosas de cemento microvibrados de 20 mm. de espesor pulido y encerado,
sobre cama de ripio de 7 cm., previa base de 0,20 m, estabilizada compactad y
con mortero de pega en proporcin 1:4 (325 Kg/c/m3).
c) Cubrepiso tipo boucle con base de goma para zona secas y para zonas hmedas
idem lo indicado en a).
28
2.1.2.6.- CIELOS.
29
2.1.2.7.1.- Marcos.
De madera, conformados por una sola pieza, nativa roja para exterior (excepto tepa y
laurelia. El espesor mnimo de los marcos de puertas ser e 38 mm. y el de ventanas no podr
ser inferior a 42 mm elaborados.
2.1.2.7.2.- Puertas.
Puertas exteriores: de terciado para exteriores con bastidor de madera roja nativa
impregnada.
2.1.2.7.3.- Ventanas.
30
2.1.2.8.- VIDRIOS.
2.1.2.9.- QUINCALLERA
Debern consultarse las siguientes cerraduras con manilla o pomo segn corresponda:
Toda hoja de puerta contar con tres bisagras de 7,5 x 7,5 cm. como mnimo. Los
tornillos que fijan las bisagras debern penetrar a lo menos 2,5 cm. en la madera.
Los bordes de radier (nariz acceso), en umbrales de puertas exteriores se rematarn con
cubrejunta metlica de un espesor de 3 mm, protegida previamente con antixido y empotrada
en el hormign.
Se debern consultar todas las molduras de terminacin en pino impregnado IPV, para
todos os recintos hmedos y en exteriores, y madera sin impregnar para todos los recintos
secos, esto es, guardapolvos y cornisas, (pudiendo remplazarse por cuarto rodones de mnimo
31
Elementos metlicos, fierro o fierro galvanizado: dos manos de pintura que contenga
antixido de distinto color. La primera en fbrica y la segunda en obra. Se consultar
obligatoriamente en canales, bajadas, ganchos de sujecin, cortagoteras, etc.
Puertas: mnimo dos manos de leo en marcos y hojas por caras y cantos.
32
Se consulta instalacin de red para agua fra para todo los artefactos, la que se ejecutar
completamente en caera de cobre o tubera y fittings de polipropileno, unidos mediante
sistema de termo-fusin, de acuerdo a recomendaciones del fabricante. El arranque
domiciliario deber ser en cobre.
2.1.3.1.2.- Grifera
Challa de ducha, ubicada mnimo a 2,00 m. con respecto al nivel del pie de ducha.
33
Lavatorio: Ser de loza vitrificada o fe estampado de 6,7 lts. mnimo de capacidad, con
sifn, rebalse u consola metlica debidamente protegida contra el xido.
W.C: Ser de loza vitrificada tipo TOME con tapa y asiento de plsticos. El estanque
ser de loza vitrificada o Fe estampado enlozado, incluyendo el mecanismo completo
de descarga. LA fijacin al muro ser convenientemente protegida contra el xido.
Ducha: Se ejecutar pie de ducha in situ, el que ser impermeable. Tendr un retorno
de 8 cm sobre los parmetros y se sellar el encuentro con los mismos. El pavimento
ser un afinado a cemento con tierra de color y tendr pendiente hacia una pileta de
desage con rejilla. Alternativamente podr ofertarse el pie de ducha revestido con
material antideslizante (baldosa o cermica).
PARTIDAS OPCIONALES:
34
Puestas a Tierra: Se realizarn con un electrodo del tipo barras de cobre Copperweld y
utilizando conductores especiales para intemperie y se cuidar que las camarillas de
medida tengan tapa y no estn obstruidas con tierra.
Canalizaciones: Toda la instalacin elctrica ser embutida con caera de PVC tipo
Conduit. Se considerarn las cajas de derivacin necesarias, evitando conexiones de
centro a centro.
Conductores: Sern tipo NYA de una seccin mnima de 2,5 mm2, los que sern
soldados en sus uniones o utilizarn conectores de presin.
35
- Estar-comedor
- Cocina
- Estar-comedor-Cocina
- Bao
- Dormitorio
Todos los centros debern incluir bases de loza rectas o inclinadas segn corresponda.
Los interruptores de comando se ubicarn a una altura de entre 0,80 y 1,40m de altura.
Los enchufes debern ser de alvolo protegido y se ubicarn a una altura de entre 0,20
y 0,80m de altura.
36
37
En este captulo se har referencia a nuevos tipos de materiales que mejoren la calidad
de la construccin de las viviendas, habitabilidad, durabilidad, aislamiento y adems de
disminuir el perodo de construccin.
3.1.1.1- QU ES EL FERROCEMENTO?
38
El sistema constructivo consiste en dos paneles que genera una doble cmara de aire,
alcanzando un espesor del muro de 15 cm. De esa forma se asla a la vivienda del fro, ruido y
humedad, al no generar condensacin. A eso se deben sumar caractersticas como una buena
aislacin acstica y trmica, impermeabilidad y resistencia al fuego.
ENSAYO
Transmitancia
Trmica
Resistencia
Acstica
ELEMENTO
Panel doble cmara
c/aislacin polietireno
exp.
Panel doble cmara
c/aislacin polietireno
exp.
NORMA
RESULTADO CERTIFICACION
0,85 W/m2 C
U.B.B N 00259
ASTM E 41373
39 dB (A)
IDIEM N 215384
F-60 ( 75 min)
IDIEM N 215384
Entre las principales ventajas tcnicas de este sistema constructivo se encuentran las
siguientes:
Permite la utilizacin de sistemas mixtos (el ferrocemento puede ser usado con otros
materiales, como por ejemplo: madera, metalcon, etc).
39
Permite mediante la conformacin de los paneles de muros y tabiques, que todas las
instalaciones queden en su interior.
40
ENSAYO
ELEMENTO
Murogal Especial
Resistencia al fuego
Exterior
Tabla 2 Ensayo resistencia al fuego
NORMA
RESULTADO
CERTIFICACION
F-15 ( 22 min)
IDIEM N 251832
Mejor Calidad: Todos los elementos del sistema son dimensionalmente estables, por
lo que muros, pisos y cerchas permanecen siempre rectos, no se tuercen ni deforman
en el tiempo, ni tampoco dependen, como con otros materiales, de cambios de
humedad que causan rajaduras, deformaciones y en general deterioro.
Mayor duracin: Correctamente utilizado, los perfiles Metalcon al ser fabricados con
acero galvanizado, permiten construir casas o elementos que son permanentes en el
tiempo
que
duraran
muchos
aos.
Mas de 300 aos seria la vida de til del revestimiento de zinc que protege a los
perfiles de acero, en un ambiente residencial, no expuestos directamente al ambiente,
para un espesor de zinc de 10 micrones, esto segn la American Iron Steel Institute
41
42
Por
su
perfecto
acabado
puede
permanecer
como
terminacin,
pudiendo
El Sistema RBS fue aprobado en Chile por oficio ordinario N 0188 del Ministerio de
Vivienda y Urbanismo, Divisin Tcnica de Estudio y Fomento Habitacional de fecha 26 de
febrero de 2003.
ENSAYO
ELEMENTO
MURO ROYAL 100
Resistencia al fuego
MM RELLENO C/
HORMIGON
Tabla 3 Ensayo de resistencia al fuego
NORMA
RESULTADO
CERTIFICACION
F-90 ( 94 min)
IDIEM N 369922
43
44
Las armaduras estn unidas a lo ancho del panel por alambres horizontales calibre #14
(2.03mm)
electrosoldado
en
cada
punto
de
contacto.
La retcula de alambre est completamente separada en 9,5 mm. del poliestireno para
permitir un correcto amarre del mortero aplicado a cada cara del panel despus de su montaje.
45
Rapidez. Fciles de manejar y montar, los paneles estructurales covintec miden 1,22 x
2,44 mt., alcanzando un peso de slo 11 kilos, esto es 3,7 Kg/m2. Con una tcnica de
instalacin simple, el trabajo en terreno puede ser ejecutado con una mano de obra no
especializada y alcanzando altas velocidades de instalacin.
Aislacin Acstica. A un bajo costo los paneles del sistema estructural Covintec
permiten obtener una eficiente barrera contra la contaminacin acstica, siendo capaz
de bajar 40 db los niveles de ruido entre un recinto y otro. Esto se logra a la
combinacin entre las cargas de estuco y el interior de poliestireno expandido con que
cuenta el sistema.
46
ALTO (mt)
ESPESOR (cm)
1,22
2,44
7,6
11 Kgs.
ENSAYO
ELEMENTO
NORMA
RESULTADO CERTIFICACION
Transmitancia
Panel Estructural
Nch 851 Of. 70 0,72 W/m2 C IDIEM N 197734
Trmica
Covintec.
Resistencia
Panel Estructural
ASTM E 41340 dB (A)
IDIEM N 196019
Acstica
Covintec.
73
Resistencia al
Panel Estructural
NCH 935/1 Of.
F-60 (69 min) IDIEM N 200402
Fuego
Covintec.
84
Tabla 4 Ensayos no mecnicos panel estructural
47
ALTO (mt)
ESPESOR (cm)
1,00
2,44
4,6
6 Kgs.
ENSAYO
ELEMENTO
Resistencia
Panel Light Covintec.
Acstica
Resistencia al
Panel Light Covintec.
Fuego
Tabla 5 Ensayos no mecnicos panel light
NORMA
ASTM E 41373
NCH 935/1 Of.
84
48
RESULTADO CERTIFICACION
40 dB (A)
F-30 ( 40 min)
IDIEM N 196019
IDIEM N 219508
El SmartSide es un tablero cuyas hojuelas han sido tratadas con Boratos de Zinc,
proceso que los hace resistentes a las termitas, evitando la pudricin por hongos y actuando
como agente retardador del fuego. El canto es sellado en fbrica lo que mejora la resistencia a
la intemperie y el Film saturado en resinas fenlicas resistente al los rayos UV, impermeable y
flexible altamente resistente a los agentes climticos.
49
b) Presentacin:
ENSAYO
Resistencia al
Fuego
REV.
EXTERIOR
Panel 11,1 mm
AISLACION
Lana mineral
50 mm papel
una cara 40
Kg/m3.
ESTRUCTURA
Fe galv.
60x38x6x0,85mm.
ESPESOR (mm)
11,1 y 15,1
REV.
INTERIOR
Yeso Cartn
10mm.
RESULTADO
F30
Film especial y adhesivos MDI que da la resistencia contra los agentes climticos.
50
51
b) Presentacin:
ANCHO (m)
LARGO (m)
ESPESOR (mm)
1.2
2.4
52
b) Presentacin:
ANCHO (m)
LARGO (m)
ESPESOR (mm)
1.2
2.4
53
Es un tinglado que posee una apariencia similar a la madera que se presenta en color
gris, en medidas de 0.19 x 2.40 y 0.19 x 3.66m en 6y 8mm de espesor, es fcil y rpido de
instalar, no requiere de tratamiento previo ni posterior, menor manutencin, no crea hongos,
no se pudre, es un material incombustible y con alta resistencia a la humedad.
54
Mayor espesor
No es combustible.
No se pudre
Densidad
mnima
(gr/cm3)
Resistencia a la flexin
Paralela a la fibra
(Kgf/cm2)
Normal a la fibra
(Kgf/cm2)
Absorcin mx. de agua
(%)
1.20
130
200
39
b) Presentacin:
ANCHO (m).
LARGO (m).
ESPESOR (mm.)
0.19
0.19
2.4
3.66
6y8
6y8
55
d) Pesos:
MEDIDAS
Son muy resistentes al ataque fsico y totalmente inerte a la corrosin. No las atacan los
insectos.
56
Dan gran seguridad, pues desmontar una hoja desde el exterior, es prcticamente
imposible.
57
58
CAPITULO
IV:
ANALISIS
COMPARATIVO
EN
UNA
Como punto de partida se realizar un anlisis desde el punto de vista econmico, para
luego analizar los rendimientos de construccin de ambos materiales, y finalmente una
comparacin de calidad de los materiales y su ejecucin en terreno.
4.1.- ANALISIS DE COSTOS
Para poder realizar esta parte del estudio se solicit informacin a la Empresa
Constructora Socovesa S.A quienes otorgaron los planos estructurales de la vivienda.
Cabe destacar que, los valores de los presupuestos que se detallan son slo
referenciales, ya que la empresa no entrega informacin de los presupuestos oficiales de la
respectiva vivienda, por ser stos considerados como confidenciales.
59
de material en vez de otro. (En el anexo A se muestran los presupuestos detallados de ambas
soluciones).
Solucin
UF / M2
Cantidad
M2
Total UF
Presupuesto A
Presupuesto B
6,65
7,32
41,21
41,21
274
302
1. Es necesario precisar que la calidad de los materiales de cada una de las partidas entre
una vivienda y otra son distintos. La vivienda construida en Metalcon especifica
materiales de mayor calidad y mejor terminacin, en consecuencia esto significa que el
costo directo por metro cuadrado construido es considerablemente mayor si se toma
como referencia a la otra solucin.
2. En cuanto a los costos de la estructura en s, se puede concluir que el Metalcon es
ligeramente ms barato que la madera. Adems, este material disminuye los costos en
las fundaciones, debido a la mayor superficie y menor volumen de stas, como
consecuencia del peso por unidad de este material con referencia a la madera.
3. Finalmente, se puede decir que esta comparacin de presupuestos entre estos dos tipos
de soluciones muestra que realmente existe una diferencia considerable de precios, pero
hay que considerar que los valores entregados no son 100% confiables ya que estos son
solo referenciales, no oficiales. Hay que considerar adems que la vivienda que se
estudia tiene que ajustarse a un valor que no sobrepase a lo indicado por el Serviu.
60
Para poder realizar este anlisis, se dividi en tres partes, que son: el transporte, la
confeccin y el montaje de los materiales utilizados e la construccin, en especial la
estructura, comparando el metalcon con la madera.
4.2.1.- TRANSPORTE
Con la finalidad de tener una apreciacin ms cercana de las diferencias que existen en
los medios de transporte a utilizar para movilizar los distintos tipos de estructuras, a
continuacin se mostrar una tabla la cual indicar las diferencias que existen entre estos
materiales.
61
METALCON
PESO ( KG/MT)
MADERA
60CA085
0,96
1,97
62C085
0,72
1,97
Solera de 45x75mm
60CA085
0,96
1,97
Pieza de 38x90mm
40CA085
0,84
0,98
Pieza de 25x70mm
40CA085
0,84
1,31
Pieza de 25x100mm
350MA05
0,98
1,31
Pieza de 45x45mm
Si observamos los pesos mostrados en la tabla anterior, nos daremos cuenta que entre
los perfiles de madera y los perfiles de Metalcon existe una considerable diferencia; esto hace
que el metalcon sea ms conveniente de transportar y trabajar por el hecho de que en un solo
viaje es posible acarrear aproximadamente un 50 % ms de perfiles de Metalcon que de
perfiles de madera.
4.2.2.- CONFECCION
Durante la confeccin de los paneles de Metalcon, se debe tener especial cuidado en el
aplome de los distintos montantes (pies derechos), adems del calce perfecto entre el montante
y la canal superior e inferior (soleras).
La sencilla fabricacin de los paneles con Metalcon ayuda a contribuir con aumentar
los rendimientos de fabricacin de paneles y cerchas de Metalcon, de este modo es posible
llegar a fabricar 55 metros lineales de paneles de acero galvanizado liviano al da, con solo dos
personas.
62
En cuanto a la calidad de los materiales se estima que la vida til de los materiales de
Metalcon es de aproximadamente entre 300 aos, por ser materiales de acero galvanizado; y
para la madera se estima una vida til de aproximadamente 30 a 40 aos. Lo que hace que la
calidad en la duracin del Metalcon sea considerablemente mayor que la estructura de madera,
ya que el metalcon no requiere de ningn tratamiento contra la humedad ni contra el ataque de
otros agentes abrasivos como las termitas.
ambiente, lo que implica que se sufran desaplomes. Esto es importantsimo, debido a que la
prdida de tiempo y de material utilizado en controlar y solucionar stos problemas aumentan
los rendimientos de colocacin considerablemente y los costos de madera que se encuentran
con pandeo, forzarlas para que lleguen a su lugar original, y luego reforzarlas con otra pieza de
las mismas dimensiones.
Por ltimo, la gran diferencia entre el sistema constructivo con metalcon y el con
madera es que, el sistema de Metalcon considera 0% de prdida en el control y solucin de
defectos de calidad, en cuanto a la madera se estima un 5-10% de prdidas de materiales y de
entre un 15-20% de prdidas en rendimientos y duraciones de cada una de las actividades.
63
5.1.- GENERALIDADES
Mejorar la calidad de las viviendas que se construyen, es la principal tarea que tiene el
gobierno y las empresas constructoras. Es por eso que cada da se pueden encontrar diferentes
materiales con nuevas tecnologas, a fin de logar una buena calidad en la vivienda a un costo
razonable y sobre todo en un menor tiempo.
Para tener una idea acerca de los distintos tipos de de sistemas constructivos, se realiz
un estudio comparativo de un muro tipo, usando diferentes materiales innovadores. Se
mostrar el sistema constructivo en s y un anlisis de precios unitarios por metro cuadrado,
con el fin de mostrar las diferencias de costos entre un sistema y otro.
64
65
ESPECIFICACIONES MATERIALES
PINO IMPREGNADO DE 2x3"
PINO IMPREGNADO DE 1X3"
CLAVO CORRIENTE DED 3 1/2"
PLANCHA 5V ZINC-ALUM
CLAVO TECHO DE 1 3/4"
FIELTRO N10
AISLAN GLASS 40 MM
VOLCANITA ST 10 MM
TORNILLO PUNTA FINA 6 X 1 1/4"
HUINCHA JUNTURA INVISIBLE
BASE PARA JUNTURA
A.- TOTAL MATERIAL
Unid.
PULG.
PULG.
KG
M2
UN
M2
M2
M2
UN
ML
KG
Cantd.
1,02
0,08
0,48
1,00
8,00
1,05
1,05
1,00
15,00
1,50
0,76
P.Unitario
2380
2380
815
1990
19
158
924
2137
10
30
243
$
Total
2429
190
391
1990
152
166
970
2137
150
45
185
8806
MANO DE OBRA
Unid.
Cantd.
P.Unitario
Total
CARPINTERO + 1 AYUD
DS
0,24
19000
4560
LEYES SOCIALES
B,- TOTAL MANO DE OBRA
55%
4560
2508
7068
TOTAL A+B
M2
TOTAL
M2
9,4
TOTAL
UF/M2
66
$ 15874
15874
$ 17.976,45
$149216
8.3
67
ESPECIFICACIONES MATERIALES
SIDING FIBROCEMENTO
MONTANTE 60CA085
CANAL 62CO085
TIRANTE
TORNILLO AUT. #8
FIELTRO N10
AISLAN GLASS 40 MM
FIBROCEMENTO 6 MM
TORNILLO AUTO. #6
HUINCHA JUNTURA INVISIBLE
BASE PARA JUNTURA
A.- TOTAL MATERIAL
Unid.
M2
ML
ML
ML
UN
M2
M2
M2
UN
ML
KG
Cantd.
1,00
4,00
1,00
0,44
15,00
1,05
1,05
1,00
15,00
1,50
0,76
P.Unitario
3829
582
412
356
5
158
924
3226
10
30
243
$
Total
3829
2328
412
157
75
166
970
3226
150
45
185
11542
MANO DE OBRA
Unid.
Cantd.
P.Unitario
Total
CARPINTERO + 1 AYUD
DS
0,23
19000
4370
LEYES SOCIALES
B,- TOTAL MANO DE OBRA
55%
4370
2404
6774
TOTAL A+B
M2
TOTAL
M2
9,4
TOTAL
UF/M2
$ 18316
18316
$ 17.976,45
$ 172170
9,57
TIPO DE REVESTIMIENTO
VALOR
UF/M2
8,74
8,86
9,92
PANELVOLCAN
STUCOVOLCAN
SMARTSIDEPANEL
68
69
ESPECIFICACIONES MATERIALES
MORTERO 460 KG C/M3
FE 4,2 MM ESTRIADO
MALLA GALLINERO
POLIETILENO EXP. 10 MM
FIELTRO N15
ALAMBRE N18
HORMIGON H-20 PILARES
FE 8 MM ESTRIADO
PINTURA
A.- TOTAL MATERIAL
Unid.
LT
KG
M2
M2
M2
KG
M3
KG
M2
Cantd.
50,00
1,05
1,00
1,00
1,00
0,48
0,01
0,40
2,00
P.Unitario
51
378
650
219
158
733
31517
378
1607
$
Total
2550
397
650
219
158
352
255
149
3214
7540
MANO DE OBRA
Unid.
Cantd.
P.Unitario
Total
MAESTRO + AYUD
DS
0,21
19000
3990
LEYES SOCIALES
B,- TOTAL MANO DE OBRA
55%
3990
2195
6185
TOTAL A+B
M2
TOTAL
M2
9,4
TOTAL
UF/M2
$13725
15492
$ 17.976,45
70
$ 129015
7.2
71
ESPECIFICACIONES MATERIALES
SIDING VINILICO
MURO ROYAL 100 MM
HORMIGON H-20
FIERRO 8 MM ESTRIADO
FIERRO 10 MM ESTRIADO
A.- TOTAL MATERIAL
Unid.
M2
M2
M3
KG
KG
Cantd.
1,00
1,00
0,08
0,95
1,48
P.Unitario
5457
19027
31517
378
378
$
Total
5457
19027
2521
358
559
27923
MANO DE OBRA
Unid.
Cantd.
P.Unitario
Total
CARPINTERO + 1 AYUD
DS
0,2
19000
3800
LEYES SOCIALES
B,- TOTAL MANO DE OBRA
55%
3800
2090
5890
TOTAL A+B
M2
TOTAL
M2
9,4
TOTAL
UF/M2
$ 33813
24.528
$ 17.976,45
72
$ 317842
17,68
73
ESPECIFICACIONES MATERIALES
PANEL ESTRUCTURAL e=7,6 CM
ESTUCO e=2,5 CM
PERFIL CANAL 100/50/3
PINTURA
A.- TOTAL MATERIAL
Unid.
M2
M2
ML
M2
Cantd.
1,00
2,00
0,50
2,00
P.Unitario
7475
1000
1611
1607
$
Total
7475
2000
806
3214
13495
MANO DE OBRA
Unid.
Cantd.
P.Unitario
Total
CARPINTERO + 1 AYUD
DS
0,2
19000
3800
LEYES SOCIALES
B,- TOTAL MANO DE OBRA
55%
3800
2090
5890
TOTAL A+B
M2
TOTAL
M2
9,4
TOTAL
UF/M2
$ 19385
10.870
$ 17.976,45
74
$ 182219
10,14
A continuacin se mostrar una tabla, donde se muestran las ventajas de los diferentes
materiales innovadores, utilizados ya en viviendas sociales.
TABIQUERIA
VENTAJAS
COVINTEC
RBS
METALCON
FERROCEMENTO
MADERA
Transmitancia
Trmica
0,72 w/m 2 C
1,22 w/m2 C
0,72 w/m2 C
0,85 w/m2 C
0,72 w/m2 C
Aislacin Acstica
40 db
45 db
20 db
38 db
20 db
Resistencia al fuego
F-60
F-90
F-15
F-60
F- 15
Rendimiento
40 m2 / da
40 m2 / da
36 m2 / da
38 m2 / da
32 m2 / da
Instalaciones
Preembutidas
Embutidas
Embutidas
Embutidas
Embutidas
Superficie
e= 11 cms
e= 10 cms
e= 9 cms
e=15 cms
e= 9 cms
Valor/m2
10,14 UF/m2
17,68 UF/m2
8,74 9,92
UF/m2
7,2 UF/m2
8,3 UF/m2
75
CONCLUSIONES
El mercado actual ofrece distintas alternativas de materiales que pueden ser utilizados
en la construccin de revestimiento exterior y estructura de una vivienda social, que no
estn presentes en las especificaciones tcnicas del SERVIU. Entre estos materiales
encontramos el Covintec, Ferrocemento, el RBS (Sistema Royal) que son para
estructura y el Smartside Panel, Panelvolcan, Estucovolcan, Siding de fibrocemento,
que son para el revestimiento.
76
- De la Resistencia al Fuego, cabe sealar que el que posee mayor resistencia es el Sistema
RBS, Luego estn el Convintec y Ferrocemento, y como ltimo est el Metalcon y la
Tabiquera Madera.
- Otra ventaja que es importante comparar entre los materiales mencionados con anterioridad
es el Rendimiento por m2/da, ya que esto es de importancia en trminos de eficiencia de
trabajo de construccin de una vivienda debido a que nos permite un ahorro en tiempo de
trabajo lo que se puede traducir en una entrega de obra ms a corto plazo entre otras cosas. Es
as como podemos sealar que el Covintec y el sistema RBS, materiales innovadores, son los
que tienen un mejor rendimiento, siendo el de menor rendimiento la Tabiquera de Madera, la
cual est sealada en las especificaciones tcnicas del SERVIU.
- Las Instalaciones, son similares entre todos los materiales siendo el Covintec el nico que se
diferencia del resto.
- En base a la superficie, todos los materiales presentan valores similares a excepcin del
ferrocemento que posee un valor superior al de los otros, es decir la superficie de la vivienda
es inferior.
- Una de las ventajas que mayor relevancia posee es el Valor /m2 ya que ello nos permite de
alguna manera manejar el costo de una vivienda social, pudiendo utilizar materiales que
tengan ventajas muy positivas y que a su vez sean mas econmicos. A pesar de que la
estructura con metalcon y la estructura de madera valen prcticamente lo mismo (alrededor de
las 8 UF), son ms baratos que el Covintec que los supera en dos UF , siendo el ms costo el
Sistema RBS que supera en ms del 100% al valor de la tabiquera madera y metalcon y en un
70% aproximadamente al Covintec.
77
De los puntos anteriores podemos sealar que de todos los materiales mencionados el
Covintec es el que mayores ventajas rene por lo que sera una alternativa innovadora
a los materiales sealados en las especificaciones tcnicas del SERVIU, adems cabe
destacar que es superior a la Tabiquera de Madera, el cual es un material especificado
por el SERVIU que actualmente se utiliza en construccin de viviendas sociales.
78
ANEXOS
ANEXO A. PRESUPUESTOS VIVIENDA SOCIAL 41,21 M2
UTILIZANDO DIFERENTES ALTERNATIVAS DE LAS ETG. DEL
SERVIU.
a) PRESUPUESTO ALTERNATIVA A
ITEM
DESCRIPCION
UNIDAD
CANT.
1 Movimiento de tierra
1.1 Despeje capa vegetal
1.2 Excavaciones
m2
m3
50,00
3,78
$
$
5.193
3.635
$
$
259.650
13.740
2
2.1
2.2
2.3
2.4
2.5
m3
m3
m3
m2
Kg
0,46
3,25
1,33
9,73
105,00
$
$
$
$
$
19.141
31.064
39.059
7.281
669
$
$
$
$
$
8.805
100.896
51.948
70.844
70.245
3 Base de pavimentos
3.1 Cama de Ripio
3.2 Radier H-15
m2
m2
29,60
29,60
$
$
867
2.980
$
$
25.663
88.208
4 Estrcuturas de madera
4.1 Tabiques perimetrales (incl. Sobretabique)
4.2 Tabiques interiores
m2
m2
64,53
19,84
$
$
5.331
5.176
$
$
344.009
102.692
5
5.1
5.2
5.3
5.4
5.5
5.6
Techumbre y Hojalatera
Estructura de techumbre
Cubierta
Costaneras
Caballete
Canales
Bajadas
m2
m2
m2
ml
ml
ml
34,94
52,63
52,63
11,90
22,60
7,50
$
$
$
$
$
$
3.366
4.996
1.324
2.914
3.141
3.141
$
$
$
$
$
$
117.608
262.939
69.682
34.677
70.987
23.558
6
6.1
6.2
6.3
Revestimientos Exteriores
Tapacanes
Frontones
Muros perimetrales
ml
m2
m2
36,15
5,61
70,09
$
$
$
1.418
5.333
4.886
$
$
$
51.261
29.918
342.460
7
7.1
7.1
7.2
Revestimientos Interiores
Muros perimetrales
Muros interiores
Muros cocina y bao
m2
m2
m2
49,09
32,79
19,47
$
$
$
4.999
4.657
7.306
$
$
$
245.401
152.703
142.248
m2
m2
40,14
40,14
$
$
6.063
3.276
$
$
243.369
131.499
Fundaciones
Emplantillado
Cimientos H-10
Sobrecimientos H-20
Moldajes
Armadura de acero
8 Cielos
8.1 Estructura de Cielo
8.2 Revestimiento de Cielo
79
P.UNITARIO
P.TOTAL
9 Aislacin
9.1 Cielo
9.2 Tabiques perimetrales
m2
m2
36,44
59,73
$
$
2.024
1.207
$
$
73.755
72.094
10 Pavimentos
10.2 Pavimento vinlico
10.3 Cubre piso
m2
m2
6,35
30,09
$
$
5.138
4.949
$
$
32.626
148.915
11
11.1
11.2
11.3
11.4
gl
u
u
gl
1,00
2,00
3,00
1,00
$
$
$
$
34.996
21.398
13.408
221.660
$
$
$
$
34.996
42.796
40.224
221.660
12 Closet y muebles
12.1 Closet
12.2 Mueble de cocina
gl
gl
1,00
1,00
$
$
100.000
20.000
$
$
100.000
20.000
13
13.1
13.2
13.3
13.4
ml
ml
ml
ml
44,15
50,25
56,90
27,80
$
$
$
$
1.074
1.307
1.433
1.675
$
$
$
$
47.417
65.677
81.538
46.565
m2
m2
75,70
11,00
$
$
1.605
1.251
$
$
121.499
13.761
m2
m2
67,19
12,16
$
$
1.320
1.251
$
$
88.691
15.212
gl
gl
gl
gl
gl
gl
1,00
1,00
1,00
1,00
1,00
1,00
$
$
$
$
$
$
158.351
31.625
79.181
119.910
120.000
154.553
$
$
$
$
$
$
158.351
31.625
79.181
119.910
120.000
154.553
Puertas y Ventanas
Marcos de puertas
Puertas Exteriores
Puertas Interiores
Ventanas de Aluminio
Molduras
Guardapolvos
Cornisas
Pilastra interior
Pilastra exterior
14
14.1
14.1.1
14.1.2
14.2
14.2.1
14.2.2
Pinturas
Exteriores
Esmalte Sinttico
Oleo
Interiores
Ltex
Oleo
15
15.1
15.1.1
15.1.2
15.2
15.3
15.4
15.5
Instalaciones
Artefactos y Accesorios Sanitarios
Bao
Cocina
Agua Potable
Alcantarillado
Electricidad
Gas Licuado
$ 4.929.085
274
80
$ 17.976
41,21
UF/m2
6,65
b) PRESUPUETOA ALTERNATIVA B.
ITEM
DESCRIPCION
UNIDAD
CANT.
1 Movimiento de tierra
1.1 Despeje capa vegetal
1.2 Excavaciones
m2
m3
50,00
3,78
$
$
3.488
2.441
$
$
174.400
9.227
2
2.1
2.2
2.3
2.4
2.5
m3
m3
m3
m2
Kg
0,46
3,25
1,33
9,73
105,00
$
$
$
$
$
26.323
34.655
39.059
7.281
669
$
$
$
$
$
12.109
112.559
51.948
70.844
70.245
3 Base de pavimentos
3.1 Cama de Ripio
3.2 Radier H-15
m2
m2
29,60
29,60
$
$
867
2.980
$
$
25.663
88.208
4 Estrcutura Metalcon
4.1 Tabiques perimetrales (incl. Sobretabique)
4.2 Tabiques interiores
m2
m2
64,53
19,84
$
$
5.037
4.205
$
$
325.038
83.427
5
5.1
5.2
5.3
5.4
5.5
5.6
Techumbre y Hojalatera
Estructura de techumbre
Cubierta
Costaneras
Caballete
Canales (PVC)
Bajadas (PVC)
m2
m2
m2
ml
ml
ml
24,80
52,63
52,63
11,90
22,60
7,50
$
$
$
$
$
$
3.535
4.996
2.378
2.914
3.878
3.909
$
$
$
$
$
$
87.668
262.939
125.154
34.677
87.643
29.318
6
6.1
6.2
6.3
Revestimientos Exteriores
Tapacanes
Frontones
Muros perimetrales
ml
m2
m2
36,15
5,61
70,09
$
$
$
1.291
11.541
12.720
$
$
$
46.670
64.745
891.545
7
7.1
7.1
7.2
Revestimientos Interiores
Muros perimetrales
Muros interiores
Muros cocina y bao
m2
m2
m2
49,09
32,79
19,47
$
$
$
4.964
5.039
7306
$
$
$
243.683
165.229
142248
8 Cielos
8.1 Estructura de Cielo
8.2 Revestimiento de Cielo
m2
m2
40,14
40,14
$
$
6.417
3.202
$
$
257.578
128.528
9 Aislacin
9.1 Cielo
9.2 Tabiques perimetrales
m2
m2
36,44
59,73
$
$
2.004
1.034
$
$
73.026
61.761
10 Pavimentos
10.2 Pavimento vinlico
10.3 Cubre piso
m2
m2
6,35
30,09
$
$
4.892
4.703
$
$
31.064
141.513
11 Puertas y Ventanas
11.1 Marcos de puertas
gl
1,00
19.755
19.755
Fundaciones
Emplantillado
Cimientos H-10
Sobrecimientos H-20
Moldajes
Armadura de acero
81
P.UNITARIO
P.TOTAL
u
u
gl
2,00
3,00
1,00
$
$
$
19.145
11.155
197.004
$
$
$
38.290
33.465
197.004
12 Closet y muebles
12.1 Closet
12.2 Mueble de cocina
gl
gl
1,00
1,00
$
$
100.000
20.000
$
$
100.000
20.000
13
13.1
13.2
13.3
13.4
ml
ml
ml
ml
44,15
50,25
56,90
27,80
$
$
$
$
2.297
1.238
1.364
1.606
$
$
$
$
101.413
62.210
77.612
44.647
m2
m2
75,70
11,00
$
$
1.315
1.403
$
$
99.546
15.433
m2
m2
67,19
12,16
$
$
1.315
1.403
$
$
88.355
17.060
gl
gl
gl
gl
gl
gl
1,00
1,00
1,00
1,00
1,00
1,00
$
$
$
$
$
$
158.351
31.625
79.181
119.910
120.000
154.553
$
$
$
$
$
$
158.351
31.625
79.181
119.910
120.000
154.553
Molduras
Guardapolvos
Cornisas
Pilastra interior
Pilastra exterior
14
14.1
14.1.1
14.1.2
14.2
14.2.1
14.2.2
Pinturas
Exteriores
Ltex
Oleo
Interiores
Ltex
Oleo
15
15.1
15.1.1
15.1.2
15.2
15.3
15.4
15.5
Instalaciones
Artefactos y Accesorios Sanitarios
Bao
Cocina
Agua Potable
Alcantarillado
Electricidad
Gas Licuado
$ 5.420.096
302
82
$ 17.976
41,21
UF/m2
7,32
M3
UNIDAD
JORNAL EXCAVACION
DIA
CANTIDAD
0,50
PRECIO
6.700
TOTAL
3.350
LEYES SOCIALES
55% 3.350
EXCAVACIONES
1.843
5.193
5.193
M3
UNIDAD
CANTIDAD
PRECIO
TOTAL
JORNAL EXCAVADOR
DIA
0,25 6.700
1.675
JORNAL ACARREO
DIA
0,10 6.700
670
-
LEYES SOCIALES
55%
2.345
1.290
3.635
EMPLANTILLADO
3.635
M3
UNIDAD
CANTIDAD
RIPIO
M3
0,81
4.000
3.240
ARENA
M3
0,47
5.000
2.350
CEMENTO
SACOS
1,00
3.420
3.420
PERDIDA
5%
9.010
451
9.461
DIA
CANTIDAD
PRECIO
TOTAL
PRECIO
0,80 7.000
TOTAL
5.600
LEYES SOCIALES
55%
83
DIA
CANTIDAD
0,10
5.600
3.080
8.680
PRECIO
10.000
TOTAL
1.000
-
19.141
CIMIENTO H-10
1.000
M3
UNIDAD
CANTIDAD
RIPIO
M3
0,88
4.000
3.520
ARENA
M3
0,46
5.000
2.275
CEMENTO
SACOS
4,00
3.420
13.680
PERDIDAS
5%
19.475
974
20.449
CONCRETERO
UNIDAD
CANTIDAD
DIA
0,90
PRECIO
TOTAL
PRECIO
7.000
TOTAL
6.300
-
LEYES SOCIALES
55%
6.300
3.465
9.765
UNIDAD
CANTIDAD
BETONERA
DIA
0,05
10.000
500
VIBRADOR DE INMERSION
DIA
0,05
7.000
350
850
PRECIO
SOBRECIMIENTO H-20
TOTAL
31.064
M3
UNIDAD
CANTIDAD
RIPIO
M3
0,88
4.000
3.520
ARENA
M3
0,46
5.000
2.275
CEMENTO
SACOS
6,00
3.420
20.520
PERDIDAS
5%
31.722
1.586
27.901
84
PRECIO
TOTAL
CONCRETERO
UNIDAD
CANTIDAD
DIA
0,95
PRECIO
7.000
TOTAL
6.650
-
LEYES SOCIALES
55%
CANTIDAD
6.650
3.658
10.308
PRECIO
TOTAL
BETONERA
DIA
0,05
10.000
500
VIBRADOR DE INMERSION
DIA
0,05
7.000
350
850
MOLDAJES
39.059
M2
UNIDAD
CANTIDAD
PRECIO
TOTAL
PULG
1,250
900
1.125
M2
1,000
4.529
4.529
KG
0,158
815
129
DESMOLDANTE
KG
0,013
968
13
BROCHA 5X5/8"
0,013
933
12
PERDIDAS
10% 5.808
$
UNIDAD
DIA
CANTIDAD
0,05
581
5.808
PRECIO
19.000
TOTAL
950
-
LEYES SOCIALES
55% 950
1.473
ARMADURA ACERO
523
7.281
KG
UNIDAD
CANTIDAD
FIERRO A 44 - 28 H
KG
1,05
ALAMBRE NEGRO N 18
KG
0,01
PERDIDAS
PRECIO
378
733
8% 386
TOTAL
397
5
31
-
85
433
UNIDAD
ENFIERRADOR + AYUD.
DIA
CANTIDAD
0,0080
PRECIO
19.000
TOTAL
152
LEYES SOCIALES
55% 152
CAMA DE RIPIO
84
236
669
M3
UNIDAD
CANTIDAD
PRECIO
TOTAL
RIPIO
M3
0,100
4.000
400
POLIETILENO 0,1 mm
COMBUSTIBLE PLACA
COMPACTADORA
M2
1,000
50
50
LTS
0,026
450
12
DESGASTE DE HERRAMIENTA
3% 462
14
PERDIDAS
5% 476
24
$
UNIDAD
JORNAL
JORNAL OPERADOR PLACA
COMPACTADORA
CANTIDAD
500
PRECIO
TOTAL
DIA
0,022
6.500
143
DIA
0,010
6.500
65
-
LEYES SOCIALES
55% 208
$
UNIDAD
PLACA COMPACTADORA
DIA
CANTIDAD
0,006
114
322
PRECIO
7.500
TOTAL
45
-
RADIER
45
867
M2
UNIDAD
CANTIDAD
PRECIO
TOTAL
RIPIO
M3
0,06
4.000
220
ARENA
M3
0,03
5.000
170
SACOS
0,28
3.420
958
CEMENTO
86
PERDIDAS
5% 3.173
$
UNIDAD
ALBAIL + AYUYD.
DIA
LEYES SOCIALES
CANTIDAD
0,1
19.000
TABIQUERIA PERIMETRAL
1.507
PRECIO
55% 950
159
TOTAL
950
523
1.473
2.980
M2
UNIDAD
CANTIDAD
PRECIO
TOTAL
PULG
0,7800
2.380
1.856
PULG
0,0500
2.380
119
KG
0,4795
815
391
CARBONILEUM
GLN
0,0030
4.782
14
TRANSPORTE
PULG
0,7800
80
62
PERDIDAS
10% 2.380
$
UNIDAD
CARPINTERO + 1 AYUD
DIA
CANTIDAD
0,090
238
2.680
PRECIO
19.000
TOTAL
1.710
LEYES SOCIALES
55% 1.710
TABIQUERIA INTERIOR
941
2.651
5.331
M2
UNIDAD
CANTIDAD
PRECIO
TOTAL
PULG
1,0206
1.666
1.700
PULG
0,0823
1.666
137
CLAVOS 3 1/2"
PULG
0,4795
815
391
CARBONILEUM
LT
0,0750
547
41
TRANSPORTE
PULG
1,1000
80
88
87
PERDIDAS
10% 2.269
CARPINTERO + 1 AYUD
LEYES SOCIALES
2.584
$
UNIDAD
DIA
CANTIDAD
0,088
PRECIO
19.000
55% 1.672
TOTAL
1.672
920
2.592
ESTRUCTURA TECHUMBRE
227
5.176
M2
UNIDAD
CANTIDAD
PRECIO
TOTAL
PULG
0,1100
2.380
262
PULG
0,0500
2.380
119
PULG
0,0700
2.380
167
PULG
0,0100
2.380
24
KG
0,0750
815
61
PULG
0,2400
80
19
CLAVOS DE 2 1/2"
TRANSPORTE
PERDIDAS
10% 633
CARPINTERO + 1 AYUD.
715
$
UNIDAD
DIA
CANTIDAD
0,090
63
PRECIO
19.000
TOTAL
1.710
LEYES SOCIALES
55% 1.710
2.651
CUBIERTA
941
3.366
M2
UNIDAD
CANTIDAD
PRECIO
TOTAL
M2
2085
2085
PERDIDA
5%
PL ZINC-ALUM DE 0,35 MM
88
143
1.144
3.229
161
3.229
UNIDAD
CARPINTERO + 1 AYUD.
DIA
CANTIDAD
0,0600
PRECIO
19.000
TOTAL
1.140
LEYES SOCIALES
55% 1.140
1.767
4.996
COSTANERAS
627
M2
UNIDAD
CANTIDAD
PRECIO
PULG
KG
0,08
815
65
PULG
0,246
80
20
10%
650
65
735
TRANSPORTE
PERDIDAS
0,246 2.380
TOTAL
DIA
CANTIDAD
0,0200
585
PRECIO
19.000
TOTAL
380
LEYES SOCIALES
55% 380
589
1.324
CABALLETE
209
ML
UNIDAD
CANTIDAD
PRECIO
PL
0,17
10% 1.597
160
SELLOS
10% 1.597
160
PERDIDAS
6% 1.462
88
$
UNIDAD
HOJALATERO + AYUD.
6.716
TOTAL
DIA
CANTIDAD
0,04
1.142
1.550
PRECIO
22.000
TOTAL
880
-
LEYES SOCIALES
55% 880
89
484
CANALES
1.364
2.914
ML
UNIDAD
CANTIDAD
PRECIO
TOTAL
PL
0,11
6.716
739
10% 1.469
147
SELLOS
10% 1.469
147
PERDIDAS
6% 1.033
62
$
UNIDAD
HOJALATERO + AYUD.
DIA
CANTIDAD
0,06
1.095
PRECIO
22.000
TOTAL
1.320
LEYES SOCIALES
55% 1.320
BAJADAS
726
2.046
3.141
ML
UNIDAD
CANTIDAD
PRECIO
TOTAL
PL
0,11
6.716
739
10% 1.469
147
SELLOS
10% 1.469
147
PERDIDAS
6% 1.033
62
$
UNIDAD
HOJALATERO + AYUD.
DIA
CANTIDAD
0,06
1.095
PRECIO
22.000
TOTAL
1.320
LEYES SOCIALES
55% 1.320
726
2.046
3.141
90
TAPACANES
ML
UNIDAD
CANTIDAD
TOTAL
PULG
0,220
2.618
576
KG
0,020
815
16
PULG
0,220
80
18
10% 610
$
UNIDAD
CARPINTERO INSTALACION
PRECIO
DIA
CANTIDAD
0,040
61
592
PRECIO
13.328
TOTAL
533
-
LEYES SOCIALES
55% 533
REVESTIMIENTO FRONTONES
293
826
1.418
M2
UNIDAD
CANTIDAD
PRECIO
TOTAL
FIBROCEMENTO 6 mm
M2
1,000 2.358
2.358
FIELTRO N10
M2
1,000 158
158
TORNILLO AUTORROSCANTE N6
10
90
ML
1,50 30
45
KG
0,76 243
185
PERDIDA
5%
DIA
CANTIDAD
0,080
2.835
142
2.977
PRECIO
19.000
TOTAL
1.520
-
LEYES SOCIALES
55% 1.520
836
2.356
5.333
91
M2
UNIDAD
CANTIDAD
PRECIO
TOTAL
ZINC-ALUM 5V DE 0,35 mm
M2
1,000
1.990
1.990
FIELTRO N10
M2
1,000
158
158
19
152
2.300
230
2.530
PERDIDAS
10%
DIA
CANTIDAD
0,080
PRECIO
19.000
TOTAL
1.520
-
LEYES SOCIALES
55% 1.520
836
2.356
4.886
M2
CANTIDAD
PRECIO
1,00 2.137
TOTAL
M2
UN
15,00
10
150
ML
1,50
30
45
KG
0,76
243
185
PERDIDAS
2.517
126
5%
$
UNIDAD
DIA
CANTIDAD
0,080
2.137
2.643
PRECIO
19.000
TOTAL
1.520
-
LEYES SOCIALES
55% 1.520
836
2.356
4.999
92
REVESTIMIENTO MUROS
INTERIORES
M2
UNIDAD
CANTIDAD
PRECIO
1,00 1.921
TOTAL
1.921
UN
15,00
10
150
ML
1,50
30
45
KG
0,76
243
185
PERDIDA
2.301
115
5%
$
UNIDAD
DIA
CANTIDAD
0,080
2.301
PRECIO
19.000
TOTAL
1.520
-
LEYES SOCIALES
55% 1.520
836
2.356
4.657
M2
CANTIDAD
PRECIO
TOTAL
SUPERBOARD DE 4 MM
M2
1,000
4.395
UN
9,00
10
90
ML
1,50
30
45
KG
0,76
243
185
PERDIDA
4.714
236
5%
$
UNIDAD
CARPINTERO + 1 AYUD.
DIA
CANTIDAD
0,080
4.395
4.950
PRECIO
19.000
TOTAL
1.520
-
LEYES SOCIALES
55% 1.520
ESTRUCTURA CIELO
836
2.356
7.306
M2
UNIDAD
93
CANTIDAD
PRECIO
TOTAL
ENCINTADO DE 2X2
CLAVOS DE 3 1/2"
TRANSPORTE
PERDIDA
PULG
0,204 1.666
340
KG
0,070 875
61
PULG
0,204 80
16
10 417
$
UNIDAD
CARPINTERO + AYUD.
DIA
CANTIDAD
0,0500
4.173
4.590
PRECIO
19.000
TOTAL
950
LEYES SOCIALES
55% 950
1.473
REVESTIMIENTO CIELO
523
6.063
M2
UNIDAD
CANTIDAD
PRECIO
1,00 1.618
TOTAL
M2
UN
15,00
10
150
ML
1,50
30
45
KG
0,76
243
185
PERDIDAS
1.998
100
5%
$
UNIDAD
DIA
CANTIDAD
0,040
1.618
2.098
PRECIO
19.000
TOTAL
760
LEYES SOCIALES
55% 760
M2
UNIDAD
1.178
3.276
AISLACION CIELO
418
M2
CANTIDAD
2,050
PRECIO
924
TOTAL
1.894
-
94
1.894
UNIDAD
CARPINTERO + AYUD. ( Instalacion)
DIA
CANTIDAD
0,009
PRECIO
9.310
TOTAL
84
LEYES SOCIALES
55% 84
AISLACION TABIQUES
130
2.024
M2
UNIDAD
AISLAN GLASS DE 40 MM
46
M2
CANTIDAD
1,020
PRECIO
924
TOTAL
942
-
$
UNIDAD
DIA
CANTIDAD
0,009
942
PRECIO
19.000
TOTAL
171
LEYES SOCIALES
55% 171
PAVIMENTO VINILICO
PEGAMENTO ELASTROPEN
PERDIDAS
M2
CANTIDAD
TOTAL
1,00
3.590
3.590
GLN
0,076
8.990
683
5% 4.273
214
$
UNIDAD
LEYES SOCIALES
PRECIO
M2
FLEXETERO + AYUD.
265
1.207
UNIDAD
PISO VINILICO TIPO PISOFLEX EN 1,4
MM
94
DIA
CANTIDAD
0,028
PRECIO
15.000
55% 420
4.487
TOTAL
420
231
651
5.138
95
CUBRE PISO
M2
UNIDAD
CANTIDAD
TOTAL
M2
1,00
3.410
3.410
GLN
0,076
8.990
683
5% 4.093
205
$
UNIDAD
FLEXETERO + AYUD.
PRECIO
DIA
CANTIDAD
0,028
4.298
PRECIO
15.000
TOTAL
420
LEYES SOCIALES
0% 35
MARCO DE PUERTAS
35
35
U
UNIDAD
CANTIDAD
PRECIO
TOTAL
MARCO FE 1 mm
ML
8,450
TORNILLOS
UN
20,00 20
400
OLEO SINTETICO
GLN
0,120 5.990
719
BROCHA
UN
0,500 979
490
PERDIDAS
5% 4.651
$
UNIDAD
360
DIA
CANTIDAD
0,120
3.042
233
3.442
PRECIO
19.000
TOTAL
2.280
-
LEYES SOCIALES
55% 2.280
U
UNIDAD
3.534
6.976
MARCO DE PUERTAS
1.254
PULG
96
CANTIDAD
1,220
PRECIO
1.904
TOTAL
2.323
815
41
KG
0,050
OLEO SINTETICO
GLN
0,012 5.990
72
0,500 979
490
BROCHA
PERDIDAS
5% 2.926
$
UNIDAD
146
DIA
CANTIDAD
0,110
2.364
PRECIO
19.000
TOTAL
2.090
-
LEYES SOCIALES
55% 2.090
1.150
3.240
5.604
5 28.020
PUERTAS EXTERIORES
U
UNIDAD
CANTIDAD
PUERTA HDF DE 44 MM
15.990
15.990
330
990
TIRADOR DE MADERA
CERRADURA TUBULAR TIPO
SCANAVINI
GLN
0,8
OLEO SINTETICO
A.- TOTAL MATERIAL
UNIDAD
CARPINTERO + AYUD. (Instal. )
DIA
CANTIDAD
0,150
PRECIO
TOTAL
5.990
4.792
16.980
PRECIO
19.000
TOTAL
2.850
-
LEYES SOCIALES
55% 2.850
PUERTAS INTERIORES
1.568
4.418
21.398
U
UNIDAD
CANTIDAD
PUERTA MDF DE 44 MM
TIRADOR DE MADERA
97
PRECIO
8.990
TOTAL
8.990
GLN
0,8
DIA
CANTIDAD
0,150
5.990
4.792
8.990
PRECIO
19.000
TOTAL
2.850
-
LEYES SOCIALES
55% 2.850
VENTANAS
1.568
4.418
13.408
GL
UNIDAD
CANTIDAD
PRECIO
TOTAL
VENTANA 1
1,000
69.600
69.600
VENTANA 2
2,000
44.750
89.500
VENTANA 5
2,000
31.280
62.560
-
$
UNIDAD
CANTIDAD
221.660
PRECIO
TOTAL
-
LEYES SOCIALES
0% -
221.660
CLOSET
GL
UNIDAD
SUBCONTRATO MC MUEBLES
GL
CANTIDAD
1
PRECIO
100.000
TOTAL
100.000
-
$
UNIDAD
98
CANTIDAD
PRECIO
100.000
TOTAL
LEYES SOCIALES
0% -
MUEBLE DE COCINA
100.000
GL
UNIDAD
SUBCONTRATO MC MUEBLES
GL
CANTIDAD
1
PRECIO
20.000
TOTAL
20.000
-
$
UNIDAD
CANTIDAD
20.000
PRECIO
TOTAL
LEYES SOCIALES
0% -
GUARDAPOLVOS
20.000
ML
UNIDAD
CANTIDAD
PRECIO
TOTAL
ML
1,0000
615
615
PUNTILLAS DE 11/2"
KG
0,0020
2.120
OLEO SINTETICO
GLN
0,001 5.990
LIJA N100
UN
BROCHA
UN
0,026 979
25
PERDIDAS
5% 683
34
0,50
$
UNIDAD
CARPINTERO TERMINACION
64
DIA
CANTIDAD
0,020
32
717
PRECIO
11.500
TOTAL
230
LEYES SOCIALES
55% 230
99
127
CORNISAS
357
1.074
ML
UNIDAD
CANTIDAD
PRECIO
TOTAL
850
850
2.120
0,001 5.990
ML
1,000
PUNTILLAS DE 1 1/2"
KG
0,0024
OLEO SINTETICO
GLN
LIJA N100
UN
BROCHA
UN
0,026 979
25
PERDIDA
5% 905
45
0,26
$
UNIDAD
CARPINTERO TERMINACION
69
DIA
CANTIDAD
0,020
18
950
PRECIO
11.500
TOTAL
230
LEYES SOCIALES
55% 230
357
1.307
PILASTRA EXTERIOR
127
ML
UNIDAD
CANTIDAD
PRECIO
TOTAL
ML
1,000
1.200
1.200
KG
0,0024
2.120
OLEO SINTETICO
GLN
0,001 5.990
LIJA N100
UN
BROCHA
UN
PERDIDAS
0,26
0,026 979
5% 1.255
$
UNIDAD
CARPINTERO TERMINACION
69
DIA
CANTIDAD
0,020
18
25
63
1.318
PRECIO
11.500
TOTAL
230
LEYES SOCIALES
55% 230
$
100
127
357
1.675
PILASTRA INTERIOR
ML
UNIDAD
CANTIDAD
970
2.120
0,001 5.990
ML
1,000
KG
0,0024
OLEO SINTETICO
GLN
LIJA N100
UN
BROCHA
UN
PERDIDAS
0,26
69
0,026 979
5% 1.025
$
UNIDAD
DIA
TOTAL
970
CARPINTERO TERMINACION
PRECIO
CANTIDAD
0,020
18
25
51
1.076
PRECIO
11.500
TOTAL
230
LEYES SOCIALES
55% 230
OLEO
127
357
1.433
M2
UNIDAD
CANTIDAD
PRECIO
TOTAL
GLN
0,050
5.990
300
BROCHA 5x5/8"
UN
0,010
1.594
16
-
$
UNIDAD
PINTOR
DIA
CANTIDAD
0,067
316
PRECIO
9.000
TOTAL
603
-
LEYES SOCIALES
55% 603
$
332
935
1.251
101
ESMALTE SINTETICO
M2
UNIDAD
CANTIDAD
PRECIO
TOTAL
ESMALTE SINTETICO
GLN
0,0500
9.900
495
RODILLO
UN
0,100
1.750
175
670
DIA
CANTIDAD
0,067
PRECIO
9.000
TOTAL
603
-
LEYES SOCIALES
55% 603
LATEX
332
935
1.605
M2
UNIDAD
CANTIDAD
PRECIO
TOTAL
LATEX EXTRACUBRIENTE
GLN
0,0500
4.200
210
RODILLO
UN
0,100
1.750
175
385
DIA
CANTIDAD
0,067
PRECIO
9.000
TOTAL
603
-
LEYES SOCIALES
55% 603
BAO
935
1.320
GL
UNIDAD
332
CANTIDAD
PRECIO
TOTAL
UN
1,00
20.210
20.210
UN
1,00
14.280
14.280
102
UN
1,00
95.000
95.000
-
$
UNIDAD
GASFITER + AYUD.
DIA
CANTIDAD
2
129.490
PRECIO
9.310
TOTAL
18.620
-
LEYES SOCIALES
55% 18.620
10.241
28.861
158.351
COCINA
GL
UNIDAD
UN
CANTIDAD
1,00
PRECIO
20.000
TOTAL
20.000
-
$
UNIDAD
CARPINTERO
DIA
CANTIDAD
20.000
PRECIO
1 7.500
TOTAL
7.500
-
LEYES SOCIALES
55% 7.500
11.625
31.625
AGUA POTABLE
4.125
GL
UNIDAD
103
CANTIDAD
PRECIO
TOTAL
PVC HIDRAULICO DE 20 MM
ML
18,00
282
5.076
PVC HIDRAULICO DE 13 MM
ML
12,00
282
3.384
UN
11,00
79
869
UN
14,00
79
1.106
UN
3,00
125
375
UN
2,00
125
250
LLAVE DE PASO DE 20 MM
UN
2,00
2.000
4.000
LLAVE DE CORTE DE 13 MM
UN
2,00
2.000
4.000
LLJ 19 MM
UN
1,00
1.260
1.260
MAP 13 MM
UN
1,00
30.000
30.000
50.320
DIA
CANTIDAD
2
PRECIO
9.310
TOTAL
18.620
LEYES SOCIALES
55% 18.620
10.241
28.861
ALCANTARILLADO
79.181
GL
UNIDAD
EXCAVACIONES Y RETIRO DE
EXEDENTES
CANTIDAD
PRECIO
TOTAL
M3
4,500
2.850
12.825
RELLENO SELECCIONADO
RELLENO CON MATERIAL DE
EXCAVACIONES
M3
0,520
3.300
1.716
M3
3,000
1.800
5.400
ML
15,000
2.021
30.315
PVC SANITARIO 75 MM
ML
4,000
1.099
4.396
PVC SANITARIO 50 MM
ML
4,000
608
2.432
PVC SANITARIO 38 MM
ML
2,000
493
986
UN
3,000
1.310
3.930
CODO 90 DE 75 MM
UN
1,000
636
636
CODO 90 DE 110 MM
UN
1,000
777
777
CODO 90 DE 50 MM
UN
1,000
318
318
CODO 90 DE 38 MM
UN
1,000
318
318
SIFONES
UN
2,000
1.000
2.000
104
$
UNIDAD
GASFITER + AYUD
UN
DIA
CANTIDAD
2
91.049
PRECIO
9.310
TOTAL
18.620
LEYES SOCIALES
55% 18.620
10.241
28.861
GAS LICUADO
119.910
GL
UNIDAD
EXCAVACIONES Y RETIRO DE
EXEDENTES
RELLENO CON MATERIAL DE
EXCAVACIONES
CANTIDAD
PRECIO
TOTAL
M3
1,000
2.850
2.850
M3
0,900
1.800
1.620
PROTECCION CAERIAS
ML
4,330
550
2.382
CAERIA CU 1/2"
ML
7,690
1.832
14.088
CAERIA CU 3/8"
ML
2,890
1.328
3.838
5,000
248
1.240
3,000
230
690
1,000
236
236
2,000
1.680
3.360
1,000
1.680
1.680
1,000
318
318
CALEFONT 5 LT
1,000
48.390
48.390
NICHO CILINDROS
1,000
45.000
45.000
125.692
DIA
CANTIDAD
2
PRECIO
9.310
TOTAL
18.620
LEYES SOCIALES
55% 18.620
10.241
28.861
154.553
105
TABIQUERIA PERIMETRAL
M2
CANTIDAD
PRECIO
TOTAL
MONTANTE 60CA085
UNIDAD
ML
4,0200
582
2.340
CANAL 62C085
ML
1,5800
412
651
ML
0,4400
415
183
21
TORNILLO AUTOPERFORANTE #8
15
UNIDAD
CARPINTERO + 1 AYUD
DIA
75
3.270
CANTIDAD
PRECIO
TOTAL
0,060
19.000
1.140
-
LEYES SOCIALES
55%
1.140
$
1.767
TABIQUERIA INTERIOR
627
5.037
M2
UNIDAD
CANTIDAD
PRECIO
TOTAL
MONTANTE 40CA085
ML
3,00
597
1.791
CANAL 42C085
ML
1,00
597
597
10
50
TORNILLOS AUTPERFORANTES #8
A.- TOTAL MATERIAL
$
UNIDAD
CARPINTERO + 1 AYUD
DIA
2.438
CANTIDAD
PRECIO
TOTAL
0,060
19.000
1.140
-
LEYES SOCIALES
55%
1.140
$
627
1.767
4.205
106
ESTRUCTURA TECHUMBRE
M2
CANTIDAD
PRECIO
TOTAL
MONTANTE 60CA085
UNIDAD
ML
1,8500
582
1.077
CANAL 62C085
ML
0,0600
412
25
MONTANTE 40CA085
ML
0,2000
597
119
CANAL 42CA085
ML
0,1000
597
60
ESTABILIZADORES 350MA05
ML
0,9200
484
445
42
$
UNIDAD
CARPINTERO + 1 AYUD.
DIA
1.768
CANTIDAD
PRECIO
TOTAL
0,060
19.000
1.140
-
LEYES SOCIALES
55%
1.140
$
COSTANERAS
3.535
M2
UNIDAD
COSTANERA 350MA05
TORNILLO AUTOPERFORANTE #10
ML
U
CANTIDAD
PRECIO
TOTAL
3,00
484
1.452
42
$
UNIDAD
CARPINTERO + 1 AYUD.
627
1.767
DIA
1.494
CANTIDAD
PRECIO
TOTAL
0,0300
19.000
570
-
LEYES SOCIALES
55%
570
$
884
CANALES
314
2.378
ML
CANTIDAD
PRECIO
TOTAL
UNIDAD
ML
0,46
1.200
552
20%
552
110
SELLOS
10%
1.469
147
107
809
UNIDAD
HOJALATERO + AYUD.(Instalacion)
DIA
CANTIDAD
0,09
PRECIO
TOTAL
22.000
1.980
1.980
1.089
LEYES SOCIALES
55%
3.069
BAJADAS
3.878
ML
UNIDAD
CANTIDAD
PRECIO
TOTAL
ML
0,46
1.187
546
10%
1.469
147
SELLOS
10%
1.469
147
$
UNIDAD
HOJALATERO + AYUD.(Instalacion)
DIA
CANTIDAD
0,09
840
PRECIO
TOTAL
22.000
1.980
1.980
1.089
LEYES SOCIALES
55%
3.069
REVESTIMIENTO FRONTONES
3.909
M2
CANTIDAD
PRECIO
TOTAL
SAIDING VINILICO
UNIDAD
ML
5,300
776
4.113
M2
1,050
2.279
2.393
FIELTRO N10
M2
1,000
158
158
10
90
75
TORNILLO AUTORROSCANTE N6
9
15,00
$
UNIDAD
CARPINTERO + 1 AYUD.
DIA
6.829
CANTIDAD
PRECIO
TOTAL
0,160
19.000
3.040
-
LEYES SOCIALES
55%
3.040
$
1.672
4.712
11.541
108
REVESTIMIENTO EXTERIOR
(Perimetral)
M2
CANTIDAD
PRECIO
TOTAL
SAIDING VINILICO
UNIDAD
M2
1,000
3.882
3.882
ML
0,440
1.927
848
ML
0,080
1.544
124
PERFIL J
ML
0,270
571
154
PERFIL COMIENZO
ML
M2
0,450
1,05
284
2.393
10
90
15
75
M2
158
158
FIELTRO N10
9,00
632
2.279
$
UNIDAD
DIA
8.008
CANTIDAD
PRECIO
TOTAL
0,160
19.000
3.040
-
LEYES SOCIALES
55%
3.040
$
4.712
SUPERBOARD 6 MM
TORNILLO AUTORROSCANTE N6
1.672
12.720
M2
UNIDAD
CANTIDAD
PRECIO
TOTAL
M2
1,00
3.226
3.226
150
15,00
10
ML
1,50
30
45
KG
0,76
243
185
PERDIDA
5%
3.605
DIA
180
3.786
CANTIDAD
PRECIO
TOTAL
0,040
19.000
760
-
LEYES SOCIALES
55%
760
$
1.178
418
4.964
M2
UNIDAD
109
CANTIDAD
PRECIO
TOTAL
SUPERBOARD DE 4 MM
M2
1,000
1.212
1.212
UN
9,00
138
1.242
ML
1,50
30
45
KG
0,76
243
185
PERDIDA
5%
2.683
$
UNIDAD
DIA
134
2.683
CANTIDAD
PRECIO
TOTAL
0,080
19.000
1.520
-
LEYES SOCIALES
55%
1.520
$
2.356
ESTRUCTURA CIELO
836
5.039
M2
UNIDAD
CANTIDAD
PRECIO
TOTAL
PORTANTE 35MA05
ML
2,000
1.666
3.332
CANAL PRIMETRAL
ML
0,800
815
652
12,000
80
960
$
UNIDAD
CARPINTERO + AYUD.
DIA
4.944
CANTIDAD
PRECIO
TOTAL
0,0500
19.000
950
55%
950
523
LEYES SOCIALES
1.473
VENTANAS
6.417
GL
UNIDAD
CANTIDAD
PRECIO
TOTAL
VENTANA 1
1,000
71.324
71.324
VENTANA 2
2,000
34.990
69.980
VENTANA 5
2,000
27.850
55.700
-
$
UNIDAD
110
CANTIDAD
197.004
PRECIO
TOTAL
LEYES SOCIALES
0%
197.004
111
112
BIBLIOGRAFIA
-
www.covintec.cl
www.royalandina.com
www.lpchile.cl
www.minvu.cl
www.sodimac.cl
www.cintac.cl
www.volcan.cl