MEJORAMIENTO DEL JR. SANTA INS CUADRAS 05 Y 06, JR. SGTO. MENDOZA CUADRA 01 Y PSJE. SGTO. LORES, EN EL SECTOR HUAYCO, DISTRITO
DE TARAPOTO, PROVINCIA DE SAN MARTN SAN MARTN
Cliente
Lugar
tem
01
Costo al
Descripcin
Und.
Metrado
29 FEBRERO 2016
Precio S/.
Parcial S/.
TRABAJOS PRELIMINARES
28,533.84
01.01
und
1.00
1,757.80
1,757.80
01.02
m2
01.03
GLB
4,609.20
1.22
5,623.22
1.00
2,321.90
01.04
2,321.90
m2
1,339.59
0.78
01.05
1,044.88
m3
24.68
100.93
2,490.95
01.06
m3
27.33
126.17
3,448.23
01.07
m3
52.00
12.63
656.76
01.08
11,190.10
01.08.01
1.00
3,000.00
3,000.00
01.08.02
GLB
1.00
3,517.50
3,517.50
01.08.03
GLB
1.00
2,172.60
2,172.60
01.08.04
GLB
1.00
1,500.00
1,500.00
01.08.05
GLB
1.00
1,000.00
1,000.00
und
10.00
297.02
2,970.20
02
02.01
03
03.01
OBRAS PROVISIONALES
PUENTE DE MADERA PARA PASE PEATONAL SOBRE ZANJA (PROV. DURANTE LA OBRA)
2,970.20
EXPLANACIONES
81,636.32
MOVIMIENTO DE TIERRAS
81,636.32
03.01.01
m3
2,954.45
3.76
11,108.73
03.01.02
m3
780.40
37.19
29,023.08
03.01.03
m2
4,609.20
1.55
7,144.26
03.01.04
m3
2,954.45
11.63
34,360.25
04
04.01
PAVIMENTOS
403,565.77
156,592.68
04.01.01
m3
921.84
75.88
69,949.22
04.01.02
BASE GRANULAR
m3
895.91
96.71
86,643.46
IMPRIMACION ASFALTICA
m2
4,479.54
4.24
18,993.25
m3
223.98
959.84
214,984.96
m3
25.93
367.07
9,518.13
04.03.02
m2
2.72
41.40
112.61
04.03.03
DOWELS 3/4"X0.45M@0.30M
kg
358.80
4.05
1,453.14
04.03.04
47.84
2.01
96.16
04.03.05
47.84
9.01
431.04
04.03.06
58.42
13.59
793.93
04.03.07
47.84
12.33
589.87
04.02
04.02.01
04.02.02
04.03
04.03.01
05
05.01
Total S/.
PAVIMENTO ASFALTICO
233,978.21
PAVIMENTO DE CONCRETO
12,994.88
497,597.77
51,833.97
05.01.01
m2
414.12
1.47
608.76
05.01.02
m2
414.12
4.39
1,817.99
Presupuesto
MEJORAMIENTO DEL JR. SANTA INS CUADRAS 05 Y 06, JR. SGTO. MENDOZA CUADRA 01 Y PSJE. SGTO. LORES, EN EL SECTOR HUAYCO, DISTRITO
DE TARAPOTO, PROVINCIA DE SAN MARTN SAN MARTN
Cliente
Lugar
tem
Costo al
Descripcin
Und.
05.01.03
m2
05.01.04
05.01.05
05.01.06
05.01.07
Metrado
29 FEBRERO 2016
Precio S/.
Parcial S/.
414.12
12.38
5,126.81
m3
75.43
354.75
26,758.79
m2
825.31
4.31
3,557.09
m2
214.68
40.58
8,711.71
560.60
9.37
5,252.82
343.01
0.84
288.13
05.02.02
m3
7.63
33.78
257.74
05.02.03
m3
19.73
377.19
7,441.96
05.02.04
kg
768.68
4.27
3,282.26
05.02.05
m2
223.91
40.58
9,086.27
05.02.06
45.20
9.37
423.52
05.02.07
m3
7.63
11.63
88.74
1,666.03
0.78
1,299.50
05.02
05.02.01
05.03
SARDINELES
20,868.62
359,505.27
05.03.01
m2
05.03.02
m2
624.76
1.47
918.40
05.03.03
m3
1,208.89
8.58
10,372.28
05.03.04
m3
444.48
51.01
22,672.92
05.03.05
m2
624.76
12.38
7,734.53
05.03.06
m3
31.24
255.14
7,970.57
05.03.07
m3
319.32
377.19
120,444.31
05.03.08
kg
16,560.75
4.27
70,714.40
05.03.09
m2
2,429.63
41.40
100,586.68
05.03.10
291.60
9.37
2,732.29
05.03.11
m3
1,208.89
11.63
14,059.39
m2
61.24
1.47
90.02
05.04.02
m3
7.66
33.78
258.75
05.04.03
m3
4.59
427.73
1,963.28
05.04.04
m2
28.64
47.95
1,373.29
05.04.05
30.68
9.37
287.47
05.04.06
m3
7.66
11.63
89.09
51.33
0.78
40.04
05.04
05.04.01
05.05
4,061.90
40,456.83
05.05.01
m2
05.05.02
m2
35.78
1.47
52.60
05.05.03
m3
223.85
8.58
1,920.63
05.05.04
m3
184.01
51.01
9,386.35
05.05.05
m3
3.58
255.14
913.40
05.05.06
m3
35.98
377.19
13,571.30
05.05.07
kg
1,807.84
4.27
7,719.48
05.05.08
m2
101.63
41.40
4,207.48
05.05.09
4.50
9.37
42.17
05.05.10
m3
223.85
11.63
2,603.38
05.06
MUROS DE ENCAUZAMIENTO
Total S/.
20,871.18
Presupuesto
MEJORAMIENTO DEL JR. SANTA INS CUADRAS 05 Y 06, JR. SGTO. MENDOZA CUADRA 01 Y PSJE. SGTO. LORES, EN EL SECTOR HUAYCO, DISTRITO
DE TARAPOTO, PROVINCIA DE SAN MARTN SAN MARTN
Cliente
Lugar
tem
Descripcin
Costo al
Und.
Metrado
Precio S/.
m2
05.06.02
m3
47.33
8.58
406.09
05.06.03
112.20
12.72
1,427.18
05.06.04
m3
212.40
26.93
5,719.93
05.06.05
m3
40.35
218.66
8,822.93
05.06.06
m2
62.00
32.43
2,010.66
05.06.07
m2
13.89
40.05
556.29
05.06.08
m3
159.53
11.63
1,855.33
und
5.00
150.69
753.45
7.00
391.18
2,738.26
06.01
07
1.47
Parcial S/.
05.06.01
06
49.50
29 FEBRERO 2016
ACCESOS VEHICULARES
RAMPA DE CONCRETO F'C=175 KG/CM2 2.00x0.50x0.15M EN ACCESOS VEHICULARES
753.45
13,268.36
07.01
SEAL REGLAMENTARIA
und
07.02
SEAL INFORMATIVA
und
5.00
464.91
2,324.55
07.03
m2
324.29
13.45
4,361.70
07.04
PINTADO DE SARDINELES
m2
130.47
11.54
1,505.62
07.05
PINTADO DE VEREDAS
m2
202.62
11.54
2,338.23
08
33,169.55
08.01
GLB
1.00
1,500.00
1,500.00
08.02
GLB
1.00
1,000.00
1,000.00
08.03
GLB
1.00
1,500.00
1,500.00
08.04
GLB
1.00
1,500.00
1,500.00
08.05
GLB
1.00
2,000.00
2,000.00
08.06
PLAN DE CONTINGENCIAS
GLB
1.00
1,000.00
1,000.00
08.07
PLAN DE ABANDONO
GLB
1.00
1,500.00
1,500.00
08.08
GLB
1.00
2,000.00
2,000.00
08.09
ARBORIZACIN Y JARDINERIA
m2
305.86
26.22
8,019.65
08.10
m3
4,614.00
2.85
13,149.90
09
Total S/.
72.77
VARIOS
17,163.26
09.01
und
26.00
118.29
3,075.54
09.02
und
27.00
172.08
4,646.16
09.03
und
5.00
261.50
1,307.50
09.04
BASURERO BASCULANTE
und
6.00
331.25
1,987.50
09.05
PLACA RECORDATORIA
und
1.00
526.86
526.86
09.06
und
3.00
763.10
2,289.30
09.07
und
4.00
832.60
3,330.40
COSTO DIRECTO
GASTOS GENERALES
UTILIDAD
10.387%
5.00%
1,078,658.52
112,040.69
53,932.93
============
SUB_TOTAL
I.G.V.
18.00%
1,244,632.14
224,033.78
============
COSTO DE OBRA
1,468,665.92