Documentos de Académico
Documentos de Profesional
Documentos de Cultura
ALIDAD
PROVIN
CIAL
DE
PUNO
GERENCIA MUNICIPAL
EJECUTORES:
Supervisor
Residente
Asistente Tcnico
Asistente Administrativo
ACIN DE INVERSIONES
cip 60095
cip 72112
INFORME FINAL
4.6.2.-
4.6.3.-
4.6.4.-
4.6.5.-
4.6.6.-
4.6.7.-
4.6.8.-
4.6.9.-
4.6.10.-
4.6.11.-
METRADOS FINALES
ASIGNACIN PRESUPUESTAL
=======================================================
====================================
Direccin: Jirn Deustua N458 4to Piso - Plaza de Armas
4.7.2.-
4.7.3.-
4.7.4.-
4.7.5.-
COSTO DE INVERSIN
4.7.6.-
4.7.7.-
REQUERIMIENTO DE MATERIALES
4.7.8.-
4.9.2.-
ASIGNACIN DE RESPONSABILIDAD
4.9.3.-
4.9.4.-
CONCILIACIN CONTABLE
4.9.5.-
PANEL FOTOGRAFICO
ARCHIVADORES:
4.9.6.-
CUADERNO DE OBRA
4.9.7.-
4.9.8.-
4.9.9.-
4.9.10.-
4.9.11.-
=======================================================
====================================
Direccin: Jirn Deustua N458 4to Piso - Plaza de Armas
=======================================================
====================================
Direccin: Jirn Deustua N458 4to Piso - Plaza de Armas
=======================================================
====================================
Direccin: Jirn Deustua N458 4to Piso - Plaza de Armas
MOTIVO DE LA LIQUIDACIN:
En el uso de Facultades y Normativas vigentes de Control Interno, que para el Sector Publico. En epecial para las
Municipalidades se exige que toda Obra construida con los Recursos del Tesoro Publico debe de ser Liquidados una vez
concluida, para posteriormente descargarlos en la Contabilidad de la Institucin y que estos sean sustentados con Docuentos
fuentes de Sustentacin. Cabe indicar que la Liquidacin de Obra es por
Posteriormente despues de la Liquidacin, se procedera a la Entrega de Obra a la Entidad respectiva o Unidad Organica y/o
a la que corresponda la cual se encargara de su Operacin y Mantenimiento de acuerdo a lo establecido en la Resolucin
de Contraloria N195-88-CG, Item 12.
2.1.2.-
NATURALEZA Y OBJETIVOS:
2.1.2.1.-
NATURALEZA
En el presente Informe de Liquidacin de Obras se presenta en forma razonable y evidente, los resultados de nivel Fisico y
Financiero aplicando en funcin a las Normativas Vigentes que regulan la Ejecucin de Obras Publicas por Cmites de
Gestin, en especial las Resoluciones de Contraloria General de la Republica, para el Sector Publico y Municipalidades
Provinciales y Distritales que rige para el Estado Peruano.
2.1.2.2.-
OBJETIVOS
2.1.2.2.1.-
PARTE FISICA
Se analizo los Metrados Finales de la Obra Ejecutada, Valorizacin Final de Obra, Memoria Descriptiva y otros referente a la
parte Fisica; de la Obra denominado: "Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y
Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno, Provincia de Puno - Puno" de acuerdo al
Expediente Tcnico, Informes Mensuales presentado por el Residente y Supervisor de Obra a las oficinas inmediatas y la
Visita realizada, la cual corresponde al Acta de Recepcin de Obra realizada por la Comisin In - Situ para Valrizar la
Ejecucin Final de Obra, ejecutado por la Municipalidad Provincial de Puno, mediante los Miembros del Comit de Gestin.
2.1.2.2.2.-
PARTE FINANCIERA
Determinar el Balance de Obra ejecutada, y denominada: "Construccin de Pistas, Veredas y Graderios en el Jirn:
Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno, Provincia de Puno - Puno"
con sus respectivas notas al Estado Financiero de Obras y otros analisis, para descargar la cuenta Construccin en curso de
la Contabilidad de la Municipalidad Provincial de Puno.
2.1.3.-
ALCANCE
La presente Liquidacin de Obras se rige en las Normas que regula la Ejecucin de Obras Publicas por Comites de Gestin,
conforme se detalla en la parte de la Base Legal y/o de acuerdo a las Normas de la Contraloria General de la Republica,
Ejecucin de Obras por Comites de Gestin.
DEL EXPEDIENTE TCNICO:
Primero: El Expediente Tcnico ha sido Aprobado con Resolucin Gerencial N670-2012-MPP/GM, con un Presupuesto Total
de S/. 602,314.22 Nuevos Soles, con un Presupuesto de Asignacin en el ao 2013 de S/. 400,000.00 (Cuatrocientos mil con
00/100 Nuevos Soles), y mediante Memorndum N1014-2013-MPP/GA la Suma de S/. 197,262.00 (Ciento Noventa y Siete Mil
2.2.-
ANTECEDENTES
Para la presente Obra la Municipalidad Provincial de Puno, Aprueba el Expediente Tcnico denominado: "Construccin de
Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la
Ciudad de Puno, Provincia de Puno - Puno", con un Presupuesto Base segn Expediente Tcnico la Suma de
S/. 602,314.22 (Seiscientos dos mil Trescientos Catorce con 22/100 Nuevos Soles), se logro Desembolsar S/. 597,262.00
(Quinientos Noventa y Siete mil Doscientos Sesenta y dos con 00/100 Nuevos Soles), mediante Resolucin Gerencial
N670-2012-MP/GM y Memorndum N1014-2013-MPP/GA; quedando un Saldo de S/. 5,052.22 (Cinco Mil Cincuenta y dos
con 22/100 Nuevos Soles), correspondiente a la Liquidacin de Obra.
2.3.-
BASE LEGAL
1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.-
17.18.19.20.-
2.4.-
2.4.2.-
El Expediente Tcnico denominado: "Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y
Pasajes Atalaya y Catari de la Ciudad de Puno, Provincia de Puno - Puno" fue Aprobado mediante Resolucin Gerencial
N670-2012-MPP/GM en fecha: 14 de Diciembre del 2012.
2.4.3.-
EJECUTORES
2.5.-
OBSERVACIONES
2.5.1.-
PARTE TCNICA
Del Expediente Tcnico inicial Aprobado mediante Resolucin Gerencial N670-2012-MPP/GM se tiene un Presupuesto Total
de S/. 602,314.22 con un Costo Directo S/. 495,391.72 el Plazo de Ejecucin es de 150 das calendario (5 Meses). Lo cual no
se ha cumplido ya que en el Proceso de Ejecucin se presentarn Mayores Metrados, Adicionales de Obra (Partidas Nuevas)
y Deductivos; siendo estos inconvenientes la causa de que la Obra no se haya Culminado en el Tiempo Establecido, por otra
parte se ha paralizado la Obra por 20 das calendario los motivos son: que la Municipalidad Provincial de Puno no dio
respuesta alguna a tiempo sobre la Ampliacin Presupuestal solicitada por la Suma de S/.140,812.25
Finalmente se tiene en el Expediente Tcnico un Presupuesto Total de Obra que asciende a S/. 602,314.22 y una Ampliacin
Presupuestal la suma de S/. 140,812.25 debidamente sustentado por los Ejecutores y Aprobado por Resolucin de Alcaldia.
En el presente Informe de Liquidacin Tecnica de Obra se considera los Cuadros de Analisis comparativo de Precios de lo
Programado, Ejecutado y Financiero, tambien se considera las Valorizaciones desagregadas por: Presupuesto Base, Mayores
Metrados, Partidas Nuevas (Adicionales de Obra) y Deductivos debidamente Aprobados.
2.6.-
CONCLUSIONES
2.6.1.-
PARTE TCNICA
De acuerdo a la Informacin proporcionada del Informe Final y los Informes Mensuales de Obra, presentado por el Residente
y Supervisor de Obra se observa que no era necesario la Ejecucin de: Mejoramiento de Subrasante, Veredas, Cunetas y
Graderios siendo considerando como Deductivos.
La Infraestructura Vial consiste en: Pavimento Rigido: Concreto f'c=210 kg/cm2 con un e=10 cm. Con una Base Granular de
e=20 cm. Construccin de Veredas con Piso de Concreto Frotachado, Coloreado y Bruado e=10 cm. f'c=175 kg/cm2 en
ambos lados. Habilitacin de reas Verdes con Sembrado de Grass y Sealizacion respectivamente.
Adicinalmente se Ejecuto (Partidas Nuevas) Adicionales de Obra como son: Movimiento de Tierras, Sub Drenaje, Mejoramiento
de Subrasante, Muros de Contencin, Graderios de Concreto Armado, Veredas, Sardineles, Barandas Metalicas y Tarrajeo
texturado de Muros.
2.7.-
RECOMENDACIONES
2.7.1.-
PARTE TCNICA
Se recomienda a la Sub Gerencia de Estudios Definitivos (SGED) elaborar los Expedientes Tcnicos en coordinacin con los
Evaluadores provenientes de Gerencia de Ingenieria Municipal (GIM) y la Oficina de Supervisin y Liquidcin de Inversiones
(OSyLI), esto con la finalidad de que en el Proceso de Ejecucin se evite de varias Falencias como son: Adicionales de Obra
(Partidas Nuevas), Mayores Metrados, Deductivos, Ampliacines de Plazo y Ampliaciones Presupuestales.
Los Miembros del Comit de Gestin deben de Brindar todas las facilidades tanto con el Personal Obrero, Tecnico y
Administrativo para lograr las metas establecidas en el Expediente Tcnico de esta manera Culminar la Obra en el Tiempo
Establecido, se debe tener mayor Control en la Distribucin del Presupuesto.
Se recomienda a la Gerencia de Ingenieria Municipal (GIM), y la Sub Gerencia de Obras Publicas y Mantenimiento (SGOPM),
tomar las medidas correctivas necesarias para los Ejecutores directos de Obra como son: (Residente de Obra, Asistente
Tcnico y Asistente Administrativo), siendo los Responsables directos; Llevar un buen Control, Seguimiento y Monitoreo tanto en
el Proceso Constructivo y la parte Documentaria (Informes Mensuales y Informe Final), ya que se ha podido apreciar algunas
falencias en lo concerniente a la Valorizacin Final de Obra donde se pudo ver que no esta de acuerdo al Expediente
Tcnico Aprobado en los Costos Indirectos.
Por otra parte el Supervisor de Obra debio de controlar que se cumpla estrictamente en lo concerniente a la Valorizacin
Final de Obra (Costos Indirectos) se haga de acuerdo al Expediente Tcnico Aprobado tanto en Presupuesto Base, Mayores
Metrados, Adicionales de Obra (Partidas Nuevas) y Deductivos.
Resumen de Valorizacin Final:
VALORIZACION ACUMULADA
EXPEDIENTE TECNICO APROBADO
MAYORES METRADOS (Aprobados)
PARTIDAS NUEVAS (Aprobados)
DEDUCTIVOS (Aprobados)
VALORIZACION FISICA TOTAL
Estado de la Obra
PRESUPUESTO TOTAL
492,933.29
199,081.98
135,050.41
66,948.98
760,116.71
PORCENTAJE
81.84%
158.13%
100.00%
52.32%
287.64%
: Culminada e Inagurada.
La Obra incialmente estaba Proyectada con un Plazo de Ejecucin de 150 das calendario (5 Meses), sin embargo se Ejecuto
en 215 das calendario (7.17 Meses) por la misma razn que se Ejecuto Partidas Nuevas que no contempla en el Expediente
Tcnico, asi mismo se Ejecutaron Mayores Metrados; dichos aspectos son la causa de que la Obra no se haya Culminado
en el Plazo Establecido segun el Expediente Tcnico.
2.8.-
NOTAS COMPLEMENTARIAS
Adems de las situaciones antes expuestas, se tuvo mayores contratiempos por factores Climatolgicos que han motivado la
Desaceleracin del ritmo de Ejecucin de la Obra, por todos los inconvenientes que han ocurrido en la Obra.
La Valorizacin Fisica Final de la Obra incluyendo: Mayores Metrados, Adicionales de Obra (Partidas Nuevas) y Deductivos de
Obra debidamente Aprobados y Sustentado por los Ejecutores de Obra asciende a un Total de S/. 760,116.71 equivalente a
287.64% del Presupuesto Total; y la Ejecucin Financiera Final incluyendo Costo Directo, Costos Indirectos y la Ampliacin
Presupuestal asciende a un Monto de Inversin Total de S/. 738,074.25 equivalente a 99.32% del Presupuesto Total mas la
Ampliacin Presupuestal; por lo que se observa una Diferencia Presupuestal de S/. 22,042.46 equivalente a 2.99%; lo que
indica la Conciliacin Contable es favorable.
2.9.-
En tanto se procede a la Liquidacin Tecnico - Financiera teniendo como base el Informe Final, Informes Mensuales,
Expediente Tcnico y Expediente de Ampliacin Presupuestal, dicha Liquidacin fue con Visita a la Obra en coordinacin con
los Ejecutores Directos y Miembros del Comit de Gestin con la finalidad de proceder a las medidas respectivas para el
Metrado respectivo posterior a eso su Valorizacin Final.
2.9.1.-
DE LA ASIGNACIN PRESUPUESTAL
2.9.2.-
De los Metrados realmente Ejecutados de acuerdo al Expediente Tcnico Aprobado, se verifico los Metrados Finales
respectivos llegando a Ejecutarse un 81.84% con un Monto S/. 492,933.29 del Costo Total.
De los Metrados realmente Ejecutados de acuerdo a los Mayores Metrados Aprobados, se verifico los Metrados Finales
respectivos llegando a Ejecutarse un 158.13% con un Monto S/. 199,081.98 del Costo Total.
De los Metrados realmente Ejecutados de acuerdo a las Partidas Nuevas Aprobados, se verifico los Metrados Finales
respectivos llegando a Ejecutarse un 100.00% con un Monto S/. 135,050.41 del Costo Total.
De los Metrados realmente Ejecutados de acuerdo a los Deductivos de Obra Aprobados, se verifico los Metrados Finales
respectivos llegando a Ejecutarse un 52.32% con un Monto S/. 66,948.98 del Costo Total.
Llegando de esta manera a una Ejecucin Fisica Total de S/. 760,116.71 con un 287.64% del Costo Total.
2.9.3.-
La Obra incialmente estaba Proyectada con un Plazo de Ejecucin de 150 das calendario (5 Meses), sin embargo se Ejecuto
en 215 das calendario (7.17 Meses) por la misma razn que se Ejecuto Partidas Nuevas que no contempla en el Expediente
Tcnico, asi mismo se Ejecutaron Mayores Metrados; dichos aspectos son la causa de que la Obra no se haya Culminado
en el Plazo Establecido en el Expediente Tcnico.
2.9.4.-
La Municipalidad Provincial de Puno, a travs de la Gerencia de Ingeniera Municipal (GIM), se propuso la Ejecucin de la
Obra. "Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari de la Ciudad de
Puno, Provincia de Puno - Puno". As mismo de acuerdo al Expediente Tcnico Aprobado se logr Ejecutar las siguientes Sub
Partidas:
Item
Descripcin
01
01.01
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
01.01.01.02
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
01.01.02.02
01.01.03
01.01.03.01
01.01.04
DEMOLICIONES Y DESMONTAJES
01.01.04.01
ESCARIFICADO DE VEREDAS
01.01.04.02
01.01.04.03
ELIMINACION DE DEMOLICIONES
01.01.05
01.01.05.01
01.01.05.02
01.01.06
SEGURIDAD Y SALUD
01.01.06.01
02
PISTAS Y VEREDAS
02.01
MOVIMIENTO DE TIERRAS
02.01.01
CORTES
02.01.01.01
02.01.02
02.01.02.01
02.01.03
02.01.03.01
02.02
MEJORAMIENTO DE SUBRASANTE
02.02.01
02.02.01.01
02.02.02
CONFORMACION DE ENROCADO
02.02.02.01
CONFORMACION DE ENROCADO
02.02.03
02.02.03.01
02.02.03.02
02.02.04
CONFORMACION DE SUBRAZANTE
02.02.04.01
02.03
SUB BASE
02.03.01
02.03.01.01
02.03.01.02
02.03.01.03
02.03.02
02.03.02.01
02.03.02.02
02.03.02.03
02.03.03
02.03.03.01
02.03.03.02
02.04
PAVIMENTO RIGIDO
02.04.01
02.04.02
02.04.03
02.04.04
02.05
VEREDAS DE CONCRETO
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.05.06
02.05.07
02.05.08
02.06
SARDINELES
02.06.01
02.06.02
02.06.03
02.06.04
02.06.05
02.07
02.07.01
02.08
CANALIZACION
02.08.01
02.08.02
02.08.03
02.08.04
02.08.05
02.08.06
02.08.07
02.08.08
03
AREAS VERDES
03.01
JARDINERAS DE CONCRETO
03.01.01
03.01.02
03.01.03
03.01.04
03.01.05
03.01.06
03.01.07
03.02
SEMBRADO DE GRASS
03.02.01
03.02.02
SEMBRADO DE GRASS
04
SEALIZACION
04.01
PINTURA EN SARDINELES
04.02
PINTURA EN JARDINERAS
04.03
PINTURA EN PAVIMENTO
05
VARIOS
05.01
05.02
05.03
05.04
01
01.01
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
01.01.02.02
01.01.03
01.01.03.01
01.01.04
01.01.04.01
01.01.04.02
01.01.05
SEGURIDAD Y SALUD
01.01.05.01
01.01.05.02
02
PISTAS Y VEREDAS
02.01
MOVIMIENTO DE TIERRAS
02.01.01
CORTES
02.01.01.01
02.01.02
02.01.02.01
02.01.03
02.01.03.01
02.02
MEJORAMIENTO DE SUBRAZANTE
02.02.01
02.02.01.01
02.02.02
CONFORMACION DE ENROCADO
02.02.02.01
CONFORMACION DE ENROCADO
02.02.03
02.02.03.01
02.02.03.02
02.02.03.03
02.02.04
CONFORMACION DE SUBRAZANTE
02.02.04.01
02.03
SUB BASE
02.03.01
02.03.01.01
02.03.02
02.03.02.01
02.03.02.02
02.03.02.03
02.03.03
02.03.03.01
02.03.03.02
02.03.03.03
02.04
PAVIMENTO RIGIDO
02.04.01
02.04.02
02.04.03
02.04.04
02.05
VEREDAS DE CONCRETO
02.05.01
02.05.02
02.05.03
02.05.04
02.05.05
02.05.06
02.05.07
02.05.08
02.06
GRADERIOS
02.06.01
02.06.02
GRADERIOS DE CONCRETO: fc=175 kg/cm2 ACABADO COLOREADO FROTACHADO Y BRUADO C:A 1:2
02.06.03
02.07
SARDINELES
02.07.01
02.07.02
02.07.03
02.07.04
02.07.05
02.07.06
02.08
02.08.01
02.08.02
02.09
MACETEROS
02.09.01
02.09.02
02.09.03
02.09.04
02.09.05
03
AREAS VERDES
03.01
JARDINERAS DE CONCRETO
03.01.01
03.02
SEMBRADO DE GRASS
03.02.01
03.02.02
SEMBRADO DE GRASS
04
SEALIZACION
04.01
PINTURA EN SARDINELES
04.02
PINTURA EN PAVIMENTO
05
VARIOS
05.01
05.02
05.03
05.04
01
01.01
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
01.01.02.02
01.01.03
01.01.03.01
01.01.04
01.01.04.01
01.01.04.02
01.01.05
SEGURIDAD Y SALUD
01.01.05.01
01.01.05.02
02
PISTAS Y VEREDAS
02.01
MOVIMIENTO DE TIERRAS
02.01.01
CORTES
02.01.01.01
02.01.02
02.01.02.01
02.01.03
02.01.03.01
02.02
SUB BASE
02.02.01
02.02.01.01
02.02.02
02.02.02.01
02.02.02.02
02.02.02.03
02.02.03
02.02.03.01
02.02.03.02
02.02.03.03
02.03
PAVIMENTO RIGIDO
02.03.01
02.03.02
02.03.03
02.03.04
02.04
CUNETA RECTANGULAR
02.04.01
02.04.02
02.04.03
02.04.04
02.05
VEREDAS DE CONCRETO
02.05.01
02.05.02
2.9.5.-
02.05.03
02.05.04
02.05.05
02.05.06
02.05.07
02.05.08
02.06
MURO DE CONTENCION
02.06.01
02.06.02
02.07
GRADERIOS
02.07.01
02.07.02
GRADERIOS DE CONCRETO: fc=175 kg/cm2 ACABADO COLOREADO FROTACHADO Y BRUADO C:A 1:2
02.07.03
02.08
02.08.01
02.08.02
02.09
MACETEROS
02.09.01
02.09.02
02.09.03
02.09.04
02.09.05
03
AREAS VERDES
03.01
JARDINERAS DE CONCRETO
03.01.01
03.02
SEMBRADO DE GRASS
03.02.01
03.02.02
SEMBRADO DE GRASS
04
SEALIZACION
04.01
05
VARIOS
05.01
05.02
05.03
05.04
Para la presente Obra se cuenta con 07 Informes Mensuales correspondiente a los Meses de: Abril - Mayo - Junio Julio - Agosto - Setiembre y Octubre del 2013. Estos Informes han sido presentados por parte de el Ingeniero Residente a
la Sub Gerencia de Obras Publicas y Mantenimiento y por parte del Supervisor a la Oficina de Supervisin y Liquidacin de
Inversiones en los tiempos establecidos segn Directiva, estos Informes nos sirven como Base para proceder a la Liquidacin
Tecnico - Financiera de Obra.
2.9.6.-
DE LAS VALORIZACIONES
De la Valorizacin Final que presenta el Ingeniero Residente de Obra fueron de acuerdo al Avance Fisico Mensual que se
realizaron en Obra, solo se observa una falencia en los Costos Indirectos tanto en el Presupuesto Base, Mayores Metrados,
Adicionales de Obra (Partidas Nuevas) y Deductivos los Costos Indirectos no estan de acuerdo al Expediente Tcnico. Donde
se llego a los siguientes Resultados:
VALORIZACION ACUMULADA
EXPEDIENTE TECNICO APROBADO
MAYORES METRADOS (Aprobados)
PRESUPUESTO TOTAL
492,933.29
199,081.98
PORCENTAJE
81.84%
158.13%
2.9.7.-
135,050.41
66,948.98
760,116.71
100.00%
52.32%
287.64%
En el Proceso de Ejecucin de Obra se verifico el Informe Final de Obra donde se constat que se utilizo 4 Cuadernos de
Obra debidamente Legalizadas, asi como lo indica la Resolucin de Contraloria N195-88-CG en el Item 5, en donde se
realizaron las Anotaciones a diario de las Partidas Ejecutadas, Ingreso y Salida de Materiales, Mano de Obra, Equipos,
Personal Tecnico Administrativo y Ocurrencias; debidamente llenados por el Ingeniero Residente y Supervisor de Obra. Cuyo
Cuaderno de Obra se adjunta a la Liquidacin de Obra.
2.9.8.-
De las Pruebas de Control de Calidad, en el Informe Final presentado por parte de el Ingeniero Residente de Obra se observa
que se han hecho las Pruebas de Resistencia a la Compresin por parte del Laboratorio de Suelos y Pavimentos de la
Municipalidad Provincial de Puno, as como nos indica en la Resolucin de Contraloria N195-88-CG en el Item 9, para tal
efecto se adjunta los Certificados de Control de Calidad a la presente Liquidacin Tecnico - Financiero.
2.9.9.-
Se cuenta en el Informe Final con los Planos de Replanteo tanto en el Jirn: Antonio Machado y los Pasajes Atalaya y Catari,
fue que con dichos Planos se realizo la Verificacin In - Situ con la Finalidad de veriticar que los Planos sea tal y cual se
indica en Obra, muy a parte se cuenta con los Planos iniciales del Expediente Tcnico donde se pudo observar algunas
Modificaciones que se muestra en los Planos Post - Construccin.
2.9.10.-
Una vez Formulada la Comisin de Recepcin y Liquidacin de Obra que se hizo por se coordino con los Responsables
directos de Ejecucin como son: (Residente y Supervisor) y Miembros del Comit de Gestin para dirigirnos a la Obra siendo
en el Barrio Huascar en el Jirn: Antonio Machado primera y segunda cuadra y los Pasajes Atalaya y Catari.
Al termino de la Verificacin de los trabajos Ejecutados, la Comisin ha constatado y determinado la CONFORMIDAD con el
Ecpediente Tcnico de Obra que se tomo como Base, y luego de la CERTIFICACIN de lo Ejecutado se ha ceido lo
dispuesto en los Planos y Exspecificacines Tcnicas Aprobadas. Se observa que existe Deterioros en Veredas y Muros de
Contencin en el Jirn: Antonio Machado primera y segunda cuadra esto por la falta de Mantenimiento.
Se recomienda hacer el Mantenimiento de esta Obra a fin de que su Deterioro no sea mayor. Otros aspectos relacionados
con la Ejecucin de la Obra se adjunta en el Informe Final de Obra.
ctor Publico
Lo cual no
o, por otra
es de Obra
eo tanto en
se Ejecuto
Expediente
se Ejecuto
Expediente
uientes Sub
Residente a
a se observa
aya y Catari,
Se Constituyen con la Finalidad de Vereficar el Estado Situacional de la Obra, acto que se efectua en los siguientes
Terminos:
Primero: El Proyecto de Inversin Publica ejecutado cuenta con los siguientes datos generales:
a) Obra
b) Componente
c)
Codigo SNIP
Aprobacin Expediente Tecnico
Sector
Pliego
Unidad Ejecutora
Unidad Gestora
Funcin
Divisin Funcional
Grupo Funcional
Actividad
Finalidad
Ejecucin Fisica
Fuente de Financiamiento
Ubicacin
Barrio
Distrito
Provincia
Regin
Plazo de Ejecucin Programada
Ampliacin de Plazo N01
Ampliacin de Plazo N02
Plazo Real de Ejecucin
Presupuesto (PIA Y/O PIM)
Ampliacin Presupuestal
Ejecucin Financiera Total
Costo Directo
Gastos de Residencia
Gastos de Seguridad
Operativos de Comit
Operativos Institucionales
Gastos de Supervisin
Seguimiento y Monitoreo
Gastos de Liquidacin
L DE LA OBRA
io Machado y Pasajes
Unidad Gestora
Oficina Receptora
Presupuesto Aprobado
Modalidad de Ejecucin
Plazo de Ejecucin Programada
Paralizaciones
Fecha Inicio de Obra
Fecha de Culminacin
Ampliacin de Plazo N01
Fecha de Culminacin N01
Ampliacin de Plazo N02
Fecha de Culminacin N02
Fecha Real de Culminacin
Ao Presupuestal
Obra
Unidad Ejecutora
Componente
Meta
Ubicacin
Barrio
Distrito
Provincia
Regin
Fuente de Financiamiento
Presidente de la Comisin
Ing. Rodolfo Humberto Najar Pineda
Miembro de la Comisin
Ing. Mary Doris Merma Ramos
te Recaudados
Liquidacin de Inversiones
70-2012-MPP/GM
-MPP/OSyLI
Miembro de la Comisin
ry Doris Merma Ramos
Miembro de la Comisin
CPC Bas Israel
MEMORIA DESCRIPTIVA:
Datos Presupuestales
A.B.C.D.E.F.G.H.I.J.K.M.N.O.P.Q.-
Sector
Pliego
Unidad Gestora
Unidad Ejecutora
Programa
Sub Programa
Funcin
Divisin Funcional
Grupo Funcional
Oficina Receptora
Modalidad de Ejecucin
Codigo SNIP
Actividad o Proyecto
Componente
Finalidad
Fuente de Financiamiento
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
:
Gobiernos Locales
01 Municipalidad Provincial de Puno
Municipalidad Provincial de Puno
011 Sede Puno
036 Transporte Urbano
0074 Vias Urbanas
015 Transporte
011 Transferencia e Intermediacin Financiera
0019 Transferencia de Carcter General
Oficina de Supervisin y Liquidacin de Inversiones - OSyLI
Administracin Directa
200988
"Construccin y Mejoramiento del Acceso Vial Sur - Puno"
2153520 "Construccin y Mejoramiento del Acceso Vial Sur - Puno"
38911 Transferencia Financiera para Proyectos de Inversin
5.07 Recursos Ordinarios - FONCOMUN
5.08 Impuestos Municipales
2.09 Recursos Directamente Recaudados
UBICACIN:
Barrio
Distrito
Provincia
Regin
: Huascar
: Puno
: Puno
: Puno
602,314.22
S/.
4,102,814.00
#REF!
135,050.41
66,948.98
#REF!
S/.
623,244.65
63,211.10
10,561.50
12,061.00
3,450.00
22,546.00
3,000.00
738,074.25
TIEMPO DE EJECUCIN
Fecha Inicio de Obra
Plazo de Ejecucin Programada
Fecha de Culminacin
Ampliacin de Plazo N01
Termino de Ampliacin N01
Ampliacin de Plazo N02
Termino de Ampliacin N02
Paralizacin de Obra
Fecha de Culminacin Real
Plazo de Ejecucin Real
Das de Retraso
RESPONSABILIDADES
Aprobacin Expediente Tcnico
Modalidad de Ejecucin
RESPONSABLE DE EJECUCIN
RESPONSABLE DE SUPERVISIN
Design. Supervisor de Obra
Colegiatura
calendario (1.5 Meses) desde: 03/09/2013 hasta: 18/10/2013 en Fecha: 24 de Setiembre del 20.13.
2.- Resolucin Gerencial N473-2013-MPP/GM Resolucin que Aprueba la Ampliacin de Plazo N02 por 30 das
calendario (1 Mes) desde: 18/10/2013 hasta: 18/11/2013 en Fecha: 06 de Noviembre del 2013.
3.- Resolucin Gerencial N593-2013-MPP/GM Resolucin que Aprueba la Paralizacin y Reinicio de Obra por 20
das calendario desde: 24/10/2013 hasta: 13/11/2013 en Fecha: 27 de Diciembre del 2013.
En el mencionado Proyecto tambien se tubieron Ampliaciones de Plazo de Ejecucion de Obra:
Al Proyecto Ejecutado se le asigno un Presupuesto parcial en un inicio, tambien durante la Ejecucin de Obra se
encontro presencia del Nivel Freatico en el Piso de la Construccin, lo que perfudico la Construccin del Piso para lo
cual se iso tratamiento de la Base del Piso, mediante Sub Drenaje cuya funcin es evacuar el Agua proveniente de la
Subbase y Base conformantes de una Estructura de Pavimento en las zonas donde esta pueda afectar el Pavimento,
ademas se realizo la Construccin de Muros de Contencin existiendo Empujes activos en los Graderios del Jirn:
Antonio Machado, muy a parte de eso se tubo la Ejecucin de Barandas Metalicas de Tubo =2". Todas estas Partidas
se ejecutaron Adicionalmente ya que no contempla en el Expediente Tcnico por lo que se Solicito la Ampliacin
Presupuestal por Partidas Nuevas debidamente sustentado que fue Aprobada mediante Resolucin de Alcaldia
N971-2013-MPP/A en Fecha: 24/10/2013. Estos Trabajos como consecuencia trajo una demora en los trabajos
realizados y en el Cronograma de Ejecucin, a la vez se realizo Mayores Metrados, Deductivos que fueron debidamente
sustentados y Aprobado en el Expediente de Ampliacin Presupuestal.
4.2.-
ANTECEDENTES:
La Obra: "Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y
Catari del Barrio Huascar de la Ciudad de Puno" es un Componente del Estudio de Pre-Inversin a nivel de Perfil
declarado Viable con el Informe Tcnico N048-2012-MPP/GPP-SGPPI-EGPIP en Fecha: 26/10/2012 con Codigo SNIP
N200988. El Proyecto Integral segn Estudio de Perfil contempla como Primera Alternativa la Construccin de Pistas
con Pavimento Rigido de e=20 cm. (f'c=210 kg/cm2), con una Subbase de e=20 cm. En una Longitud de 1058.90 m. Y
un Ancho de Calzada variable de 3.60-7.80 m. En un rea total de 4919.90 m2. Construccin de Veredas con Piso de
Concreto Coloreado, Frootachado y Bruado e=10 cm. (f'c=175 kg/cm2) en un rea de 1953.70 m2. Construccin de
Graderios de Concreto e=10 cm. (f'c=140 kg/cm2) con Acabado de piso frotachado en un rea de 346.20 m2
Habilitacin de reas Verdes en 41.40 m2 con Sembrado de Grass.
4.3.-
GRADO DE CUMPLIMIENTO:
El Grado de Cumplimiento se ha logrado alcanzar en la Ejecucin Fisica Total de S/. 760,116.71 cuyo Monto es
equivalente al 287.64% del Expediente Tcnico Aprobado + Mayores Metrados (Aprobados) + Adicionales de Obra
(Aprobados) - Deductivos (Aprobados) y en la Ejecucin Financiera se ha logrado alcanzar un Total de S/. 738,074.25
que es equivalente al 99.32% en relacin al Expediente Tcnico + la Ampliacin Presupuestal debidamente Aprobados.
4.4.-
OBJETIVOS CONSEGUIDOS:
OBJETIVO GENERAL:
1.- El Objetivo del Proyecto es Brindar condiciones adecuadas de Transitabilidad vehicular y peatonal en las calles
conexas del Barrio Huscar de la Ciudad de Puno. A fin de mejorar la calidad de vida de la poblacin del sector.
2.- Mejorar la Infraestructura Vial que contribuya al ordenamiento del Sistema de Transito en el Barrio Huascar y
contribuya con el ordenamiento general de la Ciudad de Puno, generando una mejor organizacin fsico espacial y un
mayor dinamismo de flujos vehiculares.
OBJETIVOS ESPECIFICOS:
1.- Construccin de Pistas con Pavimento Rgido e=20 cm. f'c=210 kg/cm2
2.3.4.5.6.7.-
4.5.-
SITUACIN DE LA OBRA:
La Obra actualmente se encuentra Culminada e Inagurada, se han hecho todos los Metrados del Expediente Tecnico
Aprobado. Cabe mencionar que inicialmente el Plazo de Ejecucion fue de 150 dias calendarios (5 Meses), sin embargo
la Obra tuvo muchos contratiempos y retrazos, debidamente sustentado por los Ejecutores de la Obra, generando de esta
manera Ampliaciones de Plazo que han sido debidamente presentado y Aprobado por la Direccin OSyLI. A la vez se ha
Ejecutado en Obra Mayores Metrados Partidas Nuevas (Adicionales de Obra), y Deductivos generando Ampliacin
Presupuestal que ha sido debidamente Sustentado por los Ejecutores de Obra y Aprobada por la Oficina de Supervisin
y Liquidacin de Inversiones, los Ejecutores cumplieron en presentar el Informe Final de Obra tanto Tecnica y
Financiera. Aunque la Obra esta concluido los Trabajos no estan bien realizados al parecer es por falta de la Direccion
Tecnica, sin embargo es responsabilidad de los Ejecutores Ing. Residente de Obra y Ing. Supervisor de Obra, y el Plazo
de Responsabilidad es de Siete aos, contado a partir de la Conformidad de la Recepcion total o parcial de la Obra.
Presupuesto de Obra
Costo Directo
Gastos Generales
Gastos de Supervisin
Gastos de Liquidacin
Gastos de Expediente Tecnico
Gastos de Seguimiento y Monitoreo
S/.
S/.
S/.
S/.
S/.
S/.
S/.
4,722,145.00
3,969,595.40
523,323.56
103,799.10
46,160.42
70,316.52
8,950.00
S/.
600,000.00
2009
CIERA
SINTESIS :
La Obra se dio Inicio en Fecha: 03 de Abril del 2013 con un Plazo de Ejecucin de: 150 das calendario (
siendo los Miembros del Comit de Gestin y Ejecutores los siguientes:
Presidente
Secretario
Tesorero
Residente
Supervisor
Jirn: Antonio Machado primera cuadra Construccin de Pavimento Rigido: Concreto f'c=210 kg/cm2 e=20 cm
Longitud de: 233.06 ml. Dentro de las colindancias siguientes:
Por el Norte
Por el Sur
Por el Este
: I. E. S. Politecnico Huascar
: Propiedades particulares del mismo Jirn
: Urbanizacin Tercer Centenario
En el Jirn: Antonio Machado segunda cuadra Construccin de Pavimento Rigido: Concreto f'c=210 kg/cm2 e
en una Longitud de: 75.16 ml. Dentro de las colindancias siguientes:
Por
Por
Por
Por
el
el
el
el
Norte
Sur
Este
Oeste
En los Pasajes: Atalaya y Catari Construccin de Pavimento Rigido: Concreto f'c=210 kg/cm2 e=20 cm. en u
Longitud de: 173.96 ml. Dentro de las colindancias siguientes:
Por
Por
Por
Por
%
86.88%
#REF!
100.00%
52.32%
#REF!
%
el
el
el
el
Norte
Sur
Este
Oeste
Una vez efectuado la Compatibilidad del Proyecto, se ha encontrado varias observaciones, las mismas que s
informado mediante Documentos a la Municipalidad Provincial de Puno resaltando dentro de ello, la no existe
el Expediente Tcnico las Partidas de Profundizacin de Tuberias de Red Matriz tanto de Agua y Desague,
Partidas de Desbroce Acarreo y Eliminacin de Maleza y Vegetacin existente. Durante el Proceso de Ejecuc
visto en los Pasajes Atalaya y Catari segn Expediente Tecnico indica en el Presupuesto la Ejecucin de Pi
Veredas, sin embargo en los Planos no indica la Ejecucin de Veredas, aspecto que se ha Solicitado se jus
Tambien se hace constar que en el Expediente Tcnico, no se considera el Estudio de Mecanica de Suelos
Pasajes Atalaya y Catari, hecho que se tuvo que efectuar el Muestreo de Suelos para asi obtener las Carac
Fisico - Mecanica del Terreno.
El factor climatologico ha sido otro inconveniente en el Proceso de Construccin perfudicando los Trabajos a
tanto en el Rendimiento de Maquinaria y Mano de Obra causando retraso en el Avance Fisico.
Asi mismo las Tuberias de Red Matriz de Agua y Desague se hallan muy superficiales, por lo que requieren
Profundizacin, Partida que no contempla el Expediente Tecnico. Tambien se observa el Deterioro de las Tub
Desague por la antigedad y la Calidad de las mismas asi mismo en las tuberias de Agua, estos en alguno
Las Partidas Adicionales tanto de Profundizacin de Red Matriz de Agua y Desague han sido necesarias Eje
de garantizar la Funcionabilidad de las Tuberias, paralelamente se viene Ejecutando Conexiones Domiciliares
coordinacin con SEDA PUNO.
Respecto a la Valorizacin Final Fisico y Financiera de Obra se llego al siguiente resumen:
Valorizacin Fisica
Valorizacin Financiera
: S/. 760,116.71
: S/. 738,074.25
287.64%
99.32%
405-2013-MPP/GM
RESUMEN DE VALORIZACIN FINAL:
473-2013-MPP/GM
Presupuesto Expediente Tcnico
Presupuesto Mayores Metrados
Presupuesto Adicionales de Obra
Presupuesto Deductivos
PRESUPUESTO TOTAL EJECUTADO
2.-
S/.
492,933.29
199,081.98
135,050.41
66,948.98
760,116.71
DATOS GENERALES :
3.-
EJECUCIN DE OBRA :
1. Descripcin de Trabajos Ejecutados.2. Recursos Utilizados.- Personal Tecnico - Administrativo/Mano de Obra/Equipos Maquinaria; Partidas Ejecutad
Metrados Presupuesto Base, Mayores Metrados, Adicionales de Obra y Deductivos.
4.-
5.-
6.-
7.-
9.-
ESTIPULACIONES FINALES :
ME FINAL
%
81.84%
158.13%
100.00%
52.32%
287.64%
ente/meta/obra
cutora/Presupuesto de Obra
a Termino Real/Supervisor/Residente
MAQUINARIA :
ones y Recomendaciones
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno - Puno"
Item
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
Metrado
Presupuesto Base
Parcial
Mayores Metrados
%
Metrado
01
20,434.32
01.01
20,434.32
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
m2
40.00
117.85
4,714.00
40.00
4,714.00
100.00%
01.01.01.02
und
1.00
1,062.17
1,062.17
1.00
1,062.17
100.00%
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
glb
1.00
500.00
500.00
1.00
500.00
100.00%
01.01.02.02
glb
1.00
750.00
750.00
1.00
750.00
100.00%
01.01.03
01.01.03.01
1.00
5,416.77
100.00%
01.01.04
DEMOLICIONES Y DESMONTAJES
01.01.04.01
ESCARIFICADO DE VEREDAS
m2
530.24
5.48
2,905.72
530.24
2,905.72
100.00%
01.01.04.02
m2
30.90
22.48
694.63
30.90
694.63
100.00%
01.01.04.03
ELIMINACION DE DEMOLICIONES
m3
32.15
11.87
381.62
32.15
381.62
100.00%
01.01.05
01.01.05.01
m2
1,247.57
1.06
1,322.42
1,247.57
1,322.42
100.00%
01.01.05.02
m2
1,247.57
1.24
1,546.99
1,247.57
1,546.99
100.00%
01.01.06
SEGURIDAD Y SALUD
01.01.06.01
1.00
1,140.00
100.00%
02
PISTAS Y VEREDAS
02.01
MOVIMIENTO DE TIERRAS
02.01.01
CORTES
02.01.01.01
1,361.73
5,460.54
100.00%
1,589.93
02.01.02
02.01.02.01
1,634.08
20,932.56
100.00%
1,907.08
02.01.03
02.01.03.01
1,484.44
4,958.03
100.00%
02.02
MEJORAMIENTO DE SUBRASANTE
02.02.01
02.02.01.01
457.44
22,396.26
100.00%
02.02.02
CONFORMACION DE ENROCADO
02.02.02.01
CONFORMACION DE ENROCADO
457.44
2,676.02
100.00%
02.02.03
02.02.03.01
0.00%
5,776.17
1,250.00
5,416.77
glb
1.00
5,416.77
5,416.77
3,981.97
2,869.41
1,140.00
glb
1.00
1,140.00
1,140.00
258,390.06
31,351.13
5,460.54
m3
1,361.73
4.01
5,460.54
20,932.56
m3
1,634.08
12.81
m2
1,484.44
3.34
20,932.56
4,958.03
4,958.03
40,061.36
22,396.26
m3
457.44
48.96
22,396.26
750.00
2,676.02
m3
457.44
5.85
2,676.02
1,898.00
m3
92.04
7.18
660.85
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno - Puno"
Item
Descripcin
Presupuesto de Obra
Und.
m3
Metrado
78.40
Precio S/.
15.78
Parcial S/.
1,237.15
Metrado
02.02.03.02
02.02.04
CONFORMACION DE SUBRAZANTE
02.02.04.01
02.03
SUB BASE
02.03.01
02.03.01.01
m3
183.71
7.18
1,319.04
183.71
02.03.01.02
m3
183.71
4.73
868.95
02.03.01.03
156.49
24.63
3,854.35
02.03.02
02.03.02.01
m3
183.71
7.18
02.03.02.02
m3
183.71
02.03.02.03
m3
02.03.03
02.03.03.01
02.03.03.02
Presupuesto Base
Parcial
Mayores Metrados
%
Metrado
0.00%
0.00%
1,319.04
100.00%
183.71
868.95
100.00%
156.49
3,854.35
100.00%
1,319.04
183.71
1,319.04
100.00%
5.55
1,019.59
183.71
1,019.59
100.00%
156.49
15.99
2,502.28
156.49
2,502.28
100.00%
m3
312.99
2.57
804.38
312.99
804.38
100.00%
m2
1,360.82
3.72
5,062.25
1,360.82
5,062.25
100.00%
02.04
02.04.01
PAVIMENTO RIGIDO
PAVIMENTO RIGIDO: CONCRETO fc= 210 KG/CM2
m3
273.92
339.37
101,610.29
92,960.23
271.22
92,043.93
99.01%
02.04.02
m2
141.08
28.75
4,056.05
140.10
4,027.88
99.31%
02.04.03
m2
1,369.61
0.47
643.72
1,356.11
637.37
99.01%
02.04.04
705.41
5.60
3,950.30
705.41
3,950.30
100.00%
02.05
VEREDAS DE CONCRETO
02.05.01
m2
744.45
1.24
923.12
744.45
923.12
100.00%
02.05.02
m3
34.03
19.33
657.80
34.03
657.80
100.00%
02.05.03
m3
44.24
7.25
320.74
44.24
320.74
100.00%
02.05.04
m3
44.24
8.78
388.43
44.24
388.43
100.00%
02.05.05
m2
113.43
5.11
579.63
113.43
579.63
100.00%
02.05.06
m2
598.77
38.02
22,765.24
584.37
22,217.75
97.60%
02.05.07
m2
10.44
27.45
286.58
10.44
286.58
100.00%
02.05.08
104.36
5.60
584.42
104.36
584.42
100.00%
02.06
SARDINELES
13,091.07
m2
1,474.22
8.88
13,091.07
16,749.87
6,042.33
4,840.90
5,866.63
26,505.94
21,582.10
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno - Puno"
Item
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
Metrado
Presupuesto Base
Parcial
Mayores Metrados
%
Metrado
02.06.01
m3
36.42
19.33
704.00
36.42
704.00
100.00%
02.06.02
m3
47.35
7.25
343.29
47.35
343.29
100.00%
02.06.03
m3
47.35
8.78
415.73
47.35
415.73
100.00%
02.06.04
m3
36.42
309.21
11,261.43
36.42
11,261.43
100.00%
50.61
02.06.05
m2
291.37
30.40
8,857.65
291.37
8,857.65
100.00%
635.54
02.07
02.07.01
39.60
1,981.58
100.00%
02.08
CANALIZACION
02.08.01
1,981.58
m2
39.60
50.04
1,981.58
m2
22.71
1.24
28.16
0.00%
02.08.02
m3
10.43
19.33
201.61
0.00%
02.08.03
m2
22.71
1.87
42.47
0.00%
02.08.04
m2
22.71
21.71
493.03
0.00%
02.08.05
m3
18.24
339.37
6,190.11
0.00%
02.08.06
m2
124.29
27.45
3,411.76
0.00%
02.08.07
kg
849.71
4.57
3,883.17
0.00%
02.08.08
10.20
421.32
4,297.46
0.00%
03
AREAS VERDES
03.01
JARDINERAS DE CONCRETO
03.01.01
m2
2.15
1.24
2.67
2.15
2.67
100.00%
03.01.02
m3
0.74
19.33
14.30
0.74
14.30
100.00%
03.01.03
m3
0.65
7.25
4.71
0.65
4.71
100.00%
03.01.04
m3
0.74
12.81
9.48
0.74
9.48
100.00%
03.01.05
m3
0.42
296.86
124.68
0.42
124.68
100.00%
03.01.06
m2
2.80
25.59
71.65
2.80
71.65
100.00%
03.01.07
m2
2.80
12.52
35.06
2.80
35.06
100.00%
03.02
SEMBRADO DE GRASS
03.02.01
m3
0.65
25.07
16.30
0.65
16.30
100.00%
03.02.02
SEMBRADO DE GRASS
m2
2.15
9.06
19.48
2.15
19.48
100.00%
04
SEALIZACION
04.01
PINTURA EN SARDINELES
m2
263.24
1,179.32
100.00%
04.02
PINTURA EN JARDINERAS
04.03
PINTURA EN PAVIMENTO
18,547.78
298.33
262.55
35.77
1,603.54
263.24
4.48
1,179.32
m2
3.85
5.30
20.41
3.85
20.41
100.00%
m2
56.40
7.16
403.82
56.40
403.82
100.00%
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno - Puno"
Item
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
Metrado
Presupuesto Base
Parcial
Mayores Metrados
%
Metrado
05
VARIOS
05.01
und
5.00
316.10
7,236.29
1,580.50
5.00
1,580.50
100.00%
05.02
und
25.00
61.52
1,538.00
25.00
1,538.00
100.00%
05.03
und
12.00
282.85
3,394.20
12.00
3,394.20
100.00%
05.04
m2
1,247.57
0.58
723.59
1,247.57
723.59
100.00%
01
13,532.21
01.01
13,532.21
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
1.00
1,062.17
100.00%
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
glb
1.00
500.00
500.00
1.00
500.00
100.00%
01.01.02.02
glb
1.00
750.00
750.00
1.00
750.00
100.00%
01.01.03
01.01.03.01
1.00
5,416.77
100.00%
01.01.04
01.01.04.01
m2
201.42
1.06
213.51
201.42
213.51
100.00%
01.01.04.02
m2
201.42
1.24
249.76
201.42
249.76
100.00%
01.01.05
SEGURIDAD Y SALUD
01.01.05.01
glb
1.00
1,140.00
1,140.00
1.00
1,140.00
100.00%
01.01.05.02
und
35.00
120.00
4,200.00
35.00
4,200.00
100.00%
02
PISTAS Y VEREDAS
02.01
MOVIMIENTO DE TIERRAS
02.01.01
CORTES
02.01.01.01
243.17
975.11
100.00%
278.18
02.01.02
02.01.02.01
352.60
4,516.81
100.00%
403.30
02.01.03
02.01.03.01
201.42
672.74
100.00%
314.16
02.02
MEJORAMIENTO DE SUBRAZANTE
8,036.06
02.02.01
4,930.76
02.02.01.01
100.71
4,930.76
100.00%
02.02.02
CONFORMACION DE ENROCADO
1,062.17
und
1.00
1,062.17
1,062.17
1,250.00
5,416.77
glb
1.00
5,416.77
5,416.77
463.27
5,340.00
64,482.84
6,164.66
975.11
m3
243.17
4.01
975.11
4,516.81
m3
352.60
12.81
m2
201.42
3.34
4,516.81
672.74
m3
100.71
48.96
672.74
4,930.76
589.15
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno - Puno"
Item
Descripcin
Presupuesto de Obra
Und.
m3
Metrado
100.71
Precio S/.
02.02.02.01
CONFORMACION DE ENROCADO
02.02.03
5.85
02.02.03.01
m3
27.19
02.02.03.02
m3
02.02.03.03
m3
02.02.04
CONFORMACION DE SUBRAZANTE
02.02.04.01
02.03
SUB BASE
02.03.01
02.03.01.01
02.03.02
02.03.02.01
m3
27.19
7.18
02.03.02.02
m3
27.19
m3
Parcial S/.
589.15
Metrado
100.71
Presupuesto Base
Parcial
589.15
Mayores Metrados
%
Metrado
100.00%
727.53
7.18
195.22
0.00%
27.19
5.55
150.90
0.00%
24.17
15.78
381.40
0.00%
0.00%
1,788.61
m2
201.42
8.88
1,788.61
2,622.69
813.72
m3
22.16
36.72
813.72
22.16
813.72
100.00%
34.55
195.22
27.19
195.22
100.00%
42.40
5.55
150.90
27.19
150.90
100.00%
42.40
24.17
15.99
386.48
24.17
386.48
100.00%
71.09
72.23
732.61
02.03.03
02.03.03.01
m3
46.33
2.57
119.07
46.33
119.07
100.00%
02.03.03.02
m3
46.33
4.49
208.02
46.33
208.02
100.00%
72.23
02.03.03.03
m2
201.42
3.72
749.28
201.42
749.28
100.00%
314.06
02.04
PAVIMENTO RIGIDO
02.04.01
m3
40.28
339.37
13,669.82
40.28
13,669.82
100.00%
62.81
02.04.02
m2
29.43
28.75
846.11
29.43
846.11
100.00%
45.28
02.04.03
m2
201.42
0.47
94.67
201.42
94.67
100.00%
314.06
02.04.04
120.90
5.60
677.04
120.90
677.04
100.00%
226.43
02.05
VEREDAS DE CONCRETO
02.05.01
m3
27.40
19.33
529.64
27.40
529.64
100.00%
28.87
02.05.02
m3
27.40
7.25
198.65
27.40
198.65
100.00%
28.87
02.05.03
m3
27.40
8.78
240.57
27.40
240.57
100.00%
28.87
02.05.04
m2
136.98
5.11
699.97
02.05.05
m2
136.98
38.02
5,207.98
02.05.06
m2
5.96
27.45
02.05.07
m2
136.98
0.47
02.03.02.03
1,076.37
15,287.64
7,438.83
0.00%
136.98
5,207.98
100.00%
163.60
5.96
163.60
100.00%
64.38
136.98
64.38
100.00%
142.76
142.76
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno - Puno"
Item
Descripcin
02.05.08
02.06
GRADERIOS
02.06.01
Presupuesto de Obra
Und.
m
Metrado
59.65
Precio S/.
5.60
Parcial S/.
334.04
Metrado
Mayores Metrados
%
Metrado
59.65
334.04
100.00%
94.98
117.78
48.45%
13,565.46
m2
196.02
1.24
243.06
m3
31.43
343.75
10,804.06
m2
82.84
30.40
2,518.34
02.06.03
02.07
SARDINELES
02.07.01
m3
5.19
19.33
02.07.02
m3
5.19
02.07.03
m3
5.19
02.07.04
m3
02.07.05
02.07.06
02.08
02.08.01
m2
3.20
50.04
02.08.02
m2
0.83
27.45
02.09
MACETEROS
02.09.01
m3
12.98
309.21
4,013.55
02.09.02
m2
86.50
30.40
2,629.60
02.09.03
m2
86.50
12.52
1,082.98
02.09.04
m2
86.50
0.47
02.09.05
m2
86.50
4.48
03
AREAS VERDES
03.01
JARDINERAS DE CONCRETO
03.01.01
03.02
SEMBRADO DE GRASS
03.02.01
m3
29.70
25.07
03.02.02
SEMBRADO DE GRASS
m2
29.70
9.06
04
SEALIZACION
04.01
PINTURA EN SARDINELES
m2
30.27
4.48
04.02
PINTURA EN PAVIMENTO
m2
12.30
7.16
05
VARIOS
05.01
02.06.02
Presupuesto Base
Parcial
0.00%
33.67
1,023.57
40.64%
100.32
5.19
100.32
100.00%
6.98
7.25
37.63
5.19
37.63
100.00%
6.98
8.78
45.57
5.19
45.57
100.00%
6.98
5.19
309.21
1,604.80
5.19
1,604.80
100.00%
6.98
m2
34.60
30.40
1,051.84
34.60
1,051.84
100.00%
46.53
33.95
5.60
190.12
33.95
190.12
100.00%
38.00
160.13
3.20
160.13
100.00%
22.78
0.83
22.78
100.00%
0.00%
0.00%
0.00%
40.66
0.00%
387.52
0.00%
3,030.28
182.91
8,154.30
1,396.40
382.73
m3
19.80
19.33
382.73
19.80
382.73
100.00%
744.58
29.70
744.58
100.00%
269.08
29.70
269.08
100.00%
135.61
30.27
135.61
100.00%
88.07
12.30
88.07
100.00%
2.00
632.20
100.00%
1,013.66
223.68
2,470.87
und
2.00
316.10
632.20
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno - Puno"
Item
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
Metrado
Presupuesto Base
Parcial
Mayores Metrados
%
Metrado
05.02
und
5.00
61.52
307.60
5.00
307.60
100.00%
05.03
und
5.00
282.85
1,414.25
5.00
1,414.25
100.00%
05.04
m2
201.42
0.58
116.82
201.42
116.82
100.00%
01
14,626.73
01.01
14,626.73
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
1.00
1,062.17
100.00%
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
glb
1.00
500.00
500.00
1.00
500.00
100.00%
01.01.02.02
glb
1.00
750.00
750.00
1.00
750.00
100.00%
01.01.03
01.01.03.01
1.00
5,416.77
100.00%
01.01.04
01.01.04.01
m2
677.30
1.06
717.94
677.30
717.94
100.00%
01.01.04.02
m2
677.30
1.24
839.85
677.30
839.85
100.00%
01.01.05
SEGURIDAD Y SALUD
01.01.05.01
glb
1.00
1,140.00
1,140.00
1.00
1,140.00
100.00%
01.01.05.02
und
35.00
120.00
4,200.00
35.00
4,200.00
100.00%
02
PISTAS Y VEREDAS
02.01
MOVIMIENTO DE TIERRAS
02.01.01
CORTES
02.01.01.01
422.11
1,692.66
100.00%
02.01.02
02.01.02.01
569.85
7,299.78
100.00%
02.01.03
02.01.03.01
677.30
2,262.18
100.00%
02.02
SUB BASE
02.02.01
02.02.01.01
74.50
2,735.64
100.00%
02.02.02
02.02.02.01
m3
91.44
7.18
656.54
91.44
656.54
100.00%
02.02.02.02
m3
91.44
5.55
507.49
91.44
507.49
100.00%
1,062.17
und
1.00
1,062.17
1,062.17
1,250.00
5,416.77
glb
1.00
5,416.77
5,416.77
1,557.79
5,340.00
104,571.03
11,254.62
1,692.66
m3
422.11
4.01
1,692.66
7,299.78
m3
569.85
12.81
7,299.78
2,262.18
m2
677.30
3.34
2,262.18
8,818.70
2,735.64
m3
74.50
36.72
2,735.64
2,463.70
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno - Puno"
Item
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
Metrado
Presupuesto Base
Parcial
Mayores Metrados
%
Metrado
02.02.03
02.02.03.01
m3
155.78
2.57
400.35
155.78
400.35
100.00%
02.02.03.02
m3
155.78
4.49
699.45
155.78
699.45
100.00%
02.02.03.03
m2
677.30
3.72
2,519.56
677.30
2,519.56
100.00%
02.03
PAVIMENTO RIGIDO
02.03.01
m3
130.11
339.37
44,155.43
120.61
40,931.42
92.70%
02.03.02
m2
158.31
28.75
4,551.41
107.91
3,102.41
68.16%
02.03.03
m2
677.30
0.47
318.33
603.05
283.43
89.04%
02.03.04
719.58
5.60
4,029.65
210.00
1,176.00
29.18%
02.04
CUNETA RECTANGULAR
02.04.01
m3
5.35
19.33
103.42
0.00%
02.04.02
m3
5.35
567.16
3,034.31
0.00%
02.04.03
m2
53.52
27.45
1,469.12
0.00%
02.04.04
4.63
52.00
240.76
0.00%
02.05
VEREDAS DE CONCRETO
02.05.01
m3
3.27
19.33
63.21
3.27
63.21
100.00%
66.15
02.05.02
m3
3.27
7.25
23.71
3.27
23.71
100.00%
66.15
02.05.03
m3
3.27
8.78
28.71
3.27
28.71
100.00%
72.77
02.05.04
m2
16.37
5.11
83.65
16.37
83.65
100.00%
02.05.05
m2
24.45
38.02
929.59
24.45
929.59
100.00%
309.70
02.05.06
m2
2.86
27.45
78.51
2.86
78.51
100.00%
43.32
02.05.07
m2
24.45
0.47
11.49
24.45
11.49
100.00%
309.70
02.05.08
28.59
5.60
160.10
28.59
160.10
100.00%
129.79
02.06
MURO DE CONTENCION
02.06.01
m3
7.47
361.42
2,699.81
7.47
2,699.81
100.00%
02.06.02
m2
28.42
28.75
817.08
28.42
817.08
100.00%
02.07
GRADERIOS
02.07.01
m2
85.41
1.24
105.91
0.00%
m3
41.17
343.75
14,152.19
0.00%
m2
55.54
30.40
1,688.42
0.00%
02.02.02.03
02.07.03
02.08
02.07.02
m3
81.28
15.99
1,299.67
81.28
1,299.67
100.00%
3,619.36
53,054.82
4,847.61
1,378.97
3,516.88
15,946.51
562.16
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno - Puno"
Item
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
02.08.01
m2
10.00
50.04
02.08.02
m2
2.25
27.45
02.09
MACETEROS
02.09.01
m3
8.26
309.21
02.09.02
m2
55.08
30.40
02.09.03
m2
55.08
02.09.04
m2
02.09.05
m2
03
AREAS VERDES
03.01
JARDINERAS DE CONCRETO
03.01.01
03.02
SEMBRADO DE GRASS
03.02.01
m3
19.14
25.07
03.02.02
SEMBRADO DE GRASS
m2
63.81
9.06
04
SEALIZACION
04.01
05
VARIOS
05.01
und
4.00
05.02
und
8.00
05.03
und
8.00
05.04
m2
677.30
0.58
Parcial S/.
Metrado
Presupuesto Base
Parcial
Mayores Metrados
%
Metrado
500.40
10.00
500.40
100.00%
61.76
2.25
61.76
100.00%
2,554.07
8.26
2,554.07
100.00%
1,674.43
55.08
1,674.43
100.00%
12.52
689.60
55.08
689.60
100.00%
55.08
0.47
25.89
55.08
25.89
100.00%
55.08
4.48
246.76
55.08
246.76
100.00%
12.76
246.65
100.00%
479.84
19.14
479.84
100.00%
578.12
63.81
578.12
100.00%
0.00%
1,264.40
100.00%
5,190.75
1,304.61
246.65
m3
12.76
19.33
246.65
1,057.96
408.62
m2
57.07
7.16
408.62
4,412.19
316.10
1,264.40
4.00
61.52
492.16
8.00
492.16
100.00%
282.85
2,262.80
8.00
2,262.80
100.00%
392.83
677.30
392.83
100.00%
407,797.73
82.32%
495,391.72
Costo Directo
01
MOVIMIENTO DE TIERRAS
01.03
SUB DRENAJE
379.18
01.03.01
m3
2.40
39.43
94.63
0.00%
01.03.02
SUB DRENAJE
15.00
18.97
284.55
0.00%
02
MEJORAMIENTO DE SUBRASANTE
02.01
CONFORMACIN DE ENROCADO
02.01.01
0.00%
02.02
CAPA ANTICONTAMINANTE
02.02.01
CAPA ANTICONTAMINANTE
0.00%
379.18
15,078.05
7,521.72
m3
292.56
25.71
7,521.72
7,556.33
m3
252.72
29.90
7,556.33
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno - Puno"
Item
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
Metrado
Presupuesto Base
Parcial
Mayores Metrados
%
Metrado
03
03.01
100.00
86.00
10,172.84
8,600.00
0.00%
03.02
m3
323.63
4.86
1,572.84
0.00%
01
MOVIMIENTO DE TIERRAS
559.56
01.01
EXCAVACIN DE ZANJAS
559.56
01.01.01
0.00%
02
SUBDRENAJE
02.01
m3
3.20
39.43
126.18
0.00%
02.02
SUBDRENAJE
20.00
18.97
379.40
0.00%
03
03.01
CAPA ANTICONTAMINANTE
03.01.01
CAPA ANTICONTAMINANTE
0.00%
04
04.01
0.00%
05
ENROCADO DE VEREDAS
05.01
m3
45.73
35.70
1,632.56
0.00%
05.02
ENROCADO DE VEREDAS
m3
45.73
5.26
240.54
0.00%
06
MUROS DE CONTENCIN
06.01
ZAPATAS
06.01.01
m3
18.80
296.82
5,580.22
0.00%
06.01.02
kg
1,052.00
4.86
5,112.72
0.00%
06.02
06.02.01
m3
36.20
326.34
11,813.51
0.00%
06.02.02
ENCOFRADO Y DESENCOFRADO
m2
187.46
62.31
11,680.63
0.00%
06.03
06.03.01
kg
2,593.82
4.86
12,605.97
0.00%
06.03.02
27.00
86.00
2,322.00
0.00%
06.04
TARRAJEO EN MUROS
06.04.01
0.00%
08
08.05
0.00%
02
m3
38.59
14.50
559.56
505.58
645.84
645.84
m3
21.60
29.90
645.84
684.50
m2
35.80
19.12
684.50
1,873.10
49,941.51
10,692.94
23,494.14
14,927.97
826.47
m2
27.00
30.61
826.47
1,468.94
kg
302.25
4.86
1,468.94
9,900.35
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno - Puno"
Item
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
Metrado
Presupuesto Base
Parcial
Mayores Metrados
%
Metrado
02.01
m3
110.50
35.70
3,944.85
0.00%
02.02
CONFORMACIN DE ENROCADO
m3
110.50
25.71
2,840.96
0.00%
02.03
CAPA ANTICONTAMINANTE
m3
72.60
42.90
3,114.54
0.00%
03
VEREDAS DE CONCRETO
03.01
SUMINISTRO DE ROCA
m3
77.43
35.70
2,764.25
0.00%
03.02
ACARREO DE ROCA
m3
77.43
16.70
1,293.08
0.00%
03.03
EMPEDRADO DE VEREDAS
m3
77.43
5.26
407.28
0.00%
03.04
m2
148.76
32.47
4,830.24
0.00%
03.05
m3
28.30
309.21
8,750.64
0.00%
04
MURO DE CONTENCIN
04.01
0.00%
Costo Directo
18,045.49
801.84
kg
156.00
5.14
801.84
110,056.76
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno - Puno"
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
Metrado
Presupuesto Base
Parcial
Mayores Metrados
%
Metrado
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del Barrio Huascar de la Ciudad de Puno - Puno"
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
Metrado
Presupuesto Base
Parcial
Mayores Metrados
%
Metrado
Mayores Metrados
Parcial
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
Item
%
01
01.01
01.01.01
-
0.00%
0.00%
0.00%
01.01.01.01
0.00%
0.00%
0.00%
01.01.01.02
0.00%
0.00%
0.00%
01.01.02.01
0.00%
0.00%
0.00%
01.01.02.02
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
01.01.04.01
0.00%
0.00%
0.00%
01.01.04.02
0.00%
0.00%
0.00%
01.01.04.03
0.00%
0.00%
0.00%
01.01.05.01
0.00%
0.00%
0.00%
01.01.05.02
0.00%
0.00%
0.00%
01.01.02
01.01.03
01.01.03.01
01.01.04
01.01.05
01.01.06
01.01.06.01
02
02.01
02.01.01
6,375.62
116.76%
0.00%
0.00%
24,429.69
116.71%
0.00%
0.00%
0.00%
0.00%
0.00%
02.01.01.01
02.01.02
02.01.02.01
02.01.03
02.01.03.01
02.02
02.02.01
163.96%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
36,720.00
02.02.01.01
02.02.02
02.02.02.01
02.02.03
92.04
660.85
02.02.03.01
COMPARA
Mayores Metrados
Parcial
-
%
0.00%
Deductivos de Obra
Metrado
Parcial
78.40
1,237.15
%
100.00%
Metrado
Adicionales de Obra
Parcial
Item
0.00%
0.00%
02.02.03.02
02.02.04
0.00%
1,474.22
13,091.07
100.00%
02.02.04.01
02.03
02.03.01
0.00%
0.00%
0.00%
02.03.01.01
0.00%
0.00%
0.00%
02.03.01.02
0.00%
0.00%
0.00%
02.03.01.03
0.00%
0.00%
0.00%
02.03.02.01
0.00%
0.00%
0.00%
02.03.02.02
0.00%
0.00%
0.00%
02.03.02.03
0.00%
0.00%
0.00%
02.03.03.01
0.00%
0.00%
0.00%
02.03.03.02
0.00%
0.00%
0.00%
02.04
02.04.01
0.00%
0.00%
0.00%
02.04.02
0.00%
0.00%
0.00%
02.04.03
0.00%
0.00%
0.00%
02.04.04
0.00%
0.00%
0.00%
02.05.01
0.00%
0.00%
0.00%
02.05.02
0.00%
0.00%
0.00%
02.05.03
0.00%
0.00%
0.00%
02.05.04
0.00%
0.00%
0.00%
02.05.05
0.00%
0.00%
0.00%
02.05.06
0.00%
0.00%
0.00%
02.05.07
0.00%
0.00%
0.00%
02.05.08
02.03.02
02.03.03
02.05
02.06
COMPARA
Mayores Metrados
Parcial
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
Item
0.00%
0.00%
0.00%
02.06.01
0.00%
0.00%
0.00%
02.06.02
0.00%
0.00%
0.00%
02.06.03
15,649.12
138.96%
0.00%
0.00%
02.06.04
19,320.42
218.12%
0.00%
0.00%
02.06.05
02.07
0.00%
0.00%
0.00%
02.07.01
0.00%
0.00%
0.00%
02.08.01
0.00%
0.00%
0.00%
02.08.02
0.00%
0.00%
0.00%
02.08.03
0.00%
0.00%
0.00%
02.08.04
0.00%
0.00%
0.00%
02.08.05
0.00%
0.00%
0.00%
02.08.06
0.00%
0.00%
0.00%
02.08.07
0.00%
0.00%
0.00%
02.08.08
02.08
03
03.01
-
0.00%
0.00%
0.00%
03.01.01
0.00%
0.00%
0.00%
03.01.02
0.00%
0.00%
0.00%
03.01.03
0.00%
0.00%
0.00%
03.01.04
0.00%
0.00%
0.00%
03.01.05
0.00%
0.00%
0.00%
03.01.06
0.00%
0.00%
0.00%
03.01.07
0.00%
0.00%
0.00%
03.02.01
0.00%
0.00%
0.00%
03.02.02
0.00%
0.00%
0.00%
04.01
0.00%
0.00%
0.00%
04.02
0.00%
0.00%
0.00%
04.03
03.02
04
COMPARA
Mayores Metrados
Parcial
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
Item
%
05
0.00%
0.00%
0.00%
05.01
0.00%
0.00%
0.00%
05.02
0.00%
0.00%
0.00%
05.03
0.00%
0.00%
0.00%
05.04
01
01.01
01.01.01
0.00%
0.00%
0.00%
01.01.01.01
0.00%
0.00%
0.00%
01.01.02.01
0.00%
0.00%
0.00%
01.01.02.02
01.01.02
01.01.03
-
0.00%
0.00%
0.00%
01.01.03.01
01.01.04
0.00%
0.00%
0.00%
01.01.04.01
0.00%
0.00%
0.00%
01.01.04.02
0.00%
0.00%
0.00%
01.01.05.01
0.00%
0.00%
0.00%
01.01.05.02
01.01.05
02
02.01
02.01.01
1,115.50
114.40%
0.00%
0.00%
5,166.27
114.38%
0.00%
0.00%
1,049.29
155.97%
0.00%
02.01.01.01
02.01.02
02.01.02.01
02.01.03
0.00%
02.01.03.01
02.02
02.02.01
0.00%
0.00%
0.00%
02.02.01.01
02.02.02
COMPARA
Mayores Metrados
Parcial
Deductivos de Obra
Metrado
Parcial
-
%
0.00%
Metrado
Adicionales de Obra
Parcial
Item
0.00%
0.00%
27.19
195.22
100.00%
0.00%
02.02.03.01
0.00%
27.19
150.90
100.00%
0.00%
02.02.03.02
0.00%
0.00%
0.00%
02.02.03.03
0.00%
100.00%
0.00%
0.00%
02.02.02.01
02.02.03
02.02.04
201.42
1,788.61
02.02.04.01
02.03
02.03.01
1,268.68
155.91%
0.00%
0.00%
02.03.01.01
02.03.02
304.43
155.94%
0.00%
0.00%
02.03.02.01
235.32
155.94%
0.00%
0.00%
02.03.02.02
1,136.73
294.12%
0.00%
0.00%
02.03.02.03
185.63
155.90%
0.00%
0.00%
02.03.03.01
324.31
155.90%
0.00%
0.00%
02.03.03.02
1,168.30
155.92%
0.00%
0.00%
02.03.03.03
21,315.83
155.93%
0.00%
0.00%
02.04.01
1,301.80
153.86%
0.00%
0.00%
02.04.02
02.03.03
02.04
147.61
155.92%
0.00%
0.00%
02.04.03
1,268.01
187.29%
0.00%
0.00%
02.04.04
558.06
105.36%
0.00%
0.00%
02.05.01
209.31
105.36%
0.00%
0.00%
02.05.02
253.48
105.36%
0.00%
0.00%
02.05.03
100.00%
0.00%
02.05.04
02.05
5,427.74
67.10
0.00%
136.98
699.97
104.22%
0.00%
0.00%
02.05.05
0.00%
0.00%
0.00%
02.05.06
104.22%
0.00%
0.00%
02.05.07
COMPARA
Mayores Metrados
Parcial
Deductivos de Obra
Metrado
Parcial
-
%
0.00%
Metrado
Adicionales de Obra
Parcial
Item
0.00%
0.00%
101.04
125.29
51.55%
0.00%
02.06.01
0.00%
22.07
7,586.56
70.22%
0.00%
02.06.02
0.00%
49.17
1,494.77
59.36%
0.00%
02.06.03
0.00%
02.05.08
02.06
02.07
134.92
134.49%
0.00%
0.00%
02.07.01
50.61
134.49%
0.00%
0.00%
02.07.02
61.28
134.49%
0.00%
0.00%
02.07.03
2,158.29
134.49%
0.00%
0.00%
02.07.04
1,414.51
134.48%
0.00%
0.00%
02.07.05
212.80
111.93%
0.00%
0.00%
02.07.06
02.08
0.00%
0.00%
0.00%
02.08.01
0.00%
0.00%
0.00%
02.08.02
0.00%
0.00%
0.00%
02.09.01
0.00%
0.00%
0.00%
02.09.02
0.00%
0.00%
0.00%
02.09.03
0.00%
0.00%
0.00%
02.09.04
0.00%
0.00%
0.00%
02.09.05
02.09
03
03.01
-
0.00%
0.00%
0.00%
0.00%
0.00%
03.02.01
0.00%
0.00%
0.00%
03.02.02
0.00%
03.01.01
03.02
04
-
0.00%
0.00%
0.00%
04.01
0.00%
0.00%
0.00%
04.02
0.00%
0.00%
0.00%
05
05.01
COMPARA
Mayores Metrados
Parcial
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
Item
0.00%
0.00%
0.00%
05.02
0.00%
0.00%
0.00%
05.03
0.00%
0.00%
0.00%
05.04
01
01.01
01.01.01
0.00%
0.00%
0.00%
01.01.01.01
0.00%
0.00%
0.00%
01.01.02.01
0.00%
0.00%
0.00%
01.01.02.02
01.01.02
01.01.03
-
0.00%
0.00%
0.00%
0.00%
0.00%
01.01.04.01
0.00%
0.00%
0.00%
01.01.04.02
0.00%
0.00%
0.00%
01.01.05.01
0.00%
0.00%
0.00%
01.01.05.02
0.00%
01.01.03.01
01.01.04
01.01.05
02
02.01
02.01.01
-
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
02.01.01.01
02.01.02
02.01.02.01
02.01.03
02.01.03.01
02.02
02.02.01
0.00%
0.00%
0.00%
02.02.01.01
02.02.02
0.00%
0.00%
0.00%
02.02.02.01
0.00%
0.00%
0.00%
02.02.02.02
COMPARA
Mayores Metrados
Parcial
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
Item
0.00%
0.00%
0.00%
02.02.02.03
0.00%
0.00%
0.00%
02.02.03.01
0.00%
0.00%
0.00%
02.02.03.02
0.00%
0.00%
0.00%
02.02.03.03
0.00%
9.50
3,224.02
7.30%
0.00%
02.03.01
0.00%
50.40
1,449.00
31.84%
0.00%
02.03.02
0.00%
74.25
34.90
10.96%
0.00%
02.03.03
0.00%
509.58
2,853.65
70.82%
0.00%
02.03.04
0.00%
5.35
103.42
100.00%
0.00%
02.04.01
0.00%
5.35
3,034.31
100.00%
0.00%
02.04.02
0.00%
53.52
1,469.12
100.00%
0.00%
02.04.03
0.00%
4.63
240.76
100.00%
0.00%
02.04.04
02.02.03
02.03
02.04
02.05
1,278.68
2022.94%
0.00%
0.00%
02.05.01
479.59
2022.94%
0.00%
0.00%
02.05.02
638.92
2225.38%
0.00%
0.00%
02.05.03
0.00%
0.00%
0.00%
02.05.04
11,774.79
1266.67%
0.00%
0.00%
02.05.05
1,189.13
1514.69%
0.00%
0.00%
02.05.06
145.56
1266.67%
0.00%
0.00%
02.05.07
726.82
453.97%
0.00%
0.00%
02.05.08
0.00%
0.00%
0.00%
02.06.01
0.00%
0.00%
0.00%
02.06.02
0.00%
85.41
105.91
100.00%
0.00%
02.07.01
0.00%
41.17
14,152.19
100.00%
0.00%
02.07.02
0.00%
55.54
1,688.42
100.00%
0.00%
02.07.03
02.06
02.07
02.08
COMPARA
Mayores Metrados
Parcial
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
Item
0.00%
0.00%
0.00%
02.08.01
0.00%
0.00%
0.00%
02.08.02
0.00%
0.00%
0.00%
02.09.01
0.00%
0.00%
0.00%
02.09.02
0.00%
0.00%
0.00%
02.09.03
0.00%
0.00%
0.00%
02.09.04
0.00%
0.00%
0.00%
02.09.05
02.09
03
03.01
-
0.00%
0.00%
0.00%
03.01.01
03.02
0.00%
0.00%
0.00%
03.02.01
0.00%
0.00%
0.00%
03.02.02
04
0.00%
0.00%
0.00%
0.00%
04.01
0.00%
0.00%
05.01
0.00%
0.00%
0.00%
05.02
0.00%
0.00%
0.00%
05.03
0.00%
0.00%
0.00%
05.04
165,264.15
159.60%
05
55,386.08
11.18%
01
01.01
0.00%
0.00%
2.40
94.63
100.00%
01.01.01
0.00%
0.00%
15.00
284.55
100.00%
01.01.02
01.01.03
01.01.04
0.00%
0.00%
292.56
7,521.72
100.00%
0.00%
0.00%
252.72
7,556.33
100.00%
01.01.05
01.01.06
01.01.07
COMPARA
Mayores Metrados
Parcial
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
Item
01.01.08
-
0.00%
0.00%
100.00
8,600.00
100.00%
01.01.09
0.00%
0.00%
323.63
1,572.84
100.00%
01.01.10
01.02
01.02.01
01.03
01.03.01
0.00%
0.00%
38.59
559.56
100.00%
0.00%
0.00%
3.20
126.18
100.00%
02
0.00%
0.00%
20.00
379.40
100.00%
02.01
01.03.02
02.01.01
02.02
02.02.01
0.00%
0.00%
21.60
645.84
100.00%
0.00%
0.00%
35.80
684.50
100.00%
0.00%
0.00%
45.73
1,632.56
100.00%
03.02
0.00%
0.00%
45.73
240.54
100.00%
03.03
02.02.02
03
03.01
03.04
03.05
-
0.00%
0.00%
18.80
5,580.22
100.00%
04
0.00%
0.00%
1,052.00
5,112.72
100.00%
04.01
04.01.01
0.00%
0.00%
36.20
11,813.51
100.00%
04.01.02
0.00%
0.00%
187.46
11,680.63
100.00%
04.01.03
0.00%
0.00%
2,593.82
12,605.97
100.00%
04.01.05
0.00%
0.00%
27.00
2,322.00
100.00%
04.01.06
0.00%
0.00%
27.00
826.47
100.00%
0.00%
0.00%
302.25
1,468.94
100.00%
04.01.04
04.02
04.02.01
04.02.02
01
01.01
COMPARA
Mayores Metrados
Parcial
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
Item
0.00%
0.00%
110.50
3,944.85
100.00%
01.01.01
0.00%
0.00%
110.50
2,840.96
100.00%
01.02
0.00%
0.00%
72.60
3,114.54
100.00%
01.02.01
0.00%
0.00%
77.43
2,764.25
100.00%
01.02.03
0.00%
0.00%
77.43
1,293.08
100.00%
01.02.04
0.00%
0.00%
77.43
407.28
100.00%
01.02.05
0.00%
0.00%
148.76
4,830.24
100.00%
01.03
0.00%
0.00%
28.30
8,750.64
100.00%
01.03.01
01.02.02
01.03.02
-
0.00%
0.00%
156.00
801.84
100.00%
110,056.76
100.00%
02
02.01
02.02
03
03.01
03.01.01
03.01.02
04
04.01
05
05.01
05.02
06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.03
06.03.01
06.03.02
06.04
06.04.01
COMPARA
Mayores Metrados
Parcial
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
Item
06.04.02
07
07.01
07.02
07.03
07.04
07.05
08
08.01
08.02
08.03
08.04
08.05
08.06
08.07
08.08
08.09
08.10
08.11
09
09.01
09.02
09.03
09.04
10
10.01
01
01.01
01.01.01
01.01.02
01.01.03
01.01.04
01.02
01.02.01
COMPARA
Mayores Metrados
Parcial
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
Item
%
02
02.01
02.02
02.03
02.04
03
03.01
03.02
03.03
03.04
03.05
03.06
04
04.01
05
05.01
05.01.01
05.01.02
05.01.03
05.01.04
05.01.05
05.01.06
05.02
05.02.01
05.02.02
06
06.01
06.02
COMPARA
4.6.2 CUADRO COMPARATIVO DE METRADOS FINALES (Incluye Mayores Metrados, Deductivos y Adicionales
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
20,434.32
20,434.32
CONSTRUCCIONES PROVISIONALES
Metrado
Presupuesto Base
Parcial
Metrado
Mayores Metrados
Parcial
5,776.17
m2
40.00
117.85
4,714.00
40.00
4,714.00
100.00%
0.00%
und
1.00
1,062.17
1,062.17
1.00
1,062.17
100.00%
0.00%
INSTALACIONES PROVISIONALES
1,250.00
glb
1.00
500.00
500.00
1.00
500.00
100.00%
0.00%
glb
1.00
750.00
750.00
1.00
750.00
100.00%
0.00%
1.00
5,416.77
100.00%
0.00%
5,416.77
glb
1.00
5,416.77
DEMOLICIONES Y DESMONTAJES
5,416.77
3,981.97
ESCARIFICADO DE VEREDAS
m2
530.24
5.48
2,905.72
530.24
2,905.72
100.00%
0.00%
m2
30.90
22.48
694.63
30.90
694.63
100.00%
0.00%
ELIMINACION DE DEMOLICIONES
m3
32.15
11.87
381.62
32.15
381.62
100.00%
0.00%
2,869.41
m2
1,247.57
1.06
1,322.42
1,247.57
1,322.42
100.00%
0.00%
m2
1,247.57
1.24
1,546.99
1,247.57
1,546.99
100.00%
0.00%
1.00
1,140.00
100.00%
0.00%
1,361.73
5,460.54
100.00%
1,589.93
6,375.62
116.76%
1,634.08
20,932.56
100.00%
1,907.08
24,429.69
116.71%
1,484.44
4,958.03
100.00%
457.44
22,396.26
100.00%
457.44
2,676.02
100.00%
0.00%
0.00%
0.00%
SEGURIDAD Y SALUD
SEALIZACION DE SEGURIDAD Y/O DESVIO DE TRAFICO EN OBRA
1,140.00
glb
1.00
1,140.00
PISTAS Y VEREDAS
MOVIMIENTO DE TIERRAS
31,351.13
CORTES
CORTE DE TERRENO NORMAL CON MAQUINARIA
5,460.54
m3
1,361.73
4.01
m3
1,634.08
12.81
m2
1,484.44
3.34
0.00%
22,396.26
m3
457.44
48.96
CONFORMACION DE ENROCADO
22,396.26
750.00
36,720.00
163.96%
2,676.02
m3
457.44
5.85
4,958.03
40,061.36
CONFORMACION DE ENROCADO
20,932.56
4,958.03
MEJORAMIENTO DE SUBRASANTE
SUMINISTRO DE ROCA GRANDE PUESTO EN OBRA
5,460.54
20,932.56
1,140.00
258,390.06
2,676.02
1,898.00
m3
92.04
7.18
660.85
4.6.2 CUADRO COMPARATIVO DE METRADOS FINALES (Incluye Mayores Metrados, Deductivos y Adicionales
Descripcin
CARGUIO Y TRANSPORTE DE MATERIAL DE CANTERA A OBRA
Presupuesto de Obra
Und.
m3
Metrado
78.40
Precio S/.
15.78
CONFORMACION DE SUBRAZANTE
CONFORMACION DE SUB RAZANTE CON MATERIAL DE PRESTAMO E=0.20 m.
Parcial S/.
1,237.15
Metrado
Presupuesto Base
Parcial
Metrado
Mayores Metrados
Parcial
0.00%
0.00%
0.00%
0.00%
13,091.07
m2
1,474.22
8.88
SUB BASE
13,091.07
16,749.87
6,042.33
m3
183.71
7.18
1,319.04
183.71
1,319.04
100.00%
258.71
1,857.54
140.83%
m3
183.71
4.73
868.95
183.71
868.95
100.00%
258.71
1,223.70
140.83%
156.49
24.63
3,854.35
156.49
3,854.35
100.00%
220.24
5,424.51
140.74%
4,840.90
m3
183.71
7.18
1,319.04
183.71
1,319.04
100.00%
258.71
1,857.54
140.83%
m3
183.71
5.55
1,019.59
183.71
1,019.59
100.00%
258.71
1,435.84
140.83%
m3
156.49
15.99
2,502.28
156.49
2,502.28
100.00%
220.24
3,521.64
140.74%
m3
312.99
2.57
804.38
312.99
804.38
100.00%
440.49
1,132.06
140.74%
m2
1,360.82
3.72
5,062.25
1,360.82
5,062.25
100.00%
1,915.17
7,124.43
140.74%
PAVIMENTO RIGIDO
PAVIMENTO RIGIDO: CONCRETO fc= 210 KG/CM2
m3
273.92
339.37
101,610.29
92,960.23
271.22
92,043.93
99.01%
0.00%
m2
141.08
28.75
4,056.05
140.10
4,027.88
99.31%
0.00%
m2
1,369.61
0.47
643.72
1,356.11
637.37
99.01%
0.00%
705.41
5.60
3,950.30
705.41
3,950.30
100.00%
0.00%
5,866.63
VEREDAS DE CONCRETO
26,505.94
m2
744.45
1.24
923.12
744.45
923.12
100.00%
0.00%
m3
34.03
19.33
657.80
34.03
657.80
100.00%
0.00%
m3
44.24
7.25
320.74
44.24
320.74
100.00%
0.00%
m3
44.24
8.78
388.43
44.24
388.43
100.00%
0.00%
m2
113.43
5.11
579.63
113.43
579.63
100.00%
0.00%
m2
598.77
38.02
22,765.24
584.37
22,217.75
97.60%
0.00%
m2
10.44
27.45
286.58
10.44
286.58
100.00%
104.36
5.60
584.42
104.36
584.42
100.00%
SARDINELES
21,582.10
176.56
988.74
0.00%
169.18%
4.6.2 CUADRO COMPARATIVO DE METRADOS FINALES (Incluye Mayores Metrados, Deductivos y Adicionales
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
Metrado
Presupuesto Base
Parcial
Metrado
Mayores Metrados
Parcial
m3
36.42
19.33
704.00
36.42
704.00
100.00%
0.00%
m3
47.35
7.25
343.29
47.35
343.29
100.00%
0.00%
m3
47.35
8.78
415.73
47.35
415.73
100.00%
m3
36.42
309.21
11,261.43
36.42
11,261.43
100.00%
60.61
18,741.22
166.42%
m2
291.37
30.40
8,857.65
291.37
8,857.65
100.00%
635.54
19,320.42
218.12%
39.60
1,981.58
100.00%
0.00%
0.00%
1,981.58
m2
39.60
50.04
m2
22.71
1.24
28.16
0.00%
0.00%
m3
10.43
19.33
201.61
0.00%
0.00%
m2
22.71
1.87
42.47
0.00%
0.00%
m2
22.71
21.71
493.03
0.00%
0.00%
m3
18.24
339.37
6,190.11
0.00%
0.00%
m2
124.29
27.45
3,411.76
0.00%
0.00%
kg
849.71
4.57
3,883.17
0.00%
0.00%
10.20
421.32
4,297.46
0.00%
0.00%
CANALIZACION
1,981.58
18,547.78
AREAS VERDES
298.33
JARDINERAS DE CONCRETO
262.55
m2
2.15
1.24
2.67
2.15
2.67
100.00%
0.00%
m3
0.74
19.33
14.30
0.74
14.30
100.00%
0.00%
m3
0.65
7.25
4.71
0.65
4.71
100.00%
0.00%
m3
0.74
12.81
9.48
0.74
9.48
100.00%
0.00%
m3
0.42
296.86
124.68
0.42
124.68
100.00%
0.00%
m2
2.80
25.59
71.65
2.80
71.65
100.00%
0.00%
m2
2.80
12.52
35.06
2.80
35.06
100.00%
0.00%
SEMBRADO DE GRASS
35.77
m3
0.65
25.07
16.30
0.65
16.30
100.00%
0.00%
SEMBRADO DE GRASS
m2
2.15
9.06
19.48
2.15
19.48
100.00%
0.00%
263.24
1,179.32
100.00%
SEALIZACION
1,603.54
PINTURA EN SARDINELES
m2
263.24
4.48
PINTURA EN JARDINERAS
PINTURA EN PAVIMENTO
1,179.32
322.00
1,442.56
122.32%
m2
3.85
5.30
20.41
3.85
20.41
100.00%
0.00%
m2
56.40
7.16
403.82
56.40
403.82
100.00%
0.00%
4.6.2 CUADRO COMPARATIVO DE METRADOS FINALES (Incluye Mayores Metrados, Deductivos y Adicionales
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
VARIOS
Parcial S/.
Metrado
Presupuesto Base
Parcial
Metrado
Mayores Metrados
Parcial
7,236.29
und
5.00
316.10
1,580.50
5.00
1,580.50
100.00%
0.00%
und
25.00
61.52
1,538.00
25.00
1,538.00
100.00%
0.00%
und
12.00
282.85
3,394.20
12.00
3,394.20
100.00%
0.00%
m2
1,247.57
0.58
723.59
1,247.57
723.59
100.00%
0.00%
1.00
1,062.17
100.00%
0.00%
13,532.21
13,532.21
CONSTRUCCIONES PROVISIONALES
CARTEL DE OBRA DE 2.40m x 4.80m
1,062.17
und
1.00
1,062.17
INSTALACIONES PROVISIONALES
1,062.17
1,250.00
glb
1.00
500.00
500.00
1.00
500.00
100.00%
0.00%
glb
1.00
750.00
750.00
1.00
750.00
100.00%
0.00%
1.00
5,416.77
100.00%
0.00%
5,416.77
glb
1.00
5,416.77
5,416.77
463.27
m2
201.42
1.06
213.51
201.42
213.51
100.00%
0.00%
m2
201.42
1.24
249.76
201.42
249.76
100.00%
0.00%
SEGURIDAD Y SALUD
5,340.00
glb
1.00
1,140.00
1,140.00
1.00
1,140.00
100.00%
0.00%
und
35.00
120.00
4,200.00
35.00
4,200.00
100.00%
0.00%
243.17
975.11
100.00%
278.18
1,115.50
114.40%
352.60
4,516.81
100.00%
403.30
5,166.27
114.38%
201.42
672.74
100.00%
314.16
1,049.29
155.97%
100.71
4,930.76
100.00%
PISTAS Y VEREDAS
64,482.84
MOVIMIENTO DE TIERRAS
6,164.66
CORTES
CORTE DE TERRENO NORMAL CON MAQUINARIA
975.11
m3
243.17
4.01
m3
352.60
12.81
m2
201.42
3.34
975.11
4,516.81
4,516.81
672.74
672.74
MEJORAMIENTO DE SUBRAZANTE
8,036.06
4,930.76
m3
100.71
48.96
4,930.76
589.15
0.00%
4.6.2 CUADRO COMPARATIVO DE METRADOS FINALES (Incluye Mayores Metrados, Deductivos y Adicionales
Descripcin
CONFORMACION DE ENROCADO
Presupuesto de Obra
Und.
m3
Metrado
100.71
Precio S/.
5.85
27.19
m3
m3
100.71
Presupuesto Base
Parcial
589.15
Metrado
Mayores Metrados
Parcial
100.00%
0.00%
7.18
195.22
0.00%
0.00%
27.19
5.55
150.90
0.00%
0.00%
24.17
15.78
381.40
0.00%
0.00%
0.00%
0.00%
CONFORMACION DE SUBRAZANTE
1,788.61
m2
201.42
8.88
SUB BASE
1,788.61
2,622.69
589.15
Metrado
727.53
Parcial S/.
813.72
m3
22.16
36.72
813.72
22.16
813.72
100.00%
77.37
2,841.03
349.14%
732.61
m3
27.19
7.18
195.22
27.19
195.22
100.00%
82.40
591.63
303.05%
m3
27.19
5.55
150.90
27.19
150.90
100.00%
74.11
411.31
272.56%
m3
24.17
15.99
386.48
24.17
386.48
100.00%
71.09
1,136.73
294.12%
m3
46.33
2.57
119.07
46.33
119.07
100.00%
148.46
381.54
320.44%
m3
46.33
4.49
208.02
46.33
208.02
100.00%
148.46
666.59
320.44%
m2
201.42
3.72
749.28
201.42
749.28
100.00%
681.51
2,535.22
338.35%
1,076.37
PAVIMENTO RIGIDO
15,287.64
m3
40.28
339.37
13,669.82
40.28
13,669.82
100.00%
72.81
24,709.53
180.76%
m2
29.43
28.75
846.11
29.43
846.11
100.00%
45.28
1,301.80
153.86%
m2
201.42
0.47
94.67
201.42
94.67
100.00%
314.06
147.61
155.92%
120.90
5.60
677.04
120.90
677.04
100.00%
226.43
1,268.01
187.29%
VEREDAS DE CONCRETO
7,438.83
m3
27.40
19.33
529.64
27.40
529.64
100.00%
28.87
558.06
105.36%
m3
27.40
7.25
198.65
27.40
198.65
100.00%
28.87
209.31
105.36%
m3
27.40
8.78
240.57
27.40
240.57
100.00%
28.87
253.48
105.36%
m2
136.98
5.11
699.97
m2
136.98
38.02
5,207.98
m2
5.96
27.45
m2
136.98
0.47
0.00%
136.98
5,207.98
100.00%
163.60
5.96
163.60
100.00%
64.38
136.98
64.38
100.00%
142.76
142.76
5,427.74
67.10
0.00%
104.22%
0.00%
104.22%
4.6.2 CUADRO COMPARATIVO DE METRADOS FINALES (Incluye Mayores Metrados, Deductivos y Adicionales
Descripcin
VEREDAS: JUNTA ASFALTICA
Presupuesto de Obra
Und.
m
Metrado
59.65
Precio S/.
5.60
GRADERIOS
TRAZO Y REPLANTEO EN GRADERIOS
GRADERIOS DE CONCRETO: fc=175 kg/cm2 ACABADO COLOREADO FROTACHADO Y BRUADO C:A
1:2
GRADERIOS: ENCOFRADO Y DESENCOFRADO CARAVISTA
Parcial S/.
334.04
Metrado
Presupuesto Base
Parcial
Metrado
Mayores Metrados
Parcial
59.65
334.04
100.00%
0.00%
94.98
117.78
48.45%
0.00%
13,565.46
m2
196.02
1.24
243.06
m3
31.43
343.75
10,804.06
m2
82.84
30.40
2,518.34
SARDINELES
0.00%
0.00%
33.67
1,023.57
40.64%
0.00%
3,030.28
m3
5.19
19.33
100.32
5.19
100.32
100.00%
6.98
134.92
134.49%
m3
5.19
7.25
37.63
5.19
37.63
100.00%
6.98
50.61
134.49%
m3
5.19
8.78
45.57
5.19
45.57
100.00%
6.98
61.28
134.49%
m3
5.19
309.21
1,604.80
5.19
1,604.80
100.00%
9.94
3,073.55
191.52%
m2
34.60
30.40
1,051.84
34.60
1,051.84
100.00%
46.53
1,414.51
134.48%
33.95
5.60
190.12
33.95
190.12
100.00%
38.00
212.80
111.93%
182.91
m2
3.20
50.04
160.13
3.20
160.13
100.00%
0.00%
m2
0.83
27.45
22.78
0.83
22.78
100.00%
0.00%
m3
12.98
309.21
4,013.55
0.00%
0.00%
m2
86.50
30.40
2,629.60
0.00%
0.00%
m2
86.50
12.52
1,082.98
0.00%
0.00%
m2
86.50
0.47
40.66
0.00%
0.00%
m2
86.50
4.48
387.52
0.00%
0.00%
MACETEROS
8,154.30
AREAS VERDES
1,396.40
JARDINERAS DE CONCRETO
JARDINERAS: EXCAVACION EN TERRENO NORMAL
382.73
m3
19.80
19.33
SEMBRADO DE GRASS
382.73
19.80
382.73
100.00%
0.00%
1,013.66
m3
29.70
25.07
744.58
29.70
744.58
100.00%
0.00%
SEMBRADO DE GRASS
m2
29.70
9.06
269.08
29.70
269.08
100.00%
0.00%
SEALIZACION
223.68
PINTURA EN SARDINELES
m2
30.27
4.48
135.61
30.27
135.61
100.00%
0.00%
PINTURA EN PAVIMENTO
m2
12.30
7.16
88.07
12.30
88.07
100.00%
0.00%
2.00
632.20
100.00%
0.00%
VARIOS
NIVELACION DE BUZONES EN GENERAL
2,470.87
und
2.00
316.10
632.20
4.6.2 CUADRO COMPARATIVO DE METRADOS FINALES (Incluye Mayores Metrados, Deductivos y Adicionales
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
Metrado
Presupuesto Base
Parcial
Metrado
Mayores Metrados
Parcial
und
5.00
61.52
307.60
5.00
307.60
100.00%
0.00%
und
5.00
282.85
1,414.25
5.00
1,414.25
100.00%
0.00%
m2
201.42
0.58
116.82
201.42
116.82
100.00%
0.00%
1.00
1,062.17
100.00%
0.00%
14,626.73
14,626.73
CONSTRUCCIONES PROVISIONALES
CARTEL DE OBRA DE 2.40m x 4.80m
1,062.17
und
1.00
1,062.17
INSTALACIONES PROVISIONALES
1,062.17
1,250.00
glb
1.00
500.00
500.00
1.00
500.00
100.00%
0.00%
glb
1.00
750.00
750.00
1.00
750.00
100.00%
0.00%
1.00
5,416.77
100.00%
0.00%
717.94
677.30
717.94
100.00%
0.00%
839.85
677.30
839.85
100.00%
0.00%
5,416.77
glb
1.00
5,416.77
5,416.77
1,557.79
m2
677.30
1.06
m2
677.30
1.24
SEGURIDAD Y SALUD
5,340.00
glb
1.00
1,140.00
1,140.00
1.00
1,140.00
100.00%
0.00%
und
35.00
120.00
4,200.00
35.00
4,200.00
100.00%
0.00%
422.11
1,692.66
100.00%
0.00%
569.85
7,299.78
100.00%
0.00%
677.30
2,262.18
100.00%
0.00%
74.50
2,735.64
100.00%
102.50
3,763.80
137.58%
PISTAS Y VEREDAS
104,571.03
MOVIMIENTO DE TIERRAS
11,254.62
CORTES
CORTE DE TERRENO NORMAL CON MAQUINARIA
1,692.66
m3
422.11
4.01
7,299.78
m3
569.85
12.81
7,299.78
2,262.18
m2
677.30
3.34
SUB BASE
2,262.18
8,818.70
1,692.66
2,735.64
m3
74.50
36.72
2,735.64
2,463.70
m3
91.44
7.18
656.54
91.44
656.54
100.00%
119.44
857.58
130.62%
m3
91.44
5.55
507.49
91.44
507.49
100.00%
115.24
639.58
126.03%
4.6.2 CUADRO COMPARATIVO DE METRADOS FINALES (Incluye Mayores Metrados, Deductivos y Adicionales
Descripcin
CARGUIO Y TRANSPORTE DE MATERIAL DE PRESTAMO DE CANTERA A OBRA (CANTERA
JAYLLIHUAYA)
CONFORMACION DE SUB BASE
Presupuesto de Obra
Und.
Metrado
Precio S/.
m3
81.28
15.99
m3
155.78
2.57
m3
155.78
4.49
m2
677.30
3.72
Parcial S/.
1,299.67
Metrado
Presupuesto Base
Parcial
Metrado
Mayores Metrados
Parcial
81.28
1,299.67
100.00%
105.08
1,680.23
129.28%
400.35
155.78
400.35
100.00%
207.58
533.48
133.25%
699.45
155.78
699.45
100.00%
207.58
932.03
133.25%
2,519.56
677.30
2,519.56
100.00%
902.52
3,357.37
133.25%
3,619.36
PAVIMENTO RIGIDO
53,054.82
m3
130.11
339.37
44,155.43
120.61
40,931.42
92.70%
0.00%
m2
158.31
28.75
4,551.41
107.91
3,102.41
68.16%
0.00%
m2
677.30
0.47
318.33
603.05
283.43
89.04%
0.00%
719.58
5.60
4,029.65
210.00
1,176.00
29.18%
0.00%
CUNETA RECTANGULAR
4,847.61
m3
5.35
19.33
103.42
0.00%
0.00%
m3
5.35
567.16
3,034.31
0.00%
0.00%
m2
53.52
27.45
1,469.12
0.00%
0.00%
4.63
52.00
240.76
0.00%
0.00%
VEREDAS DE CONCRETO
1,378.97
m3
3.27
19.33
63.21
3.27
63.21
100.00%
66.15
1,278.68
2022.94%
m3
3.27
7.25
23.71
3.27
23.71
100.00%
66.15
479.59
2022.94%
m3
3.27
8.78
28.71
3.27
28.71
100.00%
72.77
638.92
2225.38%
m2
16.37
5.11
83.65
16.37
83.65
100.00%
m2
24.45
38.02
929.59
24.45
929.59
100.00%
309.70
11,774.79
1266.67%
m2
2.86
27.45
78.51
2.86
78.51
100.00%
43.32
1,189.13
1514.69%
m2
24.45
0.47
11.49
24.45
11.49
100.00%
309.70
145.56
1266.67%
28.59
5.60
160.10
28.59
160.10
100.00%
129.79
726.82
453.97%
MURO DE CONTENCION
0.00%
3,516.88
m3
7.47
361.42
2,699.81
7.47
2,699.81
100.00%
0.00%
m2
28.42
28.75
817.08
28.42
817.08
100.00%
0.00%
m2
85.41
1.24
105.91
0.00%
0.00%
m3
41.17
343.75
14,152.19
0.00%
0.00%
m2
55.54
30.40
1,688.42
0.00%
0.00%
GRADERIOS
TRAZO Y REPLANTEO EN GRADERIOS
GRADERIOS DE CONCRETO: fc=175 kg/cm2 ACABADO COLOREADO FROTACHADO Y BRUADO C:A
1:2
GRADERIOS: ENCOFRADO Y DESENCOFRADO CARAVISTA
RAMPAS Y ACCESOS DOMICILIARES
15,946.51
562.16
4.6.2 CUADRO COMPARATIVO DE METRADOS FINALES (Incluye Mayores Metrados, Deductivos y Adicionales
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
m2
10.00
50.04
m2
2.25
27.45
MACETEROS
Parcial S/.
Metrado
Presupuesto Base
Parcial
Metrado
Mayores Metrados
Parcial
500.40
10.00
500.40
100.00%
0.00%
61.76
2.25
61.76
100.00%
0.00%
5,190.75
m3
8.26
309.21
2,554.07
8.26
2,554.07
100.00%
0.00%
m2
55.08
30.40
1,674.43
55.08
1,674.43
100.00%
0.00%
m2
55.08
12.52
689.60
55.08
689.60
100.00%
0.00%
m2
55.08
0.47
25.89
55.08
25.89
100.00%
0.00%
m2
55.08
4.48
246.76
55.08
246.76
100.00%
0.00%
12.76
246.65
100.00%
0.00%
AREAS VERDES
1,304.61
JARDINERAS DE CONCRETO
JARDINERAS: EXCAVACION EN TERRENO NORMAL
246.65
m3
12.76
19.33
SEMBRADO DE GRASS
246.65
1,057.96
m3
19.14
25.07
479.84
19.14
479.84
100.00%
0.00%
SEMBRADO DE GRASS
m2
63.81
9.06
578.12
63.81
578.12
100.00%
0.00%
0.00%
0.00%
1,264.40
100.00%
0.00%
SEALIZACION
PINTURA EN PAVIMENTO CON CEMENTO FROTACHADO COLOREADO OCRE ROJO
408.62
m2
57.07
7.16
VARIOS
408.62
4,412.19
und
4.00
316.10
1,264.40
4.00
und
8.00
und
8.00
61.52
492.16
8.00
492.16
100.00%
0.00%
282.85
2,262.80
8.00
2,262.80
100.00%
m2
677.30
0.58
0.00%
392.83
677.30
392.83
100.00%
0.00%
407,797.73
82.32%
214,378.48
43.27%
495,391.72
Costo Directo
MOVIMIENTO DE TIERRAS
29,194.23
26,691.88
m3
160.70
20.24
3,252.57
0.00%
0.00%
m3
41.45
79.96
3,314.34
0.00%
0.00%
glb
1.00
405.98
405.98
0.00%
0.00%
glb
1.00
2,250.53
2,250.53
0.00%
0.00%
m3
144.63
89.63
12,963.19
0.00%
0.00%
m3
30.00
20.24
607.20
0.00%
0.00%
m3
9.00
79.96
719.64
0.00%
0.00%
4.6.2 CUADRO COMPARATIVO DE METRADOS FINALES (Incluye Mayores Metrados, Deductivos y Adicionales
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
Metrado
Presupuesto Base
Parcial
Metrado
Mayores Metrados
Parcial
glb
1.00
785.98
785.98
0.00%
0.00%
glb
1.00
1,585.78
1,585.78
0.00%
0.00%
m3
9.00
89.63
806.67
0.00%
0.00%
0.00%
0.00%
94.63
0.00%
0.00%
284.55
0.00%
0.00%
0.00%
0.00%
2,123.17
m3
192.84
11.01
SUB DRENAJE
379.18
m3
2.40
39.43
SUB DRENAJE
15.00
18.97
MEJORAMIENTO DE SUBRASANTE
17,322.20
CONFORMACIN DE ENROCADO
CONFORMACIN DE ROCA H=0.80-1.00 M.
2,123.17
7,521.72
m3
292.56
25.71
CAPA ANTICONTAMINANTE
7,521.72
9,800.48
CAPA ANTICONTAMINANTE
m3
252.72
29.90
7,556.33
0.00%
0.00%
m2
252.72
8.88
2,244.15
0.00%
0.00%
13,205.97
85.50
86.00
7,353.00
0.00%
0.00%
m3
323.63
4.86
1,572.84
0.00%
0.00%
94.10
5.60
526.96
0.00%
0.00%
SUMINISTRO DE ROCA
m3
91.63
35.70
3,271.19
0.00%
0.00%
EMPEDRADO DE VEREDAS
m3
91.63
5.26
481.97
0.00%
0.00%
943.42
MACETEROS
922.40
m3
2.00
309.21
618.42
0.00%
0.00%
m2
4.82
30.40
146.53
0.00%
0.00%
kg
20.94
4.13
86.48
0.00%
0.00%
m2
2.40
0.47
1.13
0.00%
0.00%
MACETEROS: BRUAS
20.10
2.94
59.09
0.00%
0.00%
m2
2.40
4.48
10.75
0.00%
0.00%
SEMBRADO DE CETICIOS
21.02
m3
0.24
25.07
6.02
0.00%
0.00%
SEMBRADO DE CETICIOS
Und.
4.00
3.75
15.00
0.00%
0.00%
MOVIMIENTO DE TIERRAS
11,145.86
EXCAVACIN DE ZANJAS
559.56
4.6.2 CUADRO COMPARATIVO DE METRADOS FINALES (Incluye Mayores Metrados, Deductivos y Adicionales
Descripcin
EXCAVACIN DE ZANJAS PARA ZAPATAS PARA MURO DE CONTENCIN
Presupuesto de Obra
Und.
m3
Metrado
38.59
Precio S/.
14.50
Parcial S/.
559.56
Metrado
Presupuesto Base
Parcial
Metrado
Mayores Metrados
Parcial
0.00%
0.00%
9,113.02
m3
65.00
20.24
1,315.60
0.00%
0.00%
m3
15.00
79.96
1,199.40
0.00%
0.00%
glb
1.00
45.98
45.98
0.00%
0.00%
glb
1.00
1,308.68
1,308.68
0.00%
0.00%
m3
58.50
89.63
5,243.36
0.00%
0.00%
1,473.29
m3
50.17
10.94
548.86
0.00%
0.00%
m2
84.50
10.94
924.43
0.00%
0.00%
SUBDRENAJE
505.58
m3
3.20
39.43
126.18
0.00%
0.00%
SUBDRENAJE
20.00
18.97
379.40
0.00%
0.00%
837.65
CAPA ANTICONTAMINANTE
837.65
CAPA ANTICONTAMINANTE
m3
21.60
29.90
645.84
0.00%
0.00%
m3
21.60
8.88
191.81
0.00%
0.00%
0.00%
0.00%
684.50
m2
35.80
19.12
ENROCADO DE VEREDAS
684.50
1,873.10
m3
45.73
35.70
1,632.56
0.00%
0.00%
ENROCADO DE VEREDAS
m3
45.73
5.26
240.54
0.00%
0.00%
MUROS DE CONTENCIN
51,558.54
ZAPATAS
10,692.94
m3
18.80
296.82
5,580.22
0.00%
0.00%
kg
1,052.00
4.86
5,112.72
0.00%
0.00%
23,494.14
m3
36.20
326.34
11,813.51
0.00%
0.00%
ENCOFRADO Y DESENCOFRADO
m2
187.46
62.31
11,680.63
0.00%
0.00%
16,088.97
kg
2,593.82
4.86
12,605.97
0.00%
0.00%
40.50
86.00
3,483.00
0.00%
0.00%
0.00%
0.00%
TARRAJEO EN MUROS
TARRAJEO MUROS TEXTURADO DE EXTERIORES
1,282.50
m2
27.00
32.00
864.00
4.6.2 CUADRO COMPARATIVO DE METRADOS FINALES (Incluye Mayores Metrados, Deductivos y Adicionales
Descripcin
PINTURA EN MUROS EXTERIORES
Presupuesto de Obra
Und.
m2
Metrado
27.00
Precio S/.
15.50
AREAS VERDES
Parcial S/.
418.50
Metrado
Presupuesto Base
Parcial
Metrado
Mayores Metrados
Parcial
0.00%
0.00%
1,619.69
m3
24.75
7.25
179.44
0.00%
0.00%
m3
24.75
12.81
317.05
0.00%
0.00%
m3
1.14
296.86
338.42
0.00%
0.00%
m2
24.64
25.59
630.54
0.00%
0.00%
m2
12.32
12.52
154.25
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
24,446.39
m3
130.00
12.50
1,625.00
m3
130.00
19.30
2,509.00
m3
130.00
12.81
1,665.30
m3
28.20
343.75
9,693.75
0.00%
0.00%
kg
1,090.43
4.86
5,299.49
0.00%
0.00%
m2
19.80
27.82
550.84
0.00%
0.00%
m3
3.00
296.82
890.46
0.00%
0.00%
kg
54.45
4.86
264.63
0.00%
0.00%
m3
1.89
296.82
560.99
0.00%
0.00%
kg
54.60
4.86
265.36
0.00%
0.00%
m2
18.00
62.31
1,121.58
0.00%
0.00%
2,963.72
m2
3.20
45.65
146.08
0.00%
0.00%
m2
28.00
53.13
1,487.64
0.00%
0.00%
m2
28.00
32.00
896.00
0.00%
0.00%
PINTURA EN MUROS
m2
28.00
15.50
434.00
0.00%
0.00%
0.00%
0.00%
OTROS
SALIDA PLUVIAL DE AGUA 3"
146.33
und
1.00
146.33
MOVIMIENTO DE TIERRAS
146.33
19,301.15
17,566.20
m3
117.60
20.24
2,380.22
0.00%
0.00%
glb
1.00
2,241.78
2,241.78
0.00%
0.00%
m3
29.40
79.96
2,350.82
0.00%
0.00%
m3
118.19
89.63
10,593.37
0.00%
0.00%
0.00%
0.00%
1,734.96
m3
157.58
11.01
1,734.96
4.6.2 CUADRO COMPARATIVO DE METRADOS FINALES (Incluye Mayores Metrados, Deductivos y Adicionales
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
Metrado
Presupuesto Base
Parcial
Metrado
Mayores Metrados
Parcial
10,545.03
m3
110.50
35.70
3,944.85
0.00%
0.00%
CONFORMACIN DE ENROCADO
m3
110.50
25.71
2,840.96
0.00%
0.00%
CAPA ANTICONTAMINANTE
m3
72.60
42.90
3,114.54
0.00%
0.00%
m3
72.60
8.88
644.69
0.00%
0.00%
VEREDAS DE CONCRETO
18,393.76
SUMINISTRO DE ROCA
m3
77.43
35.70
2,764.25
0.00%
0.00%
ACARREO DE ROCA
m3
77.43
16.70
1,293.08
0.00%
0.00%
EMPEDRADO DE VEREDAS
m3
77.43
5.26
407.28
0.00%
0.00%
m2
148.76
32.47
4,830.24
0.00%
0.00%
m3
28.30
309.21
8,750.64
0.00%
0.00%
62.19
5.60
348.26
0.00%
0.00%
0.00%
0.00%
MURO DE CONTENCIN
ACERO PARA MURO DE CONTENCIN fy=4200 kg/cm2
801.84
kg
156.00
5.14
801.84
1,415.13
MACETEROS
1,383.61
m3
3.00
309.21
927.63
0.00%
0.00%
m2
7.23
30.40
219.79
0.00%
0.00%
kg
31.41
4.13
129.72
0.00%
0.00%
m2
3.60
0.47
1.69
0.00%
0.00%
MACETEROS: BRUAS
30.15
2.94
88.64
0.00%
0.00%
m2
3.60
4.48
16.13
0.00%
0.00%
SEMBRADO DE CETICIOS
31.53
m3
0.36
25.07
9.03
0.00%
0.00%
SEMBRADO DE CETICIOS
und
6.00
3.75
22.50
0.00%
0.00%
SEALIZACIN
799.39
PINTURA EN SARDINELES
m2
138.40
5.30
733.52
0.00%
0.00%
PINTURA EN PAVIMENTO
m2
9.20
7.16
65.87
0.00%
0.00%
Costo Directo
207,703.47
dicionales de Obra)
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
92.04
660.85
dicionales de Obra)
Deductivos de Obra
Metrado
Parcial
78.40
1,237.15
100.00%
1,474.22
13,091.07
100.00%
Metrado
Adicionales de Obra
Parcial
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
2.70
916.30
0.99%
0.00%
0.98
28.18
0.69%
0.00%
13.50
6.35
0.99%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
14.40
2.40%
0.00%
547.49
-
0.00%
0.00%
0.00%
0.00%
dicionales de Obra)
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
22.71
28.16
100.00%
0.00%
10.43
201.61
100.00%
0.00%
22.71
42.47
100.00%
0.00%
22.71
493.03
100.00%
0.00%
18.24
6,190.11
100.00%
0.00%
124.29
3,411.76
100.00%
0.00%
849.71
3,883.17
100.00%
0.00%
10.20
4,297.46
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
dicionales de Obra)
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
dicionales de Obra)
Deductivos de Obra
Metrado
Parcial
-
Metrado
Adicionales de Obra
Parcial
0.00%
0.00%
27.19
195.22
100.00%
0.00%
27.19
150.90
100.00%
0.00%
24.17
381.40
100.00%
0.00%
201.42
1,788.61
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
136.98
699.97
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
dicionales de Obra)
Deductivos de Obra
Metrado
Parcial
-
Metrado
Adicionales de Obra
Parcial
0.00%
0.00%
101.04
125.29
51.55%
0.00%
31.43
10,804.06
100.00%
0.00%
49.17
1,494.77
59.36%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
12.98
4,013.55
100.00%
0.00%
86.50
2,629.60
100.00%
0.00%
86.50
1,082.98
100.00%
0.00%
86.50
40.66
100.00%
0.00%
86.50
387.52
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
dicionales de Obra)
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
dicionales de Obra)
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
9.50
3,224.02
7.30%
0.00%
50.40
1,449.00
31.84%
0.00%
74.25
34.90
10.96%
0.00%
509.58
2,853.65
70.82%
0.00%
5.35
103.42
100.00%
0.00%
5.35
3,034.31
100.00%
0.00%
53.52
1,469.12
100.00%
0.00%
4.63
240.76
100.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
85.41
105.91
100.00%
0.00%
41.17
14,152.19
100.00%
0.00%
55.54
1,688.42
100.00%
0.00%
dicionales de Obra)
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
100.00%
0.00%
57.07
408.62
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
0.00%
87,593.99
17.68%
0.00%
160.70
3,252.57
100.00%
0.00%
41.45
3,314.34
100.00%
0.00%
1.00
405.98
100.00%
0.00%
1.00
2,250.53
100.00%
0.00%
144.63
12,963.19
100.00%
0.00%
30.00
607.20
100.00%
0.00%
9.00
719.64
100.00%
dicionales de Obra)
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
0.00%
1.00
785.98
100.00%
0.00%
1.00
1,585.78
100.00%
0.00%
9.00
806.67
100.00%
0.00%
192.84
2,123.17
100.00%
0.00%
2.40
94.63
100.00%
0.00%
15.00
284.55
100.00%
0.00%
292.56
7,521.72
100.00%
0.00%
252.72
7,556.33
100.00%
0.00%
252.72
2,244.15
100.00%
0.00%
85.50
7,353.00
100.00%
0.00%
323.63
1,572.84
100.00%
0.00%
94.10
526.96
100.00%
0.00%
91.63
3,271.19
100.00%
0.00%
91.63
481.97
100.00%
0.00%
2.00
618.42
100.00%
0.00%
4.82
146.53
100.00%
0.00%
20.94
86.48
100.00%
0.00%
2.40
1.13
100.00%
0.00%
20.10
59.09
100.00%
0.00%
2.40
10.75
100.00%
0.00%
0.24
6.02
100.00%
0.00%
4.00
15.00
100.00%
dicionales de Obra)
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
0.00%
38.59
559.56
100.00%
0.00%
65.00
1,315.60
100.00%
0.00%
15.00
1,199.40
100.00%
0.00%
1.00
45.98
100.00%
0.00%
1.00
1,308.68
100.00%
0.00%
58.50
5,243.36
100.00%
0.00%
50.17
548.86
100.00%
0.00%
84.50
924.43
100.00%
0.00%
3.20
126.18
100.00%
0.00%
20.00
379.40
100.00%
0.00%
21.60
645.84
100.00%
0.00%
21.60
191.81
100.00%
0.00%
35.80
684.50
100.00%
0.00%
45.73
1,632.56
100.00%
0.00%
45.73
240.54
100.00%
0.00%
18.80
5,580.22
100.00%
0.00%
1,052.00
5,112.72
100.00%
0.00%
36.20
11,813.51
100.00%
0.00%
187.46
11,680.63
100.00%
0.00%
2,593.82
12,605.97
100.00%
0.00%
40.50
3,483.00
100.00%
0.00%
27.00
864.00
100.00%
dicionales de Obra)
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
0.00%
27.00
418.50
100.00%
0.00%
24.75
179.44
100.00%
0.00%
24.75
317.05
100.00%
0.00%
1.14
338.42
100.00%
0.00%
24.64
630.54
100.00%
0.00%
12.32
154.25
100.00%
0.00%
130.00
1,625.00
100.00%
0.00%
130.00
2,509.00
100.00%
0.00%
130.00
1,665.30
100.00%
0.00%
28.20
9,693.75
100.00%
0.00%
1,090.43
5,299.49
100.00%
0.00%
19.80
550.84
100.00%
0.00%
3.00
890.46
100.00%
0.00%
54.45
264.63
100.00%
0.00%
1.89
560.99
100.00%
0.00%
54.60
265.36
100.00%
0.00%
18.00
1,121.58
100.00%
0.00%
3.20
146.08
100.00%
0.00%
28.00
1,487.64
100.00%
0.00%
28.00
896.00
100.00%
0.00%
28.00
434.00
100.00%
0.00%
1.00
146.33
100.00%
0.00%
117.60
2,380.22
100.00%
0.00%
1.00
2,241.78
100.00%
0.00%
29.40
2,350.82
100.00%
0.00%
118.19
10,593.37
100.00%
0.00%
157.58
1,734.96
100.00%
dicionales de Obra)
Deductivos de Obra
Metrado
Parcial
Metrado
Adicionales de Obra
Parcial
0.00%
110.50
3,944.85
100.00%
0.00%
110.50
2,840.96
100.00%
0.00%
72.60
3,114.54
100.00%
0.00%
72.60
644.69
100.00%
0.00%
77.43
2,764.25
100.00%
0.00%
77.43
1,293.08
100.00%
0.00%
77.43
407.28
100.00%
0.00%
148.76
4,830.24
100.00%
0.00%
28.30
8,750.64
100.00%
0.00%
62.19
348.26
100.00%
0.00%
156.00
801.84
100.00%
0.00%
3.00
927.63
100.00%
0.00%
7.23
219.79
100.00%
0.00%
31.41
129.72
100.00%
0.00%
3.60
1.69
100.00%
0.00%
30.15
88.64
100.00%
0.00%
3.60
16.13
100.00%
0.00%
0.36
9.03
100.00%
0.00%
6.00
22.50
100.00%
0.00%
138.40
733.52
100.00%
0.00%
9.20
65.87
100.00%
207,703.47
100.00%
Item
Descripcin
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
01
01.01
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
m2
40.00
###
01.01.01.02
und
1.00
###
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
glb
1.00
###
01.01.02.02
glb
1.00
###
01.01.03
01.01.03.01
glb
1.00
###
01.01.04
DEMOLICIONES Y DESMONTAJES
01.01.04.01
ESCARIFICADO DE VEREDAS
m2
530.24
###
01.01.04.02
m2
30.90
###
01.01.04.03
ELIMINACION DE DEMOLICIONES
m3
32.15
###
01.01.05
01.01.05.01
m2
1,247.57
###
01.01.05.02
m2
1,247.57
###
01.01.06
SEGURIDAD Y SALUD
01.01.06.01
glb
1.00
###
02
PISTAS Y VEREDAS
02.01
MOVIMIENTO DE TIERRAS
02.01.01
CORTES
02.01.01.01
m3
1,361.73
###
228.20
02.01.02
02.01.02.01
m3
1,634.08
###
273.00
02.01.03
02.01.03.01
m2
1,484.44
###
02.02
MEJORAMIENTO DE SUBRASANTE
02.02.01
02.02.01.01
m3
457.44
###
02.02.02
CONFORMACION DE ENROCADO
02.02.02.01
CONFORMACION DE ENROCADO
m3
457.44
###
02.02.03
02.02.03.01
m3
92.04
###
02.02.03.02
m3
78.40
###
02.02.04
CONFORMACION DE SUBRAZANTE
02.02.04.01
m2
1,474.22
###
02.03
SUB BASE
02.03.01
02.03.01.01
m3
183.71
###
75.00
02.03.01.02
m3
183.71
###
75.00
02.03.01.03
m3
156.49
###
63.75
02.03.02
02.03.02.01
m3
183.71
###
75.00
02.03.02.02
m3
183.71
###
75.00
m3
156.49
###
63.75
02.03.02.03
292.56
-
Item
Descripcin
02.03.03
02.03.03.01
02.03.03.02
02.04
02.04.01
02.04.02
02.04.03
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
m3
m2
312.99
1,360.82
###
###
127.50
554.35
m3
273.92
271.22
m2
141.08
140.10
m2
1,369.61
1,356.11
02.04.04
705.41
###
02.05
VEREDAS DE CONCRETO
02.05.01
m2
744.45
###
02.05.02
m3
34.03
###
02.05.03
m3
44.24
###
02.05.04
m3
44.24
###
02.05.05
m2
113.43
###
02.05.06
m2
598.77
02.05.07
m2
10.44
###
02.05.08
104.36
###
02.06
SARDINELES
02.06.01
m3
36.42
###
02.06.02
m3
47.35
###
02.06.03
m3
47.35
###
02.06.04
m3
36.42
###
24.19
02.06.05
m2
291.37
###
344.17
02.07
02.07.01
m2
39.60
###
02.08
CANALIZACION
02.08.01
m2
22.71
###
02.08.02
m3
10.43
###
02.08.03
m2
22.71
###
02.08.04
m2
22.71
###
02.08.05
m3
18.24
###
02.08.06
m2
124.29
###
02.08.07
kg
849.71
###
02.08.08
10.20
###
03
AREAS VERDES
03.01
JARDINERAS DE CONCRETO
03.01.01
m2
2.15
###
03.01.02
m3
0.74
###
03.01.03
m3
0.65
###
03.01.04
m3
0.74
###
03.01.05
m3
0.42
###
03.01.06
m2
2.80
###
03.01.07
m2
2.80
###
03.02
SEMBRADO DE GRASS
03.02.01
m3
0.65
###
03.02.02
SEMBRADO DE GRASS
m2
2.15
###
584.37
72.20
Item
Descripcin
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
04
SEALIZACION
04.01
PINTURA EN SARDINELES
m2
263.24
###
04.02
PINTURA EN JARDINERAS
m2
3.85
###
04.03
PINTURA EN PAVIMENTO
m2
56.40
###
05
VARIOS
05.01
und
5.00
###
05.02
und
25.00
###
05.03
und
12.00
###
05.04
m2
1,247.57
###
01
01.01
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
und
1.00
###
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
glb
1.00
###
01.01.02.02
glb
1.00
###
01.01.03
01.01.03.01
glb
1.00
###
01.01.04
01.01.04.01
m2
201.42
###
01.01.04.02
m2
201.42
###
01.01.05
SEGURIDAD Y SALUD
01.01.05.01
glb
1.00
###
01.01.05.02
und
35.00
###
02
PISTAS Y VEREDAS
02.01
MOVIMIENTO DE TIERRAS
02.01.01
CORTES
02.01.01.01
m3
243.17
###
35.01
02.01.02
02.01.02.01
m3
352.60
###
50.70
02.01.03
02.01.03.01
m2
201.42
###
112.74
02.02
MEJORAMIENTO DE SUBRAZANTE
02.02.01
02.02.01.01
m3
100.71
###
02.02.02
CONFORMACION DE ENROCADO
02.02.02.01
CONFORMACION DE ENROCADO
m3
100.71
###
02.02.03
02.02.03.01
m3
27.19
###
02.02.03.02
m3
27.19
###
02.02.03.03
m3
24.17
###
02.02.04
CONFORMACION DE SUBRAZANTE
02.02.04.01
m2
201.42
###
02.03
SUB BASE
02.03.01
02.03.01.01
m3
22.16
02.03.02
###
57.76
55.21
Item
Descripcin
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
02.03.02.01
m3
27.19
###
55.21
02.03.02.02
m3
27.19
###
46.92
02.03.02.03
m3
24.17
###
46.92
02.03.03
02.03.03.01
m3
46.33
###
102.13
02.03.03.02
m3
46.33
###
102.13
02.03.03.03
m2
201.42
###
480.09
02.04
PAVIMENTO RIGIDO
02.04.01
m3
40.28
###
32.53
02.04.02
m2
29.43
###
15.85
02.04.03
m2
201.42
###
112.64
02.04.04
120.90
###
105.53
02.05
VEREDAS DE CONCRETO
02.05.01
m3
27.40
###
1.47
02.05.02
m3
27.40
###
1.47
02.05.03
m3
27.40
###
02.05.04
m2
136.98
02.05.05
m2
136.98
###
02.05.06
m2
5.96
###
02.05.07
m2
136.98
###
5.78
02.05.08
59.65
###
02.06
GRADERIOS
02.06.01
m2
196.02
02.06.02
GRADERIOS DE CONCRETO: fc=175 kg/cm2 ACABADO COLOREADO FROTACHADO Y BRUADO C:A 1:2
m3
31.43
02.06.03
m2
82.84
02.07
SARDINELES
02.07.01
m3
5.19
###
1.79
02.07.02
m3
5.19
###
1.79
02.07.03
m3
5.19
###
1.79
02.07.04
m3
5.19
###
4.75
02.07.05
m2
34.60
###
11.93
02.07.06
33.95
###
4.05
02.08
02.08.01
m2
3.20
###
02.08.02
m2
0.83
###
02.09
MACETEROS
02.09.01
m3
12.98
###
02.09.02
m2
86.50
###
02.09.03
m2
86.50
###
02.09.04
m2
86.50
###
02.09.05
m2
86.50
###
03
AREAS VERDES
03.01
JARDINERAS DE CONCRETO
03.01.01
m3
19.80
1.47
-
###
5.78
94.98
-
###
33.67
###
Item
Descripcin
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
03.02
SEMBRADO DE GRASS
03.02.01
m3
29.70
###
03.02.02
SEMBRADO DE GRASS
m2
29.70
###
04
SEALIZACION
04.01
PINTURA EN SARDINELES
m2
30.27
###
04.02
PINTURA EN PAVIMENTO
m2
12.30
###
05
VARIOS
05.01
und
2.00
###
05.02
und
5.00
###
05.03
und
5.00
###
05.04
m2
201.42
###
01
01.01
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
und
1.00
###
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
glb
1.00
###
01.01.02.02
glb
1.00
###
01.01.03
01.01.03.01
glb
1.00
###
01.01.04
01.01.04.01
m2
677.30
###
01.01.04.02
m2
677.30
###
01.01.05
SEGURIDAD Y SALUD
01.01.05.01
glb
1.00
###
01.01.05.02
und
35.00
###
02
PISTAS Y VEREDAS
02.01
MOVIMIENTO DE TIERRAS
02.01.01
CORTES
02.01.01.01
m3
422.11
###
02.01.02
02.01.02.01
m3
569.85
###
02.01.03
02.01.03.01
m2
677.30
###
02.02
SUB BASE
02.02.01
02.02.01.01
m3
74.50
###
28.00
02.02.02
02.02.02.01
m3
91.44
###
28.00
02.02.02.02
m3
91.44
###
23.80
02.02.02.03
m3
81.28
###
23.80
02.02.03
02.02.03.01
m3
155.78
###
51.80
02.02.03.02
m3
155.78
###
51.80
02.02.03.03
m2
677.30
###
225.22
02.03
PAVIMENTO RIGIDO
Item
Descripcin
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
02.03.01
m3
130.11
120.61
02.03.02
m2
158.31
107.91
02.03.03
m2
677.30
603.05
02.03.04
719.58
210.00
02.04
CUNETA RECTANGULAR
02.04.01
m3
5.35
###
02.04.02
m3
5.35
###
02.04.03
m2
53.52
###
02.04.04
4.63
###
02.05
VEREDAS DE CONCRETO
02.05.01
m3
3.27
###
62.88
02.05.02
m3
3.27
###
62.88
02.05.03
m3
3.27
###
69.50
02.05.04
m2
16.37
###
02.05.05
m2
24.45
###
02.05.06
m2
2.86
###
40.46
02.05.07
m2
24.45
###
285.25
02.05.08
28.59
###
101.20
02.06
MURO DE CONTENCION
02.06.01
m3
7.47
###
02.06.02
m2
28.42
###
02.07
GRADERIOS
02.07.01
m2
85.41
###
02.07.02
GRADERIOS DE CONCRETO: fc=175 kg/cm2 ACABADO COLOREADO FROTACHADO Y BRUADO C:A 1:2
m3
41.17
###
02.07.03
m2
55.54
###
02.08
02.08.01
m2
10.00
###
02.08.02
m2
2.25
###
02.09
MACETEROS
02.09.01
m3
8.26
###
02.09.02
m2
55.08
###
02.09.03
m2
55.08
###
02.09.04
m2
55.08
###
02.09.05
m2
55.08
###
03
AREAS VERDES
03.01
JARDINERAS DE CONCRETO
03.01.01
m3
12.76
###
03.02
SEMBRADO DE GRASS
03.02.01
m3
19.14
###
03.02.02
SEMBRADO DE GRASS
m2
63.81
###
04
SEALIZACION
04.01
m2
57.07
05
VARIOS
05.01
und
4.00
###
05.02
und
8.00
###
285.25
###
Item
Descripcin
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
05.03
und
8.00
###
05.04
m2
677.30
###
01
MOVIMIENTO DE TIERRAS
01.01
01.01.01
m3
160.70
###
01.01.02
m3
41.45
###
01.01.03
glb
1.00
###
01.01.04
glb
1.00
###
01.01.05
m3
144.63
###
01.01.06
m3
30.00
###
01.01.07
m3
9.00
###
01.01.08
glb
1.00
###
01.01.09
glb
1.00
###
01.01.10
m3
9.00
###
01.02
01.02.01
m3
192.84
###
01.03
SUB DRENAJE
01.03.01
m3
2.40
###
01.03.02
SUB DRENAJE
15.00
###
02
MEJORAMIENTO DE SUBRASANTE
02.01
CONFORMACIN DE ENROCADO
02.01.01
m3
292.56
###
02.02
CAPA ANTICONTAMINANTE
02.02.01
CAPA ANTICONTAMINANTE
m3
252.72
###
02.02.02
m2
252.72
###
03
03.01
85.50
###
03.02
m3
323.63
###
03.03
94.10
###
03.04
SUMINISTRO DE ROCA
m3
91.63
###
03.05
EMPEDRADO DE VEREDAS
m3
91.63
###
04
04.01
MACETEROS
04.01.01
m3
2.00
###
04.01.02
m2
4.82
###
04.01.03
kg
20.94
###
04.01.04
m2
2.40
###
04.01.05
MACETEROS: BRUAS
20.10
###
04.01.06
m2
2.40
###
04.02
SEMBRADO DE CETICIOS
04.02.01
m3
0.24
###
04.02.02
SEMBRADO DE CETICIOS
Und.
4.00
###
01
MOVIMIENTO DE TIERRAS
01.01
EXCAVACIN DE ZANJAS
01.01.01
m3
38.59
###
01.02
01.02.01
m3
65.00
###
Item
Descripcin
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
01.02.02
m3
15.00
###
01.02.03
glb
1.00
###
01.02.04
glb
1.00
###
01.02.05
m3
58.50
###
01.03
01.03.01
m3
50.17
###
01.03.02
m2
84.50
###
02
SUBDRENAJE
02.01
m3
3.20
###
02.02
SUBDRENAJE
20.00
###
03
03.01
CAPA ANTICONTAMINANTE
03.01.01
CAPA ANTICONTAMINANTE
m3
21.60
###
03.01.02
m3
21.60
###
04
04.01
m2
35.80
###
05
ENROCADO DE VEREDAS
05.01
m3
45.73
###
05.02
ENROCADO DE VEREDAS
m3
45.73
###
06
MUROS DE CONTENCIN
06.01
ZAPATAS
06.01.01
m3
18.80
###
06.01.02
kg
1,052.00
###
06.02
06.02.01
m3
36.20
###
06.02.02
ENCOFRADO Y DESENCOFRADO
m2
187.46
###
06.03
06.03.01
kg
2,593.82
###
06.03.02
40.50
###
06.04
TARRAJEO EN MUROS
06.04.01
m2
27.00
###
06.04.02
m2
27.00
###
07
AREAS VERDES
07.01
m3
24.75
###
07.02
m3
24.75
###
07.03
m3
1.14
###
07.04
m2
24.64
###
07.05
m2
12.32
###
08
08.01
m3
130.00
###
08.02
m3
130.00
###
08.03
m3
130.00
###
08.04
m3
28.20
###
08.05
kg
1,090.43
###
08.06
m2
19.80
###
08.07
m3
3.00
###
08.08
kg
54.45
###
08.09
m3
1.89
###
08.10
kg
54.60
###
08.11
m2
18.00
###
09
09.01
m2
3.20
###
Item
Descripcin
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
09.02
m2
28.00
###
09.03
m2
28.00
###
09.04
PINTURA EN MUROS
m2
28.00
###
10
OTROS
10.01
und
1.00
###
01
MOVIMIENTO DE TIERRAS
01.01
01.01.01
m3
117.60
###
01.01.02
glb
1.00
###
01.01.03
m3
29.40
###
01.01.04
m3
118.19
###
01.02
01.02.01
m3
157.58
###
02
02.01
m3
110.50
###
02.02
CONFORMACIN DE ENROCADO
m3
110.50
###
02.03
CAPA ANTICONTAMINANTE
m3
72.60
###
02.04
m3
72.60
###
03
VEREDAS DE CONCRETO
03.01
SUMINISTRO DE ROCA
m3
77.43
###
03.02
ACARREO DE ROCA
m3
77.43
###
03.03
EMPEDRADO DE VEREDAS
m3
77.43
###
03.04
m2
148.76
###
03.05
m3
28.30
###
03.06
62.19
###
04
MURO DE CONTENCIN
04.01
kg
156.00
###
05
05.01
MACETEROS
05.01.01
m3
3.00
###
05.01.02
m2
7.23
###
05.01.03
kg
31.41
###
05.01.04
m2
3.60
###
05.01.05
MACETEROS: BRUAS
30.15
###
05.01.06
m2
3.60
###
05.02
SEMBRADO DE CETICIOS
05.02.01
m3
0.36
###
05.02.02
SEMBRADO DE CETICIOS
und
6.00
###
06
SEALIZACIN
06.01
PINTURA EN SARDINELES
m2
138.40
###
06.02
PINTURA EN PAVIMENTO
m2
9.20
###
mparativo
Total
Saldo
Metrados
40.00
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
530.24
100.00%
30.90
100.00%
32.15
100.00%
1,247.57
100.00%
1,247.57
100.00%
1.00
100.00%
1,589.93
116.76%
1,907.08
116.71%
1,484.44
100.00%
750.00
163.96%
457.44
100.00%
0.00%
92.04
0.00%
78.40
0.00%
1,474.22
258.71
140.83%
258.71
140.83%
220.24
140.74%
258.71
140.83%
258.71
140.83%
220.24
140.74%
mparativo
Total
Saldo
Metrados
440.49
1,915.17
140.74%
140.74%
271.22
99.01%
2.70
140.10
99.31%
0.98
1,356.11
99.01%
13.50
705.41
100.00%
744.45
100.00%
34.03
100.00%
44.24
100.00%
44.24
100.00%
113.43
100.00%
584.37
97.60%
14.40
10.44
100.00%
176.56
169.18%
36.42
100.00%
47.35
100.00%
47.35
100.00%
60.61
166.42%
635.54
218.12%
39.60
100.00%
0.00%
22.71
0.00%
10.43
0.00%
22.71
0.00%
22.71
0.00%
18.24
0.00%
124.29
0.00%
849.71
0.00%
10.20
2.15
100.00%
0.74
100.00%
0.65
100.00%
0.74
100.00%
0.42
100.00%
2.80
100.00%
2.80
100.00%
0.65
100.00%
2.15
100.00%
mparativo
Total
Saldo
Metrados
321.00
121.94%
3.85
100.00%
56.40
100.00%
5.00
100.00%
25.00
100.00%
12.00
100.00%
1,247.57
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
201.42
100.00%
201.42
100.00%
1.00
100.00%
35.00
100.00%
278.18
114.40%
403.30
114.38%
314.16
155.97%
100.71
100.00%
100.71
100.00%
0.00%
27.19
0.00%
27.19
0.00%
24.17
0.00%
201.42
77.37
349.14%
mparativo
Total
Saldo
Metrados
82.40
303.05%
74.11
272.56%
71.09
294.12%
148.46
320.44%
148.46
320.44%
681.51
338.35%
72.81
180.76%
45.28
153.86%
314.06
155.92%
226.43
187.29%
28.87
105.36%
28.87
105.36%
28.87
105.36%
0.00%
136.98
142.76
104.22%
5.96
100.00%
142.76
104.22%
59.65
100.00%
94.98
48.45%
101.04
0.00%
31.43
33.67
40.64%
49.17
6.98
134.49%
6.98
134.49%
6.98
134.49%
9.94
191.52%
46.53
134.48%
38.00
111.93%
3.20
100.00%
0.83
100.00%
0.00%
12.98
0.00%
86.50
0.00%
86.50
0.00%
86.50
0.00%
86.50
19.80
100.00%
mparativo
Total
Saldo
Metrados
29.70
100.00%
29.70
100.00%
30.27
100.00%
12.30
100.00%
2.00
100.00%
5.00
100.00%
5.00
100.00%
201.42
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
677.30
100.00%
677.30
100.00%
1.00
100.00%
35.00
100.00%
422.11
100.00%
569.85
100.00%
677.30
100.00%
102.50
137.58%
119.44
130.62%
115.24
126.03%
105.08
129.28%
207.58
133.25%
207.58
133.25%
902.52
133.25%
mparativo
Total
Saldo
Metrados
120.61
92.70%
9.50
107.91
68.16%
50.40
603.05
89.04%
74.25
210.00
29.18%
509.58
0.00%
5.35
0.00%
5.35
0.00%
53.52
0.00%
4.63
66.15
2022.94%
66.15
2022.94%
72.77
2225.38%
16.37
100.00%
309.70
1266.67%
43.32
1514.69%
309.70
1266.67%
129.79
453.97%
7.47
100.00%
28.42
100.00%
0.00%
85.41
0.00%
41.17
0.00%
55.54
10.00
100.00%
2.25
100.00%
8.26
100.00%
55.08
100.00%
55.08
100.00%
55.08
100.00%
55.08
100.00%
12.76
100.00%
19.14
100.00%
63.81
100.00%
0.00%
57.07
4.00
100.00%
8.00
100.00%
mparativo
Total
Saldo
Metrados
8.00
100.00%
677.30
100.00%
160.70
100.00%
41.45
100.00%
1.00
100.00%
1.00
100.00%
144.63
100.00%
30.00
100.00%
9.00
100.00%
1.00
100.00%
1.00
100.00%
9.00
100.00%
192.84
100.00%
2.40
100.00%
15.00
100.00%
292.56
100.00%
252.72
100.00%
252.72
100.00%
85.50
100.00%
323.63
100.00%
94.10
100.00%
91.63
100.00%
91.63
100.00%
2.00
100.00%
4.82
100.00%
20.94
100.00%
2.40
100.00%
20.10
100.00%
2.40
100.00%
0.24
100.00%
4.00
100.00%
38.59
100.00%
65.00
100.00%
mparativo
Total
Saldo
Metrados
15.00
100.00%
1.00
100.00%
1.00
100.00%
58.50
100.00%
50.17
100.00%
84.50
100.00%
3.20
100.00%
20.00
100.00%
21.60
100.00%
21.60
100.00%
35.80
100.00%
45.73
100.00%
45.73
100.00%
18.80
100.00%
1,052.00
100.00%
36.20
100.00%
187.46
100.00%
2,593.82
100.00%
40.50
100.00%
27.00
100.00%
27.00
100.00%
24.75
100.00%
24.75
100.00%
1.14
100.00%
24.64
100.00%
12.32
100.00%
130.00
100.00%
130.00
100.00%
130.00
100.00%
28.20
100.00%
1,090.43
100.00%
19.80
100.00%
3.00
100.00%
54.45
100.00%
1.89
100.00%
54.60
100.00%
18.00
100.00%
3.20
100.00%
mparativo
Total
Saldo
Metrados
28.00
100.00%
28.00
100.00%
28.00
100.00%
1.00
100.00%
117.60
100.00%
1.00
100.00%
29.40
100.00%
118.19
100.00%
157.58
100.00%
110.50
100.00%
110.50
100.00%
72.60
100.00%
72.60
100.00%
77.43
100.00%
77.43
100.00%
77.43
100.00%
148.76
100.00%
28.30
100.00%
62.19
100.00%
156.00
100.00%
3.00
100.00%
7.23
100.00%
31.41
100.00%
3.60
100.00%
30.15
100.00%
3.60
100.00%
0.36
100.00%
6.00
100.00%
138.40
100.00%
9.20
100.00%
Obra:
Item
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
01
01
OBRAS PROVISIONALES
3,229,120.71
01.01
m2
62.00
105.28
01.02
und
2.00
909.73
1,819.46
01.03
glb
1.00
12,962.00
12,962.00
01.04
glb
1.00
500.00
500.00
01.05
glb
1.00
500.00
02
TRABAJOS PRELIMINARES
02.01
km
1.50
715.81
02.02
m2
11,904.86
0.77
9,166.74
02.03
m3
2,380.97
4.63
11,023.89
m3
159.46
33.94
5,412.07
m2
108.03
0.74
79.94
22,308.82
6,527.36
500.00
81,644.88
1,073.72
02.05
02.06
m2
406.15
1.48
601.10
02.07
da
208.00
155.99
32,445.92
02.08
glb
1.00
11,895.00
11,895.00
02.09
m2
2,850.00
3.49
03
EXPLANACIONES
03.01
m3
4,901.07
3.84
18,820.11
03.02
m2
7,668.76
1.25
9,585.95
03.03
m3
490.11
10.76
5,273.58
03.04
CONFORMACIN DE TERRAPLEN
m3
2,457.94
29.51
72,533.81
03.05
ENROCADO EN TERRAPLEN
m3
586.19
73.77
43,243.24
03.06
m3
6,089.57
5.63
34,284.28
04
PAVIMENTOS
04.01
SUB BASE
04.01.01
04.01.01.01
04.01.02
04.01.02.01
02.04
9,946.50
183,740.97
1,238,810.15
81,180.79
19,404.92
m2
11,904.86
1.63
19,404.92
m3
1,198.78
4.05
4,855.06
04.01.02.02
m3
1,198.78
4.00
4,795.12
04.01.02.03
m3
922.14
20.81
19,189.73
04.01.03
04.01.03.01
m3
1,106.57
4.99
14,514.50
5,521.78
04.01.03.02
m3
1,106.57
4.06
4,492.67
04.01.03.03
m3
922.14
4.88
04.01.04
04.01.04.01
m3
1,844.28
3.12
04.01.04.02
m3
184.43
10.76
1,984.47
04.01.04.03
m2
6,284.02
1.70
10,682.83
04.02
BASE
04.02.01
04.02.01.01
m3
3,963.90
4.05
16,053.80
04.02.01.02
m3
3,963.90
4.00
15,855.60
04.02.01.03
m3
3,049.14
20.81
63,452.60
28,839.91
4,500.04
18,421.45
5,754.15
174,231.51
95,362.00
Obra:
Item
Presupuesto de Obra
Descripcin
Und.
Metrado
Precio S/.
Parcial S/.
04.02.02
04.02.02.01
6,561.77
04.02.03
CONFORMACIN DE BASE
04.02.03.01
m3
5,081.92
3.50
04.02.03.02
RIEGO DE BASE
m3
508.19
10.73
5,452.88
04.02.03.03
m2
18,834.99
2.17
40,871.93
04.02.03.04
m2
710.86
11.53
04.03
PAVIMENTO FLEXIBLE
04.03.01
PIEDRA CHANCADA
04.03.01.01
m3
1,943.38
4.54
8,822.95
04.03.01.02
m3
1,943.38
24.52
47,651.68
04.03.01.03
CHANCADO DE PIEDRA
m3
1,943.38
23.90
04.03.02
CARPETA ASFALTICA
04.03.02.01
LIMPIEZA DE SUPERFICIE
m2
17,448.99
0.45
7,852.05
04.03.02.02
IMPRIMACIN
m2
17,448.99
3.21
56,011.26
04.03.02.03
m3
1,439.54
524.50
755,038.73
04.03.02.04
ARENADO
m2
17,448.99
0.77
13,435.72
04.03.02.05
m3
1,439.54
14.41
20,743.77
04.03.02.06
ESPARCIDO Y COMPACTADO
m2
17,448.99
1.57
05
05.01
m3
199.07
05.02
m3
208.22
41.86
8,716.09
05.03
und
65.00
682.20
44,343.00
05.04
und
47.00
979.28
46,026.16
05.05
m2
579.90
3.67
06
06.01
CUNETAS
06.01.01
06.01.02
06.01.03
m3
2,439.32
2.69
6,561.77
72,307.74
17,786.72
8,196.22
983,397.85
102,921.40
46,446.78
880,476.44
27,394.91
103,154.41
9.75
1,940.93
2,128.23
623,547.46
69,546.33
5,246.28
0.98
5,141.35
m3
173.59
299.27
51,950.28
m2
526.03
19.93
10,483.78
06.01.04
559.92
3.52
06.02
CANAL PLUVIAL
06.02.01
km
0.97
715.81
694.34
06.02.02
m3
1,580.79
24.83
39,251.02
06.02.03
m2
969.00
16.15
15,649.35
06.02.04
m3
384.73
299.27
115,138.15
06.02.05
m3
189.43
328.52
62,231.54
06.02.06
m2
4,850.86
22.04
106,912.95
06.02.07
kg
25,341.71
3.96
100,353.17
06.03
SUMIDEROS
06.03.01
54.59
0.63
34.39
06.03.02
m3
96.58
24.83
2,398.08
06.03.03
m2
60.05
7.02
421.55
06.03.04
m3
31.48
331.58
10,438.14
06.03.05
m2
375.75
21.95
8,247.71
06.03.06
kg
2,823.51
3.98
11,237.57
06.03.07
54.73
410.15
22,447.51
06.03.08
m2
6.74
362.51
06.04
ALCANTARILLAS
1,970.92
440,230.52
57,668.27
2,443.32
52,171.80
Obra:
Item
Presupuesto de Obra
Descripcin
Und.
Metrado
Precio S/.
Parcial S/.
06.04.01
81.50
0.63
51.35
06.04.02
85.80
17.05
1,462.89
06.04.03
m3
696.95
5.61
3,909.89
06.04.04
m3
8.81
126.71
1,116.32
06.04.05
m3
3.84
154.35
592.70
06.04.06
m3
17.76
299.27
5,315.04
06.04.07
m2
145.60
21.95
3,195.92
06.04.08
kg
414.56
3.98
1,649.95
06.04.09
57.50
368.69
21,199.68
06.04.10
24.00
569.92
13,678.08
06.05
06.05.01
m3
1.30
328.52
427.08
06.05.02
m2
10.68
299.27
3,196.20
06.05.03
kg
77.20
3.98
07
SISTEMA DE RIEGO
07.01
1,038.20
4.49
4,661.52
07.02
1,038.20
3.10
3,218.42
07.03
38.20
16.38
625.72
07.04
1,000.00
22.56
22,560.00
07.05
und
2.00
36.45
72.90
07.06
und
21.00
52.45
1,101.45
07.07
und
21.00
10.17
213.57
07.08
und
2.00
10.33
20.66
07.09
und
23.00
11.83
272.09
07.10
und
2.00
9.63
19.26
07.11
und
2.00
11.63
23.26
07.12
und
50.00
9.63
481.50
07.13
MEDIDOR DE AGUA
und
2.00
65.00
130.00
07.14
und
2.00
36.58
73.16
07.15
und
21.00
52.08
1,093.68
07.16
CAJA DE REGISTRO
pza
2.00
100.75
201.50
07.17
CAJA DE VALVULAS
pza
33.00
100.75
3,324.75
07.18
1,038.20
0.47
08
PISTAS Y VEREDAS
08.01
SARDINELES
08.01.01
m3
325.02
24.83
8,070.25
08.01.02
m3
740.05
299.27
221,474.76
08.01.03
m2
4,622.00
30.01
138,706.22
08.02
PISOS
08.02.01
m2
7,116.70
0.26
08.02.02
m2
5,976.95
0.74
4,422.94
08.02.03
m2
3,929.19
3.14
12,337.66
08.02.04
m2
2,744.25
4.12
11,306.31
08.02.05
m2
2,744.25
70.04
192,207.27
08.02.06
m2
65.10
41.98
2,732.90
08.02.07
40.95
1.10
45.05
08.02.08
m2
114.39
31.64
3,619.30
08.02.09
m3
8.72
288.53
2,515.98
08.02.10
m2
19.05
31.35
597.22
3,930.54
307.26
38,581.39
487.95
652,995.39
368,251.23
284,744.16
1,850.34
Obra:
Item
Presupuesto de Obra
Descripcin
Und.
Metrado
Precio S/.
Parcial S/.
08.02.11
m2
701.05
22.95
16,089.10
08.02.12
m2
701.05
42.91
30,082.06
08.02.13
JUNTAS ASFALTICAS
2,148.00
3.23
09
BARANDAS
09.01
kg
130.77
3.68
481.23
09.02
m3
40.11
299.27
12,003.72
09.03
456.95
35.96
16,431.92
09.04
m2
456.95
12.28
5,611.35
09.05
m2
106.93
19.05
2,037.02
09.06
m2
661.71
5.39
3,566.62
09.07
1,233.77
1.10
10
REAS VERDES
10.01
m3
647.35
27.80
17,996.33
10.02
SEMBRADO DE GRASS
m2
2,524.42
6.10
15,398.96
10.03
m2
378.66
14.36
5,437.56
10.04
und
100.00
37.92
11
SEALIZACIN
11.01
SEALIZACIN HORIZONTAL
11.01.01
PINTADO DE SARDINELES
m2
11.01.02
11.02
SEALIZACIN VERTICAL
11.02.01
11.02.02
6,938.04
41,489.00
1,357.15
42,624.85
3,792.00
112,972.16
84,771.09
2,745.34
24.44
67,096.11
941.16
18.78
17,674.98
m3
4.52
24.83
m2
1.50
7.02
10.53
11.02.03
m3
4.75
143.68
682.48
11.02.04
m3
0.60
299.27
179.56
11.02.05
m2
7.80
33.38
260.36
11.02.06
kg
36.12
3.98
143.76
11.02.07
und
26.00
202.07
5,253.82
11.02.08
und
3.00
951.88
2,855.64
11.02.09
und
16.00
354.49
5,671.84
11.02.10
und
1.00
354.49
354.49
11.02.11
und
1.00
354.49
354.49
11.02.12
und
26.00
354.49
9,216.74
11.02.13
und
3.00
741.49
2,224.47
11.02.14
DELINEADORES REFLECTIVOS
und
10.00
68.16
681.60
11.03
ROMPEMUELLES
11.03.01
m3
0.25
310.72
77.68
11.03.02
m2
6.55
18.53
121.37
12
CONTROL DE CALIDAD
12.01
glb
1.00
10,000.00
13
PARADEROS URBANOS
13.01
m3
1.92
24.83
47.67
13.02
m3
1.92
141.19
271.08
13.03
und
6.00
420.76
2,524.56
13.04
und
6.00
2,894.99
17,369.94
13.05
PANEL PUBLICITARIO
und
6.00
1,618.85
14
VARIOS
28,002.02
112.23
199.05
10,000.00
10,000.00
29,926.36
9,713.10
46,326.09
Obra:
Item
Presupuesto de Obra
Descripcin
Und.
Metrado
Precio S/.
Parcial S/.
14.01
COLECTOR DE DESECHOS
und
9.00
390.61
3,515.49
14.02
und
70.00
229.98
16,098.60
14.03
und
140.00
58.12
8,136.80
14.04
und
140.00
95.25
13,335.00
14.05
und
70.00
35.52
2,486.40
14.06
und
140.00
19.67
2,753.80
15
15.01
02
01
OBRAS PROVISIONALES
01.01
m2
62.00
105.28
6,527.36
01.02
und
1.00
909.73
909.73
01.03
glb
1.00
500.00
500.00
01.04
glb
1.00
500.00
02
TRABAJOS PRELIMINARES
02.01
m2
4,387.70
0.44
1,930.59
02.02
m3
343.47
33.94
11,657.37
02.03
102.00
0.82
83.64
02.04
48.01
0.37
03
MOVIMIENTO DE TIERRAS
03.01
m2
4,387.70
1.37
6,011.15
03.02
m3
222.64
10.85
2,415.64
03.03
m3
679.36
12.29
8,349.33
03.04
m3
679.36
5.63
04
CONCRETO SIMPLE
04.01
LOSA DEPORTIVA
04.01.01
m3
120.00
232.72
04.01.02
m2
20.00
21.03
420.60
04.01.03
441.60
3.56
1,572.10
04.02
GRADERIOS
04.02.01
m3
73.50
173.67
04.02.02
m2
71.52
30.79
04.03
JARDINERAS Y SARDINELES
04.03.01
m3
16.60
292.83
4,860.98
04.03.02
m2
221.40
40.87
9,048.62
04.03.03
m3
5.88
292.83
1,721.84
04.03.04
m2
78.34
45.47
3,562.12
04.04
BANCAS DE CONCRETO
04.04.01
m3
4.65
188.34
04.04.02
m2
20.23
30.61
04.05
04.05.01
m3
7.56
173.67
04.05.02
m2
50.40
40.87
05
05.01
m2
84.00
63.07
5,297.88
05.02
m2
129.08
102.33
13,208.76
998.78
m3
438.06
2.28
998.78
561,917.79
8,437.09
500.00
13,689.36
17.76
20,600.92
3,824.80
68,947.31
29,919.10
27,926.40
14,966.85
12,764.75
2,202.10
19,193.56
1,495.02
875.78
619.24
3,372.79
1,312.95
2,059.85
18,506.64
Obra:
Item
Presupuesto de Obra
Descripcin
Und.
Metrado
Precio S/.
Parcial S/.
06
CONCRETO ARMADO
06.01
ZAPATAS
122,925.07
06.01.01
m2
101.60
16.15
1,640.84
06.01.02
m3
30.48
262.74
8,008.32
06.01.03
kg
684.20
4.12
2,818.90
06.02
SOBRECIMIENTO ARMADO
06.02.01
m3
5.21
288.48
1,502.98
06.02.02
m2
55.33
27.29
1,509.96
06.02.03
kg
284.20
4.12
06.03
COLUMNAS
06.03.01
m3
178.20
309.81
55,208.14
06.03.02
m2
563.88
40.65
22,921.72
06.03.03
kg
4,160.52
4.12
17,141.34
06.04
VIGAS DE CONFINAMIENTO
06.04.01
m3
4.54
262.22
1,190.48
06.04.02
m2
156.65
52.55
8,231.96
06.04.03
kg
383.38
4.12
07
PISOS
07.01
m2
595.11
22.95
07.02
m2
311.09
6.51
2,025.20
07.03
m2
311.09
47.42
14,751.89
07.04
m2
570.71
65.37
37,307.31
07.05
m2
24.40
42.91
1,047.00
07.06
m2
612.26
4.12
2,522.51
07.07
m2
612.26
70.04
42,882.69
08
ENCHAPES Y TARRAJEOS
08.01
m2
11.16
40.30
449.75
08.02
m2
770.58
12.18
9,385.66
08.03
m2
228.69
19.05
4,356.54
08.04
TARRAJEO EN GRADERIOS
m2
191.28
11.68
09
CARPINTERA METALICA
09.01
glb
2.00
8,570.00
17,140.00
09.02
glb
2.00
8,900.00
17,800.00
09.03
glb
3.00
5,500.00
16,500.00
09.04
und
4.00
10,133.43
40,533.72
09.05
m2
380.52
124.40
47,336.69
10
PINTURA
10.01
m2
1,326.16
7.09
9,402.47
10.02
743.40
2.06
1,531.40
10.03
696.22
1.05
11
SISTEMA DE RIEGO
11.01
144.10
4.49
11.02
144.10
3.10
446.71
11.03
144.10
24.10
3,472.81
11.04
und
4.00
36.45
145.80
11.05
und
2.00
7.17
14.34
11.06
und
5.00
10.33
51.65
11.07
und
29.00
9.13
264.77
12,468.06
4,183.84
1,170.90
95,271.21
11,001.96
1,579.53
114,194.38
13,657.77
16,426.11
2,234.15
139,310.41
11,664.91
731.03
5,711.06
647.01
Obra:
Item
Presupuesto de Obra
Descripcin
Und.
Metrado
Precio S/.
Parcial S/.
11.08
MEDIDOR DE AGUA
und
1.00
65.00
65.00
11.09
und
3.00
44.08
132.24
11.10
CAJA DE VALVULAS
pza
4.00
100.75
403.00
11.11
144.10
0.47
12
JARDINERIA
12.01
m3
423.02
27.80
11,759.96
12.02
SEMBRADO DE GRASS
m2
1,410.07
6.10
8,601.43
12.03
und
7.00
6.92
48.44
12.04
und
16.00
5.92
13
VARIOS
13.01
03
INSTALACIONES ELECTRICAS
01
OBRAS PRELIMINARES
01.01
TRAZO INICIAL
glb
1.00
551.88
551.88
01.02
EXCAVACION
m3
735.48
9.31
6,847.32
01.03
1,272.00
9.98
12,694.56
01.04
225.00
6.81
1,532.25
01.05
201.00
3.75
753.75
01.06
84.00
78.09
6,559.56
01.07
10.00
50.92
509.20
01.08
m3
613.00
15.10
9,256.30
01.09
und
11.00
91.38
02
02.01
625.00
20.03
12,518.75
02.02
850.00
13.08
11,118.00
02.03
440.00
5.34
2,349.60
02.04
258.00
11.77
3,036.66
02.05
jgo
2.00
417.51
835.02
02.06
jgo
3.00
313.83
03
03.01
POSTE DE CONCRETO DE 11 M.
und
24.00
1,101.99
26,447.76
03.02
und
22.00
249.14
5,481.08
03.03
und
8.00
675.24
5,401.92
03.04
jgo
37.00
1,178.78
43,614.86
03.05
jgo
22.00
402.44
8,853.68
03.06
jgo
8.00
651.88
5,215.04
04
INSTALACIN DE EQUIPOS
04.01
TABLERO DE DISTRIBUCIN
und
1.00
1,008.10
1,008.10
04.02
und
1.00
1,094.78
1,094.78
04.03
und
3.00
273.85
05
OBRAS COMPLEMENTARIAS
05.01
und
40.00
135.49
5,419.60
05.02
und
4.00
1,066.28
4,265.12
05.03
PRUEBAS ELECTRICAS
glb
1.00
423.87
423.87
Costo Directo
Gastos Generales (13.18%)
67.73
20,504.54
94.72
1,000.00
glb
1.00
1,000.00
1,000.00
178,556.88
39,710.00
1,005.18
30,799.52
941.49
95,014.34
2,924.43
821.55
10,108.59
3,969,595.40
523,323.56
Obra:
Item
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
103,799.10
46,160.42
70,316.52
8,950.00
4,722,145.00
PRESUPUESTO TOTAL
Presupuesto de Obra
Costo Directo
Gastos Generales
Gastos de Supervisin
Gastos de Liquidacin
Gastos de Expediente Tecnico
Gastos de Seguimiento y Monitoreo
S/.
S/.
S/.
S/.
S/.
S/.
S/.
4,722,145.00
3,969,595.40
523,323.56
103,799.10
46,160.42
70,316.52
8,950.00
E)
Metrado
Ejecutado
Parcial
62.00
6,527.36
100.00%
2.00
1,819.46
100.00%
1.00
12,962.00
100.00%
1.00
500.00
100.00%
1.00
500.00
100.00%
1.50
1,073.72
100.00%
11,904.86
9,166.74
100.00%
2,380.97
11,023.89
100.00%
159.46
5,412.07
100.00%
108.03
79.94
100.00%
406.15
601.10
100.00%
208.00
32,445.92
100.00%
1.00
11,895.00
100.00%
2,850.00
9,946.50
100.00%
4,901.07
18,820.11
100.00%
7,668.76
9,585.95
100.00%
490.11
5,273.58
100.00%
2,457.94
72,533.81
100.00%
586.19
43,243.24
100.00%
6,089.57
34,284.28
100.00%
11,904.86
19,404.92
100.00%
1,198.78
4,855.06
100.00%
1,198.78
4,795.12
100.00%
922.14
19,189.73
100.00%
1,106.57
5,521.78
100.00%
1,106.57
4,492.67
100.00%
922.14
4,500.04
100.00%
1,844.28
5,754.15
100.00%
184.43
1,984.47
100.00%
6,284.02
10,682.83
100.00%
3,963.90
16,053.80
100.00%
3,963.90
15,855.60
100.00%
3,049.14
63,452.60
100.00%
E)
Metrado
Ejecutado
Parcial
2,439.32
6,561.77
100.00%
5,081.92
17,786.72
100.00%
508.19
5,452.88
100.00%
18,834.99
40,871.93
100.00%
710.86
8,196.22
100.00%
1,943.38
8,822.95
100.00%
1,943.38
47,651.68
100.00%
1,943.38
46,446.78
100.00%
17,448.99
7,852.05
100.00%
17,448.99
56,011.26
100.00%
1,439.54
755,038.73
100.00%
17,448.99
13,435.72
100.00%
1,439.54
20,743.77
100.00%
17,448.99
27,394.91
100.00%
199.07
1,940.93
100.00%
208.22
8,716.09
100.00%
0.00% Ocultar
0.00% Ocultar
Memoria Valorizada ?
Memoria Valorizada ?
0.00% Ocultar Memoria Valorizada ?
1,967.50
1,928.15
37.50%
93.73
28,050.58
54.00%
193.10
3,848.48
36.71%
0.00% Ocultar
0.97
694.34
100.00%
1,580.79
39,251.02
100.00%
969.00
15,649.35
100.00%
384.73
115,138.15
100.00%
189.43
62,231.54
100.00%
4,850.86
106,912.95
100.00%
25,341.71
100,353.17
100.00%
54.59
34.39
100.00%
96.58
2,398.08
100.00%
60.05
421.55
100.00%
31.48
10,438.14
100.00%
375.75
8,247.71
100.00%
2,823.51
11,237.57
100.00%
54.73
22,447.51
100.00%
6.74
2,443.32
100.00%
Memoria Valorizada ?
E)
Metrado
Ejecutado
Parcial
81.50
51.35
100.00%
85.80
1,462.89
100.00%
696.95
3,909.89
100.00%
8.81
1,116.32
100.00%
3.84
592.70
100.00%
17.76
5,315.04
100.00%
145.60
3,195.92
100.00%
414.56
1,649.95
100.00%
57.50
21,199.68
100.00%
0.00% Ocultar
1.30
427.08
100.00%
10.68
3,196.20
100.00%
77.20
307.26
100.00%
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
0.00% Ocultar
202.67
5,032.30
62.36%
293.37
87,796.84
39.64%
2,216.20
66,508.16
47.95%
7,116.70
1,850.34
100.00%
5,976.95
4,422.94
100.00%
3,929.19
12,337.66
100.00%
0.00% Ocultar
2,744.25
192,207.27
100.00%
45.00
1,889.10
69.12%
40.95
45.05
100.00%
114.39
3,619.30
100.00%
8.72
2,515.98
100.00%
19.05
597.22
100.00%
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
Memoria Valorizada ?
0.11
0.82
0.15
Memoria Valorizada ?
E)
Metrado
Ejecutado
Parcial
0.00%
0.00%
2,148.00
6,938.04
100.00%
130.77
481.23
100.00%
32.30
9,666.42
80.53%
307.80
11,068.49
67.36%
398.78
4,897.02
87.27%
106.93
2,037.02
100.00%
233.70
1,259.64
35.32%
465.58
512.14
37.74%
620.40
17,247.12
95.84%
1,579.07
9,632.33
62.55%
207.70
2,982.57
54.85%
58.00
2,199.36
58.00%
2,745.34
67,096.11
100.00%
941.16
17,674.98
100.00%
4.52
112.23
100.00%
1.50
10.53
100.00%
4.75
682.48
100.00%
0.60
179.56
100.00%
7.80
260.36
100.00%
36.12
143.76
100.00%
26.00
5,253.82
100.00%
3.00
2,855.64
100.00%
16.00
5,671.84
100.00%
1.00
354.49
100.00%
1.00
354.49
100.00%
26.00
9,216.74
100.00%
3.00
2,224.47
100.00%
10.00
681.60
100.00%
0.00%
0.00%
1.00
10,000.00
100.00%
1.92
47.67
100.00%
1.92
271.08
100.00%
6.00
2,524.56
100.00%
6.00
17,369.94
100.00%
0.00%
E)
Metrado
Ejecutado
Parcial
9.00
3,515.49
100.00%
70.00
16,098.60
100.00%
140.00
8,136.80
100.00%
140.00
13,335.00
100.00%
70.00
2,486.40
100.00%
140.00
2,753.80
100.00%
438.06
998.78
100.00%
62.00
6,527.36
100.00%
1.00
909.73
100.00%
1.00
500.00
100.00%
1.00
500.00
100.00%
4,387.70
1,930.59
100.00%
343.47
11,657.37
100.00%
102.00
83.64
100.00%
48.01
17.76
100.00%
4,387.70
6,011.15
100.00%
222.64
2,415.64
100.00%
679.36
8,349.33
100.00%
679.36
3,824.80
100.00%
120.00
27,926.40
100.00%
20.00
420.60
100.00%
441.60
1,572.10
100.00%
73.50
12,764.75
100.00%
71.52
2,202.10
100.00%
16.60
4,860.98
100.00%
221.40
9,048.62
100.00%
5.88
1,721.84
100.00%
78.34
3,562.12
100.00%
4.65
875.78
100.00%
20.23
619.24
100.00%
7.56
1,312.95
100.00%
50.40
2,059.85
100.00%
84.00
5,297.88
100.00%
129.08
13,208.76
100.00%
E)
Metrado
Ejecutado
Parcial
101.60
1,640.84
100.00%
30.48
8,008.32
100.00%
684.20
2,818.90
100.00%
5.21
1,502.98
100.00%
55.33
1,509.96
100.00%
284.20
1,170.90
100.00%
178.20
55,208.14
100.00%
563.88
22,921.72
100.00%
4,160.52
17,141.34
100.00%
4.54
1,190.48
100.00%
156.65
8,231.96
100.00%
383.38
1,579.53
100.00%
595.11
13,657.77
100.00%
311.09
2,025.20
100.00%
311.09
14,751.89
100.00%
0.00%
0.00%
612.26
0.00%
42,882.69
100.00%
11.16
449.75
100.00%
770.58
9,385.66
100.00%
228.69
4,356.54
100.00%
191.28
2,234.15
100.00%
2.00
17,140.00
100.00%
2.00
17,800.00
100.00%
3.00
16,500.00
100.00%
4.00
40,533.72
100.00%
380.52
47,336.69
100.00%
1,326.16
9,402.47
100.00%
743.40
1,531.40
100.00%
696.22
731.03
100.00%
144.10
647.01
100.00%
144.10
446.71
100.00%
144.10
3,472.81
100.00%
4.00
145.80
100.00%
2.00
14.34
100.00%
5.00
51.65
100.00%
29.00
264.77
100.00%
E)
Metrado
Ejecutado
Parcial
1.00
65.00
100.00%
3.00
132.24
100.00%
4.00
403.00
100.00%
144.10
67.73
100.00%
423.02
11,759.96
100.00%
1,410.07
8,601.43
100.00%
7.00
48.44
100.00%
16.00
94.72
100.00%
1.00
1,000.00
100.00%
1.00
551.88
100.00%
735.48
6,847.32
100.00%
1,272.00
12,694.56
100.00%
225.00
1,532.25
100.00%
201.00
753.75
100.00%
84.00
6,559.56
100.00%
10.00
509.20
100.00%
613.00
9,256.30
100.00%
11.00
1,005.18
100.00%
625.00
12,518.75
100.00%
850.00
11,118.00
100.00%
440.00
2,349.60
100.00%
258.00
3,036.66
100.00%
2.00
835.02
100.00%
3.00
941.49
100.00%
24.00
26,447.76
100.00%
22.00
5,481.08
100.00%
8.00
5,401.92
100.00%
37.00
43,614.86
100.00%
22.00
8,853.68
100.00%
8.00
5,215.04
100.00%
1.00
1,008.10
100.00%
1.00
1,094.78
100.00%
3.00
821.55
100.00%
40.00
5,419.60
100.00%
4.00
4,265.12
100.00%
1.00
423.87
100.00%
3,448,964.73
86.88%
454,687.27
3,448,965.51
0.78
E)
Metrado
Ejecutado
Parcial
90,185.37
40,106.27
61,094.19
7,776.17
4,102,814.00
86.88%
Obra:
Item
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
01
02
TRABAJOS PRELIMINARES
1,504,305.42
02.01
km
1.50
715.81
02.02
m2
11,904.86
0.77
9,166.74
02.03
m3
2,380.97
4.63
11,023.89
02.04
m3
159.46
33.94
5,412.07
02.05
ELIMINACIN DE MALEZA
m2
108.03
0.74
79.94
02.07
da
208.00
155.99
32,445.92
02.08
glb
1.00
11,895.00
11,895.00
03
EXPLANACIONES
03.01
m3
4,901.07
3.84
18,820.11
03.02
m2
7,668.76
1.25
9,585.95
03.03
m3
490.11
10.76
5,273.58
03.04
CONFORMACIN DE TERRAPLEN
m3
2,457.94
29.51
72,533.81
03.05
ENROCADO EN TERRAPLEN
m3
586.19
73.77
43,243.24
03.06
m3
6,089.57
5.63
04
PAVIMENTOS
04.01
SUB BASE
04.01.01
04.01.01.01
04.01.02
04.01.02.01
71,097.28
1,073.72
183,740.97
34,284.28
1,238,810.15
81,180.79
19,404.92
m2
11,904.86
1.63
19,404.92
m3
1,198.78
4.05
4,855.06
04.01.02.02
m3
1,198.78
4.00
4,795.12
04.01.02.03
m3
922.14
20.81
19,189.73
04.01.03
04.01.03.01
m3
1,106.57
4.99
14,514.50
5,521.78
04.01.03.02
m3
1,106.57
4.06
4,492.67
04.01.03.03
m3
922.14
4.88
04.01.04
04.01.04.01
m3
1,844.28
3.12
04.01.04.02
m3
184.43
10.76
1,984.47
04.01.04.03
m2
6,284.02
1.70
10,682.83
04.02
BASE
04.02.01
04.02.01.01
m3
3,963.90
4.05
16,053.80
04.02.01.02
m3
3,963.90
4.00
15,855.60
04.02.01.03
m3
3,049.14
20.81
63,452.60
04.02.02
04.02.02.01
m3
2,439.32
2.69
04.02.03
CONFORMACIN DE BASE
04.02.03.01
m3
5,081.92
3.50
04.02.03.02
RIEGO DE BASE
m3
508.19
10.73
5,452.88
04.02.03.03
m2
18,834.99
2.17
40,871.93
04.02.03.04
m2
710.86
11.53
04.03
PAVIMENTO FLEXIBLE
983,397.85
04.03.01
PIEDRA CHANCADA
102,921.40
28,839.91
4,500.04
18,421.45
5,754.15
174,231.51
95,362.00
6,561.77
6,561.77
72,307.74
17,786.72
8,196.22
Obra:
Item
Presupuesto de Obra
Descripcin
Und.
Metrado
Precio S/.
Parcial S/.
04.03.01.01
m3
1,943.38
4.54
8,822.95
04.03.01.02
m3
1,943.38
24.52
47,651.68
04.03.01.03
CHANCADO DE PIEDRA
m3
1,943.38
23.90
04.03.02
CARPETA ASFALTICA
04.03.02.01
LIMPIEZA DE SUPERFICIE
m2
17,448.99
0.45
7,852.05
04.03.02.02
IMPRIMACIN
m2
17,448.99
3.21
56,011.26
04.03.02.03
m3
1,439.54
524.50
755,038.73
04.03.02.04
ARENADO
m2
17,448.99
0.77
13,435.72
04.03.02.05
m3
1,439.54
14.41
20,743.77
04.03.02.06
ESPARCIDO Y COMPACTADO
m2
17,448.99
1.57
27,394.91
05
05.01
m3
199.07
9.75
1,940.93
05.02
m3
208.22
41.86
8,716.09
02
92,222.63
04
CONCRETO SIMPLE
44,885.94
04.01
LOSA DEPORTIVA
04.01.01
m3
120.00
232.72
04.01.02
m2
20.00
21.03
420.60
04.01.03
441.60
3.56
1,572.10
04.02
GRADERIOS
04.02.01
m3
73.50
173.67
04.02.02
m2
71.52
30.79
09
CARPINTERA METALICA
09.05
46,446.78
880,476.44
10,657.02
29,919.10
27,926.40
14,966.85
12,764.75
2,202.10
47,336.69
m2
380.52
124.40
47,336.69
1,596,528.07
Costo Directo
Gastos Generales (13.18%)
210,475.04
41,746.87
18,565.22
28,280.54
3,599.59
1,899,195.33
PRESUPUESTO TOTAL
Presupuesto de Obra
Costo Directo
Gastos Generales
Gastos de Supervisin
Gastos de Liquidacin
Gastos de Expediente Tecnico
Gastos de Seguimiento y Monitoreo
S/.
S/.
S/.
S/.
S/.
S/.
S/.
4,722,145.00
3,969,595.40
523,323.56
103,799.10
46,160.42
70,316.52
8,950.00
OS)
Metrado
Ejecutado
Parcial
0.23
164.64
15.33%
2,126.99
1,637.78
17.87%
1,558.77
7,217.11
65.47%
65.43
2,220.69
41.03%
1,609.50
1,191.03
1489.86%
104.00
16,222.96
50.00%
0.50
5,947.50
50.00%
918.29
3,526.23
18.74%
1,418.25
1,772.81
18.49%
18.74%
91.83
988.09
668.75
19,734.81
27.21%
3,138.42
231,521.24
535.39%
1,905.66
10,728.87
31.29%
2,138.49
3,485.74
17.96%
215.30
871.97
17.96%
215.30
861.20
17.96%
165.99
3,454.25
18.00%
199.19
993.96
18.00%
199.19
808.71
18.00%
165.99
810.03
18.00%
331.98
1,035.78
18.00%
33.20
357.23
18.00%
1,233.61
2,097.14
19.63%
1,611.00
6,524.55
40.64%
1,611.00
6,444.00
40.64%
1,239.23
25,788.38
40.64%
991.39
2,666.84
40.64%
991.39
3,469.87
19.51%
99.14
1,063.77
19.51%
13,038.92
28,294.46
69.23%
710.86
8,196.22
100.00%
OS)
Metrado
Ejecutado
Parcial
260.23
1,181.44
13.39%
260.23
6,380.84
13.39%
260.23
6,219.50
13.39%
12,502.51
5,626.13
71.65%
12,502.51
40,133.06
71.65%
192.76
101,102.62
13.39%
12,502.51
9,626.93
71.65%
192.76
2,777.67
13.39%
1,736.51
2,726.32
9.95%
550.30
5,365.43
276.44%
863.01
36,125.60
414.47%
20.00
4,654.40
16.67%
25.00
525.75
125.00%
68.40
243.50
15.49%
27.50
4,775.93
37.41%
79.27
2,440.72
110.84%
355.20
44,186.88
93.35%
674,190.58
42.23%
88,880.55
1.17
17,629.10
7,839.82
11,942.46
1,520.06
802,002.56
674,189.41
42.23%
Obra:
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno"
Item
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
01
MOVIMIENTO DE TIERRAS
01.03
SUB DRENAJE
379.18
01.03.01
m3
2.40
39.43
94.63
2.40
01.03.02
SUB DRENAJE
15.00
18.97
284.55
15.00
02
MEJORAMIENTO DE SUBRASANTE
02.01
CONFORMACIN DE ENROCADO
02.01.01
02.02
CAPA ANTICONTAMINANTE
02.02.01
CAPA ANTICONTAMINANTE
03
03.01
100.00
86.00
8,600.00
100.00
03.02
m3
323.63
4.86
1,572.84
323.63
01
MOVIMIENTO DE TIERRAS
01.01
EXCAVACIN DE ZANJAS
01.01.01
02
SUBDRENAJE
02.01
m3
3.20
39.43
126.18
3.20
02.02
SUBDRENAJE
20.00
18.97
379.40
20.00
03
03.01
CAPA ANTICONTAMINANTE
03.01.01
CAPA ANTICONTAMINANTE
04
04.01
05
ENROCADO DE VEREDAS
05.01
m3
45.73
35.70
1,632.56
45.73
05.02
ENROCADO DE VEREDAS
m3
45.73
5.26
240.54
45.73
06
MUROS DE CONTENCIN
06.01
ZAPATAS
06.01.01
m3
18.80
296.82
5,580.22
18.80
06.01.02
kg
1,052.00
4.86
5,112.72
1,052.00
06.02
06.02.01
m3
36.20
326.34
11,813.51
36.20
06.02.02
ENCOFRADO Y DESENCOFRADO
m2
187.46
62.31
11,680.63
187.46
06.03
06.03.01
kg
2,593.82
4.86
12,605.97
2,593.82
06.03.02
27.00
86.00
2,322.00
27.00
06.04
TARRAJEO EN MUROS
06.04.01
08
08.05
02
02.01
379.18
15,078.05
7,521.72
m3
292.56
25.71
7,521.72
292.56
7,556.33
m3
252.72
29.90
7,556.33
252.72
10,172.84
559.56
559.56
m3
38.59
14.50
559.56
38.59
505.58
645.84
645.84
m3
21.60
29.90
645.84
21.60
684.50
m2
35.80
19.12
684.50
35.80
1,873.10
49,941.51
10,692.94
23,494.14
14,927.97
826.47
m2
27.00
30.61
826.47
27.00
1,468.94
kg
302.25
4.86
1,468.94
302.25
m3
110.50
35.70
3,944.85
110.50
02.02
CONFORMACIN DE ENROCADO
m3
110.50
25.71
2,840.96
110.50
02.03
CAPA ANTICONTAMINANTE
m3
72.60
42.90
3,114.54
72.60
03
VEREDAS DE CONCRETO
9,900.35
18,045.49
Obra:
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno"
Item
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
03.01
SUMINISTRO DE ROCA
m3
77.43
35.70
2,764.25
77.43
03.02
ACARREO DE ROCA
m3
77.43
16.70
1,293.08
77.43
03.03
EMPEDRADO DE VEREDAS
m3
77.43
5.26
407.28
77.43
03.04
m2
148.76
32.47
4,830.24
148.76
03.05
m3
28.30
309.21
8,750.64
28.30
04
MURO DE CONTENCIN
04.01
801.84
kg
156.00
5.14
801.84
110,056.76
24,993.65
135,050.41
156.00
Obra:
Item
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno"
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
Obra:
Item
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno"
Descripcin
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
S)
4.6.6 VALORIZA
Item
01
100.00%
01.01.01
284.55
100.00%
01.01.02
01.01.03
01.01.04
7,521.72
100.00%
7,556.33
100.00%
8,600.00
100.00%
1,572.84
100.00%
01.01.05
01.01.06
01.01.07
01.01.08
01.01.09
01.01.10
100.00%
01.03.01
126.18
100.00%
02
379.40
100.00%
02.01
01.03.02
02.01.01
02.02
645.84
100.00%
02.02.01
684.50
100.00%
1,632.56
100.00%
03.02
240.54
100.00%
03.03
02.02.02
03
03.01
03.04
03.05
5,580.22
100.00%
04
5,112.72
100.00%
04.01
11,813.51
100.00%
04.01.02
11,680.63
100.00%
04.01.03
12,605.97
100.00%
04.01.05
2,322.00
100.00%
04.01.06
826.47
100.00%
04.01.01
04.01.04
04.02
04.02.01
#REF!
1,468.94
04.02.02
100.00%
01
01.01
3,944.85
100.00%
2,840.96
100.00%
3,114.54
100.00%
01.01.01
S)
4.6.6 VALORIZA
Item
2,764.25
100.00%
01.02.03
1,293.08
100.00%
01.02.04
407.28
100.00%
01.02.05
4,830.24
100.00%
8,750.64
100.00%
801.84
100.00%
110,056.76
100.00%
02.02
03
24,993.65
03.01
03.01.01
135,050.41
100.00%
03.01.02
04
04.01
05
05.01
05.02
06
06.01
06.01.01
06.01.02
06.02
06.02.01
06.02.02
06.03
06.03.01
06.03.02
06.04
06.04.01
06.04.02
07
07.01
07.02
07.03
07.04
07.05
08
08.01
08.02
08.03
08.04
08.05
08.06
08.07
08.08
08.09
S)
4.6.6 VALORIZA
Item
08.10
08.11
09
09.01
09.02
09.03
09.04
10
#REF!
10.01
01
S)
4.6.6 VALORIZA
Presupuesto de Obra
Descripcin
Und.
Metrado
Precio S/.
MOVIMIENTO DE TIERRAS
Parcial S/.
29,194.23
26,691.88
m3
160.70
20.24
3,252.57
160.70
m3
41.45
79.96
3,314.34
41.45
glb
1.00
405.98
405.98
1.00
glb
1.00
2,250.53
2,250.53
1.00
m3
144.63
89.63
12,963.19
144.63
m3
30.00
20.24
607.20
30.00
m3
9.00
79.96
719.64
9.00
glb
1.00
785.98
785.98
1.00
glb
1.00
1,585.78
1,585.78
1.00
m3
9.00
89.63
806.67
9.00
2,123.17
m3
192.84
11.01
SUB DRENAJE
2,123.17
192.84
379.18
m3
2.40
39.43
94.63
2.40
SUB DRENAJE
15.00
18.97
284.55
15.00
MEJORAMIENTO DE SUBRASANTE
17,322.20
CONFORMACIN DE ENROCADO
CONFORMACIN DE ROCA H=0.80-1.00 M.
7,521.72
m3
292.56
25.71
CAPA ANTICONTAMINANTE
7,521.72
292.56
9,800.48
CAPA ANTICONTAMINANTE
m3
252.72
29.90
7,556.33
252.72
m2
252.72
8.88
2,244.15
252.72
13,205.97
85.50
86.00
7,353.00
85.50
m3
323.63
4.86
1,572.84
323.63
94.10
5.60
526.96
94.10
SUMINISTRO DE ROCA
m3
91.63
35.70
3,271.19
91.63
EMPEDRADO DE VEREDAS
m3
91.63
5.26
481.97
91.63
943.42
MACETEROS
922.40
m3
2.00
309.21
618.42
m2
4.82
30.40
146.53
4.82
kg
20.94
4.13
86.48
20.94
m2
2.40
0.47
1.13
2.40
MACETEROS: BRUAS
20.10
2.94
59.09
20.10
m2
2.40
4.48
10.75
2.40
SEMBRADO DE CETICIOS
2.00
21.02
m3
0.24
25.07
6.02
0.24
SEMBRADO DE CETICIOS
Und.
4.00
3.75
15.00
4.00
MOVIMIENTO DE TIERRAS
11,145.86
EXCAVACIN DE ZANJAS
EXCAVACIN DE ZANJAS PARA ZAPATAS PARA MURO DE CONTENCIN
559.56
m3
38.59
14.50
559.56
38.59
9,113.02
m3
65.00
20.24
1,315.60
65.00
m3
15.00
79.96
1,199.40
15.00
Presupuesto de Obra
Descripcin
Und.
Metrado
Precio S/.
Parcial S/.
glb
1.00
45.98
45.98
glb
1.00
1,308.68
1,308.68
1.00
m3
58.50
89.63
5,243.36
58.50
m3
50.17
10.94
548.86
50.17
m2
84.50
10.94
924.43
84.50
1.00
1,473.29
SUBDRENAJE
505.58
m3
3.20
39.43
126.18
3.20
SUBDRENAJE
20.00
18.97
379.40
20.00
837.65
CAPA ANTICONTAMINANTE
837.65
CAPA ANTICONTAMINANTE
m3
21.60
29.90
645.84
21.60
m3
21.60
8.88
191.81
21.60
684.50
m2
35.80
19.12
ENROCADO DE VEREDAS
684.50
35.80
1,873.10
m3
45.73
35.70
1,632.56
45.73
ENROCADO DE VEREDAS
m3
45.73
5.26
240.54
45.73
MUROS DE CONTENCIN
51,558.54
ZAPATAS
10,692.94
m3
18.80
296.82
5,580.22
18.80
kg
1,052.00
4.86
5,112.72
1,052.00
m3
36.20
326.34
11,813.51
36.20
ENCOFRADO Y DESENCOFRADO
m2
187.46
62.31
11,680.63
187.46
kg
2,593.82
4.86
12,605.97
2,593.82
40.50
86.00
3,483.00
40.50
23,494.14
16,088.97
TARRAJEO EN MUROS
1,282.50
m2
27.00
32.00
864.00
27.00
m2
27.00
15.50
418.50
27.00
AREAS VERDES
1,619.69
m3
24.75
7.25
179.44
24.75
m3
24.75
12.81
317.05
24.75
m3
1.14
296.86
338.42
1.14
m2
24.64
25.59
630.54
24.64
m2
12.32
12.52
154.25
12.32
24,446.39
m3
130.00
12.50
1,625.00
130.00
m3
130.00
19.30
2,509.00
130.00
m3
130.00
12.81
1,665.30
130.00
m3
28.20
343.75
9,693.75
28.20
kg
1,090.43
4.86
5,299.49
1,090.43
m2
19.80
27.82
550.84
19.80
m3
3.00
296.82
890.46
3.00
kg
54.45
4.86
264.63
54.45
m3
1.89
296.82
560.99
1.89
Presupuesto de Obra
Descripcin
Und.
Metrado
Precio S/.
Parcial S/.
kg
54.60
4.86
265.36
54.60
m2
18.00
62.31
1,121.58
18.00
2,963.72
m2
3.20
45.65
146.08
3.20
m2
28.00
53.13
1,487.64
28.00
m2
28.00
32.00
896.00
28.00
PINTURA EN MUROS
m2
28.00
15.50
434.00
28.00
OTROS
SALIDA PLUVIAL DE AGUA 3"
146.33
und
1.00
146.33
MOVIMIENTO DE TIERRAS
146.33
1.00
19,301.15
17,566.20
m3
117.60
20.24
2,380.22
glb
1.00
2,241.78
2,241.78
1.00
m3
29.40
79.96
2,350.82
29.40
m3
118.19
89.63
10,593.37
118.19
117.60
1,734.96
m3
157.58
11.01
m3
110.50
35.70
3,944.85
110.50
CONFORMACIN DE ENROCADO
m3
110.50
25.71
2,840.96
110.50
CAPA ANTICONTAMINANTE
m3
72.60
42.90
3,114.54
72.60
m3
72.60
8.88
644.69
72.60
1,734.96
157.58
10,545.03
VEREDAS DE CONCRETO
18,393.76
SUMINISTRO DE ROCA
m3
77.43
35.70
2,764.25
77.43
ACARREO DE ROCA
m3
77.43
16.70
1,293.08
77.43
EMPEDRADO DE VEREDAS
m3
77.43
5.26
407.28
77.43
m2
148.76
32.47
4,830.24
148.76
m3
28.30
309.21
8,750.64
28.30
62.19
5.60
348.26
62.19
MURO DE CONTENCIN
ACERO PARA MURO DE CONTENCIN fy=4200 kg/cm2
801.84
kg
156.00
5.14
801.84
156.00
1,415.13
MACETEROS
1,383.61
m3
3.00
309.21
927.63
m2
7.23
30.40
219.79
7.23
kg
31.41
4.13
129.72
31.41
m2
3.60
0.47
1.69
3.60
MACETEROS: BRUAS
30.15
2.94
88.64
30.15
m2
3.60
4.48
16.13
3.60
SEMBRADO DE CETICIOS
3.00
31.53
m3
0.36
25.07
9.03
0.36
SEMBRADO DE CETICIOS
und
6.00
3.75
22.50
6.00
SEALIZACIN
799.39
PINTURA EN SARDINELES
m2
138.40
5.30
733.52
138.40
PINTURA EN PAVIMENTO
m2
9.20
7.16
65.87
9.20
Costo Directo
207,703.47
Descripcin
Gastos Generales y de Supervisin (12.03%)
PRESUPUESTO TOTAL
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
24,993.65
232,697.12
3,252.57
100.00%
3,314.34
100.00%
405.98
100.00%
2,250.53
100.00%
12,963.19
100.00%
607.20
100.00%
719.64
100.00%
785.98
100.00%
1,585.78
100.00%
806.67
100.00%
2,123.17
100.00%
94.63
100.00%
284.55
100.00%
7,521.72
100.00%
7,556.33
100.00%
2,244.15
100.00%
7,353.00
100.00%
1,572.84
100.00%
526.96
100.00%
3,271.19
100.00%
481.97
100.00%
618.42
100.00%
146.53
100.00%
86.48
100.00%
1.13
100.00%
59.09
100.00%
10.75
100.00%
6.02
100.00%
15.00
100.00%
559.56
100.00%
1,315.60
100.00%
1,199.40
100.00%
100.00%
1,308.68
100.00%
5,243.36
100.00%
548.86
100.00%
924.43
100.00%
126.18
100.00%
379.40
100.00%
645.84
100.00%
191.81
100.00%
684.50
100.00%
1,632.56
100.00%
240.54
100.00%
5,580.22
100.00%
5,112.72
100.00%
11,813.51
100.00%
11,680.63
100.00%
12,605.97
100.00%
3,483.00
100.00%
864.00
100.00%
418.50
100.00%
179.44
100.00%
317.05
100.00%
338.42
100.00%
630.54
100.00%
154.25
100.00%
1,625.00
100.00%
2,509.00
100.00%
1,665.30
100.00%
9,693.75
100.00%
5,299.49
100.00%
550.84
100.00%
890.46
100.00%
264.63
100.00%
560.99
100.00%
100.00%
1,121.58
100.00%
146.08
100.00%
1,487.64
100.00%
896.00
100.00%
434.00
100.00%
146.33
100.00%
2,380.22
100.00%
2,241.78
100.00%
2,350.82
100.00%
10,593.37
100.00%
1,734.96
100.00%
3,944.85
100.00%
2,840.96
100.00%
3,114.54
100.00%
644.69
100.00%
2,764.25
100.00%
1,293.08
100.00%
407.28
100.00%
4,830.24
100.00%
8,750.64
100.00%
348.26
100.00%
801.84
100.00%
927.63
100.00%
219.79
100.00%
129.72
100.00%
1.69
100.00%
88.64
100.00%
16.13
100.00%
9.03
100.00%
22.50
100.00%
733.52
100.00%
65.87
100.00%
207,703.47
100.00%
100.00%
Obra:
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno"
Item
Presupuesto de Obra
Descripcin
Und.
Metrado
Precio S/.
Parcial S/.
02
PISTAS Y VEREDAS
14,989.07
02.02
MEJORAMIENTO DE SUBRASANTE
14,989.07
02.02.03
02.02.03.01
m3
92.04
7.18
660.85
02.02.03.02
m3
78.40
15.78
1,237.15
02.02.04
CONFORMACION DE SUBRAZANTE
02.02.04.01
m2
1,474.22
8.88
02
PISTAS Y VEREDAS
02.02
MEJORAMIENTO DE SUBRAZANTE
02.02.03
02.02.03.01
m3
27.19
7.18
02.02.03.02
m3
27.19
5.55
02.02.04
CONFORMACION DE SUBRAZANTE
02.02.04.01
02.05
VEREDAS DE CONCRETO
02.05.04
02.06
GRADERIOS
02.06.01
m2
196.02
1.24
243.06
02.06.02
GRADERIOS DE CONCRETO: fc=175 kg/cm2 ACABADO COLOREADO FROTACHADO Y BRUADO C:A 1:2
m3
31.43
343.75
10,804.06
02.06.03
m2
82.84
30.40
2,518.34
02
PISTAS Y VEREDAS
02.03
PAVIMENTO RIGIDO
02.03.01
m3
130.11
339.37
44,155.43
02.03.02
m2
158.31
28.75
4,551.41
02.03.03
m2
677.30
0.47
318.33
02.03.04
719.58
5.60
4,029.65
02.04
CUNETA RECTANGULAR
02.04.01
m3
5.35
19.33
103.42
02.04.02
m3
5.35
567.16
3,034.31
02.04.03
m2
53.52
27.45
1,469.12
02.04.04
4.63
52.00
02.07
GRADERIOS
02.07.01
m2
85.41
1.24
105.91
02.07.02
GRADERIOS DE CONCRETO: fc=175 kg/cm2 ACABADO COLOREADO FROTACHADO Y BRUADO C:A 1:2
m3
41.17
343.75
14,152.19
02.07.03
m2
55.54
30.40
1,688.42
Costo Directo
Gastos de Residencia (10.36%)
Gastos de Seguridad (2.30%)
Gastos Operativos de Comit (2.52%)
Gastos Operativos Institucionales (1.27%)
Gastos de Supervisin (3.66%)
Gastos de Liquidacin (0.71%)
Gastos de Seguimiento y Monitoreo (0.76%)
1,898.00
13,091.07
13,091.07
16,400.17
2,134.74
346.13
195.22
150.90
1,788.61
m2
201.42
8.88
m2
136.98
5.11
1,788.61
699.97
699.97
13,565.46
73,848.94
53,054.82
4,847.61
240.76
15,946.51
105,238.18
10,906.91
2,421.75
2,656.49
1,338.34
3,850.37
743.52
796.63
Obra:
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno"
Item
Descripcin
PRESUPUESTO TOTAL
Presupuesto de Obra
Und.
Metrado
Precio S/.
Parcial S/.
127,952.18
Metrado
Deductivos de Obra
Parcial
Item
%
02
02.02
02.02.03
92.04
660.85
100.00%
02.02.03.01
78.40
1,237.15
100.00%
02.02.03.02
1,474.22
13,091.07
100.00%
02.02.04
02.02.04.01
02.04
02.04.01
02.04.02
02.04.03
27.19
195.22
100.00%
02.05
27.19
150.90
100.00%
02.05.06
201.42
1,788.61
100.00%
136.98
699.97
100.00%
101.04
125.29
51.55%
02.08.05
22.07
7,586.56
70.22%
02.08.06
49.17
1,494.77
59.36%
02.08.07
02.08
02.08.01
02.08.02
02.08.03
02.08.04
02.08.08
02
9.50
3,224.02
7.30%
50.40
1,449.00
31.84%
02.02
02.02.03
74.25
34.90
10.96%
02.02.03.01
509.58
2,853.65
70.82%
02.02.03.02
5.35
103.42
100.00%
02.02.04
5.35
3,034.31
100.00%
02.02.04.01
53.52
1,469.12
100.00%
02.05
4.63
240.76
100.00%
02.05.04
85.41
105.91
100.00%
02.06.01
41.17
14,152.19
100.00%
02.06.02
55.54
1,688.42
100.00%
02.06.03
02.02.03.03
02.06
02.09
55,386.08
52.63%
02.09.01
02.09.02
5,740.22
1,274.55
1,398.09
704.36
2,026.42
419.26
02.09.03
02.09.04
02.09.05
02
02.03
02.03.01
02.03.02
Metrado
Deductivos de Obra
Parcial
66,948.98
Item
%
52.32%
02.03.03
02.03.04
02.04
02.04.01
02.04.02
02.04.03
02.04.04
02.07
02.07.01
02.07.02
02.07.03
04
04.01
Presupuesto de Obra
Descripcin
Und.
Metrado
Precio S/.
PISTAS Y VEREDAS
Deductivos de Obra
Parcial S/.
Metrado
153,962.09
MEJORAMIENTO DE SUBRASANTE
14,989.07
1,898.00
m3
92.04
7.18
660.85
92.04
m3
78.40
15.78
1,237.15
78.40
CONFORMACION DE SUBRAZANTE
CONFORMACION DE SUB RAZANTE CON MATERIAL DE PRESTAMO E=0.20m
13,091.07
m2
1,474.22
8.88
PAVIMENTO RIGIDO
13,091.07
1,474.22
97,660.00
m3
273.92
339.37
92,960.23
m2
141.08
28.75
4,056.05
0.98
m2
1,369.61
0.47
643.72
13.50
m2
598.77
38.02
VEREDAS DE CONCRETO
VEREDA DE CONCRETO fc=175 kg/cm2, ACABADO 1:2 COLOREADO BRUADO Y FROTACHADO
2.70
22,765.24
CANALIZACION
22,765.24
14.40
18,547.78
m2
22.71
1.24
28.16
22.71
m3
10.43
19.33
201.61
10.43
m2
22.71
1.87
42.47
22.71
m2
22.71
21.71
493.03
22.71
m3
18.24
339.37
6,190.11
18.24
m2
124.29
27.45
3,411.76
124.29
kg
849.71
4.57
3,883.17
849.71
10.20
421.32
4,297.46
10.20
PISTAS Y VEREDAS
24,935.87
MEJORAMIENTO DE SUBRAZANTE
2,516.14
727.53
m3
27.19
7.18
195.22
27.19
m3
27.19
5.55
150.90
27.19
m3
24.17
15.78
381.40
24.17
CONFORMACION DE SUBRAZANTE
CONFORMACION DE SUB BASE CON MATERIAL DE PRESTAMO E=0.20m
1,788.61
m2
201.42
8.88
VEREDAS DE CONCRETO
VEREDAS: AFIRMADO E=0.15m
1,788.61
201.42
699.97
m2
136.98
5.11
GRADERIOS
699.97
136.98
13,565.46
m2
196.02
1.24
243.06
101.04
GRADERIOS DE CONCRETO: fc=175 kg/cm2 ACABADO COLOREADO FROTACHADO Y BRUADO C:A 1:2
m3
31.43
343.75
10,804.06
31.43
m2
82.84
30.40
2,518.34
49.17
MACETEROS
8,154.30
m3
12.98
309.21
4,013.55
12.98
m2
86.50
30.40
2,629.60
86.50
m2
86.50
12.52
1,082.98
86.50
m2
86.50
0.47
40.66
86.50
m2
86.50
4.48
387.52
86.50
PISTAS Y VEREDAS
73,848.94
PAVIMENTO RIGIDO
53,054.82
m3
130.11
339.37
44,155.43
9.50
m2
158.31
28.75
4,551.41
50.40
Presupuesto de Obra
Descripcin
Und.
Metrado
Precio S/.
Deductivos de Obra
Parcial S/.
Metrado
m2
677.30
0.47
318.33
74.25
719.58
5.60
4,029.65
509.58
CUNETA RECTANGULAR
4,847.61
m3
5.35
19.33
103.42
m3
5.35
567.16
3,034.31
5.35
m2
53.52
27.45
1,469.12
53.52
4.63
52.00
240.76
4.63
GRADERIOS
5.35
15,946.51
m2
85.41
1.24
105.91
85.41
GRADERIOS DE CONCRETO: fc=175 kg/cm2 ACABADO COLOREADO FROTACHADO Y BRUADO C:A 1:2
m3
41.17
343.75
14,152.19
41.17
m2
55.54
30.40
1,688.42
55.54
SEALIZACION
PINTURA EN PAVIMENTO CON CEMENTO FROTACHADO COLOREADO OCRE ROJO
Costo Directo
Gastos de Residencia (10.36%)
408.62
m2
57.07
7.16
408.62
253,155.52
26,237.09
5,825.64
6,390.32
3,219.43
9,262.25
1,916.33
306,006.57
57.07
Deductivos de Obra
Parcial
660.85
100.00%
1,237.15
100.00%
13,091.07
100.00%
916.30
0.99%
28.18
0.69%
6.35
0.99%
547.49
2.40%
28.16
100.00%
201.61
100.00%
42.47
100.00%
493.03
100.00%
6,190.11
100.00%
3,411.76
100.00%
3,883.17
100.00%
4,297.46
100.00%
195.22
100.00%
150.90
100.00%
381.40
100.00%
1,788.61
100.00%
699.97
100.00%
125.29
51.55%
10,804.06
100.00%
1,494.77
59.36%
4,013.55
100.00%
2,629.60
100.00%
1,082.98
100.00%
40.66
100.00%
387.52
100.00%
3,224.02
7.30%
1,449.00
31.84%
Deductivos de Obra
Parcial
34.90
10.96%
2,853.65
70.82%
103.42
100.00%
3,034.31
100.00%
1,469.12
100.00%
240.76
100.00%
105.91
100.00%
14,152.19
100.00%
1,688.42
100.00%
408.62
100.00%
87,593.99
34.60%
9,078.26
2,015.72
2,211.10
1,113.95
3,204.82
663.07
105,880.91
34.60%
VALORIZACION ACUMULADA
EXPEDIENTE TECNICO APROBADO (Presupuesto Base)
MAYORES METRADOS (Aprobados)
PARTIDAS NUEVAS (Adicionales Aprobados)
DEDUCTIVOS (Aprobados)
VALORIZACION FISICA TOTAL
NAL DE LA OBRA
PRESUPUESTO TOTAL
S/. 4,102,814.00
#REF!
S/. 135,050.41
S/. 66,948.98
#REF!
PORCENTAJE
86.88%
#REF!
100.00%
52.32%
#REF!
"Mejoramiento de la Infraestructura Vial en el Jirn: Antonio Machado y vias conexas del Barrio Huascar de la Ciuda
Provincia de Puno - Puno"
Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari
PRESUPUESTO DE OBRA
S/.
S/.
S/.
S/.
S/.
S/.
EJECUCION PRESUPUESTAL
S/.
S/.
S/.
S/.
VALOR DE LA OBRA
S/.
COSTO DE INVERSION
S/.
CUADRO DE CONCILIACION
VALOR DE LA OBRA
S/.
COSTO DE INVERSION
S/.
602,314.22
738,074.25
4,102,814.00
135,050.41
66,948.98
738,074.25
0.00
0.00
0.00
#VALUE!
#VALUE!
738,074.25
100.00%
#VALUE!
#VALUE!
738,074.25
100.00%
#VALUE!
#VALUE!
01
01.01
OBRAS PROVISIONALES
ALMACEN, CASETA DE GUARDIANIA Y RESISDENCIA
Esta Partida incluye las Construcciones y Habilitacin de Ambientes que se han realizado para trabajos de Personal Tcnico,
Administrativo y Almacenaje de Materiales durante la Ejecucin de la Obra.
Item
01.01
01.02
Cantidad
m2
62.00
P. U.
111.75
Total
S/. 6,928.50
Esta Partida se Ejecuto la Cocacin del Cartel de Obra de 3.60 * 2.40 m. Durante la Ejecucin de la Obra.
Item
01.02
01.03
Cantidad
Und.
1.00
P. U.
1,062.17
Total
S/. 1,062.17
Esta Partida se Ejecuto para el Transporte de Maquinaria como: Tractor sobre Oruga, Cargador Frontal, Excavadora y otros
durante la Ejecucin de la Obra.
Item
01.03
01.04
Cantidad
glb
1.00
P. U.
500.00
Total
S/. 500.00
Se Ejecutarn Trabajos requeridos para Suministar Agua Requerida durante el Proceso Constructivo, la cual fue necesaria para
Trabajos como Produccin de Concreto, Curado de Concreto, Asentado de Adoquines, Curado de Adoquines, Limpieza de Obra
Limpieza de Materiales, Limpieza de Herramientas y Equipos.
Item
01.04
01.05
Cantidad
glb
1.00
P. U.
750.00
Total
S/. 750.00
Durante el Proceso Constructivo fue necesario el Suministro de Energia Elctrica puesto que algunos das se trabajo durante la
noche (Demolicin de Carpeta Asfaltica) usndose Reflectores asi como tambien seales luminosas las cuales permitian un
mejor orden vehicular como tambien era un medio de seguridad tanto para los usuarios de la Va como tambien para el
Personal que laobra en la Obra.
Item
01.05
02
02.01
Cantidad
1.00
P. U.
500.00
Total
S/. 500.00
TRABAJOS PRELIMINARES
TRAZO, NIVELACIN Y REPLANTEO
Esta Partida se Ejecuto tanto como para conformar la Subbase como la Base, consisti en llevar al Terreno el Eje, Niveles y
Progresivas a lo largo de la va, con el fin de poder alcanzar el nivel requerido tanto en Planos como en el Expediente
Tnico, esta actividad se realizo manualmente, utilizando para tal fin Equipos como Teodolito, Nivel, Mira Topografica, Wincha,
Estacas, Cordel, Brochas y Yeso (color blanco). Para conseguir este objetivo se tuvo la participacin activa de un Topgrafo.
Por otra parte se realizo con Wincha se midio la Longitud de la Va en un total de 1160 metros lineales, realizando el marcado
de Progresivas cada 20 metros, pintando en la cara de las aceras la referencia correspondiente (color Amarillo).
Item
02.01
02.02
Cantidad
530.24
P. U.
5.48
Total
S/. 2,905.72
Debido a que la Obra es un Mejoramiento de la Va esta ya se encontraba construida por lo que se realizo la Demolicin de
Carpeta Asfaltica en una Longitud de 1173 m. En un Ancho de 14 m. Para lo cual se uso Maquinaria: Tractor Oruga D6 y D7
como tambien Motoniveladora para complementar el Trabajo de Corte.
Item
02.02
02.03
Cantidad
30.90
P. U.
22.48
Total
S/. 694.63
Los Trabajos de Remocin y Apilamiento de Material de Base se hicieron con Tractor Oruga D6 y D7, complementando los
Trabajos con Motoniveladora acumilndolo y posteriormente con el Cargador Frontal es eliminado por medio de los Volquetes,
este material es reciclado y mejorado en la PG 1+140 (desvi Salcedo) para ser usaqdo en la nueva capa (base) que
posteriormente ser colocada.
Item
Item
02.03
02.04
Und.
Cantidad
m3
32.15
P. U.
11.87
Total
S/. 381.62
Al igual que la Carpeta Asfltica se encontraban construidas: Canal, Alcantarilla y otros los cuales furon demolidos con ayuda
de una Compresora y con colaboracin del Personal Obrero y sus Herramientas Manuales.
Item
02.04
02.05
Cantidad
m2
P. U.
1,247.57
1.06
Total
S/. 1,322.42
ELIMINACIN DE MALEZA
Consisti en la Eliminacin de los Materiales Orgnicos, Materiales provenientes de la Demolicin de Carpeta Asfaltica y
Demolicin de Canal, Alcantarilla y Veredas las cuales fueron eliminados con ayuda de Cargador Frontal, Retroexcavadora y
Volquetes a lugares dispuestos en Botaderos instalados por la Municipalidad Provincial de Puno.
Item
02.05
02.06
Cantidad
m2
1,247.52
P. U.
1.24
Total
S/. 1,546.92
Item
02.06
02.07
Cantidad
1.00
P. U.
1,140.00
Total
S/. 1,140.00
Debido a que la Av. Panamericana es el unico acceso a la parte Sur del Departamento se ejecuto esta Partida para poder
mantener tanto la Seguridad y el orden de los Usuarios de la Va durante el Proceso Constructivo de la Va, ya que esto
permite tambien mas facilidad al momento de Ejecutar la Obra.
Item
02.07
02.08
Cantidad
1,589.93
P. U.
4.01
Total
S/. 6,375.62
Item
02.08
02.09
Cantidad
1,907.08
P. U.
12.81
Total
S/. 24,429.69
Para facilitar el Transito de tal manera de no ocasionar congestin vehicular ni accidentes se tuvo que conformar una
Superficie de Rodadura provisional con ayuda de Motoniveladora y Rodillo en la PG. 0+00 - 0+720 de la Va principal.
Item
02.09
03
03.01
Cantidad
1,484.44
P. U.
3.34
Total
S/. 4,958.03
EXPLANACIONES
CORTE DE MATERIAL SUELTO RENDIMIENTO=460 M3/DIA
En la Ejecucin de esta Partida se Corto la Va en nivel de Subrasante el cual estaa constituido por material orgnico y fue
sustituido, para poder Mejorar la Estructura Val.
Item
03.01
03.02
Cantidad
750.00
P. U.
48.96
Total
S/. 36,720.00
Esta Partida se Ejecuto entre las Progresivas 0+000 - 0+375 en donde se Perfilo el Terreno con ayuda de Motoniveladora y se
Compacto el mismo con ayuda de un Rodillo.
Item
03.02
03.03
Cantidad
457.44
P. U.
5.85
Total
S/. 2,676.02
Para la Ejecucin de las dos anteriores Partidas es necesario el Riego ya que el trabajo de Corte con Tractor sobre Oruga, se
facilita con el Agua, al igual que en el Perfilado y la Compactacin, ya que es necesario para poder conformar la va, es
importante el Riego ya que durante el Proceso Constructivo se disminuira la Emisin de polvo disminuyendo de este modo el
Impacto Ambiental.
Item
03.03
03.04
Cantidad
-
P. U.
7.18
Total
S/. 0.00
CONFORMACIN DE TERRAPLEN
Se conformo el Terrapln entre las PG 0+375 - 0+720 con un Ancho de 15 m. (Ancho de toda la Va), y entre las PG
0+720 - 0+760 margen izquierdo con un Ancho de 7.5 m. Debido a que no se tenia construido ninguna va en ese tramo, la
Conformacin de Terrapln comprende la Construccin de una Estructura compuesta con material procedente de la Cantera
Ventilla, en lugares donde sea necesario el reemplazo o Ampliacin de la Sub rasante por ser inadecuado y cuya finalidad es
la soportar la Estructura del Pavimento, ademas de elevar el nivel del Terreno de acuerdo a las Seciones y Perfiles.
Trabajos realizados:
Se realizo la Extraccin Acumulacin y Acopio del material granular en la Cantera ubicada en Ventilla con ayuda de Maquinaria
Excavadora y Tractor sobre oruga, como tambien fue necesario para su Carguio y Transporte Cargador Fontal y Volquetes los
cuales lo dejaron extendido en la Va principal en el tramo indicado.
Para su Conformado fue necesario usar tanto Motoniveladora como Nivel Topografico para lograr el nivel indicado en Planos y
Expediente Tcnico, fue necesario tambien Rodillo Vibratorio y Camion cisterna de esta manera la Densidad de Campo a nivel
de Subrasante alcanzo el 95% de esta forma cumplir con los requisitos solicitados para poder Conformar la Sub Base encima
de este nivel de la Estructura Val.
Item
03.04
03.05
Cantidad
-
P. U.
15.78
Total
S/. 0.00
ENROCADO EN TERRAPLEN
El Enrocado de Terrapln se Ejecut entre las PG 0+720 - 1+160 de la Va principal el margen izquierdo de la Va con un
Ancho de 9 m. (extendiendose mas del ancho de la va proyectada debido a que se construiran Veredas en el tramo Adicional)
Trabajos realizados:
La Extraccin de material roca se realiz en la Cantera San Luis de Alba donde el Material fue Perforado se realizaron disparos
en roca fija para obtener Voladura, este trabajo fue Ejecutado por el Ing. Responsable de Voladuras el cual est incluido en los
Gastos Generales del Expediente Tcnico; para la Voladura se uso Dinamita y para la Perforacin se us una Compresora.
Con el uso de una Excavadora se procedio a Ejecutar el Desquinche y Acumulacin del Material Roca producto de la Voladura
y del Perforado, para su Carguio se uso la misma Excavadora y para su Transporte se us 4 Volquetes de 12 m3 alquilados
del Ministerio de Agricultura.
Se conformo el Enrocado en el tramo indicado debido a que en este tramo se tiene Material muy blando y orgnico se
conformo con la ayuda de Maquinaria Pesada: Excavadora y Tractor oruga los cuales extendieron el Material para luego ser
rellenados con Material Granular (Cantera Ventilla) y despues compactarlos de tal modo conformar la Estructura del Terraplen.
Item
03.05
03.06
Cantidad
-
P. U.
8.88
Total
S/. 0.00
El producto de todo el Material Excedente resultante de todas las Partidas anteriores descritas para la Conformacin de
Terrapln fueron Eliminados con ayuda de Cargador Frontal, Retroexcavadora y Volquetes a lugares dispuestos en Botaderos
instalados por la Municipalidad Provincial de Puno.
Item
03.06
04
04.01
04.01.01
04.01.01.01
Cantidad
258.71
P. U.
7.18
Total
S/. 1,857.54
PAVIMENTOS
SUB BASE
TRATAMIENTO DE SUB BASE EXISTENTE
PERFILADO Y COMPACTADO DE SUB BASE EXISTENTE
Entre las PG 0+000 - 0+375 de la Va principal debido a que se encontr un Material adecuado para conformar la Subbase,
este Material fue tratado sin retirarlo del sitio para lo cual primero se corto tanto la Carpeta Asfaltica como la Base del
Pavimento existente luego se realiz la Nivelacin y Perfilado del material removido tanto con una Motoniveladora como con el
trabajo del Topografo de Obra quien indicada a que nivel tenia que estar la Subbase, para luego esta ser Compactada tanto
con Rodillo y con apoyo de un Camin Cisterna quien le otorgaba el contenido de Humedad ptimo para su Compactacin al
terminar este trabajo, el auxiliar de Laboratorio realizo los Ensayos de Densidad de Campo (>99%) y speedy (6.5%), con lo que
se aprob los trabajos realizados.
Item
04.01.01.01
04.01.02
04.01.02.01
Cantidad
258.71
P. U.
4.73
Total
S/. 1,223.70
La Extraccin y Apilamiento es necesario para poder Conformar con Material Hormigon la capa Subbase en un 50%, el
Material Hormign proviene de la Cantera Cutimbo ubicada cerca al Puente Cutimbo en la Carretera Puno - Moquegua, dicha
Extraccin y Apilamiento de Hormign se realiz tanto con Tractor de Orugas como con Cargador Frontal.
Item
Cantidad
P. U.
Total
04.01.02.01
04.01.02.02
m3
220.24
24.63
S/. 5,424.51
Para poder obtener un Material adecuado para Conformar la Subbase, luego de haber extraido acumulado el Material se armo
una zaranda con ayuda de un Cargador Frontal se procedi a zarandear el Material de tal forma de tener un Material
adecuado y seleccionado para conformar la Sub base.
Item
04.01.02.02
04.01.02.03
Cantidad
258.71
P. U.
7.18
Total
S/. 1,857.54
El Carguio de material procedente de la Cantera Cutimbo se realiz con Cargador Frontal y se transporto dicho material de
Cantera a Obra con Volquetes, descargando el Material en el desvi a Salcedo PG 1+140 donde posteriormente ser mezclado.
Item
04.01.02.03
04.01.03
04.01.03.01
Cantidad
258.71
P. U.
5.55
Total
S/. 1,435.84
Para Conformar la Subbase se usara el material proveniente de la Cantera Salcedo el cual estar en un 50% de la Subbase,
al igual que en la Cantera Cutimbo se Extraer y acumulara el Material con Tractor de Orugas y Cargador Frontal.
Item
04.01.03
04.01.03.02
Cantidad
220.24
P. U.
15.99
Total
S/. 3,521.64
Para poder obtener un Material adecuado para Conformar la Subbase, luego de haber Extraido y Acumulado el material, en el
desvi a Salcedo PG 1+140 (en la Cantera acondicionada en Obra) se arm una zaranda, una vez armada la zaranda con
ayuda de un Cargador Frontal se procedi a zarandear el Material de tal forma de tener un material adecuado y seleccionado
para Conformar la Sub Base.
Item
04.01.03.02
04.01.03.03
Cantidad
440.49
P. U.
2.57
Total
S/. 1,132.06
El Carguio de material procedente de la Cantera Salcedo se realizo con Cargador Frontal y se transporto dicho Material de
Cantera a Obra con Volquetes, descargando el Material en el desvio a Salcedo PG 1+140 donde posteriormente fue
Zarandeado y Mezclado.
Item
04.01.03.03
04.01.04
04.01.04.01
Cantidad
P. U.
1,915.17
3.72
Total
S/. 7,124.43
Primero teniendo los Materiales de las Canteras Cutimbo y Salcedo se mezclaron estas en un porcentale de 50% cada una en
un lugar acondicionado en la Obra (desvio a Salcedo) con ayuda de un Cargador Frontal teniendo los Materiales mezclados
en el lugar ubicado y acondicionado en la misma Obra (desvio a Salcedo), se acumulo el Material Mezclado con la ayuda del
Cargador Frontal y se cargo este material a los Volquetes que realizarn el traslado correspondiente del Material mezclado a la
zona de Conformacin de Sub Base (primero en el margen izquierdo y luego el margen derecho entre las PG 0+000 - 1+143,
brindando de esta manera una va alterna para el Trnsito de los usuarios de la va) dejando el Material en puntos distintos.
Item
04.01.04.01
04.01.04.02
Cantidad
P. U.
271.22
339.37
Total
S/. 92,043.93
Luego se extendio el Material con ayuda de una Motoniveladora, una vez extendido el Material en el margen izquierdo de la
Va principal entre las PG 0+000 - 1+143 se plantillaron los niveles de la subbase, de acuerdo a las Plantillas del Topgrafo,
la Motoniveladora realiz un recorrido de extremo a extremo realizando un nuevo batido hasta conseguir la uniformidad en el
Mezclado y posteriormente la Conformacin segn las pendientes requeridas tanto longitudinal como transversal para este fin
fue de gran ayuda las Plantillas de Nivelacin que se establecieron cada 10 m. Para este se realizo el Riego de Subbase.
Item
04.01.04.02
04.01.04.03
Cantidad
P. U.
140.10
28.75
Total
S/. 4,027.88
Una vez culminada la Conformacin se prosigui con el Compactado, quedando este capa compactada a una Densidad de
Campo mayor al 99% de la maxima Densidad determinada por el Proctor Modificado, cumpliendo con esto el requisito mnimo
de relacin de Densidad de Campo y Densidad maxima que es 95%, para compactar los extremos de la Calzada se utiliz la
Plancha Compactadora.
La Compactacin se efectuo longitudinalmente, comenzando por los bordes exteriores avanzando hacia el centro, traslapando
en cada recorrido un Acnho no menor de un tercio (1/3) del Ancho del Rodillo liso Vibratorio.
La Compactacin se realiz hasta llegar al 100%, para lo que fue necesario el Riego contante y el posterior pas del Rodillo
liso Vibratorio al mismo tiempo que se verificaba el Grado de Compactacin en cada progresiva (cada 20 m. Longitudinales) a
travs de la Prueba del Cono de Arena.
Durante la Conformacin de la Capa Sub base se tuvieron en cuenta los siguientes requerimientos exigidos por el MTC en su
Acpite Especificaciones Tcnicas generales para Carreteras EG-2000, las cuales se describen a continuacin.
Item
04.01.04.03
04.02
04.02.01
04.02.01.01
Cantidad
m2
1,356.11
P. U.
0.47
Total
S/. 637.37
BASE
MATERIAL DE PRESTAMO CANTERA CUTIMBO (MEZCLA 60%)
EXTRACCIN Y APILAMIENTO DE HORMIGON (CANTERA CUTIMBO)
Primero se realiz la Extraccin y Apilamiento que es necesario para poder conformar con Material hormign la capa Base en
un 60%, el material hormigon proviene de la Cantera Cutimbo ubicada cerca al Puente Cutimbo en la Carretera Puno Moquegua, dicha Extraccin y Apilamiento de Hormign se realiz tanto con Tractor de Orugas como con Cargador Frontal.
Item
04.02.01.01
04.02.01.02
Cantidad
705.41
P. U.
5.60
Total
S/. 3,950.30
Para poder obtener un Material adecuado para Conformar la Base, luego de haber Extraido acumnulado el Material se arm
una zaranda, una vez armada la zaranda con ayuda de un Cargador Frontal se procedio a zarandear el Material de tal forma
de tener un material adecuado y seleccionado para conformar la Base.
Item
04.02.01.02
04.02.01.03
Cantidad
744.45
P. U.
1.24
Total
S/. 923.12
El Carguio de material procedente de la Cantera Cutimbo se realizo con Cargador Frontal y se transporto dicho Material de
Cantera a Obra con Volquetes, descargando el Material en el desvio a Salcedo PG 1+140 donde posteriormente sera mezclado.
Item
04.02.01.03
04.02.02
04.02.02.01
Cantidad
34.03
P. U.
19.33
Total
S/. 657.80
El Material tanto de las Canteras Cutimbo como Viluyo fueron mezcladas con el Material de Base existente el cual fue
reciclado y mejorado. Para reciclar este material primero se corto la Carpeta Asfaltica existente, luego con Tractor de Orugas y
Motoniveladora se removi el material Base el cual fue transportado en Volquetes a los cuales se les cargo con un Cargador
Frontal, este material Base fue transportado al lugar acondicionado en Obra (desvio a Salcedo) donde fue zarandeado y
mezclado para su posterior uso.
Item
04.02.02.01
04.02.03
04.02.03.01
Cantidad
44.24
P. U.
Total
7.25
S/. 320.74
CONFORMACIN DE BASE
MEZCLADO DE MATERIAL RECICLADO DE BASE 40% - CANTERA CUTIMBO 60%
Se mezcl tanto el material de Cutimbo (60%) como el Material propio reciclado (40%) en el ambiente acondicionado. Con
ayuda de Cargador Frontal, luego transportando el Material en Volquetes y dejando el material Base en la va donde se
extendio el Material y con ayuda de una Motoniveladora se llego a los niveles indicados por el Topografo, quien plantillo en el
eje, pendientes transversales y longitudinales los cuales fueron revisados milimtricamente puestos que estos son los que
determinaron el bombeo, peraltes y pendientes ltimos de la va.
Item
04.02.03.01
04.02.03.02
Cantidad
44.24
P. U.
Total
8.78
S/. 388.43
RIEGO DE BASE
Al conseguir el nivel adecuado de acuerdo a los Planos y Expediente Tcnico y por Aprobacin del Supervisor se procedi a
Compactar la Base siempre manteniendo el Riego usando Camin Cisterna y compactando con un Rodillo liso Vibratorio.
Item
04.02.03.02
04.02.03.03
Cantidad
113.43
P. U.
Total
5.11
S/. 579.63
Al conseguir el nivel adecuado de acuerdo a los Planos y Expediente Tcnico y por Aprobacin del Supervisor se procedi a
Compactar la Base siempre manteniendo el Riego usando Camin Cisterna y compactando con un Rodillo liso Vibratorio, en
esta Partida se tiene un porcentaje de Avance elevado debido a que se ha realizado el Recompactado de la Base en la
Progresiva km. 0+000 @ km. 0+740
Item
04.02.03.03
Cantidad
584.37
P. U.
38.02
Total
S/. 22,217.75
04.02.03.04
Item
04.02.03.04
04.03
04.03.01
04.03.01.01
Cantidad
10.44
P. U.
27.45
Total
S/. 286.58
PAVIMENTO FLEXIBLE
PIEDRA CHANCADA
EXTRACCIN Y APILAMIENTO DE MATERIAL OVER
Para la Extraccin y Acumulacin mediante el uso de Maquinaria pesada (Tractor sobre oruga y Cargador Frontal) del material
para la Construccin del Pavimento Flexible, esta Extraccin y Acumulacin se ejecut en la Cantera Pichacani.
Item
04.03.01
04.03.01.02
Cantidad
176.56
P. U.
5.60
Total
S/. 988.74
Para el Carguio y Transporte de Material Over a la Planta Chancadora se uso Maquinaria pesada: Cargador Frontal y Volquetes
dicho material fue transportado desde la Cantera Pichacani hasta la Planta Chancadora en un tiempo aproximado de 2:30 min.
Item
04.03.01.02
04.03.01.03
Cantidad
36.42
P. U.
19.33
Total
S/. 704.00
CHANCADO DE PIEDRA
Se realiz el Chancado de Material Over en la Planta Chancadora, la cual se enduentra ubicada en la Carretera a Laraqueri,
de esta manera se obtuvo el Agregado segn Especificaciones para la Produccin de Pavimento Flexible.
Item
04.03.01.03
04.03.02
04.03.02.01
CARPETA ASFALTICA
LIMPIEZA DE SUPERFICIE
Cantidad
47.35
P. U.
7.25
Total
S/. 343.29
Al terminar de conformar la Base dejando esta lista y cumpliendo todos los Controles de Calidad as como todos los
Alineamientos, gradientes y seciones tpicas que indican los Planos y Expediente Tcnico, se proceder a limpiar la Base.
Antes de la aplicacin de la Capa de Imprimacin, todo material suelto fino o extrao debe ser retirado; para cumplir este fin
limpio toda la va tanto con la Compresora como con Herramientas Manuales. Se limpio primero el margen izquierdo y luego
el margen derecho en un Ancho de 15 m. Entre las PG 0+000 - 1+143
Item
04.03.02.01
04.03.02.02
Cantidad
47.35
P. U.
8.78
Total
S/. 415.73
IMPRIMACIN
Se realiz el Riwgo de Imprimacin durante el da con Emulsin Asfaltica, realizando primero el Carguio de los Materiales
CRS-1 y agua al camin imprimador los cuales segn diseo se mezclaron en proporcin de 50% CRS - 1 y 50% de agua.
Una vez alcanzada la Temperatura adecuada y culminado el Trabajo de Limpieza de la Base, se procedi al Riego
correspondiente, cubriendo las franjas que no se llegaron a imprimar con el Camin imprimador de forma manual de tal forma
que la Emulsin pueda penetrar por lo menos 7 mm.
En esta Partida se tiene el porcentaje que se muestra debido a que se ha realizado doble Trabajo de Imprimacin entre la
Progresiva km 0+000 @ km 0+740, la primera efectuada en el Mes de Octubre del 2010, deteriorada en el Mes de Marzo del
2011, procediendo a la Re Conformacin e Imprimado en el Mes de Mayo del 2011.
Item
04.03.02.02
04.03.02.03
Cantidad
60.61
P. U.
309.21
Total
S/. 18,741.22
Este Trabajo consisti en la Preparacin de la Mezcla Asfltica en Caliente la cual fue colocada sobre una superficie
debidamente preparada. La Mezcla Bituminosa que se emple en la Pavimentacin en Caliente comprendia agregados
minerales gruesos, finos, filler mineral y material bituminoso, para lo cual se us la Planta de Asfalto de propiedad del GRP.
Item
04.03.02.03
04.03.02.04
Cantidad
635.54
P. U.
30.40
Total
S/. 19,320.42
ARENADO
Se realizo el Riego de Imprimacin durante el da con Emulsin Asfaltica, procediendo con el Arenado 2 horas despus del
Riego de Imprimacin para abrir el Transito sobre la va, esta Partida consiste en el Esparcido de Material Petre, (ARENA
FINA), despus del Riego de Imprimacin, en todo el rea necesaria y de esta manera poder conservar el Imprimado hasta su
Pavimentacin, ya que en la va se encuentra un gran nmero de trafico y tambien por la presencia de Precipitaciones
Pluviales, el porcentaje alto es debido al doble trabajo del Arenado en la Progresiva km 0+000 @ km 0+740
Item
04.03.02.04
04.03.02.05
Cantidad
39.60
P. U.
50.04
Total
S/. 1,981.58
La mezcla a la salida de la Planta no tuvo una Temperatura menor de 120c y fue transportada desde la Planta Mezcladora
hasta la Obra en Volquetes de 12 m3. No se despach carga alguna a una hora muy avanzada del turno laboral, que pudo
impedir la colocacin.
Item
04.03.02.05
04.03.02.06
Cantidad
m2
P. U.
1.24
Total
S/. 0.00
ESPARCIDO Y COMPACTADO
Se us una Esparcidora para la Distribucin y Terminacin del Pavimento, automtica aprobada, capaz de distribuir y terminar
la mezcla de acuerdo con los Alineamientos, pendientes y Perfil tipo de Obras exigida, la Temperatura de Colocacin de la
Mezcla Asfaltica en la base imprimada ser 120c minimo. Inmediatamente despues que la mezcla haya sido repartida y
emparejada, la superficie fue compactada por un Rodillo tipo tamdem y un Rodillo Neumatico esto en todo el largo de la va
de 1143 m. Con un Ancho promedio de 14 m. Y los empalmes con las Avenidas: Ejercito y Simn Bolivar.
Item
04.03.02.06
05
05.01
Cantidad
m3
P. U.
19.33
Total
S/. 0.00
El uso de Explosivos fue realizado con previa Aprobacin del Supervisor y Residente de Obra, los cuales tomaron las medidas
necesarias para proteger a las personas, las Obras y las propiedades Publicas y Privadas. Dicha Partida se ejecut para la
posterior Construccin del Muro de Contencin.
Item
05.01
05.02
Cantidad
m2
P. U.
1.87
Total
S/. 0.00
En la zona donde se ubico el Muro de Contencin, se rellen con material seleccionado el cual fue Compactado hasta llegar
a los niveles previstos en los Planos, para la posterior Ejecucin de la Estructura indicada en los Planos.
Item
05.02
05.03
Cantidad
-
P. U.
21.71
Total
S/. 0.00
05.04
Cantidad
-
P. U.
339.37
Total
S/. 0.00
Item
05.04
05.05
Cantidad
-
P. U.
27.45
Total
S/. 0.00
Item
05.05
Cantidad
-
P. U.
4.57
Total
S/. 0.00
06
06.01
06.01.01
Se denimina asi a la Excavacin de las Zanjas donde se emplazaran el Dren Longitudinal (Cuneta) a lo largo de la va.
Item
06.01.01
06.01.02
Cantidad
P. U.
421.32
Total
S/. 0.00
El Residente diseo la Mezcla la cual fue con una Resistecia f'c=175 kg/cm2, la cual fue colocado a lo largo de la va tanto
en el margen derecho como izquierdo con un Ancho variable de 30 @ 60 cm.
Item
06.01.02
06.01.03
Cantidad
m2
2.15
P. U.
1.24
Total
S/. 2.67
Se realiz Construcciones temporales de Madera para poder sostener el Concreto de las Cunetas dichas Construccines
temporales fueron realizadas con una altura de 30 cm. A lo largo de toda la va.
Item
06.01.03
06.01.04
Cantidad
0.74
P. U.
19.33
Total
S/. 14.30
El Material sellante para la parte superior de las Juntas de las Cunetas deber asegurar la Impermeabilidad de las mismas y
ser resistente a la agresin de agentes externos, para lo cual deber permanecer adherido a los bordes de las Losas. El
material debe ser flexible bajo cualquier condicin de clima, dctil para adaptarse a cualquier movimiento, as como imperm.
Item
06.01.04
06.02
06.02.01
Cantidad
0.65
P. U.
7.25
Total
S/. 4.71
CANAL PLUVIAL
TRAZO, NIVELACIN Y REPLANTEO
Para poder construir el Canal Pluvial primero se realizo el Trazo y Replanteo en el cual el Topogrfo de Obra con ayuda de
Personal Obrero trazo superficialmente el lugar donde se constryuyo el Canal Pluvial el Trazo lo realizo con Yeso, midio las
longitudes usando un Teodolito mecanico y con cinta metrica.
Item
06.02.01
06.02.02
Cantidad
m3
P. U.
0.74
12.81
Total
S/. 9.48
Se procedi con el Excavado del lugar donde se constryuy el Canal Pluvial, este excavado se realiz con Excavadora
removiendo todo el material, el Personal Obrero elimin el material ya que en su lugar se construy el Canal Pluvial.
Item
06.02.02
06.02.03
Cantidad
m3
0.42
P. U.
296.86
Total
S/. 124.68
Se procedi con vaciar el Solado de Canal el cual tenia un Ancho de 1.80 m. Y una altura de 2" el cual fue extendido de
manera adecuada, al terminar este trabajo se procedio con el Curado de Concreto usada en el Solado.
Item
06.02.03
06.02.04
Cantidad
m2
2.80
P. U.
25.59
Total
S/. 71.65
El Concreto usado para el Muro de Canal tenia una Resistencia f'c=175 kg/cm2 el cual fue preparado en Mezcladora de
Concreto, transportado y vaciado por Prsonal Obrero, dicho Muro de Canal tenia un Ancho de 20 cm. Y una Altura variable
entre 1.00-0.60 m. El cual al ser Desencofrado tubo un proceso de Curado.
Item
06.02.04
06.02.05
Cantidad
m2
2.80
P. U.
12.52
Total
S/. 35.06
Se procedi a mezclar el Concreto con una Mezcladora alcanzando una Resistencia de 210 kg/cm2 al terminar el vaciado de
Concreto en la tapa de canal esta tenia una Longitud de 1.20 m. Y una Altura de 0.20 m. La cual fue debidamente curada
para asi poder alcanzar su Resistencia.
Item
Item
06.02.05
06.02.06
Und.
m3
Cantidad
P. U.
0.65
25.07
Total
S/. 16.30
Se procedi a Encofrar los Muros de Canal este trabajo se realiz con paneles de 40 cm. De alto y 2.40 m. De largo, el Muro
de Canal se encofro en ambos lados tanto hacia el exterior del Canal como hacia el interior del canal en ambos lados
(primero lado izquierdo y luego lado derecho). Despues se procedi a encofrar la Base de la Tapa de Canal la cual tenia un
Ancho de 0.80 metros.
Item
06.02.06
06.02.07
Cantidad
P. U.
2.15
9.06
Total
S/. 19.48
Se procedi al Armado de la Estructura Metlica que iba en la tapa de Canal con Acero de 1/2", 3/8" y 1/4", se Armo el
Acero de Refuerzo en dos capas.
Item
06.02.07
06.03
06.03.01
Cantidad
P. U.
322.00
4.48
Total
S/. 1,442.56
SUMIDEROS
TRAZO, NIVELACIN Y REPLANTEO
Comprende el Replanteo de los Sumideros la va principal y la va alterna, fijando los ejes de referencia y estacas de
Nivelacin. Los ejes fueron fijados permanentemente por seales fijas en el terreno, tales como balizas, tarjetas o de
preferencia varillas de Acero, y la medicin en los niveles que va a construirse.
Item
06.03.01
06.03.02
Cantidad
P. U.
3.85
5.30
Total
S/. 20.41
Se realizaron Trabajos de Excavacin necesaria para llegar al nivel de Fundacin de las Estructuras descritas en los Planos y
adems el Acarreo del Material a una distancia de 30 m. Las excavaciones fueron de acuerdo al tipo de material encontrado.
Item
06.03.02
Cantidad
56.40
P. U.
7.16
Total
S/. 403.82
06.03.03
Se procedi con vaciar el Solado de Sumideros de manera adecuada, al terminar este trabajo se procedio con el Curado de
Concreto usada en el Solado.
Item
06.03.03
06.03.04
Cantidad
Und.
5.00
P. U.
316.10
Total
S/. 1,580.50
Se procedi a mezclar el Concreto con una Mezcladora alcanzando una resistencia f'c=210 kg/cm2 al terminar el Vaciado de
Concreto en los Sumideros a lo largo de la va la cual fue debidamente curada para as poder alcanzar su Resistencia.
Item
06.03.04
06.03.05
Cantidad
Und.
25.00
P. U.
61.52
Total
S/. 1,538.00
Se procedi a Encofrar los Muros de Sumidero con diferentes dimensiones a lo largo de la va principal.
Item
06.03.05
06.03.06
Cantidad
12.00
P. U.
282.85
Total
S/. 3,394.20
Se procedio al Armado de la Estructura Metalica que iba dentro del Sumidero, se us Acero de 12", 3/8" y 1/4".
Item
06.03.06
06.03.07
Cantidad
1,247.57
P. U.
0.58
Total
S/. 723.59
Se ejecuto esta Partida con la Construccin de unas Rejillas Metalicas de acuerdo a diseo, conformado en su techo por una
parrilla sobre la base de Bastones de fierro liso de 1 1/4" soldados y empotrados con un perfil de riel de tren, seguido de un
techo con la tapa de Mantenimiento.
Item
Item
06.03.07
06.03.08
Und.
Cantidad
m2
P. U.
1,247.57
0.58
Total
S/. 723.59
Esta Partida contempla la Colocacin de una Rejilla de Acero liso de 1" en los lugares donde fue requerido segn lo
especificado en los Planos del Proyecto cuya caracteristica principal de estas es la de evacuar las aguas pluviales sobre las
Cunetas hacia los Canales colectores y el Canal principal de Evacuacin de Aguas Pluviales.
Item
06.03.08
06.04
06.04.01
Cantidad
m2
1,247.57
P. U.
0.58
Total
S/. 723.59
ALCANTARILLAS
TRAZO, NIVELACIN Y REPLANTEO
Comprende los trabajos de Trazo, Nivelacin y Replanteo de las Alcantarillas en la va principal, fijando los ejes de referencia y
Estacas de Nivelacin.
Item
06.04.01
06.04.02
Cantidad
m2
3.85
P. U.
5.30
Total
S/. 20.41
Se realizaron Trabajos de Excavacin necesaria para llegar al nivel de fundacin de las Estructuras descritas para lo cual se
uso Maquinaria pesada (Excavadora).
Item
06.04.02
06.04.03
Cantidad
3.85
P. U.
5.30
Total
S/. 20.41
En las zonas donde se ubicaron las Alcantarilas, se rellen con material seleccionado en capas y compactado hasta llegar a
los niveles previstos de la Rasante de la va.
Item
06.04.03
06.04.04
Cantidad
3.85
P. U.
5.30
Total
S/. 20.41
Para esta Partida se us Concreto Ciclpeo en la Entrada y Salida de las Alcantarillas parte intermedia tal como se especifica
en los Planos del Proyecto.
Item
06.04.04
06.04.05
Cantidad
m2
P. U.
3.85
5.30
Total
S/. 20.41
Esta Partida se refiere al Concreto Ciclpeo que se us en la Cimentacin de los Aleros y los Dentellones de las Alcantarillas
tal como se especifica en los Planos del Proyecto.
Item
06.04.05
06.04.06
Cantidad
m2
P. U.
3.85
5.30
Total
S/. 20.41
El Concreto usado para la Construccin de los Muros y tapas de Alcantarilla tenia una Resistencia f'c=175 kg/cm2 el cual fue
preparado en Mezcladora de Concreto, transportado y vaciado por Personal Obrero, al ser Desencofrado se procedio al Curado.
Item
06.04.06
06.04.07
Cantidad
m2
P. U.
3.85
5.30
Total
S/. 20.41
Item
06.04.07
06.04.08
Cantidad
3.85
P. U.
5.30
Total
S/. 20.41
Se procedi a armar la Estructura Metlica que iba dentro de la Alcantarilla, para lo cual se us Acero de 1/2", 3/8" y 1/4".
Item
06.04.08
Cantidad
3.85
P. U.
5.30
Total
S/. 20.41
06.04.09
En esta Partida se Ejecuto el Suministro, Armado y Colocacin de las Alcantarillas tipo tuberia metalica corrugada TMC de 24".
Item
06.04.09
06.04.10
Cantidad
m2
3.85
P. U.
5.30
Total
S/. 20.41
En esta Partida se Ejecuto el Suministro, Armado y Colocacin de las Alcantarillas tipo tuberia metalica corrugada TMC de 36".
Item
06.04.10
06.05
06.05.01
Cantidad
m2
3.85
P. U.
5.30
Total
S/. 20.41
Se procedi a mezclar el Concreto con una Mezcladora alcanzando una Resistencia f'c=210 kg/cm2 al terminar el vaciado de
Concreto en el Registro, fue debidamente curada para asi poder alcanzar su Resistencia.
Ejecucin Expediente Tcnico
Item
Und.
Cantidad
P. U.
06.05.01
06.05.02
m2
3.85
5.30
Total
S/. 20.41
Item
06.05.02
06.05.03
Cantidad
3.85
P. U.
5.30
Total
S/. 20.41
Para Ejecutar esta Partida se procedi a armar el Acero de acuerdo con los Planos del Proyecto y Especificaciones Tecnicas.
Item
06.05.03
08
PISTAS Y VEREDAS
Cantidad
3.85
P. U.
5.30
Total
S/. 20.41
08.01
08.01.01
SARDINELES
EXCAVACIN EN TERRENO NORMAL INC. ACARREO D=30 M.
Para la Construccin de Sardineles primero se procedio con el Excavado, en el margen izquierdo y derecho de la va principal,
en el cual se elimino Material Excedente no apropiado para la Construccin de Sardinel, para esto se uso Herramientas
Manuales (Lampas, Picos, Buggis) descargando este material en lugares donde se necesitaba relleno (costados de Veredas).
Item
08.01.01
08.01.02
Cantidad
P. U.
421.32
Total
S/. 0.00
Al terminar con la Excavacin se procedio a Encofrar, al culminar el Encofrado se vacio el Concreto f'c=175 kg/cm2 con un
Ancho de 15 cm. Y con una Altura variable entre 40 a 60 cm. Para de esta forma se pueda obtener la uniformidad exigida
tanto por Planos como por el Expediente Tcnico, para el vaciado de Concreto se uso una Mezcladora de Concreto, como
tambien una Vibradora de Concreto. Se dejaron Bruas cada 3 m. Con el fin de evitar posteriores Rajaduras en el Sardinel.
Item
08.01.02
08.01.03
Cantidad
P. U.
421.32
Total
S/. 0.00
Al terminar el excavado se procedio a encofrar el Sardinel no solo en la cara vista si no tambien en la cara posterior, para el
Encofrado se uso paneles previamente construidos por los Carpinteros de Obra.
Item
08.01.03
08.02
08.02.01
Cantidad
P. U.
421.32
Total
S/. 0.00
PISOS
TRAZO Y REPLANTEO DURANTE LA CONSTRUCCIN
El Trazo y Replanteo se realiz antes de proceder con el Corte as como tambien antes de colocar el Concreto los cuales
tienen que estar a nivel y pendiente indicado en Planos y Expediente Tcnico, estos trabajos lo ejecuto el Topgrafo de Obra
junto con personal Obrero usando Materiales como: Yeso, Cordel, Ocre, etc.
Item
08.02.01
Cantidad
-
P. U.
421.32
Total
S/. 0.00
08.02.02
Debido a la presencia de Desniveles en el Terreno natural como tambien por no tener el Material adecuado para construir
Veredas se procedi a Cortar material que excedia, luego este material sirvio como Relleno al costado de Veredas donde no
se tenia Estabilidad.
Item
08.02.02
08.02.03
Cantidad
P. U.
421.32
Total
S/. 0.00
Con material adecuado se procedi a rellenar los lugares donde se precederi a adoquinar, esto se realizo con Transporte de
Material ligante por parte del Personal Obrero para luego proceder a humedecer y compactar con Plancha Compactadora.
Item
08.02.03
08.02.04
Cantidad
P. U.
421.32
Total
S/. 0.00
Con material adecuado se procedi a rellenar los lugares donde se precederi a adoquinar, esto se realizo con Transporte de
Material ligante por parte del Personal Obrero para luego proceder a humedecer y compactar con Plancha Compactadora.
Ejecucin Expediente Tcnico
Item
Und.
Cantidad
P. U.
Total
08.02.04
08.02.05
421.32
S/. 0.00
El Asentado de Concreto se ha realizado en Veredas en amobos margenes a lo largo de la va, al culminar con un Falso Piso
de Concreto de 4" Mezcla 1:8, con un Bloque de dimensiones 20 cm * 10 cm * 6 cm. El mismo que ha sido aparejado uno a
continuacin de otro. Para el Asentado de Adoquin se humedecia el Adoquin y se preparaba mortero el cual servia para juntar
el falso piso de Concreto con los Adoquines.
Item
08.02.05
08.02.06
Cantidad
-
P. U.
421.32
Total
S/. 0.00
La Vereda de Concreto tiene un espesor de 4" que se coloc directamente sobre el Terreno de fundacin cuya ubicacin se
definio como se Especifica en los Planos del Proyecto.
Item
08.02.06
08.02.07
Cantidad
P. U.
421.32
Total
S/. 0.00
Las Bruas se Ejecutaron con Seccin rectangular, biseladas, de poca profundidad y espesor efectuado sobre las Veredas para
definir diseos geometricos, delimitar tipos de pisos, y las dimensiones de Bruas se haran de acuerdo a los Planos.
Item
08.02.07
08.02.08
Cantidad
P. U.
421.32
Total
S/. 0.00
Se construyeron Rampas para Discapacitados en los Paraderos de un Espedor de 4" con Acabado Frotachado y Bruado.
Item
08.02.08
08.02.09
Cantidad
P. U.
421.32
Total
S/. 0.00
Idem al Item 08.02.08 Rampas: Concreto f'c=140 kg/cm2 Acabado 1:2 Bruado.
Item
08.02.09
08.02.10
Cantidad
P. U.
421.32
Total
S/. 0.00
Item
08.02.10
08.02.11
Cantidad
-
P. U.
421.32
Total
S/. 0.00
Item
08.02.11
08.02.13
Cantidad
P. U.
421.32
Total
S/. 0.00
JUNTAS ASFALTICAS
El Material sellante para la parte superior de las Juntas de las Cunetas deber asegurar la Impermeabilidad de las mismas y
ser resistente a la agresin de agentes externos, para lo cual deber permanecer adherido a los bordes de las Losas. El
material debe ser flexible bajo cualquier condicin de clima, dctil para adaptarse a cualquier movimiento, as como imperm.
Item
08.02.13
09
09.01
Cantidad
P. U.
421.32
Total
S/. 0.00
BARANDAS
MECHAS DE ACERO DE FIJACIN EN BARANDAS SOBRE MUROS DE GAVIONES
Se instalaron de Barras dobladas de Acero como elementos de Anclaje para fijar el Muro de Concreto de Barandas sobre el
remate del Muro de Concreto Ciclpeo a esparciamientos constantes. Se dobl y torci una Barra de Acero de 3/8" en
torno a una Piedra colocada en la parte superior del Muro de Contencin.
Item
09.01
09.02
Cantidad
-
P. U.
421.32
Total
S/. 0.00
Item
09.02
09.03
Cantidad
-
P. U.
421.32
Total
S/. 0.00
El Pasamano Metlico es el elemento metlico anclado a la Baranda de Concreto que conforma el elemento horizontal de
Proteccin o resguardo en reas contiguas a los Taludes.
Item
09.03
Cantidad
-
P. U.
421.32
Total
S/. 0.00
09.04
El Tarrajeo de Superficies contempla el Recubrimiento de Estructuras de Concreto con mezcla Cemento Arena en proporcion
1:4, a fin de preparar la superficie para preparar el acabado final.
Item
09.04
09.05
Cantidad
P. U.
421.32
Total
S/. 0.00
Este trabajo se realizo recubriendo las superficies con la aplicacin de mezcla fina de Cemento Arena en roporcion indicada
con agregados seleccionados tamizados de 1/4".
Item
09.05
09.06
Cantidad
-
P. U.
421.32
Total
S/. 0.00
Este trabajo se realizo recubriendo las superficies con la aplicacin de mezcla fina de Cemento Arena en roporcion indicada
con agregados seleccionados tamizados de 1/4".
Item
09.06
09.07
Cantidad
-
P. U.
421.32
Total
S/. 0.00
Item
09.07
10
10.01
Cantidad
-
P. U.
421.32
Total
S/. 0.00
REAS VERDES
PREPARACIN, ZARANDEO Y EXTENDIDO DE TIERRA NEGRA
Este trabajo se realizo con Criterios Tcnicos y referencias Normativas de Mano de Obra, Materiales, Herramientas, Equipo,
Servicios para la Preparacin de la Tierra de Cultivo. En las zonas donde se plantaron Especies Vegetales se remplaz el
Suelo existente y se mejorar su composicin Fisico-Quimica, para obtener un Material rico en Nutrientes y de contextura
franco liviana.
Item
10.01
10.02
Cantidad
P. U.
421.32
Total
S/. 0.00
SEMBRADO DE GRASS
Consiste en el Suministro y el Sembrado de Grass Natural en toda el rea de Jardinera, indicada en los Planos, como
tambin en el segundo y tercer nivel del Muro de Contencin.
Item
10.02
10.03
Cantidad
P. U.
421.32
Total
S/. 0.00
Consisti en el Suministro y el Sembrado de Flores en las reas de Jardinera segn se indica en los Planos, asi como
tambien en el segundo y tercer nivel del Muro de Contencin.
Item
10.03
10.04
Cantidad
P. U.
421.32
Total
S/. 0.00
Consisti en el Suministro y el Sembrado de Plantones de Alamos en las reas de Jardinera segn se indica en los Planos,
asi como tambien en el segundo y tercer nivel del Muro de Contencin.
Item
10.04
11
11.01
11.01.01
Cantidad
-
P. U.
421.32
Total
S/. 0.00
SEALIZACIN
SEALIZACIN HORIZONTAL
PINTADO DE SARDINELES
Esta Partida se refiere al Pintado de Seales de Trnsito en borde de Sardineles en Jardineras y Veredas laterales, utilizando
para ello: Pintura Esmalte Color Amarillo, para el Pintado se utiliz una Maquina liviana para acelerar el Proceso del Pintado.
Item
11.01.01
Cantidad
-
P. U.
421.32
Total
S/. 0.00
11.01.02
Se realiz el Pintado de Seales de Trnsito sobre el Pavimento, a lo largo de toda la va como marcas especificas sealadas
en los Planos dichas marcas fueron pintadas de color Amarillo y Blanco.
Item
11.01.02
11.02
11.02.01
Cantidad
-
P. U.
421.32
Total
S/. 0.00
SEALIZACIN VERTICAL
EXCAVACIN EN TERRENO NORMAL INC. ACARREO D=30 M.
Para la Colocacin de Seales Verticales, primero se procedi con el excavado, este excavado se dio en el margen derecho e
izquierdo de la va principal, en el cual se elimino Material Excedente no apropiado, para esto se uso solo Herramientas
Manuales (lampas, picos, buggis), descargando este material en lugares donde se necesitaba relleno (costado de Veredas).
Item
11.02.01
11.02.02
Cantidad
-
P. U.
421.32
Total
S/. 0.00
Llevaron Solado todos los fondos de las Excavaciones para el vaciado de Dados de Concreto donde se anclaron los Postes
para la Sealizacin Vertical. Estos son de 4" de espesor de Concreto Mezcla 1:12 (Cemento - Hormigon) proporcionando una
base para el Trasado y Colocacin de Armadura.
Item
11.02.02
11.02.03
Cantidad
-
P. U.
421.32
Total
S/. 0.00
El Concreto que se uso fue Ciclpeo con una Mezcla Cemento - Hormigon en proporcion 1:10, el batido de estos Materiales
se har utilizando necesariamente Mezcadora Mecanica.
Item
11.02.03
11.02.04
Cantidad
-
P. U.
421.32
Total
S/. 0.00
El Concreto usado tenia una Mezcla de Agua, Cemento, Agregado Grueso y Agregado fino, se preparo con Mezcladora
Mecanica, una vez batida esta mezcla fue vaciada dentro de los Encofrados y las Armaduras de Acero de acuerdo a los Planos
Item
11.02.04
11.02.05
Cantidad
P. U.
421.32
Total
S/. 0.00
Para el Encofrado se uso Madera en buen estado, libre de deflexiones, constituido en Paneles y/o elementos unitarios, sirve
para formar secciones correctas y debidamente alineadas.
Item
11.02.05
11.02.06
Cantidad
P. U.
421.32
Total
S/. 0.00
El Acero de Refuerzo son barras de fierro corrugado con dimetros especificados, los cuales fueron ubicados en Estructuras de
Concreto Armado de acuerdo a indicaciones del Residente y Supervisor.
Item
11.02.06
11.02.07
Cantidad
-
P. U.
421.32
Total
S/. 0.00
Comprende la Instalacin de Postes Metlicos de Soporte para la Colocacin de los Paneles de Seales Reglamentarias y
Preventivas; Se entiende como Soporte al Suministro, Almacenamiento, Transporte e Instalacin del tubo Metlico de 3" y Altura
variable; incluye la Colocacin de Accesorios de Fijacin al panel correspondiente y el pintado reglamentario.
Item
11.02.07
11.02.08
Cantidad
-
P. U.
421.32
Total
S/. 0.00
Comprende la Instalacin de Postes Metlicos de Soporte para la Colocacin de los Paneles de Seales Informativas; Se
entiende como Soporte al Suministro, Almacenamiento, Transporte e Instalacin del tubo Metlico de 3" y Altura variable;
incluye la Colocacin de Accesorios de Fijacin al panel correspondiente y el pintado reglamentario.
Item
Item
11.02.08
11.02.09
Und.
m
Cantidad
-
P. U.
421.32
Total
S/. 0.00
Para esta Partida se realiz el Suministro, Almacenamiento, Transporte de Panel Rectangular para Seales Reglamentarias.
Item
11.02.09
11.02.10
Cantidad
-
P. U.
421.32
Total
S/. 0.00
Para esta Partida se realiz el Suministro, Almacenamiento, Transporte de Panel Triangular para Seales Reglamentarias.
Item
11.02.10
11.02.11
Cantidad
-
P. U.
421.32
Total
S/. 0.00
Para esta Partida se realiz el Suministro, Almacenamiento, Transporte de Panel Octogonal para Seales Reglamentarias.
Item
11.02.11
11.02.12
Cantidad
-
P. U.
421.32
Total
S/. 0.00
Para esta Partida se realiz el Suministro, Almacenamiento, Transporte de Panel para Seales Preventivas.
Item
11.02.12
11.02.13
Cantidad
-
P. U.
421.32
Total
S/. 0.00
Para esta Partida se realiz el Suministro, Almacenamiento, Transporte de Panel para Seales Informativas.
Item
11.02.13
Cantidad
-
P. U.
421.32
Total
S/. 0.00
11.02.14
DELINEADORES REFLECTIVOS
Para esta Partida se realiz el Suministro, Almacenamiento, Transporte de Panel para Seales Informativas.
Item
11.02.14
12
12.01
Cantidad
P. U.
421.32
Total
S/. 0.00
CONTROL DE CALIDAD
PRUEBAS DE CONTROL DE CALIDAD
Se realizaron los Ensayos y Pruebas de Control de Calidad necesarios segn Normas Vigentes y con Aprobacin del Supervisor
de Obra en Subrasante, Sub base, Base, Obras de Concreto y Obras de Pavimento Flexible dichos Ensayos fueron de Arena y
spedy en subbase y base, marshal y lavado asfaltico en la Carpeta Asafaltica, Cono de Abrams y Pruebas de Compresin.
Item
12.01
13
13.01
Cantidad
P. U.
421.32
Total
S/. 0.00
PARADEROS URBANOS
EXCAVACIN EN TERRENO NORMAL INC. ACARREO D=30 M.
Item
13.01
13.02
Cantidad
P. U.
421.32
Total
S/. 0.00
Se realizo Dados de Concreto Ciclopeo mezcla 1:10 + 30% PM por cada Paradero con las dimensiones indicadas en los
Planos, se empotraron los parantes de tubo fierro negro de 4" en los Dados de Concreto.
Item
13.02
13.03
Cantidad
P. U.
421.32
Total
S/. 0.00
Consisti en el Suministro, Elaboracin e Instalacin de Bancas de Madera Tornillo con espaldar y apoyos metalicos.
Item
Item
13.03
13.04
Und.
m
Cantidad
-
P. U.
421.32
Total
S/. 0.00
Consisti en la Confeccin e Instalacin de los Paraderos Urbanos ubicados en los lugares que se sealan en los Planos,
segn detalles especificados en los Planos.
Item
13.04
Cantidad
-
P. U.
421.32
Total
S/. 0.00
ADA
Va
01
01.01.01.01
rsonal Tcnico,
100.00%
01.01.02
01.01.02.01
Und.
1.00
INSTALACIONES PROVISIONALES
AGUA PARA LA CONSTRUCCIN
01.01.02.02
1.00
100.00%
Idem al Item 01.01.02.02 Energia Electrica para la Construccin
Item
adora y otros
01.01.02.02
%
100.00%
01.01.03
01.01.03.01
Cantidad
glb
1.00
Item
Cantidad
e necesaria para
Limpieza de Obra
01.01.03.01
01.01.04
01.01.04.01
glb
1.00
100.00%
Item
Item
trabajo durante la
01.01.04.01
permitian un
Und.
m2
Cantidad
201.42
ien para el
01.01.04.02
100.00%
Item
01.01.04.02
01.01.05
01.01.05.01
Eje, Niveles y
Cantidad
201.42
SEGURIDAD Y SALUD
SEALIZACIN DE SEGURIDAD Y/O DESVIO DE TRAFICO EN OB
Expediente
grafica, Wincha,
un Topgrafo.
lizando el marcado
Idem al Item 01.01.06.01 Sealizacin de Seguridad y/o desvio de Trafico en Obra
Item
100.00%
01.01.05.01
01.01.05.02
la Demolicin de
Cantidad
1.00
r Oruga D6 y D7
Item
%
01.01.05.02
Cantidad
35.00
100.00%
02
02.01
02.01.01
02.01.01.01
ementando los
PISTAS Y VEREDAS
MOVIMIENTO DE TIERRAS
CORTES
CORTE DE TERRENO NORMAL CON MAQUINARIA
e los Volquetes,
Idem al Item 02.01.01.01 Corte de Terreno normal con Maquinaria
Und.
%
02.01.01.01
m3
Cantidad
278.18
%
100.00%
02.01.02.01
Item
%
02.01.02.01
Cantidad
m3
403.30
100.00%
02.01.03
02.01.03.01
Asfaltica y
excavadora y
Item
%
02.01.03.01
Cantidad
m2
314.16
100.00%
02.02
02.02.01.01
02.02.02
02.02.02.01
m3
100.71
CONFORMACIN DE ENROCADO
CONFORMACIN DE ENROCADO
Und.
02.02.02.01
Cantidad
m3
100.71
da para poder
02.02.03
02.02.03.01
ya que esto
116.76%
O EN OBRA
Und.
Cantidad
02.02.03.01
02.02.03.02
m3
Se realizara el Zarandeo de Hormign de la Cantera Ventilla para su posterior colocacin y/o uso
mencionada, de acuerdo a los requerimientos necesarios, con la utilizacin de un Cargador Frontal
HP y 3.5 Yd3, una zaranda metlica de a 1 ", de acuerdo a las necesidades.
%
El Cargador Frontal Esparcir el Material apilado previamente sobre la zaranda metlica para selec
116.71%
Item
Cantidad
CM. FC=1.3
02.02.03.03
Item
100.00%
02.02.03.03
02.02.04
02.02.04.01
Cantidad
-
Idem al Item 02.02.04.01 Conformacin de Sub Rasante con Material de Prestamo e=20 cm.
orgnico y fue
Item
02.02.04.01
%
163.96%
ND.=2420 M2/DIA
02.03
02.03.01
02.03.01.01
SUB BASE
MATERIAL DE PRESTAMO CANTERA CUTIMBO (MEZCLA 50%)
SUMINISTRO DE HORMIGON (CANTERA CUTIMBO) PUESTO EN
anticontaminante. El material ser un tamao mx. 2; para dicho trabajo ser necesario Oficial, Ho
otoniveladora y se
material, as mismo controlar la cantidad y dimensiones que haya solicitado el Ingeniero Residente
Item
100.00%
02.03.01.01
02.03.02.01
Cantidad
77.37
MEZCLA 50%)
r sobre Oruga, se
ar la va, es
de este modo el
Item
%
02.03.02.02
0.00%
Idem al Item 02.03.02.02 Zarandeo de Material de Prestamo (Cantera Jayllihuaya Mezcla 50%)
Item
tre las PG
02.03.02.02
en ese tramo, la
Cantidad
74.11
e la Cantera
02.03.02.03
cuya finalidad es
uda de Maquinaria
y Volquetes los
ado en Planos y
e Campo a nivel
ub Base encima
Idem al Item 02.03.02.03 Carguio y Transporte de Material de Prestamo de Cantera a Obra (Cante
0.00%
la Va con un
Item
02.03.03
02.03.03.01
Cantidad
el tramo Adicional)
Idem al Item 02.03.03.01 Mezclado de Material de Prestamo Cantera Cutimbo 50%
realizaron disparos
st incluido en los
Item
a Compresora.
02.03.03.01
to de la Voladura
Cantidad
148.46
12 m3 alquilados
02.03.03.02
rgnico se
Se refiere al Carguo y Traslado del material compuesto por el Hormign y el material seleccionado
a del Terraplen.
%
0.00%
02.03.03.03
Idem al Item 02.03.03.02 Conformacin de Sub Base con Material de Prestamo e=20 cm.
02.03.03.03
02.04
02.04.01
en Botaderos
m2
681.51
PAVIMENTO RIGIDO
PAVIMENTO RIGIDO: CONCRETO f'c=210 kg/cm2
140.83%
02.04.01
02.04.02
m3
Cantidad
72.81
mar la Subbase,
mpactada tanto
Compactacin al
%
140.83%
02.04.03
m2
Cantidad
45.28
Moquegua, dicha
Cantidad
314.06
140.74%
Item
02.05.01
Cantidad
Material se armo
Idem al Item 02.05.02 Veredas: Excavacin en Terreno Normal
02.05.02
140.83%
Idem al Item 02.05.03 Veredas: Acarreo de Material Excedente Dprom=30 m.
A CUTIMBO)
Item
ho material de
02.05.02
02.05.03
%
Cantidad
m3
28.87
140.83%
Item
02.05.03
02.05.04
% de la Subbase,
Cantidad
m3
28.87
02.05.05
140.74%
Idem al Item 02.05.06 Veredas de Concreto f'c=175 kg/cm2 Acabado 1:2 Coloreado Bruado y Fro
Und.
02.05.05
Cantidad
m2
142.76
el material, en el
02.05.06
zaranda con
o y seleccionado
Idem al Item 02.04.02 Pavimento Rigido: Encofrado y Desencofrado
Item
%
02.05.06
140.74%
A SALCEDO)
02.05.07
Cantidad
5.96
ho Material de
Item
02.05.07
%
Item
140.74%
SALCEDO 50%
02.06
02.06.01
Cantidad
142.76
Cantidad
GRADERIOS
TRAZO Y REPLANTEO EN GRADERIOS
ales mezclados
rial mezclado a la
Item
G 0+000 - 1+143,
02.06.01
puntos distintos.
02.06.02
Cantidad
94.98
99.01%
Idem al Item 02.05.06 Veredas de Concreto f'c=175 kg/cm2 Acabado, Coloreado Frotachado y Bru
izquierdo de la
s del Topgrafo,
Item
iformidad en el
02.06.02
Cantidad
-
de Subbase.
Item
99.31%
#REF!
02.07
02.07.01
Cantidad
33.67
SARDINELES
SARDINELES: EXCAVACIN EN TERRENO NORMAL
Densidad de
requisito mnimo
zada se utiliz la
ro, traslapando
Item
Longitudinales) a
or el MTC en su
02.07.01
%
02.07.02
m3
6.98
99.01%
Idem al Item 02.05.03 Veredas: Acarreo de Material Excedente Dprom.=30 m.
Item
a capa Base en
02.07.02
ra Puno -
Cantidad
6.98
gador Frontal.
Item
%
#REF!
Cantidad
6.98
100.00%
02.07.04
Idem al Item 02.05.06 Veredas de Concreto f'c=175 kg/cm2 Acabado 1:2 Coloreado Bruado y Fro
aterial se arm
Item
100.00%
02.07.04
A CUTIMBO)
02.07.05
ho Material de
Cantidad
9.94
02.07.06
100.00%
Idem al Item 02.05.08 Veredas: Junta Asfaltica
m2
46.53
Item
02.07.06
ctor de Orugas y
Cantidad
38.00
on un Cargador
andeado y
02.08
02.08.01
%
100.00%
Idem al Item 02.07.01 Rampas: Concreto f'c=175 kg/cm2 Acabado 1:2 Coloreado y Frotachado
Item
Cantidad
cionado. Con
donde se
en plantillo en el
on los que
%
100.00%
02.08.02
Item
r se procedi a
Cantidad
02.08.02
m2
0.83
#REF!
m3
Vibratorio.
02.09.02
100.00%
Idem al Item 02.04.02 Pavimento Rigido: Encofrado y Desencofrado
Und.
02.09.02
r se procedi a
m2
Cantidad
-
Vibratorio, en
02.09.03
Base en la
Previo al inicio del tarrajeo la superficie donde se aplicara la mezcla se limpiar y humedecern, r
frotachado con una mezcla que ser una proporcin en volumen de 1 parte de Cemento y 4 parte
02.09.03
%
02.09.04
m2
100.00%
Idem al Item 02.04.03 Pavimento Rigido: Curado de Losa
Item
169.18%
#REF!
03.01
03.01.01
Cantidad
m2
Cantidad
m2
JARDINERAS DE CONCRETO
JARDINERAS: EXCAVACIN EN TERRENO NORMAL
Frontal y Volquetes
do de 2:30 min.
Item
100.00%
03.01.01
03.02
03.02.01
Cantidad
m3
19.80
SEMBRADO DE GRASS
PREPARACIN, ZARANDEO Y EXTENDIDO DE TIERRA NEGRA
era a Laraqueri,
Idem al Item 03.02.01 Preparacin, Zarandeo y Extendido de Tierra Negra
%
100.00%
Item
03.02.01
Cantidad
29.70
03.02.02
SEMBRADO DE GRASS
piar la Base.
cumplir este fin
quierdo y luego
Idem al Item 03.02.02 Sembrado de Grass
%
Item
100.00%
03.02.02
04
Cantidad
29.70
SEALIZACIN
s Materiales
50% de agua.
macin entre la
166.42%
Item
#REF!
Cantidad
30.27
218.12%
Item
05.01
mprimado hasta su
Und.
despus del
etre, (ARENA
Cantidad
Item
05.01
%
05.02
Cantidad
2.00
100.00%
anta Mezcladora
%
0.00%
05.03
Und.
5.00
Item
Cantidad
ribuir y terminar
ocacin de la
repartida y
largo de la va
%
0.00%
05.04
Item
ejecut para la
%
0.00%
05.04
Cantidad
201.42
do hasta llegar
%
0.00%
%
0.00%
%
0.00%
%
0.00%
de la va.
%
0.00%
de la va tanto
%
100.00%
struccines
%
100.00%
e las mismas y
as Losas. El
como imperm.
%
100.00%
a con ayuda de
%
100.00%
%
100.00%
extendido de
%
100.00%
zcladora de
Altura variable
%
100.00%
ar el vaciado de
amente curada
%
100.00%
De largo, el Muro
mbos lados
a cual tenia un
%
100.00%
", se Armo el
%
122.32%
%
100.00%
en los Planos y
erial encontrado.
%
100.00%
n el Curado de
%
100.00%
el Vaciado de
esistencia.
%
100.00%
%
100.00%
%
100.00%
n, seguido de un
%
100.00%
%
100.00%
es de referencia y
%
100.00%
para lo cual se
%
100.00%
hasta llegar a
%
100.00%
mo se especifica
%
100.00%
NTO DE ALEROS
e las Alcantarillas
%
100.00%
rocedio al Curado.
%
100.00%
%
100.00%
%
100.00%
%
100.00%
%
100.00%
r el vaciado de
%
100.00%
%
100.00%
ciones Tecnicas.
%
100.00%
de la va principal,
erramientas
s de Veredas).
%
0.00%
kg/cm2 con un
ormidad exigida
oncreto, como
en el Sardinel.
%
0.00%
posterior, para el
%
0.00%
pgrafo de Obra
%
0.00%
para construir
edas donde no
%
0.00%
on Transporte de
mpactadora.
%
0.00%
on Transporte de
mpactadora.
%
0.00%
ya ubicacin se
%
0.00%
%
0.00%
%
0.00%
o y Bruado.
%
0.00%
%
0.00%
%
0.00%
%
0.00%
e las mismas y
as Losas. El
como imperm.
%
0.00%
AVIONES
andas sobre el
de 3/8" en
%
0.00%
%
0.00%
horizontal de
%
0.00%
en proporcion
%
0.00%
orcion indicada
%
0.00%
orcion indicada
%
0.00%
%
0.00%
entas, Equipo,
remplaz el
e contextura
%
0.00%
nos, como
%
0.00%
s, asi como
%
0.00%
a en los Planos,
%
0.00%
erales, utilizando
%
0.00%
ecificas sealadas
%
0.00%
margen derecho e
erramientas
de Veredas).
%
0.00%
oporcionando una
%
0.00%
estos Materiales
%
0.00%
%
0.00%
unitarios, sirve
%
0.00%
n Estructuras de
%
0.00%
LAMENTARIAS Y
amentarias y
co de 3" y Altura
%
0.00%
RMATIVAS
mativas; Se
a variable;
%
0.00%
glamentarias.
%
0.00%
amentarias.
%
0.00%
amentarias.
%
0.00%
%
0.00%
%
0.00%
%
0.00%
in del Supervisor
fueron de Arena y
e Compresin.
%
0.00%
%
0.00%
adas en los
%
0.00%
%
0.00%
n los Planos,
%
0.00%
DESCRIPTIVA VALORIZADA
4.6.10 ME
Compo
01
01.01.01.01
NARES Y SEGURIDAD
S/. 1,062.17
100.00%
01.01.01.01
01.01.02
01.01.02.01
INSTALACIONES PROVISIONALES
AGUA PARA LA CONSTRUCCIN
S/. 500.00
Item
100.00%
01.01.02.01
01.01.02.02
Total
S/. 750.00
Item
100.00%
01.01.02.02
01.01.03
01.01.03.01
UINARIA Y HERRAMIENTAS
UINARIA Y EQUIPO
MOVILIZACIN Y DESMOVILIZACIN
MOVILIZACIN Y DESMOVILIZACIN D
Total
S/. 5,416.77
Item
100.00%
01.01.03.01
01.01.04
01.01.04.01
Item
P. U.
1.06
Total
S/. 213.51
Item
100.00%
01.01.04.01
01.01.04.02
Total
S/. 249.76
Item
100.00%
01.01.04.02
01.01.05
01.01.05.01
DE TRAFICO EN OBRA
SEGURIDAD Y SALUD
SEALIZACIN DE SEGURIDAD Y/O D
Total
S/. 1,140.00
Item
100.00%
01.01.05.01
01.01.05.02
Total
S/. 4,200.00
Item
100.00%
01.01.05.02
02
02.01
02.01.01
02.01.01.01
PISTAS Y VEREDAS
MOVIMIENTO DE TIERRAS
CORTES
CORTE DE TERRENO NORMAL CON M
Total
S/. 1,115.50
114.40%
02.01.01.01
02.01.02.01
Total
S/. 5,166.27
Item
114.38%
02.01.02.01
02.01.03
02.01.03.01
E EN ZONAS DE CORTE
E EN ZONAS DE CORTE
Total
S/. 1,049.29
Item
155.97%
02.01.03.01
02.02
02.02.01.01
SUB BASE
SUMINISTRO DE HORMIGON (CANTER
S/. 4,930.76
100.00%
02.02.01.01
02.02.02
02.02.02.01
P. U.
5.85
Total
S/. 589.15
Item
100.00%
02.02.02.01
02.02.02.02
DE CANTERA
P. U.
Total
7.18
S/. 0.00
0.00%
02.02.02.02
02.02.02.03
NTERA VENTILLA
Item
02.02.02.03
Total
02.02.03.01
CANTERA A OBRA
Item
Total
S/. 0.00
02.02.03.01
0.00%
02.02.03.02
Item
%
S/. 0.00
0.00%
02.02.03.02
02.02.03.03
O (MEZCLA 50%)
MBO) PUESTO EN OBRA
Item
02.02.03.03
PAVIMENTO RIGIDO
PAVIMENTO RIGIDO: CONCRETO f'c=2
Item
349.14%
02.03.01
Total
S/. 2,841.03
02.03
02.03.01
Item
#REF!
Idem al Item 02.04.03 Pavimento Rigido: Curado de Losa
Item
Total
S/. 411.31
#REF!
%
272.56%
02.03.04
Item
02.03.04
Total
02.04
CUNETA RECTANGULAR
Total
S/. 381.54
02.04.02
320.44%
Item
Item
#REF!
S/. 2,535.22
338.35%
Item
#REF!
339.37
Total
S/. 24,709.53
180.76%
02.05
02.05.01
VEREDAS DE CONCRETO
VEREDAS: EXCAVACIN EN TERRENO
COFRADO
Item
02.05.01
02.05.02
%
P. U.
28.75
Total
S/. 1,301.80
153.86%
Item
02.05.02
Total
S/. 147.61
%
155.92%
02.05.03
Item
Total
02.05.03
Item
#REF!
TE Dprom=30 m.
Item
Total
S/. 209.31
#REF!
%
105.36%
ERIAL EXCEDENTE
02.05.06
Item
Total
S/. 253.48
02.05.06
%
105.36%
02.05.07
Total
S/. 5,427.74
104.22%
#REF!
02.06
02.06.01
Total
S/. 163.60
MURO DE CONTENCION
MURO DE CONTENCION: CONCRETO
%
Item
100.00%
02.06.01
02.06.02
Total
S/. 67.10
Item
104.22%
Total
#REF!
02.07.02
Total
S/. 117.78
48.46%
Item
02.07.02
02.07.03
Item
Total
S/. 0.00
02.07.03
0.00%
02.08
Total
S/. 1,023.57
%
Item
40.64%
#REF!
02.08.02
Item
19.33
S/. 134.92
134.49%
02.08.02
02.09
02.09.01
ENTE Dprom.=30 m.
MACETEROS
SARDINELES: CONCRETO f'c=175 kg/c
Total
S/. 50.61
%
Item
134.49%
02.09.01
Total
S/. 61.28
%
Item
134.49%
#REF!
Total
S/. 3,073.55
Item
191.52%
#REF!
02.09.04
O CARAVISTA
S/. 1,414.51
134.48%
02.09.04
02.09.05
Item
111.93%
02.09.05
Total
S/. 212.80
03
03.01
03.01.01
eado y Frotachado
AREAS VERDES
JARDINERAS DE CONCRETO
JARDINERAS: EXCAVACIN EN TERRE
Total
Item
03.02
03.02.01
SEMBRADO DE GRASS
PREPARACIN, ZARANDEO Y EXTEND
Total
S/. 22.78
Item
100.00%
03.02.01
309.21
S/. 0.00
0.00%
#REF!
04
04.01
SEALIZACIN
PINTURA EN PAVIMENTO CON CEMEN
Total
S/. 0.00
Item
0.00%
04.01
TACHADO
05
05.01
VARIOS
NIVELACIN DE BUZONES EN GENER
Item
05.01
%
12.52
S/. 0.00
0.00%
05.02
Item
05.02
%
P. U.
0.47
Total
S/. 0.00
Total
S/. 0.00
Total
S/. 382.73
0.00%
0.00%
%
100.00%
P. U.
25.07
Total
S/. 744.58
100.00%
TIERRA NEGRA
05.03
05.04
05.04
Total
S/. 269.08
Total
S/. 135.61
Total
100.00%
%
100.00%
Total
S/. 632.20
%
100.00%
OMICILIARIAS DE AGUA
61.52
Total
S/. 307.60
100.00%
OMICILIARIAS DE DESAGUE
Total
Total
S/. 116.82
%
100.00%
01
de 2.40 * 4.80 m.
1.00
1,062.17
S/. 1,062.17
100.00%
ROVISIONALES
NSTRUCCIN
onstruccin
Ejecucin Expediente Tcnico
Und.
1.00
500.00
%
S/. 500.00
100.00%
CA PARA LA CONSTRUCCIN
permeables introducidos en el
a para la Construccin
Und.
Cantidad
Und.
1.00
P. U.
750.00
Total
S/. 750.00
%
100.00%
Cantidad
glb
1.00
P. U.
5,416.77
Total
S/. 5,416.77
100.00%
02
02.01.01
Y REPLANTEO PRELIMINAR
N Y REPLANTEO
Und.
m2
Cantidad
677.30
P. U.
1.06
Total
S/. 717.94
100.00%
eo durante el Proceso
Ejecucin Expediente Tcnico
Und.
m2
Cantidad
677.30
P. U.
1.24
Total
S/. 839.85
%
100.00%
02.02
02.02.01
Se denomina as a la Capa d
Cantidad
1.00
P. U.
1,140.00
Total
S/. 1,140.00
%
100.00%
03
03.01
ECCIN INDIVIDUAL
Cantidad
35.00
P. U.
120.00
Total
S/. 4,200.00
%
100.00%
03.02
Cantidad
422.11
P. U.
4.01
Total
S/. 1,692.66
100.00%
Material Excedente
Ejecucin Expediente Tcnico
Und.
m3
Cantidad
569.85
P. U.
12.81
Total
S/. 7,299.78
100.00%
Material Excedente
Cantidad
677.30
P. U.
3.34
Total
S/. 2,262.18
100.00%
S/. 3,763.80
137.58%
102.50
36.72
Cantidad
119.44
P. U.
7.18
Total
S/. 857.58
Und.
Cantidad
P. U.
Total
%
130.62%
m3
115.24
5.55
S/. 639.58
126.03%
Cantidad
105.08
P. U.
15.99
Total
S/. 1,680.23
%
129.28%
Cantidad
207.58
P. U.
2.57
Total
S/. 533.48
%
133.25%
Cantidad
207.58
P. U.
4.49
Total
S/. 932.03
%
133.25%
902.52
3.72
%
S/. 3,357.37
133.25%
Cantidad
120.61
P. U.
339.37
Total
S/. 40,931.42
%
92.70%
Encofrado y Desencofrado
Ejecucin Expediente Tcnico
Und.
m2
Cantidad
107.91
P. U.
28.75
Total
S/. 3,102.41
%
68.16%
Curado de Losa
Ejecucin Expediente Tcnico
Und.
m2
Cantidad
603.05
P. U.
0.47
Total
S/. 283.43
%
89.04%
O: JUNTA ASFALTICA
Junta Asfaltica
Cantidad
210.00
P. U.
5.60
Total
S/. 1,176.00
%
29.18%
n en Terreno Normal
Ejecucin Expediente Tcnico
Und.
m3
Cantidad
-
P. U.
19.33
Total
S/. 0.00
%
0.00%
Cantidad
m2
P. U.
27.45
Total
S/. 0.00
%
0.00%
structura Metalica
Ejecucin Expediente Tcnico
Und.
Cantidad
P. U.
52.00
Total
S/. 0.00
%
0.00%
n en Terreno Normal
Ejecucin Expediente Tcnico
Und.
Cantidad
m3
66.15
P. U.
19.33
Total
S/. 1,278.68
2022.94%
Cantidad
66.15
P. U.
7.25
Total
S/. 479.59
2022.94%
Cantidad
P. U.
Total
m3
72.77
8.78
S/. 638.92
Cantidad
m2
P. U.
16.37
Total
5.11
S/. 83.65
2225.38%
%
100.00%
Cantidad
m2
P. U.
309.70
38.02
Total
S/. 11,774.79
%
1266.67%
RADO Y DESENCOFRADO
Encofrado y Desencofrado
Ejecucin Expediente Tcnico
Und.
m2
Cantidad
P. U.
43.32
27.45
Total
S/. 1,189.13
%
1514.69%
O DE LOSA
Curado de Losa
Ejecucin Expediente Tcnico
Und.
m
Cantidad
P. U.
129.79
5.60
Total
S/. 726.82
453.97%
Cantidad
P. U.
7.47
361.42
Total
S/. 2,699.81
%
100.00%
Encofrado y Desencofrado
Ejecucin Expediente Tcnico
Und.
Cantidad
P. U.
Total
Cantidad
P. U.
Total
eo durante el Proceso
Und.
m2
1.24
S/. 0.00
0.00%
Cantidad
m3
P. U.
343.75
Total
S/. 0.00
%
0.00%
OFRADO Y DESENCOFRADO
Encofrado y Desencofrado
Ejecucin Expediente Tcnico
Und.
Cantidad
m2
P. U.
30.40
Total
S/. 0.00
%
0.00%
OS DOMICILIARES
eo durante el Proceso
Ejecucin Expediente Tcnico
Und.
Cantidad
m3
10.00
P. U.
50.04
Total
S/. 500.40
%
100.00%
ADO Y DESENCOFRADO
Encofrado y Desencofrado
Ejecucin Expediente Tcnico
m2
2.25
27.45
S/. 61.76
100.00%
Cantidad
8.26
P. U.
309.21
Total
S/. 2,554.07
Cantidad
55.08
P. U.
30.40
Total
S/. 1,674.43
%
100.00%
%
100.00%
Cantidad
P. U.
Total
55.08
12.52
S/. 689.60
100.00%
55.08
0.47
S/. 25.89
100.00%
ADO DE CONCRETO
Curado de Losa
m2
CO EN SARDINELES DE CONCRETO
Cantidad
m2
P. U.
55.08
4.48
Total
S/. 246.76
%
100.00%
CONCRETO
AVACIN EN TERRENO NORMAL
n en Terreno Normal
Ejecucin Expediente Tcnico
Und.
Cantidad
P. U.
Total
Cantidad
P. U.
Total
m3
19.14
25.07
S/. 479.84
100.00%
m2
63.81
9.06
S/. 578.12
100.00%
UZONES EN GENERAL
s en General
Cantidad
-
P. U.
7.16
Total
S/. 0.00
%
0.00%
Cantidad
Und.
4.00
P. U.
316.10
Total
S/. 1,264.40
%
100.00%
Cantidad
8.00
P. U.
61.52
Total
S/. 492.16
%
100.00%
Und.
m2
Cantidad
8.00
Cantidad
677.30
P. U.
282.85
P. U.
0.58
Total
S/. 2,262.80
100.00%
Total
S/. 392.83
100.00%
MOVIMIENTO DE TIERRAS
specificacin est referida a los trabajos necesarios para captar y evacuar el agua proveniente de la subbase y base
e conformantes de una Estructura de Pavimento en las zonas donde sta pueda afectar el pavimento. As mismo, el
permitir drenar el agua del subsuelo, filtraciones de taludes y flujos subterrneos.
nto en contacto con la subrasante este tipo de dren no es adecuado para drenar flujos de corrientes de agua
nea que se puedan hallar por debajo del nivel en que son colocados. Este subdren debe llevar tubera perforada de
metros (100 mm) de dimetro, filtro granular y/o geotextil de acuerdo al diseo.
Item
#REF!
Cantidad
m3
2.40
P. U.
39.43
Total
S/. 94.63
100.00%
Drenaje de una va es el Sistema que tiene por objeto el manejo de las aguas subterrneas por medio de elementos
razones expuestas anteriormente se desprende la conveniencia de proteger la seccin estructural de los pavimentos, de
ctos del agua exterior que pudiera penetrar en ella. Por su elevado costo es imposible eliminar completamente la
n contra el agua exterior, para garantizar que la prctica de eliminacin de finos funcione adecuadamente en lo
y aadir Obras especiales de proteccin en aquellos lugares en los cuales las condiciones del Flujo interno de agua
alizar un adecuado sistema de Subdrenaje se requiere obtener buena informacin sobre la disposicin y naturaleza de
eriales involucrados. Esta puede provenir de inspeccin de campo, de Estudios Geolgicos o de sondeos con muestreo,
de Pruebas de Laboratorio.
Item
#REF!
Cantidad
15.00
P. U.
18.97
Total
S/. 284.55
100.00%
MEJORAMIENTO DE SUBRASANTE
nde los trabajos de Mejoramiento de Sub Rasante mediante la Construccin de un Enrocado promedio de 0.80-1.00 m.
o maximo de la roca utilizada fue los 2/3 del Espesor del Enrocado tam. Max. 25 cm. La Roca fue puesta en Obra
mente por los proveedores directamente, el Costo incluyo los trabajos de Extraccin y Apilamiento, Zarandeo, Carguio y
Item
02.01.01
Cantidad
292.56
P. U.
25.71
Total
S/. 7,521.72
100.00%
CAPA ANTICONTAMINANTE
CAPA ANTICONTAMINANTE
omina as a la Capa de Arena que se coloca sobre subrasantes arcillosas, limosas, hmedas susceptibles de
cimiento para impedir la intrusin de Materiales inadecuados que puedan contaminar las capas superiores de la
ra del Pavimento. El Material de la Capa Anticontaminante ser Arena no plstica, adems debe cumplir las relaciones
metros entre el Material que est por colocarse (el Material Anticontaminante) y el Suelo de Subrasante.
e Material diseada para prevenir la Migracin de Agua o finos provenientes de una Capa inferior.
Item
02.02.01
Cantidad
252.72
P. U.
29.90
Total
S/. 7,556.33
100.00%
nde las Barandas Metlicas de Tubo =2" para Veredas, Escaleras, Balcones, etc. La unidad incluye pasamanos, los
Item
03.01
Cantidad
100.00
P. U.
86.00
Total
S/. 8,600.00
100.00%
artida se refiere al Acero de Refuerzo mediante barras de fierro corrugado con dimetros especificados, el doblado estar
in al citado dimetro. La ubicacin de los Aceros de Refuerzo deben estar de acuerdo a los Planos de Estructuras.
as armaduras deberan estar libres de escamas oxidadas, aceite, grasa, mortero endurecido o cualquier otro
Cantidad
P. U.
Total
03.02
m3
323.63
4.86
S/. 1,572.84
100.00%
01
MOVIMIENTO DE TIERRAS
Las Excavaciones de Zanjas para Zapatas seran del tamao exacto al diseo de las Estructuras indicadas en los planos de
Cimentacin. El fondo de las Excavaciones debe quedar limpio y parejo. Se retirara todo derrumbe y material suelto.
Si por error se excavara en exceso no se permitira llenar la excavacin con material suelto, si no con Concreto en proporcin
Ejecucin Expediente Tcnico
Item
Und.
Cantidad
P. U.
#REF!
02
02.01
m3
38.59
14.50
SUBDRENAJE
EXCAVACIN PARA SUB DRENAJE
02.02
Cantidad
m3
3.20
P. U.
39.43
SUB DRENAJE
Item
02.02
03
03.01
03.01.01
Cantidad
20.00
P. U.
18.97
MEJORAMIENTO DE SUBRASANTE
CAPA ANTICONTAMINANTE
CAPA ANTICONTAMINANTE
Und.
03.01.01
04.01
Cantidad
m3
21.60
P. U.
29.90
Llevaran Solados de Cimentacin todos los fondos para excavaciones para zapatas, estos seran de un e=4" de Espesor de
Concreto Mezcla 1:12 (Cemento - Hormigon) proporcinando una base para el trasado de columnas y colocacin de armadura.
Se tendra cuidado en mantener los niveles de fundacin al ras de los Solados de Cimentacin.
Item
04.01
05
05.01
Cantidad
35.80
P. U.
19.12
ENROCADO DE VEREDAS
SUMINISTRO DE ROCA MEDIANA PUESTO EN OBRA
El Item comprende el Trabajo de Suministro de Roca Mediana, necesario para la Conformacin de el Enrocado. Para el
Suministro de Roca Mediana puesto en Obra, el proveedor realizo la Extraccin, Apilamiento, y Carguio de dicho material, asi
mismo la Supervisin controlo la Cantidad y Tamao que solicito el Residente de Obra.
Item
05.01
05.02
Cantidad
45.73
P. U.
35.70
ENROCADO DE VEREDAS
Comprende los Trabajos de Mejoramiento de Veredas mediante la Construccin de un Enrocado promedio, de 40 cm. De
espesor, que permiti proteger la Sub Base de la accin del agua. Las caractersticas del Material fue Rocas sanas,
Item
05.02
06
06.01
06.01.01
Cantidad
45.73
P. U.
5.26
MURO DE CONTENCIN
ZAPATAS
ZAPATAS: CONCRETO f'c=210 kg/cm2
Constituyen el Cimiento de las columnas. Su dimensin y forma varia segn el diseo que tenga, o de que la Capacidad
soportan dos o mas columnas y Zapatas Conectadas, a las que son unidas por una o mas vigas de cimentacin.
Se respetara para estas tareas lo estipulado por el Reglamento Nacional de Edificaciones. En caso de que exista terreno en
Und.
06.01.01
Cantidad
m3
18.80
P. U.
296.82
Todas las Armaduras debern estar libres de escamas oxidadas, aceite, grasa mortero endurecido o cualquier otro revestimiento
que pueda destruir o reducir su adherencia al Concreto. Las Armaduras de Acero deben ser varillas corrugadas, acordes con la
Norma A615 de la ASTM. El Lmite de Resistencia ser de 4,200 kg/cm2.
Este trabajo consiste en el Suministro, Transportes, almacenamiento, corte, doblamiento y colocacin de las barras de Acero de
grado 60 dentro de las diferentes Estructuras permanentes de Concreto, de acuerdo con los Planos del Proyecto, esta
Especificacin y las instrucciones del Supervisor.
Und.
#REF!
06.02
06.02.01
kg
Cantidad
18.80
P. U.
296.82
06.02.02
ENCOFRADO Y DESENCOFRADO
06.03
06.03.01
Item
06.03.01
Cantidad
2,593.82
P. U.
4.86
Item
#REF!
06.04
06.04.01
Cantidad
27.00
P. U.
86.00
TARRAJEO EN MUROS
TARRAJEO MUROS TEXTURADO DE EXTERIORES
Se realizar en Muros Exteriores de acuerdo al cuadro de acabados. Estas mezclas se prepararn en bateas limpias de todo
residuo anterior, la mezcla ser paeteada con fuerza y presionada contra los paramentos, para evitar vacos interiores,
uniformidad de los ladrillos. Las superficies a obtenerse sern planas, sin resquebraduras o defectos de textura.
Comprende el Acabado superficial que tendrn los Muros segn se indica en los Planos (Detalles Constructivos), esto se
ejecuta con el fin de conseguir una superficie rugosa pero uniforme de acuerdo a lo propuesto por el Proyectista.
Item
06.04.01
08
08.05
Cantidad
27.00
P. U.
30.61
Item
Cantidad
P. U.
A VALORIZADA
02
Item
%
100.00%
02.02
02.02
Total
S/. 126.18
Total
S/. 379.40
Ejecucin
Und.
m3
100.00%
Item
Tcnico
Und.
CONFORMACIN DE ENROCADO
Item
Tcnico
Ejecucin
%
100.00%
03
03.01
Ejecucin
Und.
VEREDAS DE CONCRETO
SUMINISTRO DE ROCA
Item
03.01
Ejecucin
Und.
m3
Total
S/. 645.84
100.00%
Item
Ejecucin
Item
#REF!
03.03
Tcnico
Total
S/. 684.50
100.00%
Und.
m3
EMPEDRADO DE VEREDAS
40 cm. Que permitio proteger la Sub Base de la accin del agua. El tamao max
Espesor del Empedrado con un Tamao Maximo de 25 cm. La Piedra fue puesta
directamente, el Costo incluyo los trabajos de Extraccin y Apilamiento, Zarandeo,
trabajos de Supervisin.
n de el Enrocado. Para el
Item
03.03
Tcnico
Total
S/. 1,632.56
100.00%
03.04
Ejecucin
Und.
m3
Item
03.04
Ejecucin
Und.
m2
Idem al Item 02.05.06 Veredas de Concreto f'c=175 kg/cm2 Acabado 1:2 Coloread
Tcnico
Total
S/. 240.54
Item
100.00%
#REF!
04
04.01
Ejecucin
Und.
m3
MURO DE CONTENCIN
ACERO PARA MURO DE CONTENCIN fy=4200 kg/c
Ejecucin
Und.
04.01
Total
S/. 5,580.22
100.00%
Total
S/. 5,580.22
100.00%
Tcnico
Tcnico
Tcnico
Total
S/. 12,605.97
%
100.00%
kg
Tcnico
Total
S/. 2,322.00
100.00%
defectos de textura.
Tcnico
Total
%
100.00%
to en Obra
Ejecucin Expediente Tcnico
Cantidad
P. U.
Total
P. U.
25.71
Total
S/. 2,840.96
100.00%
P. U.
Total
P. U.
35.70
Total
S/. 2,764.25
100.00%
Cantidad
77.43
P. U.
16.70
Total
S/. 1,293.08
100.00%
P. U.
5.26
Total
S/. 407.28
%
100.00%
ESENCOFRADO
P. U.
32.47
Total
S/. 4,830.24
%
100.00%
P. U.
309.21
Total
S/. 8,750.64
%
100.00%
P. U.
Total
156.00
5.14
S/. 801.84
100.00%
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno
Item
Descripcin
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
01
01.01
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
m2
40.00
###
01.01.01.02
und
1.00
###
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
glb
1.00
###
01.01.02.02
glb
1.00
###
01.01.03
01.01.03.01
glb
1.00
###
01.01.04
DEMOLICIONES Y DESMONTAJES
01.01.04.01
ESCARIFICADO DE VEREDAS
m2
530.24
###
01.01.04.02
m2
30.90
###
01.01.04.03
ELIMINACION DE DEMOLICIONES
m3
32.15
###
01.01.05
01.01.05.01
m2
1,247.57
###
01.01.05.02
m2
1,247.57
###
01.01.06
SEGURIDAD Y SALUD
01.01.06.01
glb
1.00
###
02
PISTAS Y VEREDAS
02.01
MOVIMIENTO DE TIERRAS
02.01.01
CORTES
02.01.01.01
m3
1,361.73
###
228.20
02.01.02
02.01.02.01
m3
1,634.08
###
273.00
02.01.03
02.01.03.01
m2
1,484.44
###
02.02
MEJORAMIENTO DE SUBRASANTE
02.02.01
02.02.01.01
m3
457.44
###
02.02.02
CONFORMACION DE ENROCADO
02.02.02.01
CONFORMACION DE ENROCADO
m3
457.44
###
02.02.03
02.02.03.01
m3
92.04
###
02.02.03.02
m3
78.40
###
02.02.04
CONFORMACION DE SUBRAZANTE
02.02.04.01
m2
1,474.22
###
02.03
SUB BASE
02.03.01
02.03.01.01
m3
183.71
###
75.00
02.03.01.02
m3
183.71
###
75.00
02.03.01.03
m3
156.49
###
63.75
02.03.02
02.03.02.01
m3
183.71
###
75.00
02.03.02.02
m3
183.71
###
75.00
292.56
-
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno
Item
Descripcin
02.03.02.03
02.03.03
02.03.03.01
02.03.03.02
02.04
02.04.01
02.04.02
02.04.03
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
m3
156.49
###
63.75
m3
m2
312.99
1,360.82
###
###
127.50
554.35
m3
273.92
271.22
m2
141.08
140.10
m2
1,369.61
1,356.11
02.04.04
705.41
###
02.05
VEREDAS DE CONCRETO
02.05.01
m2
744.45
###
02.05.02
m3
34.03
###
02.05.03
m3
44.24
###
02.05.04
m3
44.24
###
02.05.05
m2
113.43
###
02.05.06
m2
598.77
02.05.07
m2
10.44
###
02.05.08
104.36
###
02.06
SARDINELES
02.06.01
m3
36.42
###
02.06.02
m3
47.35
###
02.06.03
m3
47.35
###
02.06.04
m3
36.42
###
24.19
02.06.05
m2
291.37
###
344.17
02.07
02.07.01
m2
39.60
###
02.08
CANALIZACION
02.08.01
m2
22.71
###
02.08.02
m3
10.43
###
02.08.03
m2
22.71
###
02.08.04
m2
22.71
###
02.08.05
m3
18.24
###
02.08.06
m2
124.29
###
02.08.07
kg
849.71
###
02.08.08
10.20
###
03
AREAS VERDES
03.01
JARDINERAS DE CONCRETO
03.01.01
m2
2.15
###
03.01.02
m3
0.74
###
03.01.03
m3
0.65
###
03.01.04
m3
0.74
###
03.01.05
m3
0.42
###
03.01.06
m2
2.80
###
03.01.07
m2
2.80
###
03.02
SEMBRADO DE GRASS
584.37
72.20
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno
Item
Descripcin
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
03.02.01
m3
0.65
###
03.02.02
SEMBRADO DE GRASS
m2
2.15
###
04
SEALIZACION
04.01
PINTURA EN SARDINELES
m2
263.24
###
04.02
PINTURA EN JARDINERAS
m2
3.85
###
04.03
PINTURA EN PAVIMENTO
m2
56.40
###
05
VARIOS
05.01
und
5.00
###
05.02
und
25.00
###
05.03
und
12.00
###
05.04
m2
1,247.57
###
01
01.01
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
und
1.00
###
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
glb
1.00
###
01.01.02.02
glb
1.00
###
01.01.03
01.01.03.01
glb
1.00
###
01.01.04
01.01.04.01
m2
201.42
###
01.01.04.02
m2
201.42
###
01.01.05
SEGURIDAD Y SALUD
01.01.05.01
glb
1.00
###
01.01.05.02
und
35.00
###
02
PISTAS Y VEREDAS
02.01
MOVIMIENTO DE TIERRAS
02.01.01
CORTES
02.01.01.01
m3
243.17
###
35.01
02.01.02
02.01.02.01
m3
352.60
###
50.70
02.01.03
02.01.03.01
m2
201.42
###
112.74
02.02
MEJORAMIENTO DE SUBRAZANTE
02.02.01
02.02.01.01
m3
100.71
###
02.02.02
CONFORMACION DE ENROCADO
02.02.02.01
CONFORMACION DE ENROCADO
m3
100.71
###
02.02.03
02.02.03.01
m3
27.19
###
02.02.03.02
m3
27.19
###
02.02.03.03
m3
24.17
###
02.02.04
CONFORMACION DE SUBRAZANTE
02.02.04.01
m2
201.42
###
02.03
SUB BASE
57.76
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno
Item
Descripcin
02.03.01
02.03.01.01
02.03.02
02.03.02.01
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
m3
22.16
###
55.21
m3
27.19
###
55.21
02.03.02.02
m3
27.19
###
46.92
02.03.02.03
m3
24.17
###
46.92
02.03.03
02.03.03.01
m3
46.33
###
102.13
02.03.03.02
m3
46.33
###
102.13
02.03.03.03
m2
201.42
###
480.09
02.04
PAVIMENTO RIGIDO
02.04.01
m3
40.28
###
32.53
02.04.02
m2
29.43
###
15.85
02.04.03
m2
201.42
###
112.64
02.04.04
120.90
###
105.53
02.05
VEREDAS DE CONCRETO
02.05.01
m3
27.40
###
1.47
02.05.02
m3
27.40
###
1.47
02.05.03
m3
27.40
###
02.05.04
m2
136.98
02.05.05
m2
136.98
###
02.05.06
m2
5.96
###
02.05.07
m2
136.98
###
5.78
02.05.08
59.65
###
02.06
GRADERIOS
02.06.01
m2
196.02
02.06.02
GRADERIOS DE CONCRETO: fc=175 kg/cm2 ACABADO COLOREADO FROTACHADO Y BRUADO C:A 1:2
m3
31.43
02.06.03
m2
82.84
02.07
SARDINELES
02.07.01
m3
5.19
###
1.79
02.07.02
m3
5.19
###
1.79
02.07.03
m3
5.19
###
1.79
02.07.04
m3
5.19
###
4.75
02.07.05
m2
34.60
###
11.93
02.07.06
33.95
###
4.05
02.08
02.08.01
m2
3.20
###
02.08.02
m2
0.83
###
02.09
MACETEROS
02.09.01
m3
12.98
###
02.09.02
m2
86.50
###
02.09.03
m2
86.50
###
02.09.04
m2
86.50
###
1.47
-
###
5.78
94.98
-
###
33.67
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno
Item
Descripcin
02.09.05
03
AREAS VERDES
03.01
JARDINERAS DE CONCRETO
03.01.01
03.02
SEMBRADO DE GRASS
03.02.01
03.02.02
04
SEALIZACION
04.01
04.02
05
VARIOS
05.01
05.02
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
m2
86.50
###
m3
19.80
###
m3
29.70
###
SEMBRADO DE GRASS
m2
29.70
###
PINTURA EN SARDINELES
m2
30.27
###
PINTURA EN PAVIMENTO
m2
12.30
###
und
2.00
###
und
5.00
###
05.03
und
5.00
###
05.04
m2
201.42
###
01
01.01
01.01.01
CONSTRUCCIONES PROVISIONALES
01.01.01.01
und
1.00
###
01.01.02
INSTALACIONES PROVISIONALES
01.01.02.01
glb
1.00
###
01.01.02.02
glb
1.00
###
01.01.03
01.01.03.01
glb
1.00
###
01.01.04
01.01.04.01
m2
677.30
###
01.01.04.02
m2
677.30
###
01.01.05
SEGURIDAD Y SALUD
01.01.05.01
glb
1.00
###
01.01.05.02
und
35.00
###
02
PISTAS Y VEREDAS
02.01
MOVIMIENTO DE TIERRAS
02.01.01
CORTES
02.01.01.01
m3
422.11
###
02.01.02
02.01.02.01
m3
569.85
###
02.01.03
02.01.03.01
m2
677.30
###
02.02
SUB BASE
02.02.01
02.02.01.01
m3
74.50
###
28.00
02.02.02
02.02.02.01
m3
91.44
###
28.00
02.02.02.02
m3
91.44
###
23.80
02.02.02.03
m3
81.28
###
23.80
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno
Item
Descripcin
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
02.02.03
02.02.03.01
m3
155.78
###
02.02.03.02
m3
155.78
###
51.80
02.02.03.03
m2
677.30
###
225.22
02.03
PAVIMENTO RIGIDO
02.03.01
m3
130.11
120.61
02.03.02
m2
158.31
107.91
02.03.03
m2
677.30
603.05
02.03.04
719.58
210.00
02.04
CUNETA RECTANGULAR
02.04.01
m3
5.35
###
02.04.02
m3
5.35
###
02.04.03
m2
53.52
###
02.04.04
4.63
###
02.05
VEREDAS DE CONCRETO
02.05.01
m3
3.27
###
62.88
02.05.02
m3
3.27
###
62.88
02.05.03
m3
3.27
###
69.50
02.05.04
m2
16.37
###
02.05.05
m2
24.45
###
02.05.06
m2
2.86
###
40.46
02.05.07
m2
24.45
###
285.25
02.05.08
28.59
###
101.20
02.06
MURO DE CONTENCION
02.06.01
m3
7.47
###
02.06.02
m2
28.42
###
02.07
GRADERIOS
02.07.01
m2
85.41
###
02.07.02
GRADERIOS DE CONCRETO: fc=175 kg/cm2 ACABADO COLOREADO FROTACHADO Y BRUADO C:A 1:2
m3
41.17
###
02.07.03
m2
55.54
###
02.08
02.08.01
m2
10.00
###
02.08.02
m2
2.25
###
02.09
MACETEROS
02.09.01
m3
8.26
###
02.09.02
m2
55.08
###
02.09.03
m2
55.08
###
02.09.04
m2
55.08
###
02.09.05
m2
55.08
###
03
AREAS VERDES
03.01
JARDINERAS DE CONCRETO
03.01.01
m3
12.76
###
03.02
SEMBRADO DE GRASS
03.02.01
m3
19.14
###
51.80
285.25
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno
Item
Descripcin
03.02.02
SEMBRADO DE GRASS
04
SEALIZACION
04.01
05
VARIOS
05.01
05.02
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
m2
63.81
###
m2
57.07
und
4.00
###
und
8.00
###
05.03
und
8.00
###
05.04
m2
677.30
###
01
MOVIMIENTO DE TIERRAS
01.01
01.01.01
m3
160.70
###
01.01.02
m3
41.45
###
01.01.03
glb
1.00
###
01.01.04
glb
1.00
###
01.01.05
m3
144.63
###
01.01.06
m3
30.00
###
01.01.07
m3
9.00
###
01.01.08
glb
1.00
###
01.01.09
glb
1.00
###
01.01.10
m3
9.00
###
01.02
01.02.01
m3
192.84
###
01.03
SUB DRENAJE
01.03.01
m3
2.40
###
01.03.02
SUB DRENAJE
15.00
###
02
MEJORAMIENTO DE SUBRASANTE
02.01
CONFORMACIN DE ENROCADO
02.01.01
m3
292.56
###
02.02
CAPA ANTICONTAMINANTE
02.02.01
CAPA ANTICONTAMINANTE
m3
252.72
###
02.02.02
m2
252.72
###
03
03.01
85.50
###
03.02
m3
323.63
###
03.03
94.10
###
03.04
SUMINISTRO DE ROCA
m3
91.63
###
03.05
EMPEDRADO DE VEREDAS
m3
91.63
###
04
04.01
MACETEROS
04.01.01
m3
2.00
###
04.01.02
m2
4.82
###
04.01.03
kg
20.94
###
###
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno
Item
Descripcin
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
04.01.04
m2
2.40
###
04.01.05
MACETEROS: BRUAS
20.10
###
04.01.06
m2
2.40
###
04.02
SEMBRADO DE CETICIOS
04.02.01
m3
0.24
###
04.02.02
SEMBRADO DE CETICIOS
Und.
4.00
###
01
MOVIMIENTO DE TIERRAS
01.01
EXCAVACIN DE ZANJAS
01.01.01
m3
38.59
###
01.02
01.02.01
m3
65.00
###
01.02.02
m3
15.00
###
01.02.03
glb
1.00
###
01.02.04
glb
1.00
###
01.02.05
m3
58.50
###
01.03
01.03.01
m3
50.17
###
01.03.02
m2
84.50
###
02
SUBDRENAJE
02.01
m3
3.20
###
02.02
SUBDRENAJE
20.00
###
03
03.01
CAPA ANTICONTAMINANTE
03.01.01
CAPA ANTICONTAMINANTE
m3
21.60
###
03.01.02
m3
21.60
###
04
04.01
m2
35.80
###
05
ENROCADO DE VEREDAS
05.01
m3
45.73
###
05.02
ENROCADO DE VEREDAS
m3
45.73
###
06
MUROS DE CONTENCIN
06.01
ZAPATAS
06.01.01
m3
18.80
###
06.01.02
kg
1,052.00
###
06.02
06.02.01
m3
36.20
###
06.02.02
ENCOFRADO Y DESENCOFRADO
m2
187.46
###
06.03
06.03.01
kg
2,593.82
###
06.03.02
40.50
###
06.04
TARRAJEO EN MUROS
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno
Item
Descripcin
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
06.04.01
m2
27.00
###
06.04.02
m2
27.00
###
07
AREAS VERDES
07.01
m3
24.75
###
07.02
m3
24.75
###
07.03
m3
1.14
###
07.04
m2
24.64
###
07.05
m2
12.32
###
08
08.01
m3
130.00
###
08.02
m3
130.00
###
08.03
m3
130.00
###
08.04
m3
28.20
###
08.05
kg
1,090.43
###
08.06
m2
19.80
###
08.07
m3
3.00
###
08.08
kg
54.45
###
08.09
m3
1.89
###
08.10
kg
54.60
###
08.11
m2
18.00
###
09
09.01
m2
3.20
###
09.02
m2
28.00
###
09.03
m2
28.00
###
09.04
PINTURA EN MUROS
m2
28.00
###
10
OTROS
10.01
und
1.00
###
01
MOVIMIENTO DE TIERRAS
01.01
01.01.01
m3
117.60
###
01.01.02
glb
1.00
###
01.01.03
m3
29.40
###
01.01.04
m3
118.19
###
01.02
01.02.01
m3
157.58
###
02
02.01
m3
110.50
###
02.02
CONFORMACIN DE ENROCADO
m3
110.50
###
02.03
CAPA ANTICONTAMINANTE
m3
72.60
###
02.04
m3
72.60
###
03
VEREDAS DE CONCRETO
03.01
SUMINISTRO DE ROCA
m3
77.43
###
"Construccin de Pistas, Veredas y Graderios en el Jirn: Antonio Machado y Pasajes Atalaya y Catari del
Barrio Huascar de la Ciudad de Puno - Puno
Item
Descripcin
Und.
Programado
Metrado Comparativo
Ejecutado
Mayor M.
03.02
ACARREO DE ROCA
m3
77.43
###
03.03
EMPEDRADO DE VEREDAS
m3
77.43
###
03.04
m2
148.76
###
03.05
m3
28.30
###
03.06
62.19
###
04
MURO DE CONTENCIN
04.01
kg
156.00
###
05
05.01
MACETEROS
05.01.01
m3
3.00
###
05.01.02
m2
7.23
###
05.01.03
kg
31.41
###
05.01.04
m2
3.60
###
05.01.05
MACETEROS: BRUAS
30.15
###
05.01.06
m2
3.60
###
05.02
SEMBRADO DE CETICIOS
05.02.01
m3
0.36
###
05.02.02
SEMBRADO DE CETICIOS
und
6.00
###
06
SEALIZACIN
06.01
PINTURA EN SARDINELES
m2
138.40
###
06.02
PINTURA EN PAVIMENTO
m2
9.20
###
mparativo
Total
Saldo
Metrados
40.00
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
530.24
100.00%
30.90
100.00%
32.15
100.00%
1,247.57
100.00%
1,247.57
100.00%
1.00
100.00%
1,589.93
116.76%
1,907.08
116.71%
1,484.44
100.00%
750.00
163.96%
457.44
100.00%
0.00%
92.04
0.00%
78.40
0.00%
1,474.22
258.71
140.83%
258.71
140.83%
220.24
140.74%
258.71
140.83%
258.71
140.83%
mparativo
Total
Saldo
Metrados
220.24
140.74%
440.49
1,915.17
140.74%
140.74%
271.22
99.01%
2.70
140.10
99.31%
0.98
1,356.11
99.01%
13.50
705.41
100.00%
744.45
100.00%
34.03
100.00%
44.24
100.00%
44.24
100.00%
113.43
100.00%
584.37
97.60%
14.40
10.44
100.00%
176.56
169.18%
36.42
100.00%
47.35
100.00%
47.35
100.00%
60.61
166.42%
635.54
218.12%
39.60
100.00%
0.00%
22.71
0.00%
10.43
0.00%
22.71
0.00%
22.71
0.00%
18.24
0.00%
124.29
0.00%
849.71
0.00%
10.20
2.15
100.00%
0.74
100.00%
0.65
100.00%
0.74
100.00%
0.42
100.00%
2.80
100.00%
2.80
100.00%
mparativo
Total
Saldo
Metrados
0.65
100.00%
2.15
100.00%
321.00
121.94%
3.85
100.00%
56.40
100.00%
5.00
100.00%
25.00
100.00%
12.00
100.00%
1,247.57
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
201.42
100.00%
201.42
100.00%
1.00
100.00%
35.00
100.00%
278.18
114.40%
403.30
114.38%
314.16
155.97%
100.71
100.00%
100.71
100.00%
0.00%
27.19
0.00%
27.19
0.00%
24.17
0.00%
201.42
mparativo
Total
Saldo
Metrados
77.37
349.14%
82.40
303.05%
74.11
272.56%
71.09
294.12%
148.46
320.44%
148.46
320.44%
681.51
338.35%
72.81
180.76%
45.28
153.86%
314.06
155.92%
226.43
187.29%
28.87
105.36%
28.87
105.36%
28.87
105.36%
0.00%
136.98
142.76
104.22%
5.96
100.00%
142.76
104.22%
59.65
100.00%
94.98
48.45%
101.04
0.00%
31.43
33.67
40.64%
49.17
6.98
134.49%
6.98
134.49%
6.98
134.49%
9.94
191.52%
46.53
134.48%
38.00
111.93%
3.20
100.00%
0.83
100.00%
0.00%
12.98
0.00%
86.50
0.00%
86.50
0.00%
86.50
mparativo
Total
-
0.00%
Saldo
Metrados
86.50
19.80
100.00%
29.70
100.00%
29.70
100.00%
30.27
100.00%
12.30
100.00%
2.00
100.00%
5.00
100.00%
5.00
100.00%
201.42
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
1.00
100.00%
677.30
100.00%
677.30
100.00%
1.00
100.00%
35.00
100.00%
422.11
100.00%
569.85
100.00%
677.30
100.00%
102.50
137.58%
119.44
130.62%
115.24
126.03%
105.08
129.28%
mparativo
Total
Saldo
Metrados
207.58
133.25%
207.58
133.25%
902.52
133.25%
120.61
92.70%
9.50
107.91
68.16%
50.40
603.05
89.04%
74.25
210.00
29.18%
509.58
0.00%
5.35
0.00%
5.35
0.00%
53.52
0.00%
4.63
66.15
2022.94%
66.15
2022.94%
72.77
2225.38%
16.37
100.00%
309.70
1266.67%
43.32
1514.69%
309.70
1266.67%
129.79
453.97%
7.47
100.00%
28.42
100.00%
0.00%
85.41
0.00%
41.17
0.00%
55.54
10.00
100.00%
2.25
100.00%
8.26
100.00%
55.08
100.00%
55.08
100.00%
55.08
100.00%
55.08
100.00%
12.76
100.00%
19.14
100.00%
mparativo
Total
63.81
100.00%
0.00%
Saldo
Metrados
-
57.07
4.00
100.00%
8.00
100.00%
8.00
100.00%
677.30
100.00%
160.70
100.00%
41.45
100.00%
1.00
100.00%
1.00
100.00%
144.63
100.00%
30.00
100.00%
9.00
100.00%
1.00
100.00%
1.00
100.00%
9.00
100.00%
192.84
100.00%
2.40
100.00%
15.00
100.00%
292.56
100.00%
252.72
100.00%
252.72
100.00%
85.50
100.00%
323.63
100.00%
94.10
100.00%
91.63
100.00%
91.63
100.00%
2.00
100.00%
4.82
100.00%
20.94
100.00%
mparativo
Total
Saldo
Metrados
2.40
100.00%
20.10
100.00%
2.40
100.00%
0.24
100.00%
4.00
100.00%
38.59
100.00%
65.00
100.00%
15.00
100.00%
1.00
100.00%
1.00
100.00%
58.50
100.00%
50.17
100.00%
84.50
100.00%
3.20
100.00%
20.00
100.00%
21.60
100.00%
21.60
100.00%
35.80
100.00%
45.73
100.00%
45.73
100.00%
18.80
100.00%
1,052.00
100.00%
36.20
100.00%
187.46
100.00%
2,593.82
100.00%
40.50
100.00%
mparativo
Total
Saldo
Metrados
27.00
100.00%
27.00
100.00%
24.75
100.00%
24.75
100.00%
1.14
100.00%
24.64
100.00%
12.32
100.00%
130.00
100.00%
130.00
100.00%
130.00
100.00%
28.20
100.00%
1,090.43
100.00%
19.80
100.00%
3.00
100.00%
54.45
100.00%
1.89
100.00%
54.60
100.00%
18.00
100.00%
3.20
100.00%
28.00
100.00%
28.00
100.00%
28.00
100.00%
1.00
100.00%
117.60
100.00%
1.00
100.00%
29.40
100.00%
118.19
100.00%
157.58
100.00%
110.50
100.00%
110.50
100.00%
72.60
100.00%
72.60
100.00%
77.43
100.00%
mparativo
Total
Saldo
Metrados
77.43
100.00%
77.43
100.00%
148.76
100.00%
28.30
100.00%
62.19
100.00%
156.00
100.00%
3.00
100.00%
7.23
100.00%
31.41
100.00%
3.60
100.00%
30.15
100.00%
3.60
100.00%
0.36
100.00%
6.00
100.00%
138.40
100.00%
9.20
100.00%
Asignacin Presupuestal
Resolucines/Memorndum
Fecha
Acumulado
S/. 400,000.00
R. G. N670-2013-MPP/GM
12/14/2012
S/. 400,000.00
S/. 197,262.00
M. N1014-2013-MPP/GA
7/10/2013
S/. 197,262.00
S/. 140,812.25
R. A. N971-2013-MPP/A
10/24/2013
S/. 140,812.25
S/. 738,074.25
Fuente de Financiamiento:
2012
S/. 400,000.00
2013
S/. 400,000.00
S/. 197,262.00
S/. 597,262.00
S/. 49,994.00
S/. 647,256.00
S/. 62,984.00
S/. 710,240.00
S/. 27,834.25
S/. 738,074.25
S/. 738,074.25
4.7.1
ASIGNACION PRESUPUESTAL
1
2
3
5.18
5.08
2.09
2012
S/. 400,000.00
2013
S/. 197,262.00
S/. 49,994.00
S/. 62,984.00
5.18
S/. 27,834.25
5.18
4.7.2
EJECUCION PRESUPUESTAL
PRESUPUESTO ASIGNADO
EJECUCION PRESUPUESTAL 2013
SALDO PRESUPUESTAL
PRESUPUESTO EJECUTADO
COSTO DE INVERSION 2013
PRESUPUESTO APROBADO EXPEDIENTE TECNIC
AMPLIACIN PRESUPUESTAL
EJECUCION PRESUPUESTAL 2012
SALDO PRESUPUESLiquidacin
PRESUPUESTO EJECUTADO
(+) Pecosa N 365 S/. 789.64
(+) Pecosa N 1413 S/. 2,751.57
(-) NEA N 14 S/. 3,240.00
COSTO DE INVERSION 2013
4.7.3
4.7.-
ASIGNACIN PRESUPUESTAL
4.7.2.-
EJECUCIN PRESUPUESTAL
4.7.3.-
4.7.4.-
4.7.5.-
COSTO DE INVERSIN
4.7.6.-
4.7.7.-
REQUERIMIENTO DE MATERIALES
4.7.8.-
FECHA
12/14/2012
7/10/2013
10/24/2013
ACUMULADO
S/. 400,000.00
S/. 197,262.00
S/. 140,812.25
S/. 738,074.25
S/. 400,000.00
S/. 597,262.00
S/. 647,256.00
S/. 710,240.00
S/. 738,074.25
acumulado
S/. 738,074.25
S/. 738,074.25
S/. 0.00
S/. 738,074.25
S/. 738,074.25
S/. 602,314.22
S/. 140,812.25
S/. 738,074.25
S/. 5,052.22
S/. 738,074.25
S/. 738,074.25
S/. 743,126.47
S/. 602,314.22
S/. 140,812.25
S/. 738,074.25
S/. 0.00
S/. 738,074.25
S/. 5,052.22
SI
SI
PRESUPUESTAL
SI
PRESUPUESTAL
SI
SI
EN OBRA
UAL DE LA OBRA
SI
SI
SI
La Ejecucin Fisica Final alcanza la suma de S/. 760,116.71 equivalente a 287.64% del Presupuesto Total.
Existe Conciliaciones entre la Ejecucin Financiera y la Ejecucin Fisica puesto a que se genera una diferencia de S/. 22,042.46
equivalente a 2.99% lo que puede decirse que se ha Invertido segn las Partidas Valorizadas en Presupuesto Base, Mayores Metrados,
Deductivos y Adicionales de Obra debidamente Aprobadas.
Se ha alcanzado las Metas Fisicas establecidas en el Proyecto de Inversin.
C.- RECOMENDACIONES :
Se recomienda a la Gerencia de Ingenieria Municipal (GIM), y la Sub Gerencia de Obras Publicas y Mantenimiento (SGOPM), tomar
las medidas correctivas necesarias para los Ejecutores directos de Obra como son: (Residente de Obra, Asistente Tcnico y Asistente
Administrativo), siendo los Responsables directos; Llevar un buen Control, Seguimiento y Monitoreo tanto en el Proceso de Ejecucin y
en la parte Documentaria (Informes Mensuales y Informe Final), ya que se ha podido apreciar algunas falencias en lo concerniente a
la Valorizacin Final de Obra donde se pudo ver que no esta de acuerdo al Expediente Tcnico en los Costos Indirectos.
Por otra parte el Supervisor de Obra debio de controlar que se cumpla estrictamente en lo concerniente a la Valorizacin Final de
Obra (Costos Indirectos) se haga de acuerdo al Expediente Tcnico Aprobado tanto en Presupuesto Base, Mayores Metrados y
Adicionales de Obra (Partidas Nuevas).