Jorge Chavez International Airport

Project Standard Specification Rev.1

SECTION 02209 - CRUSHED AGGREGATE SECCIN 02209 BASE GRANULAR BASE COURSE PART 1 - GENERAL 1.1 DESCRIPTION A. This item consists of a base course composed of crushed aggregates constructed on a prepared course in accordance with these specifications and in conformity to the dimensions and typical cross sections shown on the plans. PARTE 1 - GENERALIDADES 1.1 DESCRIPCIN Este tem consiste en una capa base compuesta de agregados triturados, construidos sobre una capa preparada de acuerdo con las presentes especificaciones y de conformidad con las dimensiones y secciones transversales tpicas sealadas en los planos. 1.2 PRESENTACION DE DOCUMENTOS A. Reportes siguiente: de ensayos: Remitir lo

1.2 SUBMITTALS A. Test Reports: Submit the following:

1.

Laboratory analysis from a qualified 1. independent geotechnical engineering testing agency for aggregate from each material source and then weekly for the material tests described in Part 2 of this specification. Density and moisture content tests on a 2. lot basis as defined and described in Part 3, Section 3.5.

2.

Anlisis realizados por un laboratorio independiente y calificado de ingeniera geotcnica, para cada agregado proveniente de diversas fuentes y luego semanalmente para los ensayos de materiales descritos en la Parte 2 de la presente especificacin. Ensayos de contenido de humedad y densidad sobre la base de lotes tal como se define y describe en la Parte 3, Seccin 3.5.

1.3 Quality Assurance A. Testing and Inspection Service: Subcontractor shall employ a qualified independent geotechnical engineering testing agency to perform laboratory analysis for aggregate from each material source for the tests described in Part 2 of this specification and for density and moisture content tests on a lot basis as defined and described in Part 3, Section 3.5.

1.3 Aseguramiento de la Calidad A. Servicio de Inspeccin y Ensayos: El Subcontratista deber emplear a una entidad de ensayos de ingeniera geotcnica independiente para realizar el anlisis de laboratorio para agregados de cada tipo de material para los ensayos descritos en la Parte 2 de la presente especificacin y para los ensayos de contenido de humedad y densidad, sobre la base de lotes, tal como se define y describe en la Parte 3, Seccin 3.5.

PART 2 - MATERIALS 2.1 AGGREGATE A. Aggregates shall consist of

PARTE 2 - MATERIALES 2.1 AGREGADOS clean, A Los agregados consistirn en partculas

02209 - Crushed Aggregate Base Course

Page 2 of 11

Jorge Chavez International Airport


Project Standard Specification Rev.1

sound, durable particles of crushed stone, crushed gravel, or crushed slag and shall be free from coatings of clay, silt, vegetable matter, and other objectionable materials and shall contain no clay balls. Fine aggregate passing the No. 4 (4.75 mm) sieve shall consist of fines from the operation of crushing the coarse aggregate. If necessary, fine aggregate may be added to produce the correct gradation. The fine aggregate shall be produced by crushing stone, gravel, or slag that meet the requirements for wear and soundness specified for coarse aggregate.

limpias, slidas y resistentes de piedra chancada, grava triturada o escorias trituradas y debern estar libres de arcilla, limo, material vegetal y otros materiales no deseados y no debern contener grumos de arcilla. Los agregados finos que pasan por la malla N 4 (4.75 mm) consistirn en agregados obtenidos al triturar agregados gruesos. De ser necesario, se puede aadir agregado fino para producir la gradacin correcta. El agregado fino estar formado por piedra, grava o escorias trituradas que renan los requerimientos de desgaste y solidez especificados para el agregado grueso.. B. Las escorias trituradas debern ser calentadas en horno y luego enfriadas y debern tener un peso unitario de no menos de 1.12 mg/m al ser sometidas a ensayo de conformidad con la norma ASTM C 29. C. La porcin de agregado chancado que es retenida en la malla N 4 (4.75 mm) no deber contener ms del 15% en peso, de piezas planas o alargadas tal como se define en la norma ASTM D 693 y debe tener al menos 90% de peso de partculas con al menos dos caras fracturadas y 100% con al menos una cara fracturada. El rea de cada cara debe ser igual o al menos 75% del rea central ms pequea de la pieza. Cuando 2 caras fracturadas son contiguas, el ngulo entre los planos de las fracturas deber ser de al menos 30 para contarse como 2 caras fracturadas. D. El porcentaje de desgaste no deber ser mayor de 40% al ser sometido a ensayo de conformidad con la norma ASTM C 131. La solidez del sulfato de sodio no deber exceder el 12%, luego de 5 ciclos, al ser sometido a ensayo de conformidad con la norma ASTM C 88. E. La fraccin que pasa por la malla N 40 (0.42 mm) debe tener un lmite lquido no mayor de 25 y un ndice de plasticidad de no ms de 4 al ser sometido a ensayo de conformidad con la norma ASTM D 4318. El agregado fino deber tener un valor mnimo de 35 para equivalente de arena al ser sometido a ensayo de conformidad con

B. The crushed slag shall be an air-cooled, blast furnace slag and shall have a unit weight of not less than 1.12 Mg/cubic meter when tested in accordance with ASTM C 29.

C. The crushed aggregate portion which is retained on the No. 4 (4.75 mm) sieve shall contain not more than 15 percent, by weight, of flat or elongated pieces as defined in ASTM D 693 and shall have at least 90 percent by weight of particles with at least two fractured faces and 100 percent with at least one fractured face. The area of each face shall be equal to at least 75 percent of the smallest midsectional area of the piece. When two fractured faces are contiguous, the angle between the planes of fractures shall be at least 30 to count as two fractured faces. D. The percentage of wear shall not be greater than 45 percent when tested in accordance with ASTM C 131. The sodium sulfate soundness loss shall not exceed 12 percent, after 5 cycles, when tested in accordance with ASTM C 88.

E. The fraction passing the No. 40 (0.42 mm) sieve shall have a liquid limit no greater than 25 and a plasticity index of not more than 4 when tested in accordance with ASTM D 4318. The fine aggregate shall have a minimum sand equivalent value of 35 when tested in accordance with ASTM D 2419.

02209 - Crushed Aggregate Base Course

Page 3 of 11

Jorge Chavez International Airport


Project Standard Specification Rev.1

la norma ASTM D 2419. a. Sampling and Testing. The Subcontractor, prior to the start of production, shall furnish test reports for the tests described in this Part 2 for proposed aggregates. a. Muestreo y Ensayos. El Subcontratista, antes de iniciar la produccin debe proporcionar los reportes de ensayo para las pruebas descritas en esta Parte 2 para los agregados propuestos. Despus de que el Contratista haya aprobado el inicio de la produccin de agregados, el Subcontratista deber proporcionar reportes de ensayos adicionales para los ensayos descritos en esta Parte 2, para los agregados en produccin. Estos reportes de ensayos sern la base de aprobacin de los lotes especficos de agregados desde el punto de vista de los requerimientos de calidad de esta seccin. Si se necesita una fuente alterna de agregados despus de que la produccin haya sido aprobada por el Contratista, se deber proporcionar un juego completo de reportes de ensayos para los agregados propuestos de la nueva fuente. La produccin de esta nueva fuente no proceder hasta que el Contratista haya aprobado la fuente de agregados. Al momento de la aprobacin, la produccin podr comenzar a partir de la nueva fuente y se suministrarn reportes de ensayos semanales para esta nueva fuente. Las muestras de agregados para verificar la gradacin deben ser tomadas por el Subcontratista al menos una vez al da. El muestreo deber realizarse de conformidad con la norma ASTM D 75, y los ensayos deben cumplir con los requerimientos de las normas ASTM C 136 y C 117. Los reportes de gradacin sern proporcionados al Contratista para cada muestreo. b. La gradacin (mezcla para la obra) de la mezcla final deber estar dentro del rango designado indicado en la Tabla 1, al ser sometida a ensayo de conformidad con la norma ASTM C117 y C 136. La gradacin final deber tener una buena

After the Contractor has given approval to start aggregate production, the Subcontractor shall furnish additional test reports for the tests described in this Part 2 for the aggregates in production. These test reports will be the basis of approval of specific lots of aggregates from the standpoint of the quality requirements of this section.

If an alternate source of aggregates is necessary after production has been approved by the Contractor, a complete set of test reports shall be provided for the proposed aggregates from the new source. Production from this new source may not proceed until the Contractor has approved the source of aggregates. Upon approval, production may commence from the new source and weekly test reports provided for this new source.

Samples of aggregates to check gradation shall be taken by the Subcontractor at least once daily. Sampling shall be in accordance with ASTM D 75, and testing shall be in accordance with ASTM C 136 and C 117. Gradation reports shall be provided to the Contractor for each sampling.

b. Gradation Requirements. The gradation (job mix) of the final mixture shall fall within the design range indicated in Table 1, when tested in accordance with ASTM C 117 and C 136. The final gradation shall be continuously well

02209 - Crushed Aggregate Base Course

Page 4 of 11

Jorge Chavez International Airport


Project Standard Specification Rev.1

graded from coarse to fine and shall not vary from the low limit on one sieve to the high limit on an adjacent sieve or vice versa. TABLE 1. REQUIREMENTS GRADATION OF AGGREGATE Design Range % by Weight Passing Sieves 100 95-100 70-95 55-85 30-60 12-30 0-8 5 8 8 8 5 3

gradacin para pasar de la gruesa a la fina y no deber diferir del lmite menor en una malla al lmite mayor en una malla adyacente o viceversa.

FOR TABLA 1. REQUERIMIENTOS PARA GRADACIN DEL AGREGADO Rango de Diseo % por Peso que Pasa la Malla 100 95-100 70-95 55-85 30-60 12-30 0-8 5 8 8 8 5 3 % de Toleran cia de Mezcla para la Obra

Sieve Size

Job Mix Toleranc es %

Tamao de la Malla

2 inch (50.0 mm) 1-1/2 inch (37.0 mm) 1 inch (25.0 mm) 3/4 inch (19.0 mm) No. 4 (4.75 mm) No. 30 (0.60 mm) No. 200 (0.075 mm)

2 pulgadas (50.0 mm) 1-1/2 pulgadas (37.0 mm) 1 pulgadas (25.0 mm) pulgadas (19.0 mm) No. 4 (4.75 mm) No. 30 (0.60 mm) No. 200 (0.075 mm)

F. The job mix tolerances in Table 1 shall be applied to the job mix gradation to establish a job control-grading band. The full tolerance still will apply if application of the tolerances results in a job control grading band outside the design range.

F. Las tolerancias de la mezcla para la obra presentadas en la Tabla 1 debern aplicarse a la gradacin de la mezcla para la obra para establecer una banda de gradacin de control para el trabajo. La tolerancia completa se seguir aplicando si la aplicacin de las tolerancias da como resultado una banda de gradacin de control de trabajo que se encuentra fuera del rango de diseo. G. La fraccin de la mezcla final que pasa por la malla N 200 (0.075 mm) no deber exceder el 60% de la fraccin que pasa por la malla N 30 (0.60 mm).

G. The fraction of the final mixture that passes the No. 200 (0.075 mm) sieve shall not exceed 60 percent of the fraction passing the No. 30 (0.60 mm) sieve.

PART 3 - CONSTRUCTION METHODS

PARTE 3 CONSTRUCCIN 3.1 PREPARACIN SUBYACENTE

MTODOS

DE

3.1 PREPARING UNDERLYING COURSE

DE

LA

CAPA

A.

The underlying course shall be checked A.

La capa subyacente debe ser revisada

02209 - Crushed Aggregate Base Course

Page 5 of 11

Jorge Chavez International Airport


Project Standard Specification Rev.1

and accepted by the Contractor before placing and spreading operations are started. Any ruts or soft yielding places caused by improper drainage conditions, hauling, or any other cause shall be corrected at the Subcontractor's expense before the base course is placed thereon. Material shall not be placed on frozen subgrade. 3.2 MIXING A. The aggregate shall be uniformly blended during crushing operations or mixed in a plant. The plant shall blend and mix the materials to meet the specifications and to secure the proper moisture content for compaction.

y aceptada por el Contratista antes de que se inicien las operaciones de colocacin y esparcido. Cualquier ranura o lugares blandos causados por condiciones de drenaje inadecuados, transporte o cualquier otra causa deber ser corregida por cuenta del Subcontratista antes de que la capa sea colocada. El material no debe ser colocado en plataformas muy fras. 3.2 MEZCLADO A. El agregado debe ser uniformemente mezclado durante las operaciones de trituracin o mezclado en una planta. La planta debe combinar y mezclar los materiales para cumplir con las especificaciones y para asegurar la humedad correcta del contenido para la compactacin. 3.3 COLOCACIN A. El material para la base de agregado triturado debe ser colocado en la subbase/subrasante humedecida en capas de espesor uniforme con un equipo mecnico. B. La profundidad mxima de una capa compactada debe ser de 150 mm. Si la profundidad total de los materiales compactados es de ms de 150 mm, debe construirse en dos o ms capas. En una construccin de capas mltiples, la base debe ser colocada en capas de profundidad similar. C. La capa construida previamente debe ser limpiada de material suelto y extrao antes de colocar la siguiente capa. La superficie del material compactado debe mantenerse hmeda hasta que sea cubierta con la siguiente capa. 3.4 COMPACTACIN A. Inmediatamente despus culminar las operaciones de esparcido, el agregado triturado debe ser minuciosamente compactado. El nmero, tipo y peso de los rodillos debe ser suficiente para compactar el material a la densidad requerida.

3.3 PLACING A. The crushed aggregate base material shall be placed on the moistened subbase/subgrade in layers of uniform thickness with a mechanical spreader.

B. The maximum depth of a compacted layer shall be 150 mm. If the total depth of the compacted material is more than 150 mm, it shall be constructed in two or more layers. In multi-layer construction, the base course shall be placed in approximately equal-depth layers.

C. The previously constructed layer should be cleaned of loose and foreign material prior to placing the next layer. The surface of the compacted material shall be kept moist until covered with the next layer.

3.4 COMPACTION A. Immediately upon completion of the spreading operations, the crushed aggregate shall be thoroughly compacted. The number, type, and weight of rollers shall be sufficient to compact the material to the required density.

02209 - Crushed Aggregate Base Course

Page 6 of 11

Jorge Chavez International Airport


Project Standard Specification Rev.1

3.5 ACCEPTANCE TESTING

SAMPLING

AND 3.5 ACEPTACIN DE MUESTRAS ENSAYOS DE DENSIDAD

A. Aggregate base course shall be accepted for density and moisture content on a lot basis. A lot will consist of one day's production where it is not expected to exceed 2000 square meters. A lot will consist of one-half day's production where a day's production is expected to consist of between 2000 and 4000 square meters. The defined lot may be adjusted by the Contractor if a days production is greater than 4000 square meters or less than 2000 square meters. B. Each lot shall be divided into two equal sublots. One test shall be made for each sublot. Sampling locations will be determined by the Contractor on a random basis in accordance with statistical procedures contained in ASTM D 3665.

A. Se aceptar la densidad del agregado para la capa base en base a lotes. Un lote consistir en la produccin de un da en el que no se espera exceder los 2000 metros cuadrados. Un lote estar formado por la produccin de medio da en el que se espera que la produccin del da sea de entre 2000 y 4000 metros cuadrados. El lote definido puede ser ajustado por el Contratista, si la produccin del da es mayor a los 4000 metros cuadrados o menor de 2000 metros cuadrados. B. Cada lote debe ser dividido en dos sublotes iguales. Por cada sublote se debe realizar un ensayo. El Contratista determinar la ubicacin de las muestras aleatoriamente de conformidad con los procedimientos estadsticos contenidos en la norma ASTM D 3665. C. La densidad de cada lote ser aceptada cuando la densidad del campo sea al menos del 100 por ciento de la densidad mxima de las muestras de laboratorio preparadas mediante muestras del material de la capa base entregadas al sitio de la Obra. Las muestras deben ser compactadas y sometidas a ensayo de conformidad con la norma ASTM D 1557. La densidad de campo in situ debe ser determinada de conformidad con la norma ASTM D 1556 o D 2167. En caso no se alcanzase la densidad especificada, el lote completo deber ser trabajado nuevamente y/o recompactado y deber realizarse dos ensayos aleatorios adicionales. Este procedimiento deber seguirse hasta alcanzar la densidad especificada. D. En lugar del mtodo nuclear de determinacin de densidad de campo, se puede ejecutar un ensayo de aceptacin empleando un indicador nuclear de conformidad con la norma ASTM D 2922. El indicador debe ser calibrado de conformidad con el prrafo 4 de la norma ASTM D 2922. Las pruebas de calibracin debern ser realizadas en el primer lote de

C. Each lot will be accepted for density when the field density is at least 100 percent of the maximum density of laboratory specimens prepared from samples of the base course material delivered to the job site. The specimens shall be compacted and tested in accordance with ASTM D 1557. The in-place field density shall be determined in accordance with ASTM D 1556 or D 2167. If the specified density is not attained, the entire lot shall be reworked and/or recompacted and two additional random tests made. This procedure shall be followed until the specified density is reached.

D. In lieu of the core method of field density determination, acceptance testing may be accomplished using a nuclear gage in accordance with ASTM D 2922. The gage should be field calibrated in accordance with paragraph 4 of ASTM D 2922. Calibration tests shall be conducted on the first lot of material placed that meets the density requirements.

02209 - Crushed Aggregate Base Course

Page 7 of 11

Jorge Chavez International Airport


Project Standard Specification Rev.1

material instalado que requerimientos de densidad. E. Use of ASTM D 2922 results in a wet unit weight, and when using this method, ASTM D 3017 shall be used to determine the moisture content of the material. The calibration curve furnished with the moisture gages shall be checked as described in paragraph 7 of ASTM D 3017. The calibration checks of both the density and moisture gages shall be made at the beginning of a job and at intervals as determined by the Contractor.

rena

los

E. El empleo de los resultados de la norma ASTM D 2922 resulta en un peso unitario hmedo, y cuando se use este mtodo, la seccin ASTM D 3017 se emplear para determinar el contenido de humedad del material. La curva de calibracin proporcionada con las medidas de humedad debe ser revisada tal como se describe en el prrafo 7 de la norma ASTM D 3017. Las revisiones de calibracin tanto de la densidad como de las medidas de humedad deben ser realizadas al inicio del trabajo y en intervalos tal como lo determine el Contratista.

F. If a nuclear gage is used for density F. Si se emplea un indicador nuclear para determination, two random readings shall be determinar la densidad, debern realizarse dos lecturas aleatorias por cada sublote. made for each sublot. G. The moisture content of the material during placing operations shall not be below, nor more than 1-1/2 percentage points above, the optimum moisture content as determined by ASTM D 1557. G. El contenido de humedad del material durante las operaciones de colocacin no debern ser inferiores, ni mayores a 1-1/2 puntos porcentuales indicados, al contenido de humedad determinado por la norma ASTM D 1557. 3.6 ACABADO A. La superficie del agregado de la capa base debe ser acabado con cuchilla o con un equipo automtico especialmente diseado para este propsito. B. En ningn caso se aadirn capas delgadas de material en la capa superior de la base para alcanzar el nivel deseado. Si la elevacin de la capa superior es de 12 mm o ms del nivel especificado, deber ser retirada hasta alcanzar una profundidad de al menos 75 mm, se aadir el material nuevo y ser combinado y recompactado para alcanzar el nivel deseado. Si la superficie terminada supera el tamao del nivel requerido, sta se deber cortar para alcanzar el nivel y aplanar nuevamente. 3.7 TOLERANCIAS DE SUPERFICIE

3.6 FINISHING A. The surface of the aggregate base course shall be finished by blading or with automated equipment especially designed for this purpose. B. In no case will the addition of thin layers of material be added to the top layer of base course to meet grade. If the elevation of the top layer is 12 mm or more below grade, the top layer of base shall be scarified to a depth of at least 75 mm, new material added, and the layer shall be blended and recompacted to bring it to grade. If the finished surface is above plan grade, it shall be cut back to grade and rerolled.

3.7 SURFACE TOLERANCES

A. The finished surface shall not vary more A. La superficie terminada no debe variar than 9 mm when tested with a 4.8 m en ms de 9 mm al ser sometida a ensayo

02209 - Crushed Aggregate Base Course

Page 8 of 11

Jorge Chavez International Airport


Project Standard Specification Rev.1

straightedge applied parallel with or at right angles to the centerline. The Subcontractor shall correct any deviation in excess of this amount.

con emparejadora de 4.8 m aplicada paralelamente con o en ngulos rectos con respecto a la lnea recta. El Subcontratista debe corregir cualquier desviacin que exceda esta cantidad. 3.8 CONTROL DE ESPESOR A. El espesor completado de la capa base debe estar con una margen de 12 mm del espesor designado. Deben hacerse cuatro determinaciones de espesor para cada lote de material colocado. El tamao del lote debe ser consistente con las especificaciones del prrafo 3.5. Cada lote debe ser dividido en cuatro sublotes iguales. Debe realizarse un ensayo por cada sublote. El Contratista determinar las ubicaciones de las muestras aleatoriamente de acuerdo con los procedimientos contenidos en la norma ASTM D 3665. En el lugar en el que el espesor sea deficiente por ms de 12 mm, el Subcontratista deber corregir tales reas excavando a la profundidad requerida y reemplazando el lugar con material nuevo. Se puede requerir realizar agujeros adicionales para identificar los lmites de las reas deficientes. 3.9 MANTENIMIENTO A. La capa base debe mantenerse en una condicin que rena todas las especificaciones requeridas hasta que el trabajo sea aceptado. El equipo empleado en la construccin de una seccin adyacente puede ser empleado sobre porciones completadas de capa base, sin necesariamente ocasionar dao alguno pero al ser utilizado en toda la profundidad de la capa puede ocasionar una compactacin desigual. REQUERIMIENTOS DE ENSAYO ASTM C 29 Peso Unitario del Agregado.

3.8 THICKNESS CONTROL A. The completed thickness of the base course shall be within 12 mm of the design thickness. Four determinations of thickness shall be made for each lot of material placed. The lot size shall be consistent with that specified in paragraph 3.5. Each lot shall be divided into four equal sublots. One test shall be made for each sublot. Sampling locations will be determined by the Contractor on a random basis in accordance with procedures contained in ASTM D 3665. Where the thickness is deficient by more than 12 mm, the Subcontractor shall correct such areas by excavating to the required depth and replacing with new material. Additional test holes may be required to identify the limits of deficient areas.

3.9 MAINTENANCE A. The base course shall be maintained in a condition that will meet all specification requirements until the work is accepted. Equipment used in the construction of an adjoining section may be routed over completed portions of the base course, provided no damage results and provided that the equipment is routed over the full width of the base course to avoid rutting or uneven compaction.

TESTING REQUIREMENTS ASTM C 29 Unit Weight of Aggregate

ASTM C 88 Soundness of Aggregates by ASTM C 88 Resistencia de los Agregados Use of Sodium Sulfate or Magnesium Sulfate usando Sulfato de Sodio o Sulfato de Magnesio. ASTM C 117 Materials Finer than 75um ASTM C 117 Materiales finos que pasan la

02209 - Crushed Aggregate Base Course

Page 9 of 11

Jorge Chavez International Airport


Project Standard Specification Rev.1

(No. 200) Sieve in Mineral Aggregates by Malla 75um (No. 200) Washing Minerales por Lavado.

en

Agregados

ASTM C 131 Resistance to Abrasion of ASTM C 131 Resistencia a la Abrasin de Small Size Coarse Aggregate by Use of the Agregados Gruesos de Tamao Pequeo Los Angeles Machine Empleando la Mquina de Los ngeles. ASTM C 136 Sieve or Screen Analysis of ASTM C 136 Anlisis de Tamizado o Fine and Coarse Aggregate Cribado de Agregados Finos y Gruesos. ASTM D 75 Sampling Aggregate ASTM D 75 Muestreo de Agregados. ASTM D 693 Piedra Triturada, Escoria Triturada y Grava Triturada para Capas Base de Piedra de Macadn Seca o con Poca Agua y Superficie y Capas Base de Piedra de Macadn Bituminoso para Pavimento. ASTM D 698 Relaciones HumedadDensidad de la Mezcla de Suelos y SueloAgregado Empleando un Apisonador de 5.5-lb (2.49-kg) y 12 en Cada (305mm).

ASTM D 693 Crushed Stone, Crushed Slag, and Crushed Gravel for Dry-or WaterBound Macadam Base Courses and Bituminous Macadam Base and Surface Courses of Pavements.

ASTM D 698 Moisture-Density Relations of Soils and Soil - Aggregate Mixtures Using 5.5-lb (2.49-kg) Rammer and 12-in (305mm) Drop

ASTM D 1556 Density of Soil in Place by the ASTM D 1556 Densidad de Suelos Sand - Cone Method Colocados mediante el Mtodo Cono de Arena. ASTM D 1557 Moisture-Density Relations of ASTM D 1557 Relaciones de HumedadSoils and Soil-Aggregate Mixtures Using 10- Densidad de Mezcla de Suelos y SueloAgregado Empleando un Apisonador de 10lb (4.5kg) Rammer and18 in (457mm) Drop lb (4.5kg) y 18 en Cada (457 mm) ASTM D 2419 Sand Equivalent Soils and Fine Aggregate Value of ASTM D 2419 Valor Equivalente de Arena de Suelos y Agregados Finos.

ASTM D 2922 Density of Soil and Soil- ASTM D 2922 Densidad del Suelo y Aggregate in Place by Nuclear Methods Agregados de Suelo Colocados Mediante Mtodos Nucleares. ASTM D 3017 Moisture Content of Soil and ASTM D 3017 Contenido de Humedad de Soil-Aggregate in Place by Nuclear Methods Suelos y Suelos-Agregados colocados, mediante Mtodos Nucleares. ASTM D 3665 Random Sampling of Paving ASTM D 3665 Muestras Aleatorias Materials Materiales para Pavimentar de

ASTM D 4318 Liquid Limit, Plastic Limit, and ASTM D 4318 Lmite Lquido, Lmite Plasticity Index of Soils Plstico e ndice de Plasticidad de los Suelos. ASTM D4791 Flat Particles, Elongated ASTM D4791 Partculas planas, alargadas Particles, or Flat and Elongated Particles in o partculas planas o alargadas del

02209 - Crushed Aggregate Base Course

Page 10 of 11

Jorge Chavez International Airport


Project Standard Specification Rev.1

Coarse Aggregate. ASTM D422 Particle Size analysis of soils.

agregado grueso. ASTM D422 Anlisis partculas para suelos. de tamao de

ASTM D1883 CBR (California Bearing Ratio) ASTM D1883 CBR (California Bearing of Laboratory-Compacted Soils. Ratio).

FIN DE LA SECCIN

02209 - Crushed Aggregate Base Course

Page 11 of 11