DESCRIPCIN

1 OBRAS PROVISIONALES
1.01 ALMACEN 5.0x6.0M

PARCIAL S/.

F.C.

1,283.16

PARCIAL S/.
1,052.87

1,283.16

1,052.87

Remuneraciones calificada

99.66

0.9

Remuneraciones no calificada

72.00

0.41

29.52

1,111.50

0.84

933.66

Material Nacional

2 OBRAS PRELIMINARES
2.01 CARTEL DE IDENTIFICACION DE OBRA DE 4.80x3.60 M.
Remuneraciones no calificada
Material Nacional
2.02 LIMPIEZA Y DESBROCE
Remuneraciones no calificada
Material Nacional

3 MEJORAMIENTO CAMARA DISIPADORA


3.01 DEMOLICION ESTRUCTURA DE CONCRETO
Remuneraciones no calificada
Material Nacional
3.02 EXCAVACION EN MATERIAL CONGLOMERADO
Remuneraciones calificada
Remuneraciones no calificada
Material Nacional
3.03 ENCOFRADO Y DESENCOFRADO NORMAL

8,874.62

89.69

3,949.15

294.62

247.27

0.50

0.41

0.21

294.12

0.84

247.06

8,599.50

3,701.88

8,190.00

0.41

409.50

0.84

8,874.62

343.98
3,986.54

46.72

19.74

45.36

0.41

1.36

0.84

61.63
4.79

3,357.90

18.60
1.14
35.80

0.9

37.80

0.41

19.04

0.84

668.67

4.31
15.50
15.99
522.95

Remuneraciones calificada

112.98

0.9

Remuneraciones no calificada

105.84

0.41

43.39

Material Nacional

449.85

0.84

377.87

3.04 ARMADO Y COLOCACIN DE ACERO FY=4200 KG/CM2


Remuneraciones calificada
Remuneraciones no calificada
Material Nacional
3.05 CONCRETO F'C=210 KG/CM2
Remuneraciones calificada
Remuneraciones no calificada
Material Nacional
3.06 TARRAJEO DE MUROS Y PISOS, MEZCLA 1:5

2,156.58
165.68

101.68

1,795.73
0.9

149.11

59.85

0.41

24.54

1,931.05

0.84

1,622.08

1,737.00
93.25

1,408.33
0.9

83.93

131.04

0.41

53.73

1,512.71

0.84

1,270.68

262.27

203.98

Remuneraciones calificada

31.83

0.9

Remuneraciones no calificada

42.40

0.41

17.38

188.04

0.84

157.95

Material Nacional

4 MEJORAMIENTO CAPTACION
4.01 EXCAVACION EN MATERIAL CONGLOMERADO
Remuneraciones calificada

2,742.64

2,221.44

34.24
2.66

19.89
0.9

2.39
8.61

Remuneraciones no calificada

21.00

0.41

Material Nacional

10.58

0.84

4.02 ENCOFRADO Y DESENCOFRADO NORMAL

28.65

331.69

8.89
259.41

Remuneraciones calificada

56.04

0.9

Remuneraciones no calificada

52.50

0.41

21.53

223.15

0.84

187.45

Material Nacional
4.03 ARMADO Y COLOCACIN DE ACERO FY=4200 KG/CM2

510.79

50.44

425.32

Remuneraciones calificada

39.25

0.9

Remuneraciones no calificada

14.18

0.41

5.81

457.36

0.84

384.18

Material Nacional
4.04 CONCRETO F'C=210 KG/CM2

968.72

35.33

785.42

Remuneraciones calificada

52.01

0.9

Remuneraciones no calificada

73.08

0.41

29.96

843.63

0.84

708.65

Material Nacional
4.05 COMPUERTA METALICA CON VOLANTE

818.94

46.81

670.78

Remuneraciones calificada

75.68

0.9

Remuneraciones no calificada

50.40

0.41

20.66

692.86

0.84

582.00

Material Nacional
4.06 TARRAJEO DE MUROS Y PISOS, MEZCLA 1:5
Remuneraciones calificada

77.94
9.46

68.11

60.62
0.9

8.51

Remuneraciones no calificada

12.60

0.41

5.17

Material Nacional

55.88

0.84

46.94

5 MEJORAMIENTO DESARENADOR
5.01 EXCAVACIN EN MATERIAL SUELTO

2,581.04

2,088.93

12.98

5.49

Remuneraciones no calificada
Material Nacional
5.02 ENCOFRADO Y DESENCOFRADO NORMAL

12.60

0.41

0.38

0.84

398.02

5.17
0.32
311.28

Remuneraciones calificada

67.25

0.9

Remuneraciones no calificada

63.00

0.41

25.83

267.77

0.84

224.93

Material Nacional
5.03 CONCRETO F'C=175 KG/CM2

883.34

60.53

719.31

Remuneraciones calificada

41.70

0.9

Remuneraciones no calificada

58.59

0.41

24.02

783.05

0.84

657.76

Material Nacional
5.04 ARMADO Y COLOCACIN DE ACERO FY=4200 KG/CM2

539.14

37.53

448.35

Remuneraciones calificada

41.42

0.9

Remuneraciones no calificada

14.36

0.41

5.89

482.36

0.84

405.18

Material Nacional
5.05 ESTRUCTURAS METALICAS

468.29

37.28

384.80

Remuneraciones calificada

37.84

0.9

Remuneraciones no calificada

25.20

0.41

10.33

405.25

0.84

340.41

Material Nacional
5.06 REJILLA DE LIMPIA EN DESARENADOR 0.15x0.30 M.

182.58

34.06

144.80

Remuneraciones calificada

37.84

0.9

Remuneraciones no calificada

25.20

0.41

10.33

119.54

0.84

100.41

Material Nacional
5.07 TARRAJEO DE MUROS Y PISOS, MEZCLA 1:5

96.30

34.06

74.90

Remuneraciones calificada

11.69

0.9

Remuneraciones no calificada

15.57

0.41

6.38

Material Nacional

69.04

0.84

57.99

6 CANAL DE CONCRETO
6.01 TRAZO Y REPLANTEO
Remuneraciones calificada
Remuneraciones no calificada
Material Nacional
6.02 EXCAVACION EN MATERIAL CONGLOMERADO
Remuneraciones calificada

1,179,223.38

928,978.42

2,581.38
454.08

10.52

1,675.48
0.9

408.67

1,209.60

0.41

495.94

917.70

0.84

44,866.12
3,486.10

770.87
22,302.76

0.9

3,137.49

Remuneraciones no calificada

18,345.83

0.41

7,521.79

Material Nacional

13,861.28

0.84

11,643.48

6.03 EXCAVACIN EN MATERIAL SUELTO


Remuneraciones no calificada
Material Nacional
6.04 ENCOFRADO Y DESENCOFRADO NORMAL

18,896.20

7,984.10

18,345.83

0.41

550.37

0.84

278,613.41

7,521.79
462.31
217,897.25

Remuneraciones calificada

47,075.26

0.9

Remuneraciones no calificada

44,098.90

0.41

18,080.55

187,439.25

0.84

157,448.97

Material Nacional
6.05 CONCRETO F'C=175 KG/CM2

815,510.87

42,367.73

664,079.29

Remuneraciones calificada

38,493.90

0.9

Remuneraciones no calificada

54,091.80

0.41

22,177.64

722,925.17

0.84

607,257.14

Material Nacional
6.06 JUNTA ASFALTICA

18,775.11

34,644.51

15,039.55

Remuneraciones calificada

7,673.60

0.9

6,906.24

Remuneraciones no calificada

2,772.00

0.41

1,136.52

Material Nacional

8,329.51

0.84

7 OBRAS DE ARTE
7.01 ACUEDUCTO (02)
7.02 TRAZO Y REPLANTEO

6,996.79

52,058.37

59,529.40

33,762.42

27,440.97

17.21

11.17

Remuneraciones calificada

3.03

0.9

2.73

Remuneraciones no calificada

8.06

0.41

3.30

Material Nacional

6.12

0.84

7.03 EXCAVACIN EN MATERIAL SUELTO


Remuneraciones no calificada
Material Nacional
7.04 ENCOFRADO Y DESENCOFRADO NORMAL

100.36

5.14
42.40

97.44

0.41

2.92

0.84

7,960.39

39.95
2.45
6,225.64

Remuneraciones calificada

1,345.01

0.9

Remuneraciones no calificada

1,259.97

0.41

516.59

Material Nacional

5,355.41

0.84

4,498.54

7.05 ARMADO Y COLOCACIN DE ACERO FY=4200 KG/CM2

13,620.49

1,210.51

11,341.46

Remuneraciones calificada
Remuneraciones no calificada
Material Nacional
7.06 CONCRETO F'C=175 KG/CM2

325.46

0.84

8,911.53

0.9

Remuneraciones no calificada

15.57

0.41

6.38

Material Nacional

69.04

0.84

57.99

6,543.52
177.37

Remuneraciones no calificada

172.20

0.41

5.17

0.84

ENCOFRADO Y DESENCOFRADO NORMAL

10.52

5,214.64

EXCAVACIN EN MATERIAL SUELTO

74.94

1,379.80

70.60
4.34
1,079.11

Remuneraciones calificada

233.13

0.9

Remuneraciones no calificada

218.39

0.41

89.54

Material Nacional

928.28

0.84

779.76

CONCRETO F'C=175 KG/CM2

4,986.53

209.82

4,060.59

Remuneraciones calificada

235.38

0.9

Remuneraciones no calificada

330.75

0.41

135.61

4,420.40

0.84

3,713.14

EXCAVACIN EN MATERIAL SUELTO

ENCOFRADO Y DESENCOFRADO NORMAL

14,242.07

211.84

11,421.12

218.03

92.12

211.68

0.41

6.35

0.84

1,653.10

86.79
5.33
1,292.85

Remuneraciones calificada

279.31

0.9

251.38

Remuneraciones no calificada

261.65

0.41

107.28

1,112.14

0.84

CONCRETO F'C=175 KG/CM2

4,302.67

934.20
3,503.71

Remuneraciones calificada

203.10

0.9

Remuneraciones no calificada

285.39

0.41

117.01

3,814.18

0.84

3,203.91

Material Nacional
COMPUERTA METALICA CON VOLANTE

8,286.56

182.79

6,532.43

Remuneraciones calificada

1,892.00

0.9

Remuneraciones no calificada

1,260.00

0.41

516.60

5,134.56

0.84

4,313.03

Material Nacional

7.1 RAPIDAS (05 UND)

4,981.39
134.11

0.9

Remuneraciones no calificada

130.20

0.41

3.91

0.84

ENCOFRADO Y DESENCOFRADO NORMAL

1,702.80

177.37

EXCAVACIN EN MATERIAL SUELTO


Material Nacional

07.10.03

74.90

11.69

Material Nacional

07.10.02

96.30

508.41

Remuneraciones calificada

Material Nacional

07.10.01

9,745.40

10,608.97

Remuneraciones no calificada

07.09.04

11,967.67
0.41

7.09 TOMA LATERAL TIPO I (50 UND.)

07.09.03

10,244.72

793.80

Material Nacional

07.09.02

0.84

Remuneraciones no calificada

Material Nacional

07.09.01

154.98

12,196.09

0.9

7.08 PASARELA (20 UND.)

07.08.03

941.76

0.41

564.90

7.07 TARRAJEO DE MUROS Y PISOS, MEZCLA 1:5

07.08.02

0.9

378.00

Remuneraciones calificada
Material Nacional

07.08.01

1,046.40

1,342.64

120.70
53.38
3.28
1,050.05

Remuneraciones calificada

226.86

0.9

Remuneraciones no calificada

212.51

0.41

87.13

Material Nacional

903.27

0.84

758.75

CONCRETO F'C=175 KG/CM2

3,504.82

204.17

2,854.01

Remuneraciones calificada

165.44

0.9

Remuneraciones no calificada

232.47

0.41

95.31

3,106.91

0.84

2,609.80

Material Nacional

8 FLETE
8.01 FLETE TERRESTRE

195,000.00

148.90

175,500.00

95,000.00

85,500.00

Remuneraciones calificada

95,000.00

0.9

85,500.00

8.02 FLETE RURAL


Remuneraciones calificada

100,000.00
100,000.00

0.9

90,000.00
90,000.00

COSTO DIRECTO
GASTOS GENERALES (15 %)
UTILIDAD (10 %)
SUBTOTAL
IGV (19 %)
TOTAL PRESUPUESTO

1,454,397.06

1,177,306.75

218,159.56

176,596.01

145,439.71

117,730.67

1,817,996.33

1,471,633.43

345,419.30
2,163,415.63

279,610.35
1,751,243.79

1 OBRAS PROVISIONALES
1.01 ALMACEN 5.0x6.0M

2 OBRAS PRELIMINARES
2.01 CARTEL DE IDENTIFICACION DE OBRA DE 4.80x3.60 M.
2.02 LIMPIEZA Y DESBROCE

3 MEJORAMIENTO CAMARA DISIPADORA


3.01 DEMOLICION ESTRUCTURA DE CONCRETO
3.02 EXCAVACION EN MATERIAL CONGLOMERADO
3.03 ENCOFRADO Y DESENCOFRADO NORMAL

1,052.87
1,052.87
3,949.15
247.27
3,701.88
3,986.54
19.74
35.80
522.95

3.04 ARMADO Y COLOCACIN DE ACERO FY=4200 KG/CM2

1,795.73

3.05 CONCRETO F'C=210 KG/CM2

1,408.33

3.06 TARRAJEO DE MUROS Y PISOS, MEZCLA 1:5

4 MEJORAMIENTO CAPTACION
4.01 EXCAVACION EN MATERIAL CONGLOMERADO

203.98
2,221.44
19.89

4.02 ENCOFRADO Y DESENCOFRADO NORMAL

259.41

4.03 ARMADO Y COLOCACIN DE ACERO FY=4200 KG/CM2

425.32

4.04 CONCRETO F'C=210 KG/CM2

785.42

4.05 COMPUERTA METALICA CON VOLANTE

670.78

4.06 TARRAJEO DE MUROS Y PISOS, MEZCLA 1:5

60.62

5 MEJORAMIENTO DESARENADOR

2,088.93

5.01 EXCAVACIN EN MATERIAL SUELTO

5.49

5.02 ENCOFRADO Y DESENCOFRADO NORMAL

311.28

5.03 CONCRETO F'C=175 KG/CM2

719.31

5.04 ARMADO Y COLOCACIN DE ACERO FY=4200 KG/CM2

448.35

5.05 ESTRUCTURAS METALICAS

384.80

5.06 REJILLA DE LIMPIA EN DESARENADOR 0.15x0.30 M.

144.80

5.07 TARRAJEO DE MUROS Y PISOS, MEZCLA 1:5

6 CANAL DE CONCRETO
6.01 TRAZO Y REPLANTEO
6.02 EXCAVACION EN MATERIAL CONGLOMERADO
6.03 EXCAVACIN EN MATERIAL SUELTO

74.90
928,978.42
1,675.48
22,302.76
7,984.10

6.04 ENCOFRADO Y DESENCOFRADO NORMAL

217,897.25

6.05 CONCRETO F'C=175 KG/CM2

664,079.29

6.06 JUNTA ASFALTICA

7 OBRAS DE ARTE
7.01 ACUEDUCTO (02)
7.02 TRAZO Y REPLANTEO
7.03 EXCAVACIN EN MATERIAL SUELTO
7.04 ENCOFRADO Y DESENCOFRADO NORMAL
7.05 ARMADO Y COLOCACIN DE ACERO FY=4200 KG/CM2
7.06 CONCRETO F'C=175 KG/CM2
7.07 TARRAJEO DE MUROS Y PISOS, MEZCLA 1:5

7.08 PASARELA (20 UND.)


07.08.01

EXCAVACIN EN MATERIAL SUELTO

07.08.02

ENCOFRADO Y DESENCOFRADO NORMAL

07.08.03

CONCRETO F'C=175 KG/CM2

7.09 TOMA LATERAL TIPO I (50 UND.)

15,039.55
59,529.40
27,440.97
11.17
42.40
6,225.64
11,341.46
9,745.40
74.90
5,214.64
74.94
1,079.11
4,060.59
11,421.12

07.09.01

EXCAVACIN EN MATERIAL SUELTO

07.09.02

ENCOFRADO Y DESENCOFRADO NORMAL

1,292.85

07.09.03

CONCRETO F'C=175 KG/CM2

3,503.71

07.09.04

COMPUERTA METALICA CON VOLANTE

6,532.43

7.1 RAPIDAS (05 UND)


07.10.01

EXCAVACIN EN MATERIAL SUELTO

07.10.02

ENCOFRADO Y DESENCOFRADO NORMAL

07.10.03

CONCRETO F'C=175 KG/CM2

8 FLETE
8.01 FLETE TERRESTRE
8.02 FLETE RURAL

COSTO DIRECTO
GASTOS GENERALES (15 %)
UTILIDAD (10 %)
IGV (19 %)
TOTAL PRESUPUESTO

92.12

177.37
120.70
1,050.05
2,854.01
175,500.00
85,500.00
90,000.00
1,177,306.75
176,596.01
117,730.67
279,610.35
1,751,243.79

DESCRIPCIN
1 OBRAS PROVISIONALES
1.01 ALMACEN 5.0x6.0M

PARCIAL S/. F.C. PARCIAL S/.


1,283.16

1,052.87

1,283.16

1,052.87

Remuneraciones calificada

99.66

0.9

Remuneraciones no calificada

72.00

0.41

29.52

1,111.50

0.84

933.66

Materiales Nacional

2 OBRAS PRELIMINARES
2.01 CARTEL DE IDENTIFICACION DE OBRA DE 4.80x3.60 M.
Remuneraciones no calificada
Materiales Nacional
2.02 LIMPIEZA Y DESBROCE
Remuneraciones no calificada
Materiales Nacional

3 MEJORAMIENTO CAMARA DISIPADORA


3.01 DEMOLICION ESTRUCTURA DE CONCRETO
Remuneraciones no calificada
Materiales Nacional
3.02 EXCAVACION EN MATERIAL CONGLOMERADO

8,874.62

3,949.15

294.62

247.27

0.50

0.41

0.21

294.12

0.84

247.06

8,599.50

3,701.88

8,190.00

0.41

409.50

0.84

4,934.52

3,357.90
343.98
3,982.94

46.72

19.74

45.36

0.41

1.36

0.84

61.63

18.60
1.14
32.20

Remuneraciones no calificada

37.80

0.41

Materiales Nacional

19.88

0.84

3.03 ENCOFRADO Y DESENCOFRADO NORMAL

89.69

668.67

15.50
16.70
522.95

Remuneraciones calificada

112.98

0.9

Remuneraciones no calificada

105.85

0.41

43.40

Materiales Nacional

449.85

0.84

377.87

3.04 ARMADO Y COLOCACIN DE ACERO FY=4200 KG/CM2


Remuneraciones calificada
Remuneraciones no calificada
Materiales Nacional
3.05 CONCRETO F'C=210 KG/CM2
Remuneraciones calificada
Remuneraciones no calificada
Materiales Nacional
3.06 TARRAJEO DE MUROS Y PISOS, MEZCLA 1:5

2,156.58
165.68

101.68

1,795.73
0.9

149.11

59.85

0.41

24.54

1,931.05

0.84

1,622.08

1,737.00
93.25

1,408.33
0.9

83.93

131.04

0.41

53.73

1,512.71

0.84

1,270.68

262.27

203.98

Remuneraciones calificada

31.83

0.9

Remuneraciones no calificada

42.40

0.41

17.38

188.04

0.84

157.95

Materiales Nacional

4 MEJORAMIENTO CAPTACION
4.01 EXCAVACION EN MATERIAL CONGLOMERADO
Remuneraciones calificada

2,153.49

1,735.50

34.24
2.66

19.89
0.9

2.39
8.61

Remuneraciones no calificada

21.00

0.41

Materiales Nacional

10.58

0.84

4.02 ENCOFRADO Y DESENCOFRADO NORMAL

28.65

331.69

8.89
259.41

Remuneraciones calificada

56.04

0.9

Remuneraciones no calificada

52.50

0.41

21.53

223.15

0.84

187.45

Materiales Nacional
4.03 CONCRETO F'C=210 KG/CM2

968.72

50.44

785.42

Remuneraciones calificada

52.01

0.9

Remuneraciones no calificada

73.08

0.41

29.96

843.63

0.84

708.65

Materiales Nacional
4.04 COMPUERTA METALICA CON VOLANTE

818.94

46.81

670.78

Remuneraciones calificada

75.68

0.9

Remuneraciones no calificada

50.40

0.41

20.66

692.86

0.84

582.00

Material Nacional

5 MEJORAMIENTO DESARENADOR - CAMARA DE CARGA

1,945.15

1,565.68

5.01 EXCAVACIN EN MATERIAL SUELTO

12.98

Remuneraciones no calificada

12.60

0.41

0.38

0.84

Materiales Nacional
5.02 ENCOFRADO Y DESENCOFRADO NORMAL

68.11

5.49

398.02

5.17
0.32
311.28

Remuneraciones calificada

67.25

0.9

Remuneraciones no calificada

63.00

0.41

25.83

267.77

0.84

224.93

Materiales Nacional
5.03 CONCRETO F'C=175 KG/CM2

883.34

60.53

719.31

Remuneraciones calificada

41.70

0.9

Remuneraciones no calificada

58.59

0.41

24.02

783.05

0.84

657.76

Materiales Nacional

37.53

5.04 ESTRUCTURAS METALICAS

468.29

Remuneraciones calificada

37.84

0.9

Remuneraciones no calificada

25.20

0.41

10.33

405.25

0.84

340.41

Materiales Nacional
5.05 REJILLA DE LIMPIA EN DESARENADOR 0.15x0.30 M.

384.80

182.58

34.06

144.80

Remuneraciones calificada

37.84

0.9

Remuneraciones no calificada

25.20

0.41

10.33

119.54

0.84

100.41

Materiales Nacional

6 CANAL ENTUBADO (L=12 KM)


6.01 TRAZO Y REPLANTEO
Remuneraciones calificada
Remuneraciones no calificada
Materiales Nacional

2,049,465.14

1,570,982.26

2,581.38
454.08

34.06

1,675.48
0.9

408.67

1,209.60

0.41

495.94

917.70

0.84

770.87

6.02 EXCAVACIN EN MATERIAL SUELTO


Remuneraciones no calificada
Materiales Nacional
6.03 CAMA DE APOYO EN MATERIAL SELECCIONADO
Remuneraciones calificada
Remuneraciones no calificada
Materiales Nacional
6.04 RELLENO COMPACTADO CON MATERIAL SELECCIONADO
Remuneraciones calificada
Remuneraciones no calificada
Materiales Nacional
6.05 RELLENO CON MATERIAL PROPIO
Remuneraciones calificada
Remuneraciones no calificada
Materiales Nacional
6.06 SUM. E INSTAL. DE TUBERIA PERFILADA DE PVC D = 350 MM

1,904.85

0.84

1,600.07

8,186.87
68.46

6,529.75
0.9

61.61

270.24

0.41

110.80

7,568.26

0.84

6,357.34

348.86
68.46

180.95
0.9

270.24

0.41

10.16

0.84

412,797.92

61.61
110.80
8.53
346,455.15
330.62

779,444.33

774.72

590,179.24

Remuneraciones calificada

188,300.00

0.9

Remuneraciones no calificada

176,400.00

0.41

72,324.00

Materiales Nacional

414,744.33

0.84

348,385.24

598,487.65

169,470.00

456,619.63

Remuneraciones calificada

134,500.00

0.9

Remuneraciones no calificada

126,000.00

0.41

51,660.00

Materiales Nacional

337,987.65

0.84

283,909.63

241,433.00

121,050.00

165,915.72

Remuneraciones calificada

107,600.00

0.9

96,840.00

Remuneraciones no calificada

100,800.00

0.41

41,328.00

33,033.00

0.84

EXCAVACIN EN MATERIAL SUELTO

ARMADO Y COLOCACIN DE ACERO FY=4200 KG/CM2


Remuneraciones no calificada
Material Nacional
CONCRETO F'C=175 KG/CM2

27,747.72

99,416.40

229,416.40

25,796.53

21,204.16

100.36

42.40

97.44

0.41

2.92

0.84

13,620.49
1,046.40

39.95
2.45
11,341.46

0.9

941.76

378.00

0.41

154.98

12,196.09

0.84

10,244.72

11,967.67

9,745.40

Remuneraciones calificada

564.90

0.9

Remuneraciones no calificada

793.80

0.41

325.46

10,608.97

0.84

8,911.53

Material Nacional
TARRAJEO DE MUROS Y PISOS, MEZCLA 1:5

96.30

508.41

74.90

Remuneraciones calificada

11.69

0.9

Remuneraciones no calificada

15.57

0.41

6.38

Materia Nacional

69.04

0.84

57.99

7.02 CAMARA DE INSPECCION Y TOMAS LATERALES (50 UND)


EXCAVACIN EN MATERIAL SUELTO
Remuneraciones no calificada
Material Nacional
ENCOFRADO Y DESENCOFRADO NORMAL

73,619.87

10.52

58,669.65

433.48

183.16

420.85

0.41

12.63

0.84

27,861.34

172.55
10.61
21,789.72

Remuneraciones calificada

4,707.53

0.9

Remuneraciones no calificada

4,409.89

0.41

1,808.05

18,743.92

0.84

15,744.89

Material Nacional
CONCRETO F'C=175 KG/CM2

37,042.78

4,236.78

30,164.34

Remuneraciones calificada

1,748.50

0.9

Remuneraciones no calificada

2,457.00

0.41

1,007.37

Material Nacional

32,837.28

0.84

27,583.32

COMPUERTA METALICA CON VOLANTE

1,573.65

8,286.56

6,532.43

Remuneraciones calificada

1,892.00

0.9

Remuneraciones no calificada

1,260.00

0.41

516.60

Material Nacional

5,134.56

0.84

4,313.03

7.03 FLETE

07.03.02

221.60

345,349.80

Remuneraciones calificada

07.03.01

36.52

0.41

0.84

Materiales Nacional

07.02.04

0.9

540.49

411,130.72

Remuneraciones no calificada

07.02.03

40.58

90.80
1,858.20

0.9

7 OBRAS DE ARTE
7.01 ACUEDUCTO (02)

07.02.02

2,485.92

1,477.36

0.41

Materiales Nacional

07.02.01

0.84

806.40

6.09 SUM. E INSTAL. DE TUBERIA PERFILADA DE PVC D = 500 MM

07.01.04

108.10

860.80

6.08 SUM. E INSTAL. DE TUBERIA PERFILADA DE PVC D = 450 MM

07.01.03

0.41

Remuneraciones no calificada
6.07 SUM. E INSTAL. DE TUBERIA PERFILADA DE PVC D = 400 MM

07.01.02

1,568.16

3,603.31

Remuneraciones calificada
Materiales Nacional

07.01.01

3,711.41

130,000.00

FLETE TERRESTRE

80,000.00

Material Nacional

80,000.00

FLETE RURAL

50,000.00

Material Nacional

50,000.00

COSTO DIRECTO

1,702.80

109,200.00
67,200.00
0.84

67,200.00
42,000.00

0.84

42,000.00

2,298,072.48

1,921,884.80

GASTOS GENERALES (15 %)

344,710.87

288,282.72

UTILIDAD (10 %)

229,807.25

192,188.48

2,872,590.60

2,402,356.00

SUBTOTAL
IGV (19 %)
TOTAL PRESUPUESTO

545,792.21

456,447.64

3,418.328.81

2,858,803.64

1 OBRAS PROVISIONALES
1.01 ALMACEN 5.0x6.0M

2 OBRAS PRELIMINARES
2.01 CARTEL DE IDENTIFICACION DE OBRA DE 4.80x3.60 M.
2.02 LIMPIEZA Y DESBROCE

3 MEJORAMIENTO CAMARA DISIPADORA


3.01 DEMOLICION ESTRUCTURA DE CONCRETO
3.02 EXCAVACION EN MATERIAL CONGLOMERADO
3.03 ENCOFRADO Y DESENCOFRADO NORMAL

1,052.87
1,052.87
3,949.15
247.27
3,701.88
3,982.94
19.74
32.20
522.95

3.04 ARMADO Y COLOCACIN DE ACERO FY=4200 KG/CM2

1,795.73

3.05 CONCRETO F'C=210 KG/CM2

1,408.33

3.06 TARRAJEO DE MUROS Y PISOS, MEZCLA 1:5

4 MEJORAMIENTO CAPTACION
4.01 EXCAVACION EN MATERIAL CONGLOMERADO

203.98
1,735.50
19.89

4.02 ENCOFRADO Y DESENCOFRADO NORMAL

259.41

4.03 CONCRETO F'C=210 KG/CM2

785.42

4.04 COMPUERTA METALICA CON VOLANTE

5 MEJORAMIENTO DESARENADOR - CAMARA DE CARGA


5.01 EXCAVACIN EN MATERIAL SUELTO

670.78
1,565.68
5.49

5.02 ENCOFRADO Y DESENCOFRADO NORMAL

311.28

5.03 CONCRETO F'C=175 KG/CM2

719.31

5.04 ESTRUCTURAS METALICAS

384.80

5.05 REJILLA DE LIMPIA EN DESARENADOR 0.15x0.30 M.

6 CANAL ENTUBADO (L=12 KM)

144.80
1,570,982.26

6.01 TRAZO Y REPLANTEO

1,675.48

6.02 EXCAVACIN EN MATERIAL SUELTO

1,568.16

6.03 CAMA DE APOYO EN MATERIAL SELECCIONADO

1,858.20

6.04 RELLENO COMPACTADO CON MATERIAL SELECCIONADO

6,529.75

6.05 RELLENO CON MATERIAL PROPIO

180.95

6.06 SUM. E INSTAL. DE TUBERIA PERFILADA DE PVC D = 350 MM

346,455.15

6.07 SUM. E INSTAL. DE TUBERIA PERFILADA DE PVC D = 400 MM

590,179.24

6.08 SUM. E INSTAL. DE TUBERIA PERFILADA DE PVC D = 450 MM

456,619.63

6.09 SUM. E INSTAL. DE TUBERIA PERFILADA DE PVC D = 500 MM

7 OBRAS DE ARTE
7.01 ACUEDUCTO (02)
07.01.01

EXCAVACIN EN MATERIAL SUELTO

07.01.02

ARMADO Y COLOCACIN DE ACERO FY=4200 KG/CM2

07.01.03

CONCRETO F'C=175 KG/CM2

07.01.04

TARRAJEO DE MUROS Y PISOS, MEZCLA 1:5

7.02 CAMARA DE INSPECCION Y TOMAS LATERALES (50 UND)

165,915.72
229,416.40
21,204.16
42.40
11,341.46
9,745.40
74.90
58,669.65

07.02.01

EXCAVACIN EN MATERIAL SUELTO

07.02.02

ENCOFRADO Y DESENCOFRADO NORMAL

21,789.72

07.02.03

CONCRETO F'C=175 KG/CM2

30,164.34

07.02.04

COMPUERTA METALICA CON VOLANTE

7.03 FLETE
07.03.01

FLETE TERRESTRE

07.03.02

FLETE RURAL

COSTO DIRECTO

183.16

6,532.43
109,200.00
67,200.00
42,000.00
1,921,884.80

GASTOS GENERALES (15 %)

288,282.72

UTILIDAD (10 %)

192,188.48

IGV (19 %)
TOTAL PRESUPUESTO