Actividad
1
23/10/09
Vr.Mano de Obra
Vr.Total
M
M
M2
M2
M2
M2
HR
616.00
986.00
1,233.00
723.00
1,925.00
0.00
0.00
1,628.00
2,163.00
2,804.00
1,310.00
1,976.00
798.00
90,000.00
HR
0.00
120,000.00
M2
3,340.00
4,589.00
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
11,560.00
17,340.00
23,120.00
14,450.00
46,240.00
77,059.00
663.00
663.00
1,700.00
1,700.00
11,907.00
23,831.00
32,119.00
25,324.00
48,552.00
80,912.00
11,288.00
15,663.00
18,700.00
25,700.00
M3
M3
M3
5,100.00
6,375.00
33,723.00
61,100.00
93,875.00
289,053.00
M2
M2
M3
2,749.00
7,140.00
2,890.00
9,863.00
22,943.00
14,967.00
M3
2,887.00
28,790.00
M3
5,780.00
8,679.00
M3
2,890.00
22,715.00
M3
4,624.00
24,676.00
M3
5,780.00
59,429.00
M3
7,711.00
64,508.00
M3
0.00
38,815.00
M
M
M2
578.00
723.00
3,193.00
6,382.00
7,995.00
5,611.00
M2
5,780.00
13,403.00
M2
10,762.00
14,300.00
M3
8,497.00
57,421.00
M3
17,003.00
102,845.00
M2
7,140.00
30,918.00
U.M.
1 PRELIMINARES
1.1 Localizacin y replanteo para redes de acueducto
1.2 Localizacin y replanteo para redes de alcantarillado
1.3 Localizacin y replanteo para estructuras hidrulicas
1.4 Desmonte y limpieza en rastrojo
1.5 Descapote manual
1.6 Descapote mecnico
1.7 Ampliacin y mejoramiento de vas de acceso con
bulldozer
1.8 Control de ros mediante conformacin mecnica de
jarilln (inc. retroexcavadora orugada)
1.9 Acondicionamiento de superficies para
impermeabilizacin con membranas (limpieza con cepillo
metlico y pulidora)
2 EXCAVACIONES
2.1 Excavacin manual en conglomerado h < 1.50m
2.2 Excavacin manual en conglomerado 1.50m < h < 3.0m
2.3 Excavacin manual en conglomerado h > 3.0m
2.4 Excavacin manual en conglomerado hmedo h < 1.50m
2.5 Excavacin manual en roca h<1.5m
2.6 Excavacin manual en roca 1.5m < h < 3.0m
2.7 Excavacin mecnica en conglomerado h < 3.0m
2.8 Excavacin mecnica en conglomerado h > 3.0m
2.9 Excavacin mecnica en conglomerado hmedo h<3.0m
2.10 Excavacin mecnica en conglomerado hmedo
h>3.0m
2.11 Excavacin mecnica en roca h<3.0m
2.12 Excavacin mecnica en roca h>3.0m
2.13 Demolicin de roca con agente demoledor no expansivo
(incluye perforacin con compresor)
2.14 Entibado tipo 1 (formaleta madera 1/7 utilizaciones)
2.15 Entibado tipo 2 (formaleta madera 1/7 utilizaciones)
2.16 Retiro sobrantes de excavacin
3 RELLENOS
3.1 Arena para base de tubera (incluye extendida y
compactada)
3.2 Relleno material seleccionado proveniente de la
excavacin (incluye compactacin c/0.20m)
3.3 Relleno material seleccionado tamao mximo 3"
(incluye explote, cargue, acarreo y conformacin)
3.4 Relleno material seleccionado tamao mximo 2"
(incluye explote, cargue, acarreo y conformacin)
3.5 Sub-base triturada tamao mximo 2" (incluye acarreo,
conformacin y compactacin c/0.30m)
3.6 Base triturada tamao mximo 1 1/2" (incluye acarreo,
conformacin y compactacin c/0.10m)
3.7 Afirmado en material seleccionado tamao mximo 2"
(incluye explote, cargue, acarreo y conformacin)
4 DEMOLICIONES
4.1 Corte de pavimento flexible
4.2 Corte de pavimento rigido
4.3 Demolicin de pavimento flexible (incluye retiro de
escombros)
4.4 Demolicin de pavimento rgido (incluye retiro de
escombros)
4.5 Demolicin manual de pisos y andenes (incluye retiro de
escombros)
4.6 Demolicin de tubera en concreto (incluye retiro de
escombros)
4.7 Demolicin de concreto reforzado (incluye retiro de
escombros)
5 PAVIMENTOS
5.1 Carpeta asfltica, e=0.05m (incluye imprimacin)
Actividad
U.M.
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
M2
M2
M3
M2
7,140.00
7,140.00
122,645.00
6,460.00
39,889.00
53,036.00
538,051.00
69,442.00
M2
6,460.00
86,328.00
2,455.00
26,161.00
2,988.00
37,474.00
3,844.00
54,765.00
4,490.00
79,642.00
5,055.00
91,182.00
5,378.00
122,569.00
6,734.00
159,092.00
8,979.00
196,686.00
8,861.00
293,170.00
11,815.00
377,450.00
14,174.00
457,950.00
17,701.00
554,010.00
21,250.00
779,615.00
23,609.00
978,075.00
26,563.00
1,065,220.00
30,366.00
1,152,845.00
30,366.00
1,535,945.00
35,424.00
1,657,959.00
35,424.00
1,729,910.00
35,424.00
1,831,500.00
35,424.00
1,927,691.00
UN
35,700.00
114,270.00
UN
39,270.00
151,137.00
UN
39,270.00
313,252.00
UN
35,700.00
106,259.00
UN
7,081.00
95,728.00
UN
7,081.00
108,890.00
UN
7,081.00
181,006.00
7 DOMICILIARIAS ALCANTARILLADO
7.1 Caja inspeccin 0.50x0.50m, concreto ref. 3000 PSI
elab.en obra, h=0.70m , e=0.07m (inc. excavacin, formaleta
1/3 usos)
7.2 Caja inspeccin 0.70x0.70m, concreto ref. 3000 PSI
elab.en obra, h=0.70m , e=0.07m (inc. excavacin, formaleta
1/3 usos)
7.3 Caja inspeccin 0.90x0.90m, concreto ref. 3000 PSI
elab.en obra, h=0.90m , e=0.10m (inc. excavacin, formaleta
1/3 usos)
7.4 Caja inspeccin 0.50x0.50m, concreto ref. 3000 PSI elab.
planta, h=0.70m , e=0.07m (inc. excavacin, formaleta 1/3
usos)
7.5 Suministro e instalacin de Kit Silla Tee 8 x 4" de PVC
para alcantarillados (incluye acondicionador y adhesivo)
7.6 Suministro e instalacin de Kit Silla Tee 8 x 6" de PVC
para alcantarillados (incluye acondicionador y adhesivo)
7.7 Suministro e instalacin de Kit Silla Tee 10 x 4" de PVC
para alcantarillados (incluye acondicionador y adhesivo)
Actividad
U.M.
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
UN
7,081.00
192,669.00
UN
8,500.00
270,999.00
UN
8,500.00
277,419.00
UN
8,500.00
259,135.00
UN
8,500.00
263,241.00
UN
10,625.00
323,780.00
UN
10,625.00
414,821.00
UN
7,081.00
95,728.00
UN
7,081.00
108,890.00
UN
7,081.00
181,006.00
UN
7,081.00
192,669.00
UN
8,500.00
270,999.00
UN
8,500.00
277,419.00
UN
8,500.00
259,135.00
UN
8,500.00
263,241.00
UN
10,625.00
323,780.00
UN
10,625.00
414,470.00
1,821.00
9,036.00
1,821.00
12,614.00
1,958.00
17,208.00
2,127.00
27,158.00
2,326.00
56,565.00
2,555.00
95,261.00
3,145.00
148,166.00
3,145.00
204,638.00
3,536.00
267,451.00
4,243.00
350,417.00
4,855.00
443,621.00
5,671.00
532,512.00
Actividad
U.M.
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
1,821.00
7,837.00
1,821.00
10,761.00
1,958.00
14,788.00
2,127.00
22,940.00
2,326.00
46,825.00
2,555.00
77,996.00
3,145.00
119,837.00
3,145.00
169,356.00
3,536.00
212,857.00
4,243.00
283,412.00
4,855.00
358,351.00
5,671.00
432,792.00
1,958.00
12,308.00
2,127.00
18,960.00
2,326.00
38,923.00
2,555.00
64,200.00
3,145.00
98,894.00
3,145.00
137,016.00
3,536.00
170,279.00
4,243.00
223,196.00
4,855.00
287,318.00
5,671.00
353,900.00
2,127.00
15,956.00
2,326.00
31,227.00
Actividad
U.M.
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
2,555.00
51,114.00
3,145.00
79,030.00
3,145.00
110,382.00
3,536.00
143,842.00
4,243.00
188,455.00
4,855.00
244,422.00
5,671.00
302,470.00
1,238.00
3,643.00
1,238.00
4,491.00
1,238.00
3,011.00
1,321.00
5,694.00
1,238.00
3,416.00
1,321.00
4,431.00
1,321.00
6,777.00
1,321.00
8,404.00
1,821.00
12,653.00
1,821.00
20,230.00
1,958.00
26,359.00
2,127.00
44,603.00
1,821.00
10,879.00
1,821.00
21,686.00
1,958.00
22,292.00
2,127.00
45,631.00
1,958.00
23,855.00
Actividad
U.M.
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
2,127.00
37,973.00
2,127.00
33,606.00
UN
0.00
20,606.00
UN
0.00
26,525.00
UN
0.00
47,935.00
UN
0.00
91,990.00
UN
0.00
244,918.00
UN
0.00
581,937.00
UN
0.00
1,265,129.00
UN
0.00
1,716,982.00
UN
0.00
17,832.00
UN
0.00
20,402.00
UN
0.00
32,194.00
UN
0.00
64,785.00
UN
0.00
178,358.00
UN
0.00
386,906.00
UN
0.00
828,065.00
UN
0.00
1,162,274.00
UN
0.00
15,737.00
UN
0.00
22,033.00
UN
0.00
31,676.00
UN
0.00
58,180.00
UN
0.00
142,548.00
UN
0.00
301,278.00
UN
0.00
674,480.00
UN
0.00
908,257.00
UN
0.00
18,133.00
UN
0.00
20,842.00
UN
0.00
28,884.00
UN
0.00
55,291.00
UN
0.00
127,522.00
UN
0.00
258,820.00
UN
0.00
552,009.00
UN
0.00
730,679.00
UN
0.00
68,421.00
Actividad
U.M.
8.96 Codo Radio Corto 90 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (3")
8.97 Codo Radio Corto 90 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (4")
8.98 Codo Radio Corto 90 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (6")
8.99 Codo Radio Corto 90 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (8")
8.100 Codo Radio Corto 45 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (3")
8.101 Codo Radio Corto 45 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (4")
8.102 Codo Radio Corto 45 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (6")
8.103 Codo Radio Corto 45 PVC -Presin Trabajo 200PSIextremos unin mecanica x liso (8")
8.104 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (2")
8.105 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (3")
8.106 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (4")
8.107 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (6")
8.108 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (8")
8.109 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (10")
8.110 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (12")
8.111 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (14")
8.112 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (16")
8.113 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (18")
8.114 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (20")
8.115 Codo 90 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (24")
8.116 Codo 45 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (2")
8.117 Codo 45 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (3")
8.118 Codo 45 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (4")
8.119 Codo 45 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (6")
8.120 Codo 45 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (8")
8.121 Codo 45 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (10")
8.122 Codo 45 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (12")
8.123 Codo 45 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (14")
8.124 Codo 45 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (16")
8.125 Codo 45 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (18")
8.126 Codo 45 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (20")
8.127 Codo 45 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (24")
8.128 Codo 22.5 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (2")
8.129 Codo 22.5 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (3")
8.130 Codo 22.5 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (4")
8.131 Codo 22.5 en H.D. -Presin Trabajo 250PSI- extremo
lisos para PVC/AC (6")
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
UN
0.00
98,921.00
UN
0.00
169,075.00
UN
0.00
310,485.00
UN
0.00
605,447.00
UN
0.00
90,488.00
UN
0.00
154,542.00
UN
0.00
310,575.00
UN
0.00
605,447.00
UN
0.00
52,324.00
UN
0.00
76,714.00
UN
0.00
98,847.00
UN
0.00
266,569.00
UN
0.00
609,988.00
UN
0.00
1,032,661.00
UN
0.00
1,289,794.00
UN
0.00
1,717,950.00
UN
0.00
2,562,192.00
UN
0.00
3,090,220.00
UN
0.00
3,678,330.00
UN
0.00
4,850,298.00
UN
0.00
63,924.00
UN
0.00
79,034.00
UN
0.00
89,567.00
UN
0.00
224,809.00
UN
0.00
648,268.00
UN
0.00
777,461.00
UN
0.00
955,714.00
UN
0.00
1,396,630.00
UN
0.00
2,137,632.00
UN
0.00
2,848,940.00
UN
0.00
3,392,970.00
UN
0.00
4,583,498.00
UN
0.00
51,164.00
UN
0.00
76,714.00
UN
0.00
112,767.00
UN
0.00
225,969.00
Actividad
U.M.
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
UN
0.00
342,028.00
UN
0.00
675,381.00
UN
0.00
1,034,594.00
UN
0.00
1,396,630.00
UN
0.00
1,660,872.00
UN
0.00
2,054,340.00
UN
0.00
2,986,970.00
UN
0.00
4,583,498.00
UN
0.00
45,364.00
UN
0.00
63,954.00
UN
0.00
89,567.00
UN
0.00
213,209.00
UN
0.00
329,268.00
UN
0.00
637,101.00
UN
0.00
906,994.00
UN
0.00
1,396,630.00
UN
0.00
1,660,872.00
UN
0.00
2,054,340.00
UN
0.00
2,986,970.00
UN
0.00
4,583,498.00
UN
0.00
18,119.00
UN
0.00
29,691.00
UN
0.00
50,990.00
UN
0.00
117,882.00
UN
0.00
216,560.00
UN
0.00
369,712.00
UN
0.00
28,516.00
UN
0.00
47,926.00
UN
0.00
54,323.00
UN
0.00
63,560.00
UN
0.00
88,033.00
UN
0.00
217,744.00
UN
0.00
256,024.00
UN
0.00
319,824.00
UN
0.00
447,836.00
UN
0.00
511,636.00
Actividad
U.M.
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
UN
0.00
537,156.00
UN
0.00
575,436.00
UN
0.00
571,414.00
UN
0.00
767,454.00
UN
0.00
1,134,014.00
UN
0.00
2,121,867.00
UN
0.00
2,310,947.00
UN
0.00
17,400.00
UN
0.00
25,520.00
UN
0.00
153,120.00
UN
0.00
66,120.00
UN
0.00
96,280.00
UN
0.00
128,876.00
UN
0.00
39,104.00
UN
0.00
49,544.00
UN
0.00
75,064.00
UN
0.00
149,684.00
UN
0.00
265,468.00
UN
25,505.00
367,880.00
UN
25,505.00
500,767.00
UN
30,600.00
599,312.00
UN
38,250.00
1,012,656.00
UN
50,995.00
1,460,231.00
UN
50,995.00
2,927,117.00
UN
11,900.00
394,272.00
UN
29,750.00
471,828.00
UN
29,750.00
703,623.00
UN
29,750.00
1,382,924.00
UN
39,663.00
1,978,957.00
UN
76,500.00
4,730,765.00
UN
76,500.00
5,561,325.00
UN
102,005.00
7,095,525.00
UN
38,250.00
522,979.00
UN
38,250.00
691,345.00
Actividad
U.M.
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
UN
38,250.00
856,844.00
UN
38,250.00
1,086,524.00
UN
38,250.00
1,057,026.00
UN
38,250.00
1,327,502.00
UN
119,000.00
1,869,358.00
UN
119,000.00
2,724,046.00
UN
178,500.00
3,475,793.00
UN
178,500.00
4,676,161.00
UN
76,500.00
1,918,314.00
UN
25,505.00
108,772.00
UN
25,505.00
110,527.00
UN
25,505.00
114,364.00
UN
25,505.00
115,839.00
UN
25,505.00
119,272.00
UN
30,600.00
158,595.00
UN
30,600.00
254,193.00
M3
50,150.00
387,198.00
M3
80,240.00
464,469.00
M3
80,240.00
476,835.00
M3
28,900.00
384,778.00
M3
28,900.00
410,602.00
M3
80,240.00
509,940.00
M3
80,240.00
534,824.00
M3
80,240.00
579,932.00
M3
80,240.00
509,940.00
M3
80,240.00
534,824.00
M3
80,240.00
579,932.00
M3
161,500.00
675,656.00
M3
193,800.00
761,765.00
M3
257,550.00
846,628.00
M3
300,475.00
929,240.00
9 DOMICILIARIAS ACUEDUCTO
9.1 Acometida domic. acued. 2x1/2" (inc. sumin. e instal.
manguera 10m, accesorios, registro corte y cajilla)
9.2 Acometida domic. acued. 2.1/2x1/2" (inc. sumin. e instal.
manguera 10m, accesorios, registro corte y cajilla)
9.3 Acometida domic. acued. 3x1/2" (inc. sumin. e instal.
manguera 10m, accesorios, registro corte y cajilla)
9.4 Acometida domic. acued. 4x1/2" (inc. sumin. e instal.
manguera 10m, accesorios, registro corte y cajilla)
9.5 Acometida domic. acued. 6x1/2" (inc. sumin. e instal.
manguera 10m, accesorios, registro corte y cajilla)
9.6 Suministro e instalacin de micromedidor de velocidad chorro nico clase B 1/2" (incluye cajilla y accesorios)
9.7 Suministro e instalacin de micromedidor de velocidad chorro mltiple clase B 3/4" (incluye cajilla y accesorios)
10 CONCRETOS Y MORTEROS
10.1 Concreto 2000 PSI para solados, elab. en obra (inc.
formaleta 1/4 usos y colocacin)
10.2 Concreto 3000 PSI para placa piso, elab. en obra (inc.
formaleta 1/4 usos y colocacin)
10.3 Concreto impermeab. 3000 PSI para placa piso, elab.
en obra (inc. formaleta 1/4 usos y colocacin)
10.4 Concreto 2500 PSI para atraque de tubera (formaleta
1/3 usos)
10.5 Concreto 3000 PSI para atraque de tubera (formaleta
1/3 usos)
10.6 Concreto 3000 PSI para zapatas, elab. en obra (inc.
formaleta 1/4 usos y colocacin)
10.7 Concreto 3500 PSI para zapatas, elab. en obra (inc.
formaleta 1/4 usos y colocacin)
10.8 Concreto 4000 PSI para zapatas, elab. en obra (inc.
formaleta 1/4 usos y colocacin)
10.9 Concreto 3000 PSI para vigas de cimentacin, elab. en
obra (inc. formaleta 1/4 usos y colocacin)
10.10 Concreto 3500 PSI para vigas de cimentacin, elab.
en obra (inc. formaleta 1/4 usos y colocacin)
10.11 Concreto 4000 PSI para vigas de cimentacin, elab.
en obra (inc. formaleta 1/4 usos y colocacin)
10.12 Concreto 3000 PSI para columnas, elab. en obra,
elevaciones h<3.0m (inc. formaleta 1/4 usos y colocacin)
10.13 Concreto 3000 PSI para columnas, elab. en obra,
elevaciones 3.0<h<6.0 m (inc. formaleta 1/4 usos y
colocacin)
10.14 Concreto 3000 PSI para columnas, elab. en obra,
elevaciones 6.0<h<12.0 m (inc. formaleta 1/4 usos y
colocacin)
10.15 Concreto 3000 PSI para columnas, elab. en obra,
elevaciones 12.0<h<18.0 m (inc. formaleta 1/4 usos y
colocacin)
Actividad
U.M.
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
M3
343,400.00
1,011,853.00
M3
161,500.00
701,147.00
M3
193,800.00
787,256.00
M3
257,550.00
872,119.00
M3
300,475.00
954,731.00
M3
343,400.00
1,037,344.00
M3
161,500.00
747,356.00
M3
193,800.00
833,465.00
M3
257,550.00
918,328.00
M3
300,475.00
1,000,940.00
M3
343,400.00
1,083,553.00
M3
193,800.00
824,302.00
M3
226,100.00
876,771.00
M3
300,475.00
991,777.00
M3
343,400.00
1,074,390.00
M3
386,325.00
1,157,003.00
M3
193,800.00
849,793.00
M3
226,100.00
902,262.00
M3
300,475.00
1,017,268.00
M3
343,400.00
1,099,881.00
M3
386,325.00
1,182,494.00
M3
193,800.00
836,970.00
M3
226,100.00
889,439.00
M3
300,475.00
1,004,445.00
M3
343,400.00
1,087,058.00
Actividad
U.M.
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
M3
386,325.00
1,169,671.00
M3
161,500.00
785,859.00
M3
193,800.00
844,728.00
M3
257,550.00
961,591.00
M3
300,475.00
1,057,003.00
M3
343,400.00
1,152,416.00
M3
161,500.00
811,350.00
M3
193,800.00
870,219.00
M3
257,550.00
987,082.00
M3
300,475.00
1,082,494.00
M3
343,400.00
1,177,907.00
M3
161,500.00
857,559.00
M3
193,800.00
916,428.00
M3
257,550.00
1,033,291.00
M3
300,475.00
1,128,703.00
M3
343,400.00
1,224,116.00
M3
161,500.00
798,527.00
M3
193,800.00
857,396.00
M3
257,550.00
974,259.00
M3
300,475.00
1,069,671.00
M3
343,400.00
1,165,084.00
M3
161,500.00
826,059.00
M3
193,800.00
884,928.00
M3
257,550.00
1,001,791.00
M3
300,475.00
1,097,203.00
Actividad
U.M.
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
M3
343,400.00
1,192,616.00
M3
161,500.00
874,718.00
M3
193,800.00
933,587.00
M3
257,550.00
1,050,450.00
M3
300,475.00
1,145,862.00
M3
343,400.00
1,241,275.00
M3
193,800.00
810,155.00
M3
226,100.00
860,523.00
M3
300,475.00
962,729.00
M3
343,400.00
1,032,542.00
M3
386,325.00
1,100,394.00
M3
193,800.00
839,459.00
M3
226,100.00
885,528.00
M3
300,475.00
987,734.00
M3
343,400.00
1,057,547.00
M3
386,325.00
1,125,399.00
M3
429,250.00
1,189,887.00
M3
193,800.00
851,147.00
M3
226,100.00
930,856.00
M3
300,475.00
1,033,062.00
M3
343,400.00
1,102,875.00
M3
386,325.00
1,170,727.00
M3
193,800.00
826,880.00
M3
226,100.00
872,949.00
M3
300,475.00
975,155.00
M3
343,400.00
1,044,968.00
Actividad
U.M.
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
M3
386,325.00
1,112,820.00
M3
193,800.00
853,887.00
M3
226,100.00
899,956.00
M3
300,475.00
1,002,162.00
M3
343,400.00
1,071,975.00
M3
386,325.00
1,139,827.00
M3
193,800.00
901,620.00
M3
226,100.00
947,689.00
M3
300,475.00
1,049,895.00
M3
343,400.00
1,119,708.00
M3
386,325.00
1,187,560.00
M3
142,120.00
481,105.00
M2
2,687.00
11,485.00
M2
M2
M2
M
10,030.00
10,030.00
6,690.00
1,445.00
14,747.00
17,009.00
15,341.00
30,983.00
UN
100,300.00
427,183.00
UN
100,300.00
499,290.00
64,600.00
427,948.00
80,750.00
508,036.00
UN
50,150.00
396,212.00
UN
50,150.00
519,598.00
UN
7,225.00
108,919.00
UN
7,225.00
149,520.00
UN
9,632.00
212,893.00
UN
14,450.00
278,740.00
35,700.00
250,652.00
47,602.00
366,672.00
47,602.00
471,392.00
85,000.00
684,995.00
11 POZOS DE INSPECCION
11.1 Placa Circular Cubierta - Pozo Inspeccin D=1.20m
(concreto f'c=21MPa reforz. elab. obra, e=0.20m, inc.
arotapa+arobase)
11.2 Placa Circular Cubierta - Pozo Inspeccin D=1.50m
(concreto f'c=21MPa reforz. elab. obra, e=0.20m, inc.
arotapa+arobase)
11.3 Cilindro Pozo Inspeccin D=1.20m (concreto simple f'c
=21MPa elab. en obra, e=0.20m, incluye escalera gato var.#6)
11.4 Cilindro Pozo Inspeccin D=1.50m (concreto simple f'c
=21MPa elab. en obra, e=0.20m, incluye escalera gato var.#6)
11.5 Placa Circular Base - Pozo Inspeccin D=1.20m
(concreto f'c = 28MPa reforz. elab. en obra, e=0.20m)
11.6 Placa Circular Base - Pozo Inspeccin D=1.50m
(concreto f'c = 28MPa reforz. elab. en obra, e=0.20m)
11.7 Cauela pozo de inspeccin para tuberas entre 8" y 12"
(concreto f'c = 28MPa elab. en obra)
11.8 Cauela pozo de inspeccin para tuberas entre 16" y
24" (concreto f'c = 28MPa elab. en obra)
11.9 Cauela pozo de inspeccin para tuberas entre 27" y
33" (concreto f'c = 28MPa elab. en obra)
11.10 Cauela pozo de inspeccin para tuberas entre 36" y
42" (concreto f'c = 28MPa elab. en obra)
11.11 Cmara de cada para colectores de 8" a 12" (bajante
8", concreto simple f'c = 21MPa elab. obra)
11.12 Cmara de cada para colectores de 14" a 18" (bajante
12", concreto simple f'c = 21MPa elab. obra)
11.13 Cmara de cada para colectores de 20" a 30" (bajante
16", concreto simple f'c = 21MPa elab. obra)
11.14 Cmara de cada para colectores > 30" a 36" (bajante
20", concreto simple f'c = 21MPa elab. obra)
Actividad
U.M.
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
UN
904,400.00
9,449,863.00
UN
581,400.00
4,993,619.00
UN
35,700.00
535,571.00
193,800.00
754,699.00
193,800.00
960,817.00
UN
258,400.00
1,689,150.00
UN
452,200.00
2,920,369.00
UN
710,600.00
4,541,723.00
M3
50,150.00
453,566.00
M3
50,150.00
301,256.00
M3
50,150.00
324,441.00
M3
50,150.00
281,043.00
M3
50,150.00
286,617.00
M3
50,150.00
286,617.00
M3
50,150.00
303,060.00
M3
50,150.00
292,098.00
M3
50,150.00
316,458.00
0.00
918,000.00
68,680.00
279,914.00
M2
20,149.00
85,734.00
M2
M2
0.00
0.00
65,852.00
73,396.00
0.00
20,735.00
M2
12,920.00
43,688.00
HR
3,613.00
7,384.00
HR
3,613.00
12,474.00
867,000.00
8,772,600.00
16,720.00
75,855.00
12 SUMIDEROS
12.1 Sumidero aguas lluvias en concreto 3000PSI reforzado
elab. obra, e=0.20m, sec 0.5*0.6m, rejilla en perfil U
3x1.1/2x1/4"
12.2 Sumidero aguas lluvias en concreto 3000PSI reforzado
elab. obra,e=0.20m, sec 1.0*1.0m, rejilla en perfil U
3x1.1/2x1/4"
13 CABEZALES DE DESCARGA
13.1 Construccion cabezal descarga concreto reforzado
3500 PSI, muros, cuerpo, aletas y disip.energia e=0.25m, tub.
8" a 20"
13.2 Construccion cabezal descarga concreto reforzado
3500 PSI, muros, cuerpo, aletas y disip.energia e=0.25m, tub.
24" a 39"
13.3 Construccion cabezal descarga concreto reforzado
3500 PSI, muros, cuerpo, aletas y disip.energia e=0.25m, tub.
42" a 60"
14 PLANTA DE TRATAMIENTO
14.1 Suministro e instalacin de antracita malla 8-12 para
medio filtrante
14.2 Suministro e instalacin de arena seleccionada, malla
30 - 40
14.3 Suministro e instalacin de gravilla seleccionada malla
10 - 12 para medio filtrante
14.4 Suministro e instalacin de gravilla seleccionada malla
8 - 10 para medio filtrante
14.5 Suministro e instalacin de gravilla seleccionada malla
4 - 8 para medio filtrante
14.6 Suministro e instalacin de gravilla seleccionada malla
2 - 4 (1/2") para medio filtrante
14.7 Suministro e instalacin de gravilla seleccionada 1/2" 3/4" para medio filtrante
14.8 Suministro e instalacin de gravilla seleccionada 3/4" 1" para medio filtrante
14.9 Suministro e instalacin de grava seleccionada 1" - 2"
para medio filtrante
15 TANQUE DE ALMACENAMIENTO
15.1 Montaje de andamios para acceso a tanque elevado y
trabajo en altura, h>20m (2 torres x 16 secciones)
15.2 Escalera tipo gato tanq.elev. (parales ang.2+1/2"x1/4",
paso c/0.30m tub3/4", platin.arc.2"x1/4", 6platin.1+1/4"x3/16")
15.3 Suministro y aplicacin de membrana a base de PVC
plastificado y reforz. c/armadura de polister (contacto agua
potable)
MES
16 OBRAS ARQUITECTONICAS
16.1 Muro en ladrillo prensado a la vista tipo Santaf 0.12
16.2 Mdulo en malla eslabonada con tubo galvanizado de
2" c/2.5m, incluye tapas, ngulos y platinas.
16.3 Alfaja en concreto de 3000 PSI, a=0.20m, e=0.07m,
incluye refuerzo long. 2D1/2" + flejes D3/8"
16.4 Teja termoacstica (incluye suministro e instalacin)
MES
M3
Actividad
Fecha :
23/10/09
Vr.Mano de Obra
Vr.Total
KG
593.00
3,616.00
KG
832.00
3,889.00
KG
913.00
4,003.00
KG
1,003.00
4,166.00
KG
1,113.00
4,364.00
KG
1,254.00
4,617.00
KG
1,411.00
10,098.00
1,614.00
2,277.00
M3
0.00
285,579.00
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
292,576.00
313,131.00
337,726.00
349,790.00
334,921.00
282,141.00
221,802.00
406,011.00
362,003.00
376,011.00
422,353.00
U.M.
18 ACERO DE REFUERZO
18.1 Acero de refuerzo 60.000 PSI (incluye amarre y
figuracin)
18.2 Acero de refuerzo 60.000 PSI, elevaciones h<3.0m
(incluye amarre y figuracin)
18.3 Acero de refuerzo 60.000 PSI, elevaciones 3.0<h<6.0m
(incluye amarre y figuracin)
18.4 Acero de refuerzo 60.000 PSI, elevaciones
6.0<h<12.0m (incluye amarre y figuracin)
18.5 Acero de refuerzo 60.000 PSI, elevaciones
12.0<h<18.0m (incluye amarre y figuracin)
18.6 Acero de refuerzo 60.000 PSI, elevaciones
18.0<h<24.0m (incluye amarre y figuracin)
18.7 Fabricacin, transporte, montaje y pintura de estructura
metlica en acero estructural ASTM A-36
19 ACTIVIDADES COMPLEMENTARIAS
19.1 Levantamiento topogrfico redes de acueducto y
alcantarillado para actualiz. de catastro (inc. planos rcord y
formatos)
ANALISIS ANIDADOS
Concreto ciclpeo (60% concreto simple 3000 PSI + 40%
piedra media zonga, incluye colocacin)
Concreto simple 2000 PSI
Concreto simple 2500 PSI
Concreto simple 3000 PSI
Concreto impermeabilizado 3000 PSI
Mortero 1:3 impermeabilizado
Mortero 1:3
Mortero 1:5 para pega
Concreto simple 4000 PSI
Concreto simple 3500 PSI
Concreto impermeabilizado 3500 PSI
Concreto impermeabilizado 4000 PSI