Está en la página 1de 9

SALA DE ORDEO

A
6.00

B
4.00

C C

EQUIPO DE ORDEO

4.00

CERCO DE MULTIMALLA

2
2.00 0.50 0.50

1
6.00 SALA DE ESPERA

F
O

S A
SALA DE ESPERA

2'

6.00

0.50 0.50 2.00

3
0.90 0.40 1.20 1.00 1.20 0.40 0.90

4.00

6.00

6.00

SALA DE CUNEROS
1
10.00 1.00 0.4 1.00 3.00 2.00 3.00 PUERTA CORREDIZA 1.00

2.00

2.00 REJILLA PARA DREN CUNEROS 2.00

2.00

12.00

2.00 X 1.00 PUERTA CORREDIZA X'

4.00

A L MA C E N

4.00

C
10.00

C 2
1.00

LONA ELEVADIZA

1.80

MURO DE BLOCK

0.80 0.40 1.00 MAT. DE RELLENO COMPACTO 1.00 3.00 2.00 3.00 1.00

SECCION CORTE TRANSVERSAL X - X'

PROYECTO DE PRODUCCION CAPRINA "DOS AMIGOS"

PRESUPUESTO SALA DE CUNEROS


No. CONCEPTO LOCALIZACION EJE TRAMO
UNIDAD

LARGO

ANCHO

ALTO

PZAS.

PARCIAL

TOTAL

PRECIO UNITARIO

IMPORTE

I.- CIMENTACIN:
I.1 I.2 LIMPIA,TRAZO Y NIVELACION DE TERRENO. EXCAVACION A MANO EN TERRENO INVESTIGADO EN OBRA, INCLUYE AFINE DE FONDO Y TALUDES.

1 2 1 2 A B C

A-B A-B B-C B-C 1-2 1-2 1-2

M2 M3

15.00 12.00 12.00 4.00 4.00 10.00 10.00 10.00

20.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.10 1.10 1.10 1.10 1.10 1.10 1.10

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

300.00 13.20 13.20 4.40 4.40 11.00 11.00 11.00

300.00

22.00

6,600.00

68.20
I.3 I.4 PLANTILLA DE CONCRETO SIMPLE 6.00 CMS. DE ESPESOR f'c = 100 KG/CM2, T.M.A. 1/2". SUMINISTRO Y CONSTRUCCION DE ZAPATA CORRIDA DE 10 Cms. DE ESPESOR DE CONCRETO Fc= 250 Kg/Cm2. ARMADA CON 4 VARILLAS DE 3/8" Y ESTRIBOS DE DE 1/4" @ 20 CMS., 4 VAR 3/8" EN SENTIDO LARGO Y VAR. 3/8" @ 20 Cms. EN SENTIDO CORTO. MURETE DE ENRASE CON BLOCK DE 15X20X40 MCMS.PARA DAR NIVEL DE PISO.INCLUYE: MATERIALES,MANO DE OBRA Y HERRAMIENTA. I.6 ANCLAJE DE CASTILLOS EN CIMENTACION, AHOGADOS EN LOSA DE CIMENTACION, A BASE DE 4 VARS. DE 3/8" DE DIAM. Y CONCRETO F'C=250 KG/CM2. RELLENO Y COMPACTACION DE MATERIAL

130.00 135.00

8,866.00 8,370.00

M2

62.00

1.00

1.00

62.00

62.00

62.00 M.L. 62.00 M2 0.62

1.00

62.00

62.00

365.00

22,630.00

I.5

1.00 16.00

38.44 16.00

38.44 16.00

335.00 220.00

12,877.40 3,520.00

PZA IDEM EXCAVACION 1.00 M3 12.00 M3 62.00 M.L. 1.00 62.00 60.00 250.00 15,000.00 5.00 1.00 0.00 60.00 240.00 14,400.00 0.00 62.00 95.00 5,890.00

I.9

II.- DALAS, MUROS Y CASTILLOS:


II.1

PRODUCTO DE EXCAVACION COMPACTADO AL 85 % CON PISON DE MANO INCLUYE: MANO DE OBRA Y HERRAMIENTA.. I.10 RELLENO Y COMPACTACION DE MATERIAL PRODUCTO DE BANCO COMPACTADO AL 85 % CON PISON DE MANO INCLUYE: MANO DE OBRA Y HERRAMIENTA.. SUMINISTRO Y CONSTRUCCIN DE CADENA DE DESPLANTE CONCRETO F'c= 150 KG/CM2 SECCIN DE 15x20 CMS ARMADA CON 4 VARILLAS DE 3/8" Y ESTRIBOS DE 1/4" @ 20

II.2

SUMINISTRO Y CONSTRUCCIN DE MURO DE BLOCK HUECO DE CEMENTO 15x20x40 CMS. DE 15 CMS ESPESOR ASENTADO CON MORTERO CEMENTO-ARENA EN PROPORCIN DE 1:3 , ACABADO COMN. SUMINISTRO Y CONSTRUCCIN DE CASTILLO DE CONCRETO F'c=150 KG/CM2 15x15 CMS ARMADA CON 4 VARILLAS #3 F'y=4200 KG/CM2 ESTRIBOS #2 @ 20 CMS INCLUYE CIMBRA COMN, CRUCES DE VARILLAS,COLADO, GALVANIZADA Y

62.00 M2

1.50

1.00

93.00

180.00

260.00

46,800.00

II.3

3.50 ML

16.00

56.00

52.50

220.00

11,550.00 -

III.- ESTRUCTURA.

TECHUMBRE DE LAMINA III.1 PERFIL ESTRUCTURAL

M2
IV.- ALBAILERIA Y ACABADOS:
APLANADO EN MUROS DE BLOCK CON MORTERO CEMENTO-ARENA 1:3 A PLOMO Y IV.3 REGLA ACABADO CON FLOTA DE HULE INCLUYE REMATES Y EMBOQUILLADO FIRME DE CONCRETO F'c= 150 KG/CM2. DE 9 IV.4 CMS DE ESPESOR, INCLUYE NIVELACIN Y COMPACTACIN, ACABADO PULIDO. SUMINISTRO Y COLOCACION DE VITROPISO ANTIDERRAPANTEDE 30 X 30 CMS ASENTADO CON PEGAZULEJO, EMBOQUILLADOR COLOR, INCLUYE CORTES Y DESPERDICIOS. SUMINISTRO Y COLOCACION DE ZOCLO DE CEREAMICA DE 10 CMS DE ANCHO PRODUCTO DE CORTE DE PIEZAS, INCLUYE EMBOQUILLADO, DESPERDICIOS, MANO DE OBRA, HERRAMIENTAS Y EQUIPO NECESARIO IV.10 PINTURA VINILICA LAVABLE EN MUROS, TRABAJO TERMINADO INCLUYE PREPARACIN DE SUPERFICIE REBABEAR Y PLASTE NECESARIOS.

160.00

45,000.00 -

62.00 M2 10.00 M2 M2 10.00

1.50

2.00

186.00

360.00

155.00

55,800.00

16.00

160.00

220.00

35,200.00

16.00

160.00

160.00

280.00

44,800.00

M.L

62.00

62.00

295.00

18,290.00 -

MUROS

62.00

1.50

2.00

186.00

186.00

38.00

7,068.00 25,000.00 10,000.00 15,000.00 $ 412,661.40

V.- LONA LATERALES Y CUNEROS:

VI.- INSTALACIN ELECTRICA: VII.- INSTALACIN HIDRAULICA Y SANITARIA:

PROYECTO DE PRODUCCION CAPRINA "DOS AMIGOS"

PRESUPUESTO SALA DE ORDEO

No.

CONCEPTO

LOCALIZACION EJE TRAMO UNIDAD

LARGO

ANCHO

ALTO

PZAS.

PARCIAL

TOTAL

PRECIO UNITARIO

IMPORTE

I.- CIMENTACIN:
I.1 I.2 LIMPIA,TRAZO Y NIVELACION DE TERRENO. EXCAVACION A MANO EN TERRENO INVESTIGADO EN OBRA, INCLUYE AFINE DE FONDO Y TALUDES.

M2 1 2 3 A A B B A-B A-B A-B 1-2 2-3 1-2 2-3 M3

15.00 6.00 6.00 6.00 4.00 12.00 4.00 12.00 10.00 60.00

20.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.00

1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00

300.00 6.60 6.60 6.60 4.40 13.20 4.40 13.20 10.00 60.00

300.00

22.00

6,600.00

FOSA I.3 I.4 PLANTILLA DE CONCRETO SIMPLE 6.00 CMS. DE ESPESOR f'c = 100 KG/CM2, T.M.A. 1/2". SUMINISTRO Y CONSTRUCCION DE ZAPATA CORRIDA DE 10 Cms. DE ESPESOR DE CONCRETO Fc= 250 Kg/Cm2 ARMADA CON 4 VARILLAS DE 3/8" Y ESTRIBOS DE DE 1/4" @ 20 CMS., 4 VAR 3/8" EN SENTIDO LARGO Y VAR. 3/8" @ 20 Cms. EN SENTIDO CORTO. MURETE DE ENRASE CON BLOCK DE 15X20X40 MCMS.PARA DAR NIVEL DE PISO.INCLUYE: MATERIALES,MANO DE OBRA Y HERRAMIENTA. ANCLAJE DE CASTILLOS EN CIMENTACION, AHOGADOS EN LOSA DE CIMENTACION, A BASE DE 4 VARS. DE 3/8" DE DIAM. Y CONCRETO F'C=250 KG/CM2. RELLENO Y COMPACTACION DE MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 85 % CON PISON DE MANO INCLUYE: MANO DE OBRA Y HERRAMIENTA.. RELLENO Y COMPACTACION DE MATERIAL PRODUCTO DE BANCO COMPACTADO AL 85 % CON PISON DE MANO INCLUYE: MANO DE OBRA Y HERRAMIENTA.. SUMINISTRO Y CONSTRUCCIN DE CADENA DE DESPLANTE CONCRETO F'c= 150 KG/CM2 SECCIN DE 15x20 CMS ARMADA CON 4 VARILLAS DE 3/8" Y ESTRIBOS DE 1/4" @ 20 CMS, INCLUYE : CIMBRA COMN, CRUCES DE VARILLAS,COLADO, VIBRADO, DECIMBRADO Y CURADO.

65.00 50.00

130.00 135.00

8,450.00 6,750.00

M2
.

M.L.

60.00

1.00

60.00

50.00

365.00

18,250.00

I.5

M2 PZA IDEM EXCAVACION

60.00

0.62

1.00 15.00

37.20 15.00

31.00 15.00

335.00 220.00

10,385.00 3,300.00

I.6

I.9

M3

1.00

0.00

55.00

95.00

5,225.00

I.10

M3

8.50

5.50

0.20

1.00

9.35

9.35

240.00

2,244.00 -

II.- DALAS, MUROS Y CASTILLOS:

II.1

M.L.

60.00

1.00

60.00

60.00

250.00

15,000.00

II.2

SUMINISTRO Y CONSTRUCCIN DE MURO DE BLOCK HUECO DE CEMENTO 15x20x40 CMS. DE 15 CMS ESPESOR ASENTADO CON MORTERO CEMENTO-ARENA EN PROPORCIN DE 1:3 , ACABADO COMN. SUMINISTRO Y CONSTRUCCIN DE CASTILLO DE CONCRETO F'c=150 KG/CM2 15x15 CMS ARMADA CON 4 VARILLAS #3 F'y=4200 KG/CM2 ESTRIBOS #2 @ 20 CMS INCLUYE CIMBRA COMN, CRUCES DE VARILLAS,COLADO, VIBRADO, DECIMBRADO Y CURADO. SUMINISTRO Y CONSTRUCCIN DE CADENA DE CERRAMIENTO DE CONCRETO F'c=150 KG/CM2 15x20 CMS ARMADA CON 4 VARILLAS 3/8" F'y=4200 KG/CM2 ESTRIBOS 1/4" @ 20 CMS INCLUYE CIMBRA COMN, CRUCES DE VARILLAS,COLADO, VIBRADO, DECIMBRADO Y CURADO. TECHUMBRE DE ESTRUCTURAL LAMINA GALVANIZADA Y PERFIL

M2

60.00

3.00

1.00

180.00

180.00

260.00

46,800.00

II.3

ML

3.50

15.00

52.50

52.50

220.00

11,550.00

II.4

ML

60.00

1.00

60.00

60.00

250.00

15,000.00

III.- ESTRUCTURA.
III.1

M2 96.00 30,000.00 M2 60.00 6.00 M2 M2 4.00 6.00 3.00 16.00 12.00 16.00 2.00 360.00 96.00 48.00 96.00 144.00 96.00 220.00 280.00 31,680.00 26,880.00 360.00 155.00 55,800.00

IV.- ALBAILERIA Y ACABADOS:


IV.3 APLANADO EN MUROS DE BLOCK CON MORTERO CEMENTO-ARENA 1:3 A PLOMO Y REGLA ACABADO CON FLOTA DE HULE INCLUYE REMATES Y EMBOQUILLADO FIRME DE CONCRETO F'c= 150 KG/CM2. DE 9 CMS DE ESPESOR, INCLUYE NIVELACIN Y COMPACTACIN, ACABADO PULIDO. SUMINISTRO Y COLOCACION DE VITROPISO ANTIDERRAPANTEDE 30 X 30 CMS ASENTADO CON PEGAZULEJO, EMBOQUILLADOR COLOR, INCLUYE CORTES Y DESPERDICIOS. SUMINISTRO Y COLOCACION DE ZOCLO DE CEREAMICA DE 10 CMS DE ANCHO PRODUCTO DE CORTE DE PIEZAS, INCLUYE EMBOQUILLADO, DESPERDICIOS, MANO DE OBRA, HERRAMIENTAS Y EQUIPO NECESARIO IV.10 PINTURA VINILICA LAVABLE EN MUROS, TRABAJO TERMINADO INCLUYE PREPARACIN DE SUPERFICIE REBABEAR Y PLASTE NECESARIOS.

IV.4

M.L

50.00

50.00

295.00

14,750.00

MUROS

60.00

3.00

2.00

360.00

720.00

38.00

27,360.00 38,000.00

V.-

HERRERIA EN SISTEMA DE TRAMPAS PARA ORDEO Y BARANDAL DE PROTECCION INSTALACIN ELECTRICA: INSTALACIN HIDRAULICA Y SANITARIA:

VI.VII.-

10,000.00 20,000.00 $ 404,024.00