TABLA DE DATOS

SECCION DE

D
A

TO
S

LA CUNETA
(m) C/ PRINC
V1-V5
0.60

SECCION DE
ALTURA
ALTURA
COEFICIENTE
LA CUNETA INUNDADA DE
INUNDADA DE
(m) C/PRINC
DE
LA CUNETA
V5-V8 Y
LA CUNETA (cm)
(cm) cuneta de
DEMAS
0,60 m
cuneta de 0,40 m ESCORRENTIA
CALLES
0.40

4.20

3.80

PERIMETRO

PERIMETRO
RADIO
RADIO
SUPERFICIE
MOJADO
HIDRAULICO HIDRAULICO
MOJADO (m)
MOJADA (m2)
(m) cuneta (m) cuneta 0,60 (m) cuneta 0,40
cuneta 0,60 m
cuneta 0,60 m
0,40 m
m
m
2.142

1.938

0.021

0.019

0.0441

FRECUENCIA

INTENSIDAD

TIEMPO

DE

MINIMO DE

LLUVIA DISEO
PRESIPITACIO CONCENTRAC
(aos)

N (lts/s/ha)

ION

(min)

0.55

5.00

425.00

10.00

SUPERFICIE

COEFICIENTE

PENDIENTE

LIMITE DE

MOJADA

(m2)

cuneta 0,40 m
0.0190

INUNDACION
DE

MANNING TRANSVERSAL
0.012

2.00%

(m)
1.50

TABLA DE RESULTADOS
(SENTIDO

CALLE

PENDIENTE)

CALLE PRINCIPAL

CALLE PRINCIPAL

CALLE PRINCIPAL

CALLE PRINCIPAL

CALLE PRINCIPAL

CALLE PRINCIPAL

CALLE PRINCIPAL

CALLE 1

CALLE 2

CALLE 3

CALLE 4

CALLE 5

CALLE 5

CALLE 5

ANCHO DEL

DEL

PENDIENTE
LONITUDINAL

V9-V8
V8-V7
V7-V6
V6-V5
V5-V4
V4-V3
V3-V2
V2-V1
V12-V2
V11-V3
V10-V4
V8-V6
V9-V10
V10-V11
V11-V12

CAPACIDAD
CALLE
SECCION

POSITIVO
DE LA

CALLE PRINCIPAL

LONGITUD

TRAMO
(m)
7.50
70.50
35.00
31.50
29.00
52.50
52.00
26.00
95.50
107.50
119.00
94.50
51.25
53.50
53.50

UNITARIA
TRAMO
6.90
6.90
6.90
6.90
7.50
7.50
7.50
7.50
6.90
6.90
6.90
6.90
7.85
7.85
7.85

(m)

(%)
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.46
0.40
0.36
0.37
0.30
0.30
0.30

LLENA
(lts/s)
14.62
14.62
14.62
14.62
14.62
19.09
19.09
19.09
17.39
16.22
15.41
15.60
14.04
14.04
13.95

VELOCIDAD DE

TIEMPO DE
TRASLADO
DEL
ESCURRIMIENTO
GASTO
MAXIMO
(m/s)
(mim)
0.34
0.34
0.34
0.34
0.36
0.36
0.36
0.36
0.43
0.40
0.38
0.39
0.32
0.32
0.35

0.37
3.47
1.72
1.55
1.34
2.42
2.40
1.20
3.70
4.47
5.20
4.08
2.63
2.74
2.58

UBICACIN

VERTICES

COEFIECIENTE AREA TRIBUTARIA


DE

CAUDA DE

CAUDAL

DISTANCIA
CALCULADA PARA

ESCORRENTIA

ESCORRENTIA

UBICACIN DE
POR TRAMO

POR

SUMIDERO POR

ZONA

AL TRAMO (Ha)

(L/S)

UNITARIO (L/S/m)

L1

0.40

0.02

0.70

0.09

157.04

TRAMO

(m)

L2

0.80

0.00

0.19

0.02

591.73

L1

0.40

0.18

6.56

0.09

157.04

L2

0.80

0.02

1.74

0.02

591.73

L1

0.40

0.09

3.26

0.09

157.04

L2

0.80

0.01

0.86

0.02

591.73

L1

0.40

0.08

2.93

0.09

157.04

L2

0.40

0.03

1.13

0.04

408.30

L1

0.40

0.08

2.70

0.09

157.04

L2
L1

0.80

0.01

0.78

0.03

544.39

0.40

0.14

4.89

0.09

205.07

0.80

0.02

1.41

0.03

710.92

L1

0.40

0.14

4.84

0.09

205.07

L2
L1

0.80

0.02

1.40

0.03

710.92

0.40

0.07

2.42

0.09

205.07

L2

0.80

0.01

0.70

0.03

710.92

L1

0.40

0.25

8.89

0.09

186.83

L2

0.40

0.25

8.89

0.09

186.83

L1

0.40

0.28

10.01

0.09

174.22

L2

0.40

0.28

10.01

0.09

174.22

L1

0.40

0.31

11.08

0.09

165.51

L2
L1

0.40

0.31

11.08

0.09

165.51

0.40

0.03

1.18

0.01

1,244.70

L2

0.40

0.03

1.18

0.01

1,244.70

L1

0.80

0.02

1.44

0.03

499.72

L2
L1

0.80

0.02

1.44

0.03

499.72

0.80

0.02

1.50

0.03

499.72

L2

0.80

0.02

1.50

0.03

499.72

L1

0.80

0.02

1.50

0.03

496.37

L2

CALLE 5

V11-V12

53.50

7.85

0.30

13.95

0.35

ELEMENTOS

APORTES

LATERAL DERECHO CALLE


PRINCIPAL COMPLETA (V1V2) FINAL
LATERAL IZQUIERDO CALLE

TODOS LOS CAUDALES


UNITARIOS ENTRE VERTICES
TODOS LOS CAUDALES

FINAL LATERAL DERECHO


CALLE
PRINCIPAL
FINAL
LATERAL
DERECHO

UNITARIOS ENTRE VERTICES


TODOS LOS CAUDALES
UNITARIOS
ENTRE
VERTICES
TODOS LOS
CAUDALES

CALLE PRINCIPAL

UNITARIOS ENTRE VERTICES

2.58

L2

0.80

0.02

1.50

LONGITUD DEL TRAMO

CAUDAL TRIBUTARIO (l/s)

304.50

66.17

305.50

227.49

306.50

87.56

307.50

228.98

DISPOSITIVO O ELEMENTOS DE DRENAJES NECESARIOS


DISPOSITIVOS DE TRANSMISION

CAUDAL TRIBUTARIO AL

LONGITUD

OBSERVACION

(m)

PENDIENTE
LONGITUDINAL
(%)

ELEMENTO (L/S)
13.76

5.40

8.99

VER DETALLLE EN PLANO

24.84

6.40

3.00

VER DETALLLE EN PLANO

#REF!

5.40

8.57

VER DETALLLE EN PLANO

APORTES
TRANSVERSAL 1A ENTRE V10A-V9A Y V9A-V7A

BATEA 1
OESTE CON CALLE 2A NORTE
BATEA B-1A MAS CALLE 2A SUR

BATEA 2
TRANV 1A V7A-V4A OESTE MAS TRANSV 2A ESTE

BATEA 3
Y CALLE 1A V6A-V5AY V5A-V4A NORTE Y V5A-V4A

FINAL CALLE

0.03

496.37

También podría gustarte