Documentos de Académico
Documentos de Profesional
Documentos de Cultura
SECCION DE
D
A
TO
S
LA CUNETA
(m) C/ PRINC
V1-V5
0.60
SECCION DE
ALTURA
ALTURA
COEFICIENTE
LA CUNETA INUNDADA DE
INUNDADA DE
(m) C/PRINC
DE
LA CUNETA
V5-V8 Y
LA CUNETA (cm)
(cm) cuneta de
DEMAS
0,60 m
cuneta de 0,40 m ESCORRENTIA
CALLES
0.40
4.20
3.80
PERIMETRO
PERIMETRO
RADIO
RADIO
SUPERFICIE
MOJADO
HIDRAULICO HIDRAULICO
MOJADO (m)
MOJADA (m2)
(m) cuneta (m) cuneta 0,60 (m) cuneta 0,40
cuneta 0,60 m
cuneta 0,60 m
0,40 m
m
m
2.142
1.938
0.021
0.019
0.0441
FRECUENCIA
INTENSIDAD
TIEMPO
DE
MINIMO DE
LLUVIA DISEO
PRESIPITACIO CONCENTRAC
(aos)
N (lts/s/ha)
ION
(min)
0.55
5.00
425.00
10.00
SUPERFICIE
COEFICIENTE
PENDIENTE
LIMITE DE
MOJADA
(m2)
cuneta 0,40 m
0.0190
INUNDACION
DE
MANNING TRANSVERSAL
0.012
2.00%
(m)
1.50
TABLA DE RESULTADOS
(SENTIDO
CALLE
PENDIENTE)
CALLE PRINCIPAL
CALLE PRINCIPAL
CALLE PRINCIPAL
CALLE PRINCIPAL
CALLE PRINCIPAL
CALLE PRINCIPAL
CALLE PRINCIPAL
CALLE 1
CALLE 2
CALLE 3
CALLE 4
CALLE 5
CALLE 5
CALLE 5
ANCHO DEL
DEL
PENDIENTE
LONITUDINAL
V9-V8
V8-V7
V7-V6
V6-V5
V5-V4
V4-V3
V3-V2
V2-V1
V12-V2
V11-V3
V10-V4
V8-V6
V9-V10
V10-V11
V11-V12
CAPACIDAD
CALLE
SECCION
POSITIVO
DE LA
CALLE PRINCIPAL
LONGITUD
TRAMO
(m)
7.50
70.50
35.00
31.50
29.00
52.50
52.00
26.00
95.50
107.50
119.00
94.50
51.25
53.50
53.50
UNITARIA
TRAMO
6.90
6.90
6.90
6.90
7.50
7.50
7.50
7.50
6.90
6.90
6.90
6.90
7.85
7.85
7.85
(m)
(%)
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.46
0.40
0.36
0.37
0.30
0.30
0.30
LLENA
(lts/s)
14.62
14.62
14.62
14.62
14.62
19.09
19.09
19.09
17.39
16.22
15.41
15.60
14.04
14.04
13.95
VELOCIDAD DE
TIEMPO DE
TRASLADO
DEL
ESCURRIMIENTO
GASTO
MAXIMO
(m/s)
(mim)
0.34
0.34
0.34
0.34
0.36
0.36
0.36
0.36
0.43
0.40
0.38
0.39
0.32
0.32
0.35
0.37
3.47
1.72
1.55
1.34
2.42
2.40
1.20
3.70
4.47
5.20
4.08
2.63
2.74
2.58
UBICACIN
VERTICES
CAUDA DE
CAUDAL
DISTANCIA
CALCULADA PARA
ESCORRENTIA
ESCORRENTIA
UBICACIN DE
POR TRAMO
POR
SUMIDERO POR
ZONA
AL TRAMO (Ha)
(L/S)
UNITARIO (L/S/m)
L1
0.40
0.02
0.70
0.09
157.04
TRAMO
(m)
L2
0.80
0.00
0.19
0.02
591.73
L1
0.40
0.18
6.56
0.09
157.04
L2
0.80
0.02
1.74
0.02
591.73
L1
0.40
0.09
3.26
0.09
157.04
L2
0.80
0.01
0.86
0.02
591.73
L1
0.40
0.08
2.93
0.09
157.04
L2
0.40
0.03
1.13
0.04
408.30
L1
0.40
0.08
2.70
0.09
157.04
L2
L1
0.80
0.01
0.78
0.03
544.39
0.40
0.14
4.89
0.09
205.07
0.80
0.02
1.41
0.03
710.92
L1
0.40
0.14
4.84
0.09
205.07
L2
L1
0.80
0.02
1.40
0.03
710.92
0.40
0.07
2.42
0.09
205.07
L2
0.80
0.01
0.70
0.03
710.92
L1
0.40
0.25
8.89
0.09
186.83
L2
0.40
0.25
8.89
0.09
186.83
L1
0.40
0.28
10.01
0.09
174.22
L2
0.40
0.28
10.01
0.09
174.22
L1
0.40
0.31
11.08
0.09
165.51
L2
L1
0.40
0.31
11.08
0.09
165.51
0.40
0.03
1.18
0.01
1,244.70
L2
0.40
0.03
1.18
0.01
1,244.70
L1
0.80
0.02
1.44
0.03
499.72
L2
L1
0.80
0.02
1.44
0.03
499.72
0.80
0.02
1.50
0.03
499.72
L2
0.80
0.02
1.50
0.03
499.72
L1
0.80
0.02
1.50
0.03
496.37
L2
CALLE 5
V11-V12
53.50
7.85
0.30
13.95
0.35
ELEMENTOS
APORTES
CALLE PRINCIPAL
2.58
L2
0.80
0.02
1.50
304.50
66.17
305.50
227.49
306.50
87.56
307.50
228.98
CAUDAL TRIBUTARIO AL
LONGITUD
OBSERVACION
(m)
PENDIENTE
LONGITUDINAL
(%)
ELEMENTO (L/S)
13.76
5.40
8.99
24.84
6.40
3.00
#REF!
5.40
8.57
APORTES
TRANSVERSAL 1A ENTRE V10A-V9A Y V9A-V7A
BATEA 1
OESTE CON CALLE 2A NORTE
BATEA B-1A MAS CALLE 2A SUR
BATEA 2
TRANV 1A V7A-V4A OESTE MAS TRANSV 2A ESTE
BATEA 3
Y CALLE 1A V6A-V5AY V5A-V4A NORTE Y V5A-V4A
FINAL CALLE
0.03
496.37