Documentos de Académico
Documentos de Profesional
Documentos de Cultura
TEKHNE LTDA.
TECNOLOGIA EN ARQUITECTURA E INGENIERIA
NIT 800.159.771-6
GERENTE GENERAL: NICHOLAS P. FRIEND
CARRERA 18 No. 78-74 OF.205
TELEFONO 6364425 5304336
BOGOTA D.C., COLOMBIA
www.tekhne.biz
No se permite copiar o
distribuir este material en
ninguna forma que sea con
propsitos comerciales, o
su distribucin como parte
de algn ofrecimiento
comercial.
ABREVIATURAS
A/inox
Abusard.
Acom.
Acust.
Adapt.
Aglr.
Aisl.
Al.
Alcant.
Alig.
Alum.
Alumin.
Aluz.
AMP.
Anch.
Ant.
Apto.
Are.
Arq.
Artic.
ACERO INOXIDABLE
ABUSARDADO
ACOMETIDA
ACUSTICO
ADAPTADOR
AGLOMERADO
AISLANTE
ALUMINO
ALCANTARILLADO
ALIGERADO
ALUMBRADO
ALUMINIO
ALUZINC
AMPERIOS
ANCHO
ANTICUCARACHA
APARTAMENTO
ARENA
ARQUITECTNICO(A)
ARTICULADO
Bald.
Bicol.
Blc.
Bllo.
Bocad.
Bov.
Br.
Bt.
Bte.
BALDOSIN
BICOLOR
BLANCO(A)
BRILLO
BOCADILLO
BOVEDA
BRONCE
BULTO
BRILLANTE
C.
C.Oculto
C.S./Oculto
C.Visto
C/blck
C/Circ.
C/creto.
C/Dim.
C/mez.
C/miento
C/Pil.
C/Prem.
C/raso
C/sosco
C/tilla
Cal.
Calent.
Carp.
Caset.
CREMA
CARRIL OCULTO
CARRIL SEMI OCULTO
CARRIL VISTO
CONCREBLOCK
CORTA CIRCUITO
CONCONCRETO
CONCRETOS DIAMANTE
CENTRAL DE MEZCLAS
CERRAMIENTO
CON PILOTO
CONCRETO PREMEZCLADO
CIELO RASO
CON SOSOCO
CARRETILLA
CALIBRE
CALENTADOR
CARPINTERIA
CASETON
Cbt.
Cemto.
Cerr.
CHLLG
Chp.
Cil.
Cimto.
Circl
Ciruit.
Clas.
Clboy.
Clro.
Cmica.
CN/
Coc.
Coj.
Col.
Coloc.
Com.
Comb.
Compac.
Compl.
Concr.
Concretd.
Conex.
Conm.
CONS.
Const.
Cont
Corru.
CABALLETE
CEMENTO
CERRADURA
CHALENGER
CHAPA
CILINDRO
CIMIENTO
CIRCULAR
CIRCUITOS
CLASICA
CLARABOYA
CLARO
CERAMICA
CONDUIT
COCINA
Cr.
Cristac.
Crna.
Csr
Cte.
Cuad.
Cumb.
CONJUNTO
COLOR
COLOCACIN
COMUN
COMBUSTIBLE
COMPACTACION
COMPLETO
CONCRETO
CONCRETODO
CONEXIN
CONMUTABLE
CONSTRUCCION
CONSTRUCTOR
CONTADOR
CORRUGADO
CONVENCIONAL
CROMO
CRISTACRIL
CORONA
CD. SISMO RESISTENTE
CORRIENTE
CUADRADO
CUMBRERA
DD.
Dec.
Dech.
Demol.
Dens.
Depos.
Des
Div.
Domes.
Drdo.
Dto.
DIA
DECORADO
DERECHO
DEMOLICION
DENSIDAD
DEPOSITO
DESMONTABLE
DIVISION
DOMESTICO
DORADO
DIRECTO
Conv.
E.
Elec.
Empot.
Enc.
Entr.
Entrep.
ESCAL.
Escor.
Eslab.
Esm.
Esmlt.
Estrd.
Estruc.
Excav.
ESTRATO
ELECTRICO(A)
EMPOTRAR
ENCENDIDO
ENTRADA
ENTREPISO
ESCALERA
ESCORIA
ESLABONADO(A)
ESMALTE
ESMALTADO(A)
ESTRIADO
ESTRUCTURAL
EXCAVACION
Fglas.
Fig.
Floj.
FIBERGLASS
FIGURADO
FLOJA
Galv.
Gn.
Gral.
Gran.
Grav.
GrIf.
Grno.
GALVANIZADO(A)
GALON
GENERAL
GRANITO
GRAVILLA
GRIFERIA
GRANO
h.
Hech.
HidroRep.
Horiz.
Hr.
ALTURA
HECHURA
HIDRO/PELENTE
HORIZONTAL
HORA
Imperm.
Import.
Incrust.
Indir.
Indu.
Inox.
Insp.
Inst.
Instit.
Int.
Interrup.
Intr.
IMPERMEALIZADO
IMPORTADO
INCRUSTAR
INDIRECTO(A)
INDUSTRIAL
INOXIDABLE
INSPECCION
INSTALADO
INSTITUCIONAL
INTEGRAL
INTERRUPTOR
INTERIOR
Jp.
JUNTA PERDIDA
Kg.
KILOGRAMO
L/m.
LAVAMANOS
L/NEX
LUMINEX
L/p.
LAVAPLATOS
Lad.
Lav.
Liv.
Llv.
Lt.
LADRILLO
LAVADA
LIVIANA
LLAVE
LITRO
M.
M.H.
M/rrate.
M2.
M3.
Mad.
Mang.
Marm.
Mat.
Mctrl.
Mda.
MdeO.
Mec.
Met.
Mezcl.
METRO
MACHIEMBRIADO
MONSERRATE
METRO CUADRADO
METRO CUBICO
MADERA
MANGUERA
MARMOL
MATE
MONOCONTROL
MONEDA
MANO DE OBRA
MECANICO(A)
METALICO(A)
MEZCLADO
Mix.
MIXTO
Ml.
Mlc
Mold.
Ms.
Mult.
METRO LINEAL
METRO LINEAL COMPLETO
MOLDURADO
MES
MULTIPLE
Nal.
Nat.
NACIONAL
NATURAL
Obr.
Ocul.
Ond.
Oper.
Osc.
OBRA
OCULTO
ONDULADO(A)
OPERARIO
OSCURO
P/P.
Pa/tado
Pand.
Pcna.
Pdra.
Peds.
Perd.
Perf.
PARA PAETAR
PAETADO
PANDERETA
PORCELANA
PIEDRA
PEDESTAL
PERDIDA
PERFIL (ADO)
Pes
PESADA
Pf.
Pfon.
POSFORMADO(A)
PLAFON
Pil.
PILOTO
Piso T.
Plast.
Pte.
Polo T.
PISO TIPO
PLASTICO(A)
PAETE
POLO A TIERRA
Por/nato.
Porc.
Posfor.
Ppal
Prd.
Prefab.
Pren.
Pres.
Prfndo.
Provis.
Prstg.
Ps.
PSI.
Pta
Ptan.
Pts
PORCELANATO
PORCELANA
POSFORMADA
PRINCIPAL
PARED
PREFABRICADO
PRENSADO
PRESION
PROFUNDO(A)
PROVISIONAL
PRESTIGIO
PISO
LIBRAS POR PULGADA2
PUNTA
PORTANTE
PUESTOS
R.
R/caucho
R/maciza
R/olas
Rec.
Rect.
Refz.
Regs.
Rej.
Res.
Rll.
Rosc.
RUEDA
RUEDA DE CAUCHO
RUEDA MACIZA
ROMPEOLAS
RECOCIDO
RECTO
REFORZADO
REGISTROS
REJILLA
RESIDENCIAL
ROLLO
ROSCADO
S.P.
S/B.
S/cal.
Sanit.
Sbrp.
Secc.
Seg.
Senc.
Sint.
Sist.
Sold.
SIN PULIR
SEMIBLANCO
SILICAL
SANITARIO
SOBREPONER
SECCION
SEGURIDAD
SENCILLO (A)
SINTETICO
SISTEMA
SOLDADO
STA/FE
SANTA FE
Stl.
STILO
T/Comn
TOLETE COMUN
T/Fino
TOLETE FINO
T/Fino
T/Reco.
Tabiq.
Tabl.
Tbcon.
Telf.
TOLETE FINO
TOLETE RECOCIDO
TABIQUE
TABLERO
TABICON
TELEFONO
Templ.
TEMPLADO
Text.
Tier.
TEXTURADO (A)
TIERRA
TIF
Ton.
TITANI
TONELADAS
Traf.
Trans.
Trav.
Trns.
Trnza.
Tte.
TRAFICO
TRANSPORTE
TRAVERTINO
TRANSPARENTE
TRENZA-DO(A)
TOLETE
Un.
UNIDAD
Vent.
Ventil.
Vitrif.
Vj.
VENTANA
VENTILACION
VITRIFICADO
VIAJE
Proveedores
10/07/2006 Bogot
Nombre
Cd. Direccin
14
186
162
151
1
119
2
127
147
137
165
65
1001
126
82
19
Telfono/Fax
Contacto
ENRIQUE ALVARADO MELO
SANDRA CHIQUIZA - AIDA
JUAN MANUEL AMORTEGUI -
CARRERA 32 No. 9 - 30
AVENIDA 68 No. 19-52 OF.401
AVENIDA AMERICAS No. 55-80
2250091/
2621400/2621366
7126417/
2142997/
4335692/
2015678/2372691
4203411/4203179
/
AVE 19 # 118 95
AVE BOYACA 55 09
CALLE 54 Sur No 27 - 57
CARRERA 16A No.78-75 OF.201
CALLE 93B # 15 - 31
CARRERA 25 No. 13-33/43
TRANS 93 # 65A 30
CALLE 76 No 19 - 75
6550450/6208851
4100193/
2703252/
6363290/6364135
2189200/
2011100/2017928
2230600/
3457672/5485538
FRANCISCO
YOLANDA MAYORGA/CLAUDIA
SANDRA GOMEZ / GRACIELA
ING. FABIO FAJARDO/MARIA
YOLIMA ROZO/MILENA
Fabio Vargas
KR27 68-25
CALLE 5 A No 68 B -71
Cra.172C No. 05 SOACHA
AUTOPISTA NORTE # 106 74
HELBERT ROZO
ALCOPISOS
ALFONSO NIETO & CIA
ALFONSO VENEGAS
ALMACEN EL ARQUITECTO
ALMACEN LISTO
ALMACEN SANITARIO S.A.
AMERICAN
ANTENAS ABAB
53
27
91
18
6
73
85
140
AVE CARACAS 50 45
CARRERA 13 15 50
CARRERA 11 No. 80-27
AUTOPISTA NORTE No 132-87
CARRERA 25 No. 13 - 33 / 43
CALLE 9 53A 58
CARRERA 90 No 70 - 22
2558517/2558537
6158700/
2161054/
5304010/
6308000/2251344
3513577/2477891
2603534/2606066
2230354/4371036
ARQUITECTURA DE ACABADOS
ASERRIOS SAN JOSE
ASTRO EQUIPOS LTDA
ATA IMPERMEABILIZADORA
AVE COLOMBIANA BOGOTA
BALDOSINES DELTA
BARNES DE COLOMBIA S.A.
BLITEC
75
109
113
10
11
45
39
146
Calle 67 No.15 - 71
AVENIDA BOYACA No. 71A-27
CALLE 75 No 69 K - 43
AVENIDA CARACAS No. 65-17
km.3 Via Nemocon.
AVENIDA 68 No. 34 - 06 Sur
CALLE 15 No. 41-17
DIAGONAL 21 No 36-70
2357771/2357680
8261348/2231921
3108596/
6606927/
ZIPAQUIR/8526931
7110813/
3377077/2692359
3685553/
1007
131
110
9
138
77
114
20
CARRERA 68 G No 39 F - 10 Sur
CARRERA 25 No. 15-93
AUTOP. MEDELLIN 66A 48
AUTOP. NORTE 137 61
CALLE 12 No.32A-39
CALLE 92 No. 15-60
DIAG 45 No 87 - 55
CARRERA 14 No 75 - 58
7245858/7112967
3751101/5669222
6469000/2243211
6148935/6148997
3603499/2019912
6108599/2184481
3143240/5303850
2499217/3466561
JESSICA RAMIREZ
ARGEMIRO CARDENAS
JOSE FIGUEROA /JULIAN
TATIANA / MIGUEL CACERES
EZPERANZA
MARIA ELVIRA
Judy
RAUL MEZA
cel: 3108060837
48
96
81
79
61
59
35
22
6706623/6700703
4362802/4362802
4407595/
2719602/2216666
5312222/2556523
4473000/4473014
6218904/
2050611/2790364
CARMEN RODRIGUEZ
Isabel Morales
Hipolito SanchezAdriana Navarro
FABIO REINA
MARIA MORALES - MANUEL
LUPE FARFAN
JEISON PULIDO - ING. MIGUEL
ING. ELIZABET OSORIO -
BUNDY
CASAFER LTDA
CEMEX
CERAMICA ITALIA S.A.
CERRACOL S.A.
CERRADURAS INTERATLANTICA
CHALLENGER
CIELOS RASOS Y DIVISIONES & CIA.
CIMSA ELECTRODOMESTICOS
CITERPHONE DE COLOMBIA LTDA
CITYGAS
CODENSA E.S.P.
COLEMPAQUES
COLOMBIT (NORVENTAS)
COLORA LTDA.
COLREJILLAS BOGOTA
Proveedores
10/07/2006 Bogot
Nombre
Cd. Direccin
Telfono/Fax
Contacto
COMERCIALIZADORA DE VITROLIT
COMODIN BOGOTA
COMPAIA DE SERVICIOS S.A.
CONCRELAB LTDA.
CONCRETOS MODULARES
CONCRETURAS TREMIX LTDA
CONSTRUEQUIPOS - G. LOBO
CONSTRUMAQUINAS LTDA
94
180
117
125
26
176
68
1009
CALLE 20 # 44A 21
2442454/
/
6205403/2034779
4364506/4305840
6039000/6469000
6260860/6260863
6762043/2182538
6700639/6700232
COPROMARMOL
CORONA ALFONSO NIETO L. & CIA.
CORONA ALFONSO NIETO
CORTES PERFECTOS
CREAR SEALIZACIN
CRISTACRYL
CRISTALVIT LTDA
DAGA
90
5
112
132
183
28
1010
173
CARRERA 32 # 19 14 SUR
AUTP. NORTE N 7A - 25
AUTOP. NORTE 138 83
AV. CALLE 68 No. 74A-74
CALLE 164 No 52 - 34 Oficina 215
Car 13 97 97
AV (CARRERA) 68 No 5 - 72 /73
AUTOPISTA NORTE No 137A 03
2033177/
6158700/
615 8700/
2761043/
5278914/
6101204/6102435
2621512/
6331090/
MARIBEL JIMENEZ
JOHANA RODRIGUEZ/JOHANA
CARLOS PEDRAZA
JULIO PALOMARES LEONARDO
MELIER ABRIL / RODRIGO
JULIETA RIVERA
JANETH GONZALES
DIANA CAICEDO
DEPOSITO LA PATRIA
DIS HIERROS
DISNAHIERROS LTDA.
DISPANO
DISTRIB. MADERAS EL ECUADOR
DISTRIBUIDORA BOG LTDA.
DISTRIBUIDORA PEVEGAL LTDA.
E.A.A.B. E.S.P.
141
1012
129
41
52
124
47
80
6715080/5265155
4128421/
2011977/2775093
2699950/2692494
6708092/
3335600/5617122
2013100/2017190
3686800/Ext.7113
E.T.B. E.P.S.
EL PROVEEDOR DEL CONSTRUCTOR
ELECTRO IMPORTADORA BOGOTA
ELECTROFUMIGACION TORO
EQUIPOS GLEASON
EQUIPOS, ANDAMIOS Y
ETERNIT COLOMBIANA S.A.
EXCAVADORAS Y MAQUINARIAS
78
142
184
42
107
84
3
108
CARRERA 7 No. 20 - 39
AVE CARACAS 60 49
CARRERA 12 No 16 - 81
CALLE 21 No 32 - 54
Av. Cra. 68 No. 24-01
AUTONORTE KM.17
CARRERA 7 No. 26-20 PISO 16
TRANSV. 46 No 107-49
177/6579304
2170553/2354729
3426736/
3686400/
4117926/4110668
6761811/2154623
3238100/7198829
6137610/5337211
SANDRA CHINGATE / AN
LUCY PEREZ / MANUEL
MAURICIO CASTAEDA
ANGELA LAMPREA - DIANA
JUAN GUILLERMO NAVARRO
YULIETH ACOSTA
CLARA ELSI
RICARDO VALBUENA
EXIPLAST
EXTINTORES COLOMBIA
FACODEX LTDA
FANASHI Y CIA LTDA.
FAVELEC LTDA.
FEDERACION COL. TRANSP. CARGA
FERRASA
FERRETERIA CYRGO LTDA.
172
21
120
1002
72
56
1008
83
2383619/
3413024/5665379
2761072/4363880
4300170/2520498
3462103/
3440077/2685167
4228445/4211641
4228555/4155105
CRA.15 No 12 - 50
CALLE 17 A No 23 - 12
CARRERA 15 # 11 71
CALLE 163A No 41A-80
CALLE 14 29 73 PISO 1
AV. CARACAS No.74-25
CARRERA 22 No. 15-39
CARRERA 9 No 80 - 12
2437033/2776347
2774916/2019617
3417112/2084371
6718451/
2010936/
6511212/2353994
3701177/3702384
3100055/2355992
FERRETERIA EL TERMINAL
FERRETERIA JER
FERRETERIA LOS ANGEOS
FERRETERIA MALLAS Y ANGEOS
FERRETERIA WILLCAR
FERRICENTROS S.A.
FERRO ALUMINIOS LTDA.
FIBERGLASS COLOMBIA S.A.
25
57
145
24
134
30
13
43
Proveedores
10/07/2006 Bogot
Nombre
Cd. Direccin
FIBRIT LTDA.
FIJACIONES TORRES
FIRPLAK BOGOTA
FORMAPLAC LTDA.
FORMARAN LTDA
GP INSTALACIONES / GRUPO
GRANITOS Y MARMOLES
GRICOL LTDA.
58
185
123
55
33
188
32
7
Telfono/Fax
Contacto
6917850/
4104011/4167283
6125849/6123984
4203255/2603252
2501743/
6303616/
7245120/7753391
3603899/2374860
HELENA RESTREPO/WILIAN
FDO RAMIREZ/ADRIANA
CRISTINA VANEGAS / MILENA
YADIRA MASMELA
DIANA CASTILLA
RAFAEL ESPINO
MARIA HELENA DE PIEROS
ANDREA ARIAS
115
163
111
102
149
86
23
1004
615 8700/
4142099/2623456
4464000/2110100
4269800/
2922666/
2113500/2124480
3526911/3377065
5614213/
CARLOS PEDRAZA
CLAUDIA MALAGON/SANDRA
JHON FREDY BERMUDEZ
ERNESTO PEREZ
166
135
31
139
1011
159
179
16
7831114/
3350703/2698024
3369393/
2575973/2832816
2744105/
2567569/3146490
5722156/
2066986/
JULIO RODRIGUEZ
CECILIA CAON- YOHANNA
ALEJANDRA MORENO.
JENNY IZACIGA
JANETH SORA
JAVIER VARGAS MORENO
JORGE ROBAYO
JAIME SABOGAL
17
148
101
60
103
4
51
133
4121540/
6309778/6309778
2120894/2120902
/2118760
2151916/2149736
2103069/3170028
4376700/Ext.2209
4361424/5455818
MADESA LTDA.
MARMOLES VENEZIANOS
MATERIALES EL ORIENTE
MBT DE COLOMBIA
MELCO DE COLOMBIA BOGOTA
MELECSA
METAZA
NACIONAL DE ELECTRICOS
54
121
50
38
29
167
158
49
2447999/
7120079/7127121
4506366/4501716
3217210/
3267300/3478836
3603055/
4242240/4242304
3341052/6101785
VIVIANA PEA
JENNY RENDON
LUZ MARINA / PATRICIA
ING CARLOS LIZARAZO-ING
SILVIO GARCIA CARDONA
Antonio Prez
MARIA DEL PILAR HOYOS JOSE CAICEDO
CALLE 69 # 18 - 11
CARRERA 50 No 17-65
CARRERA 50 17 65
CARRERA 50 17 65
CALLE 71 42 13
AVENIDA 15 No119 A - 03 OFICINA
CALLE 23 No.6-34
CALLE 21 No. 68 A - 98
2552575/
4473000/2610039
4473000/2610039
4473000/2610039
2503705/2257744
7900020/2124097
2434544/2589292
4249323/
ELIZABETH / ESTELA
LUCIA CASTRO
PATRICIA VARGAS - LUPE
LUPE FARFAN- PATRICIA
JUAN MANUEL FRANCO
ALBERTO CAMARGO
PAOLA RODRIGUEZ
ANGELA CORDOBA
NACIONAL DE YESO
NORVENTAS GEOTEXTIL
NORVENTAS PAVCO S.A. -TUBERIANORVENTAS/PAVCO/RECUBRIMIEN
OBRALUM
PAVIOBRAS LTDA
PERFEX LTDA.
PHILAAC LTDA.
1005
168
40
104
136
71
118
74
Proveedores
10/07/2006 Bogot
Nombre
Cd. Direccin
Telfono/Fax
Contacto
12
34
128
93
161
122
95
99
2881100/5978700
4505064/
7102420/7102262
2550490/3101512
8265110/8265107
3680952/
2588845/
6711569/
MARILUZ OSUNA
FREDDY PARDO
MARIA
MARTHA LUCERO GUEVARA
HUMBERTO RODRIGUEZ - ING.
MARI LUZ DUQUE
MELBA GIRALDO/ ORLANDO
HELBER PEREZ/CAROLINA
MARINA GAMEZ - JAIME
97
130
189
177
106
15
100
37
2252729/2257626
3415077/2847293
3677529/3666223
6378199/6229246
3513577/2477891
6250020/6782916
4144040/5713648
4123300/
DIANA CASTILLO
LIBIA TORRES / FLOR TORRES
RODRIGO DUARTE
JUAN PABLO MORENO /DANIEL
ALBA ROCIO MANTILLA ALEJANDRO VANEGAS
NORA INES VILLAMIL
JENNY PEREZ
SILPLAS
SUBMURACIONES Y PILOTAJES
SUECO
T.V. CABLE LTDA.
TEGIPLAST
TEKHNE LTDA.
TELECTRICOS LTDA.
TERPEL
143
87
8
98
66
116
187
178
Diag 16 63A 61
TRANS 46 # 102A 95
CARRERA 54 No 42 - 80 Sur
CALLE 11A No. 94-76
Av. 81(Calle 80)#68-05
Carrera 18 No. 78 - 74 Oficina 205
Cra: 12 No.17-19
Ave el Dorado 120 42
4142511/AA20666
2539525/2714573
2040200/
/6164082
4343027/4343027
6364425/6915026
3423672/3420301
4139260/
TEXSA DE COLOMBIA
TITAN MANUFACTURAS
TORNILLOS 7777777
TOXEMENT S.A.
TUBERIA ACCESORIOS CELTA
TUBOS MOORE S.A.
VAREGO LTDA.
VITEMPLEX LTDA.
69
170
1006
36
70
44
62
76
2359024/2116561
3353550/8643726
6061836/
3683188/2448969
6301010/6300514
/
6918677/3100347
2470134/
ANTONIO ATALA/AMPARO
SHIRLY MEJIA -VENTAS - PILAR
ALEJANDRO MOLINA - YESID
TANIA NAVARRO/FRANCY
MONICA HOYOS
ELSA PAEZ - HENRY ORJUELA
OMAR IVAN GUTIERREZ
ANDREA FLOREZ
CALLE 12 # 32A 17
3603499/2019912
YALE CERRADURAS
150
CONTENIDO
MATERIALES, EQUIPOS Y MANO DE OBRA
Gr. 1
Gr. 2
Gr. 3
Bloques y Ladrillos
Gr. 48
Cableado Estructurado
10
Gr. 4
Cielosrasos
12
Gr. 5
Cubiertas y Accesorios
14
Gr. 6
18
Gr. 7
24
Gr. 41
27
Gr. 8
Equipos Especiales
28
Gr. 9
31
Gr. 10
Ferretera y Herramientas
33
Gr. 46
Fletes
37
Gr. 11
38
Gr. 12
44
Gr. 44
Inst. de Gas
48
Gr. 13
50
Gr. 14
59
Gr. 42
Inst. Hospitalarias
64
Gr. 15
Maderas
65
Gr. 34
MdeO Carpinteras
69
Gr. 28
MdeO Cielosrasos
70
Gr. 24
71
Gr. 27
MdeO Cubiertas
73
Gr. 31
74
Gr. 36
75
Gr. 45
76
Gr. 33
77
Gr. 32
79
Gr. 25
MdeO Mampostera
80
Gr. 29
81
Gr. 37
82
Gr. 26
MdeO Paetes
83
Gr. 38
MdeO Pintura
84
Gr. 30
85
Gr. 22
86
Gr. 23
88
Gr. 47
89
Gr. 35
90
Gr. 43
91
Gr. 16
Pavimentos
93
Gr. 17
94
Gr. 18
Pinturas
95
Gr. 19
Prefabricados
98
Gr. 39
99
Gr. 40
Tarifas y Servicios
101
Gr. 20
103
Gr. 21
109
ACEROS,HIERROS/MALLAS,CERCHAS (1)
10/07/2006 Bogot
Referencia
Descripcin
Fecha
Precio
ML
04/07/2006
314.36
KG
04/07/2006
2,801.40
KG
30/06/2006
2,865.20
KG
04/07/2006
3,126.20
KG
04/07/2006
3,271.20
2532
ML
04/07/2006
3,612.24
ANGULO
ANGULO
"x2"
2535
ML
30/06/2006
13,450.00
ANGULO
" x 3"
2539
ML
04/07/2006
31,587.96
ANGULO
3/16" x 2"
2533
ML
04/07/2006
8,144.36
ANGULO
5/16" x 3"
2538
ML
04/07/2006
19,392.88
7,818.40
ANGULO
" x 1 "
2534
ML
04/07/2006
ANGULO
2530
ML
04/07/2006
3,242.20
ANGULO
3/16" x 2 "
2529
ML
04/07/2006
10,245.12
10
ML
04/07/2006
10,858.76
11
ML
30/06/2006
2,184.00
ML
04/07/2006
4,839.00
2542
ML
04/07/2006
2,992.80
2543
ML
30/06/2006
3,348.00
ANGULO " x
2536
ML
30/06/2006
16,481.28
12
ML
30/06/2006
5,684.00
13
ML
30/06/2006
5,916.00
14
UN
30/06/2006
83,543.00
ANGULO 1/8" x
2"
3"
50DV077
3705
UN
NACIONAL DE ELECTRICOS
01/07/2006
6,264.00
TORN
3957
ML
01/07/2006
208.80
ESPARRAGO DE 3/16"xTA-18
TORN
3956
ML
01/07/2006
395.56
ESPARRAGO DE 3/16"xTA-9
TORN
3955
ML
01/07/2006
208.80
3954
ML
01/07/2006
395.56
3953
ML
01/07/2006
208.80
3/8"
1992
KG
01/07/2006
2,088.00
"
20
KG
01/07/2006
2,173.84
"
299
ML
30/06/2006
1,838.00
2943
KG
30/06/2006
681.00
25
KG
01/07/2006
2,310.72
152
KG
01/07/2006
2,078.72
318
ML
01/07/2006
3,350.08
23
ML
01/07/2006
4,979.88
308
Kg
01/07/2006
2,228.36
352
Kg
01/07/2006
2,204.00
410
ML
01/07/2006
6,701.32
ACEROS,HIERROS/MALLAS,CERCHAS (1)
10/07/2006 Bogot
Referencia
Descripcin
Fecha
Precio
430
Kg
01/07/2006
2,207.48
578
ML
01/07/2006
8,774.24
27
ML
01/07/2006
1,691.28
3315
KG
13/06/2006
2,030.00
"
No 4
2917
KG
DIS HIERROS
01/07/2006
2,083.00
3/8"
144
Kg
DIS HIERROS
01/07/2006
2,083.00
2918
KG
DIS HIERROS
01/07/2006
2,083.00
2919
KG
DIS HIERROS
01/07/2006
2,088.00
2921
KG
DIS HIERROS
01/07/2006
2,096.00
19
KG
DIS HIERROS
01/07/2006
2,083.00
"
21
ML
01/07/2006
2,107.72
26
ML
01/07/2006
3,332.68
24
ML
01/07/2006
4,860.40
2920
ML
01/07/2006
6,535.44
2942
ML
01/07/2006
8,403.04
2719
ML
01/07/2006
1,171.60
2521
UN
DISNAHIERROS LTDA.
01/07/2006
191,400.00
2522
UN
DISNAHIERROS LTDA.
01/07/2006
301,600.00
30
UN
DISNAHIERROS LTDA.
01/07/2006
55,100.00
29
UN
01/07/2006
97,991.00
3059
M2
01/07/2006
3,061.24
31
UN
01/07/2006
39,034.00
4011
M2
01/07/2006
19,517.00
32
UN
01/07/2006
32,625.00
4012
M2
01/07/2006
16,311.92
33
UN
01/07/2006
27,985.00
4013
M2
01/07/2006
13,991.92
3035
M2
01/07/2006
6,700.00
35
M2
01/07/2006
8,600.00
2346
M2
01/07/2006
5,100.00
34
UN
01/07/2006
5,486.00
1990
UN
01/07/2006
6,635.00
15X15
3291
UN
DISNAHIERROS LTDA.
01/07/2006
49,300.00
M-106
9424
UN
MATERIALES EL ORIENTE
01/07/2006
54,450.00
M-084
9423
UN
MATERIALES EL ORIENTE
27/05/2006
43,015.00
M-159
9426
UN
MATERIALES EL ORIENTE
27/05/2006
81,220.00
M-131
9425
UN
MATERIALES EL ORIENTE
27/05/2006
67,035.00
MALLA ELECTROSOLDADA 6 mm x 6
M-188
9427
UN
MATERIALES EL ORIENTE
27/05/2006
96,545.00
M-221
9428
UN
MATERIALES EL ORIENTE
27/05/2006
113,500.00
10.6X.60X1.2
3758
M2
DISNAHIERROS LTDA.
01/07/2006
226,200.00
39
UN
01/07/2006
42,559.00
46
UN
01/07/2006
36,000.00
37
UN
01/07/2006
37,093.32
5mm
38
UN
01/07/2006
57,700.72
40
UN
01/07/2006
83,178.96
44
UN
29/06/2006
20,500.00
ACEROS,HIERROS/MALLAS,CERCHAS (1)
10/07/2006 Bogot
Referencia
Fecha
Precio
3909
UN
29/06/2006
45,000.00
42
UN
01/07/2006
45,000.00
43
UN
01/07/2006
99,500.00
47
UN
29/06/2006
60,000.00
41
UN
29/06/2006
200,000.00
38,500.00
Descripcin
45
UN
29/06/2006
2976
UN
01/07/2006
2,934.00
MALLA ZARANDA 4 mm x 4 mm
9429
UN
MATERIALES EL ORIENTE
27/05/2006
82,130.00
9430
ML
MATERIALES EL ORIENTE
27/05/2006
3,783.00
9431
ML
MATERIALES EL ORIENTE
27/05/2006
2,923.00
9432
ML
MATERIALES EL ORIENTE
27/05/2006
3,352.00
9433
ML
MATERIALES EL ORIENTE
27/05/2006
2,591.00
(0.76 mm)
3942
M2
01/07/2006
39,111.72
0.96 mm)
3943
M2
01/07/2006
38,679.04
0.51 mm)
3272
M2
01/07/2006
36,198.96
(0.96 mm)
3944
M2
01/07/2006
46,804.84
3967
ML
FERRASA
01/07/2006
14,337.60
3968
ML
FERRASA
01/07/2006
18,433.56
1/4"
3969
ML
FERRASA
01/07/2006
17,192.36
1/4"
3970
ML
FERRASA
01/07/2006
23,200.00
PAGC120x6
49
ML
01/07/2006
9,356.56
PAG C120x60
1821
ML
01/07/2006
11,062.92
PHR C120x60
702
ML
01/07/2006
9,356.56
PAGC 22x8
51
ML
01/07/2006
17,275.88
PAGC 16x6
50
ML
01/07/2006
12,935.16
PERFIL ESTRUCTURAL Z 14
PAG Z305x80
3949
ML
01/07/2006
25,890.04
PAG Z160x60
3946
ML
01/07/2006
12,935.16
PAG Z160x60
3947
ML
01/07/2006
12,935.16
PAG Z220x80
3948
ML
01/07/2006
17,275.88
3273
ML
01/07/2006
15,360.72
52
UN
01/07/2006
27,057.00
PERFIL P10-12-N
PLATINA
" x 1 "
PLATINA 2 x "
737
UN
01/07/2006
34,788.40
3301
UN
01/07/2006
40,582.60
3702
UN
30/06/2006
4,853.00
3695
UN
NACIONAL DE ELECTRICOS
01/07/2006
14,326.00
-14x7/8GRIS
3950
ML
04/07/2006
417.60
10-16-3/4GRI
3951
ML
04/07/2006
276.08
3952
ML
04/07/2006
167.04
3/4" Cal. 20
54
ML
DISNAHIERROS LTDA.
04/07/2006
1,450.00
TUBO CUADRADO
1"
53
ML
DISNAHIERROS LTDA.
09/06/2006
2,416.28
Cal. 18
Cal. 20
6Mts.
tiros de 6 m
55
ML
DISNAHIERROS LTDA.
04/07/2006
2,822.28
3728
UN
FERRETERIA EL TERMINAL
01/03/2005
10,942.00
787
UN
FERRETERIA EL TERMINAL
01/03/2005
5,042.00
2523
ML
DISNAHIERROS LTDA.
04/07/2006
43,886.28
3488
ML
20/06/2006
91,787.32
56
ML
FERRASA
04/07/2006
22,585.20
Referencia
ARENA DE PEA
Viaje 6m3
Fecha
Precio
60
M3
ALFONSO VENEGAS
30/06/2006
26,666.00
62
M3
ALFONSO VENEGAS
30/06/2006
38,333.00
64
M3
ALFONSO VENEGAS
30/06/2006
80,000.00
1995
M3
ALFONSO VENEGAS
28/06/2006
26,666.00
612
Bt
CEMEX
07/03/2006
12,000.00
CEMENTO BLANCO 40 Kg
70
KG
DEPOSITO LA PATRIA
30/06/2006
908.28
71
KG
DEPOSITO LA PATRIA
30/06/2006
374.68
581
KG
CEMEX
07/03/2006
240.00
ARENA SEMILAVADA
CEMENTO DIAMANTE Const
579
Tn
CEMEX
07/03/2006
240,000.00
Diamante
751
TN
EL PROVEEDOR DEL
30/06/2006
292,000.00
Diamante
673
BT
EL PROVEEDOR DEL
30/06/2006
14,600.00
72
KG
EL PROVEEDOR DEL
01/07/2006
9,000.00
2651
M3
CEMEX
30/06/2005
266,916.00
2685
M3
03/03/2006
247,080.00
2817
M3
CEMEX
30/06/2005
278,168.00
GRAVA FINA
2652
M3
CEMEX
30/06/2005
283,852.00
3597
M3
CONCRETURAS TREMIX
16/06/2006
283,040.00
2686
M3
03/03/2006
263,900.00
2818
M3
CEMEX
07/03/2006
295,104.00
2653
M3
CEMEX
07/03/2006
300,556.00
3598
M3
CONCRETURAS TREMIX
LTDA
16/06/2006
300,440.00
3606
M3
CONCRETURAS TREMIX
LTDA
16/06/2006
314,360.00
6023
M3
CONCRETURAS TREMIX
LTDA
16/06/2006
323,640.00
2687
M3
03/03/2006
277,240.00
2819
M3
CEMEX
07/03/2006
311,808.00
2654
M3
CEMEX
07/03/2006
313,316.00
3599
M3
CONCRETURAS TREMIX
LTDA
16/06/2006
313,200.00
3607
M3
CONCRETURAS TREMIX
LTDA
16/06/2006
327,120.00
3603
M3
CONCRETURAS TREMIX
LTDA
16/06/2006
336,400.00
2688
M3
03/03/2006
289,884.00
2820
M3
CEMEX
30/06/2005
328,048.00
2655
M3
CEMEX
30/06/2005
333,752.00
2689
M3
03/03/2006
308,444.00
2821
M3
CEMEX
30/06/2005
348,464.00
3600
M3
CONCRETURAS TREMIX
LTDA
16/06/2006
332,920.00
3608
M3
CONCRETURAS TREMIX
LTDA
16/06/2006
348,000.00
3604
M3
CONCRETURAS TREMIX
LTDA
16/06/2006
357,280.00
2656
M3
CEMEX
30/06/2005
347,652.00
3601
M3
CONCRETURAS TREMIX
16/06/2006
346,840.00
LTDA
LTDA
Descripcin
Fecha
Precio
3609
M3
CONCRETURAS TREMIX
LTDA
16/06/2006
361,920.00
3605
M3
CONCRETURAS TREMIX
LTDA
16/06/2006
371,200.00
2690
M3
03/03/2006
321,204.00
2822
M3
CEMEX
30/06/2005
362,848.00
2657
M3
CEMEX
30/06/2005
363,776.00
2691
M3
03/03/2006
336,284.00
2823
M3
CEMEX
30/06/2005
378,508.00
2658
M3
CEMEX
30/06/2005
382,220.00
2692
M3
03/03/2006
353,104.00
2824
M3
CEMEX
30/06/2005
396,952.00
2659
M3
CEMEX
30/06/2005
413,888.00
2825
M3
CEMEX
30/06/2005
425,140.00
82
M3
CEMEX
30/06/2005
337,328.00
CONCRETO PAVIMENTO
MR-36
2660
M3
CEMEX
30/06/2005
321,436.00
CONCRETO PAVIMENTO
MR-39
2661
M3
CEMEX
30/06/2005
333,384.00
CONCRETO PAVIMENTO
MR-41
2662
M3
CEMEX
30/06/2005
349,392.00
CONCRETO PAVIMENTO
MR-43
2663
M3
CEMEX
30/06/2005
362,036.00
CONCRETO PAVIMENTO
MR-45
2664
M3
CEMEX
30/06/2005
372,128.00
CONCRETO PAVIMENTO
MR-46
3318
M3
CEMEX
30/06/2005
385,584.00
CONCRETO PAVIMENTO
MR-50
4025
M3
CEMEX
30/06/2005
418,876.00
CONCRETO PROFESIONAL
3500PSI
3188
M3
CEMEX
30/06/2005
313,316.00
CONCRETO PROFESIONAL
4000PSI
3192
M3
CEMEX
30/06/2005
347,652.00
CONCRETO PROFESIONAL
3500PSI
3200
M3
CEMEX
30/06/2005
330,216.00
9477
UN
CONCRELAB LTDA.
04/03/2006
25,520.00
3587
UN
CONCRELAB LTDA.
04/03/2005
132,124.00
9474
UN
CONCRELAB LTDA.
04/03/2006
635,680.00
9475
UN
CONCRELAB LTDA.
04/03/2006
290,000.00
9476
UN
CONCRELAB LTDA.
04/03/2006
371,200.00
3586
UN
CONCRELAB LTDA.
04/03/2006
60,320.00
3589
UN
CONCRELAB LTDA.
04/03/2006
81,200.00
3582
UN
CONCRELAB LTDA.
04/03/2006
6,960.00
2083
UN
CONCRELAB LTDA.
06/03/2006
211,120.00
2087
UN
CONCRELAB LTDA.
04/03/2006
185,600.00
3588
UN
CONCRELAB LTDA.
04/03/2006
15,080.00
3590
UN
CONCRELAB LTDA.
04/03/2006
19,720.00
3583
UN
CONCRELAB LTDA.
04/03/2006
40,600.00
3581
UN
CONCRELAB LTDA.
04/03/2006
34,800.00
3584
UN
CONCRELAB LTDA.
04/03/2006
40,600.00
1681
UN
CONCRELAB LTDA.
04/03/2005
31,784.00
3577
UN
CONCRELAB LTDA.
04/03/2006
4,640.00
E130
D100
1682
UN
CONCRELAB LTDA.
04/03/2005
42,456.00
A400
83
BT
COPROMARMOL
06/06/2006
8,120.00
GRAVILLA DE RIO M3
84
M3
ALFONSO VENEGAS
01/07/2006
80,000.00
GRAVILLA FINA M3
85
M3
ALFONSO VENEGAS
01/07/2006
80,000.00
MARMOLINA
1053
kg
ALMACEN LISTO
30/06/2006
182.00
3945
BT
COPROMARMOL
06/06/2006
5,800.00
Descripcin
Fecha
Precio
109
M3
CEMEX
30/06/2005
292,436.00
140
M3
CEMEX
30/06/2005
309,140.00
1622
M3
CEMEX
30/06/2005
321,900.00
1623
M3
CEMEX
30/06/2005
342,316.00
1624
M3
CEMEX
30/06/2005
356,236.00
1625
M3
CEMEX
30/06/2005
372,476.00
1626
M3
CEMEX
30/06/2005
390,804.00
3193
KG
CEMEX
04/03/2006
158.80
SOLO
3325
M3
ACOEX
06/03/2006
185,600.00
SOLO
3326
M3
ACOEX
06/03/2006
162,400.00
98
M3
ALFONSO VENEGAS
28/06/2006
26,666.00
3058
ML
ACOEX
06/03/2006
30,160.00
3044
ML
ACOEX
06/03/2006
25,520.00
3328
ML
ACOEX
06/03/2006
52,200.00
3327
ML
ACOEX
06/03/2006
83,520.00
1717
M2
ECOFLORA
01/07/2006
5,800.00
100
M3
ALFONSO VENEGAS
01/07/2006
20,000.00
3309
M3
NINGUNO EN PARTICULAR
04/03/2004
12,000.00
3311
M3
NINGUNO EN PARTICULAR
04/03/2004
20,000.00
3615
M3
22/06/2006
169,360.00
3616
M3
22/06/2006
177,480.00
3617
M3
22/06/2006
196,040.00
3614
M3
22/06/2006
163,560.00
3613
M3
22/06/2006
143,840.00
3194
M3
CEMEX
30/06/2005
177,016.00
RETIRO DE ESCOMBROS
2473
M3
JAIME SABOGAL
01/07/2006
13,333.00
TIERRA NEGRA
1621
M3
JAIME SABOGAL
01/07/2006
40,000.00
101
M3
ALFONSO VENEGAS
04/07/2006
38,333.00
1962
KG
ALMACEN LISTO
04/07/2006
600.00
3195
BT
NACIONAL DE YESO
20/06/2006
15,000.00
Sugerido M2
Base 30
TRITURADO DE MAQUINA
YESO (saco de 25Kg)
YESO PIRAMIDE
Piramide
Referencia
Fecha
Precio
Fab. ADCOL
1711
UN
28/06/2006
Obra ADCOL
137
UN
28/06/2006
578.00
1880
ML
04/07/2006
11,476.00
1881
ML
30/06/2006
9,860.00
1777
UN
27/05/2006
770.00
2143
UN
27/05/2006
845.00
Fab.
2409
UN
03/03/2006
507.00
Dep.
1965
UN
03/03/2006
870.00
Fab. BL4
1689
UN
28/06/2006
810.00
Obra BL4
114
UN
28/06/2006
881.00
Fab.
1778
UN
28/10/2005
690.00
Obra
2145
UN
27/05/2006
765.00
2408
UN
03/03/2006
537.00
Dep.
1966
UN
03/03/2006
910.00
Fab. BL5
1690
UN
28/06/2006
833.00
Obra BL5
116
UN
28/06/2006
913.00
Fab.
1779
UN
28/10/2005
720.00
Obra
2148
UN
27/05/2006
795.00
106
UN
24/06/2006
1,200.00
107
UN
24/06/2006
1,800.00
1,953.00
529.00
PI-10 Obra
2373
UN
CONCRETOS MODULARES
01/03/2005
CM10 Obra
2374
UN
CONCRETOS MODULARES
01/03/2005
891.00
CT10 Obra
110
UN
CONCRETOS MODULARES
01/03/2005
1,584.00
Fab.
112
UN
24/06/2006
1,000.00
Fab.
2911
UN
24/06/2006
1,400.00
Obra
2912
UN
24/06/2006
1,176.00
Fab.
93
UN
24/06/2006
2,300.00
Fab.
113
UN
24/06/2006
1,700.00
CM-20 Obra
2362
UN
CONCRETOS MODULARES
01/03/2005
1,625.00
PT-16 Obra
2365
UN
CONCRETOS MODULARES
01/03/2005
2,508.00
CT-12 Obra
2367
UN
CONCRETOS MODULARES
01/03/2005
1,797.00
PI-12 Obra
2368
UN
CONCRETOS MODULARES
01/03/2005
2,280.00
EI-12 Obra
2375
un
CONCRETOS MODULARES
01/03/2005
2,294.00
EI-15 Obra
2370
UN
CONCRETOS MODULARES
01/03/2005
2,605.00
PI-16 Obra
2364
UN
CONCRETOS MODULARES
01/03/2005
2,508.00
PP-16 Obra
2371
UN
CONCRETOS MODULARES
01/03/2005
2,934.00
EI-18 Obra
111
UN
CONCRETOS MODULARES
01/03/2005
2,512.00
1884
ML
30/06/2006
7,990.00
1883
ML
30/06/2006
7,310.00
Descripcin
Fab LB14
Obra LB14
Fecha
Precio
1882
ML
30/06/2006
10,200.00
1708
UN
28/06/2006
1,448.00
120
UN
28/06/2006
1,559.00
Fab.
2929
UN
27/05/2006
295.00
1894
UN
30/06/2006
530.00
1893
UN
30/06/2006
600.00
1873
UN
30/06/2006
607.00
1631
UN
03/03/2006
270.00
1654
UN
27/05/2006
305.00
Fab.
3376
UN
30/06/2006
420.00
Fab.
3377
UN
30/06/2006
380.00
Dep.
2931
UN
03/03/2006
350.00
Dep.
2910
UN
03/03/2006
375.00
Obra
2157
UN
27/05/2006
511.00
Fab.
1770
UN
27/05/2006
420.00
Fab.
1891
UN
30/06/2006
1,340.00
Fab.
1892
UN
30/06/2006
1,040.00
Fab.
1772
UN
03/03/2006
190.00
Obra
1968
UN
27/05/2006
252.00
1875
UN
30/06/2006
525.00
1876
UN
30/06/2006
480.00
125
UN
30/06/2006
558.00
Dep.
2930
UN
03/03/2006
483.00
Fab LPOR30
1728
UN
28/06/2006
766.00
Obra LPOR30
128
UN
28/06/2006
837.00
Dep.
123
UN
DEPOSITO LA PATRIA
28/06/2006
330.00
3302
UN
28/06/2006
424.00
122
UN
28/06/2006
462.00
Fab.
1890
UN
30/06/2006
1,281.00
Fab.
1889
UN
30/06/2006
1,563.00
Obra Dep.
1710
UN
03/03/2006
415.00
3375
UN
30/06/2006
380.00
Fab.
2903
UN
03/03/2006
260.00
Fab.
1636
UN
06/03/2006
330.00
Obra.
2153
UN
27/05/2006
365.00
Fab.
135
UN
06/03/2006
270.00
Obra
1969
UN
27/05/2006
307.00
Fab.
134
UN
28/10/2005
380.00
Obra.
2138
UN
27/05/2006
417.00
Obra LTFL
139
UN
04/03/2006
504.00
Fab.+ flete
1886
UN
30/06/2006
532.00
Fab.
1885
UN
30/06/2006
616.00
Fab.+ flete
1887
UN
30/06/2006
250.00
Fab.
1888
UN
30/06/2006
360.00
Fab.
3374
UN
30/06/2006
420.00
Fab.
3373
UN
30/06/2006
690.00
Referencia
Fecha
Fab. LTFL
Precio
2898
UN
28/06/2006
622.00
127
UN
HANETEC S.A.
06/03/2006
20,880.00
3321
UN
HANETEC S.A.
07/03/2006
34,800.00
2347
UN
2,000.00
103
UN
9,500.00
VITROBLOCK PISO
VITROMURO .0.19 x0.19x0.08
SOL
Fecha
2810
UN
DAGA
04/03/2005
38,705.90
3748
UN
DAGA
04/03/2005
116,784.44
9811
ML
DAGA
30/06/2006
4,800.00
9810
ML
DAGA
30/06/2006
660.00
9809
ML
DAGA
30/06/2006
9,000.00
9791
ML
DAGA
30/06/2006
11,800.00
9808
ML
DAGA
30/06/2006
13,800.00
9804
ML
DAGA
30/06/2006
12,000.00
9807
ML
DAGA
30/06/2006
13,200.00
9797
ML
DAGA
30/06/2006
6,500.00
2,134.40
Descripcin
WS1226
Precio
3517
UN
FIJACIONES TORRES
20/06/2006
2802
UN
NACIONAL DE ELECTRICOS
04/07/2006
1,569.48
9800
UN
DAGA
30/06/2006
227,000.00
9799
UN
DAGA
04/03/2006
336,400.00
9801
UN
DAGA
30/06/2006
554,000.00
9812
UN
DAGA
30/06/2006
880,000.00
2847
UN
NACIONAL DE ELECTRICOS
30/06/2006
49,874.20
3515
UN
NACIONAL DE ELECTRICOS
30/06/2006
286,424.88
9806
UN
DAGA
30/06/2006
292,000.00
9794
UN
DAGA
30/06/2006
172,000.00
9819
UN
DAGA
30/06/2006
1,300.00
3740
UN
NACIONAL DE ELECTRICOS
01/07/2006
12,122.00
3516
UN
NACIONAL DE ELECTRICOS
01/07/2006
66,990.00
9796
UN
DAGA
30/06/2006
4,200.00
9821
UN
DAGA
30/06/2006
4,200.00
9805
UN
DAGA
30/06/2006
10,400.00
9816
UN
DAGA
30/06/2006
93,700.00
3742
UN
DAGA
04/03/2005
29,336.00
9817
UN
DAGA
30/06/2006
102,000.00
9815
UN
DAGA
30/06/2006
118,000.00
9813
UN
DAGA
30/06/2006
93,400.00
9795
UN
DAGA
30/06/2006
84,000.00
9814
UN
DAGA
30/06/2006
96,000.00
9792
UN
DAGA
30/06/2006
289,000.00
9793
UN
DAGA
30/06/2006
534,200.00
3424
UN
DAGA
01/07/2006
186,000.00
9822
UN
DAGA
30/06/2006
900.00
9818
UN
DAGA
30/06/2006
400.00
9803
UN
DAGA
30/06/2006
464.00
0-0406330-1
Fecha
Precio
9820
UN
DAGA
30/06/2006
19,000.00
2857
UN
DAGA
30/06/2006
22,919.32
Descripcin
Referencia
Fecha
Precio
ACRILICO 2mm.
13200 blanc
141
M2
CRISTACRYL
04/07/2006
120,292.00
ACRILICO 3mm.
13202 blanco
142
M2
CRISTACRYL
04/07/2006
177,248.00
24140
3041
M2
07/03/2006
19,034.44
1720
UN
FORMAPLAC LTDA.
04/07/2006
6,797.60
1718
UN
FORMAPLAC LTDA.
04/07/2006
6,797.60
1721
UN
FORMAPLAC LTDA.
04/07/2006
6,797.60
APLIQUE YESO
AP1
3196
UN
ARQUITECTURA DE ACABADOS
30/06/2006
47,502.00
AP2
3198
UN
ARQUITECTURA DE ACABADOS
30/06/2006
47,502.00
AR1
3197
UN
ARQUITECTURA DE ACABADOS
30/06/2006
17,052.00
BAQUETON
BC1
3199
ML
ARQUITECTURA DE ACABADOS
30/06/2006
13,920.00
BAQUETON DECORADO
BD1
3180
ML
ARQUITECTURA DE ACABADOS
30/06/2006
16,820.00
CR1
3189
ML
ARQUITECTURA DE ACABADOS
30/06/2006
24,969.00
CLOUDS sin/inst.
24600
2505
M2
04/03/2005
29,660.00
CORNISA DECORADA
CD3
3182
ML
ARQUITECTURA DE ACABADOS
30/06/2006
21,460.00
MC2
3181
ML
ARQUITECTURA DE ACABADOS
30/06/2006
16,820.00
PP1
3183
ML
ARQUITECTURA DE ACABADOS
30/06/2006
23,780.00
PP2
3184
ML
ARQUITECTURA DE ACABADOS
30/06/2006
21,460.00
20409
148
M2
07/03/2006
10,985.20
20022
2501
PLC
07/03/2006
10,985.20
24500
3043
M2
02/03/2006
9,913.36
FR1
3206
UN
ARQUITECTURA DE ACABADOS
30/06/2006
23,780.00
FR-4
3209
UN
ARQUITECTURA DE ACABADOS
27/06/2006
28,420.00
154
M2
FORMAPLAC LTDA.
01/07/2006
1,851.36
155
M2
FORMAPLAC LTDA.
01/07/2006
7,405.44
3040
M2
07/03/2006
13,838.80
549
3465
M2
HANETEC S.A.
30/06/2006
69,020.00
550
3464
M2
HANETEC S.A.
30/06/2006
67,280.00
584
3466
M2
HANETEC S.A.
07/03/2006
54,172.00
589
3467
M2
HANETEC S.A.
07/03/2006
62,292.00
704
3454
M2
HANETEC S.A.
07/03/2006
27,840.00
3462
UN
HANETEC S.A.
07/03/2006
40,600.00
Fglas
Cieloraso
3320
UN
HANETEC S.A.
07/03/2006
22,040.00
RH90/pedido
3471
M2
HANETEC S.A.
07/03/2006
22,620.00
2790
3463
M2
HANETEC S.A.
07/03/2006
75,400.00
1830
3461
M2
HANETEC S.A.
07/03/2006
52,200.00
1732
3457
M2
HANETEC S.A.
07/03/2006
44,080.00
1729
3460
M2
HANETEC S.A.
07/03/2006
40,600.00
3458
M2
HANETEC S.A.
07/03/2006
52,200.00
3455
M2
HANETEC S.A.
07/03/2006
26,680.00
1450
Descripcin
Fecha
Precio
Decor
MULTIPANEL
162
M2
01/07/2006
70,095.00
Decor
MULTIPANEL
163
M2
01/07/2006
75,314.00
Decor
MULTIPANEL
164
M2
01/07/2006
76,675.00
TIPO 84RV5
161
M2
01/07/2006
63,213.00
TIPO 84R
1627
M2
01/07/2006
106,314.00
TIPO 98Z
1812
M2
01/07/2006
42,774.00
Decor
Decor
MULTIPANEL
158
M2
01/07/2006
54,198.00
Decor
MULTIPANEL
1815
M2
01/07/2006
64,616.00
Decor
MULTIPANEL
160
M2
01/07/2006
67,948.00
1813
M2
01/07/2006
68,129.00
TIPO 84R
TILE
166
M2
01/07/2006
151,095.00
LUXALON MaderAlum V5
Acust
TIPO 84R
1817
M2
01/07/2006
123,210.00
LUXALON MaderAlum V5
Decor
TIPO 84R
1816
M2
01/07/2006
108,772.00
157
M2
01/07/2006
161,561.00
TIPO CELL
TIPO CELL
156
M2
01/07/2006
156,785.00
MD1
3190
UN
ARQUITECTURA DE ACABADOS
30/06/2006
58,000.00
MD3
3191
UN
ARQUITECTURA DE ACABADOS
30/06/2006
58,000.00
20700
186
M2
07/03/2006
51,643.00
PERFILERIA DE ENSAMBLE
9408
M2
HANETEC S.A.
07/03/2006
8,700.00
PERFILERIA DE ENSAMBLE
9407
M2
HANETEC S.A.
07/03/2006
7,540.00
3901
M2
HANETEC S.A.
07/03/2006
19,720.00
2253
UN
01/07/2006
26,546.60
2254
UN
01/07/2006
46,026.48
1048
176
UN
COLOMBIT (NORVENTAS)
01/07/2006
9,029.44
4224
1628
UN
COLOMBIT (NORVENTAS)
01/07/2006
12,627.76
02061
1629
UN
COLOMBIT (NORVENTAS)
01/07/2006
46,986.96
187
UN
01/07/2006
8,700.00
SUPERCEL .60x121x4mm
AMARRE CABALLETE
ETERNIT
Referencia
Fecha
9900001000
Precio
2259
UN
04/07/2006
145.00
10722
212
UN
30/06/2006
4,529.00
0602000000
189
ML
30/06/2006
19,077.36
0602020000
2245
ML
30/06/2006
12,595.28
13165
190
UN
CRISTACRYL
30/06/2006
331,760.00
13190
2271
UN
CRISTACRYL
30/06/2006
279,908.00
13163
2272
UN
CRISTACRYL
30/06/2006
637,420.00
13173
2273
UN
CRISTACRYL
30/06/2006
842,624.00
13193
9422
UN
CRISTACRYL
30/06/2006
553,320.00
CABALLETE 4% C43
0023023000
2349
UN
30/06/2006
8,081.72
ETERNIT
193
UN
30/06/2006
13,345.80
2959
UN
30/06/2006
33,317.52
0002020000
192
UN
30/06/2006
23,600.20
TZL-2.0-26
1820
UN
30/06/2006
40,707.88
1934
UN
30/06/2006
260.00
2300
UN
CRISTACRYL
30/06/2006
58,116.00
CABALLETE CUBIERTA
TZL.60x2m-26
13107
0009044000
194
UN
30/06/2006
13,024.48
0009010000
2263
UN
30/06/2006
21,712.88
0009065000
2264
UN
30/06/2006
23,103.72
13106
2305
UN
CRISTACRYL
30/06/2006
125,048.00
1933
UN
30/06/2006
320.00
195
ML
30/06/2006
10,346.00
MOORE
12445
0601001000
2241
ML
30/06/2006
12,392.28
0601003000
2242
ML
30/06/2006
8,298.64
0601002000
196
ML
30/06/2006
9,721.96
11774
216
UN
30/06/2006
1,380.00
11781
217
UN
30/06/2006
4,000.00
12825
245
UN
30/06/2006
4,754.00
CANALETA 43 x 3.50
ETERNIT
0022012000
197
UN
30/06/2006
76,908.00
CANALETA 43 x 4.00
ETERNIT
0022032000
198
UN
30/06/2006
90,815.24
CANALETA 43 x 4.50
ETERNIT
1945
UN
30/06/2006
95,883.28
CANALETA 43 x 5.00
ETERNIT
1946
UN
30/06/2006
102,907.08
CANALETA 43 x 5.50
ETERNIT
201
UN
30/06/2006
111,646.52
CANALETA 43 x 6.00
ETERNIT
202
UN
30/06/2006
121,525.08
CANALETA 43 x 7.50
ETERNIT
1947
UN
30/06/2006
139,126.92
13111
209
UN
CRISTACRYL
30/06/2006
375,608.00
13155
464,464.00
2065
UN
CRISTACRYL
30/06/2006
CANALETA 90 x 3.75
ETERNIT
2352
UN
30/06/2006
93,586.48
CANALETA 90 x 4.50
ETERNIT
1948
UN
30/06/2006
112,310.04
Descripcin
Fecha
Precio
CANALETA 90 x 5.25
ETERNIT
205
UN
30/06/2006
131,032.44
CANALETA 90 x 6.00
ETERNIT
206
UN
30/06/2006
150,081.96
CANALETA 90 x 7.50
ETERNIT
207
UN
30/06/2006
187,594.04
CANALETA 90 x 9.00
ETERNIT
208
UN
30/06/2006
225,107.28
ACESCO
TZC90x4.5-24
210
UN
30/06/2006
134,483.44
ACESCO
TZC90x4.5-24
1600
ML
30/06/2006
29,885.08
ACESCO
TZC90x6-24
1818
UN
30/06/2006
179,311.64
ACESCO
TZC90x8-24
1819
UN
30/06/2006
239,081.80
2261
UN
01/07/2006
34,904.40
2262
UN
01/07/2006
56,160.24
2265
UN
01/07/2006
28,951.28
2266
UN
01/07/2006
46,411.60
CODO BAJANTE
CR x90 ETERNIT
2246
UN
01/07/2006
4,775.72
2243
UN
01/07/2006
7,821.88
211
UN
01/07/2006
6,449.60
99
UN
01/07/2006
37,030.68
TZA73x305-30
TZA73x366-30
159
UN
01/07/2006
44,437.28
CUBIERTA ROYALCO
3483
M2
20/06/2006
69,979.32
3899
M2
01/07/2006
90,184.00
250c LUXALON
3187
M2
01/07/2006
83,432.00
250c LUXALON
3903
M2
01/07/2006
101,148.00
350c LUXALON
3907
M2
01/07/2006
42,120.00
250c LUXALON
3904
M2
01/07/2006
49,054.00
3mm.
13175
2280
UN
CRISTACRYL
01/07/2006
360,528.00
13177
2281
UN
CRISTACRYL
01/07/2006
553,320.00
CUPULA No.1
158x114 3mm.
13150
2284
UN
CRISTACRYL
01/07/2006
279,908.00
CUPULA No.2
158x140 3mm.
13151
2285
UN
CRISTACRYL
01/07/2006
322,016.00
CUPULA No.3
158x230 3mm.
13152
2286
UN
CRISTACRYL
01/07/2006
553,320.00
13092
213
UN
CRISTACRYL
01/07/2006
110,084.00
13094
214
UN
CRISTACRYL
01/07/2006
183,512.00
13052
2287
UN
CRISTACRYL
01/07/2006
183,628.00
13091
2288
UN
CRISTACRYL
01/07/2006
76,560.00
13053
2289
UN
CRISTACRYL
01/07/2006
183,628.00
13072
2290
UN
CRISTACRYL
01/07/2006
76,560.00
13083
2291
UN
CRISTACRYL
01/07/2006
134,444.00
13084
2292
UN
CRISTACRYL
01/07/2006
134,444.00
Perfil en C
3275
UN
METAZA
21/06/2006
243.60
9900003100
2256
UN
01/07/2006
1,224.96
2257
UN
01/07/2006
1,865.28
215
UN
01/07/2006
509.24
2267
UN
01/07/2006
38,825.20
2268
UN
01/07/2006
54,972.40
2269
UN
01/07/2006
77,664.32
2270
UN
01/07/2006
109,911.16
13154
2274
UN
CRISTACRYL
01/07/2006
375,608.00
Fab.
2934
UN
28/06/2006
1,700.00
Referencia
Fecha
Precio
13102
2293
UN
CRISTACRYL
01/07/2006
126,440.00
13104
2294
UN
CRISTACRYL
01/07/2006
187,688.00
13142
2295
UN
CRISTACRYL
01/07/2006
149,524.00
13143
2296
UN
CRISTACRYL
01/07/2006
224,576.00
13101
218
UN
CRISTACRYL
01/07/2006
179,452.00
13103
2066
UN
CRISTACRYL
01/07/2006
269,004.00
13130
2297
UN
CRISTACRYL
01/07/2006
253,112.00
13110
2298
UN
CRISTACRYL
01/07/2006
375,608.00
13160
2299
UN
CRISTACRYL
01/07/2006
464,464.00
+ flete
2034
M2
01/07/2006
22,109.60
+ flete
5,011.20
229
ML
07/03/2006
518
un
07/03/2006
5,011.20
3274
ML
METAZA
21/06/2006
17,498.60
996
ML
METAZA
21/06/2006
21,367.20
VERDE
00-06041-00
2970
UN
08/06/2006
153,100.28
2453
UN
01/07/2006
61,200.00
2455
UN
08/06/2006
91,900.00
2456
UN
08/06/2006
122,500.00
222
UN
01/07/2006
22,762.68
223
UN
01/07/2006
49,349.88
TEJA ETERNIT
808101100
9421
UN
01/07/2006
57,252.00
TEJA ETERNIT No 5
No 10
808101050
9418
UN
01/07/2006
28,400.00
TEJA ETERNIT No 4
808101040
9417
UN
01/07/2006
22,668.00
TEJA ETERNIT No 6
808101060
9419
UN
01/07/2006
34,911.00
TEJA ETERNIT No 8
808101080
9420
UN
01/07/2006
45,304.00
EDIL TH
1664
M2
EDILMER
01/07/2006
21,260.00
+ flete
228
M2
07/03/2006
26,981.60
ETERNIT
1951
UN
01/07/2006
20,853.32
ETERNIT
1952
UN
01/07/2006
32,118.08
ETERNIT
1953
UN
01/07/2006
41,679.96
ETERNIT
1954
UN
01/07/2006
52,670.96
Gris
2239
UN
01/07/2006
13,393.36
Gris
224
UN
01/07/2006
26,067.52
225
UN
01/07/2006
32,657.48
226
UN
01/07/2006
40,147.60
227
UN
01/07/2006
52,100.24
2240
UN
01/07/2006
65,839.28
249
M2
01/07/2006
22,109.60
1932
UN
30/06/2006
460.00
1931
UN
30/06/2006
542.00
AA Ref.763 MOORE
+ flete
2481
UN
07/03/2006
18,432.40
00-01041-00
235
UN
01/07/2006
26,400.00
00-07041-00
230
UN
01/07/2006
28,300.00
00-01051-00
165
UN
01/07/2006
32,900.00
00-07051-00
2972
UN
01/07/2006
35,100.00
00-01061-00
360
UN
01/07/2006
39,700.00
Referencia
Fecha
Precio
00-07061-00
231
UN
00-01081-00
322
UN
01/07/2006
42,500.00
01/07/2006
00-07081-00
1944
52,900.00
UN
01/07/2006
56,500.00
00-01101-00
00-07011-00
1660
UN
01/07/2006
66,100.00
2979
UN
01/07/2006
70,600.00
00-08161-00
2767
UN
01/07/2006
42,200.00
00-08071-00
404
UN
01/07/2006
18,792.00
TR
1858
M2
EDILMER
01/07/2006
21,260.00
2306
UN
CRISTACRYL
01/07/2006
201,492.00
2307
UN
CRISTACRYL
01/07/2006
302,064.00
3484
M2
20/06/2006
22,371.76
102509999
232
UN
COLOMBIT (NORVENTAS)
01/07/2006
20,859.12
102510013
233
UN
COLOMBIT (NORVENTAS)
01/07/2006
32,125.04
102510039
234
UN
COLOMBIT (NORVENTAS)
01/07/2006
41,691.56
28520
2474
M2
07/03/2006
31,024.20
28540
3067
M2
01/07/2006
31,024.00
236
UN
01/07/2006
14,506.96
237
UN
01/07/2006
22,342.76
238
UN
01/07/2006
28,994.20
13133
239
UN
CRISTACRYL
01/07/2006
193,952.00
13113
2067
UN
CRISTACRYL
01/07/2006
291,508.00
13134
2304
UN
CRISTACRYL
01/07/2006
253,112.00
13114
2303
UN
CRISTACRYL
01/07/2006
375,608.00
13144
2301
UN
CRISTACRYL
01/07/2006
154,048.00
13145
2302
UN
CRISTACRYL
01/07/2006
229,216.00
240
UN
01/07/2006
15,714.52
241
UN
01/07/2006
22,276.64
13166
2276
UN
CRISTACRYL
01/07/2006
165,648.00
13191
2277
UN
CRISTACRYL
01/07/2006
139,780.00
13164
2278
UN
CRISTACRYL
01/07/2006
637,420.00
13174
2279
UN
CRISTACRYL
01/07/2006
842,624.00
13194
2722
UN
CRISTACRYL
01/07/2006
293,944.00
3mm
13176
2282
UN
CRISTACRYL
01/07/2006
129,340.00
13178
2283
UN
CRISTACRYL
01/07/2006
293,944.00
243
UN
04/07/2006
3,050.80
TORNILLO COMPL.METALcCAN-43
242
UN
04/07/2006
910.60
2255
UN
04/07/2006
1,124.04
2260
UN
04/07/2006
1,360.68
2351
UN
04/07/2006
1,959.24
1814
M2
37,600.00
VITROLIT (MARQUESINAS)
6mm
ENCHAPES,PISOS,ALFOMBRAS,PAPEL (6)
10/07/2006 Bogot
Referencia
Descripcin
Fecha
Precio
3482
M2
20/06/2006
37,120.00
A-6 GRIS
246
UN
CONCRETOS MODULARES
04/03/2006
390.00
A-8 GRIS
248
UN
CONCRETOS MODULARES
04/03/2006
446.00
780
250
M2
07/03/2006
17,372.16
788
2480
M2
07/03/2006
17,372.16
1920
M2
30/06/2006
14,900.00
1919
M2
30/06/2006
13,200.00
1922
M2
30/06/2006
14,900.00
1910
M2
04/07/2006
13,200.00
+flete
1908
M2
30/06/2006
14,900.00
+flete
1906
M2
30/06/2006
14,900.00
1918
M2
30/06/2006
14,900.00
1771
UN
27/05/2006
461.00
1909
M2
04/07/2006
15,400.00
1907
M2
30/06/2006
17,300.00
1905
M2
30/06/2006
15,400.00
1917
M2
30/06/2006
17,300.00
LIVIANO
A 009647
254
M2
04/07/2006
34,341.00
A 000042
256
M2
30/06/2006
108,168.00
A 011660
263
M2
30/06/2006
60,710.00
259
M2
30/06/2006
93,672.00
255
M2
30/06/2006
39,789.00
267
M2
NORVENTAS/PAVCO/RECUBRIMI
04/07/2006
46,304.88
273
M2
NORVENTAS/PAVCO/RECUBRIMI
04/07/2006
26,555.88
278
M2
NORVENTAS/PAVCO/RECUBRIMI
04/07/2006
87,158.92
2126
M2
NORVENTAS/PAVCO/RECUBRIMI
04/07/2006
40,537.36
2123
M2
NORVENTAS/PAVCO/RECUBRIMI
04/07/2006
45,328.16
272
M2
NORVENTAS/PAVCO/RECUBRIMI
04/07/2006
135,061.12
A 028452
2122
M2
NORVENTAS/PAVCO/RECUBRIMI
04/07/2006
19,568.04
277
M2
NORVENTAS/PAVCO/RECUBRIMI
04/07/2006
164,043.72
275
M2
NORVENTAS/PAVCO/RECUBRIMI
04/07/2006
90,735.20
265
M2
NORVENTAS/PAVCO/RECUBRIMI
04/07/2006
49,587.68
276
M2
NORVENTAS/PAVCO/RECUBRIMI
04/07/2006
77,196.84
2127
M2
NORVENTAS/PAVCO/RECUBRIMI
04/07/2006
37,256.88
2125
M2
NORVENTAS/PAVCO/RECUBRIMI
04/07/2006
69,326.24
293
M2
BALDOSINES DELTA
07/03/2006
21,460.00
Recortadas
9483
M2
BALDOSINES DELTA
02/03/2006
22,620.00
294
M2
BALDOSINES DELTA
07/03/2006
17,400.00
9448
M2
BALDOSINES DELTA
07/03/2006
19,140.00
ENCHAPES,PISOS,ALFOMBRAS,PAPEL (6)
10/07/2006 Bogot
Referencia
Fecha
Precio
3912
M2
FIBRIT LTDA.
07/03/2006
38,587.40
EA-10 Obra
2378
UN
CONCRETOS MODULARES
01/03/2005
494.00
TEI-18 Obra
2377
UN
CONCRETOS MODULARES
01/03/2005
1,564.00
TPI-16 Obra
Descripcin
2376
UN
CONCRETOS MODULARES
01/03/2005
1,634.00
1896
UN
30/06/2006
509.00
1895
UN
30/06/2006
709.00
2725
KG
07/03/2006
2,167.00
302
ML
NORVENTAS/PAVCO/RECUBRIMI
01/07/2006
26,314.60
18
M2
PORTAPLAST
01/07/2006
42,000.00
306
M2
PORTAPLAST
01/07/2006
42,000.00
CONCOLOR J - 10 CRNA
90010 BLANCO
AZUL
25704 BLANCO
2829
M2
07/03/2006
21,017.00
28813
2428
M2
07/03/2006
19,104.00
1794
M2
07/03/2006
31,316.00
28803 BLANCO
2744
M2
07/03/2006
19,104.00
45511 GRIS
1796
M2
07/03/2006
32,303.00
35506 BEIGE
1865
M2
04/03/2006
29,000.00
52105 BLANCO
2838
M2
04/03/2006
24,500.00
28809 BEIGE
2427
M2
07/03/2006
19,371.00
28809 GRIS
338
M2
07/03/2006
19,371.00
2839
M2
07/03/2006
19,976.00
45517 BEIGE
2861
M2
07/03/2006
32,303.00
45509
2751
M2
07/03/2006
31,316.00
1904
M2
07/03/2006
23,989.00
1802
M2
07/03/2006
20,848.00
35509 AZUL C
1792
M2
07/03/2006
22,419.00
28800 AZUL O
2639
M2
07/03/2006
19,976.00
28800 BEIGE
2826
M2
07/03/2006
19,976.00
2946
M2
01/07/2006
16,724.46
1294
M2
01/07/2006
20,120.20
889
M2
01/07/2006
18,467.20
ENCHAPE EGEO
23103
2424
M2
01/07/2006
23,570.88
35600 BLANCO
2679
M2
04/03/2006
22,500.00
35600 BEIGE
332
M2
04/03/2006
22,500.00
3940
M2
01/07/2006
26,456.12
339
M2
04/03/2006
23,000.00
1930
ML
30/06/2006
6,400.00
1928
ML
30/06/2006
11,520.00
1927
ML
30/06/2006
15,360.00
+flete
31100 5KL
2726
KG
07/03/2006
728.00
GP009000
2449
KG
30/06/2006
9,115.00
3138
M2
GRANITOS Y MARMOLES
07/03/2006
307,600.00
3139
M2
GRANITOS Y MARMOLES
07/03/2006
120,756.00
3140
M2
GRANITOS Y MARMOLES
07/03/2006
162,800.00
3141
M2
GRANITOS Y MARMOLES
07/03/2006
312,400.00
3137
M2
GRANITOS Y MARMOLES
07/03/2006
155,900.00
3136
M2
GRANITOS Y MARMOLES
07/03/2006
94,700.00
ENCHAPES,PISOS,ALFOMBRAS,PAPEL (6)
10/07/2006 Bogot
Referencia
Fecha
3143
M2
GRANITOS Y MARMOLES
07/03/2006
454,200.00
3142
M2
GRANITOS Y MARMOLES
07/03/2006
327,300.00
3145
M2
GRANITOS Y MARMOLES
07/03/2006
271,900.00
3144
M2
GRANITOS Y MARMOLES
07/03/2006
176,100.00
3147
M2
GRANITOS Y MARMOLES
07/03/2006
236,000.00
3146
M2
GRANITOS Y MARMOLES
07/03/2006
195,100.00
3149
M2
GRANITOS Y MARMOLES
07/03/2006
209,900.00
3148
M2
GRANITOS Y MARMOLES
07/03/2006
301,600.00
2939
M2
MARMOLES VENEZIANOS
23/06/2006
404,376.00
2940
M2
MARMOLES VENEZIANOS
23/06/2006
1,119,168.00
Descripcin
GRUPO 5
ref731
Comercial
Precio
291
M2
30/06/2006
31,088.00
1665
ML
30/06/2006
2,870.00
309
ML
NORVENTAS/PAVCO/RECUBRIMI
01/07/2006
4,768.76
507
ML
BALDOSINES DELTA
07/03/2006
5,452.00
508
ML
BALDOSINES DELTA
07/03/2006
5,568.00
310
ML
NORVENTAS/PAVCO/RECUBRIMI
01/07/2006
2,909.28
2450
KG
30/06/2006
1,079.00
2729
M2
MARMOLES VENEZIANOS
23/06/2006
11,600.00
3173
M2
GRANITOS Y MARMOLES
07/03/2006
379,900.00
3171
M2
GRANITOS Y MARMOLES
07/03/2006
439,600.00
3172
M2
GRANITOS Y MARMOLES
07/03/2006
359,600.00
3170
M2
GRANITOS Y MARMOLES
07/03/2006
144,000.00
3151
M2
GRANITOS Y MARMOLES
07/03/2006
101,100.00
3152
UN
GRANITOS Y MARMOLES
07/03/2006
2,400.00
3153
M2
GRANITOS Y MARMOLES
07/03/2006
122,900.00
3175
M2
GRANITOS Y MARMOLES
07/03/2006
252,500.00
3174
M2
GRANITOS Y MARMOLES
07/03/2006
146,100.00
3177
M2
GRANITOS Y MARMOLES
07/03/2006
291,700.00
3176
M2
GRANITOS Y MARMOLES
07/03/2006
334,200.00
3167
M2
GRANITOS Y MARMOLES
07/03/2006
69,600.00
2888
M2
MARMOLES VENEZIANOS
23/06/2006
126,208.00
3156
M2
GRANITOS Y MARMOLES
07/03/2006
184,440.00
3154
M2
GRANITOS Y MARMOLES
07/03/2006
103,400.00
3155
UN
GRANITOS Y MARMOLES
07/03/2006
2,300.00
3178
M2
GRANITOS Y MARMOLES
07/03/2006
144,600.00
3179
M2
GRANITOS Y MARMOLES
07/03/2006
228,100.00
3157
M2
GRANITOS Y MARMOLES
07/03/2006
82,100.00
3158
UN
GRANITOS Y MARMOLES
07/03/2006
2,100.00
3159
M2
GRANITOS Y MARMOLES
07/03/2006
137,700.00
313
M2
30/06/2006
89,000.00
328
M2
GRANITOS Y MARMOLES
07/03/2006
65,600.00
3106
M2
GRANITOS Y MARMOLES
07/03/2006
80,700.00
2727
M2
MARMOLES VENEZIANOS
23/06/2006
14,500.00
2728
M2
MARMOLES VENEZIANOS
23/06/2006
10,440.00
2732
M2
MARMOLES VENEZIANOS
23/06/2006
31,320.00
2941
M2
MARMOLES VENEZIANOS
23/06/2006
15,080.00
Residencial
Extra
ENCHAPES,PISOS,ALFOMBRAS,PAPEL (6)
10/07/2006 Bogot
Referencia
Descripcin
Fecha
Precio
26,680.00
2731
M2
MARMOLES VENEZIANOS
23/06/2006
320
M2
MARMOLES VENEZIANOS
23/06/2006
6,960.00
351
M2
MARMOLES VENEZIANOS
01/07/2006
96,164.00
3163
M2
GRANITOS Y MARMOLES
07/03/2006
86,500.00
3164
UN
GRANITOS Y MARMOLES
07/03/2006
2,000.00
3165
M2
GRANITOS Y MARMOLES
07/03/2006
139,600.00
3166
M2
GRANITOS Y MARMOLES
07/03/2006
132,300.00
3160
M2
GRANITOS Y MARMOLES
07/03/2006
186,700.00
2128
UN
NORVENTAS/PAVCO/RECUBRIMI
21/06/2006
11,825.04
2129
UN
NORVENTAS/PAVCO/RECUBRIMI
21/06/2006
13,024.48
15 kilos
CINTIA
437
M2
KONKER
01/07/2006
16,000.00
1317
M2
01/07/2006
15,305.04
323
ML
NORVENTAS/PAVCO/RECUBRIMI
01/07/2006
47,394.12
825.00
90104
324
KG
07/03/2006
90106
2724
KG
04/03/2005
800.00
325
M2
MARMOLES VENEZIANOS
01/07/2006
66,816.00
2938
M2
30/06/2006
47,444.00
327
M2
GRANITOS Y MARMOLES
07/03/2006
70,500.00
674
ML
NORVENTAS/PAVCO/RECUBRIMI
21/06/2006
10,625.60
271
M2
04/03/2006
24,000.00
PIEDRA CORALINA
305x15.3x2
PIEDRA CORALINA
30x15
Brillado
35804
2418
UN
07/03/2006
2,977.00
33719
2684
M2
04/03/2005
26,500.00
3394
M2
30/06/2006
17,168.00
3395
M2
30/06/2006
18,328.00
3389
M2
30/06/2006
18,560.00
3393
M2
30/06/2006
19,720.00
3385
M2
30/06/2006
16,008.00
3384
M2
30/06/2006
18,096.00
3391
M2
30/06/2006
19,952.00
3390
M2
30/06/2006
16,936.00
3388
M2
30/06/2006
16,936.00
3387
M2
30/06/2006
16,936.00
30512 GRIS C
1799
M2
07/03/2006
19,540.00
33803 CREMA
2827
M2
04/03/2006
20,000.00
35303
2421
M2
07/03/2006
19,540.00
33802 BEIGE
2740
M2
07/03/2006
18,232.00
1795
M2
07/03/2006
18,232.00
66518 BEIGE
2435
M2
07/03/2006
18,232.00
TABLETA
3476
M2
HANETEC S.A.
07/03/2006
55,680.00
3939
M2
01/07/2006
22,085.24
PISO CORLON
3479
M2
HANETEC S.A.
07/03/2006
75,400.00
3935
M2
01/07/2006
23,441.28
3934
M2
01/07/2006
23,485.36
1753
M2
01/07/2006
21,266.28
2683
M2
01/07/2006
21,621.10
305
M2
04/03/2006
14,900.00
25650
ENCHAPES,PISOS,ALFOMBRAS,PAPEL (6)
10/07/2006 Bogot
Descripcin
Referencia
Fecha
Obra
1784
UN
27/05/2006
1783
UN
06/03/2006
270.00
356
M2
KONKER
01/07/2006
37,600.00
3931
M2
01/07/2006
20,106.28
1367
M2
01/07/2006
20,629.44
3474
M2
HANETEC S.A.
01/07/2006
45,240.00
3936
M2
01/07/2006
24,964.36
PISO MEDINTECH
3480
M2
HANETEC S.A.
07/03/2006
116,000.00
3473
M2
HANETEC S.A.
07/03/2006
104,400.00
Precio
370.00
30802 VERDE
1801
M2
07/03/2006
18,232.00
41301CAFE
2733
M2
07/03/2006
19,104.00
41523 CAFE
2737
M2
07/03/2006
19,104.00
9333
M2
01/07/2006
25,153.44
1651
M2
01/07/2006
25,153.44
2734
M2
07/03/2006
19,104.00
3478
M2
HANETEC S.A.
07/03/2006
69,600.00
41313 CAFE
PISO POSSIBILITIES
PISO PRAGA GRIS 41x41 CRNA
41522 GRIS
2682
M2
07/03/2006
19,976.00
41804
1076
M2
07/03/2006
19,976.00
33405 BEIGE
1809
M2
04/03/2006
24,000.00
33405 TERRE
2382
M2
04/03/2006
23,900.00
41513 BEIGE
2135
M2
07/03/2006
19,371.00
33941
2723
M2
07/03/2006
17,517.00
41004
2133
M2
01/07/2006
32,541.56
41510
2828
M2
07/03/2006
19,976.00
3475
M2
HANETEC S.A.
07/03/2006
75,400.00
2,671.00
PISO STONETEX
PISO TACO PUGLIA 13 x 13 CRNA
43514
1980
UN
07/03/2006
43004
2110
UN
04/03/2006
4,000.00
42004
2075
UN
04/03/2006
10,200.00
Negro
3932
M2
01/07/2006
22,810.24
30520
2550
M2
04/03/2006
17,900.00
3477
M2
HANETEC S.A.
30/06/2006
113,680.00
1793
M2
07/03/2006
20,363.00
3938
M2
01/07/2006
22,675.68
1808
M2
07/03/2006
20,363.00
POLISEC PAVCO
330
M2
NORVENTAS/PAVCO/RECUBRIMI
01/07/2006
614.80
342
M2
PISOS PARDO
01/07/2006
11,000.00
1723
M2
01/07/2006
19,500.00
341
M2
01/07/2006
12,000.00
1722
M2
01/07/2006
13,500.00
1678
M2
PISOS PARDO
28/06/2006
8,000.00
2741
M2
24/05/2006
22,500.00
80
M2
01/07/2006
17,500.00
PULIDA POTE
145
M2
01/07/2006
24,000.00
348
M2
30/06/2006
12,600.00
1822
M2
30/06/2006
15,400.00
349
M2
30/06/2006
12,600.00
PISO TRANSLATIONS
PISO TURIN 41 x 41 CRNA
41524 CREMA
41525 CAFE
ENCHAPES,PISOS,ALFOMBRAS,PAPEL (6)
10/07/2006 Bogot
Referencia
Descripcin
Fecha
Precio
1823
M2
30/06/2006
15,450.00
+ flete
350
M2
30/06/2006
12,600.00
+ flete
1872
M2
30/06/2006
15,400.00
1899
M2
30/06/2006
17,200.00
1900
M2
30/06/2006
14,000.00
G 4500
3168
M2
30/06/2006
7,508.00
G 4300
3162
M2
30/06/2006
11,217.00
G 4160
3379
M2
30/06/2006
11,217.00
G 4230
3382
M2
30/06/2006
11,252.00
G 4241
3161
M2
30/06/2006
9,802.00
G 4100
3380
M2
30/06/2006
10,904.00
G 4101
3381
M2
30/06/2006
10,904.00
3324
M2
30/06/2006
9,802.00
G 4060
3383
M2
30/06/2006
11,600.00
2693
M2
30/06/2006
10,904.00
89
UN
06/03/2006
170.00
94
UN
27/05/2006
380.00
592
UN
27/05/2006
566.00
1926
M2
30/06/2006
12,600.00
1925
M2
30/06/2006
15,450.00
1924
M2
30/06/2006
15,650.00
1923
M2
30/06/2006
19,100.00
355
M2
30/06/2006
14,100.00
2561
M2
30/06/2006
17,200.00
Fab.
G000160
353
M2
30/06/2006
21,460.00
G001172
344
M2
30/06/2006
11,183.00
357
M2
NORVENTAS/PAVCO/RECUBRIMI
21/06/2006
20,015.80
358
M2
NORVENTAS/PAVCO/RECUBRIMI
21/06/2006
21,482.04
359
M2
NORVENTAS/PAVCO/RECUBRIMI
21/06/2006
25,789.12
364
ML
30/06/2006
10,764.00
362
ML
30/06/2006
10,764.00
363
ML
30/06/2006
10,764.00
Descripcin
Fecha
Precio
367
DD
CONSTRUEQUIPOS - G. LOBO
21/06/2006
368
DD
CONSTRUEQUIPOS - G. LOBO
04/07/2006
440.80
1638
MS
CONSTRUEQUIPOS - G. LOBO
04/07/2006
13,224.00
2720
MS
30/06/2006
1,160,000.00
369
M3
CEMEX
07/03/2006
20,500.00
APISONADOR CANGURO
AUTOBOMBA PARA CONCRETO
BOMBEO
812.00
4040
21/06/2006
11,600.00
2476
MES IR LTDA.
20/06/2006
1,392,000.00
3808
DD
TELECTRICOS LTDA.
30/06/2006
1,883.84
3305
DIA
27/06/2006
40,600.00
371
M3
CEMEX
07/03/2006
23,780.00
Vibrocompact
372
DD
VAREGO LTDA.
30/06/2006
300,000.00
2447
VJ
CONSTRUEQUIPOS - G. LOBO
21/06/2006
116,000.00
2446
VJ
CONSTRUEQUIPOS - G. LOBO
21/06/2006
139,200.00
CAMPERO
3745
HR
27/06/2006
21,529.60
CASE 430
373
HR
A Y G INVERCIONES Y EQUIPOS
30/06/2006
85,000.00
CARGADOR BOBCAT+Oper.
753
753
2634
HR
EXCAVADORAS Y MAQUINARIAS
03/03/2006
35,000.00
CARGADOR BOBCAT+Oper.
853
853
105
HR
EXCAVADORAS Y MAQUINARIAS
03/03/2006
35,000.00
2503
HR
EXCAVADORAS Y MAQUINARIAS
07/03/2006
45,000.00
326
SM
IR LTDA.
20/06/2006
788.80
959
DD
CONSTRUEQUIPOS - G. LOBO
01/07/2006
81.20
CARGADOR RETROEXCAVADOR
MF86HD
H100
DIMAPACK
1656
07/03/2006
17,400.00
138
HR
EXCAVADORAS Y MAQUINARIAS
03/03/2006
25,000.00
CINTURON DE SEGURIDAD
949
DD
COLORA LTDA.
01/07/2006
800.00
376
HR
01/07/2006
43,500.00
2837
DD
01/07/2006
348,000.00
2468
HR
01/07/2006
50,750.00
3234
MS
COLORA LTDA.
28/06/2006
4,200,000.00
3233
DD
COLORA LTDA.
01/07/2006
406,000.00
3235
HR
COLORA LTDA.
28/06/2006
33,832.56
3236
MS
COLORA LTDA.
28/06/2006
7,000,000.00
30,160.00
COMPRESOR Oper.+Comb
P185-WJD
1650
HR
CONSTRUEQUIPOS - G. LOBO
21/06/2006
COMPRESOR Oper.+Comb
P185-WJD
1658
DD
CONSTRUEQUIPOS - G. LOBO
21/06/2006
241,280.00
COMPRESOR Oper.+Comb
P185-WJD
1659
MS
CONSTRUEQUIPOS - G. LOBO
21/06/2006
7,238,400.00
CORTADORA DE LADRILLO
Trifasica
378
DD
CONSTRUMAQUINAS LTDA
01/07/2006
29,000.00
1035
27/06/2006
336,400.00
3239
DD
COLORA LTDA.
28/06/2006
35,000.00
3240
MS
COLORA LTDA.
01/07/2006
336,400.00
CRUCETAS CORTAS
329
SM
IR LTDA.
20/06/2006
336.40
384
DD
CONSTRUEQUIPOS - G. LOBO
01/07/2006
52.20
Descripcin
CRUCETAS LARGAS
Fecha
Precio
346
SM
IR LTDA.
20/06/2006
336.40
2632
MS
EQUIPOS GLEASON
01/07/2006
1,461,600.00
3565
MS
EQUIPOS GLEASON
01/07/2006
556,800.00
EQUIPO DE COMPACTACION
3220
DD
COLORA LTDA.
28/06/2006
58,000.00
EQUIPO DE COMPACTACION
3232
MS
COLORA LTDA.
28/06/2006
1,392,000.00
EQUIPO DE TOPOGRAFIA
EQUIPO SOLDADURA ELECTRICA
BIFASICO
KOMATSU
FORCLAMPS
814
04/03/2004
2,000,000.00
380
DD
01/07/2006
34,800.00
3245
DD
COLORA LTDA.
04/03/2006
19,720.00
922
DD
COLORA LTDA.
28/06/2006
1,508.00
9484
M3
INVERSIONES GVM
30/06/2006
60,000.00
3371
M3
INVERSIONES GVM
30/06/2006
4,000.00
2636
HR
A Y G INVERCIONES Y EQUIPOS
07/06/2006
70,000.00
381
DD
CONSTRUEQUIPOS - G. LOBO
21/06/2006
58.00
2162
M2
CONSTRUEQUIPOS - G. LOBO
01/07/2006
812.00
383
M2
CONSTRUEQUIPOS - G. LOBO
01/07/2006
3,248.00
382
MS
CONSTRUEQUIPOS - G. LOBO
01/07/2006
5,341.80
FORMALETA SARDINEL ML
386
DD
27/06/2006
1,160.00
GRUA AUTODESPLEGABLE+OPERARIO
2448
MS
CONSTRUEQUIPOS - G. LOBO
21/06/2006
3,364,000.00
2745
HR
27/06/2006
21,852.08
3792
DD
CONSTRUEQUIPOS - G. LOBO
01/07/2006
150,800.00
2504
MS
CONSTRUEQUIPOS - G. LOBO
21/06/2006
8,352,000.00
2475
SM
IR LTDA.
20/06/2006
9,280.00
3786
UN
TELECTRICOS LTDA.
01/07/2006
348,000.00
LLAVES TENSORAS
1653
DD
CONSTRUEQUIPOS - G. LOBO
21/06/2006
580.00
MARTILLO ROMPEDOR
Percutor
3252
DD
01/07/2006
81,200.00
MARTILLO ROTATORIO
Rotopercutor
92,800.00
3251
DD
01/07/2006
MEZCLADORA DE CONCRETO
388
DD
CONSTRUEQUIPOS - G. LOBO
21/06/2006
46,400.00
MEZCLADORA DE CONCRETO
2406
MS
CONSTRUEQUIPOS - G. LOBO
21/06/2006
522,000.00
Concentrado
688
LT
MBT DE COLOMBIA
01/07/2006
3,480.00
Normal 920
9444
LT
MBT DE COLOMBIA
01/07/2006
6,950.00
MINICARGADOR BOBCAT
C/C Ord
3254
HR
01/07/2006
29,000.00
MINICARGADOR BOBCAT
C/C Ord
3255
DD
01/07/2006
232,000.00
4036
29/06/2006
1,566.00
4037
29/06/2006
2,262.00
4038
29/06/2006
2,610.00
4039
29/06/2006
3,654.00
390
UN
CONSTRUEQUIPOS - G. LOBO
21/06/2006
1,670.40
2721
MS
01/07/2006
348,000.00
391
DD
CONSTRUEQUIPOS - G. LOBO
21/06/2006
34,800.00
2497
HR
30/06/2006
60,000.00
9789
HR
30/06/2006
45,000.00
392
MS
COLORA LTDA.
28/06/2006
4,524.00
950
DD
COLORA LTDA.
28/06/2006
150.80
394
UN
COLORA LTDA.
28/06/2006
3,828.00
393
UN
COLORA LTDA.
28/06/2006
893.20
1655
DD
CONSTRUEQUIPOS - G. LOBO
21/06/2006
58.00
Mes
Descripcin
4500 VATIOS
Fecha
Precio
395
SM
FORMARAN LTDA
28/06/2006
2,320.00
3807
UN
CONSTRUEQUIPOS - G. LOBO
01/07/2006
13,920.00
396
DD
CONSTRUEQUIPOS - G. LOBO
21/06/2006
232.00
3,480.00
354
SM
IR LTDA.
20/06/2006
1757
DD
IR LTDA.
20/06/2006
348.00
2108
MS
01/07/2006
377,000.00
397
MS
01/07/2006
348,000.00
1715
MS
CONSTRUEQUIPOS - G. LOBO
21/06/2006
464,000.00
151
DD
FORMARAN LTDA
01/07/2006
34,800.00
401
DD
01/07/2006
33,640.00
2445
MS
01/07/2006
522,000.00
150
DD
FORMARAN LTDA
28/06/2006
34,800.00
9416
DD
CONSTRUMAQUINAS LTDA
01/07/2006
29,000.00
3253
HR
01/07/2006
75,400.00
RANA O VIBROCOMPACTADOR
GASOLINA
RANA VIBROCOMPACTADORA/DIA
Gasolina
RANA VIBROCOMPACTADORA/DIA
RETROEXCAVADORA
hyundai 200
1000 KL
375
DD
01/07/2006
114,840.00
3803
DD
TELECTRICOS LTDA.
01/07/2006
2,422.08
1666
DD
CONSTRUEQUIPOS - G. LOBO
21/06/2006
290.00
930
DD
COLORA LTDA.
28/06/2006
1,856.00
1652
DD
CONSTRUEQUIPOS - G. LOBO
21/06/2006
139.20
1657
DD
CONSTRUEQUIPOS - G. LOBO
21/06/2006
134.56
3243
DD
COLORA LTDA.
01/07/2006
81,200.00
3244
28/06/2006
840,000.00
3802
DD
CONSTRUEQUIPOS - G. LOBO
04/07/2006
7,978.48
TRINQUETE
3785
DD
TELECTRICOS LTDA.
04/07/2006
2,246.92
400
DD
04/07/2006
31,320.00
348,000.00
VIBRADOR A GASOLINA
VIBRADOR ELECTRICO
2444
MS
04/07/2006
Monofasico
3246
DD
04/07/2006
139,200.00
3247
04/07/2006
4,315,200.00
c/c
3248
DD
04/07/2006
232,000.00
c/c
3249
MS
04/07/2006
4,176,000.00
c/c
3250
DD
04/07/2006
417,600.00
VIBROCOMPACTADORA ELECTRICA
3237
DD
COLORA LTDA.
28/06/2006
34,800.00
VIBROCOMPACTADORA ELECTRICA
3238
MS
COLORA LTDA.
28/06/2006
382,800.00
2629
VJ
27/06/2006
116,000.00
402
VJ
JAIME SABOGAL
04/07/2006
120,000.00
Referencia
Fecha
Precio
Ref.9003
2121
UN
30/06/2006
11,136.00
1232
3793
UN
30/06/2006
37,520.20
Ref.5150
2394
UN
30/06/2006
47,293.20
CASCO ARSEG
Ref.100967
2118
UN
21/06/2006
18,293.20
3794
UN
ABASTECER S YS LTDA
07/03/2006
40,600.00
90171
2391
UN
01/07/2006
124,932.00
9017A
2390
UN
01/07/2006
99,644.00
CINTURON P/HERRAMIENTA.
Ref90178
2393
UN
01/07/2006
55,030.40
CONO SEALIZACION
.70
3805
UN
ABASTECER S YS LTDA
07/03/2006
40,600.00
lam. elect.
3796
UN
ABASTECER S YS LTDA
07/03/2006
7,105.00
146
UN
EXTINTORES COLOMBIA
28/02/2005
45,000.00
147
UN
EXTINTORES COLOMBIA
28/02/2005
57,500.00
439
UN
EXTINTORES COLOMBIA
28/02/2005
67,500.00
2924
UN
FACODEX LTDA
07/03/2006
71,920.00
2922
UN
FACODEX LTDA
07/03/2006
48,720.00
2923
UN
FACODEX LTDA
07/03/2006
44,080.00
2926
UN
FACODEX LTDA
07/03/2006
67,280.00
2392
UN
21/06/2006
4,466.00
3937
UN
21/06/2006
6,925.20
3797
UN
ABASTECER S YS LTDA
28/10/2005
3,045.00
MASCARILLA DESCHABLE
Ref.100101
2389
UN
01/07/2006
522.00
Ref.9000
2119
UN
01/07/2006
12,794.80
3806
UN
ABASTECER S YS LTDA
07/03/2006
23,200.00
9092
3798
UN
01/07/2006
4,083.20
3799
UN
21/06/2006
3,723.60
Descripcin
Fecha
Precio
9409
UN
07/06/2006
0.00
30-45 T.V.
3489
UN
ANTENAS ABAB
30/06/2006
420,000.00
8-10 T.V.
403
UN
ANTENAS ABAB
30/06/2006
120,000.00
2401
UN
06/03/2006
57,420,000.00
GPS3
2835
UN
30/06/2006
148,480,000.00
GPS3
2348
UN
30/06/2006
91,060,000.00
GPS3
406
UN
30/06/2006
92,800,000.00
ASPIRADORA INDUSTRIAL 15
AI15AFM
1967
UN
PERFEX LTDA.
30/06/2006
3,408,650.72
1647
UN
RELIEVES BOGOTA
15/06/2006
2,227,200.00
2388
UN
IHM
06/03/2006
2,128,600.00
AVISO 4 M. x 3 M. LAMINA
BOMBA A/NEGRAS 3" 1HP SUMERGIB
64282000A3
64280000A3
408
UN
IHM
07/03/2006
2,146,000.00
1E0156
3122
UN
02/03/2006
2,146,000.00
1E0161
3121
UN
02/03/2006
3,554,240.00
1E0157
3123
UN
02/03/2006
3,579,760.00
1E0142
2021
UN
02/03/2006
1,146,080.00
1E0044
3118
UN
02/03/2006
1,095,040.00
1E0045
3119
UN
02/03/2006
1,269,040.00
1E0015
3120
UN
02/03/2006
1,682,000.00
1D0300
3104
UN
02/03/2006
1,417,520.00
1D0311
3116
UN
02/03/2006
4,246,760.00
1D0065
3115
UN
02/03/2006
1,774,800.00
3117
UN
02/03/2006
8,294,000.00
1A0100
3112
UN
04/03/2006
360,760.00
1A0083
3113
UN
04/03/2006
356,120.00
1A0095
3114
UN
04/03/2006
793,440.00
1G0088
3108
UN
04/03/2006
1,613,560.00
1G0087
3109
UN
04/03/2006
1,469,720.00
1G0115
3110
UN
04/03/2006
2,270,120.00
1G0120
3111
UN
04/03/2006
2,927,840.00
1979
UN
04/03/2006
844,480.00
1993
UN
04/03/2006
1,025,440.00
409
UN
07/03/2006
1,568,320.00
3105
UN
04/03/2006
1,749,280.00
411
UN
07/03/2006
2,045,080.00
3107
UN
04/03/2006
1,965,040.00
1996
UN
04/03/2006
1,183,200.00
1H0149
1972
UN
04/03/2006
2,955,680.00
Visual-Sonor
412
UN
429,200.00
9447
UN
545,200.00
Referencia
Fecha
A Color
2465
UN
FAVELEC LTDA.
30/06/2005
4,500,000.00
CITOFONOS TERRANEO
600W-S
9446
UN
57,188.00
334602
418
UN
48,488.00
Precio
461
PS
01/07/2006
68,078.08
3084
UN
IHM
07/03/2006
3,828,000.00
97627001C1
68
UN
IHM
07/03/2006
2,900,000.00
97629001C1
1683
UN
IHM
07/03/2006
3,075,160.00
EQUIPOS DE PRESION
97630001C1
296
UN
IHM
07/03/2006
3,422,000.00
EQUIPOS DE PRESION
97631001C1
3079
UN
IHM
07/03/2006
3,619,200.00
97639001C1
3085
UN
IHM
07/03/2006
5,162,000.00
97636001C1
3083
UN
IHM
07/03/2006
5,162,000.00
EQUIPOS DE PRESION
97634001C1
3081
UN
IHM
07/03/2006
4,089,000.00
EQUIPOS DE PRESION
65273202C1
3082
UN
IHM
07/03/2006
5,080,800.00
2834
UN
23/06/2006
138,736,000.00
EQUIPOS DE PRESION
97633001C1
1J2303
3124
UN
04/03/2006
1,385,040.00
HI-PRESS 1 HP
1J2312
429
UN
07/03/2006
1,972,000.00
HI-PRESS 1HP
1J2366
3127
UN
04/03/2006
2,108,880.00
HI-PRESS 1HP
1J2314
3128
UN
04/03/2006
1,903,560.00
HI-PRESS 2HP
1J2370
3129
UN
04/03/2006
2,781,680.00
HI-PRESS 3.0HP
1J2436
3132
UN
04/03/2006
2,987,000.00
HI-PRESS 3/4HP
1J2307
3125
UN
04/03/2006
1,897,760.00
HI-PRESS 3/4HP
1J2309
3126
UN
04/03/2006
1,722,600.00
HI-PRESS 3HP
1J2428
3130
UN
04/03/2006
3,162,160.00
HI-PRESS 3HP
1J2430
3131
UN
04/03/2006
3,286,280.00
HI-PRESS 5HP
1J2441
3133
UN
04/03/2006
3,225,960.00
HI-PRESS 5HP
1J2445
3134
UN
04/03/2006
3,473,040.00
HI-PRESS 6.6HP
1J2455
3135
UN
04/03/2006
3,582,080.00
HI-PRESS 7.5 HP
1J2461
2024
UN
04/03/2006
5,504,200.00
1 PC
9411
UN
07/06/2006
156,089.60
1 PC
9412
UN
07/06/2006
75,353.60
1 PC's
9413
UN
07/06/2006
110,339.20
3573
UN
NINGUNO EN PARTICULAR
07/03/2006
26,000.00
1G0045
2014
UN
04/03/2006
845,640.00
719,200.00
63894000A2
3080
UN
IHM
07/03/2006
3093
UN
IHM
07/03/2006
841,000.00
3097
UN
IHM
07/03/2006
1,296,880.00
3098
UN
IHM
07/03/2006
1,441,880.00
3099
UN
IHM
07/03/2006
2,127,440.00
3100
UN
IHM
07/03/2006
2,127,440.00
3101
UN
IHM
07/03/2006
21,751,160.00
3102
UN
IHM
07/03/2006
2,056,680.00
3103
UN
IHM
07/03/2006
4,714,240.00
3095
UN
IHM
07/03/2006
1,401,280.00
3094
UN
IHM
07/03/2006
986,000.00
3096
UN
IHM
07/03/2006
1,915,160.00
MOTOBOMBAS CENTRIFUGAS
3070
UN
IHM
07/03/2006
671,640.00
63864000A2
Referencia
Fecha
MOTOBOMBAS CENTRIFUGAS
63899000A2
Precio
3086
UN
IHM
07/03/2006
755,160.00
PARARRAYOS 45 M. DE RADIO
2466
UN
FAVELEC LTDA.
30/06/2005
3,625,778.00
PARARRAYOS FRANKIN
3730
UN
FAVELEC LTDA.
30/06/2005
147,320.00
59322000F2
3091
UN
IHM
07/03/2006
35,409,940.76
59733000F2
3046
UN
IHM
07/03/2006
21,832,325.36
2200EA
1970
UN
IMPORSEC
07/03/2006
522,000.00
3378
04/03/2006
1,392,000.00
462
MS
01/07/2006
94,192.00
T.V.CABLE INSTALACION
463
UN
07/06/2006
0.00
2402
UN
07/06/2006
40,368.00
Fecha
2780
UN
CHALLENGER
20/06/2006
2779
UN
CHALLENGER
20/06/2006
585,800.00
G-100
405
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
2,393,660.00
548
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
1,804,247.00
413
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
3,228,149.00
CALENTADOR 15 GN
71CR15
545
UN
30/06/2006
416,440.00
CALENTADOR 15 GN.Elec/Domes
E-15
377
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
437,118.00
CALENTADOR 20 GN
71CR201
546
UN
30/06/2006
486,040.00
CALENTADOR 20 GN GAS
ACOMULACI
547
UN
30/06/2006
709,920.00
CALENTADOR 20 GN.Elec/Domes
E-20
541
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
511,929.00
G-20
542
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
778,409.00
E-30I
379
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
673,220.00
CALENTADOR 30 GN.Elec/Domes
E-30
544
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
673,220.00
G-30
387
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
916,327.00
CALENTADOR 30 GN.Mix.Domes.
M-30
399
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
996,011.00
549
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
1,161,597.00
Descripcin
CALENTADOR DE PASO 10 LT
CPHO10
WH7110nat.
Precio
507,900.00
543
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
674,000.00
1732
UN
CHALLENGER
20/06/2006
866,673.00
CA-60
416
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
174,075.00
CA-76
424
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
198,366.00
CX 4100
988
UN
CHALLENGER
20/06/2006
359,770.00
CAMPANA EXTRAC.horiz.90cm
CX 4900
1007
UN
CHALLENGER
20/06/2006
631,723.24
CX 4500
2774
UN
CHALLENGER
20/06/2006
290,366.56
CAMPANA EXTRAC.horiz.pint.60cm
CX 4600
2773
UN
CHALLENGER
20/06/2006
363,843.28
CAMPANA EXTRAC.PINTURA
CH-76
414
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
191,028.00
CAMPANA EXTRAC.PINTURA
CH-60
417
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
142,205.00
U-171 -4WH
441
UN
AMERICAN
07/03/2006
951,200.00
U-209 -4WH
561
UN
AMERICAN
07/03/2006
1,142,600.00
755050/51
989
UN
CHALLENGER
20/06/2006
939,750.00
V.I.S.
3262
UN
CHALLENGER
20/06/2006
1,024,275.00
75165/66
1731
UN
CHALLENGER
20/06/2006
1,019,025.00
V.I.S.
3263
UN
CHALLENGER
20/06/2006
1,087,794.00
75180/81
2770
UN
CHALLENGER
20/06/2006
1,019,025.00
V.I.S.
3264
UN
CHALLENGER
20/06/2006
1,019,025.00
75195/96
2778
UN
CHALLENGER
20/06/2006
1,304,692.00
75210/11
3261
UN
CHALLENGER
20/06/2006
1,289,505.00
U-171-4WH
453
UN
AMERICAN
07/03/2006
916,400.00
U-209-4WH
442
UN
AMERICAN
07/03/2006
1,067,200.00
A-120- 3WH
87
UN
AMERICAN
07/03/2006
626,400.00
Referencia
SP5030EI
726
UN
CHALLENGER
20/06/2006
286,293.80
ESTUFA Gas
G504
435
UN
01/07/2006
444,280.00
ESTUFA Gas
G 604E
1938
UN
01/07/2006
524,320.00
700
434
UN
SUECO
01/07/2006
110,532.92
405
1868
UN
SUECO
01/07/2006
191,212.08
SP5020ES
1014
UN
CHALLENGER
20/06/2006
319,757.48
SP5030EI
9455
UN
CHALLENGER
01/07/2006
286,293.80
412
1870
UN
SUECO
01/07/2006
272,363.36
702
9490
UN
SUECO
01/07/2006
86,537.16
SL6440E
1098
UN
CHALLENGER
20/06/2006
799,569.44
SS 6640EI
987
UN
CHALLENGER
20/06/2006
516,108.36
SL6540EI
1097
UN
CHALLENGER
20/06/2006
921,027.24
SC6040EI
3258
UN
CHALLENGER
20/06/2006
570,994.92
306
432
UN
SUECO
01/07/2006
49,219.96
SP5020EI
433
UN
CHALLENGER
20/06/2006
300,634.88
SP5030
1867
UN
CHALLENGER
20/06/2006
252,300.00
302
1866
UN
SUECO
01/07/2006
32,120.40
ESTUFA MIXTA
502-2
436
UN
01/07/2006
610,160.00
SS6631EI
3257
UN
CHALLENGER
20/06/2006
564,620.72
SL6431EI
1127
UN
CHALLENGER
20/06/2006
915,361.80
SC6031EI
3259
UN
CHALLENGER
20/06/2006
601,093.44
SC6631EI
3260
UN
CHALLENGER
20/06/2006
564,620.00
SD6131EI
1013
UN
CHALLENGER
20/06/2006
561,079.24
SI7641EI
994
UN
CHALLENGER
20/06/2006
861,184.00
AM2A-6
2754
UN
CIMSA ELECTRODOMESTICOS
07/03/2006
536,638.00
HG-51
443
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
445,635.00
HE2500
1001
UN
CHALLENGER
20/06/2006
590,470.16
HE9500
1002
UN
CHALLENGER
20/06/2006
1,399,777.80
HORNO ELECTRICO
HORNO A GAS
CIMSA
CIMSA
CHLL
CIMSA
Fecha
Precio
HC-51
445
UN
CIMSA ELECTRODOMESTICOS
01/03/2005
408,680.00
HG2540 nat.
995
UN
CHALLENGER
20/06/2006
597,729.44
HG 2560 nat.
999
UN
CHALLENGER
20/06/2006
781,686.88
HG 2590 nat.
1000
UN
CHALLENGER
20/06/2006
1,084,978.16
444
UN
01/07/2006
356,120.00
1943
UN
01/07/2006
380,480.00
446
UN
ALMACEN LISTO
01/07/2006
63,400.00
143
UN
ALMACEN LISTO
01/07/2006
96,899.00
440
UN
01/07/2006
131,080.00
450
UN
04/03/2006
50,694.00
60 X 60
LAVAPLATOS 60 x 40 Esmaltado
LAVAPLATOS A.Inox.0.48
LV3042
1011
UN
CHALLENGER
20/06/2006
120,750.20
LAVAPLATOS MOEN
22901
2606
UN
03/03/2005
348,481.00
1937
UN
01/07/2006
683,240.00
1939
UN
01/07/2006
1,032,400.00
1940
UN
01/07/2006
1,102,000.00
3266
UN
CHALLENGER
20/06/2006
120,750.20
NEVERA NE 8
NEVERA NE10
2 Puertas
NEVERA NE12
POCETA V.I.S
LV 3042
Fecha
3849
UN
CASAFER LTDA
04/07/2006
538.24
3846
UN
CASAFER LTDA
04/07/2006
1,009.20
466
UN
FERRICENTROS S.A.
04/07/2006
14,950.00
1971
LB
FERRETERIA EL TERMINAL
04/07/2006
1,856.00
465
UN
CASAFER LTDA
13/06/2006
23,200.00
1,972.00
Descripcin
Precio
469
UN
FERRETERIA EL TERMINAL
29/06/2006
1973
UN
DEPOSITO LA PATRIA
28/06/2006
2,499.80
467
UN
CASAFER LTDA
30/06/2006
40,600.00
1998
UN
CASAFER LTDA
30/06/2006
45,240.00
1999
UN
CASAFER LTDA
13/06/2006
52,200.00
BARRA 18 Lbs.HERRAGRO
470
UN
CASAFER LTDA
13/06/2006
55,680.00
BATEA METALICA
471
UN
DEPOSITO LA PATRIA
28/06/2006
9,000.44
188209
474
UN
FERRICENTROS S.A.
30/06/2006
1,100.00
188235
475
UN
FERRICENTROS S.A.
30/06/2006
4,600.00
239
472
UN
CASAFER LTDA
13/06/2006
1,450.00
188287
3756
UN
FERRICENTROS S.A.
30/06/2006
650.00
188524
473
UN
FERRICENTROS S.A.
30/06/2006
1,950.00
206635
476
UN
FERRICENTROS S.A.
30/06/2006
5,400.00
11558
1092
JG
HOMECENTER
21/06/2006
7,850.00
31972
1091
JG
HOMECENTER
30/06/2006
47,950.00
BROCHA DE CERDA
1"
2437
UN
ALMACEN LISTO
30/06/2006
2,600.00
BROCHA DE CERDA
2"
2439
UN
ALMACEN LISTO
30/06/2006
4,500.00
BROCHA DE CERDA
3"
2441
UN
ALMACEN LISTO
30/06/2006
7,700.00
BROCHA DE CERDA
4"
478
UN
ALMACEN LISTO
30/06/2006
12,600.00
BROCHA DE CERDA
5"
2442
UN
ALMACEN LISTO
30/06/2006
15,800.00
2438
UN
ALMACEN LISTO
30/06/2006
3,200.00
1974
UN
CASAFER LTDA
30/06/2006
1,740.00
1975
UN
DEPOSITO LA PATRIA
30/06/2006
2,900.00
850
2147
UN
CASAFER LTDA
30/06/2006
32,480.00
870
2154
UN
CASAFER LTDA
30/06/2006
44,080.00
110-40
2146
UN
CERRACOL S.A.
30/06/2006
19,200.00
110-50
2142
UN
CERRACOL S.A.
30/06/2006
26,300.00
480
UN
EL PROVEEDOR DEL
13/06/2006
16,000.00
477
UN
CASAFER LTDA
13/06/2006
12,180.00
1977
UN
FERRETERIA EL TERMINAL
30/06/2006
104,400.00
CARRETILLA "BUGUI"
1976
UN
DEPOSITO LA PATRIA
28/06/2006
108,750.00
92,650.00
296164
482
UN
FERRICENTROS S.A.
01/07/2006
318070
483
UN
FERRICENTROS S.A.
01/07/2006
800.00
331292
484
UN
FERRICENTROS S.A.
01/07/2006
11,950.00
485
UN
CASAFER LTDA
01/07/2006
50C10506
3700
UN
NACIONAL DE ELECTRICOS
01/07/2006
6,032.00
40377
1691
UN
HOMECENTER
01/07/2006
470,950.00
364286
486
UN
FERRICENTROS S.A.
01/07/2006
19,900.00
400010
487
UN
FERRICENTROS S.A.
01/07/2006
38,600.00
425905
488
UN
FERRICENTROS S.A.
01/07/2006
6,500.00
DILATACION BRONCE
Fundicin
489
ML
COPROMARMOL
06/06/2006
4,640.00
3372
UN
FERRETERIA EL TERMINAL
29/06/2006
255,200.00
490
UN
FERRETERIA EL TERMINAL
29/06/2006
60,320.00
1553
UN
HOMECENTER
01/07/2006
16,950.00
6,500.00
Descripcin
Fecha
Precio
255,200.00
32018-73187
434203
491
UN
FERRICENTROS S.A.
01/07/2006
ESCOBA NYLON
SUAVE
2017
UN
CASAFER LTDA
13/06/2006
3,248.00
460347
492
UN
FERRICENTROS S.A.
01/07/2006
10,650.00
3708
UN
FERRICENTROS S.A.
29/06/2005
4,582.00
468266
494
UN
FERRICENTROS S.A.
01/07/2006
3,650.00
468301
516
UN
FERRICENTROS S.A.
30/06/2006
4,950.00
1981
UN
DEPOSITO LA PATRIA
28/06/2006
1,400.12
99FL03
495
UN
NACIONAL DE ELECTRICOS
01/07/2006
12,122.00
490306
496
UN
FERRICENTROS S.A.
01/07/2006
11,400.00
8010
167
CT
01/07/2006
8,200.00
9510
2478
CT
20/06/2006
4,500.00
GUANTES CARNAZA
1982
UN
DEPOSITO LA PATRIA
01/07/2006
5,300.04
HERRAMIENTA ELCTRICA %
2948
%M
NINGUNO EN PARTICULAR
04/03/2004
0.00
HERRAMIENTA MENOR %
2936
%M
NINGUNO EN PARTICULAR
04/03/2004
0.00
529
UN
CASAFER LTDA
01/07/2006
2,668.00
650.00
HOJA DE SEGUETA
LIJA DE AGUA PROFESIONAL
573285
532
UN
FERRICENTROS S.A.
01/07/2006
726106
514
UN
FERRICENTROS S.A.
30/06/2006
750.00
8248
1126
UN
HOMECENTER
01/07/2006
199,500.00
582034
499
UN
FERRICENTROS S.A.
01/07/2006
21,400.00
500
UN
FERRICENTROS S.A.
01/07/2006
149,900.00
611210
501
UN
FERRICENTROS S.A.
01/07/2006
54,200.00
641060
502
UN
FERRICENTROS S.A.
01/07/2006
10,700.00
Azul
793
M2
TEGIPLAST
07/06/2006
696.00
92
ML
FERRETERIA EL TERMINAL
29/06/2006
928.00
1984
ML
FERRETERIA EL TERMINAL
29/06/2006
806.00
503
ML
FERRETERIA EL TERMINAL
29/06/2006
673.00
2,821.12
34925
504
UN
01/07/2006
MANILA "
13-
2506
ML
FERRETERIA EL TERMINAL
29/06/2006
974.00
MANILA 5/8"
16-5/8
2518
ML
FERRETERIA EL TERMINAL
29/06/2006
1,589.00
672263
505
UN
FERRICENTROS S.A.
01/07/2006
16,600.00
675205
509
UN
FERRICENTROS S.A.
01/07/2006
23,100.00
510
UN
CASAFER LTDA
13/06/2006
13,920.00
16,350.00
704462
511
UN
FERRICENTROS S.A.
01/07/2006
535283
1983
UN
FERRICENTROS S.A.
01/07/2006
4,500.00
2001
UN
DEPOSITO LA PATRIA
01/07/2006
15,428.00
2002
UN
DEPOSITO LA PATRIA
01/07/2006
14,732.00
Referencia
Fecha
Precio
724025
519
UN
FERRICENTROS S.A.
01/07/2006
4,500.00
724081
513
UN
FERRICENTROS S.A.
01/07/2006
7,000.00
PERNO 5/8" X 24
50PA24
740
UN
NACIONAL DE ELECTRICOS
01/07/2006
5,742.00
50P08
3725
UN
NACIONAL DE ELECTRICOS
01/07/2006
2,480.08
PICA GAVILAN
GAVILAN
2003
UN
DEPOSITO LA PATRIA
28/06/2006
18,328.00
390
515
ML
01/07/2006
4,109.00
1743
UN
HOMECENTER
01/07/2006
53,900.00
1749
UN
HOMECENTER
26/06/2006
71,900.00
3590
520
ML
09/06/2006
21,628.20
521
ML
09/06/2006
42,838.80
522
UN
CASAFER LTDA
13/06/2006
2,320.00
62593
1554
UN
HOMECENTER
01/07/2006
249,950.00
93309
1139
UN
HOMECENTER
01/07/2006
299,900.00
67716
1353
UN
HOMECENTER
01/07/2006
539,900.00
524
LB
DISPANO
07/03/2006
3,166.80
527
LB
DISPANO
07/03/2006
3,364.00
525
LB
DISPANO
07/03/2006
2,945.24
528
LB
DISPANO
07/03/2006
3,005.56
1986
LB
DISPANO
07/03/2006
2,945.24
1987
LB
DISPANO
07/03/2006
5,544.80
2974
LB
FERRETERIA EL TERMINAL
29/06/2006
3,132.00
1684
UN
HOMECENTER
01/07/2006
286,950.00
3314
UN
CASAFER LTDA
13/06/2006
13,920.00
530
UN
FERRICENTROS S.A.
01/07/2006
12,900.00
1687
UN
HOMECENTER
26/06/2006
189,900.00
1688
UN
HOMECENTER
01/07/2006
379,000.00
3837
UN
FERRICENTROS S.A.
01/07/2006
12,100.00
3973
KG
30/06/2006
6,774.40
531
KG
MATERIALES EL ORIENTE
27/05/2006
215.00
180
UN
FERRICENTROS S.A.
01/07/2006
399,900.00
555
UN
FERRICENTROS S.A.
01/07/2006
439,900.00
91566
301
UN
HOMECENTER
01/07/2006
48,900.00
131
UN
HOMECENTER
01/07/2006
93,950.00
3738
UN
FERRICENTROS S.A.
29/06/2005
3,399.00
533
UN
CASAFER LTDA
13/06/2006
11,600.00
286.00
"-9"-1- 3/4"
61957
SEGUETA MARCO
SERRUCHO DE MANO MANGO Mad.20" 885334
SIERRA CIRCULAR 71/4
10 AMP
5634
897063
6013
Negro
3838
UN
TORNILLOS 7777777
04/07/2006
6 X 1"
4023
UN
TORNILLOS 7777777
04/07/2006
10.00
Hierro
3697
UN
TORNILLOS 7777777
22/06/2006
582.00
Hierro
3703
UN
TORNILLOS 7777777
04/07/2006
815.00
Con Tuerca
3694
UN
TORNILLOS 7777777
04/07/2006
2,892.00
Con Tuerca
3704
UN
TORNILLOS 7777777
04/07/2006
3,092.00
TORNILLO GOLOSO
Caja de 100
534
UN
TORNILLOS 7777777
22/06/2006
20.00
3561
UN
FERRETERIA EL TERMINAL
01/03/2005
3,712.00
535
UN
TORNILLOS 7777777
22/06/2006
24.00
3737
UN
TORNILLOS 7777777
04/07/2006
450.00
3712
UN
NACIONAL DE ELECTRICOS
30/06/2006
4,872.00
1" x 8
Aglomerado
50TOA5/8
ZAPAPICO
Referencia
536
UN
CASAFER LTDA
Fecha
Precio
04/07/2006
12,760.00
FLETES (46)
10/07/2006 Bogot
Referencia
Fecha
FLETE ARMENIA/MEDELLIN
2874
TN
29/06/2005
52,684.00
FLETE BARRANQUILLA/BOGOTA
2324
TN
29/06/2005
105,608.00
FLETE
2333
TN
29/06/2005
78,228.00
FLETE BARRANQUILLA/CALI
2334
TN
29/06/2005
116,263.00
FLETE BARRANQUILLA/MEDELLIN
2356
TN
29/06/2005
87,075.00
FLETE BARRANQUILLA/PEREIRA
2860
TN
29/06/2005
109,108.00
FLETE BOGOTA/BARRANQUILLA
2332
TN
29/06/2005
64,391.00
FLETE BOGOTA/BUCARAMANGA
2325
TN
29/06/2005
49,492.00
FLETE BOGOTA/CALI
2326
TN
29/06/2005
57,236.00
FLETE BOGOTA/CARTAGENA
2327
TN
07/03/2006
74,693.56
FLETE BOGOTA/CUCUTA
2328
TN
07/03/2006
72,619.48
FLETE BOGOTA/IBAGUE
2329
TN
07/03/2006
42,595.20
FLETE BOGOTA/MEDELLIN
2330
TN
29/06/2005
55,713.00
FLETE
2862
TN
29/06/2005
59,026.00
FLETE BUCARAMANGA/BOGOTA
2863
TN
29/06/2005
67,052.00
FLETE BUCARAMANGA/CALI
2864
TN
29/06/2005
88,782.00
FLETE BUCARAMANGA/CUCUTA
2916
TN
29/06/2005
35,773.00
FLETE BUCARAMANGA/MEDELLIN
2865
TN
29/06/2005
81,421.00
FLETE BUCARAMANGA/PEREIRA
2866
TN
29/06/2005
70,245.00
FLETE CALI/BARRANQUILLA
2868
TN
29/06/2005
98,376.00
FLETE CALI/BOGOTA
2869
TN
29/06/2005
65,456.00
FLETE CALI/BUCARAMANGA
2870
TN
29/06/2005
89,564.00
FLETE CALI/BUENAVENTURA
2871
TN
29/06/2005
35,123.00
FLETE CALI/IBAGUE
2872
TN
29/06/2005
51,087.00
FLETE CALI/PEREIRA
2867
TN
29/06/2005
36,720.00
FLETE IPIALES/CALI
2873
TN
29/06/2005
63,859.00
FLETE MEDELLIN/BARRANQUILLA
2875
TN
29/06/2005
55,450.00
FLETE MEDELLIN/BOGOTA
2885
TN
29/06/2005
56,170.00
FLETE MEDELLIN/BUCARAMANGA
2890
TN
29/06/2005
67,567.00
FLETE MEDELLIN/CALI
2891
TN
29/06/2005
51,875.00
Descripcin
Precio
GRIFERIAS,APARATOS,ACCESORIOS (11)
10/07/2006 Bogot
Descripcin
Referencia
Fecha
10092
2040
UN
04/07/2006
1,073.00
8458 color
539
UN
07/03/2006
229,159.00
847
538
UN
07/03/2006
281,617.00
846
2707
UN
07/03/2006
404,939.00
846 color
2068
UN
07/03/2006
432,549.00
4010
UN
FIRPLAK BOGOTA
30/06/2006
58,000.00
511
2396
UN
SILPLAS
26/06/2006
6,577.20
9435
UN
SILPLAS
30/06/2006
2,865.20
2092
UN
GRICOL LTDA.
30/06/2006
9,029.00
3916
UN
COLEMPAQUES
30/06/2006
53,244.00
3915
UN
COLEMPAQUES
30/06/2006
36,888.00
550
UN
01/07/2006
13,178.00
2095
UN
GRICOL LTDA.
01/07/2006
10,986.00
551
UN
07/03/2006
5,541.00
01-195311
Precio
93100Cromo
01-193304
93110Neutro
01033011
3556
UN
GRICOL LTDA.
01/07/2006
226,909.00
2526
2595
UN
03/03/2005
587,250.00
2604
UN
03/03/2005
475,745.00
2607
UN
03/03/2005
559,700.00
2346cp BLANC
2558
UN
03/03/2005
741,058.00
2352
2591
UN
03/03/2005
364,533.00
57419
731
UN
04/03/2005
321,600.00
58400
887
UN
07/03/2006
119,968.00
58410
888
UN
07/03/2006
108,960.00
52480
559
UN
07/03/2006
234,339.00
52400
563
UN
07/03/2006
138,532.00
01113500
3574
UN
GRICOL LTDA.
01/07/2006
55,172.00
5541
899
UN
07/03/2006
138,532.00
55403
900
UN
07/03/2006
152,432.00
45400
553
UN
07/03/2006
108,400.00
45410
554
UN
07/03/2006
98,325.00
DUCHA MONOCROMADO
01084011
3569
UN
GRICOL LTDA.
01/07/2006
136,852.00
54410
GRIVAL
560
UN
07/03/2006
35,262.00
2084
UN
GRICOL LTDA.
01/07/2006
81,049.00
51405
901
UN
07/03/2006
56,346.00
J9400
557
UN
07/03/2006
25,840.00
010522122
2097
UN
GRICOL LTDA.
01/07/2006
75,189.00
01041211
3566
UN
GRICOL LTDA.
01/07/2006
308,492.00
01103622
2076
UN
GRICOL LTDA.
01/07/2006
53,182.00
FLOTADOR
VFLT02
2560
UN
07/03/2006
19,952.00
GRIFERIAS,APARATOS,ACCESORIOS (11)
10/07/2006 Bogot
Descripcin
Referencia
Fecha
Precio
VFLT06
562
UN
07/03/2006
44,080.00
FLUXOMETRO
70710
3281
UN
09/07/2006
351,902.00
70720
3293
UN
09/07/2006
351,902.00
LB-43
564
UN
15/06/2006
167,156.00
LB-16
565
UN
15/06/2006
95,004.00
01031511
3553
UN
GRICOL LTDA.
01/07/2006
260,253.00
3559
UN
GRICOL LTDA.
01/07/2006
260,253.00
01110400
2790
UN
GRICOL LTDA.
01/07/2006
47,363.00
01100500
2771
UN
GRICOL LTDA.
01/07/2006
58,942.00
5713
UN
GRICOL LTDA.
01/07/2006
88,385.00
2088
UN
GRICOL LTDA.
01/07/2006
122,998.00
01100522
2081
UN
GRICOL LTDA.
01/07/2006
42,014.00
2094
UN
GRICOL LTDA.
01/07/2006
32,959.00
01100322
2074
UN
GRICOL LTDA.
01/07/2006
30,742.00
01032030
3558
UN
GRICOL LTDA.
01/07/2006
201,662.00
01031911
3557
UN
GRICOL LTDA.
01/07/2006
252,734.00
01-041911
3567
UN
GRICOL LTDA.
01/07/2006
252,734.00
01112700
5763
UN
GRICOL LTDA.
01/07/2006
54,019.00
01112000
3575
UN
GRICOL LTDA.
01/07/2006
29,017.00
01 0600 00
3570
UN
GRICOL LTDA.
01/07/2006
86,526.00
01060100
2082
UN
GRICOL LTDA.
01/07/2006
87,265.00
3560
UN
GRICOL LTDA.
01/07/2006
166,862.00
3554
UN
GRICOL LTDA.
01/07/2006
166,862.00
L4621
2575
UN
03/03/2005
255,200.00
58140
770
UN
07/03/2006
83,774.00
84004
2602
UN
03/03/2005
974,400.00
64621
2531
UN
03/03/2005
376,135.00
64962
2555
UN
03/03/2005
523,392.00
58100
886
UN
07/03/2006
104,740.00
50120
597
UN
07/03/2006
27,247.00
50130
596
UN
07/03/2006
44,150.00
50100
2811
UN
07/03/2006
47,660.00
52100
526
UN
07/03/2006
229,803.00
601
UN
07/03/2006
103,263.00
2806
UN
07/03/2006
128,479.00
51150
600
UN
07/03/2006
42,303.00
59140
1084
UN
07/03/2006
29,481.00
7425
2547
UN
03/03/2005
447,650.00
67531
2548
UN
03/03/2005
355,814.00
Cromo
2791
UN
07/03/2006
86,758.00
70320Cromo
569
UN
07/03/2006
61,369.00
71300
568
UN
07/03/2006
100,754.00
CRNA
06800 6pieza
3508
JG
07/03/2006
23,008.00
CRNA
06804piezas
3509
JG
07/03/2006
33,592.00
4851150Cromo
CRNA
06804piezas
573
JG
07/03/2006
24,618.00
CRNA
06800 6pieza
3510
JG
07/03/2006
35,943.00
GRIFERIAS,APARATOS,ACCESORIOS (11)
10/07/2006 Bogot
Descripcin
INCRUST. ELITE
CORONA
Referencia
Fecha
Precio
0660
1692
JG
01/07/2006
71,825.44
00140 COLOR
3507
JG
07/03/2006
24,388.00
00140 BLANCO
3506
JG
07/03/2006
26,096.00
INCRUST.ESPACIO(Prstg/Stl)
4400 blanco
574
JG
07/03/2006
82,829.00
9204
81
UN
SANITARIOS MARACAY
28/06/2006
17,000.00
572
UN
07/03/2006
6,902.00
4002
UN
FIRPLAK BOGOTA
01/07/2006
4,419,000.00
4004
UN
FIRPLAK BOGOTA
01/07/2006
4,286,000.00
4006
UN
FIRPLAK BOGOTA
01/07/2006
4,688,000.00
46,000.00
5037
77
UN
SANITARIOS MARACAY
28/06/2006
5037
9445
UN
SANITARIOS MARACAY
28/06/2006
48,000.00
9400
UN
SANITARIOS MARACAY
28/06/2006
102,000.00
5046/5070
74
UN
SANITARIOS MARACAY
28/06/2006
176,000.00
732Color GRI
2793
UN
07/03/2006
40,494.00
732 blanco
2697
UN
07/03/2006
43,310.00
LAVAMANOS ACUACER+Grif.4"
732blc+50110
2794
UN
07/03/2006
96,652.00
LAVAMANOS ACUACER+Grif.8"
732col+50180
2795
UN
04/03/2006
98,700.00
07388blc+471
2797
UN
04/03/2006
125,000.00
07388col+471
2789
UN
04/03/2006
132,500.00
42240blanco
951
UN
07/03/2006
87,430.00
42240color
958
UN
07/03/2006
93,024.00
2800
UN
04/03/2006
151,500.00
CRNA
71780blanco
3502
UN
07/03/2006
262,290.00
CRNA
71780color
3503
UN
07/03/2006
280,697.00
CRNA 07278blanco
3504
UN
07/03/2006
143,569.00
CRNA 07278color
3505
UN
07/03/2006
153,619.00
71480/40bla
589
UN
07/03/2006
82,829.00
71480/40col
2783
UN
07/03/2006
89,271.00
01304-8
591
UN
01/07/2006
209,946.08
LAVAMANOS MAXIMO
734 color
2782
UN
04/03/2006
250,000.00
LAVAMANOS MAXIMO
734 BLANCO
2786
UN
04/03/2006
229,000.00
LAVAMANOS PEDEST.VERONA
5142-900C
577
UN
01/07/2006
100,885.20
5142-971C
9449
UN
01/07/2006
107,950.76
LAVAMANOS PRESTIGIO
737
2696
UN
04/03/2006
360,000.00
2704
UN
04/03/2006
360,000.00
LAVAMANOS PRESTIGIO
737
2703
UN
04/03/2006
489,000.00
71680 color
2694
UN
01/07/2006
400,338.00
LAVAMANOS PRESTIGIO
70680 color
2700
UN
04/03/2006
648,000.00
LAVAMANOS PRESTIGIO
70680 color
2699
UN
04/03/2006
677,000.00
726Color Neg
2695
UN
07/03/2006
213,514.00
LAVAMANOS PRESTIGIO
726 color Bl
2701
UN
04/03/2006
585,000.00
LAVAMANOS PRESTIGIO
726Color Bl
2702
UN
04/03/2006
527,000.00
5070
1726
UN
SANITARIOS MARACAY
28/06/2006
160,000.00
9401
UN
SANITARIOS MARACAY
28/06/2006
170,000.00
CRNA
07268blanco
3496
UN
07/03/2006
213,514.00
07268color
3497
UN
04/03/2005
225,000.00
GRIFERIAS,APARATOS,ACCESORIOS (11)
10/07/2006 Bogot
Descripcin
Referencia
5091/5090
Fecha
Precio
76
UN
SANITARIOS MARACAY
28/06/2006
140,000.00
9402
UN
SANITARIOS MARACAY
28/06/2006
145,000.00
75
UN
SANITARIOS MARACAY
28/06/2006
150,000.00
5091/5090
71580/40Bla
587
UN
07/03/2006
213,514.00
725ColorAzul
586
UN
07/03/2006
122,402.00
715col+90510
2705
UN
04/03/2006
247,000.00
725Color Azu
2706
UN
04/03/2006
288,000.00
07388blanco
2787
UN
07/03/2006
46,016.00
07388 GRIS
2788
UN
07/03/2006
49,182.00
7348blanco
582
UN
07/03/2006
82,829.00
150/9601
2958
UN
SANITARIOS MARACAY
28/06/2006
250,000.00
9403
UN
SANITARIOS MARACAY
28/06/2006
260,000.00
150/9694
2975
UN
SANITARIOS MARACAY
28/06/2006
270,000.00
LAVARROPA PORCELANA
Sin tanque
4007
UN
FIRPLAK BOGOTA
01/07/2006
164,000.00
LAVARROPA PORCELANA
Sin tanque
4008
UN
FIRPLAK BOGOTA
01/07/2006
255,000.00
LAVARROPA PORCELANA
Con tanque
4009
UN
FIRPLAK BOGOTA
01/07/2006
393,000.00
Cromo
594
UN
07/03/2006
18,564.00
97720Cromo
593
UN
07/03/2006
22,906.00
97770Cromo
595
UN
07/03/2006
97,051.00
01063800
3572
UN
GRICOL LTDA.
01/07/2006
37,728.00
16,588.00
GRIVAL
GRICOL
LLAVE L/M.URANO Cl
01100122
2079
UN
GRICOL LTDA.
01/07/2006
GRICOL
01100222
2080
UN
GRICOL LTDA.
01/07/2006
8,986.00
01-997711
2091
UN
GRICOL LTDA.
01/07/2006
16,620.00
GRICOL
LLAVE TERM.EXT.Cr.
GRICOL
01-995411
2089
UN
GRICOL LTDA.
01/07/2006
23,619.00
GRICOL
01-995711
2090
UN
GRICOL LTDA.
01/07/2006
22,471.00
RB 1149-00
2099
UN
GRICOL LTDA.
01/07/2006
3,908.00
RB 0190-00
2098
UN
GRICOL LTDA.
01/07/2006
3,409.00
ORINAL GRANDE
06104
603
UN
07/03/2006
197,868.00
9450
UN
01/07/2006
147,324.64
6100
606
UN
01/07/2006
85,831.88
ORINAL MEDIANO
6101
605
UN
01/07/2006
123,304.52
9451
UN
01/07/2006
212,979.48
604
UN
07/03/2006
101,235.00
2799
UN
04/03/2006
174,588.00
CORONA
06103blanco
PAPELERA ASTRO
6840 BLANCO
607
UN
07/03/2006
6,902.00
92400Cromo
609
UN
07/03/2006
13,484.00
2086
UN
GRICOL LTDA.
01/07/2006
26,948.00
2078
UN
GRICOL LTDA.
01/07/2006
7,394.00
31900
UN
GRICOL LTDA.
01/07/2006
60,569.00
558
UN
07/03/2006
17,271.00
01041311
REGADERA VENECIANA
92420Neutro
GRIVAL
0111300
2085
UN
GRICOL LTDA.
29/06/2006
20,632.92
01103522
2077
UN
GRICOL LTDA.
01/07/2006
21,802.00
SANITARIO ACUACER
30038 Blanco
611
UN
07/03/2006
158,295.00
20090 Blanco
2792
UN
07/03/2006
184,063.00
20090 Color
614
UN
07/03/2006
188,665.00
1043
79
UN
SANITARIOS MARACAY
28/06/2006
190,000.00
GRIFERIAS,APARATOS,ACCESORIOS (11)
10/07/2006 Bogot
Descripcin
Referencia
1065
Fecha
Precio
78
UN
SANITARIOS MARACAY
28/06/2006
690,000.00
9404
UN
SANITARIOS MARACAY
28/06/2006
710,000.00
1065
2405
UN
SANITARIOS MARACAY
28/06/2006
730,000.00
2633
9452
UN
01/07/2006
208,175.92
610
UN
01/07/2006
224,189.72
30789blanco
3500
UN
07/03/2006
579,800.00
30789color
3501
UN
07/03/2006
616,612.00
2634
3286
UN
24/05/2006
266,891.64
1090
2947
UN
SANITARIOS MARACAY
28/06/2006
168,000.00
20090 Blanco
617
UN
07/03/2006
289,900.00
20090 Color
2807
UN
07/03/2006
303,705.00
1073
2768
UN
SANITARIOS MARACAY
28/06/2006
335,000.00
9405
UN
SANITARIOS MARACAY
28/06/2006
345,000.00
1073
2803
UN
SANITARIOS MARACAY
28/06/2006
355,000.00
SANITARIO PRESTIGIO
30633 Color
2698
UN
07/03/2006
736,253.00
30839Blanco
1810
UN
07/03/2006
552,190.00
30839Color
3493
UN
07/03/2006
607,409.00
SANITARIO STILO
30535Color
616
UN
07/03/2006
322,111.00
2633
9453
UN
01/07/2006
184,689.40
2632
426
UN
01/07/2006
198,407.56
1092
2851
UN
SANITARIOS MARACAY
28/06/2006
360,000.00
9406
UN
SANITARIOS MARACAY
28/06/2006
375,000.00
1092
2927
UN
SANITARIOS MARACAY
28/06/2006
385,000.00
93130
618
UN
07/03/2006
6,003.00
3,638.00
GRIVAL
01194115
2093
UN
GRICOL LTDA.
01/07/2006
01-194004
2096
UN
GRICOL LTDA.
01/07/2006
3,896.00
281
UN
COLEMPAQUES
01/07/2006
100,572.00
448
UN
COLEMPAQUES
01/07/2006
179,684.00
1663
UN
COLEMPAQUES
01/07/2006
303,456.00
282
UN
COLEMPAQUES
01/07/2006
503,440.00
621
UN
COLEMPAQUES
01/07/2006
1,576,324.00
GRICOL
005052503
2977
UN
NINGUNO EN PARTICULAR
07/03/2006
606,699.72
3202000000
608
UN
01/07/2006
570,140.00
Bajito
3919
UN
COLEMPAQUES
01/07/2006
366,444.00
Bajito
3917
UN
COLEMPAQUES
01/07/2006
124,236.00
Bajito
3918
UN
COLEMPAQUES
01/07/2006
217,268.00
Azabache car
622
ML
MARMOLES VENEZIANOS
23/06/2006
216,237.92
02100
624
UN
01/07/2006
49,322.04
02651
3285
UN
24/05/2006
533,783.28
2650
2796
UN
24/05/2006
512,432.32
91420Cromo
Con Trans
627
UN
07/03/2006
60,003.00
2528
UN
01/07/2006
1,587,808.00
4001
UN
FIRPLAK BOGOTA
01/07/2006
829,000.00
4003
UN
FIRPLAK BOGOTA
01/07/2006
868,000.00
4005
UN
FIRPLAK BOGOTA
01/07/2006
1,070,000.00
1756
UN
24/05/2006
6,832.40
6860
GRIFERIAS,APARATOS,ACCESORIOS (11)
10/07/2006 Bogot
Descripcin
Referencia
Fecha
6860
9454
UN
24/05/2006
632
UN
ALMACEN LISTO
04/07/2006
1,800.00
631
UN
07/03/2006
19,124.00
96700Cromo
Precio
7,310.32
IMPERMEABIL.,ADITIVOS,QUIMICOS (12)
10/07/2006 Bogot
Referencia
Descripcin
Fecha
Precio
A.C.P.M.
633
GLN
TERPEL
04/07/2006
ACCLGUARD HE 5 KILOS
700
KG
TOXEMENT S.A.
04/07/2006
4,698.00
1305
KG
TOXEMENT S.A.
04/07/2006
11,629.00
634
KG
TOXEMENT S.A.
04/07/2006
17,234.00
636
LT
04/07/2006
90.00
637
KG
TOXEMENT S.A.
04/07/2006
1,943.00
638
KG
07/03/2006
5,394.00
639
KG
ATA IMPERMEABILIZADORA
07/03/2006
1,667.00
ACRISELLO BLANCO
ADERCRIL
5 KILOS
4 KILOS
AGUA
AIR TOC D (AIRE)
20 KILOS
140002
Fglas
25005
CARROTANQUE DE AGUA
11.000 Lt
12199
5,131.84
658
M2
30/06/2006
948.00
9471
VJ
16/06/2006
100,000.00
22
M2
30/06/2006
1,535.00
2182
KG
TOXEMENT S.A.
30/06/2006
7,347.00
659
KG
TOXEMENT S.A.
30/06/2006
8,005.00
660
KG
TOXEMENT S.A.
01/07/2006
6,859.00
640
GN
TEXSA DE COLOMBIA
01/07/2006
19,000.00
1957
GLN
ATA IMPERMEABILIZADORA
07/03/2006
20,200.00
20 ML
2183
ML
TOXEMENT S.A.
01/07/2006
8,816.00
30 ML
2184
ML
TOXEMENT S.A.
01/07/2006
15,428.00
15 ML
2185
ML
TOXEMENT S.A.
01/07/2006
26,796.00
126
ML
07/03/2006
26,796.00
421295
V-15 421195
3331
ML
07/03/2006
15,428.00
421095
2743
ML
07/03/2006
8,816.00
645
KG
TOXEMENT S.A.
29/06/2006
3,555.00
646
KG
TOXEMENT S.A.
29/06/2006
4,866.00
647
KG
TOXEMENT S.A.
01/07/2006
11,021.00
CURASEAL BLANCO
20 KILOS
CURASEAL TRANSPARENTE
DESMOLDATOC
20 Kg
16 KILOS
3073
29/06/2006
19,024.00
E3F GROUT
2192
KG
TOXEMENT S.A.
29/06/2006
17,643.00
663
KG
TOXEMENT S.A.
01/07/2006
2,177.00
3186
GLN
01/07/2006
7,957.60
661
GLN
ATA IMPERMEABILIZADORA
07/03/2006
8,600.00
662
GLN
ATA IMPERMEABILIZADORA
07/03/2006
12,800.00
5 KILOS
EMULSION ASFALTICA
18 KILOS
Fglas
Fglas
25180
25060
3060
07/03/2006
34,243.20
25080
3062
07/03/2006
244,017.60
EPOTOC (4 Kg.)
3076
KG
TOXEMENT S.A.
01/07/2006
41,211.00
311044
1942
GLN
07/03/2006
32,000.00
313050
752
GLN
07/03/2006
43,000.00
316091
856
GLN
07/03/2006
42,000.00
317044
1955
GLN
01/07/2006
46,000.00
319044
2524
GLN
07/03/2006
54,000.00
IMPERMEABIL.,ADITIVOS,QUIMICOS (12)
10/07/2006 Bogot
Descripcin
Referencia
218249
Fecha
Precio
454
GLN
07/03/2006
16,704.00
635
KG
TOXEMENT S.A.
29/06/2006
1,276.00
2544
KG
TOXEMENT S.A.
01/07/2006
1,219.00
2748
KG
TOXEMENT S.A.
01/07/2006
1,071.00
644
KG
TOXEMENT S.A.
01/07/2006
5,467.00
20 KI
2545
KG
TOXEMENT S.A.
01/07/2006
8,294.00
EUCON 537
20 kl
3074
KG
TOXEMENT S.A.
01/07/2006
10,051.00
1961
M2
ATA IMPERMEABILIZADORA
07/03/2006
1,127.00
651
GL
TEXSA DE COLOMBIA
01/07/2006
17,500.00
6,034.32
TEXSA
24200
3042
M2
01/07/2006
3303000001
3677
M2
NORVENTAS GEOTEXTIL
01/07/2006
8,340.40
HR-750
3678
M2
NORVENTAS GEOTEXTIL
01/07/2006
11,101.20
GEOTEXTIL NT 1600
13122
1082
M2
NORVENTAS GEOTEXTIL
17/06/2006
2,273.60
GEOTEXTIL NT 1800
13127
1760
M2
NORVENTAS GEOTEXTIL
17/06/2006
2,859.40
GEOTEXTIL NT 2000
13133
1786
M2
NORVENTAS GEOTEXTIL
17/06/2006
3,386.04
GEOTEXTIL NT REPAVIMENTACION
13174
1787
M2
NORVENTAS GEOTEXTIL
17/06/2006
2,452.24
GEOTEXTIL NT REPAVIMENTACION
13170
1807
M2
NORVENTAS GEOTEXTIL
17/06/2006
2,912.76
GEOTEXTIL T 1050
12202
1901
M2
NORVENTAS GEOTEXTIL
17/06/2006
1,773.64
GEOTEXTIL T 1400
12203
1964
M2
NORVENTAS GEOTEXTIL
17/06/2006
2,349.00
GEOTEXTIL T 1700
12204
2025
M2
NORVENTAS GEOTEXTIL
17/06/2006
2,905.80
3075
KG
TOXEMENT S.A.
01/07/2006
1,852.00
654
KG
TOXEMENT S.A.
01/07/2006
3,032.00
210320
655
KG
07/03/2006
13,224.00
IGASOL CUBIERTA
811802
2717
KG
07/03/2006
3,074.00
811002
656
KG
07/03/2006
8,352.00
IGOL IMPRIMANTE
20 KILOS
16 KILOS
IMPERMEABILIZANTE ALUMOL 16 Kg
803046
657
KG
07/03/2006
14,964.00
666
KG
07/03/2006
8,700.00
IMPERMEABILIZANTE PLASTOCRETE
101502
676
KG
07/03/2006
5,046.00
120677
679
KG
07/03/2006
3,030.00
1959
GL
ATA IMPERMEABILIZADORA
01/07/2006
30,000.00
3071
KG
TOXEMENT S.A.
29/06/2006
12,760.00
6,336.00
MSC
725
M2
EDILMER
09/07/2006
27580
9482
M2
02/03/2006
9,392.52
MG
1059
M2
EDILMER
01/07/2006
10,863.00
Bajo Teja
890
M2
EDILMER
01/07/2006
8,431.00
Bajo Teja
716
M2
EDILMER
01/07/2006
9,695.00
682
M2
TEXSA DE COLOMBIA
01/07/2006
12,800.00
MANTO MORTER-PLAS N3
TEXSA
683
M2
TEXSA DE COLOMBIA
01/07/2006
10,000.00
MANTO MORTER-PLAS N4
TEXSA
684
M2
TEXSA DE COLOMBIA
01/07/2006
11,500.00
MRAN
1046
M2
EDILMER
01/07/2006
10,365.00
EDIL MP
1081
M2
EDILMER
01/07/2006
9,270.00
MP
1119
M2
EDILMER
01/07/2006
8,200.00
27521
9481
M2
02/03/2006
5,471.72
2188
KG
TOXEMENT S.A.
01/07/2006
11,136.00
2189
KG
TOXEMENT S.A.
01/07/2006
7,373.00
689
KG
07/03/2006
13,600.00
MASIL CARBURANTE
MASIL NEGRO
25 KILOS
4 KILOS
IMPERMEABIL.,ADITIVOS,QUIMICOS (12)
10/07/2006 Bogot
Descripcin
Referencia
Fecha
Precio
500723
2479
KG
07/03/2006
15,600.00
PEGANTE BOXER
290102
2957
GN
FERRICENTROS S.A.
01/07/2006
47,400.00
290360
691
GN
FERRICENTROS S.A.
01/07/2006
28,200.00
665
GN
ATA IMPERMEABILIZADORA
07/03/2006
19,300.00
693
GL
TEXSA DE COLOMBIA
01/07/2006
40,000.00
1958
GN
ATA IMPERMEABILIZADORA
01/07/2006
42,700.00
3065
07/03/2006
45,158.80
3066
07/03/2006
209,507.60
694
KG
07/03/2006
3,944.00
695
LT
MBT DE COLOMBIA
01/07/2006
4,524.00
696
LT
MBT DE COLOMBIA
01/07/2006
5,104.00
697
LT
MBT DE COLOMBIA
01/07/2006
5,336.00
2190
KG
TOXEMENT S.A.
01/07/2006
32,519.00
692
KG
TOXEMENT S.A.
01/07/2006
32,519.00
698
KG
TOXEMENT S.A.
01/07/2006
6,878.00
3307
HR
16/06/2006
18,000.00
PROTECTOP BLANCO
102002
5 KILOS
PROTECTOP TRANSPARENTE
699
KG
TOXEMENT S.A.
29/06/2006
2,053.00
3077
KG
TOXEMENT S.A.
01/07/2006
3,467.00
110002
678
KG
07/03/2006
4,002.00
111001
704
KG
07/03/2006
7,250.00
111102
705
KG
07/03/2006
4,640.00
124062
703
KG
02/03/2006
2,900.00
124162
2004
KG
27/10/2005
2,529.00
SIKA GUARD 63 N
522573
706
KG
07/03/2006
74,820.00
120777
707
KG
07/03/2006
3,515.00
SIKA TRANSPARENTE
500002
708
KG
07/03/2006
11,542.00
303571
710
KG
07/03/2006
47,212.00
200296
2746
UN
07/03/2006
20,880.00
200998
2739
KG
07/03/2006
46,400.00
606970
641
KG
07/03/2006
20,300.00
122064
711
KG
07/03/2006
1,914.00
47,560.00
20 KILOS
4 KILOS
SIKADUR 32 PRIMER
16 KILOS
1 KILO
SIKAFLEX-1a BLANCO
SIKAFLEX PRO 3WF Gris
SIKAGUARD 62 (GRIS)
1 KILO
712
KG
07/03/2006
3 KILOS
127261
15
KG
02/03/2006
603.00
101002
713
KG
07/03/2006
8,468.00
105001
709
KG
07/03/2006
5,626.00
Fglas 27560
671
M2
07/03/2006
12,516.40
27005
3063
M2
07/03/2006
6,873.00
27710
668
M2
07/03/2006
8,456.40
27080
3064
M2
07/03/2006
10,154.64
27570
670
M2
07/03/2006
14,171.72
652
KG
TOXEMENT S.A.
01/07/2006
23,137.00
715
M2
TEXSA DE COLOMBIA
01/07/2006
675.00
1960
M2
ATA IMPERMEABILIZADORA
07/03/2006
895.00
3072
KG
TOXEMENT S.A.
01/07/2006
31,842.00
2191
KG
TOXEMENT S.A.
04/07/2006
73,358.00
2193
KG
TOXEMENT S.A.
04/07/2006
16,815.00
TEXSA
3 KILOS
IMPERMEABIL.,ADITIVOS,QUIMICOS (12)
10/07/2006 Bogot
Referencia
Fecha
3078
KG
TOXEMENT S.A.
04/07/2006
9,860.00
667
KG
TOXEMENT S.A.
04/07/2006
4,796.00
680
KG
TOXEMENT S.A.
04/07/2006
3,401.00
2194
KG
TOXEMENT S.A.
04/07/2006
3,359.00
Descripcin
2 KILOS
Precio
Fecha
ADAPTADOR HEMBRA CU DE
2227
UN
BUNDY
22/06/2006
1,873.00
ADAPTADOR MACHO CU DE
1611
UN
BUNDY
22/06/2006
1,358.00
3789
UN
BUNDY
22/06/2006
130.00
CODO 3/8" AG
1,595.00
Descripcin
Precio
3765
UN
BUNDY
10/11/2004
CODO CU 90 DE
727
UN
BUNDY
22/06/2006
646.00
730
UN
BUNDY
22/06/2006
3,091.00
3826
ML
BUNDY
22/06/2006
27,260.00
3830
UN
CITYGAS
30/06/2005
10,904.00
CONEXION GASODOMESTICO
Acero Flexom
3812
UN
BUNDY
28/02/2004
83,752.00
FUNDENTE
16 Onzas
3811
LB
BUNDY
22/06/2006
6,414.00
hasta 5 mtr
3858
UN
GP INSTALACIONES / GRUPO
30/06/2006
200,000.00
hasta 18mtr
3853
UN
GP INSTALACIONES / GRUPO
30/06/2006
600,000.00
hasta 18 mtr
3854
UN
GP INSTALACIONES / GRUPO
30/06/2006
650,000.00
hasta 18 mtr
3855
UN
GP INSTALACIONES / GRUPO
30/06/2006
700,000.00
hasta 18 mtr
3856
UN
GP INSTALACIONES / GRUPO
30/06/2006
750,000.00
hasta 18 mtr
3857
UN
GP INSTALACIONES / GRUPO
30/06/2006
800,000.00
3861
UN
GP INSTALACIONES / GRUPO
30/06/2006
600,000.00
LIMPIADOR 7070
3834
UN
CITYGAS
30/06/2005
16,862.00
3762
UN
CITYGAS
30/06/2005
6,075.00
3568
UN
GP INSTALACIONES / GRUPO
30/06/2006
50,000.00
3760
UN
CITYGAS
30/06/2005
208,800.00
NICHO 37x20x10cm
3822
UN
GP INSTALACIONES / GRUPO
30/06/2006
30,000.00
3821
UN
GP INSTALACIONES / GRUPO
01/07/2006
25,000.00
3820
UN
GP INSTALACIONES / GRUPO
01/07/2006
20,000.00
3809
UN
BUNDY
28/02/2004
6,380.00
POYO
3827
UN
GP INSTALACIONES / GRUPO
30/06/2006
25,000.00
REGULADOR E-METER
3836
UN
CITYGAS
30/06/2005
127,600.00
REGULADOR GAS RP 40
3761
UN
CITYGAS
30/06/2005
46,690.00
3824
UN
GP INSTALACIONES / GRUPO
30/06/2006
15,000.00
REJILLA GALVANIZADA
3823
UN
GP INSTALACIONES / GRUPO
30/06/2006
25,000.00
957
UN
BUNDY
22/06/2006
1,204.00
SOLDADURA P/COBRE
3810
LB
BUNDY
22/06/2006
25,588.00
3485
UN
BUNDY
28/02/2004
440.00
TEE CU DE
3825
UN
BUNDY
22/06/2006
1,115.00
3832
UN
CITYGAS
30/06/2005
6,374.00
3831
ML
CITYGAS
30/06/2005
1,624.00
TUBO CU RIGIDO DE
497
ML
BUNDY
22/06/2006
69,014.00
UNION CU RIGIDO DE
1572
UN
BUNDY
22/06/2006
525.00
9415
UN
07/03/2006
22,564.32
SEMICODO CU 45 DE
VBB30GA
Referencia
Fecha
VBB10GA
3828
UN
07/03/2006
7,772.00
VBB20GA
9414
UN
07/03/2006
11,426.00
4054
UN
BUNDY
22/06/2006
5,480.00
Precio
Referencia
Fecha
ABRAZADERA 1 SALIDA
99AB100
3707
UN
NACIONAL DE ELECTRICOS
04/07/2006
627.56
ABRAZADERA EN U
50AU
3701
UN
NACIONAL DE ELECTRICOS
04/07/2006
9,802.00
TIPO 2
3791
UN
NACIONAL DE ELECTRICOS
04/07/2006
7,540.00
10234
2461
UN
04/07/2006
248.00
10247
3781
UN
04/07/2006
329.00
ANSI 52 - 30
625
UN
NACIONAL DE ELECTRICOS
04/07/2006
19,024.00
30AS06R
3723
UN
NACIONAL DE ELECTRICOS
04/07/2006
18,096.00
30AS10
3732
UN
NACIONAL DE ELECTRICOS
04/07/2006
47,792.00
30A34KV
3693
UN
NACIONAL DE ELECTRICOS
04/07/2006
63,751.28
3784
ML
INTERAMERICANA DE CABLES -
04/07/2006
1,226.12
2051019R
Precio
718
ML
INTERAMERICANA DE CABLES -
04/07/2006
3,174.92
3782
ML
INTERAMERICANA DE CABLES -
04/07/2006
1,998.68
721
ML
INTERAMERICANA DE CABLES -
04/07/2006
859.56
0190071A
3602
ML
INTERAMERICANA DE CABLES -
04/07/2006
770.24
26AD14I
2763
ML
NACIONAL DE ELECTRICOS
04/07/2006
208.80
26AD10I
2764
ML
NACIONAL DE ELECTRICOS
04/07/2006
498.80
2765
ML
NACIONAL DE ELECTRICOS
04/07/2006
319.00
2766
ML
NACIONAL DE ELECTRICOS
04/07/2006
814.32
2070001H
2832
ML
INTERAMERICANA DE CABLES -
04/07/2006
1,538.16
2070001A
2816
ML
INTERAMERICANA DE CABLES -
04/07/2006
980.20
FACOMEC
722
ML
INTERAMERICANA DE CABLES -
04/07/2006
464.00
2831
ML
INTERAMERICANA DE CABLES -
04/07/2006
1,067.20
62AM86
724
UN
NACIONAL DE ELECTRICOS
30/06/2006
17,461.48
62AM102
723
UN
NACIONAL DE ELECTRICOS
30/06/2006
20,827.80
3521
UN
NACIONAL DE ELECTRICOS
30/06/2006
6,960.00
3523
UN
NACIONAL DE ELECTRICOS
30/06/2006
9,360.04
61
UN
ELECTRO IMPORTADORA
30/06/2006
25,000.00
52BIFBL
BALASTO
2 x 48
BALASTO 2 x 48
05E248S
729
UN
NACIONAL DE ELECTRICOS
30/06/2006
18,734.00
BALASTO 2 x 96
05E296S
728
UN
NACIONAL DE ELECTRICOS
30/06/2006
23,606.00
06C601
734
UN
NACIONAL DE ELECTRICOS
30/06/2006
823.60
06C1501
733
UN
NACIONAL DE ELECTRICOS
30/06/2006
2,227.20
06M125
776
UN
NACIONAL DE ELECTRICOS
30/06/2006
8,120.00
66B050
769
UN
NACIONAL DE ELECTRICOS
30/06/2006
464.00
66B100
768
UN
NACIONAL DE ELECTRICOS
30/06/2006
777.20
749
UN
29/06/2006
5,788.00
39513
753
UN
29/06/2006
9,964.00
1005T-LP
3204
UN
29/06/2006
4,907.00
3003
UN
29/06/2006
1,508.00
736
UN
29/06/2006
3,886.00
605
Referencia
Fecha
Precio
805
3215
UN
29/06/2006
11,090.00
3033
UN
29/06/2006
7,366.00
9905
3022
UN
29/06/2006
4,037.00
1005
3203
UN
29/06/2006
3,016.00
1.00m X1"
3612
UN
ELECTRO IMPORTADORA
20/06/2006
6,000.00
26CA1/0
2876
ML
NACIONAL DE ELECTRICOS
30/06/2006
5,185.20
26CA02
834
ML
NACIONAL DE ELECTRICOS
30/06/2006
3,398.80
26CA2/0
2877
ML
NACIONAL DE ELECTRICOS
30/06/2006
6,322.00
26CA04
613
ML
NACIONAL DE ELECTRICOS
30/06/2006
2,274.76
26CA4/0
2161
ML
NACIONAL DE ELECTRICOS
30/06/2006
9,807.80
2005009R
2846
ML
INTERAMERICANA DE CABLES -
30/06/2006
13,734.40
FACOMEC
2845
ML
INTERAMERICANA DE CABLES -
30/06/2006
8,846.16
FACOMEC
2844
ML
INTERAMERICANA DE CABLES -
30/06/2006
5,738.52
FACOMEC
2842
ML
INTERAMERICANA DE CABLES -
30/06/2006
3,724.76
FACOMEC
2841
ML
INTERAMERICANA DE CABLES -
30/06/2006
2,572.88
FACOMEC
2840
ML
INTERAMERICANA DE CABLES -
30/06/2006
1,788.72
FACOMEC
2833
ML
INTERAMERICANA DE CABLES -
30/06/2006
1,241.20
741
ML
INTERAMERICANA DE CABLES -
30/06/2006
22,423.96
742
ML
INTERAMERICANA DE CABLES -
30/06/2006
28,037.20
2755
ML
INTERAMERICANA DE CABLES -
30/06/2006
35,182.80
2756
ML
INTERAMERICANA DE CABLES -
30/06/2006
43,933.84
0190122B
3734
ML
INTERAMERICANA DE CABLES -
30/06/2006
22,588.68
0461061A
2758
ML
INTERAMERICANA DE CABLES -
30/06/2006
2,648.28
FACOMEC
2759
ML
INTERAMERICANA DE CABLES -
30/06/2006
1,060.24
CABLE ENCAUCHETADO 2 x 8 ST
26E208
2757
ML
NACIONAL DE ELECTRICOS
30/06/2006
10,720.72
CABLE ENCAUCHETADO 3 x 8 ST
26E308
758
ML
NACIONAL DE ELECTRICOS
30/06/2006
13,360.88
66CG100
748
UN
NACIONAL DE ELECTRICOS
30/06/2006
1,749.28
36S3030H
744
UN
NACIONAL DE ELECTRICOS
30/06/2006
24,354.20
60CP5
745
UN
NACIONAL DE ELECTRICOS
30/06/2006
981.36
27P6060E
747
UN
NACIONAL DE ELECTRICOS
30/06/2006
76,908.00
27P92138
3576
UN
NACIONAL DE ELECTRICOS
30/06/2006
13,224.00
27P1520
3329
UN
NACIONAL DE ELECTRICOS
30/06/2006
29,116.00
ROF
3520
UN
NACIONAL DE ELECTRICOS
30/06/2006
1,102.00
CDK-2
1762
UN
LUMINEX S.A.
30/06/2006
10,208.00
CDK-3
1768
UN
LUMINEX S.A.
30/06/2006
12,180.00
C24
750
UN
NACIONAL DE ELECTRICOS
30/06/2006
1,347.92
ROF
3563
UN
NACIONAL DE ELECTRICOS
30/06/2006
870.00
CT-2
2961
UN
LUMINEX S.A.
30/06/2006
12,760.00
CT-4
746
UN
LUMINEX S.A.
30/06/2006
21,576.00
CT-6
2962
UN
LUMINEX S.A.
30/06/2006
29,348.00
CT-8
2963
UN
LUMINEX S.A.
30/06/2006
41,876.00
CT-9
2964
UN
LUMINEX S.A.
30/06/2006
52,664.00
3735
UN
TELECTRICOS LTDA.
30/06/2006
39,022.40
3790
ML
ALMACEN LISTO
30/06/2006
15,542.00
4RS27M
4050
UN
FIJACIONES TORRES
20/06/2006
246.00
42CW
4048
UN
FIJACIONES TORRES
20/06/2006
169.00
Referencia
Fecha
Precio
4D60
4051
UN
FIJACIONES TORRES
20/06/2006
247.00
3D60
4052
UN
FIJACIONES TORRES
20/06/2006
246.00
22LRSC5
3687
UN
FIJACIONES TORRES
30/06/2006
148.48
3RS27M
4049
UN
FIJACIONES TORRES
20/06/2006
245.00
32CW
4047
UN
FIJACIONES TORRES
20/06/2006
168.00
9468
UN
INVENTOR ILUMINACION
25/06/2004
100,920.00
9465
UN
INVENTOR ILUMINACION
25/06/2004
112,520.00
9469
UN
INVENTOR ILUMINACION
04/03/2006
90,596.00
9466
UN
INVENTOR ILUMINACION
04/03/2006
138,040.00
9470
UN
INVENTOR ILUMINACION
04/03/2006
129,920.00
9467
UN
INVENTOR ILUMINACION
04/03/2006
191,400.00
2419
UN
TELECTRICOS LTDA.
01/07/2006
75,400.00
2426
UN
NACIONAL DE ELECTRICOS
01/07/2006
30,619.36
0020-C
754
UN
29/06/2006
1,682.00
0092P
3017
UN
29/06/2006
371.00
69
3015
UN
29/06/2006
696.00
0020-C3
3011
UN
29/06/2006
2,714.00
H62
3736
UN
FIJACIONES TORRES
20/06/2006
102.08
1508
4045
UN
FIJACIONES TORRES
20/06/2006
107.00
1510
4046
UN
FIJACIONES TORRES
20/06/2006
130.00
14CM150
285
UN
NACIONAL DE ELECTRICOS
01/07/2006
6,148.00
CODO metalico
1/2"
14CM050
284
UN
NACIONAL DE ELECTRICOS
01/07/2006
1,136.80
14CM075
283
UN
NACIONAL DE ELECTRICOS
01/07/2006
1,890.80
14CM100
133
UN
NACIONAL DE ELECTRICOS
01/07/2006
3,016.00
14CM200
755
UN
NACIONAL DE ELECTRICOS
01/07/2006
7,540.00
3692
ML
NACIONAL DE ELECTRICOS
30/06/2006
6,380.00
738
UN
NACIONAL DE ELECTRICOS
01/07/2006
2,552.00
76CT1/0
3733
UN
NACIONAL DE ELECTRICOS
01/07/2006
2,227.20
99NK30
3562
UN
NACIONAL DE ELECTRICOS
01/07/2006
1,680.84
3392
UN
TELECTRICOS LTDA.
23/06/2006
174.00
3552
UN
TELECTRICOS LTDA.
01/07/2006
34,800.00
CONMUTABLE
AVE
402
763
UN
29/06/2006
2,807.00
LX-202CL
1738
UN
LUMINEX S.A.
01/07/2006
21,112.00
DK2BL+DKT2B
1727
UN
LUMINEX S.A.
01/07/2006
24,012.00
L/NEX DK-2B+DKT2B
1702
UN
LUMINEX S.A.
01/07/2006
18,908.00
LX-020C
1640
UN
LUMINEX S.A.
01/07/2006
7,424.00
LX-020CL
L/NEX
1644
UN
LUMINEX S.A.
01/07/2006
13,108.00
1769
UN
29/06/2006
16,460.00
LX-222CL
1739
UN
LUMINEX S.A.
01/07/2006
29,232.00
66CM200U
1897
ML
NACIONAL DE ELECTRICOS
30/06/2006
22,794.00
50CT15K
1172
UN
NACIONAL DE ELECTRICOS
01/07/2006
128,760.00
739
UN
29/06/2006
6,960.00
2989
UN
LUMINEX S.A.
01/07/2006
15,544.00
2990
UN
LUMINEX S.A.
01/07/2006
15,544.00
2991
UN
LUMINEX S.A.
01/07/2006
20,300.00
2992
UN
LUMINEX S.A.
01/07/2006
35,148.00
Fecha
Precio
2994
UN
LUMINEX S.A.
01/07/2006
44,428.00
2995
UN
LUMINEX S.A.
01/07/2006
75,516.00
2996
UN
LUMINEX S.A.
01/07/2006
75,516.00
2997
UN
LUMINEX S.A.
01/07/2006
75,516.00
2980
UN
LUMINEX S.A.
01/07/2006
11,252.00
2981
UN
LUMINEX S.A.
01/07/2006
11,252.00
2982
UN
LUMINEX S.A.
01/07/2006
11,252.00
2983
UN
LUMINEX S.A.
01/07/2006
30,508.00
2984
UN
LUMINEX S.A.
01/07/2006
30,508.00
2985
UN
LUMINEX S.A.
01/07/2006
36,888.00
2986
UN
LUMINEX S.A.
01/07/2006
67,744.00
2987
UN
LUMINEX S.A.
01/07/2006
67,744.00
2988
UN
LUMINEX S.A.
01/07/2006
67,744.00
Descripcin
DPX-U 527111
626
UN
LUMINEX S.A.
01/07/2006
312,504.00
DPX-U 527112
447
UN
LUMINEX S.A.
01/07/2006
312,504.00
DPX-U 527211
855
UN
LUMINEX S.A.
01/07/2006
313,432.00
DPXU 527212
648
UN
LUMINEX S.A.
01/07/2006
313,432.00
2993
UN
LUMINEX S.A.
01/07/2006
35,148.00
1044
UN
NACIONAL DE ELECTRICOS
01/07/2006
731,154.96
756
UN
01/07/2006
7,244.00
11076
918
775
UN
29/06/2006
24,105.00
1018
3211
UN
29/06/2006
27,144.00
XMC-7D3L
3339
UN
LUMINEX S.A.
01/07/2006
42,340.00
XMC-7L
3068
UN
LUMINEX S.A.
01/07/2006
61,828.00
LX-707C3
1950
UN
LUMINEX S.A.
01/07/2006
73,776.00
LX-070C3
1963
UN
LUMINEX S.A.
01/07/2006
41,876.00
KR7BDL
3363
UN
LUMINEX S.A.
01/07/2006
54,520.00
3364
UN
LUMINEX S.A.
01/07/2006
42,340.00
66
UN
01/07/2006
6,312.00
3524
UN
NACIONAL DE ELECTRICOS
01/07/2006
302,760.00
4044
UN
FIJACIONES TORRES
20/06/2006
150.00
3518
UN
NACIONAL DE ELECTRICOS
01/07/2006
257,346.00
3711
UN
NACIONAL DE ELECTRICOS
01/07/2006
9,164.00
GRAPA PRENSORA
3729
UN
NACIONAL DE ELECTRICOS
01/07/2006
22,852.00
3747
UN
NACIONAL DE ELECTRICOS
01/07/2006
16,224.92
3726
UN
FERRETERIA EL TERMINAL
28/02/2005
580.00
12511
22LRSC6
50GC
DK1B+DKT2B
1724
UN
LUMINEX S.A.
01/07/2006
18,096.00
1916N
3029
UN
29/06/2006
9,268.00
INTERRUPTOR 4 VIAS
604-31323
759
UN
29/06/2006
8,758.00
1747
UN
LUMINEX S.A.
01/07/2006
37,236.00
1733
UN
LUMINEX S.A.
01/07/2006
9,280.00
DK-2B
3365
UN
LUMINEX S.A.
01/07/2006
15,312.00
KR - 2BL
3352
UN
LUMINEX S.A.
01/07/2006
11,484.00
2718
UN
LUMINEX S.A.
01/07/2006
18,792.00
AVE
XMC2L+XMTI
2618
UN
LUMINEX S.A.
01/07/2006
18,792.00
KR320B
3351
UN
LUMINEX S.A.
01/07/2006
8,816.00
Fecha
1620
UN
29/06/2006
5,777.00
00182
3019
UN
29/06/2006
1,380.00
211
3008
UN
29/06/2006
2,668.00
611
911 LP
Descripcin
Precio
761
UN
29/06/2006
5,243.00
3034
UN
29/06/2006
10,707.00
762
UN
29/06/2006
6,426.00
3030
UN
29/06/2006
6,055.00
1761
UN
29/06/2006
11,820.00
9911
3026
UN
29/06/2006
5,249.00
KR-1BDL
3349
UN
LUMINEX S.A.
01/07/2006
15,428.00
2576
UN
LUMINEX S.A.
01/07/2006
22,736.00
LX-101CL
1700
UN
LUMINEX S.A.
01/07/2006
19,140.00
KR-1BTL
3350
UN
LUMINEX S.A.
01/07/2006
62,756.00
XMC-7DL
2581
UN
LUMINEX S.A.
01/07/2006
54,520.00
1916-NLP
3038
UN
29/06/2006
9,268.00
KR
2380
UN
LUMINEX S.A.
01/07/2006
17,052.00
912
780
UN
29/06/2006
5,800.00
760
UN
29/06/2006
5,580.00
916
3009
UN
29/06/2006
5,243.00
916-LP
3037
UN
29/06/2006
8,920.00
201
3002
UN
29/06/2006
1,427.00
401
765
UN
29/06/2006
2,564.00
601
766
UN
29/06/2006
3,886.00
9901
3020
UN
01/07/2006
3,642.00
L/NEX LX-010C
2998
UN
LUMINEX S.A.
01/07/2006
6,728.00
1001-LP
3213
UN
01/07/2006
4,826.00
602
764
UN
29/06/2006
4,269.00
1902-LP
298
UN
29/06/2006
7,238.00
9902
3021
UN
29/06/2006
3,990.00
1002
3202
UN
29/06/2006
3,851.00
KR-1BL
3347
UN
LUMINEX S.A.
01/07/2006
9,744.00
DK-1BL+DKT2B
21,924.00
1677
UN
LUMINEX S.A.
01/07/2006
3032
UN
29/06/2006
6,473.00
1643
UN
LUMINEX S.A.
01/07/2006
11,832.00
3028
UN
29/06/2006
2,807.00
3201
UN
29/06/2006
8,955.00
INTERRUPTOR TEMP. DE
DK1TBL+DKT
1703
UN
LUMINEX S.A.
01/07/2006
94,656.00
613
767
UN
29/06/2006
7,389.00
9913
3027
UN
29/06/2006
7,418.00
913 LP
3036
UN
29/06/2006
14,836.00
LX-111CL
1701
UN
LUMINEX S.A.
01/07/2006
26,448.00
3660
UN
ELECTRO IMPORTADORA
01/07/2006
105,792.00
3688
UN
ELECTRO IMPORTADORA
01/07/2006
82,940.00
2187
UN
NACIONAL DE ELECTRICOS
01/07/2006
26,961.88
LUMINARIA AHORRADORA DE
2 x 17
9462
UN
INVENTOR ILUMINACION
04/03/2006
171,680.00
LUMINARIA AHORRADORA DE
2 x 17
9459
UN
INVENTOR ILUMINACION
04/03/2006
192,560.00
Referencia
Fecha
Precio
LUMINARIA AHORRADORA DE
2 x 32
9463
UN
INVENTOR ILUMINACION
04/03/2006
189,080.00
LUMINARIA AHORRADORA DE
2 x 32
9460
UN
INVENTOR ILUMINACION
04/03/2006
208,800.00
LUMINARIA AHORRADORA DE
4 x 32-3.00M
9464
UN
INVENTOR ILUMINACION
04/03/2006
334,080.00
LUMINARIA AHORRADORA DE
4 x 32-3.20M
9461
UN
INVENTOR ILUMINACION
04/03/2006
378,160.00
INDOLUX
1006
UN
INVENTOR ILUMINACION
07/03/2006
324,800.00
3640
UN
INVENTOR ILUMINACION
07/03/2006
313,200.00
3653
UN
INVENTOR ILUMINACION
07/03/2006
290,000.00
KR-MKestanda
3343
UN
LUMINEX S.A.
01/07/2006
2,668.00
KR-MZPperla
3344
UN
LUMINEX S.A.
01/07/2006
2,668.00
KR-MQPmeta
3345
UN
LUMINEX S.A.
01/07/2006
2,668.00
KR-MCR-PL
3342
UN
LUMINEX S.A.
01/07/2006
4,988.00
3341
UN
LUMINEX S.A.
01/07/2006
4,988.00
3340
UN
LUMINEX S.A.
01/07/2006
2,668.00
3512
HR
NINGUNO EN PARTICULAR
06/03/2005
6,300.00
3593
UN
CODENSA E.S.P.
29/06/2006
50,717.52
3594
UN
CODENSA E.S.P.
29/06/2006
99,316.88
3596
UN
CODENSA E.S.P.
29/06/2006
464,433.84
168.00
M62027
4053
UN
FIJACIONES TORRES
20/06/2006
T32032
3686
UN
FIJACIONES TORRES
01/07/2006
226.20
46KPB
3783
UN
NACIONAL DE ELECTRICOS
01/07/2006
4,060.00
DK-0B +DKT2B
1748
UN
LUMINEX S.A.
01/07/2006
10,440.00
786
UN
NACIONAL DE ELECTRICOS
01/07/2006
3,509.00
SODIO
3689
UN
INVENTOR ILUMINACION
07/03/2006
307,400.00
DK4BJL
3367
UN
LUMINEX S.A.
01/07/2006
19,952.00
DK4BL
3366
UN
LUMINEX S.A.
01/07/2006
23,432.00
99RGS
0030
DK-6B +DKT2B
778
UN
NACIONAL DE ELECTRICOS
01/07/2006
3,480.00
3744
UN
NACIONAL DE ELECTRICOS
30/06/2006
17,445.24
779
UN
29/06/2006
1,264.00
1668
UN
LUMINEX S.A.
01/07/2006
10,324.00
3696
UN
07/03/2006
1,898.00
782
UN
NACIONAL DE ELECTRICOS
01/07/2006
788.80
99SSL
28
781
UN
29/06/2006
1,311.00
0028-RS
3013
UN
29/06/2006
1,021.00
0029
3014
UN
29/06/2006
2,784.00
STARTER 40 W
99ST40
783
UN
NACIONAL DE ELECTRICOS
01/07/2006
348.00
TABLERO 12c/total
TWC-12M
944
UN
LUMINEX S.A.
01/07/2006
312,620.00
27TP12
784
UN
NACIONAL DE ELECTRICOS
01/07/2006
190,704.00
27TP18
785
UN
NACIONAL DE ELECTRICOS
01/07/2006
225,620.00
1900-0
1935
UN
29/06/2006
2,204.00
3214
UN
29/06/2006
2,552.00
3057
UN
LUMINEX S.A.
01/07/2006
17,864.00
UN
NACIONAL DE ELECTRICOS
30/06/2006
15,023.16
AVE
TERMOSTATO CALENTADOR
20TC
77
3016
UN
29/06/2006
10,324.00
405
735
UN
29/06/2006
1,926.00
655
773
UN
29/06/2006
5,928.00
653
774
UN
29/06/2006
7,621.00
AVE
AVE
AVE
Fecha
Precio
3050
UN
LUMINEX S.A.
01/07/2006
15,312.00
3358
UN
LUMINEX S.A.
01/07/2006
8,004.00
1746
UN
LUMINEX S.A.
01/07/2006
13,456.00
AQ 040K
3359
UN
LUMINEX S.A.
01/07/2006
12,180.00
AQ 040KTRIGO
3051
UN
LUMINEX S.A.
01/07/2006
12,180.00
915LP
1790
UN
29/06/2006
11,287.00
TOMA 20AMP
0020-T
788
UN
29/06/2006
2,610.00
Descripcin
KR-4BL
AVE
96
3018
UN
29/06/2006
684.00
1006-N
3207
UN
29/06/2006
2,993.00
1006
3205
UN
29/06/2006
2,645.00
0020-T
3010
UN
29/06/2006
2,610.00
DK675B+DKT
1674
UN
LUMINEX S.A.
04/07/2006
15,080.00
LX-060-75C
1673
UN
LUMINEX S.A.
04/07/2006
6,032.00
KR301BG
3353
UN
NINGUNO EN PARTICULAR
04/03/2004
13,500.00
3045
UN
LUMINEX S.A.
04/07/2006
14,616.00
XMC-3G
2752
UN
LUMINEX S.A.
04/07/2006
5,220.00
KR-6-75B
3361
UN
LUMINEX S.A.
04/07/2006
5,104.00
LX-303C
1642
UN
LUMINEX S.A.
04/07/2006
6,728.00
666
3000
UN
29/06/2006
3,944.00
666 -N
3001
UN
29/06/2006
4,942.00
9966-N
1043
UN
29/06/2006
4,246.00
9966
3031
UN
29/06/2006
3,729.00
DK-3BG+DKT
1752
UN
LUMINEX S.A.
04/07/2006
16,240.00
1898
UN
TELECTRICOS LTDA.
04/07/2006
2,691.20
LX-301C
2999
UN
LUMINEX S.A.
04/07/2006
9,396.00
0206
3004
UN
29/06/2006
1,380.00
606
790
UN
29/06/2006
3,283.00
406
789
UN
29/06/2006
1,427.00
806-EA
3216
UN
29/06/2006
10,208.00
LX-301CG
1641
UN
LUMINEX S.A.
04/07/2006
11,832.00
LK-050CU
1699
UN
LUMINEX S.A.
04/07/2006
8,352.00
DK5BDU+DKT
1648
UN
LUMINEX S.A.
04/07/2006
21,924.00
DK-5BDU
1759
UN
LUMINEX S.A.
04/07/2006
18,328.00
606 T
791
UN
29/06/2006
3,329.00
3056
UN
LUMINEX S.A.
04/07/2006
7,656.00
3024
UN
29/06/2006
4,588.00
3006
UN
29/06/2006
1,844.00
1736
UN
LUMINEX S.A.
04/07/2006
14,732.00
3055
UN
LUMINEX S.A.
04/07/2006
14,964.00
3218
UN
29/06/2006
10,788.00
906-TA4
LK-050CDU
3052
UN
LUMINEX S.A.
04/07/2006
11,832.00
KR5B
3360
UN
LUMINEX S.A.
04/07/2006
4,524.00
0206 -T
3005
UN
29/06/2006
1,346.00
9906T
3023
UN
29/06/2006
3,318.00
1698
UN
LUMINEX S.A.
04/07/2006
14,384.00
792
UN
29/06/2006
1,740.00
AVE 406 T
Fecha
Precio
3217
UN
29/06/2006
10,347.00
1006T
3208
UN
29/06/2006
2,772.00
LK050CD+DK
1646
UN
LUMINEX S.A.
04/07/2006
19,024.00
DK5B+DKT2B
1758
UN
LUMINEX S.A.
04/07/2006
20,996.00
DK5BU
3368
UN
LUMINEX S.A.
04/07/2006
12,992.00
DK-6-75B
3362
UN
LUMINEX S.A.
04/07/2006
11,484.00
0020-T3
3012
UN
29/06/2006
3,271.00
1906-TVA
1094
UN
29/06/2006
3,016.00
406-TVA
1108
UN
29/06/2006
1,740.00
TOMA+CONMUTABLE PILOTO
926LP
1750
UN
29/06/2006
9,524.00
1742
UN
LUMINEX S.A.
04/07/2006
9,396.00
TOMA+INTERRUPTOR SENCILLO
LX-301CL
1645
UN
LUMINEX S.A.
04/07/2006
16,008.00
LX-301CG
Descripcin
1740
UN
LUMINEX S.A.
04/07/2006
11,832.00
3355
UN
LUMINEX S.A.
04/07/2006
5,452.00
TOMACORRIENTE DOBLE/PROTEC
KR303BGF
3357
UN
LUMINEX S.A.
04/07/2006
59,856.00
KR3BG
3356
UN
LUMINEX S.A.
04/07/2006
5,220.00
TOMACORRIENTE POLO A
XMC-3G+XMC
3047
UN
LUMINEX S.A.
04/07/2006
12,528.00
TRANSFORMADOR MONOFASICO
2399
UN
DISICO
04/07/2006
4,519,128.00
TRANSFORMADOR TRIFASICO
3682
UN
DISICO
04/07/2006
9,007,829.20
3683
UN
DISICO
04/07/2006
10,589,524.00
3684
UN
DISICO
04/07/2006
14,993,000.00
3679
UN
DISICO
04/07/2006
4,514,140.00
3680
UN
DISICO
04/07/2006
5,312,220.00
3681
UN
DISICO
04/07/2006
6,818,596.00
60TC150
801
ML
NACIONAL DE ELECTRICOS
04/07/2006
6,595.76
60TC100
800
ML
NACIONAL DE ELECTRICOS
04/07/2006
3,343.12
60TC050
802
ML
NACIONAL DE ELECTRICOS
04/07/2006
1,844.40
60TC200D
799
ML
NACIONAL DE ELECTRICOS
04/07/2006
10,144.20
60TC075
803
ML
NACIONAL DE ELECTRICOS
04/07/2006
2,411.64
3/4"
12478
797
ML
04/07/2006
1,828.00
1"
12464
794
ML
04/07/2006
2,533.00
1 "
12469
1120
ML
04/07/2006
3,915.00
1"
12467
798
ML
04/07/2006
4,991.00
2"
12475
795
ML
04/07/2006
7,675.00
12472
796
ML
04/07/2006
1,396.00
06T32
805
UN
NACIONAL DE ELECTRICOS
04/07/2006
5,777.96
06T40P
804
UN
NACIONAL DE ELECTRICOS
04/07/2006
3,207.40
14UG075MT
810
UN
NACIONAL DE ELECTRICOS
04/07/2006
870.00
3/4"
12856
1635
UN
04/07/2006
369.00
1"
12843
1661
UN
04/07/2006
600.00
1950959207
811
UN
04/07/2006
1,776.00
14UG150MT
809
UN
NACIONAL DE ELECTRICOS
04/07/2006
4,524.00
14UG100MT
807
UN
NACIONAL DE ELECTRICOS
04/07/2006
1,392.00
14UG050MT
808
UN
NACIONAL DE ELECTRICOS
04/07/2006
498.80
14UG200MT
806
UN
NACIONAL DE ELECTRICOS
04/07/2006
5,162.00
1912
UN
TELECTRICOS LTDA.
04/07/2006
8,120.00
Referencia
Fecha
207
3007
UN
29/06/2006
5,545.00
607
812
UN
29/06/2006
7,679.00
907
3025
UN
29/06/2006
6,995.00
1007
3210
UN
29/06/2006
8,317.00
Precio
813
UN
04/03/2006
1,200.00
10186
1087
UN
04/07/2006
797.00
10209
1095
UN
04/07/2006
976.00
10118
2041
UN
04/07/2006
5,270.00
10143
2042
UN
04/07/2006
27,953.00
10188
771
UN
04/07/2006
238.00
10211
772
UN
04/07/2006
429.00
10170
2037
UN
04/07/2006
897.00
10179
882
UN
04/07/2006
1,884.00
10193
2038
UN
04/07/2006
3,152.00
10203
947
UN
04/07/2006
12,384.00
10216
2039
UN
04/07/2006
22,777.00
BAJANTE (RAINGO)
12431
864
ML
30/06/2006
16,230.00
11770
1713
UN
30/06/2006
1,458.00
12824
1773
UN
30/06/2006
2,755.00
10472
2049
UN
30/06/2006
4,336.00
10476
2046
UN
30/06/2006
2,997.00
10527
2047
UN
30/06/2006
10,778.00
2015
UN
03/03/2006
23,896.00
815
UN
07/03/2006
137,228.00
Descripcin
PAVCO
Fecha
Precio
2016
Un
07/03/2006
48,488.00
828
UN
01/07/2006
1,319.00
567.00
PAVCO
10806
825
UN
01/07/2006
10828
826
UN
01/07/2006
907.00
PAVCO
10796
823
UN
01/07/2006
1,726.00
PAVCO
10822
830
UN
01/07/2006
22,244.00
827
UN
01/07/2006
1,319.00
1033
UN
01/07/2006
730.00
1036
UN
01/07/2006
1,319.00
10729
1017
ML
01/07/2006
14,367.00
PAVCO
10728
2158
ML
01/07/2006
19,341.00
10732
2000
ML
01/07/2006
15,043.00
10828
422
UN
01/07/2006
550.00
10806
421
UN
01/07/2006
345.00
10796
423
UN
01/07/2006
1,074.00
10843
829
UN
01/07/2006
3,850.00
PAVCO
PAVCO
PAVCO
10860
824
UN
01/07/2006
6,307.00
PAVCO
10870
456
UN
01/07/2006
21,173.00
PAVCO
10882
457
UN
01/07/2006
45,522.00
Referencia
Fecha
Precio
PAVCO
10950
1099
UN
01/07/2006
2,176.00
PAVCO
10954
1101
UN
01/07/2006
4,729.00
PAVCO
10958
831
UN
01/07/2006
8,676.00
PAVCO
10962
60,094.00
832
UN
01/07/2006
816
UN
FERRETERIA JER
01/07/2006
870.00
817
UN
FERRETERIA JER
01/07/2006
1,705.20
CODO GALVANIZADO
"
32010G
820
UN
07/03/2006
823.60
CODO GALVANIZADO
3/4"
32020G
821
UN
07/03/2006
1,322.40
32030G
818
UN
03/03/2006
2,018.40
32050G
822
UN
07/03/2006
4,338.40
32060G
819
UN
07/03/2006
7,690.80
12530
1911
UN
01/07/2006
1,626.00
12537
2055
UN
01/07/2006
2,108.00
2057
UN
30/06/2006
98,355.00
4014
M2
30/06/2006
17,075.00
1730
UN
01/07/2006
76,786.20
4015
M2
01/07/2006
38,393.68
188
UN
01/07/2006
58,098.60
4016
M2
01/07/2006
29,049.88
3840
UN
01/07/2006
45,257.40
4017
M2
01/07/2006
22,629.28
833
UN
01/07/2006
37,131.60
4018
M2
01/07/2006
18,565.80
1729
UN
01/07/2006
29,962.80
4019
M2
01/07/2006
14,981.40
1405
UN
01/07/2006
24,522.40
4020
M2
01/07/2006
12,261.20
675
UN
01/07/2006
21,088.80
4021
M2
01/07/2006
10,544.40
468
UN
01/07/2006
17,910.40
4022
M2
01/07/2006
8,955.20
25,736.00
11198
2060
UN
01/07/2006
12868
2054
UN
01/07/2006
9,441.00
RPW02
837
UN
07/03/2006
44,080.00
RPW04
838
UN
07/03/2006
36,772.00
RPW06
835
UN
07/03/2006
50,228.00
RPW10
839
UN
07/03/2006
87,696.00
RPW12
836
UN
07/03/2006
140,128.00
3/32
840
KG
FERRETERIA WILLCAR
13/06/2006
38,000.00
11744
842
UN
01/07/2006
57,229.00
11755
841
UN
01/07/2006
53,374.00
11888
2048
UN
01/07/2006
270.00
11890
2044
UN
01/07/2006
194.00
11915
2045
UN
01/07/2006
12,512.00
11927
2043
UN
01/07/2006
393.00
11942
2064
UN
01/07/2006
829.00
Fecha
Descripcin
Precio
1397
UN
01/07/2006
" ULTRATEMP
12058
2056
UN
01/07/2006
969.00
12080
1018
UN
01/07/2006
1,531.00
12007
1825
UN
01/07/2006
6,268.00
12060
685
UN
01/07/2006
455.00
12043
361
UN
01/07/2006
1,494.00
PAVCO
PAVCO
1,631.00
PAVCO
12052
343
UN
01/07/2006
3,856.00
PAVCO
12048
686
UN
01/07/2006
5,062.00
PAVCO
12081
345
UN
01/07/2006
766.00
PAVCO
12086
965
UN
01/07/2006
59,230.00
12010
2051
UN
01/07/2006
6,687.00
PAVCO
12190
1111
UN
01/07/2006
4,516.00
PAVCO
12194
2061
UN
01/07/2006
9,319.00
PAVCO
12197
1176
UN
01/07/2006
85,391.00
PAVCO
12556
848
ML
04/07/2006
3,519.00
RALCO
CPVC
857
ML
30/06/2005
5,899.00
PAVCO
12558
849
ML
04/07/2006
5,784.00
CPVC
858
ML
30/06/2005
9,696.00
2967
ML
FERRETERIA JER
04/07/2006
9,048.00
2966
ML
FERRETERIA JER
04/07/2006
14,500.00
3848
ML
FERRETERIA JER
04/07/2006
16,008.00
2969
ML
FERRETERIA JER
04/07/2006
8,526.00
2968
ML
FERRETERIA JER
27/05/2006
12,064.00
1594
ML
30/06/2005
1,845.00
1603
ML
30/06/2005
3,346.00
1604
ML
30/06/2005
5,175.00
1605
ML
30/06/2005
6,596.00
1716
ML
30/06/2005
10,148.00
1602
ML
30/06/2005
2,415.00
1725
ML
30/06/2005
6,013.00
1735
ML
30/06/2005
13,660.00
5,525.00
TUBO GALVANIZADO
"
861
ML
04/07/2006
TUBO GALVANIZADO
3/4"
862
ML
04/07/2006
7,388.00
1"
859
ML
04/07/2006
12,109.00
TUBO GALVANIZADO
1"
863
ML
04/07/2006
19,592.00
TUBO GALVANIZADO
2"
860
ML
04/07/2006
26,932.00
TUBO GALVANIZADO
TUBO GAS
3/4"
PAVCO
12537
907
ML
04/07/2006
2,108.00
TUBO GAS
1"
PAVCO
12526
908
ML
04/07/2006
3,306.00
12530
701
ML
04/07/2006
1,626.00
PAVCO
12560
853
ML
04/07/2006
1,917.00
PAVCO
12571
850
ML
04/07/2006
2,796.00
12574
854
ML
04/07/2006
6,570.00
12582
851
ML
04/07/2006
10,073.00
12567
852
ML
04/07/2006
1,521.00
870
ML
07/03/2006
2,007.00
1580
ML
30/06/2005
3,694.00
PAVCO
3/4"
PAVCO
PAVCO
PAVCO
Fecha
1581
ML
30/06/2005
6,651.00
1582
ML
30/06/2005
8,676.00
875
ML
30/06/2005
2,532.00
Descripcin
Precio
871
ML
07/03/2006
13,314.00
1583
ML
30/06/2005
20,810.00
1584
ML
30/06/2005
28,818.00
438
ML
07/03/2006
49,249.00
1585
ML
30/06/2005
7,604.00
872
ML
07/03/2006
9,427.00
843
ML
04/07/2006
10,955.00
873
ML
30/06/2005
14,078.00
844
ML
04/07/2006
15,267.00
874
ML
30/06/2005
19,625.00
845
ML
04/07/2006
32,327.00
41,562.00
RALCO
RALCO
PAVCO
RALCO
PAVCO
RALCO
PAVCO
RALCO
12719
12726
12733
1586
ML
30/06/2005
PAVCO
12745
846
ML
04/07/2006
6,237.00
PAVCO
0181004001
847
ML
04/07/2006
10,754.00
1590
ML
30/06/2005
4,189.00
1591
ML
30/06/2005
6,054.00
1592
ML
30/06/2005
7,009.00
1593
ML
30/06/2005
13,818.00
UNION CALIENTE
2058
UN
04/07/2006
783.00
12924
1054
UN
04/07/2006
530.00
UNION GAS
3/4"
PAVCO
12873
983
UN
04/07/2006
3,602.00
UNION GAS
1"
PAVCO
12869
1016
UN
04/07/2006
6,107.00
UNION GAS
"
12871
931
UN
04/07/2006
3,606.00
PAVCO
12926
1122
UN
04/07/2006
223.00
PAVCO
12952
458
UN
04/07/2006
350.00
PAVCO
12906
459
UN
04/07/2006
568.00
UNION PRESION
PAVCO
"
PAVCO
12916
517
UN
04/07/2006
1,039.00
PAVCO
12911
2035
UN
04/07/2006
1,416.00
PAVCO
12933
602
UN
04/07/2006
2,322.00
PAVCO
12945
2036
UN
04/07/2006
11,371.00
12958
67
UN
04/07/2006
24,700.00
PAVCO
PAVCO
13307
1630
UN
04/07/2006
2,053.00
PAVCO
13041
2063
UN
04/07/2006
4,101.00
PAVCO
13044
1633
UN
04/07/2006
17,970.00
12969
2059
UN
04/07/2006
5,045.00
PAVCO
UNIVERSAL GALVANIZADO
"
877
UN
07/03/2006
3,720.00
UNIVERSAL GALVANIZADO
3/4"
878
UN
07/03/2006
5,070.00
876
UN
07/03/2006
6,140.00
PAVCO
12971
407
UN
04/07/2006
1,906.00
PAVCO
12964
420
UN
04/07/2006
5,107.00
12977
419
UN
04/07/2006
3,379.00
13102
2050
UN
04/07/2006
5,273.00
880
UN
07/03/2006
15,179.00
Descripcin
Fecha
Precio
C6430 Gris
879
UN
07/03/2006
7,943.00
2"
13226
451
UN
04/07/2006
3,852.00
3"
13229
1179
UN
04/07/2006
7,911.00
4"
13233
2062
UN
04/07/2006
13,642.00
6"
13236
1182
UN
04/07/2006
65,132.00
Fecha
2350
UN
06/03/2006
2,248,080.00
2335
M2
06/03/2006
77,140.00
2258
M2
06/03/2006
59,160.00
2336
UN
06/03/2006
85,260.00
2337
UN
06/03/2006
49,880.00
2519
UN
06/03/2006
118,320.00
Descripcin
Precio
2616
UN
INOX INDUSTRIAL
06/03/2006
7,888,000.00
HIG-2C DL
2592
UN
INOX INDUSTRIAL
06/03/2006
6,165,400.00
TIPO 304
2590
UN
INOX INDUSTRIAL
06/03/2006
2,691,200.00
SALPICADERO
2603
UN
INOX INDUSTRIAL
06/03/2006
1,508,000.00
2593
UN
INOX INDUSTRIAL
06/03/2006
1,450,000.00
2605
UN
INOX INDUSTRIAL
06/03/2006
7,308,000.00
2344
UN
06/03/2006
331,760.00
2340
UN
06/03/2006
49,880.00
2338
UN
06/03/2006
99,760.00
2339
UN
06/03/2006
52,200.00
2343
UN
06/03/2006
17,980.00
2342
UN
06/03/2006
26,100.00
2341
UN
06/03/2006
34,800.00
REVELADOR AUTOMATICO
2649
GL
AJOVECO
06/03/2006
239,424.00
1697
UN
06/03/2006
136,068.00
757
UN
06/03/2006
6,712,340.00
2.50x.80x.90
MADERAS (15)
10/07/2006 Bogot
Descripcin
Referencia
Fecha
4.4300
4032
UN
CHALLENGER
20/06/2006
191,300.00
6.3400
4033
UN
CHALLENGER
20/06/2006
565,000.00
BIBLIOTECA MODULAR 6
6.2107
4030
UN
CHALLENGER
20/06/2006
332,400.00
2106
UN
01/03/2005
9,280.00
885
ML
09/06/2006
3,286.28
CHAZOS DE MADERA
3287
UN
MADESA LTDA.
09/06/2006
754.00
3900
UN
RODRIGO DUARTE
20/06/2006
580,000.00
3997
UN
RODRIGO DUARTE
20/06/2006
480,000.00
3698
UN
FERRICENTROS S.A.
29/06/2005
30,973.00
883
ML
01/07/2006
870.00
3746
UN
01/07/2006
1,740.00
2420
UN
01/07/2006
1,740.00
3699
UN
NACIONAL DE ELECTRICOS
01/07/2006
17,699.28
3278
ML
09/06/2006
3,986.92
830.56
CERCO ORDINARIO
3Mx8cmx8cm
Precio
891
ML
01/07/2006
2665
ML
01/07/2006
931.48
892
ML
09/06/2006
1,086.92
2666
ML
01/07/2006
1,256.28
6441052
4029
UN
CHALLENGER
20/06/2006
239,295.00
6441552
4027
UN
CHALLENGER
20/06/2006
456,750.00
6708352
4034
UN
CHALLENGER
20/06/2006
2,139,774.00
6702652
4035
UN
CHALLENGER
20/06/2006
193,906.00
6740052
4028
UN
CHALLENGER
20/06/2006
367,395.00
POSTFORMA
896
UN
MADESA LTDA.
09/06/2006
88,614.72
2102
895
UN
MADESA LTDA.
09/06/2006
51,157.16
2109-Posfor
897
UN
MADESA LTDA.
09/06/2006
51,157.16
898
UN
MADESA LTDA.
09/06/2006
68,438.84
512
UN
PIZANO S.A.
01/07/2006
57,835.00
2069
UN
PIZANO S.A.
01/07/2006
110,394.00
GUADUA
903
ML
09/06/2006
1,740.00
904
ML
01/03/2005
11,600.00
905
ML
01/03/2005
15,080.00
182
ML
01/07/2006
3,955.60
178
ML
01/07/2006
1,118.24
179
ML
01/07/2006
1,946.48
Lamina
59057
2322
UN
HOMECENTER
01/07/2006
17,500.00
97133
2320
UN
HOMECENTER
01/07/2006
30,150.00
97134
2321
UN
HOMECENTER
01/07/2006
49,900.00
982
UN
HOMECENTER
01/07/2006
1,750.00
MADERAS (15)
10/07/2006 Bogot
Descripcin
Referencia
PISO
921
M2
TABLA
923
ML
LISTON EN FLORMORADO
PISO
894
LISTON EN VIROLA/TECHO
Fecha
Precio
28/10/2005
23,200.00
09/06/2006
2,590.28
M2
01/03/2005
46,400.00
2107
M2
01/03/2005
9,860.00
PISO
924
M2
01/03/2005
46,400.00
TECHO
928
M2
01/03/2005
9,860.00
PISO
925
M2
01/03/2005
55,000.00
6 cm.
TECHO
ENCHAPE
926
M2
01/03/2005
7,540.00
2459
M2
01/03/2005
8,700.00
927
M2
01/03/2005
34,800.00
929
M2
28/10/2005
40,600.00
932
UN
01/07/2006
55,680.00
PARKET GRANADILLO
935
M2
ALCOPISOS
03/03/2006
60,000.00
934
M2
ALCOPISOS
07/03/2006
73,000.00
90
M2
ALCOPISOS
03/03/2006
60,000.00
936
M2
ALCOPISOS
01/07/2006
60,000.00
884
UN
01/07/2006
68,440.00
2675
UN
01/07/2006
87,000.00
2676
UN
01/07/2006
68,440.00
2101
UN
01/07/2006
34,220.00
906
UN
01/07/2006
38,280.00
2102
UN
25/05/2006
44,080.00
2104
UN
25/05/2006
33,060.00
2671
ML
25/05/2006
7,714.00
937
ML
09/06/2006
1,352.56
PLANCHON EUCALIPTUS 18 x 4 x
169
ML
25/05/2006
3,064.72
PLANCHON EUCALIPTUS 18 x 4 x
172
ML
25/05/2006
2,349.00
933
ML
09/06/2006
4,350.00
POSTE DE LUZ
893
ML
25/05/2006
10,034.00
2673
UN
25/05/2006
7,714.00
917
UN
PIZANO S.A.
01/07/2006
72,011.00
PILOTE DE MADERA
8M 14Diame
918
UN
PIZANO S.A.
01/07/2006
82,066.00
38070
3927
UN
HOMECENTER
26/06/2006
31,950.00
38073
3928
UN
HOMECENTER
26/06/2006
42,900.00
PZ-1
998
UN
HOMECENTER
26/06/2006
42,900.00
38075
3929
UN
HOMECENTER
26/06/2006
42,900.00
38076
997
UN
HOMECENTER
26/06/2006
47,900.00
914
UN
SERVITRIPLEX
07/03/2006
68,086.20
915
UN
SERVITRIPLEX
07/03/2006
72,169.40
916
UN
SERVITRIPLEX
07/03/2006
72,169.40
939
UN
SERVITRIPLEX
07/03/2006
68,085.04
3409
UN
SERVITRIPLEX
07/03/2006
85,820.28
3410
UN
SERVITRIPLEX
07/03/2006
104,500.92
3411
UN
SERVITRIPLEX
07/03/2006
104,500.92
32 mm.
3412
UN
SERVITRIPLEX
07/03/2006
85,820.28
63351
948
UN
HOMECENTER
26/06/2006
79,900.00
MADERAS (15)
10/07/2006 Bogot
Descripcin
Referencia
Fecha
Precio
63352 PZ-1
2011
UN
HOMECENTER
26/06/2006
79,900.00
En Cedro
4043
UN
RODRIGO DUARTE
20/06/2006
220,000.00
36 mm.
3396
UN
SERVITRIPLEX
07/03/2006
179,614.40
36 mm.
3400
UN
SERVITRIPLEX
07/03/2006
179,614.40
36 mm.
3397
UN
SERVITRIPLEX
07/03/2006
243,881.88
36 mm.
3401
UN
SERVITRIPLEX
07/03/2006
240,296.32
36 mm.
3398
UN
SERVITRIPLEX
07/03/2006
243,881.88
36 mm.
3402
UN
SERVITRIPLEX
07/03/2006
240,296.32
25 mm.
3399
UN
SERVITRIPLEX
07/03/2006
138,620.00
25 mm.
3403
UN
SERVITRIPLEX
07/03/2006
95,324.16
En Cedro
4042
UN
RODRIGO DUARTE
20/06/2006
450,000.00
909
UN
SERVITRIPLEX
07/03/2006
323,829.00
910
UN
SERVITRIPLEX
07/03/2006
323,829.00
938
UN
SERVITRIPLEX
07/03/2006
205,256.00
h=1.80-2.10M
38 mm.
3406
UN
SERVITRIPLEX
07/03/2006
50,212.92
38 mm.
3405
UN
SERVITRIPLEX
07/03/2006
58,908.28
38 mm.
3404
UN
SERVITRIPLEX
07/03/2006
58,908.28
3407
UN
SERVITRIPLEX
07/03/2006
36,683.84
919
UN
PIZANO S.A.
01/07/2006
82,066.00
3413
UN
PIZANO S.A.
24/06/2006
48,953.00
911
UN
PIZANO S.A.
01/07/2006
59,160.00
912
UN
PIZANO S.A.
01/07/2006
65,364.00
913
UN
PIZANO S.A.
01/07/2006
65,364.00
REPISA 8x.4x.3
940
ML
09/06/2006
615.96
REPISA 8x.4x.5
2667
ML
09/06/2006
1,595.00
170
ML
25/05/2006
1,699.40
173
ML
25/05/2006
2,900.00
941
ML
09/06/2006
2,744.56
942
ML
09/06/2006
3,286.28
943
ML
09/06/2006
2,474.28
945
UN
PIZANO S.A.
01/07/2006
67,734.00
Lamina
2944
UN
PIZANO S.A.
01/07/2006
17,490.00
946
UN
PIZANO S.A.
01/07/2006
51,119.00
68955
984
UN
HOMECENTER
01/07/2006
4,300.00
Lamina
3920
UN
PIZANO S.A.
04/07/2006
39,994.00
Lamina
962
UN
PIZANO S.A.
07/03/2006
27,740.00
Lamina
960
UN
PIZANO S.A.
04/07/2006
35,840.00
952
UN
CORTES PERFECTOS
09/06/2006
35,000.00
TIPO A
954
UN
CORTES PERFECTOS
09/06/2006
20,000.00
Especial
956
UN
CORTES PERFECTOS
09/06/2006
65,000.00
Lamina
955
UN
PIZANO S.A.
04/07/2006
30,358.00
2672
ML
25/05/2006
1,267.88
VARA DE CORREDOR 6 M.
963
ML
09/06/2006
1,062.56
VARA DE LIMATON 4 M.
175
ML
25/05/2006
2,929.00
VARA DE LIMATON 6 M.
174
ML
09/06/2006
2,030.00
VARA DE LIMATON 6 M.
920
ML
25/05/2006
3,063.56
VARA DE CLAVO
6 METROS.
MADERAS (15)
10/07/2006 Bogot
Descripcin
Referencia
Fecha
Precio
964
UN
09/06/2006
81,200.00
2668
UN
04/07/2006
127,600.00
Fecha
1316
M2
NINGUNO EN PARTICULAR
07/03/2006
5,250.00
MdeO CLOSET
3998
UN
NINGUNO EN PARTICULAR
06/03/2005
220,500.00
1505
M2
NINGUNO EN PARTICULAR
07/03/2006
66,150.00
1328
UN
NINGUNO EN PARTICULAR
06/03/2005
9,765.00
333
UN
NINGUNO EN PARTICULAR
07/03/2006
7,140.00
16
UN
NINGUNO EN PARTICULAR
07/03/2006
3,675.00
1322
UN
NINGUNO EN PARTICULAR
07/03/2006
4,200.00
1506
UN
NINGUNO EN PARTICULAR
06/03/2005
23,835.00
1507
M2
NINGUNO EN PARTICULAR
07/03/2006
7,500.00
4024
M2
NINGUNO EN PARTICULAR
06/03/2005
7,350.00
1210
UN
NINGUNO EN PARTICULAR
06/03/2005
11,550.00
1508
UN
NINGUNO EN PARTICULAR
07/03/2006
4,000.00
191
M2
OBRALUM
30/06/2006
9,450.00
1509
UN
NINGUNO EN PARTICULAR
06/03/2005
105,000.00
1510
UN
NINGUNO EN PARTICULAR
06/03/2005
64,000.00
1511
ML
NINGUNO EN PARTICULAR
06/03/2005
10,500.00
1512
UN
NINGUNO EN PARTICULAR
06/03/2005
12,600.00
1513
UN
NINGUNO EN PARTICULAR
06/03/2005
14,700.00
1514
M2
NINGUNO EN PARTICULAR
06/03/2005
18,795.00
Descripcin
Precio
Fecha
1399
ML
NINGUNO EN PARTICULAR
06/03/2005
MdeO ACRILICO
2883
M2
NINGUNO EN PARTICULAR
07/03/2006
2,000.00
MdeO AISLAPOR
2882
M2
NINGUNO EN PARTICULAR
06/03/2005
10,815.00
2945
M2
NINGUNO EN PARTICULAR
06/03/2005
5,250.00
1400
ML
NINGUNO EN PARTICULAR
06/03/2005
7,455.00
2884
M2
NINGUNO EN PARTICULAR
07/03/2006
10,000.00
3212
ML
NINGUNO EN PARTICULAR
06/03/2005
3,675.00
2886
M2
NINGUNO EN PARTICULAR
06/03/2005
10,605.00
2568
M2
NINGUNO EN PARTICULAR
07/03/2006
3,990.00
2569
M2
NINGUNO EN PARTICULAR
06/03/2005
3,675.00
1398
ML
NINGUNO EN PARTICULAR
06/03/2005
4,095.00
2460
M2
NINGUNO EN PARTICULAR
07/03/2006
18,564.00
1401
M2
NINGUNO EN PARTICULAR
07/03/2006
6,280.00
1402
M2
NINGUNO EN PARTICULAR
07/03/2006
7,350.00
MdeO MEDALLON
3222
UN
NINGUNO EN PARTICULAR
06/03/2005
7,350.00
MdeO PANAL
2900
M2
NINGUNO EN PARTICULAR
06/03/2005
9,400.00
MdeO PIRAMIDE
2901
M2
NINGUNO EN PARTICULAR
06/03/2005
6,000.00
MdeO SUPERACUSTICO
2571
M2
NINGUNO EN PARTICULAR
06/03/2005
3,675.00
MdeO SUPERCEL
2902
M2
NINGUNO EN PARTICULAR
06/03/2005
3,675.00
MdeO TABLEX
1403
M2
NINGUNO EN PARTICULAR
06/03/2005
5,250.00
Descripcin
MdeO CORNISA
C-2
MdeO DEKORFLEX
MdeO DURACUSTIC 5/8"
FGLAS
Precio
3,150.00
Fecha
Precio
MdeO BASES
1268
M3
NINGUNO EN PARTICULAR
07/03/2006
12,000.00
MdeO CASETON
1269
M2
NINGUNO EN PARTICULAR
06/03/2005
1,650.00
MdeO CICLOPEO
335
M3
NINGUNO EN PARTICULAR
07/03/2006
60,000.00
MdeO COLUMNAS
1270
M3
NINGUNO EN PARTICULAR
07/03/2006
115,000.00
48
M3
NINGUNO EN PARTICULAR
03/03/2006
60,000.00
1272
M3
NINGUNO EN PARTICULAR
07/03/2006
140,000.00
1271
M3
NINGUNO EN PARTICULAR
07/03/2006
105,000.00
2166
TN
NINGUNO EN PARTICULAR
06/03/2005
194,000.00
2167
TN
NINGUNO EN PARTICULAR
06/03/2005
194,000.00
3279
M2
NINGUNO EN PARTICULAR
07/03/2006
13,950.00
2186
M2
NINGUNO EN PARTICULAR
06/03/2005
9,800.00
3290
M2
NINGUNO EN PARTICULAR
07/03/2006
22,000.00
1273
M2
NINGUNO EN PARTICULAR
06/03/2005
16,338.00
1274
M2
NINGUNO EN PARTICULAR
06/03/2005
12,350.00
1275
M2
NINGUNO EN PARTICULAR
06/03/2005
9,800.00
1277
M2
NINGUNO EN PARTICULAR
06/03/2005
9,450.00
1276
M2
NINGUNO EN PARTICULAR
07/03/2006
11,850.00
1278
M2
NINGUNO EN PARTICULAR
07/03/2006
24,275.00
1279
M2
NINGUNO EN PARTICULAR
06/03/2005
16,500.00
4026
UN
NINGUNO EN PARTICULAR
07/03/2006
9,000.00
1280
UN
NINGUNO EN PARTICULAR
06/03/2005
12,600.00
MdeO ESCALERAS
1281
M3
NINGUNO EN PARTICULAR
07/03/2006
170,000.00
3972
UN
NINGUNO EN PARTICULAR
06/03/2005
9,250.00
3974
UN
NINGUNO EN PARTICULAR
06/03/2005
6,300.00
1283
M3
NINGUNO EN PARTICULAR
06/03/2005
2,625.00
1285
M2
NINGUNO EN PARTICULAR
06/03/2005
12,705.00
1286
M2
NINGUNO EN PARTICULAR
07/03/2006
12,400.00
2163
M2
NINGUNO EN PARTICULAR
07/03/2006
13,300.00
1287
M2
NINGUNO EN PARTICULAR
07/03/2006
13,750.00
2168
M2
NINGUNO EN PARTICULAR
07/03/2006
16,100.00
3185
M3
NINGUNO EN PARTICULAR
06/03/2005
139,335.00
1288
M3
NINGUNO EN PARTICULAR
07/03/2006
138,000.00
1289
M2
NINGUNO EN PARTICULAR
07/03/2006
3,650.00
3988
UN
NINGUNO EN PARTICULAR
06/03/2005
8,500.00
1292
M2
NINGUNO EN PARTICULAR
07/03/2006
22,000.00
2165
M2
NINGUNO EN PARTICULAR
04/03/2004
22,600.00
1290
M2
NINGUNO EN PARTICULAR
04/03/2004
21,120.00
2164
M2
NINGUNO EN PARTICULAR
06/03/2005
24,885.00
1291
M2
NINGUNO EN PARTICULAR
06/03/2005
16,800.00
1293
M2
NINGUNO EN PARTICULAR
06/03/2005
23,100.00
3271
M2
NINGUNO EN PARTICULAR
07/03/2006
14,000.00
MdeO SOBRECIMIENTO
1295
M3
NINGUNO EN PARTICULAR
06/03/2005
84,000.00
3277
M2
NINGUNO EN PARTICULAR
07/03/2006
12,600.00
1296
M3
NINGUNO EN PARTICULAR
06/03/2005
182,280.00
1297
M3
NINGUNO EN PARTICULAR
06/03/2005
131,250.00
104
M2
NINGUNO EN PARTICULAR
07/03/2006
2,920.00
Descripcin
Fecha
Precio
1298
M3
NINGUNO EN PARTICULAR
06/03/2005
13,000.00
1299
M3
NINGUNO EN PARTICULAR
07/03/2006
75,000.00
1300
M3
NINGUNO EN PARTICULAR
04/03/2004
5,500.00
1301
M3
NINGUNO EN PARTICULAR
07/03/2006
155,000.00
1302
M3
NINGUNO EN PARTICULAR
06/03/2005
74,550.00
3270
M3
NINGUNO EN PARTICULAR
06/03/2005
135,000.00
1303
M3
NINGUNO EN PARTICULAR
07/03/2006
165,000.00
1304
M3
NINGUNO EN PARTICULAR
07/03/2006
100,000.00
MdeO ZAPATAS
1282
M3
NINGUNO EN PARTICULAR
07/03/2006
80,000.00
SUBCONTRATO SOLDADURA
3971
NINGUNO EN PARTICULAR
04/03/2004
0.00
Descripcin
Fecha
1372
M2
NINGUNO EN PARTICULAR
07/03/2006
4,400.00
2353
M2
NINGUNO EN PARTICULAR
07/03/2006
12,000.00
1373
M2
NINGUNO EN PARTICULAR
07/03/2006
12,000.00
1374
ML
NINGUNO EN PARTICULAR
07/03/2006
6,500.00
1375
ML
NINGUNO EN PARTICULAR
07/03/2006
3,500.00
1376
M2
NINGUNO EN PARTICULAR
06/03/2005
6,825.00
1377
M2
NINGUNO EN PARTICULAR
07/03/2006
9,000.00
1378
M2
NINGUNO EN PARTICULAR
07/03/2006
9,000.00
1379
M2
NINGUNO EN PARTICULAR
06/03/2005
8,190.00
1380
M2
NINGUNO EN PARTICULAR
06/03/2005
8,190.00
1381
M2
NINGUNO EN PARTICULAR
07/03/2006
6,500.00
2881
UN
NINGUNO EN PARTICULAR
06/03/2005
16,275.00
1382
UN
NINGUNO EN PARTICULAR
06/03/2005
10,500.00
2457
M2
NINGUNO EN PARTICULAR
06/03/2005
4,515.00
1384
M2
NINGUNO EN PARTICULAR
06/03/2005
17,325.00
1385
M2
NINGUNO EN PARTICULAR
07/03/2006
16,000.00
1386
M2
NINGUNO EN PARTICULAR
07/03/2006
12,000.00
1383
M2
NINGUNO EN PARTICULAR
07/03/2006
16,450.00
1387
M2
NINGUNO EN PARTICULAR
06/03/2005
9,950.00
2772
ML
NINGUNO EN PARTICULAR
06/03/2005
5,250.00
1388
M2
NINGUNO EN PARTICULAR
06/03/2005
9,975.00
1389
M2
NINGUNO EN PARTICULAR
06/03/2005
8,925.00
1390
M2
NINGUNO EN PARTICULAR
07/03/2006
8,200.00
1391
M2
NINGUNO EN PARTICULAR
06/03/2005
2,100.00
1392
M2
NINGUNO EN PARTICULAR
06/03/2005
6,825.00
1393
M2
NINGUNO EN PARTICULAR
06/03/2005
3,675.00
3276
M2
NINGUNO EN PARTICULAR
06/03/2005
4,200.00
1394
M2
NINGUNO EN PARTICULAR
06/03/2005
5,775.00
1395
M2
NINGUNO EN PARTICULAR
06/03/2005
7,875.00
1396
M2
NINGUNO EN PARTICULAR
07/03/2006
6,500.00
MdeO TRAGANTES
2458
UN
NINGUNO EN PARTICULAR
06/03/2005
3,990.00
Descripcin
Precio
Fecha
MdeO BISELADO
1448
ML
NINGUNO EN PARTICULAR
06/03/2005
3,465.00
MdeO BOCELES
1449
ML
NINGUNO EN PARTICULAR
03/03/2006
3,150.00
MdeO ENCHAPE
1451
M2
NINGUNO EN PARTICULAR
07/03/2006
9,000.00
1452
M2
NINGUNO EN PARTICULAR
07/03/2006
4,900.00
1453
M2
NINGUNO EN PARTICULAR
07/03/2006
9,250.00
1454
M2
NINGUNO EN PARTICULAR
07/03/2006
13,000.00
1455
UN
NINGUNO EN PARTICULAR
07/03/2006
139,650.00
MdeO GABINETE
1456
UN
NINGUNO EN PARTICULAR
06/03/2005
10,500.00
MdeO INCRUSTACIONES
1457
JG
NINGUNO EN PARTICULAR
07/03/2006
25,000.00
1670
ML
NINGUNO EN PARTICULAR
06/03/2005
8,925.00
MdeO LISTELLO
1462
M2
NINGUNO EN PARTICULAR
06/03/2005
13,125.00
MdeO MARMOL
1458
M2
NINGUNO EN PARTICULAR
06/03/2005
13,650.00
1459
ML
NINGUNO EN PARTICULAR
07/03/2006
22,000.00
MdeO REJILLA
1460
UN
NINGUNO EN PARTICULAR
06/03/2005
1,785.00
1461
UN
NINGUNO EN PARTICULAR
06/03/2005
1,785.00
1463
UN
NINGUNO EN PARTICULAR
06/03/2005
3,150.00
1464
UN
NINGUNO EN PARTICULAR
06/03/2005
6,090.00
1465
ML
NINGUNO EN PARTICULAR
07/03/2006
2,800.00
1466
UN
NINGUNO EN PARTICULAR
06/03/2005
9,450.00
Descripcin
Precio
Fecha
1518
UN
NINGUNO EN PARTICULAR
06/03/2005
315,000.00
1517
UN
NINGUNO EN PARTICULAR
06/03/2005
756,000.00
Descripcin
Precio
Fecha
3829
UN
NINGUNO EN PARTICULAR
06/03/2005
6,090.00
3755
UN
NINGUNO EN PARTICULAR
03/03/2006
22,050.00
3757
UN
NINGUNO EN PARTICULAR
06/03/2005
32,550.00
3842
UN
NINGUNO EN PARTICULAR
06/03/2005
26,355.00
3839
UN
NINGUNO EN PARTICULAR
06/03/2005
12,915.00
3835
UN
NINGUNO EN PARTICULAR
06/03/2005
2,100.00
3833
UN
NINGUNO EN PARTICULAR
07/03/2006
790.00
3845
UN
NINGUNO EN PARTICULAR
07/03/2006
1,425.00
3843
UN
NINGUNO EN PARTICULAR
07/03/2006
750.00
3816
UN
GP INSTALACIONES / GRUPO
30/06/2006
20,000.00
3814
UN
GP INSTALACIONES / GRUPO
30/06/2006
20,000.00
3813
UN
GP INSTALACIONES / GRUPO
30/06/2006
60,000.00
3815
UN
GP INSTALACIONES / GRUPO
30/06/2006
25,000.00
3818
UN
GP INSTALACIONES / GRUPO
30/06/2006
35,000.00
3763
UN
NINGUNO EN PARTICULAR
07/03/2006
12,675.00
3841
UN
NINGUNO EN PARTICULAR
06/03/2005
9,450.00
3764
UN
NINGUNO EN PARTICULAR
07/03/2006
10,200.00
3819
UN
GP INSTALACIONES / GRUPO
30/06/2006
25,000.00
3847
UN
NINGUNO EN PARTICULAR
06/03/2005
3,000.00
3850
UN
NINGUNO EN PARTICULAR
07/03/2006
3,600.00
3867
UN
NINGUNO EN PARTICULAR
06/03/2005
1,785.00
Descripcin
Precio
Fecha
1488
UN
NINGUNO EN PARTICULAR
06/03/2005
7,875.00
1489
ML
NINGUNO EN PARTICULAR
06/03/2005
23,100.00
1490
ML
NINGUNO EN PARTICULAR
06/03/2005
9,975.00
3724
UN
NINGUNO EN PARTICULAR
07/03/2006
6,000.00
MdeO BALA
3522
UN
NINGUNO EN PARTICULAR
06/03/2005
9,345.00
2467
ML
NINGUNO EN PARTICULAR
06/03/2005
7,560.00
MdeO CABLEADO
1491
ML
NINGUNO EN PARTICULAR
06/03/2005
1,050.00
1706
UN
NINGUNO EN PARTICULAR
06/03/2005
57,750.00
1667
UN
NINGUNO EN PARTICULAR
07/03/2006
75,000.00
1707
UN
NINGUNO EN PARTICULAR
07/03/2006
75,000.00
3749
UN
NINGUNO EN PARTICULAR
06/03/2005
66,990.00
MdeO DERIVACION 90
3716
UN
NINGUNO EN PARTICULAR
06/03/2005
5,150.00
1492
UN
NINGUNO EN PARTICULAR
06/03/2005
21,945.00
3492
UN
NINGUNO EN PARTICULAR
07/03/2006
21,600.00
3491
UN
NINGUNO EN PARTICULAR
07/03/2006
21,150.00
3720
UN
NINGUNO EN PARTICULAR
06/03/2005
2,600.00
3714
UN
NINGUNO EN PARTICULAR
06/03/2005
7,665.00
3721
UN
NINGUNO EN PARTICULAR
07/03/2006
2,850.00
3715
UN
NINGUNO EN PARTICULAR
06/03/2005
21,000.00
MdeO LAMPARA
3685
UN
NINGUNO EN PARTICULAR
07/03/2006
7,000.00
MdeO LUMINARIA
3611
UN
NINGUNO EN PARTICULAR
06/03/2005
17,850.00
3525
UN
NINGUNO EN PARTICULAR
06/03/2005
9,450.00
3226
ML
NINGUNO EN PARTICULAR
07/03/2006
1,705,000.00
MdeO PARARRAYOS
3691
UN
NINGUNO EN PARTICULAR
06/03/2005
12,500.00
1493
UN
NINGUNO EN PARTICULAR
06/03/2005
71,400.00
MdeO REFLECTOR
3690
UN
NINGUNO EN PARTICULAR
07/03/2006
1,100.00
3719
UN
NINGUNO EN PARTICULAR
07/03/2006
4,300.00
3717
UN
NINGUNO EN PARTICULAR
07/03/2006
23,000.00
3727
UN
NINGUNO EN PARTICULAR
06/03/2005
15,100.00
1494
UN
NINGUNO EN PARTICULAR
06/03/2005
16,750.00
1495
UN
NINGUNO EN PARTICULAR
07/03/2006
19,700.00
3519
UN
NINGUNO EN PARTICULAR
06/03/2005
14,175.00
3555
UN
NINGUNO EN PARTICULAR
06/03/2005
15,645.00
1496
UN
NINGUNO EN PARTICULAR
06/03/2005
14,175.00
3564
UN
NINGUNO EN PARTICULAR
06/03/2005
15,645.00
1497
UN
NINGUNO EN PARTICULAR
06/03/2005
14,175.00
MdeO SALIDA TV
3330
UN
NINGUNO EN PARTICULAR
06/03/2005
14,175.00
3610
UN
NINGUNO EN PARTICULAR
06/03/2005
15,645.00
2680
UN
NINGUNO EN PARTICULAR
06/03/2005
119,448.00
1502
UN
NINGUNO EN PARTICULAR
06/03/2005
18,500.00
1500
UN
NINGUNO EN PARTICULAR
06/03/2005
18,500.00
1501
UN
NINGUNO EN PARTICULAR
06/03/2005
36,000.00
1499
UN
NINGUNO EN PARTICULAR
06/03/2005
618,000.00
3224
ML
NINGUNO EN PARTICULAR
06/03/2005
1,470.00
3225
ML
NINGUNO EN PARTICULAR
07/03/2006
2,300.00
1503
UN
NINGUNO EN PARTICULAR
06/03/2005
15,750.00
Descripcin
Precio
Fecha
MdeO TRANSFORMADOR
2798
UN
NINGUNO EN PARTICULAR
06/03/2005
3722
UN
NINGUNO EN PARTICULAR
07/03/2006
1,000.00
3713
UN
NINGUNO EN PARTICULAR
06/03/2005
36,540.00
3731
UN
NINGUNO EN PARTICULAR
07/03/2006
8,500.00
1504
UN
NINGUNO EN PARTICULAR
06/03/2005
22,365.00
Descripcin
Referencia
Precio
295,000.00
Fecha
Precio
MdeO ACOMETIDA
1467
UN
NINGUNO EN PARTICULAR
01/07/2006
27,170.00
1468
ML
NINGUNO EN PARTICULAR
07/03/2006
4,800.00
MdeO BIDET
2949
UN
NINGUNO EN PARTICULAR
06/03/2005
24,150.00
1469
UN
NINGUNO EN PARTICULAR
07/03/2006
182,070.00
2950
UN
NINGUNO EN PARTICULAR
06/03/2005
42,000.00
2951
UN
NINGUNO EN PARTICULAR
07/03/2006
50,000.00
2952
UN
NINGUNO EN PARTICULAR
06/03/2005
22,785.00
1471
UN
NINGUNO EN PARTICULAR
06/03/2005
404,000.00
2953
UN
NINGUNO EN PARTICULAR
06/03/2005
24,550.00
1470
ML
NINGUNO EN PARTICULAR
06/03/2005
8,350.00
1472
UN
NINGUNO EN PARTICULAR
07/03/2006
25,000.00
2954
UN
NINGUNO EN PARTICULAR
07/03/2006
22,500.00
1473
UN
NINGUNO EN PARTICULAR
07/03/2006
25,000.00
MdeO LLAVE
2955
UN
NINGUNO EN PARTICULAR
06/03/2005
17,850.00
Descripcin
(INSTALACION)
P/P
1575
UN
NINGUNO EN PARTICULAR
07/03/2006
16,500.00
P/P
1576
UN
NINGUNO EN PARTICULAR
07/03/2006
18,000.00
P/P
1574
UN
NINGUNO EN PARTICULAR
07/03/2006
19,000.00
P/P
1573
UN
NINGUNO EN PARTICULAR
07/03/2006
19,000.00
MdeO ORINAL
2956
UN
NINGUNO EN PARTICULAR
07/03/2006
19,000.00
1474
UN
NINGUNO EN PARTICULAR
07/03/2006
16,000.00
1475
UN
NINGUNO EN PARTICULAR
07/03/2006
22,000.00
1185
UN
NINGUNO EN PARTICULAR
04/03/2004
14,000.00
1140
UN
NINGUNO EN PARTICULAR
04/03/2004
14,000.00
1090
UN
NINGUNO EN PARTICULAR
04/03/2004
14,000.00
953
UN
NINGUNO EN PARTICULAR
04/03/2004
10,170.00
1476
UN
NINGUNO EN PARTICULAR
06/03/2005
11,550.00
1477
UN
NINGUNO EN PARTICULAR
07/03/2006
28,000.00
1478
ML
NINGUNO EN PARTICULAR
07/03/2006
2,436.00
1479
ML
NINGUNO EN PARTICULAR
07/03/2006
6,006.00
1480
ML
NINGUNO EN PARTICULAR
07/03/2006
19,089.00
MdeO REGISTRO
1481
UN
NINGUNO EN PARTICULAR
07/03/2006
12,000.00
3280
UN
NINGUNO EN PARTICULAR
06/03/2005
35,889.00
1482
UN
NINGUNO EN PARTICULAR
07/03/2006
20,000.00
1483
UN
NINGUNO EN PARTICULAR
06/03/2005
103,000.00
1484
UN
NINGUNO EN PARTICULAR
06/03/2005
178,000.00
1485
UN
NINGUNO EN PARTICULAR
06/03/2005
19,950.00
2115
UN
NINGUNO EN PARTICULAR
06/03/2005
98,000.00
MdeO TRAGANTE
1486
UN
NINGUNO EN PARTICULAR
06/03/2005
4,389.00
1487
UN
NINGUNO EN PARTICULAR
07/03/2006
3,050.00
Fecha
Precio
MdeO ALFAGIAS
1306
ML
NINGUNO EN PARTICULAR
07/03/2006
15,250.00
MdeO ARCOS
1307
ML
NINGUNO EN PARTICULAR
06/03/2005
34,125.00
1308
ML
NINGUNO EN PARTICULAR
07/03/2006
12,000.00
1323
M2
NINGUNO EN PARTICULAR
07/03/2006
8,750.00
1311
M2
NINGUNO EN PARTICULAR
07/03/2006
6,250.00
2933
M2
NINGUNO EN PARTICULAR
06/03/2005
4,095.00
2932
M2
NINGUNO EN PARTICULAR
07/03/2006
7,500.00
1312
M2
NINGUNO EN PARTICULAR
07/03/2006
7,000.00
1313
M2
NINGUNO EN PARTICULAR
06/03/2005
3,885.00
1314
UN
NINGUNO EN PARTICULAR
06/03/2005
3,675.00
1310
M2
NINGUNO EN PARTICULAR
07/03/2006
6,000.00
MdeO BOVEDAS
1315
M2
NINGUNO EN PARTICULAR
06/03/2005
23,100.00
3288
UN
NINGUNO EN PARTICULAR
06/03/2005
1,050.00
MdeO CHIMENEAS
1318
UN
NINGUNO EN PARTICULAR
06/03/2005
178,500.00
1327
ML
NINGUNO EN PARTICULAR
06/03/2005
5,000.00
1329
ML
NINGUNO EN PARTICULAR
06/03/2005
8,400.00
MdeO DINTEL
1331
ML
NINGUNO EN PARTICULAR
07/03/2006
15,000.00
1330
ML
NINGUNO EN PARTICULAR
06/03/2005
5,565.00
1333
ML
NINGUNO EN PARTICULAR
07/03/2006
3,900.00
1334
M2
NINGUNO EN PARTICULAR
07/03/2006
8,750.00
1335
ML
NINGUNO EN PARTICULAR
06/03/2005
6,300.00
3322
M2
NINGUNO EN PARTICULAR
06/03/2005
12,600.00
1284
M2
NINGUNO EN PARTICULAR
07/03/2006
8,750.00
1337
UN
NINGUNO EN PARTICULAR
06/03/2005
14,070.00
2904
M2
NINGUNO EN PARTICULAR
07/03/2006
3,150.00
6,000.00
Descripcin
1CV
P/P
58
M2
NINGUNO EN PARTICULAR
06/03/2005
P/P
1350
M2
NINGUNO EN PARTICULAR
06/03/2005
4,580.00
1CV
1352
M2
NINGUNO EN PARTICULAR
07/03/2006
10,650.00
1CV
17
M2
NINGUNO EN PARTICULAR
07/03/2006
12,400.00
P/P
2899
M2
NINGUNO EN PARTICULAR
06/03/2005
5,040.00
P/P
1343
M2
NINGUNO EN PARTICULAR
07/03/2006
9,850.00
P/P
1346
M2
NINGUNO EN PARTICULAR
06/03/2005
6,550.00
1CV
36
M2
NINGUNO EN PARTICULAR
07/03/2006
8,200.00
1CV
1326
M2
NINGUNO EN PARTICULAR
07/03/2006
6,900.00
1CV
2928
M2
NINGUNO EN PARTICULAR
07/03/2006
6,900.00
P/P
1342
M2
NINGUNO EN PARTICULAR
06/03/2005
4,095.00
1351
M2
NINGUNO EN PARTICULAR
07/03/2006
5,375.00
1339
ML
NINGUNO EN PARTICULAR
07/03/2006
5,500.00
1344
ML
NINGUNO EN PARTICULAR
06/03/2005
3,800.00
1345
M2
NINGUNO EN PARTICULAR
06/03/2005
1,365.00
1336
UN
NINGUNO EN PARTICULAR
06/03/2005
28,350.00
1348
ML
NINGUNO EN PARTICULAR
07/03/2006
5,500.00
1349
ML
NINGUNO EN PARTICULAR
07/03/2006
5,500.00
Fecha
Precio
MdeO CONCRETO
1406
M3
NINGUNO EN PARTICULAR
07/03/2006
10,000.00
MdeO MORTERO
1407
M3
NINGUNO EN PARTICULAR
07/03/2006
10,500.00
1408
LT
NINGUNO EN PARTICULAR
07/03/2006
12.00
1409
TN
NINGUNO EN PARTICULAR
07/03/2006
240,000.00
1410
TN
NINGUNO EN PARTICULAR
07/03/2006
240,000.00
1411
TN
NINGUNO EN PARTICULAR
07/03/2006
240,000.00
1412
TN
NINGUNO EN PARTICULAR
07/03/2006
240,000.00
1413
TN
NINGUNO EN PARTICULAR
07/03/2006
240,000.00
1414
TN
NINGUNO EN PARTICULAR
07/03/2006
240,000.00
1415
TN
NINGUNO EN PARTICULAR
07/03/2006
240,000.00
1416
TN
NINGUNO EN PARTICULAR
07/03/2006
240,000.00
3292
KG
NINGUNO EN PARTICULAR
07/03/2006
190.00
1417
M2
NINGUNO EN PARTICULAR
06/03/2005
3,990.00
1418
M2
NINGUNO EN PARTICULAR
06/03/2005
3,990.00
Descripcin
Fecha
ASEO GENERAL
1639
M2
NINGUNO EN PARTICULAR
07/03/2006
3,135.00
1519
M2
NINGUNO EN PARTICULAR
07/03/2006
7,500.00
1520
M2
NINGUNO EN PARTICULAR
07/03/2006
7,500.00
MdeO ANDEN
1521
M2
NINGUNO EN PARTICULAR
07/03/2006
6,750.00
3303
M2
NINGUNO EN PARTICULAR
03/03/2006
4,515.00
3299
ML
NINGUNO EN PARTICULAR
07/03/2006
6,500.00
MdeO CAUELA
3229
ML
NINGUNO EN PARTICULAR
07/03/2006
15,000.00
3297
M3
NINGUNO EN PARTICULAR
07/03/2006
42,000.00
1522
M2
NINGUNO EN PARTICULAR
07/03/2006
7,500.00
3228
M2
NINGUNO EN PARTICULAR
07/03/2006
8,750.00
1523
M2
NINGUNO EN PARTICULAR
06/03/2005
9,200.00
3296
M3
NINGUNO EN PARTICULAR
07/03/2006
14,000.00
3230
ML
NINGUNO EN PARTICULAR
06/03/2005
7,350.00
3223
UN
NINGUNO EN PARTICULAR
06/03/2005
45,150.00
3221
UN
NINGUNO EN PARTICULAR
07/03/2006
61,500.00
3995
M2
NINGUNO EN PARTICULAR
07/03/2006
5,586.00
3231
ML
NINGUNO EN PARTICULAR
06/03/2005
8,600.00
3978
ML
NINGUNO EN PARTICULAR
07/03/2006
10,000.00
3979
ML
NINGUNO EN PARTICULAR
04/03/2004
11,000.00
3295
ML
NINGUNO EN PARTICULAR
07/03/2006
6,500.00
3316
ML
NINGUNO EN PARTICULAR
06/03/2005
115.00
3990
M2
NINGUNO EN PARTICULAR
07/03/2006
2,300.00
1524
M2
NINGUNO EN PARTICULAR
07/03/2006
2,300.00
3300
ML
NINGUNO EN PARTICULAR
06/03/2005
5,250.00
3992
M2
NINGUNO EN PARTICULAR
06/03/2005
1,995.00
3319
M2
NINGUNO EN PARTICULAR
04/03/2004
8,930.00
3294
ML
NINGUNO EN PARTICULAR
06/03/2005
6,510.00
3310
M3
NINGUNO EN PARTICULAR
07/03/2006
8,000.00
MdeO SARDINEL
1525
ML
NINGUNO EN PARTICULAR
07/03/2006
5,500.00
129
ML
NINGUNO EN PARTICULAR
06/03/2005
4,725.00
3323
ML
NINGUNO EN PARTICULAR
04/03/2004
5,800.00
3298
M3
NINGUNO EN PARTICULAR
07/03/2006
75,000.00
Descripcin
MdeO SEPARADOR
Precio
Fecha
1354
M2
NINGUNO EN PARTICULAR
07/03/2006
8,000.00
1355
ML
NINGUNO EN PARTICULAR
07/03/2006
2,250.00
MdeO GOTERAS
1356
ML
NINGUNO EN PARTICULAR
07/03/2006
2,500.00
1357
M2
NINGUNO EN PARTICULAR
06/03/2005
4,450.00
1358
M2
NINGUNO EN PARTICULAR
06/03/2005
1,575.00
1359
M2
NINGUNO EN PARTICULAR
06/03/2005
3,990.00
1360
M2
NINGUNO EN PARTICULAR
06/03/2005
3,675.00
1361
M2
NINGUNO EN PARTICULAR
07/03/2006
5,750.00
1362
M2
NINGUNO EN PARTICULAR
07/03/2006
5,750.00
1363
M2
NINGUNO EN PARTICULAR
07/03/2006
5,100.00
1364
ML
NINGUNO EN PARTICULAR
07/03/2006
4,000.00
1365
M2
NINGUNO EN PARTICULAR
07/03/2006
4,200.00
1366
M2
NINGUNO EN PARTICULAR
07/03/2006
4,850.00
1338
M2
NINGUNO EN PARTICULAR
07/03/2006
5,100.00
1368
M2
NINGUNO EN PARTICULAR
07/03/2006
4,650.00
1369
M2
NINGUNO EN PARTICULAR
07/03/2006
3,000.00
1370
M2
NINGUNO EN PARTICULAR
07/03/2006
3,500.00
1371
M2
NINGUNO EN PARTICULAR
06/03/2005
4,200.00
Descripcin
Precio
Fecha
1527
ML
NINGUNO EN PARTICULAR
07/03/2006
1528
M2
NINGUNO EN PARTICULAR
07/03/2006
5,000.00
1529
M2
NINGUNO EN PARTICULAR
07/03/2006
16,500.00
1530
M2
NINGUNO EN PARTICULAR
07/03/2006
2,400.00
1531
M2
NINGUNO EN PARTICULAR
07/03/2006
4,650.00
1532
M2
NINGUNO EN PARTICULAR
07/03/2006
5,750.00
1533
ML
NINGUNO EN PARTICULAR
07/03/2006
4,200.00
1534
ML
NINGUNO EN PARTICULAR
07/03/2006
3,450.00
1535
M2
NINGUNO EN PARTICULAR
07/03/2006
5,750.00
1536
M2
NINGUNO EN PARTICULAR
07/03/2006
11,250.00
MdeO ESTUCO
1537
M2
NINGUNO EN PARTICULAR
07/03/2006
2,850.00
1538
M2
NINGUNO EN PARTICULAR
07/03/2006
4,550.00
1539
ML
NINGUNO EN PARTICULAR
06/03/2005
1,995.00
1540
M2
NINGUNO EN PARTICULAR
07/03/2006
12,000.00
1541
ML
NINGUNO EN PARTICULAR
07/03/2006
1,850.00
1542
M2
NINGUNO EN PARTICULAR
07/03/2006
3,800.00
3227
ML
NINGUNO EN PARTICULAR
07/03/2006
2,800.00
1543
M2
NINGUNO EN PARTICULAR
07/03/2006
2,200.00
1544
ML
NINGUNO EN PARTICULAR
06/03/2005
1,050.00
1545
M2
NINGUNO EN PARTICULAR
06/03/2005
1,575.00
1546
M2
NINGUNO EN PARTICULAR
06/03/2005
9,975.00
1547
M2
NINGUNO EN PARTICULAR
07/03/2006
3,500.00
1548
M2
NINGUNO EN PARTICULAR
06/03/2005
4,600.00
Descripcin
Precio
4,000.00
Fecha
1419
M2
NINGUNO EN PARTICULAR
07/03/2006
5,750.00
1420
M2
NINGUNO EN PARTICULAR
07/03/2006
4,650.00
1421
M2
NINGUNO EN PARTICULAR
06/03/2005
4,725.00
1422
M2
NINGUNO EN PARTICULAR
07/03/2006
4,400.00
1705
M2
NINGUNO EN PARTICULAR
07/03/2006
4,500.00
1423
M2
NINGUNO EN PARTICULAR
07/03/2006
4,650.00
1424
M2
NINGUNO EN PARTICULAR
06/03/2005
7,875.00
1425
M2
NINGUNO EN PARTICULAR
07/03/2006
8,500.00
3989
ML
NINGUNO EN PARTICULAR
07/03/2006
5,400.00
3980
M2
NINGUNO EN PARTICULAR
06/03/2005
22,250.00
1427
M2
NINGUNO EN PARTICULAR
07/03/2006
18,000.00
1428
M2
NINGUNO EN PARTICULAR
07/03/2006
22,250.00
1429
ML
NINGUNO EN PARTICULAR
07/03/2006
12,250.00
1430
M2
NINGUNO EN PARTICULAR
06/03/2005
8,600.00
1431
ML
NINGUNO EN PARTICULAR
06/03/2005
2,100.00
1432
ML
NINGUNO EN PARTICULAR
07/03/2006
4,000.00
1433
M2
NINGUNO EN PARTICULAR
06/03/2005
3,360.00
1166
M2
NINGUNO EN PARTICULAR
06/03/2005
7,350.00
1434
M2
NINGUNO EN PARTICULAR
06/03/2005
7,875.00
3981
M2
NINGUNO EN PARTICULAR
06/03/2005
11,550.00
1435
UN
NINGUNO EN PARTICULAR
06/03/2005
20,000.00
1436
ML
NINGUNO EN PARTICULAR
07/03/2006
16,000.00
1437
ML
NINGUNO EN PARTICULAR
06/03/2005
10,300.00
1438
ML
NINGUNO EN PARTICULAR
06/03/2005
2,100.00
1439
ML
NINGUNO EN PARTICULAR
07/03/2006
6,500.00
1440
M2
NINGUNO EN PARTICULAR
07/03/2006
8,000.00
3982
M2
NINGUNO EN PARTICULAR
07/03/2006
14,100.00
1441
M2
NINGUNO EN PARTICULAR
07/03/2006
10,000.00
1442
M2
NINGUNO EN PARTICULAR
07/03/2006
10,000.00
1443
M2
NINGUNO EN PARTICULAR
07/03/2006
12,000.00
1444
M2
NINGUNO EN PARTICULAR
06/03/2005
12,915.00
1445
M2
NINGUNO EN PARTICULAR
06/03/2005
7,875.00
1446
ML
NINGUNO EN PARTICULAR
06/03/2005
6,600.00
1447
ML
NINGUNO EN PARTICULAR
07/03/2006
3,500.00
Descripcin
Precio
Descripcin
Fecha
Precio
431
UN
NINGUNO EN PARTICULAR
06/03/2005
2,100.00
2116
UN
NINGUNO EN PARTICULAR
06/03/2005
120,750.00
MdeO CAMPAMENTO
3268
M2
NINGUNO EN PARTICULAR
07/03/2006
25,000.00
1224
UN
NINGUNO EN PARTICULAR
07/03/2006
1,000,000.00
1223
UN
NINGUNO EN PARTICULAR
07/03/2006
1,250,000.00
1225
M2
NINGUNO EN PARTICULAR
06/03/2005
3,675.00
1226
ML
NINGUNO EN PARTICULAR
06/03/2005
7,560.00
1221
ML
NINGUNO EN PARTICULAR
07/03/2006
5,000.00
3991
ML
NINGUNO EN PARTICULAR
07/03/2006
2,850.00
3986
M2
NINGUNO EN PARTICULAR
07/03/2006
5,000.00
2893
M2
NINGUNO EN PARTICULAR
06/03/2005
5,040.00
1227
M2
NINGUNO EN PARTICULAR
06/03/2005
3,255.00
3984
ML
NINGUNO EN PARTICULAR
07/03/2006
2,250.00
3983
ML
NINGUNO EN PARTICULAR
07/03/2006
3,250.00
2894
M2
NINGUNO EN PARTICULAR
06/03/2005
4,410.00
2889
M2
NINGUNO EN PARTICULAR
06/03/2005
4,410.00
2895
M2
NINGUNO EN PARTICULAR
06/03/2005
3,950.00
M2
NINGUNO EN PARTICULAR
06/03/2005
14,490.00
1228
M2
NINGUNO EN PARTICULAR
07/03/2006
8,750.00
1229
M2
NINGUNO EN PARTICULAR
07/03/2006
10,500.00
M3
NINGUNO EN PARTICULAR
06/03/2005
38,350.00
2169
M3
NINGUNO EN PARTICULAR
06/03/2005
15,015.00
1230
M2
NINGUNO EN PARTICULAR
06/03/2005
9,660.00
1231
M2
NINGUNO EN PARTICULAR
07/03/2006
45,000.00
1232
M2
NINGUNO EN PARTICULAR
06/03/2005
10,836.00
1233
M2
NINGUNO EN PARTICULAR
07/03/2006
39,000.00
1234
M2
NINGUNO EN PARTICULAR
07/03/2006
26,500.00
3985
ML
NINGUNO EN PARTICULAR
07/03/2006
4,900.00
1235
M3
NINGUNO EN PARTICULAR
07/03/2006
110,000.00
MdeO DESCAPOTE
1236
M2
NINGUNO EN PARTICULAR
07/03/2006
3,250.00
3994
M2
NINGUNO EN PARTICULAR
07/03/2006
1,600.00
1237
UN
NINGUNO EN PARTICULAR
07/03/2006
17,500.00
1238
UN
NINGUNO EN PARTICULAR
06/03/2005
6,300.00
1239
M2
NINGUNO EN PARTICULAR
06/03/2005
2,205.00
1240
M3
NINGUNO EN PARTICULAR
07/03/2006
14,000.00
1242
M3
NINGUNO EN PARTICULAR
07/03/2006
16,100.00
1243
M3
NINGUNO EN PARTICULAR
07/03/2006
15,100.00
1244
M3
NINGUNO EN PARTICULAR
07/03/2006
13,500.00
1245
M3
NINGUNO EN PARTICULAR
07/03/2006
13,550.00
1241
M3
NINGUNO EN PARTICULAR
06/03/2005
7,875.00
3987
M2
NINGUNO EN PARTICULAR
06/03/2005
2,275.00
1246
UN
NINGUNO EN PARTICULAR
07/03/2006
51,400.00
336
M2
NINGUNO EN PARTICULAR
07/03/2006
1,650.00
3993
GL
NINGUNO EN PARTICULAR
06/03/2005
231,000.00
2896
M2
NINGUNO EN PARTICULAR
06/03/2005
1,900.00
2897
M2
NINGUNO EN PARTICULAR
06/03/2005
2,250.00
Fecha
1248
UN
NINGUNO EN PARTICULAR
06/03/2005
462,000.00
1249
UN
NINGUNO EN PARTICULAR
06/03/2005
199,500.00
1250
M3
NINGUNO EN PARTICULAR
07/03/2006
7,000.00
1247
M2
NINGUNO EN PARTICULAR
06/03/2005
2,100.00
1251
M3
NINGUNO EN PARTICULAR
07/03/2006
8,000.00
Descripcin
Precio
Fecha
1994
UN
NINGUNO EN PARTICULAR
07/03/2006
7,000.00
1252
UN
NINGUNO EN PARTICULAR
06/03/2005
6,615.00
1253
UN
NINGUNO EN PARTICULAR
07/03/2006
8,500.00
2159
UN
NINGUNO EN PARTICULAR
06/03/2005
9,450.00
1257
UN
NINGUNO EN PARTICULAR
03/03/2006
15,000.00
1258
UN
NINGUNO EN PARTICULAR
01/07/2006
25,000.00
1254
UN
NINGUNO EN PARTICULAR
07/03/2006
80,000.00
1578
UN
NINGUNO EN PARTICULAR
07/03/2006
71,000.00
1255
UN
NINGUNO EN PARTICULAR
07/03/2006
80,000.00
1256
UN
NINGUNO EN PARTICULAR
06/03/2005
55,650.00
Descripcin
Precio
307
UN
NINGUNO EN PARTICULAR
06/03/2005
6,825.00
1259
UN
NINGUNO EN PARTICULAR
07/03/2006
350,000.00
506
UN
NINGUNO EN PARTICULAR
07/03/2006
115,000.00
1260
UN
NINGUNO EN PARTICULAR
06/03/2005
29,400.00
340
UN
NINGUNO EN PARTICULAR
06/03/2005
9,450.00
1261
UN
NINGUNO EN PARTICULAR
06/03/2005
23,100.00
1262
UN
NINGUNO EN PARTICULAR
07/03/2006
8,600.00
1263
UN
NINGUNO EN PARTICULAR
06/03/2005
7,700.00
1264
ML
NINGUNO EN PARTICULAR
07/03/2006
12,000.00
1265
ML
NINGUNO EN PARTICULAR
06/03/2005
4,515.00
1266
ML
NINGUNO EN PARTICULAR
07/03/2006
2,900.00
1267
ML
NINGUNO EN PARTICULAR
06/03/2005
9,660.00
2160
ML
NINGUNO EN PARTICULAR
06/03/2005
4,830.00
247
ML
NINGUNO EN PARTICULAR
07/03/2006
4,500.00
1526
ML
NINGUNO EN PARTICULAR
07/03/2006
28,800.00
Fecha
3718
UN
NINGUNO EN PARTICULAR
06/03/2005
4,225.00
3511
UN
NINGUNO EN PARTICULAR
06/03/2005
7,560.00
3739
UN
NINGUNO EN PARTICULAR
07/03/2006
6,500.00
3741
UN
NINGUNO EN PARTICULAR
06/03/2005
7,770.00
3514
UN
NINGUNO EN PARTICULAR
06/03/2005
59,200.00
3743
UN
NINGUNO EN PARTICULAR
06/03/2005
8,500.00
3513
UN
NINGUNO EN PARTICULAR
06/03/2005
68,000.00
2960
UN
NINGUNO EN PARTICULAR
07/03/2006
8,400.00
Descripcin
Precio
Fecha
ASEO DE VIDRIOS
3219
M2
NINGUNO EN PARTICULAR
07/03/2006
1,309.00
1173
UN
NINGUNO EN PARTICULAR
06/03/2005
4,515.00
1515
UN
NINGUNO EN PARTICULAR
06/03/2005
3,465.00
2858
UN
NINGUNO EN PARTICULAR
06/03/2005
13,125.00
3337
UN
NINGUNO EN PARTICULAR
07/03/2006
40,000.00
3338
UN
NINGUNO EN PARTICULAR
07/03/2006
40,000.00
1516
UN
NINGUNO EN PARTICULAR
06/03/2005
5,145.00
2805
M2
NINGUNO EN PARTICULAR
07/03/2006
4,200.00
2855
M2
NINGUNO EN PARTICULAR
07/03/2006
4,200.00
2853
M2
NINGUNO EN PARTICULAR
06/03/2005
7,035.00
2714
M2
NINGUNO EN PARTICULAR
07/03/2006
4,200.00
2715
M2
NINGUNO EN PARTICULAR
07/03/2006
4,200.00
2856
M2
NINGUNO EN PARTICULAR
07/03/2006
4,200.00
2854
M2
NINGUNO EN PARTICULAR
07/03/2006
4,200.00
Descripcin
Precio
Fecha
2208
UN
TITAN MANUFACTURAS
16/06/2006
355,000.00
2209
UN
POSTES MEDINA
03/03/2006
243,600.00
2210
UN
TITAN MANUFACTURAS
16/06/2006
73,900.00
2175
UN
TITAN MANUFACTURAS
16/06/2006
156,500.00
2174
UN
TITAN MANUFACTURAS
16/06/2006
66,700.00
Descripcin
Precio
A60
2173
M2
TITAN MANUFACTURAS
16/06/2006
27,500.00
A50
2207
M2
TITAN MANUFACTURAS
16/06/2006
25,000.00
2176
UN
TITAN MANUFACTURAS
16/06/2006
27,800.00
M-62
2212
UN
POSTES MEDINA
03/03/2006
110,780.00
BORDILLOS DE CONFINAMIENTO
bc20115
664
UN
TITAN MANUFACTURAS
16/06/2006
7,600.00
BORDILLOS DE CONFINAMIENTO
bc23115
2204
UN
TITAN MANUFACTURAS
16/06/2006
9,000.00
BORDILLOS DE CONFINAMIENTO
bc30015
2171
UN
TITAN MANUFACTURAS
16/06/2006
18,000.00
3283
GL
CIVICON
07/03/2006
3,712,000.00
3284
GL
CIVICON
07/03/2006
9,091,600.00
CA-A
2205
UN
POSTES MEDINA
04/03/2006
10,250.00
CU004
2206
UN
TITAN MANUFACTURAS
16/06/2006
21,700.00
CA-A
2172
UN
POSTES MEDINA
04/03/2006
17,750.00
DEMARCACION BALONCESTO -
9788
UN
CANCHAS Y RECUBRIMIENTOS
28/06/2006
208,800.00
9489
UN
CANCHAS Y RECUBRIMIENTOS
28/06/2006
243,600.00
3638
UN
CIVICON
07/03/2006
1,925,280.00
SINTETICA
3635
M2
CANCHAS Y RECUBRIMIENTOS
28/06/2006
32,126.20
IDENTIFICADOR DE ESCENARIOS
ID -46
3625
UN
CREAR SEALIZACIN
28/06/2006
370,040.00
IDENTIFICADOR DE ESCENARIOS
ID-67
3624
UN
CREAR SEALIZACIN
28/06/2006
464,241.28
3618
UN
CREAR SEALIZACIN
28/06/2006
464,241.28
IDG-S2
3619
UN
CREAR SEALIZACIN
28/06/2006
604,249.80
IDG-M
464,241.28
3620
UN
CREAR SEALIZACIN
28/06/2006
MALLA BASKET
3752
UN
CANCHAS Y RECUBRIMIENTOS
01/07/2006
29,000.00
3750
UN
CANCHAS Y RECUBRIMIENTOS
28/06/2006
232,000.00
3754
UN
CANCHAS Y RECUBRIMIENTOS
01/07/2006
159,862.50
9485
UN
CANCHAS Y RECUBRIMIENTOS
01/07/2006
348,000.00
(PLG-H)
3622
UN
CREAR SEALIZACIN
28/06/2006
847,422.92
3621
UN
CREAR SEALIZACIN
28/06/2006
847,422.92
PLAQUETA DE 50X1.00X0,6
50 X 1
2218
M2
POSTES MEDINA
04/03/2006
25,566.00
PLAQUETA DE 60x40x0.6
A - 30
2177
M2
POSTES MEDINA
04/03/2006
22,040.00
P40402
2216
UN
TITAN MANUFACTURAS
16/06/2006
9,200.00
PORTAPENDONES 1 CARA
PPD-1
3628
UN
CREAR SEALIZACIN
28/06/2006
736,890.00
PORTAPENDONES 2 CARAS
PPD-2
3629
UN
CREAR SEALIZACIN
28/06/2006
928,481.40
PORTERIA FUTBOL
3753
UN
CIVICON
04/03/2006
1,740,000.00
PORTERIA MULTIFUNCIONAL
3751
UN
CANCHAS Y RECUBRIMIENTOS
01/07/2006
4,524,000.00
Fecha
9487
PAR
CANCHAS Y RECUBRIMIENTOS
28/06/2006
522,000.00
9486
PAR
CANCHAS Y RECUBRIMIENTOS
28/06/2006
452,400.00
Descripcin
Precio
SARDINEL ACHANFLADO
SA45100
2215
UN
TITAN MANUFACTURAS
16/06/2006
23,100.00
SARDINELES (H 30cm)
SR30100
118
UN
TITAN MANUFACTURAS
16/06/2006
16,200.00
SARDINELES (H 40cm)
SA 40100
130
UN
TITAN MANUFACTURAS
16/06/2006
19,800.00
SARDINELES (H 45cm)
SA 45 100
132
UN
TITAN MANUFACTURAS
16/06/2006
23,100.00
SARDINELES (H 50cm)
A 10
2170
UN
TITAN MANUFACTURAS
16/06/2006
22,300.00
SARDINELES (H 55cm)
SA 55100
428
UN
TITAN MANUFACTURAS
16/06/2006
28,700.00
SC-120
3626
UN
CREAR SEALIZACIN
28/06/2006
493,290.00
SC-80
3627
UN
CREAR SEALIZACIN
28/06/2006
398,112.00
PC 4 DESTINO
3623
UN
CREAR SEALIZACIN
28/06/2006
479,776.00
11A-07
3633
UN
CREAR SEALIZACIN
28/06/2006
229,680.00
3632
UN
CREAR SEALIZACIN
28/06/2006
229,680.00
11A-06
3630
UN
CREAR SEALIZACIN
28/06/2006
229,680.00
60X60cm
3804
UN
ABASTECER S YS LTDA
07/03/2006
145,000.00
150x150 cm
3800
UN
ABASTECER S YS LTDA
07/03/2006
145,000.00
60x60cm
3801
UN
ABASTECER S YS LTDA
07/03/2006
145,000.00
3631
M2
CANCHAS Y RECUBRIMIENTOS
28/06/2006
5,220.00
2.10 ALTO
3637
ML
FERRETERIA EL TERMINAL
29/06/2006
1,856.00
TOPELLANTAS
TL003
2213
UN
TITAN MANUFACTURAS
16/06/2006
5,800.00
PAVIMENTOS (16)
10/07/2006 Bogot
Descripcin
Referencia
MDCI
966
M3
PAVIOBRAS LTDA
27/06/2006
342,200.00
MDCI
967
M3
PAVIOBRAS LTDA
27/06/2006
249,400.00
970
M2
PAVIOBRAS LTDA
27/06/2006
17,110.00
971
M2
PAVIOBRAS LTDA
27/06/2006
23,954.00
3490
M2
CANCHAS Y RECUBRIMIENTOS
30/06/2006
19,511.20
3282
M2
CANCHAS Y RECUBRIMIENTOS
28/06/2006
16,820.00
3930
UN
CANCHAS Y RECUBRIMIENTOS
28/06/2006
41,359.80
TIPO A
700 GRS.
Fecha
Precio
IMPRIMANTE ASFALTICO
CRL1
3317
M2
16/06/2006
600.00
RODADURA 1150
MDC2
3312
M3
16/06/2006
220,000.00
RODADURA 1350
MDC3
3313
M3
16/06/2006
250,000.00
MDC2
978
M2
PAVIOBRAS LTDA
27/06/2006
8,990.00
MDC2
979
M2
PAVIOBRAS LTDA
27/06/2006
10,788.00
MDC2
974
M3
PAVIOBRAS LTDA
27/06/2006
359,600.00
975
M3
PAVIOBRAS LTDA
01/07/2006
266,800.00
980
M2
PAVIOBRAS LTDA
27/06/2006
10,440.00
981
M2
PAVIOBRAS LTDA
27/06/2006
12,528.00
PERFILES,DIVISIONES,VENTANERIA (17)
10/07/2006 Bogot
Descripcin
Referencia
Fecha
A-09
1083
ML
30/06/2006
2,375.68
A-09 Mate
1093
ML
30/06/2006
2,680.76
ANGULO 1x1x1/8
A-11 Crudo
1086
ML
30/06/2006
6,243.12
990
ML
OBRALUM
30/06/2006
25,000.00
993
M2
OBRALUM
30/06/2006
180,000.00
Precio
991
M2
OBRALUM
30/06/2006
120,000.00
3486
ML
20/06/2006
10,866.88
PASAMANOS ANOLOK X 6M
FS387
1096
ML
01/07/2006
11,252.00
S-387
1222
ML
01/07/2006
10,842.52
U-67 Mate
1003
ML
01/07/2006
6,842.84
PERFIL T
1x1/16
DA-17ANOLO
1985
ML
01/07/2006
1,545.12
PERFIL T 3/4x1/16
DA-19ANOLO
1589
ML
01/07/2006
1,705.20
PERFIL U
U-74
1005
ML
01/07/2006
1,282.96
3481
M2
20/06/2006
174,000.00
x" CRUDO
PUERTA FRANCESA
PUERTA METALICA ENTRADA SIN
PUERTA PANORAMA
300
UN
INDUSTRIAS METALICAS
30/06/2006
162,400.00
2815
M2
20/06/2006
150,800.00
TC-21CRUDO
2144
ML
04/07/2006
4,140.04
T-116
2150
ML
04/07/2006
4,071.60
T-117
2151
ML
04/07/2006
7,335.84
T-116
2149
ML
04/07/2006
4,526.00
T-117
2152
ML
04/07/2006
8,072.44
1021
M2
OBRALUM
30/06/2006
150,000.00
2477
M2
20/06/2006
69,600.00
VENTANA EUROPA
2814
M2
20/06/2006
150,800.00
VENTANA PROYECTANTE
2813
M2
20/06/2006
81,200.00
2812
M2
20/06/2006
92,800.00
59
M2
INDUSTRIAS METALICAS
30/06/2006
40,600.00
1022
M2
OBRALUM
30/06/2006
180,000.00
119
UN
INDUSTRIAS METALICAS
30/06/2006
14,616.00
295
UN
INDUSTRIAS METALICAS
30/06/2006
43,848.00
57
M2
INDUSTRIAS METALICAS
30/06/2006
40,600.00
1020
M2
OBRALUM
30/06/2006
100,000.00
1019
M2
OBRALUM
30/06/2006
190,000.00
PINTURAS (18)
10/07/2006 Bogot
Referencia
Descripcin
ACRILTEX PINTUCO
ALUMINIO Bte. ECP 0100 PINTUCO
ECP 0100
Fecha
Precio
1023
GN
04/07/2006
47,230.00
1024
GN
06/06/2006
58,608.00
1832
GN
30/06/2005
75,348.00
1834
GN
30/06/2005
39,270.00
310
1025
GN
06/06/2006
27,094.00
2026
1026
GLN
PHILAAC LTDA.
30/06/2005
32,500.00
1835
GN
30/06/2005
34,477.00
1027
GLN
PHILAAC LTDA.
07/03/2006
29,500.00
1837
GN
30/06/2005
29,628.00
1028
GN
30/06/2006
23,590.00
1839
GN
30/06/2005
40,808.00
1838
GN
30/06/2005
44,508.00
2100
SD-1
7205
1029
GN
06/06/2006
40,600.00
5001
1030
GLN
PHILAAC LTDA.
30/06/2005
47,000.00
CAL NARE
1032
KG
DEPOSITO LA PATRIA
28/06/2006
498.80
CAOLIN IMPALPABLE
1031
BT
ALMACEN LISTO
30/06/2006
4,600.00
8,004.00
CARRAPLAST (Aplicado)
Col. claro
1066
M2
ARQUITECTURA DE ACABADOS
20/06/2006
CARRAPLAST (Aplicado)
Col. Oscuro
2564
M2
ARQUITECTURA DE ACABADOS
20/06/2006
6,728.00
CASEINA PINTUCO
1798
GN
30/06/2006
25,720.00
1857
GN
30/06/2005
96,347.00
1744
GLN
PHILAAC LTDA.
30/06/2005
33,800.00
1201
1826
GN
30/06/2005
51,446.00
1824
GN
30/06/2005
58,621.00
1037
GN
06/06/2006
39,620.00
1850
GN
30/06/2005
64,507.00
1851
GN
30/06/2005
54,784.00
1827
GN
30/06/2005
54,531.00
1828
GN
30/06/2005
49,034.00
1853
GN
30/06/2005
65,237.00
1854
GN
30/06/2005
75,038.00
1038
GN
01/07/2006
42,009.00
1040
GN
01/07/2006
42,091.00
1765
GLN
PHILAAC LTDA.
07/03/2006
48,500.00
1811
GN
01/07/2006
46,497.00
1039
GLN
PHILAAC LTDA.
30/06/2005
52,700.00
266
M2
ARQUITECTURA DE ACABADOS
20/06/2006
29,000.00
12,470.00
Blanco
Blanco
Col. claro
117060
1806
GN
06/06/2006
1041
KG
ALMACEN LISTO
01/07/2006
960.00
1859
GN
30/06/2005
89,589.00
PINTURAS (18)
10/07/2006 Bogot
Referencia
Fecha
Precio
1860
GN
30/06/2005
89,589.00
1833
GN
30/06/2005
80,360.00
1861
GN
30/06/2005
89,589.00
Descripcin
GRANIPLAST (Aplicado)
1874
M2
ARQUITECTURA DE ACABADOS
20/06/2006
9,860.00
Col. claro
1843
GN
30/06/2005
61,273.00
1844
GN
30/06/2005
61,273.00
1845
GN
30/06/2005
61,273.00
1805
GN
01/07/2006
18,657.00
1797
GN
01/07/2006
26,950.00
3501
INTERVINIL PINTUCO
LACA MADERA TRANSPARENTE Bte.
7500
1050
GLN
PHILAAC LTDA.
30/06/2005
36,000.00
6601
1042
GLN
PHILAAC LTDA.
30/06/2005
66,700.00
5505
1045
GLN
PHILAAC LTDA.
30/06/2005
64,600.00
2464
GLN
PHILAAC LTDA.
30/06/2005
48,000.00
2463
GLN
PHILAAC LTDA.
30/06/2005
62,700.00
1863
GN
30/06/2005
45,914.00
1864
GN
30/06/2005
48,130.00
1047
GN
01/07/2006
36,090.00
1048
GN
01/07/2006
43,860.00
53-30
7400
3903
1052
GLN
PHILAAC LTDA.
30/06/2005
70,000.00
MARMOLPLAST (Aplicado)
Col. claro
2563
M2
ARQUITECTURA DE ACABADOS
20/06/2006
9,860.00
5201
1055
GLN
PHILAAC LTDA.
30/06/2005
40,500.00
119.139
1056
GN
01/07/2006
41,230.00
7001
1057
GLN
PHILAAC LTDA.
28/10/2005
43,000.00
1058
GN
01/07/2006
21,780.00
1840
GN
30/06/2005
21,460.00
0501
1755
GLN
PHILAAC LTDA.
30/06/2005
30,200.00
0592
2472
GLN
PHILAAC LTDA.
30/06/2005
26,000.00
653
1060
GN
07/06/2006
73,133.00
1855
GN
30/06/2005
97,264.00
1856
GN
30/06/2005
97,264.00
2530
2462
GLN
PHILAAC LTDA.
30/06/2005
53,600.00
2517
1767
GLN
PHILAAC LTDA.
30/06/2005
53,600.00
PINTURAMA PINTUCO
1804
GN
01/07/2006
12,930.00
1061
KG
ALMACEN LISTO
30/06/2006
406.00
1062
GN
07/06/2006
45,516.00
REMOVEDOR ICO
1841
GN
30/06/2005
59,670.00
REMOVEDOR PHILAAC
8000
1063
GLN
PHILAAC LTDA.
07/03/2006
21,800.00
RETARDADOR PHILAAC
8025
1766
GLN
PHILAAC LTDA.
07/03/2006
27,800.00
1064
GN
07/06/2006
32,130.00
1862
GN
30/06/2005
39,547.00
7434
1065
GLN
PHILAAC LTDA.
03/03/2006
40,800.00
7428
1051
GLN
PHILAAC LTDA.
30/06/2005
37,700.00
SILICONITE PINTUCO
3103
1067
GN
01/07/2006
29,345.00
8467
1068
GLN
PHILAAC LTDA.
30/06/2005
35,000.00
9100
1071
GLN
PHILAAC LTDA.
30/06/2005
14,000.00
9101
1072
GLN
PHILAAC LTDA.
28/10/2005
13,800.00
PINTURAS (18)
10/07/2006 Bogot
Descripcin
Referencia
Fecha
Precio
THINNER PINTUCO
121132
1070
GN
04/03/2006
10,700.00
7427
1073
LT
07/06/2006
15,343.00
8038
1074
GLN
PHILAAC LTDA.
07/03/2006
11,000.00
1601
1075
GLN
PHILAAC LTDA.
28/10/2005
45,000.00
0901
1754
GLN
PHILAAC LTDA.
30/06/2005
20,500.00
1701
1763
GLN
PHILAAC LTDA.
30/06/2005
45,000.00
1847
GN
30/06/2005
50,830.00
1846
GN
30/06/2005
50,830.00
1848
GN
30/06/2005
50,830.00
1829
GN
30/06/2005
50,830.00
1830
GN
30/06/2005
33,801.00
1831
GN
30/06/2005
16,456.00
1077
UN
04/07/2006
203,250.00
VINILTEX PINTUCO
1078
GN
04/07/2006
40,650.00
1049
GN
04/07/2006
79,520.00
2150
1079
LT
07/06/2006
15,300.00
1080
BT
ALMACEN LISTO
04/07/2006
11,300.00
PREFABRICADOS (19)
10/07/2006 Bogot
Referencia
Descripcin
BAJANTE TALUD
Fecha
Precio
2217
UN
TITAN MANUFACTURAS
16/06/2006
9,300.00
Original
3924
M2
POLIEXPANDIDOS
16/06/2006
1,809.60
Original
3289
M2
POLIEXPANDIDOS
16/06/2006
904.80
Original
3923
M2
POLIEXPANDIDOS
16/06/2006
1,447.68
LP-10
3911
M2
FIBRIT LTDA.
07/03/2006
84,083.76
LP-4
3908
M2
FIBRIT LTDA.
07/03/2006
53,274.16
LP-6
3910
M2
FIBRIT LTDA.
07/03/2006
59,265.56
E-6 R
1085
M2
FIBRIT LTDA.
07/03/2006
61,845.40
PEC
2801
UN
FIBRIT LTDA.
07/03/2006
46,618.08
HIDRAULICO
9456
ML
SUBMURACIONES Y PILOTAJES
01/07/2006
60,000.00
HIDRAULICO
9457
ML
SUBMURACIONES Y PILOTAJES
01/07/2006
68,000.00
HIDRAULICO
9458
ML
SUBMURACIONES Y PILOTAJES
01/07/2006
90,000.00
DE CAIDA
1088
ML
SUBMURACIONES Y PILOTAJES
01/07/2006
90,000.00
DE CAIDA
3922
ML
SUBMURACIONES Y PILOTAJES
01/07/2006
120,000.00
PLACALISTA
1764
M2
07/06/2006
42,920.00
PLAQUETA
1675
M2
07/06/2006
27,840.00
AP
777
UN
POSTES MEDINA
07/03/2006
319,000.00
AP
2230
UN
POSTES MEDINA
03/03/2006
435,000.00
AP
2231
UN
POSTES MEDINA
03/03/2006
477,920.00
AP
2232
UN
POSTES MEDINA
03/03/2006
435,000.00
AP
2233
UN
POSTES MEDINA
03/03/2006
477,920.00
AP
2234
UN
POSTES MEDINA
03/03/2006
574,200.00
AP
2235
UN
POSTES MEDINA
03/03/2006
788,800.00
AP
2228
UN
POSTES MEDINA
30/06/2005
232,000.00
AP
2229
UN
POSTES MEDINA
30/06/2005
278,400.00
2219
UN
POSTES MEDINA
03/03/2006
226,200.00
LINEA
2221
UN
POSTES MEDINA
03/03/2006
313,200.00
LINEA
2222
UN
POSTES MEDINA
03/03/2006
353,800.00
LINEA
2223
UN
POSTES MEDINA
03/03/2006
429,200.00
LINEA
2224
UN
POSTES MEDINA
30/06/2005
477,920.00
LINEA
2225
UN
POSTES MEDINA
03/03/2006
574,200.00
LINEA
2226
UN
POSTES MEDINA
03/03/2006
730,800.00
LINEA
2220
UN
POSTES MEDINA
03/03/2006
278,400.00
P0205
2178
UN
TITAN MANUFACTURAS
16/06/2006
16,200.00
P0280
2179
UN
TITAN MANUFACTURAS
16/06/2006
26,000.00
POLO-P
2180
UN
POSTES MEDINA
03/03/2006
35,380.00
1676
ML
07/06/2006
15,660.00
VIGUETA
Fecha
ADMINISTRADOR + PREST
4000
MS
NINGUNO EN PARTICULAR
07/03/2006
1,818,212.55
ADMINISTRADOR S/PREST
3999
MS
NINGUNO EN PARTICULAR
07/03/2006
1,159,278.12
ALMACENISTA (Trans.Incl )
1549
MS
NINGUNO EN PARTICULAR
07/03/2006
909,130.53
3766
MS
NINGUNO EN PARTICULAR
07/03/2006
1,425,881.00
1550
MS
NINGUNO EN PARTICULAR
30/06/2006
455,700.00
3767
MS
NINGUNO EN PARTICULAR
30/06/2006
847,739.00
AYUDANTE ALBAILERIA DE
2914
JR
NINGUNO EN PARTICULAR
30/06/2006
15,190.00
3896
JR
NINGUNO EN PARTICULAR
30/06/2006
28,258.00
2915
JR
NINGUNO EN PARTICULAR
30/06/2006
15,190.00
3787
JR
NINGUNO EN PARTICULAR
30/06/2006
21,893.03
3267
JR
NINGUNO EN PARTICULAR
07/03/2006
18,888.87
3306
JR
NINGUNO EN PARTICULAR
07/03/2006
19,891.41
3354
JR
NINGUNO EN PARTICULAR
07/03/2006
19,891.41
3759
JR
NINGUNO EN PARTICULAR
07/03/2006
18,091.92
Descripcin
CADENERO 1
Precio
642
30/06/2006
501,270.00
3768
30/06/2006
932,512.00
714
07/03/2006
860,086.92
3769
07/03/2006
1,348,962.62
1551
MS
NINGUNO EN PARTICULAR
07/03/2006
447,244.88
3770
MS
NINGUNO EN PARTICULAR
30/06/2006
832,009.00
1552
MS
NINGUNO EN PARTICULAR
07/03/2006
1,282,312.19
CONTRAMAESTRO + PREST.56.84%
3771
MS
NINGUNO EN PARTICULAR
07/03/2006
2,011,179.56
HERRAMENTERO
2777
MS
NINGUNO EN PARTICULAR
01/07/2006
408,000.00
HERRAMENTERO (Trans.Incl)
2775
MS
NINGUNO EN PARTICULAR
01/07/2006
455,700.00
3772
HH
NINGUNO EN PARTICULAR
07/03/2006
3,694.85
69
HH
NINGUNO EN PARTICULAR
07/03/2006
2,290.37
3773
HH
NINGUNO EN PARTICULAR
07/03/2006
8,727.18
149
HH
NINGUNO EN PARTICULAR
07/03/2006
4,289.67
HORA/Cuad. ALBA-IL/Of+Ayu
Cuad. 1/1
1555
HH
NINGUNO EN PARTICULAR
07/03/2006
6,590.43
Cuad. 1/1
3774
HH
NINGUNO EN PARTICULAR
07/03/2006
12,259.17
HORA/Cuad. CARPINT/Of+Ayu
1556
HH
NINGUNO EN PARTICULAR
07/03/2006
6,298.22
HORA/Cuad. CARPINT/Of+Ayu
3775
HH
NINGUNO EN PARTICULAR
07/03/2006
11,716.32
1557
HH
NINGUNO EN PARTICULAR
07/03/2006
6,701.31
3776
HH
NINGUNO EN PARTICULAR
07/03/2006
12,463.61
LABORATORISTA INSPECTOR
3996
MS
NINGUNO EN PARTICULAR
06/03/2005
1,236,644.85
1559
MS
NINGUNO EN PARTICULAR
07/03/2006
1,407,414.86
3777
MS
NINGUNO EN PARTICULAR
07/03/2006
2,207,389.80
1558
MS
NINGUNO EN PARTICULAR
06/03/2005
599,019.75
3778
MS
NINGUNO EN PARTICULAR
06/03/2005
1,037,295.00
Fecha
Precio
2804
JR
NINGUNO EN PARTICULAR
06/03/2005
34,118.70
2937
JR
NINGUNO EN PARTICULAR
06/03/2005
31,274.25
3788
JR
NINGUNO EN PARTICULAR
06/03/2005
36,837.15
3169
JR
NINGUNO EN PARTICULAR
06/03/2005
31,843.35
3269
JR
NINGUNO EN PARTICULAR
06/03/2005
33,607.35
3386
JR
NINGUNO EN PARTICULAR
06/03/2005
33,123.30
3452
JR
NINGUNO EN PARTICULAR
06/03/2005
32,697.00
PORCENTAJE CONTRATO
9999
NINGUNO EN PARTICULAR
07/03/2006
1.31
1560
MS
NINGUNO EN PARTICULAR
07/03/2006
1,569,482.25
RESIDENTE + PREST.56.84%
3779
MS
NINGUNO EN PARTICULAR
06/03/2005
2,461,575.90
598
06/03/2005
1,184,254.05
3780
06/03/2005
1,844,608.50
Descripcin
TOPOGRAFO
TOPOGRAFO + PREST.
Referencia
Fecha
Muro -Normal
1569
UN
E.A.A.B. E.S.P.
04/07/2006
Muro -Normal
1568
UN
E.A.A.B. E.S.P.
04/07/2006
723,335.00
Muro -Normal
1567
UN
E.A.A.B. E.S.P.
30/06/2006
1,148,333.00
Normal
1570
UN
E.A.A.B. E.S.P.
30/06/2006
1,472,341.00
Normal
1571
UN
E.A.A.B. E.S.P.
30/06/2006
3,163,909.00
Normal
2201
UN
E.A.A.B. E.S.P.
30/06/2006
4,731,945.00
Normal
2202
UN
E.A.A.B. E.S.P.
30/06/2006
9,067,001.00
CALIBRACION DE MEDIDOR
183
UN
CODENSA E.S.P.
29/06/2006
8,834.56
CALIBRACION DE MEDIDOR
2540
UN
CODENSA E.S.P.
29/06/2006
29,262.16
CALIBRACION DE MEDIDOR
185
UN
CODENSA E.S.P.
29/06/2006
8,834.56
CALIBRACION DE MEDIDOR
2553
UN
CODENSA E.S.P.
29/06/2006
406,083.52
CALIBRACION DE MEDIDOR
566
UN
CODENSA E.S.P.
29/06/2006
229,858.64
2214
UN
E.A.A.B. E.S.P.
01/07/2006
82,568.00
425
UN
E.T.B.
E.P.S.
29/06/2006
85,840.00
CONEXION NO RESIDENCIAL
1595
UN
E.T.B.
E.P.S.
29/06/2006
85,840.00
1596
UN
E.T.B.
E.P.S.
29/06/2006
85,840.00
1597
UN
E.T.B.
E.P.S.
29/06/2006
85,840.00
1598
UN
E.T.B.
E.P.S.
29/06/2006
85,840.00
1599
UN
E.T.B.
E.P.S.
29/06/2006
85,840.00
3571
UN
E.T.B.
E.P.S.
29/06/2006
85,840.00
1601
UN
E.T.B.
E.P.S.
29/06/2006
85,840.00
1561
UN
CITYGAS
30/06/2005
359,490.00
1562
UN
CITYGAS
30/06/2005
359,490.00
1563
UN
CITYGAS
30/06/2005
359,490.00
1564
UN
CITYGAS
30/06/2005
359,490.00
1565
UN
CITYGAS
30/06/2005
359,490.00
1566
UN
CITYGAS
30/06/2005
359,490.00
INSPECCION DE MEDIDOR
2436
UN
CODENSA E.S.P.
01/07/2006
41,699.68
INSPECCION DE MEDIDOR
2443
UN
CODENSA E.S.P.
01/07/2006
46,663.32
2909
UN
CODENSA E.S.P.
29/06/2006
61,817.56
1587
UN
CODENSA E.S.P.
29/06/2006
174,687.88
1588
UN
CODENSA E.S.P.
29/06/2006
232,315.52
2387
UN
CODENSA E.S.P.
29/06/2006
117,108.96
1608
UN
E.A.A.B. E.S.P.
01/07/2006
84,233.00
1606
UN
E.A.A.B. E.S.P.
01/07/2006
954,228.00
1607
UN
E.A.A.B. E.S.P.
01/07/2006
222,093.00
1609
UN
E.A.A.B. E.S.P.
01/07/2006
2,568,953.00
1610
UN
E.A.A.B. E.S.P.
01/07/2006
2,559,303.00
1612
UN
E.A.A.B. E.S.P.
30/06/2006
3,308,790.00
Desde nicho
CONEXION ACOMETIDA
VALOR HORA
Precio
508,103.00
Descripcin
Fecha
Precio
1613
UN
E.A.A.B. E.S.P.
30/06/2006
4,482,882.00
PARAMETRIZACION ELECTRONICA
184
UN
CODENSA E.S.P.
29/06/2006
99,605.72
2541
UN
CODENSA E.S.P.
29/06/2006
21,028.48
Referencia
Fecha
10054
3532
UN
04/07/2006
8,963.00
10055
3533
UN
04/07/2006
17,666.00
10056
3534
UN
04/07/2006
34,357.00
1102
ML
04/07/2006
27,318.00
1103
UN
04/07/2006
26,018.00
12778
Precio
FIBRIT CIT30F
2132
UN
FIBRIT LTDA.
07/03/2006
31,736.44
FIBRIT CAI65F
1106
UN
FIBRIT LTDA.
07/03/2006
106,766.00
CIT-30F
1105
UN
FIBRIT LTDA.
07/03/2006
30,004.56
CAI-97F
2836
UN
FIBRIT LTDA.
07/03/2006
116,232.00
CIMA-530
1104
UN
FIBRIT LTDA.
07/03/2006
62,143.52
0602340000
1107
UN
30/06/2006
2,959.16
0602330000
2248
UN
30/06/2006
2,959.16
2247
UN
30/06/2006
2,316.52
0602200000
2249
UN
30/06/2006
2,746.88
0602210000
2250
UN
30/06/2006
2,317.68
0602220000
2251
UN
30/06/2006
2,181.96
CARCAMO H.F.
CAR40x100
552
UN
COLREJILLAS BOGOTA
30/06/2006
510,295.60
3537
UN
01/07/2006
11,732.00
3538
UN
01/07/2006
26,024.00
3535
UN
01/07/2006
23,826.00
3536
UN
01/07/2006
52,121.00
10714
1100
UN
01/07/2006
29,150.00
10719
1774
UN
01/07/2006
56,353.00
MOORE
282
1112
UN
07/03/2006
17,376.80
MOORE
283
1113
UN
07/03/2006
21,715.20
MOORE
26,500.00
284
2484
UN
07/03/2006
13458
1114
UN
01/07/2006
94,727.00
12457
1115
ML
01/07/2006
139,437.00
CU-30-10
1117
UN
FIBRIT LTDA.
01/07/2006
22,787.04
CC5"x3"
136
UN
COLREJILLAS BOGOTA
01/07/2006
15,103.20
C4"X2"
1118
UN
COLREJILLAS BOGOTA
01/07/2006
6,704.80
MOORE
SEGUNDAS
1109
UN
07/03/2006
17,376.80
MOORE
273
1110
UN
07/03/2006
17,376.00
1160
ML
01/07/2006
6,593.44
PAVCO
506
9436
UN
SILPLAS
26/06/2006
68,904.00
508
2404
UN
SILPLAS
01/07/2006
73,114.80
390064
3549
UN
01/07/2006
1,541.00
390065
3550
UN
01/07/2006
2,502.00
390066
3551
UN
01/07/2006
4,519.00
Referencia
Fecha
390067
2109
UN
01/07/2006
7,895.00
390068
2111
UN
01/07/2006
16,554.00
390069
2112
UN
01/07/2006
33,706.00
390070
2113
UN
01/07/2006
48,721.00
390071
2114
UN
01/07/2006
54,812.00
MR-70
1123
UN
FIBRIT LTDA.
07/03/2006
31,162.24
MTPA-60
1125
UN
FIBRIT LTDA.
07/03/2006
92,447.36
H4"x3"
319
UN
COLREJILLAS BOGOTA
01/07/2006
5,950.80
TA3x2"
315
UN
COLREJILLAS BOGOTA
01/07/2006
3,793.20
TA6x4"
316
UN
COLREJILLAS BOGOTA
01/07/2006
15,323.60
TC-3x2" Al.
1212
UN
COLREJILLAS BOGOTA
27/06/2006
3,480.00
TC3x2"
317
UN
COLREJILLAS BOGOTA
01/07/2006
10,370.40
RA 120x40cm
385
UN
COLREJILLAS BOGOTA
01/07/2006
681,360.80
CAR-50x120
2623
UN
COLREJILLAS BOGOTA
01/07/2006
821,094.40
2626
UN
COLREJILLAS BOGOTA
01/07/2006
447,748.40
2358
UN
SILPLAS
26/06/2006
591.60
Precio
009
L5x7cm x11/2
347
UN
COLREJILLAS BOGOTA
27/06/2006
2,691.20
2615
UN
COLREJILLAS BOGOTA
27/06/2006
2,053.20
9437
UN
SILPLAS
26/06/2006
1,125.20
013
2357
UN
SILPLAS
01/07/2006
1,310.80
017
9441
UN
SILPLAS
26/06/2006
1,612.40
002
2275
UN
SILPLAS
26/06/2006
1,612.40
004
2354
UN
SILPLAS
26/06/2006
1,612.40
018
2345
UN
SILPLAS
26/06/2006
1,612.40
026
9439
UN
SILPLAS
01/07/2006
2,041.60
021
9438
UN
SILPLAS
01/07/2006
3,097.20
029
9440
UN
SILPLAS
26/06/2006
3,572.80
001
2156
UN
SILPLAS
26/06/2006
1,612.40
REJILLA SIFON
037
9434
UN
SILPLAS
26/06/2006
2,273.60
93705Gris
1130
UN
07/03/2006
3,047.00
R-25-C
3913
UN
FIBRIT LTDA.
07/03/2006
19,622.56
R-46-P
1137
UN
FIBRIT LTDA.
07/03/2006
66,123.48
R-85-P
3914
UN
FIBRIT LTDA.
07/03/2006
181,671.08
R-70-MP
1138
UN
FIBRIT LTDA.
07/03/2006
112,818.12
R-77-MP
649
UN
FIBRIT LTDA.
29/06/2005
104,710.00
Galvanizado
623
UN
COLREJILLAS BOGOTA
27/06/2006
442,192.00
Galvanizado
653
UN
COLREJILLAS BOGOTA
01/07/2006
307,748.00
Galvanizado
628
UN
COLREJILLAS BOGOTA
01/07/2006
336,168.00
Galvanizado
599
UN
COLREJILLAS BOGOTA
01/07/2006
363,446.56
Galvanizado
630
UN
COLREJILLAS BOGOTA
01/07/2006
423,516.00
T3x1 "
168
UN
COLREJILLAS BOGOTA
27/06/2006
2,842.00
T3x2"
171
UN
COLREJILLAS BOGOTA
01/07/2006
15,845.60
T5"x3 "
312
UN
COLREJILLAS BOGOTA
27/06/2006
8,839.20
T6"x4 "
314
UN
COLREJILLAS BOGOTA
01/07/2006
14,291.20
389
UN
COLREJILLAS BOGOTA
01/07/2006
1,809.60
370
UN
COLREJILLAS BOGOTA
27/06/2006
1,763.20
GRIVAL
3"
Referencia
Fecha
Precio
030
9442
UN
SILPLAS
26/06/2006
2,853.60
007
2363
UN
SILPLAS
01/07/2006
2,360.60
2366
UN
SILPLAS
26/06/2006
3,445.20
S3"x2"
366
UN
COLREJILLAS BOGOTA
01/07/2006
4,779.20
SC4"x3"
2414
UN
COLREJILLAS BOGOTA
01/07/2006
41,400.40
11169
3543
UN
01/07/2006
49,862.00
11170
3544
UN
01/07/2006
59,411.00
11171
3545
UN
01/07/2006
66,490.00
11176
3546
UN
01/07/2006
55,317.00
11177
3547
UN
01/07/2006
64,112.00
11178
3548
UN
01/07/2006
76,324.00
SB 30x30
571
UN
COLREJILLAS BOGOTA
01/07/2006
144,791.20
TPA-60-MP
1142
UN
FIBRIT LTDA.
07/03/2006
250,297.84
505
1143
UN
SILPLAS
26/06/2006
3,944.00
RN 15x15cm.
493
UN
COLREJILLAS BOGOTA
01/07/2006
13,699.60
501
1144
UN
SILPLAS
26/06/2006
4,750.20
509
2403
UN
SILPLAS
26/06/2006
4,767.60
9443
UN
SILPLAS
26/06/2006
3,800.16
CAI-TP
1141
UN
FIBRIT LTDA.
07/03/2006
128,992.00
PAVCO
11968
1775
UN
01/07/2006
67,095.00
11962
3539
UN
01/07/2006
40,209.00
12089
3540
UN
01/07/2006
102,276.00
TEE GRES 4 x 4
MOORE
353
1168
UN
02/03/2006
16,240.00
TEE GRES 6 x 6
MOORE
356
1170
UN
07/03/2006
30,401.28
TEE GRES 8 x 8
MOORE
357
2485
UN
07/03/2006
52,116.48
507
2407
UN
SILPLAS
04/07/2006
3,700.40
CLASE 1
1146
ML
04/07/2006
41,794.80
CLASE 1
1147
ML
04/07/2006
58,566.08
CLASE 1
2005
ML
04/07/2006
93,136.40
CLASE 1
2006
ML
04/07/2006
110,084.00
CLASE 1
2007
ML
04/07/2006
120,803.56
CLASE 1
2008
ML
04/07/2006
143,262.32
CLASE 1
2009
ML
04/07/2006
188,631.08
CLASE 1
1145
ML
04/07/2006
33,201.52
CLASE 1
2010
ML
04/07/2006
220,794.40
1404
ML
30/06/2005
46,225.00
1498
ML
30/06/2005
65,543.00
455
ML
07/03/2006
11,836.00
537
ML
07/03/2006
21,105.00
881
ML
30/06/2005
31,424.00
12406
3526
ML
04/07/2006
11,839.00
12408
3527
ML
04/07/2006
21,108.00
12410
3528
ML
04/07/2006
31,427.00
12397
303
ML
04/07/2006
46,228.00
12399
1135
ML
04/07/2006
65,545.00
12401
1136
ML
04/07/2006
103,403.00
Referencia
Fecha
12403
1426
ML
04/07/2006
135,098.00
12405
1450
ML
04/07/2006
161,974.00
13330
1150
ML
04/07/2006
20,312.00
865
ML
04/07/2006
24,038.00
13298
1151
ML
04/07/2006
37,044.00
868
ML
30/06/2005
52,177.00
1152
ML
04/07/2006
63,839.00
869
ML
30/06/2005
88,435.00
866
ML
30/06/2005
136,850.00
1153
ML
04/07/2006
100,101.00
13273
13297
Precio
867
ML
30/06/2005
192,485.00
2878
ML
TITAN MANUFACTURAS
16/06/2006
303,600.00
2879
ML
TITAN MANUFACTURAS
16/06/2006
398,640.00
2880
ML
TITAN MANUFACTURAS
16/06/2006
496,276.00
2677
ML
TITAN MANUFACTURAS
16/06/2006
126,764.00
2730
ML
TITAN MANUFACTURAS
16/06/2006
154,396.00
2750
ML
TITAN MANUFACTURAS
16/06/2006
192,852.00
2769
ML
TITAN MANUFACTURAS
16/06/2006
242,704.00
CLASE 1
2236
ML
TITAN MANUFACTURAS
16/06/2006
8,720.00
CLASE 1
2237
ML
TITAN MANUFACTURAS
16/06/2006
14,720.00
CLASE 1
2244
ML
TITAN MANUFACTURAS
16/06/2006
18,000.00
CLASE 1
2361
ML
TITAN MANUFACTURAS
16/06/2006
21,440.00
CLASE 1
2384
ML
TITAN MANUFACTURAS
16/06/2006
27,040.00
CLASE 1
2386
ML
TITAN MANUFACTURAS
16/06/2006
35,440.00
CLASE 1
2411
ML
TITAN MANUFACTURAS
16/06/2006
46,240.00
CLASE 1
2627
ML
TITAN MANUFACTURAS
04/07/2006
59,920.00
CLASE 1
2631
ML
TITAN MANUFACTURAS
16/06/2006
88,400.00
CLASE UNICA
2638
ML
TITAN MANUFACTURAS
04/07/2006
126,320.00
183
1004
UN
07/03/2006
17,376.80
204
1010
UN
07/03/2006
45,604.24
12485
1149
ML
04/07/2006
8,752.00
1148
ML
04/07/2006
15,460.00
102
1156
UN
07/03/2006
8,688.40
123
2496
UN
07/03/2006
21,715.20
103
1157
UN
07/03/2006
14,476.80
124
1158
UN
07/03/2006
38,001.60
126
1159
UN
07/03/2006
47,768.80
MOORE
127
73
UN
07/03/2006
58,633.36
MOORE
128
2487
UN
07/03/2006
71,662.48
MOORE
130
200
UN
07/03/2006
102,068.40
MOORE
131
2490
UN
07/03/2006
136,810.40
MOORE
132
2491
UN
07/03/2006
173,953.60
MOORE
133
203
UN
07/03/2006
262,763.20
MOORE
134
2494
UN
07/03/2006
403,916.64
MOORE
135
204
UN
07/03/2006
506,706.56
182
1154
UN
07/03/2006
10,857.60
MOORE
MOORE
Referencia
Fecha
Precio
ETERNIT
CLS25 GRIS
2308
ML
04/07/2006
6,891.56
ETERNIT
CLS25 GRIS
2309
ML
04/07/2006
12,417.80
ETERNIT
CLS25 GRIS
2318
ML
04/07/2006
19,757.12
ETERNIT
CLS25 GRIS
2310
ML
04/07/2006
32,996.20
ETERNIT
CLS25 GRIS
2311
ML
04/07/2006
54,489.84
ETERNIT
CLS25 GRIS
2312
ML
04/07/2006
63,646.88
ETERNIT
CLS25 GRIS
2313
ML
04/07/2006
88,967.36
ETERNIT
CLS25 GRIS
2314
ML
04/07/2006
121,368.48
ETERNIT
CLS25 GRIS
2315
ML
04/07/2006
152,014.52
ETERNIT
CLS25 GRIS
2316
ML
04/07/2006
19,199.48
ETERNIT
CLS25 GRIS
2317
ML
04/07/2006
227,072.32
ETERNIT
CLS25 GRIS
2319
ML
04/07/2006
313,466.80
PAVCO
12338
1164
ML
04/07/2006
14,571.00
PAVCO
12349
1161
ML
04/07/2006
24,041.00
PAVCO
52,180.00
12359
1162
ML
04/07/2006
12799
3529
UN
04/07/2006
9,251.00
12801
3530
UN
04/07/2006
22,417.00
12802
3531
UN
04/07/2006
30,826.00
12804
304
UN
04/07/2006
82,808.00
12807
567
UN
04/07/2006
134,328.00
12811
570
UN
04/07/2006
247,353.00
12814
690
UN
04/07/2006
274,050.00
12817
902
UN
04/07/2006
292,317.00
PAVCO
1781
UN
04/07/2006
26,309.00
PAVCO
1780
UN
04/07/2006
45,118.00
1116
UN
04/07/2006
180.00
1163
UN
04/07/2006
6,728.00
1785
UN
04/07/2006
7,044.00
12858
1782
UN
04/07/2006
5,204.00
504
2395
UN
SILPLAS
26/06/2006
1,102.00
500
2372
UN
SILPLAS
26/06/2006
1,635.60
VP 2"
2432
UN
COLREJILLAS BOGOTA
04/07/2006
10,138.40
1776
UN
04/07/2006
80,417.00
12848
ETERNIT
W RETEN
13175
3541
UN
04/07/2006
54,927.00
13207
3542
UN
04/07/2006
105,080.00
1165
UN
04/07/2006
104,652.00
MOORE
303
1167
UN
06/03/2006
21,648.00
MOORE
305
2012
UN
07/03/2006
23,162.88
MOORE
329
1169
UN
07/03/2006
30,401.28
MOORE
330
1989
UN
07/03/2006
52,116.48
MOORE
332
1134
UN
07/03/2006
66,595.60
MOORE
333
2486
UN
07/03/2006
82,520.08
MOORE
334
2488
UN
07/03/2006
97,718.40
MOORE
336
2489
UN
07/03/2006
140,429.60
MOORE
337
1155
UN
07/03/2006
191,098.40
MOORE
338
2492
UN
07/03/2006
243,217.20
Referencia
Fecha
Precio
MOORE
339
2493
UN
07/03/2006
366,270.00
MOORE
340
2495
UN
07/03/2006
484,991.36
MOORE
341
481
UN
07/03/2006
608,048.80
Referencia
Fecha
Precio
189050
1171
UN
FERRICENTROS S.A.
30/06/2006
29,270.00
MDF en Bgt
2647
ML
BLITEC
28/10/2005
464,000.00
SierraPuerta
1204
UN
ALMACEN EL ARQUITECTO
13/06/2006
103,356.00
115
UN
ALARMAS AUTOCERRADURAS
25/02/2005
90,000.00
274
UN
ALARMAS AUTOCERRADURAS
25/02/2005
45,000.00
117
UN
ALARMAS AUTOCERRADURAS
25/02/2005
90,000.00
731
121
UN
ALARMAS AUTOCERRADURAS
25/02/2005
35,000.00
GEBE
427
UN
ALARMAS AUTOCERRADURAS
25/02/2005
90,000.00
3894
UN
ALMACEN EL ARQUITECTO
30/06/2006
28,884.00
3893
UN
ALMACEN EL ARQUITECTO
30/06/2006
28,884.00
494/502/3257
3336
UN
CERRADURAS INTERATLANTICA
28/06/2006
1,493,616.00
494 Y 502
3335
UN
CERRADURAS INTERATLANTICA
28/06/2006
787,983.00
1141
1175
UN
CERRADURAS INTERATLANTICA
01/07/2006
27,260.00
1141A
1174
UN
CERRADURAS INTERATLANTICA
01/07/2006
30,044.00
1152
1177
UN
CERRADURAS INTERATLANTICA
01/07/2006
24,940.00
1145
1178
UN
CERRADURAS INTERATLANTICA
01/07/2006
29,232.00
1140
2130
UN
CERRADURAS INTERATLANTICA
01/07/2006
33,930.00
1142
1180
UN
CERRADURAS INTERATLANTICA
01/07/2006
34,220.00
1143A
1183
UN
CERRADURAS INTERATLANTICA
01/07/2006
41,760.00
CLAS
1153
1712
UN
CERRADURAS INTERATLANTICA
01/07/2006
24,592.00
CLAS
1149
1184
UN
CERRADURAS INTERATLANTICA
01/07/2006
24,940.00
CERRADURA SCHLAGE-FLAIR
A- 40S
3332
UN
ALMACEN EL ARQUITECTO
01/07/2006
52,084.00
A50WS
1186
UN
ALMACEN EL ARQUITECTO
01/07/2006
33,872.00
A40S
1187
UN
ALMACEN EL ARQUITECTO
01/07/2006
29,754.00
A40S
1188
UN
ALMACEN EL ARQUITECTO
01/07/2006
29,754.00
2023
UN
ALMACEN EL ARQUITECTO
01/07/2006
59,392.00
2022
UN
ALMACEN EL ARQUITECTO
01/07/2006
59,392.00
1191
UN
ALMACEN EL ARQUITECTO
01/07/2006
59,392.00
A71WS
1189
UN
ALMACEN EL ARQUITECTO
01/07/2006
33,640.00
A80WD
2020
UN
ALMACEN EL ARQUITECTO
01/07/2006
33,640.00
A80WD
1192
UN
ALMACEN EL ARQUITECTO
01/07/2006
33,640.00
A80PD
1194
UN
ALMACEN EL ARQUITECTO
01/07/2006
37,294.00
A80PD
1193
UN
ALMACEN EL ARQUITECTO
01/07/2006
37,294.00
2027
UN
ALMACEN EL ARQUITECTO
01/07/2006
163,328.00
2029
UN
ALMACEN EL ARQUITECTO
01/07/2006
163,328.00
A10S
1197
UN
ALMACEN EL ARQUITECTO
01/07/2006
29,754.00
A10S
1196
UN
ALMACEN EL ARQUITECTO
01/07/2006
29,754.00
A30D
1198
UN
ALMACEN EL ARQUITECTO
01/07/2006
29,754.00
2026
UN
ALMACEN EL ARQUITECTO
01/07/2006
137,808.00
Fecha
2028
UN
ALMACEN EL ARQUITECTO
01/07/2006
137,808.00
5302
1199
UN
CERRACOL S.A.
01/07/2006
32,000.00
1200
UN
CERRACOL S.A.
01/07/2006
54,000.00
2044
1201
UN
CERRACOL S.A.
01/07/2006
15,800.00
987
1203
UN
CERRACOL S.A.
01/07/2006
76,500.00
C-1000
3890
UN
ALMACEN EL ARQUITECTO
01/07/2006
93,960.00
3891
UN
ALMACEN EL ARQUITECTO
01/07/2006
72,268.00
3892
UN
ALMACEN EL ARQUITECTO
01/07/2006
28,884.00
Descripcin
Precio
A50PD
2019
UN
ALMACEN EL ARQUITECTO
01/07/2006
39,324.00
A50PD
1195
UN
ALMACEN EL ARQUITECTO
01/07/2006
39,324.00
A71WS
1190
UN
ALMACEN EL ARQUITECTO
01/07/2006
29,754.00
A30D
2018
UN
ALMACEN EL ARQUITECTO
01/07/2006
29,754.00
6 mm
2965
M2
INTERVIDRIOS
01/07/2006
32,000.00
4 mm
1208
M2
INTERVIDRIOS
13/06/2006
45,000.00
3 mm
3 mm
2711
M2
INTERVIDRIOS
13/06/2006
25,000.00
4 mm
4 mm
108
M2
INTERVIDRIOS
01/07/2006
31,000.00
19,720.00
IMPORTADO
2760
UN
ALMACEN EL ARQUITECTO
01/07/2006
IMPORTADO
2761
UN
ALMACEN EL ARQUITECTO
01/07/2006
19,720.00
1213
UN
VITEMPLEX LTDA.
01/07/2006
1,170,440.00
con accesori
2181
UN
VITEMPLEX LTDA.
01/07/2006
1,241,571.20
CROMADA
1579
UN
ALMACEN EL ARQUITECTO
13/06/2006
8,120.00
406
2140
UN
ALMACEN EL ARQUITECTO
04/07/2006
1,345.60
4mm
3092
M2
18,400.00
2641
M2
BLITEC
28/10/2005
754,000.00
9491
M2
BLITEC
03/03/2006
928,000.00
4 mm.
262
M2
INTERVIDRIOS
04/07/2006
27,000.00
5 mm.
264
M2
INTERVIDRIOS
04/07/2006
32,000.00
6 mm.
269
M2
INTERVIDRIOS
04/07/2006
38,000.00
10 mm
1205
M2
INTERVIDRIOS
04/07/2006
87,000.00
3966
M2
VITEMCO S.A
07/03/2006
72,052.24
260
M2
INTERVIDRIOS
04/07/2006
27,000.00
4 mm.
5 mm.
261
M2
INTERVIDRIOS
13/06/2006
32,000.00
3964
M2
VITEMCO S.A
07/03/2006
47,810.56
3965
M2
VITEMCO S.A
07/03/2006
59,764.36
4 mm
280
M2
CRISTALVIT LTDA
04/07/2006
76,560.00
5 mm
279
M2
CRISTALVIT LTDA
04/07/2006
92,800.00
6 mm
1206
M2
CRISTALVIT LTDA
04/07/2006
114,840.00
3963
M2
VITEMCO S.A
07/03/2006
146,027.76
10 mm
1207
M2
CRISTALVIT LTDA
04/07/2006
170,520.00
12 mm
3958
M2
VITEMCO S.A
06/03/2006
290,788.80
4 mm
334
M2
CRISTALVIT LTDA
04/07/2006
68,440.00
5 mm
337
M2
CRISTALVIT LTDA
04/07/2006
83,520.00
6 mm
1211
M2
CRISTALVIT LTDA
04/07/2006
100,920.00
4 mm
3962
M2
VITEMCO S.A
07/03/2006
168,604.84
6 mm
3960
M2
VITEMCO S.A
07/03/2006
156,652.20
5 mm
3961
M2
CRISTALVIT LTDA
04/07/2006
154,280.00
Referencia
Fecha
5 mm
9360
M2
VITEMCO S.A
07/03/2006
131,418.72
4 mm
253
M2
INTERVIDRIOS
04/07/2006
23,500.00
4 mm
1214
M2
INTERVIDRIOS
13/06/2006
16,000.00
3 mm
1217
M2
INTERVIDRIOS
04/07/2006
16,000.00
4 mm
1218
M2
INTERVIDRIOS
04/07/2006
17,000.00
5 mm.
1219
M2
INTERVIDRIOS
04/07/2006
22,500.00
6 mm
1220
M2
INTERVIDRIOS
04/07/2006
31,500.00
219
M2
INTERVIDRIOS
04/07/2006
21,000.00
244
M2
INTERVIDRIOS
04/07/2006
26,500.00
4 mm.
124
M2
INTERVIDRIOS
04/07/2006
38,000.00
5 mm.
672
M2
INTERVIDRIOS
04/07/2006
41,000.00
5 mm
1216
M2
CRISTALVIT LTDA
04/07/2006
92,800.00
2mm
199
M2
17,900.00
5mm
3039
M2
23,100.00
6mm
3061
M2
29,900.00
3mm
452
M2
4 mm
321
M2
INTERVIDRIOS
13/06/2006
Precio
13,800.00
106,720.00
CONTENIDO
ANLISIS DE PRECIOS UNITARIOS RESUMIDOS
Gr. 1
Gr. 23
Cableado Estructurado
Gr. 13
Carpintera de Madera
Gr. 14
Carpintera Metlica
Gr. 7
Cielosrasos
Gr. 3
Cimentacin y Estructura
Gr. 9
Cubiertas
10
Gr. 10
Enchapes y Accesorios
12
Gr. 17
Equipos Especiales
13
Gr. 18
14
Gr. 12
15
Gr. 20
Inst. Gas
17
Gr. 11
18
Gr. 4
Mampostera
21
Gr. 8
23
Gr. 5
24
Gr. 15
Pintura
25
Gr. 9
Pisos
26
Gr. 2
29
Gr. 22
Sueldos y Jornales
30
Gr. 19
31
Gr . 21
Vias
32
Gr. 16
Vidrios y Cerraduras
33
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
ALUMBRADO PROVISIONAL
BAO PROVISIONAL EN OBRA 4m2
BAO PROVISIONAL EN OBRA 4m2 (CON
CAMPAMENTO 40 M2
CAMPAMENTO 50 M2
CAMPAMENTO CON BAO M2
CAMPAMENTO M2
CERCA ALAMBRE DE PUAS 4 HILOS
CERCA EN LAMINA H=2.20 M.
CERCA EN LAMINA / BASE
796
1036
1037
3
2
741
90
4
5
7
UN
UN
UN
UN
UN
UN
M2
ML
ML
ML
104,646.50
461,933.10
629,933.10
2,779,693.10
3,528,195.33
87,446.83
68,495.46
2,409.95
46,928.11
48,260.82
19,700.00
120,750.00
120,750.00
1,000,000.00
1,250,000.00
27,100.00
25,165.38
3,675.00
7,680.00
5,120.00
125,331.50
582,683.10
750,683.10
3,779,693.10
4,778,195.33
115,901.83
94,919.10
6,084.95
54,608.11
53,380.82
1
6
277
278
56
76
59
77
16
8
ML
ML
ML
ML
M2
M3
M2
M3
M3
M2
17,740.09
17,747.75
19,821.86
20,986.85
0.00
0.00
0.00
0.00
0.00
0.00
3,675.00
3,675.00
3,675.00
3,675.00
4,410.00
140,000.00
5,040.00
105,000.00
110,000.00
3,255.00
21,415.09
21,606.50
23,496.86
24,661.85
5,730.00
480,545.00
7,440.00
277,650.00
260,900.00
9,255.00
100
370
843
9
10
845
851
11
12
13
M2
M2
M2
M2
M2
M3
M3
M2
M2
M2
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4,410.00
3,950.00
14,490.00
8,750.00
10,500.00
38,350.00
15,015.00
9,660.00
45,000.00
10,836.00
5,610.00
5,150.00
58,125.00
17,150.00
25,500.00
183,625.00
91,965.00
41,910.00
94,035.00
48,936.00
14
15
17
18
19
20
21
22
23
24
M2
M2
M2
M3
UN
UN
M2
M3
M3
M3
0.00
0.00
0.00
0.00
0.00
0.00
0.00
78,353.22
0.00
0.00
39,000.00
26,500.00
3,250.00
0.00
17,500.00
6,300.00
2,205.00
7,875.00
14,000.00
0.00
106,500.00
54,250.00
9,550.00
21,250.00
23,500.00
12,300.00
4,845.00
86,385.72
16,320.00
15,250.00
25
26
27
28
M3
M3
M3
M3
0.00
0.00
0.00
0.00
16,100.00
13,500.00
15,100.00
13,550.00
36,222.00
33,570.00
36,402.00
34,821.00
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
EXPLANACION Y EXTENDIDA
EXPLANACION Y RETIRO
INSTALACION SANITARIA PROVISIONAL
LOCALIZACION Y REPLANTEO
LOCALIZACION Y REPLANTEO CON EQUIPO
PICAR PAETE DE MURO
PICAR PAETE DE TECHO
RED AGUA PROVISIONAL (50 M.)
RED ELECTRICA PROVISIONAL (50 M.)
RED INSTALACIONES ELECTRICA PROVISIONAL
29
30
31
695
746
377
380
32
33
803
M3
M3
UN
M2
M2
M2
M2
UN
UN
UN
0.00
0.00
476,799.37
1,178.54
0.00
0.00
0.00
147,688.60
1,072,553.40
1,701,349.36
0.00
0.00
51,400.00
1,650.00
254.56
1,900.00
2,250.00
462,000.00
199,500.00
332,500.00
6,000.00
30,500.00
528,199.37
2,828.54
654.56
1,900.00
2,250.00
609,688.60
1,272,053.40
2,033,849.36
795
34
35
36
37
UN
M3
M3
M2
M3
114,724.00
0.00
26,800.00
1,327.36
0.00
14,175.00
0.00
7,000.00
2,100.00
8,000.00
129,607.75
29,245.20
35,145.60
3,427.36
27,800.00
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
2024
475
3034
3035
3036
3037
3038
3738
815
3039
UN
ML
ML
ML
ML
ML
UN
ML
UN
ML
32,422.00
72,037.51
44,527.64
47,971.40
33,365.91
35,684.67
363,962.18
36,128.33
629,028.56
61,605.60
4,225.00
7,560.00
6,500.00
6,500.00
6,500.00
6,500.00
68,000.00
7,770.00
59,200.00
8,500.00
36,858.25
80,277.91
51,417.64
54,861.40
40,060.91
42,379.67
440,122.18
44,597.63
700,068.56
70,190.60
814
478
UN
UN
187,860.00
11,323.95
68,000.00
8,400.00
260,620.00
20,143.95
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
892
564
563
802
565
566
403
320
567
568
UN
M2
M2
UN
M2
M2
M2
M2
M2
M2
580,000.00
115,544.69
87,041.48
480,000.00
32,030.82
60,772.26
17,592.00
12,084.00
18,477.12
29,499.60
220,500.00
66,150.00
66,150.00
220,500.00
23,835.00
23,835.00
7,500.00
7,500.00
7,500.00
7,500.00
800,500.00
181,694.69
153,191.48
700,500.00
55,865.82
84,607.26
25,092.00
19,584.00
25,977.12
36,999.60
763
762
761
589
569
570
571
572
573
574
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
323,829.00
65,364.00
323,829.00
47,900.00
94,738.31
94,907.51
130,469.75
59,160.00
65,364.00
65,364.00
4,000.00
4,000.00
4,000.00
4,000.00
14,700.00
14,700.00
14,700.00
4,000.00
4,000.00
4,000.00
327,829.00
69,364.00
327,829.00
51,900.00
109,438.31
109,607.51
145,169.75
63,160.00
69,364.00
69,364.00
575
576
577
578
579
580
581
582
583
584
UN
UN
UN
UN
UN
UN
ML
ML
M2
M2
68,086.20
72,169.40
72,169.40
72,011.00
82,066.00
82,066.00
143,436.34
112,723.42
106,165.68
101,089.89
4,000.00
4,000.00
4,000.00
4,000.00
4,000.00
4,000.00
64,000.00
64,000.00
64,000.00
64,000.00
72,086.20
76,169.40
76,169.40
76,011.00
86,066.00
86,066.00
207,436.34
176,723.42
170,165.68
165,089.89
585
758
586
804
587
588
595
593
590
591
ML
ML
ML
UN
UN
UN
M2
M2
M2
M2
13,036.14
16,282.98
8,810.64
154,250.17
125,510.02
107,023.30
58,075.00
39,390.88
46,577.08
53,763.28
10,500.00
10,500.00
10,500.00
105,000.00
105,000.00
105,000.00
18,795.00
18,795.00
18,795.00
18,795.00
23,536.14
26,782.98
19,310.64
259,250.17
230,510.02
212,023.30
76,870.00
58,185.88
65,372.08
72,558.28
592
594
M2
M2
70,291.54
45,139.84
18,795.00
18,795.00
89,086.54
63,934.84
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
596
597
598
57
975
976
978
996
997
998
UN
ML
ML
M2
M2
M2
M2
M2
M2
M2
21,795.08
25,042.00
61,539.52
3,061.24
19,517.00
16,311.92
13,991.92
17,075.00
38,393.68
29,049.88
0.00
0.00
0.00
7,570.50
7,570.50
7,570.50
7,570.50
7,570.50
7,570.50
7,570.50
21,893.16
36,310.90
89,232.31
10,631.74
27,087.50
23,882.42
21,562.42
24,645.50
45,964.18
36,620.38
999
1013
1020
1021
1022
1023
599
600
601
602
M2
M2
M2
M2
M2
M2
UN
UN
UN
UN
22,629.28
18,565.80
14,981.40
12,261.20
10,544.40
17,910.40
36,177.38
44,247.05
54,538.97
65,115.38
7,570.50
7,570.50
7,570.50
7,570.50
7,570.50
7,570.50
0.00
0.00
0.00
0.00
30,199.78
26,136.30
22,551.90
19,831.70
18,114.90
25,480.90
52,457.20
64,158.22
79,081.50
94,417.30
603
604
605
606
694
607
608
609
610
611
UN
UN
UN
M2
UN
M2
M2
M2
M2
ML
80,413.72
46,736.45
62,959.90
26,827.81
162,400.00
46,348.31
88,536.88
23,371.43
29,819.94
31,586.40
0.00
0.00
0.00
0.00
7,140.00
0.00
0.00
0.00
0.00
0.00
116,599.89
67,767.85
91,291.86
26,948.53
169,540.00
67,205.05
128,378.47
33,888.57
43,238.91
45,800.28
612
614
613
616
615
690
691
693
675
617
UN
M2
M2
M2
M2
UN
UN
UN
UN
M2
28,477.02
190,000.00
100,000.00
150,000.00
180,000.00
78,633.82
18,786.33
49,408.44
120,740.87
38,706.88
0.00
9,450.00
9,450.00
9,450.00
9,450.00
4,462.50
3,990.00
4,095.00
4,515.00
0.00
41,291.68
199,450.00
109,450.00
159,450.00
189,450.00
83,096.32
22,776.33
53,503.44
125,255.87
56,124.98
618
619
M2
M2
50,689.24
59,733.50
0.00
0.00
73,499.40
86,613.57
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
879
995
232
875
876
893
894
896
897
889
M2
M2
ML
M2
M2
M2
M2
M2
M2
M2
21,251.66
23,478.71
4,468.81
135,159.95
193,824.63
153,914.60
111,499.20
158,224.00
135,024.00
41,808.99
10,815.00
5,250.00
9,467.85
2,000.00
2,000.00
3,675.00
3,675.00
3,675.00
3,675.00
3,675.00
32,066.66
28,728.71
13,936.66
137,159.95
195,824.63
157,589.60
115,174.20
161,899.00
138,699.00
45,483.99
233
248
250
888
878
237
898
238
239
124
ML
ML
M2
M2
M2
M2
M2
M2
M2
M2
16,820.00
23,780.00
22,573.95
22,573.95
25,634.92
25,090.76
60,035.60
64,239.53
73,699.53
22,769.53
3,675.00
3,675.00
3,990.00
3,675.00
6,280.00
6,280.00
6,280.00
7,350.00
7,350.00
7,350.00
20,495.00
27,455.00
26,563.95
26,248.95
31,914.92
31,370.76
66,315.60
71,589.53
81,049.53
30,119.53
LISTON M.H.(OTOBO)
LISTON M.H.(PEINE MONO)
LISTON M.H.(PINO ROMERON)
LUXALON ACERO 130B LISO DECOR. (instalado)
LUXALON ACERO 80B (instalado)
LUXALON ACERO 84R COBR V5 DECO (instalado)
LUXALON ALUHORIZ 12mm. (instalado)
LUXALON ALUMHORIZ 130B (instalado)
LUXALON ALUMHORIZ 80B (instalado)
LUXALON MADERALUM 84R V5 ACUST (instalado)
240
241
242
245
244
659
859
246
247
858
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
24,045.53
21,493.53
51,479.53
55,823.94
69,986.44
109,503.42
44,057.22
72,197.85
78,975.25
126,906.30
7,350.00
7,350.00
7,350.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
31,395.53
28,843.53
58,829.53
55,823.94
69,986.44
109,503.42
44,057.22
72,197.85
78,975.25
126,906.30
855
540
249
243
883
236
251
M2
M2
ML
M2
M2
M2
M2
112,035.16
155,627.85
58,000.00
161,488.55
63,418.62
20,220.19
18,225.74
0.00
0.00
7,350.00
0.00
3,675.00
3,675.00
5,250.00
112,035.16
155,627.85
65,350.00
161,488.55
67,093.62
23,895.19
23,475.74
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
313
378
379
384
388
419
451
626
72
840
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
24,523.82
30,125.12
23,209.90
27,861.30
22,315.26
25,570.56
65,042.84
76,879.92
27,299.98
34,294.84
1,650.00
1,650.00
1,650.00
1,650.00
1,650.00
1,650.00
1,650.00
1,650.00
1,650.00
1,650.00
26,173.82
31,775.12
24,859.90
29,511.30
23,965.26
27,220.56
66,692.84
78,529.92
28,949.98
35,944.84
73
841
74
842
70
71
844
253
252
700
M2
M2
M2
M2
M2
M2
M3
M3
M3
UN
29,341.71
32,008.10
30,180.51
33,395.12
50,581.82
58,395.29
370,377.69
110,318.54
111,911.25
176,141.80
1,650.00
1,650.00
1,650.00
1,650.00
1,650.00
1,650.00
115,000.00
64,320.00
64,160.00
125,395.00
30,991.71
33,658.10
31,830.51
35,045.12
52,231.82
60,045.29
531,290.49
174,638.54
176,071.25
304,044.70
82
850
79
81
80
846
847
848
696
78
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
55,589.80
56,395.42
60,032.26
56,971.14
59,051.05
69,161.97
65,159.72
64,708.32
64,514.42
59,164.80
14,676.00
14,857.50
14,857.50
15,039.00
15,039.00
14,676.00
25,792.50
25,974.00
22,000.00
14,676.00
74,140.20
75,127.32
79,077.36
75,884.54
77,964.45
88,025.57
94,826.62
94,556.72
88,561.02
78,028.40
293
220
931
84
902
85
895
91
1038
92
M2
M2
M2
M2
M2
M2
M2
UN
UN
M3
62,348.86
79,396.00
82,308.76
64,974.45
97,323.39
66,513.79
72,505.19
17,383.81
56,810.35
374,327.60
13,950.00
12,600.00
12,600.00
16,338.00
12,387.08
12,387.08
12,387.08
12,600.00
9,000.00
170,000.00
77,326.62
91,996.00
94,908.76
85,186.85
112,958.47
82,148.87
88,140.27
29,983.81
66,440.35
550,591.60
93
699
1003
1004
M3
KG
M3
M3
10,899.36
49,403.04
391,645.00
391,645.00
2,625.00
190.00
0.00
0.00
13,524.36
49,593.04
577,245.00
554,045.00
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
98
1002
1000
523
1001
801
1008
95
96
75
M3
ML
ML
ML
ML
M3
M2
M2
M2
M2
329,824.71
56,343.74
125,033.77
161,225.52
269,008.78
388,828.30
148,966.72
32,966.61
39,483.58
45,995.42
138,000.00
0.00
0.00
0.00
0.00
16,100.00
23,100.00
12,705.00
12,400.00
13,300.00
483,077.26
81,863.74
155,193.77
213,425.52
352,528.78
425,428.30
182,749.52
51,924.01
57,985.18
66,812.22
97
83
145
279
280
283
284
849
281
282
M2
M2
M2
TN
TN
TN
TN
TN
TN
TN
49,253.91
59,034.50
32,966.61
2,280,395.28
2,219,495.28
2,370,527.28
2,219,495.28
2,223,895.04
2,370,527.28
2,219,495.28
13,750.00
16,100.00
14,000.00
240,000.00
240,000.00
240,000.00
240,000.00
194,000.00
240,000.00
240,000.00
70,758.51
82,251.10
53,219.01
2,520,395.28
2,459,495.28
2,610,527.28
2,459,495.28
2,417,895.04
2,610,527.28
2,459,495.28
285
286
288
287
289
290
291
292
99
965
TN
TN
TN
TN
TN
TN
M2
KG
TN
ML
2,280,395.28
2,219,495.28
2,219,495.28
2,280,395.28
2,280,395.28
2,219,495.28
4,119.83
4,100.79
2,284,795.04
19,712.64
240,000.00
240,000.00
240,000.00
240,000.00
240,000.00
240,000.00
3,990.00
3,990.00
194,000.00
9,435.00
2,520,395.28
2,459,495.28
2,459,495.28
2,520,395.28
2,520,395.28
2,459,495.28
8,109.83
8,090.79
2,478,795.04
37,893.16
964
966
967
968
969
973
101
102
103
104
ML
ML
ML
ML
ML
ML
M3
M3
M3
M3
15,329.40
11,185.93
9,459.90
26,168.48
13,079.71
13,076.89
351,706.92
369,659.88
363,041.37
474,608.69
9,435.00
6,426.00
6,426.00
6,426.00
6,426.00
6,426.00
84,000.00
84,000.00
182,280.00
131,250.00
32,194.95
21,135.08
19,063.85
39,114.15
23,407.63
23,404.24
436,959.72
454,912.68
561,445.37
615,370.69
VIGA CIMIENTO
VIGA DE AMARRE EN CONCRETO
VIGA DE CIMIENTO 0.25 x 0.25
VIGA DE CIMIENTO 0.40 x 0.60
VIGA DE CIMIENTO 0.55 x 0.90
VIGA PERFIL ACERO EN T 75mm DIACO
VIGA PERFIL ACERO EN T 100mm DIACO
VIGA TEE (25x25x20x40)
VIGA TEE (25x25x20x50)
VIGAS AEREAS CUBIERTA
106
105
107
108
109
963
962
111
112
113
M3
M3
M3
M3
M3
ML
ML
M3
M3
M3
347,608.27
332,728.33
349,594.39
349,338.22
345,373.54
18,537.03
24,595.16
339,117.76
339,964.05
333,889.66
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
9,435.00
9,435.00
100,000.00
100,000.00
74,550.00
428,872.27
413,992.33
430,858.39
430,602.22
426,637.54
36,364.86
44,240.44
440,370.56
441,216.85
456,927.66
137
M3
339,268.93
135,000.00
532,500.93
Descripcin
VIGAS DE ENTREPISO
ZAPATAS
ZAPATAS 0.75 x 0.75
ZAPATAS 1.50 x 1.50
ZAPATAS 2.50 x .55
ZAPATAS 2.50 x 2.50
ZAPATAS CORRIDA 1.50 x .40
115
116
117
118
87
119
39
Und.
M3
M3
M3
M3
M3
M3
M3
Materiales
361,164.14
333,997.74
323,565.29
322,153.77
315,492.27
325,527.79
326,381.38
Mano de Obra
74,550.00
80,000.00
80,000.00
80,000.00
80,000.00
80,000.00
80,000.00
Valor Total
484,202.14
417,129.74
406,697.29
406,225.37
399,563.87
409,599.39
410,452.98
CUBIERTAS (6)
10/07/2006 Bogot
Cd.
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
195
196
110
198
199
200
201
202
203
204
M2
M2
ML
ML
ML
ML
M2
M2
M2
M2
10,524.22
11,791.30
26,967.49
53,967.87
29,529.58
9,648.30
57,283.91
58,745.14
54,629.10
52,747.09
5,121.22
10,233.50
9,000.00
10,054.60
6,500.00
3,500.00
9,000.00
9,000.00
9,000.00
9,000.00
15,645.45
22,024.80
35,967.49
64,022.47
36,029.58
13,148.30
66,283.91
67,745.14
63,629.10
61,747.09
CANALETA 43 DE 5.50 M.
CANALETA 43 DE 6.00 M.
CANALETA 90 DE 3.75 M.
CANALETA 90 DE 4.50 M.
CANALETA 90 DE 5.25 M.
CANALETA 90 DE 6.00 M.
CANALETA 90 DE 7.50 M.
CANALETA 90 DE 9.00 M.
CANALETA ACESCO 4.50 M.
CUMBRERA #1 (2.20x.90)Cristac.
205
206
207
208
209
210
211
212
213
863
M2
M2
M2
M2
M2
M2
M2
M2
M2
UN
51,711.99
51,222.44
34,361.42
33,245.71
31,801.97
33,254.23
32,152.46
31,411.14
35,456.83
384,048.74
9,000.00
9,000.00
8,190.00
8,190.00
8,190.00
8,190.00
8,190.00
8,190.00
6,825.00
16,275.00
60,711.99
60,222.44
42,551.42
41,435.71
39,991.97
41,444.23
40,342.46
39,601.14
42,281.83
400,323.74
CUMBRERA #2(1.50x2.04)Cristac.
CUPULA #1 (1.58x1.13)Cristacr.
CUPULA #2 (1.58x1.40)Cristacr.
CUPULA #3 (1.58x2.30)Cristacr.
DOMO CIRCULAR D=0.80 Cristacr.
DOMO CIRCULAR D=1.10 Cristacr.
DOMO CUADRADO BURBUJA (0.65x0.65)
DOMO CUADRADO BURBUJA (1.17x1.17)
DOMO CUADRADO DIAMANTE(0.65x0.65)
DOMO CUADRADO DIAMANTE(1.17x1.17)
864
865
866
867
868
214
869
870
871
872
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
578,119.68
296,534.66
345,518.03
578,314.82
120,536.86
206,979.20
86,931.26
200,161.12
86,931.26
198,056.42
16,275.00
16,275.00
16,275.00
16,275.00
10,500.00
10,500.00
10,500.00
10,500.00
10,500.00
10,500.00
594,394.68
312,809.66
361,793.03
594,589.82
131,036.86
217,479.20
97,431.26
210,661.12
97,431.26
208,556.42
873
857
114
856
188
706
852
853
854
216
UN
M2
M2
M2
M2
M2
M2
M2
M2
M2
148,790.82
40,132.00
44,179.20
27,004.00
47,310.97
36,149.95
32,854.11
28,415.01
21,492.80
13,226.33
10,500.00
11,340.00
12,317.52
15,675.00
22,175.00
15,675.00
15,675.00
15,675.00
15,675.00
16,000.00
159,290.82
51,472.00
56,496.72
42,679.00
69,485.97
51,824.95
48,529.11
44,090.01
37,167.80
29,226.33
217
197
221
218
M2
M2
M2
M2
12,581.53
42,643.21
1,153.12
51,780.14
12,000.00
12,317.52
2,100.00
8,200.00
24,581.53
54,960.73
3,510.16
59,980.14
CUBIERTAS (6)
10/07/2006 Bogot
Cd.
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
219
319
224
225
223
226
227
228
222
230
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
0.00
18,822.97
30,682.48
34,547.83
55,288.48
27,627.72
27,293.11
27,142.49
35,925.53
29,621.85
2,100.00
4,200.00
8,093.40
6,500.00
5,884.20
3,675.00
3,675.00
3,675.00
6,825.00
6,500.00
10,979.22
23,022.97
38,775.88
41,047.83
61,172.68
31,302.72
30,968.11
30,817.49
42,750.53
36,121.85
231
229
414
416
M2
M2
UN
UN
28,576.50
178,896.53
7,133.28
390.34
6,500.00
22,950.00
4,017.30
4,019.48
35,076.50
201,846.53
11,150.58
4,409.83
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
830
409
411
753
381
315
382
391
383
89
UN
M2
M2
M2
M2
M2
M2
M2
M2
M2
69,402.92
0.00
0.00
17,761.08
24,225.50
25,167.14
23,158.49
23,438.84
20,659.98
282,611.33
25,000.00
0.00
0.00
9,250.00
9,192.94
9,192.94
9,192.94
9,192.94
9,192.94
18,192.94
94,402.92
120,000.00
180,000.00
27,011.08
33,418.44
34,360.08
32,351.43
32,631.78
29,852.91
300,804.26
386
385
318
389
914
925
393
394
397
399
M2
M2
M2
M2
M2
M2
UN
UN
UN
UN
26,724.29
26,724.29
26,789.29
24,074.09
30,878.22
22,142.31
167,156.00
95,004.00
28,803.72
88,373.37
9,192.94
9,192.94
9,192.94
9,192.94
9,192.94
8,067.94
10,500.00
10,500.00
25,000.00
25,000.00
35,917.23
35,917.23
35,982.23
33,267.03
40,071.16
30,210.25
177,656.00
105,504.00
53,803.72
113,373.37
396
398
395
400
401
374
376
375
404
405
UN
UN
UN
UN
UN
M2
M2
M2
UN
M2
27,251.82
76,819.63
7,233.40
130,263.39
121,940.25
394,396.29
144,930.29
95,659.29
7,576.70
77,116.83
25,000.00
25,000.00
9,450.00
142,745.35
142,745.35
13,842.94
13,842.94
13,842.94
9,450.00
13,242.55
52,251.82
101,819.63
16,683.40
273,008.74
264,685.60
408,239.23
158,773.23
109,502.23
17,026.70
90,359.38
PIEDRA MUECA
PIRLAN DUCHA ARQUICER MACEDONIA 25x35
PIRLAN DUCHA PORCELANA 20x30
REJ ILLA PLASTICA 3x2"C/SOSCO CUAD.ANT
REJILLA PLASTICA 3"x2" c/SOSCO CTE
REJILLA PVC- 3x2"
REJILLA VENTILACION PLASTICA 15x15
REMATES PORCELANA BISELADOS
TAPA LAVAMANOS MARMOL NEGRO
TAPA MESON GRANITO NAT JASPE
406
407
408
417
415
412
413
420
519
520
M2
ML
ML
UN
UN
UN
UN
ML
ML
M2
72,069.83
6,592.04
5,595.33
1,839.47
1,839.47
3,729.78
2,610.38
0.00
216,692.06
164,149.14
13,242.55
22,000.00
22,000.00
1,785.00
1,785.00
1,785.00
1,785.00
3,465.00
8,925.00
8,925.00
85,312.38
28,592.04
27,595.33
3,624.47
3,624.47
5,514.78
4,395.38
3,465.00
225,617.06
173,074.14
TAPAS REGISTRO
15x15
TAPAS REGISTRO
20x20
TOALLERO ACUCER CORONA
422
421
423
UN
UN
UN
4,171.07
4,977.27
7,059.47
3,150.00
3,150.00
9,450.00
7,321.07
8,127.27
16,509.47
Descripcin
ASCENSOR 7 PARADAS
BOMBA SUMERGIBLE POZO 4" 1HP
BOMBA AGUA 3"- 1 HP
BOMBA ALTA PRESION
BOMBAS EYECTORAS
EQUIPO DE PRESION CONSTANTE
EQUIPO PRESION - 1 HP P1060
NEVERA INTEGRAL
PARARRAYOS 45MT
SALIDA BOMBA TRIFASICA PVC
SHUT BASURAS ETERNIT
Und.
Materiales
Mano de Obra
685
688
687
686
689
697
698
702
2021
886
UN
UN
UN
UN
UN
UN
UN
UN
UN
92,800,000.00
0.00
0.00
0.00
0.00
0.00
0.00
1,032,400.00
147,320.00
69,520.28
0.00
0.00
0.00
0.00
315,000.00
756,000.00
0.00
0.00
12,500.00
26,000.00
92,800,000.00
2,955,680.00
2,128,600.00
1,146,080.00
1,159,480.00
3,831,160.00
1,972,000.00
1,032,400.00
159,820.00
96,820.28
704
PS
68,078.08
28,350.00
96,428.08
Valor Total
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
ANDAMIO COLGANTE
ANDAMIO TUBULAR (6 SECCIONES 1 SEMANA)
ANDAMIO TUBULAR (6 SECCIONES 1MES)
COMPLEMENTO TENDIDO CABLE
FORMALETA MES/M2
HERRAMIENTA CERRA. REPAVIMENTACION
HERRAMIENTA PARA CAMARAS
HERRAMIENTA PARA EXCAVACION
HERRAMIENTA PARA RELLENO
HERRAMIENTA TENDIDO CABLE AEREO
709
707
708
3933
716
3931
3942
3934
3940
3943
DD
SM
MS
DD
MS
DD
DD
DD
DD
DD
0.00
0.00
0.00
0.00
0.00
5,800.00
11,600.00
11,600.00
5,800.00
11,600.00
14,779.40
14,779.40
56,516.00
0.00
3,694.85
0.00
0.00
0.00
0.00
0.00
15,591.40
33,293.00
135,860.00
163,622.64
9,036.65
34,631.39
76,837.07
14,813.26
43,012.86
284,648.11
3939
3932
3941
3938
3936
3937
3935
718
722
UN
UN
UN
UN
UN
UN
UN
DD
MS
580,000.00
580,000.00
580,000.00
580,000.00
580,000.00
580,000.00
580,000.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
28,258.00
847,739.00
779,525.80
795,139.40
691,922.60
949,378.80
701,800.00
748,200.00
779,525.80
63,058.00
1,311,739.00
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
529
1006
1005
525
526
527
528
530
816
817
ML
ML
ML
UN
UN
ML
ML
UN
UN
UN
18,866.80
12,145.88
27,281.32
167,828.72
178,019.08
9,148.03
9,447.83
120,000.00
13,920.00
9,360.04
9,975.00
9,975.00
9,975.00
7,875.00
7,875.00
27,300.00
27,300.00
0.00
9,345.00
9,345.00
29,340.55
22,619.63
37,755.07
176,097.47
186,287.83
37,813.03
38,112.83
120,000.00
23,732.25
18,891.94
BOTONERA/FUENTE CITOFONOS
CAJA AMPLIFICADOR T.V.
CANTONERA ELECTRICA
CITOFONOS
DERIVACION C/RET INF
DUCTO CABLE ANTENA T.V. (PVC)
DUCTO CABLE ANTENA TV (C.N.)
EMPALME AEREO DE 20 PARES
EMPALME Y CANALIZACION
200PARES
ESTRIBO P/MEDIA TENSION
532
1009
533
534
2030
535
536
810
809
2027
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
0.00
29,116.00
0.00
48,488.00
782,488.58
18,561.31
24,049.72
82,708.00
14,124,619.36
15,748.74
0.00
16,750.00
0.00
0.00
53,465.00
21,945.00
21,945.00
21,150.00
21,600.00
2,600.00
429,200.00
46,703.50
90,000.00
48,488.00
880,893.20
41,603.56
47,091.97
104,915.50
14,147,299.36
18,478.74
2023
2628
2025
1019
3688
890
818
891
1018
537
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
163,353.00
22,852.00
270,940.12
107,290.72
84,438.72
335,704.48
302,760.00
324,104.48
300,904.48
311,107.30
7,665.00
2,850.00
21,000.00
7,000.00
7,000.00
17,850.00
9,450.00
17,850.00
17,850.00
71,400.00
182,003.65
25,844.50
321,980.84
114,640.72
91,788.72
354,446.98
312,871.50
342,846.98
319,646.98
386,077.30
PARCIAL 30 MT PVC
POSTE DE CONCRETO 10 MT
REFLECTOR DE PISO 250W
RETENIDA P/MEDIA TENS. CPS
RETENIDA TERM POSTE
SALIDA VENTILADOR PVC
SALIDA BIFASICA C.N.
SALIDA BIFASICA PVC.
SALIDA CITOFONO PVC
SALIDA FOTOCELDA PVC
538
539
2020
2026
3033
887
541
542
811
882
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
393,333.98
477,920.00
307,400.00
167,549.24
121,915.77
31,943.20
27,305.79
25,476.31
5,988.46
20,072.43
71,400.00
0.00
1,100.00
0.00
31,600.00
15,645.00
19,700.00
19,700.00
14,175.00
15,645.00
468,303.98
477,920.00
308,555.00
167,549.24
161,244.57
48,370.45
47,990.79
46,161.31
20,872.21
36,499.68
543
544
545
546
UN
UN
UN
UN
20,733.37
35,498.12
33,668.64
19,361.27
14,175.00
14,175.00
14,175.00
14,175.00
34,908.37
49,673.12
47,843.64
33,536.27
SALIDA MONOFASICA CN
SALIDA MONOFASICA CONMUT.CN
SALIDA MONOFASICA CONMUT.PVC
SALIDA MONOFASICA PVC
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
547
548
885
884
549
550
551
1010
1012
776
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
22,089.76
27,006.37
25,296.38
25,296.38
22,509.92
51,596.39
48,158.48
248,077.84
22,050.59
7,679.00
14,175.00
14,175.00
15,100.00
15,645.00
14,175.00
19,700.00
19,700.00
14,175.00
14,175.00
22,365.00
36,264.76
41,181.37
41,151.38
41,723.63
37,393.67
72,281.39
68,843.48
262,961.59
36,934.34
31,162.25
552
133
555
556
557
558
559
560
880
881
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
27,915.96
3,104,877.75
696,307.60
84,589.52
381,004.32
510,466.12
13,260.55
20,256.73
10,589,524.00
14,993,000.00
57,750.00
119,448.00
618,000.00
18,500.00
18,500.00
36,000.00
14,175.00
15,750.00
295,000.00
295,000.00
88,553.46
3,230,298.15
1,345,207.60
104,014.52
400,429.32
548,266.12
28,144.30
36,794.23
10,942,978.16
15,346,454.16
703
2629
2022
3032
561
562
UN
UN
UN
UN
UN
UN
4,519,128.00
4,872.00
362,895.12
11,445.77
13,027.06
12,112.33
295,000.00
1,000.00
36,540.00
8,600.00
22,365.00
22,365.00
4,872,582.16
5,922.00
401,262.12
20,475.77
36,510.31
35,595.58
TRANSFORMADOR 50KWA
TUERCA DE OJO ALARGADO
VESTIDA P/ESTRUCTURA TANG.CPS
VIGUETA ANCLA DE RETENIDA
ZUMBADOR TIMBRE 110V CN
ZUMBADOR TIMBRE 110V PVC
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
711
3928
3042
720
721
723
717
710
712
151
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
298,612.60
252,805.43
80,914.04
134,143.26
1,941.88
3,199.52
22,741.33
0.00
11,072.62
512,392.83
6,090.00
32,550.00
22,050.00
26,355.00
750.00
1,425.00
12,915.00
0.00
790.00
20,000.00
304,702.60
285,355.43
102,964.04
160,498.26
2,691.88
4,624.52
35,656.33
27,260.00
11,862.62
532,392.83
94
553
298
713
3929
657
554
714
3930
719
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
1,147,721.73
30,000.00
15,000.00
50,127.60
213,103.60
0.00
0.00
127,727.60
46,817.60
18,171.09
60,000.00
20,000.00
25,000.00
2,100.00
12,675.00
0.00
0.00
10,404.00
10,404.00
9,450.00
1,207,721.73
50,000.00
40,000.00
52,227.60
225,778.60
25,000.00
20,000.00
138,131.60
57,221.60
27,621.09
724
725
783
UN
UN
UN
12,136.08
18,973.12
8,399.81
3,000.00
3,600.00
1,785.00
15,136.08
22,573.12
10,184.81
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
Cd.
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
425
426
427
428
429
430
431
432
433
434
UN
UN
UN
ML
ML
ML
ML
ML
ML
ML
237,804.15
79,642.55
188,366.15
8,251.47
12,599.82
13,063.83
17,203.08
38,244.45
7,820.00
21,267.06
27,170.00
27,170.00
27,170.00
4,800.00
4,800.00
4,800.00
4,800.00
4,800.00
4,800.00
4,800.00
264,974.15
106,812.55
215,536.15
13,051.47
17,399.82
17,863.83
22,003.08
43,044.45
12,620.00
26,067.06
812
813
435
437
436
438
439
440
441
442
UN
UN
UN
UN
UN
UN
UN
UN
UN
ML
284,829.36
352,599.26
281,617.00
281,617.00
229,159.00
124,287.04
416,440.00
486,040.00
709,920.00
18,674.48
67,500.00
67,500.00
24,150.00
24,150.00
24,150.00
42,000.00
50,000.00
50,000.00
50,000.00
8,350.00
352,329.36
420,099.26
305,767.00
305,767.00
253,309.00
166,287.04
466,440.00
536,040.00
759,920.00
27,024.48
443
444
445
447
446
453
450
448
452
449
ML
ML
ML
UN
UN
UN
UN
UN
UN
UN
9,836.49
14,949.67
19,672.97
199,368.22
172,752.15
35,262.00
430,560.00
17,271.00
108,400.00
98,325.00
8,350.00
8,350.00
8,350.00
178,000.00
51,500.00
22,785.00
22,785.00
22,785.00
22,785.00
22,785.00
18,186.49
23,299.67
28,022.97
377,368.22
224,252.15
58,047.00
453,345.00
40,056.00
131,185.00
121,110.00
455
458
457
459
460
461
1034
1035
462
464
ML
UN
UN
UN
UN
UN
UN
UN
UN
UN
7,822.23
86,758.00
86,758.00
476.85
0.00
0.00
4,612,311.90
5,014,311.90
63,400.00
96,899.00
5,250.00
24,550.00
24,550.00
20,000.00
182,070.00
404,000.00
101,244.50
101,244.50
25,000.00
25,000.00
13,072.23
111,308.00
111,308.00
20,476.85
182,070.00
404,000.00
4,718,618.63
5,120,618.63
88,400.00
121,899.00
465
463
467
466
UN
UN
UN
UN
131,080.00
63,400.00
96,652.00
43,310.00
25,000.00
25,000.00
22,500.00
22,500.00
156,080.00
88,400.00
119,152.00
65,810.00
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
Cd.
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
468
472
471
474
470
469
473
860
476
477
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
132,500.00
213,514.00
122,402.00
0.00
0.00
0.00
107,950.76
250,000.00
120,750.20
50,694.00
22,500.00
22,500.00
22,500.00
22,500.00
22,500.00
22,500.00
22,500.00
22,500.00
25,000.00
25,000.00
155,000.00
236,014.00
144,902.00
22,500.00
22,500.00
22,500.00
130,450.76
272,500.00
145,750.20
75,694.00
481
479
480
824
482
483
484
485
486
797
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
23,619.00
22,906.00
18,564.00
84,233.00
549,770.00
101,235.00
85,831.88
23,129.06
36,627.55
12,449.11
17,850.00
17,850.00
17,850.00
0.00
19,000.00
19,000.00
19,000.00
22,000.00
16,000.00
16,000.00
41,469.00
40,756.00
36,414.00
116,241.54
568,770.00
120,235.00
104,831.88
45,129.06
52,627.55
28,449.11
800
715
487
798
488
489
490
491
492
495
UN
UN
UN
UN
UN
ML
ML
ML
ML
ML
31,556.98
22,965.79
93,649.34
43,617.18
62,994.09
15,620.20
13,553.08
4,803.97
7,114.27
8,196.96
28,000.00
28,000.00
28,000.00
22,000.00
11,550.00
2,436.00
2,436.00
6,006.00
6,006.00
19,089.00
59,556.98
50,965.79
121,649.34
65,617.18
74,544.09
18,056.20
15,989.08
10,809.97
13,120.27
27,285.96
496
497
493
494
498
500
499
501
502
503
ML
ML
ML
ML
ML
ML
ML
ML
ML
UN
22,153.04
31,316.04
13,360.38
6,047.30
4,270.01
2,390.01
14,538.14
2,963.93
8,674.58
56,368.00
19,089.00
19,089.00
19,089.00
19,089.00
6,006.00
6,006.00
6,006.00
6,006.00
6,006.00
12,000.00
41,242.04
50,405.04
32,449.38
25,136.30
10,276.01
8,396.01
20,544.14
8,969.93
14,680.58
68,368.00
REGISTRO 1/2"
REGISTRO 3/4"
REGISTROS 1/2 LAVADERO
REVENTILACION 3" PVC
SANITARIO ACUACER BLANC.CORONA
SANITARIO CORONA ACUARIO 30038
SANITARIO CORONA AVANTI BLANCO
SANITARIO CORONA AVANTI COLOR
SANITARIO CORONA STILO BCO.805
SANITARIO CORONA VICTORIANA 2010
504
505
506
507
510
509
392
511
513
512
UN
UN
UN
ML
UN
UN
UN
UN
UN
UN
47,800.00
41,842.00
0.00
10,030.99
160,925.54
160,925.54
186,693.54
191,295.54
324,741.54
2,630.54
12,000.00
12,000.00
12,000.00
4,800.00
20,000.00
20,000.00
20,000.00
20,000.00
20,000.00
20,000.00
59,800.00
53,842.00
12,000.00
14,830.99
180,925.54
180,925.54
206,693.54
211,295.54
344,741.54
22,630.54
SANITARIO FLUXOMETRO
514
UN
864,334.32
35,889.00
900,223.32
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
Cd.
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
410
424
508
833
515
831
832
454
521
1033
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
885,685.28
269,522.18
226,820.26
170,630.54
192,630.54
337,630.54
362,630.54
60,003.00
1,593,349.00
1,194,311.90
35,889.00
20,000.00
20,000.00
20,000.00
20,000.00
20,000.00
20,000.00
22,785.00
19,950.00
101,244.50
921,574.28
289,522.18
246,820.26
190,630.54
212,630.54
357,630.54
382,630.54
82,788.00
1,613,299.00
1,300,618.63
1032
522
524
UN
UN
UN
1,396,311.90
6,944.80
1,848.00
101,244.50
4,389.00
3,050.00
1,502,618.63
11,333.80
4,898.00
MAMPOSTERIA (4)
10/07/2006 Bogot
Cd.
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
121
122
123
120
125
126
979
128
127
905
ML
ML
ML
ML
ML
ML
M2
M2
M2
M2
9,084.46
9,758.40
7,493.46
9,873.96
17,130.75
12,974.20
31,980.53
13,793.98
13,649.60
28,350.36
15,250.00
15,250.00
15,328.62
15,328.62
34,229.83
12,163.80
9,186.80
6,152.88
6,152.88
6,686.80
24,334.46
25,008.40
22,822.09
25,202.59
51,499.79
25,138.00
41,167.33
19,946.86
19,802.48
35,037.16
132
904
129
131
130
641
134
750
135
988
M2
M2
M2
M2
M2
M2
m2
M2
M2
M2
28,422.81
14,652.64
12,158.89
14,692.02
28,988.14
2,071.50
16,795.08
1,675.08
26,545.56
18,269.74
6,686.80
6,185.64
6,185.64
6,185.64
6,577.60
6,141.96
7,141.96
7,141.96
4,212.60
7,740.24
35,109.61
20,838.28
18,344.53
20,877.66
35,565.74
8,213.46
23,937.04
8,817.04
30,758.16
26,009.98
983
989
766
765
743
136
531
138
139
140
M2
M2
M2
M2
M2
M2
UN
UN
ML
ML
16,937.17
14,800.08
4,062.17
1,327.18
1,675.08
89,165.48
952.58
113,521.99
20,829.13
8,023.27
9,067.27
4,236.96
9,067.27
7,612.48
4,236.96
23,258.34
1,061.03
180,393.16
5,173.25
15,109.20
26,004.44
19,037.04
13,129.44
8,939.65
5,912.04
112,423.82
2,013.60
293,915.16
26,002.38
23,132.47
141
981
982
215
970
971
142
143
771
144
ML
ML
ML
ML
ML
ML
ML
ML
ML
M2
4,572.13
20,277.00
24,489.43
33,353.93
7,513.30
8,612.93
16,691.60
8,163.52
1,873.60
21,353.14
15,109.20
15,412.00
15,618.00
15,927.00
15,088.68
15,147.08
20,877.00
4,009.20
4,009.20
8,859.20
19,681.33
35,689.00
40,107.43
49,280.93
22,601.98
23,760.01
37,568.60
12,172.72
5,882.80
30,212.34
759
147
146
148
M2
M2
PS
UN
19,129.30
2,196.75
0.00
13,141.08
6,474.72
5,352.00
28,350.00
3,751.44
25,604.02
7,548.75
28,350.00
16,892.52
MAMPOSTERIA (4)
10/07/2006 Bogot
Cd.
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
780
781
908
907
149
977
664
987
972
161
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
31,030.72
60,360.78
14,638.30
28,321.05
52,940.46
24,327.43
16,614.63
19,512.27
12,456.63
17,937.63
8,968.40
9,132.20
8,968.40
9,132.20
14,070.00
3,477.60
6,174.72
4,754.72
4,754.72
4,754.72
39,999.12
69,492.98
23,606.70
37,453.25
67,010.46
27,805.03
22,789.35
24,266.99
17,211.35
22,692.35
152
974
160
909
985
666
163
744
745
155
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
46,441.64
66,261.44
45,122.84
57,823.64
77,223.00
9,019.64
67,231.64
9,019.64
2,705.89
4,509.82
10,614.40
13,164.40
5,804.40
5,804.40
5,859.00
5,804.40
5,804.40
7,664.40
7,129.32
6,932.20
57,056.04
79,425.84
50,927.24
63,628.04
83,082.00
14,824.04
73,036.04
16,684.04
9,835.21
11,442.02
986
910
772
86
159
980
162
990
991
984
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
38,289.37
32,910.22
4,509.82
23,913.82
33,615.82
23,850.82
34,145.02
34,145.02
26,401.06
4,509.82
5,757.20
5,757.20
7,282.20
5,757.20
7,282.20
4,477.20
5,757.20
7,282.20
4,477.20
7,282.20
44,046.57
38,667.42
11,792.02
29,671.02
40,898.02
28,328.02
39,902.22
41,427.22
30,878.26
11,792.02
874
877
150
153
154
768
157
767
158
M2
M2
ML
ML
M2
ML
ML
ML
ML
2,073.15
2,073.15
3,776.20
8,869.96
181.80
2,874.43
8,163.75
2,874.43
13,998.54
12,600.00
12,600.00
5,663.80
3,909.20
1,365.00
5,609.20
5,718.40
5,609.20
5,827.60
35,553.15
49,473.15
9,440.00
12,779.16
1,546.80
8,483.63
13,882.15
8,483.63
19,826.14
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
254
255
256
257
258
259
260
261
262
270
M3
M3
M3
M3
M3
M3
MS
UN
UN
LT
251,236.00
227,480.00
224,940.00
224,164.00
215,368.00
207,868.00
0.00
31,784.00
42,456.00
132.09
10,000.00
10,000.00
10,000.00
10,000.00
10,000.00
10,000.00
0.00
0.00
0.00
12.00
261,236.00
237,480.00
234,940.00
234,164.00
225,368.00
217,868.00
17,400.00
31,784.00
42,456.00
144.09
269
272
271
274
273
276
275
264
263
266
M3
LT
M3
LT
M3
LT
M3
LT
M3
LT
139,010.93
119.32
123,896.11
108.44
113,418.09
99.80
102,831.14
77.03
85,767.97
202.58
10,500.00
12.00
10,500.00
12.00
10,500.00
12.00
10,500.00
12.00
10,500.00
12.00
149,510.93
131.32
134,396.11
120.44
123,918.09
111.80
113,331.14
89.03
96,267.97
214.58
265
268
267
156
348
862
861
M3
LT
M3
M3
LT
LT
M3
203,807.54
163.99
175,224.60
233,371.56
222.04
146.38
153,217.78
10,500.00
12.00
10,500.00
10,500.00
12.00
12.00
10,500.00
214,307.54
175.99
185,724.60
243,871.56
234.04
158.38
163,717.78
PAETES/REPELLOS/REVOQUES (5)
10/07/2006 Bogot
Cd.
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
164
169
170
171
992
172
173
174
175
185
M2
M2
M2
M2
ML
ML
ML
M2
M2
M2
6,128.77
4,007.46
5,343.28
1,611.55
722.86
810.71
871.60
2,598.47
840.42
4,708.06
8,000.00
5,030.31
5,090.41
8,000.00
2,304.60
2,311.24
2,565.84
4,450.00
1,575.00
3,675.00
14,128.77
9,037.76
10,433.68
9,611.55
3,027.46
3,121.95
3,437.43
7,048.47
2,415.42
8,383.06
187
805
165
166
167
168
177
178
179
180
ML
M2
M2
M2
M2
M2
M2
M2
M2
M2
7,645.60
3,843.26
3,843.26
4,312.12
3,843.26
3,555.66
4,007.46
2,387.10
2,127.54
1,947.62
4,577.50
5,633.61
6,075.71
6,075.71
6,075.71
6,079.18
4,830.31
4,830.31
4,830.31
4,830.31
12,223.10
9,476.87
9,918.97
10,387.83
9,918.97
9,634.83
8,837.76
7,217.40
6,957.85
6,777.92
181
176
182
183
184
189
993
994
190
769
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
1,765.82
3,058.24
2,725.71
2,495.20
2,262.29
5,134.17
3,903.43
3,479.00
3,850.63
2,415.21
4,830.31
5,331.00
5,331.00
5,331.00
5,331.00
3,591.00
6,044.84
6,044.84
4,163.25
4,848.00
6,596.12
8,389.24
8,056.71
7,826.20
7,593.29
8,725.17
9,948.27
9,523.84
8,013.88
7,263.21
PAETE TALUDES
RESANES GENERALES
RUSTICO MUROS 1:5
RUSTICO PLACAS 1:4
RUSTICO PLACAS 1:5
764
191
192
193
194
M2
M2
M2
M2
M2
2,379.87
1,529.12
2,521.29
3,370.79
2,725.71
4,829.76
3,115.50
3,713.68
5,331.00
5,331.00
7,209.63
4,644.62
6,234.96
8,701.79
8,056.71
PINTURA (15)
10/07/2006 Bogot
Cd.
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
620
621
622
623
624
625
628
629
630
631
ML
M2
M2
M2
M2
M2
ML
M2
ML
M2
706.84
1,530.11
1,748.61
10,186.16
119.76
10,155.80
669.69
2,205.67
1,020.52
3,365.78
4,000.00
5,000.00
2,200.00
16,500.00
2,400.00
0.00
3,450.00
5,750.00
3,450.00
5,750.00
4,706.84
6,530.11
3,948.61
26,686.16
2,519.76
10,155.80
4,119.69
7,955.67
4,470.52
9,115.78
632
633
627
634
635
636
637
638
639
640
M2
M2
M2
M2
M2
M2
ML
M2
ML
M2
1,521.38
1,735.14
15,945.57
602.40
2,963.90
2,634.90
196.00
1,730.40
731.33
2,240.80
4,650.00
4,650.00
11,250.00
2,850.00
4,550.00
4,550.00
1,995.00
12,000.00
1,850.00
3,800.00
6,171.38
6,385.14
27,195.57
3,452.40
7,513.90
7,184.90
2,191.00
13,730.40
3,211.33
6,040.80
SILCOPLAST FACHADA
TINTILLA SOBRE MADERA LINEAL
TINTILLA SOBRE MADERA LLENA
TINTILLA SOBRE MUEBLES
VINILO SOBRE PAETE (2 MANOS)
WASH-PRIMER SOBRE ALUMINIO
642
643
644
645
646
647
M2
ML
M2
M2
M2
M2
8,244.12
607.43
1,331.86
8,659.24
1,626.00
8,026.50
0.00
1,050.00
1,575.00
9,975.00
3,500.00
4,600.00
8,244.12
1,657.43
2,906.86
18,634.24
5,126.00
12,626.50
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
ADOQUIN CONCRETO 6 Cm
ADOQUIN CONCRETO 8 Cm
ADOQUIN GRES 10x10x2.5 MOORE
ADOQUIN I GRES 10x20x5.5 MOORE
ADOQUIN LADRILLO MACIZO STA/FE
ADOQUIN Liv. Nat.15x15 MOORE
ADOQUIN LIV. YOMASA
ADOQUIN NATURAL 15x15 MOORE
ADOQUIN Vitrif. 26x12.5 MOORE
AFINADO ENDURECIDO MORTERO 1:3 h=4
294
295
296
944
787
945
959
946
947
299
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
20,595.77
23,479.77
18,404.10
18,404.10
21,097.92
16,203.36
17,950.24
14,452.36
16,718.36
10,741.59
7,564.80
7,564.80
7,564.80
7,564.80
7,564.80
7,564.80
7,564.80
7,564.80
7,564.80
6,203.60
28,167.84
31,051.84
25,976.16
25,976.16
28,669.99
23,775.43
25,522.31
22,024.43
24,290.43
16,945.19
186
300
701
302
303
301
748
747
310
309
M2
M2
ML
M2
M2
M2
M2
M2
M2
M2
5,797.34
7,669.75
1,654.75
8,028.47
6,449.89
6,619.01
4,014.23
7,569.70
111,413.04
40,982.67
4,990.20
5,103.60
2,213.40
5,080.40
5,065.20
4,853.60
4,740.20
4,953.60
0.00
0.00
10,787.54
12,773.35
3,868.15
13,108.87
11,515.09
11,472.61
8,754.43
12,523.30
111,413.04
40,982.67
906
311
913
920
418
915
916
918
919
912
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
62,531.30
96,482.16
27,352.56
47,694.03
87,158.92
139,112.95
20,155.08
168,965.03
93,457.26
79,512.75
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
62,531.30
96,482.16
27,352.56
47,694.03
87,158.92
139,112.95
20,155.08
168,965.03
93,457.26
79,512.75
921
911
312
66
839
67
742
68
838
69
M2
M2
M2
M3
M3
M3
M2
M3
M3
M3
38,374.59
41,753.48
69,326.24
94,587.38
47,448.10
280,261.80
14,013.09
26,000.00
144,615.00
58,615.00
0.00
0.00
0.00
12,000.00
12,000.00
13,000.00
2,920.00
12,000.00
12,000.00
12,000.00
38,374.59
41,753.48
69,326.24
107,932.98
61,466.50
293,261.80
16,933.09
39,345.60
158,633.40
71,960.60
903
314
324
325
M2
M2
M2
M2
42,098.17
32,697.69
43,260.00
43,260.00
7,564.80
8,500.00
7,350.00
7,350.00
49,670.24
41,197.69
50,610.00
50,610.00
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
GRANITO
GRANITO NATURAL ROJO GUAYANA PISO
GRAVILLA LAVADA
GUARDAESCOBA 25x7.5x1.2 MOORE
GUARDAESCOBA CEDRO 6 Cm
GUARDAESCOBA CEDRO MACHO 8 Cm
GUARDAESCOBA GRANITO
GUARDAESCOBA GRAVILLA
GUARDAESCOBA VINISOL 6.8mm PAV
IMPERMEABILIZACION EDIL ESPECIAL
353
360
331
338
327
328
329
330
326
333
M2
M2
M2
M2
ML
ML
ML
ML
ML
M2
31,694.19
283,156.29
8,304.21
3,146.90
12,568.54
16,222.54
1,486.48
1,340.06
2,996.56
0.00
30,463.05
18,192.94
22,476.01
4,000.00
2,100.00
2,100.00
12,250.00
8,640.79
0.00
8,925.00
62,157.24
301,349.23
30,780.22
7,146.90
14,668.54
18,322.54
13,736.48
9,980.85
2,996.56
17,381.40
332
334
335
336
337
308
304
305
307
306
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
32,639.88
52,871.33
62,331.33
46,491.33
383,572.20
107,254.09
455,909.09
94,791.09
175,111.09
146,909.09
3,360.00
7,875.00
7,875.00
7,875.00
40,692.94
8,067.94
13,107.94
13,107.94
13,107.94
13,107.94
35,999.88
60,746.33
70,206.33
54,366.33
424,265.14
115,322.03
469,017.03
107,899.03
188,219.03
160,017.03
PARKET GUAYACAN
PARKET ZAPAN INSTALADO
PASO ESCALERA GRANITO
PASO ESCALERA GRAVILLA
PASO ESCALERA VINILO
PASO ESCALERAS EN GRAVILLA Y TABLETA
PIRLAN 0.10 FLORMORADO
PIRLAN ALUMINIO
PIRLAN CEDRO CAQUETA (0.10)
PIRLAN LADRILLO
344
343
345
346
347
1007
349
350
351
352
M2
M2
ML
ML
UN
UN
ML
ML
ML
ML
0.00
0.00
11,564.85
2,113.65
0.00
8,405.71
4,694.96
699.73
6,654.56
10,469.17
0.00
0.00
28,231.53
10,399.23
0.00
20,109.20
12,600.00
2,100.00
12,600.00
6,599.23
73,000.00
61,800.00
39,796.38
12,512.88
48,815.94
28,514.91
17,294.96
2,799.73
19,254.56
17,068.40
950
932
770
936
322
323
940
928
935
941
ML
M2
M2
M2
M2
M2
M2
M2
M2
M2
10,838.11
3,121.09
28,582.14
30,416.09
25,224.89
21,043.09
21,998.93
23,721.09
21,900.05
21,900.05
0.00
8,067.94
8,192.94
8,067.94
8,067.94
8,067.94
8,067.94
8,067.94
8,067.94
8,067.94
10,838.11
11,189.03
36,775.08
38,484.03
33,292.83
29,111.03
30,066.87
31,789.03
29,967.99
29,967.99
917
937
926
927
922
933
321
402
899
923
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
25,868.89
3,121.09
27,265.61
25,025.36
27,311.01
25,390.83
18,468.09
0.00
35,141.73
28,834.38
8,067.94
8,067.94
8,067.94
8,067.94
8,067.94
8,067.94
8,067.94
0.00
8,067.94
8,067.94
33,936.83
11,189.03
35,333.55
33,093.30
35,378.95
33,458.76
26,536.03
39,480.00
43,209.67
36,902.32
930
M2
21,900.05
8,067.94
29,967.99
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
961
317
924
960
316
934
751
938
929
939
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
22,798.21
22,798.21
29,029.14
22,798.21
3,121.09
23,696.37
28,102.14
23,073.22
21,163.60
36,638.90
8,067.94
8,067.94
8,067.94
8,067.94
8,067.94
8,067.94
9,192.94
8,067.94
8,067.94
8,067.94
30,866.15
30,866.15
37,097.07
30,866.15
11,189.03
31,764.31
37,295.08
31,141.16
29,231.54
44,706.84
942
354
355
356
357
358
359
951
952
953
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
23,696.37
27,537.73
33,729.18
50,494.93
694.72
0.00
7,952.00
26,173.15
22,795.23
40,835.55
8,067.94
10,000.00
10,000.00
12,000.00
0.00
12,000.00
11,000.00
40,692.94
40,692.94
40,692.94
31,764.31
37,537.73
43,729.18
62,494.93
694.72
12,000.00
18,952.00
66,866.09
63,488.17
81,528.49
955
954
956
957
958
297
363
339
340
341
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
54,037.32
37,977.31
19,095.61
21,155.61
22,572.89
12,802.61
13,911.45
16,551.41
16,551.41
16,515.41
42,429.38
40,692.94
7,610.25
7,610.25
7,610.25
7,610.25
8,067.94
8,167.16
8,167.16
8,167.16
96,466.70
78,670.25
26,705.86
28,765.86
30,183.14
20,412.86
21,979.38
24,718.57
24,718.57
24,682.57
361
342
364
948
362
949
365
366
367
368
M2
M2
M2
M2
M2
M2
M2
M2
M2
ML
12,776.39
17,250.82
25,149.03
18,847.32
14,563.72
22,400.82
0.00
0.00
0.00
11,670.77
8,067.94
8,095.50
8,095.50
8,095.50
8,095.50
8,095.50
0.00
0.00
0.00
6,644.10
20,844.32
25,346.32
33,244.53
26,942.82
22,659.22
30,496.32
20,616.27
26,562.79
22,126.50
18,314.87
369
943
371
372
373
ML
ML
ML
ML
ML
11,670.77
934.63
10,951.85
11,347.85
11,347.85
6,644.10
6,644.10
6,644.10
4,044.10
4,044.10
18,314.87
7,578.73
17,595.95
15,391.95
15,391.95
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
58
40
807
55
806
44
45
46
38
47
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
23,260.64
13,582.78
52,230.54
68,081.34
284,441.07
106,048.63
126,112.08
147,912.90
161,651.27
211,880.02
9,457.15
9,099.95
9,458.35
9,205.15
73,370.00
81,333.78
81,937.80
82,694.02
83,022.86
84,736.88
32,717.80
22,682.73
61,688.88
77,286.49
357,811.07
215,714.36
236,381.83
258,938.88
273,006.08
324,948.85
692
48
43
42
41
49
50
51
52
799
UN
UN
UN
UN
UN
UN
ML
ML
UN
ML
245,365.29
273,607.82
32,136.44
245,624.00
62,543.52
424,454.99
8,404.12
6,701.36
572,140.00
18,667.09
61,668.29
62,493.12
15,000.00
25,000.00
6,825.00
363,990.00
29,400.00
29,400.00
23,100.00
9,669.30
335,365.53
364,432.89
47,136.44
270,624.00
69,368.52
788,444.99
37,804.12
36,101.36
595,240.00
28,336.39
900
901
837
63
60
834
61
835
62
836
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
9,079.36
15,249.45
32,600.32
60,684.76
7,208.12
16,198.13
15,008.87
28,635.83
25,921.33
37,277.14
4,837.15
9,666.43
9,669.30
5,338.50
9,663.58
5,228.78
4,837.15
5,436.19
9,666.43
10,165.63
13,916.52
24,915.87
42,269.62
66,023.26
16,871.70
21,426.91
19,846.02
34,072.02
35,587.76
47,442.76
64
53
54
65
1024
1025
1026
1027
1028
1029
ML
ML
ML
ML
ML
ML
ML
ML
ML
ML
17,583.33
27,498.10
58,172.37
16,609.99
13,411.67
24,918.89
36,667.42
60,305.36
88,380.76
145,453.01
4,515.00
4,515.00
4,515.00
2,900.00
4,500.00
4,500.00
4,500.00
4,500.00
4,500.00
28,800.00
22,098.33
32,013.10
62,687.37
19,509.99
18,136.67
29,643.89
41,392.42
65,030.36
93,105.76
175,693.01
1030
1031
ML
ML
181,686.50
211,667.89
28,800.00
28,800.00
211,926.50
241,907.89
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
792
793
794
820
234
235
456
649
516
517
MS
MS
MS
MS
JR
JR
JR
JR
JR
JR
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
909,130.53
455,700.00
447,244.88
1,282,312.19
49,308.70
46,464.25
50,732.22
58,730.18
53,498.76
53,014.71
909,130.53
455,700.00
447,244.88
1,282,312.19
49,308.70
46,464.25
50,732.22
58,730.18
53,498.76
53,014.71
518
3045
3046
3047
3043
3044
823
825
827
JR
HR
HR
HR
HR
HR
MS
MS
MS
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
50,788.92
6,590.43
6,298.22
6,701.31
2,290.37
4,289.67
1,407,414.86
599,019.75
1,569,482.25
50,788.92
6,590.43
6,298.22
6,701.31
2,290.37
4,289.67
1,407,414.86
599,019.75
1,569,482.25
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
726
727
728
729
730
778
390
819
731
775
M2
M2
M2
M2
M2
ML
UN
UN
M2
M3
25,325.64
25,780.39
26,864.99
28,602.05
0.00
11,305.27
13,348,864.98
0.00
35,703.25
142,713.11
6,750.00
6,750.00
6,750.00
6,750.00
3,135.00
6,720.50
2,974,500.00
0.00
7,500.00
60,000.00
32,174.24
32,611.59
33,696.19
35,433.25
3,135.00
18,025.77
47,306,983.38
31,332,512.00
43,203.25
205,713.11
732
733
777
774
734
779
1011
760
3041
3040
M2
ML
M3
M3
M2
ML
UN
M3
UN
UN
50,731.05
6,011.12
313,316.00
0.00
0.00
40,293.19
106,182,201.31
0.00
0.00
0.00
9,200.00
5,500.00
75,000.00
14,000.00
2,300.00
5,250.00
6,085,015.33
0.00
27,692.00
27,692.00
59,931.05
11,569.12
400,325.20
14,280.00
2,740.80
45,543.19
122,259,016.64
1,252.80
1,962,164.34
4,847,301.84
735
387
736
737
738
739
740
773
M2
M2
ML
ML
ML
ML
UN
ML
5,800.00
428.14
7,040.36
7,374.44
6,428.07
8,038.36
2,227,200.00
10,994.81
0.00
420.00
5,500.00
5,500.00
5,500.00
5,500.00
0.00
13,032.05
5,800.00
848.14
12,621.56
12,955.64
11,928.07
13,619.56
2,227,200.00
24,026.86
PRADIZACION JARDINES
REPLANTEO CANCHAS
SARDINEL 15x15 C:140 KG/C2
SARDINEL 15x15 C:175 KG/C2
SARDINEL 15x15 C:210 KG/C2
SARDINEL 15x15 C:245 KG/C2
SEALIZACION
TOPES EN CONCRETO PARQUEADERO
VIAS (21)
10/07/2006 Bogot
Cd.
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
656
786
784
785
782
788
821
789
826
790
M2
M2
M3
M3
M2
M2
M2
M2
M2
M2
49,777.26
35,672.96
18,080.00
28,480.00
17,458.00
21,650.06
86,989.78
21,300.90
86,989.78
19,876.90
7,187.94
12,300.00
8,000.00
8,000.00
4,515.00
5,116.05
1,491.00
5,025.75
1,491.00
4,625.75
57,008.79
47,972.96
26,080.00
36,480.00
46,333.00
39,146.31
95,224.98
37,914.65
94,919.98
35,328.15
822
829
828
791
808
88
ML
M2
M2
KG
ML
M2
720.00
81,805.38
75,134.77
2,656.40
16,634.40
45,326.20
115.00
0.00
0.00
576.00
3,630.00
7,168.50
835.00
83,974.58
77,303.97
3,232.40
21,412.80
58,515.70
Descripcin
Und.
Materiales
Mano de Obra
Valor Total
BISAGRA VAIVEN
BRAZO RETENEDOR
CERRADURA ALCOBA
CERRADURA ANTIPANICO PUERTA DOBLE
CERRADURA ANTIPANICO PUERTA SENCILLA
CERRADURA BAOS
CERRADURA CUARTO DE BASURAS
CERRADURA CUARTO DE BOMBAS
CERRADURA CUARTO SUBESTACION
CERRADURA DEPOSITO
648
650
752
1017
1015
749
754
755
756
757
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
29,270.00
103,356.00
27,260.00
1,493,616.00
787,983.00
24,940.00
37,294.00
37,294.00
33,640.00
33,640.00
3,465.00
13,125.00
5,145.00
40,000.00
40,000.00
5,145.00
5,145.00
5,145.00
5,145.00
5,145.00
32,735.00
116,481.00
32,405.00
1,533,616.00
827,983.00
30,085.00
42,439.00
42,439.00
38,785.00
38,785.00
ESPEJO 4mm
ESPEJO 6mm
PUERTA CRISTAL
10mm
SAFE ALCOBA 141 CLASIC ALUM. SATINADA
SAFE BAO 152 CLASIC ALUMINIO SATINADO
SAFE CLOSET 145 ALUMINIO SATINADO
SAFE ENTRADA 142A ALUMINIO SATINADO
SAFE SOBREPONER ALUMINIO SATINADO
SAFE TERRAZA 149 CLASICA ALUMINIO
SCHLAGE ALCOBA A 50 WS
654
655
660
661
662
663
665
667
668
669
M2
M2
UN
UN
UN
UN
UN
UN
UN
UN
45,000.00
32,000.00
1,170,440.00
27,260.00
24,940.00
29,232.00
34,220.00
41,760.00
24,940.00
33,872.00
4,200.00
4,200.00
0.00
4,515.00
4,515.00
4,515.00
4,515.00
4,515.00
4,515.00
4,515.00
49,200.00
36,200.00
1,170,440.00
31,775.00
29,455.00
33,747.00
38,735.00
46,275.00
29,455.00
38,387.00
SCHLAGE BAO A 40 S
SCHLAGE CLOSET A 71 WS
SCHLAGE ENTRADA A 80 PD
SCHLAGE OFICINA A 50 PD
SCHLAGE PASO A 10 S
SCHLAGE TERRAZA A 30 S
VIDRIO CRISTAL CRUD BRONC 10mm
VIDRIO CRISTAL TEMPL BRONC 6mm
VIDRIO CRISTAL TEMPL BRONCE 5mm
VIDRIO CRISTAL TEMPL INCOL 10m
670
671
672
673
674
676
651
652
679
653
UN
UN
UN
UN
UN
UN
M2
M2
M2
M2
29,754.00
29,754.00
37,294.00
39,324.00
29,754.00
29,754.00
87,000.00
114,840.00
92,800.00
170,520.00
4,515.00
4,515.00
4,515.00
4,515.00
4,515.00
4,515.00
7,035.00
4,200.00
4,200.00
7,035.00
34,269.00
34,269.00
41,809.00
43,839.00
34,269.00
34,269.00
94,035.00
119,040.00
97,000.00
177,555.00
658
677
680
681
682
683
678
684
M2
M2
M2
M2
M2
M2
M2
UN
100,920.00
16,000.00
16,000.00
17,000.00
22,500.00
31,500.00
76,560.00
15,800.00
4,200.00
4,200.00
4,200.00
4,200.00
4,200.00
4,200.00
4,200.00
4,515.00
105,120.00
20,200.00
20,200.00
21,200.00
26,700.00
35,700.00
80,760.00
20,315.00
CONTENIDO
ANLISIS DE PRECIOS UNITARIOS DETALLADOS
Gr. 1
Gr. 23
Cableado Estructurado
Gr. 13
Carpintera de Madera
11
Gr. 14
Carpintera Metlica
17
Gr. 7
Cielosrasos
22
Gr. 3
Cimentacin y Estructura
26
Gr. 9
Cubiertas
42
Gr. 10
Enchapes y Accesorios
50
Gr. 17
Equipos Especiales
55
Gr. 18
57
Gr. 12
60
Gr. 20
Inst. Gas
72
Gr. 11
76
Gr. 4
Mampostera
88
Gr. 8
98
Gr. 5
102
Gr. 15
Pintura
105
Gr. 9
Pisos
109
Gr. 2
124
Gr. 22
Sueldos y Jornales
130
Gr. 19
132
Gr . 21
Vas
136
Gr. 16
Vidrios y Cerraduras
139
Cd.
Valor Total
ALUMBRADO PROVISIONAL
ALAMBRE AISLADO No.10 THHN-THWN 90 600V
BOMBILLO MERCURIO 125W / 220V
CAJA TACO 4Circ. Monof L/NEX
HERRAMIENTA ELCTRICA %
MdeO SALIDA BIFASICA Y Trifas.
796
3782
776
746
2948
1495
37.50
1.00
1.00
5.00
1.00
UN
ML
UN
UN
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
1,998.68
8,120.00
21,576.00
19,700.00
19,700.00
125,331.50
74,950.50
8,120.00
21,576.00
985.00
19,700.00
1036
472
2653
215
525
100
943
226
243
2672
2116
3.00
0.21
8.08
0.74
0.48
12.24
8.00
4.00
12.24
1.00
UN
UN
M3
UN
LB
M3
ML
UN
UN
ML
UN
( 0.00)
( 4.00)
( 1.00)
( 5.00)
(20.00)
( 2.00)
( 0.00)
( 0.00)
( 2.00)
( 0.00)
1,450.00
300,556.00
509.24
2,945.24
20,000.00
2,474.28
40,147.60
3,050.80
1,267.88
120,750.00
582,683.10
4,350.00
62,515.65
4,114.66
2,164.75
9,600.00
30,285.19
321,180.80
12,203.20
15,518.85
120,750.00
1037
472
2653
215
525
100
2947
943
226
243
2672
2116
3.00
0.21
8.08
0.74
0.48
1.00
12.24
8.00
4.00
12.24
1.00
UN
UN
M3
UN
LB
M3
UN
ML
UN
UN
ML
UN
( 0.00)
( 4.00)
( 1.00)
( 5.00)
(20.00)
( 0.00)
( 2.00)
( 0.00)
( 0.00)
( 2.00)
( 0.00)
1,450.00
300,556.00
509.24
2,945.24
20,000.00
168,000.00
2,474.28
40,147.60
3,050.80
1,267.88
120,750.00
750,683.10
4,350.00
62,515.65
4,114.66
2,164.75
9,600.00
168,000.00
30,285.19
321,180.80
12,203.20
15,518.85
120,750.00
CAMPAMENTO 40 M2
BISAGRA COBRIZADA 3"
CONCRETO 2000 PSI (140N)
GANCHO PLACA Ond.150mm ETERNIT
PORTACANDADO NEGRO No. 4
PUNTILLA 2" CON CABEZA
RECEBO / MATERIAL DE SUB BASE
TABLA CHAPA .30x.025x3 ORDINAR
TEJA PLACA Ond. No. 6 ETERNIT
VARA DE CLAVO 6 METROS.
3
472
2652
215
522
525
100
943
226
2672
9.00
1.98
60.60
3.00
7.35
5.70
275.00
30.00
116.28
UN
UN
M3
UN
UN
LB
M3
ML
UN
ML
( 0.00)
( 4.00)
( 1.00)
( 0.00)
( 5.00)
(20.00)
( 0.00)
( 0.00)
( 2.00)
1,450.00
283,852.00
509.24
2,320.00
2,945.24
20,000.00
2,474.28
40,147.60
1,267.88
3,779,693.10
13,050.00
560,891.55
30,859.94
6,960.00
21,647.51
114,000.00
680,427.00
1,204,428.00
147,429.09
Cd.
1224
Valor Total
1.00 UN
( 0.00)
1,000,000.00
1,000,000.00
CAMPAMENTO 50 M2
BISAGRA COBRIZADA 3"
CONCRETO 2000 PSI (140N)
GANCHO PLACA Ond.150mm ETERNIT
PORTACANDADO NEGRO No. 4
PUNTILLA 2" CON CABEZA
RECEBO / MATERIAL DE SUB BASE
TABLA CHAPA .30x.025x3 ORDINAR
TEJA PLACA Ond. No. 6 ETERNIT
VARA DE CLAVO 6 METROS.
MdeO CAMPAMENTO 50M
2
472
2652
215
522
525
100
943
226
2672
1223
12.36
2.50
75.75
4.00
9.45
7.13
361.20
37.50
145.35
1.00
UN
UN
M3
UN
UN
LB
M3
ML
UN
ML
UN
( 3.00)
( 4.00)
( 1.00)
( 0.00)
( 5.00)
(20.00)
( 5.00)
( 0.00)
( 2.00)
( 0.00)
1,450.00
283,852.00
509.24
2,320.00
2,945.24
20,000.00
2,474.28
40,147.60
1,267.88
1,250,000.00
4,778,195.33
17,922.00
708,494.59
38,574.93
9,280.00
27,832.52
142,560.00
893,709.94
1,505,535.00
184,286.36
1,250,000.00
741
9
472
2687
892
25
2794
1987
100
940
611
943
2474
2672
175
2936
3268
1247
0.04
0.25
0.07
0.85
0.03
0.01
0.48
0.14
1.20
0.02
10.50
0.62
4.00
2.00
5.00
1.00
1.00
UN
KG
UN
M3
ML
KG
UN
LB
M3
ML
UN
ML
M2
ML
ML
%M
M2
M2
( 0.00)
( 3.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
(20.00)
( 0.00)
( 0.00)
( 5.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
3,271.20
1,450.00
277,240.00
1,086.92
2,310.72
96,652.00
5,544.80
20,000.00
615.96
158,295.00
2,474.28
31,024.20
1,267.88
2,929.00
27,100.00
25,000.00
2,100.00
115,901.83
130.85
358.44
19,406.80
923.88
69.32
966.52
2,661.50
2,880.00
739.15
3,165.90
25,979.94
19,235.00
5,071.52
5,858.00
1,355.00
25,000.00
2,100.00
90
A 273
1689
2653
215
100
943
224
2672
2936
3268
0.02
13.13
0.05
2.10
0.13
3.15
1.05
1.16
5.00
1.00
M2
M3
UN
M3
UN
M3
ML
UN
ML
%M
M2
( 5.00)
( 5.00)
( 5.00)
( 5.00)
(30.00)
( 5.00)
( 5.00)
( 5.00)
( 0.00)
( 0.00)
123,918.09
810.00
300,556.00
509.24
20,000.00
2,474.28
26,067.52
1,267.88
25,165.38
25,000.00
94,919.10
1,951.71
10,631.25
15,779.19
1,069.40
2,600.00
7,793.98
27,370.90
1,464.40
1,258.27
25,000.00
4
4
525
2672
1225
4.08
0.03
0.82
1.00
ML
ML
LB
ML
M2
( 2.00)
( 5.00)
( 2.00)
( 0.00)
314.36
2,945.24
1,267.88
3,675.00
6,084.95
1,282.59
92.78
1,034.59
3,675.00
CAMPAMENTO M2
MORTERO 1 : 6 ARENA PEA (M3)
BLOQUE #4 STA/FE 33x23x9 Fab.
CONCRETO 2500 PSI (175N)
GANCHO PLACA Ond.150mm ETERNIT
RECEBO / MATERIAL DE SUB BASE
TABLA CHAPA .30x.025x3 ORDINAR
TEJA PLACA Ond. No. 4 ETERNIT
VARA DE CLAVO 6 METROS.
HERRAMIENTA MENOR %
MdeO CAMPAMENTO
CERCA ALAMBRE DE PUAS 4 HILOS
ALAMBRE DE PUA Cal. 12
PUNTILLA 2" CON CABEZA
VARA DE CLAVO 6 METROS.
MdeO CERCA EN MADERA
Cd.
Valor Total
5
A 270
99
49
94
534
1226
10.00
0.54
2.47
6.57
0.17
1.00
ML
LT
UN
ML
UN
UN
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
144.09
37,030.68
9,356.56
380.00
20.00
7,560.00
54,608.11
1,440.93
19,996.57
23,110.70
2,496.60
3.31
7,560.00
7
A 270
99
1969
49
534
1221
10.00
0.54
12.60
2.45
0.17
1.00
ML
LT
UN
UN
ML
UN
ML
( 0.00)
( 0.00)
( 5.00)
( 0.00)
( 4.00)
( 0.00)
144.09
37,030.68
307.00
9,356.56
20.00
5,000.00
53,380.82
1,440.93
20,144.69
3,868.20
22,923.57
3.43
5,000.00
1
525
943
2672
1225
0.11
5.99
2.05
1.00
ML
LB
ML
ML
M2
( 5.00)
( 4.00)
( 4.00)
( 0.00)
2,945.24
2,474.28
1,267.88
3,675.00
21,415.09
323.17
14,821.93
2,595.00
3,675.00
6
525
943
2672
2936
1225
0.11
5.90
2.25
5.00
1.00
ML
LB
ML
ML
%M
M2
( 5.00)
( 4.00)
( 4.00)
( 0.00)
( 0.00)
2,945.24
2,474.28
1,267.88
3,675.00
3,675.00
21,606.50
309.25
14,590.33
2,848.17
183.75
3,675.00
277
525
943
2672
1225
0.14
6.64
2.36
1.00
ML
LB
ML
ML
M2
( 5.00)
( 4.00)
( 4.00)
( 0.00)
2,945.24
2,474.28
1,267.88
3,675.00
23,496.86
411.30
16,417.34
2,993.21
3,675.00
278
525
943
2672
1225
0.14
6.99
2.59
1.00
ML
LB
ML
ML
M2
( 5.00)
( 4.00)
( 4.00)
( 0.00)
2,945.24
2,474.28
1,267.88
3,675.00
24,661.85
411.30
17,292.25
3,283.30
3,675.00
56
402
2889
M2
0.01 VJ
1.00 M2
( 0.00)
( 0.00)
120,000.00
4,410.00
5,730.00
1,320.00
4,410.00
76
376
3253
402
1272
6.95
0.30
0.13
1.00
M3
HR
HR
VJ
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
43,500.00
75,400.00
120,000.00
140,000.00
480,545.00
302,325.00
22,620.00
15,600.00
140,000.00
Cd.
Valor Total
59
402
2893
M2
0.02 VJ
1.00 M2
( 0.00)
( 0.00)
120,000.00
5,040.00
7,440.00
2,400.00
5,040.00
77
376
402
1271
M3
3.50 HR
0.17 VJ
1.00 M3
( 0.00)
( 0.00)
( 0.00)
43,500.00
120,000.00
105,000.00
277,650.00
152,250.00
20,400.00
105,000.00
DEMOLICION COLUMNAS
COMPRESOR 2 MARTILLOS 185 PCM
VOLQUETA (VIAJE 6M3 Max.3O KM)
MdeO Demol VIGAS Y COLUMNAS
16
376
402
1235
M3
3.00 HR
0.17 VJ
1.00 M3
( 0.00)
( 0.00)
( 0.00)
43,500.00
120,000.00
110,000.00
260,900.00
130,500.00
20,400.00
110,000.00
8
402
1227
M2
0.05 VJ
1.00 M2
( 0.00)
( 0.00)
120,000.00
3,255.00
9,255.00
6,000.00
3,255.00
100
402
2894
M2
0.01 VJ
1.00 M2
( 0.00)
( 0.00)
120,000.00
4,410.00
5,610.00
1,200.00
4,410.00
370
402
2895
M2
0.01 VJ
1.00 M2
( 0.00)
( 0.00)
120,000.00
3,950.00
5,150.00
1,200.00
3,950.00
843
376
402
2
M2
0.81 HR
0.07 VJ
1.00 M2
( 0.00)
( 0.00)
( 0.00)
43,500.00
120,000.00
14,490.00
58,125.00
35,235.00
8,400.00
14,490.00
9
402
1228
M2
0.07 VJ
1.00 M2
( 0.00)
( 0.00)
120,000.00
8,750.00
17,150.00
8,400.00
8,750.00
10
402
1229
M2
0.13 VJ
1.00 M2
( 0.00)
( 0.00)
120,000.00
10,500.00
25,500.00
15,000.00
10,500.00
845
376
402
3
M3
2.65 HR
0.25 VJ
1.00 M3
( 0.00)
( 0.00)
( 0.00)
43,500.00
120,000.00
38,350.00
183,625.00
115,275.00
30,000.00
38,350.00
851
376
402
2169
M3
1.30 HR
0.17 VJ
1.00 M3
( 0.00)
( 0.00)
( 0.00)
43,500.00
120,000.00
15,015.00
91,965.00
56,550.00
20,400.00
15,015.00
11
376
402
M2
0.30 HR
0.16 VJ
( 0.00)
( 0.00)
43,500.00
120,000.00
41,910.00
13,050.00
19,200.00
Cd.
Valor Total
1230
1.00 M2
( 0.00)
9,660.00
9,660.00
12
376
402
1231
M2
0.41 HR
0.26 VJ
1.00 M2
( 0.00)
( 0.00)
( 0.00)
43,500.00
120,000.00
45,000.00
94,035.00
17,835.00
31,200.00
45,000.00
13
376
402
1232
M2
0.60 HR
0.10 VJ
1.00 M2
( 0.00)
( 0.00)
( 0.00)
43,500.00
120,000.00
10,836.00
48,936.00
26,100.00
12,000.00
10,836.00
14
376
402
1233
M2
1.00 HR
0.20 VJ
1.00 M2
( 0.00)
( 0.00)
( 0.00)
43,500.00
120,000.00
39,000.00
106,500.00
43,500.00
24,000.00
39,000.00
15
376
402
1234
M2
0.50 HR
0.05 VJ
1.00 M2
( 0.00)
( 0.00)
( 0.00)
43,500.00
120,000.00
26,500.00
54,250.00
21,750.00
6,000.00
26,500.00
17
402
1236
M2
0.05 VJ
1.00 M2
( 5.00)
( 0.00)
120,000.00
3,250.00
9,550.00
6,300.00
3,250.00
18
373
402
M3
0.01 HR
0.17 VJ
( 0.00)
( 0.00)
85,000.00
120,000.00
21,250.00
850.00
20,400.00
19
402
1237
UN
0.05 VJ
1.00 UN
( 0.00)
( 0.00)
120,000.00
17,500.00
23,500.00
6,000.00
17,500.00
20
402
1238
UN
0.05 VJ
1.00 UN
( 0.00)
( 0.00)
120,000.00
6,300.00
12,300.00
6,000.00
6,300.00
DESMONTE VENTANAS
VOLQUETA (VIAJE 6M3 Max.3O KM)
MdeO Desmonte VENTANAS
21
402
1239
M2
0.02 VJ
1.00 M2
( 0.00)
( 0.00)
120,000.00
2,205.00
4,845.00
2,640.00
2,205.00
22
2106
941
2936
1241
M3
UN
ML
%M
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
9,280.00
2,744.56
7,875.00
7,875.00
86,385.72
41,760.00
36,593.22
157.50
7,875.00
23
2936
402
1240
M3
2.00 %M
0.02 VJ
1.00 M3
( 0.00)
( 0.00)
( 0.00)
14,000.00
120,000.00
14,000.00
16,320.00
280.00
2,040.00
14,000.00
4.50
13.33
2.00
1.00
Cd.
EXCAVACION MECANICA
CARGADOR .50 M3 SOBRE LLANTAS
VOLQUETA (VIAJE 6M3 Max.3O KM)
Valor Total
24
373
402
M3
0.01 HR
0.12 VJ
( 0.00)
( 0.00)
85,000.00
120,000.00
15,250.00
850.00
14,400.00
25
2936
402
1242
M3
2.00 %M
0.17 VJ
1.00 M3
( 0.00)
( 0.00)
( 0.00)
16,100.00
120,000.00
16,100.00
36,222.00
322.00
19,800.00
16,100.00
26
2936
402
1244
M3
2.00 %M
0.17 VJ
1.00 M3
( 0.00)
( 0.00)
( 0.00)
13,500.00
120,000.00
13,500.00
33,570.00
270.00
19,800.00
13,500.00
27
2936
402
1243
M3
2.00 %M
0.18 VJ
1.00 M3
( 0.00)
( 0.00)
( 0.00)
15,100.00
120,000.00
15,100.00
36,402.00
302.00
21,000.00
15,100.00
28
2936
402
1245
M3
2.00 %M
0.18 VJ
1.00 M3
( 0.00)
( 0.00)
( 0.00)
13,550.00
120,000.00
13,550.00
34,821.00
271.00
21,000.00
13,550.00
EXPLANACION Y EXTENDIDA
BULLDOZER D-6 CATERPILLAR
29
372
M3
0.02 DD
( 0.00)
300,000.00
6,000.00
6,000.00
EXPLANACION Y RETIRO
BULLDOZER D-6 CATERPILLAR
CARGADOR .50 M3 SOBRE LLANTAS
VOLQUETA (VIAJE 6M3 Max.3O KM)
30
372
373
402
M3
0.03 DD
0.02 HR
0.17 VJ
( 0.00)
( 0.00)
( 0.00)
300,000.00
85,000.00
120,000.00
30,500.00
9,000.00
1,700.00
19,800.00
UN
UN
UN
M3
UN
UN
LB
M3
ML
UN
UN
UN
ML
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
1,450.00
116,232.00
283,852.00
509.24
2,320.00
2,945.24
20,000.00
2,474.28
49,322.04
14,506.96
8,688.40
1,267.88
51,400.00
528,199.37
4,350.00
116,232.00
28,385.20
4,073.92
2,320.00
3,534.29
2,000.00
103,919.76
49,322.04
58,027.84
86,884.00
17,750.32
51,400.00
M2
0.01 KG
1.00 ML
0.02 LB
( 0.00)
( 0.00)
( 0.00)
3,271.20
1,086.92
2,945.24
2,828.54
32.71
1,086.92
58.90
31
472
2836
2652
215
522
525
100
943
624
236
1156
2672
1246
695
9
892
525
3.00
1.00
0.10
8.00
1.00
1.20
0.10
42.00
1.00
4.00
10.00
14.00
1.00
Cd.
336
1.00 M2
746
814
642
714
598
0.00
0.00
0.00
0.00
M2
MES
MES
MES
MES
Valor Total
( 0.00)
1,650.00
1,650.00
( 0.00)
( 0.00)
( 0.00)
( 0.00)
2,000,000.00
501,270.00
860,086.92
1,184,254.05
654.56
400.00
50.13
86.01
118.43
377
2896
M2
1.00 M2
( 0.00)
1,900.00
1,900.00
1,900.00
380
2897
M2
1.00 M2
( 0.00)
2,250.00
2,250.00
2,250.00
32
825
594
837
940
852
1248
5.00
1.00
1.00
10.00
50.00
1.00
UN
UN
UN
UN
ML
ML
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
567.00
18,564.00
44,080.00
615.96
1,521.00
462,000.00
609,688.60
2,835.00
18,564.00
44,080.00
6,159.60
76,050.00
462,000.00
33
2876
2877
746
2990
892
920
1249
50.00
100.00
1.00
4.00
5.00
30.00
1.00
UN
ML
ML
UN
UN
ML
ML
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
5,185.20
6,322.00
21,576.00
15,544.00
1,086.92
3,063.56
199,500.00
1,272,053.40
259,260.00
632,200.00
21,576.00
62,176.00
5,434.60
91,906.80
199,500.00
803
2461
3784
718
2763
748
745
750
2964
2185
284
283
3349
3347
779
788
3010
1043
802
803
20.00
400.00
150.00
150.00
4.00
26.00
24.00
2.00
3.00
7.00
15.00
5.00
10.00
26.00
2.00
2.00
15.00
30.00
30.00
UN
UN
ML
ML
ML
UN
UN
UN
UN
ML
UN
UN
UN
UN
UN
UN
UN
UN
ML
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
248.00
1,226.12
3,174.92
208.80
1,749.28
981.36
1,347.92
52,664.00
26,796.00
1,136.80
1,890.80
15,428.00
9,744.00
1,264.00
2,610.00
2,610.00
4,246.00
1,844.40
2,411.64
2,033,849.36
4,960.00
490,448.00
476,238.00
31,320.00
6,997.12
25,515.36
32,350.08
105,328.00
80,388.00
7,957.60
28,362.00
77,140.00
97,440.00
32,864.00
5,220.00
5,220.00
63,690.00
55,332.00
72,349.20
Cd.
UNION PRESION
" PAVCO
MdeO SALIDA BIFASICA Y Trifas.
MdeO Tabl.PARCIALES 12-CIRCUIT
RED INSTALACIONES TELEFONICAS PROVISIONALES
ALAMBRE PARALELO 2x18 DWP - PVC
TOMA TELEF SALIDA AMERICAN SENCILLO.
HERRAMIENTA ELCTRICA %
MdeO SALIDA TELEFONO/TIMBRE
1122
1495
1500
795
2816
1699
2948
1497
Valor Total
10.00 UN
15.00 UN
2.00 UN
( 0.00)
( 0.00)
( 0.00)
223.00
19,700.00
18,500.00
2,230.00
295,500.00
37,000.00
UN
ML
UN
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
980.20
8,352.00
14,175.00
14,175.00
129,607.75
98,020.00
16,704.00
708.75
14,175.00
100.00
2.00
5.00
1.00
RELLENOS EN TIERRA
BULLDOZER D-6 CATERPILLAR
RODILLO VIBRATORIO "BENITIN"
VOLQUETA (VIAJE 6M3 Max.3O KM)
34
372
375
402
M3
0.02 DD
0.03 DD
0.17 VJ
( 0.00)
( 0.00)
( 0.00)
300,000.00
114,840.00
120,000.00
29,245.20
6,000.00
3,445.20
19,800.00
RELLENOS RECEBO
RECEBO / MATERIAL DE SUB BASE
RANA A GASOLINA DE 50X74 CM
MdeO RELLENOS RECEBO
35
100
401
1250
M3
1.34 M3
0.04 DD
1.00 M3
( 0.00)
( 0.00)
( 0.00)
20,000.00
33,640.00
7,000.00
35,145.60
26,800.00
1,345.60
7,000.00
REPLANTEO
DURMIENTE ORDINARIO 4Mx.04x.04
PUNTILLA 2" SIN CABEZA
MdeO REPLANTEO EXTERIOR
36
892
528
1247
M2
1.00 ML
0.08 LB
1.00 M2
( 0.00)
( 0.00)
( 0.00)
1,086.92
3,005.56
2,100.00
3,427.36
1,086.92
240.44
2,100.00
37
402
1251
M3
0.17 VJ
1.00 M3
( 0.00)
( 0.00)
120,000.00
8,000.00
27,800.00
19,800.00
8,000.00
Cd.
Valor Total
2024
3723
3695
2948
3718
1.00
1.00
5.00
1.00
UN
UN
UN
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
18,096.00
14,326.00
4,225.00
4,225.00
36,858.25
18,096.00
14,326.00
211.25
4,225.00
475
2810
2802
2847
2857
2948
2936
3511
0.15
2.12
1.02
0.53
6.00
3.00
1.00
ML
UN
UN
UN
UN
%M
%M
UN
( 0.00)
( 6.00)
( 2.00)
( 5.00)
( 0.00)
( 0.00)
( 0.00)
38,705.90
1,569.48
49,874.20
22,919.32
7,560.00
7,560.00
7,560.00
80,277.91
5,805.89
3,327.30
50,871.68
12,032.64
453.60
226.80
7,560.00
3034
3735
3736
3738
3737
2948
2936
3739
1.00
3.00
1.00
4.00
5.00
1.00
1.00
ML
UN
UN
UN
UN
%M
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
39,022.40
102.08
3,399.00
450.00
6,500.00
6,500.00
6,500.00
51,417.64
39,022.40
306.24
3,399.00
1,800.00
325.00
65.00
6,500.00
3035
3735
483
3738
3737
2948
2936
3739
1.00
3.00
1.00
7.00
5.00
1.00
1.00
ML
UN
UN
UN
UN
%M
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
39,022.40
800.00
3,399.00
450.00
6,500.00
6,500.00
6,500.00
54,861.40
39,022.40
2,400.00
3,399.00
3,150.00
325.00
65.00
6,500.00
3036
3748
3790
3736
2948
2936
3739
0.15
1.00
3.00
2.00
1.00
1.00
ML
UN
ML
UN
%M
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
116,784.44
15,542.00
102.08
6,500.00
6,500.00
6,500.00
40,060.91
17,517.67
15,542.00
306.24
130.00
65.00
6,500.00
3037
ML
42,379.67
Cd.
Valor Total
3748
3790
483
3737
2948
2936
3739
0.15
1.00
2.10
2.10
2.00
1.00
1.00
UN
ML
UN
UN
%M
%M
UN
( 0.00)
( 0.00)
( 5.00)
( 5.00)
( 0.00)
( 0.00)
( 0.00)
116,784.44
15,542.00
800.00
450.00
6,500.00
6,500.00
6,500.00
17,517.67
15,542.00
1,680.00
945.00
130.00
65.00
6,500.00
CUARTO DE CONTROL
ANCLAJE CHAZO EXP. 1/2 x 2 3/4"
BANDEJA RACK C/16 TOM. ELE
DUCTO VERT .80"P/MANEJ.CABLE
HERRAMIENTA ELCTRICA %
HERRAMIENTA MENOR %
MdeO PATCH PANEL
3038
3517
3515
3516
2948
2936
3513
4.00
1.00
1.03
10.00
2.00
1.00
UN
UN
UN
UN
%M
%M
UN
( 0.00)
( 0.00)
( 3.00)
( 0.00)
( 0.00)
( 0.00)
2,134.40
286,424.88
66,990.00
68,000.00
68,000.00
68,000.00
440,122.18
8,537.60
286,424.88
68,999.70
6,800.00
1,360.00
68,000.00
3738
2802
3740
2857
2948
2936
3741
4.00
1.26
0.64
6.00
3.00
1.00
ML
UN
UN
UN
%M
%M
UN
( 0.00)
( 5.00)
( 6.00)
( 0.00)
( 0.00)
( 0.00)
1,569.48
12,122.00
22,919.32
7,770.00
7,770.00
7,770.00
44,597.63
6,277.92
15,273.72
14,576.69
466.20
233.10
7,770.00
815
3517
3515
3516
3518
2948
2936
3514
4.00
1.00
1.03
1.03
10.00
10.00
1.00
UN
UN
UN
UN
UN
%M
%M
UN
( 0.00)
( 0.00)
( 3.00)
( 3.00)
( 0.00)
( 0.00)
( 0.00)
2,134.40
286,424.88
66,990.00
257,346.00
59,200.00
59,200.00
59,200.00
700,068.56
8,537.60
286,424.88
68,999.70
265,066.38
5,920.00
5,920.00
59,200.00
PATCH CORD 2m
PATCH CORD AMP QUANTUM (CAT6)
HERRAMIENTA MENOR %
MdeO PATCH CORD 2m
3039
3742
2936
3743
ML
2.10 UN
1.00 %M
1.00 UN
( 5.00)
( 0.00)
( 0.00)
29,336.00
8,500.00
8,500.00
70,190.60
61,605.60
85.00
8,500.00
PATCH PANEL
PATCH PANEL AMP 24 PUERTOS CAT 5E
HERRAMIENTA ELCTRICA %
HERRAMIENTA MENOR %
MdeO PATCH PANEL
814
3424
2948
2936
3513
1.01
5.00
2.00
1.00
UN
UN
%M
%M
UN
( 1.00)
( 0.00)
( 0.00)
( 0.00)
186,000.00
68,000.00
68,000.00
68,000.00
260,620.00
187,860.00
3,400.00
1,360.00
68,000.00
478
2187
1898
1912
2936
2960
0.01
1.03
1.02
5.00
1.00
UN
UN
UN
UN
%M
UN
( 0.00)
( 3.00)
( 2.00)
( 0.00)
( 0.00)
26,961.88
2,691.20
8,120.00
8,400.00
8,400.00
20,143.95
269.62
2,771.94
8,282.40
420.00
8,400.00
Cd.
Valor Total
892
3900
3998
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
580,000.00
220,500.00
800,500.00
580,000.00
220,500.00
564
472
894
691
884
527
535
956
1505
1.28
0.63
0.26
0.42
0.16
3.64
0.74
1.00
M2
UN
M2
GN
UN
LB
UN
UN
M2
( 2.00)
( 5.00)
( 4.00)
( 5.00)
( 4.00)
( 4.00)
( 5.00)
( 0.00)
1,450.00
46,400.00
28,200.00
68,440.00
3,364.00
24.00
65,000.00
66,150.00
181,694.69
1,848.75
29,232.00
7,332.00
28,744.80
524.78
87.36
47,775.00
66,150.00
CLOSET FLORMORADO
BISAGRA COBRIZADA 3"
PEGANTE COLBON MADERA
PIEZA CEDRO CAQUETA
PIEZA FLORMORADO 18 x 4 x 2.80M
PUNTILLA 1" SIN CABEZA
TORNILLO PARA MADERA 8 x 2"
TRIPLEX F/MORADO 1.20x2.40 4mm
MdeO CLOSET (HECHURA E Inst.)
563
472
691
884
2101
527
535
956
1505
0.78
0.26
0.37
0.55
0.16
4.16
0.53
1.00
M2
UN
GN
UN
UN
LB
UN
UN
M2
( 2.00)
( 4.00)
( 5.00)
( 5.00)
( 4.00)
( 4.00)
( 5.00)
( 0.00)
1,450.00
28,200.00
68,440.00
34,220.00
3,364.00
24.00
65,000.00
66,150.00
153,191.48
1,124.04
7,332.00
25,151.70
18,684.12
524.78
99.84
34,125.00
66,150.00
802
3997
3998
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
480,000.00
220,500.00
700,500.00
480,000.00
220,500.00
DIFUSOR FLORMORADO
PEGANTE COLBON MADERA
PIEZA FLORMORADO 18 x 4 x 2.80M
PUNTILLA 1" SIN CABEZA
MdeO DIFUSORES (Hech/Inst)
565
691
2101
527
1506
0.10
0.84
0.11
1.00
M2
GN
UN
LB
UN
( 4.00)
( 5.00)
( 5.00)
( 0.00)
28,200.00
34,220.00
3,364.00
23,835.00
55,865.82
2,932.80
28,744.80
353.22
23,835.00
566
691
884
527
1506
0.10
0.84
0.10
1.00
M2
GN
UN
LB
UN
( 4.00)
( 5.00)
( 4.00)
( 0.00)
28,200.00
68,440.00
3,364.00
23,835.00
84,607.26
2,932.80
57,489.60
349.86
23,835.00
403
2957
952
M2
0.10 GN
0.37 UN
( 0.00)
( 2.00)
47,400.00
35,000.00
25,092.00
4,740.00
12,852.00
Cd.
Valor Total
1507
1.00 M2
( 0.00)
7,500.00
7,500.00
320
2957
954
1507
M2
0.10 GN
0.37 UN
1.00 M2
( 0.00)
( 2.00)
( 0.00)
47,400.00
20,000.00
7,500.00
19,584.00
4,740.00
7,344.00
7,500.00
567
2957
960
1507
M2
0.10 GN
0.38 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
47,400.00
35,840.00
7,500.00
25,977.12
4,929.60
13,547.52
7,500.00
568
2957
956
1507
M2
0.10 GN
0.38 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
47,400.00
65,000.00
7,500.00
36,999.60
4,929.60
24,570.00
7,500.00
763
909
1508
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
323,829.00
4,000.00
327,829.00
323,829.00
4,000.00
762
913
1508
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
65,364.00
4,000.00
69,364.00
65,364.00
4,000.00
761
910
1508
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
323,829.00
4,000.00
327,829.00
323,829.00
4,000.00
589
997
1508
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
47,900.00
4,000.00
51,900.00
47,900.00
4,000.00
569
691
884
527
956
1513
0.15
0.32
0.21
1.05
1.00
UN
GN
UN
LB
UN
UN
( 0.00)
( 5.00)
( 4.00)
( 5.00)
( 0.00)
28,200.00
68,440.00
3,364.00
65,000.00
14,700.00
109,438.31
4,230.00
21,558.60
699.71
68,250.00
14,700.00
570
691
884
527
956
1513
0.16
0.32
0.21
1.05
1.00
UN
GN
UN
LB
UN
UN
( 4.00)
( 5.00)
( 4.00)
( 5.00)
( 0.00)
28,200.00
68,440.00
3,364.00
65,000.00
14,700.00
109,607.51
4,399.20
21,558.60
699.71
68,250.00
14,700.00
571
691
884
527
956
0.16
0.34
0.21
1.58
UN
GN
UN
LB
UN
( 4.00)
( 5.00)
( 4.00)
( 5.00)
28,200.00
68,440.00
3,364.00
65,000.00
145,169.75
4,399.20
22,995.84
699.71
102,375.00
4mm
Cd.
Valor Total
1513
1.00 UN
( 0.00)
14,700.00
14,700.00
572
911
1508
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
59,160.00
4,000.00
63,160.00
59,160.00
4,000.00
573
912
1508
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
65,364.00
4,000.00
69,364.00
65,364.00
4,000.00
574
913
1508
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
65,364.00
4,000.00
69,364.00
65,364.00
4,000.00
PIZANO
575
914
1508
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
68,086.20
4,000.00
72,086.20
68,086.20
4,000.00
PIZANO
576
915
1508
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
72,169.40
4,000.00
76,169.40
72,169.40
4,000.00
PIZANO
577
916
1508
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
72,169.40
4,000.00
76,169.40
72,169.40
4,000.00
578
917
1508
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
72,011.00
4,000.00
76,011.00
72,011.00
4,000.00
579
918
1508
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
82,066.00
4,000.00
86,066.00
82,066.00
4,000.00
580
919
1508
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
82,066.00
4,000.00
86,066.00
82,066.00
4,000.00
581
472
691
884
527
535
960
1510
4.08
0.21
0.95
0.42
4.16
1.83
1.00
ML
UN
GN
UN
LB
UN
UN
UN
( 2.00)
( 4.00)
( 5.00)
( 4.00)
( 4.00)
( 5.00)
( 0.00)
1,450.00
28,200.00
68,440.00
3,364.00
24.00
35,840.00
64,000.00
207,436.34
5,916.00
5,865.60
64,675.80
1,399.42
99.84
65,479.68
64,000.00
582
472
894
691
884
4.08
0.53
0.21
0.40
ML
UN
M2
GN
UN
( 2.00)
( 5.00)
( 4.00)
( 5.00)
1,450.00
46,400.00
28,200.00
68,440.00
176,723.42
5,916.00
24,360.00
5,865.60
27,307.56
4mm
Cd.
Valor Total
527
535
956
1510
0.42
4.16
0.74
1.00
LB
UN
UN
UN
( 4.00)
( 4.00)
( 5.00)
( 0.00)
3,364.00
24.00
65,000.00
64,000.00
1,399.42
99.84
47,775.00
64,000.00
583
894
691
884
527
535
956
1510
0.55
0.21
0.37
0.56
6.24
0.74
1.00
M2
M2
GN
UN
LB
UN
UN
UN
( 5.00)
( 4.00)
( 5.00)
( 4.00)
( 4.00)
( 5.00)
( 0.00)
46,400.00
28,200.00
68,440.00
3,364.00
24.00
65,000.00
64,000.00
170,165.68
25,334.40
5,865.60
25,151.70
1,889.22
149.76
47,775.00
64,000.00
584
691
884
527
535
960
1510
0.21
0.91
0.73
6.24
0.84
1.00
M2
GN
UN
LB
UN
UN
UN
( 4.00)
( 5.00)
( 4.00)
( 4.00)
( 5.00)
( 0.00)
28,200.00
68,440.00
3,364.00
24.00
35,840.00
64,000.00
165,089.89
5,865.60
62,519.94
2,448.99
149.76
30,105.60
64,000.00
585
884
527
535
1511
0.18
0.23
2.08
1.00
ML
UN
LB
UN
ML
( 5.00)
( 4.00)
( 4.00)
( 0.00)
68,440.00
3,364.00
24.00
10,500.00
23,536.14
12,216.54
769.68
49.92
10,500.00
758
884
527
535
1511
0.22
0.26
2.10
1.00
ML
UN
LB
UN
ML
( 2.00)
( 4.00)
( 0.00)
( 0.00)
68,440.00
3,364.00
24.00
10,500.00
26,782.98
15,357.94
874.64
50.40
10,500.00
586
894
527
535
1511
0.17
0.26
2.00
1.00
ML
M2
LB
UN
ML
( 0.00)
( 4.00)
( 0.00)
( 0.00)
46,400.00
3,364.00
24.00
10,500.00
19,310.64
7,888.00
874.64
48.00
10,500.00
804
472
691
906
4023
535
962
960
1509
3.12
0.22
0.84
0.43
8.32
1.75
1.75
1.00
UN
UN
GN
UN
UN
UN
UN
UN
UN
( 2.00)
( 4.00)
( 0.00)
( 4.00)
( 4.00)
(25.00)
(25.00)
( 0.00)
1,450.00
28,200.00
38,280.00
10.00
24.00
27,740.00
35,840.00
105,000.00
259,250.17
4,525.74
6,100.22
32,155.20
4.33
199.68
48,545.00
62,720.00
105,000.00
4mm
587
UN
230,510.02
Cd.
Valor Total
472
894
691
884
527
535
956
1509
3.06
0.42
0.21
0.38
0.42
8.32
1.05
1.00
UN
M2
GN
UN
LB
UN
UN
UN
( 2.00)
( 5.00)
( 4.00)
( 5.00)
( 4.00)
( 4.00)
( 5.00)
( 0.00)
1,450.00
46,400.00
28,200.00
68,440.00
3,364.00
24.00
65,000.00
105,000.00
4,437.00
19,488.00
5,865.60
25,870.32
1,399.42
199.68
68,250.00
105,000.00
588
472
691
884
527
535
960
1509
3.06
0.21
0.84
0.42
8.32
1.05
1.00
UN
UN
GN
UN
LB
UN
UN
UN
( 2.00)
( 4.00)
( 5.00)
( 4.00)
( 4.00)
( 5.00)
( 0.00)
1,450.00
28,200.00
68,440.00
3,364.00
24.00
35,840.00
105,000.00
212,023.30
4,437.00
5,865.60
57,489.60
1,399.42
199.68
37,632.00
105,000.00
595
472
691
884
527
535
1514
1.36
0.14
0.76
0.14
4.16
1.00
M2
UN
GN
UN
LB
UN
M2
( 2.00)
( 4.00)
( 5.00)
( 4.00)
( 4.00)
( 0.00)
1,450.00
28,200.00
68,440.00
3,364.00
24.00
18,795.00
76,870.00
1,967.07
3,812.64
51,740.64
454.81
99.84
18,795.00
593
472
691
884
527
535
1514
1.36
0.14
0.48
0.14
4.16
1.00
M2
UN
GN
UN
LB
UN
M2
( 2.00)
( 4.00)
( 5.00)
( 4.00)
( 4.00)
( 0.00)
1,450.00
28,200.00
68,440.00
3,364.00
24.00
18,795.00
58,185.88
1,967.07
3,812.64
33,056.52
454.81
99.84
18,795.00
590
472
691
884
527
535
1514
1.36
0.14
0.59
0.14
4.16
1.00
M2
UN
GN
UN
LB
UN
M2
( 2.00)
( 4.00)
( 5.00)
( 4.00)
( 4.00)
( 0.00)
1,450.00
28,200.00
68,440.00
3,364.00
24.00
18,795.00
65,372.08
1,967.07
3,812.64
40,242.72
454.81
99.84
18,795.00
591
472
691
884
527
535
1514
1.36
0.14
0.69
0.14
4.16
1.00
M2
UN
GN
UN
LB
UN
M2
( 2.00)
( 4.00)
( 5.00)
( 4.00)
( 4.00)
( 0.00)
1,450.00
28,200.00
68,440.00
3,364.00
24.00
18,795.00
72,558.28
1,967.07
3,812.64
47,428.92
454.81
99.84
18,795.00
592
4mm
M2
89,086.54
Cd.
Valor Total
472
691
884
527
535
1514
1.36
0.14
0.93
0.14
4.16
1.00
UN
GN
UN
LB
UN
M2
( 2.00)
( 4.00)
( 5.00)
( 4.00)
( 4.00)
( 0.00)
1,450.00
28,200.00
68,440.00
3,364.00
24.00
18,795.00
1,967.07
3,812.64
63,957.18
454.81
99.84
18,795.00
594
472
691
884
527
535
1514
1.36
0.14
0.57
0.14
4.16
1.00
M2
UN
GN
UN
LB
UN
M2
( 2.00)
( 4.00)
( 5.00)
( 4.00)
( 4.00)
( 0.00)
1,450.00
28,200.00
68,440.00
3,364.00
24.00
18,795.00
63,934.84
1,967.07
3,812.64
38,805.48
454.81
99.84
18,795.00
Cd.
596
1025
474
30
531
9999
CELOSIA ALUMINIO
CELOSIA ALUMINIO .60 x 1.00 M.
TORNILLO GOLOSO
1" x 8
PORCENTAJE CONTRATO
Valor Total
UN
GN
UN
UN
KG
%
( 2.00)
( 0.00)
( 1.00)
( 1.00)
( 0.00)
27,094.00
1,100.00
55,100.00
215.00
21,795.08
21,893.16
773.80
561.00
20,312.62
147.66
98.08
597
990
534
9999
ML
1.00 ML
2.10 UN
45.00 %
( 0.00)
( 0.00)
( 0.00)
25,000.00
20.00
25,042.00
36,310.90
25,000.00
42.00
11,268.90
ESCALERA DE GATO
ANTICORROSIVO OXIDO DE HIERRO ROJO
SOLDADURA ELECTRICA DE 1/8
TUBO GALVANIZADO
1"
PORCENTAJE CONTRATO
598
1025
531
859
9999
0.01
0.01
5.05
45.00
ML
GN
KG
ML
%
( 2.00)
( 1.00)
( 1.00)
( 0.00)
27,094.00
215.00
12,109.00
61,539.52
89,232.31
386.90
2.17
61,150.45
27,692.79
57
3059
4024
M2
1.00 M2
1.03 M2
( 0.00)
( 3.00)
3,061.24
7,350.00
10,631.74
3,061.24
7,570.50
975
4011
4024
M2
1.00 M2
1.03 M2
( 0.00)
( 3.00)
19,517.00
7,350.00
27,087.50
19,517.00
7,570.50
976
4012
4024
M2
1.00 M2
1.03 M2
( 0.00)
( 3.00)
16,311.92
7,350.00
23,882.42
16,311.92
7,570.50
978
4013
4024
M2
1.00 M2
1.03 M2
( 0.00)
( 3.00)
13,991.92
7,350.00
21,562.42
13,991.92
7,570.50
996
4014
4024
M2
1.00 M2
1.03 M2
( 0.00)
( 3.00)
17,075.00
7,350.00
24,645.50
17,075.00
7,570.50
997
4015
4024
M2
1.00 M2
1.03 M2
( 0.00)
( 3.00)
38,393.68
7,350.00
45,964.18
38,393.68
7,570.50
998
4016
M2
1.00 M2
( 0.00)
29,049.88
36,620.38
29,049.88
0.03
0.51
0.37
0.69
0.45
Cd.
Valor Total
4024
1.03 M2
( 3.00)
7,350.00
7,570.50
999
4017
4024
M2
1.00 M2
1.03 M2
( 0.00)
( 3.00)
22,629.28
7,350.00
30,199.78
22,629.28
7,570.50
1013
4018
4024
M2
1.00 M2
1.03 M2
( 0.00)
( 3.00)
18,565.80
7,350.00
26,136.30
18,565.80
7,570.50
1020
4019
4024
M2
1.00 M2
1.03 M2
( 0.00)
( 3.00)
14,981.40
7,350.00
22,551.90
14,981.40
7,570.50
1021
4020
4024
M2
1.00 M2
1.03 M2
( 0.00)
( 3.00)
12,261.20
7,350.00
19,831.70
12,261.20
7,570.50
1022
4021
4024
M2
1.00 M2
1.03 M2
( 0.00)
( 3.00)
10,544.40
7,350.00
18,114.90
10,544.40
7,570.50
1023
468
4024
M2
1.00 UN
1.03 M2
( 0.00)
( 3.00)
17,910.40
7,350.00
25,480.90
17,910.40
7,570.50
599
1025
473
30
531
9999
0.07
3.00
0.52
0.05
45.00
UN
GN
UN
UN
KG
%
( 2.00)
( 0.00)
( 1.00)
( 1.00)
( 0.00)
27,094.00
1,950.00
55,100.00
215.00
36,177.38
52,457.20
1,934.51
5,850.00
28,382.01
10.86
16,279.82
600
1025
473
30
531
9999
0.08
3.00
0.66
0.06
45.00
UN
GN
UN
UN
KG
%
( 2.00)
( 0.00)
( 1.00)
( 1.00)
( 0.00)
27,094.00
1,950.00
55,100.00
215.00
44,247.05
64,158.22
2,210.87
5,850.00
36,173.15
13.03
19,911.17
601
1025
473
30
531
9999
0.11
3.00
0.83
0.07
45.00
UN
GN
UN
UN
KG
%
( 2.00)
( 0.00)
( 1.00)
( 1.00)
( 0.00)
27,094.00
1,950.00
55,100.00
215.00
54,538.97
79,081.50
3,039.95
5,850.00
45,633.82
15.20
24,542.54
602
1025
473
30
531
0.13
3.00
1.01
0.10
UN
GN
UN
UN
KG
( 2.00)
( 0.00)
( 1.00)
( 1.00)
27,094.00
1,950.00
55,100.00
215.00
94,417.30
3,592.66
5,850.00
55,651.00
21.72
Cd.
9999
45.00 %
603
1025
473
30
531
9999
0.16
3.00
1.27
0.10
45.00
604
1025
473
30
531
9999
Valor Total
( 0.00)
65,115.38
29,301.92
UN
GN
UN
UN
KG
%
( 2.00)
( 0.00)
( 1.00)
( 1.00)
( 0.00)
27,094.00
1,950.00
55,100.00
215.00
80,413.72
116,599.89
4,421.74
5,850.00
70,120.26
21.72
36,186.17
0.17
3.00
0.66
0.07
45.00
UN
GN
UN
UN
KG
%
( 2.00)
( 0.00)
( 1.00)
( 1.00)
( 0.00)
27,094.00
1,950.00
55,100.00
215.00
46,736.45
67,767.85
4,698.10
5,850.00
36,173.15
15.20
21,031.40
605
10
20
52
531
9999
3.36
8.40
0.30
0.20
45.00
UN
ML
KG
UN
KG
%
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
10,858.76
2,173.84
27,057.00
215.00
62,959.90
91,291.86
36,485.43
18,260.26
8,171.21
43.00
28,331.96
MARQUESINAS LAMINA
ANTICORROSIVO OXIDO DE HIERRO ROJO
LAMINA COLD ROLLED Ca.18 1x2 M
SOLDADURA ELECTRICA DE 1/8
TUBO CUADRADO 1" Cal. 18
PORCENTAJE CONTRATO
606
1025
30
531
53
9999
0.04
0.42
0.22
1.01
0.45
M2
GN
UN
KG
ML
%
( 2.00)
( 1.00)
( 1.00)
( 1.00)
( 0.00)
27,094.00
55,100.00
215.00
2,416.28
26,827.81
26,948.53
967.26
23,373.42
46.69
2,440.44
120.73
694
300
333
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
162,400.00
7,140.00
169,540.00
162,400.00
7,140.00
607
11
1025
475
30
504
531
9999
0.89
0.26
1.56
0.53
0.33
0.16
45.00
M2
ML
GN
UN
UN
UN
KG
%
( 0.00)
( 2.00)
( 0.00)
( 1.00)
( 0.00)
( 1.00)
( 0.00)
2,184.00
27,094.00
4,600.00
55,100.00
2,821.12
215.00
46,348.31
67,205.05
1,943.76
7,047.15
7,176.00
29,216.78
930.97
33.66
20,856.74
PUERTAS LAMINA
ANTICORROSIVO OXIDO DE HIERRO ROJO
BISAGRA NUDO 2 1/2 1" EN COBRE
LAMINA COLD ROLLED Ca.18 1x2 M
SOLDADURA ELECTRICA DE 1/8
PORCENTAJE CONTRATO
608
1025
473
30
531
9999
0.07
1.50
1.52
0.93
45.00
M2
GN
UN
UN
KG
%
( 2.00)
( 0.00)
( 1.00)
( 1.00)
( 0.00)
27,094.00
1,950.00
55,100.00
215.00
88,536.88
128,378.47
1,934.51
2,925.00
83,476.50
200.86
39,841.59
REJA BANCARIA
609
M2
33,888.57
Cd.
Valor Total
1025
27
531
9999
0.20
10.47
0.61
45.00
GN
ML
KG
%
( 2.00)
( 1.00)
( 1.00)
( 0.00)
27,094.00
1,691.28
215.00
23,371.43
5,527.18
17,713.96
130.29
10,517.14
REJAS LAMINA
ANTICORROSIVO OXIDO DE HIERRO ROJO
LAMINA COLD ROLLED Ca.18 1x2 M
SOLDADURA ELECTRICA DE 1/8
TUBO CUADRADO 1" Cal. 18
PORCENTAJE CONTRATO
610
1025
30
531
53
9999
0.02
0.21
0.46
7.37
45.00
M2
GN
UN
KG
ML
%
( 2.00)
( 1.00)
( 1.00)
( 1.00)
( 0.00)
27,094.00
55,100.00
215.00
2,416.28
29,819.94
43,238.91
497.45
11,408.46
98.80
17,815.23
13,418.97
611
11
1025
20
531
9999
4.09
0.04
9.82
0.96
45.00
ML
ML
GN
KG
KG
%
( 1.00)
( 2.00)
( 1.00)
( 1.00)
( 0.00)
2,184.00
27,094.00
2,173.84
215.00
31,586.40
45,800.28
8,933.65
1,105.44
21,341.02
206.29
14,213.88
612
1025
30
531
9999
0.02
0.51
0.46
45.00
UN
GN
UN
KG
%
( 2.00)
( 1.00)
( 1.00)
( 0.00)
27,094.00
55,100.00
215.00
28,477.02
41,291.68
552.72
27,825.50
98.80
12,814.66
614
1019
191
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
190,000.00
9,450.00
199,450.00
190,000.00
9,450.00
613
1020
191
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
100,000.00
9,450.00
109,450.00
100,000.00
9,450.00
616
1021
191
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
150,000.00
9,450.00
159,450.00
150,000.00
9,450.00
615
1022
191
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
180,000.00
9,450.00
189,450.00
180,000.00
9,450.00
690
A 269
59
16
UN
0.08 M3
1.68 M2
1.00 UN
( 0.00)
( 0.00)
( 0.00)
149,510.93
40,600.00
3,675.00
83,096.32
11,213.32
68,208.00
3,675.00
691
A 269
119
16
UN
0.03 M3
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
149,510.93
14,616.00
3,675.00
22,776.33
4,485.33
14,616.00
3,675.00
693
UN
53,503.44
Cd.
Valor Total
A 269
295
16
0.04 M3
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
149,510.93
43,848.00
3,675.00
5,980.44
43,848.00
3,675.00
675
A 269
57
16
UN
0.08 M3
2.70 M2
1.00 UN
( 0.00)
( 0.00)
( 0.00)
149,510.93
40,600.00
3,675.00
125,255.87
11,960.87
109,620.00
3,675.00
617
11
1025
474
30
504
531
9999
1.67
0.14
1.05
0.53
0.33
0.16
45.00
M2
ML
GN
UN
UN
UN
KG
%
( 1.00)
( 2.00)
( 0.00)
( 1.00)
( 0.00)
( 1.00)
( 0.00)
2,184.00
27,094.00
1,100.00
55,100.00
2,821.12
215.00
38,706.88
56,124.98
3,639.64
3,730.84
1,155.00
29,216.78
930.97
33.66
17,418.10
618
11
1025
474
30
504
531
9999
1.62
0.18
1.05
0.71
0.67
0.21
45.00
M2
ML
GN
UN
UN
UN
KG
%
( 1.00)
( 2.00)
( 0.00)
( 1.00)
( 0.00)
( 1.00)
( 0.00)
2,184.00
27,094.00
1,100.00
55,100.00
2,821.12
215.00
50,689.24
73,499.40
3,529.34
4,836.28
1,155.00
39,233.96
1,890.15
44.52
22,810.16
619
11
1025
474
30
504
531
9999
1.62
0.21
1.05
0.86
0.67
0.24
45.00
M2
ML
GN
UN
UN
UN
KG
%
( 1.00)
( 2.00)
( 0.00)
( 1.00)
( 0.00)
( 1.00)
( 0.00)
2,184.00
27,094.00
1,100.00
55,100.00
2,821.12
215.00
59,733.50
86,613.57
3,529.34
5,803.53
1,155.00
47,303.35
1,890.15
52.12
26,880.07
Cd.
Valor Total
879
1718
1093
2882
M2
1.47 UN
4.20 ML
1.00 M2
( 5.00)
( 5.00)
( 0.00)
6,797.60
2,680.76
10,815.00
32,066.66
9,992.47
11,259.19
10,815.00
995
923
2479
2944
4023
2945
4.18
0.01
0.71
0.23
1.00
M2
ML
KG
UN
UN
M2
( 2.00)
( 0.00)
( 2.00)
( 0.00)
( 0.00)
2,590.28
15,600.00
17,490.00
10.00
5,250.00
28,728.71
10,832.55
156.00
12,487.86
2.30
5,250.00
CANES EN PLANCHON
PLANCHON ORDINARIO 17x.4x.4
PUNTILLA 2" CON CABEZA
MdeO CANES EN PLANCHON
232
933
525
1400
ML
1.02 ML
0.01 LB
1.27 ML
( 2.00)
( 8.00)
( 0.00)
4,350.00
2,945.24
7,455.00
13,936.66
4,437.00
31.81
9,467.85
875
141
1093
2883
M2
1.03 M2
4.20 ML
1.00 M2
( 3.00)
( 5.00)
( 0.00)
120,292.00
2,680.76
2,000.00
137,159.95
123,900.76
11,259.19
2,000.00
876
142
1093
2883
M2
1.03 M2
4.20 ML
1.00 M2
( 3.00)
( 5.00)
( 0.00)
177,248.00
2,680.76
2,000.00
195,824.63
182,565.44
11,259.19
2,000.00
893
3465
3901
2569
M2
1.03 M2
4.20 M2
1.00 M2
( 3.00)
( 5.00)
( 0.00)
69,020.00
19,720.00
3,675.00
157,589.60
71,090.60
82,824.00
3,675.00
894
3454
3901
2569
M2
1.03 M2
4.20 M2
1.00 M2
( 3.00)
( 5.00)
( 0.00)
27,840.00
19,720.00
3,675.00
115,174.20
28,675.20
82,824.00
3,675.00
896
3463
3901
2569
M2
1.00 M2
4.20 M2
1.00 M2
( 0.00)
( 5.00)
( 0.00)
75,400.00
19,720.00
3,675.00
161,899.00
75,400.00
82,824.00
3,675.00
897
M2
138,699.00
Cd.
Valor Total
3458
3901
2569
1.00 M2
4.20 M2
1.00 M2
( 0.00)
( 5.00)
( 0.00)
52,200.00
19,720.00
3,675.00
52,200.00
82,824.00
3,675.00
889
1093
2505
2569
M2
4.20 ML
1.03 M2
1.00 M2
( 5.00)
( 3.00)
( 0.00)
2,680.76
29,660.00
3,675.00
45,483.99
11,259.19
30,549.80
3,675.00
233
3181
3212
ML
1.00 ML
1.00 ML
( 0.00)
( 0.00)
16,820.00
3,675.00
20,495.00
16,820.00
3,675.00
248
3183
3212
ML
1.00 ML
1.00 ML
( 0.00)
( 0.00)
23,780.00
3,675.00
27,455.00
23,780.00
3,675.00
DURACUSTIC 5/8"
FGLAS
ANGULO 1x1x1/16 BLANCO
DURACUSTIC 5/8" S/inst. Fglas
MdeO DURACUSTIC 5/8" FGLAS
250
1093
148
2568
M2
4.20 ML
1.03 M2
1.00 M2
( 5.00)
( 3.00)
( 0.00)
2,680.76
10,985.20
3,990.00
26,563.95
11,259.19
11,314.76
3,990.00
888
1093
2501
2569
M2
4.20 ML
1.03 PLC
1.00 M2
( 5.00)
( 3.00)
( 0.00)
2,680.76
10,985.20
3,675.00
26,248.95
11,259.19
11,314.76
3,675.00
878
883
923
689
1628
525
1401
0.53
4.34
0.01
1.03
0.27
1.00
M2
ML
ML
KG
UN
LB
M2
( 2.00)
( 2.00)
( 5.00)
( 3.00)
( 8.00)
( 0.00)
870.00
2,590.28
13,600.00
12,627.76
2,945.24
6,280.00
31,914.92
461.45
11,228.86
142.80
13,006.59
795.21
6,280.00
237
883
923
689
176
525
1401
0.53
4.34
0.01
1.38
0.27
1.00
M2
ML
ML
KG
UN
LB
M2
( 2.00)
( 2.00)
( 5.00)
( 3.00)
( 8.00)
( 0.00)
870.00
2,590.28
13,600.00
9,029.44
2,945.24
6,280.00
31,370.76
461.45
11,228.86
142.80
12,462.43
795.21
6,280.00
898
883
923
689
2254
525
1401
0.53
4.34
0.01
1.03
0.27
1.00
M2
ML
ML
KG
UN
LB
M2
( 2.00)
( 2.00)
( 5.00)
( 3.00)
( 8.00)
( 0.00)
870.00
2,590.28
13,600.00
46,026.48
2,945.24
6,280.00
66,315.60
461.45
11,228.86
142.80
47,407.27
795.21
6,280.00
LISTON M.H.(AMARILLO)
238
M2
71,589.53
Cd.
Valor Total
883
923
924
689
525
1402
0.53
4.34
1.10
0.05
0.27
1.00
ML
ML
M2
KG
LB
M2
( 2.00)
( 2.00)
(10.00)
( 5.00)
( 8.00)
( 0.00)
870.00
2,590.28
46,400.00
13,600.00
2,945.24
7,350.00
461.45
11,228.86
51,040.00
714.00
795.21
7,350.00
239
883
923
925
689
525
1402
0.53
4.34
1.10
0.05
0.27
1.00
M2
ML
ML
M2
KG
LB
M2
( 2.00)
( 2.00)
(10.00)
( 5.00)
( 8.00)
( 0.00)
870.00
2,590.28
55,000.00
13,600.00
2,945.24
7,350.00
81,049.53
461.45
11,228.86
60,500.00
714.00
795.21
7,350.00
124
883
923
2459
689
525
1402
0.53
4.34
1.10
0.05
0.27
1.00
M2
ML
ML
M2
KG
LB
M2
( 2.00)
( 2.00)
(10.00)
( 5.00)
( 8.00)
( 0.00)
870.00
2,590.28
8,700.00
13,600.00
2,945.24
7,350.00
30,119.53
461.45
11,228.86
9,570.00
714.00
795.21
7,350.00
LISTON M.H.(OTOBO)
CUARTOBOCEL MEDIA CAA 2 x 2 x 2.80
LISTON EN AMARILLO 8 x.2.2 x3
LISTON M.H. CEDRO BLANCO
MERULEX I.F.S. Transparente 3 KILOS
PUNTILLA 2" CON CABEZA
MdeO LISTON M.H.
240
883
923
928
689
525
1402
0.53
4.34
1.10
0.05
0.27
1.00
M2
ML
ML
M2
KG
LB
M2
( 2.00)
( 2.00)
(10.00)
( 5.00)
( 8.00)
( 0.00)
870.00
2,590.28
9,860.00
13,600.00
2,945.24
7,350.00
31,395.53
461.45
11,228.86
10,846.00
714.00
795.21
7,350.00
241
883
923
926
689
525
1402
0.53
4.34
1.10
0.05
0.27
1.00
M2
ML
ML
M2
KG
LB
M2
( 2.00)
( 2.00)
(10.00)
( 5.00)
( 8.00)
( 0.00)
870.00
2,590.28
7,540.00
13,600.00
2,945.24
7,350.00
28,843.53
461.45
11,228.86
8,294.00
714.00
795.21
7,350.00
242
883
923
927
689
525
1402
0.53
4.34
1.10
0.05
0.27
1.00
M2
ML
ML
M2
KG
LB
M2
( 2.00)
( 2.00)
(10.00)
( 5.00)
( 8.00)
( 0.00)
870.00
2,590.28
34,800.00
13,600.00
2,945.24
7,350.00
58,829.53
461.45
11,228.86
38,280.00
714.00
795.21
7,350.00
245
158
M2
1.03 M2
( 3.00)
54,198.00
55,823.94
55,823.94
244
M2
69,986.44
Cd.
Decor
Valor Total
160
1.03 M2
( 3.00)
67,948.00
69,986.44
659
1627
M2
1.03 M2
( 3.00)
106,314.00
109,503.42
109,503.42
859
1812
M2
1.03 M2
( 3.00)
42,774.00
44,057.22
44,057.22
246
162
M2
1.03 M2
( 3.00)
70,095.00
72,197.85
72,197.85
247
164
M2
1.03 M2
( 3.00)
76,675.00
78,975.25
78,975.25
858
1817
M2
1.03 M2
( 3.00)
123,210.00
126,906.30
126,906.30
855
1816
M2
1.03 M2
( 3.00)
108,772.00
112,035.16
112,035.16
540
166
M2
1.03 M2
( 3.00)
151,095.00
155,627.85
155,627.85
249
3191
3222
ML
1.00 UN
1.00 UN
( 0.00)
( 0.00)
58,000.00
7,350.00
65,350.00
58,000.00
7,350.00
243
156
M2
1.03 M2
( 3.00)
156,785.00
161,488.55
161,488.55
MONOACUSTICO 1"
FGLAS
ANGULO 1x1x1/16 BLANCO
MONOACUSTIC0 1 1/2" S/inst. Fglas
MdeO SUPERACUSTICO
883
1093
186
2571
M2
4.20 ML
1.01 M2
1.00 M2
( 5.00)
( 1.00)
( 0.00)
2,680.76
51,643.00
3,675.00
67,093.62
11,259.19
52,159.43
3,675.00
SUPERCEL
ETERNIT
ANGULO 1x1x1/16 BLANCO
SUPERCEL .60x121x4mm
MdeO SUPERCEL
236
1093
187
2902
M2
4.20 ML
1.03 UN
1.00 M2
( 5.00)
( 0.00)
( 0.00)
2,680.76
8,700.00
3,675.00
23,895.19
11,259.19
8,961.00
3,675.00
251
689
940
946
4023
1403
0.18
2.50
0.28
2.16
1.00
M2
KG
ML
UN
UN
M2
( 5.00)
( 2.00)
( 4.00)
( 8.00)
( 0.00)
13,600.00
615.96
51,119.00
10.00
5,250.00
23,475.74
2,427.60
1,539.28
14,237.25
21.60
5,250.00
ETERNIT
Cd.
Valor Total
313
22
167
2478
923
1269
3.10
0.00
0.00
7.62
1.00
M2
M2
CT
CT
ML
M2
( 0.00)
( 8.00)
( 8.00)
( 3.00)
( 0.00)
1,535.00
8,200.00
4,500.00
2,590.28
1,650.00
26,173.82
4,758.50
11.51
10.69
19,743.11
1,650.00
378
22
167
2478
923
1269
4.42
0.00
0.00
9.00
1.00
M2
M2
CT
CT
ML
M2
( 0.00)
( 8.00)
( 8.00)
( 3.00)
( 0.00)
1,535.00
8,200.00
4,500.00
2,590.28
1,650.00
31,775.12
6,784.70
11.51
10.69
23,318.22
1,650.00
379
22
167
2478
923
1269
2.86
0.00
0.00
7.26
1.00
M2
M2
CT
CT
ML
M2
( 0.00)
( 8.00)
( 8.00)
( 3.00)
( 0.00)
1,535.00
8,200.00
4,500.00
2,590.28
1,650.00
24,859.90
4,390.10
9.74
8.75
18,801.31
1,650.00
384
22
167
2478
923
1269
4.06
0.00
0.00
8.34
1.00
M2
M2
CT
CT
ML
M2
( 0.00)
( 8.00)
( 8.00)
( 3.00)
( 0.00)
1,535.00
8,200.00
4,500.00
2,590.28
1,650.00
29,511.30
6,232.10
9.74
8.75
21,610.71
1,650.00
388
22
167
2478
923
1269
2.71
0.00
0.00
7.00
1.00
M2
M2
CT
CT
ML
M2
( 0.00)
( 8.00)
( 8.00)
( 3.00)
( 0.00)
1,535.00
8,200.00
4,500.00
2,590.28
1,650.00
23,965.26
4,159.85
5.31
7.78
18,142.32
1,650.00
419
22
167
2478
923
1269
3.84
0.00
0.00
7.59
1.00
M2
M2
CT
CT
ML
M2
( 0.00)
( 8.00)
( 8.00)
( 3.00)
( 0.00)
1,535.00
8,200.00
4,500.00
2,590.28
1,650.00
27,220.56
5,894.40
5.31
7.78
19,663.07
1,650.00
451
M2
66,692.84
Cd.
Valor Total
22
167
2478
923
1269
5.76
0.00
0.00
21.69
1.00
M2
CT
CT
ML
M2
( 0.00)
( 8.00)
( 8.00)
( 3.00)
( 0.00)
1,535.00
8,200.00
4,500.00
2,590.28
1,650.00
8,841.60
7.08
6.32
56,187.84
1,650.00
626
22
167
2478
923
1269
7.84
0.00
0.00
25.03
1.00
M2
M2
CT
CT
ML
M2
( 0.00)
( 8.00)
( 8.00)
( 3.00)
( 0.00)
1,535.00
8,200.00
4,500.00
2,590.28
1,650.00
78,529.92
12,034.40
7.08
6.32
64,832.12
1,650.00
72
9
903
923
525
1269
0.08
1.58
8.76
0.55
1.00
M2
KG
ML
ML
LB
M2
( 0.00)
( 5.00)
( 3.00)
(10.00)
( 0.00)
3,271.20
1,740.00
2,590.28
2,945.24
1,650.00
28,949.98
261.70
2,740.50
22,677.90
1,619.88
1,650.00
840
9
903
923
525
1269
0.11
1.75
11.07
0.75
1.00
M2
KG
ML
ML
LB
M2
( 0.00)
( 5.00)
( 3.00)
(10.00)
( 0.00)
3,271.20
1,740.00
2,590.28
2,945.24
1,650.00
35,944.84
359.83
3,051.09
28,680.88
2,203.04
1,650.00
73
9
903
923
525
1269
0.07
1.94
9.32
0.54
1.00
M2
KG
ML
ML
LB
M2
( 0.00)
( 5.00)
( 3.00)
(10.00)
( 0.00)
3,271.20
1,740.00
2,590.28
2,945.24
1,650.00
30,991.71
228.98
3,379.95
24,145.30
1,587.48
1,650.00
841
9
903
923
525
1269
0.09
1.44
10.53
0.66
1.00
M2
KG
ML
ML
LB
M2
( 0.00)
( 5.00)
( 3.00)
(10.00)
( 0.00)
3,271.20
1,740.00
2,590.28
2,945.24
1,650.00
33,658.10
294.41
2,502.99
27,266.84
1,943.86
1,650.00
74
9
903
923
525
1269
0.07
1.66
9.90
0.48
1.00
M2
KG
ML
ML
LB
M2
( 0.00)
( 5.00)
( 3.00)
(10.00)
( 0.00)
3,271.20
1,740.00
2,590.28
2,945.24
1,650.00
31,830.51
228.98
2,886.66
25,639.37
1,425.50
1,650.00
M2
0.09 KG
1.90 ML
( 0.00)
( 5.00)
3,271.20
1,740.00
35,045.12
294.41
3,306.87
842
9
903
Cd.
Valor Total
923
525
1269
10.88 ML
0.55 LB
1.00 M2
( 3.00)
(10.00)
( 0.00)
2,590.28
2,945.24
1,650.00
28,173.96
1,619.88
1,650.00
70
9
903
923
525
1269
0.20
3.26
16.15
0.83
1.00
M2
KG
ML
ML
LB
M2
( 0.00)
( 5.00)
( 3.00)
(10.00)
( 0.00)
3,271.20
1,740.00
2,590.28
2,945.24
1,650.00
52,231.82
654.24
5,663.70
41,834.06
2,429.82
1,650.00
71
9
903
923
525
1269
0.20
4.04
18.20
1.21
1.00
M2
KG
ML
ML
LB
M2
( 0.00)
( 5.00)
( 3.00)
(10.00)
( 0.00)
3,271.20
1,740.00
2,590.28
2,945.24
1,650.00
60,045.29
654.24
7,033.95
47,143.36
3,563.74
1,650.00
COLUMNAS EN CONCRETO
A.C.P.M.
CONCRETO 3000 PSI (210N)
PUNTILLA 2" CON CABEZA
TABLA BURRA .30x.025x3 ORDINAR
ANDAMIO TUBULAR (SECC.)
MORDAZAS EN PLATINA CON CUA
PARALES - MES
VIBRADOR A GASOLINA
MdeO COLUMNAS
844
633
2654
525
942
368
390
394
400
1270
0.44
1.03
3.63
10.56
14.00
4.00
7.00
0.20
1.00
M3
GLN
M3
LB
ML
DD
UN
UN
DD
M3
( 0.00)
( 3.00)
(10.00)
( 5.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,945.24
3,286.28
440.80
1,670.40
3,828.00
31,320.00
115,000.00
531,290.49
2,258.01
322,715.48
10,691.22
34,712.98
6,171.20
6,681.60
26,796.00
6,264.00
115,000.00
253
A 258
98
335
M3
0.43 M3
0.65 M3
1.00 M3
( 8.00)
( 8.00)
( 0.00)
225,368.00
26,666.00
60,000.00
174,638.54
97,358.98
17,279.57
60,000.00
252
A 255
98
335
M3
0.42 M3
0.65 M3
1.00 M3
( 4.00)
( 8.00)
( 0.00)
237,480.00
26,666.00
60,000.00
176,071.25
98,791.68
17,279.57
60,000.00
DESARENADOR
MORTERO 1 : 4 ARENA PEA (M3)
ALAMBRE NEGRO Cal. 18
CONCRETO 2500 PSI COMUN C/Prem
HIERRO A-40 Liso/Rect " (6.5mm)
LADRILLO PRECOCIDO COMUN 12x24x6 Dep.
RECEBO / MATERIAL DE SUB BASE
HERRAMIENTA MENOR %
MdeO CONSTRUCCION DESARENADOR
MdeO EXCAV. MANUAL
700
A 269
9
2687
2943
123
100
2936
506
1241
UN
M3
KG
M3
KG
UN
M3
%M
UN
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
149,510.93
3,271.20
277,240.00
681.00
330.00
20,000.00
125,395.00
115,000.00
7,875.00
304,044.70
35,882.62
168.47
71,389.30
4,910.01
63,221.40
3,090.00
2,507.90
115,000.00
7,875.00
82
0.24
0.05
0.26
7.21
191.58
0.15
2.00
1.00
1.00
M2
74,140.20
Cd.
Valor Total
A 72
633
2654
525
942
383
400
3279
0.44
0.04
0.14
0.02
0.30
1.00
0.02
1.00
M2
GLN
M3
LB
ML
M2
DD
M2
(10.00)
( 0.00)
( 4.00)
( 0.00)
(10.00)
( 0.00)
( 0.00)
( 0.00)
28,949.98
5,131.84
313,316.00
2,945.24
3,286.28
3,248.00
31,320.00
13,950.00
12,737.99
179.61
42,360.32
61.85
976.03
3,248.00
626.40
13,950.00
850
A 73
633
2654
942
383
400
3279
0.55
0.04
0.12
0.30
1.00
0.02
1.00
M2
M2
GLN
M3
ML
M2
DD
M2
(10.00)
( 0.00)
( 4.00)
(10.00)
( 0.00)
( 0.00)
( 0.00)
30,991.71
5,131.84
313,316.00
3,286.28
3,248.00
31,320.00
13,950.00
75,127.32
17,045.44
179.61
39,101.84
976.03
3,248.00
626.40
13,950.00
79
A 73
633
2654
525
942
383
400
3279
0.55
0.04
0.14
0.02
0.40
1.00
0.03
1.00
M2
M2
GLN
M3
LB
ML
M2
DD
M2
(10.00)
( 0.00)
( 4.00)
( 0.00)
(10.00)
( 0.00)
( 0.00)
( 0.00)
30,991.71
5,131.84
313,316.00
2,945.24
3,286.28
3,248.00
31,320.00
13,950.00
79,077.36
17,045.44
179.61
42,360.32
53.01
1,301.37
3,248.00
939.60
13,950.00
81
A 74
633
2654
525
942
383
400
3279
0.66
0.04
0.11
0.02
0.30
1.00
0.02
1.00
M2
M2
GLN
M3
LB
ML
M2
DD
M2
(10.00)
( 0.00)
( 4.00)
( 0.00)
(10.00)
( 0.00)
( 0.00)
( 0.00)
31,830.51
5,131.84
313,316.00
2,945.24
3,286.28
3,248.00
31,320.00
13,950.00
75,884.54
21,008.14
179.61
35,843.35
53.01
976.03
3,248.00
626.40
13,950.00
80
A 74
633
2654
525
942
383
400
3279
0.66
0.04
0.12
0.02
0.40
1.00
0.02
1.00
M2
M2
GLN
M3
LB
ML
M2
DD
M2
(10.00)
( 0.00)
( 0.00)
( 0.00)
(10.00)
( 0.00)
( 0.00)
( 0.00)
31,830.51
5,131.84
313,316.00
2,945.24
3,286.28
3,248.00
31,320.00
13,950.00
77,964.45
21,008.14
179.61
37,597.92
53.01
1,301.37
3,248.00
626.40
13,950.00
846
A 840
M2
0.44 M2
(10.00)
35,944.84
88,025.57
15,815.73
Cd.
Valor Total
633
2654
942
383
400
3279
0.04
0.17
0.53
1.00
0.03
1.00
GLN
M3
ML
M2
DD
M2
( 0.00)
( 4.00)
(10.00)
( 0.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
3,286.28
3,248.00
31,320.00
13,950.00
179.61
52,135.78
1,756.85
3,248.00
939.60
13,950.00
847
A 841
633
2654
942
383
400
2164
0.55
0.04
0.15
0.53
1.00
0.02
1.00
M2
M2
GLN
M3
ML
M2
DD
M2
(10.00)
( 0.00)
( 4.00)
(10.00)
( 0.00)
( 0.00)
( 0.00)
33,658.10
5,131.84
313,316.00
3,286.28
3,248.00
31,320.00
24,885.00
94,826.62
18,511.95
179.61
45,618.81
1,756.85
3,248.00
626.40
24,885.00
848
A 842
633
2654
942
383
400
2164
0.66
0.04
0.13
0.53
1.00
0.02
1.00
M2
M2
GLN
M3
ML
M2
DD
M2
(10.00)
( 0.00)
( 4.00)
(10.00)
( 0.00)
( 0.00)
( 0.00)
35,045.12
5,131.84
313,316.00
3,286.28
3,248.00
31,320.00
24,885.00
94,556.72
23,129.78
179.61
40,731.08
1,756.85
3,248.00
626.40
24,885.00
696
2656
3289
2162
2936
400
3290
0.18
0.70
1.40
2.00
0.02
1.00
M2
M3
M2
M2
%M
DD
M2
( 5.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
347,652.00
904.80
812.00
22,000.00
31,320.00
22,000.00
88,561.02
63,881.06
633.36
1,136.80
440.00
469.80
22,000.00
78
A 72
633
2654
525
942
383
400
3279
0.44
0.04
0.15
0.02
0.40
1.00
0.03
1.00
M2
M2
GLN
M3
LB
ML
M2
DD
M2
(10.00)
( 0.00)
( 4.00)
( 0.00)
(10.00)
( 0.00)
( 0.00)
( 0.00)
28,949.98
5,131.84
313,316.00
2,945.24
3,286.28
3,248.00
31,320.00
13,950.00
78,028.40
12,737.99
179.61
45,618.81
53.01
1,301.37
3,248.00
939.60
13,950.00
293
9
2654
903
2943
525
940
0.14
0.18
1.50
4.50
0.02
0.05
M2
KG
M3
ML
KG
LB
ML
( 0.00)
( 5.00)
( 5.00)
( 0.00)
( 0.00)
( 0.00)
3,271.20
313,316.00
1,740.00
681.00
2,945.24
615.96
77,326.62
457.97
55,926.91
2,612.61
3,064.50
58.90
30.80
Cd.
Valor Total
942
2162
400
3279
0.06
0.88
0.01
1.00
ML
M2
DD
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
3,286.28
812.00
31,320.00
13,950.00
197.18
714.56
313.20
13,950.00
220
2654
3291
3272
3273
3277
0.10
0.07
1.00
0.55
1.00
M2
M3
UN
M2
ML
M2
( 5.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
313,316.00
49,300.00
36,198.96
15,360.72
12,600.00
91,996.00
31,253.27
3,495.37
36,198.96
8,448.40
12,600.00
931
2654
3291
3942
3273
3277
0.10
0.07
1.00
0.55
1.00
M2
M3
UN
M2
ML
M2
( 5.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
313,316.00
49,300.00
39,111.72
15,360.72
12,600.00
94,908.76
31,253.27
3,495.37
39,111.72
8,448.40
12,600.00
84
633
113
2654
20
525
942
383
400
1273
0.35
9.36
0.10
5.94
0.08
0.47
1.00
0.02
1.00
M2
GLN
UN
M3
KG
LB
ML
M2
DD
M2
( 0.00)
( 7.00)
( 4.00)
( 0.00)
( 8.00)
( 2.00)
( 0.00)
( 0.00)
( 0.00)
5,131.84
1,700.00
313,316.00
2,173.84
2,945.24
3,286.28
3,248.00
31,320.00
16,338.00
85,186.85
1,796.14
15,916.25
32,584.86
12,912.61
222.66
1,541.92
3,248.00
626.40
16,338.00
902
A 270
2654
3911
3909
383
1274
3.09
0.03
1.00
0.07
1.00
1.00
M2
LT
M3
M2
UN
M2
M2
( 3.00)
( 3.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
144.09
313,316.00
84,083.76
45,000.00
3,248.00
12,350.00
112,958.47
445.25
9,681.46
84,083.76
3,150.00
3,248.00
12,350.00
85
A 270
2654
3908
3909
383
1274
3.09
0.03
1.00
0.07
1.00
1.00
M2
LT
M3
M2
UN
M2
M2
( 3.00)
( 3.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
144.09
313,316.00
53,274.16
45,000.00
3,248.00
12,350.00
82,148.87
445.25
9,681.46
53,274.16
3,150.00
3,248.00
12,350.00
895
A 270
2654
3910
3909
3.09
0.03
1.00
0.07
M2
LT
M3
M2
UN
( 3.00)
( 3.00)
( 0.00)
( 0.00)
144.09
313,316.00
59,265.56
45,000.00
88,140.27
445.25
9,681.46
59,265.56
3,150.00
Cd.
Valor Total
383
1274
1.00 M2
1.00 M2
( 0.00)
( 0.00)
3,248.00
12,350.00
3,248.00
12,350.00
91
9
2653
892
20
525
942
1280
0.12
0.03
0.08
3.03
0.01
0.11
1.00
UN
KG
M3
ML
KG
LB
ML
UN
( 0.00)
(10.00)
( 0.00)
( 2.00)
( 8.00)
( 2.00)
( 0.00)
3,271.20
300,556.00
1,086.92
2,173.84
2,945.24
3,286.28
12,600.00
29,983.81
392.54
9,918.35
86.95
6,585.43
31.81
368.72
12,600.00
1038
3517
2801
2936
4026
4.12
1.03
7.00
1.00
UN
UN
UN
%M
UN
( 3.00)
( 3.00)
( 0.00)
( 0.00)
2,134.40
46,618.08
9,000.00
9,000.00
66,440.35
8,793.73
48,016.62
630.00
9,000.00
ESCALERAS EN CONCRETO
A.C.P.M.
CONCRETO 3000 PSI (210N)
PLANCHON ORDINARIO 17x.4x.4
PUNTILLA 2" CON CABEZA
REPISA 8x.4x.3
TABLA BURRA .30x.025x3 ORDINAR
VARA DE CLAVO 6 METROS.
VIBRADOR A GASOLINA
MdeO ESCALERAS
92
633
2654
933
525
940
942
2672
400
1281
0.27
1.04
1.53
2.38
2.04
9.38
1.06
0.20
1.00
M3
GLN
M3
ML
LB
ML
ML
ML
DD
M3
( 0.00)
( 4.00)
( 2.00)
( 8.00)
( 2.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
4,350.00
2,945.24
615.96
3,286.28
1,267.88
31,320.00
170,000.00
550,591.60
1,385.60
325,848.64
6,655.50
6,997.89
1,256.56
30,838.45
1,344.97
6,264.00
170,000.00
93
676
1283
M3
2.16 KG
1.00 M3
( 0.00)
( 0.00)
5,046.00
2,625.00
13,524.36
10,899.36
2,625.00
MALLAS ELECTROSOLDADAS
ALAMBRE NEGRO Cal. 18
MALLA ELECTROSOLDADA 2.35x4m
MdeO REFUERZO MALLA kg
699
9
3291
3292
KG
0.03 KG
1.00 UN
1.00 KG
( 5.00)
( 0.00)
( 0.00)
3,271.20
49,300.00
190.00
49,593.04
103.04
49,300.00
190.00
1003
2654
3325
M3
1.25 M3
1.00 M3
(25.00)
( 0.00)
313,316.00
185,600.00
577,245.00
391,645.00
185,600.00
1004
2654
3326
M3
1.25 M3
1.00 M3
(25.00)
( 0.00)
313,316.00
162,400.00
554,045.00
391,645.00
162,400.00
98
2654
525
381
2162
1.04
1.35
5.00
6.31
M3
M3
LB
DD
M2
( 4.00)
( 8.00)
( 0.00)
( 1.00)
313,316.00
2,945.24
58.00
812.00
483,077.26
325,848.64
3,976.07
290.00
5,125.75
Cd.
Valor Total
393
400
1288
4.00 UN
0.20 DD
1.00 M3
( 0.00)
( 0.00)
( 0.00)
893.20
31,320.00
138,000.00
3,572.80
6,264.00
138,000.00
1002
9
2654
25
2918
3044
1.00
0.09
2.63
9.40
1.00
ML
KG
M3
KG
KG
ML
( 0.00)
(25.00)
( 0.00)
( 0.00)
( 0.00)
3,271.20
313,316.00
2,310.72
2,083.00
25,520.00
81,863.74
3,271.20
27,415.15
6,077.19
19,580.20
25,520.00
1000
9
2654
25
2918
3058
2.00
0.25
4.40
14.40
1.00
ML
KG
M3
KG
KG
ML
( 0.00)
(25.00)
( 0.00)
( 0.00)
( 0.00)
3,271.20
313,316.00
2,310.72
2,083.00
30,160.00
155,193.77
6,542.40
78,329.00
10,167.17
29,995.20
30,160.00
523
9
2654
25
2918
3328
2.10
0.35
5.28
15.60
1.00
ML
KG
M3
KG
KG
ML
( 0.00)
(25.00)
( 0.00)
( 0.00)
( 0.00)
3,271.20
313,316.00
2,310.72
2,083.00
52,200.00
213,425.52
6,869.52
109,660.60
12,200.60
32,494.80
52,200.00
1001
9
2654
25
2918
3327
3.50
0.63
7.03
21.84
1.00
ML
KG
M3
KG
KG
ML
( 0.00)
(25.00)
( 0.00)
( 0.00)
( 0.00)
3,271.20
313,316.00
2,310.72
2,083.00
83,520.00
352,528.78
11,449.20
195,822.50
16,244.36
45,492.72
83,520.00
801
637
2821
154
923
525
942
369
2168
1.25
1.04
4.00
2.78
1.35
1.65
1.00
1.00
M3
KG
M3
M2
ML
LB
ML
M3
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
1,943.00
348,464.00
1,851.36
2,590.28
2,945.24
3,286.28
20,500.00
16,100.00
425,428.30
2,424.86
362,402.56
7,405.44
7,203.57
3,976.07
5,415.79
20,500.00
16,100.00
1008
2654
525
940
942
369
400
1293
0.47
0.03
0.11
0.11
0.46
0.04
1.00
M2
M3
LB
ML
ML
M3
DD
M2
( 3.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
313,316.00
2,945.24
615.96
3,286.28
20,500.00
31,320.00
23,100.00
182,749.52
148,449.12
88.36
67.76
361.49
9,430.00
1,252.80
23,100.00
Cd.
Valor Total
95
633
2654
525
371
383
400
1285
0.03
0.10
0.08
0.10
1.00
0.02
1.00
M2
GLN
M3
LB
M3
M2
DD
M2
( 0.00)
( 4.00)
( 8.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,945.24
23,780.00
3,248.00
31,320.00
12,705.00
51,924.01
159.09
32,584.86
222.66
2,378.00
3,248.00
626.40
12,705.00
96
633
2654
525
371
383
1286
0.03
0.12
0.08
0.12
1.00
1.00
M2
GLN
M3
LB
M3
M2
M2
( 0.00)
( 4.00)
( 8.00)
( 0.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,945.24
23,780.00
3,248.00
12,400.00
57,985.18
159.09
39,101.84
222.66
2,853.60
3,248.00
12,400.00
75
633
2654
525
371
383
400
2163
0.03
0.15
0.08
0.14
1.00
0.03
1.00
M2
GLN
M3
LB
M3
M2
DD
M2
( 0.00)
( 4.00)
( 8.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,945.24
23,780.00
3,248.00
31,320.00
13,300.00
66,812.22
153.96
45,618.81
222.66
3,329.20
3,248.00
939.60
13,300.00
97
633
2654
525
371
383
400
1287
0.03
0.16
0.08
0.15
1.00
0.03
1.00
M2
GLN
M3
LB
M3
M2
DD
M2
( 0.00)
( 4.00)
( 8.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,945.24
23,780.00
3,248.00
31,320.00
13,750.00
70,758.51
153.96
48,877.30
222.66
3,567.00
3,248.00
939.60
13,750.00
83
633
2654
525
371
383
400
2168
0.03
0.19
0.08
0.11
1.00
0.04
1.00
M2
GLN
M3
LB
M3
M2
DD
M2
( 0.00)
( 4.00)
( 8.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,945.24
23,780.00
3,248.00
31,320.00
16,100.00
82,251.10
159.09
58,652.76
222.66
2,615.80
3,248.00
1,252.80
16,100.00
145
633
2654
525
371
383
0.03
0.10
0.08
0.10
1.00
M2
GLN
M3
LB
M3
M2
( 0.00)
( 4.00)
( 8.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,945.24
23,780.00
3,248.00
53,219.01
159.09
32,584.86
222.66
2,378.00
3,248.00
Cd.
Valor Total
400
3271
0.02 DD
1.00 M2
( 0.00)
( 0.00)
31,320.00
14,000.00
626.40
14,000.00
279
9
1992
1410
TN
26.90 KG
1,050.00 KG
1.00 TN
( 0.00)
( 5.00)
( 0.00)
3,271.20
2,088.00
240,000.00
2,520,395.28
87,995.28
2,192,400.00
240,000.00
280
9
3315
1410
TN
26.90 KG
1,050.00 KG
1.00 TN
( 0.00)
( 5.00)
( 0.00)
3,271.20
2,030.00
240,000.00
2,459,495.28
87,995.28
2,131,500.00
240,000.00
283
9
20
1411
TN
26.90 KG
1,050.00 KG
1.00 TN
( 0.00)
( 5.00)
( 0.00)
3,271.20
2,173.84
240,000.00
2,610,527.28
87,995.28
2,282,532.00
240,000.00
284
9
3315
1411
TN
26.90 KG
1,050.00 KG
1.00 TN
( 0.00)
( 5.00)
( 0.00)
3,271.20
2,030.00
240,000.00
2,459,495.28
87,995.28
2,131,500.00
240,000.00
849
9
3315
2166
TN
28.25 KG
1,050.00 KG
1.00 TN
( 5.00)
( 5.00)
( 0.00)
3,271.20
2,030.00
194,000.00
2,417,895.04
92,395.04
2,131,500.00
194,000.00
281
9
20
1413
TN
26.90 KG
1,050.00 KG
1.00 TN
( 0.00)
( 5.00)
( 0.00)
3,271.20
2,173.84
240,000.00
2,610,527.28
87,995.28
2,282,532.00
240,000.00
282
9
3315
1413
TN
26.90 KG
1,050.00 KG
1.00 TN
( 0.00)
( 5.00)
( 0.00)
3,271.20
2,030.00
240,000.00
2,459,495.28
87,995.28
2,131,500.00
240,000.00
285
9
1992
1414
TN
26.90 KG
1,050.00 KG
1.00 TN
( 0.00)
( 5.00)
( 0.00)
3,271.20
2,088.00
240,000.00
2,520,395.28
87,995.28
2,192,400.00
240,000.00
286
9
3315
1414
TN
26.90 KG
1,050.00 KG
1.00 TN
( 0.00)
( 5.00)
( 0.00)
3,271.20
2,030.00
240,000.00
2,459,495.28
87,995.28
2,131,500.00
240,000.00
288
9
3315
1415
TN
26.90 KG
1,050.00 KG
1.00 TN
( 0.00)
( 5.00)
( 0.00)
3,271.20
2,030.00
240,000.00
2,459,495.28
87,995.28
2,131,500.00
240,000.00
Cd.
Valor Total
287
9
1992
1415
TN
26.90 KG
1,050.00 KG
1.00 TN
( 0.00)
( 5.00)
( 0.00)
3,271.20
2,088.00
240,000.00
2,520,395.28
87,995.28
2,192,400.00
240,000.00
289
9
1992
1416
TN
26.90 KG
1,050.00 KG
1.00 TN
( 0.00)
( 5.00)
( 0.00)
3,271.20
2,088.00
240,000.00
2,520,395.28
87,995.28
2,192,400.00
240,000.00
290
9
3315
1416
TN
26.90 KG
1,050.00 KG
1.00 TN
( 0.00)
( 5.00)
( 0.00)
3,271.20
2,030.00
240,000.00
2,459,495.28
87,995.28
2,131,500.00
240,000.00
291
38
1418
M2
0.07 UN
1.00 M2
( 2.00)
( 0.00)
57,700.72
3,990.00
8,109.83
4,119.83
3,990.00
292
38
1417
KG
0.07 UN
1.00 M2
( 3.00)
( 0.00)
57,700.72
3,990.00
8,090.79
4,100.79
3,990.00
99
9
1992
2166
TN
28.25 KG
1,050.00 KG
1.00 TN
( 5.00)
( 5.00)
( 0.00)
3,271.20
2,088.00
194,000.00
2,478,795.04
92,395.04
2,192,400.00
194,000.00
965
3968
3973
2936
3972
3971
1.01
0.16
0.01
1.02
30.00
ML
ML
KG
%M
UN
%
( 1.00)
( 1.00)
( 0.00)
( 2.00)
( 0.00)
18,433.56
6,774.40
9,435.00
9,250.00
29,148.58
37,893.16
18,617.90
1,094.74
0.94
9,435.00
8,744.57
964
3967
3973
2936
3972
3971
1.01
0.13
0.01
1.02
30.00
ML
ML
KG
%M
UN
%
( 1.00)
( 1.00)
( 0.00)
( 2.00)
( 0.00)
14,337.60
6,774.40
9,435.00
9,250.00
24,765.35
32,194.95
14,480.98
848.43
0.94
9,435.00
7,429.60
966
1821
531
2936
3974
3971
1.01
0.06
0.01
1.02
20.00
ML
ML
KG
%M
UN
%
( 1.00)
( 1.00)
( 0.00)
( 2.00)
( 0.00)
11,062.92
215.00
6,426.00
6,300.00
17,612.57
21,135.08
11,173.55
12.38
0.64
6,426.00
3,522.51
ML
1.01 ML
( 1.00)
9,356.56
19,063.85
9,450.13
967
49
Cd.
Valor Total
531
2936
3974
3971
0.05
0.01
1.02
20.00
KG
%M
UN
%
( 1.00)
( 0.00)
( 2.00)
( 0.00)
215.00
6,426.00
6,300.00
15,886.54
9.77
0.64
6,426.00
3,177.31
968
3949
531
2936
3974
3971
1.01
0.09
0.01
1.02
20.00
ML
ML
KG
%M
UN
%
( 1.00)
( 1.00)
( 0.00)
( 2.00)
( 0.00)
25,890.04
215.00
6,426.00
6,300.00
32,595.13
39,114.15
26,148.94
19.54
0.64
6,426.00
6,519.03
969
3946
531
2936
3974
3971
1.01
0.07
0.01
1.02
20.00
ML
ML
KG
%M
UN
%
( 1.00)
( 1.00)
( 0.00)
( 2.00)
( 0.00)
12,935.16
215.00
6,426.00
6,300.00
19,506.35
23,407.63
13,064.51
15.20
0.64
6,426.00
3,901.27
973
3947
531
2936
3974
3971
1.01
0.06
0.01
1.02
20.00
ML
ML
KG
%M
UN
%
( 1.00)
( 1.00)
( 0.00)
( 2.00)
( 0.00)
12,935.16
215.00
6,426.00
6,300.00
19,503.53
23,404.24
13,064.51
12.38
0.64
6,426.00
3,900.71
101
2654
892
525
943
400
1295
1.04
6.63
1.62
5.61
0.04
1.00
M3
M3
ML
LB
ML
DD
M3
( 4.00)
( 2.00)
( 8.00)
( 2.00)
( 0.00)
( 0.00)
313,316.00
1,086.92
2,945.24
2,474.28
31,320.00
84,000.00
436,959.72
325,848.64
7,206.28
4,771.29
13,880.71
1,252.80
84,000.00
102
2654
892
525
943
400
1295
1.04
11.02
2.88
9.44
0.04
1.00
M3
M3
ML
LB
ML
DD
M3
( 4.00)
( 2.00)
( 8.00)
( 2.00)
( 0.00)
( 0.00)
313,316.00
1,086.92
2,945.24
2,474.28
31,320.00
84,000.00
454,912.68
325,848.64
11,973.51
8,492.89
23,344.83
1,252.80
84,000.00
103
885
2654
923
525
940
383
400
1296
8.16
1.04
1.07
1.73
4.08
4.00
0.10
1.00
M3
ML
M3
ML
LB
ML
M2
DD
M3
( 2.00)
( 4.00)
( 2.00)
( 8.00)
( 2.00)
( 0.00)
( 0.00)
( 0.00)
3,286.28
313,316.00
2,590.28
2,945.24
615.96
3,248.00
31,320.00
182,280.00
561,445.37
26,816.04
325,848.64
2,774.19
5,089.37
2,513.12
12,992.00
3,132.00
182,280.00
Cd.
Valor Total
104
2685
2820
525
942
2672
2162
400
1297
0.50
1.04
2.29
0.78
0.48
4.00
0.20
1.00
M3
M3
M3
LB
ML
ML
M2
DD
M3
( 0.00)
( 4.00)
( 8.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
( 0.00)
247,080.00
328,048.00
2,945.24
3,286.28
1,267.88
812.00
31,320.00
131,250.00
615,370.69
123,540.00
341,169.92
6,743.42
2,547.52
607.82
3,248.00
6,264.00
131,250.00
VIGA CIMIENTO
A.C.P.M.
CONCRETO 3000 PSI (210N)
DURMIENTE ORDINARIO 3Mx4cmx4cm
PUNTILLA 2" CON CABEZA
REPISA 8x.4x.3
TABLA BURRA .30x.025x3 ORDINAR
VIBRADOR A GASOLINA
MdeO VIGA CIMENTACION
106
633
2654
891
525
940
942
400
1299
0.10
1.04
0.57
2.38
2.88
3.65
0.20
1.00
M3
GLN
M3
ML
LB
ML
ML
DD
M3
( 0.00)
( 4.00)
( 2.00)
( 8.00)
( 0.00)
( 2.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
830.56
2,945.24
615.96
3,286.28
31,320.00
75,000.00
428,872.27
513.18
325,848.64
474.42
6,997.89
1,773.96
12,000.18
6,264.00
75,000.00
105
633
2653
891
525
940
942
400
1299
0.03
1.04
1.89
1.59
3.17
3.59
0.20
1.00
M3
GLN
M3
ML
LB
ML
ML
DD
M3
( 0.00)
( 4.00)
( 2.00)
( 8.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
5,131.84
300,556.00
830.56
2,945.24
615.96
3,286.28
31,320.00
75,000.00
413,992.33
153.96
312,578.24
1,567.27
4,675.86
1,953.95
11,799.06
6,264.00
75,000.00
107
633
2654
892
525
940
942
400
1299
0.22
1.04
3.06
1.85
3.06
3.64
0.20
1.00
M3
GLN
M3
ML
LB
ML
ML
DD
M3
( 0.00)
( 4.00)
( 2.00)
( 8.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
1,086.92
2,945.24
615.96
3,286.28
31,320.00
75,000.00
430,858.39
1,129.00
325,848.64
3,325.98
5,439.27
1,884.84
11,966.66
6,264.00
75,000.00
108
633
2654
892
525
940
942
400
1299
0.14
1.04
1.02
1.16
5.10
4.60
0.20
1.00
M3
GLN
M3
ML
LB
ML
ML
DD
M3
( 0.00)
( 4.00)
( 2.00)
( 8.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
1,086.92
2,945.24
615.96
3,286.28
31,320.00
75,000.00
430,602.22
718.46
325,848.64
1,108.66
3,403.52
3,141.40
15,117.55
6,264.00
75,000.00
Cd.
Valor Total
109
633
2654
892
525
940
942
400
1299
0.10
1.04
0.64
0.83
2.87
4.29
0.20
1.00
M3
GLN
M3
ML
LB
ML
ML
DD
M3
( 0.00)
( 4.00)
( 2.00)
( 8.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
1,086.92
2,945.24
615.96
3,286.28
31,320.00
75,000.00
426,637.54
513.18
325,848.64
698.45
2,449.26
1,765.46
14,098.54
6,264.00
75,000.00
963
3969
3973
2936
3972
3971
1.01
0.17
0.01
1.02
30.00
ML
ML
KG
%M
UN
%
( 1.00)
( 1.00)
( 0.00)
( 2.00)
( 0.00)
17,192.36
6,774.40
9,435.00
9,250.00
27,972.97
36,364.86
17,364.28
1,172.74
0.94
9,435.00
8,391.89
962
3970
3973
2936
3972
3971
1.01
0.17
0.01
1.02
30.00
ML
ML
KG
%M
UN
%
( 1.00)
( 1.00)
( 0.00)
( 2.00)
( 0.00)
23,200.00
6,774.40
9,435.00
9,250.00
34,031.11
44,240.44
23,432.00
1,163.16
0.94
9,435.00
10,209.33
111
2654
892
525
943
400
1304
1.05
2.35
0.60
2.35
0.04
1.00
M3
M3
ML
LB
ML
DD
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
313,316.00
1,086.92
2,945.24
2,474.28
31,320.00
100,000.00
440,370.56
328,981.80
2,554.26
1,767.14
5,814.56
1,252.80
100,000.00
112
2654
892
525
943
400
1304
1.05
2.63
0.70
2.45
0.04
1.00
M3
M3
ML
LB
ML
DD
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
313,316.00
1,086.92
2,945.24
2,474.28
31,320.00
100,000.00
441,216.85
328,981.80
2,858.60
2,061.67
6,061.99
1,252.80
100,000.00
113
633
2654
525
942
383
400
1302
0.08
1.04
1.13
1.31
13.00
0.20
1.00
M3
GLN
M3
LB
ML
M2
DD
M3
( 0.00)
( 4.00)
( 8.00)
( 2.00)
( 0.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,945.24
3,286.28
3,248.00
31,320.00
74,550.00
456,927.66
410.55
325,848.64
3,339.90
4,290.57
42,224.00
6,264.00
74,550.00
M3
0.10 GLN
( 0.00)
5,131.84
532,500.93
513.18
137
633
Cd.
Valor Total
2654
525
942
383
400
3270
1.04
1.47
2.61
16.00
0.20
1.00
M3
LB
ML
M2
DD
M3
( 4.00)
( 8.00)
( 2.00)
( 0.00)
( 0.00)
( 0.00)
313,316.00
2,945.24
3,286.28
3,248.00
31,320.00
135,000.00
325,848.64
4,325.97
8,581.13
51,968.00
6,264.00
135,000.00
VIGAS DE ENTREPISO
A.C.P.M.
CONCRETO 3000 PSI (210N)
PUNTILLA 2" CON CABEZA
TABLA BURRA .30x.025x3 ORDINAR
FORMALETA ENTREPISO 4 SEMANAS
VIBRADOR A GASOLINA
MdeO VIGAS AEREAS DE CUBIERTA
115
633
2654
525
942
383
400
1302
0.14
1.04
3.78
7.14
13.00
0.20
1.00
M3
GLN
M3
LB
ML
M2
DD
M3
( 0.00)
( 4.00)
( 8.00)
( 2.00)
( 0.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,945.24
3,286.28
3,248.00
31,320.00
74,550.00
484,202.14
718.46
325,848.64
11,133.01
23,464.04
42,224.00
6,264.00
74,550.00
ZAPATAS
A.C.P.M.
CONCRETO 3000 PSI (210N)
LISTON EN AMARILLO 8 x.2.2 x3
PUNTILLA 2" CON CABEZA
REPISA 8x.4x.3
TABLA BURRA .30x.025x3 ORDINAR
VIBRADOR A GASOLINA
MdeO ZAPATAS
116
633
2654
923
525
940
942
400
1282
0.07
1.04
2.43
0.06
0.55
0.30
0.10
1.00
M3
GLN
M3
ML
LB
ML
ML
DD
M3
( 0.00)
( 4.00)
( 2.00)
( 8.00)
( 0.00)
( 2.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,590.28
2,945.24
615.96
3,286.28
31,320.00
80,000.00
417,129.74
359.23
325,848.64
6,288.16
190.85
338.78
972.08
3,132.00
80,000.00
117
633
2654
525
940
942
400
1282
0.18
1.00
0.69
3.67
1.53
0.10
1.00
M3
GLN
M3
LB
ML
ML
DD
M3
( 0.00)
( 0.00)
( 8.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,945.24
615.96
3,286.28
31,320.00
80,000.00
406,697.29
923.73
313,316.00
2,035.75
2,261.81
5,028.01
3,132.00
80,000.00
118
633
2654
525
940
942
400
1282
0.04
1.00
0.33
1.53
2.04
0.13
1.00
M3
GLN
M3
LB
ML
ML
DD
M3
( 0.00)
( 0.00)
( 8.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,945.24
615.96
3,286.28
31,320.00
80,000.00
406,225.37
205.27
313,316.00
986.07
942.42
6,704.01
4,071.60
80,000.00
87
633
2654
525
940
942
0.02
1.00
0.10
0.40
0.46
M3
GLN
M3
LB
ML
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,945.24
615.96
3,286.28
399,563.87
123.68
313,316.00
294.52
246.38
1,511.69
Cd.
400
1282
0.13 DD
1.00 M3
119
633
2654
525
940
942
400
1282
0.04
1.00
0.19
0.80
3.33
0.13
1.00
39
633
2654
525
940
942
400
1282
0.04
1.03
0.17
0.77
0.75
0.13
1.00
Valor Total
( 0.00)
( 0.00)
31,320.00
80,000.00
4,071.60
80,000.00
M3
GLN
M3
LB
ML
ML
DD
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,945.24
615.96
3,286.28
31,320.00
80,000.00
409,599.39
205.27
313,316.00
559.60
492.77
10,954.16
4,071.60
80,000.00
M3
GLN
M3
LB
ML
ML
DD
M3
( 0.00)
( 3.00)
( 8.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
5,131.84
313,316.00
2,945.24
615.96
3,286.28
31,320.00
80,000.00
410,452.98
205.27
322,715.48
508.94
471.21
2,480.48
4,071.60
80,000.00
CUBIERTAS (6)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
195
A 861
1372
M2
0.07 M3
1.00 M2
( 8.00)
( 0.00)
163,717.78
4,400.00
15,645.45
11,245.45
4,400.00
ALEROS DE CUBIERTA
MORTERO 1:4 ARENA Lav.PEA(M3)
MALLA CON VENA 2.00 M. x 0.53
PUNTILLA 2" CON CABEZA
REPISA 8x.4x.3
MdeO ENTRAMADO Y PADETE ALERO
196
A 861
34
525
940
1387
0.03
1.07
0.54
0.31
1.00
M2
M3
UN
LB
ML
M2
( 8.00)
( 2.00)
( 8.00)
( 2.00)
( 0.00)
163,717.78
5,486.00
2,945.24
615.96
9,950.00
22,024.80
4,420.38
5,875.51
1,590.43
188.48
9,950.00
110
2349
655
242
1377
2.52
0.21
4.20
1.00
ML
UN
KG
UN
M2
( 5.00)
( 5.00)
( 5.00)
( 0.00)
8,081.72
13,224.00
910.60
9,000.00
35,967.49
20,365.93
2,777.04
3,824.52
9,000.00
198
A 861
2259
192
229
1374
1375
0.01
3.24
1.21
4.83
1.00
1.00
ML
M3
UN
UN
ML
ML
ML
( 4.00)
( 8.00)
( 5.00)
( 5.00)
( 0.00)
( 0.00)
163,717.78
145.00
23,600.20
5,011.20
6,500.00
3,500.00
64,022.47
851.33
469.80
28,497.24
24,204.10
6,500.00
3,500.00
199
192
215
1374
ML
1.15 UN
4.69 UN
1.00 ML
( 0.00)
( 2.00)
( 0.00)
23,600.20
509.24
6,500.00
36,029.58
27,140.23
2,389.35
6,500.00
200
109
229
1375
ML
0.02 M3
1.05 ML
1.00 ML
( 0.00)
( 5.00)
( 0.00)
292,436.00
5,011.20
3,500.00
13,148.30
4,386.54
5,261.76
3,500.00
CANALETA 43 DE 3.50 M.
CANALETA 43 x 3.50 ETERNIT
IGAS GRIS (SELLANTE) 0.1 KILOS
TORNILLO COMPL.METALcCAN-43 ETERNIT
MdeO CANALETA No.43 (3-5 M.)
201
197
655
242
1377
0.72
0.11
0.74
1.00
M2
UN
KG
UN
M2
( 2.00)
( 5.00)
( 5.00)
( 0.00)
76,908.00
13,224.00
910.60
9,000.00
66,283.91
55,226.10
1,388.52
669.29
9,000.00
M2
0.62 UN
( 2.00)
90,815.24
67,745.14
56,505.24
CANALETA 43 DE 4.00 M.
CANALETA 43 x 4.00
ETERNIT
202
198
CUBIERTAS (6)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
655
242
1377
0.13 KG
0.63 UN
1.00 M2
( 5.00)
( 5.00)
( 0.00)
13,224.00
910.60
9,000.00
1,666.22
573.68
9,000.00
CANALETA 43 DE 4.50 M.
CANALETA 43 x 4.50 ETERNIT
IGAS GRIS (SELLANTE) 0.1 KILOS
TORNILLO COMPL.METALcCAN-43 ETERNIT
MdeO CANALETA No.43 (3-5 M.)
203
1945
655
242
1377
0.55
0.11
0.58
1.00
M2
UN
KG
UN
M2
( 2.00)
( 5.00)
( 5.00)
( 0.00)
95,883.28
13,224.00
910.60
9,000.00
63,629.10
52,714.71
1,388.52
525.87
9,000.00
CANALETA 43 DE 5.00 M.
CANALETA 43 x 5.00 ETERNIT
IGAS GRIS (SELLANTE) 0.1 KILOS
TORNILLO COMPL.METALcCAN-43 ETERNIT
MdeO CANALETA No.43 (3-5 M.)
204
1946
655
242
1377
0.49
0.13
0.54
1.00
M2
UN
KG
UN
M2
( 2.00)
( 5.00)
( 5.00)
( 0.00)
102,907.08
13,224.00
910.60
9,000.00
61,747.09
50,593.24
1,666.22
487.63
9,000.00
CANALETA 43 DE 5.50 M.
CANALETA 43 x 5.50 ETERNIT
IGAS GRIS (SELLANTE) 0.1 KILOS
TORNILLO COMPL.METALcCAN-43 ETERNIT
MdeO CANALETA No.43 (5.5-6 M.)
205
201
655
242
1378
0.44
0.09
0.90
1.00
M2
UN
KG
UN
M2
( 2.00)
( 5.00)
( 5.00)
( 0.00)
111,646.52
13,224.00
910.60
9,000.00
60,711.99
49,640.05
1,249.67
822.27
9,000.00
CANALETA 43 DE 6.00 M.
CANALETA 43 x 6.00 ETERNIT
IGAS GRIS (SELLANTE) 0.1 KILOS
TORNILLO COMPL.METALcCAN-43 ETERNIT
MdeO CANALETA No.43 (5.5-6 M.)
206
202
655
242
1378
0.41
0.08
0.84
1.00
M2
UN
KG
UN
M2
( 2.00)
( 5.00)
( 5.00)
( 0.00)
121,525.08
13,224.00
910.60
9,000.00
60,222.44
49,346.72
1,110.82
764.90
9,000.00
CANALETA 90 DE 3.75 M.
CANALETA 90 x 3.75 ETERNIT
IGAS GRIS (SELLANTE) 0.1 KILOS
TORNILL0 FIJACION METALICO AN-90 ETERNIT
TRABA COMPL. C-90 ETERNIT
MdeO CANALETA No.90 3.75-5.25M
207
2352
655
243
2351
1379
0.32
0.14
0.64
0.33
1.00
M2
UN
KG
UN
UN
M2
( 2.00)
( 5.00)
( 0.00)
( 2.00)
( 0.00)
93,586.48
13,224.00
3,050.80
1,959.24
8,190.00
42,551.42
29,964.33
1,805.08
1,952.51
639.50
8,190.00
CANALETA 90 DE 4.50 M.
CANALETA 90 x 4.50 ETERNIT
IGAS GRIS (SELLANTE) 0.1 KILOS
TORNILL0 FIJACION METALICO AN-90 ETERNIT
TRABA COMPL. C-90 ETERNIT
MdeO CANALETA No.90 3.75-5.25M
208
1948
655
243
2351
1379
0.26
0.11
0.53
0.27
1.00
M2
UN
KG
UN
UN
M2
( 2.00)
( 2.00)
( 2.00)
( 2.00)
( 0.00)
112,310.04
13,224.00
3,050.80
1,959.24
8,190.00
41,435.71
29,624.24
1,483.73
1,618.14
519.59
8,190.00
CANALETA 90 DE 5.25 M.
CANALETA 90 x 5.25 ETERNIT
IGAS GRIS (SELLANTE) 0.1 KILOS
TORNILL0 FIJACION METALICO AN-90 ETERNIT
TRABA COMPL. C-90 ETERNIT
MdeO CANALETA No.90 3.75-5.25M
209
205
655
243
2351
1379
0.22
0.09
0.23
0.23
1.00
M2
UN
KG
UN
UN
M2
( 2.00)
( 5.00)
( 2.00)
( 2.00)
( 0.00)
131,032.44
13,224.00
3,050.80
1,959.24
8,190.00
39,991.97
29,376.95
1,249.67
715.72
459.64
8,190.00
M2
0.19 UN
( 2.00)
150,081.96
41,444.23
29,254.28
CANALETA 90 DE 6.00 M.
CANALETA 90 x 6.00
ETERNIT
210
206
CUBIERTAS (6)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
655
243
2351
1380
0.08
0.82
0.20
1.00
KG
UN
UN
M2
( 5.00)
( 2.00)
( 2.00)
( 0.00)
13,224.00
3,050.80
1,959.24
8,190.00
1,110.82
2,489.45
399.68
8,190.00
CANALETA 90 DE 7.50 M.
CANALETA 90 x 7.50 ETERNIT
IGAS GRIS (SELLANTE) 0.1 KILOS
TORNILL0 FIJACION METALICO AN-90 ETERNIT
TRABA COMPL. C-90 ETERNIT
MdeO CANALETA No.90 6-9 M.
211
207
655
243
2351
1380
0.15
0.06
0.65
0.16
1.00
M2
UN
KG
UN
UN
M2
( 2.00)
( 5.00)
( 2.00)
( 2.00)
( 0.00)
187,594.04
13,224.00
3,050.80
1,959.24
8,190.00
40,342.46
29,008.04
833.11
1,991.56
319.75
8,190.00
CANALETA 90 DE 9.00 M.
CANALETA 90 x 9.00 ETERNIT
IGAS GRIS (SELLANTE) 0.1 KILOS
TORNILL0 FIJACION METALICO AN-90 ETERNIT
TRABA COMPL. C-90 ETERNIT
MdeO CANALETA No.90 6-9 M.
212
208
655
243
2351
1380
0.13
0.05
0.53
0.13
1.00
M2
UN
KG
UN
UN
M2
( 2.00)
( 5.00)
( 2.00)
( 2.00)
( 0.00)
225,107.28
13,224.00
3,050.80
1,959.24
8,190.00
39,601.14
28,838.94
694.26
1,618.14
259.80
8,190.00
213
210
243
1376
M2
0.25 UN
0.60 UN
1.00 M2
( 0.00)
( 2.00)
( 0.00)
134,483.44
3,050.80
6,825.00
42,281.83
33,620.86
1,835.97
6,825.00
CUMBRERA #1 (2.20x.90)Cristac.
CUMBRERA No. 1 220x90 3mm.
SIKAFLEX-1a BLANCO
TORNILLO GOLOSO
1" x 8
MdeO DOMOS CUPUL CUMBR. GRANDE
863
2280
2746
534
2881
1.00
1.12
8.16
1.00
UN
UN
UN
UN
UN
( 0.00)
(12.00)
( 2.00)
( 0.00)
360,528.00
20,880.00
20.00
16,275.00
400,323.74
360,528.00
23,357.54
163.20
16,275.00
CUMBRERA #2(1.50x2.04)Cristac.
CUMBRERA No. 2 150x204 3mm.
SIKAFLEX-1a BLANCO
TORNILLO GOLOSO
1" x 8
MdeO DOMOS CUPUL CUMBR. GRANDE
864
2281
2746
534
2881
1.00
1.18
12.24
1.00
UN
UN
UN
UN
UN
( 0.00)
(12.00)
( 2.00)
( 0.00)
553,320.00
20,880.00
20.00
16,275.00
594,394.68
553,320.00
24,554.88
244.80
16,275.00
CUPULA #1 (1.58x1.13)Cristacr.
CUPULA No.1 158x114 3mm.
SIKAFLEX-1a BLANCO
TORNILLO GOLOSO
1" x 8
MdeO DOMOS CUPUL CUMBR. GRANDE
865
2284
2746
534
2881
1.00
0.79
8.16
1.00
UN
UN
UN
UN
UN
( 0.00)
(12.00)
( 2.00)
( 0.00)
279,908.00
20,880.00
20.00
16,275.00
312,809.66
279,908.00
16,463.46
163.20
16,275.00
CUPULA #2 (1.58x1.40)Cristacr.
CUPULA No.2 158x140 3mm.
SIKAFLEX-1a BLANCO
TORNILLO GOLOSO
1" x 8
MdeO DOMOS CUPUL CUMBR. GRANDE
866
2285
2746
534
2881
1.00
1.12
8.16
1.00
UN
UN
UN
UN
UN
( 0.00)
(12.00)
( 2.00)
( 0.00)
322,016.00
20,880.00
20.00
16,275.00
361,793.03
322,016.00
23,338.83
163.20
16,275.00
CUPULA #3 (1.58x2.30)Cristacr.
CUPULA No.3 158x230 3mm.
SIKAFLEX-1a BLANCO
867
2286
2746
UN
1.00 UN
1.18 UN
( 0.00)
(12.00)
553,320.00
20,880.00
594,589.82
553,320.00
24,709.22
CUBIERTAS (6)
10/07/2006 Bogot
APU Componentes
TORNILLO GOLOSO
1" x 8
MdeO DOMOS CUPUL CUMBR. GRANDE
Cd.
534
2881
Valor Total
14.28 UN
1.00 UN
( 2.00)
( 0.00)
20.00
16,275.00
285.60
16,275.00
868
213
2746
534
1382
1.00
0.49
8.16
1.00
UN
UN
UN
UN
UN
( 0.00)
(12.00)
( 2.00)
( 0.00)
110,084.00
20,880.00
20.00
10,500.00
131,036.86
110,084.00
10,289.66
163.20
10,500.00
214
214
2746
534
1382
1.00
1.12
4.08
1.00
UN
UN
UN
UN
UN
( 0.00)
(12.00)
( 2.00)
( 0.00)
183,512.00
20,880.00
20.00
10,500.00
217,479.20
183,512.00
23,385.60
81.60
10,500.00
869
2288
2746
534
1382
1.00
0.49
4.08
1.00
UN
UN
UN
UN
UN
( 0.00)
(12.00)
( 2.00)
( 0.00)
76,560.00
20,880.00
20.00
10,500.00
97,431.26
76,560.00
10,289.66
81.60
10,500.00
870
2287
2746
534
1382
1.00
0.78
8.16
1.00
UN
UN
UN
UN
UN
( 0.00)
(12.00)
( 2.00)
( 0.00)
183,628.00
20,880.00
20.00
10,500.00
210,661.12
183,628.00
16,369.92
163.20
10,500.00
871
2290
2746
534
1382
1.00
0.49
4.08
1.00
UN
UN
UN
UN
UN
( 0.00)
(12.00)
( 2.00)
( 0.00)
76,560.00
20,880.00
20.00
10,500.00
97,431.26
76,560.00
10,289.66
81.60
10,500.00
872
2289
2746
534
1382
1.00
0.68
8.16
1.00
UN
UN
UN
UN
UN
( 0.00)
(12.00)
( 2.00)
( 0.00)
183,628.00
20,880.00
20.00
10,500.00
208,556.42
183,628.00
14,265.22
163.20
10,500.00
873
2291
2746
534
1382
1.00
0.68
4.08
1.00
UN
UN
UN
UN
UN
( 0.00)
(12.00)
( 2.00)
( 0.00)
134,444.00
20,880.00
20.00
10,500.00
159,290.82
134,444.00
14,265.22
81.60
10,500.00
857
210
933
525
940
243
0.26
0.81
0.03
0.65
0.60
M2
UN
ML
LB
ML
UN
( 2.00)
( 2.00)
( 8.00)
( 2.00)
( 2.00)
134,483.44
4,350.00
2,945.24
615.96
3,050.80
51,472.00
34,293.28
3,505.23
95.43
402.10
1,835.97
CUBIERTAS (6)
10/07/2006 Bogot
APU Componentes
MdeO CANALETA ACESCO
MdeO ENTRAMADO CANALETA
ENTRAMADO + MALLA + TEJA BARRO
MORTERO 1:4 ARENA Lav.PEA(M3)
ASFALTO 190 CANECA DE 200 Kg
LISTON EN AMARILLO 8 x.2.2 x3
MALLA CON VENA 2.40 M. x 0.53
PLANCHON ORDINARIO 17x.4x.4
PUNTILLA 2" CON CABEZA
TEJA "S" STA/FE
MdeO ALISTADO Imp. TEJA DE BAR
Cd.
1376
2457
Valor Total
1.00 M2
1.00 M2
( 0.00)
( 0.00)
6,825.00
4,515.00
6,825.00
4,515.00
114
A 861
639
923
1990
933
525
2934
1373
0.03
0.21
3.21
0.74
1.79
0.11
10.50
1.00
M2
M3
KG
ML
UN
ML
LB
UN
M2
( 8.00)
( 5.00)
( 2.00)
( 2.00)
( 2.00)
( 8.00)
( 5.00)
( 0.00)
163,717.78
1,667.00
2,590.28
6,635.00
4,350.00
2,945.24
1,700.00
12,000.00
56,496.72
4,950.83
350.07
8,322.57
4,940.42
7,764.75
318.09
17,850.00
12,000.00
ENTRAMADO + RURALIT
CABALLETE ONDULIT ARTICULADO ETERNIT
PLANCHON ORDINARIO 17x.4x.4
PUNTILLA 2" CON CABEZA
REPISA 8x.4x.3
TEJA RURALIT No.4
TEJA RURALIT No.6
MdeO ENTRAMADO TEJA ONDULADA
MdeO TEJA ASBESTO CEMENTO
856
194
933
525
940
232
233
1386
1393
0.16
1.06
0.03
0.65
0.40
0.36
1.00
1.00
M2
UN
ML
LB
ML
UN
UN
M2
M2
( 2.00)
( 2.00)
( 8.00)
( 2.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
13,024.48
4,350.00
2,945.24
615.96
20,859.12
32,125.04
12,000.00
3,675.00
42,679.00
2,125.60
4,614.48
95.43
402.10
8,297.76
11,468.64
12,000.00
3,675.00
188
192
215
933
525
940
224
226
240
241
1374
1386
1393
0.12
2.63
0.99
0.03
1.07
0.50
0.57
0.05
0.06
1.00
1.00
1.00
M2
UN
UN
ML
LB
ML
UN
UN
UN
UN
ML
M2
M2
( 0.00)
( 5.00)
( 2.00)
( 8.00)
( 2.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
23,600.20
509.24
4,350.00
2,945.24
615.96
26,067.52
40,147.60
15,714.52
22,276.64
6,500.00
12,000.00
3,675.00
69,485.97
2,832.02
1,336.76
4,303.89
95.43
659.69
13,028.55
22,932.31
785.73
1,336.60
6,500.00
12,000.00
3,675.00
706
215
933
525
940
224
1386
1393
2.31
1.07
0.03
0.71
1.14
1.00
1.00
M2
UN
ML
LB
ML
UN
M2
M2
( 5.00)
( 2.00)
( 8.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
509.24
4,350.00
2,945.24
615.96
26,067.52
12,000.00
3,675.00
51,824.95
1,176.34
4,658.85
95.43
439.80
29,779.53
12,000.00
3,675.00
852
215
933
525
M2
1.49 UN
0.57 ML
0.03 LB
( 5.00)
( 2.00)
( 8.00)
509.24
4,350.00
2,945.24
48,529.11
759.28
2,484.72
95.43
CUBIERTAS (6)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
REPISA 8x.4x.3
TEJA PLACA Ond. No. 6 ETERNIT
MdeO ENTRAMADO TEJA ONDULADA
MdeO TEJA ASBESTO CEMENTO
940
226
1386
1393
0.71
0.72
1.00
1.00
ML
UN
M2
M2
( 2.00)
( 2.00)
( 0.00)
( 0.00)
615.96
40,147.60
12,000.00
3,675.00
439.80
29,074.89
12,000.00
3,675.00
853
215
933
525
940
227
1386
1393
1.00
0.43
0.03
0.71
0.49
1.00
1.00
M2
UN
ML
LB
ML
UN
M2
M2
( 5.00)
( 2.00)
( 8.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
509.24
4,350.00
2,945.24
615.96
52,100.24
12,000.00
3,675.00
44,090.01
507.97
1,863.54
95.43
439.80
25,508.28
12,000.00
3,675.00
ENTRAMADO + TEJALIT
CABALLETE ONDULIT ARTICULADO ETERNIT
GANCHO PLACA Ond.150mm ETERNIT
PLANCHON ORDINARIO 17x.4x.4
PUNTILLA 2" CON CABEZA
REPISA 8x.4x.3
TEJA TEJALIT # 4 DOBLE ETERNIT
TEJA TEJALIT # 6 DOBLE ETERNIT
MdeO ENTRAMADO TEJA ONDULADA
MdeO TEJA ASBESTO CEMENTO
854
194
215
933
525
940
236
237
1386
1393
0.16
1.00
1.06
0.03
0.65
0.40
0.36
1.00
1.00
M2
UN
UN
ML
LB
ML
UN
UN
M2
M2
( 2.00)
( 5.00)
( 2.00)
( 8.00)
( 2.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
13,024.48
509.24
4,350.00
2,945.24
615.96
14,506.96
22,342.76
12,000.00
3,675.00
37,167.80
2,125.60
507.97
4,614.48
95.43
402.10
5,770.87
7,976.37
12,000.00
3,675.00
216
933
525
940
1385
2.67
0.32
1.05
1.00
M2
ML
LB
ML
M2
( 2.00)
( 8.00)
( 2.00)
( 0.00)
4,350.00
2,945.24
615.96
16,000.00
29,226.33
11,624.94
954.26
647.13
16,000.00
217
933
525
940
1386
2.67
0.22
0.52
1.00
M2
ML
LB
ML
M2
( 2.00)
( 8.00)
( 2.00)
( 0.00)
4,350.00
2,945.24
615.96
12,000.00
24,581.53
11,624.94
636.17
320.42
12,000.00
ENTRAMADO+ALISTADO+TEJA BARRO
MORTERO 1:4 ARENA Lav.PEA(M3)
ALAMBRE DE PUA Cal. 12
ALAMBRE NEGRO Cal. 18
ASFALTO 190 CANECA DE 200 Kg
GUADUA
LISTON EN AMARILLO 8 x.2.2 x3
PLANCHON ORDINARIO 17x.4x.4
PUNTILLA 2" CON CABEZA
TEJA "S" STA/FE
MdeO ALISTADO + TEJA DE BARRO
197
A 861
4
9
639
903
923
933
525
2934
2353
0.03
6.30
0.02
0.21
0.89
3.16
1.79
0.09
10.50
1.00
M2
M3
ML
KG
KG
ML
ML
ML
LB
UN
M2
( 8.00)
( 0.00)
( 2.00)
( 5.00)
( 5.00)
( 2.00)
( 2.00)
( 8.00)
( 5.00)
( 0.00)
163,717.78
314.36
3,271.20
1,667.00
1,740.00
2,590.28
4,350.00
2,945.24
1,700.00
12,000.00
54,960.73
4,950.83
1,980.47
66.73
350.07
1,552.95
8,190.47
7,764.75
254.47
17,850.00
12,000.00
( 7.00)
5,131.84
3,510.16
1,153.12
INMUNIZANTE CUBIERTA
A.C.P.M.
221
633
M2
0.22 GLN
CUBIERTAS (6)
10/07/2006 Bogot
APU Componentes
BROCHA DE CERDA 4"
MdeO INMUNIZANTE CUBIERTA
Cd.
Valor Total
478
1391
0.02 UN
1.00 M2
( 2.00)
( 0.00)
12,600.00
2,100.00
257.04
2,100.00
218
639
657
671
1390
2.00
0.25
3.57
1.00
M2
KG
KG
M2
M2
( 5.00)
( 5.00)
( 5.00)
( 0.00)
1,667.00
14,964.00
12,516.40
8,200.00
59,980.14
3,325.67
3,770.93
44,683.55
8,200.00
219
1391
668
M2
1.00 M2
1.05 M2
( 0.00)
( 5.00)
2,100.00
8,456.40
10,979.22
2,100.00
8,879.22
319
3275
3274
3276
M2
4.00 UN
1.02 ML
1.00 M2
( 0.00)
( 2.00)
( 0.00)
243.60
17,498.60
4,200.00
23,022.97
974.40
17,848.57
4,200.00
224
A 269
228
1395
M2
0.02 M3
1.03 M2
1.00 M2
( 4.00)
( 3.00)
( 0.00)
149,510.93
26,981.60
7,875.00
38,775.88
3,109.83
27,791.05
7,875.00
225
215
222
223
1396
1.62
0.27
0.56
1.00
M2
UN
UN
UN
M2
( 2.00)
( 2.00)
( 2.00)
( 0.00)
509.24
22,762.68
49,349.88
6,500.00
41,047.83
825.89
6,036.66
27,685.28
6,500.00
223
A 861
215
2934
225
1394
0.01
2.04
10.40
1.07
1.00
M2
M3
UN
UN
UN
M2
( 4.00)
( 2.00)
( 4.00)
( 2.00)
( 0.00)
163,717.78
509.24
1,700.00
32,657.48
5,775.00
61,172.68
1,702.66
1,038.85
17,680.00
34,976.16
5,775.00
226
215
224
1393
M2
2.04 UN
1.02 UN
1.00 M2
( 2.00)
( 2.00)
( 0.00)
509.24
26,067.52
3,675.00
31,302.72
1,038.85
26,588.87
3,675.00
227
215
226
1393
M2
1.33 UN
0.66 UN
1.00 M2
( 2.00)
( 2.00)
( 0.00)
509.24
40,147.60
3,675.00
30,968.11
675.25
26,617.86
3,675.00
228
215
227
1393
M2
1.12 UN
0.51 UN
1.00 M2
( 2.00)
( 2.00)
( 0.00)
509.24
52,100.24
3,675.00
30,817.49
571.37
26,571.12
3,675.00
222
M2
42,750.53
CUBIERTAS (6)
10/07/2006 Bogot
APU Componentes
BASE FELT plus S/inst.
Fglas
EMULSION ASFALTICA 3.6 Kg (19)
PUNTILLA 1" CON CABEZA
TEJA SHINGLE CLASSIC PLUS onix blackS/inst.
MdeO SHINGLE CON Imperm.
Cd.
658
3186
524
2474
1392
1.10
0.20
0.32
1.04
1.00
230
215
230
1381
M2
GLN
LB
M2
M2
Valor Total
(10.00)
( 0.00)
( 8.00)
( 4.00)
( 0.00)
948.00
7,957.60
3,166.80
31,024.20
6,825.00
1,042.80
1,591.52
1,026.04
32,265.17
6,825.00
M2
2.04 UN
1.01 UN
1.00 M2
( 2.00)
( 1.00)
( 0.00)
509.24
28,300.00
6,500.00
36,121.85
1,038.85
28,583.00
6,500.00
231
215
231
1381
M2
1.33 UN
0.66 UN
1.00 M2
( 2.00)
( 1.00)
( 0.00)
509.24
42,500.00
6,500.00
35,076.50
675.25
27,901.25
6,500.00
229
215
940
2066
1381
1383
2.04
2.04
0.66
1.00
1.00
M2
UN
ML
UN
M2
M2
( 2.00)
( 2.00)
( 1.00)
( 0.00)
( 0.00)
509.24
615.96
269,004.00
6,500.00
16,450.00
201,846.53
1,038.85
1,256.56
176,601.13
6,500.00
16,450.00
414
A 269
1118
2458
UN
0.00 M3
1.01 UN
1.00 UN
( 4.00)
( 1.00)
( 0.00)
149,510.93
6,704.80
3,990.00
11,150.58
388.73
6,771.85
3,990.00
416
A 269
2458
UN
0.00 M3
1.00 UN
( 4.00)
( 0.00)
149,510.93
3,990.00
4,409.83
419.83
3,990.00
Cd.
830
636
70
81
1457
Valor Total
UN
LT
KG
UN
JG
( 0.00)
( 0.00)
( 0.00)
( 0.00)
90.00
908.28
17,000.00
25,000.00
94,402.92
40.50
1,362.42
68,000.00
25,000.00
409
991
M2
1.00 M2
( 0.00)
120,000.00
120,000.00
120,000.00
411
993
M2
1.00 M2
( 0.00)
180,000.00
180,000.00
180,000.00
753
70
305
1453
M2
3.15 KG
1.00 M2
1.00 M2
( 5.00)
( 0.00)
( 0.00)
908.28
14,900.00
9,250.00
27,011.08
2,861.08
14,900.00
9,250.00
0.45
1.50
4.00
1.00
381
A 269
70
1294
1451
0.02
0.60
1.05
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 5.00)
( 0.00)
149,510.93
908.28
20,120.20
9,000.00
33,418.44
2,747.26
544.97
21,126.21
9,000.00
315
A 269
70
2829
1451
0.02
0.60
1.05
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 5.00)
( 0.00)
149,510.93
908.28
21,017.00
9,000.00
34,360.08
2,747.26
544.97
22,067.85
9,000.00
382
A 269
70
2744
1451
0.02
0.60
1.05
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 5.00)
( 0.00)
149,510.93
908.28
19,104.00
9,000.00
32,351.43
2,747.26
544.97
20,059.20
9,000.00
391
A 269
70
338
1451
0.02
0.60
1.05
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 5.00)
( 0.00)
149,510.93
908.28
19,371.00
9,000.00
32,631.78
2,747.26
544.97
20,339.55
9,000.00
383
A 269
M2
0.02 M3
( 5.00)
149,510.93
29,852.91
2,747.26
Cd.
Valor Total
70
2946
1451
0.60 KG
1.05 M2
1.00 M2
( 0.00)
( 5.00)
( 0.00)
908.28
16,724.46
9,000.00
544.97
17,560.68
9,000.00
89
A 269
3145
1427
M2
0.02 M3
1.03 M2
1.00 M2
( 5.00)
( 3.00)
( 0.00)
149,510.93
271,900.00
18,000.00
300,804.26
2,747.26
280,057.00
18,000.00
386
A 269
70
2679
1451
0.02
0.60
1.05
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 5.00)
( 0.00)
149,510.93
908.28
22,500.00
9,000.00
35,917.23
2,747.26
544.97
23,625.00
9,000.00
385
A 269
70
332
1451
0.02
0.60
1.05
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 5.00)
( 0.00)
149,510.93
908.28
22,500.00
9,000.00
35,917.23
2,747.26
544.97
23,625.00
9,000.00
318
A 269
70
339
1451
0.02
0.60
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
149,510.93
908.28
23,000.00
9,000.00
35,982.23
2,747.26
544.97
23,690.00
9,000.00
389
A 269
70
2839
1451
0.02
0.60
1.05
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 5.00)
( 0.00)
149,510.93
908.28
19,976.00
9,000.00
33,267.03
2,747.26
544.97
20,974.80
9,000.00
914
A 269
70
3940
1451
0.02
0.60
1.05
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 5.00)
( 0.00)
149,510.93
908.28
26,456.12
9,000.00
40,071.16
2,747.26
544.97
27,778.93
9,000.00
925
A 269
70
889
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
18,467.20
7,875.00
30,210.25
2,747.26
566.77
19,021.22
7,875.00
393
564
1456
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
167,156.00
10,500.00
177,656.00
167,156.00
10,500.00
394
565
1456
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
95,004.00
10,500.00
105,504.00
95,004.00
10,500.00
Cd.
Valor Total
397
636
70
3506
1457
0.45
1.50
1.05
1.00
UN
LT
KG
JG
JG
( 0.00)
( 0.00)
( 5.00)
( 0.00)
90.00
908.28
26,096.00
25,000.00
53,803.72
40.50
1,362.42
27,400.80
25,000.00
399
636
70
574
1457
0.45
1.50
1.05
1.00
UN
LT
KG
JG
JG
( 0.00)
( 0.00)
( 5.00)
( 0.00)
90.00
908.28
82,829.00
25,000.00
113,373.37
40.50
1,362.42
86,970.45
25,000.00
396
636
70
573
1457
0.45
1.50
1.05
1.00
UN
LT
KG
JG
JG
( 0.00)
( 0.00)
( 5.00)
( 0.00)
90.00
908.28
24,618.00
25,000.00
52,251.82
40.50
1,362.42
25,848.90
25,000.00
398
636
70
1692
1457
0.45
1.50
1.05
1.00
UN
LT
KG
JG
JG
( 0.00)
( 0.00)
( 5.00)
( 0.00)
90.00
908.28
71,825.44
25,000.00
101,819.63
40.50
1,362.42
75,416.71
25,000.00
395
636
70
572
1466
0.15
0.35
1.00
1.00
UN
LT
KG
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
90.00
908.28
6,902.00
9,450.00
16,683.40
13.50
317.90
6,902.00
9,450.00
400
A 257
A 269
70
332
20
943
1455
0.25
0.06
2.66
2.66
1.18
0.61
1.00
UN
M3
M3
KG
M2
KG
ML
UN
( 0.00)
( 5.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
234,164.00
149,510.93
908.28
22,500.00
2,173.84
2,474.28
139,650.00
273,008.74
58,541.00
8,477.27
2,416.02
59,850.00
2,565.13
1,509.31
139,650.00
LAVADEROS PORCELANA
20x30
CONCRETO 1:3:3 AreLavRio+Grav.
MORTERO 1 : 4 ARENA PEA (M3)
CEMENTO BLANCO 40 Kg
ENCHAPE CLASICA MADRID 20*30 CRNA
HIERRO A-40 Liso/Rect "
TABLA CHAPA .30x.025x3 ORDINAR
MdeO ENCHAPE LAVADERO .60 x.60
401
A 257
A 269
70
338
20
943
1455
0.25
0.06
2.66
2.66
1.18
0.61
1.00
UN
M3
M3
KG
M2
KG
ML
UN
( 0.00)
( 5.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
234,164.00
149,510.93
908.28
19,371.00
2,173.84
2,474.28
139,650.00
264,685.60
58,541.00
8,477.27
2,416.02
51,526.86
2,565.13
1,509.31
139,650.00
374
A 269
M2
0.02 M3
( 5.00)
149,510.93
408,239.23
2,747.26
Cd.
CEMENTO BLANCO 40 Kg
MARMOL BOTTICINO CLASICO (305x305x20)
MdeO MARMOL
70
3173
1458
Valor Total
0.60 KG
1.03 M2
1.00 M2
( 0.00)
( 3.00)
( 0.00)
908.28
379,900.00
13,650.00
544.97
391,297.00
13,650.00
376
A 269
70
3159
1458
0.02
0.60
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
149,510.93
908.28
137,700.00
13,650.00
158,773.23
2,747.26
544.97
141,831.00
13,650.00
375
A 269
70
313
1458
0.02
0.60
1.04
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 4.00)
( 0.00)
149,510.93
908.28
89,000.00
13,650.00
109,502.23
2,747.26
544.97
92,560.00
13,650.00
404
636
70
607
1466
0.15
0.50
1.03
1.00
UN
LT
KG
UN
UN
( 0.00)
( 0.00)
( 3.00)
( 0.00)
90.00
908.28
6,902.00
9,450.00
17,026.70
13.50
454.14
7,109.06
9,450.00
PIEDRA BLANCA
MORTERO 1:3 ARENA Lav.PEA(M3)
CEMENTO BLANCO 40 Kg
PIEDRA CORALINA (305x305x16)
MdeO ENCHAPE EN PIEDRA
405
A 267
70
327
1454
0.02
0.50
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
185,724.60
908.28
70,500.00
13,000.00
90,359.38
4,290.24
454.14
72,615.00
13,000.00
PIEDRA MUECA
MORTERO 1:3 ARENA Lav.PEA(M3)
CEMENTO BLANCO 40 Kg
MARMOL PIEDRA MUECA (305x305x20)
MdeO ENCHAPE EN PIEDRA
406
A 267
70
328
1454
0.02
0.50
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
185,724.60
908.28
65,600.00
13,000.00
85,312.38
4,290.24
454.14
67,568.00
13,000.00
407
636
70
581
332
1459
0.04
0.58
2.62
0.24
1.00
ML
LT
KG
KG
M2
ML
( 0.00)
( 0.00)
( 3.00)
( 5.00)
( 0.00)
90.00
908.28
240.00
22,500.00
22,000.00
28,592.04
3.60
526.80
627.89
5,433.75
22,000.00
408
636
70
581
338
1459
0.04
0.58
2.54
0.23
1.00
ML
LT
KG
KG
M2
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
90.00
908.28
240.00
19,371.00
22,000.00
27,595.33
3.60
526.80
609.60
4,455.33
22,000.00
417
70
2345
UN
0.25 KG
1.00 UN
( 0.00)
( 0.00)
908.28
1,612.40
3,624.47
227.07
1,612.40
CRNA
Cd.
Valor Total
1460
1.00 UN
( 0.00)
1,785.00
1,785.00
415
70
2156
1460
UN
0.25 KG
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
908.28
1,612.40
1,785.00
3,624.47
227.07
1,612.40
1,785.00
412
70
1212
1460
UN
0.28 KG
1.00 UN
1.00 UN
(10.00)
( 0.00)
( 0.00)
908.28
3,480.00
1,785.00
5,514.78
249.78
3,480.00
1,785.00
413
70
2363
1460
UN
0.28 KG
1.00 UN
1.00 UN
(10.00)
( 0.00)
( 0.00)
908.28
2,360.60
1,785.00
4,395.38
249.78
2,360.60
1,785.00
420
1448
ML
1.00 ML
( 0.00)
3,465.00
3,465.00
3,465.00
519
70
622
1670
ML
0.50 KG
1.00 ML
1.00 ML
( 0.00)
( 0.00)
( 0.00)
908.28
216,237.92
8,925.00
225,617.06
454.14
216,237.92
8,925.00
520
70
3137
1670
M2
0.50 KG
1.05 M2
1.00 ML
( 0.00)
( 5.00)
( 0.00)
908.28
155,900.00
8,925.00
173,074.14
454.14
163,695.00
8,925.00
TAPAS REGISTRO
15x15
CEMENTO BLANCO 40 Kg
TAPA REGISTRO 15 x 15 cm.
MdeO TAPA REGISTRO
422
70
1143
1463
UN
0.25 KG
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
908.28
3,944.00
3,150.00
7,321.07
227.07
3,944.00
3,150.00
TAPAS REGISTRO
20x20
CEMENTO BLANCO 40 Kg
TAPA REGISTRO 20 x 20 cm.
MdeO TAPA REGISTRO
421
70
1144
1463
UN
0.25 KG
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
908.28
4,750.20
3,150.00
8,127.27
227.07
4,750.20
3,150.00
423
70
1756
1466
UN
0.25 KG
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
908.28
6,832.40
9,450.00
16,509.47
227.07
6,832.40
9,450.00
Cd.
ASCENSOR 7 PARADAS
ASCENSOR 7 PARADAS/8 PERSONAS
Valor Total
685
406
UN
1.00 UN
( 0.00)
92,800,000.00
92,800,000.00
92,800,000.00
688
1972
UN
1.00 UN
( 0.00)
2,955,680.00
2,955,680.00
2,955,680.00
687
2388
UN
1.00 UN
( 0.00)
2,128,600.00
2,128,600.00
2,128,600.00
686
2021
UN
1.00 UN
( 0.00)
1,146,080.00
1,146,080.00
1,146,080.00
BOMBAS EYECTORAS
BOMBA SUMERGIBLE AGUAS NEGRAS 0.4HP
MdeO INSTALACION BOMBA EYECT 2
689
1979
1518
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
844,480.00
315,000.00
1,159,480.00
844,480.00
315,000.00
697
1683
1517
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
3,075,160.00
756,000.00
3,831,160.00
3,075,160.00
756,000.00
698
429
UN
1.00 UN
( 0.00)
1,972,000.00
1,972,000.00
1,972,000.00
702
1939
UN
1.00 UN
( 0.00)
1,032,400.00
1,032,400.00
1,032,400.00
PARARRAYOS 45MT
PARARRAYOS FRANKIN
MdeO PARARRAYOS
2021
3730
3691
1.00 UN
1.00 UN
( 0.00)
( 0.00)
147,320.00
12,500.00
159,820.00
147,320.00
12,500.00
886
3781
3782
3602
3576
2060
3783
841
3561
797
2948
3573
UN
UN
ML
ML
UN
UN
UN
UN
UN
ML
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
329.00
1,998.68
770.24
13,224.00
25,736.00
4,060.00
53,374.00
3,712.00
1,828.00
26,000.00
26,000.00
96,820.28
658.00
35,976.24
130.94
13,224.00
257.36
4,060.00
533.74
3,712.00
10,968.00
1,300.00
26,000.00
EQUIPO PRESION - 1 HP
HI-PRESS 1 HP
P1060
NEVERA INTEGRAL
NEVERA NE10
HACEB
704
2.00
18.00
0.17
1.00
0.01
1.00
0.01
1.00
6.00
5.00
1.00
PS
96,428.08
Cd.
461
1336
( 0.00)
( 0.00)
68,078.08
28,350.00
Valor Total
68,078.08
28,350.00
Cd.
Valor Total
ANDAMIO COLGANTE
ANDAMIO COLGANTE 40mt.
HORA AYUDANTE ALBA-IL + PREST
709
367
3772
DD
1.00 DD
4.00 HH
( 0.00)
( 0.00)
812.00
3,694.85
15,591.40
812.00
14,779.40
707
368
3772
SM
42.00 DD
4.00 HH
( 0.00)
( 0.00)
440.80
3,694.85
33,293.00
18,513.60
14,779.40
708
1638
3896
MS
6.00 MS
2.00 JR
( 0.00)
( 0.00)
13,224.00
28,258.00
135,860.00
79,344.00
56,516.00
3933
3792
3803
3802
DD
1.00 DD
2.00 DD
1.00 DD
( 0.00)
( 0.00)
( 0.00)
150,800.00
2,422.08
7,978.48
163,622.64
150,800.00
4,844.16
7,978.48
FORMALETA MES/M2
FORMALETA ENTREPISO POR M2
HORA AYUDANTE ALBA-IL + PREST
716
382
3772
MS
1.00 MS
1.00 HH
( 0.00)
( 0.00)
5,341.80
3,694.85
9,036.65
5,341.80
3,694.85
3931
A 3932
388
3237
DD
0.01 UN
0.20 DD
0.50 DD
( 0.00)
( 0.00)
( 0.00)
795,139.40
46,400.00
34,800.00
34,631.39
7,951.39
9,280.00
17,400.00
3942
A 3941
A 3937
3808
3792
388
391
400
0.01
0.01
1.00
0.08
0.40
0.50
0.40
DD
UN
UN
DD
DD
DD
DD
DD
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
691,922.60
748,200.00
1,883.84
150,800.00
46,400.00
34,800.00
31,320.00
76,837.07
6,919.23
7,482.00
1,883.84
12,064.00
18,560.00
17,400.00
12,528.00
3934
A 3936
A 3935
DD
0.01 UN
0.01 UN
( 0.00)
( 0.00)
701,800.00
779,525.80
14,813.26
7,018.00
7,795.26
3940
A 3939
3807
3237
DD
0.01 UN
0.03 UN
1.00 DD
( 0.00)
( 0.00)
( 0.00)
779,525.80
13,920.00
34,800.00
43,012.86
7,795.26
417.60
34,800.00
Cd.
Valor Total
3943
A 3938
A 3937
3245
3792
3786
3243
3802
3785
0.01
0.01
1.00
1.00
0.01
1.00
1.00
2.00
DD
UN
UN
DD
DD
UN
DD
DD
DD
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
949,378.80
748,200.00
19,720.00
150,800.00
348,000.00
81,200.00
7,978.48
2,246.92
284,648.11
9,493.79
7,482.00
19,720.00
150,800.00
3,480.00
81,200.00
7,978.48
4,493.84
3939
3795
3800
3801
3793
2117
3794
3796
3937
3797
0.04
2.00
2.00
2.00
2.00
2.00
2.00
2.00
5.00
UN
ROL
UN
UN
UN
UN
UN
UN
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
0.00
145,000.00
145,000.00
37,520.20
0.00
40,600.00
7,105.00
6,925.20
3,045.00
779,525.80
0.00
290,000.00
290,000.00
75,040.40
0.00
81,200.00
14,210.00
13,850.40
15,225.00
3932
3795
3800
3801
3793
2117
3794
3796
3937
3797
3798
3799
0.04
2.00
2.00
2.00
2.00
2.00
2.00
2.00
5.00
2.00
2.00
UN
ROL
UN
UN
UN
UN
UN
UN
UN
UN
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
0.00
145,000.00
145,000.00
37,520.20
0.00
40,600.00
7,105.00
6,925.20
3,045.00
4,083.20
3,723.60
795,139.40
0.00
290,000.00
290,000.00
75,040.40
0.00
81,200.00
14,210.00
13,850.40
15,225.00
8,166.40
7,447.20
3941
3795
3800
3801
3793
2117
3796
3797
3799
0.04
2.00
2.00
2.00
2.00
2.00
5.00
2.00
UN
ROL
UN
UN
UN
UN
UN
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
0.00
145,000.00
145,000.00
37,520.20
0.00
7,105.00
3,045.00
3,723.60
691,922.60
0.00
290,000.00
290,000.00
75,040.40
0.00
14,210.00
15,225.00
7,447.20
3938
3795
3800
3801
3793
2117
0.04
2.00
2.00
2.00
2.00
UN
ROL
UN
UN
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
0.00
145,000.00
145,000.00
37,520.20
0.00
949,378.80
0.00
290,000.00
290,000.00
75,040.40
0.00
Cd.
Valor Total
3794
2390
3937
2.00 UN
2.00 UN
2.00 UN
( 0.00)
( 0.00)
( 0.00)
40,600.00
99,644.00
6,925.20
81,200.00
199,288.00
13,850.40
3936
3804
3800
3805
UN
2.00 UN
2.00 UN
3.00 UN
( 0.00)
( 0.00)
( 0.00)
145,000.00
145,000.00
40,600.00
701,800.00
290,000.00
290,000.00
121,800.00
3937
3800
3801
3805
3806
2.00
2.00
3.00
2.00
UN
UN
UN
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
145,000.00
145,000.00
40,600.00
23,200.00
748,200.00
290,000.00
290,000.00
121,800.00
46,400.00
3935
3795
3800
3801
3793
2117
3794
3796
3937
3797
0.04
2.00
2.00
2.00
2.00
2.00
2.00
2.00
5.00
UN
ROL
UN
UN
UN
UN
UN
UN
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
0.00
145,000.00
145,000.00
37,520.20
0.00
40,600.00
7,105.00
6,925.20
3,045.00
779,525.80
0.00
290,000.00
290,000.00
75,040.40
0.00
81,200.00
14,210.00
13,850.40
15,225.00
MOTOBOMBA
MOTOBOMBAS ELECTRICAS DE 2" Y 3"
AYUDANTE ALBAILERIA GENERAL +PREST
718
391
3896
DD
1.00 DD
1.00 JR
( 0.00)
( 0.00)
34,800.00
28,258.00
63,058.00
34,800.00
28,258.00
PLUMA 250KG
PLUMA ELECTRICA 300 kg
AYUDANTE ADMON.+ PREST(86.03%)
722
1715
3767
MS
1.00 MS
1.00 MS
( 0.00)
( 0.00)
464,000.00
847,739.00
1,311,739.00
464,000.00
847,739.00
Cd.
Valor Total
529
2842
2841
798
2948
1490
3.00
1.05
1.00
5.00
1.00
ML
ML
ML
ML
%M
ML
( 0.00)
( 5.00)
( 0.00)
( 0.00)
( 0.00)
3,724.76
2,572.88
4,991.00
9,975.00
9,975.00
29,340.55
11,174.28
2,701.52
4,991.00
498.75
9,975.00
1006
2840
798
2948
1490
4.00
1.00
5.00
1.00
ML
ML
ML
%M
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
1,788.72
4,991.00
9,975.00
9,975.00
22,619.63
7,154.88
4,991.00
498.75
9,975.00
1005
2876
2846
795
2948
1490
1.00
1.05
1.00
5.00
1.00
ML
ML
ML
ML
%M
ML
( 0.00)
( 5.00)
( 0.00)
( 0.00)
( 0.00)
5,185.20
13,734.40
7,675.00
9,975.00
9,975.00
37,755.07
5,185.20
14,421.12
7,675.00
498.75
9,975.00
525
3784
3782
769
768
747
802
808
2948
1488
26.04
19.85
4.08
3.06
1.00
6.43
6.43
5.00
1.00
UN
ML
ML
UN
UN
UN
ML
UN
%M
UN
( 5.00)
( 5.00)
( 2.00)
( 2.00)
( 0.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
1,226.12
1,998.68
464.00
777.20
76,908.00
1,844.40
498.80
7,875.00
7,875.00
176,097.47
31,928.16
39,663.80
1,893.12
2,378.23
76,908.00
11,852.11
3,205.29
393.75
7,875.00
526
3784
3782
769
768
747
794
796
2948
1488
26.04
19.85
4.08
3.06
1.00
6.43
6.43
5.00
1.00
UN
ML
ML
UN
UN
UN
ML
ML
%M
UN
( 5.00)
( 5.00)
( 2.00)
( 2.00)
( 0.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
1,226.12
1,998.68
464.00
777.20
76,908.00
2,533.00
1,396.00
7,875.00
7,875.00
186,287.83
31,928.16
39,663.80
1,893.12
2,378.23
76,908.00
16,277.06
8,970.70
393.75
7,875.00
Cd.
Valor Total
527
3784
3782
797
2936
1489
1491
1.05
3.00
1.02
5.00
1.00
4.00
ML
ML
ML
ML
%M
ML
ML
( 5.00)
( 0.00)
( 2.00)
( 0.00)
( 0.00)
( 0.00)
1,226.12
1,998.68
1,828.00
27,300.00
23,100.00
1,050.00
37,813.03
1,287.43
5,996.04
1,864.56
1,365.00
23,100.00
4,200.00
528
3784
3782
797
2936
1489
1491
1.05
3.15
1.02
5.00
1.00
4.00
ML
ML
ML
ML
%M
ML
ML
( 5.00)
( 5.00)
( 2.00)
( 0.00)
( 0.00)
( 0.00)
1,226.12
1,998.68
1,828.00
27,300.00
23,100.00
1,050.00
38,112.83
1,287.43
6,295.84
1,864.56
1,365.00
23,100.00
4,200.00
530
403
UN
1.00 UN
( 0.00)
120,000.00
120,000.00
120,000.00
816
3521
2948
3522
UN
2.00 UN
5.00 %M
1.00 UN
( 0.00)
( 0.00)
( 0.00)
6,960.00
9,345.00
9,345.00
23,732.25
13,920.00
467.25
9,345.00
817
3523
2936
3522
UN
1.00 UN
2.00 %M
1.00 UN
( 0.00)
( 0.00)
( 0.00)
9,360.04
9,345.00
9,345.00
18,891.94
9,360.04
186.90
9,345.00
BOTONERA/FUENTE CITOFONOS
CENTRAL DE CONSERJERIA 10 PTOS
532
412
UN
1.00 UN
( 0.00)
429,200.00
429,200.00
429,200.00
1009
3329
2948
1494
UN
1.00 UN
5.00 %M
1.00 UN
( 0.00)
( 0.00)
( 0.00)
29,116.00
16,750.00
16,750.00
46,703.50
29,116.00
837.50
16,750.00
CANTONERA ELECTRICA
CANTONERA ELECTRICA AUTA
533
115
UN
1.00 UN
( 0.00)
90,000.00
90,000.00
90,000.00
CITOFONOS
CITOFONOS TERRANEO BASICO
HERRAMIENTA ELCTRICA %
534
418
2948
UN
1.00 UN
5.00 %M
( 0.00)
( 0.00)
48,488.00
0.00
48,488.00
48,488.00
0.00
UN
UN
UN
UN
UN
UN
UN
%M
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
36,858.25
18,478.74
182,003.65
25,844.50
321,980.84
167,549.24
53,465.00
880,893.20
73,716.50
55,436.22
182,003.65
77,533.50
321,980.84
167,549.24
2,673.25
2030
A 2024
A 2027
A 2023
A 2628
A 2025
A 2026
2948
2.00
3.00
1.00
3.00
1.00
1.00
5.00
Cd.
Valor Total
535
769
745
796
2948
1492
1.02
1.02
12.24
5.00
1.00
UN
UN
UN
ML
%M
UN
( 2.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
464.00
981.36
1,396.00
21,945.00
21,945.00
41,603.56
473.28
1,000.99
17,087.04
1,097.25
21,945.00
536
769
745
802
2948
1492
1.02
1.02
12.24
5.00
1.00
UN
UN
UN
ML
%M
UN
( 2.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
464.00
981.36
1,844.40
21,945.00
21,945.00
47,091.97
473.28
1,000.99
22,575.46
1,097.25
21,945.00
810
2419
3392
2948
3491
1.00
42.00
5.00
1.00
UN
UN
UN
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
75,400.00
174.00
21,150.00
21,150.00
104,915.50
75,400.00
7,308.00
1,057.50
21,150.00
EMPALME Y CANALIZACION
200PARES
CIERR EMPALME TUBULAR ESTANDAR 700
CONECTOR UNITARIO RELLENO 200 PARES
HERRAMIENTA ELCTRICA %
MdeO EMPALME 200 PARES
809
2426
3552
2948
3492
1.00
405.00
5.00
1.00
UN
UN
UN
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
30,619.36
34,800.00
21,600.00
21,600.00
14,147,299.36
30,619.36
14,094,000.00
1,080.00
21,600.00
2027
3734
3733
2948
3720
0.50
2.00
5.00
1.00
UN
ML
UN
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
22,588.68
2,227.20
2,600.00
2,600.00
18,478.74
11,294.34
4,454.40
130.00
2,600.00
2023
3701
3723
3692
3698
3705
3703
3704
2447
3745
2948
3714
1.00
3.00
8.00
1.00
2.00
2.00
1.00
0.05
0.25
5.00
1.00
UN
UN
UN
ML
UN
UN
UN
UN
VJ
HR
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
9,802.00
18,096.00
6,380.00
30,973.00
6,264.00
815.00
3,092.00
116,000.00
21,529.60
7,665.00
7,665.00
182,003.65
9,802.00
54,288.00
51,040.00
30,973.00
12,528.00
1,630.00
3,092.00
5,220.00
5,382.40
383.25
7,665.00
2628
3729
2948
3721
UN
1.00 UN
5.00 %M
1.00 UN
( 0.00)
( 0.00)
( 0.00)
22,852.00
2,850.00
2,850.00
25,844.50
22,852.00
142.50
2,850.00
Cd.
Valor Total
2025
3707
625
3698
3705
3708
3747
3725
3703
2447
3745
2948
3715
2.00
6.00
2.00
4.00
2.00
3.00
3.00
4.00
0.12
0.70
5.00
1.00
UN
UN
UN
UN
UN
UN
UN
UN
UN
VJ
HR
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
627.56
19,024.00
30,973.00
6,264.00
4,582.00
16,224.92
2,480.08
815.00
116,000.00
21,529.60
21,000.00
21,000.00
321,980.84
1,255.12
114,144.00
61,946.00
25,056.00
9,164.00
48,674.76
7,440.24
3,260.00
13,920.00
15,070.72
1,050.00
21,000.00
1019
3687
3660
3686
2948
3685
4.00
1.00
4.00
5.00
1.00
UN
UN
UN
UN
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
148.48
105,792.00
226.20
7,000.00
7,000.00
114,640.72
593.92
105,792.00
904.80
350.00
7,000.00
3688
3687
3688
3686
2948
3685
4.00
1.00
4.00
5.00
1.00
UN
UN
UN
UN
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
148.48
82,940.00
226.20
7,000.00
7,000.00
91,788.72
593.92
82,940.00
904.80
350.00
7,000.00
890
3784
3612
1006
2948
3611
4.00
1.00
1.00
5.00
1.00
UN
ML
UN
UN
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
1,226.12
6,000.00
324,800.00
17,850.00
17,850.00
354,446.98
4,904.48
6,000.00
324,800.00
892.50
17,850.00
LUMINARIA PEDESTAL
FAROL DE PEDESTAL DE 70W
HERRAMIENTA ELCTRICA %
HERRAMIENTA MENOR %
MdeO LUMINARIA PEDESTAL
818
3524
2948
2936
3525
1.00
5.00
2.00
1.00
UN
UN
%M
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
302,760.00
9,450.00
9,450.00
9,450.00
312,871.50
302,760.00
472.50
189.00
9,450.00
891
3784
3612
3640
2948
3611
4.00
1.00
1.00
5.00
1.00
UN
ML
UN
UN
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
1,226.12
6,000.00
313,200.00
17,850.00
17,850.00
342,846.98
4,904.48
6,000.00
313,200.00
892.50
17,850.00
1018
3784
3612
UN
4.00 ML
1.00 UN
( 0.00)
( 0.00)
1,226.12
6,000.00
319,646.98
4,904.48
6,000.00
Cd.
3653
2948
3611
Valor Total
1.00 UN
5.00 %M
1.00 UN
( 0.00)
( 0.00)
( 0.00)
290,000.00
17,850.00
17,850.00
290,000.00
892.50
17,850.00
PARCIAL 30 MT C.N.
ALAMBRE AISLADO No. 8 THHN-THWN 90 600V
BOQUILLAS COD 1" + TUERCA
TUBO 1" PVC 3MTS COLMENA
HERRAMIENTA ELCTRICA %
MdeO PARCIAL DE 30 METROS.
537
718
768
800
2948
1493
66.15
1.02
30.00
5.00
1.00
UN
ML
UN
ML
%M
UN
( 5.00)
( 2.00)
( 0.00)
( 0.00)
( 0.00)
3,174.92
777.20
3,343.12
71,400.00
71,400.00
386,077.30
210,020.96
792.74
100,293.60
3,570.00
71,400.00
PARCIAL 30 MT PVC
ALAMBRE AISLADO No. 8 THHN-THWN 90 600V
BOQUILLAS COD 1" + TUERCA
TUBO CONDUIT PVC
1"
HERRAMIENTA ELCTRICA %
MdeO PARCIAL DE 30 METROS.
538
718
768
794
2948
1493
99.23
1.02
30.60
5.00
1.00
UN
ML
UN
ML
%M
UN
( 5.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
3,174.92
777.20
2,533.00
71,400.00
71,400.00
468,303.98
315,031.44
792.74
77,509.80
3,570.00
71,400.00
POSTE DE CONCRETO 10 MT
POSTE DE CONC. PRETENS ALUMBRADO
539
2231
UN
1.00 UN
( 0.00)
477,920.00
477,920.00
477,920.00
2020
3689
2948
3690
UN
1.00 UN
5.00 %M
1.00 UN
( 0.00)
( 0.00)
( 0.00)
307,400.00
1,100.00
1,100.00
308,555.00
307,400.00
55.00
1,100.00
2026
3732
12
3744
2948
1.00
18.00
1.00
5.00
UN
UN
ML
UN
%M
( 0.00)
( 0.00)
( 0.00)
( 0.00)
47,792.00
5,684.00
17,445.24
0.00
167,549.24
47,792.00
102,312.00
17,445.24
0.00
3033
A 3032
3791
3729
3726
3728
3745
2948
401
3717
1.00
1.00
4.00
1.00
1.00
0.25
5.00
0.01
1.00
UN
UN
UN
UN
UN
UN
HR
%M
DD
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
20,475.77
7,540.00
22,852.00
580.00
10,942.00
21,529.60
31,600.00
33,640.00
23,000.00
161,244.57
20,475.77
7,540.00
91,408.00
580.00
10,942.00
5,382.40
1,580.00
336.40
23,000.00
887
2461
3784
3602
3563
2060
3783
1668
2.00
6.00
0.08
1.00
0.01
1.00
1.00
UN
UN
ML
ML
UN
UN
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
248.00
1,226.12
770.24
870.00
25,736.00
4,060.00
10,324.00
48,370.45
496.00
7,356.72
61.62
870.00
257.36
4,060.00
10,324.00
Cd.
Valor Total
841
3561
796
2948
3610
0.01
1.00
3.06
5.00
1.00
UN
UN
ML
%M
UN
( 0.00)
( 0.00)
( 2.00)
( 0.00)
( 0.00)
53,374.00
3,712.00
1,396.00
15,645.00
15,645.00
533.74
3,712.00
4,271.76
782.25
15,645.00
541
3784
721
769
745
788
802
2948
1495
9.45
4.20
2.04
1.02
1.01
4.08
5.00
1.00
UN
ML
ML
UN
UN
UN
ML
%M
UN
( 5.00)
( 5.00)
( 2.00)
( 2.00)
( 1.00)
( 2.00)
( 0.00)
( 0.00)
1,226.12
859.56
464.00
981.36
2,610.00
1,844.40
19,700.00
19,700.00
47,990.79
11,586.83
3,610.15
946.56
1,000.99
2,636.10
7,525.15
985.00
19,700.00
542
3784
721
769
745
788
796
2948
1495
9.45
4.20
2.04
1.02
1.01
4.08
5.00
1.00
UN
ML
ML
UN
UN
UN
ML
%M
UN
( 5.00)
( 5.00)
( 2.00)
( 2.00)
( 1.00)
( 2.00)
( 0.00)
( 0.00)
1,226.12
859.56
464.00
981.36
2,610.00
1,396.00
19,700.00
19,700.00
46,161.31
11,586.83
3,610.15
946.56
1,000.99
2,636.10
5,695.68
985.00
19,700.00
811
2461
3520
2060
841
796
2948
3519
2.00
1.00
0.01
0.01
2.55
5.00
1.00
UN
UN
UN
UN
UN
ML
%M
UN
( 0.00)
( 0.00)
( 5.00)
( 5.00)
( 2.00)
( 0.00)
( 0.00)
248.00
1,102.00
25,736.00
53,374.00
1,396.00
14,175.00
14,175.00
20,872.21
496.00
1,102.00
270.23
560.43
3,559.80
708.75
14,175.00
882
2461
3784
721
3563
3562
2060
841
3561
796
2948
3555
2.00
3.15
3.15
1.00
2.00
0.01
0.01
1.00
3.06
5.00
1.00
UN
UN
ML
ML
UN
UN
UN
UN
UN
ML
%M
UN
( 0.00)
( 5.00)
( 5.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 2.00)
( 0.00)
( 0.00)
248.00
1,226.12
859.56
870.00
1,680.84
25,736.00
53,374.00
3,712.00
1,396.00
15,645.00
15,645.00
36,499.68
496.00
3,862.28
2,707.61
870.00
3,361.68
257.36
533.74
3,712.00
4,271.76
782.25
15,645.00
SALIDA MONOFASICA CN
ALAMBRE AISLADO No.12 THHN-THWN 90
543
3784
UN
3.15 ML
( 5.00)
1,226.12
34,908.37
3,862.28
Cd.
Valor Total
721
769
745
761
779
802
1496
3.15
2.04
1.02
1.01
1.01
3.06
1.00
ML
UN
UN
UN
UN
ML
UN
( 5.00)
( 2.00)
( 2.00)
( 1.00)
( 1.00)
( 2.00)
( 0.00)
859.56
464.00
981.36
5,243.00
1,264.00
1,844.40
14,175.00
2,707.61
946.56
1,000.99
5,295.43
1,276.64
5,643.86
14,175.00
544
3784
721
769
745
762
779
802
1496
4.20
14.70
3.06
1.02
1.01
1.01
4.08
1.00
UN
ML
ML
UN
UN
UN
UN
ML
UN
( 5.00)
( 5.00)
( 2.00)
( 2.00)
( 1.00)
( 1.00)
( 2.00)
( 0.00)
1,226.12
859.56
464.00
981.36
6,426.00
1,264.00
1,844.40
14,175.00
49,673.12
5,149.70
12,635.53
1,419.84
1,000.99
6,490.26
1,276.64
7,525.15
14,175.00
545
3784
721
769
745
762
779
796
1496
4.20
14.70
3.06
1.02
1.01
1.01
4.08
1.00
UN
ML
ML
UN
UN
UN
UN
ML
UN
( 5.00)
( 5.00)
( 2.00)
( 2.00)
( 1.00)
( 1.00)
( 2.00)
( 0.00)
1,226.12
859.56
464.00
981.36
6,426.00
1,264.00
1,396.00
14,175.00
47,843.64
5,149.70
12,635.53
1,419.84
1,000.99
6,490.26
1,276.64
5,695.68
14,175.00
546
3784
721
769
745
761
779
796
1496
3.15
3.15
2.04
1.02
1.01
1.01
3.06
1.00
UN
ML
ML
UN
UN
UN
UN
ML
UN
( 5.00)
( 5.00)
( 2.00)
( 2.00)
( 1.00)
( 1.00)
( 2.00)
( 0.00)
1,226.12
859.56
464.00
981.36
5,243.00
1,264.00
1,396.00
14,175.00
33,536.27
3,862.28
2,707.61
946.56
1,000.99
5,295.43
1,276.64
4,271.76
14,175.00
547
722
768
736
802
1497
7.35
2.04
1.01
7.14
1.00
UN
ML
UN
UN
ML
UN
( 5.00)
( 2.00)
( 1.00)
( 2.00)
( 0.00)
464.00
777.20
3,886.00
1,844.40
14,175.00
36,264.76
3,410.40
1,585.49
3,924.86
13,169.02
14,175.00
548
722
768
736
794
7.35
2.04
1.01
7.14
UN
ML
UN
UN
ML
( 5.00)
( 2.00)
( 1.00)
( 2.00)
464.00
777.20
3,886.00
2,533.00
41,181.37
3,410.40
1,585.49
3,924.86
18,085.62
Cd.
Valor Total
1497
1.00 UN
( 0.00)
14,175.00
14,175.00
885
2461
3563
2060
1668
841
796
2948
3727
2.00
1.00
0.01
1.00
0.01
9.18
5.00
1.00
UN
UN
UN
UN
UN
UN
ML
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 2.00)
( 0.00)
( 0.00)
248.00
870.00
25,736.00
10,324.00
53,374.00
1,396.00
15,100.00
15,100.00
41,151.38
496.00
870.00
257.36
10,324.00
533.74
12,815.28
755.00
15,100.00
884
2461
3563
2060
1668
841
796
2948
3564
2.00
1.00
0.01
1.00
0.01
9.18
5.00
1.00
UN
UN
UN
UN
UN
UN
ML
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 2.00)
( 0.00)
( 0.00)
248.00
870.00
25,736.00
10,324.00
53,374.00
1,396.00
15,645.00
15,645.00
41,723.63
496.00
870.00
257.36
10,324.00
533.74
12,815.28
782.25
15,645.00
549
722
769
745
791
796
2948
1497
9.45
2.04
1.02
1.01
9.18
5.00
1.00
UN
ML
UN
UN
UN
ML
%M
UN
( 5.00)
( 2.00)
( 2.00)
( 1.00)
( 2.00)
( 0.00)
( 0.00)
464.00
464.00
981.36
3,329.00
1,396.00
14,175.00
14,175.00
37,393.67
4,384.80
946.56
1,000.99
3,362.29
12,815.28
708.75
14,175.00
550
3784
3782
769
768
788
800
802
2948
1495
13.65
8.40
1.02
1.02
1.01
2.55
3.06
5.00
1.00
UN
ML
ML
UN
UN
UN
ML
ML
%M
UN
( 5.00)
( 5.00)
( 2.00)
( 2.00)
( 1.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
1,226.12
1,998.68
464.00
777.20
2,610.00
3,343.12
1,844.40
19,700.00
19,700.00
72,281.39
16,736.54
16,788.91
473.28
792.74
2,636.10
8,524.96
5,643.86
985.00
19,700.00
551
3784
3782
769
768
788
794
796
13.65
8.40
1.02
1.02
1.01
2.55
3.06
UN
ML
ML
UN
UN
UN
ML
ML
( 5.00)
( 5.00)
( 2.00)
( 2.00)
( 1.00)
( 2.00)
( 2.00)
1,226.12
1,998.68
464.00
777.20
2,610.00
2,533.00
1,396.00
68,843.48
16,736.54
16,788.91
473.28
792.74
2,636.10
6,459.15
4,271.76
Cd.
Valor Total
2948
1495
5.00 %M
1.00 UN
( 0.00)
( 0.00)
19,700.00
19,700.00
985.00
19,700.00
SALIDA TV CN
AISLADOR PIN 34.5KV ANSI 56-3
CONDUCTOR ALUMINIO AWG 4/0
TORNILLO ACERO 5/8 X 7"
HERRAMIENTA ELCTRICA %
MdeO SALIDA TV
1010
3693
3692
3694
2948
3330
3.00
8.00
2.00
5.00
1.00
UN
UN
ML
UN
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
63,751.28
6,380.00
2,892.00
14,175.00
14,175.00
262,961.59
191,253.84
51,040.00
5,784.00
708.75
14,175.00
SALIDA TV PVC.
BOQUILLAS COD "+ TUERCA
CAJA 5800 Cal 26
TOMA TV AMERICANA ABITARE COAXIAL AVE
TUBO CONDUIT PVC "
HERRAMIENTA ELCTRICA %
MdeO SALIDA TV
1012
769
745
1094
796
2948
3330
2.04
1.02
1.00
12.24
5.00
1.00
UN
UN
UN
UN
ML
%M
UN
( 2.00)
( 2.00)
( 0.00)
( 2.00)
( 0.00)
( 0.00)
464.00
981.36
3,016.00
1,396.00
14,175.00
14,175.00
36,934.34
946.56
1,000.99
3,016.00
17,087.04
708.75
14,175.00
776
812
2948
1504
UN
1.00 UN
5.00 %M
1.00 UN
( 0.00)
( 0.00)
( 0.00)
7,679.00
22,365.00
22,365.00
31,162.25
7,679.00
1,118.25
22,365.00
552
744
778
531
2948
1706
1.00
1.01
0.22
5.00
1.00
UN
UN
UN
KG
%M
UN
( 0.00)
( 1.00)
( 4.00)
( 0.00)
( 0.00)
24,354.20
3,480.00
215.00
57,750.00
57,750.00
88,553.46
24,354.20
3,514.80
46.96
2,887.50
57,750.00
SUBESTACION LOCAL
AISLADOR DE PIN DE 15KV
CABLE cobre Aisl. 2 THW - 90 C 600V
CONECT. COBRE PARA VARILLA CW 3/4"
CORTA CIRCUITO IND. 15 kv 100A
CUCHILLA MONOP. 400 A 15K
PERNO 5/8" X 24
PLATINA 2 x "
PORTA AISLADOR 1 PUESTO
VARILLA CW 5/8" X 2.40
HERRAMIENTA ELCTRICA %
MdeO SUBESTACION LOCAL
133
625
2846
738
1172
1044
740
737
786
787
2948
2680
9.18
6.30
3.06
3.06
3.06
8.00
3.15
9.45
3.15
5.00
1.00
UN
UN
ML
UN
UN
UN
UN
UN
UN
UN
%M
UN
( 2.00)
( 5.00)
( 2.00)
( 2.00)
( 2.00)
( 0.00)
( 5.00)
( 5.00)
( 5.00)
( 0.00)
( 0.00)
19,024.00
13,734.40
2,552.00
128,760.00
731,154.96
5,742.00
34,788.40
3,509.00
5,042.00
119,448.00
119,448.00
3,230,298.15
174,640.32
86,526.72
7,809.12
394,005.60
2,237,334.18
45,936.00
109,583.46
33,160.05
15,882.30
5,972.40
119,448.00
555
718
3782
1025
473
30
520
521
44.10
14.70
0.00
12.00
5.00
1.50
4.50
UN
ML
ML
GN
UN
UN
ML
ML
( 5.00)
( 5.00)
( 2.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
3,174.92
1,998.68
27,094.00
1,950.00
55,100.00
21,628.20
42,838.80
1,345,207.60
140,013.97
29,380.60
0.00
23,400.00
275,500.00
32,442.30
192,774.60
Cd.
Valor Total
531
534
2948
1499
7.14
63.00
5.00
1.00
KG
UN
%M
UN
( 4.00)
( 5.00)
( 0.00)
( 0.00)
215.00
20.00
618,000.00
618,000.00
1,536.13
1,260.00
30,900.00
618,000.00
556
746
2990
2948
1502
1.01
4.04
5.00
1.00
UN
UN
UN
%M
UN
( 1.00)
( 1.00)
( 0.00)
( 0.00)
21,576.00
15,544.00
18,500.00
18,500.00
104,014.52
21,791.76
62,797.76
925.00
18,500.00
557
2990
784
2948
1500
12.12
1.01
5.00
1.00
UN
UN
UN
%M
UN
( 1.00)
( 1.00)
( 0.00)
( 0.00)
15,544.00
190,704.00
18,500.00
18,500.00
400,429.32
188,393.28
192,611.04
925.00
18,500.00
558
2990
785
2948
1501
18.18
1.01
5.00
1.00
UN
UN
UN
%M
UN
( 1.00)
( 1.00)
( 0.00)
( 0.00)
15,544.00
225,620.00
36,000.00
36,000.00
548,266.12
282,589.92
227,876.20
1,800.00
36,000.00
TELEFONO-CITOFONO/ECONOM.
ALAMBRE TELEFONICO 2 x 22 JWT- PVC
BOQUILLAS COD "+ TUERCA
CAJA 5800 Cal 26
TOMA TELEF COLOMBIANA 400 AVE
TUBO CONDUIT PVC "
HERRAMIENTA ELCTRICA %
MdeO SALIDA TELEFONO/TIMBRE
559
722
769
745
792
796
2948
1497
5.25
2.04
1.02
1.01
5.10
5.00
1.00
UN
ML
UN
UN
UN
ML
%M
UN
( 5.00)
( 2.00)
( 2.00)
( 1.00)
( 2.00)
( 0.00)
( 0.00)
464.00
464.00
981.36
1,740.00
1,396.00
14,175.00
14,175.00
28,144.30
2,436.00
946.56
1,000.99
1,757.40
7,119.60
708.75
14,175.00
TIMBRE-BOTON / ECONOM.
ALAMBRE TELEFONICO 2 x 22 JWT- PVC
BOQUILLAS COD "+ TUERCA
BOTON TIMBRE 600 AVE
CAJA 5800 Cal 26
TUBO CONDUIT PVC "
ZUMBADOR 110 V. 600 AVE
HERRAMIENTA ELCTRICA %
MdeO TIMBRE BOTON
560
722
769
736
745
796
812
2948
1503
4.20
4.08
1.00
2.04
2.04
1.00
5.00
1.00
UN
ML
UN
UN
UN
ML
UN
%M
UN
( 5.00)
( 2.00)
( 0.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
( 0.00)
464.00
464.00
3,886.00
981.36
1,396.00
7,679.00
15,750.00
15,750.00
36,794.23
1,948.80
1,893.12
3,886.00
2,001.97
2,847.84
7,679.00
787.50
15,750.00
TRANSFORMADOR 150KWA
TRANSFORMADOR TRIFASICO 150KVA
GRUA EXTENSION PARA POSTES
HERRAMIENTA ELCTRICA %
MdeO TRANSFORMADOR
880
3683
2745
2948
2798
1.00
2.00
5.00
1.00
UN
UN
HR
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
10,589,524.00
21,852.08
295,000.00
295,000.00
10,942,978.16
10,589,524.00
43,704.16
14,750.00
295,000.00
TRANSFORMADOR 225KWA
TRANSFORMADOR TRIFASICO 225KVA
GRUA EXTENSION PARA POSTES
881
3684
2745
UN
1.00 UN
2.00 HR
( 0.00)
( 0.00)
14,993,000.00
21,852.08
15,346,454.16
14,993,000.00
43,704.16
Cd.
Valor Total
2948
2798
5.00 %M
1.00 UN
( 0.00)
( 0.00)
295,000.00
295,000.00
14,750.00
295,000.00
TRANSFORMADOR 50KWA
TRANSFORMADOR MONOFASICO 50KVA
GRUA EXTENSION PARA POSTES
HERRAMIENTA ELCTRICA %
MdeO TRANSFORMADOR
703
2399
2745
2948
2798
1.00
2.00
5.00
1.00
UN
UN
HR
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
4,519,128.00
21,852.08
295,000.00
295,000.00
4,872,582.16
4,519,128.00
43,704.16
14,750.00
295,000.00
2629
3712
2948
3722
UN
1.00 UN
5.00 %M
1.00 UN
( 0.00)
( 0.00)
( 0.00)
4,872.00
1,000.00
1,000.00
5,922.00
4,872.00
50.00
1,000.00
2022
3701
3693
3700
3692
3698
3699
3702
3695
3696
3697
3694
2948
3713
1.00
3.00
1.00
8.00
1.00
1.00
1.00
3.00
1.00
1.00
2.00
5.00
1.00
UN
UN
UN
UN
ML
UN
UN
UN
UN
UN
UN
UN
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
9,802.00
63,751.28
6,032.00
6,380.00
30,973.00
17,699.28
4,853.00
14,326.00
1,898.00
582.00
2,892.00
36,540.00
36,540.00
401,262.12
9,802.00
191,253.84
6,032.00
51,040.00
30,973.00
17,699.28
4,853.00
42,978.00
1,898.00
582.00
5,784.00
1,827.00
36,540.00
3032
A 257
3746
2420
2943
25
940
941
2948
3731
0.01
0.76
0.89
0.60
1.23
0.92
0.92
5.00
1.00
UN
M3
UN
UN
KG
KG
ML
ML
%M
UN
( 0.00)
( 8.00)
( 5.00)
( 0.00)
( 0.00)
( 8.00)
( 8.00)
( 0.00)
( 0.00)
234,164.00
1,740.00
1,740.00
681.00
2,310.72
615.96
2,744.56
8,600.00
8,500.00
20,475.77
2,341.64
1,315.44
1,552.95
408.60
2,842.19
565.45
2,519.51
430.00
8,500.00
561
768
802
812
2948
1504
2.04
2.04
1.00
5.00
1.00
UN
UN
ML
UN
%M
UN
( 2.00)
( 2.00)
( 0.00)
( 0.00)
( 0.00)
777.20
1,844.40
7,679.00
22,365.00
22,365.00
36,510.31
1,585.49
3,762.58
7,679.00
1,118.25
22,365.00
562
768
796
812
UN
2.04 UN
2.04 ML
1.00 UN
( 2.00)
( 2.00)
( 0.00)
777.20
1,396.00
7,679.00
35,595.58
1,585.49
2,847.84
7,679.00
Cd.
2948
1504
( 0.00)
( 0.00)
22,365.00
22,365.00
Valor Total
1,118.25
22,365.00
Cd.
Valor Total
711
820
3830
3760
3809
3761
3832
3831
861
877
3828
3829
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
UN
UN
UN
UN
UN
UN
UN
ML
ML
UN
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
823.60
10,904.00
208,800.00
6,380.00
46,690.00
6,374.00
1,624.00
5,525.00
3,720.00
7,772.00
6,090.00
304,702.60
823.60
10,904.00
208,800.00
6,380.00
46,690.00
6,374.00
1,624.00
5,525.00
3,720.00
7,772.00
6,090.00
3928
11
1834
3756
1850
2719
833
3758
531
3757
8.72
0.51
3.00
0.50
6.76
0.78
0.63
0.71
1.00
UN
ML
GN
UN
GN
ML
UN
M2
KG
UN
( 5.00)
( 2.00)
( 0.00)
( 0.00)
( 4.00)
( 0.00)
( 0.00)
( 1.00)
( 0.00)
2,184.00
39,270.00
650.00
64,507.00
1,171.60
37,131.60
226,200.00
215.00
32,550.00
285,355.43
19,033.56
20,027.70
1,950.00
32,253.50
7,920.02
28,962.65
142,506.00
152.01
32,550.00
3042
11
1834
3756
1850
2719
833
3758
531
3755
4.00
0.20
2.00
0.20
2.81
0.28
0.16
0.40
1.00
UN
ML
GN
UN
GN
ML
UN
M2
KG
UN
( 0.00)
( 2.00)
( 0.00)
( 0.00)
( 4.00)
( 0.00)
( 0.00)
( 1.00)
( 0.00)
2,184.00
39,270.00
650.00
64,507.00
1,171.60
37,131.60
226,200.00
215.00
22,050.00
102,964.04
8,736.00
8,011.08
1,300.00
12,901.40
3,289.85
10,396.85
36,192.00
86.86
22,050.00
720
11
1834
3756
1850
2719
833
5.08
0.31
2.00
0.30
3.22
0.38
UN
ML
GN
UN
GN
ML
UN
( 0.00)
( 2.00)
( 0.00)
( 0.00)
( 4.00)
( 0.00)
2,184.00
39,270.00
650.00
64,507.00
1,171.60
37,131.60
160,498.26
11,094.72
12,016.62
1,300.00
19,352.10
3,777.24
14,110.01
Cd.
Valor Total
3758
531
3842
0.32 M2
0.51 KG
1.00 UN
( 0.00)
( 1.00)
( 0.00)
226,200.00
215.00
26,355.00
72,384.00
108.58
26,355.00
721
816
3834
840
3843
1.02
0.04
0.01
1.00
UN
UN
UN
KG
UN
( 2.00)
( 0.00)
( 0.00)
( 0.00)
870.00
16,862.00
38,000.00
750.00
2,691.88
887.40
674.48
380.00
750.00
723
1835
818
3834
3762
3845
0.01
1.02
0.04
0.02
1.00
UN
GN
UN
UN
UN
UN
( 0.00)
( 2.00)
( 0.00)
( 0.00)
( 0.00)
34,477.00
2,018.40
16,862.00
6,075.00
1,425.00
4,624.52
344.77
2,058.77
674.48
121.50
1,425.00
717
3840
3837
531
3838
3839
0.45
0.10
0.10
4.00
1.00
UN
UN
UN
KG
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
45,257.40
12,100.00
215.00
286.00
12,915.00
35,656.33
20,365.83
1,210.00
21.50
1,144.00
12,915.00
CONEXION GASODOMESTICO
CONEXION GASODOMESTICO
710
3826
UN
1.00 ML
( 0.00)
27,260.00
27,260.00
27,260.00
712
3830
3834
3833
UN
1.00 UN
0.01 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
10,904.00
16,862.00
790.00
11,862.62
10,904.00
168.62
790.00
151
2227
1611
3789
727
3812
3811
532
3568
3809
957
3810
3485
3825
497
1572
4054
3814
UN
UN
UN
UN
UN
UN
LB
UN
UN
UN
UN
LB
UN
UN
ML
UN
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 3.00)
( 0.00)
( 0.00)
( 0.00)
1,873.00
1,358.00
130.00
646.00
83,752.00
6,414.00
650.00
50,000.00
6,380.00
1,204.00
25,588.00
440.00
1,115.00
69,014.00
525.00
5,480.00
20,000.00
532,392.83
1,873.00
2,716.00
1,300.00
6,460.00
7,847.56
801.75
130.00
50,000.00
1,196.25
1,204.00
4,797.75
440.00
1,115.00
426,506.52
525.00
5,480.00
20,000.00
1.00
2.00
10.00
10.00
0.09
0.13
0.20
1.00
0.19
1.00
0.19
1.00
1.00
6.18
1.00
1.00
1.00
Cd.
94
2227
1611
3789
3765
727
730
3812
3811
532
3568
3809
957
3810
3485
497
1572
4054
3813
INSTALACION NICHO
NICHO 37x20x10cm
MdeO INSTALACION NICHO
Valor Total
UN
UN
UN
UN
UN
UN
UN
UN
LB
UN
UN
UN
UN
LB
UN
ML
UN
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 1.00)
( 0.00)
( 0.00)
( 0.00)
1,873.00
1,358.00
130.00
1,595.00
646.00
3,091.00
83,752.00
6,414.00
650.00
50,000.00
6,380.00
1,204.00
25,588.00
440.00
69,014.00
525.00
5,480.00
60,000.00
1,207,721.73
1,873.00
2,716.00
2,600.00
1,595.00
9,690.00
3,091.00
15,703.50
1,202.63
45.50
50,000.00
1,196.25
1,204.00
4,797.75
440.00
1,045,562.10
525.00
5,480.00
60,000.00
553
3822
3816
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
30,000.00
20,000.00
50,000.00
30,000.00
20,000.00
298
3824
3819
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
15,000.00
25,000.00
40,000.00
15,000.00
25,000.00
713
3568
3809
3835
UN
1.00 UN
0.02 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
50,000.00
6,380.00
2,100.00
52,227.60
50,000.00
127.60
2,100.00
3929
3760
3809
3763
UN
1.02 UN
0.02 UN
1.00 UN
( 2.00)
( 0.00)
( 0.00)
208,800.00
6,380.00
12,675.00
225,778.60
212,976.00
127.60
12,675.00
657
3821
UN
1.00 UN
( 0.00)
25,000.00
25,000.00
25,000.00
554
3820
UN
1.00 UN
( 0.00)
20,000.00
20,000.00
20,000.00
714
3809
3836
3764
UN
0.02 UN
1.00 UN
1.02 UN
( 0.00)
( 0.00)
( 2.00)
6,380.00
127,600.00
10,200.00
138,131.60
127.60
127,600.00
10,404.00
REGULADOR RP 40
PEGANTE O SELLANTE Fuerza Media
3930
3809
UN
0.02 UN
( 0.00)
6,380.00
57,221.60
127.60
1.00
2.00
20.00
1.00
15.00
1.00
0.19
0.19
0.07
1.00
0.19
1.00
0.19
1.00
15.15
1.00
1.00
1.00
Cd.
Valor Total
3761
3764
1.00 UN
1.02 UN
( 0.00)
( 2.00)
46,690.00
10,200.00
46,690.00
10,404.00
SOMBRERETE P/CHIMENEA
LAMINA Galv. Cal. 20 1 x 2 M
SOLDADURA ELECTRICA DE 1/8
TORNILLO 1" X "
MdeO ORNAMENTACION CHIMENEA
719
3840
531
3838
3841
0.35
0.20
8.00
1.00
UN
UN
KG
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
45,257.40
215.00
286.00
9,450.00
27,621.09
15,840.09
43.00
2,288.00
9,450.00
724
3846
3834
840
3838
2967
3847
1.00
0.04
0.01
2.00
1.05
1.00
UN
UN
UN
KG
UN
ML
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 5.00)
( 0.00)
1,009.20
16,862.00
38,000.00
286.00
9,048.00
3,000.00
15,136.08
1,009.20
674.48
380.00
572.00
9,500.40
3,000.00
725
3849
3834
840
3838
3848
3850
1.00
0.04
0.01
2.00
1.05
1.00
UN
UN
UN
KG
UN
ML
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 5.00)
( 0.00)
538.24
16,862.00
38,000.00
286.00
16,008.00
3,600.00
22,573.12
538.24
674.48
380.00
572.00
16,808.40
3,600.00
783
1835
3809
3828
3867
0.01
0.02
1.02
1.00
UN
GN
UN
UN
UN
( 0.00)
( 0.00)
( 2.00)
( 0.00)
34,477.00
6,380.00
7,772.00
1,785.00
10,184.81
344.77
127.60
7,927.44
1,785.00
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
425
2015
815
820
837
841
861
1467
1.00
1.00
2.00
1.00
0.05
5.10
1.00
UN
UN
UN
UN
UN
UN
ML
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 4.00)
( 2.00)
( 0.00)
23,896.00
137,228.00
823.60
44,080.00
53,374.00
5,525.00
27,170.00
264,974.15
23,896.00
137,228.00
1,647.20
44,080.00
2,775.45
28,177.50
27,170.00
426
2015
825
837
841
852
1467
1.00
2.00
1.00
0.05
5.10
1.00
UN
UN
UN
UN
UN
ML
UN
( 0.00)
( 0.00)
( 0.00)
( 4.00)
( 2.00)
( 0.00)
23,896.00
567.00
44,080.00
53,374.00
1,521.00
27,170.00
106,812.55
23,896.00
1,134.00
44,080.00
2,775.45
7,757.10
27,170.00
427
815
826
838
841
853
1467
1.00
2.00
1.00
0.05
5.10
1.00
UN
UN
UN
UN
UN
ML
UN
( 0.00)
( 0.00)
( 0.00)
( 4.00)
( 2.00)
( 0.00)
137,228.00
907.00
36,772.00
53,374.00
1,917.00
27,170.00
215,536.15
137,228.00
1,814.00
36,772.00
2,775.45
9,776.70
27,170.00
428
830
841
846
1468
0.06
0.01
1.02
1.00
ML
UN
UN
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
22,244.00
53,374.00
6,237.00
4,800.00
13,051.47
1,334.64
555.09
6,361.74
4,800.00
429
831
841
847
1468
0.06
0.02
1.02
1.00
ML
UN
UN
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
8,676.00
53,374.00
10,754.00
4,800.00
17,399.82
520.56
1,110.18
10,969.08
4,800.00
430
830
841
843
1468
0.06
0.01
1.02
1.00
ML
UN
UN
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
22,244.00
53,374.00
10,955.00
4,800.00
17,863.83
1,334.64
555.09
11,174.10
4,800.00
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
431
831
841
844
1468
0.06
0.02
1.02
1.00
ML
UN
UN
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
8,676.00
53,374.00
15,267.00
4,800.00
22,003.08
520.56
1,110.18
15,572.34
4,800.00
432
832
841
845
1468
0.06
0.03
1.02
1.00
ML
UN
UN
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
60,094.00
53,374.00
32,327.00
4,800.00
43,044.45
3,605.64
1,665.27
32,973.54
4,800.00
433
833
531
1468
ML
0.21 UN
0.10 KG
1.00 ML
( 5.00)
( 4.00)
( 0.00)
37,131.60
215.00
4,800.00
12,620.00
7,797.64
22.36
4,800.00
434
864
212
841
1468
1.02
0.06
0.08
1.00
ML
ML
UN
UN
ML
( 2.00)
( 0.00)
( 4.00)
( 0.00)
16,230.00
4,529.00
53,374.00
4,800.00
26,067.06
16,554.60
271.74
4,440.72
4,800.00
812
A 396
A 467
A 510
UN
1.00 UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
52,251.82
119,152.00
180,925.54
352,329.36
52,251.82
119,152.00
180,925.54
813
A 397
A 468
A 511
UN
1.00 UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
53,803.72
155,000.00
211,295.54
420,099.26
53,803.72
155,000.00
211,295.54
435
538
2949
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
281,617.00
24,150.00
305,767.00
281,617.00
24,150.00
437
538
2949
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
281,617.00
24,150.00
305,767.00
281,617.00
24,150.00
436
539
2949
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
229,159.00
24,150.00
253,309.00
229,159.00
24,150.00
438
1104
2950
UN
2.00 UN
1.00 UN
( 0.00)
( 0.00)
62,143.52
42,000.00
166,287.04
124,287.04
42,000.00
439
545
2951
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
416,440.00
50,000.00
466,440.00
416,440.00
50,000.00
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
440
546
2951
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
486,040.00
50,000.00
536,040.00
486,040.00
50,000.00
441
547
2951
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
709,920.00
50,000.00
759,920.00
709,920.00
50,000.00
442
195
216
217
245
534
1470
1.02
2.74
0.68
0.34
0.20
1.00
ML
ML
UN
UN
UN
UN
ML
( 2.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
10,346.00
1,380.00
4,000.00
4,754.00
20.00
8,350.00
27,024.48
10,552.92
3,781.20
2,720.00
1,616.36
4.00
8,350.00
443
833
531
1470
ML
0.26 UN
0.42 KG
1.00 ML
( 5.00)
( 4.00)
( 0.00)
37,131.60
215.00
8,350.00
18,186.49
9,747.05
89.44
8,350.00
444
833
531
1470
ML
0.40 UN
0.62 KG
1.00 ML
( 5.00)
( 4.00)
( 0.00)
37,131.60
215.00
8,350.00
23,299.67
14,815.51
134.16
8,350.00
445
833
531
1470
ML
0.53 UN
0.83 KG
1.00 ML
( 5.00)
( 4.00)
( 0.00)
37,131.60
215.00
8,350.00
28,022.97
19,494.09
178.88
8,350.00
447
818
819
836
859
860
1484
2.00
2.00
1.00
1.02
1.02
1.00
UN
UN
UN
UN
ML
ML
UN
( 0.00)
( 0.00)
( 0.00)
( 2.00)
( 2.00)
( 0.00)
2,018.40
7,690.80
140,128.00
12,109.00
26,932.00
178,000.00
377,368.22
4,036.80
15,381.60
140,128.00
12,351.18
27,470.64
178,000.00
446
823
824
836
841
850
851
1483
2.00
2.00
1.00
0.05
1.07
1.07
0.50
UN
UN
UN
UN
UN
ML
ML
UN
( 0.00)
( 0.00)
( 0.00)
( 4.00)
( 2.00)
( 2.00)
( 0.00)
1,726.00
6,307.00
140,128.00
53,374.00
2,796.00
10,073.00
103,000.00
224,252.15
3,452.00
12,614.00
140,128.00
2,775.45
2,994.52
10,788.18
51,500.00
453
560
2952
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
35,262.00
22,785.00
58,047.00
35,262.00
22,785.00
HACEB
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
450
731
888
2952
UN
1.00 UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
321,600.00
108,960.00
22,785.00
453,345.00
321,600.00
108,960.00
22,785.00
448
558
2952
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
17,271.00
22,785.00
40,056.00
17,271.00
22,785.00
452
553
2952
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
108,400.00
22,785.00
131,185.00
108,400.00
22,785.00
449
554
2952
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
98,325.00
22,785.00
121,110.00
98,325.00
22,785.00
455
833
531
2772
ML
0.21 UN
0.11 KG
1.00 ML
( 5.00)
( 4.00)
( 0.00)
37,131.60
215.00
5,250.00
13,072.23
7,797.64
24.60
5,250.00
458
2791
2953
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
86,758.00
24,550.00
111,308.00
86,758.00
24,550.00
457
2791
2953
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
86,758.00
24,550.00
111,308.00
86,758.00
24,550.00
459
70
1482
UN
0.53 KG
1.00 UN
( 5.00)
( 0.00)
908.28
20,000.00
20,476.85
476.85
20,000.00
460
1469
UN
1.00 UN
( 0.00)
182,070.00
182,070.00
182,070.00
461
1471
UN
1.00 UN
( 0.00)
404,000.00
404,000.00
404,000.00
UN
M3
UN
UN
UN
UN
%M
UN
( 3.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
185,724.60
5,541.00
260,253.00
4,286,000.00
607.00
101,244.50
98,000.00
4,718,618.63
57,388.90
5,541.00
260,253.00
4,286,000.00
6,373.50
5,062.23
98,000.00
UN
0.31 M3
1.00 UN
( 3.00)
( 0.00)
185,724.60
5,541.00
5,120,618.63
57,388.90
5,541.00
1034
A 267
551
3553
4004
1873
2936
2115
1035
A 267
551
0.31
1.00
1.00
1.00
10.50
5.00
1.00
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
APU Componentes
Cd.
3553
4006
1873
2936
2115
Valor Total
UN
UN
UN
%M
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
260,253.00
4,688,000.00
607.00
101,244.50
98,000.00
260,253.00
4,688,000.00
6,373.50
5,062.23
98,000.00
462
446
1472
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
63,400.00
25,000.00
88,400.00
63,400.00
25,000.00
464
143
1472
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
96,899.00
25,000.00
121,899.00
96,899.00
25,000.00
465
440
1472
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
131,080.00
25,000.00
156,080.00
131,080.00
25,000.00
463
446
1472
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
63,400.00
25,000.00
88,400.00
63,400.00
25,000.00
467
2794
2954
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
96,652.00
22,500.00
119,152.00
96,652.00
22,500.00
466
2697
2954
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
43,310.00
22,500.00
65,810.00
43,310.00
22,500.00
468
2789
2954
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
132,500.00
22,500.00
155,000.00
132,500.00
22,500.00
CRNA
472
587
2954
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
213,514.00
22,500.00
236,014.00
213,514.00
22,500.00
CRNA
471
586
2954
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
122,402.00
22,500.00
144,902.00
122,402.00
22,500.00
474
588
2954
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
0.00
22,500.00
22,500.00
0.00
22,500.00
470
584
2954
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
0.00
22,500.00
22,500.00
0.00
22,500.00
469
583
2954
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
0.00
22,500.00
22,500.00
0.00
22,500.00
CRNA
CRNA
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
473
9449
2954
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
107,950.76
22,500.00
130,450.76
107,950.76
22,500.00
860
2958
2954
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
250,000.00
22,500.00
272,500.00
250,000.00
22,500.00
476
1011
1473
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
120,750.20
25,000.00
145,750.20
120,750.20
25,000.00
477
450
1473
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
50,694.00
25,000.00
75,694.00
50,694.00
25,000.00
481
2089
2955
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
23,619.00
17,850.00
41,469.00
23,619.00
17,850.00
479
593
2955
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
22,906.00
17,850.00
40,756.00
22,906.00
17,850.00
480
594
2955
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
18,564.00
17,850.00
36,414.00
18,564.00
17,850.00
824
1608
9999
UN
1.00 UN
38.00 %
( 0.00)
( 0.00)
84,233.00
84,233.00
116,241.54
84,233.00
32,008.54
482
3293
603
2956
UN
1.00 UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
351,902.00
197,868.00
19,000.00
568,770.00
351,902.00
197,868.00
19,000.00
483
604
2956
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
101,235.00
19,000.00
120,235.00
101,235.00
19,000.00
484
606
2956
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
85,831.88
19,000.00
104,831.88
85,831.88
19,000.00
485
828
827
841
848
849
1475
2.00
2.00
0.02
2.66
1.28
1.00
UN
UN
UN
UN
ML
ML
UN
( 0.00)
( 0.00)
( 4.00)
( 2.00)
( 2.00)
( 0.00)
1,319.00
1,319.00
53,374.00
3,519.00
5,784.00
22,000.00
45,129.06
2,638.00
2,638.00
1,110.18
9,368.28
7,374.60
22,000.00
CHLLG
CRNA
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
486
825
826
823
829
838
841
853
850
854
852
1474
2.46
1.07
0.77
0.74
0.50
0.04
0.59
0.50
0.44
2.67
1.00
UN
UN
UN
UN
UN
UN
UN
ML
ML
ML
ML
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 4.00)
( 2.00)
( 2.00)
( 2.00)
( 2.00)
( 0.00)
567.00
907.00
1,726.00
3,850.00
36,772.00
53,374.00
1,917.00
2,796.00
6,570.00
1,521.00
16,000.00
52,627.55
1,394.82
970.49
1,329.02
2,849.00
18,386.00
2,220.36
1,134.10
1,397.44
2,881.60
4,064.72
16,000.00
797
2049
422
421
423
2060
841
850
870
875
1474
1.00
1.00
1.00
1.00
0.01
0.01
0.41
0.61
1.05
1.00
UN
UN
UN
UN
UN
UN
UN
ML
ML
ML
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
4,336.00
550.00
345.00
1,074.00
25,736.00
53,374.00
2,796.00
2,007.00
2,532.00
16,000.00
28,449.11
4,336.00
550.00
345.00
1,074.00
360.30
747.24
1,149.16
1,226.28
2,661.13
16,000.00
800
1099
2060
366
841
872
451
1477
1.00
0.04
1.00
0.04
1.85
1.00
1.00
UN
UN
UN
UN
UN
ML
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
2,176.00
25,736.00
4,779.20
53,374.00
9,427.00
3,852.00
28,000.00
59,556.98
2,176.00
1,070.62
4,779.20
2,220.36
17,458.80
3,852.00
28,000.00
715
824
2060
841
872
451
1477
1.00
0.04
0.04
1.00
1.00
1.00
UN
UN
UN
UN
ML
UN
UN
( 0.00)
( 0.00)
( 4.00)
( 0.00)
( 0.00)
( 0.00)
6,307.00
25,736.00
53,374.00
9,427.00
3,852.00
28,000.00
50,965.79
6,307.00
1,070.62
2,309.17
9,427.00
3,852.00
28,000.00
487
830
831
841
843
844
1477
2.77
1.37
0.10
0.95
0.28
1.00
UN
UN
UN
UN
ML
ML
UN
( 0.00)
( 0.00)
( 4.00)
( 2.00)
( 2.00)
( 0.00)
22,244.00
8,676.00
53,374.00
10,955.00
15,267.00
28,000.00
121,649.34
61,615.88
11,886.12
5,550.90
10,391.91
4,204.53
28,000.00
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
798
1033
2074
2060
841
848
1475
3.00
1.00
0.01
0.01
2.71
1.00
UN
UN
UN
UN
UN
ML
UN
( 0.00)
( 0.00)
( 0.00)
( 4.00)
( 2.00)
( 0.00)
730.00
30,742.00
25,736.00
53,374.00
3,519.00
22,000.00
65,617.18
2,190.00
30,742.00
360.30
777.13
9,547.75
22,000.00
488
820
821
818
822
838
861
862
859
863
1476
2.46
1.07
1.51
1.00
0.50
2.67
0.59
0.50
0.44
1.00
UN
UN
UN
UN
UN
UN
ML
ML
ML
ML
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 2.00)
( 2.00)
( 2.00)
( 2.00)
( 0.00)
823.60
1,322.40
2,018.40
4,338.40
36,772.00
5,525.00
7,388.00
12,109.00
19,592.00
11,550.00
74,544.09
2,026.06
1,414.97
3,047.78
4,338.40
18,386.00
14,765.01
4,370.74
6,052.08
8,593.05
11,550.00
489
816
840
2966
1478
0.50
0.01
1.02
1.00
ML
UN
KG
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
870.00
38,000.00
14,500.00
2,436.00
18,056.20
435.00
395.20
14,790.00
2,436.00
490
817
840
2968
1478
0.50
0.01
1.02
1.00
ML
UN
KG
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
1,705.20
38,000.00
12,064.00
2,436.00
15,989.08
852.60
395.20
12,305.28
2,436.00
491
827
841
848
1479
0.50
0.01
1.02
1.00
ML
UN
UN
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
1,319.00
53,374.00
3,519.00
6,006.00
10,809.97
659.50
555.09
3,589.38
6,006.00
492
828
841
849
1479
0.50
0.01
1.02
1.00
ML
UN
UN
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
1,319.00
53,374.00
5,784.00
6,006.00
13,120.27
659.50
555.09
5,899.68
6,006.00
495
821
862
1480
ML
0.50 UN
1.02 ML
1.00 ML
( 0.00)
( 2.00)
( 0.00)
1,322.40
7,388.00
19,089.00
27,285.96
661.20
7,535.76
19,089.00
496
822
ML
0.50 UN
( 0.00)
4,338.40
41,242.04
2,169.20
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
TUBO GALVANIZADO
1"
MdeO RED SUMINISTRO Galv.
863
1480
1.02 ML
1.00 ML
( 2.00)
( 0.00)
19,592.00
19,089.00
19,983.84
19,089.00
497
819
860
1480
ML
0.50 UN
1.02 ML
1.00 ML
( 0.00)
( 2.00)
( 0.00)
7,690.80
26,932.00
19,089.00
50,405.04
3,845.40
27,470.64
19,089.00
493
818
859
1480
ML
0.50 UN
1.02 ML
1.00 ML
( 0.00)
( 2.00)
( 0.00)
2,018.40
12,109.00
19,089.00
32,449.38
1,009.20
12,351.18
19,089.00
494
820
861
1480
ML
0.50 UN
1.02 ML
1.00 ML
( 0.00)
( 2.00)
( 0.00)
823.60
5,525.00
19,089.00
25,136.30
411.80
5,635.50
19,089.00
498
823
841
850
1479
0.50
0.01
1.02
1.00
ML
UN
UN
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
1,726.00
53,374.00
2,796.00
6,006.00
10,276.01
863.00
555.09
2,851.92
6,006.00
500
825
841
852
1479
0.50
0.01
1.02
1.00
ML
UN
UN
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
567.00
53,374.00
1,521.00
6,006.00
8,396.01
283.50
555.09
1,551.42
6,006.00
499
824
841
851
1479
0.50
0.02
1.02
1.00
ML
UN
UN
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
6,307.00
53,374.00
10,073.00
6,006.00
20,544.14
3,153.50
1,110.18
10,274.46
6,006.00
501
826
841
853
1479
0.50
0.01
1.02
1.00
ML
UN
UN
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
907.00
53,374.00
1,917.00
6,006.00
8,969.93
453.50
555.09
1,955.34
6,006.00
502
823
841
854
1479
0.50
0.02
1.02
1.00
ML
UN
UN
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
1,726.00
53,374.00
6,570.00
6,006.00
14,680.58
863.00
1,110.18
6,701.40
6,006.00
REGISTRO 1"
REGISTRO PASO Dto.1" RED WHIT
UNIVERSAL GALVANIZADO 1"
MdeO REGISTRO
503
835
876
1481
UN
1.00 UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
50,228.00
6,140.00
12,000.00
68,368.00
50,228.00
6,140.00
12,000.00
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
REGISTRO 1/2"
REGISTRO PASO Dto. " RED WH
UNIVERSAL GALVANIZADO "
MdeO REGISTRO
504
837
877
1481
UN
1.00 UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
44,080.00
3,720.00
12,000.00
59,800.00
44,080.00
3,720.00
12,000.00
REGISTRO 3/4"
REGISTRO PASO Dto. 3/4"RED WH
UNIVERSAL GALVANIZADO 3/4"
MdeO REGISTRO
505
838
878
1481
UN
1.00 UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
36,772.00
5,070.00
12,000.00
53,842.00
36,772.00
5,070.00
12,000.00
506
1481
UN
1.00 UN
( 0.00)
12,000.00
12,000.00
12,000.00
507
830
841
846
1468
0.14
0.01
1.02
1.00
ML
UN
UN
ML
ML
( 0.00)
( 4.00)
( 2.00)
( 0.00)
22,244.00
53,374.00
6,237.00
4,800.00
14,830.99
3,114.16
555.09
6,361.74
4,800.00
510
813
70
611
1482
1.00
1.58
1.00
1.00
UN
UN
KG
UN
UN
( 0.00)
( 5.00)
( 0.00)
( 0.00)
1,200.00
908.28
158,295.00
20,000.00
180,925.54
1,200.00
1,430.54
158,295.00
20,000.00
509
813
70
611
1482
1.00
1.58
1.00
1.00
UN
UN
KG
UN
UN
( 0.00)
( 5.00)
( 0.00)
( 0.00)
1,200.00
908.28
158,295.00
20,000.00
180,925.54
1,200.00
1,430.54
158,295.00
20,000.00
392
813
70
2792
1482
1.00
1.58
1.00
1.00
UN
UN
KG
UN
UN
( 0.00)
( 5.00)
( 0.00)
( 0.00)
1,200.00
908.28
184,063.00
20,000.00
206,693.54
1,200.00
1,430.54
184,063.00
20,000.00
511
813
70
614
1482
1.00
1.58
1.00
1.00
UN
UN
KG
UN
UN
( 0.00)
( 5.00)
( 0.00)
( 0.00)
1,200.00
908.28
188,665.00
20,000.00
211,295.54
1,200.00
1,430.54
188,665.00
20,000.00
513
813
70
616
1482
1.00
1.58
1.00
1.00
UN
UN
KG
UN
UN
( 0.00)
( 5.00)
( 0.00)
( 0.00)
1,200.00
908.28
322,111.00
20,000.00
344,741.54
1,200.00
1,430.54
322,111.00
20,000.00
UN
1.00 UN
( 0.00)
1,200.00
22,630.54
1,200.00
512
813
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
APU Componentes
CEMENTO BLANCO 40 Kg
SANITARIO VICTORIANA CRNA.
MdeO SANITARIO TANQUE (INSTALACION)
Cd.
Valor Total
70
615
1482
1.58 KG
1.00 UN
1.00 UN
( 5.00)
( 0.00)
( 0.00)
908.28
0.00
20,000.00
1,430.54
0.00
20,000.00
SANITARIO FLUXOMETRO
FLUXOMETRO
TAZA FLUXOMETRO INSTIT. CRNA
MdeO SANITARIO FLUXOMETRO
514
3281
2796
3280
UN
1.00 UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
351,902.00
512,432.32
35,889.00
900,223.32
351,902.00
512,432.32
35,889.00
410
3281
3285
3280
UN
1.00 UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
351,902.00
533,783.28
35,889.00
921,574.28
351,902.00
533,783.28
35,889.00
424
813
70
3286
1482
1.00
1.58
1.00
1.00
UN
UN
KG
UN
UN
( 0.00)
( 5.00)
( 0.00)
( 0.00)
1,200.00
908.28
266,891.64
20,000.00
289,522.18
1,200.00
1,430.54
266,891.64
20,000.00
508
813
70
610
1482
1.00
1.58
1.00
1.00
UN
UN
KG
UN
UN
( 0.00)
( 5.00)
( 0.00)
( 0.00)
1,200.00
908.28
224,189.72
20,000.00
246,820.26
1,200.00
1,430.54
224,189.72
20,000.00
833
813
70
2947
1482
1.00
1.58
1.00
1.00
UN
UN
KG
UN
UN
( 0.00)
( 5.00)
( 0.00)
( 0.00)
1,200.00
908.28
168,000.00
20,000.00
190,630.54
1,200.00
1,430.54
168,000.00
20,000.00
515
813
70
79
1482
1.00
1.58
1.00
1.00
UN
UN
KG
UN
UN
( 0.00)
( 5.00)
( 0.00)
( 0.00)
1,200.00
908.28
190,000.00
20,000.00
212,630.54
1,200.00
1,430.54
190,000.00
20,000.00
831
813
70
2768
1482
1.00
1.58
1.00
1.00
UN
UN
KG
UN
UN
( 0.00)
( 5.00)
( 0.00)
( 0.00)
1,200.00
908.28
335,000.00
20,000.00
357,630.54
1,200.00
1,430.54
335,000.00
20,000.00
832
813
70
2851
1482
1.00
1.58
1.00
1.00
UN
UN
KG
UN
UN
( 0.00)
( 5.00)
( 0.00)
( 0.00)
1,200.00
908.28
360,000.00
20,000.00
382,630.54
1,200.00
1,430.54
360,000.00
20,000.00
454
627
UN
1.00 UN
( 0.00)
60,003.00
82,788.00
60,003.00
INST.HIDRAULIC/SANIT/LATONERIA (11)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
2952
1.00 UN
( 0.00)
22,785.00
22,785.00
521
551
2528
1485
UN
1.00 UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
5,541.00
1,587,808.00
19,950.00
1,613,299.00
5,541.00
1,587,808.00
19,950.00
1033
A 267
551
3553
1873
4003
2936
2115
0.31
1.00
1.00
10.50
1.00
5.00
1.00
UN
M3
UN
UN
UN
UN
%M
UN
( 3.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
185,724.60
5,541.00
260,253.00
607.00
868,000.00
101,244.50
98,000.00
1,300,618.63
57,388.90
5,541.00
260,253.00
6,373.50
868,000.00
5,062.23
98,000.00
1032
A 267
551
3553
1873
4005
2936
2115
0.31
1.00
1.00
10.50
1.00
5.00
1.00
UN
M3
UN
UN
UN
UN
%M
UN
( 3.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
185,724.60
5,541.00
260,253.00
607.00
1,070,000.00
101,244.50
98,000.00
1,502,618.63
57,388.90
5,541.00
260,253.00
6,373.50
1,070,000.00
5,062.23
98,000.00
TRAGANTES 4"
CEMENTO GRIS (constructor)
CUPULA TRADICIONAL C-4"x2" Al.
MdeO TRAGANTE
522
581
1118
1486
UN
1.00 KG
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
240.00
6,704.80
4,389.00
11,333.80
240.00
6,704.80
4,389.00
524
581
632
1487
UN
0.20 KG
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
240.00
1,800.00
3,050.00
4,898.00
48.00
1,800.00
3,050.00
MAMPOSTERIA (4)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
121
9
2653
892
20
923
1306
0.09
0.02
0.37
0.77
0.18
1.00
ML
KG
M3
ML
KG
ML
ML
( 5.00)
( 4.00)
( 2.00)
( 5.00)
( 2.00)
( 0.00)
3,271.20
300,556.00
1,086.92
2,173.84
2,590.28
15,250.00
24,334.46
291.95
6,251.56
399.12
1,666.25
475.58
15,250.00
122
9
2653
892
20
923
1306
0.11
0.02
0.37
1.05
0.18
1.00
ML
KG
M3
ML
KG
ML
ML
( 5.00)
( 4.00)
( 2.00)
( 5.00)
( 0.00)
( 0.00)
3,271.20
300,556.00
1,086.92
2,173.84
2,590.28
15,250.00
25,008.40
358.93
6,251.56
399.12
2,282.53
466.25
15,250.00
123
A 267
122
678
1306
0.01
12.60
0.09
1.00
ML
M3
UN
KG
ML
( 4.00)
( 5.00)
( 0.00)
( 0.00)
185,724.60
462.00
4,002.00
15,250.00
22,822.09
1,390.71
5,821.20
360.18
15,250.00
120
A 267
139
678
1306
0.01
16.28
0.09
1.00
ML
M3
UN
KG
ML
( 4.00)
( 5.00)
( 5.00)
( 0.00)
185,724.60
504.00
4,002.00
15,250.00
25,202.59
1,390.71
8,202.60
359.28
15,250.00
125
A 271
891
122
525
943
1652
1307
0.01
4.00
16.25
0.40
1.57
1.00
1.00
ML
M3
ML
UN
LB
ML
DD
ML
( 4.00)
( 2.00)
( 8.00)
( 8.00)
( 2.00)
( 0.00)
( 0.00)
134,396.11
830.56
462.00
2,945.24
2,474.28
139.20
34,125.00
51,499.79
1,341.81
3,320.91
7,509.35
1,176.92
3,886.60
139.20
34,125.00
126
A 861
139
1308
ML
0.02 M3
21.00 UN
1.00 ML
( 4.00)
( 5.00)
( 0.00)
163,717.78
504.00
12,000.00
25,138.00
2,554.00
10,584.00
12,000.00
979
M2
41,167.33
MAMPOSTERIA (4)
10/07/2006 Bogot
APU Componentes
MORTERO 1 : 5 ARENA PEA (M3)
BLOQUE #4 STA/FE 33x23x9 Obra
MdeO BLOQUE #4 Tab .23
Cd.
Valor Total
A 271
114
1323
0.04 M3
30.45 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
881.00
8,750.00
5,590.88
26,826.45
8,750.00
128
A 861
114
1310
M2
0.01 M3
13.13 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
163,717.78
881.00
6,000.00
19,946.86
2,383.73
11,563.13
6,000.00
127
A 861
1965
1310
M2
0.01 M3
13.13 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
163,717.78
870.00
6,000.00
19,802.48
2,383.73
11,418.75
6,000.00
905
A 861
1966
1311
M2
0.04 M3
24.15 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
163,717.78
910.00
6,250.00
35,037.16
6,810.66
21,976.50
6,250.00
132
A 861
116
1311
M2
0.04 M3
24.15 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
163,717.78
913.00
6,250.00
35,109.61
6,810.66
22,048.95
6,250.00
904
A 861
1966
1310
M2
0.02 M3
13.13 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
163,717.78
910.00
6,000.00
20,838.28
2,894.53
11,943.75
6,000.00
129
A 861
1779
1310
M2
0.02 M3
13.13 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
163,717.78
720.00
6,000.00
18,344.53
2,894.53
9,450.00
6,000.00
131
A 861
116
1310
M2
0.02 M3
13.13 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
163,717.78
913.00
6,000.00
20,877.66
2,894.53
11,983.13
6,000.00
130
A 861
2148
1311
M2
0.03 M3
30.45 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
163,717.78
795.00
6,250.00
35,565.74
5,107.99
24,207.75
6,250.00
641
A 861
1340
1310
M2
0.01 M3
12.60 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
163,717.78
0.00
6,000.00
8,213.46
2,213.46
0.00
6,000.00
134
A 271
106
m2
0.01 M3
12.60 UN
( 4.00)
( 5.00)
134,396.11
1,200.00
23,937.04
1,817.04
15,120.00
MAMPOSTERIA (4)
10/07/2006 Bogot
APU Componentes
MdeO BLOQUE CONCRETO 0.10
Cd.
Valor Total
1312
1.00 M2
( 0.00)
7,000.00
7,000.00
750
A 271
2624
1312
M2
0.01 M3
12.60 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
0.00
7,000.00
8,817.04
1,817.04
0.00
7,000.00
135
A 271
107
1313
M2
0.03 M3
12.60 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
1,800.00
3,885.00
30,758.16
4,193.16
22,680.00
3,885.00
988
A 271
2912
2932
M2
0.02 M3
13.13 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
1,176.00
7,500.00
26,009.98
3,074.98
15,435.00
7,500.00
983
A 271
A 178
112
2933
0.01
1.00
12.88
1.00
M2
M3
M2
UN
M2
( 4.00)
( 0.00)
( 3.00)
( 0.00)
134,396.11
7,217.40
1,000.00
4,095.00
26,004.44
1,817.04
7,217.40
12,875.00
4,095.00
989
A 271
112
2933
M2
0.01 M3
13.13 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
1,000.00
4,095.00
19,037.04
1,817.04
13,125.00
4,095.00
766
A 271
A 178
1789
2933
0.01
1.00
12.88
1.00
M2
M3
M2
UN
M2
( 4.00)
( 0.00)
( 3.00)
( 0.00)
134,396.11
7,217.40
0.00
4,095.00
13,129.44
1,817.04
7,217.40
0.00
4,095.00
765
A 271
1877
2932
M2
0.01 M3
13.13 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
0.00
7,500.00
8,939.65
1,439.65
0.00
7,500.00
743
A 271
1789
2933
M2
0.01 M3
13.13 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
0.00
4,095.00
5,912.04
1,817.04
0.00
4,095.00
136
A 271
891
122
525
943
1315
0.02
16.42
66.15
0.65
16.65
1.00
M2
M3
ML
UN
LB
ML
M2
( 4.00)
( 2.00)
( 5.00)
( 8.00)
( 2.00)
( 0.00)
134,396.11
830.56
462.00
2,945.24
2,474.28
23,100.00
112,423.82
2,026.69
13,639.46
30,561.30
1,908.52
41,187.85
23,100.00
MAMPOSTERIA (4)
10/07/2006 Bogot
APU Componentes
Cd.
531
A 861
3287
3288
CHIMENEA DE 0.80 M.
CONCRETO 1:2:4 AreLavRio+Grav.
MORTERO 1:4 ARENA Lav.PEA(M3)
ALAMBRE NEGRO Cal. 18
HIERRO A-40 Liso/Rect "
LADRILLO PRECOCIDO COMUN 12x24x6 Dep.
TABLON -26-6 Vitrif. MOORE
MdeO CHIMENEAS
138
A 256
A 861
9
20
123
1925
1318
139
A 156
122
1327
140
A 269
116
20
1331
0.01
3.78
1.44
1.00
Valor Total
UN
0.00 M3
1.05 UN
1.00 UN
( 5.00)
( 5.00)
( 0.00)
163,717.78
754.00
1,050.00
2,013.60
171.90
791.70
1,050.00
UN
M3
M3
KG
KG
UN
M2
UN
( 4.00)
( 4.00)
( 0.00)
( 5.00)
( 5.00)
( 4.00)
( 0.00)
234,940.00
163,717.78
3,271.20
2,173.84
330.00
15,450.00
178,500.00
293,915.16
11,972.54
21,572.76
588.82
9,677.94
52,321.50
19,281.60
178,500.00
ML
0.02 M3
36.75 UN
1.00 ML
(10.00)
( 5.00)
( 0.00)
243,871.56
462.00
5,000.00
26,002.38
4,023.88
16,978.50
5,000.00
ML
M3
UN
KG
ML
( 4.00)
( 5.00)
( 2.00)
( 0.00)
149,510.93
913.00
2,173.84
15,000.00
23,132.47
1,554.91
3,451.14
3,126.42
15,000.00
141
A 269
20
1331
ML
0.01 M3
1.44 KG
1.00 ML
( 4.00)
( 2.00)
( 0.00)
149,510.93
2,173.84
15,000.00
19,681.33
1,554.91
3,126.42
15,000.00
981
A 256
9
20
525
2667
942
2672
1331
0.04
0.11
2.73
0.25
0.71
0.51
0.92
1.00
ML
M3
KG
KG
LB
ML
ML
ML
ML
( 3.00)
( 0.00)
( 5.00)
( 0.00)
( 2.00)
( 2.00)
( 2.00)
( 0.00)
234,940.00
3,271.20
2,173.84
2,945.24
1,595.00
3,286.28
1,267.88
15,000.00
35,689.00
9,679.53
359.83
5,934.58
736.31
1,138.83
1,676.00
1,163.91
15,000.00
982
A 256
9
20
525
2667
942
2672
1331
0.06
0.11
2.73
0.25
0.61
0.51
0.71
1.00
ML
M3
KG
KG
LB
ML
ML
ML
ML
( 3.00)
( 0.00)
( 5.00)
( 0.00)
( 2.00)
( 2.00)
( 2.00)
( 0.00)
234,940.00
3,271.20
2,173.84
2,945.24
1,595.00
3,286.28
1,267.88
15,000.00
40,107.43
14,519.29
359.83
5,934.58
736.31
976.14
1,676.00
905.27
15,000.00
215
0.05
0.13
0.18
4.45
158.55
1.25
1.00
ML
49,280.93
MAMPOSTERIA (4)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
A 256
9
20
525
2667
942
2672
1331
0.09
0.12
2.87
0.35
0.81
0.71
0.96
1.00
M3
KG
KG
LB
ML
ML
ML
ML
( 3.00)
( 0.00)
( 5.00)
( 0.00)
( 2.00)
( 2.00)
( 2.00)
( 0.00)
234,940.00
3,271.20
2,173.84
2,945.24
1,595.00
3,286.28
1,267.88
15,000.00
21,778.94
392.54
6,231.31
1,030.83
1,285.25
2,346.40
1,215.64
15,000.00
970
A 861
20
943
2672
1331
0.01
2.40
0.20
0.40
1.00
ML
M3
KG
ML
ML
ML
( 3.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
163,717.78
2,173.84
2,474.28
1,267.88
15,000.00
22,601.98
1,382.76
5,217.22
494.86
507.15
15,000.00
971
A 861
20
943
2672
1331
0.01
2.40
0.30
0.40
1.00
ML
M3
KG
ML
ML
ML
( 3.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
163,717.78
2,173.84
2,474.28
1,267.88
15,000.00
23,760.01
2,293.36
5,217.22
742.28
507.15
15,000.00
DINTEL PREFABRICADO
CONCRETO 1:3:4 AreLavRio+Grav.
ALAMBRE NEGRO Cal. 18
HIERRO A-40 Liso/Rect "
PUNTILLA 2" CON CABEZA
REPISA 8x.4x.3
TABLA CHAPA .30x.025x3 ORDINAR
VARA DE CLAVO 6 METROS.
MdeO DINTEL
MdeO DINTEL COLOCACION
142
A 258
9
20
525
940
943
2672
1331
1330
0.03
0.13
2.58
0.22
0.71
0.59
1.12
1.00
1.00
ML
M3
KG
KG
LB
ML
ML
ML
ML
ML
( 4.00)
( 5.00)
( 3.00)
( 8.00)
( 2.00)
( 2.00)
( 2.00)
( 0.00)
( 0.00)
225,368.00
3,271.20
2,173.84
2,945.24
615.96
2,474.28
1,267.88
15,000.00
5,565.00
37,568.60
7,031.48
412.17
5,597.64
636.17
439.80
1,463.78
1,422.56
15,000.00
5,565.00
143
A 861
139
678
1333
0.01
12.48
0.07
1.00
ML
M3
UN
KG
ML
( 4.00)
( 4.00)
( 0.00)
( 0.00)
163,717.78
504.00
4,002.00
3,900.00
12,172.72
1,702.66
6,289.92
280.14
3,900.00
771
A 861
2570
678
1333
0.01
12.48
0.07
1.00
ML
M3
UN
KG
ML
( 4.00)
( 4.00)
( 0.00)
( 0.00)
163,717.78
0.00
4,002.00
3,900.00
5,882.80
1,702.66
0.00
280.14
3,900.00
144
A 269
2157
678
1334
0.01
37.44
0.19
1.00
M2
M3
UN
KG
M2
( 4.00)
( 4.00)
( 2.00)
( 0.00)
149,510.93
511.00
4,002.00
8,750.00
30,212.34
1,554.91
19,131.84
775.59
8,750.00
MAMPOSTERIA (4)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
759
A 156
122
1335
M2
0.02 M3
33.00 UN
1.00 ML
( 4.00)
(10.00)
( 0.00)
243,871.56
462.00
6,300.00
25,604.02
4,058.02
15,246.00
6,300.00
147
A 258
1316
M2
0.01 M3
1.00 M2
( 2.00)
( 0.00)
225,368.00
5,250.00
7,548.75
2,298.75
5,250.00
146
1336
PS
1.00 UN
( 0.00)
28,350.00
28,350.00
28,350.00
148
A 861
114
1314
UN
0.01 M3
13.65 UN
1.00 UN
( 4.00)
( 5.00)
( 0.00)
163,717.78
881.00
3,675.00
16,892.52
1,191.87
12,025.65
3,675.00
780
A 271
2651
270
128
1284
0.02
0.00
1.75
33.66
1.00
M2
M3
M3
KG
UN
M2
( 4.00)
( 5.00)
( 3.00)
( 2.00)
( 0.00)
134,396.11
266,916.00
0.00
837.00
8,750.00
39,999.12
2,795.44
280.26
0.00
28,173.42
8,750.00
781
A 271
2651
270
128
1284
0.04
0.00
3.61
65.79
1.00
M2
M3
M3
KG
UN
M2
( 4.00)
( 5.00)
( 3.00)
( 2.00)
( 0.00)
134,396.11
266,916.00
0.00
837.00
8,750.00
69,492.98
4,892.02
784.73
0.00
55,066.23
8,750.00
908
A 271
2651
270
2931
1284
0.02
0.00
1.75
33.66
1.00
M2
M3
M3
KG
UN
M2
( 4.00)
( 5.00)
( 3.00)
( 2.00)
( 0.00)
134,396.11
266,916.00
0.00
350.00
8,750.00
23,606.70
2,795.44
280.26
0.00
11,781.00
8,750.00
907
A 271
2651
270
2931
1284
0.04
0.00
3.61
65.79
1.00
M2
M3
M3
KG
UN
M2
( 4.00)
( 5.00)
( 3.00)
( 2.00)
( 0.00)
134,396.11
266,916.00
0.00
350.00
8,750.00
37,453.25
4,892.02
784.73
0.00
23,026.50
8,750.00
149
885
2653
20
525
943
0.66
0.10
8.16
0.21
0.47
M2
ML
M3
KG
LB
ML
( 2.00)
( 4.00)
( 2.00)
( 8.00)
( 2.00)
3,286.28
300,556.00
2,173.84
2,945.24
2,474.28
67,010.46
2,178.80
31,257.82
17,738.53
604.36
1,160.93
MESONES EN CONCRETO
CERCO ORDINARIO 3Mx10cmx10cm
CONCRETO 2500 PSI (175N)
HIERRO A-40 Liso/Rect "
PUNTILLA 2" CON CABEZA
TABLA CHAPA .30x.025x3 ORDINAR
MAMPOSTERIA (4)
10/07/2006 Bogot
APU Componentes
MdeO MESONES EN CONCRETO
Cd.
Valor Total
1337
1.00 UN
( 0.00)
14,070.00
14,070.00
MURO LADRIBLOC
STA/FE
MORTERO 1 : 5 ARENA PEA (M3)
LADRIBLOC 14 STA/FE 39x14x19 Obra
MdeO MURO LADRIBLOC
977
A 271
120
2904
M2
0.03 M3
13.13 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
1,559.00
3,150.00
27,805.03
4,193.16
20,461.88
3,150.00
664
A 271
122
58
M2
0.02 M3
31.50 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
462.00
6,000.00
22,789.35
2,236.35
14,553.00
6,000.00
987
A 271
1873
1350
M2
0.02 M3
28.75 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
607.00
4,580.00
24,266.99
2,236.35
17,450.64
4,580.00
972
A 271
123
1350
M2
0.02 M3
31.50 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
330.00
4,580.00
17,211.35
2,236.35
10,395.00
4,580.00
161
A 271
139
1350
M2
0.02 M3
31.50 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
504.00
4,580.00
22,692.35
2,236.35
15,876.00
4,580.00
152
A 271
123
1343
M2
0.07 M3
113.40 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
330.00
9,850.00
57,056.04
9,784.04
37,422.00
9,850.00
974
A 271
122
17
M2
0.07 M3
123.90 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
462.00
12,400.00
79,425.84
9,784.04
57,241.80
12,400.00
160
A 271
1969
2899
M2
0.07 M3
117.60 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
307.00
5,040.00
50,927.24
9,784.04
36,103.20
5,040.00
909
A 271
1710
2899
M2
0.07 M3
117.60 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
415.00
5,040.00
63,628.04
9,784.04
48,804.00
5,040.00
985
A 271
1873
2899
M2
0.08 M3
111.30 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
607.00
5,040.00
83,082.00
10,482.90
67,559.10
5,040.00
MAMPOSTERIA (4)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
666
A 271
1209
2899
M2
0.07 M3
115.50 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
0.00
5,040.00
14,824.04
9,784.04
0.00
5,040.00
163
A 271
139
2899
M2
0.07 M3
115.50 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
504.00
5,040.00
73,036.04
9,784.04
58,212.00
5,040.00
744
A 271
2483
1326
M2
0.07 M3
63.00 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
0.00
6,900.00
16,684.04
9,784.04
0.00
6,900.00
745
A 271
1309
2928
M2
0.02 M3
63.00 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
0.00
6,900.00
9,835.21
2,935.21
0.00
6,900.00
155
A 271
2452
1346
M2
0.04 M3
65.10 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
0.00
6,550.00
11,442.02
4,892.02
0.00
6,550.00
986
A 271
1873
1351
M2
0.04 M3
55.65 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
607.00
5,375.00
44,046.57
4,892.02
33,779.55
5,375.00
910
A 271
2930
1351
M2
0.04 M3
58.80 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
483.00
5,375.00
38,667.42
4,892.02
28,400.40
5,375.00
772
A 271
2577
1326
M2
0.04 M3
63.00 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
0.00
6,900.00
11,792.02
4,892.02
0.00
6,900.00
86
A 271
123
1351
M2
0.04 M3
58.80 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
330.00
5,375.00
29,671.02
4,892.02
19,404.00
5,375.00
159
A 271
122
1326
M2
0.04 M3
63.00 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
462.00
6,900.00
40,898.02
4,892.02
29,106.00
6,900.00
980
A 271
M2
0.04 M3
( 4.00)
134,396.11
28,328.02
4,892.02
MAMPOSTERIA (4)
10/07/2006 Bogot
APU Componentes
LADRILLO REJILLA YOMASA 24x12x7 Cocido
MdeO MURO TBQUE TOLETE
Cd.
Valor Total
1969
1342
63.00 UN
1.00 M2
( 5.00)
( 0.00)
307.00
4,095.00
19,341.00
4,095.00
162
A 271
139
1351
M2
0.04 M3
58.80 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
504.00
5,375.00
39,902.22
4,892.02
29,635.20
5,375.00
990
A 271
139
2928
M2
0.04 M3
58.80 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
504.00
6,900.00
41,427.22
4,892.02
29,635.20
6,900.00
991
A 271
2153
1342
M2
0.04 M3
59.98 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
365.00
4,095.00
30,878.26
4,892.02
21,891.24
4,095.00
984
A 271
1209
2928
M2
0.04 M3
58.80 UN
1.00 M2
( 4.00)
( 5.00)
( 0.00)
134,396.11
0.00
6,900.00
11,792.02
4,892.02
0.00
6,900.00
874
1078
3322
127
M2
0.05 GN
1.00 M2
1.00 UN
( 2.00)
( 0.00)
( 0.00)
40,650.00
12,600.00
20,880.00
35,553.15
2,073.15
12,600.00
20,880.00
877
1078
3322
3321
M2
0.05 GN
1.00 M2
1.00 UN
( 2.00)
( 0.00)
( 0.00)
40,650.00
12,600.00
34,800.00
49,473.15
2,073.15
12,600.00
34,800.00
POYOS COCINA-CALENTADOR
MORTERO 1:4 ARENA Lav.PEA(M3)
LADRILLO PRECOCIDO COMUN 12x24x6 Dep.
MdeO POYO COCINA
150
A 861
123
1339
ML
0.02 M3
4.20 UN
1.00 ML
( 4.00)
( 5.00)
( 0.00)
163,717.78
330.00
5,500.00
9,440.00
2,554.00
1,386.00
5,500.00
153
A 861
122
1344
ML
0.01 M3
15.75 UN
1.00 ML
( 4.00)
( 5.00)
( 0.00)
163,717.78
462.00
3,800.00
12,779.16
1,702.66
7,276.50
3,800.00
154
72
1345
M2
0.02 KG
1.00 M2
( 1.00)
( 0.00)
9,000.00
1,365.00
1,546.80
181.80
1,365.00
ML
M3
UN
KG
ML
( 4.00)
( 5.00)
( 2.00)
( 0.00)
149,510.93
0.00
4,002.00
5,500.00
8,483.63
1,554.91
0.00
1,428.71
5,500.00
REPLANTEO INTERIOR
COLOR MINERAL ROJO
MdeO REPLANTEO INTERIOR
SOBRECIMIENTOS (0.12) CONCRETODO
MORTERO 1 : 4 ARENA PEA (M3)
BLOQUE ESTRUCT. CONCRETODO 12x20x40
SIKA 1
20 KILOS
MdeO SOBRECIMIENTOS .12/.15
768
A 269
2625
678
1348
0.01
5.25
0.36
1.00
MAMPOSTERIA (4)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
SOBRECIMIENTOS (0.15)
MORTERO 1 : 5 ARENA PEA (M3)
LADRILLO PRECOCIDO COMUN 12x24x6 Dep.
SIKA 1
20 KILOS
MdeO SOBRECIMIENTOS .12/.15
157
A 271
123
678
1348
0.02
12.60
0.36
1.00
ML
M3
UN
KG
ML
( 4.00)
( 5.00)
( 2.00)
( 0.00)
134,396.11
330.00
4,002.00
5,500.00
13,882.15
2,795.44
4,158.00
1,428.71
5,500.00
SOBRECIMIENTOS (0.15)
MORTERO 1 : 4 ARENA PEA (M3)
BLOQUE ESTRUCT. CONCRETODO 15x20x40
SIKA 1
20 KILOS
MdeO SOBRECIMIENTOS .12/.15
767
A 269
2637
678
1348
0.01
5.25
0.36
1.00
ML
M3
UN
KG
ML
( 4.00)
( 5.00)
( 2.00)
( 0.00)
149,510.93
0.00
4,002.00
5,500.00
8,483.63
1,554.91
0.00
1,428.71
5,500.00
SOBRECIMIENTOS (0.25)
MORTERO 1 : 5 ARENA PEA (M3)
LADRILLO PRECOCIDO COMUN 12x24x6 Dep.
SIKA 1
20 KILOS
MdeO SOBRECIMIENTOS 0.25
158
A 271
123
678
1349
0.03
24.15
0.54
1.00
ML
M3
UN
KG
ML
( 4.00)
( 5.00)
( 2.00)
( 0.00)
134,396.11
330.00
4,002.00
5,500.00
19,826.14
4,193.16
7,969.50
2,163.48
5,500.00
Cd.
Valor Total
254
636
64
581
84
1406
230.00
0.77
453.60
0.75
1.00
M3
LT
M3
KG
M3
M3
( 0.00)
(15.00)
( 8.00)
(12.00)
( 0.00)
90.00
80,000.00
240.00
80,000.00
10,000.00
261,236.00
20,700.00
61,640.00
108,864.00
60,032.00
10,000.00
255
636
64
581
84
1406
210.00
0.64
378.00
0.84
1.00
M3
LT
M3
KG
M3
M3
( 0.00)
(15.00)
( 8.00)
( 0.00)
( 0.00)
90.00
80,000.00
240.00
80,000.00
10,000.00
237,480.00
18,900.00
51,060.00
90,720.00
66,800.00
10,000.00
256
636
64
581
84
1406
204.00
0.55
324.00
1.06
1.00
M3
LT
M3
KG
M3
M3
( 0.00)
(15.00)
( 8.00)
(12.00)
( 0.00)
90.00
80,000.00
240.00
80,000.00
10,000.00
234,940.00
18,360.00
43,700.00
77,760.00
85,120.00
10,000.00
257
636
64
581
84
1406
184.00
0.82
324.00
0.80
1.00
M3
LT
M3
KG
M3
M3
( 0.00)
(15.00)
( 8.00)
(12.00)
( 0.00)
90.00
80,000.00
240.00
80,000.00
10,000.00
234,164.00
16,560.00
65,780.00
77,760.00
64,064.00
10,000.00
258
636
64
581
84
1406
174.00
0.72
280.80
0.94
1.00
M3
LT
M3
KG
M3
M3
( 0.00)
(15.00)
( 8.00)
(12.00)
( 0.00)
90.00
80,000.00
240.00
80,000.00
10,000.00
225,368.00
15,660.00
57,500.00
67,392.00
74,816.00
10,000.00
259
636
64
581
84
1406
164.00
0.64
248.40
1.03
1.00
M3
LT
M3
KG
M3
M3
( 0.00)
(15.00)
( 8.00)
(12.00)
( 0.00)
90.00
80,000.00
240.00
80,000.00
10,000.00
217,868.00
14,760.00
51,060.00
59,616.00
82,432.00
10,000.00
ENSAYOS
260
MS
17,400.00
Cd.
Valor Total
1656
1.00 MES
( 0.00)
17,400.00
17,400.00
261
1681
UN
1.00 UN
( 0.00)
31,784.00
31,784.00
31,784.00
ENSAYOS PROCTOR
ENSAYOS PROCTOR
262
1682
UN
1.00 UN
( 0.00)
42,456.00
42,456.00
42,456.00
270
636
60
581
1408
0.18
0.00
0.36
1.00
LT
LT
M3
KG
LT
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
26,666.00
240.00
12.00
144.09
16.20
28.53
87.36
12.00
269
636
60
581
1407
180.00
1.20
378.56
1.00
M3
LT
M3
KG
M3
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
26,666.00
240.00
10,500.00
149,510.93
16,200.00
31,956.53
90,854.40
10,500.00
272
636
60
581
1408
0.17
0.00
0.30
1.00
LT
LT
M3
KG
LT
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
26,666.00
240.00
12.00
131.32
15.30
31.39
72.63
12.00
271
636
60
581
1407
205.00
1.23
302.64
1.00
M3
LT
M3
KG
M3
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
26,666.00
240.00
10,500.00
134,396.11
18,450.00
32,812.51
72,633.60
10,500.00
274
636
60
581
1408
0.16
0.00
0.26
1.00
LT
LT
M3
KG
LT
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
26,666.00
240.00
12.00
120.44
14.40
31.39
62.65
12.00
273
636
60
581
1407
190.00
1.26
261.04
1.00
M3
LT
M3
KG
M3
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
26,666.00
240.00
10,500.00
123,918.09
17,100.00
33,668.49
62,649.60
10,500.00
276
636
60
581
1408
0.15
0.00
0.23
1.00
LT
LT
M3
KG
LT
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
26,666.00
240.00
12.00
111.80
13.50
31.39
54.91
12.00
M3
152.00 LT
( 0.00)
90.00
113,331.14
13,680.00
275
636
Cd.
ARENA DE PEA
CEMENTO GRIS (constructor)
MdeO MORTERO
60
581
1407
264
636
60
581
1408
Valor Total
1.28 M3
228.80 KG
1.00 M3
( 7.00)
( 4.00)
( 0.00)
26,666.00
240.00
10,500.00
34,239.14
54,912.00
10,500.00
0.13
0.00
0.14
1.00
LT
LT
M3
KG
LT
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
26,666.00
240.00
12.00
89.03
11.70
31.39
33.95
12.00
263
636
60
581
1407
130.00
1.25
169.52
1.00
M3
LT
M3
KG
M3
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
26,666.00
240.00
10,500.00
96,267.97
11,700.00
33,383.17
40,684.80
10,500.00
266
636
62
581
1408
0.25
0.00
0.61
1.00
LT
LT
M3
KG
LT
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
38,333.00
240.00
12.00
214.58
22.50
32.81
147.26
12.00
265
636
62
581
1407
250.00
0.89
613.60
1.00
M3
LT
M3
KG
M3
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
38,333.00
240.00
10,500.00
214,307.54
22,500.00
34,043.54
147,264.00
10,500.00
268
636
62
581
1408
0.20
0.00
0.45
1.00
LT
LT
M3
KG
LT
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
38,333.00
240.00
12.00
175.99
18.00
36.91
109.08
12.00
267
636
62
581
1407
235.00
1.09
468.00
1.00
M3
LT
M3
KG
M3
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
38,333.00
240.00
10,500.00
185,724.60
21,150.00
41,754.60
112,320.00
10,500.00
156
636
62
581
678
1407
235.00
1.09
472.16
14.28
1.00
M3
LT
M3
KG
KG
M3
( 0.00)
( 7.00)
( 4.00)
( 2.00)
( 0.00)
90.00
38,333.00
240.00
4,002.00
10,500.00
243,871.56
21,150.00
41,754.60
113,318.40
57,148.56
10,500.00
348
636
62
581
LT
0.21 LT
0.00 M3
0.45 KG
( 0.00)
( 7.00)
( 4.00)
90.00
38,333.00
240.00
234.04
18.90
36.91
109.08
Cd.
Valor Total
678
1408
0.01 KG
1.00 LT
( 2.00)
( 0.00)
4,002.00
12.00
57.15
12.00
862
636
62
581
1408
0.20
0.00
0.36
1.00
LT
LT
M3
KG
LT
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
38,333.00
240.00
12.00
158.38
18.00
41.02
87.36
12.00
861
636
62
581
1407
235.00
1.17
364.00
1.00
M3
LT
M3
KG
M3
( 0.00)
( 7.00)
( 4.00)
( 0.00)
90.00
38,333.00
240.00
10,500.00
163,717.78
21,150.00
44,707.78
87,360.00
10,500.00
PAETES/REPELLOS/REVOQUES (5)
10/07/2006 Bogot
APU Componentes
Cd.
164
34
525
940
1354
0.85
0.04
2.20
1.00
Valor Total
M2
UN
LB
ML
M2
( 2.00)
( 8.00)
( 2.00)
( 0.00)
5,486.00
2,945.24
615.96
8,000.00
14,128.77
4,644.45
127.23
1,357.08
8,000.00
169
A 156
1366
M2
0.02 M3
1.00 M2
( 6.00)
( 0.00)
243,871.56
4,850.00
9,037.76
4,187.76
4,850.00
170
A 156
1366
M2
0.02 M3
1.00 M2
( 6.00)
( 0.00)
243,871.56
4,850.00
10,433.68
5,583.68
4,850.00
171
525
940
1354
M2
0.09 LB
2.20 ML
1.00 M2
( 8.00)
( 2.00)
( 0.00)
2,945.24
615.96
8,000.00
9,611.55
254.47
1,357.08
8,000.00
992
A 269
1355
ML
0.01 M3
1.00 ML
( 4.00)
( 0.00)
149,510.93
2,250.00
3,027.46
777.46
2,250.00
FILOS Y DILATACIONES
MORTERO 1 : 4 ARENA PEA (M3)
MdeO FILOS Y DILATACIONES
172
A 269
1355
ML
0.01 M3
1.00 ML
( 8.00)
( 0.00)
149,510.93
2,250.00
3,121.95
871.95
2,250.00
GOTERAS
MORTERO 1 : 4 ARENA PEA (M3)
MdeO GOTERAS
173
A 269
1356
ML
0.01 M3
1.00 ML
(10.00)
( 0.00)
149,510.93
2,500.00
3,437.43
937.43
2,500.00
174
9
903
525
1357
0.05
1.03
0.22
1.00
M2
KG
ML
LB
M2
( 4.00)
( 3.00)
( 8.00)
( 0.00)
3,271.20
1,740.00
2,945.24
4,450.00
7,048.47
170.10
1,792.20
636.17
4,450.00
175
678
1358
M2
0.21 KG
1.00 M2
( 0.00)
( 0.00)
4,002.00
1,575.00
2,415.42
840.42
1,575.00
185
34
525
M2
0.85 UN
0.02 LB
( 2.00)
( 8.00)
5,486.00
2,945.24
8,383.06
4,644.45
63.62
PAETES/REPELLOS/REVOQUES (5)
10/07/2006 Bogot
APU Componentes
MdeO MALLA BAJO ENTRAMADO
Cd.
Valor Total
1360
1.00 M2
( 0.00)
3,675.00
3,675.00
187
A 269
1364
ML
0.06 M3
1.00 ML
(10.00)
( 0.00)
149,510.93
4,000.00
12,223.10
8,223.10
4,000.00
PAETE CIELORASOS
MORTERO 1 : 5 ARENA PEA (M3)
MdeO MORTERO
MdeO PAETE LISO CIELORASOS
805
A 271
1407
1338
M2
0.03 M3
0.02 M3
1.00 M2
(10.00)
( 0.00)
( 0.00)
134,396.11
10,500.00
5,100.00
9,476.87
4,168.97
207.90
5,100.00
165
A 271
1361
M2
0.03 M3
1.00 M2
(10.00)
( 0.00)
134,396.11
5,750.00
9,918.97
4,168.97
5,750.00
166
A 269
1362
M2
0.03 M3
1.00 M2
(10.00)
( 0.00)
149,510.93
5,750.00
10,387.83
4,637.83
5,750.00
167
A 271
1362
M2
0.03 M3
1.00 M2
(10.00)
( 0.00)
134,396.11
5,750.00
9,918.97
4,168.97
5,750.00
168
A 273
1362
M2
0.03 M3
1.00 M2
(10.00)
( 0.00)
123,918.09
5,750.00
9,634.83
3,884.83
5,750.00
177
A 156
1368
M2
0.02 M3
1.00 M2
( 6.00)
( 0.00)
243,871.56
4,650.00
8,837.76
4,187.76
4,650.00
178
A 269
1368
M2
0.02 M3
1.00 M2
( 6.00)
( 0.00)
149,510.93
4,650.00
7,217.40
2,567.40
4,650.00
179
A 271
1368
M2
0.02 M3
1.00 M2
( 6.00)
( 0.00)
134,396.11
4,650.00
6,957.85
2,307.85
4,650.00
180
A 273
1368
M2
0.02 M3
1.00 M2
( 6.00)
( 0.00)
123,918.09
4,650.00
6,777.92
2,127.92
4,650.00
181
A 275
1368
M2
0.02 M3
1.00 M2
( 6.00)
( 0.00)
113,331.14
4,650.00
6,596.12
1,946.12
4,650.00
176
A 269
1363
M2
0.02 M3
1.00 M2
(10.00)
( 0.00)
149,510.93
5,100.00
8,389.24
3,289.24
5,100.00
182
A 271
M2
0.02 M3
(10.00)
134,396.11
8,056.71
2,956.71
PAETES/REPELLOS/REVOQUES (5)
10/07/2006 Bogot
APU Componentes
MdeO PAETE BAJO PLACA
Cd.
Valor Total
1363
1.00 M2
( 0.00)
5,100.00
5,100.00
183
A 273
1363
M2
0.02 M3
1.00 M2
(10.00)
( 0.00)
123,918.09
5,100.00
7,826.20
2,726.20
5,100.00
184
A 275
1363
M2
0.02 M3
1.00 M2
(10.00)
( 0.00)
113,331.14
5,100.00
7,593.29
2,493.29
5,100.00
189
A 156
1433
M2
0.02 M3
1.00 M2
(10.00)
( 0.00)
243,871.56
3,360.00
8,725.17
5,365.17
3,360.00
993
A 269
1362
M2
0.03 M3
1.00 M2
( 4.00)
( 0.00)
149,510.93
5,750.00
9,948.27
4,198.27
5,750.00
994
A 271
1362
M2
0.03 M3
1.00 M2
( 4.00)
( 0.00)
134,396.11
5,750.00
9,523.84
3,773.84
5,750.00
190
A 156
1359
M2
0.02 M3
1.00 M2
(10.00)
( 0.00)
243,871.56
3,990.00
8,013.88
4,023.88
3,990.00
769
A 862
1368
M2
16.50 LT
1.00 M2
(10.00)
( 0.00)
158.38
4,650.00
7,263.21
2,613.21
4,650.00
PAETE TALUDES
MORTERO 1 : 4 ARENA PEA (M3)
MdeO PAETE LISO MUROS
764
A 269
1368
M2
0.02 M3
1.00 M2
( 7.00)
( 0.00)
149,510.93
4,650.00
7,209.63
2,559.63
4,650.00
RESANES GENERALES
MORTERO 1 : 4 ARENA PEA (M3)
MdeO RESANES GENERALES
191
A 269
1369
M2
0.01 M3
1.00 M2
(10.00)
( 0.00)
149,510.93
3,000.00
4,644.62
1,644.62
3,000.00
192
A 271
1370
M2
0.02 M3
1.00 M2
(10.00)
( 0.00)
134,396.11
3,500.00
6,234.96
2,734.96
3,500.00
193
A 861
1363
M2
0.02 M3
1.00 M2
(10.00)
( 0.00)
163,717.78
5,100.00
8,701.79
3,601.79
5,100.00
194
A 271
1363
M2
0.02 M3
1.00 M2
(10.00)
( 0.00)
134,396.11
5,100.00
8,056.71
2,956.71
5,100.00
PINTURA (15)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
620
1025
532
1074
1527
0.01
0.63
0.00
1.00
ML
GN
UN
GLN
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
27,094.00
650.00
11,000.00
4,000.00
4,706.84
270.94
409.50
26.40
4,000.00
621
1025
532
1074
1528
0.03
1.05
0.00
1.00
M2
GN
UN
GLN
M2
( 1.00)
( 0.00)
( 1.00)
( 0.00)
27,094.00
650.00
11,000.00
5,000.00
6,530.11
820.95
682.50
26.66
5,000.00
ANTIHUMEDAD FACHADA
SIKA TRANSPARENTE
MdeO SIKA FACHADA
16 KILOS
622
708
1543
M2
0.15 KG
1.00 M2
( 1.00)
( 0.00)
11,542.00
2,200.00
3,948.61
1,748.61
2,200.00
623
1028
532
1068
1529
0.18
3.15
0.11
1.00
( 1.00)
( 0.00)
( 0.00)
( 0.00)
23,590.00
650.00
35,000.00
16,500.00
26,686.16
4,288.66
2,047.50
3,850.00
16,500.00
624
636
1032
1530
M2
0.20 LT
0.20 KG
1.00 M2
( 0.00)
( 2.00)
( 0.00)
90.00
498.80
2,400.00
2,519.76
18.00
101.76
2,400.00
DECORPLAST FACHADA
GRANIPLAST (Aplicado)
625
1874
M2
1.03 M2
( 3.00)
9,860.00
10,155.80
10,155.80
628
1038
532
1071
1534
0.01
0.16
0.01
1.00
ML
GN
UN
GLN
ML
( 1.00)
( 0.00)
( 1.00)
( 0.00)
42,009.00
650.00
14,000.00
3,450.00
4,119.69
424.29
104.00
141.40
3,450.00
629
1038
532
1071
1532
0.03
1.00
0.02
1.00
M2
GN
UN
GLN
M2
( 1.00)
( 0.00)
( 1.00)
( 0.00)
42,009.00
650.00
14,000.00
5,750.00
7,955.67
1,272.87
650.00
282.80
5,750.00
630
M2
GN
UN
GLN
M2
ML
4,470.52
PINTURA (15)
10/07/2006 Bogot
APU Componentes
ESMALTE SEMI-Bte 1100 PINTUCO
LIJA DE AGUA PROFESIONAL
TAPAPOROS NOGAL PHILAAC
THINNER EXTRAFINO PHILAAC
MdeO ESMALTE SOBRE MADERA LIN.
Cd.
Valor Total
1040
532
1068
1071
1534
0.01
0.16
0.01
0.01
1.00
GN
UN
GLN
GLN
ML
( 1.00)
( 0.00)
( 0.00)
( 1.00)
( 0.00)
42,091.00
650.00
35,000.00
14,000.00
3,450.00
425.12
104.00
350.00
141.40
3,450.00
631
1040
532
1068
1071
1535
0.04
1.05
0.02
0.02
1.00
M2
GN
UN
GLN
GLN
M2
( 1.00)
( 5.00)
( 0.00)
( 1.00)
( 0.00)
42,091.00
650.00
35,000.00
14,000.00
5,750.00
9,115.78
1,700.48
682.50
700.00
282.80
5,750.00
632
1038
532
1071
1531
0.02
0.60
0.02
1.00
M2
GN
UN
GLN
M2
( 1.00)
( 0.00)
( 1.00)
( 0.00)
42,009.00
650.00
14,000.00
4,650.00
6,171.38
848.58
390.00
282.80
4,650.00
633
1040
532
1068
1071
1531
0.02
0.60
0.01
0.01
1.00
M2
GN
UN
GLN
GLN
M2
( 1.00)
( 0.00)
( 1.00)
( 1.00)
( 0.00)
42,091.00
650.00
35,000.00
14,000.00
4,650.00
6,385.14
850.24
390.00
353.50
141.40
4,650.00
627
1040
532
1068
1071
1536
0.14
7.00
0.11
0.11
1.00
M2
GN
UN
GLN
GLN
M2
( 1.00)
( 0.00)
( 1.00)
( 1.00)
( 0.00)
42,091.00
650.00
35,000.00
14,000.00
11,250.00
27,195.57
5,951.67
4,550.00
3,888.50
1,555.40
11,250.00
ESTUCO
634
1031
581
532
1080
1537
0.09
0.26
0.02
0.01
1.00
M2
BT
KG
UN
BT
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
4,600.00
240.00
650.00
11,300.00
2,850.00
3,452.40
414.00
62.40
13.00
113.00
2,850.00
635
1023
1031
581
532
1080
1538
0.05
0.09
0.26
0.02
0.01
1.00
M2
GN
BT
KG
UN
BT
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
47,230.00
4,600.00
240.00
650.00
11,300.00
4,550.00
7,513.90
2,361.50
414.00
62.40
13.00
113.00
4,550.00
636
1031
581
M2
0.09 BT
0.26 KG
( 0.00)
( 0.00)
4,600.00
240.00
7,184.90
414.00
62.40
CAOLIN IMPALPABLE
CEMENTO GRIS (constructor)
LIJA DE AGUA PROFESIONAL
YESO BULTO DE 2 ARROBAS
MdeO ESTUCO
PINTURA (15)
10/07/2006 Bogot
APU Componentes
LIJA DE AGUA PROFESIONAL
VINILTEX PINTUCO
YESO BULTO DE 2 ARROBAS
MdeO ESTUCO/VINILO TRES MANOS
Cd.
Valor Total
532
1078
1080
1538
0.02
0.05
0.01
1.00
UN
GN
BT
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
650.00
40,650.00
11,300.00
4,550.00
13.00
2,032.50
113.00
4,550.00
FILOS Y DILATACIONES
CAOLIN IMPALPABLE
CEMENTO GRIS (constructor)
LIJA DE AGUA PROFESIONAL
YESO BULTO DE 2 ARROBAS
MdeO FILOS Y DILATACIONES
637
1031
581
532
1080
1539
0.01
0.10
0.02
0.01
1.00
ML
BT
KG
UN
BT
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
4,600.00
240.00
650.00
11,300.00
1,995.00
2,191.00
46.00
24.00
13.00
113.00
1,995.00
638
1071
1049
1540
M2
0.01 GLN
0.02 GN
1.00 M2
( 0.00)
( 0.00)
( 0.00)
14,000.00
79,520.00
12,000.00
13,730.40
140.00
1,590.40
12,000.00
639
1060
478
1541
ML
0.01 GN
0.05 UN
1.00 ML
( 0.00)
( 0.00)
( 0.00)
73,133.00
12,600.00
1,850.00
3,211.33
731.33
630.00
1,850.00
640
636
1032
1053
1542
M2
LT
KG
kg
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
90.00
498.80
182.00
3,800.00
6,040.80
14.40
42.40
2,184.00
3,800.00
SILCOPLAST FACHADA
CARRAPLAST (Aplicado)
642
1066
M2
1.03 M2
( 3.00)
8,004.00
8,244.12
8,244.12
643
532
1068
1073
1544
0.16
0.01
0.01
1.00
ML
UN
GLN
LT
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
650.00
35,000.00
15,343.00
1,050.00
1,657.43
104.00
350.00
153.43
1,050.00
644
532
1068
1073
1545
0.50
0.02
0.02
1.00
M2
UN
GLN
LT
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
650.00
35,000.00
15,343.00
1,575.00
2,906.86
325.00
700.00
306.86
1,575.00
645
532
1068
1073
1546
3.15
0.11
0.18
1.00
M2
UN
GLN
LT
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
650.00
35,000.00
15,343.00
9,975.00
18,634.24
2,047.50
3,850.00
2,761.74
9,975.00
646
1078
1547
M2
0.04 GN
1.00 M2
( 0.00)
( 0.00)
40,650.00
3,500.00
5,126.00
1,626.00
3,500.00
0.16
0.09
12.00
1.00
PINTURA (15)
10/07/2006 Bogot
APU Componentes
Cd.
647
532
1079
1548
M2
1.05 UN
0.48 LT
1.00 M2
( 0.00)
( 0.00)
( 0.00)
650.00
15,300.00
4,600.00
Valor Total
12,626.50
682.50
7,344.00
4,600.00
Cd.
Valor Total
ADOQUIN CONCRETO 6 Cm
BASE ARENA Cemto 1:20 Com.Mec.
ADOQUIN CONC.A-6 OBRA
MdeO ADOQUIN EN CONCRETO
294
A 66
246
1519
M2
0.01 M3
51.50 UN
1.00 M2
( 8.00)
( 3.00)
( 0.00)
107,932.98
390.00
7,500.00
28,167.84
582.84
20,085.00
7,500.00
ADOQUIN CONCRETO 8 Cm
BASE ARENA Cemto 1:20 Com.Mec.
ADOQUIN CONC.A-8 OBRA
MdeO ADOQUIN EN CONCRETO
295
A 66
248
1519
M2
0.01 M3
51.50 UN
1.00 M2
( 8.00)
( 3.00)
( 0.00)
107,932.98
446.00
7,500.00
31,051.84
582.84
22,969.00
7,500.00
296
A 66
250
1519
M2
0.01 M3
1.03 M2
1.00 M2
( 8.00)
( 3.00)
( 0.00)
107,932.98
17,372.16
7,500.00
25,976.16
582.84
17,893.32
7,500.00
944
A 66
2480
1519
M2
0.01 M3
1.03 M2
1.00 M2
( 8.00)
( 3.00)
( 0.00)
107,932.98
17,372.16
7,500.00
25,976.16
582.84
17,893.32
7,500.00
787
A 66
137
1995
1519
0.01
35.02
0.01
1.00
M2
M3
UN
M3
M2
( 8.00)
( 3.00)
( 8.00)
( 0.00)
107,932.98
578.00
26,666.00
7,500.00
28,669.99
582.84
20,241.56
345.59
7,500.00
945
A 66
1920
1995
1519
0.01
1.03
0.01
1.00
M2
M3
M2
M3
M2
( 8.00)
( 3.00)
( 8.00)
( 0.00)
107,932.98
14,900.00
26,666.00
7,500.00
23,775.43
582.84
15,347.00
345.59
7,500.00
959
A 66
1771
1995
1519
0.01
37.08
0.01
1.00
M2
M3
UN
M3
M2
( 8.00)
( 3.00)
( 8.00)
( 0.00)
107,932.98
461.00
26,666.00
7,500.00
25,522.31
582.84
17,093.88
345.59
7,500.00
946
A 66
1910
1995
1519
0.01
1.03
0.01
1.00
M2
M3
M2
M3
M2
( 8.00)
( 3.00)
( 8.00)
( 0.00)
107,932.98
13,200.00
26,666.00
7,500.00
22,024.43
582.84
13,596.00
345.59
7,500.00
Cd.
Valor Total
947
A 66
1905
1995
1519
0.01
1.03
0.01
1.00
M2
M3
M2
M3
M2
( 8.00)
( 3.00)
( 8.00)
( 0.00)
107,932.98
15,400.00
26,666.00
7,500.00
24,290.43
582.84
15,862.00
345.59
7,500.00
299
A 267
699
1419
M2
0.04 M3
1.55 KG
1.00 M2
( 8.00)
( 3.00)
( 0.00)
185,724.60
2,053.00
5,750.00
16,945.19
8,023.30
3,171.89
5,750.00
186
A 267
678
1420
M2
0.03 M3
0.03 KG
1.00 M2
( 8.00)
( 0.00)
( 0.00)
185,724.60
4,002.00
4,650.00
10,787.54
6,017.48
120.06
4,650.00
300
A 267
678
1420
M2
0.04 M3
0.03 KG
1.00 M2
( 8.00)
( 0.00)
( 0.00)
185,724.60
4,002.00
4,650.00
12,773.35
8,023.30
100.05
4,650.00
701
A 861
431
ML
0.01 M3
1.00 UN
( 8.00)
( 0.00)
163,717.78
2,100.00
3,868.15
1,768.15
2,100.00
302
A 271
1422
M2
0.06 M3
1.00 M2
( 8.00)
( 0.00)
134,396.11
4,400.00
13,108.87
8,708.87
4,400.00
303
A 271
892
1990
1421
0.03
1.02
0.20
1.00
M2
M3
ML
UN
M2
( 8.00)
( 2.00)
( 0.00)
( 0.00)
134,396.11
1,086.92
6,635.00
4,725.00
11,515.09
4,354.43
1,108.66
1,327.00
4,725.00
301
A 861
1422
M2
0.04 M3
1.00 M2
( 8.00)
( 0.00)
163,717.78
4,400.00
11,472.61
7,072.61
4,400.00
748
A 271
1422
M2
0.03 M3
1.00 M2
( 8.00)
( 0.00)
134,396.11
4,400.00
8,754.43
4,354.43
4,400.00
747
A 267
1705
M2
0.04 M3
1.00 M2
( 8.00)
( 0.00)
185,724.60
4,500.00
12,523.30
8,023.30
4,500.00
310
256
M2
1.03 M2
( 3.00)
108,168.00
111,413.04
111,413.04
309
255
M2
1.03 M2
( 3.00)
39,789.00
40,982.67
40,982.67
Cd.
Valor Total
906
263
M2
1.03 M2
( 3.00)
60,710.00
62,531.30
62,531.30
311
259
M2
1.03 M2
( 3.00)
93,672.00
96,482.16
96,482.16
913
273
M2
1.03 M2
( 3.00)
26,555.88
27,352.56
27,352.56
920
267
M2
1.03 M2
( 3.00)
46,304.88
47,694.03
47,694.03
418
278
M2
1.00 M2
( 0.00)
87,158.92
87,158.92
87,158.92
915
272
M2
1.03 M2
( 3.00)
135,061.12
139,112.95
139,112.95
916
2122
M2
1.03 M2
( 3.00)
19,568.04
20,155.08
20,155.08
918
277
M2
1.03 M2
( 3.00)
164,043.72
168,965.03
168,965.03
919
275
M2
1.03 M2
( 3.00)
90,735.20
93,457.26
93,457.26
912
276
M2
1.03 M2
( 3.00)
77,196.84
79,512.75
79,512.75
921
2127
M2
1.03 M2
( 3.00)
37,256.88
38,374.59
38,374.59
911
2126
M2
1.03 M2
( 3.00)
40,537.36
41,753.48
41,753.48
312
2125
M2
1.00 M2
( 0.00)
69,326.24
69,326.24
69,326.24
66
636
60
581
401
1268
231.00
1.73
115.61
0.04
1.00
M3
LT
M3
KG
DD
M3
( 0.00)
(10.00)
( 5.00)
( 0.00)
( 0.00)
90.00
26,666.00
240.00
33,640.00
12,000.00
107,932.98
20,790.00
46,052.18
27,745.20
1,345.60
12,000.00
839
636
100
101
401
1268
73.50
0.70
0.70
0.06
1.00
M3
LT
M3
M3
DD
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
90.00
20,000.00
38,333.00
33,640.00
12,000.00
61,466.50
6,615.00
14,000.00
26,833.10
2,018.40
12,000.00
Cd.
Valor Total
67
2651
1298
M3
1.05 M3
1.00 M3
( 5.00)
( 0.00)
266,916.00
13,000.00
293,261.80
280,261.80
13,000.00
742
2651
104
M2
0.05 M3
1.00 M2
( 5.00)
( 0.00)
266,916.00
2,920.00
16,933.09
14,013.09
2,920.00
68
100
401
1268
M3
1.30 M3
0.04 DD
1.00 M3
( 0.00)
( 0.00)
( 0.00)
20,000.00
33,640.00
12,000.00
39,345.60
26,000.00
1,345.60
12,000.00
838
636
581
1621
401
1268
73.50
350.00
1.35
0.06
1.00
M3
LT
KG
M3
DD
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
90.00
240.00
40,000.00
33,640.00
12,000.00
158,633.40
6,615.00
84,000.00
54,000.00
2,018.40
12,000.00
69
636
1621
401
1268
73.50
1.30
0.04
1.00
M3
LT
M3
DD
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
90.00
40,000.00
33,640.00
12,000.00
71,960.60
6,615.00
52,000.00
1,345.60
12,000.00
903
A 66
3912
1717
1621
1519
0.01
1.00
0.50
0.00
1.00
M2
M3
M2
M2
M3
M2
( 8.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
107,932.98
38,587.40
5,800.00
40,000.00
7,500.00
49,670.24
582.84
38,587.40
2,900.00
100.00
7,500.00
314
2653
923
1425
M2
0.10 M3
1.02 ML
1.00 M2
( 0.00)
( 2.00)
( 0.00)
300,556.00
2,590.28
8,500.00
41,197.69
30,055.60
2,642.09
8,500.00
324
306
1166
M2
1.03 M2
1.00 M2
( 3.00)
( 0.00)
42,000.00
7,350.00
50,610.00
43,260.00
7,350.00
EMEFLEX NEGRO
EMEFLEX Monedas NEGRO
MdeO INSTALACION EMEFLEX
325
18
1166
M2
1.03 M2
1.00 M2
( 3.00)
( 0.00)
42,000.00
7,350.00
50,610.00
43,260.00
7,350.00
M2
M3
M2
M3
KG
ML
( 5.00)
( 0.00)
( 5.00)
( 0.00)
( 0.00)
185,724.60
12,000.00
38,333.00
908.28
4,640.00
62,157.24
8,190.46
12,000.00
1,609.99
9,082.80
6,310.40
GRANITO
MORTERO 1:3 ARENA Lav.PEA(M3)
PULIDA PLOMO PARA GRANITO
ARENA LAVADA DE PEA
CEMENTO BLANCO 40 Kg
DILATACION BRONCE
353
A 267
A 358
62
70
489
0.04
1.00
0.04
10.00
1.36
Cd.
83
1053
1427
Valor Total
0.75 BT
4.80 kg
1.00 M2
( 0.00)
( 0.00)
( 0.00)
8,120.00
182.00
18,000.00
6,090.00
873.60
18,000.00
360
A 269
70
3145
1427
0.02
0.60
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
149,510.93
908.28
271,900.00
18,000.00
301,349.23
2,747.26
544.97
280,057.00
18,000.00
GRAVILLA LAVADA
MORTERO 1 : 4 ARENA PEA (M3)
DILATACION BRONCE
GRAVILLA FINA M3
MdeO GRAVILLA LAVADA
331
A 269
489
85
1428
0.02
0.80
0.02
1.00
M2
M3
ML
M3
M2
( 5.00)
( 0.00)
( 0.00)
( 0.00)
149,510.93
4,640.00
80,000.00
22,250.00
30,780.22
3,218.22
3,712.00
1,600.00
22,250.00
338
581
72
1665
1432
0.42
0.01
1.03
1.00
M2
KG
KG
ML
ML
( 0.00)
( 0.00)
( 3.00)
( 0.00)
240.00
9,000.00
2,870.00
4,000.00
7,146.90
100.80
90.00
2,956.10
4,000.00
GUARDAESCOBA CEDRO 6 Cm
GUARDAESCOBA CEDRO MACHO 6 Cm.
LISTON EN AMARILLO 8 x.2.2 x3
MdeO GUARDAESCOBA MADERA
327
904
923
1431
ML
1.05 ML
0.15 ML
1.00 ML
( 5.00)
( 0.00)
( 0.00)
11,600.00
2,590.28
2,100.00
14,668.54
12,180.00
388.54
2,100.00
328
905
923
1431
ML
1.05 ML
0.15 ML
1.00 ML
( 5.00)
( 0.00)
( 0.00)
15,080.00
2,590.28
2,100.00
18,322.54
15,834.00
388.54
2,100.00
GUARDAESCOBA GRANITO
CEMENTO BLANCO 40 Kg
GRANITO DEL 2 A 3 BLANCO NEIVA
MARMOLINA
MdeO GUARDAESCOBA GRANITO
329
70
83
1053
1429
1.00
0.06
0.50
1.00
ML
KG
BT
kg
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
908.28
8,120.00
182.00
12,250.00
13,736.48
908.28
487.20
91.00
12,250.00
GUARDAESCOBA GRAVILLA
MORTERO 1 : 4 ARENA PEA (M3)
GRAVILLA FINA M3
MdeO GUARDAESCOBA GRAVILLA
330
A 269
85
1430
ML
0.00 M3
0.01 M3
1.00 M2
( 5.00)
( 0.00)
( 0.00)
149,510.93
80,000.00
8,600.00
9,980.85
580.85
800.00
8,600.00
326
310
ML
1.03 ML
( 3.00)
2,909.28
2,996.56
2,996.56
333
1389
668
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
8,925.00
8,456.40
17,381.40
8,925.00
8,456.40
332
639
M2
1.56 KG
( 0.00)
1,667.00
35,999.88
2,600.52
Cd.
Valor Total
671
1433
2.40 M2
1.00 M2
( 0.00)
( 0.00)
12,516.40
3,360.00
30,039.36
3,360.00
334
923
924
525
1434
0.40
1.10
0.27
1.00
M2
ML
M2
LB
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
2,590.28
46,400.00
2,945.24
7,875.00
60,746.33
1,036.11
51,040.00
795.21
7,875.00
335
923
925
525
1434
0.40
1.10
0.27
1.00
M2
ML
M2
LB
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
2,590.28
55,000.00
2,945.24
7,875.00
70,206.33
1,036.11
60,500.00
795.21
7,875.00
336
923
929
525
1434
0.40
1.10
0.27
1.00
M2
ML
M2
LB
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
2,590.28
40,600.00
2,945.24
7,875.00
54,366.33
1,036.11
44,660.00
795.21
7,875.00
337
A 267
62
70
489
3172
1053
1427
2741
0.02
0.04
2.00
1.36
1.03
1.25
1.00
1.00
M2
M3
M3
KG
ML
M2
kg
M2
M2
( 5.00)
( 5.00)
( 0.00)
( 0.00)
( 3.00)
( 0.00)
( 0.00)
( 0.00)
185,724.60
38,333.00
908.28
4,640.00
359,600.00
182.00
18,000.00
22,500.00
424,265.14
3,412.69
1,609.99
1,816.56
6,310.40
370,388.00
227.50
18,000.00
22,500.00
308
A 269
70
3151
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
101,100.00
7,875.00
115,322.03
2,747.26
566.77
104,133.00
7,875.00
304
A 269
70
3171
1444
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
439,600.00
12,915.00
469,017.03
2,747.26
566.77
452,788.00
12,915.00
305
A 269
70
313
1444
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
89,000.00
12,915.00
107,899.03
2,747.26
566.77
91,670.00
12,915.00
307
A 269
M2
0.02 M3
( 5.00)
149,510.93
188,219.03
2,747.26
Cd.
70
3166
1444
306
A 269
70
3165
1444
Valor Total
0.62 KG
1.30 M2
1.00 M2
( 4.00)
(30.00)
( 0.00)
908.28
132,300.00
12,915.00
566.77
171,990.00
12,915.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
139,600.00
12,915.00
160,017.03
2,747.26
566.77
143,788.00
12,915.00
0.02
0.62
1.03
1.00
PARKET GUAYACAN
PARKET GUAYACAN INSTALADO
344
934
M2
1.00 M2
( 0.00)
73,000.00
73,000.00
73,000.00
343
936
M2
1.03 M2
( 3.00)
60,000.00
61,800.00
61,800.00
345
A 267
A 358
62
70
83
1053
515
1436
0.02
1.00
0.02
0.16
0.38
0.05
0.90
1.00
ML
M3
M2
M3
KG
BT
kg
ML
ML
( 5.00)
( 0.00)
( 0.00)
( 4.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
185,724.60
12,000.00
38,333.00
908.28
8,120.00
182.00
4,109.00
16,000.00
39,796.38
4,095.23
12,000.00
766.66
141.69
3,085.60
9.10
3,698.10
16,000.00
346
A 269
85
1437
ML
0.01 M3
0.01 M3
1.00 ML
( 5.00)
( 0.00)
( 0.00)
149,510.93
80,000.00
10,300.00
12,512.88
1,412.88
800.00
10,300.00
347
323
UN
1.03 ML
( 0.00)
47,394.12
48,815.94
48,815.94
1007
A 269
72
85
348
1435
0.01
0.01
0.02
0.45
1.00
UN
M3
KG
M3
M2
UN
( 4.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
149,510.93
9,000.00
80,000.00
12,600.00
20,000.00
28,514.91
1,554.91
90.00
1,200.00
5,670.00
20,000.00
349
894
527
535
1512
0.09
0.14
2.00
1.00
ML
M2
LB
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
46,400.00
3,364.00
24.00
12,600.00
17,294.96
4,176.00
470.96
48.00
12,600.00
PIRLAN ALUMINIO
PIRLAN ALUMINIO DORADO
TORNILLO GOLOSO
1" x 8
MdeO PIRLANES ALUMINIO
350
515
534
1438
ML
0.17 ML
0.06 UN
1.00 ML
( 0.00)
( 0.00)
( 0.00)
4,109.00
20.00
2,100.00
2,799.73
698.53
1.20
2,100.00
Cd.
351
884
527
535
1512
Valor Total
ML
UN
LB
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
68,440.00
3,364.00
24.00
12,600.00
19,254.56
6,159.60
470.96
24.00
12,600.00
352
A 269
137
1439
ML
0.01 M3
15.84 UN
1.00 ML
( 5.00)
( 0.00)
( 0.00)
149,510.93
578.00
6,500.00
17,068.40
1,412.88
9,155.52
6,500.00
950
674
ML
1.02 ML
( 2.00)
10,625.60
10,838.11
10,838.11
0.09
0.14
1.00
1.00
932
A 269
70
1903
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
0.00
7,875.00
11,189.03
2,747.26
566.77
0.00
7,875.00
770
A 861
70
271
1440
0.02
0.62
1.05
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 5.00)
( 0.00)
163,717.78
908.28
24,000.00
8,000.00
36,775.08
3,008.31
566.77
25,200.00
8,000.00
936
A 269
70
2684
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
26,500.00
7,875.00
38,484.03
2,747.26
566.77
27,295.00
7,875.00
322
A 269
293
70
1445
0.02
1.03
0.62
1.00
M2
M3
M2
KG
M2
( 5.00)
( 3.00)
( 4.00)
( 0.00)
149,510.93
21,460.00
908.28
7,875.00
33,292.83
2,747.26
22,103.80
566.77
7,875.00
323
A 269
294
70
1445
0.02
1.03
0.62
1.00
M2
M3
M2
KG
M2
( 5.00)
( 3.00)
( 4.00)
( 0.00)
149,510.93
17,400.00
908.28
7,875.00
29,111.03
2,747.26
17,922.00
566.77
7,875.00
940
A 269
70
3395
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
18,328.00
7,875.00
30,066.87
2,747.26
566.77
18,877.84
7,875.00
928
A 269
M2
0.02 M3
( 5.00)
149,510.93
31,789.03
2,747.26
Cd.
70
2827
1445
Valor Total
0.62 KG
1.03 M2
1.00 M2
( 4.00)
( 3.00)
( 0.00)
908.28
20,000.00
7,875.00
566.77
20,600.00
7,875.00
935
A 269
70
2740
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
18,232.00
7,875.00
29,967.99
2,747.26
566.77
18,778.96
7,875.00
941
A 269
70
2435
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
18,232.00
7,875.00
29,967.99
2,747.26
566.77
18,778.96
7,875.00
917
A 269
70
3939
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
22,085.24
7,875.00
33,936.83
2,747.26
566.77
22,747.80
7,875.00
937
A 269
70
992
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
0.00
7,875.00
11,189.03
2,747.26
566.77
0.00
7,875.00
926
A 269
70
3935
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
23,441.28
7,875.00
35,333.55
2,747.26
566.77
24,144.52
7,875.00
927
A 269
70
1753
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
21,266.28
7,875.00
33,093.30
2,747.26
566.77
21,904.27
7,875.00
922
A 269
70
3934
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
23,485.36
7,875.00
35,378.95
2,747.26
566.77
24,189.92
7,875.00
933
A 269
70
2683
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
21,621.10
7,875.00
33,458.76
2,747.26
566.77
22,269.73
7,875.00
Cd.
321
A 269
70
305
1445
402
356
Valor Total
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
14,900.00
7,875.00
26,536.03
2,747.26
566.77
15,347.00
7,875.00
M2
1.05 M2
( 5.00)
37,600.00
39,480.00
39,480.00
0.02
0.62
1.03
1.00
899
A 269
70
291
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
31,088.00
7,875.00
43,209.67
2,747.26
566.77
32,020.64
7,875.00
923
A 269
70
3936
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
24,964.36
7,875.00
36,902.32
2,747.26
566.77
25,713.29
7,875.00
930
A 269
70
1801
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
18,232.00
7,875.00
29,967.99
2,747.26
566.77
18,778.96
7,875.00
961
A 269
70
2737
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
19,104.00
7,875.00
30,866.15
2,747.26
566.77
19,677.12
7,875.00
317
A 269
70
2733
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
19,104.00
7,875.00
30,866.15
2,747.26
566.77
19,677.12
7,875.00
924
A 269
70
1651
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
25,153.44
7,875.00
37,097.07
2,747.26
566.77
25,908.04
7,875.00
960
A 269
70
2734
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
19,104.00
7,875.00
30,866.15
2,747.26
566.77
19,677.12
7,875.00
Cd.
Valor Total
316
A 269
70
2736
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
0.00
7,875.00
11,189.03
2,747.26
566.77
0.00
7,875.00
934
A 269
70
2682
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
19,976.00
7,875.00
31,764.31
2,747.26
566.77
20,575.28
7,875.00
751
A 861
70
1809
1451
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
163,717.78
908.28
24,000.00
9,000.00
37,295.08
3,008.31
566.77
24,720.00
9,000.00
938
A 269
70
2135
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
19,371.00
7,875.00
31,141.16
2,747.26
566.77
19,952.13
7,875.00
929
A 269
70
2723
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
17,517.00
7,875.00
29,231.54
2,747.26
566.77
18,042.51
7,875.00
939
A 269
70
2133
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
32,541.56
7,875.00
44,706.84
2,747.26
566.77
33,517.81
7,875.00
942
A 269
70
2828
1445
0.02
0.62
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 4.00)
( 3.00)
( 0.00)
149,510.93
908.28
19,976.00
7,875.00
31,764.31
2,747.26
566.77
20,575.28
7,875.00
354
2653
155
943
1441
0.08
0.20
0.52
1.00
M2
M3
M2
ML
M2
( 3.00)
( 0.00)
( 2.00)
( 0.00)
300,556.00
7,405.44
2,474.28
10,000.00
37,537.73
24,765.81
1,484.79
1,287.12
10,000.00
355
2653
155
M2
0.10 M3
0.20 M2
( 3.00)
( 0.00)
300,556.00
7,405.44
43,729.18
30,957.27
1,484.79
Cd.
Valor Total
943
1442
0.52 ML
1.00 M2
( 2.00)
( 0.00)
2,474.28
10,000.00
1,287.12
10,000.00
356
2653
155
943
1443
0.15
0.20
1.04
1.00
M2
M3
M2
ML
M2
( 3.00)
( 0.00)
( 2.00)
( 0.00)
300,556.00
7,405.44
2,474.28
12,000.00
62,494.93
46,435.90
1,484.79
2,574.24
12,000.00
357
330
M2
1.13 M2
( 0.00)
614.80
694.72
694.72
358
341
M2
1.00 M2
( 0.00)
12,000.00
12,000.00
12,000.00
359
1049
342
M2
0.10 GN
1.00 M2
( 0.00)
( 0.00)
79,520.00
11,000.00
18,952.00
7,952.00
11,000.00
POLISEC
POLISEC PAVCO
PULIDA PLOMO PARA GRANITO
PULIDA PISO GRANITO Brllo Nat
PULIDA/LACADA PISOS MADERA.
VITRIFLEX BARNIZ SEMIMATE PINTUCO
PULIDA + LACADA PISO MADERA
RETAL DE MARMOL BLANCO Import.
MORTERO 1:3 ARENA Lav.PEA(M3)
CEMENTO BLANCO 40 Kg
DILATACION BRONCE
GRANITO DEL 2 A 3 BLANCO NEIVA
MARMOL RETAL BLANCO Huila.
MARMOLINA
MdeO GRANITO Y MARMOL
PULIDA PISO MARMOL
951
A 267
70
489
83
2727
1053
1427
2741
0.02
5.00
1.00
0.17
0.83
1.80
1.00
1.00
M2
M3
KG
ML
BT
M2
kg
M2
M2
( 5.00)
( 0.00)
( 0.00)
( 0.00)
( 4.00)
( 0.00)
( 0.00)
( 0.00)
185,724.60
908.28
4,640.00
8,120.00
14,500.00
182.00
18,000.00
22,500.00
66,866.09
3,412.69
4,541.40
4,640.00
1,380.40
12,064.00
327.60
18,000.00
22,500.00
952
A 267
70
489
83
2728
1053
1427
2741
0.02
5.00
1.00
0.17
0.83
1.80
1.00
1.00
M2
M3
KG
ML
BT
M2
kg
M2
M2
( 5.00)
( 0.00)
( 0.00)
( 0.00)
( 4.00)
( 0.00)
( 0.00)
( 0.00)
185,724.60
908.28
4,640.00
8,120.00
10,440.00
182.00
18,000.00
22,500.00
63,488.17
3,412.69
4,541.40
4,640.00
1,380.40
8,686.08
327.60
18,000.00
22,500.00
953
A 267
70
489
83
2732
1053
1427
2741
0.02
5.00
1.36
0.17
0.80
1.80
1.00
1.00
M2
M3
KG
ML
BT
M2
kg
M2
M2
( 5.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
185,724.60
908.28
4,640.00
8,120.00
31,320.00
182.00
18,000.00
22,500.00
81,528.49
3,412.69
4,541.40
6,310.40
1,380.40
25,056.00
327.60
18,000.00
22,500.00
955
A 267
M2
0.18 M3
( 5.00)
185,724.60
96,466.70
34,126.90
Cd.
Valor Total
CEMENTO BLANCO 40 Kg
DILATACION BRONCE
GRANITO DEL 2 A 3 BLANCO NEIVA
MARMOL RETAL NEGRO CARACOL
MARMOLINA
MdeO GRANITO Y MARMOL
PULIDA PISO MARMOL
70
489
83
2729
1053
1427
2741
5.00
1.36
0.17
0.80
1.80
1.00
1.00
KG
ML
BT
M2
kg
M2
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
908.28
4,640.00
8,120.00
11,600.00
182.00
18,000.00
22,500.00
4,541.40
6,310.40
1,380.40
9,280.00
327.60
18,000.00
22,500.00
954
A 267
70
489
83
2731
1053
1427
2741
0.02
5.00
1.36
0.17
0.83
1.80
1.00
1.00
M2
M3
KG
ML
BT
M2
kg
M2
M2
( 5.00)
( 0.00)
( 0.00)
( 0.00)
( 4.00)
( 0.00)
( 0.00)
( 0.00)
185,724.60
908.28
4,640.00
8,120.00
26,680.00
182.00
18,000.00
22,500.00
78,670.25
3,412.69
4,541.40
6,310.40
1,380.40
22,197.76
327.60
18,000.00
22,500.00
956
A 269
72
89
1519
0.01
0.01
103.00
1.00
M2
M3
KG
UN
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
149,510.93
9,000.00
170.00
7,500.00
26,705.86
1,569.86
126.00
17,510.00
7,500.00
957
A 269
72
94
1519
0.01
0.01
51.50
1.00
M2
M3
KG
UN
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
149,510.93
9,000.00
380.00
7,500.00
28,765.86
1,569.86
126.00
19,570.00
7,500.00
958
A 269
72
592
1519
0.01
0.01
37.08
1.00
M2
M3
KG
UN
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
149,510.93
9,000.00
566.00
7,500.00
30,183.14
1,569.86
126.00
20,987.28
7,500.00
297
A 269
72
3379
1520
0.01
0.01
1.00
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 0.00)
( 0.00)
149,510.93
9,000.00
11,217.00
7,500.00
20,412.86
1,569.86
126.00
11,217.00
7,500.00
TABLETA GUAYACAN
ALFA
MORTERO 1 : 4 ARENA PEA (M3)
COLOR MINERAL ROJO
TABLETA GRES GUAYACAN ROJA 20x10 ALFA
MdeO TABLETA /TABLON.
363
A 269
72
3380
1445
0.02
0.01
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
149,510.93
9,000.00
10,904.00
7,875.00
21,979.38
2,747.26
126.00
11,231.12
7,875.00
339
A 271
72
M2
0.03 M3
0.01 KG
( 5.00)
( 0.00)
134,396.11
9,000.00
24,718.57
3,739.57
126.00
Cd.
348
1445
340
A 271
72
349
1445
Valor Total
1.03 M2
1.00 M2
( 3.00)
( 0.00)
12,600.00
7,875.00
12,978.00
7,875.00
0.03
0.01
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
134,396.11
9,000.00
12,600.00
7,875.00
24,718.57
3,739.57
126.00
12,978.00
7,875.00
341
A 271
72
350
1445
0.03
0.01
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
134,396.11
9,000.00
12,600.00
7,875.00
24,682.57
3,739.57
90.00
12,978.00
7,875.00
361
A 269
72
3324
1445
0.02
0.01
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
149,510.93
9,000.00
9,802.00
7,875.00
20,844.32
2,747.26
126.00
10,096.06
7,875.00
342
A 271
72
355
1445
0.02
0.01
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
134,396.11
9,000.00
14,100.00
7,875.00
25,346.32
2,822.32
126.00
14,523.00
7,875.00
364
A 269
72
353
1445
0.02
0.01
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
149,510.93
9,000.00
21,460.00
7,875.00
33,244.53
3,139.73
126.00
22,103.80
7,875.00
948
A 271
72
1924
1445
0.02
0.01
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
134,396.11
9,000.00
15,650.00
7,875.00
26,942.82
2,822.32
126.00
16,119.50
7,875.00
362
A 269
72
344
1445
0.02
0.01
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
149,510.93
9,000.00
11,183.00
7,875.00
22,659.22
3,139.73
126.00
11,518.49
7,875.00
949
A 271
72
1923
1445
0.02
0.01
1.03
1.00
M2
M3
KG
M2
M2
( 5.00)
( 0.00)
( 3.00)
( 0.00)
134,396.11
9,000.00
19,100.00
7,875.00
30,496.32
2,822.32
126.00
19,673.00
7,875.00
VINISOL 1.6 mm
365
M2
20,616.27
Cd.
Valor Total
357
1.03 M2
( 3.00)
20,015.80
20,616.27
VINISOL 3.0 mm
VINISOL 3.0 Trafico Inst.
366
359
M2
1.03 M2
( 3.00)
25,789.12
26,562.79
26,562.79
367
358
M2
1.03 M2
( 3.00)
21,482.04
22,126.50
22,126.50
368
A 269
363
1446
ML
0.00 M3
1.03 ML
1.00 ML
( 5.00)
( 3.00)
( 0.00)
149,510.93
10,764.00
6,600.00
18,314.87
627.95
11,086.92
6,600.00
369
A 269
362
1446
ML
0.00 M3
1.03 ML
1.00 ML
( 5.00)
( 3.00)
( 0.00)
149,510.93
10,764.00
6,600.00
18,314.87
627.95
11,086.92
6,600.00
943
A 269
508
1446
ML
0.00 M3
0.06 ML
1.00 ML
( 5.00)
( 5.00)
( 0.00)
149,510.93
5,568.00
6,600.00
7,578.73
627.95
350.78
6,600.00
371
A 269
3152
1446
ML
0.00 M3
4.32 UN
1.00 ML
( 5.00)
( 8.00)
( 0.00)
149,510.93
2,400.00
6,600.00
17,595.95
627.95
10,368.00
6,600.00
372
A 269
364
1432
ML
0.00 M3
1.00 ML
1.00 ML
( 5.00)
( 0.00)
( 0.00)
149,510.93
10,764.00
4,000.00
15,391.95
627.95
10,764.00
4,000.00
373
A 269
363
1432
ML
0.00 M3
1.00 ML
1.00 ML
( 5.00)
( 0.00)
( 0.00)
149,510.93
10,764.00
4,000.00
15,391.95
627.95
10,764.00
4,000.00
Cd.
Valor Total
58
A 268
2012
2159
UN
0.60 LT
1.00 UN
1.00 UN
( 8.00)
( 0.00)
( 0.00)
175.99
23,162.88
9,450.00
32,717.80
104.92
23,162.88
9,450.00
40
A 255
A 268
1253
UN
0.06 M3
0.60 LT
1.00 UN
( 4.00)
( 8.00)
( 0.00)
237,480.00
175.99
8,500.00
22,682.73
14,077.81
104.92
8,500.00
807
A 268
1989
2159
UN
0.70 LT
1.00 UN
1.00 UN
( 8.00)
( 0.00)
( 0.00)
175.99
52,116.48
9,450.00
61,688.88
122.40
52,116.48
9,450.00
55
A 255
A 268
1989
1253
0.07
0.70
1.00
1.00
UN
M3
LT
UN
UN
( 4.00)
( 8.00)
( 0.00)
( 0.00)
237,480.00
175.99
52,116.48
8,500.00
77,286.49
16,547.61
122.40
52,116.48
8,500.00
806
636
9
10
60
64
581
84
20
25
123
52
100
531
1578
1406
1407
43.65
0.05
3.46
0.13
0.09
189.42
0.12
8.65
2.47
169.95
3.46
0.16
0.21
1.00
0.12
0.11
UN
LT
KG
ML
M3
M3
KG
M3
KG
KG
UN
UN
M3
KG
UN
M3
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 8.00)
( 0.00)
( 0.00)
( 0.00)
(10.00)
( 0.00)
(25.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
90.00
3,271.20
10,858.76
26,666.00
80,000.00
240.00
80,000.00
2,173.84
2,310.72
330.00
27,057.00
20,000.00
215.00
71,000.00
10,000.00
10,500.00
357,811.07
3,928.18
163.56
37,580.00
3,543.91
7,104.00
45,461.61
9,248.00
18,808.06
5,712.10
56,083.50
93,638.87
3,125.00
44.29
71,000.00
1,236.00
1,134.00
UN
0.08 M3
1.00 UN
( 4.00)
( 0.00)
225,368.00
91,291.86
215,714.36
18,047.47
91,291.86
44
A 258
A 605
Cd.
Valor Total
A 271
9
581
25
123
100
1254
0.05
0.05
1.62
2.40
38.50
0.04
1.00
M3
KG
KG
KG
UN
M3
UN
( 8.00)
( 0.00)
( 8.00)
( 0.00)
(10.00)
(25.00)
( 0.00)
134,396.11
3,271.20
240.00
2,310.72
330.00
20,000.00
80,000.00
6,821.95
163.56
388.80
5,545.73
12,705.00
750.00
80,000.00
45
A 258
A 605
A 271
9
581
25
123
100
1254
0.11
1.00
0.08
0.06
2.73
2.75
62.70
0.06
1.00
UN
M3
UN
M3
KG
KG
KG
UN
M3
UN
( 4.00)
( 0.00)
( 8.00)
( 0.00)
( 8.00)
( 0.00)
(10.00)
(25.00)
( 0.00)
225,368.00
91,291.86
134,396.11
3,271.20
240.00
2,310.72
330.00
20,000.00
80,000.00
236,381.83
25,782.10
91,291.86
10,160.35
196.27
655.78
6,354.48
20,691.00
1,250.00
80,000.00
46
A 258
A 605
A 271
9
581
25
123
100
1255
0.16
1.00
0.10
0.08
4.10
4.14
75.90
0.09
1.00
UN
M3
UN
M3
KG
KG
KG
UN
M3
UN
( 4.00)
( 0.00)
( 8.00)
( 0.00)
( 8.00)
( 0.00)
(10.00)
(25.00)
( 0.00)
225,368.00
91,291.86
134,396.11
3,271.20
240.00
2,310.72
330.00
20,000.00
80,000.00
258,938.88
36,001.19
91,291.86
14,035.79
261.70
984.96
9,566.38
25,047.00
1,750.00
80,000.00
38
A 258
A 605
A 271
9
581
25
123
100
1255
0.16
1.00
0.14
0.08
5.36
4.61
100.10
0.13
1.00
UN
M3
UN
M3
KG
KG
KG
UN
M3
UN
( 4.00)
( 0.00)
( 8.00)
( 0.00)
( 8.00)
( 0.00)
(10.00)
( 0.00)
( 0.00)
225,368.00
91,291.86
134,396.11
3,271.20
240.00
2,310.72
330.00
20,000.00
80,000.00
273,006.08
35,157.41
91,291.86
18,724.07
261.70
1,285.63
10,652.42
33,033.00
2,600.00
80,000.00
47
A 258
A 605
A 271
9
581
25
123
100
0.27
1.00
0.19
0.13
7.62
6.36
141.90
0.15
UN
M3
UN
M3
KG
KG
KG
UN
M3
( 4.00)
( 0.00)
( 8.00)
( 0.00)
( 8.00)
( 0.00)
(10.00)
(25.00)
225,368.00
91,291.86
134,396.11
3,271.20
240.00
2,310.72
330.00
20,000.00
324,948.85
60,752.00
91,291.86
26,126.60
425.26
1,829.95
14,696.18
46,827.00
3,000.00
Cd.
1255
Valor Total
1.00 UN
( 0.00)
80,000.00
80,000.00
692
A 258
A 605
A 271
9
581
25
123
100
1256
0.36
1.00
0.23
0.14
8.87
6.94
159.50
0.23
1.00
UN
M3
UN
M3
KG
KG
KG
UN
M3
UN
( 4.00)
( 0.00)
( 8.00)
( 0.00)
( 8.00)
( 0.00)
(10.00)
( 0.00)
( 0.00)
225,368.00
91,291.86
134,396.11
3,271.20
240.00
2,310.72
330.00
20,000.00
55,650.00
335,365.53
82,244.90
91,291.86
30,321.38
457.97
2,128.03
16,036.40
52,635.00
4,600.00
55,650.00
48
A 258
A 605
A 271
9
581
25
123
100
1256
0.41
1.00
0.26
0.15
10.95
7.53
194.70
0.25
1.00
UN
M3
UN
M3
KG
KG
KG
UN
M3
UN
( 4.00)
( 0.00)
( 8.00)
( 0.00)
( 8.00)
( 0.00)
(10.00)
(25.00)
( 0.00)
225,368.00
91,291.86
134,396.11
3,271.20
240.00
2,310.72
330.00
20,000.00
55,650.00
364,432.89
92,885.87
91,291.86
34,835.47
490.68
2,628.29
17,399.72
64,251.00
5,000.00
55,650.00
43
2132
100
1257
UN
1.00 UN
0.02 M3
1.00 UN
( 0.00)
( 0.00)
( 0.00)
31,736.44
20,000.00
15,000.00
47,136.44
31,736.44
400.00
15,000.00
42
2836
100
1141
1258
1.00
0.02
1.00
1.00
UN
UN
M3
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
116,232.00
20,000.00
128,992.00
25,000.00
270,624.00
116,232.00
400.00
128,992.00
25,000.00
41
1104
100
307
UN
1.00 UN
0.02 M3
1.00 UN
( 0.00)
( 0.00)
( 0.00)
62,143.52
20,000.00
6,825.00
69,368.52
62,143.52
400.00
6,825.00
UN
M3
M3
KG
KG
UN
M3
UN
( 4.00)
( 8.00)
( 0.00)
( 0.00)
(10.00)
( 0.00)
( 0.00)
217,868.00
134,396.11
3,271.20
2,310.72
330.00
20,000.00
350,000.00
788,444.99
181,266.18
72,573.90
1,144.92
40,090.99
131,769.00
11,600.00
350,000.00
ML
1.03 ML
( 3.00)
6,593.44
37,804.12
6,791.24
49
A 259
A 271
9
25
123
100
1259
50
1160
0.83
0.54
0.35
17.35
399.30
0.58
1.00
Cd.
Valor Total
100
1163
1260
0.01 M3
0.21 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
20,000.00
6,728.00
29,400.00
200.00
1,412.88
29,400.00
51
66
100
811
1260
1.03
0.01
0.00
1.00
ML
UN
M3
UN
UN
( 3.00)
( 0.00)
( 0.00)
( 0.00)
6,312.00
20,000.00
1,776.00
29,400.00
36,101.36
6,501.36
200.00
0.00
29,400.00
52
100
608
1261
UN
0.10 M3
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
20,000.00
570,140.00
23,100.00
595,240.00
2,000.00
570,140.00
23,100.00
799
A 268
2244
1267
ML
0.78 LT
1.03 ML
1.00 ML
( 8.00)
( 3.00)
( 0.00)
175.99
18,000.00
9,660.00
28,336.39
136.39
18,540.00
9,660.00
900
A 268
2236
2160
ML
0.60 LT
1.03 ML
1.00 ML
( 8.00)
( 3.00)
( 0.00)
175.99
8,720.00
4,830.00
13,916.52
104.92
8,981.60
4,830.00
901
A 268
2237
1267
ML
0.54 LT
1.03 ML
1.00 ML
( 8.00)
( 3.00)
( 0.00)
175.99
14,720.00
9,660.00
24,915.87
94.27
15,161.60
9,660.00
837
A 268
1159
1267
ML
0.78 LT
0.68 UN
1.00 ML
( 8.00)
( 3.00)
( 0.00)
175.99
47,768.80
9,660.00
42,269.62
136.39
32,473.23
9,660.00
63
A 255
A 268
1159
2160
0.05
0.78
1.03
1.00
ML
M3
LT
UN
ML
( 4.00)
( 8.00)
( 3.00)
( 0.00)
237,480.00
175.99
47,768.80
4,830.00
66,023.26
11,855.00
136.39
49,201.86
4,830.00
60
A 268
1156
1267
ML
0.30 LT
0.82 UN
1.00 ML
( 8.00)
( 3.00)
( 0.00)
175.99
8,688.40
9,660.00
16,871.70
52.46
7,159.24
9,660.00
834
A 255
A 268
1156
2160
0.04
0.30
0.82
1.00
ML
M3
LT
UN
ML
( 4.00)
( 8.00)
( 3.00)
( 0.00)
237,480.00
175.99
8,688.40
4,830.00
21,426.91
9,385.21
52.46
7,159.24
4,830.00
Cd.
Valor Total
61
A 268
1157
2160
ML
0.60 LT
1.03 UN
1.00 ML
( 8.00)
( 3.00)
( 0.00)
175.99
14,476.80
4,830.00
19,846.02
104.92
14,911.10
4,830.00
835
A 255
A 268
1157
2160
0.06
0.60
1.03
1.00
ML
M3
LT
UN
ML
( 4.00)
( 8.00)
( 3.00)
( 0.00)
237,480.00
175.99
14,476.80
4,830.00
34,072.02
14,226.00
104.92
14,911.10
4,830.00
62
A 268
1158
1267
ML
0.54 LT
0.68 UN
1.00 ML
( 8.00)
( 3.00)
( 0.00)
175.99
38,001.60
9,660.00
35,587.76
94.27
25,833.49
9,660.00
836
A 255
A 268
1158
1267
0.05
0.54
0.68
1.00
ML
M3
LT
UN
ML
( 4.00)
( 8.00)
( 3.00)
( 0.00)
237,480.00
175.99
38,001.60
9,660.00
47,442.76
11,855.00
94.27
25,833.49
9,660.00
64
84
1154
1265
ML
0.08 M3
1.03 UN
1.00 ML
( 0.00)
( 3.00)
( 0.00)
80,000.00
10,857.60
4,515.00
22,098.33
6,400.00
11,183.33
4,515.00
53
84
1004
1265
ML
0.12 M3
1.03 UN
1.00 ML
( 0.00)
( 3.00)
( 0.00)
80,000.00
17,376.80
4,515.00
32,013.10
9,600.00
17,898.10
4,515.00
54
84
1010
1265
ML
0.14 M3
1.03 UN
1.00 ML
( 0.00)
( 3.00)
( 0.00)
80,000.00
45,604.24
4,515.00
62,687.37
11,200.00
46,972.37
4,515.00
65
101
1148
1266
ML
0.03 M3
1.00 ML
1.00 ML
( 0.00)
( 0.00)
( 0.00)
38,333.00
15,460.00
2,900.00
19,509.99
1,149.99
15,460.00
2,900.00
1024
3526
3529
2936
247
1.00
0.17
5.00
1.00
ML
ML
UN
%M
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
11,839.00
9,251.00
4,500.00
4,500.00
18,136.67
11,839.00
1,572.67
225.00
4,500.00
1025
3527
3530
2936
ML
1.00 ML
0.17 UN
5.00 %M
( 0.00)
( 0.00)
( 0.00)
21,108.00
22,417.00
4,500.00
29,643.89
21,108.00
3,810.89
225.00
PAVCO
PAVCO
Cd.
247
1026
3528
3531
2936
247
Valor Total
1.00 ML
( 0.00)
4,500.00
4,500.00
1.00
0.17
5.00
1.00
ML
ML
UN
%M
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
31,427.00
30,826.00
4,500.00
4,500.00
41,392.42
31,427.00
5,240.42
225.00
4,500.00
1027
303
304
2936
247
1.00
0.17
5.00
1.00
ML
ML
UN
%M
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
46,228.00
82,808.00
4,500.00
4,500.00
65,030.36
46,228.00
14,077.36
225.00
4,500.00
1028
1135
567
2936
247
1.00
0.17
5.00
1.00
ML
ML
UN
%M
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
65,545.00
134,328.00
4,500.00
4,500.00
93,105.76
65,545.00
22,835.76
225.00
4,500.00
1029
1136
570
2936
1526
1.00
0.17
5.00
1.00
ML
ML
UN
%M
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
103,403.00
247,353.00
28,800.00
28,800.00
175,693.01
103,403.00
42,050.01
1,440.00
28,800.00
1030
1426
690
2936
1526
1.00
0.17
5.00
1.00
ML
ML
UN
%M
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
135,098.00
274,050.00
28,800.00
28,800.00
211,926.50
135,098.00
46,588.50
1,440.00
28,800.00
1031
1450
902
2936
1526
1.00
0.17
5.00
1.00
ML
ML
UN
%M
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
161,974.00
292,317.00
28,800.00
28,800.00
241,907.89
161,974.00
49,693.89
1,440.00
28,800.00
Cd.
Valor Total
792
1549
MS
1.00 MS
( 0.00)
909,130.53
909,130.53
909,130.53
793
1550
MS
1.00 MS
( 0.00)
455,700.00
455,700.00
455,700.00
794
1551
MS
1.00 MS
( 0.00)
447,244.88
447,244.88
447,244.88
820
1552
MS
1.00 MS
( 0.00)
1,282,312.19
1,282,312.19
1,282,312.19
234
2914
2804
JR
1.00 JR
1.00 JR
( 0.00)
( 0.00)
15,190.00
34,118.70
49,308.70
15,190.00
34,118.70
235
2915
2937
JR
1.00 JR
1.00 JR
( 0.00)
( 0.00)
15,190.00
31,274.25
46,464.25
15,190.00
31,274.25
456
3267
3169
JR
1.00 JR
1.00 JR
( 0.00)
( 0.00)
18,888.87
31,843.35
50,732.22
18,888.87
31,843.35
649
3787
3788
JR
1.00 JR
1.00 JR
( 0.00)
( 0.00)
21,893.03
36,837.15
58,730.18
21,893.03
36,837.15
516
3306
3269
JR
1.00 JR
1.00 JR
( 0.00)
( 0.00)
19,891.41
33,607.35
53,498.76
19,891.41
33,607.35
517
3354
3386
JR
1.00 JR
1.00 JR
( 0.00)
( 0.00)
19,891.41
33,123.30
53,014.71
19,891.41
33,123.30
518
3759
3452
JR
1.00 JR
1.00 JR
( 0.00)
( 0.00)
18,091.92
32,697.00
50,788.92
18,091.92
32,697.00
3045
1555
HR
1.00 HH
( 0.00)
6,590.43
6,590.43
6,590.43
3046
1556
HR
1.00 HH
( 0.00)
6,298.22
6,298.22
6,298.22
Cd.
Valor Total
3047
1557
HR
1.00 HH
( 0.00)
6,701.31
6,701.31
6,701.31
3043
69
HR
1.00 HH
( 0.00)
2,290.37
2,290.37
2,290.37
3044
149
HR
1.00 HH
( 0.00)
4,289.67
4,289.67
4,289.67
823
1559
MS
1.00 MS
( 0.00)
1,407,414.86
1,407,414.86
1,407,414.86
825
1558
MS
1.00 MS
( 0.00)
599,019.75
599,019.75
599,019.75
827
1560
MS
1.00 MS
( 0.00)
1,569,482.25
1,569,482.25
1,569,482.25
Cd.
Valor Total
726
2652
923
386
1521
0.09
0.09
0.09
1.00
M2
M3
ML
DD
M2
( 4.00)
( 0.00)
( 0.00)
( 0.00)
283,852.00
2,590.28
1,160.00
6,750.00
32,174.24
25,092.52
233.13
98.60
6,750.00
727
2653
923
386
1521
0.09
0.09
0.07
1.00
M2
M3
ML
DD
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
300,556.00
2,590.28
1,160.00
6,750.00
32,611.59
25,547.26
233.13
81.20
6,750.00
728
2654
923
386
1521
0.09
0.09
0.07
1.00
M2
M3
ML
DD
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
313,316.00
2,590.28
1,160.00
6,750.00
33,696.19
26,631.86
233.13
81.20
6,750.00
729
2655
923
386
1521
0.09
0.09
0.07
1.00
M2
M3
ML
DD
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
333,752.00
2,590.28
1,160.00
6,750.00
35,433.25
28,368.92
233.13
81.20
6,750.00
ASEO GENERAL
ASEO GENERAL
730
1639
M2
1.00 M2
( 0.00)
3,135.00
3,135.00
3,135.00
778
A 271
1969
3299
ML
0.02 M3
28.35 UN
1.00 ML
( 5.00)
( 5.00)
( 0.00)
134,396.11
307.00
6,500.00
18,025.77
2,822.32
8,703.45
6,500.00
UN
M2
M3
M3
M2
M3
GL
GL
M2
( 0.00)
( 0.00)
( 5.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 5.00)
9,550.00
15,250.00
35,145.60
848.14
359,600.00
3,712,000.00
9,091,600.00
16,820.00
47,306,983.38
4,297,500.00
3,431,250.00
6,642,518.40
381,664.98
8,091,000.00
7,424,000.00
9,091,600.00
7,947,450.00
390
17
24
35
387
974
3283
3284
3282
A
A
A
A
819
450.00
225.00
189.00
450.00
22.50
2.00
1.00
472.50
UN
31,332,512.00
Cd.
3283
3284
3490
3282
Valor Total
GL
GL
M2
M2
( 0.00)
( 0.00)
( 0.00)
( 0.00)
3,712,000.00
9,091,600.00
19,511.20
16,820.00
3,712,000.00
9,091,600.00
9,950,712.00
8,578,200.00
731
2653
923
1522
M2
0.11 M3
1.02 ML
1.00 M2
( 0.00)
( 2.00)
( 0.00)
300,556.00
2,590.28
7,500.00
43,203.25
33,061.16
2,642.09
7,500.00
775
2653
98
2936
335
0.42
0.62
5.00
1.00
M3
M3
M3
%M
M3
( 5.00)
( 3.00)
( 0.00)
( 0.00)
300,556.00
26,666.00
60,000.00
60,000.00
205,713.11
126,233.52
16,479.59
3,000.00
60,000.00
732
2653
923
1523
M2
0.16 M3
1.02 ML
1.00 M2
( 0.00)
( 2.00)
( 0.00)
300,556.00
2,590.28
9,200.00
59,931.05
48,088.96
2,642.09
9,200.00
733
2653
386
1525
ML
0.02 M3
0.05 DD
1.00 ML
( 0.00)
( 0.00)
( 0.00)
300,556.00
1,160.00
5,500.00
11,569.12
6,011.12
58.00
5,500.00
777
2654
2162
2936
400
3298
1.00
6.70
5.00
0.09
1.00
M3
M3
M2
%M
DD
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
313,316.00
812.00
75,000.00
31,320.00
75,000.00
400,325.20
313,316.00
5,440.40
3,750.00
2,818.80
75,000.00
774
2936
3296
M3
2.00 %M
1.00 M3
( 0.00)
( 0.00)
14,000.00
14,000.00
14,280.00
280.00
14,000.00
LIMPIEZA FACHADA
ANDAMIO TUBULAR (SECC.)
MdeO LIMPIEZA FACHADA
734
368
1524
M2
1.00 DD
1.00 M2
( 0.00)
( 0.00)
440.80
2,300.00
2,740.80
440.80
2,300.00
779
2346
3301
860
3300
1.47
0.48
0.49
1.00
ML
M2
UN
ML
ML
( 5.00)
( 5.00)
( 5.00)
( 0.00)
5,100.00
40,582.60
26,932.00
5,250.00
45,543.19
7,497.00
19,601.40
13,194.79
5,250.00
1011
A 391
A 24
A 353
A 281
446.60
655.20
60.80
0.22
UN
M2
M3
M2
TN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
32,631.78
15,250.00
62,157.24
2,610,527.28
122,259,016.64
14,573,353.58
9,991,800.00
3,779,160.25
570,139.16
Cd.
A 282
3331
2820
3291
Valor Total
TN
ML
M3
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
2,459,495.28
15,428.00
328,048.00
49,300.00
767,362.53
1,172,528.00
24,829,953.12
66,574,720.00
760
3631
400
M3
0.00 M2
0.04 DD
( 0.00)
( 0.00)
5,220.00
31,320.00
1,252.80
0.00
1,252.80
3041
A 25
3754
3753
UN
1.72 M3
1.00 UN
1.00 UN
( 0.00)
( 0.00)
( 0.00)
36,222.00
159,862.50
1,740,000.00
1,962,164.34
62,301.84
159,862.50
1,740,000.00
3040
A 25
3752
3750
3751
1.72
1.00
1.00
1.00
UN
M3
UN
UN
UN
( 0.00)
( 0.00)
( 0.00)
( 0.00)
36,222.00
29,000.00
232,000.00
4,524,000.00
4,847,301.84
62,301.84
29,000.00
232,000.00
4,524,000.00
PRADIZACION JARDINES
PRADIZACION con pasto kikuyo
735
1717
M2
1.00 M2
( 0.00)
5,800.00
5,800.00
5,800.00
REPLANTEO CANCHAS
DURMIENTE ABARCO 4mx.04x.04
PUNTILLA 2" CON CABEZA
MdeO REPLANTEO EXTERIOR
387
3278
525
1247
M2
0.10 ML
0.01 LB
0.20 M2
( 0.00)
( 0.00)
( 0.00)
3,986.92
2,945.24
2,100.00
848.14
398.69
29.45
420.00
736
2652
25
386
1525
0.02
0.59
0.07
1.00
ML
M3
KG
DD
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
283,852.00
2,310.72
1,160.00
5,500.00
12,621.56
5,677.04
1,363.32
81.20
5,500.00
737
2653
25
386
1525
0.02
0.59
0.07
1.00
ML
M3
KG
DD
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
300,556.00
2,310.72
1,160.00
5,500.00
12,955.64
6,011.12
1,363.32
81.20
5,500.00
738
2654
25
1525
ML
0.02 M3
0.07 KG
1.00 ML
( 0.00)
( 0.00)
( 0.00)
313,316.00
2,310.72
5,500.00
11,928.07
6,266.32
161.75
5,500.00
739
2655
25
386
1525
0.02
0.59
0.07
1.00
ML
M3
KG
DD
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
333,752.00
2,310.72
1,160.00
5,500.00
13,619.56
6,675.04
1,363.32
81.20
5,500.00
SEALIZACION
740
UN
2,227,200.00
Cd.
1647
773
A 269
633
2653
923
941
3295
3294
0.00
0.02
0.02
1.20
0.66
1.00
1.00
ML
M3
GLN
M3
ML
ML
ML
ML
Valor Total
( 0.00)
2,227,200.00
2,227,200.00
( 5.00)
( 0.00)
( 5.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
149,510.93
5,131.84
300,556.00
2,590.28
2,744.56
6,500.00
6,510.00
24,026.86
313.97
102.64
5,680.51
3,108.34
1,811.41
6,500.00
6,510.00
VIAS (21)
10/07/2006 Bogot
APU Componentes
Cd.
Valor Total
656
A 66
A 271
1995
2207
130
1521
0.03
0.00
0.01
1.04
1.00
1.00
M2
M3
M3
M3
M2
UN
M2
( 8.00)
( 4.00)
( 4.00)
( 4.00)
( 0.00)
( 0.00)
107,932.98
134,396.11
26,666.00
25,000.00
19,800.00
6,750.00
57,008.79
3,497.03
628.97
332.79
26,000.00
19,800.00
6,750.00
786
2687
100
1521
1241
3310
0.10
0.34
1.00
0.40
0.30
M2
M3
M3
M2
M3
M3
( 4.00)
(14.00)
( 0.00)
( 0.00)
( 0.00)
277,240.00
20,000.00
6,750.00
7,875.00
8,000.00
47,972.96
28,832.96
6,840.00
6,750.00
3,150.00
2,400.00
BASE B-200
COMPRESOR 250 PCM
RECARGA CARROTANQUE DE AGUA
RECEBO BASE B-200
MdeO RECEBO BASE-ASFALTO
784
2468
3307
3309
3310
0.04
0.03
1.30
1.00
M3
HR
HR
M3
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
50,750.00
18,000.00
12,000.00
8,000.00
26,080.00
2,030.00
450.00
15,600.00
8,000.00
BASE B-600
COMPRESOR 250 PCM
RECARGA CARROTANQUE DE AGUA
RECEBO BASE B-600
MdeO RECEBO BASE-ASFALTO
785
2468
3307
3311
3310
0.04
0.03
1.30
1.00
M3
HR
HR
M3
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
50,750.00
18,000.00
20,000.00
8,000.00
36,480.00
2,030.00
450.00
26,000.00
8,000.00
782
967
3305
3303
M2
0.07 M3
0.60 DIA
1.00 M2
( 0.00)
( 0.00)
( 0.00)
249,400.00
40,600.00
4,515.00
46,333.00
17,458.00
24,360.00
4,515.00
CALZADA V0 A V2 EN ASFALTO
BASE B-200
BASE B-600
BASE DE ASFALTO 1350
EXCAVACION MECANICA
RODADURA 1350
788
A 784
A 785
A 782
A 24
3313
0.40
0.20
0.07
0.70
0.03
M2
M3
M3
M2
M3
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
26,080.00
36,480.00
46,333.00
15,250.00
250,000.00
39,146.31
10,432.00
7,296.00
3,243.31
10,675.00
7,500.00
CALZADA V0 A V2 EN CONCRETO
BASE B-200
EXCAVACION MECANICA
JUNTA DE DILATACION EN ASFALTO
821
A 784
A 24
A 822
M2
0.10 M3
0.30 M3
1.00 ML
( 0.00)
( 0.00)
( 0.00)
26,080.00
15,250.00
835.00
95,224.98
2,608.00
4,575.00
835.00
VIAS (21)
10/07/2006 Bogot
APU Componentes
PAVIMENTO EN CONCRETO e=.18
REFUERZO DE TRANSFERENCIA
Cd.
Valor Total
A 829
A 791
1.00 M2
1.00 KG
( 0.00)
( 0.00)
83,974.58
3,232.40
83,974.58
3,232.40
CALZADA V3 A V4 EN ASFALTO
BASE B-200
BASE B-600
BASE DE ASFALTO 1350
EXCAVACION MECANICA
RODADURA 1350
789
A 784
A 785
A 782
A 24
3313
0.40
0.20
0.05
0.68
0.03
M2
M3
M3
M2
M3
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
26,080.00
36,480.00
46,333.00
15,250.00
250,000.00
37,914.65
10,432.00
7,296.00
2,316.65
10,370.00
7,500.00
CALZADA V3 A V8 EN CONCRETO
BASE B-200
EXCAVACION MECANICA
JUNTA DE DILATACION EN ASFALTO
PAVIMENTO EN CONCRETO e=.18
REFUERZO DE TRANSFERENCIA
A
A
A
A
A
826
784
24
822
829
791
0.10
0.28
1.00
1.00
1.00
M2
M3
M3
ML
M2
KG
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
26,080.00
15,250.00
835.00
83,974.58
3,232.40
94,919.98
2,608.00
4,270.00
835.00
83,974.58
3,232.40
CALZADA V5 A V8 EN ASFALTO
BASE B-200
BASE B-600
BASE DE ASFALTO 1350
EXCAVACION MECANICA
RODADURA 1350
790
A 784
A 785
A 782
A 24
3313
0.40
0.15
0.05
0.63
0.03
M2
M3
M3
M2
M3
M3
( 0.00)
( 0.00)
( 0.00)
( 0.00)
( 0.00)
26,080.00
36,480.00
46,333.00
15,250.00
250,000.00
35,328.15
10,432.00
5,472.00
2,316.65
9,607.50
7,500.00
822
3317
3316
ML
1.20 M2
1.00 ML
( 0.00)
( 0.00)
600.00
115.00
835.00
720.00
115.00
829
3318
3319
386
400
0.19
1.00
0.25
0.06
M2
M3
M2
DD
DD
( 5.00)
( 0.00)
( 0.00)
( 0.00)
385,584.00
8,930.00
1,160.00
31,320.00
83,974.58
72,875.38
8,930.00
290.00
1,879.20
828
3318
3319
386
400
0.17
1.00
0.25
0.06
M2
M3
M2
DD
DD
( 1.00)
( 0.00)
( 0.00)
( 0.00)
385,584.00
8,930.00
1,160.00
31,320.00
77,303.97
66,204.77
8,930.00
290.00
1,879.20
REFUERZO DE TRANSFERENCIA
HIERRO PR-60 1/2"
SEGUETA MARCO
MdeO REFUERZO HIERRO
791
3315
3314
1409
KG
1.00 KG
0.05 UN
0.00 TN
( 0.00)
( 0.00)
( 0.00)
2,030.00
13,920.00
240,000.00
3,232.40
2,030.00
626.40
576.00
SARDINEL EN CONCRETO
CONCRETO 2500 PSI COMUN C/Prem
FORMALETA SARDINEL ML
VIBRADOR A GASOLINA
MdeO SARDINEL
808
2687
386
400
1525
0.06
0.18
0.03
0.66
ML
M3
DD
DD
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
277,240.00
1,160.00
31,320.00
5,500.00
21,412.80
16,634.40
208.80
939.60
3,630.00
SEPARADOR
88
M2
58,515.70
VIAS (21)
10/07/2006 Bogot
APU Componentes
EXCAVACION ZANJA h=1M Material Suelto
GRAMA SINTETICA 500 GRS.
TIERRA NEGRA
MdeO SEPARADOR
Cd.
A 26
3635
1621
129
M3
M2
M3
ML
( 0.00)
( 0.00)
( 0.00)
( 0.00)
33,570.00
32,126.20
40,000.00
4,725.00
Valor Total
10,071.00
32,126.20
13,200.00
3,118.50
Cd.
Valor Total
BISAGRA VAIVEN
B100 BISAGRA PISO PLATEADO PINTADA
MdeO Coloc. BISAGRA VAIVEN
648
1171
1515
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
29,270.00
3,465.00
32,735.00
29,270.00
3,465.00
BRAZO RETENEDOR
BRAZO RETENEDOR DORMA No. 2
MdeO Coloc. BRAZO RETENEDO
650
1204
2858
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
103,356.00
13,125.00
116,481.00
103,356.00
13,125.00
CERRADURA ALCOBA
CERRADURA SAFE ALC.141 CLASIC ST
MdeO INST. CERRADURA INTERES SOCIAL
752
1175
1516
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
27,260.00
5,145.00
32,405.00
27,260.00
5,145.00
1017
3336
3338
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
1,493,616.00
40,000.00
1,533,616.00
1,493,616.00
40,000.00
1015
3335
3337
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
787,983.00
40,000.00
827,983.00
787,983.00
40,000.00
CERRADURA BAOS
CERRADURA SAFE BAO 152 CLASIC ST
MdeO INST. CERRADURA INTERES SOCIAL
749
1177
1516
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
24,940.00
5,145.00
30,085.00
24,940.00
5,145.00
754
1193
1516
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
37,294.00
5,145.00
42,439.00
37,294.00
5,145.00
755
1193
1516
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
37,294.00
5,145.00
42,439.00
37,294.00
5,145.00
756
2020
1516
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
33,640.00
5,145.00
38,785.00
33,640.00
5,145.00
CERRADURA DEPOSITO
CERRADURA SCHLAGE Dep. GOLD GEORGIA
MdeO INST. CERRADURA INTERES SOCIAL
757
1192
1516
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
33,640.00
5,145.00
38,785.00
33,640.00
5,145.00
ESPEJO
654
1208
2805
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
45,000.00
4,200.00
49,200.00
45,000.00
4,200.00
4mm
ESPEJO CRISTAL INCOLORO 4mm
MdeO INSTALACION ESPEJO 4mm
6mm
ESPEJO CRISTAL INCOLORO 3mm
MdeO INSTALACION ESPEJO 6mm
Cd.
Valor Total
655
2965
2855
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
32,000.00
4,200.00
36,200.00
32,000.00
4,200.00
PUERTA CRISTAL
10mm
PUERTA CRISTAL 10mm 1.0x2.1 M.
660
1213
UN
1.00 UN
( 0.00)
1,170,440.00
1,170,440.00
1,170,440.00
661
1175
1173
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
27,260.00
4,515.00
31,775.00
27,260.00
4,515.00
662
1177
1173
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
24,940.00
4,515.00
29,455.00
24,940.00
4,515.00
663
1178
1173
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
29,232.00
4,515.00
33,747.00
29,232.00
4,515.00
665
1180
1173
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
34,220.00
4,515.00
38,735.00
34,220.00
4,515.00
667
1183
1173
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
41,760.00
4,515.00
46,275.00
41,760.00
4,515.00
668
1184
1173
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
24,940.00
4,515.00
29,455.00
24,940.00
4,515.00
SCHLAGE ALCOBA A 50 WS
CERRADURA SCHLAGE ALC. GOLD GEORGIA
INSTALACION CERRADURA MADERA
669
1186
1173
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
33,872.00
4,515.00
38,387.00
33,872.00
4,515.00
SCHLAGE BAO A 40 S
CERRADURA SCHLAGE BAO GOLD GEORGIA
INSTALACION CERRADURA MADERA
670
1188
1173
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
29,754.00
4,515.00
34,269.00
29,754.00
4,515.00
SCHLAGE CLOSET A 71 WS
CERRRADURA SCHLAGE CL. GOLD GEORGIA
INSTALACION CERRADURA MADERA
671
1190
1173
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
29,754.00
4,515.00
34,269.00
29,754.00
4,515.00
SCHLAGE ENTRADA A 80 PD
CERRADURA SCHLAGE ENTR.ALUM N/GEORG
INSTALACION CERRADURA MADERA
672
1194
1173
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
37,294.00
4,515.00
41,809.00
37,294.00
4,515.00
SCHLAGE OFICINA A 50 PD
CERRADURAS SCHLAGE OFIC.GOLD GEORGIA
INSTALACION CERRADURA MADERA
673
1195
1173
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
39,324.00
4,515.00
43,839.00
39,324.00
4,515.00
SCHLAGE PASO A 10 S
CERRADURA SCHLAGE PASO ALUM.N/GEOR.
674
1197
UN
1.00 UN
( 0.00)
29,754.00
34,269.00
29,754.00
Cd.
Valor Total
1173
1.00 UN
( 0.00)
4,515.00
4,515.00
SCHLAGE TERRAZA A 30 S
CERRADURA SCHLAGE TERRAZA GOLD GEOR
INSTALACION CERRADURA MADERA
676
1198
1173
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
29,754.00
4,515.00
34,269.00
29,754.00
4,515.00
651
1205
2853
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
87,000.00
7,035.00
94,035.00
87,000.00
7,035.00
652
1206
2854
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
114,840.00
4,200.00
119,040.00
114,840.00
4,200.00
679
279
2856
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
92,800.00
4,200.00
97,000.00
92,800.00
4,200.00
653
1207
2853
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
170,520.00
7,035.00
177,555.00
170,520.00
7,035.00
658
1211
2854
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
100,920.00
4,200.00
105,120.00
100,920.00
4,200.00
677
1214
2715
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
16,000.00
4,200.00
20,200.00
16,000.00
4,200.00
680
1217
2714
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
16,000.00
4,200.00
20,200.00
16,000.00
4,200.00
681
1218
2715
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
17,000.00
4,200.00
21,200.00
17,000.00
4,200.00
682
1219
2856
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
22,500.00
4,200.00
26,700.00
22,500.00
4,200.00
683
1220
2854
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
31,500.00
4,200.00
35,700.00
31,500.00
4,200.00
678
280
2715
M2
1.00 M2
1.00 M2
( 0.00)
( 0.00)
76,560.00
4,200.00
80,760.00
76,560.00
4,200.00
684
1201
1173
UN
1.00 UN
1.00 UN
( 0.00)
( 0.00)
15,800.00
4,515.00
20,315.00
15,800.00
4,515.00
CONTENIDO
TABLAS DE AYUDAS Y ESPECIFICACIONES TCNICAS
1.
2.
3.
4.
5.
6.
Urbanizaciones
Presupuesto
Control de Costos
Programacin y Control
Interventora
Construccin
Hierros de Refuerzo
Puntillas
Concreto
Mortero
Dimensiones Nominales
reas para Varias Combinaciones de Barras
Ancho Mnimo de Viga para un Nmero dado de Barras en una fila
Pesos de los Materiales
Cantidades de Concreto por M de la Placa
Recubrimiento del Refuerzo
Cargas Vivas
Tejas
Rendimiento de Ladrillos
Mampostera Cantidad de Mortero, Ladrillo y mano de Obra por M
Costos de Prestaciones Sociales y Aportes 2001 Obreros Construccin menos de 2 S.M.L
Costo de Prestaciones Sociales y Aportes 2001 Empleados mas de 2 S.M.L.
TARIFAS S. C. A.
Decreto No. 2090 Septiembre 13 de 1989
CALCULO DE HONORARIOS
Para el clculo de los Honorarios, se utiliza el Honorario Bsico, calculado de acuerdo al rea
construda y al Costo Base para el Cobro de Tarifas (CBT) segn Presupuesto de la Obra.
AREA CONSTRUIDA
((M2)
1.000
4.000
5.000
% DEL
AREA ACUM.
CBT
(M2)
Primeros
7.0
1.000
Siguientes
5.0
5.000
Siguientes
4.0
10.000
En adelante
3.0
Para el costo del Area Construda, no se tendrn en cuenta los aleros, ni reas exteriores.
TIPO DE CONSTRUCCION
HONORARIO
Sencilla:
Colegios
sin
Estacionamientos en edificios
vivienda,
Proyectos de Construccin
Urbanizaciones.
en
Primera
Siguientes
Siguientes
Siguientes
Siguientes
Siguientes
Siguientes
En Adelante
No. Parcial
De Unidad
1
4
5
10
30
50
200
% de Tarifa
1 Unidad
100,0
40,0
30,0
20,0
10,0
7,5
5,0
4,0
V/. parcial
En % de 1
Unidad
100,0
160,0
150,0
200,0
300,0
375,0
1.000,0
V. Acum.
En % de 1
Unidad
100,0
260,0
410,0
610,0
910,0
1.285,0
2.285,0
Total
Acumulado
Unidades
1
5
10
20
50
100
300
1.
2.
3.
4.
COSTO DE LA CONSTRUCCION
Es el conjunto de Materiales, Equipos y Herramientas utilizados en la Obra, al igual que
Impuestos, Derechos de Conexin en Servicios, Plizas de Seguros, Honorarios y Recursos
Humanos. La terminologa que se utiliza es la siguiente:
CC E
CC P
CC R
CBT E
CBT P
Costo
Costo
Costo
Costo
Costo
ENTREGAS PARCIALES
El Arquitecto tendr derecho a que le sean pagados los siguientes porcentajes por las entregas
parciales de su trabajo:
A. El 7% a la entrega del Esquema Bsico.
B. Completar hasta el 15% a la entrega del Anteproyecto.
El Honorario de Supervisin Arquitectnica ser de un 10% para todos los casos, y por lo tanto
el Honorario total de Anteproyecto, Proyecto y Supervisin Arquitectnica (A. P. y S.) es:
En ciudades de dificultad 1 - 100%.
En ciudades de dificultad 2 - 95%.
En ciudades de dificultad 3 - 90%.
TIPOS DE HONORARIOS
1.
URBANIZACIONES:
A. Urbanizaciones de Vivienda: Inicialmente el Honorario, en todos los casos de
Urbanismo, se cobrar como un dato provisional (CBT E), luego se har la liquidacin
definitiva con el dato del presupuesto (CBT P) de la poca a la entrega del Proyecto.
El Honorario provisional se liquidar as:
Honorario Base del Proyecto Urbanistico x 8%
Unidad de Vivienda
Primeras
Siguientes
Siguientes
Siguientes
Siguientes
En adelante
No. Parcial
Vivienda
10
40
50
100
300
% Tarifa de
1 Unidad
100%
75%
50%
25%
15%
10%
Factor
Parcial
10
30
25
25
45
Factor
Acumulado
10
40
65
90
135
T/Acum.
Unidades
10
50
100
200
500
B. Para otras Urbanizaciones: 10% del valor estimado de las obras de Urbanismo.
2.
Incremento de Honorario
Se mantiene
15%
20%
30%
3.
Cimentacin y Estructura.
Elctricas, TV, Sonido, Telfonos.
Hidrulicas y Sanitarias.
Mecnicas.
CONTROL DE COSTOS:
A. Por Administracin Delegada: 0,9% del CBT R, ms los gastos reembolsables.
B. Obras a Precios Unitarios: 0,45% del CBT R, ms los gastos reembolsables.
C. Cobro de los Honorarios: Se cobrarn peridicamente durante el transcurso de la Obra.
4.
PROGRAMACION Y CONTROL:
A. Programacin de Actividades previas y de Proyectos: 2% de los Honorarios
correspondientes al A. P. y S.; es independiente de los Honorarios del Programa de
Construccin.
B. Programas Generales: Se cobrar de acuerdo a Trabajos Varios.
5.
INTERVENTORIA:
A. Interventora de Proyectos: 15% de los Honorarios del Proyecto y Supervisin
Arquitectnica, liquidados con el CBT P.
B. Interventora de Construccin:
6.
CONSTRUCCION:
A. Construccin por Administracin Delegada
Categora de la A hasta la G :
Categora H
:
Categora I
:
B. Construccin por Precio Global o Alzado: 10% del Costo Base de los Trabajos.
C. Construccin por Precios Unitarios: 10% del Costo Base de los Trabajos.
cuadrado
Redondo
DenomiNacin
Permetro Pulg.
Cant.
Area
Pulg.2
Cant.2
Peso
Lib/P
Kg/Ml
Permetro Pulg.
Cant.
Area
Pulg.2
Cant.2
Peso
Lib/P
Kg/Ml
2/8
5/16
3/8
No.2 No.2,5 No.3
0,785 0,982 1,178
1,99
2,49
2,99
0,049 0,076 0,110
0,316 0,494 0,712
0,049 0,076 0,110
0,248 0,387 0,588
1000 1250 1500
2,54
3,18
3,81
0,062 0,097 0,140
0,403 0,630 0,901
2,210
0,33
0,48
0,131 0,492 0,715
4/8
No.4
1,571
3,99
0,963
1,266
0,963
0,993
2000
5,08
0,250
1,612
0,85
1,267
5/8
No.5
1,964
4,99
0,306
1,979
0,306
1,612
2500
6,35
0,390
2,520
1,33
1,982
6/8
No.6
2,356
5,98
0,441
2,850
0,441
2,235
3000
7,62
0,562
3,629
1,91
2,846
7/8
No.7
2,749
6,98
0,601
3,879
0,601
3,041
3500
0,89
0,765
4,939
2,60
3,874
8/8
12/8
No.8 No.12
3,142 4,7111
7,98
1,97
0,785 1,167
5,067 11,40
0,785 1,167
3,973 6,943
4000 6000
10,16 15,24
1,00
2,25
6,451 14,51
3,40
7,65
5,066 11,39
PUNTILLAS
CON CABEZA
Longitud
1
1
2
2
3
3
4
4
5
5
6
Cantidad X Libra
2.835
941
363
159
104
57
39
23
22
16
14
12
SIN CABEZA
Longitud
5/8
7/8
1
1
1
2
2
Cantidad X Libra
3.243
2.530
2.014
1.966
1.566
1.033
632
275
235
CONCRETO
Mezcla
Cantidad de Mat. X M3
Cem. Arena Agua Tr/rado
X Kg
X M3 X Lts X M3
420
0,67
230
0,670
C
1
A
2
T
2
350
0,56
210
0,835
1
1
2
3
4
3
300
300
0,48
0,72
204
204
0,950
0,715
260
0,63
204
0,835
230
0,56
204
0,920
230
0,56
192
1.000
1
1
4
4
7
8
230
230
0,56
0,56
185
185
0,975
1,025
Resistencia
Usos
Kg/
P.S.I. Cm2
Usos
3.000 210 Tanques, muros de
contencin, columnas.
2.500 175 Tanques/Muros resistentes,
presin H2O.
2.000 140 Cubiertas.
2.000 140 Paredes y pisos en concreto
armado.
2.000 140 Pisos, vigas y columnas de
concreto.
2.000 140 Concreto resistente a la
vibracin.
1.500 105 Concreto resistente a la
vibracin.
1.000 70 Dintel puertas, ventanas.
1.000 70 Dintel puertas, ventanas.
MORTERO
Proporcin
C
A
1
1
Cant. Materiales x M3
Cemento (Kg)
Arena (M3)
942
0,74
610
0,97
454
1,09
1
1
4
5
364
302
1,16
1,20
261
1,20
1
1
1
7
8
9
228
203
166
1,20
1,25
1,25
10
141
1,25
USOS
Usos
Revoques sometidos a desgaste, Arena
lavada.
Pisos sometidos a desgaste, Arena
lavada.
Mampostera de ladrillo cocido, Arena
lavada.
Mampostera y paetes. Arena lavada.
Revoque de muros exteriores. Arena sin
lavar.
Mampostera ladrillo cocido. Arena sin
lavar.
Mampostera ladrillo. Arena sin lavar.
Mortero para muros de carcter
transitorio.
BARRA
No.
2
3
4
5
6
7
8
[11/8"]
9
[11/4"]
10
DIMENSIONES NOMINALES
DIAMETRO
AREA
PERIMETRO
cm
cm.
cm
0.64
0.32
1.98
0.95
0.71
2.98
1.27
1.27
3.99
1.59
1.99
4.99
1.91
2.85
5.98
2.22
3.88
6.98
2.54
5.06
7.98
[2.82]
[6.41]
[8.98]
2.87
6.45
9.00
[3.12]
[7.92]
[9.99]
3.23
8.19
10.13
PESO
kg/m
0.25
0.56
0.99
1.55
2.24
3.04
3.97
{5.030}
5.060
[6.210]
6.4
10
3.23
19
26
33
39
46
52
59
8
2.54
5.10
10.20
15.30
20.40
25.50
30.60
35.70
40.80
45.90
51.00
56.10
61.20
10
12
15
17
20
25
0.05
0.06
0.07
0.08
0.09
0.1
0.12
0.15
0.17
0.2
0.25
20
16.7
14.3
12.5
11.1
10
8.3
6.7
5.9
VIVIENDA
OFICINAS
ESCALERAS EN OFICINAS
Y VIVIENDAS
SALONES DE REUNION
- CON ASIENTOS FIJOS
- SIN ASIENTOS FIJOS
HOSPITALES
-CUARTOS
-SALAS DE OPERACIONES
COLISEOS Y ESTADIOS
-GRADERIAS
-ESCALERAS
GARAJES
-AUTOMOVILES
-VEHICULOS PESADOS
CARGAS VIVAS
180 Kg/m
HOTELES
200Kg/m
CUBIERTAS
ESCUELAS, COLEGIOS
300Kg/m
Y UNIVERSIDADES
BIBLIOTECAS
300Kg/m
-SALAS DE LECTURA
500Kg/m
-DEPOSITOS DE LIBROS
FABRICAS
200/Kg/m
-LIVIANAS
400Kg/m
-PESADAS
DEPOSITOS
400/Km/m
-LIVIANOS
500/Kg/m
-PESADOS
ALMACENES
205Kg/m
-DETAL
SEGN USO -POR MAYOR
75
50
38
20
25
38
200Kg/m
35Kg/m
200Kg/m
200Kg/m
500Kg/m
500Kg/m
1000Kg/m
500Kg/m
1000Kg/m
350Kg/m
500Kg/m
TEJAS
TIPO
COLONIAL
S
ESPAOLA
ASBESTO CEM
ASBESTO CEM
ASBESTO CEM
ASBESTO CEM
ASBESTO CEM
ASBESTO CEM
ASBESTO CEM
TEJALIT No.4
TEJALIT No.5
TEJALIT No.6
TEJALIT No.8
INGLESA
BAVARIA
ESCANDINAVA
ESCANDINAVA
No.2
No.3
No.4
No.5
No.6
No.8
No.10
MARCA
SANTA FE
SANTA FE
SANTA FE
ETERNIT
ETERNIT
ETERNIT
ETERNIT
ETERNIT
ETERNIT
ETERNIT
ETERNIT
ETERNIT
ETERNIT
ETERNIT
MOORE
MOORE
MOORE
MOORE
DIMENSIONES
0.45 x 0.22 Mt.
0.45 x 0.28.5 Mt.
0.45 x 0.18 Mt.
0.61 x 0.92 Mt.
0.91 x 0.92 Mt.
1.22 x 0.92 Mt.
1.52 x 0.92 Mt.
1.83 x 0.92 Mt.
2.44 x 0.92 Mt.
3.05 x 0.92 Mt.
1.22 x 0.64 Mt.
1.52 x 0.798 Mt.
1.83 x 0.96 Mt.
2.44 x 1.28 Mt.
31.5 x 25.5 Cm.
39.5 x 22.2 Cm.
39.5 x 22.2 Cm.
25.0 x 14.5 Cm.
PESO X UN.
2.5 Kg
3.04 Kg
1.7 Kg
6.83 Kg
10.24 Kg
13.65 Kg
17.06 Kg
20.48 Kg
27.30 Kg
34.13 Kg
4.80 Kg
6.00 Kg
7.10 Kg
9.50 Kg
3.0 Kg
3.0 Kg
3.0 Kg
1.0 Kg
CANT. X M2
16
10
11
1.78
1.19
0.89
0.71
0.59
0.44
0.35
1.28
0.82
0.57
0.32
20
13
13
30
RENDIMIENTO DE LADRILLOS
TIPO
MARCA
DIMENSION
PESO x UN
YOMASA
24,0 x 12,0 x 7
3,4 Kg
YOMASA
24,0 x 12,0 x 7
3,4 Kg
YOMASA
32,0 x 23 x 7
5 Kg
YOMASA
33,0 23,0 x 9
7 Kg
YOMASA
33,0 x 23,0 x 12
8 Kg
YOMASA
10 Kg
BLOQUE No.4
SANTAFE
33 x 23 x 9
BLOQUE No.5
SANTAFE
33 x 23 x 11,5
BLOQUE No.6
LADRIBLOC
PRENSADO
SANTAFE
SANTAFE
SANTAFE
14 x 23 x 33
14 x 19 x 39
5,5 x 12 x 24,5
TOLETE MACIZO
SANTAFE
6 x 12 x 24,5
PORTANTE
SANTAFE
9 x 14,5 x 29
TOLETE FINO
SANTAFE
6 x 12 x 24,5
TOLETE RECOCIDO
CANT. X M2
Tabiq = 62
Tabic = 112
Tabiq = 62
Tabic = 112
Tabiq = 12,5
Tabic = 42
Tabiq = 12,5
Tabic = 30
Tabiq = 12,5
Tabic = 24
Tabiq = 12,5
Tabic = 19,6
Tabiq = 12,5
Tabic = 29
Tabiq = 12,5
Tabic = 23
Tabiq = 12,5
12,5 Un/M2
Pand = 30
Tabiq = 60
Pisos
34/M2
Adoquin
Tabic = 64
Tabiq = 33,3
Pand = 30
Tabic = 103
Tabic = 106
Tabiq = 58
MAMPOSTERIA
Cantidad de Mortero, Ladrillo y Mano de Obra por M2
Clase
De
Ladrillo
Dimensin
Ancho
De
Muro
Ladrillos
X M2 de
Muro
Mortero
X M2
Lt.
Mortero
X M2
M3
Ladrillo
X M3 de
Mortero
Hora
Hombre
X M2
0,06
56,60
15,00
0,016
2000
1,5
Tolete fino
Bloque
No.4
Bloque
No.5
Bloque
No.6
24,5 x 12 x 6
0,24
103,00
96,00
0,070
1000
4,8
9 x 33 x23
0,09
12,50
12,27
0,013
900
1,77
11,5 x 33 x 23
0,12
12,50
16,50
0,017
670
2,20
14 x 33 x23
0,15
11,00
20,00
0,021
540
2,15
Planos Arquitectnicos
.25%
Clculos Estructurales
.20%
Costo de Construccin
Estudio de Suelos
.03%
A.I.U.
8%
.03%
Costos indirectos
6%
.03%
Lote
8%
Diseo Elctrico
.03%
Urbanismo
9%
Presupuesto
.02%
Financieros
10%
Programacin
.02%
Gerencia Proyecto
3%
1.00%
Ventas y publicidad
3%
.60%
Legales y Avalos
3%
Utilidad
10%
Interventora
Impuestos
Servicios Pblicos
1.70%
Imprevistos
1.59%
Seguros
.30%
Papelera
.20%
40%
%
TOTAL
APORTE
EMPLEADOR
APORTE
EMPLEADO
9.55%
10.90%
1.31%
9.13%
4.16%
12.00%
13.50%
8.70%
69.25%
9.55%
10.90%
1.31%
9.13%
4.16%
8.00%
10.13%
8.70%
61.88%
4.00%
3.375%
APORTES PARAFISCALES:
Cajas de Compensacin Familiar
Sena
FIC
I.C.B.F.
SUBTOTAL
4.00%
2.00%
2.50%
3.00%
11.50%
4.00%
2.00%
2.50%
3.00%
11.50%
0.00%
5.28%
5.28%
86.03%
78.66%
7.375%
Vestido de Labor * *
TOTAL
%
TOTAL
APORTE
EMPLEADOR
APORTE
EMPLEADO
8.33%
1.00%
8.33%
4.16%
12.00%
13.50%
0.522%
47.84%
8.33%
1.00%
8.33%
4.16%
8.00%
13.50%
0.522%
40.47%
4.00%
3.375%
7.375%
4.00%
2.00%
3.00%
9.00%
4.00%
2.00%
3.00%
9.00%
0.00%
56.84%
49.47%
3.375%