ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL

OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE

01 OBRAS PRELIMINARES 3,123,674.28 145,558.77 381,459.94 527,018.71 2,596,655.57 16.87%


01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 1.00 1,495,285.79 1,495,285.79 0.0878 131,322.04 0.23 349,814.49 0.3218 481,136.53 0.6782 1,014,149.26 32.18%
01.02 TRAZO Y REPLANTEO KM 86.20 1,059.73 91,348.73 12.03 12,748.55 20.69 21,925.16 32.72 34,673.71 53.4806 56,675.02 37.96%
01.03 LIMPIEZA GENERAL - ROCE Y DESBROCE HA 56.00 4,303.60 241,001.60 0.0000 0.00 0.00 0.00 0.0000 0.00 56.0000 241,001.60 0.00%
01.04 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL GLB 1.00 1,296,038.16 1,296,038.16 0.0011 1,488.18 0.0075 9,720.29 0.0086 11,208.47 0.9914 1,284,829.69 0.86%

02 MOVIMIENTO DE TIERRAS 5,827,069.11 0.00 0.00 0.00 5,827,069.11 0.00%


02.01 EXCAVACION NO CLASIFICADA PARA EXPLANACION M3 274,842.61 10.25 2,817,136.75 0.00 0.00 0.00 0.00 0.0000 0.00 274,842.61 2,817,136.75 0.00%
02.02 PERFILADO Y COMPACTADO DE LA SUB - RASANTE M2 497,391.31 1.41 701,321.75 0.00 0.00 0.00 0.00 0.0000 0.00 497,391.31 701,321.75 0.00%
02.03 TERRAPLENES M3 200,673.57 6.25 1,254,209.81 0.00 0.00 0.00 0.00 0.0000 0.00 200,673.57 1,254,209.81 0.00%
02.04 REMOCION DE DERRUMBES M3 82,452.78 4.49 370,212.98 0.00 0.00 0.00 0.00 0.0000 0.00 82,452.78 370,212.98 0.00%
02.05 DESQUINCHE Y PEINADO DE TALUDES M3 14,000.00 3.84 53,760.00 0.00 0.00 0.00 0.00 0.0000 0.00 14,000.00 53,760.00 0.00%
02.06 PRÉSTAMO DE CANTERA M3 63,359.58 9.95 630,427.82 0.00 0.00 0.00 0.00 0.0000 0.00 63,359.58 630,427.82 0.00%
0.0000
03 PAVIMENTOS 16,976,589.38 0.00 0.00 0.00 16,976,589.38 0.00%
03.01 MEJORAMIENTO DE LA SUB RASANTE M3 133,990.60 30.17 4,042,496.40 0.00 0.00 0.00 0.00 0.0000 0.00 133,990.60 4,042,496.40 0.00%
03.02 BASE GRANULAR M3 129,323.07 32.50 4,202,999.78 0.00 0.00 0.00 0.00 0.0000 0.00 129,323.07 4,202,999.78 0.00%
03.03 SUB BASE GRANULAR M3 119,319.16 22.90 2,732,408.76 0.00 0.00 0.00 0.00 0.0000 0.00 119,319.16 2,732,408.76 0.00%
03.04 IMPRIMACIÓN ASFÁLTICA M2 538,689.11 1.23 662,587.61 0.00 0.00 0.00 0.00 0.0000 0.00 538,689.11 662,587.61 0.00%
03.05 TRATAMIENTO SUPERFICIAL BICAPA M2 533,683.18 2.96 1,579,702.21 0.00 0.00 0.00 0.00 0.0000 0.00 533,683.18 1,579,702.21 0.00%
03.06 ASFALTO LIQUIDO RC-250 GLN 497,827.13 7.33 3,649,072.86 0.00 0.00 0.00 0.00 0.0000 0.00 497,827.13 3,649,072.86 0.00%
03.07 ADITIVO MEJORADOR DE ADHERENCIA KG 6,388.20 16.80 107,321.76 0.00 0.00 0.00 0.00 0.0000 0.00 6,388.20 107,321.76 0.00%

04 TRANSPORTE 22,571,330.85 0.00 0.00 0.00 22,571,330.85 0.00%


04.01 CARGUIO M3 215,720.79 2.02 435,756.00 0.00 0.00 0.00 0.00 0.0000 0.00 215,720.79 435,756.00 0.00%
04.02 TRANSPORTE DE MATERIAL GRANUAR HASTA 1.00 M3K 443,097.39 7.21 3,194,732.18 0.00 0.00 0.00 0.00 0.0000 0.00 443,097.39 3,194,732.18 0.00%
04.03 TRANSPORTE DE MATERIAL GRANULAR DESPUÉS DEM3K 8,954,225.84 1.91 17,102,571.35 0.00 0.00 0.00 0.00 0.0000 0.00 8,954,225.84 17,102,571.35 0.00%
04.04 TRANSPORTE DE MATERIAL A ELIMINAR HASTA 1 K M3K 245,508.48 7.21 1,770,116.14 0.00 0.00 0.00 0.00 0.0000 0.00 245,508.48 1,770,116.14 0.00%
04.05 TRANSPORTE DE MATERIAL A ELIMINAR DESPUÉS D M3K 35,683.34 1.91 68,155.18 0.00 0.00 0.00 0.00 0.0000 0.00 35,683.34 68,155.18 0.00%

05 OBRAS DE ARTE Y DRENAJE 31,926,133.48 0.00 0.00 0.00 31,926,133.48 0.00%


05.01 CUNETAS LATERALES 10,100,056.08 0.00 0.00 0.00 10,100,056.08 0.00%
05.01.01 CONSTRUCCIÓN DE CUNETAS TIPO 1 M 69,687.00 104.46 7,279,504.02 0.00 0.00 0.00 0.00 0.0000 0.00 69,687.00 7,279,504.02 0.00%
05.01.02 CONSTRUCCIÓN DE CUNETAS TIPO 2 M 24,562.00 72.37 1,777,551.94 0.00 0.00 0.00 0.00 0.0000 0.00 24,562.00 1,777,551.94 0.00%
05.01.03 CONSTRUCCIÓN DE CUNETAS TIPO 3 M 7,229.00 144.28 1,043,000.12 0.00 0.00 0.00 0.00 0.0000 0.00 7,229.00 1,043,000.12 0.00%
05.02 ALCANTARILLAS DE CONCRETO REFORZADO PARA CRUCE CANAL DE 336,158.79 0.00 0.00 0.00 336,158.79 0.00%
05.02.01 LIMPIEZA DE ALCANTARILLAS M3 22.21 23.10 513.05 0.00 0.00 0.00 0.00 0.0000 0.00 22.21 513.05 0.00%
05.02.02 EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTUR M3 816.00 13.77 11,236.32 0.00 0.00 0.00 0.00 0.0000 0.00 816.00 11,236.32 0.00%
05.02.03 DEMOLICIÓN DE ESTRUCTURAS (CON EQUIPOS) M3 523.00 49.42 25,846.66 0.00 0.00 0.00 0.00 0.0000 0.00 523.00 25,846.66 0.00%
05.02.04 ELIMINACIÓN DE ESCOMBROS M3 170.00 83.44 14,184.80 0.00 0.00 0.00 0.00 0.0000 0.00 170.00 14,184.80 0.00%
05.02.05 ELIMINACIÓN DE ALCANTARILLAS METÁLICAS M 64.95 99.42 6,457.33 0.00 0.00 0.00 0.00 0.0000 0.00 64.95 6,457.33 0.00%
05.02.06 RELLENO COMPACTADO PARA ESTRUCTURAS M3 252.00 36.20 9,122.40 0.00 0.00 0.00 0.00 0.0000 0.00 252.00 9,122.40 0.00%
05.02.07 CONCRETO SIMPLE f'C= 210 KG/CM2. M3 295.00 345.71 101,984.45 0.00 0.00 0.00 0.00 0.0000 0.00 295.00 101,984.45 0.00%
05.02.08 ACERO DE REFUERZO f´c 4200 kg/cm2 -P KG 29,355.00 3.92 115,071.60 0.00 0.00 0.00 0.00 0.0000 0.00 29,355.00 115,071.60 0.00%
05.02.09 ENCOFRADO Y DESENCOFRADO M2 1,159.00 43.42 50,323.78 0.00 0.00 0.00 0.00 0.0000 0.00 1,159.00 50,323.78 0.00%
05.02.10 PICADO Y PREPARACIÓN DE SUPERFICIE DE CO M2 40.00 35.46 1,418.40 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 1,418.40 0.00%
05.03 ALCANTARILLA DE TUBO METAL CORRUGADO 5,060,071.27 0.00 0.00 0.00 5,060,071.27 0.00%
05.04 LIMPIEZA DE ALCANTARILLAS M3 9.00 23.10 207.90 0.00 0.00 0.00 0.00 0.0000 0.00 9.00 207.90 0.00%
05.05 EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURA M3 72,318.00 13.77 995,818.86 0.00 0.00 0.00 0.00 0.0000 0.00 72,318.00 995,818.86 0.00%
05.06 DEMOLICIÓN DE ESTRUCTURAS (CON EQUIPOS) M3 12,932.00 49.42 639,099.44 0.00 0.00 0.00 0.00 0.0000 0.00 12,932.00 639,099.44 0.00%
05.07 ELIMINACIÓN DE ESCOMBROS M3 4,203.00 83.44 350,698.32 0.00 0.00 0.00 0.00 0.0000 0.00 4,203.00 350,698.32 0.00%
05.08 ELIMINACIÓN DE ALCANTARILLAS METÁLICAS M 1,950.00 99.42 193,869.00 0.00 0.00 0.00 0.00 0.0000 0.00 1,950.00 193,869.00 0.00%
05.09 RELLENO COMPACTADO PARA ESTRUCTURAS M3 48,905.00 36.20 1,770,361.00 0.00 0.00 0.00 0.00 0.0000 0.00 48,905.00 1,770,361.00 0.00%
05.23.06 LOSA DE CONCRETO EMBOQUILLADO, MAMPOSTERI M2 12,175.00 87.05 1,059,833.75 0.00 0.00 0.00 0.00 0.0000 0.00 12,175.00 1,059,833.75 0.00%
05.11 MORTERO LANZADO, SHOTCRETE CONC.SIMPLE F'C M3 100.00 501.83 50,183.00 0.00 0.00 0.00 0.00 0.0000 0.00 100.00 50,183.00 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


01.07 TALUD VERTICAL DE SALIDA ALCANTARILLA 2,504,327.77 0.00 0.00 0.00 2,504,327.77 0.00%
05.12 ALCANTARILLA TMC D = 36" M 810.00 310.67 251,642.70 0.00 0.00 0.00 0.00 0.0000 0.00 810.00 251,642.70 0.00%
05.13 ALCANTARILLA TMC D = 48" M 542.00 498.53 270,203.26 0.00 0.00 0.00 0.00 0.0000 0.00 542.00 270,203.26 0.00%
05.14 ALCANTARILLA TMC D = 60" M 186.00 750.41 139,576.26 0.00 0.00 0.00 0.00 0.0000 0.00 186.00 139,576.26 0.00%
05.15 ALCANTARILLA TMC D = 72" M 97.00 892.68 86,589.96 0.00 0.00 0.00 0.00 0.0000 0.00 97.00 86,589.96 0.00%
05.16 ABOVEDADA 29-PA-5.17 M 240.00 3,674.11 881,786.40 0.00 0.00 0.00 0.00 0.0000 0.00 240.00 881,786.40 0.00%
05.17 ABOVEDADA 08-PA-100 M 337.00 1,688.71 569,095.27 0.00 0.00 0.00 0.00 0.0000 0.00 337.00 569,095.27 0.00%
05.18 ABOVEDADA 19-PA-3.10 M 132.00 2,228.21 294,123.72 0.00 0.00 0.00 0.00 0.0000 0.00 132.00 294,123.72 0.00%
05.19 TUBERÍA PVC PERFORADO PARA SUBDREN LATER M 100.00 48.04 4,804.00 0.00 0.00 0.00 0.00 0.0000 0.00 100.00 4,804.00 0.00%
05.20 TUBERÍA PVC PERFORADO PARA SUBDREN LATER M 60.00 67.60 4,056.00 0.00 0.00 0.00 0.00 0.0000 0.00 60.00 4,056.00 0.00%
05.21 TUBERÍA PVC 3/4" PARA PILETAS EN MANANTIALE M 38.00 40.76 1,548.88 0.00 0.00 0.00 0.00 0.0000 0.00 38.00 1,548.88 0.00%
05.22 PUNTO DE AGUA Y DESAGÜE EN PILETAS UND 3.00 300.44 901.32 0.00 0.00 0.00 0.00 0.0000 0.00 3.00 901.32 0.00%
05.23 MUROS BARRERA EN ZONAS DE CORTE 3,188,896.58 0.00 0.00 0.00 3,188,896.58 0.00%
05.23.01 CONCRETO SIMPLE f'C= 210 KG/CM2. M3 3,615.50 345.71 1,249,914.51 0.00 0.00 0.00 0.00 0.0000 0.00 3,615.50 1,249,914.51 0.00%
05.23.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P KG 180,657.00 3.92 708,175.44 0.00 0.00 0.00 0.00 0.0000 0.00 180,657.00 708,175.44 0.00%
05.23.03 ENCOFRADO Y DESENCOFRADO M2 17,067.00 43.42 741,049.14 0.00 0.00 0.00 0.00 0.0000 0.00 17,067.00 741,049.14 0.00%
05.23.04 JUNTA CON WATER STOP 11" M 1,552.00 42.77 66,379.04 0.00 0.00 0.00 0.00 0.0000 0.00 1,552.00 66,379.04 0.00%
05.23.05 SELLO DE JUNTA TRANSVERSAL CON IGAS O SIMI M 60.00 44.43 2,665.80 0.00 0.00 0.00 0.00 0.0000 0.00 60.00 2,665.80 0.00%
05.23.06 LOSA DE CONCRETO EMBOQUILLADO, MAMPOSTE M2 4,833.00 87.05 420,712.65 0.00 0.00 0.00 0.00 0.0000 0.00 4,833.00 420,712.65 0.00%
05.24 MURO DE GAVION EN DEFENSA DE RIVERAS 195,376.62 0.00 0.00 0.00 195,376.62 0.00%
05'24.01 GAVIONES TIPO CAJÓN M3 516.00 251.65 129,851.40 0.00 0.00 0.00 0.00 0.0000 0.00 516.00 129,851.40 0.00%
05.24.02 GAVIONES TIPO COLCHONES RENO M3 210.00 292.77 61,481.70 0.00 0.00 0.00 0.00 0.0000 0.00 210.00 61,481.70 0.00%
05.24.03 MANTO GEOTEXTIL M2 624.00 6.48 4,043.52 0.00 0.00 0.00 0.00 0.0000 0.00 624.00 4,043.52 0.00%
05.25 MURO DE GAVION PIE DE TALUD 2,594,618.24 0.00 0.00 0.00 2,594,618.24 0.00%
05.25.01 EXCAVACIÓN PARA ESTRUCTURAS 3,639.50
M3 22.71 82,653.05 0.00 0.00 0.00 0.00 0.0000 0.00 3,639.50 82,653.05 0.00%
05.25.02 RELLENO COMPACTADO PARA ESTRUCTURAS 4,621.50
M3 36.20 167,298.30 0.00 0.00 0.00 0.00 0.0000 0.00 4,621.50 167,298.30 0.00%
05.25.03 PREPARACIÓN CIMENTACIÓN P/GAVIONES 4,060.00
M2 2.90 11,774.00 0.00 0.00 0.00 0.00 0.0000 0.00 4,060.00 11,774.00 0.00%
05.25.04 GAVIONES TIPO CAJÓN M3 9,265.00 251.65 2,331,537.25 0.00 0.00 0.00 0.00 0.0000 0.00 9,265.00 2,331,537.25 0.00%
05.55.05 SIEMBRA/REVEGETALIZACIÓN CON PLANTONES M2 3,081.00 0.44 1,355.64 0.00 0.00 0.00 0.00 0.0000 0.00 3,081.00 1,355.64 0.00%
05.26 MURO DE CONTENCION EN SALIDA DE ALCANTARILLAS 510,318.81 0.00 0.00 0.00 510,318.81 0.00%
05.26.01 CONCRETO SIMPLE f'C= 210 KG/CM2. M3 681.00 345.71 235,428.51 0.00 0.00 0.00 0.00 0.0000 0.00 681.00 235,428.51 0.00%
05.26.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P KG 46,233.00 3.92 181,233.36 0.00 0.00 0.00 0.00 0.0000 0.00 46,233.00 181,233.36 0.00%
05.26.03 ENCOFRADO Y DESENCOFRADO M2 2,157.00 43.42 93,656.94 0.00 0.00 0.00 0.00 0.0000 0.00 2,157.00 93,656.94 0.00%
05.27 BADENES 5,096,756.41 0.00 0.00 0.00 5,096,756.41 0.00%
05.27.01 LIMPIEZA DE CAUCES M3 47,600.00 13.28 632,128.00 0.00 0.00 0.00 0.00 0.0000 0.00 47,600.00 632,128.00 0.00%
05.27.02 EXCAVACIÓN PARA ESTRUCTURAS M3 8,268.00 22.71 187,766.28 0.00 0.00 0.00 0.00 0.0000 0.00 8,268.00 187,766.28 0.00%
05.27.03 CONCRETO SIMPLE f'C= 210 KG/CM2. M3 6,907.00 345.71 2,387,818.97 0.00 0.00 0.00 0.00 0.0000 0.00 6,907.00 2,387,818.97 0.00%
05.27.04 ACERO DE REFUERZO f´c 4200 kg/cm2 -P KG 276,645.00 3.92 1,084,448.40 0.00 0.00 0.00 0.00 0.0000 0.00 276,645.00 1,084,448.40 0.00%
05.27.05 GRAVA DE 1 A 1.5" PARA CIMENTACIÓN DE LOSA M3 12,905.00 34.24 441,867.20 0.00 0.00 0.00 0.00 0.0000 0.00 12,905.00 441,867.20 0.00%
05.27.06 JUNTAS TRANSVERSALES CON VARILLAS DE ACE M 6,760.00 16.11 108,903.60 0.00 0.00 0.00 0.00 0.0000 0.00 6,760.00 108,903.60 0.00%
05.27.07 SELLO DE JUNTA DE EXPANSIÓN CON MATERIAL M 1,614.00 44.02 71,048.28 0.00 0.00 0.00 0.00 0.0000 0.00 1,614.00 71,048.28 0.00%
05.27.08 SELLO DE JUNTA DE CONSTRUCCIÓN CON MATER M 4,124.00 44.32 182,775.68 0.00 0.00 0.00 0.00 0.0000 0.00 4,124.00 182,775.68 0.00%
0528 CAJA DE RECEPCION 353,841.36 0.00 0.00 0.00 353,841.36 0.00%
05.28.01 CONCRETO SIMPLE F'C= 175 KG/CM2. M3 12.00 326.53 3,918.36 0.00 0.00 0.00 0.00 0.0000 0.00 12.00 3,918.36 0.00%
05.28.02 CONCRETO SIMPLE f'C= 210 KG/CM2. M3 320.00 345.71 110,627.20 0.00 0.00 0.00 0.00 0.0000 0.00 320.00 110,627.20 0.00%
05.28.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P KG 37,186.00 3.92 145,769.12 0.00 0.00 0.00 0.00 0.0000 0.00 37,186.00 145,769.12 0.00%
05.28.04 ENCOFRADO Y DESENCOFRADO M2 2,154.00 43.42 93,526.68 0.00 0.00 0.00 0.00 0.0000 0.00 2,154.00 93,526.68 0.00%
05.29 CANAL DE EVACUACION Y RAPIDAS 1,199,629.79 0.00 0.00 0.00 1,199,629.79 0.00%
05.30 RELLENO COMPACTADO PARA ESTRUCTURAS M3 7,385.00 36.20 267,337.00 0.00 0.00 0.00 0.00 0.0000 0.00 7,385.00 267,337.00 0.00%
05.31 CONCRETO SIMPLE f'C= 210 KG/CM2. M3 860.00 345.71 297,310.60 0.00 0.00 0.00 0.00 0.0000 0.00 860.00 297,310.60 0.00%
05.32 ACERO DE REFUERZO f´c 4200 kg/cm2 KG 49,221.00 3.92 192,946.32 0.00 0.00 0.00 0.00 0.0000 0.00 49,221.00 192,946.32 0.00%
05.33 LOSA DE CONCRETO EMBOQUILLADO, MAMPOSTERÍ M2 5,007.00 87.05 435,859.35 0.00 0.00 0.00 0.00 0.0000 0.00 5,007.00 435,859.35 0.00%
05.34 SIEMBRA/REVEGETALIZACIÓN M2 5,418.00 1.14 6,176.52 0.00 0.00 0.00 0.00 0.0000 0.00 5,418.00 6,176.52 0.00%
05.35 CASCADA EN EVACUACION DE ALCANTARILLAS 370,854.18 0.00 0.00 0.00 370,854.18 0.00%
05.36 RELLENO COMPACTADO PARA ESTRUCTURAS M3 1,767.00 36.20 63,965.40 0.00 0.00 0.00 0.00 0.0000 0.00 1,767.00 63,965.40 0.00%
05.37 CONCRETO SIMPLE f'C= 210 KG/CM2. M3 327.00 345.71 113,047.17 0.00 0.00 0.00 0.00 0.0000 0.00 327.00 113,047.17 0.00%
05.38 ACERO DE REFUERZO f'y = 4200 kg/cm2 KG 11,765.00 3.92 46,118.80 0.00 0.00 0.00 0.00 0.0000 0.00 11,765.00 46,118.80 0.00%
05.39 LOSA DE CONCRETO EMBOQUILLADO, MAMPOSTERÍ M2 1,675.00 87.05 145,808.75 0.00 0.00 0.00 0.00 0.0000 0.00 1,675.00 145,808.75 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


05.40 SIEMBRA/REVEGETALIZACIÓN M2 1,679.00 1.14 1,914.06 0.00 0.00 0.00 0.00 0.0000 0.00 1,679.00 1,914.06 0.00%
05.41 POZA DISIPADORA DE ENERGIA 156,350.89 0.00 0.00 0.00 156,350.89 0.00%
05.42 CONCRETO SIMPLE f'C= 210 KG/CM2. M3 276.00 345.71 95,415.96 0.00 0.00 0.00 0.00 0.0000 0.00 276.00 95,415.96 0.00%
05.43 ACERO DE REFUERZO f´c 4200 kg/cm2 -P KG 7,237.00 3.92 28,369.04 0.00 0.00 0.00 0.00 0.0000 0.00 7,237.00 28,369.04 0.00%
05.44 ENCOFRADO Y DESENCOFRADO M2 327.00 43.42 14,198.34 0.00 0.00 0.00 0.00 0.0000 0.00 327.00 14,198.34 0.00%
05.45 LOSA DE CONCRETO EMBOQUILLADO, MAMPOSTERÍ M2 211.00 87.05 18,367.55 0.00 0.00 0.00 0.00 0.0000 0.00 211.00 18,367.55 0.00%
05.46 SUBDREN 258,876.69 0.00 0.00 0.00 258,876.69 0.00%
05.46.01 INSTALACIÓN DE GEOCOMPUESTO DE DRENAJE M2 2,959.84 20.82 61,623.87 0.00 0.00 0.00 0.00 0.0000 0.00 2,959.84 61,623.87 0.00%
05.46.02 SUMINISTRO E INSTALACIÓN DE HDPE D=4" (PER M 9,866.14 13.19 130,134.39 0.00 0.00 0.00 0.00 0.0000 0.00 9,866.14 130,134.39 0.00%
05.46.03 EXC. P/ESTRUC. EN SUELO NO ROCOSO (MANUAL) M3 887.95 28.88 25,644.00 0.00 0.00 0.00 0.00 0.0000 0.00 887.95 25,644.00 0.00%
05.46.04 RELLENO PARA SUB DREN CON MATERIAL DE CA M3 713.60 58.12 41,474.43 0.00 0.00 0.00 0.00 0.0000 0.00 713.60 41,474.43 0.00%

06.00 PONTONES Y PUENTES 5,347,729.64 0.00 0.00 0.00 0.00 5,347,729.64 0.00%
06.00 PONTON 1 (KM 2+908.91) 96,659.03 0.00 0.00 0.00 96,659.03 0.00%
06.01 LIMPIEZA DE ACCESOS m 40.00 52.63 2,105.20 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 2,105.20 0.00%
06.01.01.01 ENCOFRADO Y DESENCOFRADO m2 4.32 43.42 187.57 0.00 0.00 0.00 0.00 0.0000 0.00 4.32 187.57 0.00%
06.01.01.02 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 0.48 345.71 165.94 0.00 0.00 0.00 0.00 0.0000 0.00 0.48 165.94 0.00%
06.01.01.03 PEGAMENTO EPOXICO m2 1.20 25.87 31.04 0.00 0.00 0.00 0.00 0.0000 0.00 1.20 31.04 0.00%
06.01.01.04 EXC. NO CLASIFICADA PARA ESTRUCTURA m3 29.73 30.35 902.31 0.00 0.00 0.00 0.00 0.0000 0.00 29.73 902.31 0.00%
06.01.01.05 ENROCADO CONTRA SOCAVACION m3 99.11 88.77 8,797.99 0.00 0.00 0.00 0.00 0.0000 0.00 99.11 8,797.99 0.00%
06.01.01.07 CONSTRUCCION NUEVA 84,468.98 0.00 0.00 0.00 84,468.98 0.00%
06.01.01.07.01 ESTRIBOS 20,906.22 0.00 0.00 0.00 0.00 0.0000 0.00 0.00 20,906.22 0.00%
06.01.01.07.01.01 EXC. P/ESTRUC. EN MATERIAL COMUN SECO m3 62.48 34.74 2,170.56 0.00 0.00 0.00 0.00 0.0000 0.00 62.48 2,170.56 0.00%
06.01.01.07.01.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 339.00 3.92 1,328.88 0.00 0.00 0.00 0.00 0.0000 0.00 339.00 1,328.88 0.00%
06.01.01.07.01.03 ENCOFRADO CARAVISTA EN SECO m2 124.20 72.15 8,961.03 0.00 0.00 0.00 0.00 0.0000 0.00 124.20 8,961.03 0.00%
06.01.01.07.01.04 RELLENO DE ESTRUCTURA CON MATERIAL PROPIO m3 7.50 38.00 285.00 0.00 0.00 0.00 0.00 0.0000 0.00 7.50 285.00 0.00%
06.01.01.07.01.05 ELIMINACION DE MATERIAL EXCEDENTE m3 54.98 31.36 1,724.17 0.00 0.00 0.00 0.00 0.0000 0.00 54.98 1,724.17 0.00%
06.01.01.07.01.06 CONCRETO SIMPLE f'C= 210 KG/CM2 (PARAPETOS). m3 17.44 369.07 6,436.58 0.00 0.00 0.00 0.00 0.0000 0.00 17.44 6,436.58 0.00%
06.01.01.07.02 LOSAS Y VEREDAS/SARDINELES DE CONCRETO 24,579.08 0.00 0.00 0.00 24,579.08 0.00%
06.01.01.07.02.01 ENCOFRADO CARAVISTA EN SECO m2 73.60 72.15 5,310.24 0.00 0.00 0.00 0.00 0.0000 0.00 73.60 5,310.24 0.00%
06.01.01.07.02.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 1,872.20 3.92 7,339.02 0.00 0.00 0.00 0.00 0.0000 0.00 1,872.20 7,339.02 0.00%
06.01.01.07.02.03 CONCRETO SIMPLE f'C= 280 KG/CM2 SUPERESTRUCT m3 28.80 414.23 11,929.82 0.00 0.00 0.00 0.00 0.0000 0.00 28.80 11,929.82 0.00%
06.01.01.07.03 LOSAS DE APROXIMACION 30,203.88 0.00 0.00 0.00 30,203.88 0.00%
06.01.01.07.03.01 ENCOFRADO CARAVISTA EN SECO m2 7.20 72.15 519.48 0.00 0.00 0.00 0.00 0.0000 0.00 7.20 519.48 0.00%
06.01.01.07.03.02 ENCOFRADO CARA NO VISTA EN SECO m2 9.80 51.63 505.97 0.00 0.00 0.00 0.00 0.0000 0.00 9.80 505.97 0.00%
06.01.01.07.03.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 3,444.00 3.92 13,500.48 0.00 0.00 0.00 0.00 0.0000 0.00 3,444.00 13,500.48 0.00%
06.01.01.07.03.04 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 45.35 345.71 15,677.95 0.00 0.00 0.00 0.00 0.0000 0.00 45.35 15,677.95 0.00%
06.01.01.07.04 VARIOS 8,779.80 0.00 0.00 0.00 8,779.80 0.00%
06.01.01.07.04.01 JUNTAS DE DILATACION METALICA m 19.00 276.38 5,251.22 0.00 0.00 0.00 0.00 0.0000 0.00 19.00 5,251.22 0.00%
06.01.01.07.04.02 TUBOS DE DRENAJE PVC D=3 L= 0.75 m 4.00 28.20 112.80 0.00 0.00 0.00 0.00 0.0000 0.00 4.00 112.80 0.00%
06.01.01.07.04.03 ACABADO DE VEREDAS/SARDINELES m 11.00 15.42 169.62 0.00 0.00 0.00 0.00 0.0000 0.00 11.00 169.62 0.00%
06.01.01.07.04.04 BARANDAS METALICA m 11.00 110.41 1,214.51 0.00 0.00 0.00 0.00 0.0000 0.00 11.00 1,214.51 0.00%
06.01.01.07.04.05 DEMOLICION DE ESTRUCTURAS (MANUAL) m3 35.18 57.75 2,031.65 0.00 0.00 0.00 0.00 0.0000 0.00 35.18 2,031.65 0.00%
06.02 PONTON 2 (KM 16+220) 130,985.35 0.00 0.00 0.00 130,985.35 0.00%
06.02.01 LIMPIEZA DE ACCESOS m 40.00 52.63 2,105.20 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 2,105.20 0.00%
06.02.02 ENCOFRADO Y DESENCOFRADO m2 7.68 43.42 333.47 0.00 0.00 0.00 0.00 0.0000 0.00 7.68 333.47 0.00%
06.02.03 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 0.72 345.71 248.91 0.00 0.00 0.00 0.00 0.0000 0.00 0.72 248.91 0.00%
06.02.04 PEGAMENTO EPOXICO m2 1.80 25.87 46.57 0.00 0.00 0.00 0.00 0.0000 0.00 1.80 46.57 0.00%
06.02.05 EXC. NO CLASIFICADA PARA ESTRUCTURA m3 61.79 30.35 1,875.33 0.00 0.00 0.00 0.00 0.0000 0.00 61.79 1,875.33 0.00%
06.02.06 ENROCADO CONTRA SOCAVACION m3 205.98 88.77 18,284.84 0.00 0.00 0.00 0.00 0.0000 0.00 205.98 18,284.84 0.00%
06.02.07 CONSTRUCCION NUEVA 108,091.03 0.00 0.00 0.00 108,091.03 0.00%
06.02.07.01 ESTRIBOS 15,076.31 0.00 0.00 0.00 15,076.31 0.00%
06.02.07.01.01 EXC. P/ESTRUC. EN MATERIAL COMUN SECO m3 11.97 34.74 415.84 0.00 0.00 0.00 0.00 0.0000 0.00 11.97 415.84 0.00%
06.02.07.01.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 346.00 3.92 1,356.32 0.00 0.00 0.00 0.00 0.0000 0.00 346.00 1,356.32 0.00%
06.02.07.01.03 ENCOFRADO CARAVISTA EN SECO m2 100.80 72.15 7,272.72 0.00 0.00 0.00 0.00 0.0000 0.00 100.80 7,272.72 0.00%
06.02.07.01.04 RELLENO DE ESTRUCTURA CON MATERIAL PROPIO m3 6.40 38.00 243.20 0.00 0.00 0.00 0.00 0.0000 0.00 6.40 243.20 0.00%
06.02.07.01.05 ELIMINACION DE MATERIAL EXCEDENTE m3 5.57 31.36 174.68 0.00 0.00 0.00 0.00 0.0000 0.00 5.57 174.68 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


06.02.07.01.06 CONCRETO SIMPLE f'C= 210 KG/CM2 (PARAPETOS). m3 15.21 369.07 5,613.55 0.00 0.00 0.00 0.00 0.0000 0.00 15.21 5,613.55 0.00%
06.02.07.02 LOSAS Y VEREDAS/SARDINELES DE CONCRETO 51,826.84 0.00 0.00 0.00 51,826.84 0.00%
06.02.07.02.01 ENCOFRADO CARAVISTA EN SECO m2 130.60 72.15 9,422.79 0.00 0.00 0.00 0.00 0.0000 0.00 130.60 9,422.79 0.00%
06.02.07.02.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 4,382.00 3.92 17,177.44 0.00 0.00 0.00 0.00 0.0000 0.00 4,382.00 17,177.44 0.00%
06.02.07.02.03 CONCRETO SIMPLE f'C= 280 KG/CM2 SUPERESTRUCT m3 60.90 414.23 25,226.61 0.00 0.00 0.00 0.00 0.0000 0.00 60.90 25,226.61 0.00%
06.02.07.03 LOSAS DE APROXIMACION 30,203.88 0.00 0.00 0.00 30,203.88 0.00%
06.02.07.03.01 ENCOFRADO CARAVISTA EN SECO m2 7.20 72.15 519.48 0.00 0.00 0.00 0.00 0.0000 0.00 7.20 519.48 0.00%
06.02.07.03.02 ENCOFRADO CARA NO VISTA EN SECO m2 9.80 51.63 505.97 0.00 0.00 0.00 0.00 0.0000 0.00 9.80 505.97 0.00%
06.02.07.03.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 3,444.00 3.92 13,500.48 0.00 0.00 0.00 0.00 0.0000 0.00 3,444.00 13,500.48 0.00%
06.02.07.03.04 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 45.35 345.71 15,677.95 0.00 0.00 0.00 0.00 0.0000 0.00 45.35 15,677.95 0.00%
06.02.07.04 VARIOS 10,984.00 0.00 0.00 0.00 10,984.00 0.00%
06.02.07.04.01 JUNTAS DE DILATACION METALICA m 16.00 276.38 4,422.08 0.00 0.00 0.00 0.00 0.0000 0.00 16.00 4,422.08 0.00%
06.02.07.04.02 TUBOS DE DRENAJE PVC D=3 L= 0.75 m 6.00 28.20 169.20 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 169.20 0.00%
06.02.07.04.03 ACABADO DE VEREDAS/SARDINELES m 21.00 15.42 323.82 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 323.82 0.00%
06.02.07.04.04 BARANDAS METALICA m 21.00 110.41 2,318.61 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 2,318.61 0.00%
06.02.07.04.05 DEMOLICION DE ESTRUCTURAS (MANUAL) m3 64.94 57.75 3,750.29 0.00 0.00 0.00 0.00 0.0000 0.00 64.94 3,750.29 0.00%
06.03 PONTON 3 (KM 16+220) 97,273.30 0.00 0.00 0.00 97,273.30 0.00%
06.03.01 LIMPIEZA DE ACCESOS m 40.00 52.63 2,105.20 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 2,105.20 0.00%
06.03.02 ENCOFRADO Y DESENCOFRADO m2 12.72 43.42 552.30 0.00 0.00 0.00 0.00 0.0000 0.00 12.72 552.30 0.00%
06.03.03 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 1.80 345.71 622.28 0.00 0.00 0.00 0.00 0.0000 0.00 1.80 622.28 0.00%
06.03.04 PEGAMENTO EPOXICO m2 3.00 25.87 77.61 0.00 0.00 0.00 0.00 0.0000 0.00 3.00 77.61 0.00%
06.03.05 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 100.69 3.92 394.70 0.00 0.00 0.00 0.00 0.0000 0.00 100.69 394.70 0.00%
06.03.06 EXC. NO CLASIFICADA PARA ESTRUCTURA m3 29.41 13.77 404.98 0.00 0.00 0.00 0.00 0.0000 0.00 29.41 404.98 0.00%
06.03.07 ENROCADO CONTRA SOCAVACION m3 98.03 88.77 8,702.12 0.00 0.00 0.00 0.00 0.0000 0.00 98.03 8,702.12 0.00%
06.03.08 CONSTRUCCION NUEVA 84,414.11 0.00 0.00 0.00 84,414.11 0.00%
06.03.08.01 ESTRIBOS 20,906.22 0.00 0.00 0.00 20,906.22 0.00%
06.03.08.01.01 EXC. P/ESTRUC. EN MATERIAL COMUN SECO m3 62.48 34.74 2,170.56 0.00 0.00 0.00 0.00 0.0000 0.00 62.48 2,170.56 0.00%
06.03.08.01.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 339.00 3.92 1,328.88 0.00 0.00 0.00 0.00 0.0000 0.00 339.00 1,328.88 0.00%
06.03.08.01.03 ENCOFRADO CARAVISTA EN SECO m2 124.20 72.15 8,961.03 0.00 0.00 0.00 0.00 0.0000 0.00 124.20 8,961.03 0.00%
06.03.08.01.04 RELLENO DE ESTRUCTURA CON MATERIAL PROPIO m3 7.50 38.00 285.00 0.00 0.00 0.00 0.00 0.0000 0.00 7.50 285.00 0.00%
06.03.08.01.05 ELIMINACION DE MATERIAL EXCEDENTE m3 54.98 31.36 1,724.17 0.00 0.00 0.00 0.00 0.0000 0.00 54.98 1,724.17 0.00%
06.03.08.01.06 CONCRETO SIMPLE f'C= 210 KG/CM2 (PARAPETOS). m3 17.44 369.07 6,436.58 0.00 0.00 0.00 0.00 0.0000 0.00 17.44 6,436.58 0.00%
06.03.08.02 LOSAS Y VEREDAS/SARDINELES DE CONCRETO 24,593.51 0.00 0.00 0.00 24,593.51 0.00%
06.03.08.02.01 ENCOFRADO CARAVISTA EN SECO m2 73.80 72.15 5,324.67 0.00 0.00 0.00 0.00 0.0000 0.00 73.80 5,324.67 0.00%
06.03.08.02.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 1,872.20 3.92 7,339.02 0.00 0.00 0.00 0.00 0.0000 0.00 1,872.20 7,339.02 0.00%
06.03.08.02.03 CONCRETO SIMPLE f'C= 280 KG/CM2 SUPERESTRUCT m3 28.80 414.23 11,929.82 0.00 0.00 0.00 0.00 0.0000 0.00 28.80 11,929.82 0.00%
06.03.08.03 LOSAS DE APROXIMACION 30,203.88 0.00 0.00 0.00 30,203.88 0.00%
06.03.08.03.01 ENCOFRADO CARAVISTA EN SECO m2 7.20 72.15 519.48 0.00 0.00 0.00 0.00 0.0000 0.00 7.20 519.48 0.00%
06.03.08.03.02 ENCOFRADO CARA NO VISTA EN SECO m2 9.80 51.63 505.97 0.00 0.00 0.00 0.00 0.0000 0.00 9.80 505.97 0.00%
06.03.08.03.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 3,444.00 3.92 13,500.48 0.00 0.00 0.00 0.00 0.0000 0.00 3,444.00 13,500.48 0.00%
06.03.08.03.04 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 45.35 345.71 15,677.95 0.00 0.00 0.00 0.00 0.0000 0.00 45.35 15,677.95 0.00%
06.03.08.04 VARIOS 8,710.50 0.00 0.00 0.00 0.00 0.0000 0.00 0.00 8,710.50 0.00%
06.03.08.04.01 JUNTAS DE DILATACION METALICA m 19.00 276.38 5,251.22 0.00 0.00 0.00 0.00 0.0000 0.00 19.00 5,251.22 0.00%
06.03.08.04.02 TUBOS DE DRENAJE PVC D=3 L= 0.75 m 4.00 28.20 112.80 0.00 0.00 0.00 0.00 0.0000 0.00 4.00 112.80 0.00%
06.03.08.04.03 ACABADO DE VEREDAS/SARDINELES m 11.00 15.42 169.62 0.00 0.00 0.00 0.00 0.0000 0.00 11.00 169.62 0.00%
06.06.08.04.05 BARANDAS METALICA m 11.00 110.41 1,214.51 0.00 0.00 0.00 0.00 0.0000 0.00 11.00 1,214.51 0.00%
06.06.08.04.06 DEMOLICION DE ESTRUCTURAS (MANUAL) m3 33.98 57.75 1,962.35 0.00 0.00 0.00 0.00 0.0000 0.00 33.98 1,962.35 0.00%
6.04 PONTON 4 (KM 53+752.5) 479,671.73 0.00 0.00 0.00 479,671.73 0.00%
06.04.01 LIMPIEZA DE ACCESOS m 40.00 52.63 2,105.20 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 2,105.20 0.00%
06.04.02 CALZATURA DE ESTRIBOS/PILARES 42,748.19 0.00 0.00 0.00 42,748.19 0.00%
06.04.03 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 79.43 13.77 1,093.75 0.00 0.00 0.00 0.00 0.0000 0.00 79.43 1,093.75 0.00%
06.04.04 CONCRETO SIMPLE F'C= 175 KG/CM2.+30% PG C/socav m3 119.20 349.45 41,654.44 0.00 0.00 0.00 0.00 0.0000 0.00 119.20 41,654.44 0.00%
06.04.05 OBRAS DE ENCAUZAMIENTO 31,994.92 0.00 0.00 0.00 31,994.92 0.00%
06.04.05.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 50.00 13.77 688.50 0.00 0.00 0.00 0.00 0.0000 0.00 50.00 688.50 0.00%
06.04.05.02 ENCAUZAMIENTO DE RIO/QUEBRADAS m3 50.00 5.42 271.00 0.00 0.00 0.00 0.00 0.0000 0.00 50.00 271.00 0.00%
06.04.05.03 CONCRETO CICLOPEO FC=120KG/CM2 + 30 % PG. m3 150.38 206.38 31,035.42 0.00 0.00 0.00 0.00 0.0000 0.00 150.38 31,035.42 0.00%
06.04.05.04 CONSTRUCCION NUEVA 402,823.42 0.00 0.00 0.00 402,823.42 0.00%
06.04.05.04.01 ESTRIBOS 313,570.68 0.00 0.00 0.00 313,570.68 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


06.04.05.04.01.01 EXC. P/ESTRUC. EN MATERIAL COMUN SECO m3 1,484.42 34.74 51,568.75 0.00 0.00 0.00 0.00 0.0000 0.00 1,484.42 51,568.75 0.00%
06.04.05.04.01.02 SOLADO PARA ZAPATAS FC=100 kg/CM2 m3 17.60 72.64 1,278.46 0.00 0.00 0.00 0.00 0.0000 0.00 17.60 1,278.46 0.00%
06.04.05.04.01.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 470.00 3.92 1,842.40 0.00 0.00 0.00 0.00 0.0000 0.00 470.00 1,842.40 0.00%
06.04.05.04.01.04 ENCOFRADO CARA NO VISTA BAJO AGUA m2 272.92 60.95 16,634.47 0.00 0.00 0.00 0.00 0.0000 0.00 272.92 16,634.47 0.00%
06.04.05.04.01.05 ENCOFRADO CARA NO VISTA EN SECO m2 188.00 51.63 9,706.44 0.00 0.00 0.00 0.00 0.0000 0.00 188.00 9,706.44 0.00%
06.04.05.04.01.06 ENCOFRADO CARAVISTA EN SECO m2 197.40 72.15 14,242.41 0.00 0.00 0.00 0.00 0.0000 0.00 197.40 14,242.41 0.00%
06.04.05.04.01.07 CONCRETO SIMPLE FC=140 KG/CM2 + 30 % PG. BAJ m3 351.40 249.19 87,565.37 0.00 0.00 0.00 0.00 0.0000 0.00 351.40 87,565.37 0.00%
06.04.05.04.01.08 CONCRETO SIMPLE FC=140 KG/CM2 + 30 % PG. EN m3 352.36 228.14 80,387.41 0.00 0.00 0.00 0.00 0.0000 0.00 352.36 80,387.41 0.00%
06.04.05.04.01.09 RELLENO DE ESTRUCTURA CON MATERIAL PROPIO m3 374.00 38.00 14,212.00 0.00 0.00 0.00 0.00 0.0000 0.00 374.00 14,212.00 0.00%
06.04.05.04.01.10 ELIMINACION DE MATERIAL EXCEDENTE m3 1,110.42 31.36 34,822.77 0.00 0.00 0.00 0.00 0.0000 0.00 1,110.42 34,822.77 0.00%
06.04.05.04.01.11 CONCRETO SIMPLE f'C= 210 KG/CM2 (PARAPETOS). m3 3.55 369.07 1,310.20 0.00 0.00 0.00 0.00 0.0000 0.00 3.55 1,310.20 0.00%
06.04.05.04.02 LOSAS Y VEREDAS/SARDINELES DE CONCRETO 57,350.01 0.00 0.00 0.00 57,350.01 0.00%
06.04.05.04.02.01 ENCOFRADO CARAVISTA EN SECO m2 143.68 72.15 10,366.51 0.00 0.00 0.00 0.00 0.0000 0.00 143.68 10,366.51 0.00%
06.04.05.04.02.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 4,821.10 3.92 18,898.71 0.00 0.00 0.00 0.00 0.0000 0.00 4,821.10 18,898.71 0.00%
06.04.05.04.02.03 CONCRETO SIMPLE f'C= 280 KG/CM2 SUPERESTRUCT m3 67.80 414.23 28,084.79 0.00 0.00 0.00 0.00 0.0000 0.00 67.80 28,084.79 0.00%
06.04.05.04.03 LOSAS DE APROXIMACION 24,116.26 0.00 0.00 0.00 24,116.26 0.00%
06.04.05.04.03.01 ENCOFRADO CARAVISTA EN SECO m2 6.00 72.15 432.90 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 432.90 0.00%
06.04.05.04.03.02 ENCOFRADO CARA NO VISTA EN SECO m2 8.80 51.63 454.34 0.00 0.00 0.00 0.00 0.0000 0.00 8.80 454.34 0.00%
06.04.05.04.03.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 2,750.00 3.92 10,780.00 0.00 0.00 0.00 0.00 0.0000 0.00 2,750.00 10,780.00 0.00%
06.04.05.04.03.04 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 36.01 345.71 12,449.02 0.00 0.00 0.00 0.00 0.0000 0.00 36.01 12,449.02 0.00%
06.04.05.04.04 VARIOS 7,786.47 0.00 0.00 0.00 7,786.47 0.00%
06.04.05.04.04.01 JUNTAS DE DILATACION METALICA m 18.00 276.38 4,974.84 0.00 0.00 0.00 0.00 0.0000 0.00 18.00 4,974.84 0.00%
06.04.05.04.04.02 TUBOS DE DRENAJE PVC D=3 L= 0.75 m 6.00 28.20 169.20 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 169.20 0.00%
06.04.05.04.04.03 ACABADO DE VEREDAS/SARDINELES m 21.00 15.42 323.82 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 323.82 0.00%
06.04.05.04.04.04 BARANDAS METALICA m 21.00 110.41 2,318.61 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 2,318.61 0.00%
06.05 PONTON 5 (KM 61+910) 448,215.30 0.00 0.00 0.00 448,215.30 0.00%
06.05.01 LIMPIEZA DE ACCESOS m 40.00 52.63 2,105.20 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 2,105.20 0.00%
06.05.02 CALZATURA DE ESTRIBOS/PILARES 44,785.67 0.00 0.00 0.00 44,785.67 0.00%
06.05.03 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 83.25 13.77 1,146.35 0.00 0.00 0.00 0.00 0.0000 0.00 83.25 1,146.35 0.00%
06.05.04 CONCRETO SIMPLE F'C= 175 KG/CM2.+30% PG C/socav m3 124.88 349.45 43,639.32 0.00 0.00 0.00 0.00 0.0000 0.00 124.88 43,639.32 0.00%
06.05.05 OBRAS DE ENCAUZAMIENTO 24,276.31 0.00 0.00 0.00 24,276.31 0.00%
06.05.05.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 50.00 13.77 688.50 0.00 0.00 0.00 0.00 0.0000 0.00 50.00 688.50 0.00%
06.05.05.02 ENCAUZAMIENTO DE RIO/QUEBRADAS m3 50.00 5.42 271.00 0.00 0.00 0.00 0.00 0.0000 0.00 50.00 271.00 0.00%
06.05.05.03 CONCRETO CICLOPEO FC=120KG/CM2 + 30 % PG. m3 112.98 206.38 23,316.81 0.00 0.00 0.00 0.00 0.0000 0.00 112.98 23,316.81 0.00%
06.05.05.04 CONSTRUCCION NUEVA 377,048.12 0.00 0.00 0.00 377,048.12 0.00%
06.05.05.04.01 ESTRIBOS 296,540.59 0.00 0.00 0.00 296,540.59 0.00%
06.05.05.04.01.01 EXC. P/ESTRUC. EN MATERIAL COMUN SECO m3 1,372.42 34.74 47,677.87 0.00 0.00 0.00 0.00 0.0000 0.00 1,372.42 47,677.87 0.00%
06.05.05.04.01.02 SOLADO PARA ZAPATAS FC=100 kg/CM2 m3 16.30 72.64 1,184.03 0.00 0.00 0.00 0.00 0.0000 0.00 16.30 1,184.03 0.00%
06.05.05.04.01.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 470.00 3.92 1,842.40 0.00 0.00 0.00 0.00 0.0000 0.00 470.00 1,842.40 0.00%
06.05.05.04.01.04 ENCOFRADO CARA NO VISTA BAJO AGUA m2 272.92 60.95 16,634.47 0.00 0.00 0.00 0.00 0.0000 0.00 272.92 16,634.47 0.00%
06.05.05.04.01.05 ENCOFRADO CARA NO VISTA EN SECO m2 184.00 51.63 9,499.92 0.00 0.00 0.00 0.00 0.0000 0.00 184.00 9,499.92 0.00%
06.05.05.04.01.06 ENCOFRADO CARAVISTA EN SECO m2 191.53 72.15 13,818.89 0.00 0.00 0.00 0.00 0.0000 0.00 191.53 13,818.89 0.00%
06.05.05.04.01.07 CONCRETO SIMPLE FC=140 KG/CM2 + 30 % PG. BAJ m3 325.60 249.19 81,136.26 0.00 0.00 0.00 0.00 0.0000 0.00 325.60 81,136.26 0.00%
06.05.05.04.01.08 CONCRETO SIMPLE FC=140 KG/CM2 + 30 % PG. EN m3 341.81 228.14 77,980.53 0.00 0.00 0.00 0.00 0.0000 0.00 341.81 77,980.53 0.00%
06.05.05.04.01.09 RELLENO DE ESTRUCTURA CON MATERIAL PROPIO m3 374.00 38.00 14,212.00 0.00 0.00 0.00 0.00 0.0000 0.00 374.00 14,212.00 0.00%
06.05.05.04.01.010 ELIMINACION DE MATERIAL EXCEDENTE m3 998.42 31.36 31,310.45 0.00 0.00 0.00 0.00 0.0000 0.00 998.42 31,310.45 0.00%
06.05.05.04.01.011 CONCRETO SIMPLE f'C= 210 KG/CM2 (PARAPETOS). m3 3.37 369.07 1,243.77 0.00 0.00 0.00 0.00 0.0000 0.00 3.37 1,243.77 0.00%
06.02.07.02 LOSAS Y VEREDAS/SARDINELES DE CONCRETO 51,825.66 0.00 0.00 0.00 51,825.66 0.00%
06.05.07.02.01 ENCOFRADO CARAVISTA EN SECO m2 130.60 72.15 9,422.79 0.00 0.00 0.00 0.00 0.0000 0.00 130.60 9,422.79 0.00%
06.05.07.02.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 4,381.70 3.92 17,176.26 0.00 0.00 0.00 0.00 0.0000 0.00 4,381.70 17,176.26 0.00%
06.05.07.02.03 CONCRETO SIMPLE f'C= 280 KG/CM2 SUPERESTRUCT m3 60.90 414.23 25,226.61 0.00 0.00 0.00 0.00 0.0000 0.00 60.90 25,226.61 0.00%
06.05.07.03 LOSAS DE APROXIMACION 21,448.16 0.00 0.00 0.00 21,448.16 0.00%
06.05.07.03.01 ENCOFRADO CARAVISTA EN SECO m2 6.00 72.15 432.90 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 432.90 0.00%
06.05.07.03.02 ENCOFRADO CARA NO VISTA EN SECO m2 8.80 51.63 454.34 0.00 0.00 0.00 0.00 0.0000 0.00 8.80 454.34 0.00%
06.05.07.03.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 2,326.00 3.92 9,117.92 0.00 0.00 0.00 0.00 0.0000 0.00 2,326.00 9,117.92 0.00%
06.05.07.03.04 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 33.10 345.71 11,443.00 0.00 0.00 0.00 0.00 0.0000 0.00 33.10 11,443.00 0.00%
06.05.07.04 VARIOS 7,233.71 0.00 0.00 0.00 7,233.71 0.00%
06.05.07.04.01 JUNTAS DE DILATACION METALICA m 16.00 276.38 4,422.08 0.00 0.00 0.00 0.00 0.0000 0.00 16.00 4,422.08 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


06.05.07.04.02 TUBOS DE DRENAJE PVC D=3 L= 0.75 m 6.00 28.20 169.20 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 169.20 0.00%
06.05.07.04.03 ACABADO DE VEREDAS/SARDINELES m 21.00 15.42 323.82 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 323.82 0.00%
06.05.07.04.04 BARANDAS METALICA m 21.00 110.41 2,318.61 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 2,318.61 0.00%
06.06 PONTON 6 (KM 70+522.50) 484,330.63 0.00 0.00 0.00 484,330.63 0.00%
06.06.01 LIMPIEZA DE ACCESOS m 40.00 52.63 2,105.20 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 2,105.20 0.00%
06.06.02 CALZATURA DE ESTRIBOS/PILARES 41,152.80 0.00 0.00 0.00 41,152.80 0.00%
06.06.03 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 76.50 13.77 1,053.41 0.00 0.00 0.00 0.00 0.0000 0.00 76.50 1,053.41 0.00%
06.06.04 CONCRETO SIMPLE F'C= 175 KG/CM2.+30% PG C/socav m3 114.75 349.45 40,099.39 0.00 0.00 0.00 0.00 0.0000 0.00 114.75 40,099.39 0.00%
06.06.05 OBRAS DE ENCAUZAMIENTO 19,482.11 0.00 0.00 0.00 19,482.11 0.00%
06.06.05.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 50.00 13.77 688.50 0.00 0.00 0.00 0.00 0.0000 0.00 50.00 688.50 0.00%
06.06.05.02 ENCAUZAMIENTO DE RIO/QUEBRADAS m3 50.00 5.42 271.00 0.00 0.00 0.00 0.00 0.0000 0.00 50.00 271.00 0.00%
06.06.05.03 CONCRETO CICLOPEO FC=120KG/CM2 + 30 % PG. m3 89.75 206.38 18,522.61 0.00 0.00 0.00 0.00 0.0000 0.00 89.75 18,522.61 0.00%
06.06.05.04 CONSTRUCCION NUEVA 421,590.52 0.00 0.00 0.00 421,590.52 0.00%
06.06.05.04.01 ESTRIBOS 323,275.39 0.00 0.00 0.00 323,275.39 0.00%
06.06.05.04.01.01 EXC. P/ESTRUC. EN MATERIAL COMUN SECO m3 1,521.52 34.74 52,857.60 0.00 0.00 0.00 0.00 0.0000 0.00 1,521.52 52,857.60 0.00%
06.06.05.04.01.02 SOLADO PARA ZAPATAS FC=100 kg/CM2 m3 18.00 72.64 1,307.52 0.00 0.00 0.00 0.00 0.0000 0.00 18.00 1,307.52 0.00%
06.06.05.04.01.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 470.00 3.92 1,842.40 0.00 0.00 0.00 0.00 0.0000 0.00 470.00 1,842.40 0.00%
06.06.05.04.01.04 ENCOFRADO CARA NO VISTA BAJO AGUA m2 304.92 60.95 18,584.87 0.00 0.00 0.00 0.00 0.0000 0.00 304.92 18,584.87 0.00%
06.06.05.04.01.05 ENCOFRADO CARA NO VISTA EN SECO m2 192.00 51.63 9,912.96 0.00 0.00 0.00 0.00 0.0000 0.00 192.00 9,912.96 0.00%
06.06.05.04.01.06 ENCOFRADO CARAVISTA EN SECO m2 203.27 72.15 14,665.93 0.00 0.00 0.00 0.00 0.0000 0.00 203.27 14,665.93 0.00%
06.06.05.04.01.07 CONCRETO SIMPLE FC=140 KG/CM2 + 30 % PG. BAJ m3 360.00 249.19 89,708.40 0.00 0.00 0.00 0.00 0.0000 0.00 360.00 89,708.40 0.00%
06.06.05.04.01.08 CONCRETO SIMPLE FC=140 KG/CM2 + 30 % PG. EN m3 362.91 228.14 82,794.29 0.00 0.00 0.00 0.00 0.0000 0.00 362.91 82,794.29 0.00%
06.06.05.04.01.09 RELLENO DE ESTRUCTURA CON MATERIAL PROPIO m3 378.00 38.00 14,364.00 0.00 0.00 0.00 0.00 0.0000 0.00 378.00 14,364.00 0.00%
06.06.05.04.01.10 ELIMINACION DE MATERIAL EXCEDENTE m3 1,143.52 31.36 35,860.79 0.00 0.00 0.00 0.00 0.0000 0.00 1,143.52 35,860.79 0.00%
06.06.05.04.01.11 CONCRETO SIMPLE f'C= 210 KG/CM2 (PARAPETOS). m3 3.73 369.07 1,376.63 0.00 0.00 0.00 0.00 0.0000 0.00 3.73 1,376.63 0.00%
06.06.07.02 LOSAS Y VEREDAS/SARDINELES DE CONCRETO 63,360.39 0.00 0.00 0.00 63,360.39 0.00%
06.06.07.02.01 ENCOFRADO CARAVISTA EN SECO m2 155.37 72.15 11,209.95 0.00 0.00 0.00 0.00 0.0000 0.00 155.37 11,209.95 0.00%
06.06.07.02.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 5,399.50 3.92 21,166.04 0.00 0.00 0.00 0.00 0.0000 0.00 5,399.50 21,166.04 0.00%
06.06.07.02.03 CONCRETO SIMPLE f'C= 280 KG/CM2 SUPERESTRUCT m3 74.80 414.23 30,984.40 0.00 0.00 0.00 0.00 0.0000 0.00 74.80 30,984.40 0.00%
06.06.07.03 LOSAS DE APROXIMACION 26,615.51 0.00 0.00 0.0000 0.00 26,615.51 0.00%
06.06.07.03.01 ENCOFRADO CARAVISTA EN SECO m2 6.00 72.15 432.90 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 432.90 0.00%
06.06.07.03.02 ENCOFRADO CARA NO VISTA EN SECO m2 11.40 51.63 588.58 0.00 0.00 0.00 0.00 0.0000 0.00 11.40 588.58 0.00%
06.06.07.03.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 2,930.00 3.92 11,485.60 0.00 0.00 0.00 0.00 0.0000 0.00 2,930.00 11,485.60 0.00%
06.06.07.03.04 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 40.81 345.71 14,108.43 0.00 0.00 0.00 0.00 0.0000 0.00 40.81 14,108.43 0.00%
06.06.07.03 VARIOS 8,339.23 0.00 0.00 0.0000 0.00 8,339.23 0.00%
06.06.07.03.01 JUNTAS DE DILATACION METALICA m 20.00 276.38 5,527.60 0.00 0.00 0.00 0.00 0.0000 0.00 20.00 5,527.60 0.00%
06.06.07.03.02 TUBOS DE DRENAJE PVC D=3 L= 0.75 m 6.00 28.20 169.20 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 169.20 0.00%
06.06.07.03.03 ACABADO DE VEREDAS/SARDINELES m 21.00 15.42 323.82 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 323.82 0.00%
06.06.07.03.04 BARANDAS METALICA m 21.00 110.41 2,318.61 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 2,318.61 0.00%
06.07 PONTON 7 (KM 78+101) 485,498.35 0.00 0.00 0.00 485,498.35 0.00%
06.07.01 LIMPIEZA DE ACCESOS m 40.00 52.63 2,105.20 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 2,105.20 0.00%
06.07.02 CALZATURA DE ESTRIBOS/PILARES 47,930.90 0.00 0.00 0.00 47,930.90 0.00%
06.07.03 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 89.10 13.77 1,226.91 0.00 0.00 0.00 0.00 0.0000 0.00 89.10 1,226.91 0.00%
06.07.04 CONCRETO SIMPLE F'C= 175 KG/CM2.+30% PG C/socav m3 133.65 349.45 46,703.99 0.00 0.00 0.00 0.00 0.0000 0.00 133.65 46,703.99 0.00%
06.07.05 OBRAS DE ENCAUZAMIENTO 32,638.83 0.00 0.00 0.00 32,638.83 0.00%
06.07.05.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 50.00 13.77 688.50 0.00 0.00 0.00 0.00 0.0000 0.00 50.00 688.50 0.00%
06.07.05.02 ENCAUZAMIENTO DE RIO/QUEBRADAS m3 50.00 5.42 271.00 0.00 0.00 0.00 0.00 0.0000 0.00 50.00 271.00 0.00%
06.07.05.03 CONCRETO CICLOPEO FC=120KG/CM2 + 30 % PG. m3 153.50 206.38 31,679.33 0.00 0.00 0.00 0.00 0.0000 0.00 153.50 31,679.33 0.00%
06.07.05.04 CONSTRUCCION NUEVA 402,823.42 0.00 0.00 0.00 402,823.42 0.00%
06.07.05.04.01 ESTRIBOS 313,570.68 0.00 0.00 0.00 313,570.68 0.00%
06.07.05.04.01.01 EXC. P/ESTRUC. EN MATERIAL COMUN SECO m3 1,484.42 34.74 51,568.75 0.00 0.00 0.00 0.00 0.0000 0.00 1,484.42 51,568.75 0.00%
06.07.05.04.01.02 SOLADO PARA ZAPATAS FC=100 kg/CM2 m3 17.60 72.64 1,278.46 0.00 0.00 0.00 0.00 0.0000 0.00 17.60 1,278.46 0.00%
06.07.05.04.01.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 470.00 3.92 1,842.40 0.00 0.00 0.00 0.00 0.0000 0.00 470.00 1,842.40 0.00%
06.07.05.04.01.04 ENCOFRADO CARA NO VISTA BAJO AGUA m2 272.92 60.95 16,634.47 0.00 0.00 0.00 0.00 0.0000 0.00 272.92 16,634.47 0.00%
06.07.05.04.01.05 ENCOFRADO CARA NO VISTA EN SECO m2 188.00 51.63 9,706.44 0.00 0.00 0.00 0.00 0.0000 0.00 188.00 9,706.44 0.00%
06.07.05.04.01.06 ENCOFRADO CARAVISTA EN SECO m2 197.40 72.15 14,242.41 0.00 0.00 0.00 0.00 0.0000 0.00 197.40 14,242.41 0.00%
06.07.05.04.01.07 CONCRETO SIMPLE FC=140 KG/CM2 + 30 % PG. BAJ m3 351.40 249.19 87,565.37 0.00 0.00 0.00 0.00 0.0000 0.00 351.40 87,565.37 0.00%
06.07.05.04.01.08 CONCRETO SIMPLE FC=140 KG/CM2 + 30 % PG. EN m3 352.36 228.14 80,387.41 0.00 0.00 0.00 0.00 0.0000 0.00 352.36 80,387.41 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


06.07.05.04.01.09 RELLENO DE ESTRUCTURA CON MATERIAL PROPIO m3 374.00 38.00 14,212.00 0.00 0.00 0.00 0.00 0.0000 0.00 374.00 14,212.00 0.00%
06.07.05.04.01.10 ELIMINACION DE MATERIAL EXCEDENTE m3 1,110.42 31.36 34,822.77 0.00 0.00 0.00 0.00 0.0000 0.00 1,110.42 34,822.77 0.00%
06.07.05.04.01.11 CONCRETO SIMPLE f'C= 210 KG/CM2 (PARAPETOS). m3 3.55 369.07 1,310.20 0.00 0.00 0.00 0.00 0.0000 0.00 3.55 1,310.20 0.00%
06.07.07.02 LOSAS Y VEREDAS/SARDINELES DE CONCRETO 57,350.01 0.00 0.00 0.00 57,350.01 0.00%
06.07.07.02.01 ENCOFRADO CARAVISTA EN SECO m2 143.68 72.15 10,366.51 0.00 0.00 0.00 0.00 0.0000 0.00 143.68 10,366.51 0.00%
06.07.07.02.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 4,821.10 3.92 18,898.71 0.00 0.00 0.00 0.00 0.0000 0.00 4,821.10 18,898.71 0.00%
06.07.07.02.03 CONCRETO SIMPLE f'C= 280 KG/CM2 SUPERESTRUCT m3 67.80 414.23 28,084.79 0.00 0.00 0.00 0.00 0.0000 0.00 67.80 28,084.79 0.00%
06.07.07.03 LOSAS DE APROXIMACION 24,116.26 0.00 0.00 0.00 24,116.26 0.00%
06.07.07.03.01 ENCOFRADO CARAVISTA EN SECO m2 6.00 72.15 432.90 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 432.90 0.00%
06.07.07.03.02 ENCOFRADO CARA NO VISTA EN SECO m2 8.80 51.63 454.34 0.00 0.00 0.00 0.00 0.0000 0.00 8.80 454.34 0.00%
06.07.07.03.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 2,750.00 3.92 10,780.00 0.00 0.00 0.00 0.00 0.0000 0.00 2,750.00 10,780.00 0.00%
06.07.07.03.04 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 36.01 345.71 12,449.02 0.00 0.00 0.00 0.00 0.0000 0.00 36.01 12,449.02 0.00%
06.07.07.04 VARIOS 7,786.47 0.00 0.00 0.00 7,786.47 0.00%
06.07.07.04.01 JUNTAS DE DILATACION METALICA m 18.00 276.38 4,974.84 0.00 0.00 0.00 0.00 0.0000 0.00 18.00 4,974.84 0.00%
06.07.07.04.02 TUBOS DE DRENAJE PVC D=3 L= 0.75 m 6.00 28.20 169.20 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 169.20 0.00%
06.07.07.04.03 ACABADO DE VEREDAS/SARDINELES m 21.00 15.42 323.82 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 323.82 0.00%
06.07.07.04.04 BARANDAS METALICA m 21.00 110.41 2,318.61 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 2,318.61 0.00%
06.08 PONTON 8 (KM 79+517.15) 435,919.23 0.00 0.00 0.00 435,919.23 0.00%
06.08.01 LIMPIEZA DE ACCESOS m 40.00 52.63 2,105.20 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 2,105.20 0.00%
06.08.02 CALZATURA DE ESTRIBOS/PILARES 33,890.54 0.00 0.00 0.00 33,890.54 0.00%
06.08.03 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 63.00 13.77 867.51 0.00 0.00 0.00 0.00 0.0000 0.00 63.00 867.51 0.00%
06.08.04 CONCRETO SIMPLE F'C= 175 KG/CM2.+30% PG C/socav m3 94.50 349.45 33,023.03 0.00 0.00 0.00 0.00 0.0000 0.00 94.50 33,023.03 0.00%
06.08.05 OBRAS DE ENCAUZAMIENTO 15,558.82 0.00 0.00 0.00 15,558.82 0.00%
06.08.05.01 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 50.00 13.77 688.50 0.00 0.00 0.00 0.00 0.0000 0.00 50.00 688.50 0.00%
06.08.05.02 ENCAUZAMIENTO DE RIO/QUEBRADAS m3 50.00 5.42 271.00 0.00 0.00 0.00 0.00 0.0000 0.00 50.00 271.00 0.00%
06.08.05.03 CONCRETO CICLOPEO FC=120KG/CM2 + 30 % PG. m3 70.74 206.38 14,599.32 0.00 0.00 0.00 0.00 0.0000 0.00 70.74 14,599.32 0.00%
06.08.05.04 CONSTRUCCION NUEVA 384,364.67 0.00 0.00 0.00 384,364.67 0.00%
06.08.05.04.01 ESTRIBOS 300,285.78 0.00 0.00 0.00 300,285.78 0.00%
06.08.05.04.01.01 EXC. P/ESTRUC. EN MATERIAL COMUN SECO m3 1,428.42 34.74 49,623.31 0.00 0.00 0.00 0.00 0.0000 0.00 1,428.42 49,623.31 0.00%
06.08.05.04.01.02 SOLADO PARA ZAPATAS FC=100 kg/CM2 m3 16.90 72.64 1,227.62 0.00 0.00 0.00 0.00 0.0000 0.00 16.90 1,227.62 0.00%
06.08.05.04.01.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 470.00 3.92 1,842.40 0.00 0.00 0.00 0.00 0.0000 0.00 470.00 1,842.40 0.00%
06.08.05.04.01.04 ENCOFRADO CARA NO VISTA BAJO AGUA m2 272.92 60.95 16,634.47 0.00 0.00 0.00 0.00 0.0000 0.00 272.92 16,634.47 0.00%
06.08.05.04.01.05 ENCOFRADO CARA NO VISTA EN SECO m2 184.00 51.63 9,499.92 0.00 0.00 0.00 0.00 0.0000 0.00 184.00 9,499.92 0.00%
06.08.05.04.01.06 ENCOFRADO CARAVISTA EN SECO m2 191.53 72.15 13,818.89 0.00 0.00 0.00 0.00 0.0000 0.00 191.53 13,818.89 0.00%
06.08.05.04.01.07 CONCRETO SIMPLE FC=140 KG/CM2 + 30 % PG. BAJ m3 325.60 249.19 81,136.26 0.00 0.00 0.00 0.00 0.0000 0.00 325.60 81,136.26 0.00%
06.08.05.04.01.08 CONCRETO SIMPLE FC=140 KG/CM2 + 30 % PG. EN m3 341.81 228.14 77,980.53 0.00 0.00 0.00 0.00 0.0000 0.00 341.81 77,980.53 0.00%
06.08.05.04.01.09 RELLENO DE ESTRUCTURA CON MATERIAL PROPIO m3 374.00 38.00 14,212.00 0.00 0.00 0.00 0.00 0.0000 0.00 374.00 14,212.00 0.00%
06.08.05.04.01.10 ELIMINACION DE MATERIAL EXCEDENTE m3 1,054.42 31.36 33,066.61 0.00 0.00 0.00 0.00 0.0000 0.00 1,054.42 33,066.61 0.00%
06.08.05.04.01.11 CONCRETO SIMPLE f'C= 210 KG/CM2 (PARAPETOS). m3 3.37 369.07 1,243.77 0.00 0.00 0.00 0.00 0.0000 0.00 3.37 1,243.77 0.00%
06.08.07.02 LOSAS Y VEREDAS/SARDINELES DE CONCRETO 54,607.37 0.00 0.00 0.0000 0.00 54,607.37 0.00%
06.08.07.02.01 ENCOFRADO CARAVISTA EN SECO m2 137.58 72.15 9,926.40 0.00 0.00 0.00 0.00 0.0000 0.00 137.58 9,926.40 0.00%
06.08.07.02.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 4,593.00 3.92 18,004.56 0.00 0.00 0.00 0.00 0.0000 0.00 4,593.00 18,004.56 0.00%
06.08.07.02.03 CONCRETO SIMPLE f'C= 280 KG/CM2 SUPERESTRUCT m3 64.40 414.23 26,676.41 0.00 0.00 0.00 0.00 0.0000 0.00 64.40 26,676.41 0.00%
06.08.07.03 LOSAS DE APROXIMACION 21,961.43 0.00 0.00 0.00 21,961.43 0.00%
06.08.07.03.01 ENCOFRADO CARAVISTA EN SECO m2 6.00 72.15 432.90 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 432.90 0.00%
06.08.07.03.02 ENCOFRADO CARA NO VISTA EN SECO m2 9.30 51.63 480.16 0.00 0.00 0.00 0.00 0.0000 0.00 9.30 480.16 0.00%
06.08.07.03.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 2,326.00 3.92 9,117.92 0.00 0.00 0.00 0.00 0.0000 0.00 2,326.00 9,117.92 0.00%
06.08.07.03.04 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 34.51 345.71 11,930.45 0.00 0.00 0.00 0.00 0.0000 0.00 34.51 11,930.45 0.00%
06.08.07.04 VARIOS 7,510.09 0.00 0.00 0.0000 0.00 7,510.09 0.00%
06.08.07.04.01 JUNTAS DE DILATACION METALICA m 17.00 276.38 4,698.46 0.00 0.00 0.00 0.00 0.0000 0.00 17.00 4,698.46 0.00%
06.08.07.04.02 TUBOS DE DRENAJE PVC D=3 L= 0.75 m 6.00 28.20 169.20 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 169.20 0.00%
06.08.07.04.03 ACABADO DE VEREDAS/SARDINELES m 21.00 15.42 323.82 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 323.82 0.00%
06.08.07.04.04 BARANDAS METALICA m 21.00 110.41 2,318.61 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 2,318.61 0.00%
06.09 PONTON FLOR DE LA ESPERANZA (L=10 M) 361,140.09 0.00 0.00 0.00 361,140.09 0.00%
06.09.05.04.01.01 EXC. P/ESTRUC. EN MATERIAL COMUN BAJO AGUA m3 588.18 55.86 32,855.73 0.00 0.00 0.00 0.00 0.0000 0.00 588.18 32,855.73 0.00%
06.09.05.04.01.02 SOLADO PARA ZAPATAS FC=100 kg/CM2 m3 16.28 72.64 1,182.58 0.00 0.00 0.00 0.00 0.0000 0.00 16.28 1,182.58 0.00%
06.09.05.04.01.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 469.80 3.92 1,841.62 0.00 0.00 0.00 0.00 0.0000 0.00 469.80 1,841.62 0.00%
06.09.05.04.01.04 ENCOFRADO CARA NO VISTA BAJO AGUA m2 272.92 60.95 16,634.47 0.00 0.00 0.00 0.00 0.0000 0.00 272.92 16,634.47 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


06.09.05.04.01.05 ENCOFRADO CARA NO VISTA EN SECO m2 182.58 51.63 9,426.61 0.00 0.00 0.00 0.00 0.0000 0.00 182.58 9,426.61 0.00%
06.09.05.04.01.06 ENCOFRADO CARAVISTA EN SECO m2 191.53 72.15 13,818.89 0.00 0.00 0.00 0.00 0.0000 0.00 191.53 13,818.89 0.00%
06.09.05.04.01.07 CONCRETO SIMPLE FC=140 KG/CM2 + 30 % PG. BAJ m3 325.52 249.19 81,116.33 0.00 0.00 0.00 0.00 0.0000 0.00 325.52 81,116.33 0.00%
06.09.05.04.01.08 CONCRETO SIMPLE FC=140 KG/CM2 + 30 % PG. EN m3 341.81 228.14 77,980.53 0.00 0.00 0.00 0.00 0.0000 0.00 341.81 77,980.53 0.00%
06.09.05.04.01.09 RELLENO DE ESTRUCTURA CON MATERIAL PROPIO m3 374.08 38.00 14,215.04 0.00 0.00 0.00 0.00 0.0000 0.00 374.08 14,215.04 0.00%
06.09.05.04.01.10 ELIMINACION DE MATERIAL EXCEDENTE m3 410.16 31.36 12,862.62 0.00 0.00 0.00 0.00 0.0000 0.00 410.16 12,862.62 0.00%
06.09.05.04.01.11 CONCRETO SIMPLE f'C= 210 KG/CM2 (PARAPETOS). m3 3.37 369.07 1,243.77 0.00 0.00 0.00 0.00 0.0000 0.00 3.37 1,243.77 0.00%
06.09.05.04.02 LOSAS Y VEREDAS/SARDINELES DE CONCRETO 51,829.80 0.00 0.00 0.00 51,829.80 0.00%
06.09.07.02.01 ENCOFRADO CARAVISTA EN SECO m2 130.60 72.15 9,422.79 0.00 0.00 0.00 0.00 0.0000 0.00 130.60 9,422.79 0.00%
06.09.07.02.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 4,381.70 3.92 17,176.26 0.00 0.00 0.00 0.00 0.0000 0.00 4,381.70 17,176.26 0.00%
06.09.07.02.03 CONCRETO SIMPLE f'C= 280 KG/CM2 SUPERESTRUCT m3 60.91 414.23 25,230.75 0.00 0.00 0.00 0.00 0.0000 0.00 60.91 25,230.75 0.00%
06.09.05.04.03 LOSAS DE APROXIMACION 21,415.48 0.00 0.00 0.00 21,415.48 0.00%
06.09.07.03.01 ENCOFRADO CARAVISTA EN SECO m2 6.00 72.15 432.90 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 432.90 0.00%
06.09.07.03.02 ENCOFRADO CARA NO VISTA EN SECO m2 8.80 51.63 454.34 0.00 0.00 0.00 0.00 0.0000 0.00 8.80 454.34 0.00%
06.09.07.03.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 2,325.60 3.92 9,116.35 0.00 0.00 0.00 0.00 0.0000 0.00 2,325.60 9,116.35 0.00%
06.09.07.03.04 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 33.01 345.71 11,411.89 0.00 0.00 0.00 0.00 0.0000 0.00 33.01 11,411.89 0.00%
06.09.07.04 VARIOS 24,716.62 0.00 0.00 0.00 24,716.62 0.00%
06.09.07.04.01 JUNTAS DE DILATACION METALICA m 16.00 276.38 4,422.08 0.00 0.00 0.00 0.00 0.0000 0.00 16.00 4,422.08 0.00%
06.09.07.04.02 TUBOS DE DRENAJE PVC D=3 L= 0.75 m 6.00 28.20 169.20 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 169.20 0.00%
06.09.07.04.03 ACABADO DE VEREDAS/SARDINELES m 21.00 15.42 323.82 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 323.82 0.00%
06.09.07.04.04 BARANDAS METALICA m 21.00 110.41 2,318.61 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 2,318.61 0.00%
06.09.07.04.05 PROTECCION DE ENROCADO EN RIBERAS m3 132.00 67.95 8,969.40 0.00 0.00 0.00 0.00 0.0000 0.00 132.00 8,969.40 0.00%
06.09.07.04.06 DEMOLICION DE ESTRUCTURAS (MANUAL) m3 147.42 57.75 8,513.51 0.00 0.00 0.00 0.00 0.0000 0.00 147.42 8,513.51 0.00%
06.10 PUENTE EL MILAGRO (KM 13+150) 172,956.69 0.00 0.00 0.00 172,956.69 0.00%
06.10.01 LIMPIEZA DE APOYOS m 4.00 383.01 1,532.04 0.00 0.00 0.00 0.00 0.0000 0.00 4.00 1,532.04 0.00%
06.10.02 JUNTAS DE DILATACION METALICA m 12.20 276.38 3,371.84 0.00 0.00 0.00 0.00 0.0000 0.00 12.20 3,371.84 0.00%
06.10.03 LIMPIEZA DE TUBOS DE DRENAJE und 20.00 34.65 693.00 0.00 0.00 0.00 0.00 0.0000 0.00 20.00 693.00 0.00%
06.10.04 LIMPIEZA DE ACCESOS m 40.00 52.63 2,105.20 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 2,105.20 0.00%
06.10.05 OBRAS DE REHABILITACION 83,623.75 0.00 0.00 0.00 83,623.75 0.00%
06.10.05.01 ARENADO DE ESTRUCTURA METALICA ton 114.50 81.79 9,364.96 0.00 0.00 0.00 0.00 0.0000 0.00 114.50 9,364.96 0.00%
06.10.05.02 PINTURA DE ESTRUCTURA METALICA m 114.50 172.53 19,754.69 0.00 0.00 0.00 0.00 0.0000 0.00 114.50 19,754.69 0.00%
06.10.05.03 ENDEREZADO DE ELEMENTOS METALICOS ton 5.73 5,974.44 34,233.54 0.00 0.00 0.00 0.00 0.0000 0.00 5.73 34,233.54 0.00%
06.10.05.04 REMPLAZO DE ELEMENTOS METALICOS ton 5.73 3,537.62 20,270.56 0.00 0.00 0.00 0.00 0.0000 0.00 5.73 20,270.56 0.00%
06.10.05.05 LOSAS DE APROXIMACION 8,822.12 0.00 0.00 0.00 8,822.12 0.00%
06.10.06.01 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 15.49 345.71 5,355.05 0.00 0.00 0.00 0.00 0.0000 0.00 15.49 5,355.05 0.00%
06.10.06.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 852.25 3.92 3,340.82 0.00 0.00 0.00 0.00 0.0000 0.00 852.25 3,340.82 0.00%
06.10.06.03 PEGAMENTO EPOXICO m2 4.88 25.87 126.25 0.00 0.00 0.00 0.00 0.0000 0.00 4.88 126.25 0.00%
06.10.07 REHABILITACION DE LOSA 56,600.00 0.00 0.00 0.00 56,600.00 0.00%
06.10.07.01 SELLADO DE FISURAS m 1,000.00 56.60 56,600.00 0.00 0.00 0.00 0.00 0.0000 0.00 1,000.00 56,600.00 0.00%
06.10.08 REHABILITACION DE ESTRIBOS/PILARES 1,463.22 0.00 0.00 0.00 1,463.22 0.00%
06.10.08.01 ENCOFRADO Y DESENCOFRADO m2 12.00 43.42 521.04 0.00 0.00 0.00 0.00 0.0000 0.00 12.00 521.04 0.00%
06.10.08.02 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 2.00 345.71 691.42 0.00 0.00 0.00 0.00 0.0000 0.00 2.00 691.42 0.00%
06.10.08.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 50.77 3.92 199.02 0.00 0.00 0.00 0.00 0.0000 0.00 50.77 199.02 0.00%
06.10.08.04 PEGAMENTO EPOXICO m2 2.00 25.87 51.74 0.00 0.00 0.00 0.00 0.0000 0.00 2.00 51.74 0.00%
06.10.09 OBRAS DE ENCAUZAMIENTO 14,745.52 0.00 0.00 0.00 14,745.52 0.00%
06.10.09.01 EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS m3 55.50 13.77 764.24 0.00 0.00 0.00 0.00 0.0000 0.00 55.50 764.24 0.00%
06.10.09.02 ENROCADO CONTRA SOCAVACION m3 157.50 88.77 13,981.28 0.00 0.00 0.00 0.00 0.0000 0.00 157.50 13,981.28 0.00%
6.11 PUENTE AMOJAO (KM 39+945) 9,284.03 0.00 0.00 0.00 9,284.03 0.00%
06.11.01 LIMPIEZA DE APOYOS m 6.00 383.01 2,298.06 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 2,298.06 0.00%
06.11.02 JUNTAS DE DILATACION METALICA m 14.40 276.38 3,979.87 0.00 0.00 0.00 0.00 0.0000 0.00 14.40 3,979.87 0.00%
06.11.03 LIMPIEZA DE TUBOS DE DRENAJE und 26.00 34.65 900.90 0.00 0.00 0.00 0.00 0.0000 0.00 26.00 900.90 0.00%
06.11.04 LIMPIEZA DE ACCESOS m 40.00 52.63 2,105.20 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 2,105.20 0.00%
6.12 PUENTE EL MUYO (KM 46+425.6) 116,893.87 0.00 0.00 0.00 116,893.87 0.00%
06.12.01 LIMPIEZA DE APOYOS m 4.00 383.01 1,532.04 0.00 0.00 0.00 0.00 0.0000 0.00 4.00 1,532.04 0.00%
06.12.02 LIMPIEZA DE TUBOS DE DRENAJE und 28.00 34.65 970.20 0.00 0.00 0.00 0.00 0.0000 0.00 28.00 970.20 0.00%
06.12.03 LIMPIEZA DE ACCESOS m 40.00 52.63 2,105.20 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 2,105.20 0.00%
06.12.04 OBRAS DE REHABILITACION 32,800.25 0.00 0.00 0.00 32,800.25 0.00%
06.12.04.01 ARENADO DE ESTRUCTURA METALICA ton 57.00 81.79 4,662.03 0.00 0.00 0.00 0.00 0.0000 0.00 57.00 4,662.03 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


06.12.04.02 PINTURA DE ESTRUCTURA METALICA m2 57.00 18.05 1,028.85 0.00 0.00 0.00 0.00 0.0000 0.00 57.00 1,028.85 0.00%
06.12.04.03 ENDEREZADO DE ELEMENTOS METALICOS ton 2.85 5,974.44 17,027.15 0.00 0.00 0.00 0.00 0.0000 0.00 2.85 17,027.15 0.00%
06.12.04.04 REMPLAZO DE ELEMENTOS METALICOS ton 2.85 3,537.62 10,082.22 0.00 0.00 0.00 0.00 0.0000 0.00 2.85 10,082.22 0.00%
06.12.05 LOSAS DE APROXIMACION 12,938.98 0.00 0.00 0.00 12,938.98 0.00%
06.12.05.01 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 15.49 345.71 5,355.05 0.00 0.00 0.00 0.00 0.0000 0.00 15.49 5,355.05 0.00%
06.12.05.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 852.25 3.71 3,161.85 0.00 0.00 0.00 0.00 0.0000 0.00 852.25 3,161.85 0.00%
06.12.05.03 JUNTAS DE DILATACION METALICA m 16.00 276.38 4,422.08 0.00 0.00 0.00 0.00 0.0000 0.00 16.00 4,422.08 0.00%
16.12.06 REHABILITACION DE LOSA 66,547.20 0.00 0.00 0.00 66,547.20 0.00%
12.12.06.01 SELLADO DE FISURAS m 800.00 56.60 45,280.00 0.00 0.00 0.00 0.00 0.0000 0.00 800.00 45,280.00 0.00%
06.12.06.02 SELLADO SUPERFICIE POR DESGASTE (e=5 mm) m2 320.00 66.46 21,267.20 0.00 0.00 0.00 0.00 0.0000 0.00 320.00 21,267.20 0.00%
06.13 PUENTE EL MIRANDA (KM 59+769.6) 93,811.86 0.00 0.00 0.00 93,811.86 0.00%
06.13.01 LIMPIEZA DE APOYOS m 4.00 383.01 1,532.04 0.00 0.00 0.00 0.00 0.0000 0.00 4.00 1,532.04 0.00%
06.13.02 JUNTAS DE DILATACION METALICA m 14.40 276.38 3,979.87 0.00 0.00 0.00 0.00 0.0000 0.00 14.40 3,979.87 0.00%
06.13.03 LIMPIEZA DE TUBOS DE DRENAJE und 20.00 34.65 693.00 0.00 0.00 0.00 0.00 0.0000 0.00 20.00 693.00 0.00%
06.13.04 LIMPIEZA DE ACCESOS m 40.00 52.63 2,105.20 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 2,105.20 0.00%
06.13.05 OBRAS DE REHABILITACION 20,140.51 0.00 0.00 0.00 20,140.51 0.00%
06.13.05.01 ARENADO DE ESTRUCTURA METALICA ton 35.00 81.79 2,862.65 0.00 0.00 0.00 0.00 0.0000 0.00 35.00 2,862.65 0.00%
06.13.05.02 PINTURA DE ESTRUCTURA METALICA m2 35.00 18.05 631.75 0.00 0.00 0.00 0.00 0.0000 0.00 35.00 631.75 0.00%
06.13.05.03 ENDEREZADO DE ELEMENTOS METALICOS ton 1.75 5,974.44 10,455.27 0.00 0.00 0.00 0.00 0.0000 0.00 1.75 10,455.27 0.00%
06.13.05.04 REMPLAZO DE ELEMENTOS METALICOS ton 1.75 3,537.62 6,190.84 0.00 0.00 0.00 0.00 0.0000 0.00 1.75 6,190.84 0.00%
06.13.06 LOSAS Y SARDINELES 987.46 0.00 0.00 0.00 987.46 0.00%
06.13.06.01 ENCOFRADO Y DESENCOFRADO m2 10.56 43.42 458.52 0.00 0.00 0.00 0.00 0.0000 0.00 10.56 458.52 0.00%
06.13.06.02 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 1.53 345.71 528.94 0.00 0.00 0.00 0.00 0.0000 0.00 1.53 528.94 0.00%
06.13.07 LOSAS DE APROXIMACION 13,117.95 0.00 0.00 0.00 13,117.95 0.00%
06.13.07.01 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 15.49 345.71 5,355.05 0.00 0.00 0.00 0.00 0.0000 0.00 15.49 5,355.05 0.00%
06.13.07.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 852.25 3.92 3,340.82 0.00 0.00 0.00 0.00 0.0000 0.00 852.25 3,340.82 0.00%
06.13.07.03 JUNTAS DE DILATACION METALICA m 16.00 276.38 4,422.08 0.00 0.00 0.00 0.00 0.0000 0.00 16.00 4,422.08 0.00%
06.13.08 REHABILITACION DE LOSA 48,386.18 0.00 0.00 0.00 48,386.18 0.00%
06.13.02.01 SELLADO DE FISURAS m 640.00 56.60 36,224.00 0.00 0.00 0.00 0.00 0.0000 0.00 640.00 36,224.00 0.00%
06.13.02.02 SELLADO SUPERFICIE POR DESGASTE (e=5mm) m2 183.00 66.46 12,162.18 0.00 0.00 0.00 0.00 0.0000 0.00 183.00 12,162.18 0.00%
06.13.09 OBRAS DE ENCAUZAMIENTO 2,869.65 0.00 0.00 0.00 2,869.65 0.00%
06.13.09.01 EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS m3 15.00 13.77 206.55 0.00 0.00 0.00 0.00 0.0000 0.00 15.00 206.55 0.00%
06.13.09.02 ENROCADO CONTRA SOCAVACION m3 30.00 88.77 2,663.10 0.00 0.00 0.00 0.00 0.0000 0.00 30.00 2,663.10 0.00%
06.14 PUENTE ALMENDRO (KM 85+156) 8,729.63 0.00 0.00 0.00 8,729.63 0.00%
06.14.01 LIMPIEZA DE APOYOS m 6.00 383.01 2,298.06 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 2,298.06 0.00%
06.14.02 JUNTAS DE DILATACION METALICA m 14.40 276.38 3,979.87 0.00 0.00 0.00 0.00 0.0000 0.00 14.40 3,979.87 0.00%
06.14.03 LIMPIEZA DE TUBOS DE DRENAJE und 10.00 34.65 346.50 0.00 0.00 0.00 0.00 0.0000 0.00 10.00 346.50 0.00%
06.14.04 LIMPIEZA DE ACCESOS m 40.00 52.63 2,105.20 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 2,105.20 0.00%
06.15 PUENTE DURAN (KM 86+167) 8,729.63 0.00 0.00 0.00 8,729.63 0.00%
06.15.01 LIMPIEZA DE APOYOS m 6.00 383.01 2,298.06 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 2,298.06 0.00%
06.15.02 JUNTAS DE DILATACION METALICA m 14.40 276.38 3,979.87 0.00 0.00 0.00 0.00 0.0000 0.00 14.40 3,979.87 0.00%
06.15.03 LIMPIEZA DE TUBOS DE DRENAJE und 10.00 34.65 346.50 0.00 0.00 0.00 0.00 0.0000 0.00 10.00 346.50 0.00%
06.15.04 LIMPIEZA DE ACCESOS m 40.00 52.63 2,105.20 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 2,105.20 0.00%
06.16 PUENTE GUADALUPE 797,858.21 0.00 0.00 0.00 797,858.21 0.00%
06.16.01 EXC. P/ESTRUC. EN MATERIAL COMUN SECO m3 836.62 34.74 29,064.18 0.00 0.00 0.00 0.00 0.0000 0.00 836.62 29,064.18 0.00%
06.16.02 EXC. P/ ESTRUC. EN MATERIAL COMUN BAJO AGUA m3 1,014.08 55.86 56,646.51 0.00 0.00 0.00 0.00 0.0000 0.00 1,014.08 56,646.51 0.00%
06.16.03 SOLADO PARA ZAPATAS FC=100 kg/CM2 m3 20.50 72.64 1,489.12 0.00 0.00 0.00 0.00 0.0000 0.00 20.50 1,489.12 0.00%
06.16.04 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 31,459.00 3.92 123,319.28 0.00 0.00 0.00 0.00 0.0000 0.00 31,459.00 123,319.28 0.00%
06.16.05 ENCOFRADO CARA NO VISTA BAJO AGUA m2 278.53 60.95 16,976.40 0.00 0.00 0.00 0.00 0.0000 0.00 278.53 16,976.40 0.00%
06.16.06 ENCOFRADO CARA NO VISTA EN SECO m2 366.00 51.63 18,896.58 0.00 0.00 0.00 0.00 0.0000 0.00 366.00 18,896.58 0.00%
06.16.07 ENCOFRADO CARAVISTA EN SECO m2 315.76 72.15 22,782.08 0.00 0.00 0.00 0.00 0.0000 0.00 315.76 22,782.08 0.00%
06.16.08 CONCRETO SIMPLE f'C= 210 KG/CM2. BAJO AGUA m3 331.20 358.33 118,678.90 0.00 0.00 0.00 0.00 0.0000 0.00 331.20 118,678.90 0.00%
06.16.09 CONCRETO SIMPLE f'C= 210 KG/CM2. EN SECO m3 166.20 347.01 57,673.06 0.00 0.00 0.00 0.00 0.0000 0.00 166.20 57,673.06 0.00%
06.16.10 RELLENO DE ESTRUCTURA CON MATERIAL PROPIO m3 925.35 38.00 35,163.30 0.00 0.00 0.00 0.00 0.0000 0.00 925.35 35,163.30 0.00%
06.16.11 ELIMINACION DE MATERIAL EXCEDENTE m3 935.35 31.36 29,332.58 0.00 0.00 0.00 0.00 0.0000 0.00 935.35 29,332.58 0.00%
06.16.12 RELLENO DE ESTRUCTURA CON MATERIAL DE CANT m3 812.65 37.93 30,823.81 0.00 0.00 0.00 0.00 0.0000 0.00 812.65 30,823.81 0.00%
06.16.13 VIGAS METALICAS 147,864.53 0.00 0.00 0.00 147,864.53 0.00%
06.06.13.01 FABRICACIÓN DE ESTRUCTURA METÁLICAS ton 18.49 5,500.00 101,695.00 0.00 0.00 0.00 0.00 0.0000 0.00 18.49 101,695.00 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


06.06.13.02 PINTURA ANTOCORROSIVA PARA ESTRUCTURA META m2 287.43 33.22 9,548.42 0.00 0.00 0.00 0.00 0.0000 0.00 287.43 9,548.42 0.00%
06.06.13.03 PINTURA ESTRUCTURA METALICA m2 287.43 18.05 5,188.11 0.00 0.00 0.00 0.00 0.0000 0.00 287.43 5,188.11 0.00%
06.06.13.04 MONTAJE DE ESTRUCTURA METÁLICAS ton 18.49 1,300.00 24,037.00 0.00 0.00 0.00 0.00 0.0000 0.00 18.49 24,037.00 0.00%
06.06.13.05 TRANSPORTE DE ESTRUCTURA METALICA ton 18.49 400.00 7,396.00 0.00 0.00 0.00 0.00 0.0000 0.00 18.49 7,396.00 0.00%
06.16.14 LOSAS Y VEREDAS DE CONCRETO 50,970.09 0.00 0.00 0.00 50,970.09 0.00%
06.16.14.01 ENCOFRADO CARAVISTA EN SECO m2 207.21 72.15 14,950.20 0.00 0.00 0.00 0.00 0.0000 0.00 207.21 14,950.20 0.00%
06.16.14.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 4,708.30 3.92 18,456.54 0.00 0.00 0.00 0.00 0.0000 0.00 4,708.30 18,456.54 0.00%
06.16.14.03 CONCRETO SIMPLE f'C= 280 KG/CM2 SUPERESTRUCT m3 42.40 414.23 17,563.35 0.00 0.00 0.00 0.00 0.0000 0.00 42.40 17,563.35 0.00%
06.14.15 LOSAS DE APROXIMACION 21,417.05 0.00 0.00 0.00 21,417.05 0.00%
06.16.15.01 ENCOFRADO CARAVISTA EN SECO m2 6.00 72.15 432.90 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 432.90 0.00%
06.16.15.02 ENCOFRADO CARA NO VISTA EN SECO m2 8.80 51.63 454.34 0.00 0.00 0.00 0.00 0.0000 0.00 8.80 454.34 0.00%
06.16.15.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 2,326.00 3.92 9,117.92 0.00 0.00 0.00 0.00 0.0000 0.00 2,326.00 9,117.92 0.00%
06.16.15.04 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 33.01 345.71 11,411.89 0.00 0.00 0.00 0.00 0.0000 0.00 33.01 11,411.89 0.00%
06.16.16 VARIOS 36,760.74 0.00 0.00 0.00 36,760.74 0.00%
06.16.16.01 JUNTAS DE DILATACION METALICA m 16.00 276.38 4,422.08 0.00 0.00 0.00 0.00 0.0000 0.00 16.00 4,422.08 0.00%
06.16.16.02 APOYO DE NEOPRENO (30X30X8) und 8.00 410.86 3,286.88 0.00 0.00 0.00 0.00 0.0000 0.00 8.00 3,286.88 0.00%
06.16.16.03 TUBOS DE DRENAJE PVC D=3 L= 0.75 m 16.00 28.20 451.20 0.00 0.00 0.00 0.00 0.0000 0.00 16.00 451.20 0.00%
06.16.16.04 ACABADO DE VEREDAS/SARDINELES m 41.00 15.42 632.22 0.00 0.00 0.00 0.00 0.0000 0.00 41.00 632.22 0.00%
06.16.16.05 BARANDAS METALICA m 41.00 110.41 4,526.81 0.00 0.00 0.00 0.00 0.0000 0.00 41.00 4,526.81 0.00%
06.16.16.06 PROTECCION DE ENROCADO EN RIBERAS m3 132.00 67.95 8,969.40 0.00 0.00 0.00 0.00 0.0000 0.00 132.00 8,969.40 0.00%
06.16.16.07 DEMOLICION DE ESTRUCTURAS (MANUAL) m3 250.60 57.75 14,472.15 0.00 0.00 0.00 0.00 0.0000 0.00 250.60 14,472.15 0.00%
6.17 PUENTE MAGDALENA 1,014,725.11 0.00 0.00 0.00 1,014,725.11 0.00%
06.17.01 EXC. P/ESTRUC. EN MATERIAL COMUN SECO m3 2,170.35 34.74 75,397.96 0.00 0.00 0.00 0.00 0.0000 0.00 2,170.35 75,397.96 0.00%
06.17.02 SOLADO PARA ZAPATAS FC=100 kg/CM2 m3 26.90 72.64 1,954.02 0.00 0.00 0.00 0.00 0.0000 0.00 26.90 1,954.02 0.00%
06.17.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 26,630.00 3.92 104,389.60 0.00 0.00 0.00 0.00 0.0000 0.00 26,630.00 104,389.60 0.00%
06.17.04 ENCOFRADO CARA NO VISTA BAJO AGUA m2 442.26 60.95 26,955.75 0.00 0.00 0.00 0.00 0.0000 0.00 442.26 26,955.75 0.00%
06.17.05 ENCOFRADO CARA NO VISTA EN SECO m2 252.00 51.63 13,010.76 0.00 0.00 0.00 0.00 0.0000 0.00 252.00 13,010.76 0.00%
06.17.06 ENCOFRADO CARAVISTA EN SECO m2 176.78 72.15 12,754.68 0.00 0.00 0.00 0.00 0.0000 0.00 176.78 12,754.68 0.00%
06.17.07 CONCRETO SIMPLE f'C= 210 KG/CM2. BAJO AGUA m3 533.60 358.33 191,204.89 0.00 0.00 0.00 0.00 0.0000 0.00 533.60 191,204.89 0.00%
06.17.08 CONCRETO SIMPLE f'C= 210 KG/CM2. EN SECO m3 196.80 347.01 68,291.57 0.00 0.00 0.00 0.00 0.0000 0.00 196.80 68,291.57 0.00%
06.17.09 RELLENO DE ESTRUCTURA CON MATERIAL PROPIO m3 2,410.60 38.00 91,602.80 0.00 0.00 0.00 0.00 0.0000 0.00 2,410.60 91,602.80 0.00%
06.17.10 RELLENO DE ESTRUCTURA CON MATERIAL DE CANT m3 1,325.43 37.93 50,273.56 0.00 0.00 0.00 0.00 0.0000 0.00 1,325.43 50,273.56 0.00%
06.17.11 ELIMINACION DE MATERIAL EXCEDENTE m3 1,085.18 31.36 34,031.24 0.00 0.00 0.00 0.00 0.0000 0.00 1,085.18 34,031.24 0.00%
06.17.12 VIGAS METALICAS 246,960.03 0.00 0.00 0.00 246,960.03 0.00%
06.17.12.01 FABRICACIÓN DE ESTRUCTURA METÁLICAS ton 32.99 5,500.00 181,445.00 0.00 0.00 0.00 0.00 0.0000 0.00 32.99 181,445.00 0.00%
06.17.12.02 PINTURA ESTRUCTURA METALICA m2 522.55 18.05 9,432.03 0.00 0.00 0.00 0.00 0.0000 0.00 522.55 9,432.03 0.00%
06.17.12.03 TRANSPORTE DE ESTRUCTURA METALICA ton 32.99 400.00 13,196.00 0.00 0.00 0.00 0.00 0.0000 0.00 32.99 13,196.00 0.00%
06.17.12.04 MONTAJE DE ESTRUCTURA METÁLICAS ton 32.99 1,300.00 42,887.00 0.00 0.00 0.00 0.00 0.0000 0.00 32.99 42,887.00 0.00%
06.17.13 LOSAS Y VEREDAS DE CONCRETO 61,872.60 0.00 0.00 0.00 61,872.60 0.00%
06.17.13.01 ENCOFRADO CARAVISTA EN SECO m2 256.90 72.15 18,535.34 0.00 0.00 0.00 0.00 0.0000 0.00 256.90 18,535.34 0.00%
06.17.13.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 5,476.00 3.92 21,465.92 0.00 0.00 0.00 0.00 0.0000 0.00 5,476.00 21,465.92 0.00%
06.17.13.03 CONCRETO SIMPLE f'C= 280 KG/CM2 SUPERESTRUCT m3 52.80 414.23 21,871.34 0.00 0.00 0.00 0.00 0.0000 0.00 52.80 21,871.34 0.00%
06.17.14 LOSAS DE APROXIMACION 21,448.16 0.00 0.00 0.00 21,448.16 0.00%
06.17.14.01 ENCOFRADO CARAVISTA EN SECO m2 6.00 72.15 432.90 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 432.90 0.00%
06.17.14.02 ENCOFRADO CARA NO VISTA EN SECO m2 8.80 51.63 454.34 0.00 0.00 0.00 0.00 0.0000 0.00 8.80 454.34 0.00%
06.17.14.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 2,326.00 3.92 9,117.92 0.00 0.00 0.00 0.00 0.0000 0.00 2,326.00 9,117.92 0.00%
06.17.14.04 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 33.10 345.71 11,443.00 0.00 0.00 0.00 0.00 0.0000 0.00 33.10 11,443.00 0.00%
06.17.15 VARIOS 14,577.49 0.00 0.00 0.00 14,577.49 0.00%
06.17.15.01 JUNTAS DE DILATACION METALICA m 16.00 276.38 4,422.08 0.00 0.00 0.00 0.00 0.0000 0.00 16.00 4,422.08 0.00%
06.17.15.02 APOYO DE NEOPRENO (30X30X8) und 8.00 410.86 3,286.88 0.00 0.00 0.00 0.00 0.0000 0.00 8.00 3,286.88 0.00%
06.17.15.03 TUBOS DE DRENAJE PVC D=3 L= 0.75 m 16.00 28.20 451.20 0.00 0.00 0.00 0.00 0.0000 0.00 16.00 451.20 0.00%
06.17.15.04 ACABADO DE VEREDAS/SARDINELES m 51.00 15.42 786.42 0.00 0.00 0.00 0.00 0.0000 0.00 51.00 786.42 0.00%
06.17.15.05 BARANDAS METALICA m 51.00 110.41 5,630.91 0.00 0.00 0.00 0.00 0.0000 0.00 51.00 5,630.91 0.00%
06.18 FALSO PUENTE KM. 47+910 105,047.60 0.00 0.00 0.00 105,047.60 0.00%
06.18.01 CONSTRUCCION NUEVA 105,047.60 0.00 0.00 0.00 105,047.60 0.00%
06.18.01.01 ESTRIBOS 46,203.14 0.00 0.00 0.00 46,203.14 0.00%
06.18.01.01.01 EXC. P/ESTRUC. EN MATERIAL COMUN SECO m3 60.52 34.74 2,102.46 0.00 0.00 0.00 0.00 0.0000 0.00 60.52 2,102.46 0.00%
06.18.01.01.02 SOLADO PARA ZAPATAS FC=100 kg/CM2 m3 16.28 72.64 1,182.58 0.00 0.00 0.00 0.00 0.0000 0.00 16.28 1,182.58 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


06.18.01.01.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 74.88 3.92 293.53 0.00 0.00 0.00 0.00 0.0000 0.00 74.88 293.53 0.00%
06.18.01.01.04 ENCOFRADO CARA NO VISTA EN SECO m2 57.46 51.63 2,966.66 0.00 0.00 0.00 0.00 0.0000 0.00 57.46 2,966.66 0.00%
06.18.01.01.05 ENCOFRADO CARAVISTA EN SECO m2 95.35 72.15 6,879.50 0.00 0.00 0.00 0.00 0.0000 0.00 95.35 6,879.50 0.00%
06.18.01.01.06 CONCRETO SIMPLE FC=140 KG/CM2 + 30 % PG. EN m3 134.69 228.14 30,728.18 0.00 0.00 0.00 0.00 0.0000 0.00 134.69 30,728.18 0.00%
06.18.01.01.07 RELLENO DE ESTRUCTURA CON MATERIAL PROPIO m3 22.94 38.00 871.72 0.00 0.00 0.00 0.00 0.0000 0.00 22.94 871.72 0.00%
06.18.01.01.08 ELIMINACION DE MATERIAL EXCEDENTE m3 37.58 31.36 1,178.51 0.00 0.00 0.00 0.00 0.0000 0.00 37.58 1,178.51 0.00%
06.18.01.02 LOSAS Y VEREDAS DE CONCRETO 51,610.75 0.00 0.00 0.00 51,610.75 0.00%
06.18.01.02.01 ENCOFRADO CARAVISTA EN SECO m2 128.54 72.15 9,274.16 0.00 0.00 0.00 0.00 0.0000 0.00 128.54 9,274.16 0.00%
06.18.01.02.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 4,381.70 3.92 17,176.26 0.00 0.00 0.00 0.00 0.0000 0.00 4,381.70 17,176.26 0.00%
06.18.01.02.03 CONCRETO SIMPLE f'C= 280 KG/CM2 SUPERESTRUCT m3 60.74 414.23 25,160.33 0.00 0.00 0.00 0.00 0.0000 0.00 60.74 25,160.33 0.00%
06.18.01.03 VARIOS 7,233.71 0.00 0.00 0.00 7,233.71 0.00%
06.18.01.03.01 JUNTAS DE DILATACION METALICA m 16.00 276.38 4,422.08 0.00 0.00 0.00 0.00 0.0000 0.00 16.00 4,422.08 0.00%
06.18.01.03.02 TUBOS DE DRENAJE PVC D=3 L= 0.75 m 6.00 28.20 169.20 0.00 0.00 0.00 0.00 0.0000 0.00 6.00 169.20 0.00%
06.18.01.03.03 ACABADO DE VEREDAS/SARDINELES m 21.00 15.42 323.82 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 323.82 0.00%
06.18.01.03.04 BARANDAS METALICA m 21.00 110.41 2,318.61 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 2,318.61 0.00%
07.00 MUROS DE CONTENCION 4,398,322.41 0.00 0.00 0.00 4,398,322.41 0.00%
07.01 EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS m3 11,283.82 13.77 155,378.20 0.00 0.00 0.00 0.00 0.0000 0.00 11,283.82 155,378.20 0.00%
07.02 RELLENO PARA ESTRUCTURAS m3 18,173.00 27.18 493,942.14 0.00 0.00 0.00 0.00 0.0000 0.00 18,173.00 493,942.14 0.00%
07.03 ENCOFRADO Y DESENCOFRADO. m2 15,107.97 47.13 712,038.63 0.00 0.00 0.00 0.00 0.0000 0.00 15,107.97 712,038.63 0.00%
07.04 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 4,085.87 345.71 1,412,526.12 0.00 0.00 0.00 0.00 0.0000 0.00 4,085.87 1,412,526.12 0.00%
07.05 ACERO DE REFUERZO f´c 4200 kg/cm2 kg 276,968.83 3.92 1,085,717.81 0.00 0.00 0.00 0.00 0.0000 0.00 276,968.83 1,085,717.81 0.00%
07.06 TUBERÍA PVC D=2" m 15,496.00 23.56 365,085.76 0.00 0.00 0.00 0.00 0.0000 0.00 15,496.00 365,085.76 0.00%
07.07 TUBERÍA PVC D=4" m 2,544.00 31.91 81,179.04 0.00 0.00 0.00 0.00 0.0000 0.00 2,544.00 81,179.04 0.00%
07.08 MATERIAL DRENANTE (AG 50% - PCH 50%) m3 2,235.00 17.23 38,509.05 0.00 0.00 0.00 0.00 0.0000 0.00 2,235.00 38,509.05 0.00%
07.09 MANTO GEOTEXTIL m2 7,450.00 6.48 48,276.00 0.00 0.00 0.00 0.00 0.0000 0.00 7,450.00 48,276.00 0.00%
07.10 JUNTA DE CONSTRUCCIÓN CON TEKNOPORT m2 200.20 28.32 5,669.66 0.00 0.00 0.00 0.00 0.0000 0.00 200.20 5,669.66 0.00%
08.00 MUROS CON TIERRA ARMADA 6,143,846.33 0.00 0.00 0.00 6,143,846.33 0.00%
08.01 SECCION TIPO H=5m 1,211,449.55 0.00 0.00 0.00 1,211,449.55 0.00%
08.01.01 TIERRA ARMADA (NO ESTABILIDAD GLOBAL) 1,211,449.55 0.00 0.00 0.00 1,211,449.55 0.00%
08.01.01.01 ESTRUCTURAS 1,065,021.42 0.00 0.00 0.00 1,065,021.42 0.00%
08.01.01.01.01 ELEMENTO 1.0x1.0x5.0 (10X12/3.70XZn+Al+PVC) und 676.00 542.05 366,425.80 0.00 0.00 0.00 0.00 0.0000 0.00 676.00 366,425.80 0.00%
08.01.01.01.02 MATERIAL DE CANTERA PARA RELLENO DE ESTRUCT m3 13,840.00 31.95 442,188.00 0.00 0.00 0.00 0.00 0.0000 0.00 13,840.00 442,188.00 0.00%
08.01.01.01.03 ELEMENTO 0.5x1.0x5.0(10x12/3.70 Zn+Al+PVC) und 338.00 431.03 145,688.14 0.00 0.00 0.00 0.00 0.0000 0.00 338.00 145,688.14 0.00%
08.01.01.04 EXCAVACION PARA MUROS DE TIERRA ARMADA H=5 m3 7,880.39 14.05 110,719.48 0.00 0.00 0.00 0.00 0.0000 0.00 7,880.39 110,719.48 0.00%
08.01.01.02 SISTEMA DE DRENAJE 18,914.74 0.00 0.00 0.00 18,914.74 0.00%
08.01.01.02.01 INSTALACIÓN DE GEOCOMPUESTO DE DRENAJE MACD m2 637.34 20.82 13,269.42 0.00 0.00 0.00 0.00 0.0000 0.00 637.34 13,269.42 0.00%
08.01.01.02.02 SUMINISTRO E INSTALACIÓN DE HDPE D=4" (PERFOR m 428.00 13.19 5,645.32 0.00 0.00 0.00 0.00 0.0000 0.00 428.00 5,645.32 0.00%
08.01.03 TRANSPORTE 118,687.35 0.00 0.00 0.00 118,687.35 0.00%
08.01.01.03.01 TRANSPORTE DE MATERIAL A ELIMINAR HASTA 1 KM M3K 7,788.48 7.21 56,154.94 0.00 0.00 0.00 0.00 0.0000 0.00 7,788.48 56,154.94 0.00%
08.01.01.03.02 TRANSPORTE DE MATERIAL A ELIMINAR DESPUÉS DE M3K 32,739.48 1.91 62,532.41 0.00 0.00 0.00 0.00 0.0000 0.00 32,739.48 62,532.41 0.00%
08.01.01.04 PROGRAMA DE CIERRE Y ABANDONO 8,826.04 0.00 0.00 0.00 8,826.04 0.00%
08.01.01.04.01 ACONDICIONAMIENTO AMBIENTAL DE MATERIAL EXC m3 7,880.39 1.12 8,826.04 0.00 0.00 0.00 0.00 0.0000 0.00 7,880.39 8,826.04 0.00%
08.02 SECCION TIPO H=6m 1,258,323.73 0.00 0.00 0.00 1,258,323.73 0.00%
08.02.01 TIERRA ARMADA (NO ESTABILIDAD GLOBAL) 1,258,323.73 0.00 0.00 0.00 1,258,323.73 0.00%
08.02.01.01 ESTRUCTURAS 1,128,098.27 0.00 0.00 0.00 1,128,098.27 0.00%
08.02.01.01.01 ELEMENTO 1.0x1.0x6.0 (10X12/3.70XZn+Al+PVC) und 735.00 645.10 474,148.50 0.00 0.00 0.00 0.00 0.0000 0.00 735.00 474,148.50 0.00%
08.02.01.01.02 MATERIAL DE CANTERA PARA RELLENO DE ESTRUCT m3 11,728.80 31.95 374,735.16 0.00 0.00 0.00 0.00 0.0000 0.00 11,728.80 374,735.16 0.00%
08.02.01.01.03 ELEMENTO 0.5x1.0x6.0(10x12/3.70 Zn+Al+PVC) und 294.00 455.32 133,864.08 0.00 0.00 0.00 0.00 0.0000 0.00 294.00 133,864.08 0.00%
08.02.01.01.04 EXCAVACION PARA MUROS DE TIERRA ARMADA H=6 m3 10,374.77 14.01 145,350.53 0.00 0.00 0.00 0.00 0.0000 0.00 10,374.77 145,350.53 0.00%
08.02.01.02 SISTEMA DE DRENAJE 18,994.61 0.00 0.00 0.00 18,994.61 0.00%
08.02.01.02.01 INSTALACIÓN DE GEOCOMPUESTO DE DRENAJE MACD m2 665.25 20.82 13,850.51 0.00 0.00 0.00 0.00 0.0000 0.00 665.25 13,850.51 0.00%
08.02.01.02.02 SUMINISTRO E INSTALACIÓN DE HDPE D=4" (PERFOR m 390.00 13.19 5,144.10 0.00 0.00 0.00 0.00 0.0000 0.00 390.00 5,144.10 0.00%
08.02.01.03 TRANSPORTE 99,611.11 0.00 0.00 0.00 99,611.11 0.00%
08.02.01.03.01 TRANSPORTE DE MATERIAL A ELIMINAR HASTA 1 KM M3K 8,214.44 7.21 59,226.11 0.00 0.00 0.00 0.00 0.0000 0.00 8,214.44 59,226.11 0.00%
08.02.01.03.02 TRANSPORTE DE MATERIAL A ELIMINAR DESPUÉS DE M3K 21,143.98 1.91 40,385.00 0.00 0.00 0.00 0.00 0.0000 0.00 21,143.98 40,385.00 0.00%
08.02.01.04 PROGRAMA DE CIERRE Y ABANDONO 11,619.74 0.00 0.00 0.00 11,619.74 0.00%
08.02.01.04.01 ACONDICIONAMIENTO AMBIENTAL DE MATERIAL EXC m3 10,374.77 1.12 11,619.74 0.00 0.00 0.00 0.00 0.0000 0.00 10,374.77 11,619.74 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


08.03 SECCION TIPO H=7m 927,556.85 0.00 0.00 0.00 927,556.85 0.00%
08.03.01 TIERRA ARMADA (NO ESTABILIDAD GLOBAL) 927,556.85 0.00 0.00 0.00 927,556.85 0.00%
08.03.01.01 ESTRUCTURAS 854,152.09 0.00 0.00 0.00 854,152.09 0.00%
08.03.01.01.01 ELEMENTO 1.0x1.0x6.0 (10X12/3.70XZn+Al+PVC) und 564.00 455.32 256,800.48 0.00 0.00 0.00 0.00 0.0000 0.00 564.00 256,800.48 0.00%
08.03.01.01.02 ELEMENTO 1.0x1.0x6.0 (10X12/3.70XZn+Al+PVC) und 376.00 645.10 242,557.60 0.00 0.00 0.00 0.00 0.0000 0.00 376.00 242,557.60 0.00%
08.03.01.01.03 MATERIAL DE CANTERA PARA RELLENO DE ESTRUCT m3 8,229.10 31.95 262,919.75 0.00 0.00 0.00 0.00 0.0000 0.00 8,229.10 262,919.75 0.00%
08.03.01.01.04 EXCAVACION PARA MUROS DE TIERRA ARMADA H=7 m3 6,576.54 13.97 91,874.26 0.00 0.00 0.00 0.00 0.0000 0.00 6,576.54 91,874.26 0.00%
08.03.01.02 SISTEMA DE DRENAJE 13,683.02 0.00 0.00 0.00 13,683.02 0.00%
08.03.01.02.01 INSTALACIÓN DE GEOCOMPUESTO DE DRENAJE MACD m2 496.29 20.82 10,332.76 0.00 0.00 0.00 0.00 0.0000 0.00 496.29 10,332.76 0.00%
08.03.01.02.02 SUMINISTRO E INSTALACIÓN DE HDPE D=4" (PERFOR m 254.00 13.19 3,350.26 0.00 0.00 0.00 0.00 0.0000 0.00 254.00 3,350.26 0.00%
08.03.01.03 TRANSPORTE 52,356.02 0.00 0.00 0.00 52,356.02 0.00%
08.03.01.03.01 TRANSPORTE DE MATERIAL A ELIMINAR HASTA 1 KM M3K 5,749.56 7.21 41,454.33 0.00 0.00 0.00 0.00 0.0000 0.00 5,749.56 41,454.33 0.00%
08.03.01.03.02 TRANSPORTE DE MATERIAL A ELIMINAR DESPUÉS DE M3K 5,707.69 1.91 10,901.69 0.00 0.00 0.00 0.00 0.0000 0.00 5,707.69 10,901.69 0.00%
08.03.01.04 PROGRAMA DE CIERRE Y ABANDONO 7,365.72 0.00 0.00 0.00 7,365.72 0.00%
08.03.01.04.01 ACONDICIONAMIENTO AMBIENTAL DE MATERIAL EXC m3 6,576.54 1.12 7,365.72 0.00 0.00 0.00 0.00 0.0000 0.00 6,576.54 7,365.72 0.00%
08.04 SECCION TIPO H=8m 878,690.62 0.00 0.00 0.00 878,690.62 0.00%
08.04.01 TIERRA ARMADA (NO ESTABILIDAD GLOBAL) 878,690.62 0.00 0.00 0.00 878,690.62 0.00%
08.04.01.01 ESTRUCTURAS 780,130.59 0.00 0.00 0.00 780,130.59 0.00%
08.04.01.01.01 ELEMENTO 1.0x1.0x8.0 (10X12/3.70XZn+Al+PVC) und 504.00 591.85 298,292.40 0.00 0.00 0.00 0.00 0.0000 0.00 504.00 298,292.40 0.00%
08.04.01.01.02 ELEMENTO 1.0x1.0x8.0 (10X12/3.70XZn+Al+PVC) und 420.00 684.15 287,343.00 0.00 0.00 0.00 0.00 0.0000 0.00 420.00 287,343.00 0.00%
08.04.01.01.03 MATERIAL DE CANTERA PARA RELLENO DE ESTRUCT m3 3,869.55 31.95 123,632.12 0.00 0.00 0.00 0.00 0.0000 0.00 3,869.55 123,632.12 0.00%
08.04.01.01.04 EXCAVACION PARA MUROS DE TIERRA ARMADA H=8 m3 5,079.79 13.95 70,863.07 0.00 0.00 0.00 0.00 0.0000 0.00 5,079.79 70,863.07 0.00%
08.04.01.02 SISTEMA DE DRENAJE 13,823.74 0.00 0.00 0.00 13,823.74 0.00%
08.04.01.02.01 INSTALACIÓN DE GEOCOMPUESTO DE DRENAJE MACD m2 506.85 20.82 10,552.62 0.00 0.00 0.00 0.00 0.0000 0.00 506.85 10,552.62 0.00%
08.04.01.02.02 SUMINISTRO E INSTALACIÓN DE HDPE D=4" (PERFOR m 248.00 13.19 3,271.12 0.00 0.00 0.00 0.00 0.0000 0.00 248.00 3,271.12 0.00%
08.04.01.03 TRANSPORTE 79,046.93 0.00 0.00 0.00 79,046.93 0.00%
08.04.01.03.02 TRANSPORTE DE MATERIAL A ELIMINAR HASTA 1 KM M3K 5,127.48 7.21 36,969.13 0.00 0.00 0.00 0.00 0.0000 0.00 5,127.48 36,969.13 0.00%
08.04.01.03.03 TRANSPORTE DE MATERIAL A ELIMINAR DESPUÉS DE M3K 22,030.26 1.91 42,077.80 0.00 0.00 0.00 0.00 0.0000 0.00 22,030.26 42,077.80 0.00%
08.04.01.04 PROGRAMA DE CIERRE Y ABANDONO 5,689.36 0.00 0.00 0.00 5,689.36 0.00%
08.04.01.04.01 ACONDICIONAMIENTO AMBIENTAL DE MATERIAL EXC m3 5,079.79 1.12 5,689.36 0.00 0.00 0.00 0.00 0.0000 0.00 5,079.79 5,689.36 0.00%
08.05 SECCION TIPO H=9m Y 10 m 1,867,825.58 0.00 0.00 0.00 1,867,825.58 0.00%
08.05.01 TIERRA ARMADA (NO ESTABILIDAD GLOBAL) 1,867,825.58 0.00 0.00 0.00 1,867,825.58 0.00%
08.05.01.01 ESTRUCTURAS 1,493,181.19 0.00 0.00 0.00 1,493,181.19 0.00%
08.05.01.01.01 ELEMENTO 1.0x1.0x9.0 (10X12/3.70XZn+Al+PVC) und 559.00 741.71 414,615.89 0.00 0.00 0.00 0.00 0.0000 0.00 559.00 414,615.89 0.00%
08.05.01.01.02 MATERIAL DE CANTERA PARA RELLENO DE ESTRUCT m3 18,123.20 31.95 579,036.24 0.00 0.00 0.00 0.00 0.0000 0.00 18,123.20 579,036.24 0.00%
08.05.01.01.03 ELEMENTO 1.0x1.0x9.0 (10X12/3.70XZn+Al+PVC) und 516.00 624.42 322,200.72 0.00 0.00 0.00 0.00 0.0000 0.00 516.00 322,200.72 0.00%
08.05.01.01.03 EXCAVACION PARA MUROS DE TIERRA ARMADA H=9M m3 12,729.96 13.93 177,328.34 0.00 0.00 0.00 0.00 0.0000 0.00 12,729.96 177,328.34 0.00%
08.05.01.02 SISTEMA DE DRENAJE 16,522.90 0.00 0.00 0.00 16,522.90 0.00%
08.05.01.02.01 INSTALACIÓN DE GEOCOMPUESTO DE DRENAJE MACD m2 616.22 20.82 12,829.70 0.00 0.00 0.00 0.00 0.0000 0.00 616.22 12,829.70 0.00%
08.05.01.02.02 SUMINISTRO E INSTALACIÓN DE HDPE D=4" (PERFOR m 280.00 13.19 3,693.20 0.00 0.00 0.00 0.00 0.0000 0.00 280.00 3,693.20 0.00%
08.05.01.03 TRANSPORTE 343,863.93 0.00 0.00 0.00 343,863.93 0.00%
08.05.01.03.01 TRANSPORTE DE MATERIAL A ELIMINAR HASTA 1 KM M3K 14,917.10 7.21 107,552.29 0.00 0.00 0.00 0.00 0.0000 0.00 14,917.10 107,552.29 0.00%
08.05.01.03.02 TRANSPORTE DE MATERIAL A ELIMINAR DESPUÉS DE M3K 123,723.37 1.91 236,311.64 0.00 0.00 0.00 0.00 0.0000 0.00 123,723.37 236,311.64 0.00%
08.05.01.04 PROGRAMA DE CIERRE Y ABANDONO 14,257.56 0.00 0.00 0.00 14,257.56 0.00%
08.05.01.04.01 ACONDICIONAMIENTO AMBIENTAL DE MATERIAL EXC m3 12,729.96 1.12 14,257.56 0.00 0.00 0.00 0.00 0.0000 0.00 12,729.96 14,257.56 0.00%
09.00 SEÑALIZACION 4,011,050.76 0.00 0.00 0.00 4,011,050.76 0.00%
09.01 SEÑALES REGLAMENTARIAS und 36.00 582.85 20,982.60 0.00 0.00 0.00 0.00 0.0000 0.00 36.00 20,982.60 0.00%
09.02 SEÑALES PREVENTIVAS und 186.00 516.69 96,104.34 0.00 0.00 0.00 0.00 0.0000 0.00 186.00 96,104.34 0.00%
09.03 PANELES DE SEÑALES INFORMATIVAS m2 64.11 490.92 31,472.88 0.00 0.00 0.00 0.00 0.0000 0.00 64.11 31,472.88 0.00%
09.04 TUBO DE SOPORTE DE SEÑALES INFORMATIVAS m2 292.80 129.12 37,806.34 0.00 0.00 0.00 0.00 0.0000 0.00 292.80 37,806.34 0.00%
09.05 CIMENTACIÓN SEÑALES INFORMATIVAS m3 47.52 652.61 31,012.03 0.00 0.00 0.00 0.00 0.0000 0.00 47.52 31,012.03 0.00%
09.06 MARCAS SOBRE EL PAVIMENTO m2 15,015.85 9.80 147,155.33 0.00 0.00 0.00 0.00 0.0000 0.00 15,015.85 147,155.33 0.00%
09.07 TACHAS BIDIRECCIONALES und 3,932.00 19.34 76,044.88 0.00 0.00 0.00 0.00 0.0000 0.00 3,932.00 76,044.88 0.00%
09.08 POSTES DELINEADORES und 8,908.00 91.35 813,745.80 0.00 0.00 0.00 0.00 0.0000 0.00 8,908.00 813,745.80 0.00%
09.09 GUARDAVIAS (INCLUYE TERMINAL) m 18,637.00 143.68 2,677,764.16 0.00 0.00 0.00 0.00 0.0000 0.00 18,637.00 2,677,764.16 0.00%
09.10 HITOS KILOMÉTRICOS und 73.00 111.18 8,116.14 0.00 0.00 0.00 0.00 0.0000 0.00 73.00 8,116.14 0.00%
09.11 PINTADO DE PARAPETOS Y MUROS m2 3,410.99 20.77 70,846.26 0.00 0.00 0.00 0.00 0.0000 0.00 3,410.99 70,846.26 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


10.00 VARIOS 16,712,951.30 0.00 570,662.37 570,662.37 16,142,288.93 3.41%
10.01 REUBICACIÓN DE POSTES EXISTENTES (ELÉCTRICOS und 41.00 479.74 19,669.34 0.00 0.00 0.00 0.00 0.0000 0.00 41.00 19,669.34 0.00%
10.02 INTERCAMBIO VIAL EL REPOSO 2,388,122.42 0.00 570,662.37 570,662.37 1,817,460.05 23.90%
10.02.01 OBRAS PRELIMINARES 53,704.08 0.00 481.25 481.25 53,222.83 0.90%
10.02.01.01 TRAZO Y REPLANTEO KM 0.60 943.62 566.17 0.00 0.00 0.51 481.25 0.51 481.25 0.09 84.92 85.00%
10.02.01.02 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL GLB 1.50 35,425.27 53,137.91 0.00 0.00 0.00 0.00 0.0000 0.00 1.50 53,137.91 0.00%
10.02.02 MOVIMIENTO DE TIERRAS 362,409.26 0.00 151,149.35 151,149.35 211,259.91 41.71%
10.02.02.01 CORTE EN MATERIAL SUELTO m3 2,697.88 3.20 8,633.22 0.00 0.00 2,642.73 8,456.74 2,642.73 8,456.74 55.15 176.48 97.96%
10.02.02.02 TERRAPLENES m3 32,516.18 10.88 353,776.04 0.00 0.00 13,115.13 142,692.61 13,115.13 142,692.61 19,401.05 211,083.43 40.33%
10.02.03 DEMOLICIONES 13,871.37 0.00 0.00 0.00 13,871.37 0.00%
10.02.03.01 DEMOLICION DE PAVIMENTO EXISTENTE m2 1,440.85 6.88 9,913.05 0.00 0.00 0.00 0.00 0.0000 0.00 1,440.85 9,913.05 0.00%
10.02.03.02 ELIMINACIÓN DE ALCANTARILLAS METÁLICAS m 32.00 99.42 3,181.44 0.00 0.00 0.00 0.00 0.0000 0.00 32.00 3,181.44 0.00%
10.02.03.03 DEMOLICIÓN DE ESTRUCTURAS (CON EQUIPOS) m3 15.72 49.42 776.88 0.00 0.00 0.00 0.00 0.0000 0.00 15.72 776.88 0.00%
10.02.04 CONSTRUCCIÓN NUEVA 68,300.74 0.00 0.00 0.00 68,300.74 0.00%
10.02.04.01 SARDINEL - TIPO 1 m 656.48 69.88 45,874.82 0.00 0.00 0.00 0.00 0.0000 0.00 656.48 45,874.82 0.00%
10.02.04.02 SARDINEL - TIPO 2 m 244.28 59.21 14,463.82 0.00 0.00 0.00 0.00 0.0000 0.00 244.28 14,463.82 0.00%
10.02.04.03 VEREDA DE CONCRETO (e=0.10m) m2 136.90 58.16 7,962.10 0.00 0.00 0.00 0.00 0.0000 0.00 136.90 7,962.10 0.00%
10.02.04.04 MURO DE BARRERA 27,557.90 0.00 0.00 0.00 27,557.90 0.00%
10.02.04.04.01 EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS m3 28.80 13.77 396.58 0.00 0.00 0.00 0.00 0.0000 0.00 28.80 396.58 0.00%
10.02.04.04.02 RELLENO DE ESTRUCTURA CON MATERIAL PROPIO m3 8.12 38.00 308.56 0.00 0.00 0.00 0.00 0.0000 0.00 8.12 308.56 0.00%
10.02.04.04.03 ENCOFRADO Y DESENCOFRADO m2 42.00 43.42 1,823.64 0.00 0.00 0.00 0.00 0.0000 0.00 42.00 1,823.64 0.00%
10.02.04.04.04 CONCRETO SIMPLE f'C= 280 KG/CM2 m3 64.43 388.47 25,029.12 0.00 0.00 0.00 0.00 0.0000 0.00 64.43 25,029.12 0.00%
10.02.04.05 MUROS DE CONTENCIÓN 495,964.85 0.00 0.00 0.00 495,964.85 0.00%
10.02.04.05.01 EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS m3 342.22 13.77 4,712.37 0.00 0.00 0.00 0.00 0.0000 0.00 342.22 4,712.37 0.00%
10.02.04.05.02 RELLENO DE ESTRUCTURA CON MATERIAL PROPIO m3 119.78 38.00 4,551.64 0.00 0.00 0.00 0.00 0.0000 0.00 119.78 4,551.64 0.00%
10.02.04.05.03 ENCOFRADO Y DESENCOFRADO m2 1,492.46 43.42 64,802.61 0.00 0.00 0.00 0.00 0.0000 0.00 1,492.46 64,802.61 0.00%
10.02.04.05.04 CONCRETO SIMPLE f'C= 280 KG/CM2 m3 737.01 388.47 286,306.27 0.00 0.00 0.00 0.00 0.0000 0.00 737.01 286,306.27 0.00%
10.02.04.05.05 ACERO DE REFUERZO f´c 4200 kg/cm2 kg 34,678.25 3.91 135,591.96 0.00 0.00 0.00 0.00 0.0000 0.00 34,678.25 135,591.96 0.00%
10.02.05 PAVIMENTOS 438,721.02 0.00 89,277.56 89,277.56 349,443.46 20.35%
10.02.05.01 MEJORAMIENTO DE LA SUB RASANTE m3 5,367.28 30.17 161,930.84 0.00 0.00 2,959.15 89,277.56 2,959.15 89,277.56 2,408.13 72,653.28 55.13%
10.02.05.02 BASE GRANULAR m3 2,927.61 32.50 95,147.33 0.00 0.00 0.00 0.00 0.0000 0.00 2,927.61 95,147.33 0.00%
10.02.05.03 SUB BASE GRANULAR m3 2,927.61 22.90 67,042.27 0.00 0.00 0.00 0.00 0.0000 0.00 2,927.61 67,042.27 0.00%
10.02.05.04 IMPRIMACIÓN ASFÁLTICA m2 9,758.69 1.23 12,003.19 0.00 0.00 0.00 0.00 0.0000 0.00 9,758.69 12,003.19 0.00%
10.02.05.05 TRATAMIENTO SUPERFICIAL BICAPA m2 9,758.69 2.96 28,885.72 0.00 0.00 0.00 0.00 0.0000 0.00 9,758.69 28,885.72 0.00%
10.02.05.06 ASFALTO LIQUIDO RC-250 gln 9,758.69 7.33 71,531.20 0.00 0.00 0.00 0.00 0.0000 0.00 9,758.69 71,531.20 0.00%
10.02.05.07 ADITIVO MEJORADOR DE ADHERENCIA kg 129.79 16.80 2,180.47 0.00 0.00 0.00 0.00 0.0000 0.00 129.79 2,180.47 0.00%
10.02.06 TRANSPORTE 823,724.29 0.00 329,754.21 329,754.21 493,970.08 40.03%
10.02.06.01 CARGUÍO A VOLQUETE m3 29,858.40 2.02 60,313.97 0.00 0.00 11,816.76 23,869.86 11,816.7600 23,869.86 18,041.64 36,444.11 39.58%
10.02.06.02 TRANSPORTE DE MATERIAL GRANUAR HASTA 1.00 M3K 45,337.37 7.21 326,882.44 0.00 0.00 14,775.91 106,534.31 14,775.9100 106,534.31 30,561.46 220,348.13 32.59%
10.02.06.03 TRANSPORTE DE MATERIAL GRANULAR DESPUÉS DE M3K 226,401.32 1.91 432,426.52 0.00 0.00 104,371.75 199,350.04 104,371.7500 199,350.04 122,029.57 233,076.48 46.10%
10.08.04.08 TRANS. MATERIAL PARA TRATAMIENTO SUPERFICIAL M3K 243.97 11.25 2,744.66 0.00 0.00 0.00 0.00 0.0000 0.00 243.97 2,744.66 0.00%
10.08.04.09 TRANS. MATERIAL PARA TRATAMIENTO SUPERFICIAL M3K 1,012.46 1.34 1,356.70 0.00 0.00 0.00 0.00 0.0000 0.00 1,012.46 1,356.70 0.00%
10.02.07 SEÑALIZACIÓN 44,411.22 0.00 0.00 0.00 44,411.22 0.00%
10.02.07.01 SEÑALES PREVENTIVAS und 8.00 506.09 4,048.72 0.00 0.00 0.00 0.00 0.0000 0.00 8.00 4,048.72 0.00%
10.02.07.02 SEÑALES REGLAMENTARIAS und 10.00 582.85 5,828.50 0.00 0.00 0.00 0.00 0.0000 0.00 10.00 5,828.50 0.00%
10.02.07.03 PANELES DE SEÑALES INFORMATIVAS m2 13.91 490.92 6,828.70 0.00 0.00 0.00 0.00 0.0000 0.00 13.91 6,828.70 0.00%
10.02.07.04 CIMENTACIÓN SEÑALES INFORMATIVAS m3 5.04 651.42 3,283.16 0.00 0.00 0.00 0.00 0.0000 0.00 5.04 3,283.16 0.00%
10.02.07.05 TUBO DE SOPORTE DE SEÑALES INFORMATIVAS m 33.60 129.12 4,338.43 0.00 0.00 0.00 0.00 0.0000 0.00 33.60 4,338.43 0.00%
10.02.07.06 MARCAS EN EL PAVIMENTO (LETRAS Y SIMBOLOS) m2 87.55 24.68 2,160.73 0.00 0.00 0.00 0.00 0.0000 0.00 87.55 2,160.73 0.00%
10.02.07.07 MARCAS SOBRE EL PAVIMENTO m2 627.00 9.80 6,144.60 0.00 0.00 0.00 0.00 0.0000 0.00 627.00 6,144.60 0.00%
10.02.07.08 PINTADO DE SARDINELES Y MUROS m2 918.75 12.82 11,778.38 0.00 0.00 0.00 0.00 0.0000 0.00 918.75 11,778.38 0.00%
10.02.07.09 VARIOS 59,457.69 0.00 0.00 0.00 59,457.69 0.00%
10.02.07.09.01 REVEGETACIÓN/JARDINES m2 13,331.32 4.46 59,457.69 0.00 0.00 0.00 0.00 0.0000 0.00 13,331.32 59,457.69 0.00%
10.03 ACCESO A BAGUA CHICA 1,477,777.99 0.00 0.00 0.00 1,477,777.99 0.00%
10.03.01 OBRAS PRELIMINARES 55,647.94 0.00 0.00 0.00 55,647.94 0.00%
10.03.01.01 TRAZO Y REPLANTEO KM 2.66 943.62 2,510.03 0.00 0.00 0.00 0.00 0.0000 0.00 2.66 2,510.03 0.00%
10.03.01.02 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL GLB 1.50 35,425.27 53,137.91 0.00 0.00 0.00 0.00 0.0000 0.00 1.50 53,137.91 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


10.03.02 MOVIMIENTO DE TIERRAS 43,436.74 0.00 0.00 0.00 43,436.74 0.00%
10.03.02.01 EXCAVACIÓN PARA MEJORAMIENTO DE BERMAS m3 1,814.40 23.94 43,436.74 0.00 0.00 0.00 0.00 0.0000 0.00 1,814.40 43,436.74 0.00%
10.03.03 PAVIMENTOS 882,804.66 0.00 0.00 0.00 882,804.66 0.00%
10.03.03.01 BASE GRANULAR m3 1,814.40 32.50 58,968.00 0.00 0.00 0.00 0.00 0.0000 0.00 1,814.40 58,968.00 0.00%
10.03.03.02 IMPRIMACIÓN ASFÁLTICA m2 6,048.00 1.23 7,439.04 0.00 0.00 0.00 0.00 0.0000 0.00 6,048.00 7,439.04 0.00%
10.03.03.03 RIEGO DE LIGA m2 39,312.00 0.44 17,297.28 0.00 0.00 0.00 0.00 0.0000 0.00 39,312.00 17,297.28 0.00%
10.03.03.04 ASFALTO LIQUIDO RC-250 gln 5,745.60 7.33 42,115.25 0.00 0.00 0.00 0.00 0.0000 0.00 5,745.60 42,115.25 0.00%
10.03.03.05 ADITIVO MEJORADOR DE ADHERENCIA kg 513.40 16.80 8,625.12 0.00 0.00 0.00 0.00 0.0000 0.00 513.40 8,625.12 0.00%
10.03.03.06 REFUERZO DE AGLOMERADO ASFÁLTICO m3 907.20 466.20 422,936.64 0.00 0.00 0.00 0.00 0.0000 0.00 907.20 422,936.64 0.00%
10.03.03.07 CAPA NIVELANTE m3 687.20 466.20 320,372.64 0.00 0.00 0.00 0.00 0.0000 0.00 687.20 320,372.64 0.00%
10.03.03.08 BACHEO m2 84.23 54.98 4,630.97 0.00 0.00 0.00 0.00 0.0000 0.00 84.23 4,630.97 0.00%
10.03.03.09 TRATAMIENTO DE FISURAS m2 67.37 6.23 419.72 0.00 0.00 0.00 0.00 0.0000 0.00 67.37 419.72 0.00%
10.03.04 TRANSPORTE 137,961.11 0.00 0.00 0.00 137,961.11 0.00%
10.03.04.01 TRANSPORTE DE MATERIAL GRANULAR HASTA 1.00 M3K 1,814.40 7.21 13,081.82 0.00 0.00 0.00 0.00 0.0000 0.00 1,814.40 13,081.82 0.00%
10.03.04.02 TRANSPORTE DE MATERIAL GRANULAR DESPUÉS DE M3K 34,636.90 1.91 66,156.48 0.00 0.00 0.00 0.00 0.0000 0.00 34,636.90 66,156.48 0.00%
10.03.04.03 TRANSPORTE DE MEZCLA ASFALTICA HASTA 1 KM M3K 1,594.40 11.25 17,937.00 0.00 0.00 0.00 0.00 0.0000 0.00 1,594.40 17,937.00 0.00%
10.03.04.04 TRANSPORTE DE MEZCLA ASFALTICA DESPUES 1 KM M3K 30,437.17 1.34 40,785.81 0.00 0.00 0.00 0.00 0.0000 0.00 30,437.17 40,785.81 0.00%
10.03.05 OBRAS DE ARTE 345,372.80 0.00 0.00 0.00 345,372.80 0.00%
10.03.05.01 LIMPIEZA DE ALCANTARILLAS m3 90.40 23.10 2,088.24 0.00 0.00 0.00 0.00 0.0000 0.00 90.40 2,088.24 0.00%
10.03.05.02 CONSTRUCCIÓN DE CUNETAS TIPO 1 m 2,410.00 104.46 251,748.60 0.00 0.00 0.00 0.00 0.0000 0.00 2,410.00 251,748.60 0.00%
10.03.05.03 CONSTRUCCIÓN DE CUNETAS TIPO 3 m 120.00 144.28 17,313.60 0.00 0.00 0.00 0.00 0.0000 0.00 120.00 17,313.60 0.00%
10.03.05.04 DEMOLICIÓN DE ESTRUCTURAS (CON EQUIPOS) m3 413.28 49.42 20,424.30 0.00 0.00 0.00 0.00 0.0000 0.00 413.28 20,424.30 0.00%
10.03.05.05 CONCRETO SIMPLE F'C= 175 KG/CM2. m3 54.24 326.53 17,710.99 0.00 0.00 0.00 0.00 0.0000 0.00 54.24 17,710.99 0.00%
10.03.05.06 EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS m3 138.24 13.77 1,903.56 0.00 0.00 0.00 0.00 0.0000 0.00 138.24 1,903.56 0.00%
10.03.05.07 ENCOFRADO Y DESENCOFRADO m2 236.16 43.42 10,254.07 0.00 0.00 0.00 0.00 0.0000 0.00 236.16 10,254.07 0.00%
10.03.05.08 ALCANTARILLA TMC D = 48" m 48.00 498.53 23,929.44 0.00 0.00 0.00 0.00 0.0000 0.00 48.00 23,929.44 0.00%
10.03.06 SEÑALIZACIÓN 12,554.74 0.00 0.00 0.00 12,554.74 0.00%
10.03.06.01 SEÑALES REGLAMENTARIAS und 2.00 582.85 1,165.70 0.00 0.00 0.00 0.00 0.0000 0.00 2.00 1,165.70 0.00%
10.03.06.02 SEÑALES PREVENTIVAS und 2.00 506.09 1,012.18 0.00 0.00 0.00 0.00 0.0000 0.00 2.00 1,012.18 0.00%
10.03.06.03 PANELES DE SEÑALES INFORMATIVAS m2 1.69 490.92 829.65 0.00 0.00 0.00 0.00 0.0000 0.00 1.69 829.65 0.00%
10.03.06.04 TUBO DE SOPORTE DE SEÑALES INFORMATIVAS m 2.88 129.12 371.87 0.00 0.00 0.00 0.00 0.0000 0.00 2.88 371.87 0.00%
10.03.06.05 CIMENTACIÓN SEÑALES INFORMATIVAS m3 4.00 651.42 2,605.68 0.00 0.00 0.00 0.00 0.0000 0.00 4.00 2,605.68 0.00%
10.03.06.06 MARCAS SOBRE EL PAVIMENTO m2 648.00 9.80 6,350.40 0.00 0.00 0.00 0.00 0.0000 0.00 648.00 6,350.40 0.00%
10.03.06.07 HITOS KILOMÉTRICOS und 2.00 109.63 219.26 0.00 0.00 0.00 0.00 0.0000 0.00 2.00 219.26 0.00%
10.04 TRAMO CON AGLOMERADO ASFALTICO 7,367,715.48 0.00 0.00 0.00 7,367,715.48 0.00%
10.04.01 OBRAS PRELIMINARES 498,318.42 0.00 0.00 0.00 498,318.42 0.00%
10.04.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS GLB 0.16 1,495,285.79 239,245.73 0.00 0.00 0.00 0.00 0.0000 0.00 0.16 239,245.73 0.00%
10.04.01.02 TRAZO Y REPLANTEO KM 13.38 1,059.73 14,179.19 0.00 0.00 0.00 0.00 0.0000 0.00 13.38 14,179.19 0.00%
10.04.01.03 LIMPIEZA GENERAL - ROCE Y DESBROCE HA 8.72 4,303.60 37,527.39 0.00 0.00 0.00 0.00 0.0000 0.00 8.72 37,527.39 0.00%
10.04.01.04 MANTENIMIENTO DE TRANSITO Y SEGURIDAD VIAL GLB 0.16 1,296,038.16 207,366.11 0.00 0.00 0.00 0.00 0.0000 0.00 0.16 207,366.11 0.00%
10.04.02 MOVIMIENTO DE TIERRAS 200,954.52 0.00 0.00 0.00 200,954.52 0.00%
10.04.02.01 EXCAVACIÓN PARA MEJORAMIENTO DE BERMAS m3 9,483.46 21.19 200,954.52 0.00 0.00 0.00 0.00 0.0000 0.00 9,483.46 200,954.52 0.00%
10.04.03 PAVIMENTOS 4,380,274.11 0.00 0.00 0.00 4,380,274.11 0.00%
10.04.03.01 BASE GRANULAR m3 9,483.46 32.50 308,212.45 0.00 0.00 0.00 0.00 0.0000 0.00 9,483.46 308,212.45 0.00%
10.04.03.02 IMPRIMACIÓN ASFÁLTICA m2 31,611.53 1.23 38,882.18 0.00 0.00 0.00 0.00 0.0000 0.00 31,611.53 38,882.18 0.00%
10.04.03.03 RIEGO DE LIGA m2 195,027.53 0.44 85,812.11 0.00 0.00 0.00 0.00 0.0000 0.00 195,027.53 85,812.11 0.00%
10.04.03.04 ASFALTO LIQUIDO RC-250 gln 22,663.90 7.33 166,126.39 0.00 0.00 0.00 0.00 0.0000 0.00 22,663.90 166,126.39 0.00%
10.04.03.05 ADITIVO MEJORADOR DE ADHERENCIA kg 2,565.00 16.80 43,092.00 0.00 0.00 0.00 0.00 0.0000 0.00 2,565.00 43,092.00 0.00%
10.04.03.06 REFUERZO DE AGLOMERADO ASFÁLTICO m3 4,532.78 466.20 2,113,182.04 0.00 0.00 0.00 0.00 0.0000 0.00 4,532.78 2,113,182.04 0.00%
10.04.03.07 CAPA NIVELANTE m3 3,433.01 466.20 1,600,469.26 0.00 0.00 0.00 0.00 0.0000 0.00 3,433.01 1,600,469.26 0.00%
10.04.03.08 BACHEO m2 408.54 54.98 22,461.53 0.00 0.00 0.00 0.00 0.0000 0.00 408.54 22,461.53 0.00%
10.04.03.09 TRATAMIENTO DE FISURAS m2 326.83 6.23 2,036.15 0.00 0.00 0.00 0.00 0.0000 0.00 326.83 2,036.15 0.00%
10.04.04 TRANSPORTE 372,727.15 0.00 0.00 0.00 372,727.15 0.00%
10.04.04.01 CARGUIO m3 17,292.56 2.02 34,930.97 0.00 0.00 0.00 0.00 0.0000 0.00 17,292.56 34,930.97 0.00%
10.04.04.02 TRANSPORTE DE MATERIAL GRANUAR HASTA 1.00 M3K 9,483.46 7.21 68,375.75 0.00 0.00 0.00 0.00 0.0000 0.00 9,483.46 68,375.75 0.00%
10.04.04.03 TRANSPORTE DE MATERIAL GRANULAR DESPUÉS DE M3K 59,355.10 1.91 113,368.24 0.00 0.00 0.00 0.00 0.0000 0.00 59,355.10 113,368.24 0.00%
10.04.04.04 TRANSPORTE DE MEZCLA ASFALTICA HASTA 1 KM M3K 7,965.79 11.25 89,615.14 0.00 0.00 0.00 0.00 0.0000 0.00 7,965.79 89,615.14 0.00%
10.04.04.05 TRANSPORTE DE MEZCLA ASFALTICA DESPUES 1 KM M3K 49,579.89 1.34 66,437.05 0.00 0.00 0.00 0.00 0.0000 0.00 49,579.89 66,437.05 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


10.04.05 OBRAS DE ARTE Y DRENAJE 1,593,343.30 0.00 0.00 0.00 1,593,343.30 0.00%
10.04.05.01 CUNETAS LATERALES 1,593,343.30 0.00 0.00 0.00 1,593,343.30 0.00%
10.04.05.01.01 CONSTRUCCIÓN DE CUNETAS TIPO 1 m 13,383.00 104.46 1,397,988.18 0.00 0.00 0.00 0.00 0.0000 0.00 13,383.00 1,397,988.18 0.00%
10.04.05.01.02 CONSTRUCCIÓN DE CUNETAS TIPO 3 m 1,354.00 144.28 195,355.12 0.00 0.00 0.00 0.00 0.0000 0.00 1,354.00 195,355.12 0.00%
10.04.05.02 ALCANTARILLAS DE CONCRETO REFORZADO PARA CRUCE CANAL D 9,998.88 0.00 0.00 0.00 9,998.88 0.00%
10.04.05.02.01 LIMPIEZA DE ALCANTARILLAS m3 96.00 23.10 2,217.60 0.00 0.00 0.00 0.00 0.0000 0.00 96.00 2,217.60 0.00%
10.04.05.02.02 ELIMINACIÓN DE ALCANTARILLAS METÁLICAS m 64.00 99.42 6,362.88 0.00 0.00 0.00 0.00 0.0000 0.00 64.00 6,362.88 0.00%
10.04.05.02.03 PICADO Y PREPARACIÓN DE SUPERFICIE DE CONCR m2 40.00 35.46 1,418.40 0.00 0.00 0.00 0.00 0.0000 0.00 40.00 1,418.40 0.00%
10.04.05.03 ALCANTARILLA DE TUBO METAL CORRUGADO 23,749.03 0.00 0.00 0.00 23,749.03 0.00%
10.04.05.04 LIMPIEZA DE ALCANTARILLAS m3 44.00 23.10 1,016.40 0.00 0.00 0.00 0.00 0.0000 0.00 44.00 1,016.40 0.00%
10.04.05.05 EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS m3 287.00 13.77 3,951.99 0.00 0.00 0.00 0.00 0.0000 0.00 287.00 3,951.99 0.00%
10.04.05.06 RELLENO COMPACTADO PARA ESTRUCTURAS m3 113.00 36.20 4,090.60 0.00 0.00 0.00 0.00 0.0000 0.00 113.00 4,090.60 0.00%
10.04.05.07 LOSA DE CONCRETO EMBOQUILLADO, MAMPOSTERIA m2 27.00 87.05 2,350.35 0.00 0.00 0.00 0.00 0.0000 0.00 27.00 2,350.35 0.00%
10.04.05.08 ALCANTARILLA TMC D = 36" m 21.00 310.67 6,524.07 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 6,524.07 0.00%
10.04.05.09 ALCANTARILLA TMC D = 48" m 10.00 498.53 4,985.30 0.00 0.00 0.00 0.00 0.0000 0.00 10.00 4,985.30 0.00%
10.04.05.10 TUBERÍA PVC 3/4" PARA PILETAS EN MANANTIALES m 13.00 40.76 529.88 0.00 0.00 0.00 0.00 0.0000 0.00 13.00 529.88 0.00%
10.04.05.11 PUNTO DE AGUA Y DESAGÜE EN PILETAS und 1.00 300.44 300.44 0.00 0.00 0.00 0.00 0.0000 0.00 1.00 300.44 0.00%
10.04.05.12 MUROS CABEZALES DE ALCANTARILLAS 33,948.56 0.00 0.00 0.00 33,948.56 0.00%
10.04.05.12.01 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 30.90 345.71 10,682.44 0.00 0.00 0.00 0.00 0.0000 0.00 30.90 10,682.44 0.00%
10.04.05.12.02 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 2,865.00 3.92 11,230.80 0.00 0.00 0.00 0.00 0.0000 0.00 2,865.00 11,230.80 0.00%
10.04.05.12.03 ENCOFRADO Y DESENCOFRADO m2 211.00 43.42 9,161.62 0.00 0.00 0.00 0.00 0.0000 0.00 211.00 9,161.62 0.00%
10.04.05.12.04 JUNTA CON WATER STOP 11" m 7.00 42.77 299.39 0.00 0.00 0.00 0.00 0.0000 0.00 7.00 299.39 0.00%
10.04.05.12.05 SELLO DE JUNTA TRANSVERSAL CON IGAS O SIMILAR m 7.00 44.43 311.01 0.00 0.00 0.00 0.00 0.0000 0.00 7.00 311.01 0.00%
10.04.05.12.06 LOSA DE CONCRETO EMBOQUILLADO, MAMPOSTERIA m2 26.00 87.05 2,263.30 0.00 0.00 0.00 0.00 0.0000 0.00 26.00 2,263.30 0.00%
10.04.05.13 CANAL DE EVACUACIÓN DE RÁPIDAS 5,197.69 0.00 0.00 0.00 5,197.69 0.00%
10.04.05.13.01 RELLENO COMPACTADO PARA ESTRUCTURAS m3 31.00 36.20 1,122.20 0.00 0.00 0.00 0.00 0.0000 0.00 31.00 1,122.20 0.00%
10.04.05.13.02 CONCRETO SIMPLE f'C= 210 KG/CM2. m3 4.00 345.71 1,382.84 0.00 0.00 0.00 0.00 0.0000 0.00 4.00 1,382.84 0.00%
10.04.05.13.03 ACERO DE REFUERZO f´c 4200 kg/cm2 -P kg 213.00 3.92 834.96 0.00 0.00 0.00 0.00 0.0000 0.00 213.00 834.96 0.00%
10.04.05.13.04 LOSA DE CONCRETO EMBOQUILLADO, MAMPOSTERIA m2 21.00 87.05 1,828.05 0.00 0.00 0.00 0.00 0.0000 0.00 21.00 1,828.05 0.00%
10.04.05.13.05 SIEMBRA/REVEGETALIZACIÓN m2 26.00 1.14 29.64 0.00 0.00 0.00 0.00 0.0000 0.00 26.00 29.64 0.00%
10.04.05.14 SUBDREN 8,881.32 0.00 0.00 0.00 8,881.32 0.00%
10.04.05.14.01 INSTALACIÓN DE GEOCOMPUESTO DE DRENAJE m2 64.72 20.82 1,347.47 0.00 0.00 0.00 0.00 0.0000 0.00 64.72 1,347.47 0.00%
10.04.05.14.02 SUMINISTRO E INSTALACIÓN DE HDPE D=6" (PERFOR m 215.73 28.12 6,066.33 0.00 0.00 0.00 0.00 0.0000 0.00 215.73 6,066.33 0.00%
10.04.05.14.03 EXC. P/ESTRUC. EN SUELO NO ROCOSO (MANUAL) m3 19.42 28.88 560.85 0.00 0.00 0.00 0.00 0.0000 0.00 19.42 560.85 0.00%
10.04.05.14.04 RELLENO PARA SUB DREN CON MATERIAL DE CANTE m3 15.60 58.12 906.67 0.00 0.00 0.00 0.00 0.0000 0.00 15.60 906.67 0.00%
10.04.09 SEÑALIZACIÓN 240,322.50 0.00 0.00 0.00 240,322.50 0.00%
10.04.09.01 SEÑALES REGLAMENTARIAS und 11.00 582.85 6,411.35 0.00 0.00 0.00 0.00 0.0000 0.00 11.00 6,411.35 0.00%
10.04.09.02 SEÑALES PREVENTIVAS und 34.00 516.69 17,567.46 0.00 0.00 0.00 0.00 0.0000 0.00 34.00 17,567.46 0.00%
10.04.09.03 PANELES DE SEÑALES INFORMATIVAS m2 14.42 490.92 7,079.07 0.00 0.00 0.00 0.00 0.0000 0.00 14.42 7,079.07 0.00%
10.04.09.04 TUBO DE SOPORTE DE SEÑALES INFORMATIVAS m 72.00 129.12 9,296.64 0.00 0.00 0.00 0.00 0.0000 0.00 72.00 9,296.64 0.00%
10.04.09.05 CIMENTACIÓN SEÑALES INFORMATIVAS m3 10.80 652.61 7,048.19 0.00 0.00 0.00 0.00 0.0000 0.00 10.80 7,048.19 0.00%
10.04.09.06 MARCAS SOBRE EL PAVIMENTO m2 2,847.51 9.80 27,905.60 0.00 0.00 0.00 0.00 0.0000 0.00 2,847.51 27,905.60 0.00%
10.04.09.07 TACHAS BIDIRECCIONALES und 85.00 19.34 1,643.90 0.00 0.00 0.00 0.00 0.0000 0.00 85.00 1,643.90 0.00%
10.04.09.08 POSTES DELINEADORES und 72.00 91.35 6,577.20 0.00 0.00 0.00 0.00 0.0000 0.00 72.00 6,577.20 0.00%
10.04.09.09 GUARDAVIAS (INCLUYE TERMINAL) m 1,043.00 143.68 149,858.24 0.00 0.00 0.00 0.00 0.0000 0.00 1,043.00 149,858.24 0.00%
10.04.09.10 HITOS KILOMÉTRICOS und 13.00 111.18 1,445.34 0.00 0.00 0.00 0.00 0.0000 0.00 13.00 1,445.34 0.00%
10.04.09.11 PINTADO DE PARAPETOS Y MUROS m2 264.30 20.77 5,489.51 0.00 0.00 0.00 0.00 0.0000 0.00 264.30 5,489.51 0.00%
10.05 TRAMO CON PENDIENTE MAYORES A 6% CON TRATAMIENTO SUPERFIC 2,506,784.59 0.00 0.00 0.00 2,506,784.59 0.00%
10.05.01 OBRAS PRELIMINARES
10.05.02 MOVIMIENTO DE TIERRAS
10.05.03 PAVIMENTOS 1,528,822.50 0.00 0.00 0.00 1,528,822.50 0.00%
10.05.03.02 BASE GRANULAR m3 12,874.21 32.50 418,411.83 0.00 0.00 0.00 0.00 0.0000 0.00 12,874.21 418,411.83 0.00%
10.05.03.03 SUB BASE GRANULAR m3 11,765.49 22.90 269,429.72 0.00 0.00 0.00 0.00 0.0000 0.00 11,765.49 269,429.72 0.00%
10.05.03.04 IMPRIMACIÓN ASFÁLTICA m2 52,455.34 1.23 64,520.07 0.00 0.00 0.00 0.00 0.0000 0.00 52,455.34 64,520.07 0.00%
10.05.03.05 TRATAMIENTO SUPERFICIAL TRICAPA m2 51,649.00 4.08 210,727.92 0.00 0.00 0.00 0.00 0.0000 0.00 51,649.00 210,727.92 0.00%
10.05.03.06 ASFALTO LIQUIDO RC-250 gln 74,616.48 7.33 546,938.80 0.00 0.00 0.00 0.00 0.0000 0.00 74,616.48 546,938.80 0.00%
10.05.03.07 ADITIVO MEJORADOR DE ADHERENCIA kg 1,118.70 16.80 18,794.16 0.00 0.00 0.00 0.00 0.0000 0.00 1,118.70 18,794.16 0.00%
10.05.04 TRANSPORTE 977,962.09 0.00 0.00 0.00 977,962.09 0.00%
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


10.05.04.02 TRANSPORTE DE MATERIAL GRANUAR HASTA 1.00 M3K 24,639.70 7.21 177,652.24 0.00 0.00 0.00 0.00 0.0000 0.00 24,639.70 177,652.24 0.00%
10.05.04.03 TRANSPORTE DE MATERIAL GRANULAR DESPUÉS DE M3K 385,513.39 1.91 736,330.57 0.00 0.00 0.00 0.00 0.0000 0.00 385,513.39 736,330.57 0.00%
10.08.04.08 TRANS. MATERIAL PARA TRATAMIENTO SUPERFICIAL M3K 1,936.89 6.15 11,911.87 0.00 0.00 0.00 0.00 0.0000 0.00 1,936.89 11,911.87 0.00%
10.05.04.09 TRANS. MATERIAL PARA TRATAMIENTO SUPERFICIAL M3K 39,445.01 1.32 52,067.41 0.00 0.00 0.00 0.00 0.0000 0.00 39,445.01 52,067.41 0.00%
10.07 INTERFERENCIAS 2,926,270.54 0.00 0.00 0.00 2,926,270.54 0.00%
10.07.01 INTERF. CON EL OLEODUCTO (LOSA 1.0mx1 2,926,270.54 0.00 0.00 0.00 2,926,270.54 0.00%
10.07.01.01 CONCRETO SIMPLE F'C= 175 KG/CM2. m3 2,539.44 326.53 829,203.34 0.00 0.00 0.00 0.00 0.0000 0.00 2,539.44 829,203.34 0.00%
10.07.01.02 ACERO DE REFUERZO f´c 4200 kg/cm2 kg 193,561.76 3.91 756,826.48 0.00 0.00 0.00 0.00 0.0000 0.00 193,561.76 756,826.48 0.00%
10.07.01.03 EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS m3 28,780.32 13.77 396,305.01 0.00 0.00 0.00 0.00 0.0000 0.00 28,780.32 396,305.01 0.00%
10.07.01.04 RELLENO COMPACTADO PARA ESTRUCTURAS m3 25,782.37 36.20 933,321.79 0.00 0.00 0.00 0.00 0.0000 0.00 25,782.37 933,321.79 0.00%
10.07.01.05 EXCAVACIÓN DE CALICATAS Y TRINCHERAS m3 770.80 13.77 10,613.92 0.00 0.00 0.00 0.00 0.0000 0.00 770.80 10,613.92 0.00%
10.08 MIRADOR "RENTEMA" 26,610.94 0.00 0.00 0.00 26,610.94 0.00%
10.08.01 MIRADOR RENTEMA 26,610.94 0.00 0.00 0.00 26,610.94 0.00%
10.08.01.01 CONCRETO 16,932.58 0.00 0.00 0.00 16,932.58 0.00%
10.08.01.01.01 SARDINEL - TIPO 1 m 87.31 69.88 6,101.22 0.00 0.00 0.00 0.00 0.0000 0.00 87.31 6,101.22 0.00%
10.08.01.01.02 SARDINEL - TIPO 2 m 33.83 59.21 2,003.07 0.00 0.00 0.00 0.00 0.0000 0.00 33.83 2,003.07 0.00%
10.08.01.01.03 VEREDA DE CONCRETO (e=0.10m) m2 144.32 58.16 8,393.65 0.00 0.00 0.00 0.00 0.0000 0.00 144.32 8,393.65 0.00%
10.08.01.01.04 TACHONES m 8.00 54.33 434.64 0.00 0.00 0.00 0.00 0.0000 0.00 8.00 434.64 0.00%
10.08.01.02 PAVIMENTOS 2,033.44 0.00 0.00 0.00 2,033.44 0.00%
10.08.01.02.01 TRATAMIENTO SUPERFICIAL BICAPA m2 183.77 2.96 543.96 0.00 0.00 0.00 0.00 0.0000 0.00 183.77 543.96 0.00%
10.08.01.02.02 IMPRIMACIÓN ASFÁLTICA m2 183.77 1.23 226.04 0.00 0.00 0.00 0.00 0.0000 0.00 183.77 226.04 0.00%
10.08.01.02.03 ASFALTO LIQUIDO RC-250 gln 36.75 7.33 269.38 0.00 0.00 0.00 0.00 0.0000 0.00 36.75 269.38 0.00%
10.08.01.02.04 ADITIVO MEJORADOR DE ADHERENCIA kg 59.17 16.80 994.06 0.00 0.00 0.00 0.00 0.0000 0.00 59.17 994.06 0.00%
10.08.01.03 PINTURA 671.44 0.00 0.00 0.00 671.44 0.00%
10.08.01.03.01 PINTURA DE SARDINEL m2 71.43 9.40 671.44 0.00 0.00 0.00 0.00 0.0000 0.00 71.43 671.44 0.00%
10.08.01.04 BARANDAS 6,546.26 0.00 0.00 0.00 6,546.26 0.00%
10.08.01.04.01 BARANDA DE MADERA m 89.32 73.29 6,546.26 0.00 0.00 0.00 0.00 0.0000 0.00 89.32 6,546.26 0.00%
10.08.01.05 JARDINES 350.22 0.00 0.00 0.00 350.22 0.00%
10.08.01.05.01 REVEGETACIÓN/JARDINES CON PASTOS m2 139.49 0.36 50.22 0.00 0.00 0.00 0.00 0.0000 0.00 139.49 50.22 0.00%
10.08.01.05.02 BANCAS DE CONCRETO GLB 2.00 150.00 300.00 0.00 0.00 0.00 0.00 0.0000 0.00 2.00 300.00 0.00%
10.08.01.06 TRANSPORTE 77.00 0.00 0.00 0.00 77.00 0.00%
10.08.01.06.01 TRANS. MATERIAL PARA TRATAMIENTO SUPERFICIAL M3K 4.90 6.15 30.14 0.00 0.00 0.00 0.00 0.0000 0.00 4.90 30.14 0.00%
10.08.01.05.02 TRANS. MATERIAL PARA TRATAMIENTO SUPERFICIAL M3K 35.50 1.32 46.86 0.00 0.00 0.00 0.00 0.0000 0.00 35.50 46.86 0.00%

11.00 MEDIO AMBIENTE 4,540,465.72 0.00 0.00 0.00 4,540,465.72 0.00%


11.01 MATERIAL Y CAPACITACIÓN PARA EDUCACIÓN AMBIENTAL 130,000.00 0.00 0.00 0.00 130,000.00 0.00%
11.01.01 MATERIAL Y CAPACITACIÓN PARA EDUCACIÓN AMBIE m3 1.00 50,000.00 50,000.00 0.00 0.00 0.00 0.00 0.0000 0.00 1.00 50,000.00 0.00%
11.01.02 SEÑALIZACIÓN AMBIENTAL GLB 80.00 1,000.00 80,000.00 0.00 0.00 0.00 0.00 0.0000 0.00 80.00 80,000.00 0.00%
11.02 PROGRAMA DE MONITOREO 150,000.00 0.00 0.00 0.00 150,000.00 0.00%
11.02.01 MONITOREO GLB 1.00 150,000.00 150,000.00 0.00 0.00 0.00 0.00 0.0000 0.00 1.00 150,000.00 0.00%
11.03 PROGRAMA DE CIERRE Y ABANDONO 2,541,633.46 0.00 0.00 0.00 2,541,633.46 0.00%
11.03.01 READECUACIÓN AMBIENTAL DE CANTERAS m2 452,600.00 1.07 484,282.00 0.00 0.00 0.00 0.00 0.0000 0.00 452,600.00 484,282.00 0.00%
11.03.02 READECUACIÓN AMBIENTAL DE CAMPAMENTOS PRIM m2 6,000.00 1.07 6,420.00 0.00 0.00 0.00 0.00 0.0000 0.00 6,000.00 6,420.00 0.00%
11.03.03 READECUACIÓN AMBIENTAL DE CAMPAMENTOS SEC m2 4,800.00 1.07 5,136.00 0.00 0.00 0.00 0.00 0.0000 0.00 4,800.00 5,136.00 0.00%
11.03.04 ACONDICIONAMIENTO AMBIENTAL DE MATERIAL EXC m3 332,711.71 1.12 372,637.12 0.00 0.00 0.00 0.00 0.0000 0.00 332,711.71 372,637.12 0.00%
11.03.05 RECUPERACIÓN AMBIENTAL DE ÁREAS AFECTADAS m2 252,813.48 1.07 270,510.42 0.00 0.00 0.00 0.00 0.0000 0.00 252,813.48 270,510.42 0.00%
11.03.06 OBRAS DE PROTECCIÓN Y MEJORAMIENTO AMBIENT GLB 1.00 1,402,647.92 1,402,647.92 0.00 0.00 0.00 0.00 0.0000 0.00 1.00 1,402,647.92 0.00%
11.04 PROGRAMA DE RESTAURACIÓN Y REVEGETACIÓN 1,718,832.26 0.00 0.00 0.00 1,718,832.26 0.00%
11.04.01 REVEGETACIÓN DE TALUDES m2 443,565.00 1.34 594,377.10 0.00 0.00 0.00 0.00 0.0000 0.00 443,565.00 594,377.10 0.00%
11.04.02 REVEGETACIÓN/REFORESTACIÓN CON ARBUSTOS (CAM
m2 716,213.48 1.57 1,124,455.16 0.00 0.00 0.00 0.00 0.0000 0.00 716,213.48 1,124,455.16 0.00%

COSTO DIRECTO 121,579,163.26 145,558.77 952,122.31 1,097,681.08 120,481,482.18

FACTOR DE RELACION ### 125,469,757.13 150,216.72 982,590.70 1,132,807.42 124,336,949.71


ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL MONTO PRESUPUESTO ETAPA EJECUCION DE OBRA PORCENTAJE AVANCE REAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA, MONTO DEL PRESUPUESTO B 185,083,450.02 CON IGV MES 0.78%
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km. FACTOR RELACION 1.0320005 ACUMULADO 0.90%
CONTRATISTA : CONSORCIO VIAL AMAZONAS MONTO CONTRATADO 155,532,310.94 SIN IGV
SUPERVISOR :CONSORCIO SARAMIRIZA COSTO DIRECTO PROPUESTA 125,469,757.13
PRECIOS A FECHA ´Marzo 2007

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

PLANILLA DE METRADOS

PRESUPUESTO BASE ACUMULADO VALORIZACION ACUMULADO SALDO POR %


Item Descripción Unidad Metrado Precio Parcial ANTERIOR EN EL MES ACTUAL VALORIZAR DE

METRADO S/. METRADO S/. METRADO S/. METRADO S/. AVANCE


GASTOS GENERALES FIJOS 0.030400 3,814,280.62 4,566.59 29,870.76 34,437.35 3,779,843.27
GASTOS GENERALES VARIABLES 0.131300 16,474,179.11 19,723.46 129,014.16 148,737.62 16,325,441.49
UTILIDAD 0.077900 9,774,094.08 11,701.88 76,543.82 88,245.70 9,685,848.38

SUB TOTAL GENERAL 155,532,310.94 186,208.65 1,218,019.44 1,404,228.09 154,128,082.85

A TOTAL GENERAL EN NUEVOS SOLES SIN IGV 155,532,310.94 186,208.65 1,218,019.44 1,404,228.09 154,128,082.85
PORCENTAJE DE AVANCE 0.12% 0.78% 0.90% 99.10%

31,106,461.19 31,106,462.19

0.2000000

ATRASO
VALORIZACION CONTRATISTA 6,412,813.62 32,561,238.57 -11.44
0.1599 0.8121
1,218,019.44 1,404,228.09 -15.22
0.0078 0.0090
5,194,794.18 -3.78
0.1521
ENTIDAD :MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL
OBRA : MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA: EL REPOSO - SARAMIRIZA,
TRAMO EL REPOSO - DURAN, LONGITUD 89.24 Km.
CONTRATISTA : CONSORCIO VIAL AMAZONAS
SUPERVISOR :CONSORCIO SARAMIRIZA

VALORIZACION DE OBRA Nº 02
MES NOVIEMBRE-2007

CALCULO DE COEFICIENTES DE REAJUSTE

K = 0.118 (Mr / Mo) + 0.170 (ACMr /ACMo) + 0.420 (MMr / MMo) + 0.081(Ar / Ao) + 0.211 (Ir/ Io)

AREA GEOGRAFICA 1 : Tumbes , Piura, Lambayeque, La Libertad, Cajamarca, AMAZONAS y San Martin

INDICE BASE : MARZO-2007

FORMULA POLINOMICA INDICES INEI


SIMBOLO IU DESCRIPCION COEF INCIDENCIA BASE Mar-07 Sep-07 Oct-07 May-06
% Io K Ir K Ir K Ir K
M 47 Mano de Obra Inc. Leyes Sociales 0.118 100.00 361.29 0.118 374.22 0.122 374.22 0.122 347.52 0.114
43 Madera Nacional Para Encof. y Carpinteri 0.170 17.059 396.94 0.029 420.66 0.031 425.68 0.031
ACM 2 Acero de Construccion Liso 48.824 420.29 0.083 459.14 0.091 442.16 0.087 398.50 0.000
21 Cemento Portland Tipo I 34.118 380.07 0.058 380.07 0.058 380.07 0.058 364.80 0.000
48 Maquinaria y Equipo Nacional 0.420 56.667 333.15 0.238 331.54 0.237 324.76 0.232 311.36 0.222
MM
49 Maquinaria y Equipo Importado 43.333 267.22 0.182 261.18 0.178 251.51 0.171 385.04 0.262
A 13 Asfalto 0.081 100.00 1091.37 0.081 1230.21 0.091 ### 0.091 385.04 0.148
I 39 Indice General de Precios al Consumidor 0.211 100.00 314.64 0.211 322.15 0.216 323.17 0.217 313.80 0.210

COEFICIENTE DE REAJUSTE (K) 1.000 1.000 1.024 1.009 0.956


Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07
Ir K Ir K Ir K Ir K Ir K Ir K Ir K Ir K
347.52 0.114 361.10 0.118 361.10 0.118 361.10 0.118 361.10 0.118 361.10 0.118 ### 0.118 ### 0.118

396.68 0.000 406.96 0.000 408.84 0.000 434.79 0.000 443.56 0.000 441.51 0.000 ### 0.000 ### 0.000
364.80 0.000 364.80 0.000 366.62 0.000 370.17 0.000 370.17 0.000 371.98 0.000 ### 0.000 ### 0.000
309.94 0.221 307.94 0.220 307.09 0.219 308.32 0.220 307.38 0.220 305.95 0.219 ### 0.217 ### 0.217
385.18 0.262 383.46 0.261 383.52 0.261 385.82 0.263 382.75 0.261 378.91 0.258 ### 0.256 ### 0.256
385.18 0.148 383.46 0.148 383.52 0.148 385.82 0.148 382.75 0.147 378.91 0.146 ### 0.256
313.39 0.210 312.85 0.210 313.29 0.210 313.38 0.210 313.51 0.210 312.63 0.210 ### 0.210 ### 0.210

0.955 0.957 0.956 0.959 0.956 0.951 1.057 0.801


ENTIDAD MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL
OBRA MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA EL REPOSO - SARAMIRIZA
TRAMO EL REPOSO - DURAN
CONTRATISTA CONSORCIO VIAL AMAZONAS
SUPERVISOR CONSORCIO SARAMIRIZA

PAGOS AL CONTRATISTA
Durante el periodo que duró la obra 12 de octubre del 2007 se tramitó 39 valorizaciones las mismas que se muestran a continuacion

POR ADELANTOS

ADELANTO EN EFECTIVO S/. 31,106,461.19


(Cancelado)
ADELANTO DE MATERIALES Nº 01 S/. 61,937,295.81
(Cancelado)
POR VALORIZACIONES

VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION
CONCEPTO Nº 01 Nº 02 Nov. Nº 03 Dic. Nº 04 Ene. Nº 05 Feb. Nº 06 Mar. Nº 07 Abr. Nº 08 Mayo Nº 09 JUNIO Nº 10 JULIO
Oct.2007 2007 2007 2008 2008 2008 2008 2008 2008 2008

1.- VALORIZACION CONTRACTUAL 186,208.65 1,218,019.44 2,142,298.89 4,181,330.55 4,325,883.73 6,463,357.48 6,980,206.84 7,310,013.49 9,519,895.79 10,343,575.02

Monto Bruto de la Valorización 186,208.65 1,218,019.44 2,142,298.89 4,181,330.55 4,325,883.73 6,463,357.48 6,980,206.84 7,310,013.49 9,519,895.79 10,343,575.02

2.- REAJUSTES 4,469.01 8,169.04 19,490.50 14,467.82 28,068.24 -50,033.58 51,026.92 85,560.06 2,454.86 73,176.35

Reajuste de la Valorización 4,469.01 8,169.04 42,802.92 54,254.03 69,069.59 140,107.32 146,067.50 471,577.28 729,939.42 1,437,487.84
Deducciones de Reajustes por Adlto. Directo 0.00 0.00 23,312.42 39,786.21 6,555.41 81,206.25 -104,187.61 52,761.75 155,374.52 266,480.79
Deducciones de Reajustes por Adlto. para Materiales 0.00 0.00 0.00 0.00 34,445.94 108,934.65 199,228.19 333,255.47 572,110.04 1,097,830.70

3.- AMORTIZACIONES -37,241.73 -243,603.88 -428,459.76 -2,448,239.71 -2,615,089.20 -3,808,899.43 -4,259,233.94 -4,360,277.90 -5,714,505.03 -6,239,161.07

Amortización Adelanto Directo -37,241.73 -243,603.88 -428,459.76 -836,266.08 -865,176.72 -1,292,671.45 -1,396,041.32 -1,462,002.68 -1,903,979.09 -2,068,714.94
Amortización Adelanto Materiales 0.00 0.00 0.00 -1,611,973.63 -1,749,912.48 -2,516,227.98 -2,863,192.62 -2,898,275.22 -3,810,525.94 -4,170,446.13

4.- OTROS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.- VALORIZACION NETA 153,435.93 982,584.60 1,733,329.63 1,747,558.66 1,738,862.77 2,604,424.47 2,771,999.82 3,035,295.65 3,807,845.62 4,177,590.30

6.- Impuesto General a las Ventas - - - -

7.- MONTO A CANCELAR AL CONTRATISTA 153,435.93 982,584.60 1,733,329.63 1,747,558.66 1,738,862.77 2,604,424.47 2,771,999.82 3,035,295.65 3,807,845.62 4,177,590.30
ENTIDAD MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL
OBRA MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA EL REPOSO - SARAMIRIZA
TRAMO EL REPOSO - DURAN
CONTRATISTA CONSORCIO VIAL AMAZONAS
SUPERVISOR CONSORCIO SARAMIRIZA

PAGOS AL CONTRATISTA

POR ADELANTOS

ADELANTO EN EFECTIVO S/. 31,106,461.19


(Cancelado)
ADELANTO DE MATERIALES Nº 01 S/. 61,937,295.81
(Cancelado)
POR VALORIZACIONES

VALORIZACION VALORIZACION
VALORIZACION Nº VALORIZACION Nº VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION
CONCEPTO Nº 11 AGOS Nº 25
12 SET.2008 13 OCT.2008 Nº 14 NOV.2008 Nº 15 DIC.2008 Nº 16 ENERO Nº 17 FEBRERO Nº 18 MARZO Nº 19 ABRIL Nº 20 MAYO Nº 21 JUNIO Nº 22 JULIO Nº 23 AGOSTO Nº 24 SET.
2008 OCTUBRE
2009 2009 2009 2009 2009 2009 2009 2009 2009 2009

1.- VALORIZACION CONTRACTUAL 6,280,891.81 7,127,254.63 9,453,929.32 10,150,236.45 8,982,843.04 - 18,186,993.84 1,825,478.79 2,320,018.77 2,609,945.52 172,372.09 270,964.54 834,193.71 597,075.32 1,581,624.81 952,524.10

Monto Bruto de la Valorización 6,280,891.81 7,127,254.63 9,453,929.32 10,150,236.45 8,982,843.04 - 18,186,993.84 1,825,478.79 2,320,018.77 2,609,945.52 172,372.09 270,964.54 834,193.71 597,075.32 1,581,624.81 952,524.10

2.- REAJUSTES 4,568.48 607,905.94 936,016.18 1,064,384.41 500,747.16 -1,152,906.64 102,561.45 33,335.42 63,378.20 -58,893.29 -15,178.66 -8,648.30 -18,502.04 -42,886.28 4,601.18

Reajuste de la Valorización 1,185,085.38 1,277,804.66 1,652,405.42 1,352,364.74 1,079,563.35 -2,132,877.58 164,360.89 196,805.32 198,216.76 -51,754.71 10,321.28 44,829.18 43,187.71 11,803.83 48,886.27
Deducciones de Reajustes por Adlto. Directo 490,180.87 -25,915.92 310,667.98 249,952.94 197,961.88 -390,325.98 32,565.53 41,387.86 86,590.02 3,952.05 16,475.33 34,032.87 48,874.79 24,913.90 26,380.06
Deducciones de Reajustes por Adlto. para Materiales 690,336.03 695,814.64 405,721.26 38,027.39 380,854.31 -589,644.96 29,233.91 122,082.04 48,248.54 3,186.53 9,024.61 19,444.61 12,814.96 29,776.21 17,905.03

3.- AMORTIZACIONES -1,255,966.20 -4,672,577.54 -6,068,570.32 -6,506,303.19 -5,789,261.87 -5,040,357.67 -1,485,767.51 -2,353,354.19 -2,673,324.20 -113,478.80 -255,785.89 -825,545.41 -578,573.27 -1,538,738.53 -957,125.29

Amortización Adelanto Directo -1,255,966.20 -1,425,663.68 -1,890,785.80 -2,030,047.22 -1,796,568.59 -1,590,994.66 -1,485,767.51 -862,931.84 -970,770.37 0.00 0.00 0.00 0.00 -535,418.49 -598,834.52
Amortización Adelanto Materiales 0.00 -3,246,913.86 -4,177,784.52 -4,476,255.97 -3,992,693.28 -3,449,363.01 0.00 -1,490,422.35 -1,702,553.83 -113,478.80 -255,785.89 -825,545.41 -578,573.27 -1,003,320.04 -358,290.77

4.- OTROS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.- VALORIZACION NETA 5,029,494.09 3,062,583.03 4,321,375.18 4,708,317.66 3,694,328.33 - 24,380,258.14 442,272.74 - - 0.47 0.00 - 0.00 0.00 0.00 0.00 0.00

6.- Impuesto General a las Ventas

7.- MONTO A CANCELAR AL CONTRATISTA 5,029,494.09 3,062,583.03 4,321,375.18 4,708,317.66 3,694,328.33 -24,380,258.14 442,272.74 - - 0.47 - - 0.00 - - 0.00 - - 0.00
ENTIDAD MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL
OBRA MEJORAMIENTO Y CONSTRUCCION DE LA CARRETERA EL REPOSO - SARAMIRIZA
TRAMO EL REPOSO - DURAN
CONTRATISTA CONSORCIO VIAL AMAZONAS
SUPERVISOR CONSORCIO SARAMIRIZA

PAGOS AL CONTRATISTA

POR ADELANTOS

ADELANTO EN EFECTIVO S/. 31,106,461.19


(Cancelado)
ADELANTO DE MATERIALES Nº 01 S/. 61,937,295.81
(Cancelado)
POR VALORIZACIONES

VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION


VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION VALORIZACION
CONCEPTO Nº 27 Nº 28 Nº 33 Nº 36 Nº 38 ACUMULADO
Nº 26 NOV. Nº 29 FEBRERO Nº 30 MARZO Nº 31 ABRIL Nº 32 MAYO Nº 34 JULIO Nº 35 AGOSTO Nº 37 OCTUBRE Nº 39 DICIEMBRE
DICIEMBRE ENERO JUNIO SETIEMBRE NOVIEMBRE
2009 2009 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010 2010

1.- VALORIZACION CONTRACTUAL 425,207.54 35,381.64 69,563.17 566,042.57 159,517.97 1,167,683.18 693,905.08 106,169.88 67,827.71 7,200.18 2,605,156.29 2,186,358.86 1,276,419.82 1,345,867.58 98,169,241.76

Monto Bruto de la Valorización 425,207.54 35,381.64 69,563.17 566,042.57 159,517.97 1,167,683.18 693,905.08 106,169.88 67,827.71 7,200.18 2,605,156.29 2,186,358.86 1,276,419.82 1,345,867.58 98,169,241.76

2.- REAJUSTES 209.24 -35,381.64 -69,563.17 -87,676.89 -38,234.73 845.30 -5,569.59 4,763.28 3,651.83 713.92 1,922.93 -68.81 103,390.01 113,823.92 2,250,158.03

Reajuste de la Valorización 23,273.31 4,228.84 5,776.56 33,326.95 12,313.80 74,891.24 57,441.05 13,938.66 5,532.39 951.16 216,213.56 171,884.76 103,390.01 113,823.92 9,021,932.66
Deducciones de Reajustes por Adlto. Directo 14,535.81 32,211.08 32,783.84 52,894.58 0.00 0.00 0.00 4,283.13 0.00 0.00 0.00 0.00 0.00 0.00 1,805,692.36
Deducciones de Reajustes por Adlto. para Materiales 8,528.26 7,399.40 42,555.89 68,109.26 50,548.53 74,045.94 63,010.64 4,892.25 1,880.56 237.24 214,290.63 171,953.57 0.00 0.00 4,966,082.27

3.- AMORTIZACIONES -425,416.78 0.00 0.00 -478,365.68 -121,283.24 -1,168,528.48 -688,335.49 -110,933.16 -71,479.55 -7,914.10 -1,848,544.46 -1,175,969.92 0.00 0.00 -76,366,212.38

Amortización Adelanto Directo -319,746.93 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -25,297,653.46
Amortización Adelanto Materiales -105,669.85 0.00 0.00 -478,365.68 -121,283.24 -1,168,528.48 -688,335.49 -110,933.16 -71,479.55 -7,914.10 -1,848,544.46 -1,175,969.92 0.00 0.00 -51,068,558.92

4.- OTROS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

5.- VALORIZACION NETA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 758,534.76 1,010,320.13 1,379,809.83 1,459,691.50 24,053,187.40

6.- Impuesto General a las Ventas -

7.- MONTO A CANCELAR AL CONTRATISTA - - - - 0.00 0.00 0.00 0.00 - 0.00 0.00 0.00 758,534.76 1,010,320.13 1,379,809.83 1,459,691.50 24,053,187.40