RESUMEN DE VALORIZACION MENSUAL No. 03

EXO N

O B R A
:
:
:
:
:

CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

E.P. N 0011-2009-ED/U.E.108
EJECUCION DE LA OBRA DE ADECUACION Y MEJORAMIENTO DE LA
INFRAESTRUCTURA DE LA INSTITUCION EDUCATIVA MARIANO MELGAR,
UBICADA EN EL DISTRITO DE BREA, PROVINCIA DE LIMA, DEPARTAMENTO
DE LIMA

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing. Tito Andrade Olmos

AL 30 DE OCTUBRE DEL 2009

MONTO
DESCRIPCION

VALORIZACION

(s/IGV)

A:

ANTERIOR

ACUMULADO

474,819.55
62,767.30
18,607.46
33,487.03

1,504,041.60
96,716.51
24,519.17
55,691.54

35.83%
1.75%
3.92%
5.91%

2,693,652.97
5,422,848.52
601,646.93
887,312.94

TOTAL (A)

11,286,430.17

1,091,287.48

589,681.33

1,680,968.81

14.89%

9,605,461.36

AVANCE FISICO DE OBRA

13,430,851.90

9.67%

5.22%

14.89%

INST.ELECTRICA

9,263.00
211.37
333.07
76.85

3,219.14
755.79
10.19
1,148.36

12,482.14
967.16
343.26
1,225.21

TOTAL (B)

9,884.29

5,133.48

15,017.77

1,101,171.77

594,814.81

1,695,986.58

0.00
0.00
0.00
0.00
0.00

4,557.67
-206.91
-56.72
4.80
76.05

4,557.67
-206.91
-56.72
4.80
76.05

0.00
0.00
0.00
0.00
0.00

115.97
17.29

115.97
17.29
0.00
0.00
-49.52

INST.ELECTRICA

REAJUSTES
ESTRUCTURAS
ARQUITECTURA
INS. SANITARIAS

VALORIZACION BRUTA (VB=A+B)


DEDUCCIONES
DEDUCCION DEL ADELANTO EN EFEC.
ESTRUCTURAS
ARQUITECTURA
INS. SANITARIAS
INST. ELECTRICA
DEDUCCIONDEL ADELANTO DE MAT.
ESTRUCTURAS
ARQUITECTURA
INS. SANITARIAS
INST. ELECTRICA
TOTAL (C)

-49.52
5,183.00

AMORTIZACIONES
AMORTIZACION DEL ADELANTO EN EFEC.
ESTRUCTURAS
ARQUITECTURA
INS. SANITARIAS
INST. ELECTRICA
AMORTIZACION DEL ADELANTO DE MAT.
ESTRUCTURAS
ARQUITECTURA
INS. SANITARIAS
INST. ELECTRICA
TOTAL (D)

2,257,286.03

2,257,286.03
0.00
0.00
0.00
0.00
4,514,572.07

VALORIZACION NETA (VN=VB-D-C)


D:

E:

VALORIZAR

1,029,222.05
33,949.21
5,911.71
22,204.51

INST. SANITARIAS

D:

POR

ACUMULADO

4,197,694.57
5,519,565.02
626,166.10
943,004.47

ARQUITECTURA

C:

ACTUAL

SALDO

AVANCE

VALORIZACION CONTRACTUAL
ESTRUCTURAS

B:

CONTRATO

RETENCIONES
FONDO DE GARANTIA (5%*VB)
GASTOS DE LICITACION
MULTA POR ATRASO DE OBRA
TOTAL (E)
MONTO A PAGAR AL CONTRATISTA
EN EFECTIVO (VN-D)
EN I.G.V. (19%*VN)
TOTAL (F)
TOTAL COMPROMISO A SOLICITAR

S/.

368,156.03
347,217.68
11,453.08
1,994.37
7,490.90

216,461.89
94,963.91
12,553.46
3,721.49
6,697.41

584,617.92
442,181.59
24,006.54
5,715.86
14,188.30

235,234.41

11,252.53

340,355.08
10,774.46

614,642.97

469,065.81

575,589.49
22,026.99
0.00
0.00
1,083,708.78

486,528.80

125,798.51

612,327.32

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

486,528.80
92,440.47
578,969.27

125,798.51
23,901.72
149,700.23

612,327.32
116,342.19
728,669.51

578,969.27

149,700.23

728,669.51

85.11%

C o n s u l to r a I n te g r a l d e I n g e n ie r a

RESUMEN DE VALORIZACION MENSUAL No. 04

EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108


Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE OCTUBRE DEL 2009

MONTO
DESCRIPCION

VALORIZACION

(s/IGV)

A:

ANTERIOR

INST.ELECTRICA

2,053,917.26
602,726.41
172,488.58
93,957.28

52.85%
12.96%
43.65%
16.27%

1,832,115.46
4,046,626.94
222,668.88
483,561.98

TOTAL (A)

9,508,062.79

1,840,780.09

1,082,309.44

2,923,089.53

30.74%

6,584,973.26

11,314,594.72

19.36%

11.38%

30.74%

INST.ELECTRICA

13,345.02
2,129.12
947.37
519.41

2,863.37
4,616.84
1,122.49
1,641.61

16,208.39
6,745.96
2,069.86
2,161.02

TOTAL (B)

16,940.92

10,244.31

27,185.23

1,857,721.01

1,092,553.75

2,950,274.76

0.00

4,557.67

4,557.67

0.00
0.00
0.00
0.00
0.00

384.65
220.32
243.16
761.99
6,167.79

384.65
220.32
0.00
761.99
5,924.63

1,901,612.56

368,156.03

216,461.89

584,617.92

1,316,994.64

0.00
0.00
0.00
0.00
1,901,612.56

387,813.47
82,608.79
20,554.77
17,150.13
876,283.19

165,754.81
198,017.20
24,354.21
29,384.72
633,972.83

553,568.28
280,625.99
44,908.98
46,534.85
1,510,256.02

1,316,994.64

981,437.82

452,413.13

1,433,850.95

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

981,437.82
186,473.19
1,167,911.01

452,413.13
85,958.49
538,371.62

1,433,850.95
272,431.68
1,706,282.63

1,167,911.01

538,371.62

1,706,282.63

69.26%

REAJUSTES
ESTRUCTURAS
ARQUITECTURA
INS. SANITARIAS

VALORIZACION BRUTA (VB=A+B)


DEDUCCIONES
DEDUCCION DEL ADELANTO EN EFEC.
DEDUCCIONDEL ADELANTO DE MAT.
ESTRUCTURAS
ARQUITECTURA
INS. SANITARIAS
INST. ELECTRICA
TOTAL (C)

AMORTIZACIONES
AMORTIZACION DEL ADELANTO EN EFEC.
AMORTIZACION DEL ADELANTO DE MAT.
ESTRUCTURAS
ARQUITECTURA
INS. SANITARIAS
INST. ELECTRICA
TOTAL (D)
VALORIZACION NETA (VN=VB-D-C)

E:

VALORIZAR

504,138.88
425,299.82
93,540.83
59,329.91

AVANCE FISICO DE OBRA

D:

POR

ACUMULADO

1,549,778.39
177,426.59
78,947.75
34,627.37

INST. SANITARIAS

D:

ACUMULADO

3,886,032.72
4,649,353.36
395,157.46
577,519.26

ARQUITECTURA

C:

ACTUAL

SALDO

AVANCE

VALORIZACION CONTRACTUAL
ESTRUCTURAS

B:

CONTRATO

RETENCIONES
FONDO DE GARANTIA (5%*VB)
GASTOS DE LICITACION
MULTA POR ATRASO DE OBRA
TOTAL (E)
MONTO A PAGAR AL CONTRATISTA
EN EFECTIVO (VN-D)
EN I.G.V. (19%*VN)
TOTAL (F)
TOTAL COMPROMISO A SOLICITAR

S/.

100,000.00

90,000.00

80,000.00

70,000.00
m

60,000.00

m
m2

50,000.00

m
glb
mes

40,000.00

mes

30,000.00

20,000.00

10,000.00

0.00
1

10

11

12

13

14

C o n s u l t o r a I n t e g r a l d e I n g e n ie r a

V A L O R I Z A C I O N No. 04
EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108

FORMULA

ESTRUCTURAS

Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE OCTUBRE DEL 2009

ITEM

DESCRIPCION

01.01

OBRAS PROVISIONALES

01.01.01

ALMACN, OFICINAS Y CASETA DE GUARDIANA

01.01.02

CARTEL DE OBRA DE 2.40 X 3.60 m - PINTADO

01.01.03

BAOS PORTATILES

01.01.04

SERVICIOS HIGINICOS OBRA (URINARIO + DUCHA)

01.01.05

TRANSPORTE Y COLOCACION DE AULAS PREFABRICADA

01.01.06
01.01.07

DESINSTALACION Y DESMOVILIZACION DE AULAS PREFABRICADAS


CONSUMO DE ENERGIA ELECTRICA Y AGUA

01.01.08
01.01.09
01.02

TRABAJOS PRELIMINARES

01.02.01

LIMPIEZA DE TERRENO MANUAL

01.02.02
01.02.03

PRESUPUESTO
UNIDAD

METRADO

ANTERIOR

P.UNIT

PARCIAL

METRADO

ACTUAL

PARCIAL

METRADO

ACUMULADO

PARCIAL

METRADO

SALDO

PARCIAL

METRADO

PARCIAL

glb

1.00

4,500.00

4,500.00

0.50

2,250.00

50%

0%

0.50

2,250.00

50%

2.00

3,015.14

6,030.28

2.00

6,030.28

100%

0%

2.00

6,030.28

100%

mes

9.00

765.69

6,891.21

0%

0%

glb

1.00

6,300.00

6,300.00

0.50

3,150.00

50%

0%

0.50

13.00

1,550.00

20,150.00

13.00

20,150.00

100%

0%

13.00

u
mes

13.00
9.00

1,550.00
2,000.00

20,150.00
18,000.00

4.00

8,000.00

0%
44%

1.00

2,000.00

0%
11%

5.00

10,000.00

0%
56%

13.00
4.00

20,150.00
8,000.00

SEALIZACION Y SEGURIDAD

glb

1.00

9,530.00

9,530.00

0.39

3,669.05

39%

0.11

1,048.30

11%

0.50

4,717.35

50%

0.51

4,812.65

MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y MAQUINARIAS

glb

1.00

9,000.00

9,000.00

0.85

7,650.00

85%

0%

0.85

7,650.00

85%

0.15

1,350.00

8,193.75

0.29

2,376.19

6,700.00

1,943.00

82%

500.00

145.00

6%

7,200.00

2,088.00

88%

993.75

TRAZO Y REPLANTEO PRELIMINAR

m2
m2

11,341.47

1.30

14,743.91

7,000.00

9,100.00

62%

1,000.00

1,300.00

9%

8,000.00

10,400.00

71%

3,341.47

4,343.91

APUNTALAMIENTO DE LOSA ALIGERADA 1 Y 2 PISO H=3.60

m2

2,365.38

34.10

80,659.46

1,565.00

53,366.50

66%

0%

1,565.00

53,366.50

66%

800.38

27,292.96

01.02.04

DESMONTAJE DE PUERTAS (INC. MARCOS)

m2

329.29

8.29

2,729.81

329.29

2,729.81

100%

0%

329.29

2,729.81

100%

01.02.05

DESMONTAJE DE VENTANAS S/PROTECTOR (INC. PICADO DE BORDE PARA DESCUBRIR ANCLAJE)

m2

2,035.50

5.45

11,093.48

2,035.50

11,093.48

100%

0%

2,035.50

11,093.48

100%

01.02.06

DESMONTAJE DE APARATOS SANITARIOS

116.00

17.60

2,041.60

116.00

2,041.60

100%

0%

116.00

2,041.60

100%

01.03

DEMOLICIN Y ELIMINACIN

01.03.01

DEMOLICION DE PATIO Y VEREDA DE CONCRETO

m2

4,051.86

9.73

39,424.60

3,238.41

31,509.73

80%

0%

3,238.41

31,509.73

80%

813.45

7,914.87

01.03.02
01.03.03

DEMOLICIN DE MURO DE ALBAILERIA - SOGA


DEMOLICIN DE MURO DE ALBAILERIA - CABEZA

m2
m2

4,160.58
1,281.17

12.42
15.30

51,674.40
19,601.90

2,951.39
1,075.37

36,656.26
16,453.16

71%
84%

4%
0%

3,111.39
1,075.37

38,643.46
16,453.16

75%
84%

1,049.19
205.80

13,030.94
3,148.74

01.03.04

DEMOLICION DE MURO DE ALBAILERIA - ENCHAPADO

m2

376.20

15.30

5,755.86

200.00

3,060.00

53%

0%

200.00

3,060.00

53%

176.20

2,695.86

01.03.05

DEMOLICION DE CONTRAPISO E=2"

m2

8,426.29

4.11

34,632.05

5,851.66

24,050.32

69%

0%

5,851.66

24,050.32

69%

2,574.63

10,581.73

01.03.06

DEMOLICION DE ZAPATA

m3

185.80

90.29

16,775.88

148.00

13,362.92

80%

0%

148.00

13,362.92

80%

37.80

3,412.96

01.03.07

DEMOLICIN DE CIMIENTOS

69.07

44,441.71

457.85

31,623.70

71%

9%

517.85

35,767.90

80%

125.58

8,673.81

DEMOLICIN DE LOSA ALIGERADA

m3
m3

643.43

01.03.08

625.97

33.66

21,070.15

625.97

21,070.15

100%

0%

625.97

21,070.15

100%

01.03.09

DEMOLICIN DE COLUMNAS

m3

35.67

48.48

1,729.28

35.67

1,729.28

100%

0%

35.67

1,729.28

100%

01.03.10

DEMOLICIN DE VIGAS DE CONCRETO

m3

35.68

73.13

2,609.28

35.68

2,609.28

100%

0%

35.68

2,609.28

100%

01.03.11

REMOCION DE PISO DE CONCRETO EXISTENTE

m2

260.71

4.11

1,071.52

150.00

616.50

58%

0%

150.00

616.50

58%

110.71

455.02

01.03.12

PICADO DE COLUMNAS

m3

52.52

191.45

10,054.95

22.00

4,211.90

42%

11%

28.00

5,360.60

53%

24.52

4,694.35

01.03.13

PICADO DE VIGA DE CONCRETO ARMADO

m3

8.08

194.12

1,568.49

4.50

873.54

56%

01.03.14

PICADO DE TARRAJEO EN MUROS

m2

5,274.09

6.60

34,808.99

3,200.00

21,120.00

61%

01.03.15
01.03.16

PICADO DE LADRILLO PASTELERO EN TECHO


PICADO EN BORDE DE LOSA PARA ANCLAJE DE BARANDA (INC. TAPADO C/MEZCLA)

m2
u

5,798.17
365.00

4.37
8.04

25,338.00
2,934.60

4,644.05
80.00

20,294.50
643.20

80%
22%

01.03.17

REMOCION DE PISO CERAMICO Y LOSETA (INC. RETIRO DE REBABA)

m2

5,354.99

6.17

33,040.29

2,600.00

16,042.00

49%

01.03.18

REMOCION Y RESANE PARA UBICACION DE CENTRO DE LUZ

pto

372.00

35.31

13,135.32

150.00

5,296.50

40%

01.03.19

REMOCION DE PINTURA EN TECHOS

m2

3,171.00

3.11

9,861.81

01.03.20

PERFORACION C/BROCA Y ANCLAJE C/ADITIVO EPOXICO

568.00

16.74

9,508.32

150.00

2,511.00

26%

01.03.21

ACARREO INTERNO MAT. PROCEDENTE DE DEMOLICION

u
m3

4,849.53

14.15

68,620.85

3,958.65

56,014.90

82%

01.03.22

ELIMINACION DE MATERIAL PROCEDENTE DE LA DEMOLICION

m3

4,849.53

23.72

115,030.85

2,500.00

59,300.00

52%

1,300.00

30,836.00

01.04

MOVIMIENTO DE TIERRAS

01.04.01

EXCAVACION DE ZANJAS Y ZAPATAS

m3

1,745.45

28.30

49,396.24

1,400.00

39,620.00

80%

01.04.02

RELLENO MASIVO C/MATERIAL PRESTAMO COMP. C/EQ.

m2

1,188.98

14.67

17,442.34

01.04.03

RELLENO MANUAL CON MATERIAL DE PROPIO

m3

735.34

14.80

10,883.03

365.00

5,402.00

01.04.04

ACARREO INTERNO MATERIAL PROCEDENTE DE LA EXCAVACION (DISTANCIA GENERICA)

m3

2,763.03

14.15

39,096.87

2,030.00

01.04.05

ELIMINACION DE MATERIAL C/MAQUINA

m3

2,763.03

23.72

65,539.07

2,763.03

01.04.06
01.04.07

NIVELACIN INTERIOR Y APISONADO PARA F. PISO


NIVELACION Y COMPACTACION DE FONDO DE CISTERNA

m2
m2

1,762.84
61.92

5.68
1.84

10,012.93
113.93

340.00
-

01.04.08

AFIRMADO DE 4" PARA PISOS

m2

1,762.84

9.41

16,588.32

340.00

01.04.09

EXCAVACION DE CISTERNA

m3

198.14

5.67

1,123.45

01.04.10

CORTE MASIVO DE TERRENO A MAQUINA

1,188.98

8.89

10,570.03

01.04.11

CONFORMACION DE SUBRASANTE

m3
m2

7,926.55

4.49

35,590.21

01.05

CONCRETO SIMPLE

01.05.01

SOLADO PARA ZAPATA e=2", 1:12 CEM/HORM

m2

560.46

24.10

13,507.09

370.00

01.05.02

CIMIENTOS CORRIDOS 1:10 + 30% P.G.

m3

509.61

154.27

78,617.53

01.05.03

SUBZAPATA MEZCLA 1:10 + 30%

m3

164.30

154.20

25,335.06

01.05.04

SOBRECIMIENTO, CONCRETO 1:8 + 25% P.M.

m3

112.74

203.00

22,886.22

01.05.05

SOBRECIMIENTO, ENCOFRADO Y DESENCOFRADO

m2

1,252.71

29.47

36,917.36

01.05.06

SARDINEL, CONCRETO 1:8 + 25% P.M.

m3

10.35

202.81

2,099.08

0%

01.05.07
01.05.08

SARDINEL, ENCOFRADO Y DESENCOFRADO


FALSO PISO MEZCLA 1:8 e=4"

m2
m2

137.96
1,539.17

28.44
25.32

3,923.58
38,971.78

0%
0%

01.05.09

PATIOS DE CONCRETO 175 kg/cm E=5" FROT.Y BRUADO

m2

7,055.77

53.04

374,238.04

0%

950.00

160.00

60.00

1,987.20
-

4,144.20

6.00

1,148.70

100.00

804.00

50.00

1,765.50

100.00

1,674.00

0%

0.50
-

2,250.00
-

0%

9.00

6,891.21

3,150.00

50%

0.50

3,150.00

20,150.00

100%

288.19

0%

4.50

873.54

56%

3.58

694.95

0%

3,200.00

21,120.00

61%

2,074.09

13,688.99

0%
27%

4,644.05
180.00

20,294.50
1,447.20

80%
49%

1,154.12
185.00

5,043.50
1,487.40

0%

2,600.00

16,042.00

49%

2,754.99

16,998.29

13%

200.00

7,062.00

54%

172.00

6,073.32

0%

3,171.00

18%

0%

250.00

4,185.00

44%

318.00

5,323.32

0%

3,958.65

56,014.90

82%

890.88

12,605.95

9,861.81

27%

3,800.00

90,136.00

78%

1,049.53

24,894.85

200.00

5,660.00

11%

1,600.00

45,280.00

92%

145.45

4,116.24

0%

600.00

8,802.00

50%

600.00

8,802.00

50%

588.98

8,640.34

50%

180.00

2,664.00

24%

545.00

8,066.00

74%

190.34

2,817.03

28,724.50

73%

156.00

2,207.40

6%

2,186.00

30,931.90

79%

577.03

8,164.97

65,539.07

100%

70.00

1,660.40

3%

2,833.03

67,199.47

103%

-70.00

-1,660.40

1,931.20
-

19%
0%

500.00

2,840.00
-

28%
0%

840.00
-

4,771.20
-

48%
0%

922.84
61.92

5,241.73
113.93

3,199.40

19%

500.00

4,705.00

28%

840.00

7,904.40

48%

922.84

8,683.92

0%

198.14

1,123.45

0%

80%

80.00

711.20

7%

1,030.00

9,156.70

87%

158.98

1,413.33

0%

6,000.00

26,940.00

76%

6,000.00

26,940.00

76%

1,926.55

8,650.21

8,917.00

66%

120.00

2,892.00

21%

490.00

11,809.00

87%

70.46

1,698.09

228.00

35,173.56

45%

98.00

15,118.46

19%

326.00

50,292.02

64%

183.61

28,325.51

110.00

16,962.00

67%

35.00

5,397.00

21%

145.00

22,359.00

88%

19.30

32.00

6,496.00

28%

32.00

6,496.00

28%

64.00

12,992.00

57%

48.74

9,894.22

370.00

10,903.90

30%

150.00

4,420.50

12%

520.00

15,324.40

42%

732.71

21,592.96

0%

10.35

0%
16%

137.96
1,289.17

3,923.58
32,641.78

0%

7,055.77

374,238.04

8,445.50

0%

250.00

6,330.00
-

0%
0%
16%
0%

250.00
-

6,330.00
-

2,976.06

2,099.08

C o n s u l t o r a I n t e g r a l d e I n g e n ie r a

V A L O R I Z A C I O N No. 04
EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108

FORMULA

ESTRUCTURAS

Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE OCTUBRE DEL 2009

ITEM

DESCRIPCION

PRESUPUESTO
UNIDAD

METRADO

ANTERIOR

P.UNIT

PARCIAL

METRADO

ACTUAL

PARCIAL

ACUMULADO

PARCIAL

SALDO

ZAPATAS

01.06.01.01

ZAPATAS.- CONCRETO f'c=210 kg/cm2

01.06.01.02

ZAPATAS.- ACERO Fy=4200 Kg/cm2

01.06.02

VIGAS DE CIMENTACIN

01.06.02.01
01.06.02.02

VIGAS DE CIMENTACION.- CONCRETO fc=210kg/cm2


VIGAS DE CIMENTACION.- ACERO Fy=4200 Kg/cm2

01.06.03

COLUMNAS

01.06.03.01

COLUMNAS.- CONCRETO fc= 210Kg/cm2

01.06.03.02

COLUMNAS.- ENCOFRADO Y DESENCOFRADO

m2

2,239.32

52.39

01.06.03.03

COLUMNAS.- ACERO fy=4200 Kg/cm2

kg

29,569.49

3.46

01.06.04

COLUMNETAS Y SOLERAS

01.06.04.01

COLUMNETAS Y SOLERA.- CONCRETO fc=175Kg/cm2

m3

83.51

263.46

22,001.54

01.06.04.02

COLUMNETAS Y SOLERAS.- ENCOFRADO Y DESENCOFRADO

m2

914.32

52.39

47,901.22

01.06.04.03

COLUMNETAS Y SOLERAS.- ACERO fy=4200 Kg/cm2

kg

9,815.54

3.46

33,961.77

1,100.00

3,806.00

01.06.05

VIGAS

01.06.05.01

VIGAS - CONCRETO 210Kg/cm2

m3

334.21

283.62

94,788.64

80.00

22,689.60

24%

01.06.05.02

VIGAS.- ENCOFRADO Y DESENCOFRADO

m2

2,058.86

51.06

105,125.39

490.00

25,019.40

01.06.05.03
01.06.06

VIGAS.- ACERO fy=4200 Kg/cm2


PLACAS

kg

30,248.72

3.46

104,660.57

9,700.00

33,562.00

01.06.06.01

PLACAS CONCRETO f`c=210 Kg/Cm2 - 1 PISO

m3

128.36

292.35

37,526.05

30.00

01.06.06.02

PLACAS CONCRETO f`c=210 Kg/Cm2 - 2 PISO

m3

71.51

298.65

21,356.46

01.06.06.03

PLACAS.- ENCOFRADO Y DESENCOFRADO

m2

1,622.92

51.81

84,083.49

01.06.06.04

PLACAS.- ACERO fy=4200 Kg/cm2

kg

32,444.43

3.46

112,257.73

18,600.00

01.06.07

LOSAS MACIZA

01.06.07.01

LOSA MACIZA - CONCRETO 210 kg/cm2

m3

8.53

270.40

2,306.51

01.06.07.02

LOSA MACIZA - ENCOFRADO Y DESENCOFRADO

m2

47.06

28.83

1,356.74

01.06.07.03

LOSA MACIZA - ACERO Fy=4200 Kg/cm2

kg

673.05

3.46

2,328.75

01.06.08

LOSAS ALIGERADAS

01.06.08.01

LOSA ALIGERADA - CONCRETO 210 kg/cm2

m3

175.13

254.63

44,593.35

01.06.08.02

LOSA ALIGERADA.- ENCOFRADO Y DESENCOFRADO

m2

2,501.89

4.15

01.06.08.03
01.06.08.04

LOSA ALIGERADA.- ACERO fy=4200 Kg/cm2


LOSA ALIGERADA.- COLOCACION DE BOBEDILLA

kg
u

6,162.57
20,015.00

3.46
0.64

01.06.08.05

LOSA ALIGERADA.- COLOCACION DE VIGUETA PREFABRICADA

m2

2,501.88

01.06.08.06

SUMINISTRO DE VIGUETAS PREFABRICADAS (INC. BOBEDILLA)

m2

01.06.09

ESCALERAS

01.06.09.01

ESCALERAS.- CONCRETO fc=210 kg/cm2

01.06.09.02

ESCALERAS.- ENCOFRADO Y DESENCOFRADO

m3
m2

01.06.09.03

ESCALERAS.- ACERO fy=4200 kg/cm2

kg

01.06.10

CISTERNA Y CUARTO DE BOMBAS

01.06.10.01

CISTERNA Y CTO. DE BOMBAS.- CONCRETO fc=210 Kg/cm2

m3

45.11

249.99

11,277.05

0%

0%

0%

45.11

11,277.05

01.06.10.02

CISTERNA Y CTO. DE BOMBAS.- ENCOFRADO Y DESENCOFRADO

m2

272.68

51.85

14,138.46

0%

0%

0%

272.68

14,138.46

01.06.10.03

CISTERNA Y CTO. DE BOMBAS.- ACERO fy=4200 Kg/cm2

kg

2,799.43

3.46

9,686.03

0%

0%

0%

2,799.43

9,686.03

01.06.11

GRADERIAS

01.06.11.01

GRADERIA.- CONCRETO fc=210 kg/cm2

m3

21.67

278.33

6,031.41

0%

0%

0%

21.67

6,031.41

01.06.11.02
01.06.11.03

GRADERIA.- ENCOFRADO Y DESENCOFRADO


GRADERIA.- ACERO fy=4200 kg/cm2

m2
kg

130.55
1,429.62

29.79
3.46

3,889.08
4,946.49

0%
0%

0%
0%

0%
0%

130.55
1,429.62

3,889.08
4,946.49

01.07

VARIOS

01.07.01

JUNTAS DE DILATACION CON ESPUMA PLSTICA + JEBE MICROPOROSO

1,320.41

14.12

18,644.19

0%

0%

0%

1,320.41

18,644.19

01.07.02

JUNTAS DE DILATACION RELLENA CON MORTERO ASFALTICO e=1"


PUENTE DE ADHERENCIA UNION DE CONCRETO FRESCO Y ENDURECIDO

m
m2

206.35

01.07.03

22.00

1,048.08

01.07.04

BANCAS EN AREAS EXTERIORES

55.55

179.54

9,973.45

0%

01.07.05

CHARLAS DE SEGURIDAD EN OBRA

glb

1.00

92,773.24

92,773.24

0.42

39,036.60

42%

0.44

40,820.23

44%

0.86

79,856.82

01.07.06

EQUIPO DE PROTECCION PERSONAL (EPP)

mes

9.00

3,906.00

35,154.00

4.00

15,624.00

44%

4.00

15,624.00

44%

8.00

31,248.00

01.07.07

PREVENCIONISMO DE SEGURIDAD EN OBRA

mes

9.00

617.50

5,557.50

4.00

2,470.00

44%

4.00

2,470.00

44%

8.00

4,940.00

COSTO DIRECTO

m3

449.04

268.21

120,437.02

327.00

87,704.67

73%

40.00

10,728.40

9%

367.00

98,433.07

kg

6,962.87

3.46

24,091.53

4,360.00

15,085.60

63%

1,200.00

4,152.00

17%

5,560.00

19,237.60

m3
kg

38.80
4,502.41

279.02
3.46

10,825.98
15,578.34

15.80
1,850.00

4,408.52
6,401.00

41%
41%

12.00
1,300.00

3,348.24
4,498.00

31%
29%

27.80
3,150.00

m3

232.39

283.62

65,910.45

103.00

29,212.86

44%

15.00

4,254.30

6%

117,317.97

1,000.00

52,390.00

45%

200.00

10,478.00

102,310.44

12,800.00

44,288.00

43%

8,000.00

27,680.00

0%

24.00

6,323.04

29%

0%

160.00

8,382.40

11%

1,000.00

3,460.00

60.00

24%
32%

8,770.50

23%

35.00

18.00

5,375.70

25%

518.00

26,837.58

32%

64,356.00

57%

39,350.55

82%

82.04

22,003.95

80%

1,402.87

4,853.93

7,756.76
10,899.00

72%
70%

11.00
1,352.41

3,069.22
4,679.34

118.00

33,467.16

51%

114.39

32,443.29

9%

1,200.00

62,868.00

54%

1,039.32

54,449.97

27%

20,800.00

71,968.00

70%

8,769.49

30,342.44

24.00

6,323.04

29%

59.51

15,678.50

17%

160.00

8,382.40

17%

754.32

39,518.82

10%

2,100.00

7,266.00

21%

7,715.54

26,695.77

17,017.20

18%

140.00

39,706.80

42%

194.21

55,081.84

350.00

17,871.00

17%

840.00

42,890.40

41%

1,218.86

62,234.99

2,800.00

9,688.00

9%

12,500.00

43,250.00

41%

17,748.72

61,410.57

10,232.25

27%

65.00

19,002.75

51%

63.36

18,523.30

18.00

5,375.70

25%

36.00

10,751.40

50%

35.51

10,605.06

305.00

15,802.05

19%

823.00

42,639.63

51%

799.92

41,443.86

0%

18,600.00

64,356.00

57%

13,844.43

47,901.73

0%

0%

0%

8.53

2,306.51

0%

0%

0%

47.06

1,356.74

0%

0%

0%

673.05

2,328.75

26,736.15

60%

70.13

17,857.20

26%

10,382.84

614.00

2,548.10

21,322.49
12,809.60

1,600.00
4,300.00

5,536.00
2,752.00

2.95

7,380.55

670.00

2,501.88

42.34

105,929.60

23.32

300.73

7,013.02

156.79

66.15

2,236.23

3.46

51.46

5.25
47.64

60.00

15,277.80

34%

25%

880.00

3,652.00

35%

1,494.00

6,200.10

60%

1,007.89

4,182.74

26%
21%

2,100.00
7,700.00

7,266.00
4,928.00

34%
38%

3,700.00
12,000.00

12,802.00
7,680.00

60%
60%

2,462.57
8,015.00

8,520.49
5,129.60

1,976.50

27%

820.00

2,419.00

33%

1,490.00

4,395.50

60%

1,011.88

2,985.05

1,070.00

45,303.80

43%

420.00

17,782.80

17%

1,490.00

63,086.60

60%

1,011.88

42,843.00

2.30

691.68

10%

5.80

1,744.23

25%

8.10

2,435.91

35%

15.22

4,577.11

10,371.66

15.60

1,031.94

10%

41.00

2,712.15

26%

56.60

3,744.09

36%

100.19

6,627.57

7,737.36

465.00

1,608.90

21%

400.00

1,384.00

18%

865.00

2,992.90

39%

1,371.23

4,744.46

1,083.34
2,451.55

0%
0%

0%

0%
43%

105.00

0%

PARCIAL

01.06.01

11,458.35

METRADO
870.78

45.00

39,350.55

0%

PARCIAL

45.19

METRADO

870.78

0%

CONCRETO ARMADO

METRADO

VEREDA DE CONCRETO f'c= 175 kg/cm2 E=4"

01.06

m2

01.05.10

22.00

1,048.08
-

0%

206.35

43%

29.46

0%

55.55

9,973.45

86%

0.14

12,916.42

1,083.34

89%

1.00

3,906.00

89%

1.00

1,403.47

617.50

3,238,360.60

1,291,481.99

420,115.73

1,711,597.71

1,526,762.89

GASTOS GENERALES 13.8%

446,893.76

178,224.51

57,975.97

236,200.48

210,693.28

UTILIDAD 6.2%

200,778.36

80,071.88

26,047.18

106,119.06

94,659.30

SUB TOTAL

3,886,032.72

1,549,778.39

504,138.88

2,053,917.25

1,832,115.47

MONTO CONTRACTUAL=SUB-TOTAL*FR (1.00000)

3,886,032.72

1,549,778.39

504,138.88

2,053,917.25

1,832,115.47

738,346.22

294,457.89

95,786.39

390,244.28

348,101.94

4,624,378.94

1,844,236.28

599,925.26

2,444,161.53

2,180,217.41

I.G.V. (19%)
TOTAL PRESUPUESTO (S/.)

C o n s u l t o r a I n te g r a l d e I n g e n ie r a

V A L O R I Z A C I O N No. 04
EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108

FORMULA

ARQUITECTURA

ITEM

Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE OCTUBRE DEL 2009

PRESUPUESTO

DESCRIPCION

UNIDAD

01.01

MUROS Y TABIQUES DE ALBAILERA

01.01.01
01.01.02

MURO DE LADRILLO KK TIPO IV CABEZA M : 1:1:4 e=1.5cm


MURO DE LADRILLO KK TIPO IV SOGA M : 1:1:4 e=1.5cm

m2
m2

01.02
01.02.01

REVOQUES ENLUCIDOS Y MOLDURAS


TARRAJEO PRIMARIO, MORTERO C:A 1:5

01.02.02
01.02.03

TARRAJEO EN MURO INTERIOR Y EXTERIOR


TARRAJEO EN PLACAS INTERIOR (INC. PICADO)

01.02.04

TARRAJEO EN PLACAS EXTERIOR (INC. PICADO)

01.02.05
01.02.06

TARRAJEO DE COLUMNAS (INC. VESTIDURA DE ARISTA)


TARRAJEO EN VIGAS (INC. VESTIDURA DE ARISTAS)

01.02.07
01.02.08
01.02.09
01.02.10
01.02.11
01.02.12
01.02.13
01.02.14
01.02.15
01.03
01.03.01
01.03.02
01.03.03
01.03.04
01.03.05
01.03.06
01.04
01.04.01
01.04.02
01.04.03
01.05
01.05.01
01.05.02
01.05.03
01.05.04
01.05.05
01.06
01.06.01
01.06.02
01.07
01.07.01
01.07.02
01.07.03
01.07.04
01.07.05
01.07.06
01.07.07
01.07.08
01.08
01.08.01
01.08.02

METRADO

ANTERIOR

P.UNIT

PARCIAL

ACTUAL

PARCIAL

METRADO

51%
35%

702.00
1,025.36

1,241.89

15.42

19,149.94

11,384.41
746.73

17.01
19.24

193,648.81
14,367.09

70,157.88
61,378.05

60%
40%

m2

704.28

24.98

17,592.91

m2
m2

2,923.80
3,188.73

24.17
34.25

70,668.25
109,214.00

TARRAJEO EN CISTERNA CON IMPERMEABILIZANTE


REVESTIMIENTO DE GRANITO LAVADO EN MUROS

m2
m2

209.44
147.84

23.91
39.23

5,007.71
5,799.76

ENMARCADO DE PIZARRA
BRUAS SEGN DETALLE
VESTIDURA DE DERRAMES (1:5)
VESTIDURA DE FONDO DE ESCALERA
RESANE DE CIELO RASO C/YESO EN CENTROS DE LUZ
RESANE EN FRISO DE LOSA
CIELO RASO CON MEZCLA C:A 1:5
PISOS Y PAVIMENTOS
CONTRAPISO DE 50 mm
CONTRAPISO DE 50 mm EN PISOS SUPERIORES
PISO PORCELANATO 50 x 50 COLOR - ALTO TRANSITO
PISO CERAMICO 40 x 40 COLOR - ALTO TRANSITO
PISO DE CEMENTO PULIDO 2"
PISO DE TERRAZO PULIDO EN PASO Y CONTRAPASO EN ESCALERA
ZOCALO
ZOCALO CERAMICO 30X30 H=0.90
ZOCALO DE CERAMICO 30X20
SARDINEL EN DUCHA H=0.10m
CONTRAZOCALOS
CONTRAZOCALO DE CERAMICO H=10cm
CONTRAZOCALO DE CERAMICO H=30cm
CONTRAZOCALO DE CEMENTO PULIDO H = 10 cm
CONTRAZOCALO DE TERRAZO EN ESCALERA
CONTRAZOCALO DE PORCELANATO H=10cm
CARPINTERIA DE MADERA
PUERTA CN MACHIHEMBRADA
TICERO DE MADERA DE CEDRO (L=5m) BARNIZADO
CARPINTERIA METALICA Y HERRERA
BARANDA METALICA
PASAMANO DE FIERRO P/ SSHH DISCAPACITADOS
PUERTA DE MALLA METALICA
PUERTA METALICA LAC EN INGRESO
CERCO TIPO MALLA CON COLUMNAS FG 3
SUMINISTRO Y COLOCACION DE VIGUETAS DE FIERRO
SUMINISTRO Y COLOCACION DE ESTRUCTURA DE FIERRO PARA TECHO DE LOSA DEPORTIVA
SUMINISTRO Y COLOCACION DE ESCALERA DE GATO
CARPINTERIA DE ALUMINIO
SUMINISTRO Y COLOCACION DE ALUMINIO EN VENTANAS
SUMINISTRO Y COLOCACION DE ALUMINIO EN PUERTAS

m
m
m
m2
pto
m
m2

856.60

7.46
5.85
9.58
28.48
15.18
10.20
28.48

6,390.24

365.00

2,722.90

8,669.45
4,167.56
365.26
363.00
69.00
2,624.68

50,716.28
39,925.22
10,402.60
5,510.34
703.80
74,750.89

1,740.00
90.00

10,179.00
2,563.20

m2
m2
m2
m2
m2
m2

5,348.47
3,733.30
5,662.26
3,391.21
64.30
373.98

23.87
29.12
72.50
60.28
21.66
71.48

127,667.98
108,713.70
410,513.85
204,422.14
1,392.74
26,732.09

0%
0%
0%
0%
0%
0%

m2
m2
m

712.68
833.44
18.00

52.61
49.27
26.25

37,494.09
41,063.59
472.50

0%
0%
0%

0%
0%
0%

0%
0%
0%

2,150.07
903.21
45.61
343.55
890.30

14.24
25.21
8.78
8.28
15.45

30,617.00
22,769.92
400.46
2,844.59
13,755.14

0%
0%
0%
0%
0%

0%
0%
0%
0%
0%

0%
0%
0%
0%
0%

m2
u

348.23
70.00

503.50
136.78

175,333.81
9,574.60

0%
0%

0%
0%

0%
0%

m
m
m2
m2
m2
m
m2
m

628.96
12.60
3.60
41.64
505.61
60.60
629.98
5.30

206.71
82.53
96.84
180.00
150.67
155.00
200.00
52.10

130,012.32
1,039.88
348.62
7,495.20
76,180.26
9,393.00
125,996.00
276.13

m2
m2

2,009.21
80.50

235.01
33.39

472,184.44
2,687.90

0%

400.00

6,168.00

32%

400.00

6,168.00

32%

56,983.50
1,642.33

29%
11%

2,350.00
290.00

39,973.50
5,579.60

21%
39%

5,700.00
375.36

96,957.00
7,221.93

50%
50%

81.25

2,029.63

12%

270.00

6,744.60

38%

351.25

8,774.23

50%

850.00
910.00

20,544.50
31,167.50

29%
29%

600.00
680.00

14,502.00
23,290.00

21%
21%

1,450.00
1,590.00

35,046.50
54,457.50

50%
50%

3,350.00
85.36

15.00
-

59,964.00
53,874.00

PARCIAL

m2
m2

600.00
900.00

m2

125.36

9%
5%

ACUMULADO

PARCIAL

99.94
59.86

102.00

10,193.88
7,504.05

METRADO

1,165.38
2,549.12

m
m
m
m
m

116,468.08
152,590.32

METRADO

2,325.00
-

0%
0%
43%
20%
0%
0%
0%
0%
3%

0%
0%
0%
0%
0%
25%
0%
0%
0%
0%

0%
0%

0%
0%

0%

365.00

2,722.90

2,800.00
650.00
45.00
60.00
25.00
500.00

16,380.00
6,227.00
1,281.60
910.80
255.00
14,240.00

32%
16%
12%
17%
36%
19%

4,540.00
650.00
45.00
60.00
25.00
590.00

26,559.00
6,227.00
1,281.60
910.80
255.00
16,803.20

43%
52%
16%
12%
17%
36%
22%

250.00
240.00
600.00

5,967.50
6,988.80
43,500.00
-

5%
6%
11%
0%
0%
0%

250.00
240.00
600.00
-

5,967.50
6,988.80
43,500.00
-

5%
6%
11%
0%
0%
0%

72.00

-15.00

14,883.12
-2,325.00
-

11%
0%
0%
0%
0%
-25%
0%
0%
0%
0%

72.00
-

14,883.12
-

11%
0%
0%
0%
0%
0%
0%
0%
0%
0%

C o n s u l t o r a I n te g r a l d e I n g e n ie r a

V A L O R I Z A C I O N No. 04
EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108

FORMULA

ARQUITECTURA

Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE OCTUBRE DEL 2009

ITEM

PRESUPUESTO

DESCRIPCION

UNIDAD

ANTERIOR

01.08.03

SUMINISTRO Y COLOCACION DE CELOSIA DE ALUMINIO

m2

METRADO
303.80

P.UNIT
163.39

PARCIAL
49,637.88

01.09
01.09.01

VIDRIOS, CRISTALES Y SIMILARES


SUMINISTRO Y COLOCACION DE VIDRIO CRISTAL TEMPLADO DE 6mm EN VENTANAS

m2

2,009.21

144.88

01.09.02
01.10

SUMINISTRO Y COLOCACION DE VIDRIO CRISTAL TEMPLADO DE 10mm


CERRAJERIA

m2

80.50

247.18

01.10.01
01.10.02

BISAGRA CAPUCHINA ACERO ALUMINIZADA DE 4"


CERRADURA TRES GOLPES EN PUERTAS

pza
pza

690.00
152.00

01.10.03

CERRADURAS EN PUERTAS INTERIORES

pza

01.10.04
01.11

PICAPORTE DE 2"
PINTURA

01.11.01
01.11.02

PINTURA LATEX EN CIELORASO Y VIGAS


PINTURA LATEX EN MUROS Y COLUMNAS

01.11.03
01.11.04
01.11.05
01.11.06
01.11.07
01.11.08
01.11.09
01.11.10
01.12
01.12.01
01.12.02
01.12.03
01.12.04
01.13
01.13.01
01.13.02
01.13.03
01.13.04
01.13.05
01.13.06
01.13.07
01.13.08
01.13.09
01.13.10

PINTURA ESMALTE EN ZOCALO H=0.90m


PINTURA EXTERIOR
PINTURA EN PIZARRA
PINTURA ESMALTE EN CONTRAZOCALO DE 0.10m
PINTURA BARNIZ EN CARPINTERA DE MADERA
PINTURA DEMARCACION EN ESTACIONAMIENTO Y LOSAS DEPORTIVAS
PINTURA ESMALTE EN GRADERIA
IMPRIMACION DE MUROS Y CIELO RASO
COBERTURA
IMPERMEAB. DE TECHOS CON PINTURA ASFALTICA
CUBIERTA DE LADRILLO PASTELERO ASENTADO CON BARRO
COBERTURA DE POLICARBONATO
JUNTAS DE DILATACION EN COBERTURA DE PASTELERO C/MORTERO ASFALTICO
VARIOS
SUMINISTRO Y COLOCACION DE ESPEJO
TABIQUE DE MELAMINE CON ESTRUCTURA DE ALUMINIO EN SSHH
SUMINISTRO Y COLOCACION DE TABIQUES DE MADERA
MESA DE CONCRETO REVEST. C/MAYOLICA P/LAVADERO TIPO OVALIN
MESA DE CONCRETO REVEST. C/PORCELANATO LABORATORIO (3.60X0.80)
MESA DE CONCRETO REVEST. C/PORCELANATO LABORATORIO (1.80X0.80)
MESA DE CONCRETO EN COCINA
BANCAS, CORRIDA DE MADERA EN VESTIDORES
ASTA DE BANDERA
KID DE JUEGOS PARA NIOS

METRADO

ACTUAL

PARCIAL

METRADO

ACUMULADO

PARCIAL

METRADO

PARCIAL

0%

0%

0%

291,094.34

0%

0%

0%

19,897.99

0%

0%

0%

6.09
63.51

4,202.10
9,653.52

0%
0%

0%
0%

0%
0%

7.00

50.50

353.50

0%

0%

0%

48.00

4.29

205.92

0%

0%

0%

m2
m2

10,311.13
10,097.05

5.81
5.81

59,907.67
58,663.86

0%
0%

0%
0%

0%
0%

m2
m2
m2
m
m2
m
m2
m2

2,567.59
5,580.97
421.50
18.85
379.54
943.32
212.06
24,659.66

9.03
9.40
15.45
1.90
18.43
4.99
9.03
3.17

23,185.34
52,461.12
6,512.18
35.82
6,994.92
4,707.17
1,914.90
78,171.12

0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%

m2
m2
m2
m

4,564.40
4,564.40
74.50
834.10

4.67
29.59
78.06
6.30

21,315.75
135,060.60
5,815.47
5,254.83

0%
0%
0%
0%

p2
m
m2
u
u
u
u
m
u
u

161.78
160.76
85.79
12.50
9.00
3.00
2.00
7.34
2.00
1.00

8.45
463.89
45.00
517.48
1,000.64
574.46
1,914.69
92.01
1,061.01
3,500.00

1,367.04
74,574.96
3,860.55
6,468.50
9,005.76
1,723.38
3,829.38
675.35
2,122.02
3,500.00

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

1,200.00
80.00

35,508.00
504.00
-

0%
26%
0%
10%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

1,200.00
80.00
-

35,508.00
504.00
-

0%
26%
0%
10%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

C o n s u l t o r a I n te g r a l d e I n g e n ie r a

V A L O R I Z A C I O N No. 04
EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108

FORMULA

ARQUITECTURA

ITEM

Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE OCTUBRE DEL 2009

DESCRIPCION
COSTO DIRECTO

PRESUPUESTO
UNIDAD

METRADO

P.UNIT

ANTERIOR
PARCIAL

METRADO

ACTUAL

PARCIAL

METRADO

ACUMULADO

PARCIAL

METRADO

PARCIAL

3,874,461.13

147,855.49

354,416.52

502,272.01

GASTOS GENERALES 13.8%

534,675.64

20,404.06

48,909.48

69,313.54

UTILIDAD 6.2%

240,216.59

9,167.04

21,973.82

31,140.86

SUB TOTAL

4,649,353.36

177,426.59

425,299.82

602,726.41

MONTO CONTRACTUAL=SUB-TOTAL*FR (1.00000)

4,649,353.36

177,426.59

425,299.82

602,726.41

883,377.14

33,711.05

80,806.97

114,518.02

5,532,730.49

211,137.64

506,106.79

717,244.43

I.G.V. (19%)
TOTAL PRESUPUESTO (S/.)

Z A C I O N No. 04

SALDO
METRADO

PARCIAL

463.38
1,523.76

46,310.20
91,212.27

841.89

12,981.94

5,684.41
371.37

96,691.81
7,145.16

353.03

8,818.69

1,473.80
1,598.73

35,621.75
54,756.50

209.44
147.84

5,007.71
5,799.76

491.60

3,667.34

4,129.45
3,517.56
320.26
303.00
44.00
2,034.68

24,157.28
33,698.22
9,121.00
4,599.54
448.80
57,947.69

5,098.47
3,493.30
5,062.26
3,391.21
64.30
373.98

121,700.48
101,724.90
367,013.85
204,422.14
1,392.74
26,732.09

712.68
833.44
18.00

37,494.09
41,063.59
472.50

2,150.07
903.21
45.61
343.55
890.30

30,617.00
22,769.92
400.46
2,844.59
13,755.14

348.23
70.00

175,333.81
9,574.60

556.96
12.60
3.60
41.64
505.61
60.60
629.98
5.30

115,129.20
1,039.88
348.62
7,495.20
76,180.26
9,393.00
125,996.00
276.13

2,009.21
80.50

472,184.44
2,687.90

Z A C I O N No. 04

SALDO
METRADO
303.80

PARCIAL
49,637.88

2,009.21

291,094.34

80.50

19,897.99

690.00
152.00

4,202.10
9,653.52

7.00

353.50

48.00

205.92

10,311.13
10,097.05

59,907.67
58,663.86

2,567.59
5,580.97
421.50
18.85
379.54
943.32
212.06
24,659.66

23,185.34
52,461.12
6,512.18
35.82
6,994.92
4,707.17
1,914.90
78,171.12

4,564.40
3,364.40
74.50
754.10

21,315.75
99,552.60
5,815.47
4,750.83

161.78
160.76
85.79
12.50
9.00
3.00
2.00
7.34
2.00
1.00

1,367.04
74,574.96
3,860.55
6,468.50
9,005.76
1,723.38
3,829.38
675.35
2,122.02
3,500.00

Z A C I O N No. 04

SALDO
METRADO

PARCIAL
3,372,189.13
465,362.10
209,075.73
4,046,626.96
4,046,626.96
768,859.12
4,815,486.08

C o n s u l to r a I n te g r a l d e I n g e n ie r a

V A L O R I Z A C I O N No. 04
EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108

FORMULA

INSTALACIONES SANITARIAS

Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE OCTUBRE DEL 2009

ITEM

DESCRIPCION

PRESUPUESTO
UNIDAD

METRADO

ANTERIOR

P.UNIT

PARCIAL

METRADO

ACTUAL

PARCIAL

METRADO

ACUMULADO

PARCIAL

METRADO

SALDO

PARCIAL

METRADO

PARCIAL

01.01
01.01.01

APARATOS SANITARIOS Y ACCESORIOS


INODORO TANQUE BAJO DE LOSA

pza

21.00

250.75

5,265.75

0%

0%

0%

21.00

5,265.75

01.01.02
01.01.03

INODORO BLANCO PARA FLUXOMETRO


URINARIO CORRIDO DE CEMENTO CON ENCHAPE CERAMICO

pza
m

48.00
16.25

538.77
147.04

25,860.96
2,389.40

0%
0%

0%
0%

0%
0%

48.00
16.25

25,860.96
2,389.40

01.01.04

BEBEDERO CORRIDO DE CONCRETO REVEST.C/MAYOLICA

208.51

1,021.70

0%

0%

0%

4.90

1,021.70

CALENTADOR 80 L

m
u

4.90

01.01.05

1.00

952.38

952.38

0%

0%

0%

1.00

952.38

01.01.06
01.01.07

CALENTADOR 250 L
LAVATORIO PARA PELUQUERIA

1.00
9.00

1,959.14
216.27

1,959.14
1,946.43

0%
0%

0%
0%

0%
0%

1.00
9.00

1,959.14
1,946.43

01.01.08

LAVADERO DE COCINA DE ACERO INOXIDABLE

2.00

332.51

665.02

0%

0%

0%

2.00

665.02

01.01.09
01.01.10

LAVADERO DE ACERO INOXIDABLE PARA LABORATORIO


LAVATORIO DE LOZA BLANCA

pza
pza

13.00
8.00

308.16
162.24

4,006.08
1,297.92

0%
0%

0%
0%

0%
0%

13.00
8.00

4,006.08
1,297.92

01.01.11
01.01.12

LAVADERO TIPO OVALIN


MEZCLADORA PARA DUCHA CON GRIFERIA

pza
pza

50.00
18.00

336.97
153.24

16,848.50
2,758.32

0%
0%

0%
0%

0%
0%

50.00
18.00

16,848.50
2,758.32

01.01.13

JABONERA LOSA BLANCA

26.09

469.62

0%

0%

0%

18.00

469.62

PAPELERA DE CERAMICA

u
u

18.00

01.01.14

69.00

30.47

2,102.43

0%

0%

0%

69.00

2,102.43

01.02
01.02.01

MOVIMIENTO DE TIERRAS
EXCAVACION DE ZANJAS

01.02.02

CAMA DE ARENA

01.02.03
01.03
01.03.01
01.03.02
01.03.03

RELLENO MANUAL CON MATERIAL PROPIO


INSTALACIONES SANITARIAS DE DESAGUE
TUBERIA DE PVC SAL 2" P/VENTILACION (PAB 2)
TUBERIA DE PVC SAL 2" P/VENTILACION (PAB 3)
TUBERIA DE PVC SAL 2" P/VENTILACION (PAB 5)

01.03.04
01.03.05
01.03.06
01.03.07
01.03.08
01.03.09
01.03.10
01.03.11
01.03.12

TUBERIA DE PVC SAL 2" P/VENTILACION (PAB 6)


TUBERIA DE PVC SAL 2" P/VENTILACION (PAB 7)
TUBERIA DE PVC SAL 2" P/VENTILACION (DEPORTES)
TUBERIA DE PVC SAL 2" P/MONTANTE
SALIDA PARA VENTILACION (PAB 2)
SALIDA PARA VENTILACION (PAB 3)
SALIDA PARA VENTILACION (PAB 5)
SALIDA PARA VENTILACION (PAB 6)
SALIDA PARA VENTILACION (PAB 7)

01.03.13
01.03.14
01.03.15
01.03.16
01.03.17
01.03.18
01.03.19
01.03.20

SALIDA PARA VENTILACION (DEPORTES)


SALIDA DE DESAGUE EN PVC (PAB 2)
SALIDA DE DESAGUE EN PVC (PAB 3)
SALIDA DE DESAGUE EN PVC (PAB 5)
SALIDA DE DESAGUE EN PVC (PAB 6)
SALIDA DE DESAGUE EN PVC (PAB 7)
SALIDA DE DESAGUE EN PVC (DEPORTES)
CAJA SUMIDERO CON REJILLA DE FIERRO 3"

01.03.21
01.03.22
01.03.23
01.03.24
01.03.25
01.03.26
01.03.26.01
01.03.26.02
01.03.26.03

REJILLA DE BRONCE 2"


REJILLA DE BRONCE 3"
REGISTROS DE BRONCE DE 2"
REGISTROS DE BRONCE DE 4"
SUMIDERO DE BRONCE 2"
SUMINISTRO E INTALACION DE TUBERIAS
TUBERIA PVC SAP 2"
TUBERIA PVC SAP 3"
TUBERIA PVC SAP 4"

01.03.26.04
01.03.27
01.03.27.01
01.03.27.02
01.03.27.03
01.03.28

TUBERIA PVC SAP 6"


CAJAS Y TAPA
CAJA DE REGISTRO DE ALBAILERIA DE 12"X24" C/TAPA DE CONCRETO
CAJA DE REGISTRO DE ALBAILERIA DE 18"X24" C/TAPA DE CONCRETO
CAJA DE REGISTRO DE ALBAILERIA DE 24"X24" C/TAPA DE CONCRETO
CAMARA DE INSPECCION

pza
pza

m3

439.35

24.77

10,882.70

265.00

6,564.05

60%

120.00

2,972.40

27%

385.00

9,536.45

88%

54.35

1,346.25

m
m3

1,789.39

33.32

59,622.47

950.00

31,654.00

53%

580.00

19,325.60

32%

1,530.00

50,979.60

86%

259.39

8,642.87

281.85

19.82

105.00

2,081.10

37%

130.00

2,576.60

46%

235.00

4,657.70

83%

46.85

928.57

m
m
m
m
m
m

41.10
62.94
45.75

18.57
18.45
18.90

5,586.27
763.23
1,161.24
864.68

45.75

864.68

0%
0%
100%

45.75

864.68

0%
0%
100%

41.10
62.94
-

763.23
1,161.24
-

62.94
61.20
79.80
17.00
27.00
10.00
14.00
37.00
31.00

18.56
18.52
18.68
19.02
64.79
66.75
59.08
65.45
66.44

1,168.17
1,133.42
1,490.66
323.34
1,749.33
667.50
827.12
2,421.65
2,059.64

40.00
-

747.20
-

0%
0%
50%
0%
0%
0%
0%
0%
0%

1,133.42
743.46
323.34
534.00
827.12
981.75
2,059.64

0%
100%
50%
100%
0%
80%
100%
41%
100%

61.20
79.80
17.00
8.00
14.00
15.00
31.00

1,133.42
1,490.66
323.34
534.00
827.12
981.75
2,059.64

0%
100%
100%
100%
0%
80%
100%
41%
100%

62.94
27.00
2.00
22.00
-

1,168.17
1,749.33
133.50
1,439.90
-

31.00
27.00
12.00
19.00
37.00
31.00
27.00
13.00

62.16
105.43
94.84
109.40
105.82
104.52
128.06
189.41

1,926.96
2,846.61
1,138.08
2,078.60
3,915.34
3,240.12
3,457.62
2,462.33

15.00
-

932.40
-

48%
0%
0%
0%
0%
0%
0%
0%

1,926.96
569.04
2,078.60
3,240.12
3,457.62
-

100%
0%
50%
100%
0%
100%
100%
0%

46.00
6.00
19.00
31.00
27.00
-

2,859.36
569.04
2,078.60
3,240.12
3,457.62
-

148%
0%
50%
100%
0%
100%
100%
0%

-15.00
27.00
6.00
37.00
13.00

-932.40
2,846.61
569.04
3,915.34
2,462.33

25.00
7.00
15.00
20.00
5.00

35.79
58.35
23.27
35.24
35.06

0%
0%
0%
0%
0%

25.00
7.00
15.00
20.00
5.00

894.75
408.45
349.05
704.80
175.30

m
m
m
m

25.00
24.00
100.00

14.45
17.46
22.43

894.75
408.45
349.05
704.80
175.30
361.25
419.04
2,243.00

320.00

71.16

19.00
7.00
3.00

176.60
189.60
220.64

m
pto
pto
pto
pto
pto
pto
pto
pto
pto
pto
pto
pto
u
u
u
u
u
u

u
u

22,771.20
3,355.40
1,327.20
661.92
-

0%
0%
0%

61.20
39.80
17.00
8.00
14.00
15.00
31.00
31.00
6.00
19.00
31.00
27.00

0%
0%
0%
0%
0%

0%
0%
0%
0%
0%

52.00

1,166.36

0%
0%
52%

25.00
24.00
48.00

361.25
419.04
1,076.64

100%
100%
48%

25.00
24.00
100.00

361.25
419.04
2,243.00

100%
100%
100%

250.00

17,790.00

78%

70.00

4,981.20

22%

320.00

22,771.20

100%

15.00
4.00
2.00

2,649.00
758.40
441.28

79%
57%
67%

2.00
2.00

353.20
379.20
-

11%
29%
0%

17.00
6.00
2.00

3,002.20
1,137.60
441.28

89%
86%
67%

2.00
1.00
1.00

353.20
189.60
220.64

C o n s u l to r a I n te g r a l d e I n g e n ie r a

V A L O R I Z A C I O N No. 04
EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108

FORMULA

INSTALACIONES SANITARIAS

Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE OCTUBRE DEL 2009

ITEM

DESCRIPCION

01.03.28.01
01.04

BUZON STANDAR DE D=1.20m H=1.40m


INSTALACIONES SANITARIAS DE AGUA FRIA

01.04.01
01.04.02
01.04.03
01.04.04

SALIDA DE AGUA FRIA.- PVC (PAB 6)

01.04.05
01.04.06

SALIDA DE AGUA FRIA.- PVC (PAB 7)


SALIDA DE AGUA FRIA.- PVC (DEPORTES)

01.04.07

ALIMENTADOR

01.04.07.01
01.04.07.02

RED DE ALIMENTADOR TUBERIA DE PVC (PAB 2)


RED DE ALIMENTADOR TUBERIA DE PVC (PAB 3)

01.04.07.03
01.04.07.04

PRESUPUESTO
UNIDAD

METRADO

ANTERIOR

P.UNIT

PARCIAL

METRADO

ACTUAL

PARCIAL

3.00

1,006.00

3,018.00
-

1.00

SALIDA DE AGUA FRIA.- PVC (PAB 2)


SALIDA DE AGUA FRIA.- PVC (PAB 3)

pto
pto

28.00
12.00

104.34
85.93

2,921.52
1,031.16

0%
0%

SALIDA DE AGUA FRIA.- PVC (PAB 5)

pto
pto

34.00

84.22

2,863.48

0%

39.00

95.12

3,709.68

0%

pto

31.00
45.00

93.86
94.52

2,909.66
4,253.40

0%
0%

60.25
5.50

10.79
15.74

650.10
86.57

0%
0%

RED DE ALIMENTADOR TUBERIA DE PVC (PAB 5)


RED DE ALIMENTADOR TUBERIA DE PVC (PAB 6)

m
m

118.70
58.35

10.61
10.38

1,259.41
605.67

01.04.07.05

RED DE ALIMENTADOR TUBERIA DE PVC (PAB 7)

10.07

587.58

RED DE ALIMENTADOR TUBERIA DE PVC (DEPORTES)

m
m

58.35

01.04.07.06

126.15

10.23

1,290.51

01.04.08
01.04.08.01

RED DE DISTRIBUCION EXTERIOR


RED DE DISTRIBUCION TUBERIA DE 1/2"

01.04.08.02

RED DE DISTRIBUCION TUBERIA DE 3/4"

01.04.08.03
01.04.08.04
01.04.08.05
01.04.08.06
01.04.08.07

RED DE DISTRIBUCION TUBERIA DE 1"


RED DE DISTRIBUCION TUBERIA DE 1 1/4"
RED DE DISTRIBUCION TUBERIA DE 1 1/2"
RED DE DISTRIBUCION TUBERIA DE 2"
RED DE DISTRIBUCION TUBERIA DE 2 1/2"

01.04.08.08
01.05
01.05.01
01.05.02
01.06
01.06.01
01.06.02
01.06.03
01.06.04

RED DE DISTRIBUCION TUBERIA DE 3"


INSTALACIONES SANITARIAS DE AGUA CALIENTE
SALIDA DE AGUA CALIENTE CON TUBERIA CPVC (PAB 6)
SALIDA DE AGUA CALIENTE CON TUBERIA CPVC (DEPORTES)
VALVULAS
VALVULA TIPO BOLA 1/2"
VALVULA TIPO BOLA 3/4"
VALVULA TIPO BOLA 1"
VALVULA TIPO BOLA 1 1/4"

01.06.05
01.06.06
01.06.07
01.06.08
01.07
01.07.01
01.08
01.08.01

VALVULA TIPO BOLA 1 1/2"


VALVULA TIPO BOLA 2"
VALVULA TIPO BOLA 2 1/2"
CAJA C/TAPA DE MADERA P/VALVULA
SISTEMA DE RIEGO
SISTEMA DE RIEGO
PRUEBA HIDRAULICA
PRUEBA HIDRAULICA EN TUBERIA DE DESAGUE

01.08.02
01.08.03
01.09
01.09.01
01.09.01.01

PRUEBA HIDRAULICA Y DESINFECCION TUBERIAS DE AGUA


PRUEBA HIDRAULICA EN CISTERNA Y EQUIPO DE BOMBEO
VARIOS
EQUIPO DE BOMBA
SUMINISTRO E INSTALACION DE EQUIPOS DE BOMBEO
COSTO DIRECTO

pto

1,006.00

METRADO

33%

ACUMULADO

PARCIAL

METRADO

SALDO

28.00

2,358.16

25.00
40.00

2,346.50
3,780.80

0%
0%

100.00
40.00

1,061.00
415.20

84%
69%

100.00
40.00

1,061.00
415.20

0%

40.00

402.80

69%

40.00

402.80

0%

80.00

818.40

63%

80.00

818.40

0%
0%
82%
0%
81%
89%

2.00

1,006.00
-

33%

PARCIAL

1.00

28.00
25.00
40.00

2,012.00
2,358.16
2,346.50
3,780.80

METRADO

PARCIAL

67%

1.00

1,006.00
2,921.52
1,031.16

0%
0%

28.00
12.00

82%

6.00

505.32

0%

39.00

3,709.68

81%
89%

6.00
5.00

563.16
472.60

0%
0%

60.25
5.50

650.10
86.57

84%
69%

18.70
18.35

198.41
190.47

69%

18.35

184.78

63%

46.15

472.11

0%
0%

52.00

9.62

500.24

0%

45.00

432.90

87%

45.00

432.90

87%

7.00

67.34

m
m
m
m
m
m
m

71.50

11.22

802.23

0%

65.00

729.30

91%

65.00

729.30

91%

6.50

72.93

35.50
25.00
61.00
97.00
37.00

13.76
16.24
19.37
36.12
21.32

488.48
406.00
1,181.57
3,503.64
788.84

0%
0%
0%
0%
0%

30.00
20.00
55.00
40.00
25.00

412.80
324.80
1,065.35
1,444.80
533.00

85%
80%
90%
41%
68%

30.00
20.00
55.00
40.00
25.00

412.80
324.80
1,065.35
1,444.80
533.00

85%
80%
90%
41%
68%

5.50
5.00
6.00
57.00
12.00

75.68
81.20
116.22
2,058.84
255.84

143.00

26.83

0%

100.00

2,683.00

70%

100.00

2,683.00

70%

43.00

1,153.69

9.00
16.00

79.69
90.76

0%
0%

0%
0%

0%
0%

9.00
16.00

717.21
1,452.16

36.00
13.00
7.00
4.00

82.23
100.27
123.47
173.16

3,836.69
717.21
1,452.16
2,960.28
1,303.51
864.29
692.64

0%
0%
0%
0%

0%
0%
0%
0%

0%
0%
0%
0%

36.00
13.00
7.00
4.00

2,960.28
1,303.51
864.29
692.64

pza

18.00
5.00
4.00
87.00

225.89
309.33
636.74
41.09

0%
0%
0%
0%

0%
0%
0%
0%

0%
0%
0%
0%

18.00
5.00
4.00
87.00

4,066.02
1,546.65
2,546.96
3,574.83

592.71

19.86

0%

59%

242.71

4,820.22

m
m
glb

840.09

9.01

4,066.02
1,546.65
2,546.96
3,574.83
11,771.22
7,569.21

0%

0%

0%

840.09

7,569.21

949.30
1.00

3.09
590.00

0%
0%

0%
0%

0%
0%

949.30
1.00

2,933.34
590.00

glb

1.00

37,013.04

2,933.34
590.00
37,013.04

0%

0%

0%

1.00

37,013.04

pto
pto
u
u
u
u
u
u
u

350.00

6,951.00

59%

350.00

6,951.00

329,297.88

65,789.79

77,950.69

143,740.48

185,557.40

GASTOS GENERALES 13.8%

45,443.11

9,078.99

10,757.20

19,836.19

25,606.92

UTILIDAD 6.2%

20,416.47

4,078.97

4,832.94

8,911.91

11,504.56

SUB TOTAL

395,157.46

78,947.75

93,540.83

172,488.58

222,668.88

MONTO CONTRACTUAL=SUB-TOTAL*FR (1.00000)

395,157.46

78,947.75

93,540.83

172,488.58

222,668.88

75,079.92

15,000.07

17,772.76

32,772.83

42,307.09

470,237.37

93,947.82

111,313.59

205,261.41

264,975.97

I.G.V. (19%)
TOTAL PRESUPUESTO (S/.)

C o n s u lt o r a I n t e g r a l d e I n g e n ie r a

V A L O R I Z A C I O N No. 04
EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108

FORMULA

INSTALACIONES ELECTRICAS

Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE OCTUBRE DEL 2009

ITEM

DESCRIPCION

01.01

TRABAJOS PRELIMINARES

01.01.01

DESMONTAJE DE ARTEFACTOS ELECTRICOS

PRESUPUESTO
UNIDAD

METRADO

ANTERIOR

P.UNIT

PARCIAL

METRADO

ACTUAL

PARCIAL

METRADO

631.00

10.91

6,884.21

320.00

3,491.20

51%

ACUMULADO

PARCIAL

%
-

SALDO

PARCIAL

METRADO

PARCIAL

320.00

3,491.20

51%

311.00

3,393.01

01.01.02

PICADO Y RESANE EN MURO P/TUBO ( SECCION 10x7.5cm)

961.90

19.95

19,189.91

356.00

7,102.20

37%

0%

356.00

7,102.20

37%

605.90

12,087.71

01.01.03

EXCAVACION DE ZANJAS EN REDES ELECTRICAS

m3

108.30

33.66

3,645.38

45.00

1,514.70

42%

30.00

1,009.80

28%

75.00

2,524.50

69%

33.30

1,120.88

01.01.04

SOLADO P/COLOCACION DE DUCTOS Y TUB. E=2"

300.83

9.57

2,878.94

0%

100.00

957.00

33%

100.00

957.00

33%

200.83

1,921.94

01.01.05

RELLENO MANUAL C/MATERIAL PROPIO EN REDES ELECTRICAS

m3

140.80

17.63

2,482.30

52.00

916.76

37%

35.00

617.05

25%

87.00

1,533.81

62%

53.80

948.49

120.00

10,028.40

20%

400.00

33,428.00

65%

520.00

43,456.40

85%

91.00

7,604.87

METRADO
0%

01.02
01.02.01

SALIDA PARA CENTRO DE LUZ


SALIDA PARA LUMINARIA EN TECHO ( CENTRO DE LUZ )

pto

611.00

83.57

51,061.27

01.02.02

SALIDA PARA LUMINARIA EN PARED

pto

20.00

110.78

2,215.60

0%

10.00

1,107.80

50%

10.00

1,107.80

50%

10.00

1,107.80

01.03

SALIDA PARA INTERRUPTOR DE LUZ

01.03.01

SALIDA PARA INTERRUPTOR SIMPLE

pto

52.00

8.15

423.80

21.00

171.15

40%

10.00

81.50

19%

31.00

252.65

60%

21.00

171.15

01.03.02

SALIDA PARA INTERRUPTOR DOBLE

12.23

635.96

18.00

220.14

35%

12.00

146.76

23%

30.00

366.90

58%

22.00

269.06

SALIDA PARA INTERRUPTOR DE CONMUTACION

pto
pto

52.00

01.03.03

69.00

10.32

712.08

25.00

258.00

36%

8.00

82.56

12%

33.00

340.56

48%

36.00

371.52

01.04

SALIDAS PARA TOMACORRIENTES

01.04.01

SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA (EN PARED)

pto

475.00

8.15

3,871.25

115.00

937.25

24%

50.00

407.50

11%

165.00

1,344.75

35%

310.00

2,526.50

01.04.02

SALIDA TOMACORRIENTE DOBLE CON LINEA DE TIERRA (EN RACK)

pto

227.00

8.15

1,850.05

52.00

423.80

23%

50.00

407.50

22%

102.00

831.30

45%

125.00

1,018.75

01.05

SALIDA DE FUERZA

01.05.01

SALIDA DE FUERZA (TEBLERO DE CONTROL DE BOMBAS)

pto

2.00

174.40

348.80

0%

2.00

348.80

01.06

CAJAS DE PASE

01.06.01
01.06.02

CAJA DE PASE 0.30X0.30X0.15m


CAJA DE PASE 0.20X0.20X0.15m

u
u

2.00
36.00

83.55
55.91

167.10
2,012.76

1.00
11.00

83.55
1,397.75

01.06.03

CAJA OCTOGONAL

48.00

32.25

1,548.00

20.00

01.07

TABLEROS

01.07.01

TABLERO AUTOSOPORTADO TG ( 1-3x630A, 4-3x100A, 2-3x80A, 3-3x63A, 3-3x50A, 5-3x25A )

1.00

7,880.74

7,880.74

01.07.02

TABLERO AUTOSOPORTADO TD-CRT1, ( 1-3x63A, 1-3x32A, 1-2x16A, 5-2x20A, 6- ID2x25A-30mA)

4,347.82

4,347.82

TABLERO METALICO P/EMPOTRAR TD-01, (1-3x100A , 2-2x20A, 7-2x16A, 9- ID 2x25A- 30mA, 1-IH2x16A

u
u

1.00

01.07.03

1.00

1,847.85

1,847.85

01.07.04

TABLERO METALICO P/EMPOTRAR TD -CC1, (1-3x32A, 4-2x20A, 4-ID 2x25A-30mA)

1.00

3,405.28

3,405.28

01.07.05

TABLERO METALICO P/EMPOTRAR TD-02, ( 1-3x63A, 6-2x16A, 2-2x20A, 8-ID 2x25A-30mA, 1-IH2x16A)

1.00

2,991.07

01.07.06

TABLERO METALICO P/EMPOTRAR TD -CC2, (1-3x100A, 1-3x32A, 1-3x25A, 4-2x20A, 4-ID 2x25A-30mA)

1.00

01.07.07

TABLERO METALICO P/EMPOTRAR TD- CRT2, (1-3x32A, 1-2x16A, 5-2x20A, 6-ID 2x25A-30mA)

1.00

01.07.08

TABLERO METALICO P/EMPOTRAR TD-INDV, ( 1-3x25A, 1-2x16A,4-2x20A, 5-ID 2x25A-30mA)

01.07.09

TABLERO METALICO P/EMPOTRAR TD -03, ( 1-3x100A, 5-2x16A, 3-2x20A, 8- ID 2x25A - 30mA)

01.07.10
01.07.11

0%

0%

83.55
615.01

50%
31%

0%
0%

1.00
11.00

83.55
615.01

50%
31%

1.00
25.00

645.00

42%

0%

20.00

645.00

42%

28.00

903.00

0%

0%

0%

1.00

7,880.74

0%

0%

0%

1.00

4,347.82

0%

0%

0%

1.00

1,847.85

0%

0%

0%

1.00

3,405.28

2,991.07

0%

0%

0%

1.00

2,991.07

1,874.58

1,874.58

0%

0%

0%

1.00

1,874.58

1,659.40

1,659.40

0%

0%

0%

1.00

1,659.40

1.00

2,558.64

2,558.64

0%

0%

0%

1.00

2,558.64

1.00

2,134.52

2,134.52

0%

0%

0%

1.00

2,134.52

TABLERO METALICO P/EMPOTRAR TD- SM, (1-3x25A, 2-2x16A, 2-IH2x16A)


TABLERO METALICO P/EMPOTRAR TD -LAB 1 ,(1-3x25A, 4-2x16A, 4-2x20A, 8-ID 2x25A-30mA)

u
u

1.00
1.00

1,417.24
1,356.50

1,417.24
1,356.50

0%
0%

0%
0%

0%
0%

1.00
1.00

1,417.24
1,356.50

01.07.12

TABLERO METALICO P/EMPOTRAR TD -LAB 2, ( 1-3x25A, 2-2x16A, 4-2x20A, 6-ID 2x25A-30mA)

1.00

1,685.70

1,685.70

0%

0%

0%

1.00

1,685.70

01.07.13

TABLERO METALICO P/EMPOTRAR TD-04, ( 1-3x63A, 2-3x25A, 3-2x16A, 1-2x20A, 4-ID 2x25A-30mA)

1.00

1,639.44

1,639.44

0%

0%

0%

1.00

1,639.44

01.07.14

TABLERO METALICO P/EMPOTRAR TD-04A, (1-3x25A, 2-2x16A, 1-2x20A, 3 -ID 2x25A-30mA)

1.00

850.20

850.20

0%

0%

0%

1.00

01.07.15

TABLERO METALICO P/EMPOTRAR TD-04B, (1-3x25A, 2-2x16A, 1-2x20A, 3- ID 2x25A-30mA)

1.00

850.20

850.20

0%

0%

0%

1.00

850.20

01.07.16

TABLERO METALICO P/EMPOTRAR TD-05, (1- 3x50A, 1-3x25A, 1-2x16A, 1-2x20A, 2-ID 2x25A-30mA)

u
u

1.00

1,341.18

1,341.18

0%

0%

0%

1.00

1,341.18

01.07.17

TABLERO METALICO P/EMPOTRAR TD-05A, (1-3x25A, 1-2x16A, 1-2x20A, 2-ID 2x25A -30mA)

1.00

2,254.86

2,254.86

0%

0%

0%

1.00

2,254.86

01.07.18

TABLERO METALICO P/EMPOTRAR TD-06, (1-3x50A, 2-2x16A, 2-2x20A, 4- ID 2x25A-30mA)

1.00

1,458.00

1,458.00

0%

0%

0%

1.00

1,458.00

01.07.19

TABLERO METALICO P/EMPOTRAR TD-07, (1-3x50A, 3-2x16A, 4-2x20A, 6-ID 2x25A-30mA, 1-IH2x16A)

1.00

2,804.27

2,804.27

0%

0%

0%

1.00

2,804.27

01.07.20

TABLERO METALICO P/EMPOTRAR TD-CRT3, (1-3x100A, 1-3x63A, 2-2x16A, 5-2x20A, 7 ID 2x25A-30mA)

1.00

3,078.02

3,078.02

0%

0%

0%

1.00

3,078.02

01.07.21

TABLERO METALICO P/EMPOTRAR TD-CC3, (1- 3x63A, 6-2x20A, 1-2X16A, 6- ID 2x25A-30mA)

1.00

1,696.32

1,696.32

0%

0%

0%

1.00

1,696.32

01.07.22

TABLERO METALICO P/EMPOTRAR TD -8, (1-3x80A, 5-2x16A, 4-2x20A, 8-ID 2x25A-30mA, 1-IH2x16A

1.00

3,152.89

3,152.89

0%

0%

0%

1.00

3,152.89

01.07.23

TABLERO METALICO P/EMPOTRAR TD-9, (1-3x80A, 2-2x16A, 3-2x20A, 2-2x15A, 6- ID 2x25A-30mA, 1-IH2x16A)

1.00

2,944.41

2,944.41

0%

0%

0%

1.00

2,944.41

01.07.24
01.07.25

TABLERO METALICO P/EMPOTRAR TD-10, (1-3x40A, 1-2x16A, 3-2x20A, 4-ID 2x25A-30mA)


TABLERO METALICO P/EMPOTRAR TD-11, (1-3x40A, 5-2x20A, 3-2x16A, 3-ID 2x25A-30mA)

u
u

1.00
1.00

1,465.42
961.24

1,465.42
961.24

0%
0%

0%
0%

0%
0%

1.00
1.00

1,465.42
961.24

01.08

POSTES Y/O PASTORALES

01.08.01

POSTE DE FG 3" X 3.0M

13.00

413.25

5,372.25

0%

0%

0%

13.00

5,372.25

01.08.02

POSTE DE CONCRETO DE 8m / 200 Kg

17.00

990.09

16,831.53

0%

0%

0%

17.00

16,831.53

01.09

CABLES Y CONDUCTORES (ALIMENTADORES)

01.09.01

CABLE N2XH[3-1x240mm2+1x50mm2(T)]( MED /TG)

40.00

203.28

8,131.20

0%

0%

0%

40.00

8,131.20

01.09.02

CABLE 3-1X120mm2 NHX90+1X25mm2(T)NH70/PVC-P 65mm(TG/TD-01)

156.57

127.91

20,026.87

0%

0%

0%

156.57

20,026.87

01.09.03

CABLE 3-1X95mm2 NHX90 / PVC-P 65mm(TG/TD-CRT1)

155.20

82.19

12,755.89

0%

0%

0%

155.20

12,755.89

01.09.04

CABLE 3-1X16mm2 NHX90+1X10mm2(T)NH70/ PVC-P 35mm(TD-CRT1/TD-CC1)

10.00

224.80

0%

0%

0%

10.00

01.09.05

CABLE 3-1x70 mm2 NHX90 + 1X25mm2(T)NH70/PVC-P 55 mm(TG / TD-02)

134.00

67.12

8,994.08

0%

0%

0%

134.00

8,994.08

01.09.06

CABLE 3-1x120mm2 NHX90 + 1x25mm2(T)NH70/PVC-P 65mm( TG / TD-CC2)

146.00

127.91

18,674.86

0%

0%

0%

146.00

18,674.86

01.09.07

CABLE 3-1x16mm2 NHX90 + 1X10mm2(T)NH70/PVC-P35mm ( TD-CC2/TD-CRT2)

4.50

22.48

101.16

0%

0%

0%

4.50

101.16

01.09.08

CABLE 3-1x16mm2 NHX90 + 1X10mm2(T)NH70/PVC-P35mm ( TD-CC2/TD-INDV)

5.00

22.48

112.40

0%

0%

0%

5.00

112.40

22.48

850.20

224.80

C o n s u lt o r a I n t e g r a l d e I n g e n ie r a

V A L O R I Z A C I O N No. 04
EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108

FORMULA

INSTALACIONES ELECTRICAS

Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE OCTUBRE DEL 2009

ITEM

DESCRIPCION

PRESUPUESTO
UNIDAD

METRADO

ANTERIOR

P.UNIT

PARCIAL

METRADO

ACTUAL

PARCIAL

METRADO

ACUMULADO

PARCIAL

METRADO

SALDO

PARCIAL

METRADO

PARCIAL

01.09.09

CABLE 3-1x95mm2 NHX90 + 1X25mm2(T)NH70/PVC-P65mm ( TG/TD-03)

110.00

89.57

9,852.70

0%

0%

0%

110.00

9,852.70

01.09.10

CABLE 3-1x70mm2 NHX90 + 1X25mm2(T)NH70/PVC-P55mm ( TG/TD-SM)

179.00

67.12

12,014.48

0%

0%

0%

179.00

12,014.48

01.09.11

CABLE 3-1x35mm2 NHX90 + 1X10mm2(T)NH70/PVC-P35mm ( TG/TD-LAB 1)

171.00

35.38

6,049.98

0%

0%

0%

171.00

6,049.98

01.09.12

CABLE 3-1x35mm2 NHX90 + 1X10mm2(T)NH70/PVC-P35mm ( TG/TD-LAB 2)

186.00

35.38

6,580.68

0%

0%

0%

186.00

6,580.68

01.09.13

CABLE 3-1x50mm2 NHX90 + 1X16mm2(T)NH70/PVC-P55mm ( TG/TD-06)

161.00

50.29

8,096.69

0%

0%

0%

161.00

8,096.69

01.09.14

CABLE 3-1x50mm2 NHX90 + 1X16mm2(T)NH70/PVC-P55mm ( TG/TD-04)

123.00

50.29

6,185.67

0%

0%

0%

123.00

6,185.67

01.09.15
01.09.16

CABLE 3-1x6mm2 NHX90 + 1X6mm2(T)NH70/PVC-P25mm ( TD-04/TD-04A)


CABLE 3-1x10mm2 NHX90 + 1X10mm2(T)NH70/PVC-P25mm ( TD-04/TD-04B)

m
m

4.00
7.00

12.19
12.19

48.76
85.33

0%
0%

0%
0%

0%
0%

4.00
7.00

48.76
85.33

01.09.17

CABLE 3-1x50mm2 NHX90 + 1X16mm2(T)NH70/PVC-P55mm ( TG /TD-05)

146.00

50.29

7,342.34

0%

0%

0%

146.00

7,342.34

01.09.18

CABLE 3-1x6mm2 NHX90 + 1X6mm2(T)NH70/PVC-P25mm ( TD-05/TD-05A)

4.00

12.19

48.76

0%

0%

0%

4.00

48.76

01.09.19

CABLE 3-1x35mm2 NHX90 + 1X10mm2(T)NH70/PVC-P55mm ( TG/TD-07)

91.00

39.29

3,575.39

0%

0%

0%

91.00

3,575.39

01.09.20

CABLE 3-1x95mm2 NHX90 / PVC-P65mm ( TG/TD-CRT3)

110.00

82.19

9,040.90

0%

0%

0%

110.00

9,040.90

01.09.21

CABLE 3-1x16mm2 NHX90 + 1X10mm2(T)NH70/PVC-P35mm ( TD-CRT3/TD-CC3)

m
m

3.00

22.48

67.44

0%

0%

0%

3.00

67.44

01.09.22

CABLE 3-1x25mm2 NHX90 + 1X10mm2(T)NH70/PVC-P35mm ( TG/TD-08)

80.00

28.87

2,309.60

0%

0%

0%

80.00

2,309.60

01.09.23

CABLE 3-1x16mm2 NHX90 + 1X10mm2(T)NH70/PVC-P35mm ( TG/TD-09)

21.00

22.48

472.08

0%

0%

0%

21.00

472.08

01.09.24

CABLE 3-1x6mm2 NHX90 + 1X6mm2(T)NH70/PVC-P25mm ( TG/TD-10)

39.00

12.19

475.41

0%

0%

0%

01.09.25

CABLE 3-1x6mm2 NHX90 + 1X6mm2(T)NH70/PVC-P25mm ( TG/TD-11)

33.00

12.19

402.27

0%

0%

0%

33.00

402.27

01.09.26

CABLE 2-1X4mm2 N2XH / directamente enterrado iluminacion reas de trnsito

186.00

9.11

1,694.46

0%

0%

0%

186.00

1,694.46

01.09.27

CABLE 2-1X6mm2 N2XH / directamente enterrado iluminacion losas deportivas

514.00

10.01

5,145.14

0%

0%

0%

514.00

5,145.14

01.09.28
01.09.29

CABLE 2-1X4mm2 NH70/PVC-P20mm iluminacion exterior pabellones


CABLE 3-1x10mm2 NH70 + 1X10mm2(T)NH70/PVC-P25mm (TD-SM - ELECTROBOMBA 1)

m
m

418.00
5.00

7.60
18.38

3,176.80
91.90

0%
0%

0%
0%

0%
0%

418.00
5.00

3,176.80
91.90

01.09.30

CABLE 2-1x4mm2 NH70 + 1X4mm2(T)NH70/PVC-P20mm (TD-SM - SUMIDERO)

2.00

9.18

18.36

0%

0%

0%

2.00

18.36

01.10

CONDUCTOS Y CANALIZACIONES

01.10.01

TUBERIA PVC ELECTRICAS 1" (25mm)

32.00

8.45

270.40

12.00

101.40

01.10.02

TUBERIA PVC ELECTRICAS 1 1/2" (35mm)

9.84

1,377.60

TUBERIA PVC ELECTRICAS 2" (55mm)

m
m

140.00

01.10.03

515.00

15.44

7,951.60

01.10.04

BUZONETA DE ALIMENTADORES Y COMUNICACION

21.00

375.80

7,891.80

0%

0%

01.11

ARTEFACTOS ELECTRICOS

01.11.01

ART. BRAQUETE ECONOMICO 3x36W (PLB)

221.00

154.07

34,049.47

0%

0%

01.11.02

ART. DIFUSOR ACRILICO RECTANGULAR 2x36W (PLP)

196.00

137.57

26,963.72

0%

0%

01.11.03

ART. DIFUSOR ACRILICO CUADRADO 1X32W ( PAC)

33.00

75.67

2,497.11

0%

0%

01.11.04

ART. REJILLA DE METAL ADOSADO 2x36W (PLDM)

13.00

152.47

1,982.11

0%

0%

01.11.05
01.11.06

ART. REJILLA DE METAL ADOSADO 3x36W (PLDM)


ART. INDUSTRIAL ECONOMICO 2X36W (PLE)

u
u

59.00
2.00

246.87
137.57

14,565.33
275.14

0%
0%

01.11.07

ARTEFACTO PROYECTOR RECTANGULAR INTEGRADO 1x250W HALOGENURO METALICO (PDRI)

34.00

203.37

6,914.58

0%

01.11.08

ARTEFACTO PROYECTOR RECTANGULAR INTEGRADO 1x150W VAPOR DE SODIO (PDRI)

20.00

322.07

6,441.40

0%

01.11.09

ART. BRAQUET EXTERIOR INTEGRADO 2X18W FLUORESCENTE COMPACTO (BET)

17.00

169.97

2,889.49

0%

01.11.10

ART. FAROLA ESFERICA 1X70W VAPOR DE SODIO (FAE)

13.00

208.37

2,708.81

0%

01.11.11

ARTEF. LUCES DE EMERGENCIA

u
u

30.00

93.57

2,807.10

01.12

PRUEBAS ELECTRICAS

01.12.01

PRUEBAS DE AISLAMIENTO Y RESISTIVIDAD RED GENERAL

glb

1.00

2,982.96

2,982.96

01.13

SISTEMA DE PUESTA A TIERRA

01.13.01

SISTEMA DE PUESTA A TIERRA

5.00

1,758.24

8,791.20

01.14

SISTEMA DE COMUNICACIONES

01.14.01

SALIDA PARA DATA EN PARED

pto

138.00

104.68

01.14.02

SALIDA PARA TELEFONO

pto

50.00

60.96

01.14.03

SALIDA PARA TV-CABLE

pto

13.00

63.77

COSTO DIRECTO

10.00

84.50

31%

52.00

511.68

37%

120.00

1,852.80

23%

10.00

39.00

475.41

84.50

31%

20.00

169.00

63%

50.00

492.00

36%

102.00

1,003.68

73%

38.00

373.92

250.00

3,860.00

49%

370.00

5,712.80

72%

145.00

2,238.80

0%

21.00

7,891.80

0%

221.00

34,049.47

0%

196.00

26,963.72

0%

33.00

0%

13.00

1,982.11

0%
0%

0%
0%

59.00
2.00

14,565.33
275.14

0%

0%

34.00

6,914.58

0%

0%

20.00

6,441.40

0%

0%

17.00

2,889.49

0%

0%

13.00

2,708.81

0%

0%

0%

30.00

2,807.10

0%

0%

0%

1.00

2,982.96

0%

0%

0%

5.00

8,791.20

14,445.84

0%

40.00

4,187.20

29%

40.00

4,187.20

29%

98.00

10,258.64

3,048.00

0%

15.00

914.40

30%

15.00

914.40

30%

35.00

2,133.60

829.01

0%

26.00

1,658.02

200%

26.00

1,658.02

200%

-13.00

2,497.11

-829.01

481,266.05

28,856.14

49,441.59

78,297.73

402,968.32

GASTOS GENERALES 13.8%

66,414.71

3,982.15

6,822.94

10,805.09

55,609.63

UTILIDAD 6.2%

29,838.50

1,789.08

3,065.38

4,854.46

24,984.04

SUB TOTAL

577,519.26

34,627.37

59,329.91

93,957.28

483,561.98

MONTO CONTRACTUAL=SUB-TOTAL*FR (1.00000)

577,519.26

34,627.37

59,329.91

93,957.28

483,561.98

I.G.V. (19%)

109,728.66

6,579.20

11,272.68

17,851.88

91,876.78

TOTAL PRESUPUESTO (S/.)

687,247.92

41,206.57

70,602.59

111,809.16

575,438.76

COEFICIENTE DE REAJUSTE

EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108

FORMULA

ESTRUCTURAS

C o n s u lto r a I n t e g r a l d e I n g e n ie r a

Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE SETIEMBRE DEL 2009

K = 0.337*(Jr / Jo) + 0.088*(AAr / AAo) + 0.174*(CAr / CAo) + 0.167*(MMHr / MMHo) + 0.067*(Mr / Mo) + 0.167*(GGr / GGo)

MONOMIO

SIMBOLO

ELEMENTO REPRESENTATIVO

CODIGO

FACTOR

INCID.

INCID.

Io

JULIO '09

I. BASE
MAYO '09

Ia

MANO DE OBRA (INC. LEYES SOC.)

47

0.337

100.00%

397.23
397.23

397.23
397.23

AA

ACERO DE CONSTRUCCION LISO


ACERO DE CONSTRUCCION CORRUGADO

02
03

0.088

7.955%
92.045%

458.01
453.81
454.14

464.23
459.98
460.32

CA

AGREGADO GRUESO
CEMENTO PORTLAND TIPO I

05
21

0.174

22.414%
77.586%

212.99
323.41
298.66

214.54
323.41
299.01

MMH

MAQUINARIA Y EQUIPO NACIONAL


HERRAMIENTAS MANUALES
MAQUINARIA Y EQUIPO IMPORTADO

48
37
49

0.167

69.982%
7.862%
22.156%

338.98
259.12
257.18
314.58

338.21
258.77
258.62
314.33

MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA

43

0.067

100.00%

498.87
498.87

495.79
495.79

GG

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

39

0.167

100.00%

347.88

347.34

347.88

347.34

COEFICIENTE DE REAJUSTE: K =

1.000

COEFICIENTE DE REAJUSTE

JULIO '09

AGOSTO '09
Ka
0.337

0.089

0.174

0.167

Ir

SETIEMB '09
Kr

413.41
413.41
460.06
455.85
456.18
210.23
323.41
298.04
334.78
258.27
253.68
310.80

0.351

0.088

0.174

0.165

Ir

Kr
413.41
413.41
462.03
457.29
457.67
208.71
323.41
297.70
331.98
257.17
250.16
307.97

0.351

0.089

0.173

0.163

0.067

498.11
498.11

0.067

500.18
500.18

0.067

0.167

346.62

0.166

346.32

0.166

346.62
1.001

346.32
1.011

1.009

COEFICIENTE DE REAJUSTE
C o n s u lt o r a I n t e g r a l d e I n g e n ie r a

EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108

FORMULA

ARQUITECTURA

Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE SETIEMBRE DEL 2009

K = 0.324*(Jr / Jo) + 0.060*(MCPr / MCPo) + 0.061*(TMAr / TMAo) + 0.064*(CADr / CADo) + 0.085*(PBMr / PBMo) + 0.113*(Lr / Lo) +
0.126*(VAPr / VAPo) + 0.167*(GGr / GGo)

MONOMIO

SIMBOLO

MCP

TMA

CAD

PBM

VAP

GG

COEFICIENTE DE REAJUSTE: K =

ELEMENTO REPRESENTATIVO

CODIGO

FACTOR

Io
I. BASE

INCID.

INCID.

MAYO '09

MANO DE OBRA (INC. LEYES SOC.)

47

0.324

MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA


CERRAJERIA NACIONAL
PINTURA LATEX

43
26
54

0.060

TUBERIA DE ACERO NEGRO


MAQUINARIA Y EQUIPO NACIONAL
ACERO DE CONSTRUCCION CORRUGADO

65
48
03

CEMENTO PORTLAND TIPO I


AGREGADO GRUESO

21
05

DUCTO DE CONCRETO

31

PERFIL DE ACERO
BLOQUE Y LADRILLO

51
17

MALLA DE ALAMBRE

46

LOSETA

40

DLAR MAS INFLACIN MERCADO USA

30

ACERO DE CONSTRUCCION LISO

02

PERFIL DE ALUMINIO

52

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

39

0.061

0.064

0.085

0.113

0.126

0.167

1.000

JULIO '09
Ir

Kr

100.00%

397.23
397.23

397.23
397.23

61.030%
5.158%
33.812%

498.87
362.64
330.13

495.79
359.88
329.89

434.79

432.69

39.353%
59.638%
1.009%

328.40
338.98
453.81
335.98

332.24
338.21
459.98
337.09

50.200%
14.000%

323.41
212.99

323.41
214.54

35.800%

367.52
323.74

367.47
323.94

43.823%
51.969%

314.53
672.61

300.17
669.34

4.208%

574.28
511.55

576.81
503.66

100.000%

310.12
310.12

310.12
310.12

35.168%

371.94

378.6

1.599%

458.01

464.23

63.233%

295.50
324.98

303.96
332.77

100.00%

347.88

347.34

347.88

347.34

0.324

0.060

0.061

0.064

0.084

0.113

0.129

0.167

1.002

C o n s u lt o r a I n t e g r a l d e I n g e n ie r a

AGOSTO '09
Ia

SETIEMBRE '09
Ka

413.41
413.41
498.11
359.86
329.59

0.337

0.060

434.00
342.41
334.78
455.85
339.00
323.41
210.23

0.062

0.064

0.083

346.28
331.98
457.29
338.87
323.41
208.71

295.64
659.4

0.113

310.12
310.12

0.127

462.03

0.060

0.062

0.063

0.082

0.113

365.9

301.61
328.28
346.62

500.18
359.64
329.61

568.87
496.18

370.23
460.06

413.41
413.41

361.64
321.04

569.21
498.64
310.12
310.12

Ka
0.337

435.26

364.70
322.35
294.26
665.27

Ia

0.128

305.36
329.16
0.166

346.62

346.32

0.166

346.32
1.012

1.011

COEFICIENTE DE REAJUSTE
C o n s u l t o r a I n t e g ra l d e I n g e n ie r a

EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108

FORMULA

INSTALACIONES SANITARIAS

Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE SETIEMBRE DEL 2009

K = 0.379*(Jr / Jo) + 0.052*(VTDr / VTDo) + 0.165*(ACAr / ACAo) + 0.107*(Mr / Mo) + 0.130*(Tr / To) + 0.167*(GGr / GGo)

MONOMIO

SIMBOLO

ELEMENTO REPRESENTATIVO

CODIGO

FACTOR

Io
I. BASE

INCID.

INCID.

MAYO '09

JULIO '09
Ir

MANO DE OBRA (INC. LEYES SOC.)

47

0.379

100.00%

397.23
397.23

397.23
397.23

VTD

VALVULA DE BRONCE NACIONAL


TUBERIA DE FIERRO FUNDIDO
DUCTO DE CONCRETO

77
71
31

0.052

45.588%
42.670%
11.742%

287.51
532.98
367.52
401.65

286.03
534.33
367.47
401.54

ACA

APARATO SANITARIO CON GRIFERIA


CEMENTO PORTLAND TIPO I
AGREGADO GRUESO

10
21
05

0.165

79.394%
11.931%
8.675%

321.79
323.41
212.99
312.54

321.85
323.41
214.54
312.73

MAQUINARIA Y EQUIPO NACIONAL

48

0.107

100.00%

338.98
338.98

338.21
338.21

AA

TUBERIA DE PVC

72

0.130

100.00%

338.58
338.58

334.36
334.36

GG

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

39

0.167

100.00%

347.88

347.34

347.88

347.34

COEFICIENTE DE REAJUSTE: K =

1.000

C o n s u l t o r a I n t e g r a l d e I n g e n ie r a

JULIO '09

AGOSTO '09
Kr
0.379

0.052

0.165

Ia

SETIEMBRE '09
Ka

413.41
413.41
283.34
529.91
364.70
398.10
321.47
323.41
210.23
312.05

0.394

0.052

0.165

Ir
413.41
413.41
279.72
526.95
361.64
394.83
321.33
323.41
208.71
311.81

Kr
0.394

0.051

0.165

0.107

334.78
334.78

0.106

331.98
331.98

0.105

0.128

337.25
337.25

0.129

341.07
341.07

0.131

0.167

346.62

0.166

346.32

0.166

346.62
0.998

346.32
1.012

1.012

COEFICIENTE DE REAJUSTE
C o n s u lt o r a I n t e g r a l d e I n g e n ie r a

EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108

FORMULA

INSTALACIONES ELCTRICAS

Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE SETIEMBRE DEL 2009

K = 0.171*(Jr / Jo) + 0.056*(AGMr / AGMo) + 0.079*(CDDr / CDDo) + 0.093*(TTHr / TTHo) + 0.184*(Ar / Ao) +
0.250*(Cr / Co) + 0.167*(GGr / GGo)

MONOMIO

SIMBOLO

ELEMENTO REPRESENTATIVO

CODIGO

FACTOR

Io
I. BASE

INCID.

INCID.

MAYO '09

JULIO '09
Ir

Kr

MANO DE OBRA (INC. LEYES SOC.)

47

0.171

100.00%

397.23
397.23

397.23
397.23

AGM

ARTEFACTO DE ALUMBRADO EXTERIOR


AGREGADO GRUESO
MAQUINARIA Y EQUIPO NACIONAL

11
05
48

0.056

92.794%
4.399%
2.807%

254.62
212.99
338.98
255.16

251.94
214.54
338.21
252.72

CDD

CEMENTO PORTLAND TIPO I


DUCTO DE CONCRETO
DLAR MAS INFLACION DEL MERCADO USA

21
31
30

0.079

26.556%
15.473%
57.971%

323.41
367.52
371.94
358.37

323.41
367.47
378.60
362.22

TTH

TUBERIA DE PVC PARA ELECTRICIDAD (SAP)


TUBERIA DE FIERRO FUNDIDO
HERRAMIENTA MANUAL

74
71
37

0.093

78.953%
14.825%
6.222%

338.58
532.98
259.12
362.46

334.36
534.33
258.77
359.30

ARTEFACTO DE ALUMBRADO INTERIOR

12

0.184

100.000%

281.54
281.54

282.76
282.76

0.185

CABLE NYY Y NKY

19

0.250

100.000%

530.17
530.17

560.09
560.09

0.264

GG

INDICE GENERAL DE PRECIOS AL CONSUMIDOR

39

0.167

100.00%

347.88

347.34

0.167

347.88

347.34

COEFICIENTE DE REAJUSTE: K =

1.000

0.171

0.055

0.080

0.092

1.014

AGOSTO '09
Ia

SETIEMBRE '09
Ka

413.41
413.41
242.59
210.23
334.78
243.75
323.41
364.70
370.23
356.94
337.25
529.91
258.27
360.90

0.178

0.053

0.079

0.093

Ia

Ka
413.41
413.41
239.22
208.71
331.98
240.48
323.41
361.64
365.90
353.96
341.07
526.95
257.17
363.41

0.178

0.053

0.078

0.093

276.24
276.24

0.181

273.28
273.28

0.179

562.47
562.47

0.265

585.23
585.23

0.276

346.62

0.166

346.32

0.166

346.62

346.32
1.015

1.023

C o n s u lt o r a I n te g r a l d e I n g e n ie r a

REINTEGRO POR REAJUSTE


(CONTROL DE VALORIZACIONES Y REAJUSTES)
CONTRATO PRINCIPAL
EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

0015 -2009-ED / U. E. 108


Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE SETIEMBRE DEL 2009

VALORIZACION
No.

K-1
PROGRAM.

ESTRUCTURA
1
2
3
4

07/09
08/09
09/09
10/09

REINTEGRO ACUM.
REINTEGRO ACUM. ANTERIOR
REINTEGRO PRESENTE VALORIZACIN
ARQUITECTURA
1
2
3
4

07/09
08/09
09/09
10/09

REINTEGRO ACUM.
REINTEGRO ACUM. ANTERIOR
REINTEGRO PRESENTE VALORIZACIN

INST. SANITARIAS
1
2
3
4

07/09
08/09
09/09
10/09

REINTEGRO ACUM.
REINTEGRO ACUM. ANTERIOR
REINTEGRO PRESENTE VALORIZACIN
INST.ELECTRICA
1
2
3
4

07/09
08/09
09/09
10/09

REINTEGRO ACUM.
REINTEGRO ACUM. ANTERIOR
REINTEGRO PRESENTE VALORIZACIN
TOTAL

REINTEGRO

MES
EJECUTADO

176,997.52
235,277.69
540,416.65
-

370,253.93
342,583.79
836,940.67
504,138.88

952,691.86

2,053,917.26

234,577.09
538,807.49
-

0.00
115,966.80
61,459.79
425,299.82

773,384.58

602,726.41

19,937.16
45,794.28
-

0.00
0.00
78,947.75
93,540.83

65,731.44

172,488.58

29,137.98
66,927.95
-

0.00
0.00
34627.37
59329.91

96,065.93

93,957.28

1,887,873.81

2,923,089.53

PROGRAM.
0.001
0.011
0.009
0.009

0.002
0.012
0.011
0.011

-0.002
0.012
0.012
0.012

0.014
0.015
0.023
0.023

EJECUTADO

REINTEGRO
BRUTO
AUTORIZADO

DEDUCCION
EFECTIVO

REINTEGRO
NETO
AUTORIZADO

MATER.

177.00
2,588.05
4,863.75
0.00

370.25
3,768.42
7,532.47
4,537.25

370.25
3,768.42
7,532.47
4,537.25

370.25
3,768.42
7,532.47
4,537.25

7,628.80

16,208.39

16,208.39

0.00

0.00

16,208.39
13,345.02
2,863.37

0.00
2,814.93
5,926.88
0.00

0.00
1,391.60
676.06
4,678.30

0.00
1,391.60
676.06
4,678.30

0.00
1,391.60
676.06
4,678.30

8,741.81

6,745.96

6,745.96

0.00

0.00

6,745.96
2,129.12
4,616.84

0.00
239.25
549.53
0.00

0.00
0.00
947.37
1,122.49

0.00
0.00
947.37
1,122.49

0.00
0.00
947.37
1,122.49

788.78

2,069.86

2,069.86

0.00

0.00

2,069.86
947.37
1,122.49

0.00
437.07
1,539.34
0.00

0.00
0.00
796.43
1,364.59

0.00
0.00
796.43
1,364.59

0.00
0.00
796.43
1,364.59

1,976.41

2,161.02

2,161.02

0.00

0.00

2,161.02
519.41
1,641.61
10,244.31

C ons

DEDUCCION POR ADELANTO EN EFECTIVO


(REINTEGRO QUE NO CORRESPONDE)

EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

MONTO CONT.(s/IGV) = C
ADEL. EFECT.(s/IGV) = A
FECHA ADEL. EFECT.

:
:
:

No.
Estructura

VALORIZACION
MES
07/09
08/09
09/09
10/09

SUB-TOTAL
Arquitectura

07/09
08/09
09/09
10/09

SUB-TOTAL
Sanitaria

07/09
08/09
09/09
10/09

SUB-TOTAL
Electrica

SUB-TOTAL
TOTAL

07/09
08/09
09/09
10/09

0015 -2009-ED / U. E. 108


Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE SETIEMBRE DEL 2009


9,508,062.79
1,901,612.56
7 de Jul de 09
ADELANTO
A

MONTO
370,253.93
342,583.79
836,940.67
504,138.88

777,206.54

2,053,917.26

777,206.54

0.00
115,966.80
61,459.79
425,299.82

929,870.67

602,726.41

929,870.67

0.00
0.00
78,947.75
93,540.83

79,031.49

172,488.58

79,031.49

0.00
0.00
34627.37
59329.91

CONTRATO
C

3,886,032.72

1.001
1.011
1.009
1.009

4,649,353.36

1.002
1.012
1.011
1.011

395,157.46

0.998
1.012
1.012
1.012

115,503.85

577,519.26

1.014
1.015
1.023
1.023

93,957.28

115,503.85

9,508,062.79

2,923,089.53

1,901,612.56

9,508,062.79
DEDUCCIN ACUMULADA:
DEDUCCIN ACUMULADA ANTERIOR:
DEDUCCIN PRESENTE VALORIZACION:

C o n s u lt o r a I n t e g r a l d e I n g e n ie r a

D = V * A/C * (K / Ka-1)
DEDUCCION
D

Ka
1.001
1.001
1.001
1.001

0.00
657.46
1,337.77
805.82
2,801.05

1.002
1.002
1.002
1.002

0.00
231.47
110.41
764.01
1,105.89

0.998
0.998
0.998
0.998

0.00
0.00
221.50
262.44
483.94

1.014
1.014
1.014
1.014

DEDUCCIN ACUMULADA:
DUCCIN ACUMULADA ANTERIOR:
CCIN PRESENTE VALORIZACION:

0.00
0.00
61.47
105.32
166.79
4,557.67
4,557.67
4,557.67

C o n s u lt o r a I n t e g r a l d e I n g e n ie r a

DEDUCCION POR ADELANTO DE MATERIALES


(REINTEGRO QUE NO CORRESPONDE)

EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

MONTO CONT. (s/IGV)


ADEL.MAT. (s/IGV):
FORMULA 01

:
:
:

VALORIZACION
No.

MES

MONTO
V

0015 -2009-ED / U. E. 108


Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE SETIEMBRE DEL 2009


3,886,032.72
1,280,785.39
ESTRUCTURAS

ADELANTO PAGADO
MONTO
FECHA
A

COEFICIENTE
COEF.INCID.
INCID.
C
%

AGREGADO DRUESO (05)


1
2
3
4

07/09
08/09
09/09
10/09

370,253.93
342,583.79
836,940.67
504,138.88

0.174
10/08/09

152,659.60

10/08/09

316,716.14

10/08/09

524,613.02

10/08/09

259,424.76

10/08/09

27,371.87

22.414%

INDICES
Io
MAYO

Ia
AGO

Ir

212.99
210.23

210.23
208.71
208.71

455.85

455.85
457.29
457.29

323.41

323.41
323.41
323.41

498.11

498.11
500.18
500.18

460.06

460.06
462.03
462.03

ACERO DE CONSTRUCCIN CORRUGADO (03)


1
2
3
4

07/09
08/09
09/09
10/09

370,253.93
342,583.79
836,940.67
504,138.88

0.088

92.045%

453.81

CEMENTO PORTLAND TIPO I (21)


1
2
3
4

07/09
08/09
09/09
10/09

370,253.93
342,583.79
836,940.67
504,138.88

0.174

77.586%

323.41

MADERA NAC. ENCOF Y CARP. (43)


1
2
3
4

07/09
08/09
09/09
10/09

370,253.93
342,583.79
836,940.67
504,138.88

0.067

100.00%

498.87

ACERO DE CONSTRUCCION LISO (02)


1
2
3
4

TOTAL

07/09
08/09
09/09
10/09

370,253.93
342,583.79
836,940.67
504,138.88

0.088

1,280,785.39

7.955%

458.01

D = Coef.*V*(Ir-Ia)/Io

ADELANTO
DEFLAC.
AD=A*Io/Ia

ADELANTO
UTILIZADO
AU=C*%*V

DEDUCCION
D

154,663.79
154,663.79
154,663.79

13,360.89
32,640.99
19,661.60

0.00
-232.94
-140.31

315,298.79
315,298.79
315,298.79

27,749.15
67,791.86
40,835.05

0.00
215.11
129.58

524,613.02
524,613.02
524,613.02

46,248.69
112,986.69
68,058.57

0.00
0.00
0.00

259,820.58
259,820.58
259,820.58

22,953.11
56,075.03
33,777.30

0.00
232.68
140.15

27,249.90
27,249.90
27,249.90

2,398.22
5,858.92
3,529.17

0.00
25.20
15.18

344.27
DEDUCCIN ACUMULADA:
DEDUCCIN ACUMULADA ANTERIOR:
DEDUCCIN PRESENTE VALORIZACION:

344.27
344.27

C o n s u lt o r a I n t e g r a l d e I n g e n ie r a

DEDUCCION POR ADELANTO DE MATERIALES


(REINTEGRO QUE NO CORRESPONDE)

EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

MONTO CONT. (s/IGV)


ADEL.MAT. (s/IGV):
FORMULA 01

:
:
:

0015 -2009-ED / U. E. 108


Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE SETIEMBRE DEL 2009


4,649,353.36
2,135,006.70
ARQUITECTURA

VALORIZACION

ADELANTO PAGADO
MONTO
MONTO
FECHA
A
V
MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA (43)
No.

MES

1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

D = Coef.*V*(Ir-Ia)/Io

COEFICIENTE
COEF.INCID.
INCID.
C
%

0.060
10/08/09

169,635.73

10/08/09

94,290.93

10/08/09

113,373.12

10/08/09

149,374.42

10/08/09

41,961.37

10/08/09

165,147.28

10/08/09

170,963.34

10/08/09

525,376.93

10/08/09

380,509.35

10/08/09

106,230.34

10/08/09

203,846.73

10/08/09

14,297.16

61.030%

INDICES
Io
MAYO

Ia
AGO

ADELANTO
DEFLAC.
AD=A*Io/Ia

Ir

ADELANTO
UTILIZADO
AU=C*%*V

DEDUCCION
D

498.87
498.11

498.11
500.18
500.18

169,894.55
169,894.55
169,894.55

4,246.47
2,250.53
15,573.63

0.00
9.34
64.62

329.59

329.59
329.61
329.61

94,445.42
94,445.42
94,445.42

2,352.64
1,246.85
8,628.14

0.00
0.08
0.52

342.41

342.41
346.28
346.28

108,734.36
108,734.36
108,734.36

2,783.82
1,475.36
10,209.46

0.00
17.39
120.31

323.41

323.41
323.41
323.41

149,374.42
149,374.42
149,374.42

3,725.78
1,974.58
13,664.03

0.00
0.00
0.00

210.23

210.23
208.71
208.71

42,512.26
42,512.26
42,512.26

1,039.06
550.68
3,810.69

0.00
-3.93
-27.19

294.26

294.26
295.64
295.64

176,523.39
176,523.39
176,523.39

4,319.71
2,289.35
15,842.23

0.00
10.04
69.51

665.27

665.27
659.4
659.40

172,849.60
172,849.60
172,849.60

5,122.68
2,714.90
18,787.05

0.00
-23.69
-163.96

310.12

310.12
310.12
310.12

525,376.93
525,376.93
525,376.93

13,104.25
6,944.96
48,058.88

0.00
0.00
0.00

301.61

301.61
305.36
305.36

372,801.01
372,801.01
372,801.01

9,239.49
4,896.72
33,885.16

0.00
62.14
430.01

364.70

364.70
361.64
361.64

107,051.75
107,051.75
107,051.75

2,657.03
1,408.17
9,744.47

0.00
-11.72
-81.13

370.23

370.23
365.9
365.90

204,788.25
204,788.25
204,788.25

5,138.68
2,723.39
18,845.75

0.00
-31.70
-219.40

359.86

359.86
359.64
359.64

14,407.61
14,407.61
14,407.61

358.89
190.21
1,316.22

0.00
-0.12
-0.80

PINTURA LATEX (54)


1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.060

33.812%

330.13

TUBERIA DE ACERO NEGRO (65)


1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.061

39.353%

328.4

CEMENTO PORTLAND TIPO I (21)


1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.064

50.200%

323.41

AGREGADO GRUESO (05)


1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.064

14.000%

212.99

PERFIL DE ACERO (51)


1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.085

43.823%

314.53

BLOQUE Y LADRILLO (17)


1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.085

51.969%

672.61

LOSETA (40)
1
2
3
4

0.113

100.000%

310.12

PERFIL DE ALUMINIO (52)


1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.126

63.233%

295.5

DUCTO DE CONCRETO (31)


1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.064

35.800%

367.52

DLAR MAS INFLACIN MERCADO USA (30)


1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.126

35.168%

371.94

CERRAJERIA NACIONAL (26)


1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.060

5.158%

362.64

TOTAL

2,135,006.70

220.32
DEDUCCIN ACUMULADA:
DEDUCCIN ACUMULADA ANTERIOR:
DEDUCCIN PRESENTE VALORIZACION:

220.32
220.32

C o n s u lt o r a I n t e g r a l d e I n g e n ie r a

DEDUCCION POR ADELANTO DE MATERIALES


(REINTEGRO QUE NO CORRESPONDE)

EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

MONTO CONT. (s/IGV)


ADEL.MAT. (s/IGV):
FORMULA 01

:
:
:

VALORIZACION
MONTO
No.
MES
V
APARATO SANITARIO CON GRIFERIA (10)
1
2
3
4

07/09
08/09
09/09
10/09

78,947.75
93,540.83

0015 -2009-ED / U. E. 108


Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE SETIEMBRE DEL 2009


395,157.46
102,614.21
INST. SANITARIAS

ADELANTO PAGADO
MONTO
FECHA
A

COEFICIENTE
COEF.INCID.
INCID.
C
%

0.165
10/08/09

51,765.67

10/08/09

50,848.54

79.394%

INDICES
Io
MAYO

Ia
AGO

Ir

321.79
321.47

321.47
321.33
321.33

337.25

337.25
341.07
341.07

TUBERIA DE PVC (72)


1
2
3
4

TOTAL

07/09
08/09
09/09
10/09

78,947.75
93,540.83

0.130

100.00%

338.58

102,614.21

DEDUCCIN PRESENTE VALOR

D = Coef.*V*(Ir-Ia)/Io

ADELANTO
DEFLAC.
AD=A*Io/Ia

ADELANTO
UTILIZADO
AU=C*%*V

DEDUCCION
D

51,817.20
51,817.20
51,817.20

10,342.16
12,253.86

0.00
-4.50
-5.33

51,049.07
51,049.07
51,049.07

10,263.21
12,160.31

0.00
115.79
137.20

243.16
DEDUCCIN ACUMULADA:
DEDUCCIN ACUMULADA ANTERIOR:
DEDUCCIN PRESENTE VALORIZACION:

243.16
243.16

C o n s u lto r a I n t e g ra l d e I n g e n i e r a

DEDUCCION POR ADELANTO DE MATERIALES


(REINTEGRO QUE NO CORRESPONDE)

EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

MONTO CONT. (s/IGV)


ADEL.MAT. (s/IGV):
FORMULA 01

:
:
:

VALORIZACION
MONTO
No.
MES
V
ARTEFACTO DE ALUMBRADO INTERIOR
1
2
3
4

07/09
08/09
09/09
10/09

34,627.37
59,329.91

0015 -2009-ED / U. E. 108


Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE SETIEMBRE DEL 2009


577,519.26
284,818.80
INST. ELECTRICAS

ADELANTO PAGADO
MONTO
FECHA
A

COEFICIENTE
COEF.INCID.
INCID.
C
%

0.184
10/08/09

106,184.28

10/08/09

29,502.59

10/08/09

149,131.93

100.00%

INDICES
Io
MAYO

Ia
AGO

Ir

281.54
276.24

276.24
273.28
273.28

242.59

242.59
239.22
239.22

562.47

562.47
585.23
585.23

ARTEFACTO DE ALUMBRADO EXTERIOR


1
2
3
4

07/09
08/09
09/09
10/09

34,627.37
59,329.91

0.056

92.794%

254.62

CABLE NYY Y NKY


1
2
3
4

TOTAL

07/09
08/09
09/09
10/09

34,627.37
59,329.91

0.250

100.000%

530.17

284,818.80

DEDUCCIN PRESENTE VALORIZA

ADELANTO
DEFLAC.
AD=A*Io/Ia

ADELANTO
UTILIZADO
AU=C*%*V

DEDUCCION
D

108,221.55
108,221.55
108,221.55

6,371.44
10,916.70

0.00
-66.99
-114.77

30,965.62
30,965.62
30,965.62

1,799.40
3,083.06

0.00
-23.82
-40.81

140,567.99
140,567.99
140,567.99

8,656.84
14,832.48

0.00
371.63
636.75

761.99
DEDUCCIN ACUMULADA:
DEDUCCIN ACUMULADA ANTERIOR:
DEDUCCIN PRESENTE VALORIZACION:

761.99
761.99

AMORTIZACION DEL ADELANTO EN EFECTIVO

EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

MONTO CONTRATADO (s/IGV)


ADELANTO EFECTIVO (s/IGV)
FECHA ADEL. EFECTIVO

:
:
:

0015 -2009-ED / U. E. 108


Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE SETIEMBRE DEL 2009


9,508,062.79
1,901,612.56
7 de Jul de 09

VALORIZACION
No.
1
2
3
4

MES
07/09
08/09
09/09
10/09

TOTAL
SALDO POR AMORTIZAR
AVANCE DE OBRA ACUMULADO
AMORTIZACION ACUMULADA
AMORTIZACION ACUMULADA ANTERIOR
AMORTIZACION PRESENTE VALORIZACION

MONTO
V
370,253.93
458,550.59
1,011,975.58
1,082,309.44

MONTO DEL
ADELANTO
A
1,901,612.56
1,901,612.56
1,901,612.56
1,901,612.56

2,923,089.53

AMORTIZACION
DEL ADELANTO
AM=V*A/C
74,050.79
91,710.12
202,395.12
216,461.89

584,617.92
1,316,994.64
30.74%
584,617.92
368,156.03
216,461.89

C o n s u lt o r a I n t e g r a l d e I n g e n ie r a

RTIZACION DEL ADELANTO EN EFECTIVO

SALDO POR
AMORTIZAR
S=A-AM
1,827,561.77
1,735,851.65
1,533,456.53
1,316,994.64

1,316,994.64

C o n su

AMORTIZACION DEL ADELANTO DE MATERIALES

EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

MONTO CONT. (s/IGV)


ADEL.MAT. (s/IGV):
FORMULA 01

:
:
:

VALORIZACION
No.

MES

MONTO
V

0015 -2009-ED / U. E. 108


Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE SETIEMBRE DEL 2009


3,886,032.72
1,280,785.39
ESTRUCTURAS

ADELANTO PAGADO
MONTO
FECHA
A

COEFICIENTE
COEF.INCID.
INCID.
C
%

AGREGADO DRUESO (05)


1
2
3
4

07/09
08/09
09/09
10/09

370,253.93
342,583.79
836,940.67
504,138.88

0.174
10/08/09

22.414%

INDICES
Io
MAYO

Ia
AGO

ADELANTO
UTILIZADO
AU=C*%*V

Ir

212.99

152,659.60

210.23

210.23
208.71
208.71

13,360.89
32,640.99
19,661.60

455.85

455.85
457.29
457.29

27,749.15
67,791.86
40,835.05

323.41

323.41
323.41
323.41

46,248.69
112,986.69
68,058.57

498.11

498.11
500.18
500.18

22,953.11
56,075.03
33,777.30

460.06

460.06
462.03
462.03

2,398.22
5,858.92
3,529.17

152,659.60
ACERO DE CONSTRUCCIN CORRUGADO (03)
1
2
3
4

07/09
08/09
09/09
10/09

370,253.93
342,583.79
836,940.67
504,138.88

0.088
10/08/09

92.045%

453.81

316,716.14

316,716.14
CEMENTO PORTLAND TIPO I (21)
1
2
3
4

07/09
08/09
09/09
10/09

370,253.93
342,583.79
836,940.67
504,138.88

0.174
10/08/09

77.586%

323.41

524,613.02

524,613.02
MADERA NAC. ENCOF Y CARP. (43)
1
2
3
4

07/09
08/09
09/09
10/09

370,253.93
342,583.79
836,940.67
504,138.88

0.067
10/08/09

100.00%

498.87

259,424.76

259,424.76
ACERO DE CONSTRUCCION LISO (02)
1
2
3
4

TOTAL

07/09
08/09
09/09
10/09

370,253.93
342,583.79
836,940.67
504,138.88

0.088
10/08/09

27,371.87

7.955%

458.01

27,371.87
1,280,785.39
AMORTIZACIN ACUMULADA:
AMORTIZACIN ACUMULADA ANTERIOR:
AMORTIZACIN PRESENTE VALORIZACION:

C o n s u l to r a I n t e g r a l d e I n g e n ie r a

MONTO
AMORTIZABLE
MA=AU*Ia/Io

13,187.75
32,218.02
19,406.82

AMORTIZACION
Am=MA

13,187.75
32,218.02
19,406.82
64,812.59

27,873.89
68,096.60
41,018.61

146791.18

2,408.95
5,885.14
3,544.97
11,839.06
553,568.28

AMORTIZACIN ACUMULADA:
AMORTIZACIN ACUMULADA ANTERIOR:
AMORTIZACIN PRESENTE VALORIZACION:

297319.07

22,918.14
55,989.60
33,725.84
112,633.58

2,408.95
5,885.14
3,544.97

179727.04

46,248.69
112,986.69
68,058.57
227,293.95

22,918.14
55,989.60
33,725.84

87847.01

27,873.89
68,096.60
41,018.61
136,989.10

46,248.69
112,986.69
68,058.57

SALDO POR
AMORTIZAR
S=A-Am

553,568.28
387,813.47
165,754.81

15532.81
727,217.11

C o n s u l to r a I n t e g r a l d e I n g e n ie r a

AMORTIZACION DEL ADELANTO DE MATERIALES


EXO N

0015 -2009-ED / U. E. 108

O B R A
CONTRATISTA
SUPERVISOR

:
:
:

Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

JEFE DE SUPERVISIN
FECHA

:
:

Ing.

MONTO CONT. (s/IGV)

ADEL.MAT. (s/IGV):

FORMULA 01

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
AL 30 DE SETIEMBRE DEL 2009

4,649,353.36
2,135,006.70
ARQUITECTURA

VALORIZACION
No.

MES

ADELANTO PAGADO
MONTO
V

FECHA

COEFICIENTE

INDICES

MONTO

COEF.INCID.

INCID.

MADERA NACIONAL PARA ENCOFRADO Y CARPINTERIA (43)


1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.060
10/08/09

61.030%

ADELANTO
UTILIZADO

Io

Ia

MAYO

AGO

Ir

AU=C*%*V

498.87

169,635.73

498.11

498.11
500.18
500.18

4,246.47
2,250.53
15,573.63

329.59

329.59
329.61
329.61

2,352.64
1,246.85
8,628.14

342.41

342.41
346.28
346.28

2,783.82
1,475.36
10,209.46

323.41

323.41
323.41
323.41

3,725.78
1,974.58
13,664.03

210.23

210.23
208.71
208.71

1,039.06
550.68
3,810.69

294.26

294.26
295.64
295.64

4,319.71
2,289.35
15,842.23

665.27

665.27
659.4
659.40

5,122.68
2,714.90
18,787.05

310.12

310.12
310.12
310.12

13,104.25
6,944.96
48,058.88

301.61

301.61
305.36
305.36

9,239.49
4,896.72
33,885.16

169,635.73
PINTURA LATEX (54)
1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.060
10/08/09

33.812%

330.13

94,290.93

94,290.93
TUBERIA DE ACERO NEGRO (65)
1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.061
10/08/09

39.353%

328.4

113,373.12

113,373.12
CEMENTO PORTLAND TIPO I (21)
1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.064
10/08/09

50.200%

323.41

149,374.42

149,374.42
AGREGADO GRUESO (05)
1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.064
10/08/09

14.000%

212.99

41,961.37

41,961.37
PERFIL DE ACERO (51)
1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.085
10/08/09

43.823%

314.53

165,147.28

165,147.28
BLOQUE Y LADRILLO (17)
1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.085
10/08/09

51.969%

672.61

170,963.34

170,963.34
LOSETA (40)
1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.113
10/08/09

100.000%

310.12

525,376.93

525,376.93
PERFIL DE ALUMINIO (52)
1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.126
10/08/09

380,509.35

380,509.35

63.233%

295.5

DUCTO DE CONCRETO (31)


1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.064
10/08/09

35.800%

367.52

106,230.34

364.70

364.70
361.64
361.64

2,657.03
1,408.17
9,744.47

370.23

370.23
365.9
365.90

5,138.68
2,723.39
18,845.75

359.86

359.86
359.64
359.64

358.89
190.21
1,316.22

106,230.34
DLAR MAS INFLACIN MERCADO USA (30)
1
2
3
4

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.126
10/08/09

35.168%

371.94

203,846.73

203,846.73
CERRAJERIA NACIONAL (26)
1
2
3
4

TOTAL

07/09
08/09
09/09
10/09

115,966.80
61,459.79
425,299.82

0.060
10/08/09

14,297.16

5.158%

362.64

14,297.16
2,135,006.70
AMORTIZACIN ACUMULADA:
AMORTIZACIN ACUMULADA ANTERIOR:
AMORTIZACIN PRESENTE VALORIZACION:

MONTO

AMORTI-

SALDO POR

AMORTIZABLE

ZACION

AMORTIZAR

MA=AU*Ia/Io

Am=MA

S=A-Am

4,240.00
2,247.10
15,549.90

4,240.00
2,247.10
15,549.90
22,037.00

2,348.79
1,244.81
8,614.03

2,348.79
1,244.81
8,614.03
12,207.63

2,902.58
1,538.30
10,645.01

144629.26

13,104.25
6,944.96
48,058.88
68,108.09

9,430.53
4,997.97
34,585.80

144142.88

5,066.78
2,685.27
18,582.03
26,334.08

13,104.25
6,944.96
48,058.88

36630.92

4,041.32
2,141.81
14,821.27
21,004.40

5,066.78
2,685.27
18,582.03

130010.03

1,025.60
543.54
3,761.31
5,330.45

4,041.32
2,141.81
14,821.27

98287.23

3,725.78
1,974.58
13,664.03
19,364.39

1,025.60
543.54
3,761.31

82,083.30

2,902.58
1,538.30
10,645.01
15,085.89

3,725.78
1,974.58
13,664.03

147,598.73

457268.84

9,430.53
4,997.97
34,585.80
49,014.30

331495.05

2,636.64
1,397.37
9,669.70

2,636.64
1,397.37
9,669.70
13,703.71

5,115.05
2,710.87
18,759.11

5,115.05
2,710.87
18,759.11
26,585.03

356.14
188.75
1,306.13

AMORTIZACIN ACUMULADA:

TIZACIN PRESENTE VALORIZACION:

177261.70

356.14
188.75
1,306.13
1,851.02
280,625.99

ORTIZACIN ACUMULADA ANTERIOR:

92526.63

280,625.99
82,608.79
198,017.20

12446.14
1,854,380.71

C o n s u l to ra I n t e g ra l d e I n g e n ie r a

AMORTIZACION DEL ADELANTO DE MATERIALES

EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

MONTO CONT. (s/IGV)


ADEL.MAT. (s/IGV):
FORMULA 01

:
:
:

0015 -2009-ED / U. E. 108


Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE SETIEMBRE DEL 2009


395,157.46
102,614.21
INST. SANITARIAS

VALORIZACION
MONTO
V
APARATO SANITARIO CON GRIFERIA (10)
No.

MES

1
2
3
4

07/09
08/09
09/09
10/09

78,947.75
93,540.83

FECHA

ADELANTO PAGADO
MONTO
A

COEFICIENTE
COEF.INCID.
INCID.
C
%

0.165
10/08/09

79.394%

INDICES
Io
MAYO

Ia
AGO

ADELANTO
UTILIZADO
AU=C*%*V

Ir

321.79

51,765.67

321.47

321.47
321.33
321.33

10,342.16
12,253.86

337.25

337.25
341.07
341.07

10,263.21
12,160.31

51,765.67
TUBERIA DE PVC (72)
1
2
3
4

TOTAL

07/09
08/09
09/09
10/09

78,947.75
93,540.83

0.130
10/08/09

50,848.54

100.00%

338.58

50,848.54
102,614.21
AMORTIZACIN ACUMULADA:
AMORTIZACIN ACUMULADA ANTERIOR:
AMORTIZACIN PRESENTE VALORIZACION:

MONTO
AMORTIZABLE
MA=AU*Ia/Io

10,331.88
12,241.67

AMORTIZACION
Am=MA

10,331.88
12,241.67
22,573.55

10,222.89
12,112.54

29192.12

10,222.89
12,112.54
22,335.43
44,908.98

AMORTIZACIN ACUMULADA:
AMORTIZACIN ACUMULADA ANTERIOR:
AMORTIZACIN PRESENTE VALORIZACION:

SALDO POR
AMORTIZAR
S=A-Am

44,908.98
20,554.77
24,354.21

28513.11
57,705.23

C o n s u lt o r a I n te g r a l d e I n g e n i e r a

AMORTIZACION DEL ADELANTO DE MATERIALES

EXO N
O B R A
CONTRATISTA
SUPERVISOR
JEFE DE SUPERVISIN
FECHA

:
:
:
:
:
:

MONTO CONT. (s/IGV)


ADEL.MAT. (s/IGV):
FORMULA 01

:
:
:

0015 -2009-ED / U. E. 108


Adecuacin y Mejoramiento de Infraestructura de la IE Isabel La Catlica

CONSORCIO DHMONT & JLV INGENIEROS


ACRUTA & TAPIA INGENIEROS SAC
Ing.

AL 30 DE SETIEMBRE DEL 2009


8,556,948.36
284,818.80
INST. ELECTRICAS

VALORIZACION
MONTO
V
ARTEFACTO DE ALUMBRADO INTERIOR
No.

MES

1
2
3
4

07/09
08/09
09/09
10/09

34,627.37
59,329.91

FECHA

ADELANTO PAGADO
MONTO
A

COEFICIENTE
COEF.INCID.
INCID.
C
%

0.184
10/08/09

100.00%

INDICES
Io
MAYO

Ia
AGO

ADELANTO
UTILIZADO
AU=C*%*V

Ir

281.54

106,184.28

276.24

276.24
273.28
273.28

6,371.44
10,916.70

242.59

242.59
239.22
239.22

1,799.40
3,083.06

562.47

562.47
585.23
585.23

8,656.84
14,832.48

106,184.28
ARTEFACTO DE ALUMBRADO EXTERIOR
1
2
3
4

07/09
08/09
09/09
10/09

34,627.37
59,329.91

0.056
10/08/09

92.794%

254.62

29,502.59

29,502.59
CABLE NYY Y NKY
1
2
3
4

TOTAL

07/09
08/09
09/09
10/09

34,627.37
59,329.91

0.250
10/08/09

149,131.93

100.000%

530.17

149,131.93
284,818.80
AMORTIZACIN ACUMULADA:
AMORTIZACIN ACUMULADA ANTERIOR:
AMORTIZACIN PRESENTE VALORIZACION:

MONTO
AMORTIZABLE
MA=AU*Ia/Io

6,251.50
10,711.19

AMORTIZACION
Am=MA

6,251.50
10,711.19
16,962.69

1,714.38
2,937.40

89221.59

1,714.38
2,937.40
4,651.78

9,184.25
15,736.13

SALDO POR
AMORTIZAR
S=A-Am

24850.81

9,184.25
15,736.13
24,920.38
46,534.85
46,534.85
17,150.13
29,384.72

124211.55
238,283.95