Documentos de Académico
Documentos de Profesional
Documentos de Cultura
Pgina :
Subpresupuesto
Fecha
Lugar
0105001
001
01/10/2012
080801
Cdigo
Recurso
Unidad
Cantidad
Precio S/.
0147000022
0147000023
0147000032
0147010001
0147010002
0147010003
0147010004
0147010020
0147090006
MANO DE OBRA
HH
1,704.6615
HH
1,006.7912
HH
524.2941
HH
539.6904
HH
21,917.6811
HH
13,863.5328
HH
55,906.2189
HH
178.4928
HH
2,412.0000
9.27
9.27
10.00
10.00
9.27
7.71
6.62
9.27
10.00
0201000003
0201000013
0201800002
0202010002
0202010005
0202010006
0202010009
0202040009
0202040010
0203030002
0203030003
0203030030
0203030048
0204000000
0204010003
0205000003
0205000011
0205010004
0205010033
0213010013
0216110001
0221000001
0229010008
0229500091
0229600011
0230020001
0230150003
0230150041
0230240011
0230670013
0230750007
0230990081
0232000028
0232970003
0234000000
MATERIALES
ACEITE PARA MOTOR MULTIGRADO
Gln
71.9083
LUBRICANTES
%IN
LUBRICANTE P/TUBERIA PVC UF
Gln
0.0876
CLAVOS PARA MADERA C/C 1"
Kg
2.1643
CLAVOS PARA MADERA C/C 2 1/2"
Kg
653.4405
CLAVOS PARA MADERA C/C 3"
Kg
16.3043
CLAVOS PARA MADERA C/C 5"
Kg
1.0000
ALAMBRE NEGRO N16
Kg
490.0665
ALAMBRE NEGRO N8
Kg
1,567.8609
FIERRO CORRUGADO fy = 4,200 Kg/cm G 60 var
203.5202
1/2"
FIERRO CORRUGADO fy = 4,200 Kg/cm G 60 var
405.2461
5/8"x9.00m.
FIERRO CORRUGADO fy = 4,200 Kg/cm G 60 Kg
20,919.7513
1/4"
FIERRO CORRUGADO fy = 4,200 Kg/cm G 60 Kg
9,004.0860
ARENA FINA
m3
16.3939
TIERRA DE CHACRA O VEGETAL
m3
186.4290
PIEDRA CHANCADA DE 1/2"
m3
1,920.3248
PIEDRA MEDIANA DE 6"
m3
1,019.6012
ARENA GRUESA
m3
1,212.8400
MATERIAL SELECCIONADO PARA BASE
m3
2,767.7700
ASFALTO RC-250
Gln
1,232.6120
PEGAMENTO EPOXICO UNIVERSAL
Gln
0.4500
CEMENTO PORTLAND TIPO IP (42.5KG)
BOL
26,709.3716
ADITIVO ANTICONGELANTE
Gln
554.3800
SOLDADURA
Kg
221.4275
SEAL INFORMATIVA O PREVENTIVA FIBRA UND
35.0000
DE VIDRIO Y PARANTE METALICO S/DISEO
YESO DE 28 Kg
BOL
35.0444
SELLADOR ELSTICO DE POLIURETANO
UND
175.9282
SIKAFLEX 1C SL x1Kg.
MATERIAL DE RESPALDO P/SELLADORES
RLL
263.8923
SIKA BACKER ROD 1/4"x20m
SOLVENTE PARA PINTURA DE TRFICO
Gln
11.1956
MICROESFERAS DE VIDRIO PARA
Kg
391.8460
SEALIZACIN VIAL
CINTA MASKINGTAPE DE 2"
RLL
2.0000
TACHAS REFLECTORIZANTES BD.
UND
90.0000
FLETE
GLB
1.0000
MOVILIZACION Y DESMOVILIZACION DE
GLB
1.0000
EQUIPO MENOR Y HERRAMIENTAS
GASOLINA 84 OCT
Gln
805.6648
Parcial S/.
Presupuestado S/.
15,802.21
9,332.95
5,242.94
5,396.90
203,176.90
106,887.84
370,099.17
1,654.63
24,120.00
15,802.30
9,289.74
5,200.89
5,331.31
203,098.49
106,850.47
370,017.92
1,691.53
24,120.00
741,713.54
741,402.65
110.00
6.80
5.00
5.00
6.00
5.00
5.00
30.00
3,235.87
5,615.29
9.64
14.72
3,267.20
81.52
6.00
2,450.33
7,839.30
6,105.61
3,241.24
5,615.29
9.60
14.42
3,277.80
79.36
6.00
2,550.67
7,836.01
6,105.61
48.00
19,451.81
19,476.01
3.60
75,311.10
75,311.11
3.60
60.00
25.00
65.00
45.00
45.00
5.00
15.00
250.00
23.50
35.00
14.00
350.00
32,414.71
983.63
4,660.73
124,821.11
45,882.05
54,577.80
13,838.85
18,489.18
112.50
627,670.23
19,403.30
3,099.99
12,250.00
32,414.70
983.63
4,660.74
124,821.13
45,907.24
54,577.83
13,838.85
18,489.18
112.50
627,673.95
19,403.30
3,099.98
12,250.00
8.00
25.00
280.36
4,398.20
280.36
4,423.34
35.00
9,236.23
9,248.80
45.00
20.00
503.80
7,836.92
509.98
7,836.92
2.00
9.00
8,000.00
5,000.00
4.00
810.00
8,000.00
5,000.00
4.00
810.00
8,000.00
5,000.00
13.50
10,876.47
10,870.04
45.00
S10
Pgina :
Subpresupuesto
Fecha
Lugar
0105001
001
01/10/2012
080801
Cdigo
Recurso
Unidad
0237020042
0237520087
0238000000
0239050000
0239070001
0239070002
0239070003
0239070004
0239070005
0239070006
0239070007
0239070008
0239070009
0239070010
0239070011
0239070012
0239070013
0239070014
0239070015
0239070016
0239070017
0239130019
0239500012
0239500022
0239500087
0239500201
0239500228
0239510001
0239900103
0239990051
0243110012
0243110019
0243510063
0243600032
0243600033
0243980155
0244000022
0244000023
0244030023
0251990005
0251990501
0253000002
0253010000
0254020042
0254020100
0254450001
Cantidad
Precio S/.
RLL
18.2231
15.00
273.35
280.36
UND
m3
m3
cja
587.4355
4.2245
1,220.1246
6.0000
6.00
60.00
2.00
30.00
3,524.61
253.47
2,440.25
180.00
3,524.62
253.47
2,445.38
180.00
fco
fco
fco
pqt
RLL
RLL
RLL
pqt
fco
fco
pqt
UND
UND
UND
UND
UND
GLB
plg
UND
mll
mll
GLB
3.0000
3.0000
3.0000
15.0000
3.0000
6.0000
6.0000
3.0000
3.0000
3.0000
3.0000
3.0000
30.0000
3.0000
3.0000
3.0000
1.0000
10.0000
6.0000
0.5000
0.2500
10.0000
6.00
2.50
3.00
2.50
7.00
3.50
3.50
10.00
15.00
9.30
6.50
5.00
2.20
18.00
3.00
2.70
1,000.00
0.50
3.50
25.00
500.00
25.00
18.00
7.50
9.00
37.50
21.00
21.00
21.00
30.00
45.00
27.90
19.50
15.00
66.00
54.00
9.00
8.10
1,000.00
5.00
21.00
12.50
125.00
250.00
18.00
7.50
9.00
37.50
21.00
21.00
21.00
30.00
45.00
27.90
19.50
15.00
66.00
54.00
9.00
8.10
1,000.00
5.00
21.00
12.50
125.00
250.00
GLB
UND
80.0000
2.0000
2.50
500.00
200.00
1,000.00
200.00
1,000.00
UND
2.0000
120.00
240.00
240.00
PZA
PZA
PZA
UND
UND
UND
333.3007
39.9673
28.0355
4.0000
263.2005
11.0000
30.00
20.00
2.50
30.00
35.00
3,500.00
9,999.02
799.35
70.09
120.00
9,212.02
38,500.00
9,999.02
800.79
140.18
120.00
9,227.87
38,500.00
PZA
1,840.0026
13.00
23,920.03
23,873.97
PZA
1,051.9860
26.00
27,351.64
27,358.66
pln
UND
30.3001
47.7258
70.00
35.00
2,121.01
1,670.40
2,121.00
1,670.40
PZA
1.0000
2,500.00
2,500.00
2,500.00
8,009.6364
96.7752
15.2222
7.0089
25.5533
14.50
20.00
40.00
35.00
60.00
116,139.73
1,935.50
608.89
245.31
1,533.20
116,100.57
1,935.50
606.00
280.36
1,533.20
Gln
Kg
Gln
Gln
Gln
Parcial S/.
Presupuestado S/.
S10
Pgina :
Subpresupuesto
Fecha
Lugar
0105001
001
01/10/2012
080801
Cdigo
Recurso
Unidad
Cantidad
Precio S/.
0254450002
0254450003
0256990228
0265990016
Gln
Gln
UND
m
123.1516
25.5533
2.0000
86.6642
60.00
60.00
85.00
70.00
7,389.10
1,533.20
170.00
6,066.49
7,389.10
1,533.20
170.00
6,066.49
PZA
64.0000
350.00
22,400.00
22,400.00
PZA
PZA
649.6035
18.3350
11.00
11.00
7,145.64
201.69
7,137.17
201.50
UND
2.1756
260.00
565.66
565.68
UND
1.0000
650.00
650.00
650.00
PZA
Kg
Kg
38.0000
3.1590
8.3436
15.00
37.00
27.00
570.00
116.88
225.28
570.00
116.88
225.28
GLB
1.0000
15,000.00
15,000.00
15,000.00
GLB
1.0000
22,000.00
22,000.00
22,000.00
1,459,233.26
1,459,479.24
0265990018
0272080010
0275010001
0275031014
0279560003
0281010001
0281010002
0281010004
0298010081
0298010082
0337010001
0337800004
0337800005
0337800006
0337800008
0337800009
0337800010
0337800011
0337800012
0337800013
0337801000
0337801001
0337810002
0337810101
0337810201
0348120001
0348140001
0348210064
0349030004
HERRAMIENTAS MANUALES
GUANTE DE CUERO DE RES
GUANTE INDUSTRIAL DE JEBE
CASCO TIPO JOCKEY C/ 6 PUNTOS DE
APOYO
ANTEOJO DE SEGURIDAD DE
POLICARBONATO
TAPONES AUDITIVOS DE MATERIAL
HIPOALERGNICO
CHALECO MALLA TIPO POLO CON CINTA
FOSFORESCENTE
BOTAS DE JEBE CAA ALTA PUNTA DE
ACERO
MAMELUCO DRILL TRIPLE COSTURA, MANGA
LARGA, C/CINTAS REFLECTIVAS
CHALECO DRILL TRIPLE COSTURA,
C/CINTAS REFLECTIVAS
EXTINTOR POLVO QUIMICO SECO CAP 06 Kg
LINEA DE VIDA CABO DE NYLON DE
5/8"x1.50m
CONOS SEALIZACION VIAL NEOPRENE
COLOR ANARANJADO C/CINTA REFLECTVA
3M
MALLA PLASTICA TIPO CERCO COLOR
NARANJA h=1.00m, x 50 m.
CINTA DE SEAL PARA OBRAS AMARILLA
0.15x500m
CAMION CISTERNA 4X2 (AGUA) 1,500 GAL.
REGLA VIBRATORIA DE 5HP
MAQUINA SOLDADORA
COMPACTADOR VIBR. TIPO PLANCHA 7 HP
Parcial S/.
Presupuestado S/.
EQUIPOS
%MO
PAR
PAR
UND
300.0000
300.0000
150.0000
15.00
10.00
20.00
29,896.66
4,500.00
3,000.00
3,000.00
29,896.66
4,500.00
3,000.00
3,000.00
UND
150.0000
15.00
2,250.00
2,250.00
UND
600.0000
5.00
3,000.00
3,000.00
UND
300.0000
15.00
4,500.00
4,500.00
PAR
150.0000
50.00
7,500.00
7,500.00
UND
150.0000
90.00
13,500.00
13,500.00
UND
150.0000
45.00
6,750.00
6,750.00
UND
UND
8.0000
20.0000
150.00
65.00
1,200.00
1,300.00
1,200.00
1,300.00
PZA
40.0000
40.00
1,600.00
1,600.00
RLL
20.0000
75.00
1,500.00
1,500.00
UND
20.0000
60.00
1,200.00
1,200.00
87.3695
1,385.9500
33.6560
1,704.6615
120.00
20.00
5.00
15.00
10,484.34
27,719.00
168.28
25,569.92
10,451.67
27,719.00
168.28
25,576.20
HM
HM
HM
HM
S10
Pgina :
Subpresupuesto
Fecha
Lugar
0105001
001
01/10/2012
080801
Cdigo
Recurso
Unidad
Cantidad
Precio S/.
0349030007
HM
124.9302
140.00
17,490.23
17,473.90
HM
HM
HM
HM
HM
HM
5.6802
178.4928
314.2089
2,605.6257
124.9302
2,392.2315
15.00
180.00
220.00
5.00
220.00
10.00
85.20
32,128.70
69,125.96
13,028.13
27,484.64
23,922.31
85.19
32,085.81
69,136.57
13,027.05
27,435.64
23,922.56
512.6966
8.0000
10.4018
10.4018
120.00
180.00
300.00
350.00
61,523.59
1,440.00
3,120.54
3,640.63
61,551.47
1,440.00
3,120.53
3,710.71
401,628.13
401,601.24
0349031001
0349040009
0349040034
0349070003
0349090003
0349100011
0349170002
0349180010
0349880004
0349880008
0402060001
0402060002
0402060003
0402060004
0403010001
0403010002
0403010003
HM
HM
MEQ
MEQ
SUBCONTRATOS
DISEO DE MEZCLAS DE CONCRETO
UND
PRUEBA DE DENSIDAD DE CAMPO
UND
PRUEBA DE COMPACTACION DE SUELOS
UND
PRUEBA DE RESISTENCIA DEL CONCRETO A UND
LA FLEXIN
ALQUILER OFICINA P/RESIDENCIA DE OBRA mes
25m2
ALQUILER TERRENO P/ALMACEN DE OBRA mes
200m2
ALQUILER DE SSHH PORTTILES
mes
Parcial S/.
Presupuestado S/.
3.0000
14.0000
14.0000
28.0000
380.00
250.00
250.00
150.00
1,140.00
3,500.00
3,500.00
4,200.00
1,140.00
3,500.00
3,500.00
4,200.00
10.0000
400.00
4,000.00
4,000.00
9.0000
1,000.00
9,000.00
9,000.00
9.0000
200.00
Total
S/.
S/.
1,800.00
1,800.00
27,140.00
27,140.00
2,629,714.93
2,629,623.13
2,629,623.13
La columna parcial es el producto del precio por la cantidad requerida; y en la ltima columna se muestra el Monto Real que se est utilizando