Está en la página 1de 27

Obra

0492009

INSTALACION DEL MINICOMPLEJO DEPORTIVO EN EL P.J. DOS DE JUNIO, EN EL DISTRITO DE CHIMBOTE PROVINCIA DEL SANTA - ANCASH "

Lugar

021014

ANCASH - SANTA

Cdigo

Recurso

Unidad

Cantidad

COSTO TOTAL
TOTAL

MANO DE OBRA CALIFICADA


MANO DE OBRA NO CALIFICADA
MATERIALES

TOTAL

137,112.20
105,772.27
148,864.67
391,749.14

Precio S/.

PARCIAL S/.

Presupuesto Alternativa N 01
Presupuesto
Cliente

MUNICIPALIDAD PROVINCIAL DEL SANTA

Costo al

Lugar

Item

Und.

Metrado

Precio S/.

Parcial S/.

01

ESTRUCTURAS

Descripcin

GLB

1.00

194,609.45

194,609.45

02

ARQUITECTURA

GLB

1.00

142,155.64

142,155.64

03

INST. SANITARIAS

GLB

1.00

10,855.30

10,855.30

04

INST. ELECTRICAS

GLB

1.00

16,959.92

16,959.92

05

EQUIPAMIENTO

GLB

1.00

27,168.83

27,168.83

COSTO DIRECTO

391,749.14

GASTOS GENERALES (12%)

47,009.90

UTILIDADES (10 %)

39,174.91
---------------------

SUB TOTAL
IGV (18%)

477,933.95
86,028.11
-----------------------

PRESUPUESTO TOTAL

563,962.06

SUPERVISION 5.0%

28,198.10

COSTO DEL EXPEDIENTE TECNICO (3.0%)

16,918.86
================

COSTO TOTAL DEL PROYECTO

609,079.03

0492009

INSTALACION DEL MINICOMPLEJO DEPORTIVO EN EL P.J. DOS DE JUNIO, EN EL DISTRITO DE CHIMBOTE PRO

Lugar

021014

ANCASH - santa

Cdigo

Recurso

Obra
Fecha

Unidad

Cantidad

Precio S/.

PARCIAL S/.

COSTO TOTAL
TOTAL

MANO DE OBRA CALIFICADA


MANO DE OBRA NO CALIFICADA
MATERIALES

TOTAL

151,035.65
116,513.22
163,981.57
431,530.44

ISTRITO DE CHIMBOTE PROVINCIA DEL SANTA - ANCASH "

Presupuesto Alternativa N 01
Presupuesto
Cliente

MUNICIPALIDAD PROVINCIAL DEL SANTA

Jun-12

Costo al

Lugar

Item

Und.

Metrado

Precio S/.

Parcial S/.

01

ESTRUCTURAS

Descripcin

GLB

1.00

194,609.45

194,609.45

02

ARQUITECTURA

GLB

1.00

181,936.94

181,936.94

03

INST. SANITARIAS

GLB

1.00

10,855.30

10,855.30

04

INST. ELECTRICAS

GLB

1.00

16,959.92

16,959.92

05

EQUIPAMIENTO

GLB

1.00

27,168.83

27,168.83

COSTO DIRECTO

431,530.44

GASTOS GENERALES (12%)

51,783.65

UTILIDADES (10%)

43,153.04
---------------------

SUB TOTAL
IGV (18%)

526,467.14
94,764.08
-----------------------

PRESUPUESTO TOTAL

621,231.22

SUPERVISION 5.0%

31,061.56

COSTO DEL EXPEDIENTE TECNICO (3.0%)

18,636.94
================

COSTO TOTAL DEL PROYECTO

670,929.72

Costo Anual de Operacin y Mantenimiento SIN PROYECTO


(A Precios Privados)
DESCRIPCIN
1.-Costos de Operacin
capataz
operario
peon
2.- Costos de Mantenimiento
Pintura
Servicio de agua
Servicio de luz

UND.

hh
hh
hh
ml
glb
glb

CANTIDAD

COSTO
UNITARIO x
trimestre

Parcial (S/.)

15.96
15.24
11.93

127.68
121.92
95.44

100.00
20.00
100.00

100.00
20.00
100.00

Costo Anual de Operacin y Mantenimiento SIN PROYECTO


(A Precios Sociales)
COSTO TOTAL

345.04

220.00

Costo de Oper. y Manten. Sin Proyecto

565.04
COSTO DIRECTO

565.04

DESCRIPCIN
1.-Costos de Operacin
capataz
operario
peon
2.- Costos de Mantenimiento
Pintura
Servicio de agua
Servicio de luz

UND.

CANTIDAD

hh
hh
hh

ml
glb
glb

COSTO
UNITARIO

Parcial (S/.)

15.96
15.24
11.93
100.00
20.00
100.00

Costo de Oper. y Manten. Sin Proyecto

95.76
91.44
71.58

COSTO TOTAL

258.78

165.00
75.00
15.00
75.00
423.78

COSTO DIRECTO

423.78

GASTOS GENERALES (12%)

67.80

GASTOS GENERALES (12%)

50.85

UTILIDAD (10%)

56.50

UTILIDAD (10%)

42.38

SUB TOTAL

689.35

IGV (18%)

124.08

TOTAL

813.43

TOTAL

517.01

PRESUPUESTO DE OBRA

COSTOS DE OPERACIN Y MANTENIMIENTO A PRECIOS PRIVADOS

Alternativa 1

ALTERNATIVA N01

COSTOS DE INVERSION (PRECIOS DE MERCADO)

Operacin y Mantenimiento CON PROYECTO

PROYECTO: Minicomplejo

ALTERNATIVA 1
N

Concepto

(A Precios Privados)
DESCRIPCIN

Costos (S/.)

1.00

INTANGIBLES

16,918.86

1.-Costos de Operacin

1.01

Expediente Tcnico (3.0%)

16,918.86

CAPATAZ

2.00

INVERSION EN ACTIVOS FIJOS

391,749.14

OPERARIO

2.01

Insumos y equipos

148,864.67

2.02

Mano de Obra Calificada

137,112.20

2.03

Mano de Obra No Calificada

105,772.27

3.00

GASTOS GENERALES (12%)

47,009.90

4.00

UTILIDAD (10%)

39,174.91

5.00

IGV. 18%

86,028.11

SUB TOTAL
6.00

563,962.06

GASTOS DE SUPERVISION (5.0%)

28,198.10

TOTAL INVERSION

609,079.03

UND.

CANTIDAD

COSTO
UNITARIO
15.96
15.24
11.93

Parcial
(S/.)mensual

PEON

hh
hh
hh

2.00
2.00
4.00

255.36
243.84
381.76

2.- Costos de Mantenimiento


Pintura

Glb

1.00

1,500.00

Servico de agua
Servicio de luz
Cobertura

Glb
Glb
Glb

1.00
1.00
1.00

40.00
150.00
1,500.00
4,070.96
COSTO DIRECTO

Materiales y Equipos FC= 1/(1+I.V.G)

0.847

GASTOS GENERALES (12%)

Mano de Obra Calificada FC= 1/(1+IR)

0.909

UTILIDAD (10%)

Mano de Obra no Calificada FC= 0.68

0.680

SUB TOTAL

Gastos Generales FC= 1/(1+I.V.G)

0.847

IGV (18%)

Utilidades FC= 1/(1+I.V.G)

0.847

TOTAL

Expediente Tcnico FC= 1/(1+I.V.G)

0.847

Supervisin FC= 1/(1+I.V.G)

0.847

Bienes Importados

0.810

COSTOS DE INVERSION (PRECIOS SOCIALES)


ALTERNATIVA 1
N

Concepto

Costos (S/.)

1.00

INTANGIBLES

1.01

Expediente Tcnico (3.0%)

14,338.02

2.00

INVERSION EN ACTIVOS FIJOS

322,729.10

2.01

Insumos y equipos

126,156.50

2.02

Mano de Obra Calificada

124,647.45

2.03

Mano de Obra No Calificada

71,925.14

3.00

GASTOS GENERALES (12%)

39,838.90

4.00

UTILIDAD (10%)

33,199.08

SUB TOTAL

395,767.07

5.00

14,338.02

GASTOS DE SUPERVISION (3.0%)

23,896.70

TOTAL INVERSION

434,001.79

880.96

3,190.00

Costo de Oper. y Manten. con Proyecto


FACTORES DE CORRECCION

COSTO TOTAL

4,070.96
488.52
407.10
4,966.57
893.98
5,860.55

COSTOS DE OPERACIN Y MANTENIMIENTO A PRECIOS SOCIALES


ALTERNATIVA N01
Operacin y Mantenimiento CON PROYECTO
(A Precios Sociales)
DESCRIPCIN

UND.

CANTIDAD

COSTO
UNITARIO

FACTOR DE
CORRECCIN

Parcial
(S/.)mensual

COSTO TOTAL

1.-Costos de Operacin
CAPATAZ
OPERARIO
PEON

hh
hh
hh

2.00
2.00
4.00

15.96
15.24
11.93

0.75
0.75
0.75

191.52
182.88
286.32

660.72

hh
2.- Costos de Mantenimiento
Pintura

Glb

1.00

1,500.00

0.75

1,125.00

2,392.50

Servico de agua
Servicio de luz
Cobertura

Glb
Glb
Glb

1.00
1.00
1.00

40.00
150.00
1,500.00

0.75
0.75
0.75

30.00
112.50
1,125.00

Costo de Oper. y Manten. con Proyecto

3,053.22
COSTO DIRECTO

3,053.22

GASTOS GENERALES (12%)

366.39

UTILIDAD (10%)

305.32

TOTAL

3,724.93

CRONOGRAMA DE METAS FINANCIERAS


Meses(Nuevos Soles)
METAS

EXPEDIENTE TECNICO

Mes

Mes

Mes

Mes

16918.86

Total por meta

16,918.86

ESTRUCTURAS

64869.82

64869.82

64869.82

194,609.45

ARQUITECTURA

47385.21

47385.21

47385.21

142,155.64

INST. SANITARIAS

3618.43

3618.43

3618.43

10,855.30

INST. ELECTRICAS

5653.31

5653.31

5653.31

16,959.92

EQUIPAMIENTO

9056.28

9056.28

9056.28

27,168.83

GASTOS GENERALES

15669.97

15669.97

15669.97

47,009.90

UTILIDADES

13058.30

13058.30

13058.30

39,174.91

9399.37

9399.37

9399.37

28,198.10

28676.04

28676.04

28676.04

86,028.11

SUPERVISION DE OBRA
IGV 18%
TOTAL DEL PERIODO

### 197,386.72 197,386.72 197,386.72 609,079.03


CRONOGRAMA DE METAS FISICAS
PERIODOS

METAS

EXPEDIENTE TECNICO

Mes

Mes

Mes

Mes

100%

Total por
Componente

100%

ESTRUCTURAS

30%

40%

30%

100%

ARQUITECTURA

30%

40%

30%

100%

INST. SANITARIAS

30%

40%

30%

100%

INST. ELECTRICAS

30%

40%

30%

100%

100%

100%

EQUIPAMIENTO

GASTOS GENERALES

30%

40%

30%

100%

UTILIDADES

30%

40%

30%

100%

SUPERVISION DE OBRA

30%

40%

30%

100%

IGV 18%

30%

40%

30%

100%

PRESUPUESTO DE OBRA

COSTOS DE OPERACIN Y MANTENIMIENTO A PRECIOS PRIVADOS

Alternativa 2

ALTERNATIVA N02

ALTERNATIVA N02

COSTOS DE INVERSION (PRECIOS DE MERCADO)

Operacin y Mantenimiento CON PROYECTO

Operacin y Mantenimiento CON PROYECTO

ALTERNATIVA 2

(A Precios Privados)

Concepto

DESCRIPCIN

Costos (S/.)

1.00

INTANGIBLES

18,636.94

1.-Costos de Operacin

1.01

Expediente Tcnico (3.0%)

18,636.94

CAPATAZ

2.00

INVERSION EN ACTIVOS FIJOS

431,530.44

OPERARIO

2.01

Insumos y equipos

163,981.57

2.02

Mano de Obra Calificada

151,035.65

2.03

Mano de Obra No Calificada

116,513.22

3.00

GASTOS GENERALES (12%)

51,783.65

4.00

UTILIDAD (10%)

43,153.04

5.00

IGV. 18%

94,764.08

SUB TOTAL
6.00

621,231.22

GASTOS DE SUPERVISION (5.0%)

UND.

CANTIDAD

COSTO
UNITARIO

COSTOS DE OPERACIN Y MANTENIMIENTO A PRECIOS SOCIALES

(A Precios Sociales)
Parcial
(S/.)mensual

COSTO TOTAL

DESCRIPCIN

UND.

CANTIDAD

COSTO
UNITARIO

FACTOR DE
CORRECCIN

Parcial
(S/.)mensual

COSTO TOTAL

1.-Costos de Operacin

PEON

hh
hh
hh

2.00
2.00
4.00

2.- Costos de Mantenimiento


Pintura
Servico de agua
Servicio de luz
Cobertura

Glb
Glb
Glb
Glb

1.00
1.00
1.00
1.00

15.96
15.24
11.93

255.36
243.84
381.76

880.96

PEON

hh
hh
hh

2.00
2.00
4.00

15.96
15.24
11.93

0.75
0.75
0.75

191.52
182.88
286.32

2.- Costos de Mantenimiento


Pintura
Servico de agua
Servicio de luz
Cobertura

Glb
Glb
Glb
Glb

1.00
1.00
1.00
1.00

1,500.00
40.00
150.00
1,500.00

0.75
0.75
0.75
0.75

1,125.00
30.00
112.50
1,125.00

CAPATAZ
OPERARIO

3,190.00
1,500.00
40.00
150.00
1,500.00

660.72

2,392.50

31,061.56

TOTAL INVERSION

670,929.72

Costo de Oper. y Manten. con Proyecto

4,070.96

Costo de Oper. y Manten. con Proyecto

3,053.22

FACTORES DE CORRECCION
Materiales y Equipos FC= 1/(1+I.V.G)

0.847

COSTO DIRECTO

Mano de Obra Calificada FC= 1/(1+IR)

0.909

GASTOS GENERALES (12%)

488.52

GASTOS GENERALES (12%)

366.39

Mano de Obra no Calificada FC= 0.68

0.680

UTILIDAD (10%)

407.10

UTILIDAD (10%)

305.32

Gastos Generales FC= 1/(1+I.V.G)

0.847

SUB TOTAL

Utilidades FC= 1/(1+I.V.G)

0.847

IGV (18%)

Expediente Tcnico FC= 1/(1+I.V.G)

0.847

TOTAL

Supervisin FC= 1/(1+I.V.G)

0.847

Bienes Importados

0.810

COSTOS DE INVERSION (PRECIOS SOCIALES)


ALTERNATIVA 2
N

Concepto

Costos (S/.)

1.00

INTANGIBLES

1.01

Expediente Tcnico (3.0%)

2.00

INVERSION EN ACTIVOS FIJOS

355,501.56

2.01

Insumos y equipos

138,967.43

2.02

Mano de Obra Calificada

137,305.14

2.03

Mano de Obra No Calificada

3.00

GASTOS GENERALES (12%)

4.00

UTILIDAD (10%)
SUB TOTAL

5.00

GASTOS DE SUPERVISION (5.0%)


TOTAL INVERSION

15,794.01
15,794.01

79,228.99
43,884.45
36,570.38
435,956.39
26,323.36
478,073.76

4,070.96

COSTO DIRECTO

3,053.22

4,966.57
893.98
5,860.55

TOTAL

3,724.93

LLENAR ESTOS DATOS PARA EVALUACION ECONOMICA


DATOS GENERALES
NUMERO DE BENEFICIARIOS DIRECTOS
AOS DE DISEO DEL PROYECTO
COSTO DE OP. Y MANT. S/PROYECTO

393
10
517.01

ALTERNATIVA N01
COSTO DIRECTO

322,729.10

COSTO TOTAL (precios sociales)

434,001.79

MATERIALES Y EQUIPOS

126,156.50

MANO DE OBRA

196,572.60

COSTO DE OP. Y MANT. C/PROYECTO


CADA CUANTOS AOS SE REALIZA MANT.

3,724.93
1.00

ALTERNATIVA N02
COSTO DIRECTO

355,501.56

COSTO TOTAL (precios sociales)

478,073.76

MATERIALES Y EQUIPOS

138,967.43

MANO DE OBRA

216,534.13

COSTO DE OP. Y MANT. C/PROYECTO


CADA CUANTOS AOS SE REALIZA MANT.

3,724.93
1.00

COSTOS INCREMENTALES ALTERNATIVA N1


(PRECIO A COSTOS SOCIALES)
RUBRO

PERIODO EN AOS

VAC PS
0

A) COSTOS DE INVERSIN

434,001.79

434,001.79

ETAPA PREOPERATIVA

434,001.79

434,001.79

1.00.- INTANGIBLES

14,338.02

14,338.02

1.01.- EXPEDIENTE TECNICO

14,338.02

14,338.02

2.00.- INVERSION EN ACTIVOS FIJOS:

322,729.10

322,729.10

2.01. Insumos y Equipos

126,156.50

126,156.50

2.02. Mano de Obra Calificada

124,647.45

124,647.45

2..03 Mano de Obra No Calificada

71,925.14

71,925.14

3.00 GASTOS GENERALES (12%)

39,838.90

39,838.90

4.00 UTILIDAD (10%)

33,199.08

33,199.08

5.00 SUPERVISION (3%)

23,896.70

23,896.70

0.00

0.00

0.00

0.00

0.00

0.00

ETAPA OPERATIVA
B) COSTOS DE MANTENIMIENTO CON
PROYECTO
C) COSTOS CON PROYECTO (A+B)
D) COSTOS DE MANTENIMIENTO SIN
PROYECTO
E) TOTAL COSTOS INCREMENTALES (C-D)
F)

FA:(TASA SOCIAL DE DESCUENTO)

VAC T (Ex F)

37,249.28

0.00

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

471,251.07

434,001.79

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

5,170.12

0.00

517.01

517.01

517.01

517.01

517.01

517.01

466,080.96

434,001.79

3,207.92

3,207.92

3,207.92

3,207.92

3,207.92

3,207.92

0.09
454,589.10

VAE

1.00

0.92

0.84

0.77

0.71

0.65

0.60

434,001.79

2,943.04

2,700

2,477

2,273

2,084.93

1,913

70,834.11
0.1558200899

COSTOS INCREMENTALES ALTERNATIVA N2


(PRECIO A COSTOS SOCIALES)
RUBRO

PERIODO EN AOS

VAC PS
0

A) COSTOS DE INVERSIN

478,073.76

478,073.76

ETAPA PREOPERATIVA

478,073.76

478,073.76

1.00.- INTANGIBLES

15,794.01

15,794.01

1.01.- EXPEDIENTE TECNICO

15,794.01

15,794.01

2.00.- INVERSION EN ACTIVOS FIJOS:

355,501.56

355,501.56

2.01. Insumos y Equipos

138,967.43

138,967.43

2.02. Mano de Obra Calificada

137,305.14

137,305.14

2..03 Mano de Obra No Calificada

79,228.99

79,228.99

3.00 GASTOS GENERALES (12%)

43,884.45

43,884.45

4.00 UTILIDAD (10%)

36,570.38

36,570.38

5.00 SUPERVISION (3%)

26,323.36

26,323.36

0.00

0.00

0.00

0.00

0.00

0.00

ETAPA OPERATIVA
B) COSTOS DE MANTENIMIENTO
37,249.28

0.00

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

515,323.04

478,073.76

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

5,170.12

0.00

517.01

517.01

517.01

517.01

517.01

517.01

510,152.93

478,073.76

3,207.92

3,207.92

3,207.92

3,207.92

3,207.92

3,207.92

1.00

0.92

0.84

0.77

0.71

0.65

0.60

478,073.76

2,943.04

2,700

2,477

2,273

2,084.93

1,913

C) COSTOS CON PROYECTO (A+B)


D) COSTOS DE MANTENIMIENTO SIN
PROYECTO
E) TOTAL COSTOS INCREMENTALES (C-D)
F)

FA:TASA SOCIAL DE DESCUENTO

VAC T (Ex F)

0.09
498,661.07

VAE

77,701.41
0.1558200899

N1

AOS
7

10

0.00

0.00

0.00

0.00

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

517.01

517.01

517.01

517.01

3,207.92

3,207.92

3,207.92

3,207.92

0.55

0.50

0.46

0.42

1,755

1,610

1,477

1,355.06

N2

AOS
7

10

0.00

0.00

0.00

0.00

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

517.01

517.01

517.01

517.01

3,207.92

3,207.92

3,207.92

3,207.92

0.55

0.50

0.46

0.42

1,755

1,610

1,477

1,355.06

COSTOS INCREMENTALES ALTERNATIVA N 01


(A Precios Sociales)
RUBRO

VAC PS

A) COSTOS DE INVERSIN

434,001.79

PERIODO EN AOS
0.00

1.00

434,001.79

ETAPA PREOPERATIVA

434,001.79

434,001.79

1.00.- INTANGIBLES

14,338.02

14,338.02

1.01.- EXPEDIENTE TECNICO

14,338.02

14,338.02

322,729.10

322,729.10

2.01. Insumos y Equipos

126,156.50

126,156.50

2.02. Mano de Obra Calificada

124,647.45

124,647.45

2..03 Mano de Obra No Calificada

71,925.14

71,925.14

3.00 GASTOS GENERALES (12%)

39,838.90

39,838.90

4.00 UTILIDAD (10%)

33,199.08

33,199.08

5.00 SUPERVISION (5%)

23,896.70

23,896.70

2.00.- INVERSION EN ACTIVOS FIJOS:

2.00

3.00

4.00

5.00

6.00

7.00

8.00

9.00

10.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

ETAPA OPERATIVA
B) COSTOS DE MANTENIMIENTO

37,249.28

0.00

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

471,251.07

434,001.79

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

5,170.12

0.00

517.01

517.01

517.01

517.01

517.01

517.01

517.01

517.01

517.01

517.01

466,080.96

434,001.79

3,207.92

3,207.92

3,207.92

3,207.92

3,207.92

3,207.92

3,207.92

3,207.92

3,207.92

3,207.92

C) COSTOS CON PROYECTO (A+B)


D) COSTOS DE MANTENIMIENTO SIN
PROYECTO
E) TOTAL COSTOS INCREMENTALES (C-D)
F)

FA:

0.09

VAC PS (Ex F)

454,589.10
VAE

1.00

0.92

0.84

0.77

0.71

0.65

0.60

0.55

0.50

0.46

0.42

434,001.79

2,943.04

2,700

2,477

2,273

2,084.93

1,913

1,755

1,610

1,477

1,355.06

347201.431816

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

70,834.11
0.1558200899

-20%COSTO INV
VACT

367788.74

-15%COSTO INV
VACT

368901.521305
389488.83

-10%COSTO INV
VACT

347201.431816 2943.042936 2700.039391 2477.100358 2272.569136 2084.925813 1912.775975 1754.840344

390601.610793
411188.92

-5%COSTO INV
432889.01

5%COSTO INV
476289.19

10%COSTO INV
497989.28

15%COSTO INV
519689.37

20%COSTO INV
541389.46

FA
VACT
FA
VACT
FA
VACT

9.00%
454589.10
12.00%
452127.24
16.00%
449506.38

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

499102.058236 2943.042936 2700.039391 2477.100358 2272.569136 2084.925813 1912.775975 1754.840344


520802.147725

VACT

3207.9168

477401.968748 2943.042936 2700.039391 2477.100358 2272.569136 2084.925813 1912.775975 1754.840344


499102.058236

VACT

3207.9168

455701.879259 2943.042936 2700.039391 2477.100358 2272.569136 2084.925813 1912.775975 1754.840344


477401.968748

VACT

3207.9168

412301.700282 2943.042936 2700.039391 2477.100358 2272.569136 2084.925813 1912.775975 1754.840344


455701.879259

VACT

3207.9168

390601.610793 2943.042936 2700.039391 2477.100358 2272.569136 2084.925813 1912.775975 1754.840344


412301.700282

VACT

3207.9168

368901.521305 2943.042936 2700.039391 2477.100358 2272.569136 2084.925813 1912.775975 1754.840344

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

520802.147725 2943.042936 2700.039391 2477.100358 2272.569136 2084.925813 1912.775975 1754.840344

1.00
434001.78977
1.00
434001.78977
1.00
434001.78977

0.92

0.84

0.77

0.71

0.65

0.60

0.55

2943.042936 2700.039391 2477.100358 2272.569136 2084.925813 1912.775975 1754.840344


0.89

0.80

0.71

2864.211429 2557.331633 2283.331815


0.86

0.74

0.64

0.64
2038.68912
0.55

0.57

0.51

0.45

1609.94527 1477.0140091 1355.058724


3207.9168

3207.9168

3207.9168

1609.94527 1477.0140091 1355.058724


3207.9168

3207.9168

3207.9168

1609.94527 1477.0140091 1355.058724


3207.9168

3207.9168

3207.9168

1609.94527 1477.0140091 1355.058724


3207.9168

3207.9168

3207.9168

1609.94527 1477.0140091 1355.058724


3207.9168

3207.9168

3207.9168

1609.94527 1477.0140091 1355.058724


3207.9168

3207.9168

3207.9168

1609.94527 1477.0140091 1355.058724


3207.9168

3207.9168

3207.9168

1609.94527 1477.0140091 1355.058724

0.50
1609.94527
0.40

0.46

0.42

1477.0140091 1355.058724
0.36

0.32

1820.258143 1625.230485 1451.098647 1295.623792 1156.8069574 1032.863355


0.48

0.41

0.35

0.31

0.26

0.23

2765.445517 2384.004756 2055.176514 1771.703891 1527.330941 1316.664604 1135.055693 978.4962873 843.53128215 727.1821398

COSTOS INCREMENTALES ALTERNATIVA N 02


(A Precios Sociales)
RUBRO
A) COSTOS DE INVERSIN

PERIODO EN AOS

VAC PS
0.00
478,073.76

ETAPA PREOPERATIVA
1.00.- INTANGIBLES

1.00

478,073.76

478,073.76

478,073.76

15,794.01

15,794.01

1.01.- EXPEDIENTE TECNICO

15,794.01

15,794.01

2.00.- INVERSION EN ACTIVOS FIJOS:

355,501.56

355,501.56

2.01. Insumos y Equipos

138,967.43

138,967.43

2.02. Mano de Obra Calificada

137,305.14

137,305.14

2..03 Mano de Obra No Calificada

79,228.99

79,228.99

3.00 GASTOS GENERALES (12%)

43,884.45

43,884.45

4.00 UTILIDAD (10%)

36,570.38

36,570.38

5.00 SUPERVISION (3%)

26,323.36

26,323.36

2.00

3.00

4.00

5.00

0.00

0.00

0.00

0.00

0.00

ETAPA OPERATIVA
B) COSTOS DE MANTENIMIENTO
37,249.28

0.00

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

515,323.04

478,073.76

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

5,170.12

0.00

517.01

517.01

517.01

517.01

517.01

510,152.93

478,073.76

3,207.92

3,207.92

3,207.92

3,207.92

3,207.92

1.00

0.92

0.84

0.77

0.71

0.65

478,073.76

2,943.04

2,700

2,477

2,273

2,084.93

C) COSTOS CON PROYECTO (A+B)


D) COSTOS DE MANTENIMIENTO SIN
PROYECTO
E) TOTAL COSTOS INCREMENTALES (C-D)
F)

FA:

0.09

VAC PS (Ex F)

498,661.07
VAE

77,701.41
0.1558200899

-20%COSTO INV
VACT

382459.005884095

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

403046.32 382459.005884095

3.0429358

0.0393906

7.1003584

2.5691361

2084.925813

-15%COSTO INV
VACT

406362.693751851

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

426950.01 406362.693751851

3.0429358

0.0393906

7.1003584

2.5691361

2084.925813

-10%COSTO INV
VACT

430266.381619607

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

450853.69 430266.381619607

3.0429358

0.0393906

7.1003584

2.5691361

2084.925813

-5%COSTO INV
VACT

454170.069487363

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

474757.38 454170.069487363

3.0429358

0.0393906

7.1003584

2.5691361

2084.925813

5%COSTO INV
VACT

501977.445222875

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

522564.76 501977.445222875

3.0429358

0.0393906

7.1003584

2.5691361

2084.925813

10%COSTO INV
VACT

525881.133090631

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

546468.45 525881.133090631

3.0429358

0.0393906

7.1003584

2.5691361

2084.925813

549784.820958387

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

570372.13 549784.820958387

3.0429358

0.0393906

7.1003584

2.5691361

2084.925813

573688.508826142

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

594275.82 573688.508826142

3.0429358

0.0393906

7.1003584

2.5691361

2084.925813

0.92

0.84

0.77

0.71

0.65

15%COSTO INV
VACT
20%COSTO INV
VACT

FA
VACT
FA
VACT
FA

9.00%

1.00

498661.07 478073.757355119 2943.0429358 2700.0393906 2477.1003584 2272.5691361 2084.925813


12.00%

1.00

0.89

0.80

0.71

0.64

0.57

496199.20 478073.757355119 2864.2114286 2557.3316327 2283.3318149 2038.6891204 1820.2581432


16.00%

1.00

0.86

0.74

0.64

0.55

0.48

VACT

493578.35 478073.757355119 2765.4455172 2384.0047562 2055.176514 1771.7038914 1527.3309408

TIVA N 02

PERIODO EN AOS
6.00

7.00

8.00

9.00

10.00

0.00

0.00

0.00

0.00

0.00

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

3,724.93

517.01

517.01

517.01

517.01

517.01

3,207.92

3,207.92

3,207.92

3,207.92

3,207.92

0.60

0.55

0.50

0.46

0.42

1,913

1,755

1,610

1,477

1,355.06

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

2.7759752

4.8403442

9.9452699

77.0140091

5.0587239

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

2.7759752

4.8403442

9.9452699

77.0140091

5.0587239

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

2.7759752

4.8403442

9.9452699

77.0140091

5.0587239

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

2.7759752

4.8403442

9.9452699

77.0140091

5.0587239

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

2.7759752

4.8403442

9.9452699

77.0140091

5.0587239

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

2.7759752

4.8403442

9.9452699

77.0140091

5.0587239

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

2.7759752

4.8403442

9.9452699

77.0140091

5.0587239

3207.9168

3207.9168

3207.9168

3207.9168

3207.9168

2.7759752

4.8403442

9.9452699

77.0140091

5.0587239

0.60

0.55

0.50

0.46

0.42

1912.7759752 1754.8403442 1609.9452699 1477.0140091 1355.0587239


0.51

0.45

0.40

0.36

0.32

1625.230485 1451.0986473 1295.6237923 1156.8069574 1032.8633548


0.41

0.35

0.31

0.26

0.23

1316.6646042 1135.0556933 978.49628729 843.53128215 727.18213978

Evaluacin:
INDICADORES DE
EVALUACION

ALTERNATIVA
I

ALTERNATIVA
II

VACT

454,589.10

498,661.07
77,701.41

VAE

70,834.11

BENEFICIARIOS (PA)

393

393

CE

1,158

1,270

Anlisis de Sensibilidad:
VARIACION DE
COSTOS DE
INVERSION

Alternativa 1
VACT

-20%

367,788.74

-15%
-10%

Alternativa 2

CE

VACT

CE

936.85

403,046

1026.66

389,488.83

992.13

426,950

1087.55

411,188.92

1047.40

450,854

1148.44

-5%

432,889.01

1102.68

474,757

1209.33

0%

454,589.10

1157.95

498,661

1270.21

5%

476,289.19

1213.23

522,565

1331.10

10%

497,989.28

1268.50

546,468

1391.99

15%

519,689.37

1323.78

570,372

1452.88

20%

541,389.46

1379.05

594,276

1513.77

VARIACION DE
COSTO DE
OPORTUNIDAD DE
CAPITAL

AO

0.1558200899

Alternativa 1
VACT

Alternativa 2

CE

VACT

CE

10%

454,589

1157.95

498,661

1270.21

12%

452,127

1151.68

496,199

1263.94

16%

449,506

1145.01

493,578

1257.27

INVERSIONO y M - C/P
0 434,001.79
1
0
2
0
3
0
4
0
5
0
6
0
7
0
8
0
9
0
10
0

Tasa de descuento:
Densidad por vivienda
Lnea de corte

0
3724.9284
3724.9284
3724.9284
3724.9284
3724.9284
3724.9284
3724.9284
3724.9284
3724.9284
3724.9284

O Y M - S/P
0
517.0116
517.0116
517.0116
517.0116
517.0116
517.0116
517.0116
517.0116
517.0116
517.0116

10%
6 hab/viv
1000 S/. / persona

TOTAL
434,001.79
3,207.92
3,207.92
3,207.92
3,207.92
3,207.92
3,207.92
3,207.92
3,207.92
3,207.92
3,207.92
466,080.96

FACTOR
1.00
0.91
0.83
0.75
0.68
0.62
0.56
0.51
0.47
0.42
0.39

VACT
434,001.79
2,916.29
2,651.17
2,410.16
2,191.05
1,991.86
1,810.79
1,646.17
1,496.52
1,360.47
1,236.79
453,713.05

* VAC
=
453,713
* VAE
=
73,840
*Promedio poblacin Benef.=
393
*ICE
=
453,713
393

% de variacin Ctos. Inv.


% de variacin Ctos. O&M
% de variacin poblacin servida

1,155.72 S./poblador beneficiado

0%
0%
0%

FACTOR
0.162745395
0.162745395
0.162745395
0.162745395
0.162745395
0.162745395
0.162745395
0.162745395
0.162745395
0.162745395
0.162745395

VAE
70631.7927
474.612442
431.465857
392.241688
356.583352
324.166684
294.696986
267.90635
243.551228
221.410207
201.282006
73,839.71

beneficiado

Proyecciones de la Poblacin de la Provincia del santa


Poblacin
Poblacin
Poblacin

Ao
1993
2007

Tasa de Crecimiento Pob

Poblacin
338,951
396,434

POB (1993)

338951

POB(2007)

396434

TC

1.13

Proyecciones de Poblacin del P.J. Florida Alta


Poblacin
Poblacin

Ao
2007

Tasa de Crecimiento Pob

2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023

Poblacin
2,875
1.13

POBLACION REFERENCIAL
Ao
Poblacin
Vivienda
0
922
184
1
933
187
2
943
189
3
954
191
4
965
193
5
975
195
6
986
197
7
998
200
8
1,009
202
9
1,020
204
10
1,032
206
Total
981
196

Proyecciones de la Poblacin del P.J. Florida Alta


Poblacin
Poblacin

Ao
2007

Tasa de Crecimiento Pob

2013
2014
2015
2016
2017
2018
2019
2020
2021

Poblacin
1,150
1.13

POBLACION OBJETIVO
Ao
Poblacin
Vivienda
0
369
74
1
373
75
2
377
75
3
382
76
4
386
77
5
390
78
6
395
79
7
399
80
8
404
81

1.13

2022
2023

9
10
Total

408
413
393

82
83
79

También podría gustarte